1036 BELL ST.PDF1036 BELL ST
i ADDRESS:
TAX ACCOUNT/PARCEL NUMBER: n 1-t� 3IZD q()O t 2-b0
BUILDING PERMIT (NEW STRUCTURE): I -1 U 10 L r-5-7 b Fg)
COVENANTS (RECORDED)
CRITICAL AREAS: DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DA
PARKING AGREEMENTS DA
EASEMENT(S) RECORDED
PERMITS (OTHER): (qMQ02(kRd� CoMUggI\ )DOdLq"h4
zo
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DA
SEWER LID FEE $: LID
SHORT PLAT FILE: LOT:—T.BLOCK:U
SIDE SEWER AS BUILT DATED NU A-f—&4 I Q 7 Z.
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DA
STREET USE / ENCROACHMENT PERMIT #:
FOR:
WATER METER TAP CARD DATED: D Zzv I LQ
LATEMP\DST's\Forms\.Street File Checklist.doc
APPLICATION
for
The City of Edmonds SIDE SEWER PERMIT
NEW CONSTRUCTION E] REPAIRS
EASEMENT No. ..........................................
�
118-00800
OWNERW 1 E S t-• C 1 f f01"d.............................................................. CONTRACTOR.--•..................................................•--•------•---.............---•------......_ PERMIT No.......................
ADDRESS ....... 1.036--- Bell .... St.....................•----..........:__............................ LEGAL DESCRIPTION: LOT No. ...................... ........................ BLOCK No. ...................
.........................
•
i
NAME OF ADDITION..........................................................
c4�
DYE TESTED ON SEWER, 1972,
Approved:
DATE................................................ By------.........------•--•---••---......._..................._.......--
.....................
City of Edmonds ---Water Department
TAP CARD
Dam . `.fl C::j. ....�..
Meter No...................... Tap No..........::::......: ....................
Size.. ............................ Size. ................ .....................
Mfgrs. No ........................... Style . ................_.......
For ........1613.b
..'J ..�._
.........................
...........
........
............. ...........................................:.........._......_..
LotNo ........................................... Blk. No ........................ I ........... _..............
Add...................................................................................................... _....................
Service Location ..........................
......................................................................................._................_......._......._..............
MeterLocation................................................................................................
MakeTap..............................................................................................................
............................................................... ......................._......................... _.... .._..........
...
Pressure..............................lbs. Test .................................... %
SendBills to................................................................................_................_.....
Date of Work ... �.� r� .. - ......: .. / ._ .%......... �.
.............''�� .......................... Foreman
Guar. Voucher No ........................
Remarks: ......... . .......................................
...................... _......................... _....... _.......... ....
.. f......................................................................................................
�' ....... I ..............................
.................................................................................................................._......._..............
.........................................................................................................................._..........__
OUTGOING Index .......... Reg ...... Route Bk......... StenciL..... Card........
INCOMING Index .......... Reg ....... Route Bk......... StenciL..... Caixt.......
Material Chargeable to Installatic Meters
0.
N _T
......
SIZE DESCRIPTION
SIZE 7__ —
Meter
RATE
AMOUNT
... .......
.. 7. .................. ---------- ----------
.... Mete
.......... Meter Box .........
-----------
..........
...............
........ Mete
.......... Meter Plate ....... ...........
.............
...
.......... Check Valve .......
........
.......
..............
......... Pipe, Galv. Screw ..................
.............
.......... Nipples ....................................
..............
.............
..........
...............
.......... Bushings ..................................
.......
------ ........
.......... Plain Ells ...........................
............. *
.............
..........
...............
.......... St. Ells
--------------
- --- * ......
. ......
.
. .I..- .I ..•......... 1
.
3..�. Tees
." .
- - -; ; --- 7I
;k�-
"'
..............
.... -----
----------
....
__ .T..I.
--- ----------...............................
........
-------------
....
_
. . ... ....................... ............
.. . ...... .... . . .
............................ ....
..............
..............
........... ...
..............
............
............
... ...
..........
..........
..........
......... ..................................
.......... ..................
. ................................. ft .............
........... .
------------
.........
------
..........
Material Chargeable to Taps Connected
NU.
bl/-t
I ..........
—DESCRIPTION
RATE
AMOUNT
I ............
Pipe, Black Screw ..................
.............
..............
..........
Pipe, Galv. Screw ..................
...............
.............
..........
...... .......
..........
Lead Connections .................
..............
.............
.........
..............
...........
Curb Cocks ............................
........... .
.........
Corp. Cocks ......................... ..
...............
..............
.
.. a .......
- ------
. X I
..............
..........
Unions ....................................
..............
..........
Saddles ................................ ...
.........
........... ...
..............
..........
Nipples ....................................
...............
.......................
...............
.........
Bushings ..................................
.... .........
........
.....................
...............
..........
Plain Ells ................................
............
..............
..........
Street Ells .......................... ...
.............
.............
..........
..............
..........
Tees ..........................................
...............
.............
..........
..............
..........
Curb Boxes .......................................................
..............
............
..............
I ..........
S. O. Extensions ....................
..............
.............
..........
........
...... .......
..........
Gates ........................................
..............
....... ................
..........
----- —
Plugs ........................................
Couplings.......................................
.............
.......
------
..... .
..............
..............
..............
..............
..............
..............
..........
..........
..........
..........
..........
.........
Gate Boxes ............................
.....................................................
.....................................................
...........................................................
...........................................................
...........................................................
..............
.............
..............
..............
..............
... ...........
.............
............
............
............
.... . .......
.............
........
...........
..........
..........
.........
....
..............
..............
............
..............
..............
.......... ...
*-� -----
...........
..........
..........
..........
_ ........
..........
""' ---
......................................................... .
...........................................................
...........................................................
........ ..................................................
...........................................................
..........................................................
Hours Time —Day Men ........
..............
...............
...............
..............
...............
...............
...............
.............
............
............ I
............
............
............
............
..........
. ........
..........
..........
..........
..........
C�� ......
Hours Time —Monthly Men..
...............
............
...........
........ ..
...............
..........
Hours Time —Auto ...............
.
-
--------
..............
..........
Superintendence ......................
I
...............
............
..........
............... I
.......... :
Total .............. ...
...............
............
..........
1 k It{ L
!. 1 I•
..
.� l r:s tnAx �a
s
E.
•
1` r "`ALL"
p �p p����pppp��ff ppcDgp�p q Fi
APPUYQ I I®N ( BUIL raM f ERNIff . �. �: • APPL.No• 6�L_
CITY OF EDMONDS BuiKkag Department .Permit limit: one.
APPLiCATiON is hereby made for a permit to conduct the following work, in accordance avith'the' groom,;-*'-',. • ' 1
in plans and f•:eations. Two sets are sttbmitted herewith forapproval.
• .� , `'K.Y5
Pany g P sped�•. .. `,,. � ,:p: s�k.�,,c
new alter Off -St.
Work addn repair ........................... ��-.......... `--... . ......... Farkmg _.._......_:- ._ti 1v �•'�� } j
Occupancy.. .............................. Const. type.--_ .......... _...... ........ Use zone...... .._.......... Fire :one. ... __ ......
Lot-!A_,3 1 fBllcAddn:.._ ........ i
• ', L d f soett•backa_-.ftonr.-.......... (-� Anar.. �S x x"�'"� /... 1. ride- t-tan... .S%Fr.....
..+
g
f _t
Owner
der. ... .._arc/.:. ... . _ ...... Addtos -.._ ._.._ .. _... _ ... Tel No t i kt.?tit xj ySnatS
a.
Plansby--. ... _....................................... ............ .... Addtrs4._.._.... _......_.._.._.._....... Tel. No'..,Y eX�M
..... ............... ................. __.... _------....... _..... _... ..................
_..........__.._.._. _..
+'.5
`a akv.
The above is a correct statement, and I agree to comply with all appliable'Codcs'aei State laws regulating-
... work. � --4•'..-,M1 y� ti•+.��j� �V,x � = y i
. � Signed Owner/Agent... . !...1.���_�_.._......_..�-.. Address. ...............
_...
r PERMIT for the above work is hereby approved, setbjea to the above oondiaona and to comphana wi ' ap;y K
proved plate and spcdfications, and Building Delnrm tment notation.'thern. r e
• s
a "'Valuation :.-.....IC" .e t� o_.._.._... Permit fx:.31. _ Reed. by lr
• 4 r e r"� A h z'l t
r . Budding Department, By..,_......_-...-•---...._.._.....-•.L1/••,r3 ..._•Dace.--�3../.%wZk(^S�',('`'
NOTE — This permit does not cover plumbing, sewer, or electrical itutailations, nor does it srmit any work m,be r
done in the Right of Wav areas. Driveways and walkways must be planned to.meet the-0 f final grads of streetir h�
and alleys, and plans for future sidewalk development.
J.
`I,•• ,�„A~C. pen
LIU & ASSOCIATES., INC.
'Geotechnical.Engineering Engirieering Geology Earth Science
August 24, 2011
Mrs. Ann Bradford
1036 Bell Street
Edmonds, WA 98026
Dear Mrs. Bradford:
Subject: Gcotechnical Impact Evaluation
Wood Dcck Reconstruction
Bradford Residence
1036 Bell Street
Edmonds, Washington
L&AJob No. 11-058
INTRODUCTION
We understand that the existing wood deck abutting the back (South side) of your house,
located at the above address in Edmonds, Washington, has shown signs of decay and
needs to be replaced and reconstructed. We also understand that the new deck will be at
the same location and maintain the same configuration and size of the one to be replaced.
Because the subject residence site is mapped in steep slope area or buffer zone, City of
Edmonds is concerned about potential impact from construction of the new deck on
stability of the Slope and adjacent properties. At your request, we, have completed a
geotechnical evaluation in this regard. Presented in this report are our findings and
conclusion. RECEIVED
AUG 25 2011
DEVELOPMENT SERVICES CTR.
CITY OF EDMONDS
19213 Kenlake Place NE • Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
August 24, 2011
Mrs. Ann Bradford
L&A Job No. 11-058
Page 2
REFERENCE REPORT
A previous geotechnical investigation had been performed by Pacific Test. Laboratories
on the subject residence site, with their findings and conclusion presented in' their
04/27/1993 report titled "Inspection of Slope at the Residence Located at 1036 Bell
Street, Edmonds, Washington," (referred hereinafter as the PTi., report) a copy of which
was provided to us for our use in this evaluation
SITE CONDITIONS
Surface Condition
The general location of the subject residence is shown on Plate .l — Vicinity Map, attached
hereto. It is situated on the upper slope of a moderate to steep, southwesterly -declining
hillside which is the north valley wall of the nearby Shell Creek. The residence is
bounded by Bell Street to the north, adjoined by single-family residences to the east and
west, and backs to the south into a moderate to steep, wooded slope which extends to the
neighboring properties. The terrain within the residence site initially slopes down very
.gently southerly to the fxont of the house, then moderately to steeply to the back of the
house. A narrow, level bench area extends from the back of the house to about 10 to 12
feet past it, with the downhill edge of this bench lined by a rockery wall about 2 feet tall.
The ground then slopes down. gently southerly from the rockery to a fence before
dropping steeply onto the neighboring properties. The backyard behind the house is
covered with lawn grass and the slope beyond is dotted with medium dense, mature,
evergreen trees with occasional deciduous trees mixed in between and covered by
underbrush. `these trees are straight with no discernable downhill lean or bent in the
LIU & ASSOCIATES, INC.
August 24, 2011
Mrs. Ann Bradford
L&A. Job No. 11-058
Page 3
trunks. This indicates that the slope has been stable for at least the past several tens of
years.
Geologic Setting and Soil Condition
The Geologic Map of the Edmonds East and Tart of the Edmonds West Quadrangles
Washing by :lames P. Minard, published by U. S. Geological survey in 1983, was
referenced for the geologic and soil conditions at the residence site. According to this
publication, the surficial soil unit at and in the vicinity of the subject lot is mapped as an
Advance Outwash (Qva) soil unit.
The advance outwash soil unit is composed of stratified sand and gravel with very minor
amount of silt and cloy, deposited by the meltwater of advancing glacial ice of the last
glacier. The "sands with cobbles and a trace of silt" encountered in a shallow test pit
excavated on the subject residence site as described in the PTL report appears to confirm
this soil unit. Due to their generally granular composition, the advance outwash deposits
are of moderately high permeability and drains fairly well. The advance outwash deposits
had been glacially overridden and are generally dense to very dense in their natural;
undisturbed state, except the top 2 to 3 feet of soils exposed on steep slopes which are
normally weathered to a loose to medium -dense state. The advance outwash deposits can
stand in natural slopes or steep cuts for extended period when undisturbed. Where
exposed on slopes with poor vegetation cover and subjected to storm runoff or
groundwater seepage, the advance outwash deposits can be gradually eroded and may
slough and redeposit to a flatter inclination The underlying fresh advance outwash
LIU & ASSOCIATES, INC.
August 24, 2011
Mrs. Ann Bradford
L&A Job No. 11-058
Page 4
deposits in their native, undisturbed state are quite stable and can provide good
foundation support with little settlement expected for light to moderately heavy structures.
Groundwater Condition
The advance outwash soil unit mantling the subject residence site and the steep slope
below it is composed of fine to medium sand with various amount of gravel and
occasional cobble. This soil unit is of high permeability and would allow stormwater to
seep through easily. Stormwatcr infiltrating into the surficial advance outwash soil unit
would be perched on practically impervious fine sandy to clayey silt deposits of a
Transitional Beds soil unit underlying the advance outwash soil unit. According to the
above -referenced geologic map, the transitional beds soil unit should be tens of feet
below the ground surface within the subject residence site.
WOOD DECK
The existing wood deck (see Photo l attached hereto) off the back of the house, about 6
feet by 32 feet in plan dimensions, is 'at the main floor level, elevated at some 15 feet
above the ground. The north side of this deck is attached to the back of the house and its
south side supported on three timber posts. "phis deck has a open floor without an
impervious membrane cover. The deck has shown signs of decay and will be demolished
and reconstructed. The new deck, to be constructed with treated wood, will be at. the
same location and of the same configuration and dimension as the old deck, except that
two more timber posts will be added (to make a total of 5 posts) under its south side. Just
LIU & ASSOCIATES, INC.
August 24, 2011
Mrs. Ann Bradford
L&A Job No. 11 -058
Page 5
like the old deck, the new deck will have an open floor not covered by an impervious
membrane.
GEOLOGIC HAZARDS
Landslide Hazard
According to the above -referenced geologic map,, the residence site and the steep. slope
below it is underlain at shallow depth by dense advance outwash soil of high shear
strength. Therefore, deep-seated landslides are unlikely to occur on the residence site or
the slope below it.
Erosion Hazard
The slope below the residence site is most likely draped by a layer of topsoil and loose to
medium -dense weathered soil up to about 2 to 3 feet thick. This surficial layer of weak
soils is of low resistance against erosion and there is a remote chance that it may be,
gradually eroded if stripped of vegetation cover. Progressive erosion may result in
shallow skin -type mudflows during prolonged heavy rainstorms. This hazard can be
minimized by maintaining the vegetation on the slope and prohibiting discharge of
concentrated stormwater onto the slope.
Erosion may also occur from groundwater seepage out of the slope at the contact of the
advance outwash soil unit and the underlying transitional beds, soil unit. The soil within
and above this seepage zone can be eroded and when erosion gets to the point the soil
mass within and above the seepage zone can no longer sustain its weight slough or slide
may occur. The above -referenced geologic map shows that the contact of the two soil
LIU & ASSOCIATES, INC.
August 24, 2011
Mrs. Ann Bradford
L&A Job No. 1.1-058
Page b
units is at quite a distance from the subject residence site and the slope below it.
Therefore, the seepage erosion hazard should also be minimal within. the subject
residence site or the slope below it.
Seismic' Hazard
The Puget Sound region is in an active seismic zone. The residence site and the slope
below it are underlain at shallow depth by dense advance outwash deposits of high shear
strength. Therefore, the potential for seismic hazards, such as landslides, liquefaction,
lateral soil spreading, to occur on the site and the slope below it provided that necessary
erosion mitigation measures are fully implemented and observed.
CONCLUSION
Based on the above, the slope below the subject residence site should be stable if the
proposed new deck does not cause significant disturbance, impose heavy load or
discharge concentrated stormwater onto the slope. The proposed new deck will be
constructed to replace an existing deck which is already there. T'he new deck, which is a
very light structure, will maintain the same location and dimensions of the existing deck.
Except.the addition of two timber posts along its south.side, the loading of the new deck
will be same as that of the old. Like the existing deck, the new deck will have an open
floor with no impervious membrane cover. Therefore, there will be no concentrated
stormwater to be discharged from the new deck onto the slope below. The foundation
support to the new deck will require excavation of five small footing pits which would
cause little or no disturbance to the slope. It is, therefore, our conclusion that
LIU & ASSOCIATES, INC.
0
August 24, 2011
Mrs. Ann Bradford
L&A Job No. 11-058
Page 7
construction of the proposed new deck will not increase stormwater discharge or
transportation of sediment onto adjacent properties, will not decrease stability of the slope
or adjacent properties, and will not adversely impact other critical areas.
CLOSURE
We are pleased to be of service to you on this project. Please feel free to call us if you
have any questions regarding this report or need further consultation.
Yours very truly,
11 SSOCIA INC.
J. S. (Julian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
One Plate and One Photo attached
LIU & ASSOCIATES, INC.
1 w ,5f'.0 ``"';-`.,`t+s ., '�1' i •:2,'-.i .v 1.,t'' _'`r.r"'..
w j 41
-
°�'
e'p�5r S3
$ ✓t•IJa ' ,.+gw �,_ ° > fY F �i'_ r a
i~.'e-
]V/.i�
4- •.�.la. i` X�* 17r ii j r
Eit4_Lf .AY + IOq ^>.f. �• H!r a,. i t
` l'3.
',T-,
•
-on
H ftiTM 6TH Al
G
rSS.'.R 6TH 6TN
AJ
7711 itl S )TH ' .f z_t;v � ;xse ' , cc��'.r � •'ebb r�'-- �r�, �'� t^� `�+�' (/') - ' � "�,
Rt .wr��j ,e+ H•a py as T 1., 4AVM t"�1'T! ;
1..� j"'c �,c � .^.i,E sr�% � ��y�y q � •.;. �E ro� L:1� . � N t/7 .� LDS �, f\ ,
V) ^ � '. .LOTH :c > Ay
t a%v. L'. V yx �m TH AV
S SCA Y: i .� gr.w ' QO
i< . Atp A.PL s x£ t!1 ac tB \�. -�
R OOlii 'tiY Y a vt' �r Av, S :E . N r�
9TH 941
TN i - tAV r� I
PL SEA, rE$►A L * N .x •`-' ' d t b �u IH, ,; x az ::� me - c m" a ! T 9TH. ^~ t-+ �'•
iniH A ti
L 98TH - - AV • a 1p - b CL. } -� i,,`++' • r ! • e- C r�i `:
Q y t:� ro iiu, y ,va v 3Giii P IO i U �?;. 70 �T A tI _ c yh��'. ���., t.J 22,
CA r �b ro 9T TH AV V 4
Q96TH" r.. y.
,4,.. ... .PIN,p S• .21'tJ)'. fH PL4 r• 5. � Y .W _ „'� OLY PTC- - - � Is � 'AV � � �°�� a � ;.lp `j .�P
95TH LPL ' W 95 �'; _~• `cy r , „cs pp 3T7J or
.-A► 0 ��.� y,N 5T111 Opp 5a3tY A.`f{ m ,y �'l. 1!'YNPI`N
,.
; `latx v�u Y7� si Y Olin) 7 rFi r� : 94N3RDt .�AV-
Lip
04
0 co
O 192ND f�' Ay �f W 91� uAY h0 � AV• � re;:o * �
nSt ri t]i! L+r _.... _ a ,.�„
!T. A b.i r9 a S� ti1E Yi
v - 0 Z r'd R4E N SIN A�_ o�y cs 9tST PL' Ar4l
r
�y n �/: 0 =c ,}` o `a+im i8M v�� �woar _4oTy D � sn� : o ODD DR
BTITi
z m a6iTI�: u N w
OiTH K L' cH j +F d n
t= h m m 2�� YhA.l. tSLD !NI 86THn 'P� W rn� 'rjr ` fl8H.M.11. Yt s -r- 9SIH ?-a )e _
YJ 1 v Q PL °•
rHA!' fKM r P( Y L -�N+ > z4.` 1t1ESTH•AYaPSfH $
s m 95TN PL;W.``a m n Y �O• `^! `3 (7v L n AY,
Z O x 84T}i t V. `�rox W» . �ST- # . n1- g4TEi` AU ' H i pN! fl4TN r 'M -AU'
µ00CLAKUD wt
�"� M ?L Loco `
.,� � Imo' k � -+ �"v�is � e a AY ' W � � �. '�`^•a � eic � '
92ND PC . W Y r E: SPNo a 1 a " Ao � 82t1p PL W _ Q. Wo `� Av a ,,
s, , . 'fs �" 82h0 . AV -W' tFzm x.
rn PL . Yr to ` _82) D AV %N : ro - , ` - c < 7Ai
v,y7r''+ P ,� .. _ t iu r WMDt�u57 &'~�: t ' : `'b;� .$2 W kfi BOTH- PC W i.. .'t V
,.a I iGr 2 o Y
�J�
City of Edmonds
Critical Area Notice of Decision
Applicant:
r o r
Property Owner:
Critical Area File #:
c 2-f)k b o
Permit Number:
31^) a-wk D 6
Site Location:
Parcel Number:
�a 3 �b900190 o
Project Descri tion:
j P
\
c�C
❑ Conditional Waiver. No critical area report is required for the project described above.
1. There will be no alteration of a Critical Area or its required buffer.
2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or
23.80.040.
3. The proposal is exempt pursuant to ECDC 23.40.230.
❑ Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and
sediment control plan in compliance with ECDC 18.30.
Critical Area Report Required. The proposed project is within a critical area and/or a critical area
buffer and a critical area report is required. A critical area report has been submitted and evaluated
for compliance with the following criteria pursuant to ECDC 23.40.160:
1. ✓ The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120,
Mitigation sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare
on or off the development proposal site;
3. ✓ The proposal is consistent with the general purposes of this title and the public interest;
4. ✓ Any alterations permitted to the critical area are mitigated in accordance with ECDC
23.40.110, Mitigation requirements.
5. The proposal protects the critical area functions and values consistent with the best
available science and results in no net loss of critical functions and values; and
6. °� The proposal is consistent with other applicable regulations and standards.
[Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately
mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.1.60 and
the provisions of the City of Edmonds critical area regulations. See attached findings of
noncompliance.
❑ Favorable Critical Area Decision. The proposed project as described above and as shown on the
attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and
complies with the applicable provisions of the City of Edmonds critical area regulations. Any
subsequent changes to the proposal shall void this decision pending re -review of the proposal.
❑ Conditions. Critical Area specific condition(s) have been applied to the permit number referenced
above. See referenced permit number for specific condition(s).
Reviewer
0
Signature
i-1- it
Date
Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the
requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any,
for the permit or approval involved.
Revised 12/16/2010
k
�� �,►�Zo l 1 bC��� '
A OVED SY t_ANNING 1yy I ; L'k►i`�- D�k ; [�`
m
-°n rep 4tL Lm
a4vJ- b6a*W'
t�fo -e to
�..._ dItMP
5
AS Ei��' NOTE y�YVIoUS s�ra� t+
l�,EE NG
Dal:
vw "E9-
f ZIP,
Avlh -Br--�Orl F9os F, �
°�
(03�0 5e�(oo�
UU 4-34zo'm I Z00
Zone ComerjJ Fla&
Setbecks
Re uired Actual
Front
A o
Sides
l'U
Rear
Other
Height
rl
y
0
RECEIVED
�y F AUG - 9 2011
OEVELOPMENT SERVICES CTR.
CITY OF EDMONDS
PACIFIC TESTING LABORATORIES
EXECUTIVE OFFICES EASTSIDE DIVISION
3257 16thAve. W. • Seattle. WA 98119 11824 North Creek ParkwayN. #101 • Bothell, WA 98011
(206) 282-OW • FAX (206) 282-0710 (206) 485.4244.451-8436 • FAX (206) 485.4611
April 27, 1993
Certificate No. 9304-4060
TACOMA DIVISION PENINSULA DIVISION
2402Pacific Highway E.•Tacoma, WA 98424 10726Silverdale Way N.W.N105•Silverdale.WA 98383
(206) 922.9299 • FAX (206) 922.1512 (206) 698.6650 • FAX (206) 698-6648
RECEIVED
AUG - 9 2011
Ann Z. Bradford DEVELOPMENT SERVICES CTR.
1130 5th Avenue. South #205 CITY OF EDMONDS
Edmonds, WA 98020
Subject: Inspection of slope at the Residence Located at 1036 Bell Street, Edmonds,
Washington
Dear Ms. Bradford:
At your request a representative from Pacific Testing Laboratories was at the above mentioned
site to inspect the slope at the back of the residence..with regards to.stability.
The lot is located on the south side of Bell. Street.. with :a .relatively: level front yard. However,
the home appears to. be benched into a slope as .the.bacicyard slopes to the south at a grade of
approximately 40%. .
Beginning at, the south foundation wall of the home there is a small bench that extends
approximately 8 feet. At this point there is a small 2 to 3 foot rockery, then the remaining
southern portion of the lot slopes at 40% to the adjacent property before the topography levels
out some 200 feet away to the south.
The slope is heavily vegetated with blackberry bushes and small vine maple. There is an 18 inch
fir tree on the adjacent lot to the east that has a slight curve to the trunk, however it appears the
movement has taken place some time ago. No excess seepage was noted on the slope, that would
indicate any instability.
Soils in the area are sands with cobbles and a trace of silt. The type of soil found on the site
would appear to be a well drained therefore, reducing the risk of overloading the slope with
excess moisture.
STREET FILE
• CONSTRUCTION INSPECTION • SOILS ANALYSIS • NON-DESTRUCTIVE EXAMINATION • ENVIRONMENTAL DRILLING
• CONSULTING ENGINEERS • LITIGATION CONSULTATION • CHEMICAL ANALYSIS • CALIBRATION • STRUCTURAL/MECHANICAL LAB
A Washington Corporation furnishing Engineering services by and under the supervision of registered professional engineers.
i
PTL
Ann Bradford
Certificate No. 9304-4060
April 27, 1993
Page 2
It was noted that the downspouts at each southern corner of the house need repair. At this time
they are draining on the ground at the corner of the foundation. These shall be repaired, and
preferably tightlined to the"base of the slope, as to not cause any instability to the area. The
downspout at the southwest corner should also be directed away from the fill slope on the
adjacent property.
Based upon the visual inspection of the slope and soil classification from a shallow test pit on
the slope, we feel that there is no apparent indications of instability on the southern facing slope
at the subject lot. The home has been there for nearly 30 years and no signs of movement are
present at this time.
LZHrATIONS
This report is provided for the information of the client only. The reproduction of this report
by any method, except in full, and. its 'transmittal by any means to a third party without the
written permission of Pacific Testing Laboratories is prohibited.
This report has been prepared to aid in the evaluation of the site. Our conclusions and
recommendations have been prepared in accordance with generally accepted professional
engineering principles and practices. We make no other warranty, either expressed or implied.
Our conclusions are based on the results of the field exploration and on our interpretation of
surface conditions. If conditions are encountered that appear to be different than those described
in this report, we should be notified so that we may review and verify or . modify our
recommendations.
Sincerely,
Matt Miller, E.I.T.
Geological Engineer
PACIFIC TESTING LABORATORIES
AP P OVEU B PLANNING4,
APPROVED AS NOTED
, WnFNG1NEA1NG
Date:
bw ►le-}2
,qvl h -B ro,94oru+
I03(p F3el( free--�'
?3/
�N
147IL
� fi
sue, lac�$t�7v�
no cww&
d ► wiv&i'ov,&
# .p�,r✓ tm�5 5v ,�
UAO KC151 w# R,soZv
L,-D, 'I Uv+3gzo z.,no
Zone - � Corner N Flea
Setbick &auired Actual -
Front
2 0
Sides 1O
Rearr..----
Other
Height
00 ��,� N�v►�b��I, q$p20
° &) 774RkdbVED
AUG - 9 2011
DEVELOPMENT SERVICES CTR.
CIT1f OF EDMONDS
STREET FILE
CITY OF EDMONDS
PLAN REVIEW COMMENTS
PLANNING DIVISION
425.771.0220
DATE: August 15, 2011
TO: Rick Klemm
klemster@comcast.net
FROM: Kernen Lien, Associate Planner
RE: Plan Check BLD20110636
Deck Replacement @ 1036 Bell Street
On behalf of the Planning Division, I have reviewed the above building permit application.
During review of the subject submittal, it was found that the following information, corrections,
or clarifications need to be addressed. Please respond to the following items, so that I can
complete my review:
1. Geotechnical Report: The proposed deck replacement and new deck footings are located at
the top of a landslide hazard area as indentified under the City of Edmonds critical area
number CRA20110074. Since the proposed deck replacement includes new footings that are
within 65 feet of the landslide hazard area, a geotechnical report is required pursuant to
Edmonds Community Development Code (ECDC) 23.80.040.A. This report must be
prepared by a licensed engineer or geologist licensed in the state of Washington according to
ECDC 23.80.050.A. pursuant to ECDC 23.80.070.A.2, alterations within a landslide hazard
area or landslide hazard buffer the geotechnical report must make the following findings:
a. The development will not increase surface water discharge or sedimentation to adjacent
properties beyond predevelopment conditions;
b. The development will not decrease slope stability on adjacent properties; and
c. Such alterations will not adversely impact other critical areas;
The application for the deck replacement assessed existing slope stability but did not discuss
nor make any findings on the proposed deck consistent with ECDC 23.80. Additionally, the
report was prepared by and Engineer in Training which does not meet this City's definition
of a qualified professional according to ECDC 23.80.070.A.2.
Please submit a geotechnical report prepared by a qualified professional which makes the
specific finds in ECDC 23.80.070.A.2 as outlined above.
Feel free to contact me if you have any questions.
Please make all submittals to a Development Services Permit Coordinator, Monday through
Friday, 8:00 am 4:30 pm. If you have any questions, feel free to contact me at 425.771.0220 ext
1223.
Lien, Kernen
From: Lien, Kernen
Sent: Monday, August 15, 2011 5:05 PM
To: 'klemster@comcast.net'
Subject: BLD20110636, Planning Division Comment
Please find the attached planning division comments on the proposed deck replacement at 1036 Bell Street.
Feel free to contact me if you have any questions.
Kernen Lien
Associate Planner
City of Edmonds I Development Services Department
lien @ci.edmonds.wa. us
425-771-0220 x1223
IJ
BLD20110636 Plan