Loading...
1040 PUGET DR-NOV Letter.pdfSTREET MEMORANDUM Date: May 9, 2011 To: File From: Ed Sibrel r Senior Engineenng Technician Re: 1040 Puget Way On 5/4/2011, 1 received a phone call from the contractor responsible for upgrading the single family residence at that address. The SFR has been assessed with an NOV for drainage violations. FILE SCANNED JUL 012016 A visit to the home showed the downspouts to be connected to the footing drain system, which in turn was mislocated up to 4" too high up the foundation / basement wall on the west side of the house. There was no tightline drain installed on the west side of the house. I spoke with the laborer there and informed him that a tightline would be required to be installed, and the resulting water routed to the nearest catch basin. A question the laborer had was how to drain the new egress window under the porch. The building department had recommended"a sump pump be installed, and I allowed that pumping to a small dry well outside of the building envelope would be acceptable. There are a number of other issues with the noted sfr, however those issues are outside of the Engineering Department's purview, and are being addressed by the appropriate divisions within the City. City of Edmonds Public Works Department Engineering Division