1033 WALNUT ST.PDF11111111111111
13637
1033 WALNUT ST
STREET
CITY OF EDMONDS BARBARAFAHEY
MAYOR
7110-210TH ST.S.W. • EDMONDS, WA 98026 • (206) 771-0235 • FAX (206) 744-6057
COMMUNITY SERVICES DEPARTMENT - PUBLIC WORKS DIVISION
Est. 189v
June 2,1997
CERTIFIED FINAL NOTICE
BRENT BAKKEN
1033 WALNUT ST.
Edmonds, WA 98020
Subject: Backflow Prevention Assembly Testing - Account #111150
On April 1, 1997, you were notified by letter of your backflow prevention assembly
was due for annual testing.
On May 1, 1997, the second notice was sent which stated that you had 15 days to
take care of this matter. Failure to comply, according to the City of Edmonds
Ordinance Chapter 7.20 and WAC 246-290-490 water service to your property will
be discontinued on Wensday, June 10, 1997.
Should you have any questions or concerns, please contact me at 771-0235,
extension 644.
Sincerely,
Linda McMurphy
Water Quality Control
LK/lk
wo rd ata\water\bba kken
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
CITY OF E® ON ® S HARVE H. HARRISON
MAYOR
250 - 5th AVE, N. • EDMONDS, WASHINGTON 98020 • (206) 771-3202
OFFICE OF THE CITY ENGINEER
October 4, 1983
Jan Fulcher or Owner
•1033 Walnut .
Edmonds, Wa. 98020
Dear Ms. Fulcher:
You were contacted earlier this month concerning the
disconnection of your roof drains from the City's sanitary
sewer system. To date, we have not received any response on
this matter. Again, may I reiterate the need for you to take
action on this matter.
Please contact Dan Smith, 771-3202, extension 256, by
October 19, 1983 and he will give you any needed assistance.
Thank you for your attention to this matter.
DS/st
Sincerely,
/X� 4�5)-
PATRICK O. WILSON, Y.E.
Acting City Engineer
X0. /a-V4.?
Dan Smith Dt
0
0
CITY OF E ®IVI ®1 V ® S HARVE H. HARRISON
250- 5th AVE. N. • EDMONDS. WASHINGTON 98020 • (206) 771-3202 MAYOR
OFFICE OF THE CITY ENGINEER
September 12, 1983
Jan Fulchur or Owner
1033_ Wal nut
Edmonds, Wa. 98020
Dear Ms. Fulchur:
The City of Edmonds is currently experiencing a serious storm
water problem. Our sewage wastewater treatment system is being
overtaxed by large volumes of storm water from roofs, drains,
driveways, and parking lots. If this water is not eliminated from
the system, the sewage treatment plant will require expansion much
sooner than it otherwise would.
A series of tests were completed, identifying your property
as one of the infiltration sources. This storm water must be
removed from the sanitary sewer system as soon as possible. The
attached drawings indicate several solutions to this problem, one
of which should be applicable to your property.
The City has established this as a top priority project, and
your cooperation is urgently needed. Please contact Dan Smith or
Jerry Hauth at 771-3202 for assistance prior to installation of
your modified system.
Sincerely,
*Engineer
. ADA .E
DTS/st
Attachments (2)
cc: file
All�� 3
D n Smith Dt
Side Sewer Drawing
The City Of Edmonds EASEMENT NO- --------------------------------------------
l o 8- 0 8 0 0 0 NEW CONSTRUCTION ❑ REPAIRS ❑ LID NO- ---------- ------- ASMT. NO. ._.____--_-____
OWNER------ c....--.D RENTAES------------------- ---............................. CONTRACTOR---------------------------------------------------------------------------------- PERMIT NO. --------------------
JOB ADDRESS ---------- 1.033 __...._WALNUT' STRE.E.T .................... LEGAL DESCRIPTION: LOT NO. ______._...__--...--............. .... BLOCK NO. ------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------------------
NAMEOF ADDITION-----------------------------------------------------------------------------------------------------.................
DYE TESTED ON SEWER
Approved:
PWW-OWI.11/75 (REV.11/78) DATE ----------------------- -------------------- BY------------------------------------------------------------