Loading...
20130729093245777.pdfBeck oAssociates, ssocIaTes PLLC Structural Engineering Xr(`Ode (`OD0J�i`� � July 25`2O13 Leif Bjorback Building Official City ofEdmonds 1215"'Avenue North Edmonds, VVA0802O-3145 Subject: 2013-0502 Community Health WU ,JUL ���� �� -- �=��INY Enclosed: w (1)set ofreviewed drawings (stamped REVIEWED, signed oovormhoet 0 (1)set ofsubmitted documents a Beck Fee =$12.473.00xU.2125= (Base Fee = Bldg Permit Fee x21.25Y6\ Our review of the permit application materials & drawings is now complete. The following items should benoted asConditions ofPermit Approval: * Redlines need tobatransferred tothe 2noset ofdrawings. Redlines can bofound on sheets 82.01F & S3.30. * The only sheets that were resubmitted in response to the review comments were 82.01Fand S2.O1G. o | have collated these sheets into the drawing set that was delivered to me. o These sheets will need to be inserted into the originally submitted drawing set o for noonop|ate set nfdrawings. * Review mfthe Detention Vault ienot within the scope ofour review. � The following items are required tobesubmitted as Deferred Submittals tothis permit: o Steel stairs (bidder design) o Anchorage ofmechanical units The shall beresponsible for reviewing design drawings and calculations for compliance with the design criteria and compatibility with the design of the primary ctructuro, including review of all connections to the primary structure. The EOR shall review the submittal prior to providing it to the City for review. The submitted documents shall bear the shop drawing stamp nfthe EOR. The shall provide drawings and calculations for the deferred design submittal tothe EOR for review. Design shall conform to loading & deflection criteria oarequired bythe 2O08IBC. Drawings and calculations for deferred submittals shall be designed by structural/civil engineer licensed in the state of Washington. Deferred submittals shall bestamped/signed bythe SSE and shall include all material requirements and manufacturer literature. 16425 SE 66'b Strect, Bellevue, WA 98006 - beckplIc(c�,mm.com . PH: 206-3 13-3739 ® Special inspections are required on this project as specified within the structural drawings: concrete, reinforcing steel, and steel fabrication & erection. ® Geotechnical inspections are required as recommended by the geotechnical engineer (Geotechnical Engineering Report, Community Health Center of Snohomish County, RGI Project No. 2012-599, p. 12) for general conformance with the recommendations provided in the geotechnical report and to evaluate site conditions as they may differ from anticipated conditions. Please contact me at should you have any questions. Thank you. Douglas Beck, PE, SE Beck & Associates, PLLC Page 2 of 2