Loading...
2011.09.13 CC Committee Meetings Agenda Packet                 AGENDA EDMONDS CITY COUNCIL Council Chambers, Public Safety Complex 250 5th Avenue North, Edmonds ___________________________________________________ SEPTEMBER 13, 2011   5:30 p.m. - Call to Order and Flag Salute                 1. (30 Minutes)Convene in executive session regarding labor negotiations.     6:00 p.m. - Reconvene   City Council Committee Meetings   The City Council Committee meetings are work sessions for the City Council and staff only. The meetings are open to the public but are not public hearings. The Committees will meet in separate meeting rooms as indicated below.   2.Community Services/Development Services Committee Meeting Room:  Council Chambers   A. (5 Minutes)Report on final construction costs and approve Change Order No. 6 for the Lift Station 7 & 8 Rehabilitation Project and Council acceptance of project.     B. (10 Minutes)Adoption of the Emergency Services Coordinating Agency Hazard Mitigation Plan.   C. (15 Minutes)Introduction to the Capital Facilities Plan (2012-2017) and the Capital Improvement Program (2012-2017).   D. (5 Minutes)Authorization to advertise a Request for Qualifications to complete design and right-of-way acquisition for the 212th St SW at 76th Ave W intersection.   E. (5 Minutes)Authorization to advertise a Request for Qualifications (RFQ) for consultant services to update the Sanitary Sewer Comprehensive Plan.   F. (5 Minutes)Authorization for Mayor to sign easement granted to the City of Edmonds by Sound Transit.   G. (5 Minutes)Update on the Interurban Trail Project.   H. (5 Minutes)Ordinance amending the Edmonds City Code to add electric vehicle parking provisions.   I. (10 Minutes)Proposed ordinances setting requirements for responsible bidders and goals for apprenticeship participation on City Packet Page 1 of 313 I. (10 Minutes)Proposed ordinances setting requirements for responsible bidders and goals for apprenticeship participation on City construction contracts.   J. (15 Minutes)Discussion regarding creating a diversity commission/youth commission.   K. (10 Minutes)Parking Proposal (Councilmember Bernheim).   L. (10 Minutes)Public comments (3-minute limit per person)   3.Finance Committee Meeting Room:  Jury Meeting Room   A. (30 Minutes)Discussion of refunding and issuing new bonds.   B. (15 Minutes)Change Order Policy discussion.   C. (5 Minutes)Update of Scope of Services of Web Site Professional Services Agreement.   D. (15 Minutes)Discussion of September 6, 2011 budget presentation.   E. (10 Minutes)Inter-fund short term loan from general fund to street fund.   F. (10 Minutes)General Fund Update - July 2011   G. (10 Minutes)Update on financial policies and reporting.   H. (10 Minutes)Public comments (3-minute limit per person)   4.Public Safety Committee Meeting Room:  Police Training Room   A. (10 Minutes)Report on Marine 16.   B. (10 Minutes)Interlocal Agreement between Snohomish County and the City of Edmonds relating to prisoner transport.   C. (15 Minutes)Discussion regarding an Ethics Board.   ADJOURN   Packet Page 2 of 313 AM-4198   Item #: 2. A. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted By:Robert English Department:Engineering Committee:Community/Development Services Type:Action Information Subject Title Report on final construction costs and approve Change Order No. 6 for the Lift Station 7 & 8 Rehabilitation Project and Council acceptance of project.   Recommendation from Mayor and Staff Council approve Change Order No. 6 and accept the project.  Previous Council Action On March 18, 2008, the City Council authorized a call for bids to construct the project.   On May 6, 2008, the City Council awarded a construction contract to Interwest Construction, Inc. in the amount of $2,240,196 to complete the project.   Narrative In 2004, the City hired HDR Engineering, Inc. to design and upgrade sewer Lift Stations 7 and 8 to increase the sewage capacity and replace the outdated electrical systems at each station. The project design also included the replacement of approximately 1,500 feet of 8-inch diameter sewer pipeline in Dayton Street because the pipeline required continual maintenance due to the age and slope of pipe.  The project is now complete and was inspected and accepted by City staff.  The final construction cost for the contractor is $2,520,467. Five change orders have been processed at a cost of $210,055 and the remaining change order (Change Order No. 6) was recently agreed to in June of this year at a cost of $70,215.25. Payment of Change Order No. 6, when added to the previously paid change orders, will exceed the 10% ($224,020) contingency approved when the contract was awarded.  The final construction costs were impacted by several unforeseen conditions and a significant portion of the change order cost is related to contaminated soil found in Dayton Street, Lift Station 7 and Lift Station 8 located near the BNSF railroad tracks north of the new Sound Transit Station. The underground piping for Lift Station 8 also had to be redesigned due to a conflict with a buried electrical and communication conduit bank owned by the Washington State Ferry system. The underground piping for Lift Station 7 had to be adjusted in the field due to a conflict with a buried concrete collar used to join the Waste Water Treatment Plant outfall pipes.  Staff recommends the City Council accept the project and approve Change Order No. 6, so the final payment can be made to the contractor. The project costs will be paid by the 412 Utility Fund.     Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 08:48 PM Public Works Phil Williams 09/09/2011 07:28 AM City Clerk Sandy Chase 09/09/2011 09:03 AM Mayor Mike Cooper 09/09/2011 10:26 AM Final Approval Sandy Chase 09/09/2011 10:28 AM Form Started By: Robert English Started On: 09/08/2011 05:32 PM Packet Page 3 of 313 Final Approval Date: 09/09/2011  Packet Page 4 of 313 AM-4191   Item #: 2. B. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted By:Phil Williams Department:Public Works Committee:Community/Development Services Type:Action Information Subject Title Adoption of the Emergency Services Coordinating Agency Hazard Mitigation Plan. Recommendation from Mayor and Staff Adopt the regional Hazard Mitigation Plan prepared by ESCA Previous Council Action Narrative This Plan provides a foundation for coordination and collaboration between ten ESCA Cities and four Special Purpose Districts. It identifies mitigation strategies and future mitigation projects as a means to assist in meeting the requirements of various federal assistance programs. The plan was developed in 2010 and must now be adopted by all member participants to meet the federal eligibility requirements for receipt of disaster recovery funding. The Edmonds specific section of this regional plan is attached as a .pdf file. The entire plan is located at  http://www.esca1.com/index.php/Mitigation_Plan_Update_(2010)#MitigationPlanComponents . Attachments Edmonds section of ESCA Hazard Mitigation Plan Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Phil Williams Started On: 09/08/2011 09:58 AM Final Approval Date: 09/08/2011  Packet Page 5 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 49 Edmonds September 2010 Edmonds The City of Edmonds is located in the southwest corner of Snohomish County, about 14 miles north of Seattle. (See map on Page III-86.) It has a population of about 40,7601 people residing on about 8.9 square miles, or 5,717 acres, of land. The City is about 95% developed. Of the remaining undeveloped land, about 75% is designated for single-family residential use. Edmonds’ commercial activity is concentrated in two areas: the Downtown/Waterfront and the Highway 99 corridor. The latter includes Stevens Hospital and the medical facilities affiliated with the Hospital. This Hospital region provides critical facilities, and restoring routes to and from the Hospital will be a priority in any disaster. The City of Edmonds is a key link in the region’s transportation routes. The City has three state routes that connect the region to both the Port of Edmonds and the site of the Edmonds-Kingston Ferry Terminal. The former provides mooring for approximately 1,000 boats and watercraft. The latter is located in the Downtown/Waterfront core and provides a steady stream of vehicles and ferry- commuters into the area. The Burlington-Northern Railroad runs adjacent to the City’s shoreline and links Everett to Edmonds to the north and Seattle to the south. The rail line is currently used for freight and AMTRAK passenger rail service; approximately 35 trains pass through the City each day. Conflict between north-south rail traffic and east-west access to the waterfront and its regional facilities (ferry, port, and parks) is an ongoing concern for its potential effect on response and recovery activities in emergency situations. For a list of critical facilities located in Edmonds, see Annex B. Hazard Identification The City of Edmonds uses a GIS system, but is currently limited in the information and functions available within that system. County base information is included in the City’s GIS system, plus local zoning and Comprehensive Plan information. GIS development is an ongoing project and will be expanded in the future as funds for training and personnel allow. At some point in the future, the City plans to incorporate HAZUS as well, but resources have not been identified for this project within the foreseeable future. Packet Page 6 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 50 Edmonds September 2010 Based on past experience, GIS data, and hazard maps from the Department of Natural Resources and FEMA, Edmonds rates its risk of natural hazards as follows: HAZARD RATING (out of 80 possible) Drought 07 Earthquake 45 Flood 100-year 12 Urban 12 Landslide 14 Severe Storm 48 Tsunami & Seiche 08 Volcano 08 Wildland Urban Interface Fire 05 Drought Rating: 7 Drought is not considered to be a high-risk hazard for Edmonds. The City’s potable water is supplied by the Cities of Seattle and Everett via Alderwood Water District and is relatively stable for short-term (one season) droughts. Citizens may be asked to take conservation measures and limit lawn watering, but the City will still receive adequate potable water for its needs. At greater risk are Lake Ballinger and the streams running through the City of Edmonds. Even a short-term drought is likely to reduce water levels in Lake Ballinger and the City’s streams. Reduced water levels lead to higher water temperatures which, in turn, may make the streams uninhabitable for salmon and other aquatic organisms downstream. With several species of salmon listed as “endangered” or “threatened,” this could delay recovery efforts. The City of Edmonds considers the threat of drought to be EXTREMELY LOW. Earthquake Rating: 45 Edmonds is located in Seismic Zone 3, between several fault lines, and earthquakes are therefore considered to be a significant risk for the City. Packet Page 7 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 51 Edmonds September 2010 As discussed in this document’s HIVA, earthquakes occur in Washington State on an almost daily basis. While most quakes are minor, seismologists tell us that we can expect a deep or intraplate earthquake at a magnitude of 7.0 about every 70 years and an 8.0 or greater subduction quake every 150 to 1,100 years. Based on this information, when a major earthquake occurs in the region, the City can expect significant damage, injuries, and possibly deaths. This is due in part to the relatively dense concentration of both buildings and people in about 8.9 square miles. Secondary effects of an earthquake can include tsunami or seiche as well as landslides and soil displacement. The Edmonds waterfront which includes the Port of Edmonds facilities, two major restaurants, and the Senior Center are potentially vulnerable to damages and loss of life. Edmond’s risk from earthquake is MODERATE. Flood Rating: 12 The City contains the following creeks and watersheds within the City limits: Body of Water Description Shell Creek 753 acre watershed, plus 527 acres of overflow in the winter months. Willow Creek 434 acres Shellabarger Creek 354 acres Northstream Creek 248 acres Fruitdale 243 acres Hindley Creek 178 acres Perrinville Creek 805 acres Goodhope Pond 474 acre watershed Lake Ballinger Shared with the City of Mountlake Terrace In addition, a portion of the city is located on Puget Sound. As a result, the City of Edmonds experiences floods from three separate types of events: 100-year flooding, urban flooding, high tides, and shoreline flooding. 100-Year Flood Insurance Rate Maps (FIRMs), with an effective date of November 8, 1999, were developed for the City. These include panel numbers 1285, 1305, and 1575. These maps identify areas along the Packet Page 8 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 52 Edmonds September 2010 shoreline as “Zone AE,” and establishes base flood elevations. Other areas, further inland, are identified as “Zone A,” recognized as part of the 100-year floodplain, but no base flood elevations are established. Additionally, the maps identify several areas as part of the 500-year floodplain. Approximately 90 lots, encompassing 129.6 acres, lie within the 100- year floodplain. The affected property is valued at approximately $43,987,080. No critical buildings are located in the affected area. The City of Edmonds has incorporated the information as provided by the FIRMs in the development of the City’s Comprehensive Plan. As a result, the City restricts building in these areas. Urban Urban flooding is a semi-regular occurrence in the City of Edmonds. This is caused by excessive rainfall or snowmelt which overwhelms the stormwater system, wetlands, lake, and streams. In general, urban flooding is intensified by the increasing amount of impervious surface as surrounding jurisdictions and areas upstream develop and Edmonds continues to in-fill. Shoreline Shoreline properties may experience flooding as part of the 100-year or urban flooding events. In addition, storm events are often accompanied by significant wave action, and this can intensify the flooding experienced along the Edmonds shoreline if this coincides with high tide cycles. The City is in good standing with the NFIP and has no findings. For more complete information on the City’s NFIP standings, please see Section VI, Addendum B. Packet Page 9 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 53 Edmonds September 2010 NFIP / CRS Components Flood Insurance Rate Map (FIRM) Maintained in paper format by the Building Official and Assistant Building Official Firm updates in process? No Firm updates expected within next 2 years? No. Longer term, Lake Ballinger should be updated. There is no defined flood plain on the current FIRM. NFIP Coordinator assigned? Yes. Building Official Next scheduled date for Community Assistance Visit (CAV) or Community Assistance Contact (CAC)? Unknown. Not scheduled at this time. (Last CAV was May 2008. Identified actions completed; City is in compliance.) Do you participate in the Community Rating System (CRS)? Yes Edmond’s overall hazard rating for flooding is LOW. Landslide and Soil Displacement Rating: 14 The City of Edmonds has several areas with steep slopes and one designated landslide hazard area. These are the primary areas that may experience landslide. To mitigate for this hazard, the City has enacted a very strict ordinance that governs development, enforces current building codes, and requires soil testing and soil stabilization techniques as necessary. Nevertheless, it is still possible for soil saturation or liquefaction to cause a landslide to occur with the right combination of factors and circumstances. Edmonds could also experience soil displacement in conjunction with the creeks that run through the City. In the case of a heavy or excessive stream-flow, it is possible that the movement of the water could erode and destabilize portions of the creek banks. Excessive rainfall or snowmelt or a major earthquake are possible contributors to a landslide or soil displacement event. Having identified the hazard and assessed the possible risks, Edmonds considers landslide to be a LOW risk. Packet Page 10 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 54 Edmonds September 2010 Severe Storm Rating: 48 The City of Edmonds is subjected to severe storms on a regular basis. Windstorms occur nearly every winter, and rainstorms are not unusual. While rarer, the City has also experienced heavy snows and freezing rains. Winds and snow or ice regularly cause tree branches to break and/or trees to fall. This may cause power outages or damage buildings. As mentioned in the discussion of floods (above), severe rain or snowstorms can also be associated with and compound the severity of flood events. The Inaugural Day Storm in 1993 had winds of 66 mph. This storm interrupted power to the City for more than three days. Branches and trees were downed and laid across streets, roads, and yards. City facilities were relatively unscathed, but fences were blown over, and houses received damage from both branches and the wind itself. Since the majority of damage occurred on private property, damage totals are not available. In the winter of late 1996/early 1997, the City and region experienced a significant snowfall following by drenching rain. This resulted in mudslides and required the City of Edmonds Public Works crews to plow snow and remove mud and debris. Funds in the amount of $83,685 were approved by FEMA for clean-up and debris removal as a result of this storm event. In early December 2007, the City experienced a significant rainfall event that produced 5 inches of rainfall in a 36 hour period of time. During the peak of the heavy rains, there was also a high tide and consequently there was nowhere for the storm water to go and it backed up, flooding homes, streets and any low-lying areas. The volume of water also soaked into hillsides, causing many landslides. The some of the most significant damage occurred on Olympic View Drive near 76th Avenue West in the Perrinville neighborhood where a culvert failed and a large sinkhole developed. In addition, damage also occurred on 76th Ave West which required significant road repair work. The total combined repair costs for these two projects amounted to $639,295.93. The level of risk from Severe Storms is 48, or MODERATELY-HIGH. Tsunami & Seiche Rating: 8 As mentioned in the Earthquake section, the South County Senior Center may be occupied by as many as 300 people at any given time. In addition, Packet Page 11 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 55 Edmonds September 2010 the Edmonds waterfront has two large restaurants and a marina which may be occupied by several hundred more people. These facilities are located directly on the Puget Sound waterfront, making them a prime concern during a tsunami event. Another area of concern is the Edmonds Ferry Terminal. This facility handles two state ferries that run up to 28 ferry trips each day. During periods of heavy traffic volume, the dock could be fully loaded with 60 vehicles, and the ferry’s passenger waiting lanes may have as many as 300 additional vehicles within a mile of the dock. During peak traffic periods, as many as 600 walk-on passengers may be in the dock area. Located on the Puget Sound coast, Edmonds is potentially vulnerable to tsunami, though the likelihood of this occurring is EXTREMELY LOW on the rating scale. Volcano Rating: 8 The City of Edmonds is unlikely to suffer direct damage from a volcano eruption. In the event of an eruption, Edmonds may experience ashfall, which can interfere with the operation of motor vehicles and back-up generators, require expensive clean-up efforts by the City, and cause respiratory distress to the citizens. The City is highly unlikely to experience any lava flow, lahar activity, or any of the other risks associated with volcanoes. A secondary effect of a volcano eruption is the influx of refugees into the area. This may be an issue to the City, and the region as a whole, as resources are overwhelmed by numbers of people that the infrastructure is not designed to handle. This includes everything from roads and highways, water and electric utilities, to the regional hospital. Overall, the level of risk from a volcanic eruption is EXTREMELY LOW. Wildland-Urban Interface Fire Rating: 5 Wildland-urban interface fire is a concern to Edmonds due to the parks, wetlands, greenbelts, and undeveloped land parcels that are scattered throughout the City. The threat is in inverse proportion to the amount of rainfall in the region. When rain is scarce, the fire threat increases. During the summer of 2003, new records were set for number of days without rain. As a result, Edmonds and the north King and south Snohomish Counties region experienced several fires next to the freeway Packet Page 12 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 56 Edmonds September 2010 (I-5) that were caused by improperly extinguished cigarettes or sparks from machinery being operated next to dry grass. These fires were quickly contained and suppressed, but the close proximity of houses to these wildland areas, and the relative density of the housing units and wood shake roofs, makes wildland-urban interface fires a risk during periods of drought or excessive dryness. Offsetting the risk of fire, the region is very well developed and has adequate infrastructure to address this hazard. Fire stations are placed strategically, and are within a 4-minute average response time anywhere in the area. Additionally, interlocal agreements are in place with the surrounding jurisdictions to allow for the nearest available unit to respond to any call for fire suppression. The City of Edmonds considers the level of risk from wildland-urban interface fire to be EXTREMELY LOW. Packet Page 13 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 57 Edmonds September 2010 Mitigation Existing and Ongoing Mitigation Activities The City of Edmonds is taking the following actions in ongoing efforts to mitigate for natural hazards and to maintain public safety. All Hazards  The City of Edmonds is a member of the Emergency Services Coordinating Agency (ESCA). As a member, Edmonds receives emergency management planning, coordination, and response services. As part of its preparation and mitigation services, ESCA provides education in the form of Community Emergency Response Team (CERT) training. This training is provided to the citizens of the member Cities and Towns. The goal is to prepare people to be self-sufficient for as much as three days after a major disaster until safety personnel can get to them. CERT also provides the students with suggestions and training for personal mitigation projects such as securing water heaters and attaching tall, heavy furniture to the wall.  The City updated the fire alarm system for City Hall in 1996.  The South County Senior Center received a new fire alarm system in 2006.  Edmonds rebuilt the public safety buildings to meet current building code requirements in 1999.  The City completely upgraded the electrical wiring at the Francis Anderson center in 2002.  An emergency generator for backup electrical power was installed for City Hall in 2007.  Installed a new HVAC system for City Hall.  The Frances Anderson Center, the City’s primary recreation center was structurally reinforced to withstand a major earthquake in 2008. Packet Page 14 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 58 Edmonds September 2010 Codes and Plans The City of Edmonds Name of Document Purpose Review Schedule* Edmonds Ordinance No. 2224: Emergency Services – Disaster Coordination Chapter 6.60 of the Edmonds Municipal Code Govern disaster preparedness and disaster response in the City. Adopted August 1981 State Environmental Policy Act – City Environmental Policy (SEPA) Implement procedures and policies to improve and coordinate plans, functions, programs, and resources consistent with state and county policies for environmental protection. Adopted 1983 Shoreline Master Program Protect against adverse effects to the public health, the land and its vegetation and wildlife by managing shorelines. Adopted 2000 (last amended in 1984) Critical Areas Ordinance Protect the public from damages from landslides, subsidence erosion and flooding. Adopted 1996 Updated 2005 Stormwater Comprehensive Plan Provide guidance on the estimation and control of stormwater runoff quantity and quality. Adopted May 2003 International Building Code Construct to the highest standards available. Adopted July 2007 International Fire Code Construct to the highest standards available. Adopted July 2007. International Mechanical Code Construct to the highest standards available. Adopted July 2007 Uniform Plumbing Code Construct to the highest standards available. Most recent version Adopted July 2007 National Electric Code Construct to the highest standards available. Most recent version Adopted July 1, 1998 Edmonds Comprehensive Plan Contains community’s vision of the City’s future, provides a statement of long-range goals and policies. Adopted 1995 Updated annually Water Comprehensive Plan Proves the City’s water utility with long-term planning strategies for a twenty-year period. June 2002 Scheduled for update in 2009 6-Year Capital Facilities Plan 20-Year Capital Facilities Plan 6-Year Capital Improvement Plan Ongoing plans for the replacement and upgrade of infrastructure and critical facilities. 2008 – 2014 Updated annually Packet Page 15 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 59 Edmonds September 2010 The City of Edmonds Name of Document Purpose Review Schedule* Edmonds Environmentally Sensitive Areas Map Identifies sensitive areas in the Edmonds Shoreline area. N/A National Flood Insurance Program Most recent version Adopted July 1,1998 Community Assistance Visit (NFIP) Completed May 13, 2008 Other Jurisdictions’ Plans Edmonds School District No. 15 Capital Facilities Plan Adopted annually 2008 Edmonds-Woodway High School Master Plan -- Port of Edmonds Master Plan Adopted May 2001 Stevens Memorial Hospital Master Plan October 1994 Washington State Ferry’s Safety Management System -- Drought  Encourage water conservation.  Edmonds’ Water Conservation Program is consistent with the conservation programs developed by the two entities that provide water to the City: the Cities of Everett and Seattle. Earthquake  Edmonds’ City Hall was retrofitted for seismic reinforcement in 1997.  Edmonds recreation center, the Frances Anderson Center was structurally retrofitted for major earthquakes in 2008. This project was partially funded through a FEMA hazard mitigation project grant.  The City of Edmonds encourages voluntary seismic upgrade to properties.  The City of Edmonds is aware of and supports the Washington State Ferry System’s emergency management protocols: the Safety Management System. This system establishes:  “Drop, cover, and hold” policies during an earthquake.  As soon as the shaking stops, ferry vessels are moved away from the docking areas and taken ½ to 1 mile away from the beach.  Cars and foot passengers are evacuated from the dock and directed to move uphill and away from the shore.  Personnel and passengers wait a minimum of half an hour – longer if a threat of tsunami is established – before anyone is allowed back into the dock area. Packet Page 16 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 60 Edmonds September 2010  Before ferry operations are resumed, trained staff conduct a safety inspection of the docks and associated facilities. If there is no damage, operations may resume. Flood  The City of Edmonds restricts development in the floodway. These restrictions are codified in ECDC 19.75.050C.  Evaluated and set elevation requirements for new residential and non-residential structures in the floodplain area.  Identify alternatives to reduce development in the floodplain.  The City of Edmonds is primarily vulnerable to urban flooding. To minimize damage from this hazard, Edmonds has several City- owned and –operated stormwater outfalls with tidal gate systems to provide drainage control. The City also has several open detention ponds and a number of stormwater infiltration systems to manage stormwater flows. Landslide  To mitigate for landslide, the City of Edmonds relies on the adoption and enforcement of current building codes. In addition, the City has established building requirements to mitigate for Meadowdale landslide hazards.  The City maintains the drainage system in the Meadowdale landslide area to minimize build-up of water that could erode the embankments.  The Critical Areas Ordinance provides guidelines for, and places restrictions on, development in hazard-prone areas. Severe Storm  The City of Edmonds has completed a series of projects to restore and replace bulkhead on the waterfront to minimize damage from wave action during a severe storm.  The Comprehensive Stormwater Plan and Capital Improvement Plan are maintained in accordance with State guidelines and are used both to develop policies and as a financial management tool. The City uses these plans to maintain and enhance stormwater systems in order to minimize the effects of severe storms and the secondary effects of these storms: flooding and landslide.  As part of the Comprehensive Stormwater Plan and Capital Improvement Plan, culverts have been inventoried and mapped. Drainage problems are identified and included in the Capital Improvement Plan for future work.  Edmonds rebuilt the waterfront bulkheads to replace deteriorated wood. This reduces wave damage and shoreline erosion. Packet Page 17 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 61 Edmonds September 2010 Tsunami and Seiche  As discussed above, the City of Edmonds is aware of and supports the Washington State Ferry System’s emergency management protocols: the Safety Management System. If a tsunami was expected, the Washington Ferry System’s personnel would:  Move the vessel(s) away from the docking areas and take the ferries ½ to 1 mile away from the beach.  Evacuate cars and foot passengers from the dock areas and direct all traffic to move uphill and away from the shore.  Before ferry operations are resumed, trained staff will conduct a safety inspection of the docks and associated facilities. If there is no damage, operations may resume. Volcano  None at this time. Wildland-Urban Interface Fire  Maintain right-of-way to minimize dry grasses and undergrowth.  Ban the use of fireworks within the City. Packet Page 18 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 62 Edmonds September 2010 This page intentionally left blank. Packet Page 19 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 63 Edmonds September 2010 Mitigation Action Items The Mitigation Plan identifies short- and long-term action items developed through data collection, research, and the public participation process. Mitigation Plan activities may be considered for funding through federal and state grant programs and when other funds are made available through the budgeting process or the passage of bonds. Action items address multi-hazard (MH) or hazard-specific issues. Upon implementation, the coordinating organizations may look to partner organizations for resources and technical assistance. To help ensure activity implementation, each action item includes several pieces of information in the description. These include:  Coordinating Organization The coordinating organization is that which is willing and able to organize resources, find appropriate funding, or oversee activity implementation, monitoring and evaluation. The coordinating organizations may be local or regional agencies. Organizations written in italics are not participating in this Plan but have an established relationship with this jurisdiction.  Timeline Action items include both long- and short-term activities. Each action item includes an estimate of the timeline for implementation. Short- term action items (ST) are activities that organizations may implement with existing resources and authorities within one to two years. Long- term action items (LT) may require new or additional resources or authorities, and may take between two and five years to implement.  Ideas for Implementation Each action item includes ideas for implementation. This may be individual steps for one project, or it may be several related projects that address the natural hazard.  Plan Goals Addressed The plan goals are identified to monitor and evaluate how well the Mitigation Plan is achieving its goals once implementation begins.  Benefit-to-Cost Review Due to limitations in staff time, and because project priorities may shift based on changes in funding options and local events, a generalized benefit-to-cost review is used. The steps associated with prioritizing the mitigation projects are as follows: Packet Page 20 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 64 Edmonds September 2010 1. The jurisdiction rates the project cost as “high,” “medium,” or “low” in relation to budget and previous projects, and each rating is assigned a numerical value. 2. The project outcome is then rated as “low,” “medium,” or “high,” and each of these ratings is assigned a numerical value. 3. The two values are added together, and the total provides the cost-benefit and the priority. Example: If a project has a medium approximate cost, and is considered to be highly effective, the boxes would be marked as shown below. Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest The priority ratings with the highest numbers are considered to be the highest priorities. As always, however, these are subject to financial realities and may not be carried out in the exact order indicated. Packet Page 21 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 65 Edmonds September 2010 MULTI-HAZARD Mitigation Actions (MH) ED-01-MH-ST: Replace water mains to maintain and/or enhance critical functions; minimize damage or breakage from natural hazards such as earthquakes or landslides; and ensure adequate water pressure to be effective in fire suppression. Ideas for implementation:  The City of Edmonds is replacing steel line water mains with ductile iron pipe mains. This replacement cycle will be completed by 2008.  Beginning in 2008-2009, the City will begin replacing cast iron water mains with ductile iron or as required by current codes or technology.  The 138 miles of water mains are scheduled to be replaced at a rate of 1% per year. Coordinating Organization: Edmonds Public Works Estimated Price: $1,990,000 Funding Source: Water Utility Fund Timeline: Ongoing Plan Goals Addressed: Protect Life and Property; Provide for Emergency & Critical Services; Facilitate Continuity and Recovery Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [X] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 22 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 66 Edmonds September 2010 DROUGHT Mitigation Actions (D) ED-02-D-ST: Work with Alderwood Water District to educate consumers about drought impacts and ways to minimize water waste. Ideas for implementation:  Insert water conservation information in utility bills.  Work with schools to educate young people on the importance of water conservation and the impact of drought on watersheds.  The City loans out a Car Wash kit that removes pollutants from the water and this comes with a brochure for water conservation. Coordinating Organization: Edmonds Public Works; Edmonds Administration; Alderwood Water District Estimated Price: $10,000 Funding Source: Storm Utility Fund Timeline: Ongoing Plan Goals Addressed: Increase Public Awareness; Encourage Partnerships Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [X] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 23 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 67 Edmonds September 2010 EARTHQUAKE Mitigation Actions (E) ED-03-E-ST: Integrate new earthquake hazard mapping data for the City of Edmonds and improve technical analysis of earthquake hazards. Ideas for implementation:  Update GIS system data.  Install and train on HAZUS software; conduct HAZUS analysis. Coordinating Organization: Edmonds Development Services Estimated Price: $100,000 Funding Source: General Fund/Grants Timeline: 5 years Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 24 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 68 Edmonds September 2010 ED-04-E-ST: Conduct non-structural retrofit activities. Ideas for implementation:  Strap down and secure computers and other office equipment and machinery.  Secure shelves, lockers, and furniture to walls.  Conduct walk-throughs to ensure that heavy items are not stored overhead. Secure in place or move to safer locations.  Mount computer servers on seismic isolation platforms, or use other appropriate technology to secure servers.  Ensure facility water heaters are strapped securely to wall studs in accordance with current requirements.  Secure ceiling tiles and light fixtures with wires.  Secure the back-up generator and HVAC equipment for City Hall (Completed).  Secure ducts and piping.  Use plastic sleeves on fluorescent lighting tubes.  Secure artwork.  Replace untempered glass with tempered glass, or install polyester shatter-resistant film over existing glass.  Install child-proof latches on drawers and cabinets in appropriate locations. Coordinating Organization: Edmonds Public Works Estimated Price: $150,000 Funding Source: General Fund/Grants Timeline: 5 years, ongoing Plan Goals Addressed: Protect Life & Property; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 25 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 69 Edmonds September 2010 ED-05-E-ST: Encourage reduction of nonstructural and structural earthquake hazards in homes, schools, businesses, and government offices. Ideas for implementation:  Provide information to all Edmonds School District, City and government departments and school facility managers and teachers on securing bookcases, filing cabinets, light fixtures, and other objects that can cause injuries and block exits.  Explore partnerships to provide retrofitting classes for homeowners, renters, building professionals, and contractors. Coordinating Organization: Edmonds School District; Edmonds Development Services Estimated Price: $20,000 Funding Source: General Fund/Grants Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [X] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 26 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 70 Edmonds September 2010 ED-06-E-ST: Identify public buildings and infrastructure that require structural retrofitting. Ideas for implementation:  Conduct a seismic survey of all public buildings and infrastructure.  Coordinate with State to identify transportation infrastructure in Edmonds that requires seismic retrofits. Coordinating Organization: Edmonds Public Works; Edmonds Development Services Estimated Price: $5,000 Funding Source: General Fund Timeline: 2 years & ongoing Plan Goals Addressed: Protect Life and Property; Encourage Partnerships; Provide for Emergency or Critical Services; Facilitate Continuity and Recovery Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [X] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 27 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 71 Edmonds September 2010 ED-07-E-ST: Identify funding sources for structural and nonstructural retrofitting of structures that are identified as seismically vulnerable. Ideas for implementation:  Provide information for property owners, small businesses, and organizations on sources of funds (loans, grants, etc.). Coordinating Organization: Edmonds Chamber of Commerce; Edmonds Development Services Estimated Price: $5,000 Funding Source: Grants Timeline: Ongoing Plan Goals Addressed: Increase Public Awareness; Encourage Partnerships Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [X] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 28 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 72 Edmonds September 2010 FLOOD Mitigation Actions (F) ED-08-F-LT: Enhance data and mapping for floodplain information within the city, and identify and map flood-prone areas outside of designated floodplains. Ideas for implementation:  Apply for FEMA’s cooperative technical partnership using the 2-foot contour interval floodplain mapping data in the City of Edmonds’s GIS system.  Update 100 yr flood plain maps in the Comprehensive Plan including the Edmonds tidal marshland, SR 104 and Dayton Street right of ways and the Port of Edmonds Harbor Square property.  Use mapping data to update the flood-loss estimates for the City of Edmonds. Coordinating Organization: Edmonds Development Services Estimated Price: $120,000 Funding Source: Grants Timeline: 5 years (as funding allows) Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [X] 2 – Medium [ ] 3 [ ] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 29 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 73 Edmonds September 2010 ED- 09-F-LT: Develop acquisition and management strategies to preserve opens space for flood mitigation, fish habitat, and water quality in the floodplain. Ideas for implementation:  Continue to implement and require conservation easements for the Shell Creek Corridor by acquiring and managing floodplain open space in the City of Edmonds.  Explore funding for property acquisition from federal (e.g., FEMA’s Hazard Mitigation Grant Program), state, regional, and county governments, as well as private and non-profit organizations, trails programs, fish programs, as well as options for special appropriations.  Develop a regional partnership between flood mitigation, fish habitat, and water quality enhancement organizations and programs to improve educational programs.  Identify sites where environmental restoration work can benefit flood mitigation, fish habitat, and water quality.  Work with landowners to develop flood management practices that provide healthy fish habitat.  Identify existing watershed education programs and determine which programs would support a flood education component. Coordinating Organization: Edmonds Public Works; Edmonds Executive Department; Adopt-A-Stream Foundation Estimated Price: $108,500 Funding Source: Storm Water Utility/General Fund/Grant Timeline: 2 years (as funding allows) Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 30 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 74 Edmonds September 2010 LANDSLIDE Mitigation Actions (L) ED-10-L-ST: Improve knowledge of landslide hazard areas and understanding of vulnerability and risk to live and property in hazard-prone areas. Ideas for implementation:  Incorporate landslide information into GIS mapping, and planning and the City of Edmonds Comprehensive Plan.  Develop public information to emphasize economic risk when building on potential or historical landslide areas.  Develop or attain public information brochures to educate the community on how to maintain and enhance slope stability. Coordinating Organization: Edmonds Development Services Estimated Price: $25,000 Funding Source: Grants/General Fund Timeline: 3 years Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 6 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [X] 3 – Low [X] 3 – High [ ] 4 [ ] 5 [X] 6 – Highest Packet Page 31 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 75 Edmonds September 2010 ED-11-L-ST: Encourage construction and subdivision design by professional planning staff that can be applied to steep slopes to reduce the potential adverse impacts from development. Ideas for implementation:  Continue to implement the City’s Comprehensive Plan and Municipal Code that encourages the retention of natural features of the land and minimizes impacts to steep slopes.  Work with the City of Edmonds Planning Commission and City Council to develop guidelines to mitigate and prevent landslides. Coordinating Organization: Edmonds Development Services Estimated Price: $369,086 Funding Source: General Fund Timeline: 1 year (Completed with adoption of new critical areas regulations) Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 32 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 76 Edmonds September 2010 ED-12-L-ST: Limit activities in identified potential and historical landslide areas through regulation and public outreach. Ideas for implementation:  Analyze existing regulations regarding development in landslide prone areas. (Completed)  Identify existing mechanisms for public outreach (e.g., watershed councils, etc.). Coordinating Organization: Edmonds Development Services Estimated Price: $200,000 Funding Source: General Fund Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Public Awareness; Encourage Partnerships Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [ ] 3 [ ] 3 – Low [X] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 33 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 77 Edmonds September 2010 SEVERE STORM Mitigation Actions (S) ED-13-S-ST: Enhance public safety strategies for severe storm events. Ideas for implementation:  Develop coordinated management strategies for accident prevention through de-icing roads, plowing roads, clearing roads of fallen trees, and clearing debris from public and private property.  Enact management strategies. Coordinating Organization: Edmonds Public Works Estimated Price: $50,000 Funding Source: Street Maintenance Fund Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery Benefit-to Cost Review: 6 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [X] 3 – Low [X] 3 – High [ ] 4 [ ] 5 [X] 6 – Highest Packet Page 34 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 78 Edmonds September 2010 ED-14-S-ST: Develop and implement programs to coordinate maintenance and mitigation activities to reduce risk to public infrastructure from severe storms. Ideas for implementation:  Partner with responsible agencies and organizations to design and implement programs that reduce risk to life, property, and utility systems.  Develop partnerships between utility providers and City public works agencies to document known hazard areas. Coordinating Organization: Edmonds Public Works; Alderwood Water District; Snohomish County PUD; Puget Sound Energy Estimated Price: $25,000 Funding Source: Utility Fund/Grants Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Encourage Partnerships; Provide for Emergency & Critical Services Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [X] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 35 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 79 Edmonds September 2010 ED-15-S-ST: Increase public awareness of severe storm mitigation activities. Ideas for implementation:  Collect information on public education materials for protecting life, property, and the environment from severe storm events.  Distribute educational materials to residents and public and private sector organizations regarding evacuation routes during road closures.  Target the vulnerable or at-risk populace for disseminating preparedness information (seniors, medically fragile, etc.). Coordinating Organization: Edmonds Fire Department; Edmonds Police Department; Edmonds School District; Snohomish County PUD; Puget Sound Energy; ESCA Estimated Price: $30,000 Funding Source: Utility Fund/General Fund/Grants Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [X] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 36 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 80 Edmonds September 2010 ED-16-S-ST: Develop and implement programs to keep trees from threatening lives, property, and public infrastructure during severe storm events. Ideas for implementation:  Partner with responsible agencies and organizations to design and disseminate education information to property owners to reduce risk from tree failure to life, property, and utility systems.  Develop partnerships between utility providers and local public works agencies to document known hazard areas.  Continue to identify potentially hazardous trees in urban areas. Coordinating Organization: Edmonds Public Works; Snohomish County PUD Estimated Price: $10,000 Funding Source: Street Maintenance Fund Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 5 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [X] 2 – Medium [ ] 3 [X] 3 – Low [ ] 3 – High [ ] 4 [X] 5 [ ] 6 – Highest Packet Page 37 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 81 Edmonds September 2010 ED-17-S-LT: Require electrical utilities to use underground construction methods where possible to reduce power outages from severe storms. Ideas for implementation:  Continue to require the use of underground utilities where possible to be consistent with the City of Edmonds Municipal Code. Coordinating Organization: Edmonds Development Services; Snohomish County PUD Estimated Price: $50,000 Funding Source: General Fund Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery Benefit-to Cost Review: 6 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [ ] 2 – Medium [ ] 2 – Medium [ ] 3 [X] 3 – Low [X] 3 – High [ ] 4 [ ] 5 [X] 6 – Highest Packet Page 38 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 82 Edmonds September 2010 TSUNAMI & SEICHE Mitigation Actions (T) None identified at this time. VOLCANO Mitigation Actions (V) ED-18-V-LT: Collaborate to develop ash fall models that are specific to the north King and south Snohomish Counties area. Ideas for implementation:  Determine critical activities that must be implemented for varying degrees of ash fall. Coordinating Organization: Edmonds Development Services; Washington State Department of Natural Resources; ESCA Estimated Price: To be determined (low to medium cost) Funding Source: Grants Timeline: 5 years Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships Benefit-to Cost Review: 3 Approx Cost + Effectiveness = Priority [ ] 1 – High [X] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [ ] 2 – Medium [X] 3 [ ] 3 – Low [ ] 3 – High [ ] 4 [ ] 5 [ ] 6 – Highest Packet Page 39 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 83 Edmonds September 2010 ED-19-V-LT: Develop and implement policy for maintaining stock of filters for key vehicles and pieces of equipment. Ideas for implementation:  Identify key vehicles and equipment such as: back-up generators, fire and police vehicles, HVAC and/or other large or unusual equipment requiring filters.  Establish policy and budget to maintain spare filters. Coordinating Organization: Edmonds Executive Department; Edmonds Public Works; Edmonds Fire Department; Edmonds Police Department Estimated Price: To be determined Funding Source: General fund Timeline: 5 years Plan Goals Addressed: Protect Life & Property; Provide for Emergency & Critical Services; Facilitate Continuity and Recovery Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [X] 2 – Medium [ ] 3 [ ] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 40 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 84 Edmonds September 2010 WILDLAND-URBAN INTERFACE FIRE Mitigation Actions (W) ED-20-W-LT: Enhance outreach and education programs aimed at mitigating wildland-urban interface fire hazards and reducing or preventing the exposure of citizens, public agencies, private property owners, and businesses to natural causes. Ideas for implementation:  Visit neighborhoods and conduct education and outreach activities.  Conduct specific community-based demonstration projects of fire prevention and mitigation in the urban interface.  Establish neighborhood “drive-through” activities that pinpoint site- specific mitigation activities. Fire crews can give property owners personal suggestions and assistance.  Perform public outreach and information outreach by holding open houses at fire stations. Allow the public to visit, see the equipment, and discuss wildland-urban interface fire mitigation with the crews. Coordinating Organization: Edmonds Fire Department Estimated Price: To be determined Funding Source: General fund and grants Timeline: 4 years Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery; Protect Natural Systems Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [X] 2 – Medium [ ] 3 [ ] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 41 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 85 Edmonds September 2010 ED-21-W-LT: Increase communication, coordination, and collaboration between wildland-urban interface property owners, city planners, fire prevention crews, and city officials to address risks, existing mitigation measures, and federal assistance programs. Ideas for implementation:  Encourage all residences to practice fire plans and evacuation routes.  Encourage a standard for the State Fire Marshall to evaluate fire plans and emergency plans.  Require fire department notification of new business applications to ensure that appropriate fire plans have been developed.  Have the City Planners and Planning Commission work closely with those who choose to build in the wildland-urban interface area to identify and mitigate conditions that aggravate fire hazards, including:  Limited access for emergency equipment due to width and grade of roadways.  Poor turn-around for emergency equipment.  Inadequate water supplies.  Spacing, consistency, and species of vegetation around structures.  Inadequate fuel breaks, or lack of defensible space.  Highly flammable construction materials.  Building lots and subdivisions that are not in compliance with state and local land use and fire protection regulations.  Inadequate entry/escape routes.  Encourage all new homes and major remodels located in the interface to have fire-resistant roofs and residential sprinkler systems. Coordinating Organization: Edmonds Fire Department Estimated Price: To be determined Funding Source: General Fund and Grants as available Timeline: Ongoing Plan Goals Addressed: Protect Life & Property; Increase Public Awareness; Encourage Partnerships; Provide for Emergency & Critical Services; Facilitate Continuity & Recovery Benefit-to Cost Review: 4 Approx Cost + Effectiveness = Priority [ ] 1 – High [ ] 1 – Low [ ] 2 – Lowest [X] 2 – Medium [X] 2 – Medium [ ] 3 [ ] 3 – Low [ ] 3 – High [X] 4 [ ] 5 [ ] 6 – Highest Packet Page 42 of 313 North King and South Snohomish Counties Section III – Multi-Jurisdictional Breakouts Regional Mitigation Plan III - 86 Edmonds September 2010 1 Washington Office of Financial Management, Forecasting Division. Packet Page 43 of 313 AM-4194   Item #: 2. C. City Council Committee Meetings Date: 09/13/2011 Time:15 Minutes   Submitted By:Robert English Department:Engineering Committee:Community/Development Services Type:Information Information Subject Title Introduction to the Capital Facilities Plan (2012-2017) and the Capital Improvement Program (2012-2017). Recommendation from Mayor and Staff Review the Drafts of the Capital Facilities Plan and Capital Improvement Program and provide comments and feedback. Previous Council Action None. Narrative The City's Capital Facilities Plan (CFP) Element is a document updated annually and identifies capital projects for at least the next six years which support the City's Comprehensive Plan. The CFP contains a list of projects that need to be expanded or will be new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not included in the CFP. These preservation projects are identified within the six-year capital improvement program (CIP) along with capital facility plan projects which encompass the projected expenditure needs for all city capital related projects.  CIP vs. CFP The CFP and CIP are not the same thing; they arise from different purposes and are in response to different needs. While the CIP is a budgeting tool that includes capital and maintenance projects, tying those projects to the various City funds and revenues, the CFP is intended to identify longer term capital needs (not maintenance) and be tied to City levels of service standards. The CFP is also required to be consistent with the other elements (transportation, parks, etc) of the Comprehensive Plan, and there are restrictions as to how often a CFP can be amended. There are no such restrictions tied to the CIP.  The draft 2012-2017 CFP is attached as Exhibit 1. The CFP has three project sections comprised of General, Transportation and Stormwater. The draft 2012-2017 CIP is attached as Exhibit 2. The CIP has two sections related to general and parks projects and each project list is organized by the City's financial fund numbers.  The CFP and CIP will be presented to the full City Council on September 27, 2011 and a public hearing is tentatively scheduled for October 4, 2011.  The CFP and CIP will be presented to the Planning Board at their September 28, 2011 meeting.  Staff will provide an overview of the draft 2012-2017 CFP and CIP and would like comments and feedback from the CS/DS Committee.  Attachments Exhibit 1 - Draft CFP (2012-2017) Exhibit 2 - Draft CIP (2012-2017) Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 05:23 PM Public Works Phil Williams 09/09/2011 07:23 AM Parks and Recreation Sandy Chase 09/09/2011 09:18 AM City Clerk Sandy Chase 09/09/2011 09:19 AM Mayor Mike Cooper 09/09/2011 10:26 AM Packet Page 44 of 313 Final Approval Sandy Chase 09/09/2011 10:28 AM Form Started By: Robert English Started On: 09/08/2011 11:05 AM Final Approval Date: 09/09/2011  Packet Page 45 of 313 P a c k e t P a g e 4 6 o f 3 1 3 P a c k e t P a g e 4 7 o f 3 1 3 P a c k e t P a g e 4 8 o f 3 1 3 P a c k e t P a g e 4 9 o f 3 1 3 P a c k e t P a g e 5 0 o f 3 1 3 P a c k e t P a g e 5 1 o f 3 1 3 P a c k e t P a g e 5 2 o f 3 1 3 P a c k e t P a g e 5 3 o f 3 1 3 P a c k e t P a g e 5 4 o f 3 1 3 P a c k e t P a g e 5 5 o f 3 1 3 P a c k e t P a g e 5 6 o f 3 1 3 P a c k e t P a g e 5 7 o f 3 1 3 P a c k e t P a g e 5 8 o f 3 1 3 P a c k e t P a g e 5 9 o f 3 1 3 P a c k e t P a g e 6 0 o f 3 1 3 P a c k e t P a g e 6 1 o f 3 1 3 P a c k e t P a g e 6 2 o f 3 1 3 P a c k e t P a g e 6 3 o f 3 1 3 P a c k e t P a g e 6 4 o f 3 1 3 P a c k e t P a g e 6 5 o f 3 1 3 P a c k e t P a g e 6 6 o f 3 1 3 P a c k e t P a g e 6 7 o f 3 1 3 P a c k e t P a g e 6 8 o f 3 1 3 P a c k e t P a g e 6 9 o f 3 1 3 P a c k e t P a g e 7 0 o f 3 1 3 P a c k e t P a g e 7 1 o f 3 1 3 P a c k e t P a g e 7 2 o f 3 1 3 P a c k e t P a g e 7 3 o f 3 1 3 P a c k e t P a g e 7 4 o f 3 1 3 P a c k e t P a g e 7 5 o f 3 1 3 P a c k e t P a g e 7 6 o f 3 1 3 P a c k e t P a g e 7 7 o f 3 1 3 P a c k e t P a g e 7 8 o f 3 1 3 P a c k e t P a g e 7 9 o f 3 1 3 P a c k e t P a g e 8 0 o f 3 1 3 P a c k e t P a g e 8 1 o f 3 1 3 P a c k e t P a g e 8 2 o f 3 1 3 P a c k e t P a g e 8 3 o f 3 1 3 P a c k e t P a g e 8 4 o f 3 1 3 P a c k e t P a g e 8 5 o f 3 1 3 P a c k e t P a g e 8 6 o f 3 1 3 P a c k e t P a g e 8 7 o f 3 1 3 P a c k e t P a g e 8 8 o f 3 1 3 P a c k e t P a g e 8 9 o f 3 1 3 P a c k e t P a g e 9 0 o f 3 1 3 P a c k e t P a g e 9 1 o f 3 1 3 P a c k e t P a g e 9 2 o f 3 1 3 P a c k e t P a g e 9 3 o f 3 1 3 P a c k e t P a g e 9 4 o f 3 1 3 P a c k e t P a g e 9 5 o f 3 1 3 P a c k e t P a g e 9 6 o f 3 1 3 P a c k e t P a g e 9 7 o f 3 1 3 P a c k e t P a g e 9 8 o f 3 1 3 P a c k e t P a g e 9 9 o f 3 1 3 P a c k e t P a g e 1 0 0 o f 3 1 3 P a c k e t P a g e 1 0 1 o f 3 1 3 P a c k e t P a g e 1 0 2 o f 3 1 3 P a c k e t P a g e 1 0 3 o f 3 1 3 P a c k e t P a g e 1 0 4 o f 3 1 3 P a c k e t P a g e 1 0 5 o f 3 1 3 P a c k e t P a g e 1 0 6 o f 3 1 3 P a c k e t P a g e 1 0 7 o f 3 1 3 P a c k e t P a g e 1 0 8 o f 3 1 3 P a c k e t P a g e 1 0 9 o f 3 1 3 P a c k e t P a g e 1 1 0 o f 3 1 3 P a c k e t P a g e 1 1 1 o f 3 1 3 P a c k e t P a g e 1 1 2 o f 3 1 3 P a c k e t P a g e 1 1 3 o f 3 1 3 P a c k e t P a g e 1 1 4 o f 3 1 3 P a c k e t P a g e 1 1 5 o f 3 1 3 P a c k e t P a g e 1 1 6 o f 3 1 3 P a c k e t P a g e 1 1 7 o f 3 1 3 P a c k e t P a g e 1 1 8 o f 3 1 3 P a c k e t P a g e 1 1 9 o f 3 1 3 P a c k e t P a g e 1 2 0 o f 3 1 3 P a c k e t P a g e 1 2 1 o f 3 1 3 P a c k e t P a g e 1 2 2 o f 3 1 3 P a c k e t P a g e 1 2 3 o f 3 1 3 P a c k e t P a g e 1 2 4 o f 3 1 3 P a c k e t P a g e 1 2 5 o f 3 1 3 P a c k e t P a g e 1 2 6 o f 3 1 3 P a c k e t P a g e 1 2 7 o f 3 1 3 P a c k e t P a g e 1 2 8 o f 3 1 3 P a c k e t P a g e 1 2 9 o f 3 1 3 P a c k e t P a g e 1 3 0 o f 3 1 3 P a c k e t P a g e 1 3 1 o f 3 1 3 P a c k e t P a g e 1 3 2 o f 3 1 3 P a c k e t P a g e 1 3 3 o f 3 1 3 P a c k e t P a g e 1 3 4 o f 3 1 3 P a c k e t P a g e 1 3 5 o f 3 1 3 P a c k e t P a g e 1 3 6 o f 3 1 3 P a c k e t P a g e 1 3 7 o f 3 1 3 P a c k e t P a g e 1 3 8 o f 3 1 3 P a c k e t P a g e 1 3 9 o f 3 1 3 P a c k e t P a g e 1 4 0 o f 3 1 3 P a c k e t P a g e 1 4 1 o f 3 1 3 P a c k e t P a g e 1 4 2 o f 3 1 3 P a c k e t P a g e 1 4 3 o f 3 1 3 P a c k e t P a g e 1 4 4 o f 3 1 3 P a c k e t P a g e 1 4 5 o f 3 1 3 P a c k e t P a g e 1 4 6 o f 3 1 3 P a c k e t P a g e 1 4 7 o f 3 1 3 P a c k e t P a g e 1 4 8 o f 3 1 3 P a c k e t P a g e 1 4 9 o f 3 1 3 P a c k e t P a g e 1 5 0 o f 3 1 3 P a c k e t P a g e 1 5 1 o f 3 1 3 P a c k e t P a g e 1 5 2 o f 3 1 3 P a c k e t P a g e 1 5 3 o f 3 1 3 P a c k e t P a g e 1 5 4 o f 3 1 3 P a c k e t P a g e 1 5 5 o f 3 1 3 P a c k e t P a g e 1 5 6 o f 3 1 3 P a c k e t P a g e 1 5 7 o f 3 1 3 P a c k e t P a g e 1 5 8 o f 3 1 3 AM-4185   Item #: 2. D. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted For:Bertrand Hauss Submitted By:Megan Cruz Department:Engineering Committee:Community/Development Services Type:Action Information Subject Title Authorization to advertise a Request for Qualifications to complete design and right-of-way acquisition for the 212th St SW at 76th Ave W intersection. Recommendation from Mayor and Staff Forward item to the consent agenda for approval at the September 20, 2011 Council meeting. Previous Council Action None. Narrative 212th Street SW @ 76th Avenue W is one of the busiest signalized intersections in the City and is served by two federally classified minor arterial streets. Both arterials provide a critical link to two main activity centers (Downtown Waterfront Area and Medical / Highway 99 Activity Center) in Edmonds. The intersection experiences long queues during peak commute and school hours due to the limited capacity of the intersection. Both approaches of 76th Avenue have two shared lanes (w/ no dedicated left turn lane) and the left turn volumes are very high, and are timed independently by split phasing signal timing. The proposed improvement will provide dedicated left turn lanes on 76th Avenue and concurrent turning movements during the protected left turn phase. The existing westbound lane on 212th Street SW has a high right turn volume with no dedicated right turn lane. An additional improvement includes widening the intersection approach to add a dedicated right turn lane with overlap phasing. This project will increase the capacity and signal operation of the intersection and improve traffic flow, vehicle delay and air quality related to reduced vehicle emissions. A federal grant (through Congestion Mitigation and Air Quality program) for $940,397 was recently secured to begin the design and right of way phases.  The grant requires a local match of 13.5% ($146,700) and this amount will be funded by the Street Fund 112.    Staff will select a consultant in accordance with the City's consultant selection policy.  The design and right of way phases are tentatively scheduled for completion by December 2013. No funding source is currently secured for the construction phase, but  the completion of the design and right of way phases will help the project score well on future grant applications for construction funding.  Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 10:24 AM Public Works Phil Williams 09/08/2011 12:10 PM City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Megan Cruz Started On: 09/07/2011 02:51 PM Final Approval Date: 09/08/2011  Packet Page 159 of 313 AM-4184   Item #: 2. E. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted For:Mike De Lilla Submitted By:Megan Cruz Department:Engineering Committee:Community/Development Services Type:Action Information Subject Title Authorization to advertise a Request for Qualifications (RFQ) for consultant services to update the Sanitary Sewer Comprehensive Plan. Recommendation from Mayor and Staff Forward item to the consent agenda for approval at the September 20, 2011 Council meeting. Previous Council Action None. Narrative The City’s current Sanitary Sewer Comprehensive Plan was written in 2006 and needs to be updated. The update will review, evaluate, and address the following elements of the City’s Sanitary Sewer System: (1) Planning data and demand; (2) Sanitary Sewer System Analysis; (3) System Reliability; (4) Updates to the existing Sewer Model; (5) Regulatory Compliance with the Washington State Department of Ecology; (6) Operations and Maintenance Program; (7) Capital Facilities Plan; and (8) Financial Program. The comprehensive plan will conform to the applicable sections of Chapter 173-240 Washington Administrative Code (WAC) and as further detailed in the Washington State Department of Ecology (WSDOE) document “Criteria for Sewage Works Design.” In addition, the information from the 2010 City of Edmonds Inflow/Infiltration Study shall be incorporated. The update is also necessary for the City to comply with Washington State Growth Management Act. Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 08:06 AM Public Works Phil Williams 09/08/2011 12:09 PM City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Megan Cruz Started On: 09/07/2011 02:41 PM Final Approval Date: 09/08/2011  Packet Page 160 of 313 AM-4182   Item #: 2. F. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted For:Ed Sibrel Submitted By:Megan Cruz Department:Engineering Committee:Community/Development Services Type:Action Information Subject Title Authorization for Mayor to sign easement granted to the City of Edmonds by Sound Transit. Recommendation from Mayor and Staff Forward item to the consent agenda for approval at the September 20, 2011 Council meeting. Previous Council Action None. Narrative The design of the recently-completed Edmonds Sound Transit Station included an 8-inch proposed watermain crossing the south half of the site from West Dayton Street, and looping into the existing watermain at James Street.  The permit for the construction of Edmonds Station was conditioned on Sound Transit granting the City an easement for that purpose.    The City Attorney has reviewed the easement (Exhibit 1) and approves as to form. Attachments Exhibit 1-Easement Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 10:50 AM Public Works Phil Williams 09/08/2011 12:09 PM City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Megan Cruz Started On: 09/07/2011 11:46 AM Final Approval Date: 09/08/2011  Packet Page 161 of 313 Packet Page 162 of 313 Packet Page 163 of 313 Packet Page 164 of 313 Packet Page 165 of 313 Packet Page 166 of 313 Packet Page 167 of 313 Packet Page 168 of 313 Packet Page 169 of 313 Packet Page 170 of 313 Packet Page 171 of 313 Packet Page 172 of 313 AM-4197   Item #: 2. G. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted By:Robert English Department:Engineering Committee:Community/Development Services Type:Information Information Subject Title Update on the Interurban Trail Project. Recommendation from Mayor and Staff Review construction progress with committee. Previous Council Action On June 14, 2011, the CS/DS Committee recommended the award of a construction contract to Trimaxx Construction, Inc. in the amount of $1,368,721 to complete the project.     On June 21, 2011, the City Council awarded a construction contract to Trimaxx Construction, Inc. in the amount of $1,368,721 to complete the project.  Narrative Construction started in July on the Interurban Trail and the contractor has completed the ADA curb ramps on 76th Ave and restriping of 76th Ave to add bike lanes.  Construction work is also underway on widening and grading the new trail alignment and building the necessary retaining walls within the project limits.   Staff will review the current construction budget and the recent progress and changes in scope that have been made on the project. Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 05:21 PM Public Works Phil Williams 09/09/2011 07:26 AM City Clerk Sandy Chase 09/09/2011 09:03 AM Mayor Mike Cooper 09/09/2011 10:26 AM Final Approval Sandy Chase 09/09/2011 10:28 AM Form Started By: Robert English Started On: 09/08/2011 04:22 PM Final Approval Date: 09/09/2011  Packet Page 173 of 313 AM-4188   Item #: 2. H. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted For:Bertrand Hauss Submitted By:Megan Cruz Department:Engineering Committee:Community/Development Services Type:Action Information Subject Title Ordinance amending the Edmonds City Code to add electric vehicle parking provisions. Recommendation from Mayor and Staff Forward item to consent agenda for approval at the September 20, 2011 Council meeting. Previous Council Action None. Narrative Electric or plug-in hybrid vehicles are becoming more common and the City, with the aid of a grant, recently purchased several of these vehicles.  In Edmonds, stations are being installed (through the ChargePoint America network) at City Hall, Public Safety, and City Park parking lots, where the parking stalls will be signed for charging vehicles only. The parking limitation for those vehicles is three hours and the vehicle owner is responsible for the entire charging cost. At the intersection of Main St. @ 6th Ave, several parking stalls will also be for charging vehicles but those can also be used by non-charging vehicles, with 30-minute parking limitations.  The Downtown Parking Committee recommends the following Edmonds City Code (ECC) addition: 8.64.065 Schedule VI-A – Parking time limited for certain periods of time on certain streets.  Proposed Item # 8: Signed parking stalls at City Hall, Public Safety, and City Park parking lots: No use except for electric or plug-in hybrid vehicles for three hours maximum while charging.  Proposed Item #9: Signed parking stalls at 6th Ave. @ Main St. intersection: Thirty-minute limit for any use other than electric or plug-in hybrid vehicles. Electric vehicles and plug-in hybrids: three hours maximum while charging The ordinance has been reviewed and approved by the City attorney’s office. Attachments Exhibit 1 - Ordinance Form Review Inbox Reviewed By Date Engineering Robert English 09/08/2011 10:37 AM Public Works Phil Williams 09/08/2011 12:10 PM City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Megan Cruz Started On: 09/07/2011 04:02 PM Final Approval Date: 09/08/2011  Packet Page 174 of 313 - 1 - ORDINANCE NO. _______ AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC 8.64.065 BY ADDING PARKING LIMITATIONS TO DESIGNATED ELECTRIC VEHICLE PARKING SPACES LOCATED IN THE RIGHT-OF-WAY AND CITY-OWNED PARKING LOTS; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. WHEREAS, the ownership of all-electric vehicles and plug-in hybrids is becoming more common; WHEREAS, such vehicles have need for readily available infrastructure to support their extended use away from home; WHEREAS, parking spaces designated for electric vehicle charging need to be available for that purpose; WHEREAS, the Edmonds City Code does not include any section regarding parking limitations for this purpose; and WHEREAS, upon the recommendation of the Downtown Parking Committee, the City Council finds that a parking restriction actively enabling electric vehicle charging should be added to the Edmonds City Code, in order to make this enforceable; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOW Section 1. Section 8.64.065 of the ECC Schedule VI-A - Parking time limited for certain periods of time on certain streets is hereby amended to read as follows (new language is underlined): Packet Page 175 of 313 - 2 - 8.64.065 Schedule VI-A – Parking time limited for certain periods of time on certain streets. In accordance with ECC 8.48.155 and when signs are erected giving notice thereof, no person shall stop, stand or park a vehicle for a period of time longer than the number of hours set forth below, or between the hours set forth below: Name of Street or Road Hours – Stopped, Standing or Parking Prohibited 1. Sunset Beach access way and Sunset Beach Park Four hours maximum at any one time. 2. West side of Sunset Avenue from Edmonds Street to Caspers Street. Four-hour parking 8:00 a.m. to 10:00 p.m. No parking from 10:00 p.m. to 8:00 a.m.; provided, however, the City Council may adjust the four-hour parking time and the no parking time set forth in this subsection by appropriate motion and upon erection of appropriate signs. 3. West side of Admiral Way from Dayton Street to a point 260 feet southerly. Two-hour parking from 6:00 p.m. on Friday to midnight on Sunday, and from 6:00 p.m. on those days immediately preceding public holidays to midnight on said public holidays. 4. Both sides of the portion of 75th Place west, north of North Meadowdale Road. Four-hour parking, 8:00 a.m. to 10:00 p.m. No parking from 10:00 p.m. to 8:00 a.m. 5. Five parking spaces designated by city engineer and located at the terminus and Two hours maximum between the hours of 8:00 a.m. and dusk.* No parking between dusk and 8:00 Packet Page 176 of 313 - 3 - southerly end of Ocean Avenue. a.m. 6. Both sides of Admiral Way from its intersection with Dayton Street and south thereof to the end of the public right- of-way (approximately 2,300 feet). Three hours maximum at any one time. 7. Bracket’s Landing parking lot Four hours maximum at any one time 8. Signed parking stalls at City Hall, Public Safety, and City Park parking lots No use except for electric or plug-in hybrid vehicles for three hours maximum while charging. 9.Signed parking stalls at 6th Ave. at the Main St. intersection Thirty-minute limit for any use other than electric or plug-in hybrid vehicles. Electric or plug-in hybrid vehicles for three hours maximum while charging. *Dusk is hereby defined as commencing 30 minutes following sunset. Section 2. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Section 3. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum, and shall take Packet Page 177 of 313 - 4 - effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: MAYOR MIKE COOPER ATTEST/AUTHENTICATED: CITY CLERK, SANDRA S. CHASE APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFFREY B. TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. Packet Page 178 of 313 - 5 - SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2011, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: ORDINANCE NO. _______ AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC 8.64.065 BY ADDING PARKING LIMITATIONS TO DESIGNATED ELECTRIC VEHICLE PARKING SPACES LOCATED IN THE RIGHT-OF-WAY AND CITY-OWNED PARKING LOTS ; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2011. CITY CLERK, SANDRA S. CHASE Packet Page 179 of 313 AM-4189   Item #: 2. I. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Mayor Cooper Submitted By:Phil Williams Department:Public Works Committee:Community/Development Services Type:Action Information Subject Title Proposed ordinances setting requirements for responsible bidders and goals for apprenticeship participation on City construction contracts. Recommendation from Mayor and Staff Approval of ordinances Previous Council Action NA Narrative These two ordinances address 1) setting expectations and monitoring progress on the use of apprentices on City construction contracts, and 2) creating criteria to be used in determining whether or not a bidder on a City construction contract is a "responsible bidder" under RCW 39.04.350. Attachments Draft Apprenticeship Ordinance Draft Responsible Bidder Ordinance apprenticeship memo bidder responsibility memo Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Phil Williams Started On: 09/08/2011 09:07 AM Final Approval Date: 09/08/2011  Packet Page 180 of 313 ORDINANCE NO. AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, CONCERNING THE ADOPTION OF APPRENTICE REQUIREMENTS FOR CERTAIN CITY CAPITAL CONSTRUCTION PROJECTS; PROVIDING FOR SEVERABILITY; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the City of Edmonds (the “City”) recognizes that a highly skilled construction workforce is both essential for enhancing economic growth and critical to the successful construction of public works projects; and WHEREAS, apprenticeship training programs are proven to be particularly effective in providing training and experience to individuals seeking to enter or advance in the construction workforce; and WHEREAS, growing participation in apprenticeship programs today will ensure a viable workforce in the construction trade industry tomorrow; and WHEREAS, the responsibility to train the next generation of skilled workers rests with both the public and private sectors; and WHEREAS, the City can create opportunities for training and experience that will help assure that a trained workforce will be available in sufficient numbers in the future for the construction of public works projects; and WHEREAS, the City is committed to working in partnership with labor and business to create a skilled workforce that reflects the diversity of our population and promotes community development, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Packet Page 181 of 313 Section 1. Amended. ECC 18.00 Public Works Requirements, General Requirements 18.00.050 Apprentice Requirements. is hereby amended to add the following section, to read as follows: This section is intended to supplement, and to be followed in conjunction with, the City of Edmonds Purchasing Policies and Procedures, dated January 2009, or as amended. A. Definitions. 1. “Apprentice” means an apprentice enrolled in a state-approved apprenticeship training program. 2. “Contractor” means a person, corporation, partnership, limited liability company, or joint venture entering into a contract with the City to construct a public work. 3. “Labor hours” refers to the total number of hours worked by workers receiving an hourly wage who are directly employed on the site of the public work and who are subject to state or federal prevailing wage requirements. “Labor hours” shall also include hours worked by workers employed by subcontractors on the site of the public work, and shall include additional hours worked as a result of a contract or project adjustment or pursuant to an agreed-upon change order. 4. “Estimated cost” means the anticipated cost of a public work, as determined by the City, based upon the expected costs of materials, supplies, equipment, and labor, but excluding taxes and contingency funds. 5. “Public work” refers to all City funded construction projects that constitute a public work pursuant to RCW 39.04.010 as now or hereafter amended and estimated to cost $250,000 or more. 6. “State-approved apprenticeship training program” means an apprenticeship program approved or recognized by the Washington State Apprenticeship and Training Council. 7. “Subcontractor” means a person, corporation, partnership, limited liability company, or joint venture that has contracted with the contractor to perform all or part of the work to construct a public work by a contractor. Packet Page 182 of 313 B. Apprentice utilization. Apprentices shall be utilized for the construction of public works by contractors and subcontractors in accordance with this section. 1. Apprenticeship utilization program goal. For public works contracts with an estimated cost of Two Hundred Fifty Thousand Dollars ($250,000) or more, the Director of Public Works, or his designee, is authorized to require that up to fifteen percent (15%) of the contract labor hours, including contractor and subcontractor hours, be performed by apprentices. 2. Contract requirements. Contract documents for such public works construction projects shall include provisions detailing the apprentice labor requirements. 3. Monitoring. The City will include an Apprenticeship Utilization Form for contractors to complete when submitting their bid documents, which identifies the intended usage of apprentices by the contractor and any subcontractors. This document will require the identification of individual apprentices by name and Washington State apprenticeship registration number, an estimate of the total apprentice labor hours, and the identification of apprentice hours to be worked by minorities, women, persons with disabilities and disadvantaged youth. This provision is not intended and shall not be used to discriminate against any applicant for training. In addition, the City will require the submittal of an Apprenticeship Verification Form by the contractor at the conclusion of the public works project that will identify the actual work performed by apprentices for the contractor and subcontractors. 4. Failure to meet utilization goal. Failure by a contractor to comply with established apprenticeship requirements, unless otherwise adjusted or waived in writing as set forth below, shall be deemed a breach of contract for which the City shall be entitled to all remedies allowed by law under the contract. Failure to comply with the apprenticeship requirements may also be considered evidence bearing on a contractor’s qualification for award of future contracts with the City. [NOTE: Some jurisdictions require an assessment of $1.00 to $10.00 per hour for each hour the contractor fails to meet the utilization goal instead of a breach of contract provision.] 5. Adjustment and waiver. The Director of Public Works, or his designee, may adjust or waive the requirements of this section for a specific project at any time for the following reasons: Packet Page 183 of 313 (a) The demonstrated lack of availability of apprentices in specific geographic areas; (b) A disproportionately high ratio of material costs to labor hours, which does not make feasible the required minimum levels of apprentice participation; (c) The reasonable and necessary requirements of the contract render apprentice utilization infeasible at the required levels; (d) In order to meet the requirement, the contractor will be forced to displace members of its workforce; (e) The participating contractor has demonstrated a good faith effort to comply with the requirements of this section; and/or (f) Other criteria deemed appropriate that are not inconsistent with the purpose and goals of this section. 6. Reporting. The Director of Public Works, or his designee, shall report to the City Council annually upon the use of apprentices for public works projects. [NOTE: These are Snohomish County’s requirements and may or may not be appropriate for the City.] The report shall include, to the extent it is available: (a) The percentage of labor hours actually worked by apprentices on each project and the total number of labor hours on each project; (b) The number of apprentices by contractor broken down by trade and craft category; (c) The number and percentage of minorities, women, persons with disabilities and disadvantaged youth utilized as apprentices on each project; (d) The number of new apprentices indentured during the reporting year as a result of the City’s apprenticeship requirements; and (e) The percentage of apprentices in training on City projects who have graduated to journey level during the reporting year. Section 2. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, Packet Page 184 of 313 such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Section 3. Effective Date APPROVED: . This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. MAYOR MIKE COOPER ATTEST/AUTHENTICATED: CITY CLERK, SANDRA S. CHASE APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFFREY B. TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. Packet Page 185 of 313 6 SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2011, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, CONCERNING THE ADOPTION OF APPRENTICE REQUIREMENTS FOR CERTAIN CITY CAPITAL CONSTRUCTION PROJECTS; PROVIDING FOR SEVERABILITY; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2011. CITY CLERK, SANDRA S. CHASE Packet Page 186 of 313 ORDINANCE NO. AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, CONCERNING THE ADOPTION OF RESPONSIBLE BIDDER CRITERIA FOR CERTAIN CITY CAPITAL CONSTRUCTION PROJECTS; PROVIDING FOR SEVERABILITY; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the State of Washington enacted RCW 39.04.350 to set forth the mandatory bidder responsibility criteria for the award of public works construction contracts, and to authorize municipalities to adopt supplemental bidder responsibility criteria; and WHEREAS, the City of Edmonds (the “City”) wishes to clarify the rights and responsibilities of the City’s Public Works Department in determining the lowest responsible bidder for awarding the City’s public works construction contracts, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Amended. ECC 18.00 Public Works Requirements, General Requirements 18.00.060 Responsible Bidder Criteria. is hereby amended to add the following section, to read as follows: This section is intended to supplement, and to be followed in conjunction with, the City of Edmonds Purchasing Policies and Procedures, dated January 2009, or as amended. A. Mandatory responsible bidder criteria. 1. The bidder responsibility criteria set forth in this section shall be used by the Public Works Department to establish the minimum requirements for all contractors and subcontractors bidding on City contracts for public work (as those terms are defined in RCW 39.04.010). The bid documents shall set forth the documentation to be submitted by bidders to demonstrate their compliance with the mandatory responsible bidder criteria. 2. To be considered a responsible bidder and qualified to be awarded a City contract for public work, the bidder must: Packet Page 187 of 313 (a) At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW (contractor registration); (b) Have a current state unified business identifier (UBI) number; (c) If applicable, have: (i) industrial insurance coverage for the bidder’s employees working in Washington as required in Title 51 RCW; (ii) a state employment security department number as required in Title 50 RCW; and (iii) a state excise tax registration number as required in Title 82 RCW; (d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or RCW 39.12.065(3); and (e) Until December 31, 2013, not have violated RCW 39.04.370 more than one time as determined by the State Department of Labor and Industries. 3. A bidder must verify mandatory responsibility criteria for each first tier subcontractor, and a subcontractor of any tier that hires other subcontractors must verify mandatory responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility criteria listed in RCW 39.04.350(1) and ECC 18.00.060 and possesses an electrical contractor license, if required by chapter 19.28 RCW, or an elevator contractor license, if required by chapter 70.87 RCW. This verification requirement, as well as the mandatory responsibility criteria, must be included in every public works contract and subcontract of every tier. B. Supplemental responsible bidder criteria. 1. In addition to the mandatory bidder responsibility criteria set forth in ECC 18.00.060 (A), the Public Works Department may adopt in connection with a particular project relevant supplemental bidder responsibility criteria which the bidder must meet. Those supplemental criteria, including the basis for evaluation and the deadlines for requesting modification of the supplemental bidder responsibility criteria and for appealing a determination that a low bidder is not Packet Page 188 of 313 responsible under the supplemental bidder responsibility criteria, shall be provided in the invitation to bid or bidding documents. 2. As relevant to a particular project, supplemental bidder responsibility criteria may be included to require that: (a) The bidder shall not owe delinquent taxes to the Washington State Department of Revenue without a payment plan approved by the Department of Revenue; (b) The bidder shall not currently be debarred or suspended by the federal government; (c) The bidder shall have complied with minority and women’s business enterprises, disadvantaged business enterprises, or other similar utilization requirements or goals on federally-funded public works projects with such requirements completed by the bidder within three years of the bid submittal date, unless there are extenuating circumstances acceptable to the City; (d) The bidder shall not be listed as an ineligible contractor on the federal GSA Excluded Parties List System set forth by 31 U.S.C § 6101 and Executive Order 13496; (e) If bidding on a public works project subject to the apprenticeship utilization requirements in ECC 18.00.050, the bidder: (i) shall not have been found out of compliance with apprenticeship requirements of ECC 18.00.050 unless otherwise excepted or waived in writing by the Mayor or the Mayor’s designee pursuant to that section for a one-year period immediately preceding the date of the bid submittal deadline; and (ii) shall have complied with apprenticeship utilization goals on public works projects having such requirements that were completed by the bidder within a three-year period immediately preceding the date of the bid submittal deadline, unless there are extenuating circumstances acceptable to the City; (f) The bidder shall not have been convicted of a crime involving bidding on a public works contract within five years from the bid submittal deadline; (g) The bidder’s standard subcontract form shall include the subcontractor responsibility language required by RCW 39.06.020, and the bidder shall have an established procedure which it utilizes to validate the Packet Page 189 of 313 responsibility of each of its subcontractors. The bidder’s subcontract form shall also include a requirement that each of its subcontractors shall have and document a similar procedure to determine whether the sub-tier subcontractors with which it contracts are also “responsible” subcontractors as defined by RCW 39.06.020; (h) The bidder shall not have a record of excessive claims filed against the retainage or payment bonds for public works projects during the previous three years that demonstrate a lack of effective management by the bidder of making timely and appropriate payments to its subcontractors, suppliers, and workers, unless there are extenuating circumstances acceptable to the City; (i) The bidder shall have successfully completed projects of a similar size and scope as required by the contract documents for the project. In evaluating whether projects were successfully completed, the City may check owner references for previous projects and evaluate the owner’s assessment of bidder performance, including but not limited to quality control, safety record, timeliness of performance, use of skilled personnel, management of subcontractors, availability of and use of appropriate equipment, compliance with contract documents, and management of submittals process, change orders and close-out; (j) The bidder shall not have had any public works contract terminated for cause by a government agency during the five year period immediately preceding the bid submittal deadline for the project, unless there are extenuating circumstances acceptable to the City; (k) The bidder shall not have judgments entered by a court of law against the bidder within five years of the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts, unless there are extenuating circumstances acceptable to the City; and (l) The bidder shall not have a documented pattern of prevailing wage complaints filed against it within five years of the bid submittal date that demonstrates a failure to pay workers prevailing wages, unless there are extenuating circumstances acceptable to the City. 3. Supplemental bidder responsibility criteria may include any other criteria determined by the City to be relevant to the particular project being bid, including but not limited to the ability, capacity and skill of the bidder to perform, the experience and efficiency of the bidder, the financial situation of the bidder, and the performance of the bidder on previous contracts or services. 4. In a timely manner before the bid submittal deadline, a potential bidder may request that the City modify the supplemental bidder responsibility criteria. The Packet Page 190 of 313 City must evaluate the information submitted by the potential bidder and respond before the bid submittal deadline. If the evaluation results in a change of the criteria, the City must publish an addendum to the bidding documents identifying the modified criteria. 5. If the bidder fails to supply information requested concerning responsibility within the time and manner specified in the bid documents, the City may base its determination of responsibility upon any available information related to the supplemental criteria or may find the bidder not responsible. 6. If the City determines a bidder to be not responsible, the City must provide, in writing, the reasons for the determination. The bidder may appeal the determination within the time period specified in the bidding documents by presenting additional information to the City. The City must consider the additional information before issuing its final determination. If the final determination affirms that the bidder is not responsible, the City may not execute a contract with any other bidder until two business days after the bidder determined to be not responsible has received the final determination. 7. The invitation to bid or bidding documents shall specify the times, manner and means of communications, deadlines and determinations required by this section. Section 2. Severability Section 3. . If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Effective Date APPROVED: . This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. MAYOR MIKE COOPER Packet Page 191 of 313 ATTEST/AUTHENTICATED: CITY CLERK, SANDRA S. CHASE APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFFREY B. TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. Packet Page 192 of 313 7 SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2011, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, CONCERNING THE ADOPTION OF RESPONSIBLE BIDDER CRITERIA FOR CERTAIN CITY CAPITAL CONSTRUCTION PROJECTS; PROVIDING FOR SEVERABILITY; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2011. CITY CLERK, SANDRA S. CHASE Packet Page 193 of 313 Packet Page 194 of 313 Packet Page 195 of 313 AM-4187   Item #: 2. J. City Council Committee Meetings Date: 09/13/2011 Time:15 Minutes   Submitted For:Mayor Cooper/Councilman Wilson Submitted By:Jana Spellman Department:City Council Review Committee: Community/Development Services Committee Action: Type:Information  Information Subject Title Discussion regarding creating a diversity commission/youth commission. Recommendation from Mayor and Staff Previous Council Action On August 2, the Edmonds City Council made and passed the following motion: COUNCILMEMBER PLUNKETT MOVED, SECONDED BY COUNCILMEMBER BERNHEIM, TO REFER THE RESOLUTION TO THE COMMUNITY SERVICES/DEVELOPMENT SERVICES COMMITTEE. MOTION CARRIED (5-2), COUNCILMEMBER WILSON AND COUNCIL PRESIDENT PETERSON VOTING NO. Attach 1:  Diversity Commission Resolution Attach 2:  Lynnwood Diversity Ordinance Narrative This item has been placed on the CS/DS Committee's agenda for discussion. Attach 3:  Minutes of 8/2/11 Council Meeting Attachments Attach 1 - Diversity Commission Resolution Attach 2 - Lynnwood Diversity Ord. Attach 3 - 8-2-11 Approved Council Minutes Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jana Spellman Started On: 09/07/2011  Final Approval Date: 09/08/2011  Packet Page 196 of 313 No: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS SUPPORTING THE CREATION OF AN ORDINANCE(S) FOR THE PURPOSES OF FUTURE DELIBERATION REGARDING THE CREATION OF COMMISSION STRUCTURES RELATED TO OUTREACH, EDUCATION AND ENGAGEMENT Whereas, the City Council recognizes the increasing demographic, economic, ethnic and other diversity arising within and around the City of Edmonds, and Whereas, the City Council appreciates the efforts by citizen leaders who wish to make our city government even more inclusive and engaging of our diverse community, and Whereas, the City Council sees future deliberation on the creation of formal commission structures to further support these citizen efforts and with which to prioritize City efforts to reach out and engage relevant communities, Now Therefore be it Resolved that the Council supports the creation of an ordinance(s) for the purposes of future deliberation regarding the creation of commission structures related to outreach, education, and engagement, and be it Further Resolved that the Council recognizes and appreciates the diversity within our Edmonds community and recognizes those populations may warrant additional effort on the part of the City to engage in our representative form of democracy. PASSED, APPROVED AND ADOPTED this ____ day of _____, 2011. ____________________________________ MAYOR, MIKE COOPER ATTEST/AUTHENTICATED: _____________________________________ CITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO: Packet Page 197 of 313 CITY OF L YNN\VOOD ORDINANCE NO. 2488 AN ORDINANCE OF THE CITY OF LYNNWOOD, '¥ASHINGTON, ESTABLISIDNG A NEW CHAPTER OF THE LYNNWOOD MUNICIPAL CODE CREATING A NEIGHBORHOOD AND DEMOGRAPHIC DIVERSITY COMl\USSION AND SETTING FORnI THE DUTIES, MEMBERSHIP,AND APPLICATION OF ADVISORY BODY GENERAL PROVISIONS RELATED THERETO;AND ALSO PROVIDING FOR SEVERABILITY, AN EFFECTIVE DATE, AND FOR SUl\1MARY PUBLICATION. WHEREAS,the national 2000 census provides important objective information on racial and ethnic diversity;on the aging, income, employment and standard of living of our citizens, and also on housing and places of work;and 'VHEREAS,the national 2000 census shows that the City of Lynnwood is rapidly becoming a more demographically diverse community and home to people from many different cultures and countries; and WHEREAS, the Lynnwood City Council has previously adopted Resolution No.2002- 19 supporting our citizens' efforts to participate in encouraging mutual understanding about our increasing demographic diversity in our city through a diversity project; and WHEREAS,Resolution No.2002-19 stated in paragraph 6,«that upon recommendations of the citizens involved in the diversity project,the City of Lynnwood will consider and determine the nature and scope of the types of support which it can provide to most likely ensure the success of the project in OUT community;" and 'WHEREAS, a citizens Diversity Task Force has presented to the Lynnwood City Council its report and recommendations dated February 23,2004; and 'VHEREAS,the members of the Diversity Task Force and the City of Lynnwood have been recognized by the Association for Washington Cities for its leadership in developing a diversity project; and \VHEREAS,good stewardship of our city and community means making and following through on commitments to reach out to our citizens, and ensuring that City Government and its Internal Operations, programs and services are accessible and understandable by everyone,and in helping strengthen our sense of community;and WHEREAS,RCW 35A.l1 authorizes the City Council to organize and regulate internal city operations and processes,and to define the functions,duties and authority of city officers and staff; NOW, THEREFORE,THE CITY COUNCIL OF THE CITY LYNNWOOD DOES HEREBY ORDAIN: Section 1.New Lynnwood Municipal Code Chapter and Sections. There is hereby IfIII Packet Page 198 of 313 Position No.1: Ending December 31,2006 Position NO.2: Ending December 31,2006 Position No.3: Ending December 31, 2006 Position No.4: Ending December 31.2007 Position No.5:Ending December 31, 2007 Position No.6: Ending December 31,2007 Position No.7:Ending December 31,2007 established in the Lynnwood Municipal Code, Chapter 2.58 entitled, "Neighborhoods & Demographic Diversity Advisory Commission." Each section herein, is a new section to be included within Chapter 2.58. 2.58.010 Created. There is hereby created and established a Neighborhood and Demographic Diversity Advisory Commission of the city of Lynnwood composed of seven members as hereinafter provided. 2.58.020 Duties. The commission is hereby declared to be an advisory body of the city of Lynnwood whose duties shall be to monitor demographic trends in our city and to identify and recommend to the mayor and city council ways to encourage mutual understanding among our citizens about the increasing demographic diversity of our city through, but not limited to: 1.Connecting and partnering with neighborhood,community, educational, business, and social service groups and organizations; 2.Sponsoring city-wide, neighborhood and community events, which would include opportunities for heritage and cultural events; and 3.Programs for engaging citizens and community leaders in an wholistic approach including dialogues, education, and training about diversity issues. 2.58.030 Membership appointment - Term. Members of the commission shall be appointed to a position for a term of two years (or for fulfillment of an unexpired term).Appointees shall serve terms as follows: Any person may be removed from the commission by the mayor, with approval of the city council. 2.58.040 General Advisory Provisions - Compliance The commission structure, operations and appointments thereto, shall comply with the general provisions for advisory bodies in LMC 2.24. Section 2. Severability. If any section,sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section,sentence,clause OT phrase of this ordinance. Packet Page 199 of 313 SIGNED AND APPROVED by the Mayor of the City of Lynnwood, Washington,this 12th day of October, 2004. Section 3.Effective Date and Summary Publication. This ordinance,being an exercise of a power specifically delegated to the City legislative body,is not subject to referendum, and shall take effect January 1, 2005 and publication of an approved summary thereof consisting of the title. ADOPTED by the City Council of the City of Lynnwood,Washington,at its regular meeting held the 11th day of October,2004. Attested!Authenticated by: ~'--¥'-'ic~~~-!e---r=fo~~~'~~ Finance Director Approved As To Fonn Office of the City Attorney: Packet Page 200 of 313 Edmonds City Council Approved Minutes August 2, 2011 Page 13 Council President Peterson invited citizens and Councilmembers interested in participating on the pro and con committees to contact him via email at Peterson@ci.edmonds.wa.us. Mayor Cooper advised Mr. Taraday will write the explanatory statement. Mr. Taraday advised the pro and con statements are due on August 30. 6. DISCUSSION REGARDING A DIVERSITY COMMISSION Councilmember Wilson explained Edmonds has an increasingly diverse population. According to the 2010 Census 9.9% of residents are foreign born and 11.6% speak a language other than English at home. Diversity includes age as evidenced by strollers on City streets and the active Senior Center; economic with Edmonds having some of the most affluent residents and some of the most disadvantaged populations; an active LGBT community at the high school; and an openly gay member of the legislature who serves the 21st Legislative District. A group of citizens asked to present the idea of a Diversity Commission to the Council. He will offer a resolution that gives a stamp of approval for citizens, staff and him to create an outlines of a Commission or Commissions focused on diversity. Carol Schillios, Edmonds, explained this presentation is to, 1) open a conversation about diversity, 2) describe what might be meant by diversity, and 3) to explore the possibility and ask for the Council’s support for a forum for conversations about diversity. The 2010 Census indicates there is social, demographic and economic diversity. Of the nearly 40,000 Edmonds residents, 18,700 are male and 20,816 are female. There are 13,000 people 62 years of age and older and 9,000 kids enrolled in school of which 6,000 are elementary and high school. Approximately 3,000 or 6% of the Edmonds population are Asian and over 1,500 or 4% are Latino. The goal of a diversity commission is to explore how they are represented, not to say they are not represented but to open community relationships and explore the diversity, whether by bringing different age groups together, bringing different ethnicities together, or learning about different culture. A diversity commission would enrich the community, open communication as well as have a direct effect on public safety. She cited an example of someone afraid of a group of young people with purple hair. That discomfort can be bridged by helping people understand each other, bringing different age groups together and creating forums for learning about different cultures. In the last 10 years, nearly 11% foreign born citizens have moved into Edmonds. Over 6,000 people in the census reported they are disabled. The commission could explore how those people are served. Over 2,000 women reported in the census they are widowed. She relayed a woman who visited her shop who had not been out in public for months because she did not know what services were available. In 1999 there were over 300 families below the poverty level. There are two Section 8 housing complexes in the Edmonds bowl; the diversity commission could consider the needs of the low income residents. She clarified they were not asking the City for money; they want a forum to engage people in an effort to enrich the community. Other communities have been exploring diversity commissions and a variety of issues. The structure of the commission is unknown but she was certain there are unheard voices in the city and a diversity commission can enhance public safety and inform decision-making. There is a fair percentage of residents who speak limit English; she questioned how the City communicates with that population. She encouraged the Council to support the creation of a forum to honor and celebrate diversity. Rey Gardea, Edmonds, incoming junior at Edmonds-Woodway High School, accompanied by her friend and classmate, Taylor Minor, commented that in addition to diversity, youth are a very important part of the community. She viewed Edmonds as a diverse community encompassing multiple age groups, races and lifestyles. There is huge potential in the City, both economically and socially, and as future citizens of Edmonds, they would like to open dialogue regarding an ethnic diversity commission. She summarized Packet Page 201 of 313 Edmonds City Council Approved Minutes August 2, 2011 Page 14 they do not want youth to be feared in Edmonds. Youth are the future and have a huge economic presence in the City that is often unrecognized. She envisioned events that would unite age groups socially. She was also interested in political education for youth, pointing out a more educated youth will result in a more successful future. Per the 2010 census younger people are moving to Edmonds bringing new social and economic problems and challenges. A youth commission could address those issues from the youth perspective as well provide ideas regarding economic development from their perspective. A youth commission will provide a voice for the future of the City as well as a way to educate potential future leaders. Stacy Gardea, Edmonds, explained as a Hispanic woman, she wants to open the doors to allow exploration. She met with Edmonds-Woodway High School’s Principal and Vice Principal today and they were excited about a youth commission. She encouraged the Council to allow a dialogue to be opened, to determine what is needed. She envisioned the two commissions addressing issues and evolving over time. Councilmember Plunkett was uncertain what was meant by diverse cultures not being heard and youth not being recognized. He asked why certain cultures’ voices were not heard and what the City did that closed doors and did not recognize or hear. Ms. Schillios explained the goal is to explore what needs exists. Some of the young people who visit downtown are seeking educational things; perhaps a larger service learning program to learn about different cultures could be explored. She noted the high schools in the area have clubs for different minority groups to assist them explore their needs. There is a huge Russian population in the area; serving at the food bank recently, she found many of them speak very little English. Ms. Gardea wanted a voice for different ethnicities and youth. She recalled a meeting with a group of IB students to discuss the national budget and most did not know how the City’s Police Department was paid. She wanted an opportunity to bring City government to the youth. There are not always activities in the City that attract and promote youth; the kids need things to do. The Economic Development Committee has a lot of ideas but they are often for older citizens. For example, there could be paddle boats on the waterfront. Councilmember Fraley-Monillas commented her background is State employment where there is a very diverse population. She thanked Ms. Schillios for the work she does. She lives in a diverse family where English is not the first language and understood the cultural issues in a diverse family. For Councilmember Fraley-Monillas, Ms. Gardea advised there is interest in forming two commissions, a diversity commission and a youth commission. Ms. Schillios acknowledged the definition of the commissions has not been defined. They are seeking the City’s support to explore it. It may be one forum with subgroups to explore different issues. Direction from the Council will be important with regard to the structure of the commission(s). Although the structure is uncertain, the goal is enrichment. Councilmember Fraley-Monillas suggested including people with disabilities and intellectual disabilities in the forum. Councilmember Buckshnis suggested using the EDC as a venue. Ms. Gardea responded that was a possibility in the future, the EDC has been considering some very large issues recently. There is a group of energetic young people interested in being involved; a youth commission will give them a voice. Councilmember Buckshnis suggested creating a youth subgroup of the EDC. She pointed out Parks & Recreation Director Carrie Hite is exploring opportunity for recreational concessions on the waterfront. Councilmember Bernheim commented the questions they have raised have outlets and means of success in far more areas than a formal government setting. These issues will not be solved by only a Council commission. Everyone shares in the effort to help their fellow men, women and children who are unable Packet Page 202 of 313 Edmonds City Council Approved Minutes August 2, 2011 Page 15 to cope as effectively as others. He was supportive of any group of people that wanted to get together to help improve the community. Ms. Gardea assured the intent was not for the Council to make a decision tonight; the intent was to open a dialogue for future discussion. Councilmember Bernheim preferred to refer the issue to the Public Safety/Human Resources or Community Service/Development Services Committee. Mayor Cooper opened the opportunity for public input. There were no members of the public present who wished to comment. Councilmember Wilson advised the resolution was intended to get Council approval to move forward. He was happy to do it himself and bring it back to a committee or to full Council. He preferred to work with staff and citizens and return to the full Council for consideration. COUNCILMEMBER WILSON MOVED, SECONDED BY COUNCILMEMBER PETSO, TO APPROVE RESOLUTION 1255, SUPPORTING THE CREATION OF AN ORDINANCE(S) FOR THE PURPOSES OF FUTURE DELIBERATION REGARDING THE CREATION OF COMMISSION STRUCTURES RELATED TO OUTREACH, EDUCATION AND ENGAGEMENT. Councilmember Buckshnis inquired about the statement on the agenda that public comment will be received, questioning whether notification was required when public comment was taken. City Attorney Jeff Taraday answered there is no legal requirement for public hearing or public comment on a resolution. It is at the Council’s discretion to invite public input. Mayor Cooper explained the Council President can agree to allow public comment on any agenda item. A public hearing requires specific notice. Councilmember Plunkett commented the Council adopted the agenda; if there was a question about public comment on a specific agenda item, it could have been raised at that time. He looked forward to work being done regarding diversity. He preferred to have citizens work on it and return to the Council. He was uncomfortable with the wording in the resolution, that the Council supports the creation of an ordinance, as he was uncertain whether an ordinance was needed. He suggested a resolution and/or ordinance return to the Council after further work has been done. Councilmember Bernheim preferred to have the matter considered by a Council committee. He preferred to adopt a resolution in support of a commission, not regarding future adoption. COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER BERNHEIM, TO REFER THE RESOLUTION TO THE COMMUNITY SERVICES/DEVELOPMENT SERVICES COMMITTEE. Councilmember Wilson questioned referring a resolution that committed the Council to do nothing to a committee. Councilmember Fraley-Monillas explained her intent was to have the group that presented to the Council discuss their vision for the forum with the committee. Mayor Cooper suggested if the Council was uncomfortable with the resolution, they pass a motion of support and allow the Council President to determine how to proceed. COUNCILMEMBER FRALEY-MONILLAS WITHDREW THE MOTION. Council President Peterson advised before Councilmember Fraley-Monillas’ motion, he had added discussion regarding a diversity commission/youth commission to the CS/DS Committee’s September 13 agenda. He expressed support for the resolution. Packet Page 203 of 313 Edmonds City Council Approved Minutes August 2, 2011 Page 16 COUNCILMEMBER PLUNKETT MOVED, SECONDED BY COUNCILMEMBER BERNHEIM, TO REFER THE RESOLUTION TO THE COMMUNITY SERVICES/DEVELOPMENT SERVICES COMMITTEE. MOTION CARRIED (5-2), COUNCILMEMBER WILSON AND COUNCIL PRESIDENT PETERSON VOTING NO. Mayor Cooper expressed his strong support for this effort. He encouraged the Council not to get bogged down in the committee structure. The Council will need to discuss staff support for a diversity/youth commission. He suggested it may be preferable to utilize the energy of the people in the community who want to work on this and allow it to proceed as an ad hoc group. If the CS/DS committee decided to allow the community members to proceed with creating something more tangible, Councilmember Plunkett asked whether they could proceed without returning to the Council. Council President Peterson preferred to have it return to the Council. Councilmember Wilson advised the Public Safety/Human Resources Committee will be discussing this at their meeting next week. 7. MAYOR'S COMMENTS Mayor Cooper reported he participated as a judge in the sand sculpture contest at Marina Beach on August 1. He commented on the amazing creativity and artistic abilities. He commended the Parks & Recreation staff, Tammy Rankins in particular, and Namas Candy who sponsored the event. He relayed a call from the media after the event who said they were unable to find a parking place to take photographs of the event. He concluded the sculpture contest was another example of how hard the Parks & Recreation staff works. 8. COUNCIL COMMENTS Councilmember Petso reported the audit has commenced. It was mentioned at the entrance interview that it is less expensive and questions/concerns are more likely to be considered if they are raised now rather than later. Councilmember Petso announced the Edmonds Center for the Arts fundraising auction in September. She encouraged anyone interested in contributing to the auction to contact Jamie Herlich at the ECA. Councilmember Buckshnis reported on Step Out Edmonds, the Senior Center walking program. She announced the Edmonds Senior Center is also holding its annual auction in September. She encouraged Councilmembers and/or the Mayor to donate lunch for four as well as other items for the auction. Councilmember Bernheim expressed his support for the diversity groups. To the comment that the commission does not need any staff, he explained the commission cannot be under the city’s framework and not spend City money due to the need for staff to be assigned to the commission, reports, etc. That is yet another example of the need for a levy. Government tasks are not increasing because of new buildings but the increase in the day-to-day activities. Councilmember Fraley-Monillas reported she helped with the introduction of Reilly & Maloney at Concerts in the Park on Sunday. She encouraged the public to attend the free concerts 3:00 -4:00 p.m. at City Park on Sundays through the end of August. Councilmember Wilson relayed there has been a shortage of participation at Yost Pool this summer. His children attend swim classes daily but if not enough people go to family and/or recreation swim time, it will be part of the budget conversation. He encouraged the public to swim at Yost Pool. He also reminded Packet Page 204 of 313 AM-4170   Item #: 2. K. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Councilman Bernheim Submitted By:Jana Spellman Department:City Council Committee:Community/Development Services Type:Information Information Subject Title Parking Proposal (Councilmember Bernheim). Recommendation from Mayor and Staff Previous Council Action N/A Narrative • Eliminate three-hour free parking • In BD-1 zone, two hours free, pay for anything over that, up to four hours. • In other downtown zones, including along Admiral Way in the “Port District” to create commuter, transit-oriented parking, two hours free, pay for anything over that, up to 14 hours. I expect this would have to be on a “kiosk” basis. The kiosk is programmed for no charge whenever anybody asks for parking up to two hours.  It’s programmed to give two hours free when anyone punches in a request for more than two hours. I also attach an email received from the parking enforcement chief in the City of Kirkland regarding that city’s “electronic chalking” system. As far as this proposal goes, I think it comes down to this: if we want to do it, we can figure out a way to do it. If we don’t want to do it, we don’t need to pursue it further. Attachment:  E-mail from Kirkland Police Lieutenant Mike Murray Attachments Murray-Kirkland Police e-mail Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jana Spellman Started On: 08/31/2011 08:59 AM Final Approval Date: 09/08/2011  Packet Page 205 of 313 From:Mike Murray To:"Stephen A. Bernheim" Subject:RE: parking technology ... Date:Friday, August 26, 2011 4:21:53 PM Council Member Bernheim, Thanks for your question. However, I don’t think that this system will work in the way you asked. It works in really two manners; the way we are using it is for timed parking or “virtual chalking” is what it is called. So in all of our 30 minute, 1 hour, 2 hour, 3 hour and 4 hour spaces, instead of marking tires with chalk and returning, our Parking Enforcement Officer (PEO) makes a pass which scans the license plates and vehicles. When she makes her next pass and a vehicle is parked over the selected time limit, it sounds an alarm, she verifies the vehicle and photos, then issues the citation. The other manner it can be used is zone parking or permit parking. Zone parking is if a vehicle is parked over the time limit in a specific zone that might be set up. Permit parking is where the license plates of permitted vehicles allowed to park in a certain area are entered into the computer, and ignored when the PEO makes their pass. The computer alerts them to non- permit paying vehicles. This is mainly how Seattle PD is using their system. In order to do what you would like, the pay machine would have to interface directly with the License Plate Reader and upload the vehicle information of who had paid. I do not believe this technology is available. Or, the PEO would have to input the license plates of those who had paid, which means she would either have to get some kind of list from the pay machine (not sure if this is possible) or walk the lots and look for the pay stubs. This would be labor intensive for the PEO. Because the vehicle license information could not be transferred to the reader, you basically just have a pay and display lot with a 4 hour max and the first 2 hours free for those who paid. So that means the PEO is out and looking for displayed paid parking permits. I hope this helps with your question. Lieutenant Mike Murray Operations Divison Kirkland Police Department 123 5th Ave Kirkland, WA 98033 425-587-3402 mmurray@kirklandwa.gov From: Stephen A. Bernheim [mailto:steve@stevebernheim.com] Sent: Tuesday, August 23, 2011 10:16 AM To: Mike Murray Subject: parking technology ... Mike: Here in Edmonds, I'd like to try to accomplish the following parking regulation: Packet Page 206 of 313 Have 2 hours FREE parking; In our shopping zone, allow shoppers to pay for an additional two hours (in addition to the 2 free hours), and In other downtown zones, allow commuters the same two free initial hours, but allow them to pay by the hour up to an additional 12 hours. So...people who don't pay would get a ticket after two hours; shoppers would be allowed to park up to four hours, with the first two hours free; and commuters would be allowed to park up to 14 hours, with the first two hours free. Can your electronic chalking system help us do that ? Steve Bernheim Edmonds City Council # 6 http://www.ci.edmonds.wa.us/cp6.stm 512 Bell St. Edmonds WA 98020 Council Office Hours: after 4:30 p.m. 425-744-3021 (desk/message) 425 712 8418 (fax) 206 240 5344 (cell) council@stevebernheim.com Note: My new email address is MMurray@kirklandwa.gov and you can now findthe City of Kirkland online at www.kirklandwa.gov. Packet Page 207 of 313 AM-4195   Item #: 3. A. City Council Committee Meetings Date: 09/13/2011 Time:30 Minutes   Submitted For:Jim Tarte Submitted By:Jim Tarte Department:Finance Committee:Finance Type:Information Information Subject Title Discussion of refunding and issuing new bonds. Recommendation from Mayor and Staff Previous Council Action Ordinance 3837 Narrative In February 2011, City Council passed Ordinance 3837 to refund four bonds (three LTGO and one Water & Sewer Revenue bond).  Interest rates have decreased that allow two more bonds to be refunded at a cost savings to the City.  Phil Williams will continue a discussion of a plan to issue new bonds for water, sewer and storm services.  Alan Dashen of Dashen & Associates will discuss the best approach to refund and issue new bonds for LTGO and Water & Sewer Revenue bonds.  Attachments Ordinance 3837 Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 01:11 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jim Tarte Started On: 09/08/2011 11:24 AM Final Approval Date: 09/08/2011  Packet Page 208 of 313 Packet Page 209 of 313 Packet Page 210 of 313 Packet Page 211 of 313 Packet Page 212 of 313 Packet Page 213 of 313 Packet Page 214 of 313 Packet Page 215 of 313 Packet Page 216 of 313 Packet Page 217 of 313 Packet Page 218 of 313 Packet Page 219 of 313 Packet Page 220 of 313 Packet Page 221 of 313 Packet Page 222 of 313 Packet Page 223 of 313 Packet Page 224 of 313 Packet Page 225 of 313 Packet Page 226 of 313 Packet Page 227 of 313 AM-4196   Item #: 3. C. City Council Committee Meetings Date: 09/13/2011 Time:5 Minutes   Submitted For:Carl Nelson Submitted By:Carl Nelson Department:Finance Committee:Finance Type:Information Information Subject Title Update of Scope of Services of Web Site Professional Services Agreement. Recommendation from Mayor and Staff NONE Previous Council Action Agreement to update City's web site and work with Departments and coordinating committee has been proceeding since December of 2010. (see agenda memo #AM-3579) Narrative Creating a new City web site is proceeding (see www.edmonds-wa.gov for draft web pages) and the City is approaching the launch of the new site.  Updated site launch is now anticipated the latter part of September. This agenda item is to inform the City Council of the need to expend additional funds to complete the new website. Due to the extensive amount of work related to designing and refining web page templates, creating/deleting new/old web pages, inserting/deleting hyperlinks, creating a Sustainability website (paid for by the Energy Efficiency Conservation Block Grant) in order to launch by July 4th, and an unknown need to migrate to a more recent release of the Content Management System (Joomla 1.7), additional work above and beyond the originally identified scope of work is/was necessary. These combined efforts result in a total anticipated increase of about $16,000 in the "not to exceed" amount of the Professional Services contract moving the total from $35,000 to $51,000. Funding needed to pay for the increase comes from the Energy Efficiency Conservation Block Grant ($2,995), Information Services ($8,005), Economic Development ($2,000) and Public Works ($3,000).  Fiscal Impact Fiscal Year:2011 Revenue:Expenditure:$36,000 Fiscal Impact: Revenue to pay for subject contract increases will come from a portion of the Energy Grant, Economic Development communications line item, Information Services - maintenance and repair line item, Public Works professional services. Attachments Web Update Agreement Updated Scope of Services Form Review Inbox Reviewed By Date Community Services/Economic Dev.Stephen Clifton 09/09/2011 08:56 AM City Clerk Sandy Chase 09/09/2011 09:03 AM Mayor Mike Cooper 09/09/2011 10:26 AM Final Approval Sandy Chase 09/09/2011 10:28 AM Form Started By: Carl Nelson Started On: 09/08/2011 01:35 PM Packet Page 228 of 313 Final Approval Date: 09/09/2011  Packet Page 229 of 313 Packet Page 230 of 313 Packet Page 231 of 313 Packet Page 232 of 313 Packet Page 233 of 313 Packet Page 234 of 313 Packet Page 235 of 313 Packet Page 236 of 313 Packet Page 237 of 313 City of Edmonds 121 FIFTH AVENUE N. ● EDMONDS, WA 98020 ● 425-771-0251 COMMUNITY SERVICES DEPARTMENT Mike Cooper Mayor {BFP826940.DOC;1\00006.900150\ } 1 Exhibit C Update to Scope of Services In follow-up to the work Exhibit A & B of the Dec 16th Professional Services Agreement with Judd Boyer Design the City has requested additional work to: • Migrate to version Joomla 1.7 templates and modules produced from Exhibit A &B scope and calendar. • To complete and refine requests from departments after reviewing original web pages from the work completed under Exhibit A & B • Make available for July 4th launch a separate web site “Edmonds Energy” based on the “sustainability” section of the web site. (To be paid for from Energy Grant). The hourly rate for providing the above services will be $45/hr. Given the estimated 635 hours for City web plus the 47Hrs for Edmonds Energy, and anticipated maintenance over the next 12 months an additional $16,000 be added to the $35,000 in Section 2A Payments, raising the not to exceed amount to $51,000. Below is a breakdown of the anticipated Calendar of Activities 2011 and estimated Cost. Jan – Mar (120Hrs = $5,400) Template and Module Compatibility for Joomla 1.7 • Aurora & Life template configuration and modifications by Depratment • JCE Edit Config and PDF content access • Events Component • Forms Component • JobBoard (Employment) Components • Various Modules: Image Rotator, Accordion, News Article display. Apr-May (270Hrs = $12,150) Content Development • Transfer of 1 gig of history, pictures, and PDF files • Move cleanup Departmental Structure. • Begin Parks Page rework • First Pass Public Works Pages • Boards/Commissions - Minutes and Agendas draft design June-July (125Hrs = $5,625 + 45Hrs Edmonds Energey=$2025) Content Development • Energy Site Draft site (edmondsenergy.org) • Edmonds Energy Structure, Template and Content • Complete Parks Pages • Third Pass on Public Works Pages July-Aug (120Hrs = $5,400 + 2Hrs EdmondsEnergy=$90) Site Prep for Transfer internally Content Development • Edmonds Energy refinement. • Refine and complete Clerk, HR, Police, and Finance pages. Sept Launch Contingency (34Hrs = $1530) Launch Contingency On-Going Support (security updates, module upgrades, patches): Yearly on-going support: 5 Hrs/Mo @ $45/HR = $225/Mo not to exceed $3,500 without authorization in writing. Packet Page 238 of 313 Professional Services Agreement, Page 2 {BFP826940.DOC;1\00006.900150\ } 2 DATED THIS 23th DAY OF August, 2010. CITY OF EDMONDS By: Mayor Mike Cooper ATTEST/AUTHENTICATED: Sandra S. Chase, City Clerk APPROVED AS TO FORM: Office of the City Attorney PROVIDER By: Judd Boyer Its: Website Provider Packet Page 239 of 313 AM-4192   Item #: 3. D. City Council Committee Meetings Date: 09/13/2011 Time:15 Minutes   Submitted For:Councilmember Petso Submitted By:Jana Spellman Department:City Council Committee:Finance Type: Information Subject Title Discussion of September 6, 2011 budget presentation. Recommendation from Mayor and Staff   Previous Council Action Narrative Discussion of September 6, 2011 budget presentation. Attachments 09-06-11 Budget Workshop Presentation Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:40 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jana Spellman Started On: 09/08/2011 10:14 AM Final Approval Date: 09/08/2011  Packet Page 240 of 313 Ci t y o f E d m o n d s Ci t y o f E d m o n d s Bu d g e t W o r k s h o p Bu d g e t W o r k s h o p Bu d g e t W o r k s h o p Bu d g e t W o r k s h o p Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 24 1 of 31 3 Fi n a n c i a l S e r v i c e s Fi n a n c i a l S e r v i c e s Fi n a n c i a l S e r v i c e s Fi n a n c i a l S e r v i c e s Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 24 2 of 31 3 $3 2 , 0 0 0 , 0 0 0 $3 4 , 0 0 0 , 0 0 0 $3 6 , 0 0 0 , 0 0 0 $3 8 , 0 0 0 , 0 0 0 Ge n e r a l F u n d R e v e n u e & E x p e n d i t u r e s Hi s t o r i c a l & P r o j e c t e d $2 4 , 0 0 0 , 0 0 0 $2 6 , 0 0 0 , 0 0 0 $2 8 , 0 0 0 , 0 0 0 $3 0 , 0 0 0 , 0 0 0 20 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 Re v e n u e Pa c k e t Pa g e 24 3 of 31 3 $3 2 , 0 0 0 , 0 0 0 $3 4 , 0 0 0 , 0 0 0 $3 6 , 0 0 0 , 0 0 0 $3 8 , 0 0 0 , 0 0 0 Ge n e r a l F u n d R e v e n u e & E x p e n d i t u r e s Hi s t o r i c a l & P r o j e c t e d $2 4 , 0 0 0 , 0 0 0 $2 6 , 0 0 0 , 0 0 0 $2 8 , 0 0 0 , 0 0 0 $3 0 , 0 0 0 , 0 0 0 20 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 Re v e n u e Ex p e d i t u r e s Pa c k e t Pa g e 24 4 of 31 3 Pa r k s , R e c r e a t i o n , a n d C u l t u r a l Pa r k s , R e c r e a t i o n , a n d C u l t u r a l Se r v i c e s S e r v i c e s Se r v i c e s S e r v i c e s Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 24 5 of 31 3 Pa r k s , R e c r e a t i o n , a n d C u l t u r a l S e r v i c e s Pa r k s , R e c r e a t i o n , a n d C u l t u r a l S e r v i c e s Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : $ 3 , 5 2 1 , 0 5 4 $ 3 , 5 2 1 , 0 5 4 2% R e d u c t i o n : $ 7 0 , 4 2 1 2% R e d u c t i o n : $ 7 0 , 4 2 1 Ac c o u n t 20 1 2 P r o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Pr o f . S e r v i c e s $3 1 0 , 4 1 4 ($ 3 5 , 9 0 0 ) Pr o f . S e r v i c e s Re c . & F i t n e s s $3 1 0 , 4 1 4 ($ 3 5 , 9 0 0 ) Fi t n e s s Sa l a r i e s / B e n e f i t s $2 3 , 5 1 6 ($ 4 , 5 1 6 ) Pr o g r a m F e e s Re v e n u e $7 3 0 , 0 0 0 $ 4 5 , 0 0 0 To t a l b u d g e t re d u c t i o n / i n c r . re v e n u e $8 5 , 4 1 6 ( 2 . 4 3 % ) 1) I n c r e a s e C i t y s h a r e o f f i t n e s s c l a s s r e v e n u e s 2 ) 1 5 % i n c r e a s e i n n o n - r e s i d e n t c l a s s f e e s 3) N o c h a n g e i n s e r v i c e l e v e l Pa c k e t Pa g e 24 6 of 31 3 Po l i c e D e p a r t m e n t Po l i c e D e p a r t m e n t Po l i c e D e p a r t m e n t Po l i c e D e p a r t m e n t Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 24 7 of 31 3 Bu d g e t e d O f f i c e r s v s . P o p u l a t i o n Bu d g e t e d O f f i c e r s v s . P o p u l a t i o n As o f A s o f Ap r i l 2 0 1 1 Ap r i l 2 0 1 1 •• Ly n n w o o d L y n n w o o d 80 / 3 5 , 8 6 0 8 0/ 3 5 , 8 6 0 2 . 2 3 2 . 2 3 •• La k e w o o d L a k e w o o d 10 2 / 5 8 , 1 9 0 1 02 / 5 8 , 1 9 0 1 . 7 5 1 . 7 5 •• Bo t h e l l B o t h e l l 58 / 3 3 , 7 2 0 5 8/ 3 3 , 7 2 0 1 . 7 2 1 . 7 2 •• Pu y a l l u p P u y a l l u p 57 / 3 7 , 2 4 0 5 7/ 3 7 , 2 4 0 1 . 5 3 1 . 5 3 •• Re d m o n d R e d m o n d 84 / 5 5 , 1 5 0 8 4/ 5 5 , 1 5 0 1 . 5 2 1 . 5 2 •• Mo u n t l a k e T e r r a c e 3 0 / 1 9 , 9 9 0 Mo u n t l a k e T e r r a c e 3 0 / 1 9 , 9 9 0 1 . 5 0 1 .5 0 •• Ed m o n d s E d m o n d s 55 / 3 9 , 8 0 0 5 5/ 3 9 , 8 0 0 1 . 3 8 1 . 3 8 •• De s M o i n e s De s M o i n e s 37 / 2 9 , 6 8 0 3 7/ 2 9 , 6 8 0 1 . 2 5 1 . 2 5 •• Ki r k l a n d K i r k l a n d 99 / 8 4 , 6 2 0 9 9/ 8 4 , 6 2 0 1 . 1 7 1 . 1 7 Me d i a n o f 1 . 5 2 = 6 0 c o m m i s s i o n e d o f f i c e r s f o r E d m o n d s Me d i a n o f 1 . 5 2 = 6 0 c o m m i s s i o n e d o f f i c e r s f o r E d m o n d s Pa c k e t Pa g e 24 8 of 31 3 Po l i c e S t a f f i n g 2 0 0 0 Po l i c e S t a f f i n g 2 0 0 0 - - 2 0 1 1 2 0 1 1 Ye a r T o t a l S t a f f ( F T & P T ) C h a n g e 20 0 9 - 2 0 1 1 66 Lo s t S c h o o l R e s o u r c e O f f i c e r ( 1 F / T C o m m i ss i o n e d ) ; f r o m Su p p o r t l o s t A n i m a l C o n t r o l O f f i c e r ( 1 F / T ) , a n d C r i m e Pr e v e n t i o n U n i t ( 1 F / T a n d 2 P / T ) ; l o s t R e s e r v e P r o g r a m . 20 0 7 - 2 0 0 8 75 Ad d P / T D V C o o r d i n a t o r 20 0 6 76 Lo s t H o s p i t a l S e c u r i t y ( 6 F / T S u p p o r t ) Ad d e d 3 C o m m i s s i o n e d O f f i c e r s 20 0 5 79 An i m a l C o n t r o l O f f i c e r r e s t o r e d ( 1 F / T S u p p o r t ) 20 0 3 - 2 0 0 4 78 Lo s t 4 F / T s u p p o r t ( A d m i n S u p e r v i s o r , R e c o r d s P S A , A n i m a l Co n t r o l ) ; l o s t 3 P / T P o l i c e C a d e t s . 20 0 0 - 2 0 0 2 85 Pa c k e t Pa g e 24 9 of 31 3 Po l i c e D e p a r t m e n t Po l i c e D e p a r t m e n t Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e B u d g e t : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e B u d g e t : $ 9 , 5 0 5 , 3 1 4 $ 9 , 5 0 5 , 3 1 4 2% R e d u c t i o n : $ 1 9 0 , 1 0 6 2% R e d u c t i o n : $ 1 9 0 , 1 0 6 Ac c o u n t 20 1 2 P r o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d ( R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Pa t r o l En t r y l e v e l p o s i t i o n @ $ 8 1 , 0 6 5 / e a 1 o r 2 p o s i t i o n s ? @ $ 8 1 , 0 6 5 / e a An i m a l C o n t r o l & Do w n t o w n P a r k i n g En f o r c e m e n t Sr . A C O w / 2 5 y e a r s - $8 8 , 7 5 0 AC O - $ 7 5 , 9 3 0 Pa r k i n g P e n a l t i e s - $3 0 , 5 0 0 Pe t L i c e n s e s - $ 1 1 , 0 0 0 Pe t A d o p t i o n s - $ 4 , 0 0 0 1 o r 2 p o s i t i o n s ? To t a l b u d g e t re d u c t i o n / i n c r . re v e n u e $1 9 0 , 0 0 0 ( 2 % ) 1) T o a c h i e v e a f u l l 2 % r e d u c t i o n w o u l d r e q u i r e e l i m i n a t io n o f t h r e e p o s i t i o n s fr o m P a t r o l a n d / o r A n i m a l C o n t r o l 2) S e r v i c e l e v e l s r e d u c t i o n s w o u l d b e v e r y s i g n i f i c a n t 3) N e e d C o u n c i l D i r e c t i o n Pa c k e t Pa g e 25 0 of 31 3 Ma y o r ’ s B u d g e t s Ma y o r ’ s B u d g e t s Ci t y C l e r k ’ s O f f i c e Ci t y C l e r k ’ s O f f i c e Ci t y C l e r k ’ s O f f i c e Ci t y C l e r k ’ s O f f i c e Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 25 1 of 31 3 Ci t y C l e r k ’ s O f f i c e Ci t y C l e r k ’ s O f f i c e Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 5 8 0 , 0 8 2 $ 5 8 0 , 0 8 2 2% R e d u c t i o n : $ 1 1 , 6 0 0 2% R e d u c t i o n : $ 1 1 , 6 0 0 Ac c o u n t 20 1 2 P r o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Di r e c t S a l a r y C o s t $ 3 2 0 , 9 4 6 ($ 2 5 , 0 0 0 ) Be n e f i t s $1 0 0 , 2 2 9 ($ 8 , 0 0 0 ) To t a l b u d g e t re d u c t i o n / i n c r . re v e n u e $3 3 , 0 0 0 ( 5 . 7 % ) 1) R e d u c e p u b l i c r e c o r d s s t a f f p o s i t i o n t o p a r t t i m e 2 ) I m p a c t s 1) l o n g e r r e s p o n s e t i m e s 2) D e l a y i n c o m p l e t i n g o t h e r r e s p o n s i b i l i t i e s r e l a t e d t o r e c o r d s (i . e . p r o t e c t i o n o f e s s e n t i a l r e c o r d s , d e s t r u c t i o n o f r e c o r d s ) 3) P o t e n t i a l i n c r e a s e i n l i a b i l i t y i n m e e t i n g l e g a l g u i d e l i n e s Pa c k e t Pa g e 25 2 of 31 3 Ma y o r ’ s B u d g e t s Ma y o r ’ s B u d g e t s Hu m a n R e s o u r c e s Hu m a n R e s o u r c e s Hu m a n R e s o u r c e s Hu m a n R e s o u r c e s Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 25 3 of 31 3 Hu m a n R e s o u r c e s D e p a r t m e n t Hu m a n R e s o u r c e s D e p a r t m e n t Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 2 8 7 , 4 7 2 $ 2 8 7 , 4 7 2 2% R e d u c t i o n : $ 5 , 7 5 0 2% R e d u c t i o n : $ 5 , 7 5 0 Ac c o u n t 20 1 2 P r o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Su p p l i e s $2 , 5 0 0 ($ 5 0 0 ) Pr o f e s s i o n a l S e r v i c e s $ 1 4 , 5 0 0 ($ 2 , 5 0 0 ) Ad v e r t i s i n g $1 0 , 0 0 0 ($ 1 , 0 0 0 ) Mi s c e l l a n e o u s $ 1 2 , 2 3 0 ($ 2 , 0 0 0 ) To t a l b u d g e t re d u c t i o n / i n c r . re v e n u e $6 , 0 0 0 ( 2 . 1 % ) 1) D o e s n o t r e f l e c t L E O F F M e d i c a l I n s u r a n c e R e s e r v e or F i r e m e n ' s P e n s i o n - t h e s e a r e ma n d a t o r y O b l i g a t i o n s ( R C W 4 1 . 2 6 ) Pa c k e t Pa g e 25 4 of 31 3 Co m m u n i t y S e r v i c e s & Co m m u n i t y S e r v i c e s & Ec o n o m i c D e v e l o p m e n t Ec o n o m i c D e v e l o p m e n t Ec o n o m i c D e v e l o p m e n t Ec o n o m i c D e v e l o p m e n t Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 25 5 of 31 3 Co m m u n i t y S e r v i c e s & E c o n o m i c D e v e l o p m e n t Co m m u n i t y S e r v i c e s & E c o n o m i c D e v e l o p m e n t Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 4 4 4 , 3 8 2 $ 4 4 4 , 3 8 2 2% R e d u c t i o n : $ 8 , 8 8 8 2% R e d u c t i o n : $ 8 , 8 8 8 Ac c o u n t 20 1 2 P r o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Re v e n u e I n c r e a s e s Ec o n o m i c D e v e l o p m e n t Co m m u n i c a t i o n s Tr a v e l Ad v e r t i s i n g Mi s c e l l a n e o u s $1 2 1 , 3 0 0 ($ 1 , 9 0 0 ) ($ 5 0 0 ) ($ 3 , 0 0 0 ) ($ 2 , 0 0 0 ) Co m m u n i t y S e r v i c e s Tr a v e l Mi s c e l l a n e o u s $3 2 3 , 0 8 2 ($ 5 0 0 ) ($ 1 , 0 0 0 ) To t a l b u d g e t re d u c t i o n / i n c r . r e v e n u e $8 , 9 0 0 ( 2 . 0 % ) Pa c k e t Pa g e 25 6 of 31 3 De v e l o p m e n t S e r v i c e s De v e l o p m e n t S e r v i c e s De v e l o p m e n t S e r v i c e s De v e l o p m e n t S e r v i c e s Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 25 7 of 31 3 De v e l o p m e n t S e r v i c e s De v e l o p m e n t S e r v i c e s Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 1 , 8 3 7 , 1 5 1 $ 1 , 8 3 7 , 1 5 1 2% R e d u c t i o n : $ 3 6 , 7 4 3 2% R e d u c t i o n : $ 3 6 , 7 4 3 Ac c o u n t 20 1 2 Pr o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Sa l a r i e s $1 , 1 9 2 , 7 1 4 ($ 6 5 , 0 0 0 ) Be n e f i t s $4 0 6 , 6 9 0 ($ 2 1 , 4 5 0 ) To t a l b u d g e t re d u c t i o n / i n c r . r e v e n u e $8 6 , 4 5 0 ( 4 . 7 % ) 1) K e e p D e v e l o p m e n t S e r v i c e s D i r e c t o r p o s i t i o n o p e n f or s i x m o n t h s i n 20 1 2 2) I m p a c t s : • Li m i t e d a b i l i t y t o u n d e r t a k e c o u n c i l p r i o r i t i e s / n e w i n i t i a t i v e s • Re d u c e d c a p a b i l i t i e s f o r c o d e r e v i s i o n s • St a t u s q u o p e r m i t s y s t e m , s e r v i c e a n d f e e s t r u c t u r e Pa c k e t Pa g e 25 8 of 31 3 Pu b l i c W o r k s Pu b l i c W o r k s Pu b l i c W o r k s Pu b l i c W o r k s Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 25 9 of 31 3 Pu b l i c W o r k s Pu b l i c W o r k s (G e n e r a l F u n d P o r t i o n ) (G e n e r a l F u n d P o r t i o n ) Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 3 , 0 4 0 , 3 6 7 $ 3 , 0 4 0 , 3 6 7 2% R e d u c t i o n : $ 6 0 , 8 0 7 2% R e d u c t i o n : $ 6 0 , 8 0 7 Ac c o u n t 20 1 2 Pr o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Sa l a r i e s & B e n e f i t s – El i m i n a t e ( 1 ) c u s t o d i a n $1 , 7 6 2 , 1 0 7 ($ 6 1 , 1 0 0 ) El i m i n a t e ( 1 ) c u s t o d i a n Pr o f e s s i o n a l S e r v i c e s - En g i n e e r i n g $5 , 0 0 0 ( $ 5 , 0 0 0 ) Mi n o r e q u i p m e n t - En g i n e e r i n g $3 , 1 0 0 ($ 2 , 1 5 0 ) Mi s c e l l a n e o u s - En g i n e e r i n g $9 , 6 0 0 ($ 4 , 3 2 0 ) Ov e r t i m e $ 5 , 0 0 0 ($ 1 , 6 7 3 ) To t a l b u d g e t re d u c t i o n / i n c r . r e v e n u e $7 4 , 2 4 3 ( 2 . 4 4 % ) 1) I mp a c t - L o s s o f c u s t o d i a n w i l l r e s u l t i n l o w e r j a n i t o r i a l s e r v i c e l e v e l s a t ci t y b u i l d i n g s , m o s t n o t i c e a b l e a t F A C Pa c k e t Pa g e 26 0 of 31 3 Mu n i c i p a l C o u r t Mu n i c i p a l C o u r t Mu n i c i p a l C o u r t Mu n i c i p a l C o u r t Se p t e m b e r 6 Se p t e m b e r 6 thth , 2 0 1 1 , 2 0 1 1 Pa c k e t Pa g e 26 1 of 31 3 Mu n i c i p a l C o u r t Mu n i c i p a l C o u r t Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Pr o j e c t e d 2 0 1 2 E x p e n d i t u r e s : Ap p r o x . A p p r o x . $ 7 6 4 , 9 8 5 $ 7 6 4 , 9 8 5 2% R e d u c t i o n : $ 1 5 , 3 0 0 2% R e d u c t i o n : $ 1 5 , 3 0 0 Ac c o u n t 20 1 2 Pr o j e c t e d Ex p e n s e s 20 1 2 P r o j e c t e d Re v e n u e Pr o p o s e d (R e d u c t i o n s ) / Re v e n u e I n c r e a s e s Sa l a r i e s & B e n e f i t s $6 4 0 , 1 3 5 ($ 9 , 7 2 9 ) Pr o f e s s i o n a l Se r v i c e s $2 6 , 0 0 0 ( $ 2 , 8 0 0 ) Pr o f e s s i o n a l Se r v i c e s $2 6 , 0 0 0 ( $ 2 , 8 0 0 ) Tr a v e l $2 , 0 0 0 ($ 5 0 0 ) Re p a i r & M a i n t e n a n c e $ 1 , 2 0 0 ($ 7 0 0 ) Mi s c e l l a n e o u s $1 , 5 0 0 ($ 1 , 0 0 0 ) Su p p l i e s $7 , 0 0 0 ($ 1 , 0 0 0 ) Ho m e M o n i t o r i n g $3 5 0 ($ 3 5 0 ) To t a l b u d g e t re d u c t i o n / i n c r . r e v e n u e $1 6 , 0 7 9 ( 2 . 1 % ) Pa c k e t Pa g e 26 2 of 31 3 Im p a c t s t o C o u r t O p e r a t i o n s Im p a c t s t o C o u r t O p e r a t i o n s (2 % c u t ) ( 2 % c u t ) St a f f r e d u c t i o n s e q u i v a l e n t t o 0 . 2 5 F T E St a f f r e d u c t i o n s e q u i v a l e n t t o 0 . 2 5 F T E Di s c o n t i n u e n i g h t c o u r t s e s s i o n s . Di s c o n t i n u e n i g h t c o u r t s e s s i o n s . Di s c o n t i n u e p a s s p o r t p r o c e s s i n g w i t h a r e v e n u e l o s s o f Di s c o n t i n u e p a s s p o r t p r o c e s s i n g w i t h a r e v e n u e l o s s o f ap p r o x i m a t e l y $ 1 2 , 0 0 0 ap p r o x i m a t e l y $ 1 2 , 0 0 0 --$1 3 , 0 0 0 p e r y e a r . $1 3 , 0 0 0 p e r y e a r . ap p r o x i m a t e l y $ 1 2 , 0 0 0 ap p r o x i m a t e l y $ 1 2 , 0 0 0 --$1 3 , 0 0 0 p e r y e a r . $1 3 , 0 0 0 p e r y e a r . –– L o s s o f s t a f f t i m e r o u g h l y a p p r o x i m a t e s t i m e s p e n t p r o c e s s i n g Lo s s o f s t a f f t i m e r o u g h l y a p p r o x i m a t e s t i m e s p e n t p r o c e s s i n g pa s s p o r t a p p l i c a t i o n s . P a s s p o r t a p p l i c a t i o n s a r e n o t a c o r e pa s s p o r t a p p l i c a t i o n s . P a s s p o r t a p p l i c a t i o n s a r e n o t a c o r e ju d i c i a l f u n c t i o n a n d c a n b e t r a n s f e r r e d t o a n y o t h e r C i t y ju d i c i a l f u n c t i o n a n d c a n b e t r a n s f e r r e d t o a n y o t h e r C i t y de p a r t m e n t . de p a r t m e n t . Pa c k e t Pa g e 26 3 of 31 3 Qu e s t i o n s ? Pa c k e t Pa g e 26 4 of 31 3 AM-4193   Item #: 3. E. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Jim Tarte Submitted By:Jim Tarte Department:Finance Committee:Finance Type:Information Information Subject Title Inter-fund short term loan from general fund to street fund. Recommendation from Mayor and Staff Informational only Previous Council Action N/A Narrative The street fund has a number of projects that is being funded in most part by grants.  The grant revenue can only be collected after the expenditure is made, therefore the street fund will need to borrow up to $450,000 from the general fund on a short term basis.  See attached for details. Attachments Street Fund Cash Flow Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jim Tarte Started On: 09/08/2011 10:32 AM Final Approval Date: 09/08/2011  Packet Page 265 of 313 Street Construction / Improvement (Fund 112) Projected Interfund loan from General Fund 2011 2011 2011 2011 Sept Oct Nov Dec Beginning Cash Balance (fund 112)172,260 81,760 31,760 110,260 Revenue: Grant & Local Match Revenue - - 290,500 450,000 Expenditures: Dayton Street Overlay 10,000 160,000 20,000 212th St. SW / 84th Ave Roundabout 11,000 37,000 21,000 48,000 212th St. SW / 76th Ave W Improve 1,000 1,000 228th St. SW Corridor Improve 10,000 47,000 35,000 64,000 Main Street Pedestrian Lighting 34,000 15,000 20,000 15,000 Shell Valley Emerg Access Road 170,000 105,000 84,000 63,000 226th Street Walkway 48,000 70,000 20,000 8,000 Sunset Ave Walkway 7,500 5,000 Traffic Calming Program 11,000 11,000 11,000 290,500 450,000 212,000 210,000 Packet Page 266 of 313 AM-4190   Item #: 3. F. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Jim Tarte Submitted By:Jim Tarte Department:Finance Committee:Finance Type:Information Information Subject Title General Fund Update - July 2011 Recommendation from Mayor and Staff Informational purposes Previous Council Action N/A Narrative See attached Attachments General Fund Update - July Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jim Tarte Started On: 09/08/2011  Final Approval Date: 09/08/2011  Packet Page 267 of 313 2011 Revised Annual Budget YTD Actuals Variance % Rec/Exp BEGINNING WORKING CAPITAL 2,759,501 2,759,501 - REVENUES: REAL PERSONAL / PROPERTY TAX 9,506,114 4,852,893 4,653,221 51% EMS PROPERTY TAX 3,233,038 1,798,690 1,434,348 56% VOTED PROPERTY TAX 877,984 441,216 436,768 50% LOCAL RETAIL SALES/USE TAX 4,524,195 2,644,127 1,880,068 58% NATURAL GAS USE TAX 16,667 7,482 9,185 45% 1/10 SALES TAX LOCAL CRIM JUST 530,130 296,962 233,168 56% GAS UTILITY TAX 890,000 644,153 245,847 72% T.V. CABLE UTILITY TAX 698,865 425,143 273,722 61% TELEPHONE UTILITY TAX 1,563,454 772,749 790,706 49% ELECTRIC UTILITY TAX 1,532,043 982,714 549,329 64% SOLID WASTE UTILITY TAX 285,918 164,485 121,433 58% WATER UTILITY TAX 764,082 436,206 327,876 57% SEWER UTILITY TAX 470,000 276,100 193,900 59% STORMWATER UTILITY TAX 237,600 139,631 97,969 59% LEASEHOLD EXCISE TAX 250,938 109,584 141,354 44% PULLTABS TAX 61,043 41,449 19,594 68% LICENSES AND PERMITS 1,484,829 1,004,529 480,300 68% INTERGOVERNMENTAL 893,692 549,219 344,473 61% CHARGES FOR GOODS AND SERVICES 3,637,480 2,601,873 1,035,607 72% FINES AND FORFEITURES 667,100 359,263 307,837 54% MISCELLANEOUS 339,073 232,015 107,058 68% NONREVENUES - - - 0% INTERFUND TRANSFERS 114,727 22,806 91,921 20% 32,578,972 18,803,289 13,775,683 58% EXPENDITURES: SALARIES / WAGES 12,728,874 7,112,753 5,616,121 56% BENEFITS 4,385,811 2,392,920 1,992,891 55% SUPPLIES 531,862 229,590 302,272 43% SERVICES 4,003,708 2,299,693 1,704,015 57% INTERGOVERNMENTAL 8,876,513 6,190,204 2,686,309 70% CAPITAL OUTLAY - - - 0% DEBT SERVICE PRINCIPAL 1,111,369 62,752 1,048,617 6% DEBT SERVICE INTEREST 340,759 173,594 167,165 51% INTERFUND SERVICES 646,172 282,517 363,655 44% 32,625,068 18,744,024 13,881,045 57% CHANGE IN WORKING CAPITAL (YTD)(46,096) 59,265 (105,362) ENDING WORKING CAPITAL 2,713,405 2,818,766 (105,362) Page 1 of 6 City of Edmonds General Fund Update July 2011 Packet Page 268 of 313 2010 OUTLOOK 587,121 2011 BUDGET 700,000 TOTAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Monthly Forecast %8%5%7%8%8%10%9%11%10%10%8%7% Cumulative Forecast %8%13%19%28%36%46%55%66%76%86%93%100% Monthly Forecast $54,509 35,415 45,854 58,548 55,975 71,363 65,138 75,882 67,525 68,726 54,798 46,268 Cumulative Forecast $54,509 89,923 135,777 194,325 250,300 321,663 386,801 462,683 530,208 598,934 653,732 700,000 Actual Collected $64,450 26,992 30,969 61,193 51,964 36,921 51,938 63,646 56,636 57,643 45,962 38,807 Cumulative Collection $64,450 91,442 122,411 183,604 235,568 272,489 324,427 388,073 444,709 502,352 548,314 587,121 YEAR END FORECAST 827,667 711,822 631,090 661,380 658,799 592,988 587,121 587,121 587,121 587,121 587,121 587,121 Projected YE Variance 127,667 11,822 (68,910) (38,620) (41,201) (107,012) (112,879) (112,879) (112,879) (112,879) (112,879) (112,879) Budget Variance %18%2%-10%-6%-6%-15%-16%-16%-16%-16%-16%-16% City of Edmonds 2011 Monthly Revenue Forecasting Model REAL ESTATE EXCISE TAX - 200,000 400,000 600,000 800,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2011 CUMULATIVE COLLECTIONS Actuals/Trend Budget C:\Documents and Settings\tarte\My Documents\Book1 11 CHARTS Page 2 of 6 8/24/2011 9:12 AMPacket Page 269 of 313 2011 OUTLOOK 4,641,820 2011 BUDGET 4,524,195 TOTAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Monthly Forecast %8%10%7%8%9%8%8%9%8%8%9%8% Cumulative Forecast %8%18%25%33%41%49%57%66%75%83%92%100% Monthly Forecast $361,138 458,856 320,307 339,615 392,188 351,881 353,139 422,201 376,021 378,930 421,884 348,035 Cumulative Forecast $361,138 819,994 1,140,302 1,479,916 1,872,104 2,223,985 2,577,124 2,999,325 3,375,345 3,754,276 4,176,160 4,524,195 Actual Collected $358,415 449,791 344,713 325,279 424,567 365,381 375,982 433,178 385,797 388,782 432,853 357,084 Cumulative Collection $358,415 808,205 1,152,918 1,478,197 1,902,764 2,268,145 2,644,127 3,077,305 3,463,102 3,851,884 4,284,736 4,641,820 YEAR END FORECAST 4,490,075 4,459,150 4,574,251 4,518,939 4,598,289 4,614,029 4,641,820 4,641,820 4,641,820 4,641,820 4,641,820 4,641,820 Projected YE Variance (34,120) (65,045) 50,056 (5,256) 74,094 89,834 117,625 117,625 117,625 117,625 117,625 117,625 Budget Variance %-1%-1%1%0%2%2%3%3%3%3%3%3% City of Edmonds 2011 Monthly Revenue Forecasting Model SALES AND USE TAX - 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 5,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2011 CUMULATIVE COLLECTIONS Actuals/Trend Budget C:\Documents and Settings\tarte\My Documents\Book1 11 CHARTS Page 3 of 6 8/24/2011 9:12 AMPacket Page 270 of 313 2011 OUTLOOK 864,516 2011 BUDGET 890,000 TOTAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Monthly Forecast %14%15%13%11%9%7%5%4%3%4%6%9% Cumulative Forecast %14%29%42%53%62%69%75%78%81%85%91%100% Monthly Forecast $124,297 131,645 119,196 97,069 82,945 62,262 45,728 32,251 29,930 32,637 55,825 76,215 Cumulative Forecast $124,297 255,942 375,138 472,207 555,152 617,413 663,141 695,392 725,322 757,960 813,785 890,000 Actual Collected $118,216 119,279 111,076 103,988 83,728 62,659 45,207 31,327 29,073 31,703 54,227 74,033 Cumulative Collection $118,216 237,495 348,571 452,559 536,287 598,946 644,153 675,480 704,554 736,256 790,483 864,516 YEAR END FORECAST 846,460 825,854 826,971 852,968 859,757 863,379 864,516 864,516 864,516 864,516 864,516 864,516 Projected YE Variance (43,540) (64,146) (63,029) (37,032) (30,243) (26,621) (25,484) (25,484) (25,484) (25,484) (25,484) (25,484) Budget Variance %-5%-7%-7%-4%-3%-3%-3%-3%-3%-3%-3%-3% City of Edmonds 2011 Monthly Revenue Forecasting Model GAS UTILITY TAX - 200,000 400,000 600,000 800,000 1,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2011 CUMULATIVE COLLECTIONS Actuals/Trend Budget C:\Documents and Settings\tarte\My Documents\Book1 11 CHARTS Page 4 of 6 8/24/2011 9:12 AMPacket Page 271 of 313 2011 OUTLOOK 1,388,171 2011 BUDGET 1,563,454 TOTAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Monthly Forecast %6%10%10%6%9%7%10%9%6%11%6%13% Cumulative Forecast %6%15%25%31%40%46%56%65%71%82%87%100% Monthly Forecast $88,105 148,971 149,501 98,560 134,154 101,832 149,200 139,777 97,178 173,153 86,900 196,123 Cumulative Forecast $88,105 237,076 386,576 485,136 619,291 721,123 870,323 1,010,100 1,107,278 1,280,431 1,367,331 1,563,454 Actual Collected $119,046 76,840 134,764 113,698 110,498 110,747 107,157 124,106 86,283 153,741 77,157 174,135 Cumulative Collection $119,046 195,886 330,649 444,347 554,845 665,592 772,749 896,855 983,138 1,136,879 1,214,036 1,388,171 YEAR END FORECAST 2,112,514 1,291,816 1,337,266 1,432,002 1,400,756 1,443,059 1,388,171 1,388,171 1,388,171 1,388,171 1,388,171 1,388,171 Projected YE Variance 549,060 (271,638) (226,188) (131,452) (162,698) (120,395) (175,283) (175,283) (175,283) (175,283) (175,283) (175,283) Budget Variance %35%-17%-14%-8%-10%-8%-11%-11%-11%-11%-11%-11% City of Edmonds 2011 Monthly Revenue Forecasting Model TELEPHONE UTILITY TAX - 250,000 500,000 750,000 1,000,000 1,250,000 1,500,000 1,750,000 2,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2011 CUMULATIVE COLLECTIONS Actuals/Trend Budget C:\Documents and Settings\tarte\My Documents\Book1 11 CHARTS Page 5 of 6 8/24/2011 9:12 AMPacket Page 272 of 313 2011 OUTLOOK 1,465,626 2011 BUDGET 1,532,043 TOTAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Monthly Forecast %10%12%11%11%9%8%7%6%7%6%7%7% Cumulative Forecast %10%22%32%43%52%60%67%73%80%86%93%100% Monthly Forecast $154,344 180,865 161,039 161,397 142,207 116,798 110,597 96,931 101,381 88,779 112,474 105,231 Cumulative Forecast $154,344 335,209 496,248 657,645 799,852 916,651 1,027,247 1,124,178 1,225,559 1,314,338 1,426,812 1,532,043 Actual Collected $163,770 142,743 151,197 162,822 140,887 113,715 107,579 92,729 96,985 84,930 107,598 100,669 Cumulative Collection $163,770 306,514 457,711 620,533 761,420 875,135 982,714 1,075,443 1,172,428 1,257,359 1,364,957 1,465,626 YEAR END FORECAST 1,625,612 1,400,895 1,413,069 1,445,587 1,458,430 1,462,656 1,465,626 1,465,626 1,465,626 1,465,626 1,465,626 1,465,626 Projected YE Variance 93,569 (131,148) (118,974) (86,456) (73,613) (69,387) (66,417) (66,417) (66,417) (66,417) (66,417) (66,417) Budget Variance %6%-9%-8%-6%-5%-5%-4%-4%-4%-4%-4%-4% City of Edmonds 2011 Monthly Revenue Forecasting Model ELECTRIC UTILITY TAX - 250,000 500,000 750,000 1,000,000 1,250,000 1,500,000 1,750,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2011 CUMULATIVE COLLECTIONS Actuals/Trend Budget C:\Documents and Settings\tarte\My Documents\Book1 11 CHARTS Page 6 of 6 8/24/2011 9:12 AMPacket Page 273 of 313 AM-4180   Item #: 3. G. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Councilwoman Buckshnis Submitted By:Jana Spellman Department:City Council Committee:Finance Type:Information Information Subject Title Update on financial policies and reporting. Recommendation from Mayor and Staff Previous Council Action Narrative Discussion on financial policies and reporting. Attachments Attach 1: Tukwila Reserve Policies Attach 2: Tukwila Investment Policy Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jana Spellman Started On: 09/06/2011 10:42 AM Final Approval Date: 09/08/2011  Packet Page 274 of 313 CITY OF TUKWILA ADMINISTRATIVE MANUAL TITLE: RESERVE POLICY 1.0 PURPOSE: Index: 300-15 Page 1 of 5 To establish a Reserve Policy for the City which is capable of addressing the various types (categories) of the City's operating and restricted use funds. The objectives of this Policy are to (i) provide a clear understanding of the goals and objectives of reserve establishment, (ii) offer guidance and limitations regarding the establishment, use and replenishment of City reserves, and (iii) establish a process for periodic reporting and review of City reserves. 2.0 ORGANIZATION AFFECTED: All City funds. 3.0 REFERENCES: 4.0 GENERAL FUND RESERVE POLICY: The General Fund is used to account for all general revenues of the City not specifically levied or collected for other City funds, and for expenditures related to providing general services by the City. For the purpose of this policy and as it applies to the General Fund only, the City will establish a Contingency Reserve Fund with a minimum balance of 8% of annual General Fund revenues. At no time, however, shall the balance in the Contingency Reserve Fund fall below 4% unless specifically waived by the City Council because of an unforeseen emergency. The Contingency Reserve Fund shall initially be set at a minimum of 4% of annual General Fund revenues. The City shall reach the targeted minimum of 8% no later than fiscal year 2014 according to the following schedule: 2% by December 31, 2011 4% by December 31, 2012 6% by December 31, 2013 8% by December 31, 2014 4.1 If actual expenditures in the General Fund are less than budgeted expenditures, and the General Fund does not end the year at a deficit, at least 25% of the difference between budgeted and actual expenditures will revert to the Contingency Reserve Fund and may then be re-appropriated in a subsequent year at the discretion of the City Council. 4.2 The City will annually direct a minimum of 25% of sales tax receipts from new I I to Packet Page 275 of 313 Index: 300-15 TITLE: RESERVE POLICY Page 21 of 5 Reserve Fund. 4.3 Use of Contingency Reserve Fund -To the extent that there is an imbalance in the General Fund between revenues and budgeted expenditures, City Council and administration will strive to address the imbalance first with revenue increases, expenditure reductions, or a combination of the two. Use of the Contingency Reserve Fund is a one-time, non-recurring funding source. If an imbalance in the General Fund occurs that can not be addressed with additional revenues or expenditure reductions, a multi-year plan shall be developed to address the imbalance concurrently with the planned reserve draw down of the Contingency Fund. The implementation of the replenishment plan will be done in accordance with the guidelines below (see "Replenishment of Reserves"). A planned draw down of the fund's reserves should: a) not exceed 50% of the balance in the Contingency Reserve Fund, and b) not reduce the reserve below 4% of annual General Fund revenues. 4.4 Replenishment of Reserves -The following criteria will be used to restore the Contingency Reserve Fund based upon the remaining fund balance compared to the minimum reserve guideline: 1. If the reserves are drawn down by 25-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. 2. If the reserves are drawn down by 10-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3. If the reserves are drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. 4.5 Annual Status Reporting and Periodic Review -Annually, after presentation of the City's Comprehensive Annual Financial Report, the Finance Director will prepare and present an updated Reserve Level Status report by July 1st of the following year. At least every five years, the Mayor, based on advice from the Finance Director, will ask the City Council to reaffirm or revise this policy, including the percentages established herein. 5.0 RISK MANAGEMENT RESERVE POLICY: 5.1. The City shall maintain a Risk Management Reserve Fund dedicated to mitigation of the risk of loss arising from potential claims against the City for general liability purposes as well as claims resulting from natural disasters such as flooding and earthquakes. 5.2. The Risk Management Reserve Fund shall be set initially at a minimum of 4% Packet Page 276 of 313 TITLE: Index: 300-15 RESERVE POLICY Page 3 of 5 of annual General Fund revenues. The City shall reach the targeted minimum of 8% no later than fiscal year 2014 according to the following schedule: 2% by December 31, 2011 4% by December 31, 2012 6% by December 31, 2013 8% by December 31,2014 5.3. Legal claims expenses incurred below the City's insurance deductable amounts will be paid for out of the Risk Management Reserve Fund. Uninsured legal claim expenses will also be deducted from the Risk Management Reserve Fund. 5.4. Use of the Risk Management Reserve Fund - A draw down of the fund's reserves should: a) not exceed 50% of the balance in the Risk Management Reserve Fund, and b) not reduce the reserve below 4% of annual General Fund revenues. 5.5. Replenishment of Reserves -The following criteria will be used to restore the Risk Management Reserve Fund based upon the remaining fund balance compared to the minimum reserve guideline: 1. If the reserves are drawn down by 25-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. 2. If the reserves are drawn down by 10-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3. If the reserves are drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. 5.6. The City Council may, at their discretion and as necessary, transfer funds between the Contingency Reserve Fund and the Risk Management Reserve Fund. Once the two reserve funds are fully funded up to the minimum levels as established within this policy, at no time will the combined balances of both funds decline below 8% of annual General Fund revenues. 6.0 REVENUE STABILIZATION FUND POLICY: 6.1. The City shall maintain a Revenue Stabilization Fund dedicated to mitigating the impact of unanticipated revenue declines. 6.2. The City shall appropriate, on an annual basis, a transfer of 1 % of General Fund revenue to the Revenue Stabilization Fund beginning with the 2011- 2012 biennial budget. The Revenue Stabilization Fund will not be utilized by Packet Page 277 of 313 Index: 300-15 TITLE: RESERVE POLICY Page 4 of 5 the City unless actual General Fund revenue is 5% or more below budgeted revenue after six months through any given calendar year. At no point will the balance in the Revenue Stabilization Fund decline by more than 50%, unless actual General Fund revenue is more than 20% below budgeted revenue. 6.3. In addition to the annual 1 % appropriation, the City will transfer a minimum of 25% of the excess of any actual property tax or sales tax collections above the respective budgeted amounts. Such transfer shall take place by March 31 sl of the following fiscal year. 6.4. Replenishment of Reserves -The following criteria will be used to restore the Revenue Stabilization Fund based upon the remaining fund balance compared to the minimum reserve guideline: 1. If the reserves are drawn down by 25-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. 2. If the reserves are drawn down by 10-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3. If the reserves are drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. 6.5. If the accumulated balance in the Revenue Stabilization Fund exceeds 10% of annual General Fund revenues, such excess shall be transferred to the Contingency Reserve Fund. 7.0 ENTERPRISE FUND RESERVE POLICY: 7.1. The City shall maintain an adequate fund balance in each of the City's enterprise funds to provide funding for capital expenses, unanticipated revenue declines, and any other unbudgeted expense. The policy applies to the following funds: 1. Water Fund 2. Sewer Fund 3. Surface Water Fund 4. Foster Golf Course Fund 7.2. The City shall incorporate into its customer rate structure funding for the establishment and maintenance of a Working Capital Reserve Fund. The reserve balance shall be no less than 20% of the previous year operating and capital expenses. The City shall reach the targeted minimum of 20% no later than fiscal year 2014 according to the following schedule: Packet Page 278 of 313 Index: 300-15 TITLE: RESERVE POLICY Title: 5% by December 31, 2011 10% by December 31, 2012 15% by December 31, 2013 20% by December 31,2014 Page 5 of 5 7.3. Use of the Working Capital Reserve Fund - A draw down of the fund's reserves should: a) not exceed 50% of the balance in the Working Capital Reserve Fund, and b) not reduce the reserve below 10% of annual operating and capital expenditures within each fund. 7.4. Replenishment of Reserves -The following criteria will be used to restore the Working Capital Reserve Fund based upon the remaining fund balance compared to the minimum reserve guideline: 1. If the reserves are drawn down by 25-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. 2. If the reserves are drawn down by 10-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3. If the reserves are drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. 7.5. The Working Capital Reserve fund shall be maintained within each of the Enterprise Funds, but shall be separate from the accumulated fund balance within each fund. Initiating Department: RESERVE POLICY Finance Department Effective Date: Supercedes: M~e ~a1 Signature: 12/11109 N/A Packet Page 279 of 313 SZi ILA J0 ti Ii1 i ZLi 908 fCityo Washington OrdinanceNo 1761 ANORDINANCEOFTHECITYCOUNCILOFTHECITYOFTUKWILA WASHINGTONADOPTINGINVESTMENTPOLICIESFORTHECITY OFTUKWILASETTINGRESPONSIBILITYFORMAINTENANCE AND CHANGESREPEALINGORDINANCE NO859ASCODIFIEDAT TUKWILAMUNICIPALCODE328PROVIDINGFORSEVERABILITY ANDESTABLISHINGANEFFECTIVEDATE WHEREAStheCityofTukwilaestablishedanInvestingCityFundspolicyin1974and WHEREAStheCitydesirestoreplacetheoriginalpolicywithaninvestmentpolicythatmeetsstateand nationalstandards NOWTHEREFORE THECITYCOUNCILOFTHECITYOFTUKWILAWASHINGTON DO ORDAINASFOLLOWS Section1AdoptionofinvestmentpolicyCityAdministrative PolicyNo317InvestmentPolicy AttachmentAisherebyadoptedandincorporatedintothischapterbyreferenceasiffullysetforthherein Section2 Maintainingandchangingpolicy TheFinanceDirectorisrequiredtomaintainthe administrative investment policy Changes tothepolicyrequireapprovaloftheCityCouncilFinanceand SafetyCommittee Section3RepealerOrdinanceNo859ascodified atTMC328isherebyrepealed Section4 Severability Ifanysectionsubsection paragraphsentenceclauseorphraseofthis ordinanceoritsapplication toanypersonorsituationshouldbeheldtobeinvalidorunconstitutionalforany reasonbyacourtofcompetent jurisdictionsuchinvalidity orunconstitutionalityshallnotaffect thevalidityor constitutionality oftheremainingportions ofthisordinance oritsapplicationtoanyotherpersonorsituation Section5 EffectiveDate Thisordinanceorasummarythereofshallbepublishedintheofficial newspaper oftheCityandshalltakeeffect andbeinfullforceandeffectfive5daysafterpassage and publication asprovidedbylaw PASSED BYTtIECITYCOUNCIL OFTHECITYOFTUKWILA WASHINGTON ataRegularMeeting thereofthis dayof 2000 Steven MMulletMayor ATTESTAUTHENTICATED Jne ECantu CMCCityClerk APPROVED 440 FORM By Office ofheCityAttorney FILEDWITHTHECITYCLERK V PASSEDBYTHECITYCOUNCILi5 PUBLISHEDf EFFECTIVEDATE 61av ORDINANCE NOrr16 Investment Policy 42000 1 Packet Page 280 of 313 POLICY ANDPROCEDURE Subject INVESTMENTPOLICY EffectiveDate Supersedes 51500 NA Page1of1 10 PURPOSE ToestablishpolicyguidelinesfortheCitysinvestments 20 ORGANIZATIONSAFFECTED FinanceDepartment 30 REFERENCES OrdinanceNo1916 40 POLICY SeeAttached Index FINANCE Number 0317 StaffContact FinanceDirector Approvedby Packet Page 281 of 313 CityofTukwilaWashington INVESTMENTPOLICY Adoptedbythe TukwilaCityCouncil OnMay152000 OrdinanceNo1916 AlanRDoerschelFinanceDirector Packet Page 282 of 313 CityofTukwila InvestmentPolicy 10 Policy ItisthepolicyoftheCityofTukwilatoinvestpublicfundsinamannerthatwillprovide maximumsecuritywiththehighestinvestmentreturnwhilemeetingthedailycashflow demandsoftheCitywhileconformingtoallstateandlocalstatutesgoverningthe investmentofpublicfunds 20 Scope ThispolicyappliestotheinvestmentofallpublicfundsinthecustodyoftheTukwila FinanceDirector Fundscoveredbythispolicyincludeallcityfundscreatedbythe TukwilaCityCouncilandareaccountedforintheCitysComprehensiveAnnualFinancial ReportCAFR 21 FundTypes GeneralCurrentExpenseFunds SpecialRevenueFunds DebtServiceFunds CapitalProjectFunds EnterpriseFunds InternalServiceFunds TrustFunds AgencyFunds 22 Fundsrelatingtodebtservicewillbeinvestedinaccordance withappropriatebond documents 30 Prudence Investments shallbemadewithjudgmentandcareundercircumstancesthenprevailing whichpersonsofprudencediscretionandintelligenceexerciseinthemanagementoftheir ownaffairsnotforspeculationbutforinvestmentconsideringtheprobablesafetyoftheir capitalaswellastheprobableincometobederived Thestandardofprudencetobeusedbyinvestmentofficialsshallbetheprudentperson standardandshallbeappliedinthecontextofmanaginganoverallportfolioInvestment officersactinginaccordancewithwrittenproceduresandtheinvestmentpolicyand exercisingduediligenceshallberelievedofpersonalresponsibility foranindividual securityscreditormarketpricechangesprovideddeviationsfromexpectationsare reportedinatimelyfashionandappropriate actionistakentocontroladverse developments Packet Page 283 of 313 CityofTukwila Investment Policy 40 Objectives Theprimary objectivesinpriorityorderoftheCitysinvestment activitiesshallbe Safety Safetyoftheprincipalistheforemost objective oftheinvestmentprogram Investments oftheCityshallbeundertakeninamannerthatseekstoensurethe preservationofcapitalintheoverallportfolio Toattain thisobjective diversification isrequiredinorderthatpotential lossesonindividual securities donotexceed the incomegeneratedfromtheremainderoftheportfolio LiquidityTheCitysinvestmentportfolio willremain sufficientlyliquidtoenablethe Citytomeetalloperatingrequirements thatmightbereasonablyanticipated YieldTheCitysinvestment portfolio shallbedesigned withtheobjectiveofattaining amarketrateofreturnthroughoutbudgetary andeconomiccyclestakingintoaccount theCitysinvestmentriskconstraintsandthecashflowcharacteristicsoftheportfolio See130 50 Authority Management responsibilityoftheinvestmentprogram isvestedintheCityofTukwila Financial DirectorundertheexpressauthoritygrantedinRCW3929020 51 TheCityFinance Directormayappoint anInvestment Officerwhose responsibilities willincludeinitiatingdailytransactionsintheinvestmentportfoliobased on liquidity andcashflowrequirements oftheCity 52 Investments relatingtobondproceedsshallbemade consistentwith40 Objectives 60 EthicsandConflictofInterest 61 Officers andemployeesinvolvedintheinvestmentprocessrecognizethatthe investment portfolio issubjecttopublic reviewandevaluation Theoverallprogram willbedesigned andmanagedwithadegreeofprofessionalism thatisworthyofthe publictrust 62 Officersandemployees involvedintheinvestmentprocessshallrefrainfrom personal business activitythatcouldconflictwiththeproper executionofthe investmentprogramorwhichcouldimpairtheirabilitytomake impartial investmentdecisions Employees andinvestment officialsshalldiscloseany materialfinancialinterestsinfinancialinstitutions thatconductbusinesswithinthis jurisdictionandtheyshallfurtherdiscloseanypersonal financial investment positionsthatcouldberelated totheperformanceoftheCitysportfolioEmployees andofficers shallsubordinatetheirpersonal investmenttransactions tothoseofthe Cityparticularly withregardstothetiming ofpurchasesandsales Packet Page 284 of 313 CityofTukwila InvestmentPolicy 70 AuthorizedFinancialDealersandInstitutions 71 SelectionofaprimarybanktoprovidegeneralbankingservicesforTukwilawillbe madebytheFinanceDirectorandapprovedbytheCityCouncilandMayor 72 PursuanttostatestatutesRCW3958thedepositofpublicfundsandthe placementofinvestmentdepositsietimedepositsmoneymarketdeposit accountsandsavingsdepositsofpublicfundswillbeplacedonlywithinstitutions approvedbytheWashingtonPublicDepositProtectionCommissionPDPCas eligiblefordepositofpublicfunds Themaximumamountplacedwithanyone depositorywillnotexceedthenetworthoftheinstitutionasdetermined bythe PDPC 73 InadditiontheFinanceDirectorwillmaintainalistofapprovedbrokerdealersthat areauthorized toprovideinvestment servicestotheCity 731 AuthorizedbrokerdealersmustmaintainanofficeintheStateofWashington 732 Authorizedbrokerdealerswillbelimitedtoprimarydealersorotherdealers thatqualifyunderSECRule15C31theUniformNetCapitalRule 733 Allapprovedfirmsandtheindividualsthatrepresentthemarerequiredtoread thispolicyandcertifythattheyunderstandandwillcomplywiththeCitys investmentobjectivesandconstraints 734 Brokerdealersthathavebeenselectedtoprovideinvestmentservicestothe Cityarerequiredtosubmitanauditedfinancialstatementannuallytothe FinanceDirectorifrequested 80 AuthorizedInvestments Statestatutesandthisinvestmentpolicylimitthetypesofsecuritiesauthorizedfor investmentbytheCityTheprincipalgoverningstatutesareRCW3959andRCW3960 TheFinanceDirectormayfurtherrestricteligibleinvestmentsbythispolicyathisher discretionAuthorizedinvestmentsincludebutarenotlimitedto 81 USTreasurySecurities 82 USAgencySecuritiesieobligationsofanygovernment sponsoredcorporation eligibleforcollateralpurposesattheFederalReserve 83 Certificates ofDepositMoney Market DepositAccountsandsavingsdepositswith qualified depositories within statutorylimitsaspromulgatedbythePDPCatthetime ofinvestment 84 BankersAcceptances BAspurchased onthesecondary marketwitharatingofA 1P1itsequivalentorbetter Packet Page 285 of 313 CityofTukwila InvestmentPolicy 85 GeneralObligationBondsofastateorlocalgovernmentwhichhaveatthetimeof theinvestmentoneofthethreehighestcreditratingsofanationallyrecognized ratingagency 86 TheWashingtonStateLocalGovernment InvestmentPoolLGIP 90 SafekeepingandCustody 91 SecuritiespurchasedbytheFinanceDirectoraretobeheldinacustodialaccountin thesafekeepingortrustdepartment ofabankactingasthirdpartycustodianforthe CityofTukwila 92 AllsecuritytransactionsconductedbythecustodianonbehalfoftheCityofTukwila aretobeonadeliveryversus paymentDVPbasis 93 CertificatesofDeposittransaction receiptsforMoneyMarketDepositAccountsor savingsdepositaccountswillbeheldbytheFinanceDirector 100Diversification TheCityofTukwilawilldiversifyitsinvestmentsbysecuritytypeandinstitution 101 Nomorethanfiftypercent50 oftheCitysportfolio atthetimeofpurchase shallbeinanysingle financial institution 102 Exceptthatnomorethanseventy five75 oftheCitysportfolioatthetimeof purchaseshallbeinvestedintheWashington LocalGovernment Investment Pool and 103 Nomorethanseventyfivepercent 75 oftheCitysportfolio atthetimeof purchaseshallbeinvestedinUSTreasury orAgency securities 104 TheCitysFinance SafetyCommitteecanauthorize avarianceto101102or 103priortopurchase ifitisdeemedinthebestoverallbenefittotheCity 110Maturities Totheextentpossibleandtoprecludethesaleofsecuritiesthatcould resultinaloss investments willbemadetocoincide withanticipated cashflowrequire ments 111 Atthetimeofinvestmentaminimumoffiftypercent 50 oftheportfolio will becomprisedofinvestments maturing oravailable withinoneyear 112 Atthetimeofinvestmentnosecurities orinvestmentinstruments shallhavea maturityexceedingfouryears exceptwhencompatiblewithaspecific funds investmentneeds 113 Toprovide forongoingmarketopportunityinvestmentmaturities should be laddered orstaggered toavoidtheriskresulting fromoverconcentration of portfolioassetsinaspecific maturity 4 Packet Page 286 of 313 CityofTukwila Investment Policy 114 Theaveragematurity oftheportfolio shallnotexceedtwo2years 115 Anyvarianceto111112113or114canbeapprovedbytheFinance Safety CommitteepriortooccurrenceandifdeemedintheCitysbestinterest 120InternalControls TheFinanceDirectorshallestablish asystem ofinternal controls which aresubjectto review bytheStateAuditor Suchreviewsmayresultinrecommendationstochange operation procedurestoimprove internalcontrols Controlsshallbedesignedtoprotect against lossofpublicfundsduetofrauderrormisrepresentationorimprudentactions 130Performance StandardsBenchmarks Theinvestment portfoliowillbedesignedtoobtain anaverage rateofreturnduring budgetary andeconomic cycleswhichmeetsorexceeds theaverage90dayTreasurybill ratesforthecorrespondingtimeperiod Thisperformancestandardshalltakeintoaccount theCitysinvestmentriskconstraints andcashflowneeds 140Reporting TheFinanceDirectorwillsubmitaquarterlyreporttotheCitysFinance Safety Committee thatsummarizesthecurrentportfolio positionandperformance 150Investment Policy Adoption Adoptionofthispolicyismadepursuant totheprovisions ofRCW3648070 Approved andadoptedbytheCityCouncilofthe CityofTukwila this dayof 2000 Packet Page 287 of 313 Glossary AccruedInterestTheinterestaccumulated onabondsinceissuedateorthelastcoupon paymentThebuyerofthebondpaysthemarketpriceandaccruedinterestwhichispayable totheseller AgencyAdebtsecurityissuedbyafederalorfederallysponsoredagencyFederalagencies arebackedbythefullfaithandcreditoftheUSGovernment FederallySponsoredAgencies FSAsarebackedbyeachagencywithamarketperceptionthatthereisanimplicit govemmentguaranteeSeealsoFederalAgencySecuritiesandGovemmentSecurities AverageMaturity Aweightedaverageoftheexpirationdatesforaportfolioofdebt securitiesAnincomefundsvolatilitycanbemanagedbyshorteningorlengtheningthe averagematurityofitsportfolio BankWire Anelectronictransferoffundsbetweentwofinancialinstitutions BankersAcceptancesBAs BankersAcceptancesgenerallyarecreatedonaletterof creditissuedinatradetransactioneitherforeignordomesticBAsareshorttermnon interestbearingnotessoldatadiscountandredeemedbytheacceptingbankatmaturityfor fullfacevalue BasisPoint Ameasureofinterestrateie1100of1percentor0001 Bid Theindicatedpriceatwhichabuyeriswillingtopurchaseasecurityorcommodity WhensellingasecurityabidisobtainedSeeOffer Bond AlongtermdebtsecurityorIOUissuedbyagovemmentorcorporationthat generallypaysastatedrateofinterestandretumsthefacevalueonthematuritydate BookEntrySecurities USgovernmentandfederalagencysecuritiesthatdonotexistin definitivepaperformtheyexistonlyincomputerizedfilesmaintainedattheFederalReserve Bank BookValue TheamountatwhichanassetiscarriedonthebooksoftheownerThebook valueofanassetdoesnotnecessarilyhaveasignificantrelationshiptomarketvalue CertificatesofDeposit Adepositoffundsinabankorsavingsandloanassociationfora specifiedtermthateamsinterestataspecifiedrateorrateformula CreditRisk Theriskthatadebtorwillfailtomaketimelypaymentsofprincipalorinterest whendue CUSIPNumber AninedigitalphanumericcombinationestablishedbytheCommitteeon UniformSecuritiesIdentificationProceduresthatisusedtoidentifypubliclytradedsecurities EachpubliclytradedsecurityreceivesauniqueCUSIPnumberwhenthesecurityisissued Custodian Aindependentthirdpartyusuallyabankortrustcompanythatholdssecurities insafekeepingforaclientcounty Delivery TheprovidingofasecurityinanacceptableformtotheCountyortoanagent actingonbehalfoftheCountyandindependentofthesellerTheimportantdistinctionisthat thetransferaccomplishesabsoluteownershipcontrolbytheCounty DeliveryvsPaymentDVP ThesimultaneousexchangeofsecuritiesandcashThe safestmethodofsettlingeitherthepurchaseorsaleofasecurityInaDVPsettlementthe fundsarewiredfromthepurchasersaccountandthesecurityisdeliveredfromthesellers accountinsimultaneousinterdependentwires Packet Page 288 of 313 DepositoryBank Alocalbankusedasthepointofdepositforcashreceipts Discount Theamountbywhichthepriceofasecurityislessthanitsparvalue Diversification Dividingavailablefundsamongavarietyofsecuritiesandinstitutionssoas tominimizemarketrisk FaceValue Thevaluestatedonthefaceofabondthustheredemptionvalueatmaturity Indebtsecuritiesthetermisinterchangeablewithpar FederalAgencySecurities SecuritiesissuedbyagovemmentsponsoredagencyThese agencies werecreatedbyCongresstoundertakevarioustypesoffinancingwithouttapping thepublictreasuryInordertodosoCongressgavetheseagencies thepowertoborrow moneybyissuingsecurities Thesesecurities arebacked bytheissuing agencyandarenot directgovemment obligationshoweverthereisamarketperceptionthatthereisanimplicit govemment guaranteeTheseagenciesinclude theFederalNational MortgageAssociation FnMAtheFederalHome LoanBankSystemFHLBandtheFederalFarmCreditSystem FFCB FederalFunds Shortterminvestments borrowingsbetweenbanks Despiteitsname thesetransactionsarenotloanstoorfromthefederalgovemmentNordotheyincludeany guaranteeorbackingfromthefederalgovemmentTheyarecalledfederalfundsbecause thepartiesexchangethefundsbytransferringbalancesfromthelendersaccountwithits FederalReserveDistrictBanktotheborrowersaccountwithitsFederalReserveDistrictBank FederalFundsRate Therateatwhichbanksborrowfromoneanothergenerallyasan ovemightloan FederalReserveSystem ThecentralbankoftheUnitedStateswhichhasregulatedcredit intheeconomysinceitsinceptionin1913ItincludestheFederalReserveBank14district banksandmemberbanksoftheFederalReserveandisgovemedbytheFederalReserve Board GovernmentSecurities AnydebtobligationissuedbytheUSgovemment itsagencies orinstrumentalitiesCertainsecuritiessuchasTreasurybondsandGovemmentNational MortgageAssociationNotesGNMAorGinnieMaesarebackedbytheUSGovemmentas toprincipalandinterestpaymentsOthersecuritiessuchasthoseissuedbytheFederal HomeLoanMortgageCorporationorFreddieMacarebackedbytheissuingagency Liquidity Referstotheeaseandspeedwithwhichanassetcanbeconvertedintocash withoutasubstantiallossinvalue LossTheexcessofthecostorbookvalueofanassetoveritssellingprice LocalGovernmentInvestmentPoolLGIP Theaggregateofallfundsfrompolitical subdivisionsthatareplacedinthecustodyoftheStateTreasurerforinvestmentand reinvestment MarktoMarket Anadjustmentinthevaluationofasecuritiesportfoliotoreflectthecurrent marketvaluesoftherespectivesecuritiesintheportfolioThisprocessisalsousedtoensure thatmarginaccountsareincompliancewithmaintenance MarketValueThepriceatwhichasecurityistradingandcouldpresumablybesold MasterRepurchaseAgreement Anagreementbetweentheinvestorandthedealeror financialinstitutionThisagreementdefinesthenatureofthetransactionsidentifiesthe relationship betweenthepartiesestablishes normalpracticesregardingownershipand custody ofthecollateralsecuritiesduringthetermoftheinvestmentprovidesforremediesin theeventofadefaultbyeitherpartyandotherwiseclarifiesissuesofownership Packet Page 289 of 313 Maturity Thedateuponwhichtheprincipalorstatedvalueofaninvestmentbecomesdue Offer TheindicatedpriceatwhichaselleriswillingtosellasecurityorcommodityWhen buyingasecurityanofferisobtainedSeeBid ParValueThenominalorfacevalueofadebtsecuritythatisthevalueatmaturity Premium Theamount bywhichabondsellsaboveitsparvalue PrimeRate Theinterestrateabankchargesonloanstoitsmostcreditworthycustomers Frequently citedasastandardforgeneralinterestratelevelsintheeconomy Principal Anamountuponwhichinterestischargedoreamed QualifiedPublicDepository Afinancialinstitutionwhichdoesnotclaimexemptionfromthe paymentofanysalesorcompensating useoradvaloremtaxesunderthelawsofthisstate whichhassegregatedforthebenefitofthecommission eligiblecollateral havingavalueof notlessthanitsmaximumliabilityandwhichhasbeenapproved bythePublicDeposit protection Commissiontoholdpublicdeposits RepurchaseAgreement REPO Aformofsecuredshorttermborrowinginwhicha securityissoldwithasimultaneous agreementtobuyitbackfromthepurchaser atafuture dateEverytransactionwhereasecurityissoldunderanagreementtoberepurchased isa repofromthesellerborrowerspointofviewandareverse repurchase agreementfromthe buyerlenderspointofview Safekeeping Aservice tocustomersrendered bybanksforafeewherebyallsecuritiesand valuablesofalltypesanddescriptionsareheldinthebanksvaultforprotectionorinthecase ofbookentrysecuritiesareheldandrecordedinthecustomersnameandareinaccessibleto anyoneelse Securities Bondsnotesmortgages orotherformsofnegotiableornonnegotiable instruments SettlementDate Thedayonwhichthepaymentandthesecurityactuallychangehands SeeTradeDate Spread ThedifferencebetweentwopricesortworatesBankershavemanydifferentand highlyspecificusagesofthistermForexampletradersusespread tomean thedifference betweenbidandaskedpricesforasecurity Underwriters usespreadtomeanthedifference between thepricerealized bytheissuerandthepricepaidbytheinvestor Bankanalystsuse spread tomeanthedifferencebetween theaverageratepaidonabanksassets andthe averageratepaidonthebanksliabilitiesInassetliabilitymanagementspread mostoften referstothedifferencebetweentworatesoryields StepUps Aformofcallable securityforwhichthecouponrateincreases ifthesecurityisnot called Strips Principal andinterestcashflowsduefromanyinterestbearingsecuritycanbe separatedintodifferentfinancial instruments Thisisdonebyaprocess calledstripping Eachcoupon payment isseparated fromtheunderlyinginvestmenttocreateaseparate security Forexample afiveyearnotecanbeseparated into11pieces10semiannual coupon payments andthefinalprincipalpaymentEachofthose11piecesisaseparatecash flowthatcanbepurchased orsoldjustlikeaTreasury BillThecashflowsaresoldata discountTheamountofthediscount andthetimeuntilthecashflowispaiddetermine the investorsretum TradeDateThedayonwhichabuyerandselleragreeuponatransaction Packet Page 290 of 313 ThirdPartySafekeeping Acustodianfortheinvestorholdssecuritiesinsafekeeping Underthisarrangementthedealerorbankinvestmentdepartmenthasnoaccesstothe securities beingheld TimeDeposit Interestbearingdepositatasavingsinstitutionthathasaspecificmaturity TreasuryBills Shorttermobligations issuedbytheUSTreasuryBillsareissuedfor maturitiesofoneyearorlessTheydonotpayinterestbutinsteadareissued onadiscount basis TreasuryBonds LongtermobligationsissuedbytheUSTreasuryBondsareissuedfor initialmaturitiesgreaterthantenyears TreasuryNotesTNotes MediumtermobligationsissuedbytheUSTreasuryNotesare issuedinmaturitiesformorethanonetotenyears Yield Looselyreferstotheannualretumonaninvestmentexpressedasapercentageonan annualbasisForinterestbearingsecuritiestheyieldisafunction oftheratethepurchase priceandtheincomethatcanbeearned fromthereinvestment ofincomereceived priorto maturitycallorsaleWhilevarious formulasareusedtoexpressyieldsindifferentvariations theunderlyingcalculationismadebydividingtheamountrealizedbythecostofthesecurity andannualizingtheresult YieldCurve Agraphxaxis timeyaxis rateshowing therelationship atasinglepoint intimebetweentheavailablematuritiesofasecurityorsimilarsecuritieswithessentially identicalcreditriskandtheyieldsthatcanbeeamedforeachofthoseavailablematurities YieldCurveSlope Ayieldcurvethatdepicts thecustomary situationwherelongtermrates arehigherthanshorttermratesiscalled anupwardslopingorpositiveyieldcurve Ayield curvedepictingtheTesscommonoccurrencewhereshorttermratesarehigher thanlongterm ratesiscalledadownwardly sloping orinvertedyieldcurveYieldcurvesalsodescribethe amountofdifferencebetween shorttermandlongtermratesWhenlongtermratesaremuch higherthanshorttermratestheyieldcurve issaidtobesteepWhenlongtermratesare virtuallyidenticaltoshorttermratestheyieldcurve issaidtobeflat ZeroCouponBond AtypeofdebtsecuritythatdoesnotpayperiodicinterestZerocoupon securities arebought andsoldatpricesthatarelessthantheparvaluesofthesecuritiesThe discount ordifference betweentheprincipalpaidtopurchasethesecurityandtheprincipal retumedatmaturityconstitutestheinvestorsreturn Packet Page 291 of 313 CITYOFTUKWILA ANORDINANCEOFTHECITYCOUNCILOFTHE CITYOFTUKWILAWASHINGTON ADOPTING INVESTMENT POLICIES FOR THE CITY OF TUKWILA SETTING RESPONSIBILITY FOR MAINTENANCE ANDCHANGESREPEALING ORDINANCE NO 859 AS CODIFIED AT TUKWILA MUNICIPALCODE 328PROVIDING FORSEVERABILITY ANDESTABLISHING AN EFFECTIVEDATE On theCityCouncil oftheCityofTukwila passed Ordinance No 91 toreplacetheoriginalInvesting CityFunds policy establishedin1974withaninvestment policythatmeetsstateandnationalstandards providingforseverability andestablishing aneffective date Thefulltextofthisordinancewillbemailedwithout charge toanyonewho submitsawrittenrequesttotheCityClerkoftheCityofTukwila foracopyofthetext APPROVED bytheCityCouncilatitsmeeting of PublishedSeattleTimes fGey SUMMARYOFORDINANCE NOf eECantuCMC CityClerk Packet Page 292 of 313 AM-4201   Item #: 4. A. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted For:Mike Cooper Submitted By:Mike Cooper Department:Mayor's Office Committee:Public Safety Type:Information Information Subject Title Report on Marine 16. Recommendation from Mayor and Staff Information only Previous Council Action None Narrative Mayor Cooper will give an update on his conversations with Fire District #1 regarding Marine 16. Form Review Inbox Reviewed By Date Final Approval Sandy Chase 09/09/2011 10:36 AM Form Started By: Mike Cooper Started On: 09/09/2011 10:31 AM Final Approval Date: 09/09/2011  Packet Page 293 of 313 AM-4172   Item #: 4. B. City Council Committee Meetings Date: 09/13/2011 Time:10 Minutes   Submitted By:Gerry Gannon Department:Police Department Committee:Public Safety Type:Action Information Subject Title Interlocal Agreement between Snohomish County and the City of Edmonds relating to prisoner transport. Recommendation from Mayor and Staff Recommend the Public Safety/Human Resource Committee approve the ILA for the full Council for the consent agenda. Previous Council Action None Narrative Until 2010 the department had an agreement with Whatcom County for prisoner transport.  Due to budget cuts Whatcom County could no longer provide this service in 2011.  This service saved the department from having an officer leave the the city to pick up a prisoner and then transporting the prisoner to Snohomish County Jail.  Transporting a prisoner could take an officer out of service for one and one half hours or longer.     Snohomish County Corrections continued the service in 2011 without costs to it's contract agencies.  To continue to provide the prisoner transport service in 2012 it is necessary for the Snohomish County Corrections to charge for their transport service.   Snohomish County Corrections found that it cost Whatcom County about $93.00 per inmate to provide the prisoner transport service.  Snohomish County Corrections will be able to provide the same service for $50.00 per inmate.  This is not a new cost to the department, but continuation of our current prisoner costs. The City Attorney has approved the ILA as to form. Attachments ILA Prisoner Transport Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 01:18 PM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Gerry Gannon Started On: 08/31/2011 11:52 AM Final Approval Date: 09/08/2011  Packet Page 294 of 313 Packet Page 295 of 313 Packet Page 296 of 313 Packet Page 297 of 313 Packet Page 298 of 313 Packet Page 299 of 313 Packet Page 300 of 313 AM-4181   Item #: 4. C. City Council Committee Meetings Date: 09/13/2011 Time:15 Minutes   Submitted For:Council President Peterson Submitted By:Jana Spellman Department:City Council Committee:Public Safety Type:Information Information Subject Title Discussion regarding an Ethics Board. Recommendation from Mayor and Staff Previous Council Action N/A Narrative A couple of citizens have, independently, asked that we look into creating an ethics code and ethics board. One citizen provided the code from the City of Federal Way. See attachment. Essentially, this item is submitted to the committee for input as to whether and how we should proceed to develop an ethics code for Edmonds.  Attachments Attachment: Federal Way Code of Ethics Form Review Inbox Reviewed By Date City Clerk Sandy Chase 09/08/2011 11:41 AM Mayor Mike Cooper 09/08/2011 02:39 PM Final Approval Sandy Chase 09/08/2011 02:41 PM Form Started By: Jana Spellman Started On: 09/06/2011 10:43 AM Final Approval Date: 09/08/2011  Packet Page 301 of 313 Packet Page 302 of 313 Packet Page 303 of 313 Packet Page 304 of 313 Packet Page 305 of 313 Packet Page 306 of 313 Packet Page 307 of 313 Packet Page 308 of 313 Packet Page 309 of 313 Packet Page 310 of 313 Packet Page 311 of 313 Packet Page 312 of 313 Packet Page 313 of 313