Loading...
ENG2020-0515 ROW PERMITOF WAY EUC PERMIT PERMITNUMBER, City of Edmonds AveRIGHT 980ENG2020-051551 www.cityofedmonds.gov Description: COMCAST-OVERLASH APPROX. 782' AND MAINTENANCE SPLICE ISSUED: 12/29/2020 Address: 24126 100TH AVE W EDMONDS WA 98020-5704 EXPIRES: 06/29/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00555000000100 i NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300 OWNER UNKNOWN UNKNOWN, UNKNOWN WA FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW J. Majuuga/ 12/29/2020 RELEASED BY DATE Printed: Tuesday, December 29, 2020 10:50:15 AM 1 of 2 WAY EUC PERMIT PERMIT NUMBIER, City of Edmonds Ave-KRWOF •:• •ENG2020-0515 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE X-2 ENGINEERING FINAL" Printed: Tuesday, December 29, 2020 10:50:15 AM 2 of 2 0 \:L L?,11(7. INC. 1 s`) u 15PU'Y 2020 ROW PERMIT NO.: ENG 2020-0515 CITY DEEDMNDS DLOPMEENT ISSUE DATE: 12/29/20 EVE SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: EM55 1X1 to 2X2, SWAP CONTRACTOR: COMCAST - CABLE COM Mailing Address: COMCAST-1525 75TH ST SW EVERETT, WA 98203 CABLE COM 20021 120TH AVE NE BOTHELL. WA 98001 State License #: CABLEL*971DP City Business License #: NR - 021818 CONTACT: COMCAST- JOURDEN LAWRENCE CABLE COM - SUNSHINE CRABBS Phone #• JOURDEN LAWRENCE-425.921.8201 SUNSHINE CRABBS - 360.312.32559 Fax #: Email #• COMCAST -JOURDEN_LAWRENCE@COMCAST.COM CABLE COM - SNOHOMISH.PERM ITTING@CABLECOMLLC. NET Liability Insurance Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 24126 100TH AVE W ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family Sf EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Other ❑ Yes ❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : STARTING AT POLE NEAR 24126100TH AVE W, BEGIN OVERLASH APPROX. 782' TO POLE NEAR 24324 100TH AVE W. MAINTENANCE SPLICE PER MARKED LOCATION. JB0000430603 - 1 WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: PAVEMENT CUT: ❑ Yes ❑ No If yes, indicate size of cut: x CONCRETE CUT: ❑ Yes ❑ No If yes, indicate size of cut: X. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE Contractor or Agent DATE 12/17/2020 NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Right of Way Completed By: Scott Vermeys w /� f � - M. Completion Date: 12/10/2020 Address 24126 100TH AVE W, EDMONDS, WA Q M C A S T Survey Revision Date: Survey Revision Task ID: Footages Entered On Route Overview Sheet Engineered For: Project Manager: P2 ID: JB0000430603 Additional Pages Needed No New Ped ❑ Pole New Vault ❑V Lock Box ■ Existing U/G Footage 150' Existing Aerial Text Box Text New U/G CaIlout Arrow New Aerial New Tap 0 Interior Path Phase Identifier ❑i Footage Break ■ H Power Supply Fiber Splice Point • CO Hard Surface Cut Right of Way Provide Clear Detail about the Project Construction Notes: MAINTENANCE SPLICE PER MARKED LOCATION. SUFFWt DATA LONGITUDINAL BUFFER SPACE - S 0c90 11P.0 .% I I: I 10 I TG I GO Gi >a Ll1wf•» PPP.) I 11 I TY+ I I ' I "% I M I N 1 -0 1 9An M� - 8UPPEA VEHICLE ROLL AHIUp OWANOE - R 1MA4rORTAOI! AIItA[AMP D IK' Ywl. NVMY HOOT a Ow ^ ona" e lv IO6 t IIA.IMM NULLS ACGCOMA' C! V1Rw TIC O •e0 rQT 1sA% W�tltvmASAW M.MfACTuwFws IYOOMNCW.l101a C naI[CTK K/p.t W /rFCrrLD Y.r wP A Nq»4 N1�lP t—POIG.LLr LOCA'PU 10 "KII >1f 1AYR TK L4V11w ARIA R[OUw[O 100TH AVE W DKE IAKE AWD AKrAD Y• M UnJ y. RDAD Y VMK NItF7KES ENGINEERING DIVISION < AHI:110 I• y' TO [Ter APPROVED AS NOTED WWI wI/.Ts AP1Tow.L M « IIr1. Ow caR, %22t� M 12/29/2020 l t'6rMD L* GLA9W.G SI.10Y 14 1t1iORARr SIG. LOCAIOY O OIWr1 UNG ONAO/m NON SPACING - X III --W w1i va 00 f0 NMI IIC0. R PAL MA" .! 110 foe. wuwl .0.W L LAA111M .wltlwL/ )b 146 I1/1I Y04 wwa woAcs IA1R.+1 AR,twYY.� yy 110 11 , f"Q"tt4 A 11"WAM ofime i aw. IA lMMlI »J."T. 21 IrT»I 11. LP" M, In („All —.Cww1 YAr s[ AC..ft1tO 10 .000WWOU.1! /I,lwf.Cll]IL1 .M Oq K'AI.r1 Wr t wlOLKlO T[ WYI ArlA! TO III w0Aavnr .W GGt>rolKwa IYlATO COr M"L r � l/-• OR IP�tI 40F j Y /P' H ROAD FWAN:0 WORK IO it D► µFAD Y Y' K whin OME LIME 111121.1 ROAD ANE�O Y' Y' W 10 "r wKN1 wu t I,00"G _ 0 0 0 No Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way w per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ONE-11-ANE, TWO-WAY TRAFFIC CONTROL WITH FLAGGERS NOT TO SCALE r SPACING C[T >•.n +o �a m ^0 1 ,0 TO )D MISS. + A.L 14WIN .MP ..KAa M OMAwC+, ) CATLMWCI TK CN.MIG 2A%Q O CL 'AIKR ALA]RL 1'•0ul 4n Is ITtOOM11E1+oto. ) RIO»T rlpl< IM00". PMM014-4 •IO.DYYILT JO ".0 Al "AOCIIO s1A,I0Y/.Ott II! WIJINL N0 $ tCMCA"CP4 IO11 AJDRI]N.L ORAL• III vl•U.L —W%I0.0 I011 f1OFL IV4w1 wr i,.K,/�b. Route Overview Completed By: Scott Vermeys Address: 24126 100TH AVE W, EDMONDS, WA Completion Date: 12/10/2020 Footages 10�, COMCAS T Survey Revision Date: New Aerial Coax Overlash Coax New UG Fiber Survey Revision Task ID: New Aerial Fiber Overlash Fiber Existing UG Fiber Engineered For: Inside Footage New UG Coax Total Aerial 0 Project Manager: Conduit Only Existing UG Coax Total Underground 0 P2 ID: JB0000430603 Are Additional Pages Needed No Total Private Footage Legend New Ped ❑ Pole Vault ❑V Lock Box �J'New h Existing U/G Existing Aerial New U/G Foota a 150' g Text Box Text - I ! i_I I L `l- Edmonds Way t ``zs,.c Q`-� �---' Callout Arrow t New Aerial Interior Path New Tap Phase Identifier - ,—�--\ --� l j ''• t ° z1�rsr s.y '-- r „_ �; Footage Break g iH Fiber Splice Point PS Power Supply _ ` - zYi•a n• sv� =aJ1_- . CD Hard Surface Cut — t ,,,, - —' z� _ j,,. � 1 1 _ q Route Overview Provide Clear Detail about the Project Construction Notes: \; I I p �L j ���; �? 2 1h e - _�- 1 t_ Wri.LN "' 1OVERLASH Edmonds STARTING AT POLE NEAR 24126 100TH AVE W, BEGIN APPROX. 782'TO POLE NEAR 24324 100TH AVE W. MAINTENANCE SPLICE PER MARKED LOCATION.- ' -- a._. _-,�- L-1 ,LF sg I svi ._L-'= S._T_-236th:St SW v— — . 8J o I •� 7 �"j;�-'j�j��`''jj�����'�j—�� F�, • ��24 01 V S.V 11 � I r.\1` . �-; - , do 3n�d—St'�SW 'a tl�. ru•' ice' sw .-�,' ` � C"'��'��!�''�--r-�" i`v I I l K t � ,_99 -1- - r Route Overview Completed By: Scott Vermeys Address: 24126 100TH AVE W, EDMONDS, WA Completion Date: 12/10/2020 Footages COMCAST Survey Revision Date: New Aerial Coax Overlash Coax New UG Fiber Survey Revision Task ID: New Aerial Fiber Overlash Fiber Existing UG Fiber Engineered For: Inside Footage New UG Coax Total Aerial 0 Project Manager: Conduit Only Existing UG Coax Total Underground 0 P2 ID: JB0000430603 Are Additional Pages Needed No Total Private Footage Right of Way Completed By: Scott Vermeys A r \, ✓ _ •�jl �� ;, c • ' `� rE; /` ;, `- S Completion Date: 12/10/2020 Address 24126 100TH AVE W, EDMONDS, WA C'0MCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Route Overview Sheet Engineered For: Project Manager: P2 ID: J60000430603 Additional Pages Needed No