Loading...
10204 EDMONDS WAY.PDFiiiiiiiiiiiiii 10994 10204 EDMONDS WAY RIGHT-OF-W ity of Edmonds CONSTRUCTION PERMIT A. Address or Vicinity of Consfm6tion: ) 0o U B. Type of Work (be specific): 1i �'_ '• 1 �� �— cJQ C L CSC a n r C. Contractor: Y''1 r O Y.i tK Mailing Address: 1 State License:#: City Business License #:t D. Building Permit # (if applicable):`" A� E. ❑ Commercial ❑ Subdivision ❑ Multi -Family [ Single Family 1 INSPECTOR: F. PAVEMENT CUT: [<ES CONCRETE CUT: ❑ YES G. ❑ Mail Approved Permit 0 Pernut No• 32Z423 Issue Date: & J/— 0 - 0 � _ l Ul C.<<-r (C37 �-°j q(o . Contact: ' C Q Phone: c4Uu - 1--� � G — q a+ l Liability Insurance: Bond: $ ? Side Sewer Permit # (if applicable): ,N. ❑ City Project ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD) ❑ Other ❑ NO ❑ NO ® Call for Pickup G. SIZE OF CUT _ X S INDEMNITY. Applicant understands by his/her signature to this application he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the Citv of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. o Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. o Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — NO EXCEPTIONS. o Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK I HAVE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THAT I MUST MAKE THE PINK COPY OF THE PERMIT AV AILABLE ON SITE AT ALL TIMES FOR INSPECTIONS Signature: r'�J K Q S"' �L Date: d — �Q O N� (Contractor or Agent) P CADocuments and Settings\CurtisNy Documents\Forms\Engnrng\ROWpermit_ doc Revised 10/01/03 Pilchuck Contractors, Inc. y�xo Job # 107024946 Oct 5, 21005 Sheet 1 of 2 Rob Inglis'b°'"� NOT TO SCALE Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds Traffic Control specs. 2. Channelizing devices are 28" traffic cones. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected residents. 5. Work to take place between 9 a.m. And 4 p.m. 6. Work area will be 22' NW of CA of 102 PI SW & 90' SW of CA of SR 104. MEDIAN APPROVED Ab NU I EU 1� BY ENGINEERING QV Chi NERl�G)Ir 'F" ':-OR IS RESPONSIBLE FOP El`EROS Ol :'aT t y . A,kT) DRAINAGE a3SOl0 0& HltlM301S WORK AREA 3' x 5' • • IN SHORT LENGTH • O OF SIDEWALK ALONG 102 PL SW PEDESTRIANS TO BE • ASSISTED BY FLAGGER • • • CHANNELI7ATION DEVICE SPACING MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MEDIAN 4 4wpp LEGEND • 28" TRAFFIC CONE ® WORK AREA TRAFFIC FLOW rrFLAGGER WORK VEHICLE SIGN LOCATION Pilchuck Contractors, Inc. ay�Nv Job # 107024946 Oct 5, 2005 Sheet 2 of 2 Rob Inglis �'`°�°`"� Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds Traffic Control specs. 2. Channelizing devices are 28" traffic cones. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected residents. 5. Work to take place between 9 a.m. And 4 p.m. 6. Work area will be 22' SE of CA of 102 PI SW & 90' SW of C/L of SR 104. MEDIAN i'iPPRM:D AS Nu i to BY ENGINEERING Date:__- ��' ♦ 5P QV �O Ct":NER/CONTRr; nR IS RESPONSIBLE FOB? ,•..,.'. r,. �. J; IF coo �0, WORK AREA 3' x 5' IN GRASS AND O GRAVEL SHOULDER • o e 0 CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 NOT TO SCALE MEDIAN 44ip LEGEND • 28" TRAFFIC CONE ® WORK AREA TRAFFIC FLOW mrFLAGGER WORK VEHICLE e SIGN LOCATION Z BRANCH SADDLE o 90'W, 22'NCA r � p'o Q f STANDARD GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE —CALL" TWO 9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 1-800-424-5555. IN KITTITAS COUNTY CALL: 1-800-553-4344. 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND 2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START(SEE PERMIT FOR ALL VALVES WHERE PERSISTANT SNOWFALL MAY OBSCURE THE VALVE BOX . REQUIREMENTS). 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS 3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY FIELD PROCEDURES. APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 4. ,• EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 45 PSIG. �p4 c<` \ .TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL 'f 'LOCAL JURISDICTION REQUIREMENTS. 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 5. NOTIFY PROPERTY "'OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. ro MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. DISTRIBUTE FLYERSALONG WITH LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING REGARDING THE PURCHASE OF AN EXCESS FLOW VALVE, IF APPLICABLE. STANDARDS 2525.3400, AND 2525.1200. � 5 r 6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE—IN METHOD OR ADDITIONAL MAIN 15. MAINS AND SERVICES SHALL BE TESTED AND .PURGED PER PSE GAS OPERATING FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. STANDARDS 2525.3300 AND 2525.3400. 2b Q �i`'/ 19b 7. COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECHNICIAN ------------- AT-------------- 5CI 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE 17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS —BUILT IN RED. ') DENOTES FOOTAGE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. ( BETWEEN FITTINGS. L,O. sr s o �ti 2"MPEPOLYVALVE a /m / (OPEN POSITION) �� \ ,ti' goti 90'W, 30'5 CIL - —PROP. 2" Air=ZP rn,14AIN / (CUSTOMER PROVIDE TRENCH) 90'W C/L PLOT PLAN \. SCALE: 1 "=50' ` eL O ?y c END Of MAIN (2" MPE CAP) 90'W, 310'S CIL GAS PIPE DIRECT BURY CUSTOMER PROVIDED TRENCH NTS 1. IF THE TRENCH BOTTOM CONTAINS ANY SHARP OR UNUSUALLY ROUGH SURFACES, A MINIMUM OF 3" OF INITIAL BACKFILL MATERIA6 IS REQUIRED TO BED THE PIPE, UNLESS THE CARRIER PIPE IS ENCASED OR WRAPPED WITH AN APPROVED ROCK SHIELD MATERIAL: 2. INITIAL BACKFILL SHALL BE SAND, NATIVE SOIL, OR SOIL -BASED SELECT MATERIAL THAT DOES NOT CONTAIN ANY SHARP ROCKS OR ROCKS LARGER THAN 1/2" DIAMETER. SEE PSE SPECIFICATION 1275.1380, "SAND BACKFILL FOR GAS PIPE, ELECTRICAL CONDUIT, AND CABLE. 3. A MINIMUM OF 6" OF INITIAL BACKFILL SHALL BE PLACED OVER THE GAS PIPE. IF THE NATIVE SOIL CONTAINS ROCKS LARGER THAN 6" DIAMETER, THEN A TOTAL OF 12" OF INITIAL BACKFILL SHALL BE PLACED OVER THE GAS PIPE. 4. IF THE CARRIER PIPE IS ENCASED, INITIAL BACKFILL IS NOT REQUIRED. THE BACKFILL MATERIAL SHALL MEET FINAL BACKFILL MATERIAL REQUIREMENTS. WHERE THE CARTER PIPE ENTERS AND EXITS THE CASING, THE INITAL BACKFILL AND BEDDING REQUIREMENTS APPLY. 5. FINAL BACKFILL MAY BE SOIL -BASED SELECT MATERIAL OR NATIVE SOIL, BUT SHALL BE FREE OF CONSTRUCTION DEBRIS AND SHALL NOT CONTAIN ROCKS LARGER THAN 10" DIAMETER TO PREVENT IMPEDANCE OF GAS SYSTEM MAINTENANCE. FITTER (CHECK BOX IF COMPLETE) Work area left in Clean & Safe condition. ❑ GorrlPlgte all Pipe Tables and Gas Pressure Stamp. ❑ Field changes Red —Lined on as —built. ❑ Material verified and Changes noted on paperwork. ❑ All Valve & Tie—in Locations noted on as —built. ❑ Note beginning of Main, EOM & Line of Main locations. ❑ Show Rope Locations & Cul—de—sac Radius. ❑ Foreman's Signature Company PILCHUCK DATE 1 REV I BY DESCRIPTION. DATE GAS MAIN INSTALLATION/RETIREMENT Type/Work Pipe Size Type Estimated Length Actual Length Manufacturer INSTALL 2" MPE 60' PLAT 2" MPE 280, GAS MAIN PRESSURE & TESTING TYPE TEST PRESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF TYPE TEST PRESSURE TESTED BY DATE ON TIME ON DATE OFF TIME OFF Design Press 60 SYS MAOP 45 PSI& PROJECT PHASE NOTIF# ORDER# a O SAP Superior Service/Meter Service/Meter Service/Meter Service/Meter Service/Meter Service/Meter Service/Meter Service/Meter Retirement Retirement X208511470 107024946 X208517072 106161327 X208515062 Contractor. CONSTRUCTION COST CODES: 051-103-4 Project Manager Contact Information: KIM GRAY 425-290-2678 Cell Phone kim.gray@pse.com REV# DATE BY DESCRIPTION 2 t Vicinity Map Owner/ Developer Contact Info MATTGALVIN 423 E PIKE 5TREET SEA TTIE WA 98122 ATTN: ED CHAPMAN 206-372-1196 office CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES REAL ESTATE/EASEMENT PERMIT CSE EDMONDS FUNCTION / I CONTACT PHONE I DATE PROJECT MG KIM GRAY 206-418-4233 ENGR - GAS DRAWN BY CHECKED B' COUNTY EMER SECT GAS WK CTR APPROVED B' SNOHOMI5H 5 MCN5E& CP TECH. 1/4 SEC OP MAP PLAT MAP NW 36-27-03 164.062 166.066 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES _ CONTACT PHONE# PUGET SOUND ENERGY DESIGNED BY PILCHUCK CONTRACTORS INC. MLOCK 206-418-4217 10-03-05 KIM &RAY 206-418-4233 /0 3 05 IM 5NYD 206-418-4220 /D G/ MgLIACCI CORPORA TION 2" MPE IP MAIN EXTENSION 10204 EDMONDS WAY EDMONDS, WA 98020 Superior Order: Drawing Number: N/A SCALE: PAGE; 1" = 50' 1 1/1 3 U