1025 CASCADE LN ADDITIONAL.PDFIIIIIIIIIIIIII
13861
1025 CASCADE LN
ter.
ti
ADDRESS: 0 Ug -U a JjZejr=�
TAX ACCOUNT/PARCEL NUMBER: ()D5 qZe n D O Q O ko o
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS (RECORDED) FOR:
CRITICAL AREAS A/ DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER): C l dl D'1-[ b ) 1975 v 6k1 1.4dd I I i M 00 91XI ,P
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE $: LID #:
SHORT PLAT FILE: LOT: BLOCK:
SIDE SEWER AS BUILT DATED: �. �Cu� N7 Z
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
FOR:
WATER METER TAP CARD DATED:
LATEMP\DST's\Fonns\Street File Checklist.doc
APPLICATION
for
The City of Edmonds SIDE SEWER PERMIT EASEMENT No ...........................................
NEW CONSTRUCTION ❑ REPAIRS ❑
118-06900
OWNER..........E L-01-..................................................•-----------------------------. CONTRACTOR................................----............------.....---.................................... PERMIT No.......................
IADDRESS ......1.025 c.asCaae...Ldne...................................................... LEGAL DESCRIPTION: LOT No............................................... BLACK No.............................................
•
0
NAMEOF ADDITION.........................................................................................................................................
Dye T¢sted On Sewer 1972
Approved:
DATE................................................ By.---.................---..............................................
0
I '%Qwkftv� O
890 19�i
: 1 STIkET FIL
CITY OF EDMONDS RRYS NAUGHTEN
250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-3202 MAYOR
COMMUNITY SERVICES: PETER E. HAHN
Public Works • Planning • Parks and Recreation • Engineering DIRECTOR
August 2, 1990
W.E. Stubbs
1025..•Cascade Lane
Edmonds, WA 98020
Dear Mr. Stubbs:
Attached is a letter we need to have you sign and return to the Public
Works Division regarding the the.installation of the new storm sewer
line on Cascade Lane.
Should you have any questions, please contact Bobby Mills at 771-3202,
extension 314.
Sincerely,
Linda Klein
Public Works Secretary
CASCADE/TXTLMK41
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
\� 1
• : ,cr
Date:
TO: City of Edmonds
Public Works Division
250 - 5th Ave. N.
Edmonds, WA 98020
The City of Edmonds is authorized to enter my property at 1025 Cascade
Lane to improve drainage by installing a new storm sewer line down
Cascade Lane. The City will be cutting the asphalt to install the new
line and agrees to the following:
1. Patch asphalt upon completion.
2. Pay for overlaying to the south part of driveway,
approximately 12' x 60' and at the same time we will be
paving our complete driveway.
3. Remove and replace the shrubs existing where the City will go
through the fence.
4. Neighbors requested a new cedar fence to shield car lights
and to provide privacy because of the removal.
5. 4' X 4' border to be replace as existing.
6. Catch basin will be replace 10' to the north to provide good
drainage.
7. Gravel will be provided as requested which the cost will be
reduced from the paving bill.
Authorized:
W.E. Stubbs
DRANIMP/TXTLMK41/2
CITY OF EDMONDS
250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-3202
COMMUNITY SERVICES:
1
Public Works • Planning Parks and Recreation • Engineering
j890 91)
July 27, 1990
W.E. Stubbs
1025 Cascade Lane
Edmonds, WA 98020
LARRY S. NAUGHTEN
MAYOR
PETER E. HAHN .
DIRECTOR
Dear Mr. Stubbs:
Per our discussion, the City proposes,to improve drainage by installing
a new storm sewer line down Cascade Lane through your property. We
will be cutting the asphalt to install the new line. The City agrees
to the following:
1. Patch asphalt upon completion.
2. Pay for overlaying to the south part of driveway,
approximately 12' X 60' and at the same time you pave your
complete driveway.
3. Remove and replace the shrubs existing where we go through
the fence.
4. Neighbors requested a new cedar fence to shield car lights
and to provide privacy because of the removal.
5. 4' X 4' border will be replaced as existing.
6. Catch basin will be replaced 10' to the north to provide
good drainage.
7. Also gravel will be provided as you requested which the cost
will be reduced from the paving bill.
If these items are correct please sign the attached copy and return it
as we want to start as soon as possible.
Sincerely,
/o' 2
Bobby Mills
Public Works Supervisor
cc: Mr. Ferkinstad
Bob Alberts
Bill Stroud
DRANIMP/TXTLMK41
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
to
Date: AUG i99®
TO: City of Edmonds
Public Works Division
250 - 5th Ave. N.
Edmonds, WA 98020
The City of Edmonds is authorized to enter my property at 1025 Cascade
Lane to improve drainage by installing a new storm sewer line down
Cascade Lane. The City will be cutting the asphalt to install the new
line and agrees to the following:
1. Patch asphalt upon completion.
2. 'Pay for overlaying to the south part of driveway,
approximately 12' x 60' and at the same time we will be
paving our complete driveway.
3. Remove and replace the shrubs existing where the City will go
through the fence.
4. Neighbors requested a new cedar fence to shield car lights
and to provide privacy because of the removal.
5. 4' X 4' border to be replace as existing.
6. Catch basin will be replace 10' to the north to provide good
drainage.
7. Gravel will be provided as requested which the cost will be
reduced from the paving bill. ,
Authorized:
W.E. tub
DRANIMP/TXTLMK41/2
MEMORANDUM
November 8, 1990
TO: Bob Alberts
City Engineer
FROM: Bobby Mills a r�-
Public Works Superintendent
SUBJECT: PAYMENT OF ASPHALT AT 1025 CASCADE LANE
Per our agreement, we are to pay for 12' x 60' of asphalt overlay for
Bill Stubbs at 1025 Cascade Lane. We have installed our storm sewer
through his driveway. He waited all summer to allow us to place our
pipe down his driveway.
We had 80 sq. yds at $6.97 each = $557.60
Tax 45.16
TOTAL $602.76
The City supplied 3 yard of crushed rock at $18 per yard including tax.
Total Asphalt = $602.76
Crushed Rock = - 54.00
TOTAL 548.76
BM/lk
Attachments
n
ASPHALT/TXTSTREE
Stubbs
6JS4-onle r-
t<Not,j Wck
0-(MuA�
mek4r
(t4nrljt> Ujo�
-33qz
. J, I I I (I F-FAUD (1k.-Jure—I
vzoo
pce5
rJ8
Lime 7 -(a
WcLr CdKL'G� s 2 A
Zq
z .
(00
pVe�La�c
if � 9:�--
2-0 — t ,
over Lny
LYNNW
P.O.
BOO 1800FFICE OLDS - OLYMPIC, INC. LY SEATTLE632.0450
LYNNWOOD. WA 9"^16 Residential & Industrial Heating Oils FAX 771-4346
Heating & Air Conditioning
Asphalt Paving
Bill Stubbs
1025 Cascade Drive
Edmonds, WA 98020-2941
502418
10-31-90
P1_E-_A'.3E RETURN THIS PORTION WITH PAYMENT
Prepare and pave with asphalt: 10-25-90
1025 Cascade Drive
Edmonds, WA
Per Bid $ 2,908.58
Tax 8.1 (Ed) 235.59
TOTAL AMOUNT DUE $ 3,144.17
1 LDS OLYMPIC INC*
LYNNWO.1 OFFICE
OPERATING OLYMPIC PAVING
P.O. ,BOX' 120
6016204TH S.W. HEATING OILS • ASPHALT PAVING -b-.JZ-U4bU
LY , WA 98036
HEATING 8 AIR CONDITIONING
778-3124
-3124
PROPOSAL SUBMITTED TO
Bill Stubbs
PHONE
774-6102
GATE
7-16-90
STREET ADDRESS:
1025 Cascade Lane
JOB LOCATION
1025 Cascade Lane, Edmonds
CITY, STATE, ZIP
Edmonds, VIA 98020
-.�---- Soil sterilize and pave _b1 h=d 8 .1 sn Yris of 2" Class "B" 14odified
asphalt 'at. p and overly 334.2 sq yds -.atn IL" inches -of Class "B"-
modified Asphalt alt Mat. ---- --- - --
1 sc ds tat _ b s 7------- 2L908. 5
Customer has gates removed, trims rack all bush place crushed rock in
the rett_Lav_i-�ar'ea and hag the dui out area ready to ;gave. _
If sa-cmuttin7,is needed the charge is 250 per foot per inch.
If .;you need us to dace crus'ned rock in the storm sewer drain dug out area
the chlrZmu7-d be �18.00 a tons _1e_ estimate 4 tons.
LL PRICES PLUS TAX
law
A late payment charge may be made on any past due balance, which the calls
a "FINANCE CHARGE", and it is computed at a monthly rate of t'h% (ANNUAL
AUTHORIZSQ_
SIGNATURE
THIS PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED
PERCENTAGE RATE OF EIGHTEEN PERCENT). It is agreed that in case suit is
instituted to collect amount due on this contract or any portion thereof, reason-
30 DAYS
able attorneys fees and court costs may be added to this contract.
WITHIN
Permits, if required, will be the owner's responsibility.
We shall not be liable for damage to or breakage of septic tanks, underground pipes, and or conduits not visible from the surface of the ground nor for any
damage to approaches (including sidewalks) from the street to the property line.
We cannot be responsible for sub Qrade failures',or settling of subgrade material which was not installed under the above agreement.
Soil sterilization (weed killer), if included in contract, will be applied at rates specified by manufacturer. Olds Olympic Inc. will not be responsible for any subse-
quent growths of horsetail weed, morning glory, deep rooted terns, or perendials, which have not reached maturity prior to application.
All material is guaranteed as specified. All work to be completed in �workman-like manner according to standard practices.
Olds Olympic Inc. accepts no responsibility for any work other than I at specifically described above. Any additions to or alterations of the at)ove work will De
executed only upon written orders and may become an additional charge.
All agreements are contingent on strikes, accidents, delays: of carriers, and other delays unavoidable or beyond our control.
1
ACCEPTANCE —YOUR SIGNATUROjON ONE COPY, RETURNED TO US;
WILL MAKE THIS A LEGAL CONTFIACT PENDING ACCEPTABLE
CREDIT APPROVAL.
/�_�/
ACCEPTANCE BY DATE