1028 PUGET DR.PDFiiiiiiii lill 11
12873
1028 P U G ET DR
r
TAX ACCOUNT/PARCEL
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS (RECORDED)
CRITICAL AREAS: v �>- DETERMINATION: ❑ Conditional Waiver ❑ Study Required
,,,�Waiver
DISCRETIONARY PERMIT #'S: f U -( — U,P\ 12 v LWr fzw T I
quo-z0►-3 JgJ26L
og
L/ 44d-
DRAINAGE PLAN DATED: "L
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED
PERMITS (OTHER):
PLANNING DATA CHECKLIST DA'
SCALED PLOT PLAN DATED: C V J
SEWER LID FEE $:
LID
SHORT PLAT FILE: LOT: BLOCK:
SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #:
SOILS REPORT DATED:]
STREET USE / ENCROACHMENT PERMIT #: P �/ V n /
V
WATER METER TAP CARD DATED:
OTHER:
L:\TEMP\DST's\Forms\Street File Checklist.doc
i I
�LkG,e c
Z. S ID LA-ALK /°�sPC-c.rj of,4
NAL
Q1� _
OVA
DCCI 1)60US
opr0 tZE A4 A t ,�
,V
1 S t-t �cJ�S A �� 5'�C..t, •
rp2Es s -ro t Re A,c o ye
APPROVED AS NOTED
BY GINEERIN
TdY1 �dn h
I
Date: !9 �
�A
I
•
a
APPROVED AS NOTED
BY ENQINEERIN
ll
i
NIIN . =wmae
e
Date:
-IRIS Tt-IJ rwr— (-"OUT OF: ( -�Jl✓S
aNLq. USE' WAtGfffb 14-7 pl-�
'f?k S IANPc6i;e- +"fZMgK)T
TRkFtt t o"FROL.
PLM
NIIN . =wmae
e
Date:
-IRIS Tt-IJ rwr— (-"OUT OF: ( -�Jl✓S
aNLq. USE' WAtGfffb 14-7 pl-�
'f?k S IANPc6i;e- +"fZMgK)T
TRkFtt t o"FROL.
PLM
END or reverse cone toper to
r�R show end of work area
G20-2o Buffer Vehicle with
500' MAX TMA (optional)
100' (See Note 2)
A R�"
I
e wunn
e AREA
1
NOTES
1. Flashing warning lights and/or flags sholl,be
used to call attention to early.worning signs
when specified in contract.
2. See Buffer Data Table. Use of.buffer vehicle
is recommended. It may be a work,vehicle. if
buffer vehicle is used. minimum from end of
toper to work area shall be total:of "R" (roUl
ahead distance) plus length of vehicle. plus "B"
1 y 0 1 1 1 (buffer space). If buffer'veh(cl'e is -not used.
0 minimum distance, shall be "B"..
N4-2(L) M20-5(R) w26-1
Block on Orange I ROAD.
RItA-HEQ
D WORK
AHEAD
1 1 1
SIGN SPACING TABLE
Speed
X
45/50 MPH
5001S
35/40 MPH
350't
25/30 MPH
2001!
LEGEND
a 0 o ChonAelizing.0evices
464 Sequential Arrow sigh
Onp0 fal Ourr loaneadividedylr adoperation
ay Pere one oons s cotsed.
BUFFER DATA
Buffer Space
"
Speed (MPH)
25.
30
35°
40
45
50
8 (FT) _
-55
65
120
1701
220
280
.Buffer Vehicle Roll Ahead Distance
4 Yard Oump Truck
24.000 LBS
Stationary
Operation
R (FT) =
100
MINIMUM TAPER LENGTH = L IN FEET
Lane
Width
(feet)
Posted Speed (MPH)
25
39
3S
40
45
50
10'
105
150
205
270
450
500
11
ll5
165•'.
225
295
495
550
12
125
IBO
245
320
540
600
;CHANNELIZING
DEVICE SPACING (FT)
MPH
Taper
Tangent
35/50
30
60
25/30
20
40
FOR LOCAL
TRAFFIC CONTROL P•
0 AL
:STANDARD PLAN K-7
APPROVED FOR PUBLICATION
WWIINC70� sett MMwr OF 1"194 TAna
wtlx1no=
CITY OF EDMONDS
121 5THAVENUE NORTH • EDMONDS, WA98020 • (425) 771-0220 • FAX (425) 771-0221
Website: www d.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
C. 1890 Planning - Building - Engineering
November 23, 2004
Andy Borowski
1028 Puget Drive
Edmonds, WA 98020
GARY HAAKENSON
MAYOR
SUBJECT: Final Engineering Approval at 1028 Puget Drive, Permit #2003-0914
Mr. Borowski,
The City of Edmonds is in receipt of your letter dated November 19, 2004 requesting final
engineering approval prior to completion of the driveway and entrance.
The City of Edmonds will allow you to post a bond for the driveway improvements for 30
days. During this timeframe you must complete the driveway improvements and gain
approval by the engineering division. You will be required to obtain a bond in the amount of
$4920 prior to receiving engineering final approval. Please contact a Permit Coordinator in
our Development Services Department for the appropriate bond forms.
A bond will not be accepted for the sidewalk and driveway approach improvements. This
work however falls under the approved right-of-way construction permit, #2004-0321, which
does not expire until January 21, 2005. The sidewalk and driveway approach must be
constructed and approved by the engineering division prior to this date. In the event the work
is not complete by this date, you will be required to make application for a new right-of-way
construction permit at double the permit fees.
Please keep in mind that a final engineering inspection has not been performed on the subject
property and it is possible that corrections may stem from that inspection. Any corrections
noted will need to be addressed prior to engineering final approval.
Please feel free to contact me with any questions you may have at 425-771-0220, ext. 1338.
Please call for your required engineering inspections at 425-771-0220, ext. 1326.
Sincerely,
464
Jeanie McConnell
Engineering Technician
c: street file
--R'TW Permit #2004-0321
Permit #2003-0914
Incorporated August 11, 1890
RECEIVED November 19, 2004
Andy Borowski NOV 2z 3'2004 Permit # 2003-0914
1028 Puget Drive PERMIT
Edmonds WA 98020 COUNTER
City Of Edmonds
ATTN: Engineering Dept.
We would like to request engineering final project approval to be issued before the
driveway is finished. The standard driveway entrance will be completed by SMD Inc. as
soon as the Right of Way Construction Permit is issued. After the entrance is complete
Olympic Paving Inc. will finish with the asphalt. We agree to complete this project within
30 days. If required we are willing to post a bond deposit to cover this project until it is
complete.
Sincerely,
Indy Borowski l
0
OLYMPIC PAVING, INC.
P.O. Box 438 '
Lynnwood, WA 6-04M
Phone: (425)778-3126
Fax: (425)775-1811
M Andy Borowski
1028 Puget Drive
Edmonds WA 98020
Attn:
ASPHALT PAVING
BID PROPOSAL
Date: 10/7/2004
Phone: 425-672-M45 Fax:
SITE: same
Asphalt Paving:
Remove 5' section of existing asphalt at existing driveway, remove speed
bump, load and haul away. Raise meter to grade. Fine grade existing
crushed rock in new area, adding new crushed rock as necessary. Compact
and soil sterilize. Clean and tack existing asphalt. Pave the entire area, old
& new with 2" Class "B" modified asphalt hot mix. 1 $4,100.00
92o q�c(
Mlowr►—
' EXCLUDES: Concrete work, bulkhead work, placing new water basin, city permit.
r
PAYMENT DUE UPON RECEIPT OF INVOICE • ALL PRICES PLUS TAX
of K8 TO C(e POMER 716 contractor is na must he contractor the Sbte d Washingtam Re�tra ion Alp, OL.YMPPWMD, ExA June 1st b a general contractor and has posted with the Stab a bard of cash deposit
o(� � to tAe l�+damrpose ofsatisfyingh ol& im o *a m � r O*W ne improper work or breach of camsd in the conduct of the contractor's business. This tad or cob deposit rosy not be
by the c*n&WtDr Or b corer • chains subcontractor
which mian arise how the work doer under your oororact If any aaPpiter of materiab used in your mtntrvction or an en
ployee of docvneekb froo each r� your Pr�Y may be lend b force payment U you wish additional PMWCUM You May request the contract m� contractor subcontractor
Dorigi ntol a not paid
supplier subcontractor on your project The contractor is required b P Y originate wbu rdeal o
available from the Department of labor and idnaletea T°9+r provide you with further tnlormation about lien release documents ti you request it General Udormatioa b also
PERMM If _1 K will be the owass' rmpoinsibilay. We shag sot be liable for damage b or breakage d septic talks
for any dssage b approachtes (including sidewalks) (rout like West b the property lute. We cannot a responsible for su�bgrade � pip�or aaand/or c aconduib not visible from the surface of the ground ant
above agreleent Boll gaWntbn (weed kaft if not htchxW in the contract, will be at rates ng will no material which or a not ubasq eel Bader the
of horsela9 weed. morndog glory, deep rooted friar, or poentdsls, which have not reached by manAll our er Olympic is guaranteed
u r Farina lac. ifie not be work to be
for any subsequent growth
awns according to standard peactic>rs Olympic Favisg, Inc. Pwo to aher don
t All aui y d! b described
abov as specified. a d i All work b bi ns o f th eel in a workma ill be
etrcuatd aaA' upon wdMa orders and > ro �W�iY � any work other Nrnt the specifically describdd above. Any additions or attegtiorr of the above wort will be
say became an additional charge. AE agreematb are contlngerd an shOws, accldenfa delays of carriers and other delays unavoidable or beyond our control
A late psyrnent charge may be made on any past due balance, which the law calls a "FINANCE C HARGO, AND rr IS COWIPUTED AT A MONTHLY RATE OF 11/2% (ANNUAL
PERCENTAGE RATE OF EIGHTEEN PERCENT). it is agreed that in case suit is instituted to collect amount due on this contract or any portion thereof, reasonable attorneys fees
and court scats may be added to this cattrect
AN AUTHORIZED SIGNATURE ON ONE COPY, RETURNED TO US, WILL MAKE THIS A LEGAL CONTRACT PENDING ACCEPTABLE CREDIT APPROVAL AND WILL BE
REQUIRED FOR SCHEDUUNG OF WORK PROPOSAL MAY BE VIMMRAWN BY US IF NOT ACCEPTED Wrn_UN 30 DAYS.
x
OLYMPIC PAVING, INC DATE STOMER Au6oRIZED SIGNATURE flATE
W1
L]
SMD Inc.
7306 210th Sty SW
Edmonds, WA 98026
Phone: 425 778-4840, FAX 425 778-7102
Proposal To: Andy Borowski
Address: 1028 Puget Drive
City, State: Edmonds, WA 98020
Phone- a*34% A7A-7747
Project Driveway Entrance
Location SAME
Owner SAME
n•.A R_._-
Lk)WM0 SMDIN"110SO
Date: 11/15/2004
Proposal #: 515
-AI."''aw..
1•'�►wv+;
zin
QuLnvidi a z,;5I38.55I
8.9% WSST $ 212.68
Terms & Conditions R this proposal: UPON COMPLETION Total: $ 2,602.33
Exclusions: 1. Any Bond Premium
2. Any Permits and/or Fees
3. Any Engineering, Layout Locating, Survey, Testing or Video
4. Any Waste Material Hauled Off Site
5. Any Traffic Control Labor
s ` i/4V �, Title
�Date:
Submitted By: Title: Date-
r,
STANDA T DRAINAGE-DETENTI�i 1 SYSTEM b
WORKSHEET
qvn - AND UQ 7 RoyjSkl
CALL BYr
ADDRM to Z.� t?u Qrtt Dr PSONE: �t S 67Z 94 45
IMPERVIOUS AREA
DATE:
""'DESIGN DATA*****
PIPE DIA PIPE LG ORIFICE
z k , 8
mTC"M PIPE L[IQTN Lte
narNp ITT►ICAL)
. T
z Two Ix uQP[ � "' a
TL T
i
OYTLCT � CdlTaa,
IN. I
UPPER CATCH BASIN enreK
CONMM CATCH BASIN
•
STREET FILE a
SYSTEM CROSS SECTION
R
rxrx6• DEEP, 4-s• SPALU as EowL RECEIVED
r" CONTP(L CD rx rx r OM 3/4• tea M= cISTINQ Q%M
SEP 0 2 2003
DEVELOPMENT SERVICES CTR.
FRON Cammm mdt CITY OF EDMONDS
wnr�a L*IL
PCI1F PIPE V/ a. CAP$
RUNOFF SPREADER. TRENCH
F0077NG DRAINS SHALL NOT -BE CONNECTED TO DETENTION SYSTEM
NOTB£•
I. Call Baginee&S Division Ml-=) for a tiBhtline and detention wateln invele ioa
bdam bwk illing and for final iaspectioos. ' APPROVED BY
2. Responsibility for operatiion and mainknuve of drainage systems on private property is the G�/� /ate
sespoosbility of the property owner. Material somm dated in tba.atmw pipe must be flushed
out and removed from the cakh basins to allow proper operation. IU outlet nor t:nld ori>fioe DATE
mm beg lact am at All times.
Impermeable
Area Sq. Ft.
— Detention
Required
Vol Cu Ft
Pipe Diameter
15' 18' 240.W
2000 b0 40 28 16 10
2500 62 50 35 20 13
3000 75 80 42 24 15 Required pipe
35W 87 70 -49 �28 18 -length In feet
400........_ 1.. 80 56
___.._._..___... 32
21
_. _ .70
100 r.
40 - fig' ---.._--
Note: Allowable Pipe Materials:
Impermeable
Area Sq. Pt
Reinforced Concrete
Aluminized Steel
Aluminum
CMP Asphalt Coated
N —12 ADS (Not permitted on roads)
Outlet Orifice Diameter (Inches)
2000. 5/8
2600 5/8
3000 3/4
35W 3/4
4000
4600
5000
Table 3 — Rectangular Catch Basin Requirements
Detention Max. size Catch Basin
pipe diameter knockout Type
< 18' � M
5
18'to 245.
24' to 38' 36 19 (48' Basin)
36'to 42' 42' Type 11, CB 19 19 (54' Basin)
*Source: Assoc. Sand $ Gravel Co. Standards
5
Revised 3/16/95
I-oz�1���11 ru
Ln i
MAN
avm lob 0
3
lb-tM ` n
Olympk AVE 4
I �hl Olympk X/E
NOTES
I. ALL SIGNSAND SPACING TO CONFORM TO THE
MUTCD, AND CRY OF EDMONDS SPECS N
2. ALERT COMMUNITY TRANSIT 5 DAYS IN ADVANCE 9
3. PROTECTIVE VEHICLE RECOMMENDED - '-'
MAY SEA WORK VEHICLE
4. ALL SIGNS ARE 48- x 48' 8/0 UNLESS OTHERWISE SPECIFIED
5. ALERTAFFECTED BUSINESSES & RESIDENTS
OF WORK, DATESAND TIMES
6. CHANNELONG DEVICES ARE 28` TRAFFIC CONES.
7. WORK AREA IS 15' N/O CAL PUGET DR
& 300' E/O C/L OLYMPIC VIEW DR
MA- I ►era1 ti 5' s6r- BACK
F ALL CI i-y U7"I LI 'r6
lsz
t A4ss . )40 N
lao
��sp n„
TAPER TZENT
z0
Pilchuck Contractors, Inc.
Job #106116522
9 Oct 03
Sheet I/1
J. Buss
National Barricade Co
+Pzitl
� � W
1-11210N 00
a
z v)
SZrrt�o
RDAD
��
W20-1
3
7777
AV
iffoo
a �
Was # C TW Trot 20h1 list
IU
/99ST i 6:
83aI o.
Aiv «r w /►di � ��4 i
� *i4•ree' •�
,uar
4 fAfidne 44V _
°w
i
E�•� sc iIbOL
u
.. �� C�►J„ y�O op��ea-
v4CI,
N.
"'� 8• �� OLYMPIC AVM
14
goat pW.. iau '1�-" ",,• — —. �r �"
nice
?t9 Fne *v
i o ?
c� vv% o
t jc:�- 9 f n Z'
cTREET F
J
111E
BLD2Z ►S -1 y-35
E
i
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
Website: wwwdedmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
November 23, 2004
Andy Borowski
1028 Puget Drive
Edmonds, WA 98020
GARY HAAKENSON
MAYOR
SUBJECT: Final Engineering Approval at 1028 Puget Drive, Permit #2003-0914
Mr. Borowski,
The City of Edmonds is in receipt of your letter dated November 19, 2004 requesting final
engineering approval prior to completion of the driveway and entrance.
The City of Edmonds will allow you to post a bond for the driveway improvements for 30
days. During this timeframe you must complete the driveway improvements and gain
approval by the engineering division. You will be required to obtain a bond in the amount of
$4920 prior to receiving engineering final approval. Please contact a Permit Coordinator in
our Development Services Department for the appropriate bond forms.
A bond will not be accepted for the sidewalk and driveway approach improvements. This
work however falls under the approved right-of-way construction permit, , #2004-032 1, which
does not expire until January 21, 2005. The sidewalk and driveway approach must be
constructed and approved by the engineering division prior to this date. In the event the work
is not complete by this date, you will be required to make application for a new right-of-way
construction permit at double the permit fees.
Please keep in mind that a final engineering inspection has not been performed on the subject
property and it is possible that corrections may stem from that inspection. Any corrections
noted will need to be addressed prior to engineering final approval.
Please feel free to contact me with any questions you may have at 425-771-0220, ext. 1338.
Please call for your required engineering inspections at 425-771-0220, ext. 1326.
Sincerely,
60&4
Jeanie McConnell
Engineering Technician
+.e"s'treet file
ROW Permit #2004-0321
Permit #2003-0914
Incorporated August 11, 1890
•
•
Andy Borowski
1028 Puget Drive
Edmonds WA 98020
City Of Edmonds
RECEIVED
NOV 2 12004
PERMIT COUNTER
ATTN: Engineering Dept.
November 19, 2004
Permit # 2003-0914
We would like to request engineering final project approval to be issued before the
driveway is finished. The standard driveway entrance will be completed by SMD Inc. as
soon as the Right of Way Construction Permit is issued. After the entrance is complete
Olympic Paving Inc. will finish with the asphalt. We agree to complete this project within
30 days. If required we are willing to post a bond deposit to cover this project until it is
complete.
Sincerely,
Indy Borowski l
OLYMI'IC PAVING, Itc.
P.O. Box 438
Lynnwood, WA 9M46-04M
Phone: (425)778-3126
Fax: (425)775-1811
TO: Andy Borowski
1028 Puget Drive
Edmonds WA 98020
Attn:
ASPHALT PAVING
BID PROPOSAL
Date: 10/7/2004
Phone: 425-6724M5 Fax:
SITE: same
Asphalt Paving:
Remove 5' section of existing asphalt at existing driveway, remove speed
bump, load and haul away. Raise meter to grade. Fine grade existing
crushed rock in new area, adding new crushed rock as necessary. Compact
and soil sterilize. Clean and tack existing asphalt. Pave the entire area, old
& new with 2" Class "B" modified asphalt hot mix. $4,100.00
�4g2oOMW-
' EXCLUDES: Concrete work, bulkhead work, placing new water basin, city permit.
r
PAYMENT DUE UPON RECEIPT OF INVOICE ` ALL PRICES PLUS TAX
NO ial TO CWMMELL• 71W contrecror is regWned with rise Shia of Washington Registration No. OLYMPPOMI),
of *000 for the purpose of satisfying cWeu �D June tat as a general centrulor end has posted with the Stare a bond of cash deposit
against the contactor for negligent or ispeopes work or bleach of contract in the conduct of the coutrackWe business, This bad or cash deposit may not be
sufficient to cover a dries which nrW* wise
r j� You+ pork done mayer r Bared our n f�aceE Ay eapW� of aak+Lb used in your construction Project or any employR of the contractor or subcontnector is not paid
by the contractor a subcontractor on our psymea. D you wish additional protection, you tan
doh hoer each supplier or subcontractor an your project The contractor is required to Y request the contractor to provide you with original 'lien release'
available from the Deparbaeatof Labor and idotriea, P�� You with further information about lien release documents if you request it Genial information is also
MtMM If wlriteQ witi be the owan raPoasibittty. We 6ha0 no be table for damage a or breakage of septic tartka, underground Plpea and/tx,rnitduita trot visible from the surfaceat the ground not
for say damage to approaches linriuding sidewa 6) from the a6eat to the property line. We canrrot be mpvnsibie for subgrade failures or settling of subgrade ma*nal which was not bulaUed under the
above ag -ne t. Soli Sterilization (weed Wer), if not included in the contact will be applied at raise specified by mamnfachuw. Olyespic Paving, Inc., will not be responsible for any subsequent grewths
of baafts weed, morning glory, deep tooted ftrus, or perennials, wbich have cot reached —W ty prior to application. AU material is guaranteed as specified. All work to be completed in a workman like
rNow awarding to standard pose Olympic Paving, Inc. -MO no responsibility for any work other "a lbe Specifically described above. Any additions or aherariom of the above work will be
eaeculed miy upon writk n codes and m)r became on additional charge AD agreements are contingent on sbfkes, acddmbL drays ofarrias, and other delays unavoidable or beyond our oor r
A Lrte payment charge may be erode an any pest due balance, which the law Celle a "FINANCE CHARGE', AND IT IS COMPUTED AT A MONTHLY RATE OF 1 1/2% (ANNUAL
PERCENTAGE RATE OF EIGHIE6N PERCENT). it is agreed that in case awt is instituted to collect amount due on this contract or any Portion thereof, reasonable attorneys fees
and court costa may be added to this contract.
AN AUTHORIZED SIGNATURE ON ONE ODPY, RETURNED TO US, WILL MAKE THIS A LEGAL CONTRACT PENDING ACC iF TABLE CREDIT APPROVAL AND WILL BE
REQUIRED FOR SCIEDULING OF WORK PROPOSAL MAY BE WITHDRAWN BY US IF NOT ACCEPTED WITHIN 30 DAYS.
X dI X
OLYMPIC PAVING, INC DATE cbsToMER Au6oRIzED SIGNATURE ATE
D4
8MD Inc.
7306 210th St SW
Edmonds, WA 9#026
Phone: 426 778.4"0, FAX 425 778-7102
Proposal To: Andy Borowski
Address: 1028 Puget Drive
City. State: Edmonds, WA 9W20
Phone- A94 AW_77117
Project Driveway Entrance
Location SAME
Owner SAME
U0~ 0 SMDIN"11 OBO
Date: 11 /15/2004
Proposal #: 515
..r.a.►4,+1.vS.ww�.�1.rw..1w.1
.lit
wyi.�
was.jMOW
1•'w.w.Ml
Quvrvial $ 2,359.651
8.9% WSST $ 212.68
Total: 3 2,602.33
Terms & Conditions of this proposal: UPON COMPLETION
Exclusions: 1. Any Bond Premium
2. Any Permits and/or Fees
3. Any Engineering, Layout Locating, Survey, Testing or Video
4. Any Waste Material Hauled Off Site
5. Any Traffic Control Labor
Title
0
� -- Date:
Submitted By: Title: Date:
' X Coe., e-rt-E'S r
25- &-72_
PLANNING DATA
NAME:
SITE A
PROJE
REDUCED SITE PLAN PROVIDED?: es No)
MAP PAGE: 7-" CORNER LOT: Yes No FLAG LOT: Yes No)
ZONING: IZS — 12 CRITICAL AREAS DETERMINATION M
❑ Study Required:
❑ Conditional Waiver
SEPA DETERMINATION:
❑ Fee
❑ Checklist
❑ APO list w/ notarized form
❑ (Needed for 500 cubic yards of grading, Shoreline Area- site within 200 ft. of Puget Sound or Lake Ballinger)
-Exempt I&
SETBACKS:
Required Setbacks:
Street:-2-6 Left Side: 10 / Right Side: I O Rear: 25
Actual Setbacks:
Street: Z.9 Left Side: 10Right Side: 0 Rear: 99
Street map checked for additional setback required? Yes / No NA
❑ DETACHED STRUCTURES:
❑ ROCKERIES:
❑ FENCES/TRELLISES:
❑ BAY WINDOWS / PROJECTING MODULATION:
❑ STAIRS / DECKS:
PARKING: Required: 2_Actual:
�_
LOT AREA: I ki. W OD J6
BUILDING HEIGHT:
Datum Point: "Vt4[.M
Maximum Allowed: ' � ' / 11e2 _ SA4 '
f3-7. I
138. -7S
l ems, 2-
5-1$ .e157 : H
"e_ — 13 -r , -2--1
�;e.e-., , Gxl ow 3�
q
"ee, ; Datum Elevation:
P.D.U. CREATED?: No / Yes) 900
SUBDIVISION:
LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED:
eo
HER: 60VtY-A9Fi GI00 G1 -t -I- 13G
j- 13 -+, 20 -I- 13
nwr,,P-a
Plan Review By:
pore,in
12 + 13$ 4-2-19-0 4-- S
NewBPPlanningDataForm. DOC
APPLICATION
for
The City of Edmonds SIDE SEWER PERMT EASEMENT No ..................................
NEW CONSTRUCTION ❑ REPAIRS ❑
OWNER.......... Harbld.-Schnarm ........ 40�00 CONTRACTOR -------------------------------------------------------------------------------------------------- PERMIT No . ......................
k------------- ��w ----------------- ** --------
ADDRESS . 102 P qg�t ..... LEGAL DESCRIPTION: LOT No.. ............................................. BLOCK No . ............................................
0
...... J-Ve ................. --------------------------
........ .... u Dr
NAMEOF ADDITION .........................................................................................................................................
(j
11
1�
0 ..
Dye Tested On Sewer 1972
Approved:
A
DATE................................................ By
f.,
STREET FILE
FOR THE MEADOWDALE SEWER SYSTEM AT THE TOP OF THE CITY'S LIST FOR BLOCK GRANTS AS A
POSSIBLE SUBSTITUTION FOR ALL THE OTHERS. MOTION CARRIED.
Councilmember Allen noted that there will be a block grant seminar put on by Govern-
ment Information Services, and she suggested that the Planning Director attend.
Mayor Harrison thought if anyone went it should be someone from the County, and
Councilmember Naughton suggested checking with other cities to see if anyone was
going, and whoever went could share the information.
Councilmember Gould asked how to go about being more specific in identifying alterna-
tives in covering the balance of the project, and Mayor Harrison responded that they
should wait to see what kind of grant can be obtained and then scale the project to
fit the grant. When asked what they will do if they cannot get the 1.1 million
dollars needed, he asked in return what they would do if they do not get anything.
He thought they should try to get what they can and use it in the best way possible.
MOTION: COUNCILMEMBER NAUGHTEN MOVED, SECONDED BY COUNCILMEMBER GOULD, TO PLACE ON THE AGENDA
al nZ" OF OCTOBER 27, 1981 A DISCUSSION REGARDING PURSUING ALTERNATIVES TOiTHE 1.1 MILLION
DOLLAR FUNDING FOR THE MEADOWDALE SEWER PROJECT. MOTION CARRIED.
i
Mayor Harrison advised that the Hearing Examiner, Jim Driscoll, will be going on
vacation and a pro tem is needed for the meeting of November 5, 1981. Mr. Driscoll
had recommended Mary Ellen Ramey who is the Hearing Examiner Pro tem for the City of
Redmond. Therefore, Mayor Harrison asked for confirmation of his appointment of Mary
Ellen Ramey as Hearing Examiner Pro tem for the meeting of November;5, 1981. COUNCIL -
MOTION: MEMBER ALLEN MOVED, SECONDED BY COUNCILMEMBER GOULD, TO CONFIRM THE VYOR'S APPOINTMENT
OF MARY ELLEN RAMEY AS HEARING EXAMINER PRO TEM FOR THE MEETING OF NOVEMBER 5, 1981.
MOTION CARRIED.'
The next item on the agenda was a proposal regarding the remodel oflproperty at 5th
Ave. and Main St., but the applicant was not present so the item was moved to the end
of the agenda, just before the "Council" portion.
RIGHT-OF-WAY ACQUISITION--!1020 PUGET�DR.
City Engineer Jim Adams stated that this was the only piece of right-of-way not
acquired for the SR 524 improvement. The Department of Transportation had made an
offer of $5,000 (appraisal value $3,100 and cash settlement $1,900), which was
unacceptable to Roger Hertrich, the property owner. Mr. Hertrich has a 12' high
laurel hedge which will have to be removed for construction of the sidewalk, but that
hedge screens his home from the neighborhood business development across the street
and from the noise and traffic of the street, so he proposed that in exchange for the
right-of-way the Cit pay for the construction of a 10' brick fence (for which he had
obtained an estimate which would provide similar screening for him. He had submitted
an estimate from a masonry contractor in the amount of $10,758. The State had not
condemned the property because the cost of condemnation was too high, as compared to
the value of the property, and also there had been the matter of time. Mr. Adams
said this could be put off until after the project is completed and then a contract
could be negotiated, and City Attorney Wayne Tanaka added that a condemnation action
could be started and that way obtain immediate use and possession in order to include
this piece in the project. Councilman Kasper thought it was premature to ask the
Council to pay for the brick fence as Mr. Hertrich would have to get a variance for a
MOTION: fence over 6' high before it could be constructed. COUNCILMEMBER ALLEN MOVED,
SECONDED BY COUNCILMEMBER KASPER, TO ALLOW MR. HERTRICH TO SPEAK. MOTION CARRIED.
Mr. Hertrich circulated photographs to illustrate the before and after views from his
property and said they should demonstrate why he was so concerned. :He said he had
lived there 12 years. and although the gas station was there he was not aware of it or
of the other commercial activities because of the laurel hedge. He;said he had made
an effort to settle with the State, but he had asked for protection;of a large cedar
tree while they were constructing and they said they could not do that and negotiations
were dropped, and he was left not knowing what was going to happen next. Later he
found that his property had been omitted from the project. He felt'ihe was asking for
very little, but he said nobody from the City was willing to help get the two parties
together. When he saw what was happening to his neighbor's home with his hedge
removed he decided he wanted immediate replacement on his property.; In considering a
replacement he saw that plantings would not provide the screening he wanted so he
decided on a solid fence, and since wood would not last indefinitely he chose the
EDMONDS CITY�COUNCIL MINUTES
Page 2 - October 13, 1981
brick. He also had considered a berm but that would have left too little front yard.
He was willing to accept the amount of the fence estimate he submitted ($10,758)
although there were other costs which he would have in preparing the!site for the
fence. Councilmember Naughten suggested that he submit additional estimates as the
spread between the $5,000 offered by the State and Mr. Hertrich's request for $10,758
MOTION: was too much. After some discussion, COUNCILMEMBER KASPER MOVED, SECONDED BY COUNCIL-
cL*A, MEMBER ALLEN, TO CONTINUE THIS ITEM TO THE OCTOBER 27, 1981 WORK MEETING AND THAT
THEY BE PROVIDED ADDITIONAL INFORMATION AS TO WHAT MR. HERTRICH WILL!ACCEPT FOR A
SETTLEMENT OR OTHER ALTERNATIVES TO SOLVE THE PROBLEM, WITHOUT THE CITY'S GETTING
INVOLVED IN CONSTRUCTION, AND THE COUNCIL WILL TAKE THAT INTO EXECUTIVE SESSION.
Councilmember Gould advised Mr. Hertrich that the Council must treat!him the same as
the others who were affected in this project. He said what was proposed seemed out
of line to him, but he was willing to look at some alternatives. Mr'. Hertrich responded
that the estimate was only for the construction, not for the cost of;any permits, and
he had not added the cost of moving trees and pouring a slab for thelfence. He
mentioned some of the other costs and said the people who build the wall would deduct
$2,000 if the footings were put in, and he would be willing to deduct the cost of the
land. THE MOTION THEN CARRIED.
DISCUSSION REGARDING PORTABLE SIGNS AND PROPOSED ORDINANCES REGARDING SIGN CODE
ENFORCEMENT AND MAINTENANCE OF MULTI -FAMILY AND COMMERCIAL PLANTER AREAS
Mayor Harrison read a memorandum from Planning Director Mary Lou Block which stated
that the Code currently allows as temporary signs trailer signs, paper signs, and
sandwich board signs, with some conditions. At the next PAB meeting the Board was to
consider a recommendation that trailer signs be eliminated from the (list of allowable
temporary signs, and Ms. Block indicated that the Council may wish to make some
further recommendations in view their recent discussions. She noted that the adver-
tising device which generates the most discussion is the sandwich board sign, many of
the merchants indicating the importance of these signs to their businesses. Complaints
have been received about these signs, however, because of their clutter and nuisance
when located in the middle of the sidewalk. She suggested that it may be desirable
to allow such signs but to regulate them so they do not become a nuisance for the
community. Mayor Harrison concurred with that suggestion, saying they could be
allowed with a permit. Ms. Block had indicated a sign permit could 'specify location,
duration, and release of the City from liability. Councilmember Jaech commented that
the Gas and Go station about which she .had complained had taken down their signs and
now looks much better. She was amenable to Ms. Block's suggestions„ but she felt
only one sandwich board sign per business should be allowed. Ms. Block said the PAB
could be asked to discuss some criteria for such signs at their meeting the next
evening. Councilmember Gould stated that he really did not see any problem with
small sandwich board signs. Councilmember Jaech stated further thatishe thought if a
notice is sent to someone that they are in violation of the Code that there should be
a set time frame in which they must come into compliance. City Attorney Wayne Tanaka
recommended that a minimum time be set and that the staff be given discretion to
extend it if the situation so warrants. Councilwoman Jaech further suggested that
the notices be sent by certified mail so the parties would have to respond, but she
was told it is more difficult to get a response to certified mail aslit may be refused
or it may not be delivered if the addressee is not there at the timelof delivery.
MOTION: COUNCILMEMBER JAECH THEN MOVED TO ADOPT ORDINANCE 2242, SPECIFYING THE MANNER OF
ENFORCEMENT OF THE SIGN CODE, BUT DELETING THE PROVISION STARTING ON'!THE SEVENTH LINE
OF SECTION 1.C. REGARDING THE SENDING OF SECOND NOTICES TO VIOLATORS,(AND CONSISTING
OF TWO SENTENCES); AND FURTHER, IN THE NINETEENTH LINE OF THE SAME PARAGRAPH DELETING
THE WORDS "IN THE SECOND NOTICE"; AND FINALLY, IN THE NEXT LINE CHANGING THE WORD
"MAY" TO "SHALL" ("THE PLANNING DIRECTION SHALL REFER THE MATTER. ;). MOTION
CARRIED.
Another proposed ordinance had been provided, in draft only, regarding the maintenance
MOTION: of planter areas. COUNCILMEMBER ALLEN MOVED, SECONDED BY COUNCILMEMBER GOETZ, TO
am.',. L'L�,k PLACE ON NEXT WEEK'S CONSENT AGENDA THE PROPOSED ORDINANCE REGARDINGIMAINTENANCE OF
da PLANTER AREAS. MOTION CARRIED.
MOTION: COUNCILMEMBER ALLEN MOVED, SECONDED BY COUNCILMEMBER KASPER, THAT THE PLANNING
ADVISORY BOARD BE ASKED TO CONSIDER SANDWICH BOARD SIGNS WHEN THEY CONSIDER THE
TRAILER SIGNS. MOTION CARRIED. A short recess was announced.
I
EDMONDS CITY COUNCIL MINUTES
Page 3 - October 13, 1981
N. 1
City of Edmonds .'Permit No:?�3_0W2.,
RIGHT-O. ,F-WAY CONSTRUCTION PERMIT Issue Date: 03
"'State License #: 1-1 L 01 B0 Z_ I b IyVA I& Liability Insurance: Bond:•$
D. Building.Permit # (if applicable): Side Sewer Permit # (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project .❑�EUC (PUD, VERIZON, PSE, AT& T, OVWD)
❑ Multi -Family] Single Family ❑ Other
INSPECTOR:
k F. PAVEMENT CUT. 56 YES ❑ NO ' G. SIZE OF CUT X : S
CONCRETE CUT: ❑ YES El NO ---,�
i
INDEMNITY. • : Applicant understands by., his/her' signature o this ,application he/she :holds_ the City, of,Edmonds, harmless .from
injuries, damages or claims of any kind or description •whatsoever, foreseen or unforeseen, that may be made°against the City. of
Edmonds or any of its departments or employees, including bu1?not limited to the defense of any legal proceedings including defense
costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF, ONE. YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE 'WORK. ESTIMATED RESTORATION FEES WILL BE HELD' UNTIL THE FINAL STREET PATCH IS
COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT.
♦ Traffic control and public safety shall be in accordance with City regulations as required by, the City Engineer. Every
nagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession. f
♦ Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday - NO EXCEPTIONS.
♦ Three sets of construction drawings of proposed work are required with the permit application: • _
CALL DIAL -A -DIG (1-806''424-5555);PR10RfTO BEGINNING WORK
I HAVE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS.AND ACKNOWLEDGE
THAT 1 MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE AT ALL.TIMES FOR -INSPECTIONS
Si nature: -f' Date: 6 (D
(Contractor or Agent)
FOR CITY USE ONLY
�T �// 001
Approved by: ; 1.4 'TE tML Ay�/�r 1 IV S Right-of-way Fee: 9'"` 1.
Time Authorized: Void After 02 f 04 Disruption Fee/Fund 111:
Special Conditions ALA Ar C 'r 1� bA + A0,VANc_,F,.,4cc Lr Restoration Fee:
tFFEcrg$i I<.iNtc 5src A N 0 aCtlt t 011-f.Ix-. bF WOAX nAragr - Total Fee: ! 40-75;
�w>y r,K�c�, lIiE57`nt F kij�wr-T-h.c WAY ro /rSa4ij,lg4tleceiptNo:
7R T Cnru ��t Ti o K . 11 A r-Fic C'�t►..� T'iinL Issued by f�
.
.7 n.. ,
. r I s. _ �... _ _ .F-' I - ..:. � ,,.. :k . �.. r,.. � "•4r.;. n �...... , ,..... r. �.. �! . 1. E:T"' ,f
UPON COMPLETION OF "PERMITTED WORK, AN ENGINEERING FINAL
INSPECTION IS REQUIRED PER CHAPTER 18:00 OF THE EDMONDS
COMMUNITY DEVELOPMENT CODE (Phone 2-771-0220, Ext. 1326)
FINAL APPROVAL OF PERMITTED WORK: DATE:
Inspector's• Signature 4
For inspection requirements see Engineering Inspection Information handout.
:s,
NO WORK SHALL 111,"GIN uiuovro i,i,izmrr ISSUANCE
DAMy Documents\Forms\EngnmgVRoWpermit_.doe
i
,
c-
I
e• I �. 1 .. IMF—���'. n'/. .r .. ',c✓# •��' i° �''U ,. �� •�., �,,
City of Edmonds
Permit No: Z 004- �D �
,,RIGHT-OF-WAY CONSTRUCTION' PERMIT Issue Date:
0 Address or Vicinity of Construction: d 28-, 'r
dB Type of Work (be specific):_��`�nno y
Contractor: 'l t" l Lm c -
Mailing Address %:j Ci6 Z t C Y47'S- :1 Vvv
State License #: 6l"T NJ** 6 1 1
I
City BusinessjLicense #:
D. Building Permit # (if applicable): 2-oo3 -M 1 tf
Contact: `fir k_� I -In in
Phone- ti 7 --, • --7 r - L—i C7
Liability Insurance: ,: S Bond: $%C 00- O U
E. ❑ Commercial ❑ Subdivision ❑City Project
❑ Multi -Family Single Family Z.
❑ Other
-� ".�-
INSPECTOR:
s i
wer Permit # (if applicable):
❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD)
F. PAVEMENT CUT: ❑ YES &NO UT X
CONCRETE CUT: 9 YES �] NO
G. ❑ Mail Approved Permit �, Call for Pickup
INDEMNITY. Applicant understands by his/her signature .to this application he/she hol e City of Edmonds harmless from
injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of
Edmonds or any of its departments or employees, including but not limited to the defense: of any legal proceedings including defense
costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL.
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL. STREET PATCH IS
COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
♦ Traffic .,control and public safety shall be in accordance with City regulations as required by the City Engineer. Every
flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of, the
required training in their possession.
♦ Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday — NO EXCEPTIONS. ?
♦ Three sets of construction drawings of proposed work are required with the permit application.
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
I HAVE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THAT I MUST MAKE THE PINK COPY OF THE PERMIT AVAILABLE ON SITE AT ALL TIMES FOR INSPECTIONS
I( Signature:
or tige>tn)
Date: I I
FOR"CITY;US'ONLY,'
1, d
Approved by: 'G� Rlght o'. way Fee
�Y` _
Time Authorized: Vold After t % �i %'='i:Q?�" Disruption Fee`/.Fund:, ll:_
Special Conditions: TVIieu+izInspectlon
��� T��►�. � Stl>�4t/RC..;K+ -S'�G'T',lanls TO � Total' Fee :�$ � � 5"C)-
Receipt No c /J
0i�M'r ?5` Af2 � i ►r :
4?Ae /77909"_n Sal 6# 1 Yil S-IY71Y:
REQUIRED INSPECTIONS:
,r
Call 425-771-0220, Ext. 1326 for a 24-hour voice -recorded inspection request line.
FINAL APPROVAL OF PERMITTED WORK: �!�/DATE:-
Inspector's Signature
I
NO WORK SHALL BEGIN PRIOR
TO PERMIT ISSUANCE
CADocuments and Settings\CurtisNy Documents\Forms\Engnrng\ROWpermit—, doc - - Revised 10/01/03
Ll
CITY CLERK
CITY OF EDMONDS
III STH AVENUE NO.
EDMONDS, WA 98020
s�o�ow.s� COUNTY. rmwAs�,N�.oN
STATEMENT ON ACCESSORY DWELLING UNITS
Property Address: f &2-ter; - ",q e± ->i- j Ve
Edmonds, Washington
Legal Description: •Pc%6—F--F ,S0UAJ-b M"-1( -DFPoT SAL ?72S '31.t;
..,,.,... .� r, . , � ...._ _
Assessor's Parcel Number: C>oGq �3<=�1 000 p�O
�y T� 7,cJ ,��� c �,�j
I have read the requirements for accessory dwelfing units coa" idined in Chapter 20.21 of
the Edmonds Community Development Code and understand that an Accessory
Dwelling Unit, including a second kitchen, is prohibited until after an Accessory
Dwelling Unit permit has been approved by the City of Edmonds.
I also understand that approval of an Accessory Dwelling Unit permit is subject to
compliance with identified criteria, to public comment, and neither this statement nor
the issuance of a building permit shall act to limit the discretion of the City in the. review
of any application for an Accessory Dwelling Unit permit.
Property Owner Signature:L4�
�ve
Date: ( 0 `-'oil - 03
STATE OF WASHINGTON )
COUNTY OF SNOHOMISH )
I certify that I know or have satisfactory evidence that A N D R2- E-j BORM5KI
signed this instrument and acknowledge it to be his/her free and voluntary act for the uses and
purposes mentioned in this instrument.
Notary's pressure seals must be smudged.
Signature of
4 l i s , � � � Notary Publu
-------------
Residing at:
{. • r `, c « , r. My Appointmen
,o, ��9 _o•i ':�., Expires: 1 %
•r• b'A S N N'i`
THIS DOCUMENT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR.
STREET FILE
CITY CLERK
C� OF EDMONDS IIIIIIIilllllllllllllillllllllllllilllllllllllllllllllllllllllllllllll
Jill STH AVENUE NO.
80MONDS, WA 98020 200312010383 1 PG
12-01 -2003 12:37pm V9.00
SNOHOMISH COUNTY. WASHINGTON
STATEMENT ON ACCESSORY DWELLING UNITS
Property Address: :PK,M e4- Tv- J VO-1
Edmonds, Washington
Legal Description: _f ✓C 1 'sowb LcRY DEBO-- 5AG '7-1Z -b
000 _ -I-)- �R _ A/ iQ= = ,ter- . _ . ej _ �,— — - -
Assessor's Parcel Nµmber: GLi ;3g 00c) 009 O
I have read the requirements for accessory dwelllag units 1ned in Chapter 20.21 of
the Edmonds Community Development Code and understand that an Accessory
Dwelling Unit, including a second kitcben, is prohibited until after an Accessory
Dwelling Unit permit has been approved by the City of Edmonds.
I also understand that approval of an Accessory Dwelling Unit permit is subject to
compliance with identified criteria, to public comment, and neither this statement nor
the issuance of a building permit sball act to limit the discretion of the City in the. review
of any application for an Accessory Dwelling Unit permit.
Property Owner Signature:jwe
Date: (0 —A - 03
STATE OF WASHINGTON )
COUNTY OF SNOHOMISH )
I certify that I know or have satisfactory evidence that A N Rz
signed this instrument and acknowledge it to be his/her free and .voluntary act for the uses and
purposes mentioned in this instrument.
Notary's pressure seals must be smudged.Rated: 0 --- Z-•
ul: 410 Signature of
Notary'
�� o,►. T144
-- • » - " . Residing at:
My Appointment-
Expires: —
WA s ow
THIS DOCUMENT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR
- . City of Edmonds
Permit No" 3 'tl
4e
RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: // o
A. Address or Vicinity of Construction:
B. Type of Work (be specific): 8s�" IBC T TO 0 (TY
C. , Contractor: '�.Q`y �--� Contact:�G A /�....
Mailing Address: �-�92 Phone: "'%'�C> zx/l
State License #:SE V ZOP5 P iability InsuranceBond: $ ~
D. -,-Building Permit# (if applicable ����' Side Sewer Permit # (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project ❑ EUC (PUD, VERIZON, PSE, AT& T, OVWD)
❑ Multi -Family Single Family ❑ Other `
INSPECTOR:
I
F. PAVEMENT CUT: YES ❑ NO G. SIZE OF CUT X
CONCRETE CUT: YES ❑ NO
INDEMNITY. Applicant understands by his/her signature to this application he/she holds the City of Edmonds 'harmless from`"
injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of
Edmonds or any of its departments or employees, including but not limited to the defense of any;'legal proceedings including defense
,,,.,costs and attorney fees by reason of granting this permit. ,}W
THE CONTRACTOR IS RESPONSIBLE. FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF, ONE YEAR FOLLOWING THE FINAL
' INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS
COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
*."-"'Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every'.
flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the .
required,training in their possession.
Restoration his 'to be in accordance with. City codes. All street -cut trench work shall .be ,patched with asphalt or City
r.
approved material prior to the end of the workday - NO EXCEPTIONS. " +.
�. Three sets of construction drawings of proposed work are required with the permit application. w
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
I HAVE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THAT I ST MK THE PINK C Y OF THE PERMIT AVAILABLE ON SITE AT ALL TIMES FOR INSPECTIONS
Signature: Date: \
(Contractor or Agent)
FOR CITY USE ONLY'
Approved by: L) r I L.6ExCT Rightyof-44yFee: 160f 197t2W I�
Time Authorized: Void After 9 Disruption Fee/Fund t1'1:
Special Conditions: (�1�'�7M 0,A5 � w PEP= �I t11• Resto�tion Fee:
S't1�r�DARDS Ct -P :T" P Lgo.) AND Total Fee�'1, 75
,( IZ. :")� • A l.l.. _LALL �FFReceipt No:
n TO A 1 Issued bey �u%G�
UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL .
INSPECTION IS REQUIRED PER CHAPTER 18.00`OFTHE EDMONDS
.COMMUNITY DEVELOPMENT CODE (Phone 42,5-771-0220, Ext. 1326).
FINAL APPROVAL OF PERMITTED WORK: %OY%��/(. DATE: 25�75
Inspector's Signature ee
For inspection requirements see Engineering Ingpegfi9J1} tnforination handout.
NO WORK SI-IALL l31?GIN PRIOR TO PF.IZMIT ISSUANCE
�S Np�ED
ApP YDENGINEEFl1NG
B
D
a�.
STREET FILE
RV:CE:iVS®
SEp 0 2 2003Ell" I
DEVELCjPTlEDF EDMONDS CT r`
L
Description
No. 98®9DIvwl FECOFD OP
CCMM, UAWWATCM
THE MOWN SM FWT OF DW U MT W FEU OF--
RE EMT W FAT OP TRACT 9 OP MYAT
EOUNO MAGIHRY DEPOT FIVE ACM MACCM,
ACrO WM TO PLAT WXQRDED N VaaS 8
OP PLATE AT PAGE ", N &WMC W COUMY,
E=Wr THAT PORTION CONVEYED W THE
BTATE OP WA9HMU N BY DEED RECORDED
UNDER DNS NO.OW426BEt®6.
Vertical
THE VEiiflCAL DATUM POR nm amw w
NAVD w m"m ON BNONOH" CAMTY
F UBLWM VALLMO FOR A PIOMMM N CASE
LOCATED IN WE HTE1P8ECTION OP Fur-M
DRIVE AND 9TN AVEMM ULL BARD FONT A'
BENS TM NORRI QLARTER CORNM OP
BEGTM 24, TWP. 27 N. RMM 9 M WM.
ELEV - 86"
Lot
Coverage
LOT AREA 14,1W GO MM FEET
LOT COVERAGE 4"S 6QMM MET
L M COVERAGE AS A FERCEWAM OP LOT AREA - MSMPUL
TAB A,cc. t�i4Rc e1. tt-
oo64gq 00000 9oq
I-OT SL.dPG 2L 0/0
110
no's -
0
PUCxET DRIVE (1°.1foTH ST SW) —
III
I
.a
AND DRA�VAE F+
E I
I
POINT
-B
I
I
1 \
`� j 1�38•�
� I
I I x
-- --d
POINT 1
\ WWI
\ 1 K
\
x
V
FILTER i �aT21c �t r�GC
0
.r.
(n_
IR
'M
® p"
o M
-n -4
® .
0
o -M
o<
Np
Zv rn
N N
M.
�1
IM- gAIVEWL
ALLOWED 14°k
Plot Plan p
Legal
Description
I�TUC,D�! D IUlECOIUDED INDBU! I�COMM
W. semi~, RECOM OP SNONOMISN
OO MM UMNNSTCM
THE.MMM M MET OP TFE WEST M FEET OR
no EAST NO FEET OF TRACT 9 OP RAW
6dND.MACNNERf D@ROT." ACRE TRAM,
ACCORDNS TO PLAT RECORDED N VCUM 8
CP PLATS AT PAGE M N MO61OMSN COUNTY,
WA6NNSTOIL
E =pr THAT PORTION CONVEYED TC ne
STATE OP WA&POTON BY DEED FiECO124ED
UNDER RECOI®06 NM OW4200V 6.
Vertical
Datum
TI-E VERTICAL DATIM MR TWO SURVEY 18
KAYO ea BASED ON SNONOMMN QMTY
PUBLO ED VALUES FOR A Ma4ftM N CASE
LOCATED IN 11E INTERSECTION OP PUMET
oRIVE AMP WN AVeuE ILL SAID POINT A.60
BENS THE NORTH QUARTER CORER OF
SECTION 24, TU.P. 71 N. RGE. 9 E WFL
ELEV - DWS'
Lot
Coverage
LOT AREA 14A8O SQIARE.FEET I
LOT COVEIRAlf 4J®S SQUARE FEET
LOT COV£RAGB AS A PERCENTAGE OF LOT AREA - 2972%
Height
Calculation
POINT - A l9TUU7
PONT - B M&M
PONT-C 1319m
POINT - O tw"
TOTAL MM------
54A98 DIVIDED BY 4 - I9 T]3 &+1A>d MLM AVERAGE GRAPE
GRADE
0119%" • 78'-m• 161U MAMMM ALLOWABLE 11EIGFR
MV `-p(L 14 Z • zo
'I
I
I
I
�1
I\ x
1
I
I
I
I
I
I
I x
I
I
I'
I
I
I
I
tl
I
I
1
APPROVED BY PLANN'INU I /
I
I
�1®QED'
APpROVEGINEERING,
gy EN
pate:
0
DetoeMN W.IST- g� PAUW fZtrM GDEIs 07:= 1�
Paue►LE►k- oF MsrIN6 R6NCWIi� AIL A MINIMUM
DIsMOc.JL�' aF 2j +t'� M--o 11fe F�U, uN-6�
\Atu+eusz- is AeeAM=1Z.
N89.96'41 CONC WALK
aVA& • T_
3-u• i
I
CP NEW
Y
I NERI NTRAi.TOR IS ESPCASIBLE FOR
ER SI�4 r;, �!,iT4; .. ' DRAINAGE
I �
I
� A,
---J\
8TM /
u• II I � / I I I
/ i I MdSTM
TO
REMOVIM
\I
POINT - D
I%Z \ P004T - G 1
� 1
R
Nov 2003
DE CITY
EDMO CES CTR.
•
0
0
n O C!)
rn ^^
Om 11
InI
m
zm N ..
O < N
oo o
N Cls W m
n
0
pa 0
11JCTION PERMIT
RIGHT•aF-%Yd%Y COI�i., �cT.
AND INSPECTION REQUIRED
APPROVED AS NOTED
BY ENGINEERING
Drainage
Plan
BCAL& I W-W
Legal
Descriptioi
PqZ DEED I�cORDm I. Comm
NO 88033mm, Fi raw CP 8NO1. a4w
CCUNM, WAWMGTCM
THE NORTH K0 FEET CF THE WEST OO FEET OF
TFE EAST 320 FEET M MA= 9 M PJW
E=EPT THAT FIMM CONVEYED TO THE
STATE CP MMM6TO4 BY DEED RECORDED
UNDER RECCMIp0 W. 8042000M.
Vertical
THE VERTICAL DATIM MR THIS 81RVEY IS
NAVD_OC BAem ON wwwmw CQNTr
F UBLWHED VALUES POR A MORMW M CASE
LOCATED M THE MIERSEOTION OP F UMT
DRIVE AND WR AVEPAR ui SAID POW ALSO
BENS THE NORTH GUARIER CORER OF
SECTION 24, TWP. 21 N. MR. 3 E. WM.
ELEV • D&W
Lot
Coverage
LOT AREA I4Am0 sau" E FEET .
LOT COV£fiAC� 4"S SG &N E FEET _
LOT OOVERAME AS A PERUMAGE CP LOT AREA • 2%22%
Height
POW - A
BTJO
POW - B
B&Fa
POW - C
13TS0
PONT - D
— — —
0920
— — — — — — — — — —
TMAL
64&%
54820 DMDED BY 4 . L31331D MAXRA WMIM AVEGE GRADE
W.M.S. • 2W4V • 16233W MAXIMM AL 9ZL4BLE HEIGHT
rn
rn
r
m
PUGET DRIVE (IS&TH ST 8111)
'019
56
^, Bl
I'
n��Ns Nor
vSyTFM
� I
�f.0w-s.
IM15.
I I
I
I
k-GEP1ABLE�TI JHTL
� NSi.4L ItMS'oRh��/ �