During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator.
1. Are the two posts that support the roof continuous from footing to roof, with a strap connection
connecting the cantilevered 4x10 beam to the post? If not, provide engineering lateral
calculations.
2. Are the two posts that support the roof PT 4x6 HF #2 with the long dimension parallel with the
(2) 2x12 beam? If not provide lateral and gravity engineering.
3. What do the stainless steel cables attach to at the house?
4. The proposed 2x8 rafters appear to be connected to a ledger attached to an existing fascia board.
The fascia board is likely attached to the ends of the existing rafters with end nails. Either
provide at each side of rafter to fascia L70, A35, or similar metal connector, or provide an
engineering calculations to justify gravity and lateral loads.
5. Does the existing roof have a built in gutter? If not, provide for water runoff with a cricket or
other solution.
6. Which of two post bracing methods drawn will be used?
Pat Lawler, CBO