1043 GRANDVIEW ST.PDF11111111111111
11446
1043 GRANDVIEW
ST
�Iou� �D�f/ G�,•�V�c�v
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS,WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
*PERMIT MUST BE POSTED ON JOBSITE*
STATUS: ISSUED ENG20070518
SIDE SEWER PERMIT (I -Single Fainfly)
Permit Number: ENG20070518 Expiration Date: 10/5/2008
Job Address: 1043 GRANDVIEW ST, EDMONDS
HODEL HAROLD CALCO CONSTRUCTION
124 N E 63RD 16149 REDMOND WAY # 113
SEATTLE, WA 98115 REDMOND, WA 98052
425-868-8264
LICENSE #: CALCOC*989D9 EXP: 3/29/2008
N
N
JOB DESCRIP'I'ION
REPAIR N PROPOSE TO REUSE LATERAL LIDNUMBER:
GRINDER PUMP N I PROPOSE TO REUSE SIDE SEWER
CONNECT DRAINAGE TO CITY STORM, AND DRIVEWAY CUT
EASENIENTINFORMATION
N I PROJECT CROSSES OTHER PRIVATE PROPERTY
N VERIFICATION OF RECORDED EASEMENTS COMPLETE
INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries,
damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and
attorney fees by reason ofgranting this permit.
CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION
CALL FOR INSPECTION (425) 771-0220 EXT. 1326
24 HOUR NOTICE REQ UIRED FOR ALL INSPECTION REQUESTS
THIS APPLICATION IS NOT PERMIT UNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN
SPACE PROVIDED.
FILECOPY
STREET
\INS' , , COPY
Printed: Friday, October 05, 2007
APPLICANT COPY
STATUS: ISSUED
ENG2OO7O518
• Restore ROW to City standards
• Restore Landscape to like or better conditions.
• Call for locates of underground utilities prior to any excavation.
• Alert affected residents and/or businesses prior to work start.
• Conform to approved working drawings and Traffic Control plan.
• Public utilities maintain 5' separation from City Utilities.
• Verify clear bore crossings
• Utility patch restoration to be in accordance with Edmonds Standard detail E2.3
• CDF is required for trench backfill. Refer to Edmonds Standard Detail E4.4
• Maintain erosion & sedimentation control. Keep street clean.
• Construction hours are Monday -Friday 7am-6pm and Saturdays l0arrr6pm No work on Sundays or Federal Holidays.
• Call for required inspections as noted.
• E-Sanitary Side Sewer Inspection
• E Engineering Final
PARTIAL INSPECTION DATE: INITIAL: NOTES:
PARTIAL INSPECTION DATE: INITIAL: NOTES:
FINAL INSPECTION APPROVED DATE: INITIAL: