1011 B AVE.PDFiiiiiiiiiiiiii
10208
1011 B AV E ,$
PAID JAN 2 71961
............. .._... ]District
City of Edmonds ---Water Department
TAP CARD
No.........
Meter
Size..............................
Mfgrs.
For ...
TapNo ...................... .... _.............
Size................. ......................
,1 Style., f.......................... _........
.
LotNo ........................................... Blk. No ..----....._.........-_-............ _..
Add. .................................................. -....... _...
- _....._...........
Service Location . ....... )x.: . �.�..
MeterLocation ................... ...................... ............... _..---..........._..........._.
MakeTap........................................................... _....._......._.---..........................
.
Pressure......................---.....lbs. Test .................................... .% .........
._
SendBills to .......................................... ............................. ................ .... _...
Dateof Work ...................................................... .......... ._...._....................
..................................... w ................................... .................................... Foreman
Guar. Voucher No ........................... -.............. $................. ......................
Remarks: ......... .................................... ................................................... ...........
OUTGOING Index ........Reg....:.Route Bk.........Stenca7..._.Card...._,.
INCOMING Index .... _... Reg ...... Route Bk... ..... Stenc3l....-Card..._...
MateA Chargeable to Installation Mete&
NO.
SSIIZ—E
DESCRIPTION
RATE
AMOUNT
Meter......................................
Meter Box
............._..
..
-•. ...
...............
..........
Meter Plate ............................
..............
..-.........
•-.......
........ .....
...... _._
Check Valve ..........................
..............
-- .... ....
..........
--------------
-•-•••---
Pipe, Galv. Screw ..................
----•-••------
-- ....-•-•-
--•-•---•-
.............
--••-•----
Nipples ....................................
---•---•---•••
------ -...
•----•--•-
..............
..........
Bushings
..........
..................................
Plaui Ells' ...................................
St. Ells .................................
........... »...
-----
Tees ..........................................
--------•
..........
----- -
I
a?...?
_-Q_..
..-----
..
-•---............
- - -.--•- ---- ---- -
-
...__..
.
._.._._......
.�-
••--•...------•------••--••-•--•-••-•• ••
..........
----- -
?-�....
Material Chargeable to Taps Connected
NO. , SIZE
DESCRIPTION
RATE
AMOUNT
..............
...... ....
Pipe, Black Screw .................•
.............
.......... --•
.... »...
----•-• --•---
..........
Pipe, Galv. Screw ----------•--•---.
...............
.............
.......
..-----•......
..........
Lead Connections ..
..
.....
--•-• ....
-.
Curb Cocks ....................
Corp. Cocks ...
.......
..........
/.-.--
Unions --• .................................
.
......-•------
-------------
..........
Saddles .... ----•----
........
----••-----
..........
Nipples• ....................................
...............
.... .....
.---
---------
------------
---•-•---
Bushings ..................................
..............
........
---••------•--
-••-------
Plain Ells ................................
............
..............
..........
Street Ells .----•------••---••-•--•.....
........
_..__.:
Tees
..............
-----------------------
...........
Curb Boxes ............................
S. O. Extensions ....................
..............
..............
...............
-------•-•--
..........
..........
Gates ........................................
Plugs ........................................
•-•
.. -
... ---
..........
Couplings
---------------------•-•--•--•--•--••-•-.-•---
---•-••------•
----•--------•
..............
--•--••--•
..........
---•---•-•
Gate Boxes
....................................................
...........................................................
...........................................................
•---_.....
•••--•........
.......... ...
..............-__
....... -...
..........
.
.....
•---------
-
--------------
..............
...............
-........
-•-•------
-•-----•
...........................................................
...........................................................
...........................................................
Hours Time —Day Men
...............
-----•-•------•
..............
-
.............
---••-----•-
....... -...
-
..........
-........
-.... -•.
- -
:----
Hours Time —Monthly Men .
..............
....... ....
_.... _...
Yours Time —Auto ............ ---
Superintendence ........ ......
..............
.......
f�
Total /6F„_
•
ADDRESS:
TAX ACCOUNT/PARCEL NUMBER: U) w 17 7' UU: 1U IUL14 -
BUILDING PERMIT (NEW STRUCTURE): .l�0�7 t'S%7_.Sz/6S�R I
COVENANTS (RECORDED)
CRITICAL AREAS: 2`7 —1)DWy DETERMINATION: ❑ Conditional Waiver ❑ Study Required Waiver
DISCRETIONARY PERMIT #'S: 6d ' I —t ' � CLA Gj Q
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
10 �11m- 1 110, "a
PLANNING DATA CHECKLIST DA'
SCALED PLOT PLAN DATED:_w1fi16R,,
SEWER LID FEE $:
SHORT PLAT FILE: LOT:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
WATER METER TAP CARD. DATED:
OTHER:
LID #:
BLOCK:
LATEMP\DSTs\Forms\Street File Checklist.doc
3!
AM
WN
BUI
:4
4l9t Permit limits one Yeaa f
permit to construct the following work, m accordance with the accom
e��;A�®N; is. hereby made for*a. p
i
pan g .plans `and specifications. Two sets are submitted nereantii far approval.
i �/' Off• St 1
ni ✓ alter c-� '''`�' �Jz�
Parking.'
Work addn . repair ...._... _ ........... "T
7.1
Const. type___--••----•- Use zone......
4..jire zone
1
Occupz c •--/------------•------ r Lot.---------- / ��---- $lk:.:..._.._:.; Addn_:: _
Address-.__/ Z.
S tic tank_..:... �1_....'
-
_, tip. ..- ----- -- �P - �-----... _
Lot frontage ..................................... Area __ x .�;
of—
.,�✓ �-� /-
L side......
Bldg. set -backs front ........ °�z.......... r. sid ..._.......�_._..._..._. rear
f 1
Own(/ ...........................••••...............
--------_--•.Address_ _. ... Tel: No
• - �G� G ear....... Addre�:_.. �� Ci �'.3 ... , el
Plansby--------- ----------------
_ Address......................................:._____ -___.- Tel. No -.
--------------------
...................
...... ....:.... ....•_.... _......._......_.._._.......__..
. ,
The above is a. correct statement, and I agree co comply 'pith all applicable Codes and. Staff laws regulating this ]
work
12
Date
Signed Owner/Agent _ t.._._�................ .....
Y � •:i
PERM for the above work is hereby appmve:i, subject to the above conditions, and to compliance vntr
proved piatss and specifications, and Building Department notations thereon.
_.: Recd b -
Valuation--.•--_--._�. ? ............. Permit fee - ! Y. - `
Building Department, B
u D�. e -
•
'.°f permit does not cover, plumbing, -sewer, or electrical irstallation� ror.dces a persnrt any worn torybe
146TB —'This p
.r;one'in; thi Right of `J✓ay areas. 'Driveways and ivall�ivays must be Manned r,, neet the,dffuwl grades of.`streets ti rf
and alleys, and plans for future, sidewdlk� development: +f ;
�.
1
, 1
•I
VIA 0 , 09
-in N -�,/i
ISZZ
�Q.
4.
�776277--
rsca J-HJI1H
. ................
wacill
=91 C 9 ► ►'�i=-sc 3NO4
rev tv� � o
a
AWE NO. / 4— `--t to
Critical Areas Checklist
• Site Information (soils/topography/hydrology/vegetation)
1.
- Site AddressALocation: T o l l B AVF_ F_c>mo�fl S vu A ci Wo ZU
2.
Property Tax Account Number: ` 9 `i 0 3 0 k o O z O 3
3.
Approximate Site Size (acres or square feet): 1 5 000
4.
Is this site currently developed? X yes; no.
If yes; how is site developed? i;F5 IC)Er j T K(3"E_
5.
Describe the general site topography. Check all that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a
horizontal distance of 66-feet).
Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise
X of 10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe):
6.
Site contains areas of year-round standing water: Approx. Depth: -ES)
7.
•
Site contains areas of seasonal standing water: -4f)" ; Approx. Depth: �-
What season(s) of the year? _d9_
8.
Site is in the floodway --tE) floodplain --8- of a water course.
9.
Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? Flows are seasonal? (What time of year?
r;r,T,IL,M-V
•
•
&go.lgy-
City of Edmonds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable
City staff to determine whether any
potential Critical Areas are or may be
present on the subject property. The
information needed to complete the
Checklist should be easily available from
observations of the site or data available at
City Hall (Critical Areas inventories, maps,
or soil surveys).
An applicant, or his/her representative,
must fill out the checklist, sign and date it,
and submit it to the City. The City will
review the checklist, make a precursory site
visit, and make a determination of the
subsequent steps necessary to complete a
development permit application.
With a signed copy of this form, the
applicant should also submit a vicinity map
or plot plan for individual lots of the parcel
with enough detail that City staff can find
and identify the subject parcel(s). In
addition, the applicant shall include
other pertinent information (e.g. site
plan, topography map, etc.) or studies in
conjunction with this Checklist to assist
staff in completing their preliminary
assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
Name
lO t 1 i3 Av Z,
Street Address
F-0 Mot-io 5 w A °tYd Zfo
City, State, ZIP
Signature
Applicant Representative:
Name
Street Address
•
•
ZOG--77Y 7.Z33
Phone City, State, ZIP Phone
wl%�� 3 - 2`1- 9 `1 •
Date Signatuie Date
APPLICATION
The Cityof Edmonds for
SIDE SEWER PERMIT
NEW CONSTRUCTION ❑ REPAIRS ❑ EASEMENT No ...........................................
107-04700
OWNER ......... H.drry--- Wh_tt lltt............................................................... CONTRACTOR.............-----------------------.................------------------------..................... PERMIT No. ......................
ADDRESS .....101.1... E--Stre t------------------------------------------------------------------- LEGAL DESCRIPTION: LOT No............................................... BLOCK No.............................................
It
0
uj
W
W
X
co
NAMEOF ADDITION.........................................................................................................................................
DYE TESTED ON SEWER
JULY 9 1972
Approved:
DATE................................................ By.....................-----------.................................---
PLAT OF SURVEY FOR: HARROW ITCUTT
SOUTH 60.00 FEET OF LOT 10, F3LOCK 3,YOST's FIRST
ADDITION TO EDMONDSp ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 8 OF PLATSO PAGE 6p RECORDS OF
SNOHOMISH COUNTY, WASHINGTON.
SEP 71g45
30.00'
l A a e-Ao'oo'
125-00'-
on
QMID
F, w,0
.Fi.lo.
' ,.REID, MIDDLETON & ASSOCIATES
.406sukinq Englrice[c &land Surveyati!
Main St PR 8-1171 • f
EDMONUS,,. B�iIASHINGT0N
Joe' No: 1996..
i FB"56/46
December 3, 2001
Mr: Noel Miller
City of Edmonds
Dear Mr. Miller:
RECEIVED
DEC 1001
ENGINEERING DIVISION
I want to express. my family's appreciation for the interest and city activities surrounding the surface water a/�
conditions that my parent's property has experienced associated with the alley right-of-way and property /t�
build -out in the neighborhood. I also wish to thank city staff for the opportunity that Paul Dragoo, (my
engineer representative) and I had to meet with the City Engineer, on Friday, November 30, 2001. /' T
As we have previously indicated, alley surface water runoff was historically conveyed along the east side of
the alley to Pine Street. Over the years the adjacent properties have used the public right-of-way for yard
improvements that extend beyond their fence lines. Fill and rockeries have raised the topography of that
portion of the alley right-of-way. Consequently, the traveled portion of the alley has slowly adjusted to the
west. A route of flow for alley surface water disappeared. Altering storm water run-off from the alley has
exacerbated the traditional ground water conditions that we have privately had to deal with over the years.
In short, the current surface water issues that we have asked assistance in resolving include: increased
pooling of storm water at the entrance to my parents' garage and parking area (that is west of the alley
right-of-way); and the surface water traversing my parent's lot between the garage and south property line
that accumulates during minor storm events on the patio area between the garage and residence. We are
hoping that the improvements associated with the two catch basins will help to redirect surface water along
the historical route on the east side of the alley right-of-way.
As Dave, Paul, and I discussed on Friday afternoon, the raising of the finished grade of the alley and the
height of the berm associated with the westerly catch basin has created restrictions to ingress and egress for
my parents' garage and the level use of the adjacent visitor parking area lying perpendicular to the garage
entry. Your suggestion (this morning) that the alley surface should be re -graded as a cut (rather than built
up with fill) to promote right-of-way surface runoff returning to the historical route along the east line of
the right-of-way and minor adjustments to the height of the westerly catch basin features certainly sounds
like.a practical resolution to both the drainage and access issues. Mr. Dragoo has given me similar advice.
Mr. Dragoo has also suggested that we could create a shallow gravel filled trench adjacent to the garage
apron and extend that feature to the northeast corner of my parent's property. Mr. Dragoo believes that
such a trenching can be constructed consistent with the previous alley elevations and allow for the
conveyance of any storm water surface runoff collecting at the garage entrance back to the alley at the
northeast corner of my parent's lot. With the placement of a'minor amount of additional gravel between
alley improvements and the garage structure, he believes we can minimize existing conditions confronting
pedestrian use of the parking area during the wet season.
If such a minor improvement cannot be accomplished during your re -grading activities, might I have
permission to privately route such alley surface water runoff that collects on my parents' property to
a discharge point on the alley at the northeast corner of their lot? I could then place a small amount of
crushed rock on the parking area to tie it into the city's alley improvements.
Thank you again for all of your assistance. Please contact me at your convenience during the resolution of
this matter.
Scott R. Whitcutt
cc: Mayor Gary Hakkenson
City Engineer
Duane Bowman, Development Services Director
•
1011 B Avenue
Edmonds, WA 98020
Dec. 17/99 Telephone: 778-7233
Councilman Gary Haakenson
City of Edmonds
Dear Councilman Haakenson,
Thank you for your letter advising us that you would bring up
the problem in our alley at a staff meeting. I am assuming
that you already have, as I received a call from Jim Cameron
last Friday, Dec. loth that the crew would be out to attend to
the sd1aping of the alley on the following Tuesday as they could
not secure the right equipment on the Monday.
Well, they did come out on Monday the 13th and fiddled around
cutting a lip diagonally on the south side of the property of
the right-of-way running between the two catch basins. This lip
of course will be flattened in no time.
They did absolutely nothing to the right-of-way to the east of
our property so the alley still slopes to the west. As you know,
we had a terrible downpour on the Tuesday and during the night and
that amount of rain after only one 24 hour period has run into our
garage and off the alley onto our 5 foot apron to the cement floor
_leaving it in a muddy mess. It's a harbinger of what's go.ifi.g to
happen if our weather continues to be as rainy as it is today!
Why can they not scrape the alley to the east. I suspect it is
because they don't want to take out the "landscaping" on the property
L.o the east of us that is well in to the city's right-of-way. We
don't have any water in our basement yet, but it surely will if
this problem continues. Just as we've had in years past.
Please, continue to have this considered. It's a pain in the neck
for us and not our faults. The growth of Juniper Tams across the
alley needs to be removed so that the alley can slope to the east
harm4ng no one.
Again, thank you for your assistance. I was so pleased with your
efforts so far that I've spread the good word to many of our friends
and neighbors.
Merry Christmas and a most successful New Year to you in your new
position!
"*1011 B Avenue
Edmonds, WA 98020
Nov. 10/99
Councilman Gary Haakenson
City of Edmonds
Dear Councilman Haakenson,
Telephone 778-7233
•
Sincere congratulations on your land -slide win in the mayoral
election! You will no doubt be off for a short time after the
many hours you have put in to become our next mayor. Well done!
You asked Harry and me to get in touch with you if we continued
to have difficulty in getting the City to regrade our alley be-
tween 8th and B.
About three weeks after you -were -in our home, Noel Miller and
another City staff member were in our *alley when Harry happened
to be outside.' He told my husband that nothing could be done about
the rockery and growth infiltration, etc. that had accumulated in
the right-of-way, but that the d1`inage problem onto our property
could be attended to. We heard nothing further until I called
John Ttftelot. Mr. Turtelot told me he had nothing to do with
public .right-of-way and to get back in touch with Noel Miller. I
called Mr. Miller's office on Oct. 19th and put a message on his
voice mail requesting he call us back and let us know when they
would be grading the alley because of the drinage problem. So far
we have had no reply even though we have an4answering machine.
I've waited to push this until you were sure.to be our next mayor
but now I am getting worried about the heavy rainy season being
upon us and our once more having water collecting in pools in the
back yard and seeping into our basement. John had mentioned that
the City has a Dan Fien (?) who takes care of drainage problems.
I wish one of your staff would back up their service to the citizens.
Will you once again intervene, please? Whatever happened to the
signs in each department that assure us "We are here to serve _you"?
We would appreciate your assistance.
Best regards,
U dq
Jo fHarry Whitcut
J --AENN—
8g0 19°i O
•
U
CITY OF EDMONDS LAURA M. HALL
250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-0220 • FAX (206) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works • Planning . Parks and Recreation . Engineering
Mailed 10/10/95
October 10, 1995
Mr. and Mrs. Whitcutt
1011 B Avenue
Edmonds, WA 98020
Subject: Traffic restrictions in alley between Pine St. and Fir St.
Harry and Joy:
As you know, I sent letters in August to everyone abutting the alley. At that
time, I requested that people contact me with questions. I had two phone calls in
addition to your letters. In the August letter, I told the residents that I would
direct City crews to do work in the alley if corrections weren't completed by
September 8. Obviously, that deadline has passed, so I have requested that the
City crews remove all obstructions in the twenty foot wide right-of-way and install
gravel "shoulders" wherever applicable.
Thank you for bringing this situation to my attention. I hope that the crews
will have it corrected soon. If you would like to contact Bill Stroud at 771-0235,
he may be able to keep you apprised of the work schedule.
You should feel free to contact me at 771-0220 if you have any questions.
Sincerely,
rdon Ct Hyde
ngineering Coordinator
GCH/sf
e.
Watker
JOY10105.DOC
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
Harry & Joy Whitcutt
1011 B Avenue
Edmonds, WA 98020
Mr. Gordon Hyde
Engineering Coordinator
City of Edmonds, WA 98020
Oct. 11, 1995
Dear Mr. Hyde:
0cr 13 1995
ENGINEEHiNG
Thank you for your letter of Oct. 10th in regard'to the alley _
between- Pine& Fir -streets and—""B" and- 8th avenues.
We have uncovered property corner iron pins on the east side
of our lot which were placed as a result of a survey by Reid -
Middleton. (I sent you a copy of this survey map).
Using a tape measure indicates that the fence on the east side
of the alley is approximately six inches inside the 20' R/W.
Our feeling is that this does not seriously impact the use of
the alley. However, we see no justification for allowing the
existing landscaping to also invade the R/W. Removal of the
plants and rockery would, in our opinion, be an acceptable
solftion.
Sincerely, ,
copy to: Bill Stroud
SEp 2 9 1995
ENGINEERING
Harry M. & Joy D. Whitcutt
1011 B Avenue
Edmonds, WA 9.8020
Sept. 25/95
Mr. Gordon Hyde
Traffic Engineer
City of Edmonds
Edmonds, WA 98020
Dear Gordie,
Just a short note to ask you to inform us of the latest.
developments regarding.the improvement to the right of
way in our alley between 8th and B and Pine and Fir.
Since receiving.your letter proposing the changes that
should be made, we have heard from two neighbors asking
if we had any idea of what and when something would be
done to correct the situation.
Please advise us of what's happening.
Thank you for your consideration,
Sincerely,
0 0 i
SEP 7 1995
�NGfNEEiiIN€�;
Sept. 5, 1995
Gordon C. Hyde
Engineering Coordinator
City of Edmonds
Subject: Alley .between B Ave. S.
and 8th Ave. S.
from Pine St. to Fir St.
Dear__Mr__ Hyde -:__--
I am writing regarding obstructions in the above alley.
We are enclosing a copy of an engineering survey that establish-
ed the property corners for the south half of Lot 10 Blk 3. The
implanted pipe stakes of that survey help establish the'lot
property lines in relation to the alley R/W. (.The 20 ft. R/W
can be measured from these stakes). We will be glad to uncover
these stakes if they will assist you in your investigation.
We fully agree with your.observatio.n that there is an invasion
of R/W by rockery, fill, fences and landscaping. We agree that
this situation is hazardous to automobile traffic and diminishes
convenient access to our garage.
We ask that the situation be corrected.
Sincerely,
L l
6/rQJoy Whitcutt
Encl. Copy of Engineering survey
89p_199
August 17, 1995
CITY OF EDMONDS LAURAM.HALL
250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-0220 • FAX (206) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works • Planning . Parks and Recreation . Engineering
Resident
= azv O
t.
Edmonds, WA 98020
Subject: Traffic restrictions in alley between Pine St. and Fir St.
Dear Resident,
Mailed 8/17/95 (see also
additional addresse$ on
attached sheet)
A complaint has been received by the City regarding obstructions placed in the alley between B.
Ave. S. and 8th Ave. S., from Pine St. to Fir St. A site inspection shows most of the obstructions
are located on the east side of the alley, so your property may or may not be affected. This
notification is being sent to all seventeen (17) residences to enlist neighborhood cooperation to
rectify this situation. There are several locations where it is hazardous for people on B. Ave. S. and
8th'Ave. S. to enter or exit their rear accesses because of the various obstructions created by
landscaping, fences and rockeries. You may or may not be aware that the public right-of-way
through this particular alley is twenty (20) feet. If you do not know where your property comers
are, some of your neighbors may know, so you should be able to establish where private property
meets the public alley.
With the lovely summer weather we are enjoying this year, I realize it may be difficult to get out
and get the necessary trimming, fence moving and rockery relocation done. Because of the weather
conditions, the Street Maintenance workers will not be directed to do the necessary work until
September 18, 1995.
Your cooperation is appreciated. You should feel free to contact me at 771-0220 if you have any
questions.
Sincerely,
RDON C. HYDE
Engineering Coordinator
GCH/sf
'Oe�A
Wal er
ALLEYLTR.DOC
Incorporated August 11, 1890 0
Sister Cities Iriternational — Hekinan, Japan
•
Joy Whitcutt
1011 B Ave.
Edmonds, WA 98020
July 3, 1995
Dear Gordie,
I'r..;'!VFr, 0
J U l 6 1995
ENGINEthIN(a
I need your advice about a problem Harry and -I have had for some
years now and maybe you can head us in the right.direction to
solve it. I didn't.want to take up time talking about this at
our next parking committee meeting.
Abbut seven or eight years ago we contacted Bobby Mills about this
and got nowhere but perhaps the time is ripe now as the people
who live across the lane from u•s with the swimming pool have their
home up for sale.
When the pool was built a cyclone fence -was put up on the property
line we believe, according to where our survey stakes are located
inside the 20 foot right -a -way.. In addition, they."landscaped"
five to seven feet out into the right-of-way with Juniper Tams.
The problem was not super bad..until we purchased.a very good. used
LTD station wagon fr.om good friends and Harry deci.ded to close in
the carport to become a double garage. Even for ,-him it can be a
bit of a nuisance driving into the unfinished carport but absolutely
impossible for me unless I go back and forth many timesto`get the
vehicle in, under cover.
a •
We wish the landscaping could.be torn out so we had the proper
use of the lane. The people just north of the.pool'people added
railroad ties etc. to their west side of their property with rocks.
It's a wonder the City hasn't been sued yet with'someone scraping
the side of their cars as they drive back and.forth to their
garages. We would love to see the lane•paved properly with an
LID but I don't know how the rest of the neighbors would feel
about it.
Anyhow, Gordie, could you .give us an idea of the•next step we
should take -to get the alley back to its 20 ft. right-of-way??
Thanks for any suggestions or assistance. You could call Harry
or me at 778-7233.
See you on the 12th.
0
Resident
740 Pine St.
Edmonds, WA 98020
August 17, 1995
Subject: Traffic restrictions in alley between Pine St. and Fir St.
Dear Resident:
A complaint has been received by the City regarding obstructions placed in the
alley between "B Ave. S. and 8th Ave. S. from Pine St. to Fir St. A site
inspection shows most of the obstructions are located on the east side of the
alley so your property may or may not be affected. This notification is being sent
to all seventeen residences to enlist neighborhood cooperation to rectify this
situation. There are several locations where it is hazardous for people on "B"
Ave. S. and 8th Ave. S. to enter or exit their rear accesses because of the
various obstructions created by landscaping, fences and rockeries. You may or
may not be aware that the public right-of-way through this particular alley is
twenty feet. If you do not know where your property corners are, some of your
neighbors may, so you�should be able to establish where private property meets
the public alley.
With the lovely summer weather we are enjoying this year, 1 realize it may be
difficult to get out and get the necessary trimming, fence moving and rockery
relocation done. Because of the weather conditions, the Street Maintenance
workers will not be directed to do the necessary work until September 18. Your
cooperation is appreciated. You should feel free to contact me at 771-0220 if
you have any questions.
Sincerely,
Gordon C. Hyde
Engineering Coordinator
1011 B. Ave. S:
1021 B. Ave. S.
1029 B. Ave. S.
1031 B. Ave. S.
1041 B. Ave. S.
1049 B. Ave. S.
1053 B. Ave. S. ✓
1063 B. Ave. S..
1002 8th Ave. S.
1010 8th Ave. S
1016 8th Ave. S.
1018 8th Ave. S.
1034 8th Ave. S
1036 8th Ave. S "
1042 8th Ave. S
745 Fir St.
r1l '�- /9 �' S -
ALLEY_B.DOC
I •
i
CITY OF EDMONDS
250 5th AVE. N. • EDMONDS, WASHINGTON 98020 • (206) 771-3202
COMMUNITY SERVICES
Harry and Joy Whitcutt
1011 B Avenue
Edmonds, WA 98020
Dear Mr.1& Mrs. Whitcutt:
•
October 9, 1986
SUBJECT: Alley at 1011 B Avenue
LARRY S. NAUGHTEN
MAYOR
PETER E. HAHN
DIRECTOR
STgFz�TF /(4%
I have looked at the situation you wrote about and discussed it
with you: You have indicated that you may place a fence on your
property line. If and when you do, I will. notify the resident across
the —alley to remove their landscaping before you install your fence.
i
I do not see any real problem at this time. If any work was to be
done by the City, I would also notify the resident to remove the
landscaping. If you wish to discuss this further please contact me at
771-3202, extension 296.
Sincerely,
BOBBY R. MILLS
Superintendent of Public Works
cc: Mayor Naughten
Bill Stroud
PUBLIC WORKS • PLANNING PARKS AND RECREATION ENGINEERING'
MEMORANDUM
July 11, 1986
TO: Larry Naughten
Mayor
FROM: Bobby Mills kW'
L
SUBJECT : ( 1011 B AVENUE
I have loo at ,this and it is a very touchy subject. There is
really no pro em. The only thing that could happen is that the
neighbor's s which is planted in the alley, could get run over.
CSome day we ill need to widen the alley and at that time the shrub
will need to removed. I will have Bob Alberts look at this with
me. We will ep you informed.
/cr OL"',
F way-��-
J
►or's Desk
�S
CEIVED
18 1988
LIC WORKS
l -..�S(C. 1,
3 of,> -to
'o
Feb. 5, 1986 City of Edmonds Survey
It
We are pleased we are one of the 2000 who received the survey form to
fill out and return. You will see that we are generally pleased with
the way the different departments operate.
We do have one particular complaint that is personal to us and maybe in
other areas of the city. We complained once before of this problem and
city staff arrived to look over the situation but nothing was done about
it. We would now like to take the opportunity to place a..formal complaint
in -writing and it is the followings Landscaping_encr_oachments on ---pubic
rights of way, such as the alley between Fine and Fir_ streets and 8th and
B avenues should not be permitted.
Though we own two compact cars it is difficult to avoid driving on top of
the shrubs that have been planted into the right of way as we back out of
our garage or carport. Logs have been placed on the right of way, and
short stakes, to hold the plastic down so that weeds don't grow up between
the shrubs. `
We would appreciate very much the city attending to this problem. It would
seem at first that "landscaping" is a great idea, but to us, in this parti-
cular area it has been a great nuisance.
Thank you for your cooperation.
Sincerely,
Harry & Whitc
1011 B Atue
Edmonds, WA 980 778-7233
IN
MEMORANDUM
July 11, 1986
TD: Larry Naughten
a Mayor
FROM: Bobby Mills
Public Works Superintendent
SUBJECTz 1011 B AVENUE
I have looked at this and it is a very touchy subject. There is
i really no problem. The only thing that could happen is that the
i neighbor's shrub, which is planted in the alley, could get run over.
Scare day we will need to widen the alley and at that time the shrub
will need to be removed. I will have Bob Alberts look at this with
me. We will keep you informed.
/cr
I
STREET FIDE