20130729093245777.pdfBeck oAssociates,
ssocIaTes PLLC
Structural Engineering Xr(`Ode (`OD0J�i`�
�
July 25`2O13
Leif Bjorback
Building Official
City ofEdmonds
1215"'Avenue North
Edmonds, VVA0802O-3145
Subject: 2013-0502
Community Health
WU
,JUL ���� ��
-- �=��INY
Enclosed:
w (1)set ofreviewed drawings (stamped REVIEWED, signed oovormhoet
0 (1)set ofsubmitted documents
a Beck Fee =$12.473.00xU.2125= (Base Fee = Bldg Permit Fee x21.25Y6\
Our review of the permit application materials & drawings is now complete. The following
items should benoted asConditions ofPermit Approval:
* Redlines need tobatransferred tothe 2noset ofdrawings. Redlines can bofound on
sheets 82.01F & S3.30.
* The only sheets that were resubmitted in response to the review comments were
82.01Fand S2.O1G.
o | have collated these sheets into the drawing set that was delivered to me.
o These sheets will need to be inserted into the originally submitted drawing set
o
for noonop|ate set nfdrawings.
* Review mfthe Detention Vault ienot within the scope ofour review.
�
The following items are required tobesubmitted as Deferred Submittals tothis permit:
o Steel stairs (bidder design)
o Anchorage ofmechanical units
The shall beresponsible for reviewing design drawings and
calculations for compliance with the design criteria and compatibility with the design of the
primary ctructuro, including review of all connections to the primary structure. The EOR
shall review the submittal prior to providing it to the City for review. The submitted
documents shall bear the shop drawing stamp nfthe EOR.
The shall provide drawings and calculations for the
deferred design submittal tothe EOR for review. Design shall conform to loading &
deflection criteria oarequired bythe 2O08IBC. Drawings and calculations for deferred
submittals shall be designed by structural/civil engineer licensed in the state of
Washington. Deferred submittals shall bestamped/signed bythe SSE and shall include
all material requirements and manufacturer literature.
16425 SE 66'b Strect, Bellevue, WA 98006 - beckplIc(c�,mm.com . PH: 206-3 13-3739
® Special inspections are required on this project as specified within the structural
drawings: concrete, reinforcing steel, and steel fabrication & erection.
® Geotechnical inspections are required as recommended by the geotechnical engineer
(Geotechnical Engineering Report, Community Health Center of Snohomish County,
RGI Project No. 2012-599, p. 12) for general conformance with the recommendations
provided in the geotechnical report and to evaluate site conditions as they may differ
from anticipated conditions.
Please contact me at should you have any questions. Thank you.
Douglas Beck, PE, SE
Beck & Associates, PLLC
Page 2 of 2