Loading...
1056 DALEY ST.PDF11111111111111 10726 1056 DALEY ST ADDRESS:_ _ / t/ ✓�(� �%�I �LI , SI /'�QQ� TAX ACCOUNT/PARCEL NUMBER: v Mi-2A204--,25D BUILDING PERMIT (NEW STRUCTURE):VX...,� COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: I PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS PLANNING DATA CHECKLIST DATED: 42,1111 SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: �7 _ SIDE SEWER AS BUILT DATED'k 15 T Lq 721 SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT WATER METER TAP CARD DA' OTHER: L:\TEMP\DSTs\Forms\Street File Checklist.doc PLANNING DATO SINGLE FAMILY RESIDENTIAL STREET FILE Name: ] e, �- Date: � -- ?— v t Site Address: Tax Parcel VO4t `100 3 D S-o O Project Description:TD �1c`S� sr� CO'"Sj� 1 ` Plan Check #: TUoLO-7 `l3$ Reduced Site Plan Provided: (�E / NO) Zoning: 75_ L Map Page: Corner Lot: (YES / Flag Lot: (YES / Critical Areas Determination #: C klaoVAego ❑ Study Required Waiver SEPA Determination: -Exempt ❑ Needed (for over 500 cubic ,yards of grading) ❑ Fee-- _--- Checklist ❑ APO List with notarized form Required Setbacks Street: a Side: S\ e: Rear: Actual Setbacks Street: Side: 1 r Side: J— Rear: ❑ Detached Structures: 1 \ Rockeries: ❑ Fences/Trellises: \ 1) ❑ Bay Windows/Projecting Modulation: ❑ Stairs Deck: Bui/din Hei ht Datum Point:I'T Datum Elevation: too Maximum Height Allowed: Actual Height: Other Parking Required: Parking Provided: Lot Area: Maximum Lot Coverage: 35% Proposed: Lot Coverage Calculations: ADU Created: (YES / Subdivision: Legal Nonconforming Land Use Determination Issued: (YES / 10) Comments Plan Review By: Planning Data Farm 07-14-09.doc City of Edmonds Site Classification Worksheet The project's Classification serves to identify the specific Stormwater Management requirements applicable to your site. Complete the worksheet below to determine whether your project falls into the classification of a Large Site, Small Site (Category 1 or Category 2), or a Minor Site. Step 1: Determine the Exempt Impervious Surface Area for your project and enter it on line 1 of the table (yellow box). Step 2: Determine the Replaced Impervious Surface Area for your project and enter it on line 2 of the table below dividing the total between Exempt and Non -Exempt (orange and blue boxes); either or both may be zero. Step 3: Determine the New Impervious Surface Area for your project. If a portion of the new impervious surface area is also Non -Exempt Replaced Impervious Surface Area subtract this from the total of the new impervious surface area. Enter the final value on line 3 of the table below (blue box). Step 4: Add the values in the Non-exempt column for lines 2 and 3 and enter it into line 4 (green box). Where does the existing site runoff discharge? (Check all that apply) See Watershed Map Figure-B, Handout g 4 Supplement Chapter 2.3 ❑ Direct Discharge ❑ Edmonds Way Basin ❑ Creek or Lake Basin Line Type Area (square Feet) Impervious surface: How much and what type? (fill in colored boxes) See Definitions, Handout pg 9 Figure-C, Handout pg 7 Supplement Chapter 2.2 & Figure-C 1• Exempt Exempt Non -Exempt 2 Replaced - Examples, Handout pg 10 3. New 3(D69 4. Total Replaced +New (Non-Exelboxes) (add numbers in blue Land -disturbing activity area See Definitions, Handout pg 9 Supplement Chapter 8 sf Grading, Fill or Excavation Area /r� oL L! �� S (i—W&7 (tM C L4) sf Will project convert'/4 acre or more of native vegetation to ❑ YES U---NO lawn or landscaped area? Proceed to the Project Classification Chart (Figure D, pg 8) and use the data collected above to follow the flow chart and determine the classsiificat�io of your project. El Large Site (Handout E72a) N� mall Site (Handout E72b) ❑ Minor Site (Handout E72c) Revised on 7/9,'10 E72 - Stormirater Atanagement Erosion Control-FINAL2 RECEIVE JUN 0 8 1ffii of I BUILDING DEPARTMENT CITY OF EDMONDS rom M APPLICATION for The City of Edmonds SIDE SEWER PERYaT EASEMENT No ........................................... NEW CONSTRUCTION O REPAIRS 118-03500 OWNER.......... MCs......Aal-td--Kri.Qht............................................... ....... CONTRACTOR..--....----------..-..-...-----..--............---------------..-.-..-------------------.-..----- PERMIT No....................... ADDRESS....... 105.6... Qd-1$y... Cjt--------------------------------------------------------------- • • LEGAL DESCRIPTION: LOT No ............................................... BLOCK No............................................. NAME OF ADDITION ............................. Dye Tested On Sewer 1972 Approved: DATE................................................ By.....--...............------.......................................... LIU & ASSOCIATES, INC. Geolechnica.l Engineering Engineering Geology June 13, 2012 Mr. Wendy Priest l o s41506'Daley Street Edmonds, WA 98020 Dear leis. Priest: Subject: Final Inspection Report Priest Residence iv51, 1Sflia Daley Street Edmonds, Washington 1.&=a Job No. 1 t-004 Earth Scienoe jj*tl V`t We have provided geotechnical inspection services f6r the construction of the subject residence. Items we .have inspected include: 1) temporary erosion control with installation of silt fence and rolls or hay on the downhill side ofthe residence site. 2) verification of soil at bottom of infiltration trenches, 3) footing. bearing soil verification, 4) .subgrade snail protection with compacted crushed rock fill, and. S) final erosion control. The Daily Field Reports documenting, our inspections of the above items are attached hereto for your review. Based on our observations, it is our opinion that the. geotechnical construction work items listed above are completed in accordance with city approved plans and specifications, and is acceptable. Please contact us- " aye questions, 40�.Y:. '`+ Yours very truly, LIU SSOCIA ..NC. P7- J. S. (Julcan) T.iu. Ph.D.. P.E. Consulting Geotechnica.l Rnginecr . m Attach.: Daily Field Reports 1 through' 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 • Fax (426) 486-2746 DAILY FIELD REPORT 735=5 He 7U-7 eage ............................. Neport No. LILT & ASSOCIATES, INC. 11-004 J. Liu I of 1 1 G.-tcizikal Eugiiierning, J*'rpn:,-Ting 0,x,1oZ;, X. Virl; Stirn.r Wiles 777717r—le 77i Day of%Veek 32 12:20P 819/2011 Tues. 192.13 Kenlak-e Place NE Travel the (.icy— Time CH Site Weather Kcitmore, Wasbington 98029 1 1 : 5P Cloudy Phone- 02i i 4R-',-(X',4 Fax. t425) JXn'-2746. Ve6c;e His on si*e h r,-, '- -i a r c --d visitvrs prajeG J6 OGH 113n Client --Wendy Priest Residence 1056 Daiey Street, Edmonds Wendy Priest General Contractor General Contractor Piqj. Maroger Received Unchecked By SCL Enterprises LLC Shaun Leiser Earitroork Contractor EarthAwk Contractor Supt. Received Checked By At the request of Shaun Leiser with SCL Enterprises LLC, .1 come on site today to observe erosion mitigation measures being implemented for the subject project site. At the time of my site visit, a silt fence has already been installed along the north (downhill) side of the site east of the existing paved driveway. Also, SCL has a worker installing rollers of hay wad along the east and west sides of the site where required, to prevent sediment Movement by runoff. It is my opinion that the erosion mitigation measures already implemented are acceptable. ...................... 71 1"', ts . . . . . ........ ... .. ... ........ ............ Z!opy to: 13) C] Continued 1) Shaun Leiser/SCL Enterprises LLC 2) Wendy Priest on Next 4) Page DAILY FIELD REPORT nr,13 M(7 — 7W—rd'9e—P' Rge Merm No. I'M & ASSOCIATES, INC. 11-004 J.'Liu 1 of 1 2 Wes TIMO On Sge Date 32 1:15P 8130/2011 Tues. 19213 Kenlake Place NE Ti 5V@ rime Mrs) Kenmore. Washington 98028 1 1:35P Partly Cloudy Phoric',02i.)483-41-34 Vat: (425)4A6-2746 Vehide Hrs on 5116'— Rrs Charged Visnors 1.25 FrojerA T0-07U6�-aWj Client Wendy Priest Residence 1D56 Daley Street, Edmorias Wendy Priest Gerweral Contractor Gerera'rrntradi- Pro;_ Manager Peteved UnchLecked Sy SCL Enterprises LLC Shaun Leiser Earthwork CoAIW'or E'af"-.Vor'r Ccniavor supt. beckod By At the request of Shaun Leiser with SCIL Enterprises LLC, I come on site today to observe the infiltration trench .................... . already excavated and the.soil condition in the trench. The trench is about 6 ft wide by 6 ft deep by,40 ft long, and is Cut through a 2-5 layer of peat and layers of sand and gravelly sand about 2.5 to 3 feet thick, then into a silty sand deposit. Minor groundwater seepage is observed at, bottom of the trench-. It is my opinion that the trench rneets the requirement shown on the plans. ... ....... 6; L --400ep 7 t'7 j opyTo—. El Continued 1) Shaun Leiser/SCL Enterptises, LLC 2) Wendy Priest on Next 3) 4) MWMATMEXAMMM Page �Ot) F."o. MIME :77-17 age LIU & ASSOCUTES, 11 -004 J. Liu I of 1 3 - Lr ieenng Larik. T,4T- i es i Ire ran 7cite 1525 Day of Week 32 1: 1 5P MO/201 1 Tues.- 1921' Kciflakc Placv NE Favel'jjme iRjg) 7ime Off Site VVeatheT KCHTI .2 MQTC, wasitington, 980 8 .1 1:45P Sunny Vel;tc.e Hr,; on Si -I Hr-- Chargee V454ors, Phonc-.(42i)4S3-91',4 Fax: (4_)i)48O-2746 1.5 Project Job Uacali5n Ctirmt ---VVendy Driest Res°dence 1055 Oa:ey Street. Edmonds Wendy Priest General Contractor Gene"51 Contractor Proj. Mamger Received Unchecked By Enter rises LLC Shaun Leiser _SCL Earihworl,, Coniracor I:aritn'.01k ci_I'mut�-, SUP,- Received checked By At the request of Shaun Leiser with SCL Enterprises LLC, I come on site today to observe preparation of footing bearing subgrade soil . At the time of my site visit, SCL Enterpirlses has already completed building footprint excavation. Due to the presenre of loose organic soil, the building footprint has to be over -excavated up to 3 to 4 feel, .-rock spall fill. The organic soil has mostly been excavated out down to a blue -gray deposit of slightly silt fine to medium sand with a trace to some. gravel. Tvm puddles of standing water lie at the northC-ASt and the southwest corner of the excavation. It is my recommendation that any loose disturbed soil at bottom of excavation should be removed down to firm native bearing soil. The over -excavation should then be backfilled with 2-to-4-inc.h rock 5pialls. to finish subgrade. The rock spalls should be placed in lifts no more than 12 inches V,"91 C3301 to a 11011-Yie!3ing state with a vibratory mechanical compactor. The fuck spall fill stiould be topped with a 6-ich layer of 2-inch-minus crushed rock, also to be compacted to a non-yieldinq state. The footing foundations May then be poured on the crushed rock base, --- A sump pit should be installed at one of the comers of the building footprint. The pit should be lined by a layer of non -woven filter fabric and backfilled with clean washed 3M-to-2-inch gravel. A sump pump should be installed in the sump pit to pump out water -which may accumulate in the building footprint excavation. "Y'DIPM 71 I,j ....................... 4 Copy to: ❑ Continued 1) Shaun Leiser/SCL Enterprises LLC 2) Wendy Priest on Next 3) 4) P;3. n P —7' o 0, LIU & ASSOCIATES, INC. 11-004 J. Liu 1 of 1 4 PAI-*5 1-tie On Sre Da'e Day of Week 32 12:15P 9/612011 Tues.— I." K�jiljkc Plan : NIF Travel Time (Hf%i Time Off $4e weatner Kcmnurc. %Vashin'-folk )84,128 1 12'.40P Sunny (4`�;' 4,S3-91 F:I\l 41,6-2746 belt -!a Hrs .n Sire Hr-- C-hamged V15M,5 1 1 1.25 P r0j ecl UEFI—QCTF-751 7, 11. M Wendy Priest Residence 1056 Daley Street, Edmonds Wendv Priest, Gffi-fal Corttmctcr act<y 'I,tj rVar.80er Re--eibed 'Unchecked By SCL Enterprises LLC Shaun Leiser EaTthwoik C-w1ra--lor E.3.f'hwxk Contractor Supt Received Checked By At the request of Shaun Leiser with SCL Enterprises LLC, I come on -site today to observe preparation of subgrade soil and placement of rock Walls to backfill building footprint over -excavation, SCL Enterprises has brought in several tRick loads of 2-to-4-inch rock spalls to the site and has a heavy vibratory roller compactor on site to compact the rock spall fill. Loose disturbed soil has been removed from bottorn of building footprint excavation, SCL has started placing rock spails in the northeast corner area of the excavation and compacted the rock fill with the roller compactor. The already placed rock spall fill appears to have been compacted to a very dense state- . ....... .. .... . . —3 71171 13 copy tol. Continued l) Shaun LeiseriSCL Enterprise-,, LLC 2) Wendy Priest on Next 41 Page DAILY FIELD REPORT Job No. r-1MITF—P — 7age Report NO- 1A.1 & ASSOCIATES,INTC. 11-004 J. Liu 1 of 1 5 C I LmIhSocrwr Miles Time On Sr e Date . .... ay or �ee 32 1:50P 6/13/201 2 Wed.— [9213 Kenlake Place -NM Travel Ti7m 1,Hrs) Time Off Site We—ather Kentunre Washington !)102?,- 1 2:05P Light RainPhone, ('4215.14181-9 1.4 Fax, (4 2 i) 4,M-2 746 Vehicle Hrs on Site hrs Charged V'isitors 1.2 o a ion ient 'Wendy Priest Residence 1056,Daley Street, Edmonds Wendy,Pnest [Proy General Co Wactor General Contractor Pro], Manager Received Unchecked By SCL Enterprises LLC Shaun Leiser Earthviwk Contractor Earthwork Contractor Sept. Received Checked By At the request of Rick Godsalve, I come on site today to have an observation of final erosion Control of the subject project site: Atthe time of my site visit, fin4lgrading-of the site has:been completed and the ground within the . site is graded nearly level except along the north boundary of the site,where it drops,off northward about 1 to 4 feet down to Daley Street. No signs of erosion from surface runoff or groundwater seepage are observed within the site. The unpaved exposed ground is covered. by grass sod; shredded bark and crushed rock. Planting of trees and shrubs may ensue, but it is my opinion that final erosion Control is completed for the site. Copy to: 0 Continued 1) Shaun Leiser/SCL. Enterprises LLC 2) Wendy Priest 1 on Next 3) 4) Page Wendy Priest Project 1056 Daley St. Edmonds, WA. 98020 Stormwater Drainue Memorandum Y`rli ET FIB JUN 0f 2011 BUILDING DEPARTMENT GTY OF EDMONDS QED BY ENGINEERING 9 DAVIDO CONSULTING G.ROUP, INC. CIVIL ■ STRUCTURAL ■ LAND USE MEMORANDUM TO: City of Edmonds FROM: Erik Davido, P.E. DATE: June 7, 2011 RE: Priest Residence 1056 Daley Street Edmonds, WA 98020 Drainage/Infiltration System Design Summary This memorandum summarizes the stormwater infiltration system design. Project Summary The site at 1056 Daley Street in Edmonds, WA currently has a single family residence which will be demolished and replaced with a new single family residence. The proposed residence (2,769 SF) is approximately the same size as the existing structure. The site access will remain off of Daley Street with a new driveway to replace the existing. The site has a slight slope from south to north (less than 5% across the site). There are no critical areas on or near the site and there are no known existing drainage issues on the site. Per the City of Edmonds Stormwater Code the project is classified as a Category 1 Small Site Project which allows pre -sized infiltration trenches for stormwater runoff. The pre -sized approach resulted in long, narrow and shallow infiltration trenches that do not fit within the site so, as allowed by the City of Edmonds, engineered infiltration facilities were designed in accordance with the 2005 Department Ecology Stormwater Management Manual (SWMM). The SWMM requires -Western Washington Hydrology Model Version 3 (WWI1M3) to design infiltration trenches for the full period of record (i.e., including the 100 year storm event). For a comparison between the pre - sized approach and modeled infiltration size see Table 2 below. Fully infiltrating site runoff eliminates the need for additional facilities designed to comply with Minimum Requirement #7 — Flow Control in the Stormwater Code. An off -site analysis is also not needed since there will be no discharge to the City storm system. See the attached Drainage Plan for the locations of infiltration trenches, drywells, catch basins, etc. Methodology In order to model the developed site in WWHM3 and fit the trenches within the site, the site was broken into two basins. The north basin included the driveway (729 SF) and the north/front portion of the house roof (871 SF) while the south basin consisted of the south/back portion of the house roof (1,898 SF). See Table 1 below for site area calculations. Separate infiltration trenches were designed for each basin. As mentioned above, a design infiltration rate of 0.75 inches per hour was used per geotechnical engineer recommendation. A void percentage of 30% was assumed for the infiltration trench rock per standard industry recommendations. The trenches were iteratively changed until 100% infiltration was achieved within the modeled trenches. The trenches were sized to fit within setback requirements from the property line and house per the SWMM and geotechnical engineer recommendations. Seattle Area Office Whidbey Office 15029 Bothell Way NE, Ste 600, Lake Forest Park, WA 98155 PO Box 1132, Freeland, WA 98249 Ph. 206.523.0024 Fax 206.523.1012 Ph. 360.331.4131 Fax 360.331.5131 20110607_Drainage Design Memo_Riest Residence Final Priest Residence —1056 Daley Street Edmonds, WA 98020 June 7, 2011 The WWHM3 modeling printouts showing basin input information and infiltration system sizing results are attached. TABLE 1 BASIN AREA CALCULATIONS IDE GEED AREA_. Ct LGULA�fIONS =ROP,OSED3C_ONDI=TIONS AREA DESCRIPTION AREA IN SQ FT AREA IN ACRES TOTAL SITE AREA 8,224 0.189 AREA IN ACRES AREA DESCRIPTION AREA IN SQ FT Roof 871 0.020 Driveway 729 0.017 TOTAL IMP SURFACES 1,600 0.037 INFIL� AR ION1tTRENC$ 2LOU_OU-1fi BASIN IN Bull 9 AREA DESCRIPTION AREA IN SQ FT AREA IN ACRES Roof 1,898 0.044 TOTAL IlVIP SURFACES 1,898 0.044 PERVIOUS AREAS AREA INS FT AREA IN ACRES LANDSCAPING 4,726 0.108 Soils and Infiltration Liu & Associates, Inc. conducted a geotechnical engineering study and summarized their findings and recommendations in a report dated March 15, 2011. Tlie Liu & Associates report recommends a design infiltration rate of 0.75 inches/hour, the trenches can be located at'the north and south ends of the site as long as they are a minimum of 8 feet from the house foundation, and, soil unit at the bottom of the infiltration trenches should be verified by a geotechnical engineer. See the attached report for additional soil details. WWHM3 /Infiltration Facility Parameters The Puget Sound East 36 rain gauge was used as specified in the Stormwater Code. The infiltration trenches were input into WWHM3 with initial lengths and widths which were iteratively changed along.with the depth of the rock until 100% infiltration was achieved with no water flowing through the riser. The riser was set at the top of the rock pocket and the rock pocket modeled at 30% void ratio. Modeling and Facility Sizing Summary Two infiltration facilities were sized with the following results: TABLE 2 WWHM3 Modeling Results and Comparison toPre-Sized Method Infiltration Trench # Length ft Width ft Depth ft Volume CF WWHM Trench 1(North) 35 4.5 6 945 WWHM Trench 2 South 40 5 5 1000 Pre -Sized Trench 140 1 2 3 840 Note: Pre -sized approach shown for comparison purposes only. Davido Consulting Group, Inc. Page 2 Priest Residence —1056 Daley Street Edmonds, WA 98020 June 7, 2011 As shown in Table 2, the engineered infiltration trenches result in a total volume that is more than twice the size of the pre -sized method but allow for sizes that fit within the site. Attachments: Liu & Associates Geotechnical Engineering Study WWHM Modeling Results Drainage Plans Davido Consulting Group, Inc. Page 3 WWHM Modeling Results June 1, 2011 Priest Residence -1056 Daley St Edmonds, WA Western Washington Hydrology Model PROJECT REPORT Project Name: Priest 1 Site Address: 1056 Daley St City : Edmonds Report Date: 6/1/2011 MGS Regoin : Puget East Data Start 1939/10/1 Data End 2097/08/31 DOT Data Number: 03 WWHM3 Version: PREDEVELOPED LAND USE Name : Predev Front Bypass: No GroundWater: No Pervious Land Use Acres A B, Lawn, Flat .062 Impervious Land Use Acres ROOF TOPS FLAT 0.02 DRIVEWAYS MOD 0.017 Element Flows To: Surface Interflow Groundwater Name : Trench Front Bottom Length: 35ft. Bottom Width : 4.5ft. Trench bottom slope 1: 0.001 To 1 Trench Left side slope 0: 0 To 1 Trench right side slope 2: 0 To 1 Material thickness of first layer : 6 Pour Space of material for first layer: 0.3 Material thickness of second layer: 0 Pour Space of material for second layer : 0 Material thickness of third layer :' 0 DCG, Inc Page 1 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA Pour Space of material for third layer : 0 Infiltration On Infiltration rate : 8 Infiltration saftey factor : 0.0937 Discharge Structure Riser Height: 6 ft. Riser Diameter: 10 in. Element Flows To: Outlet 1 Outlet 2 Gravel Trench Bed Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.004 0.000 0.000 0.000 0.078 0.004 0.000 0.000 0.003 0.156 0.004 0.000 0.000 0.003 0.233 0.004 0.000 0.000 0.003 0.311 0.004 0.000 0.000 0.003 0.389 0.004 0.000 0.000 0.003 0.467 0.004 0.001 0.000 0.003 0.544 0.004 0.001 0.000 0.003 0.622 0.004 0.001 0.000 0.003 0.700 0.004 0.001 0.000 0.003 0.778 0.004 0.001 0.000 0.003 0.856 0.004 0.001 0.000 0.003 0.933 0.004 0.001 0.000 0.003 1.011 0.004 0.001 0.000 0.003 1.089 0.004 0.001 0.000 0.003 1.167 0.004 0.001 0.000 0.003 1.244 0.004 0.001 0.000 0.003 1.322 0.004 0.001 0.000 0.003 1.400 0.004 0.002 0.000 0.003 1.478 0.004 0.002 0.000 0.003 1.556 0.004 0.002 0.000 0.003 1.633 0.004 0.002 0.000 0.003 1:711 0.004 0.002 0.000 0.003 1.789 0.004 0.002 0.000 0.003 1.867 0.004 0.002 0.000 0.003 1.944 0.004 0.002 0.000 0.003 2.022 0.004 0.002 0.000 0.003 2.100 0.004 0.002 0.000 0.003 2.178 0.004 0.002 0.000 0.003 2.256 0.004 0.002 0.000 0.003 2.333 0.004 0.003 '0.000 0.003 2.411 0.004 0.003 0.000 0.003 June 1, 2011 DCG, Inc Page 2 of 27 . WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2.489 0.004 0.003 0.000 0.003 2.567 0.004 0.003 0.000 0.003 2.644 0.004 0.003 0.000 0.003 2.722 0.004 0.003 0.000 0.003 2.800 0.004 0.003 0.000 0.003 2.878 0.004 0.003 0.000 0.003 2.956 0.004 0.003 0.000 0.003 3.033 0.004 0.003 0.000 0.003 3.111 0.004 0.003 0.000 0.003 3.189 0.004 0.003 0.000 0.003 3.267 0.004 0.004 0.000 0.003 3.344 0.004 0.004 0.000 0.003 3.422 0.004 0.004 0.000 0.003 3.500 0.004 0.004 0.000 0.003 3.578 0.004 0.004 0.000 0.003 3.656 0.004 0.004 0.000 0.003 3.733 0.004 0.004 0.000 0.003 3.811 0.004 0.004 0.000 0.003 3.889 0.004 0.004 0.000 0.003 3.967 0.004 0.004 0.000 0.003 4.044 0.004 0.004 0.000 0.003 4.122 0.004 0.004 0.000 0.003 4.200 0.004 0.005 0.000 0.003 4.278 0.004 0.005 0.000 0.003 4.356 0.004 0.005 0.000 0.003 4.433 0.004 0.005 0.000 0.003 4.511 0.004 0.005 0.000 0.003 4.589 0.004 0.005 0.000 0.003 4.667 0.004 0.005 0.000 0.003 4.744 0.004 0.005 0.000 0.003 4.822 0.004 0.005 0.000 0.003 4.900 0.004 0.005 0.000 0.003 4.978 0.004 0.005 0.000 0.003 5.056 0.004 0.005 0.000 0.003 5.133 0.004 0.006 0.000 0.003 5.211 0.004 0.006 0.000 0.003 5.289 0.004 0.006 0.000 0.003 5.367 0.004 0.006 0.000 0.003 5.444 0.004 0.006 0.000 0.003 5.522 0.004 0.006 0.000 0.003 5.600 0.004 0.006 0.000 0.003 5.678 0.004 0.006 0.000 0.003 5.756 0.004 0.006 0.000 0.003 5.833 0.004 0.006 0.000 0.003 5.911 0.004 0.006 0.000 0.003 5.989 0.004 0.006 0.000 0.003 6.067 0.004 0.007 0.140 0.003 6.144 0.004 0.007 0.446 0.003 June 1, 2011 DCG, Inc Page 3 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 6.222 0.004 0.007 0.850 0.003 6.300 0.004 0.008 1.334 0.003 6.378 0.004 0.008 1.884 0.003 6.456 0.004 0.008 2.495 0.003 6.533 0.004 0.008 3.161 0.003 6.611 0.004 0.009 3.877 0.003 6.689 0.004 0.009 4.640 0.003 6.767 0.004 0.009 5.448 0.003 6.844 0.004 0.010 6.298 0.003 6.922 0.004 0.010 7.188 0.003 7.000 0.004 0.010 8.116 0.003 Name : Predev Back Bypass: No GroundWater: No Pervious Land Use Acres A B, Lawn, Flat .046 Impervious Land Use Acres ROOF TOPS FLAT 0.0436 Element Flows To: Surface Interflow Groundwater Name : Dev Back Bypass: No GroundWater: No Pervious Land Use Acres A B, Lawn, Flat .046 Impervious Land Use Acres ROOF TOPS FLAT 0.0436 Element Flows To: Surface Interflow Groundwater June 1, 2011 . DCG, Inc Page 4 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA Trench Back, Trench Back, Name : Dev Front Bypass: No GroundWater: No Pervious Land Use Acres A B, Lawn, Flat .062 Impervious Land Use Acres ROOF TOPS FLAT 0.02 DRIVEWAYS MOD 0.017 Element Flows To: Surface Interflow Trench Front, Trench Front, Groundwater Name : Trench Back Bottom Length: 40ft. Bottom Width: 5ft. Trench bottom slope 1: 0.001 To 1 Trench Left side slope 0: 0 To 1 Trench right side slope 2: 0 To 1 Material thickness of first layer : 5 Pour Space of material for first layer: 0.3 Material thickness of second layer : 0 Pour Space of material for second layer : 0 Material thickness of third layer: 0 Pour Space of material for third layer : 0 Infiltration On Infiltration rate : 8 Infiltration saftey factor : 0.0937 Discharge Structure Riser Height: 5 ft. Riser Diameter: 10 in. Element Flows To: Outlet 1 Outlet 2 June 1, 2011 DCG, Inc Page 5 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA Gravel Trench Bed Hydraulic Table Stage(ft) Area(acr) Volume(acr-ft) Dschrg(cfs) Infilt(cfs) 0.000 0.005 0.000 0.000 0.000 0.067 0.005 0.000 0.000 0.003 0.133 0.005 0.000 0.000 0.003 0.200 0.005 0.000 0.000 0.003 0.267 0.005 0.000 0.000 0.003 0.333 0.005 0.000 0.000 0.003 0.400 0.005 0.001 0.000 0.003 0.467 0.005 0.001 0.000 0.003 0.533 0.005 0.001 0.000 0.003 0.600 0.005 0.001 0.000 0.003 0.667 0.005 0.001 0.000 0.003 0.733 0.005 0.001 0.000 0.003 0.800 0.005 0.001 0.000 0.003 0.867 0.005 0.001 0.000 0.003 0.933 0.005 0.001 6.000 0.003 1.000 0.005 0.001 0.000 0.003 1.067 0.005 0.001 0.000 0.003 1.133 0.005 0.002 0.000 0.003 1.200 0.005 0.002 0.000 0.003 1.267 0.005 0.002 0.000 0.003 1.333 0.005 0.002 0.000 0.003 1.400 0.005 0.002 0.000 0.003 1.467 0.005 0.002 0.000 0.003 1.533 0.005 0.002 0.000 0.003 1.600 0.005 0.002 0.000 0.003 1.667 0.005 0.002 0.000 0.003 1.733 0.005 0.002 0.000 0.003 1.800 0.005 0.002 0.000 0.003 1.867 0.005 0.003 0.000 0.003 1.933 0.005 0.003 0.000 0.003 2.000 0.005 0.003 0.000 0.003 2.067 0.005 0.003 0.000 0.003 2.133 0.005 0.003 0.000 0.003 2.200 0.005 0.003 0.000 0.003 2.267 0.005 0.003 0.000 0.003 2.333 0.005 0.003 0.000 0.003 2.400 0.005 0.003 0.000 0.003 2.467 0.005 0.003 0.000 0.003 2.533 0.005 0.003 0.000 0.003 2.600 0.005 0.004 0.000 0.003 2.667 0.005 0.004 0.000 0.003 2.733 0.005 0.004 0.000 0.003 2.800 0.005 0.004 0.000 0.003 2.867 0.005 0.004 0.000 0.003 June 1, 2011 DCG, Inc Page 6 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2.933 0.005 0.004 0.000 0.003 3.000 0.005 0.004 0.000 0.003 3.067 0.005 0.004 0.000 0.003 3.133 0.005- 0.004 0.000 0.003 3.200 0.005 0.004 0.000 0.003 3.267 0.005 0.004 0.000 0.003 3.333 0.005 0.005 0.000 0.003 3.400 0.005 0.005 0.000 0.003 3.467 0.005 0.005 0.000 0.003 3.533 0.005 0.005 0.000 0.003 3.600 0.005 0.005 0.000 0.003 3.667 0.005 0.005 0.000 0.003 3.733 0.005 0.005 0.000 0.003 3.800 0.005 0.005 0.000 0.003 3.867 0.005 0.005' 0.000 0.003 3.933 0.005 0.005 0.000 0.003 4.000 0.005 0.006 0.000 0.003 4.067 0.005 0.006 0.000 0.003 4.133 0.005 0.006 0.000 0.003 4.200 0.005 0.006 0.000 0.003 4.267 0.005 0.006 0.000 0.003 4.333 0.005 0.006 0.000 0.003 4.400 0.005 0.006 0.000 0.003 4.467 0.005 0.006 0.000 0.003 4.533 0.005 0.006 0.000 0.003 4.600 0.005 0.006 0.000. 0.003 4.667 0.005 0.006 0.000 0.003 4.733 0.005 0.007 0.000 0.003 4.800 0.005 0.007 0.000 0.003, 4.867 0.005 0.007 0.000 0.003 4.933 0.005 0.007 0.000 0.003 5.000 0.005 0.007 0.000 0.003 5.067 0.005 0.007 0.140 0.003 5.133 0.005 0.008 0.395 0.003 5.200 0.005 0.008 0.726 0.003 5.267 0.005 0.008 1.118 0.003 5.333 0.005 0.009 1.562 0.003 5.400 0.005 0.009 2.053 0.003 5.467 0.005 0.009 2.587 0.003 5'.533 0.005 0.010 3.161 0.003 5.600 0.005 0.010 3.772 0.003 5.667 0.005 0.010 4.418 0.003 5.733 0.005 0.010 5.097 0.003 5.800 0.005 0.011 5.807 0.003 5.867 0.005 0.011 6.548 0.003 5.933 0.005 0.011 7:318 0.003 6.000 0.005 0.012 8.116 0.003 June 1, 2011 DCG, Inc Page 7 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA MITIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Periods for Predeveloped. POC #1 Return Period � Flow(cfs) 2 year 0.009716 5 year 0.012942 10 year 0.015272 25 year 0.018447 50 year 0.020984 100 year 0.023673 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.009721 5 year 0.012955 10 year 0.015293 25 year 0.018478 50 year 0.021024i 100 year 0.023724 Yearly Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1941 0.011 0.011 1942 0.012 0.012 1943 0.014 0.014 1944 0A06 0.006 1945 0.007 0.007 1946 0.009 0.009 1947 0.008 0.008 1948 0.011 0.011 1949 0.010 0.010 1950 0.011 0.011 1951 0.023 0.023 1952 0.006 0.006 1953 0.025 0.025 1954 0.011 0.011 1955 0.008 0.008 1956 0.006 0.006 1957 0.010 0.016 1958 0.006 0.006 1959 0.008 0.008 1960 0.006 0.006 June 1, 2011 DCG, Inc Page 8 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 1961 0.008 _0.008 1962 0.009 0.009 1963 0.012 0.012 1964 0.006- .0.006 1965 0.012 0.012 1966 0.008 0.008 1967 0.008 0.008 1968 0.013 0.013 1969 0.015 0.015 1970 0.007 0.007 1971 0.008 0.008 1972 0.008 0.008 1973 0.015 0.015 1974 0.007 0.007 1975 0.008 0.008 1976 0.011 0.011 1977 0.007 0.007 1978 0.010 0.010 1979 0.014 0.014 1980 0.012 0.012 1981 0.011 0.011 1982 0.012 0.012 1983 0.017 0.017 1984 0.012 0.012 1985 0.008 0.008 1986 0.007 0.007 1987 0.009 0.009 1988 0.016 0.016 1989 0.006 0.006 1990 0.011 0.011 1991 0.017 0.017 1992 0.016 0.016 1993 0.008 0.008 1994 0.007 0.007 1995 0.006 0.006 1996 0.008 0.008 1997 0.012 0.012 1998 0.011 0.011 1999 0.008 0.008 2000 0.023 0.023 2001 0.009 0.009 2002 0.006 0.006 2003 0.018 0.018 2004 0.010 0.010 2005 0.008 0.008 2006 0.009 0.009 2007 0.008 0.008 2008 0.008 0.008 June 1, 2011 DCG, Inc Page 9 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2009 0.010 0.010 2010 0.010 0.010 2011 0.032 0.032 2012 0.017 0.017 2013 0.013 0.013 2014 0.014 0.014 2015 0.013 0.013 2016 0.006 0.006 2017 0.011 0.011 2018 0.010 0.010 2019 0.010 0.010 2020 0.011 0.011 2021 0.008 0.008 2022 0.011 0.011 2023 0.010 0.010 2024 0.011 0.011 2025 0.007 0.007 2026 0.011 0.011 2027 0.007 0.007 2028 0.007 0.007 2029 0.007 0.007 2030 0.012 0.012 2031 0.011 0.011 2032 0.014 0.014 2033 0.009 0.009 2034 0.006 0.006 2035 0.009 0.009 2036 0.008 0.008 2037 0.010 0.010 2038 0.011 0.011 2039 0.011 0.011 2040 0.010 0.010 2041 0.014 0.014 2042 0.007 0.007 2043 0.013 0.013 2044 0.019 0.019 2045 0.008 0.008 2046 0.011 0.011 2047 0.009 0.009 2048 0.008 0.008 2049 0.010 0.010 2050 0.008 0.008 2051 0.010 0.010 2052 0.008 0.008 2053 0.008 0.008 2054 0.015 0.015 2055 0.007 0.007 2056 0.015 0.015 June 1, 2011 . DCG, Inc Page 10 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2057 0.012 0.012 2058 0.014 0.015 2059 0.012 0.012 2060 0.010 0.010 2061 0.014 0.014 2062 0.015 0.015 2063 0.021 0.021 2064 0.009 0.009 2065 0.011 0.011 2066 0.010 0.010 2067 0.005 0.005 2068 0.008 0.008 2069 0.013 0.013 2070 0.006 0.006 2071 0.007 0.007 2072 0.008 0.008 2073 0.008 0.008 2074 0.010 0.010 2075 0.007 0.007 2076 0.011 0.011 2077 0.010 0.010 2078 0.017 0.017 2079 0.008 0.008 2080 0.009 0.009 2081 0.011 0.011 2082 0.013 0.013 2083 0.009 0.009 2084 0.008 0.008 2085 0.008 0.008 2086 0.010 0.010 2087 0.009 0.009 2088 0.013 0.013 2089 0.008 0.008 2090 0.013 0.013 2091 0.009 0.009 2092 0.009 0.009 2093 0.014 0.014 2094 0.008 0.008 2095 0.011 0.011 2096 0.007 0.007 2097 0.012 0.012 2098 0.013 0.013 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0318 6.0318 2 0.0253. 0.0253 June 1, 2011 DCG, Inc Page 11 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 3 0.0232 0.0232 4 0.0231 0.0231 5 0.0214 0.0214 6 0.0195 0.0195 7 0.0178 0.0178 8 0.0173 0.0173 9 0.0168 0.0168 10 0.0166 0.0166 11 0.0165 0.0165 12 0.0158 0.0158 13 0.0156 0.0156 14 0.0154 0.0154 15 0.0154 0.0154 16 0.0153 0.0153 17 0.0150 0.0150 18 0.0146 0.0148 19 0.0143 0.0146 20 0.0141 0.0143 21 0.0141 0.0141 22 0.0140 0.0141 23 0.0138 0.0140 24 0.0138 0.0138 25 0.0136 0.0138 26 0.0135 0.0135 27 0.0132 0.0132 28 0.0132 0.0132 29 0.0131 0.0131 30 0.0131 0.0131 31 0.0130 0.0130 32 0.0129 0.0129 33 0.0128 0.012.8 34 0.0127 0.0127 35 0.0126 0.0126 36 0.0123 0.0123 37 0.0122 0.0122 38 0.0122 0.0122 39 0.0121 0.0121 40 0.0121 0.0121 41 0.0120 0.0120 42 0.0120 0.0120 43 0.0118 0.0118 44 0.0116 0.0116 45 0.0116 0.0116 46 0.0116 0.0116 47 0.0115 0.0115 48 0.0114 0.0114 49 0.0113 0.0113 50 0.0113 0.0113 June 1, 2011 DCG, Inc Page 12 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 51 0.0111 0.0111 52 0.0111 0.0111 53 0.0111 0.0111 54 0.0111 0.0111 55 0.0110 0.0110 56 0.0110 0.0110 57 0.0109 0.0109 58 0.0108 0.0108 59 0.0108 0.0108 60 0.0108 0.0108 61 0.0108 0.0108 62 0.0107 0.0107 63 0.0107 0.0107 64 0.0106 . 0.0106 65 0.0106 0.0106 66 0.0105 0.0105 67 0.0105 0.0105 68 0.0105 0.0105 69 0.0104 0.0104 70 0.0104 0.0104 71 0.0104 0.0104 72 0.0104 0.0104 73 0.0102 0.0102 74 0.0102 0.0102 75 0.0101 0.0101 76 0.0101 0.0101 77 0.0101 0.0101 78 0.0099 0.0099 79 0.0098 0.0098 80 0.0098 0.0098 81 0.0098 0.0098 82 0.0098 0.0098 83 0.0098 0.0098 84 0.0097 0.0097 85 0.0095 0.0095 86 0.0095 0.0095 87 0.0094 0.0094 88 0.0093 0.0093 89 0.0092 0.0092 90 0.0092 0.0092 91 0.0092 0.0092 92 0.0091 0.0091 93 0.0091 0.0091 94 0.0091 0.0091 95 0.0088 0.0088 96 0.0087 0.0087 97 0.0087 0.0087 98 0.0087 0.0087 June 1, 2011 DCG, Inc Page 13 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 99 0.0087 0.0087 100 0.0084 0.0084 101 0.0084 0.0084 102 0.0084 0.0084 103 0.0083 0.0083 104 0.0083 0.0083 105 0.0083 0.0083 106 0.0083 0.0083 107 0.0083 0.0083 108 0.0083 0.0083 109 0.0082 0.0082 110 0.0082 0.0082 111 0.0082 0.0082 112 0.0081 0.0081 113 0.0081 0.0081 114 0.0080 0.0080 115 0.0080 0.0080 116 0.0080 0.0080 117 0.0080 0.0080 118 0.0080 0.0080 119 0.0080 0.0080 120 0.0079 0.0079 121 0.0079 0.0079 122 0.0078 0.0078 123 0.0078 0.0078 124 0.0078 0.0078 125 0.0077 0.0077 126 0.0077 0.0077 127 0.0077 0.0077 128 0.0076 0.0076 129 0.0076 0.0016 130 0.0076 0.0076 131 0.0075 0.0075 132 0.0074 0.0074 133 0.0074 0.0074 134 0.0074 0.0074 135 0.0072 0.0072 136 0.0072 0.0072 137 0.0072 0.0072 138 0.0071 0.0071 139 0.0071 0.0071 140 0.0070 0.0070 141 0.0069 0.0069 142 0.0069 0.0069 143 0.0067 0.0067 144 0.0067 0.0067 145 0.0067 0.0067 146 0.0065 0.0065 June 1, 2011 DCG, Inc Page 14 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 147 0.0063 0.0063 148 0.0062 0.0062 149 0.0062 0.0062 150 0.0062 0.0062 151 0.0062 0.0062 152 0.0061' 0.0061 153 0.0061 0.0061 154 0.0060 0.0060 155 0.0058 0.0058 156 0.0058 0.0058 157 0.0057 0.0057 158 0.0051 0.0051 POC #1 The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dev Percentage Pass/Fail 0.0049 0 0 0 Pass 0.0050 0 0 0 Pass 0.0052 0 0 0 Pass 0.0053 0 0 0 Pass 0.0055 0 0 0 Pass 0.0057 0 0 0 Pass- 0.0058 0 0 0 Pass 0.0060 0 0 0 Pass 0.0062 0 0 0 Pass 0.0063 0 0 0 Pass 0.0065 0 0 0 Pass 0.0066 0 0 0 Pass 0.0068 0 0 0 Pass 0.0070 0 0 0 Pass 0.0071 0 0 0 Pass 0.0073 0 0 0 Pass 0.0075 0 0 0 Pass 0.0076 0 0 0 Pass 0.0078 0 0 0 Pass 0.0080 0 .0 0 Pass 0.0081 0 0 0 Pass 0.0083 0 0 0 Pass 0.0084 0 0 0 Pass 0.0086 0 0 0 Pass 0.0088 0 0 0 Pass 0.0089 0 0 0 Pass 0.0091 0 0 0 Pass 0.0093 0 0 0 Pass June 1, 2011 DCG, Inc Page 15 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 0.0094 0 0 0 Pass 0.0096 0 0 0 Pass 0.0097 0 0 0 Pass 0.0099 0 0 0 Pass 0.0101 0 0 0 Pass 0.0102 0 0 0 Pass 0.0104 0 0 0 Pass 0.0106 0 0 0 Pass 0.0107 0 0 0 Pass 0.0109 0 0 0 Pass 0.0110 0 0 0 Pass 0.0112 0 0 0 Pass 0.0114 0 0 0 Pass 0.0115 0 0 0 Pass 0.0117 0 0 0 Pass 0.0119 0 0 0 Pass 0.0120 0 0 0 Pass 0.0122 0 0 0 Pass 0.0124 0 0 0 Pass 0.0125 0 0 0 Pass 0.0127 0 0 0 Pass 0.0128 0 0 0 Pass 0.0130 0 0 0 Pass 0.0132 0 0 0 Pass 0.0133 0 0 0 Pass 0.0135 0 0 0 Pass 0.0137 0 0 0 Pass 0.0138 0 0 0 Pass 0.0140 0 0 0 Pass 0.0141 0 0 0 Pass 0.0143 0 0 .0 Pass 0.0145 0 0 0 Pass 0.0146 0 0 0 Pass 0.0148 0 0 0 Pass 0.0150 0 0 0 Pass 0.0151 0 0 0 Pass 0.0153 0 0 0 Pass 0.0154 0 0 0 Pass 0.0156 0 0 0 Pass 0.0158 0 0 0 Pass 0.0159 0 0 0 Pass 0.0161 0 0 0 Pass 0.0163 0 0 0 Pass 0.0164 0 0 0 Pass 0.0166 0 0 0 Pass 0.0167 0 0 0 Pass 0.0169 0 0 0 Pass 0.0171 0 0 0 Pass June 1, 2011 DCG, Inc Page 16 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 0.0172 0 0 0 Pass 0.0174 0 0 0 Pass 0.0176 0 0 0 Pass 0.0177 0 0 0 Pass 0.0179 0 0 0 Pass 0.0181.0 0 0 Pass 0.01812 0 0 0 Pass 0.0184 0. 0 0 Pass 0.0185 �0 0 0 Pass 0.0187 0 0 0 Pass 0.0189 0 0 0 Pass 0.0190 0 0 0 Pass 0.0192 0 0 0 Pass 0.0194 0 0 0 Pass 0.0195 0 0 0 Pass 0.0197 0 0 0 Pass 0.0198 0 0 0 Pass 0.0200 0 0 0 Pass 0.0202 0 0 0 Pass 0.0203 0 0 0 Pass . 0.0205 0 0 0 Pass 0.0207 0 0 0 Pass 0.0208 0 0 0 Pass 0.0210 0 0 0 Pass Water Quality BMP Flow and Volume for POC 1. On=line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Flow Frequency Return Periods for Predeveloped. POC #2 Return Period Flow(cfs) 2 year 0.010949 5 year 0.01449 10 year 0.017035 25 year 0.020489 50 year 0.023239 100 year 0.026145 Flow Frequency Return Periods for Mitigated. POC #2 Return Period Flow(cfs) 2 year 0.010957 June 1, 2011 DCG, Inc . Page 17 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 5 year 0.014512 10 year 0.01707 25 year 0.020542 50 year 0.023308 100 year 0.026232 Yearly Peaks for Predeveloped and Mitigated. POC #2 Year Predeveloped Mitigated 1941 0.012 0.012 1942 0.014 0.014 1943 0.015 0.015 1944 0.007 0.007 1945 0.008 0.008 1946 0.011 0.011 -1947 0.010 0.010 1948 0.012 0.012 1949 0.011 0.011 1950 0.012 0.012 1951 0.024 0.024 1952 0.007 0.007 1953 0.028 0.028 1954 0.012 0.012 1955 0.009 0.009 1956 0.007 0.007 1957 0.011 0.011 1958 0.006 0.006 1959 0.009 0.009 1960 0.007 0.007 1961 0.009 0.009 1962 0.010 0.010 1963 0.013 0.013 1964 0.007 0.007 1965 0.014 0.014 1966 0.010 0.010 1967 0.009 0.009 1968 0.015 0.015 1969 0.017 0.017 1970 0.008 0.008 1971 0.009 0.009 1972 0.008 0.008 1973 0.015 0.015 1974 0.008 0.008 1975 0.009 0.009 1976 0.012 0.012 1977 0.008 0.008 1978 0.011 0.011 June 1, 2011 DCG, Inc Page 18 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 1979 0.015 0.015 1980 0.013 0.013 1981 0.012 0.012 1982 0.013 0.013 1983 0.020 0.020 1984 0.013 0.013 1985 0.009 0.009 1986 0.009 0.009 1987 '0.011 0.011 1988 0.017 0.017 1989 0.007 0.007 1990 0.012 0.012 1991 0.019 0.019 1992 0.018 0.018 1993 0.010 0.010 1994 0.008 0.008 1995 0.007 0.007 1996 0.010 0.010 1997, 0.013 0.013 1998 0.012 0.012 1999 0.009 0.009 2000 0.026 0.026 2001 0.011 0.011 2002 0.007 0.007 2003 0.019 0.019 2004 0.012 0.012 2005 0.009 0.009 2006 0.010 0.010 2007 0.009. 0.009 2008 0.010 0.010 2009 0.012 0.012 2010 0.012 0.012 2011 0.035 0.035 2012 0.019 0.019 2013 0.015 0.015 2014 0.017 0.017 2015 0.014 - 0.014 2016 0.007 0.007 2017 0.012 0.012 2018 0.011 0.011 2019 0.011 0.011 2020 0.012 0.012 2021 0.009 0.009 2022 0.013 0.013 2023 0.012 0.012 2024 0.011 0.011 2025 0.008 0.008 2026 0.012 0.012 June 1, 2011 DCG, Inc Page 19 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2027 0.008 0.008 2028 0.008 0.008 2029 0.008 0.008 2030 0.013 0.013 2031 0.013 0.013 2032 0.016 0.016 2033 0.010 0.010 2034 0.007 0.007 2035 0.011 0.011 2036 0.009 0.009 2037 0.011 0.011 2038 0.012 0.012 2039 0.012 0.012 2040 0.011 0.011 2041 0.016 0.016 2042 0.008 0.008 2043 0.014 0.014 2044 0.021 0.021 2045 0.009 0.009 2046 0.013 0.013 2047 0.010 0.010 2048 0.009 0.009 2049 0.012 0.012 2050 0.008 0.008 2051 0.012 0.012 2052 0.009 0.009 2053 0.010 0.010 2054 0.016 0.016 2055 0.008 0.008 2056 0.018 0.018 2057 0.013 0.013 2058 0.015 0.017 2059 0.013 0.013 2060 0.012 0.012 2061 0.016 0.016 2062 0.017 0.017 2063 0.024 0.024 2064 0.009 0.009 2065 0.012 0.012 2066 0.011 0.011 2067 0.006 0.006 2068 0.009 0.009 2069 0.014 0.014 2070 0.007 0.007 2071 0.008 0.008 2072 0.008 0.008 2073 0.009 0.009 2074 0.012 0.012 June 1, 2011 DCG, Inc Page 20 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 2075 0.008 0.008 2076 0.012 0.012 2077 0.011 0.011 2078 0.018 0.018 2079 0.009 0.009 2080 0.011 0.011 2081 0.013 0.013 2082 0.014 0.014 2083 0.010 0.010 2084 0.009 0.009 2085 0.009 0.009 2086 0.012 0.012 2087 0.010 0.010 2088 0.015 0.015 2089 0.009 0.009 2090 0.015 0.015 2091 0.010 0.010 2092 0.010 0.010 2093 0.015 0.015 2094 0.010 0.010 2095 0.013 0.013 2096 0.008 0.008 2097 0.014 0.014 2098 0.014 0.014 Ranked Yearly Peaks for Predeveloped and Mitigated. POC #2 Rank Predeveloped Mitigated 1 0.0348 0.0348 2 0.0271 0.0277 3 0.0263 0.0263 4 0.0243 0.0243 5 0.0240 0.0240 6 0.0207 0.0207 7 0.0196 0.0196 8 0.0192 0.0192 9 0.0189 0.0189 10 0.0189 0.0189 11 0.0182 0.0182 12 0.0182 0.0182 13 0.0176 0.0176 14 0.0175 0.0175 15 0.0170 0.0174 16 0.0168 0.0170 17 0.0165 0.0168 18 0.0165 0.0165 19 0.0159 0.0165 20 0.0157 0.0159 June 1, 2011 DCG, Inc Page 21 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 21 0.0156 0.0157 22 0.0153 0.0156 23 0.0153 0.0153 24 0.0153 0.0153 25 0.0153 0.0153 26 0.0153 0.0153 27 0.0151 0.0151 28 0.0150 0.0150 29 0.0148 0.0148 30 0.0145 0.0145 31 0.0145 0.0145 32 0.0143 0.0143 33 0.0143 0.0143 34 0.0141 0.0141 35 0.0138 0.0138 36 0.0137 0.0137 37 0.0137 0.0137 38 0.01,35 0.0135 39 0.0135 0.0135 40 0.0134 0.0134 41 0.0134 0.0134 42 0.0133 0.0133 43 0.0132 0.0132 44 0.0132 0.0132 45 0.0130 0.0130 46 0.0130 0.0130 47 0.0129 0.0129 48 0.0127 0.0127 49 0.0127 0.0127 50 0.0126 0.0126 51 0.0125 0.0125 52 0.0124 0.0124 53 0.0124 0.0124 54 0.0124 0.0124 55 0.0124 0.0124 56 0.0124 0.0124 57 0.0122 0.0122 58 0.0122 0.0122 59 0.0122 0.0122 60 0.0121 0.0121 61 0.0121 0.0121 62 0.0121 0.0121 63 0.0121 0.0121 64 0.0120 0.0120 65 0.0119 0.0119 66 0.0119 0.0119 67 0.0119 0.0119 68 0.0118 0.0118 June 1, 2011 DCG, Inc Page 22 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 69 0.0118 0.0118 70 0.0118 0.0118 71 0.0118 0.0118 72 0.0117 0.0117 73 0.0117 0.0117 74 0.0115 0.0115 75 0.0115 0.0115 76 0.0114 0.0114 77 0.0113 0.0113 78 0.0113 0.0113 79 0.0112 0.0112 80 0.0112 0.0112 81 0.0112 0.0112 82 0.0111 0.0111 83 0.0111 0.0111 84 0.0109 0.0109 85 0.0108 0.0108 86 0.0108 0.0108 87 0.0108 0.0108 88 0.0107 0.0107 89 0.0107 0.0107 90 0.0105 0.0105 91 0.0104 0.0104 92 0.0101 0.0101 93 0.0101 0.0101 94 0.0100 0.0100 95 0.0100 0.0100 96 0.0100 0.0100 97 0.0097 0.0097 98 0.0097 0.0097 99 0.0096 0.0096 100 0.0096 0.0096 101, 0.0096 0.0096 102 0.0096 0.0096 103 0.0096 0.0096 104 0.0095 0.0095 105 0.0095 0.0095 106 0.0095 0.0095 107 0.0095 0.0095 108 0.0094 0.0094 109 0.0094 0.0094 110 0.0093 0.0093 111 0.0093 0.0093 112 0.0093 0.0093 113 0.0093 0.0093 114 0.0092 0.0092 115 0.0092 0.0092 116 0.0092 0.0092 June 1, 2011 DCG, Inc Page 23 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 117 0.0091 0.0091 118 0.0089 0.0089 119 0.0089 0.0089 120 0.0089 0.0089 121 0.0089 0.0089 122 0.0089 0.008.9 123 0.0088 0.0088 124 0.0088 0.0088 125 0.0087 0.0087 126 0.0086 0.0086 127 0.0086 0.0086 128 0.0086 0.0086 129 0.0085 0.0085 130 0.0084 0.0084 131 0.0083 0.0083 132 0.0083 0.0083 133 0.0083 0.0083 134 0.0083 0.0083 135 0.0082 0.0082 136 0.0081 0.0081 137 0.0081 0.0081 138 0.0080 0.0080 139 0.0080 0.0080 140 0.0078 0.0078 141 0.0077 0.0077 142 0.0077 0.0077 143 0.0077 0.0077 144 0.0076 0.0076 145 0.0076 0.0076 146 0.0074 0.0074 147 0.0073 0.0073 148 0.0073 0.0073 149 0.0072 0.0072 150 0.0071 0.0071 151 0.0071 0.0071 152 0.0071 0.0071 153 0.0069 0.0069 154 0.0066 0.0066 155 0.0066 0.0066 156 0.0066 0.0066 157 0.0064 0.0064 158 0.0058 0.0058 POC #2 The Facility PASSED The Facility PASSED. June 1, 2011 DCG, Inc Page 24 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA Flow(CFS) Predev Dev Percentage Pass/Fail 0.0055 0 0 0 Pass 0.0057 0 0 0 Pass 0.0058 0 0 0 Pass 0.0060 0 0 0 Pass 0.0062 0 0 0 Pass 0.0064 0 0 0 Pass 0.0066 0 0 0 Pass 0.0067 0 0 0 Pass 0.0069 .0 0 0 Pass 0.0071 0 0 0 Pass 0.0073 0 0 0 Pass 0.0074 0 0 0 Pass 0.0076 0 0 0 Pass 0.0078 0 0 0 Pass 0.0080 0 0 0 Pass 0.0082 0 0 0 Pass 0.0083 0 0 0 Pass 0.0085 0 0 0 Pass 0.0087 0 0 0 Pass 0.0089 0 0 0 Pass 0.0091 0 0 0 Pass 0.0092 0 0 0 Pass 0.0094 0 0 0 Pass 0.0096 0 0 0 Pass 0.0098 0 0 0 Pass 0.0100 0 0 0 Pass 0.0101 0 0 0 Pass 0.0103 0 0 0 Pass 0.0105 0 0 0 Pass 0.0107 0 0 0 Pass 0.0109 0 0 0 Pass 0.0110 0 0 0 Pass 0.0112 0 0 0 Pass 0.0114 0 0 0 Pass 0.0116 0 0 0 Pass 0.0118 0 0 0 Pass 0.0119 0 0 0 Pass 0.0121 0 0 0 Pass 0.0123 0 0 0 Pass 0.0125 0 0 0 Pass 0.0127 0 0 0 Pass 0.0128 0 0 0 Pass 0.0130 0 0 0 Pass 0.0132 0 0 0 Pass 0.0134 0 0 0 Pass 0.0135 0 0 0 Pass June 1, 2011 DCG, Inc Page 25 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 0.0137 0 0 0 Pass 0.0139 0 0 0 Pass 0.0141 0 0 0 Pass 0.0143 0 0 0 Pass 0.0144 0 0 0 Pass 0.0146 0 0 0 Pass 0.0148 0 0 0 Pass 0.0150 0 0 0 Pass 0.0152 0 0 0 Pass 0.0153 0 0 0 Pass 0.0155 0 0 0 Pass 0.0157 0 0 0 Pass 0.0159 0 0 0 Pass 0.0161 0 0 0 Pass 0.0162 0 0 0 Pass 0.0164 0 0 0 Pass 0.0166 0 0 0 Pass 0.0168 0 0 0 Pass 0.0170 0 0 0 Pass 0.0171 0 0 0 Pass 0.0173 0 0 0 Pass 0.0175 0 0 0 Pass 0.0177 0 0 0 Pass 0.0179 0 0 0 Pass 0.0180 0 0 0 Pass 0.0182 0 0 0 Pass 0.0184 0 0 0 Pass 0.0186 0 0 0 Pass 0.0188 0 0 .0 Pass 0.0189 0 0 0 Pass 0.0191 0 0_ 0 Pass 0.0193 0 0 0 Pass 0.0195 0 0 0 Pass 0.0197 0 0 0 Pass 0.0198 0 0 0 Pass 0.0200 0 0 0 Pass 0.0202 0 0 0 Pass 0.0204 0 0 0 Pass 0.0205 0 0 0 Pass 0.0207 0 0 0 Pass 0.0209 0 0 0 Pass 0.0211 0 0 0 Pass 0.0213 0 0 0 Pass 0.0214 0 0 0 Pass 0.0216 0 0 0 Pass 0.0218 0 0 0 Pass 0.0220 0 0 0 Pass 0.0222 0 0 0 Pass June 1, 2011 DCG, Inc Page 26 of 27 WWHM Modeling Results Priest Residence -1056 Daley St Edmonds, WA 0.0223 0 0 0 Pass 0.0225 0 0 0 Pass 0.0227 0 0 0 Pass 0.0229 0 0 0 Pass 0:0231 0 0 0 Pass 0.0232 0 0 0 Pass Water Quality BMP Flow and Volume for POC 2. On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. June 1, 2011 This program and accompanying documentation is provided 'as -is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of. Ecology has been advised of the possibility of such damages. DCG, Inc Page 27 of 27 LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science March 15, 2011 Ms. Wendy Priest 315 Daley Street Edmonds, WA 98020 Dear Ms. Priest: Subject: Geotechnical Engineering Study New Single -Family Residence 315 Daley Street Edmonds, Washington L&A Job No. 11-004 INTRODUCTION We have completed a geotechnical engineering study for the site of a proposed new single- family residence, located at the above address in Edmonds, Washington. The general location of the residence site is shown on Plate 1 — Vicinity Map. We understand that the proposed development for the site is to build a new single-family residence to replace the existing one currently occupying the site. The purpose of this study is to characterize the subsurface condition of the site, evaluate feasibility of onsite stormwater disposal, and provide geotechnical recommendations for onsite stormwater disposal (if feasible), grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., for the proposed development of the site. Presented in this report are our findings, conclusion and recommendations. PROJECT DESCRIPTION For our use in this study, you provided us with a property boundary plan of the residence site. According to this plan, the site is fronted by Daley Street with a 70 foot frontage and is about 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (426) 483-9134 - Fax (425) 486-2746 March 15, 2011 - .- Wendy Priest Residence L&A Job No. 11-004 Page 2 117.5 feet deep. An existing house currently occupies the northern half of the site, which is to be demolished to make way for the planned new residence. The existing driveway will also be removed and replaced with a new paved driveway. We understand the new house is to be located approximately over the footprint of the existing house and is to be an above -grade, wood -framed structure supported on perimeter concrete foundation walls and interior bearing walls and columns. The building pad is relatively flat and construction of the new house would require minimal cut or fill. We also understand that onsite stormwater disposal with infiltration trenches is planned. SCOPE OF SERVICES To achieve the above purposes, our scope of services for this study comprises specifically the following: 1 Review the geologic and soil conditions at the site based on a published geologic map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil stratum and/or to a percolable soil stratum, or to the maximum depth (about 10 feet) capable by the backhoe used in excavating the test pits, whichever occurs first. 3. Perform necessary geotechnical analyses, evaluate feasibility of using an infiltration system to dispose stormwater onsite, and provide geotechnical recommendations for onsite stormwater proposal, grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., based on subsurface conditions encountered by the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendations. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 3 SITE CONDITIONS SURFACE CONDITIONS The site is situated on a gentle, northerly to northwesterly declining slope. It is bounded by Daley Street to the north and adjoined by single-family residences on its south, east and west sides. Within the residence site, the ground generally slopes very gently northward to its north boundary, then drops steeply a few feet down to the road level of Daley Street. This steep slope appears to be resulted from grading of Daley Street. The unpaved area of the site is mostly covered with lawn grass and dotted with occasional ornamental trees and shrubs. GEOLOGIC SETTING The Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Snohomish and King Counties, by James P. Minard, published by U. S. Geological Survey in 1983, was referenced for the geologic and soil conditions at the residence site. According to this, publication, the surficial soil unit at and in the vicinity of the subject site is mapped as Advance Outwash (Qva) deposits. The geology of the Puget Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosions. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation which had occurred during the later stages of the Pleistocene Epoch, and retreated from the region some 14,500 years ago. The advance outwash soil unit is composed of stratified sand and gravel with minor amounts of silt and clay, deposited by the meltwater of advancing glacial ice. Due to its generally granular composition, the advance outwash unit is of moderately high permeability and generally drains LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 4 well. The advance outwash deposits had been overridden by glacial ice and is generally dense to very dense in its natural, undisturbed state, except the top 2 to 4 feet where exposed which may be weathered to a loose to medium -dense state. The advance outwash soil can stand in steep cuts or natural slopes for a prolong period when undisturbed. Where exposed on slopes with poor vegetation cover and subjected to storm runoff, the advance outwash deposits can be gradually eroded and may slough off and re -deposited to a flatter inclination. The advance outwash deposits in their native, undisturbed state can provide good foundation support with little settlement expected for light to moderate residential structures. SOIL CONDITION Subsurface condition of the site was explored with two test pits. These test pits were excavated. on February 17, 2011, with a track -mounted backhoe to depth of 8.0 and 9.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plate 4. Test Pit 1, located near the southwest corner of the site, encountered a layer of topsoil about 8 inches thick. This topsoil is underlain to the depth explored by interbedded layers of medium- LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 5 dense, silty fine sand, gravelly medium to coarse sand, fine sand and medium to coarse sand.. Test Pit 2, located near the northeast corner of the site encountered about 2.5 feet of loose fill underlain by a foot of relic topsoil. The topsoil is again underlain to the depth explored by interbedded layers of medium -dense, gravelly slightly -silty sand, silty sand and fine sand. The residence, site appears to be located in an old drainage swell and these interbedded sand layers underlying the site appear to be of alluvium deposits which were laid down by water flowing in the swale. The alluvium deposits are generally loose to medium -dense in their native, undisturbed state. The coarser deposits are of high permeability, while the.fine-grained deposits are moderately permeable. GROUNDWATER CONDITION Minor specks of groundwater seepage was encountered in Test Pit 1 at about 3.0 feet deep and groundwater was not encountered in Test Pit 2. The encountered groundwater in Test Pit 1 appears to be stormwater infiltrating into the ground and trapped over localized, less -permeable, silty fine sand pockets. The depth to pockets of perched groundwater may fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. The pockets of, groundwater may completely dry up during the Summer and Fall seasons.' The test pits were excavated in the middle of Winter season when groundwater would be at its highest. Yet only a very minor speck of groundwater seepage were encountered by one of the two test pits. Therefore, it is our opinion that groundwater should have minimal impact on the construction of the proposed development for the site or the planned onsite stormwater disposal facility. GENERAL DISCUSSION AND RECOMMENDATIONS LIU- & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 6 Based on the soil conditions encountered in subsurface exploration, it is our opinion that the site is suitable for the proposed development from the geotechnical engineering viewpoint, provided that the recommendations in this report are fully implemented and observed during construction. The fill, topsoil and loose soil at shallow depth should be completely stripped within the driveway and the building pad of the new residence, and in areas where structural fill is to be placed. The underlying medium -dense sand, silty sand and gravelly sand soils should be able to provide adequate foundation support to the proposed new residence and driveway. GEOLOGIC HAZARDS The subject residence site is not mapped in geologic hazard areas. The site is very gently sloped and there is a lack of continuous, extensive groundwater table under the site at shallow depth. Therefore, it is our opinion that the potential for erosion, landslide and seismic hazards to occur on the site should be minimal. However, the Puget Sound region is in an active seismic zone and the new residence should be designed for seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the test pits, it is our opinion that Seismic Use Group I and Site Class D should be used in the seismic design of the proposed residences in accordance with the 2006 International Building Code (IBC). TEMPORARY DRAINAGE AND EROSION CONTROL The onsite surficial soils contain a high percentage of fines which are sensitive to moisture and can be easily disturbed by construction traffic. A layer of clean, 2-to-4-inch quarry spalls should be placed over areas of frequent traffic, such as the entrance to the site and heavy equipment operation areas, as required, to protect the subgrade soils from disturbance by construction traffic. LIU & ASSOCIATES, INC. March 15; 2011 Wendy Priest Residence L&A Job No. 11-004 Page 7 A silt fence should be installed along the downhill boundaries of the site to minimize transport of sediment onto neighboring properties or the street during construction. The bottom of the filter cloth of the silt fences should be anchored in a trench filled with onsite soils. Ditches or interceptor trench drains should be installed on the uphill sides of construction areas, as required, to intercept and drain away storm runoff and near -surface groundwater seepage, if any, to facilitate construction work. Only clean and clear water captured by such ditches or interceptor trench drains may be discharged into a nearby storm inlet. The storm inlet should be covered with a filter sock to prevent sediment from entering the storm sewer system. The filter sock should be cleaned frequently during construction to prevent clogging, and should be removed after completion of construction. Spoil soils should be hauled off of the site as soon as possible. Spoil soils and imported structural fill material to be stored on site should be located in areas where the ground surface is no steeper than 15% grade, and should be covered. with plastic tarps securely weighted down with sandbags. SITE PREPARATION AND GENERAL GRADING The vegetation within construction limits should be cleared and their roots thoroughly grubbed. Surficial loose fill, topsoil and loose surficial soils should be stripped within the driveway, building pad and in areas where structural fill is to be placed. The exposed soils after stripping should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a fully loaded dump truck or water truck. Any areas with excessive flexing or pumping should have the weak soil over -excavated and backfilled with structural fill in accordance with recommendations in the STRUCTURAL FILL section of this report. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page .8 EXCAVATION AND FILL SLOPES Under no circumstances should excavation slopes be greater than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 1H:1V and unsupported permanent cut banks should be no steeper than 2-1/411:1V. Permanent fill embankments required to support structural or traffic load should be constructed with compacted structural fill placed over undisturbed, proof -rolled, firm, native, advance outwash soils after the surficial unsuitable soils are completely stripped. The slope of permanent fill embankments should be no steeper than 2-1/4H:1V. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The soil units and stability of cut banks should be verified by a geotechnical engineer during excavation. The above recommended cut and fill slopes are under the assumption that groundwater seepage would not be encountered during construction. If groundwater seepage is encountered, the construction should be immediately halted and the slope stability re-evaluated. The slopes may have to be flattened and other measures taken to stabilize the slopes. Surface runoff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, and should be covered with clear plastic sheets, as required, to protect them from stormwater until the vegetation is fully established. STRUCTURAL FILL Structural fill is the fill that support structural or traffic load. Structural fill should consist of clean granular soil with particles not larger than three inches and should be free of organic and LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 9 other deleterious substances. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soil that enable the soil to be compacted to the highest dry density for a given compaction effort. The onsite clean sandy soil meeting the above requirements may be used as structural fill. Imported material to be used as structural fill, if required, should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not larger than four inches. The ground over which structural fill is to be placed should be prepared in accordance with recommendations in the SITE PREPARATION AND GENERAL GRADING and EXCAVATION AND FILL SLOPES sections of. this report. Structural fill should be placed in lifts no more than 10 -inches thick in its loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM D1557 (Modified Proctor Method) as follows: Application Within building pads of the building lots Roadway/driveway subgrade Retaining wall backfill Utility trench backfill % of Maximum Dry Density 95% 95% for top 3 feet and 90% below 90% 95% for top 4 feet and 90% below LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 10 ONSITE STORMWATER DISPOSAL Feasibility Two soil samples were selected for Particle Size Distribution tests in laboratory to determine feasibility of using infiltration trenches to dispose stormwater onsite for the new residence. The first soil sample was obtained from Test Pit 1 at 4.0 feet deep, the second from Test Pit 2 at 3.5 feet deep. The reports of these tests are presented in APPENDIX = Laboratory tests, attached hereto. As shown on the particle Size Distribution reports, Soil Sample 1 (Test Pit 1 at 4.0 feet deep) was composed of fine sand with a clay content of 6.3% and sand content of 75.6%; Soil Sample 2 (Test Pit 2 at 3.5 feet deep) was composed of gravelly fine to coarse sand with a clay content of 3.3% and sand content of 85.3%. According to the USDA Texture Triangle (from U.S. Department of Agriculture), shown under Appendix, Soil Samples 1 and 2 are classified as Loamy Sand and Sand, respectively. Both types of soils should be able to support infiltration trenches for onsite stormwater disposal. Design Infiltration Rate According to Table 3.7 of the Stormwater Management Manual for Western Washington, 2005 by Washington State Department of Ecology, the estimated long-term (design) infiltration rate is 0.5 iph (inch per hour) based on a correction factor of 4 on a short-term infiltration rate of 2 iph for loamy sand, and is 2.0 iph based on a correction factor of 4 on a short-term infiltration rate of 8 iph for sand. Due to the interbedded silty sand, sand and gravelly sand layers of the alluvium deposits underlying the residence site, we recommend a design infiltration rate of 0.75 iph be used for the design of infiltration trenches to be used for onsite dispose of stormwater for the new residence. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 11 Construction Recommendations We understand that infiltration trenches are to be located at the south and/or the north end of the site. The infiltration trenches should be set back at least 5 feet from property lines and at least 8 feet from nearby house foundations. The schematic presentation of an infiltration trench with a single dispersion pipe is shown on Plate 5. The infiltration trench should be at least 24 inches wide. The schematic presentation of an infiltration trench with multiple dispersion pipes is shown on Plate 6. Multiple dispersion pipes, if used in an infiltration trench, should be placed at least 2 feet off the trench walls and spaced at no closer than 4 feet on centers. The bottom of infiltration trenches should be excavated at least 6 inches into a target loamy sand or sand layer into which stormwater is to be dispersed. To reach these soil layers, the infiltration trenches will have to be excavated to at about 3.0 feet at the south end and about 3.5 feet deep at the north end of the site. The soil unit at bottom of infiltration trenches should be verified by a geotechnical engineer. The side walls of the trenches should be lined with a layer of non -woven filter fabric. The trenches are then filled with clean .washed 3/4 to 1-1/2 inch gravel or crushed rock to within about 8 inches of the finish grade. The dispersion pipes should be constructed of 4-inch rigid PVC pipes and laid level in the gravel or crushed rock filled trenches at about 12 inches below the top of trenches. The top of the gravel or crushed rock fill should also be covered with the filter fabric liner. The remaining trenches should then be backfilled with compacted onsite clean soils. Stormwater captured over paved driveway should be routed into a sediment control structure/oil-water separator catch basin before being released into the infiltration trenches. BUILDING FOUNDATIONS LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 12 Conventional footing foundations may be used to support the new residence. Footing trenches should be excavated to at least 4 feet deep into native, undisturbed, medium -dense sand, silty sand or gravelly sand soil. Soil exposed at the bottom of footing trenches should be compacted to a non -yield state with a vibratory mechanical compactor, then covered with a minimum 8-inch layer of 2-inch crushed rock compacted to a non -yielding state. Footing foundations may then be poured on the crushed rock base. If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: • Allowable soil bearing pressure, including dead and live loads, should be no greater than 2,000 psf for footings. The preparation of the subgrade soils and the placement of crushed rock base should be verified by a geotechnical engineer before the footings are poured. • The minimum depth to bottom of perimeter footings below adjacent final exterior grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. • The minimum width should be no less than 16 inches for continuous footings, and no less than 24 inches for individual footings, except those footings supporting light -weight decks and porches. A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 3/4 inch or less and the differential settlement across building width should be 1/2 inch or less. LIU & ASSOCIATES, INC. March 15, -2011 Wendy Priest Residence L&A Job No. 11-004 Page 13 Lateral loads on buildings can be resisted by the. friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 300 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward behind the foundations for a horizontal distance at least twice the depth of the foundations below final grade. A coefficient of friction of 0.55 between the foundations and the subgrade soils may be used. These are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the building. SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used, should. be placed on firm subgrade soils prepared as outlined in the SITE PREPARATION AND GENERAL EARTHWORK and the BUILDING FOUNDATIONS sections of this report. The slab -on -grade floors may be poured on the crushed rock base described in the BUILDING FOUNDATIONS section. The rock spall fill and the crushed rock can also serve as a capillary break. to prevent moisture from migrating upward through the concrete floor slabs. DRIVEWAY PAVEMENT Performance of driveway pavement is critically related to the conditions of the underlying - subgrade soils. We recommend that the subgrade soils within the driveways be treated and prepared as described in the SITE PREPARATION AND GENERAL EARTHWORK. and STRUCTURAL FILL sections of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece. of heavy construction equipment, such as a fully -loaded dump truck. Any areas LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 14 with excessive flexing or deflection should be over -excavated and re -compacted or replaced with a structural fill or crushed rock placed and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. We recommend that a 4-inch-thick minimum, compacted, crushed rock base (CRB), consisting of 7/8-inch-minus crushed rock, be used for the driveway. The crushed rock base should be topped by 3-inch-thick Class B asphalt concrete (AC). DRAINAGE CONTROL Site and Driveway Grading The onsite surficial soils can be saturated quickly and heavy runoff and near -surface groundwater may be encountered during periods of heavy rain. To minimize potential difficulties for site grading work due to storm runoff and groundwater seepage during construction, one or more lines of ditches or interceptor trench drains should be installed, as required, along the uphill side of the site to intercept, storm runoff and near -surface groundwater flow. Water thus collected should be direct into a nearby storm inlet covered with a filter sack. Excavation of Building Footprint Excavation of building footprints, if encountering groundwater, should have the bottom of excavation sloped and ditches excavated along the bases of cut banks to direct groundwater seepage to flow into a sump pit from which water can be pumped out of the pit into a storage/settling pond onsite. The over -excavation of the building footing should be backfilled per recommendations under the BUILDING FOUNDATIONS section of this report. Runoff over Impervious Surfaces LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 15 Storm runoff over impervious surfaces, such as roofs and paved driveway, should be collected by underground drain line systems connected to downspouts and by catch basins installed in the driveway. Stormwater thus collected should be tightlined to discharge into a storm sewer or a suitable onsite stormwater disposal facility such as infiltration trenches. Building Footing Drain A subdrain should be installed, around the perimeter footings of the new residence. The subdrain should consist of a 4-inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below bottom of the perimeter footings of the new garage. The trench and the drain line should have a sufficient gradient (0.5% minimum) to generate flow by gravity. The drain line should be wrapped with a filter fabric sock and completely enclosed in clean washed gravel. The remaining. trench may be backfilled with clean onsite soils. Water collected by the perimeter footing subdrain systems should be tightlined, separately from the roof and surface stormwater drain lines, to discharge into a storm sewer or a suitable stormwater disposal facility such as infiltration trenches. Surface Drainage Water should not be allowed to stand in any areas where footings, slabs, or pavement is to be constructed. Finish ground surface should be graded to flow away from the proposed residential building. We recommend the finish ground be sloped at a gradient of 3 percent minimum for a distance of at least 10 feet away from the buildings, except in the areas to be paved. Cleanouts LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 16 Sufficient number of cleanouts at strategic locations should be provided for the underground drain line systems. The, underground drain line systems should be maintained periodically to prevent clogging. LIMITATIONS This report has been prepared for the specific application to the subject project for the exclusive use by Mrs. Wendy Priest and her associates, consultants and contractors: We recommend that this report, in its entirety, be included in the project contract documents for information of and estimating and bidding purposes by prospective contractors and for compliance to the recommendations in this report during construction. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on soil conditions encountered in the test pits, our engineering analyses, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. The actual subsurface conditions encountered during construction may vary from those encountered in the test pits. The nature and extent of such variations may not become evident until construction starts. If variations occur then, Liu & Associates, Inc., should be retained to re-evaluate the recommendations of this report, and to verify or modify them in writing prior to further construction. LIU & ASSOCIATES, INC. March r-5 2011 Wendy Priest Residence. I &A Job No 1=004: r and;: dull ordinarily exercised by.other members of the .profession currently practicing. under. similar. -conditions m this area. No. waneanty,;expressed or implied,: is made: The actual sub'§d fke conditions- encountered during constriictl*oh -,may vary .from. those encountered'in ih. e. 'test; pits. The, nature 'and � extent of .such :variations may not become evident until construction starts. If:vaiiations occur then; Liii & Associates; :lnc should :be -retained to_ re-evaluate the recommendations of this report :and,to°verify.`or modify them.in writing pr onto :further: construction. C]LOS[1RE We are;.pleased. o be:of se 'ice fo you on -this proiect.:Please ff.eel.free:to call us if W4. have_' -` question's.regarding:t . s report or -:need further c6nsultatj Six,.PlAtes a6dhed Yours very'truly LIU . ' SSOCIATES, INC : ,. N J.S (Julian) Liu, PfiD , RE.' Consulting.Geotechmcal Engineer LIU - ASSO:CIATES ';INC ; I ., jam{ f �84•: I MA-t m (FONDSi.._ WY; yy t T..$ t� lmD p J �.� a -.t �t,D €-L /�t^r i00 _ m• 3RD> ,— ;S FRI .m •�� C �r` Lr4 t�e..s '' �d ��$ Yi' 6O0 a t1t� , .700 q . C �,.$. �0 i. .�km_ 1!711 STH AYS.URN `r .. •t'' , m. t� . 6TH illlt: Y, ' r: AV A a AY S taoo ' ,a `� Lt9 rz Diem m rrn—+ S rd �t dRO� -� -t 8 •, 100 :S„ Zl b <.w �t:. tic tN1 °AYt t ri'3' E: n ', •n.�ao g sa':AY...� m N. ?.,.;• , , .lj. ^i� t0e0 ti i. ,t• ;t' �: •eC71•'• s�FBTFI r:'� �r:. apY �s mf m� �S� 'v " "t �° f„4y . s � �$ -e .�� .@;� .f ` '.`Ir 1 srn .5 '�C AY s Yld ms SI ALOiG PL 8` w PL ;9TH - Ay` S �9' rl f .41 " Sf icy ti PL YlSTA!PL A :s':N. LOTH ;�� B'� C i:•a O AY�leoo 14 msf: '1 UN( ;.P�.r� 10 �.i�� a� 4��p� a.g7TH'`-71 AY M ` rtY� A 101H PL500`:,.a A ♦^�' W . �� :im • - `J �n .Z r > 1f .''� F. ,.1.::5 i:: •-i .- c. ;. i}i i';.. i'--,�Ec♦^ rY T f� �s,• �.. P 'ice ... b vvoo . :trm Ply �. W u s PIC +'` �, a �f' AV.. ;met.. T• � � .fig•. .1.,'1. ��. W, 951�,_ Iv ►Ns-> :( N¢ }i....'�('0 - „N„'1k i. .., .. .1100;drR , v _ m. ,' '� p • ►l ti£• , t is =. ' : 11TH PL" N :.4 e� )199 Z' 14�' .� `� , . .6•f O. F t a` r ,.��r ) �,. n :,� J C LW-,'93ee' W r n 1 'r . s.. ./? •r. J� ��i .s 'k 2T11rAY 4 'S r'-- s�. s.. .,�"�' �rCat� � f O N� W '.:` y c%i:- .S ;�,.. J �. S ^a'x', `yvt �,' '6�1: h '�',il'�,•'i�- .< ti v 11z.,'w:4''�ti ' � B: �„�'? +�. t+RtT. } � 1� ✓: � � �� 'lrfO� •i ~ i ''' `a� ��-.s4 ^''>;{� "j�'S`;; i. vV SAY. 6 b. O v'SA '�i _ � 'G - W �I fr � r /V. i.+.. �^•� � n "'a y' `��.5::. �:" n: � n •N 1-"�'� _,,,, _ _ .� „ 1S _ �o:c�, h ,"� sx'-�s' . 5��; • to 92NU AU•.W taco` ate: �'f,�.� ",a �. z gR4EpApK 915T AY W. v (�' I//TI HILLCR PL �1w ihfV VfY.;K�, . p m. V/ �. OD.r •,.r �. ,� i:. �. .23 m esn� Pl w rah' �6a:= �� - M.. W = m 1 AVs N z mPI LN p' la W�-:i/.95T11 i rn m`q� (V :. sv. �w. 12 85TH PL"1 �' " Qv 86TH . AlAY m 85TH _ 1 e O Z: O 84TH1P ' i° 1 7J� !1C ' sn... 1' t' sa Ov, L W►+ BSTH AV L sN. W� �- Z C7 84TH . �;�.. • `V �yW� �S•w9oolAi(E D •.� .84TH.YY' 84TH`'t r-S2 AV N pp m. N i 84THyL r+ '0 rn. (N, RD) •tI50D :tlep p , �-. xy r j? nSi PC �g Ivsw IWO . AV :Wr: `� �'. •.e Po' v M . �'rAv co . Y ig i' t2 - 3 @ t7 ':P83IP0 ' s� '82ND P :" t2 82N0 `. AU W'' .ezWO Av :82M0 PL• M W L v,`s.. " : AV`W: rn 82ND AV. ;�� 81ST- p 2 ^M �s B15T P W 8 " 19609: _ 81S i L 9 { �'�eDTH : Pl w B+ST WEST, Y 80TH PI W �e! W s" I. =I UNIFIED SOIL CLASSIFICATION. .SYSTEM MAJOR DIVISIONS; GROUP SYMBOL. � GROUP NAME. GRAINED SAILS . MORE THAN 50% kEfTAu4tb.ON THE NO. 200,SIEVE GRAVEL MORE �N�50% OF COARSE FRACTION, RETAINED ON N0,,.4 SIEFINES VE CLEAN GRAVEL` GW WELL -GRADED GRAVEL; FINETO'COARSE GRAVEL. GP 0OORLY-'GRADED. GRAVEL GRAVEL WITH Qm SILT.Y:qRpgI:. GC CLAYEY GRAVEL SAND , MORE-,THAN.50% OF coAktt FRACTION PASSING NO: 4SIEVE , CLEAN SAND �SW WgLL-.GRAQE�p,,�AND;'FINE :TO'COARSE SAND Sp. P66RL*��blkAb GRADED S#Ob� --SAND-.WITH FINES 1 SM tILTY,,5AND SCCLAYEYZAND FINE- SILTAND CLAY INORGANICML slLr 61. CLAY GRAINED MORE THAN 50% P . AS . SI - NG , .0 NfHE, NO.-200 SIEVE. „LIQUID. LIMIT LESS THAN 5096 ORGANIC, OL ORGANIC SILT; ORGANIC SILTY AND CLAY LIQUID LIMIT .5096OR MORE I K' Q.- R.: G. A N. I b MH P*ILT16F-�H16HPLAS T)CITY;ELASTIC -SILT . CH d,LA*`o,F-'.HidH PLAstICIT—Y, FAT CLAY OH 'QRGANIC�:SILT, :ORGANIC SILT HIGHLY ORGANIC°S0ILS PT PEAT AND OTHER HIGHLY. RGAN IC--4PILS NOTES: SOIL MOISTUREMODIFIER& 77777= I: FIELD CLASSIFICATION IS BASED,O N VISUAL EXAMINATION DRY -"ASSENCE.OF M6ItTURjEj;PPPT-y,9RYi'T9 OF .. s .61L 114,GENERALAOCORDANCE WITH ITH ASTM D2408-W. THE TOUCH4 2; SOIL CLASSIFICAT.ION:USING.,LABORATPRY TESTS:IS BASED ON ASTMI32.487-83' I DE9CRIPTIONS:OF..SOIL DENSIMR.CON.S.1-STENCY ARE' BASEDON INTEkPRETATIONOF�-..BLOW--COU.NT,DATAj VISUAL.. APPEARANCE OF'SOILS,-ANQIORTEST DATA: $LIPHTLYVOIS . T . TR - AdO MOISTURE; :NOT DUSTY MOIST='DAMP, BUT- NO VISIBLEWATER VERY MOIST, ,`VERY DAMP-;. MOISTURE FELT TO THE TOUCH WETVISIBLE FRE&WAT'ER.MSATURATEDi. USUALLY'SO)L IS, OBTAINED FROM BELOW - WATER TABLE ,, R­­. ........... TEST PIT` NO. I Logged ,BY:�. JSL.;.:. Dat6:.. 2/17/2011 Depth..,.:. USCS; cL-Ass., Soll bosrIin OL; Dark brownj:slightly .silt .fine..SANDi loose; qrgeihIcj.* fihk' y SM -EqOLS .11OLS tff-q-p s QU — — — — — — — — — — med-Um. ,=dense;*siltyfi66SANDtrac—a-- Rusty -brown, gravel moist SW SW Gray, r��ens. e'j: gra. Ilyi medium V6. to co rse,S�ANb,,.m6jst melm .3 S'p — — — — — — — — — — ,,. ne. rh '.'r;heOiumLd'ensefi cnst` ,-6 7.1SW Gray With ydIIbWish stM6%. rqediumTd6nse.nddlum to.coars6- SAND, trl6(*:to;s.oi;he vel.-mo,itt -T6M OltI.-erminat 6 . d" at 8*.0 ft;,%rnInqr.,,spAqk of grqt!nOwpf 06 n. 18sy- PIT No L6gged0yJS(;136te: 2/17/2011 OtK UPPS' CLAss. Soil . Description: -Dark-brdwnIbbse.,.silti-fi.ne'SANDi-YAth. fi.nq,rpqts,.qrganiqmqist 4. 'SM U t-6fight .'I �e6j,I66se gravelly; silty.fine SAND, trace - 'of gravel ic,tFILL): -- OL silty — — - — — — — — — — — — — --- — — — — — -- -lty Me SAND, W .Wfin6:rdO'tO--.organic, ,mbist OPS019 - ,WspLl6ht.broWh1pligh-t-gray -0 Ilk 'sHOF�tiyv'pllt - ' A medium 8AND; moist F -drvy silty. ;.finfi�SAND,ihbist SP..Gray, riTeji:6W--�deh§e Test ':Iftldmil6ated it 9.5 t.4i-oUi I id viter not 1 . encountered. , . :1 dedunid b.: W .Other Ground El: -t ple W"" Qther No. lt:0-11 rl I L ASSOCIATES, INC. 1656,'.bALEYlc Gebt6chni i EaO Sdance OlriasrihdiRePlooy.. DMQND.S,WM '!_1 - :10 , . - .. ap. A m_ �- OC '15a iv'. INFILTRATIONTRENCH :SINGL-E DISPERSION. PIPE, LIU &'ASS CIATEs, -INC* INENDY�P .. RESIDENCE: 1056.DALEY STREET Geotecnu,cat Enginceru►s En�;aeenng; Grolory : r ann 5ci��nc� - E D MO N D SWAS H I N GT,O N: JOB -NO. _, 11-004. DATE 3/14/2011 PLATE A5 Cl)' ' w z R, o o Z 0 O ' m ' rn z f -� �m -0. rn Gi.EAr�I on1-5rTt 0 4� PER,F. `o 0 oo. QI/G .PIPG:. �. - , F I LTGR F,a6'RI;Gs 0.- °c ao 3 ' m RA1J�L Oj0���0.!$,�JGO.v..Qa�:�,-.e.,:.:..�a1�•.1/'`O` t.:�,�ry �a) �.i3O�O�oJ�ti'O� ..ORaGRU:?�'�:Y�W�.M1�,�1�'yL: ,r o ji.LS:. APPENDIX =rlaborafory`.Te"strResults Wendy -Priest-Residence __. LIU&ASSO:CWES,INC 17 Cl OQ r1i .23, 0% m 6R U) 0 ono CCCCCCC= *Wm==cn =MINE== Em U31 % GRAVEL 9G SAND _ ; °% FINES.. . %. C06BLES CRS. FINE CRS.. MEDIUM ' FINE SILT CLAY 0 0 6:5:. 191. 6-A ;14a �393 11:4, 3 3' ;SIEVE SQE .. PERCENT: FINER.. SPEC' "' .•PERCENT PASS? .(X=NO) ; ''" 1 114 in, 1000 1 in '947 5/8 to 91.7 112tn 85.6:•z 3/8.ui;.: 823 #4 :4 6748:i., 0 4.0, 52.00 ##41 143 00343 mm:, . 7.2 O'7219 0:0127 mm 45. : 00090 mm 4S 00064.mai 3;7. 0 0031 nisi '269., 0.0013 n3m 2. S611 Descri6ti6n Loamy sand, Wfwavel _. TP-T Afierber6 limits PL=; Lt= Coefficietits D85= 12:3„ Dgp 0 637' D50 ; -0.347 .. . Dom= 0:153 D15 O Q754 D,10-. 0 0312 _ 0.72 CEassifiaation USCS= AASHTO=,. Re+narks .43. Sample,;No . 9727 5aurce of'Sample; Priest R dence.41.=004 Location : - TP-`2 Client: Lui &Associates Project: 2011 Lubomtory Testing � C.I E TES71lVQ LAHORA-roRy. UVC. rssrc.� �.cTav i ; :PfO eCt,NO . 0911=28...._.: Date: 3 14-2019 Elev/Depth 3.S Nick Aver" g=®V►Aems. 1GOXsaiN! �0' AO; . �0' 80 60.. -40 SO0. .t4 100��1i1 �s Rsre�M t!� ... IIShaded area's applicable for,deMi of infi%traiion MV-s F[gure 3 27 USDA TeAurai Triangle. Source U S Department of Agriculture 3-74 Volume 111 Hyidirrologrc Analysis and Flow ConUol BMPs February 2005_ Wendy Priest Project 1056 Daley St. Edmonds, Wa. 98020 Geotechnical Report STREET FILE� RECEIVED JUN 0 q 2011 BUILDING DEPARTMENT GTY OF EDMONDS LIU & ASSOCIATES, INC. Geotechnical Engineering Ms. Wendy Priest 315 Daley Street Edmonds, WA 98020 Dear Ms. Priest: Engineering Geology March 15, 2011 Subject: Geotechnical Engineering Study New Single -Family Residence 315 Daley Street Edmonds, Washington L&A Job No. 11-004 INTRODUCTION Earth Science We have completed a geotechnical engineering study for the site of a proposed new single-family residence, located at the above address in Edmonds, Washington. The general location of the residence site is shown on Plate 1 — Vicinity Map. We understand that the proposed development for the site is to build a new single-family residence to replace the existing one currently occupying the site. The purpose of this study is to characterize the subsurface condition of the site, evaluate feasibility of onsite stormwater disposal, and provide geotechnical recommendations for onsite stormwater disposal (if feasible), grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., for the proposed development of the site. Presented in this report are our findings, conclusion and recommendations. PROJECT DESCRIPTION For our use in this study, you provided us with a property boundary plan of the residence site. According to this plan, the site is fronted by Daley Street with a 70 foot frontage and is about 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 2 117.5 feet deep. An existing house currently occupies the northern half of the site, which is to be demolished to make way for the planned new residence. The existing driveway will also be removed and replaced with a new paved driveway. We understand the new house is to be located approximately over the footprint of the existing house and is to be an above -grade, wood -framed structure supported on perimeter concrete foundation walls and interior bearing walls and columns. The building pad is relatively flat and construction of the new house would require minimal cut or fill. We also understand that onsite stormwater disposal with infiltration trenches is planned. SCOPE OF SERVICES To achieve the above purposes, our scope of services for this study comprises specifically the following: 1 Review the geologic and soil conditions at the site based on a published geologic map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil stratum and/or to a percolable soil stratum, or to the maximum depth (about 10 feet) capable by the backhoe used in excavating the test pits, whichever occurs first. 3. Perform necessary geotechnical analyses, evaluate feasibility of using an infiltration system to dispose stormwater onsite, and provide geotechnical recommendations for onsite stormwater proposal, grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., based on subsurface conditions encountered by the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendations. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 3 SITE CONDITIONS SURFACE CONDITIONS The site is situated on a gentle, northerly to northwesterly declining slope. It is bounded by Daley Street to the north and adjoined by single-family residences on its south, east and west sides. Within the residence site, the ground generally slopes very gently northward to its north boundary, then drops steeply a few feet down to the road level of Daley Street. This steep slope appears to be resulted from grading of Daley Street. The unpaved area of the site is mostly covered with lawn grass and dotted with occasional ornamental trees and shrubs. GEOLOGIC SETTING The Geologicp of the Edmonds East and Part of the Edmonds West Quadrangles, Snohomish and King Counties, by James P. Minard, published by U. S. Geological Survey in 1983, was referenced for the geologic and soil conditions at the residence site. According to this publication, the surficial soil unit at and in the vicinity of the subject site is mapped as Advance Outwash (Qva) deposits. The geology of the Puget Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosions. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation which had occurred during the later stages of the Pleistocene Epoch, and retreated from the region some 14,500 years ago. The advance outwash soil unit is composed of stratified sand and gravel with minor amounts of silt and clay, deposited by the meltwater of advancing glacial ice. Due to its generally granular composition, the advance outwash unit is of moderately high permeability and generally drains LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 4 well. The advance outwash deposits had been overridden by glacial ice and is generally dense to very dense in its natural, undisturbed state, except the top 2 to 4 feet where exposed which may be weathered to a loose to medium -dense state. The advance outwash soil can stand in steep cuts or natural slopes for a prolong period when undisturbed. Where exposed on slopes with poor vegetation cover and subjected to storm runoff, the advance outwash deposits can be gradually eroded and may slough off and re -deposited to a flatter inclination. The advance outwash deposits in their native, undisturbed state can provide good foundation support with little settlement expected for light to moderate residential structures. SOIL CONDITION Subsurface condition of the site was explored with two test pits. These test pits were excavated on February 17, 2011, with a track -mounted backhoe to depth of 8.0 and 9.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plate 4. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 5 Test Pit 1, located near the southwest corner of the site, encountered a layer of topsoil about 8 inches thick. This topsoil is underlain to the depth explored by interbedded layers of medium - dense, silty fine sand, gravelly medium to coarse sand, fine sand and medium to coarse sand. Test Pit 2, located near the northeast corner of the site encountered about 2.5 feet of loose fill underlain by a foot of relic topsoil. The topsoil is again underlain to the depth explored by interbedded layers of medium -dense, gravelly slightly -silty sand, silty sand and fine sand. The residence site appears to be located in an old drainage swell and these interbedded sand layers underlying the site appear to be of alluvium deposits which were laid down by water flowing in the swale. The alluvium deposits are generally loose to medium -dense in their native, undisturbed state. The coarser deposits are of high permeability, while the fine-grained deposits are moderately permeable. GROUNDWATER CONDITION Minor specks of groundwater seepage was encountered in Test Pit 1 at about 3.0 feet deep and groundwater was not encountered in Test Pit 2. The encountered groundwater in Test Pit 1 appears to be stormwater infiltrating into the ground and trapped over localized, less -permeable, silty fine sand pockets. The depth to pockets of perched groundwater may fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. The pockets of groundwater may completely dry up during the Summer and Fall seasons. The test pits were excavated in the middle of Winter season when groundwater would be at its highest. Yet only a very minor speck of groundwater seepage were encountered by one of the two test pits. Therefore, it is our opinion that groundwater should have minimal impact on the construction of the proposed development for the site or the planned onsite stormwater disposal facility. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 6 DISCUSSION AND RECOMMENDATIONS GENERAL Based on the soil conditions encountered in subsurface exploration, it is our opinion that the site is suitable for the proposed development from the geotechnical engineering viewpoint, provided that the recommendations in this report are fully implemented and observed during construction. The fill, topsoil and loose soil at shallow depth should be completely stripped within the driveway and the building pad of the new residence, and in areas where structural fill is to be placed. The underlying medium -dense sand, silty sand and gravelly sand soils should be able to provide adequate foundation support to the proposed new residence and driveway. GEOLOGIC HAZARDS The subject residence site is not mapped in geologic hazard areas. The site is very gently sloped and there is a lack of continuous, extensive groundwater table under the site at shallow depth. Therefore, it is our opinion that the potential for erosion, landslide and seismic hazards to occur on the site should be minimal. However, the Puget Sound region is in an active seismic zone and the new residence should be designed for seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the test pits, it is our opinion that Seismic Use Group I and Site Class D should be used in the seismic design of the proposed residences in accordance with the 2006 International Building Code (IBC). TEMPORARY DRAINAGE AND EROSION CONTROL The onsite surficial soils contain a high percentage of fines which are sensitive to moisture and can be easily disturbed by construction traffic. A layer of clean, 2-to-4-inch quarry spalls should be placed over areas of frequent traffic, such as the entrance to the site and heavy equipment LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 7 operation areas, as required, to protect the subgrade soils from disturbance by construction traffic. A silt fence should be installed along the downhill boundaries of the site to minimize transport of sediment onto neighboring properties or the street during construction. The bottom of the filter cloth of the silt fences should be anchored in a trench filled with onsite soils. Ditches or interceptor trench drains should be installed on the uphill sides of construction areas, as required, to intercept and drain away storm runoff and near -surface groundwater seepage, if any, to facilitate construction work. Only clean and clear water captured by such ditches or interceptor trench drains may be discharged into a nearby storm inlet. The storm inlet should be covered with a filter sock to prevent sediment from entering the storm sewer system. The filter sock should be cleaned frequently during construction to prevent clogging, and should be removed after completion of construction. Spoil soils should be hauled off of the site as soon as possible. Spoil soils and imported structural fill material to be stored on site should be located in areas where the ground surface is no steeper than 15% grade, and should be covered with plastic tarps securely weighted down with sandbags. SITE PREPARATION AND GENERAL GRADING The vegetation within construction limits should be cleared and their roots thoroughly grubbed. Surficial loose fill, topsoil and loose surficial soils should be stripped within the driveway, building pad and in areas where structural fill is to be placed. The exposed soils after stripping should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 8 with a fully loaded dump truck or water truck. Any areas with excessive flexing or pumping should have the weak soil over -excavated and backfilled with structural fill in accordance with recommendations in the STRUCTURAL FILL section of this report. EXCAVATION AND FILL SLOPES Under no circumstances should excavation slopes be greater than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 1 H:1 V and unsupported permanent cut banks should be no steeper than 2-1/4H:1V. Permanent fill embankments required to support structural or traffic load should be constructed with compacted structural fill placed over undisturbed, proof -rolled, firm, native, advance outwash soils after the surficial unsuitable soils are completely stripped. The slope of permanent fill embankments should be no steeper than 2-1/411:1V. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The soil units and stability of cut banks should be verified by a geotechnical engineer during excavation. The above recommended cut and fill slopes are under the assumption that groundwater seepage would not be encountered during construction. If groundwater seepage is encountered, the construction should be immediately halted and the slope stability re-evaluated. The slopes may have to be flattened and other measures taken to stabilize the slopes. Surface runoff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 9 and should be covered with clear plastic sheets, as required, to protect them from stormwater until the vegetation is fully established. STRUCTURAL FILL Structural fill is the fill that support structural or traffic load. Structural fill should consist of clean granular soil with particles not larger than three inches and should be free of organic and other deleterious substances. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soil that enable the soil to be compacted to the highest dry density for a given compaction effort. The onsite clean sandy soil meeting the above requirements may be used as structural fill. Imported material to be used as structural fill, if required, should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not larger than four inches. The ground over which structural fill is to be placed should be prepared in accordance with recommendations in the SITE PREPARATION AND GENERAL GRADING and EXCAVATION AND FILL SLOPES sections of this report. Structural fill should be placed in lifts no more than 10 inches thick in its loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM D1557 (Modified Proctor Method) as follows: LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 10 Application Within building pads of the building lots Roadway/driveway subgrade Retaining wall backfill Utility trench backfill ONSITE STORMWATER DISPOSAL Feasibility % of Maximum Dry Density 95% 95% for top 3 feet and 90% below 90% 95% for top 4 feet and 90% below Two soil samples were selected for Particle Size Distribution tests in laboratory to determine feasibility of using infiltration trenches to dispose stormwater onsite for the new residence. The first soil sample was obtained from Test Pit 1 at 4.0 feet deep, the second from Test Pit 2 at 3.5 feet deep. The reports of these tests are presented in APPENDIX — Laboratory tests, attached hereto. As shown on the particle Size Distribution reports, Soil Sample 1 (Test Pit 1 at 4.0 feet deep) was composed of fine sand with a clay content of 6.3% and sand content of 75.6%; Soil Sample 2 (Test Pit 2 at 3.5 feet deep) was composed of gravelly fine to coarse sand with a clay content of 3.3% and sand content of 85.3%. According to the USDA Texture Triangle (from U.S. Department of Agriculture), shown under Appendix, Soil Samples 1 and 2 are classified as Loamy Sand and Sand, respectively. Both types of soils should be able to support infiltration trenches for onsite stormwater disposal. Design Infiltration Rate According to Table 3.7 of the Stormwater Management Manual for Western Washington, 2005 by Washington State Department of Ecology, the estimated long-term (design) infiltration rate is LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 11 0.5 iph (inch per hour) based on a correction factor of 4 on a short-term infiltration rate of 2 iph for loamy sand, and is 2.0 iph based on a correction factor of 4 on a short-term infiltration rate of 8 iph for sand. Due to the interbedded silty sand, sand and gravelly sand layers of the alluvium deposits underlying the residence site, we recommend a design infiltration rate of 0.75 iph be used for the design of infiltration trenches to be used for onsite dispose of stormwater for the new residence. Construction Recommendations We understand that infiltration trenches are to be located at the south and/or the north end of the site. The infiltration trenches should be set back at least 5 feet from property lines and at least 8 feet from nearby house foundations. The schematic presentation of an infiltration trench with a single dispersion pipe is shown on Plate 5. The infiltration trench should be at least 24 inches wide. The schematic presentation of an infiltration trench with multiple dispersion pipes is shown on Plate 6. Multiple dispersion pipes, if used in an infiltration trench, should be placed at least 2 feet off the trench walls and spaced at no closer than 4 feet on centers. The bottom of infiltration trenches should be excavated at least 6 inches into a target loamy sand or sand layer into which stormwater is to be dispersed. To reach these soil layers, the infiltration trenches will have to be excavated to at about 3.0 feet at the south end and about 3.5 feet deep at the north end of the site. The soil unit at bottom of infiltration trenches should be verified by a geotechnical engineer. The side walls of the trenches should be lined with a layer of non -woven filter fabric. The trenches are then filled with clean washed 3/4 to 1-1/2 inch gravel or crushed rock to within about 8 inches of the finish grade. The dispersion pipes should be constructed of 4-inch rigid LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 12 PVC pipes and laid level in the gravel or crushed rock filled trenches at about 12 inches below the top of trenches. The top of the gravel or crushed rock fill should also be covered with the filter fabric liner. The remaining trenches should then be backfilled with compacted onsite clean soils. Stormwater captured over paved driveway should be routed into a sediment control structure/oil-water separator catch basin before being released into the infiltration trenches. BUILDING FOUNDATIONS Conventional footing foundations may be used to support the new residence. Footing trenches should be excavated to at least 4 feet deep into native, undisturbed, medium -dense sand, silty sand or gravelly sand soil. Soil exposed at the bottom of footing trenches should be compacted to a non -yield state with a vibratory mechanical compactor, then covered with a minimum 8-inch layer of 2-inch crushed rock compacted to a non -yielding state. Footing foundations may then be poured on the crushed rock base. If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: • Allowable soil bearing pressure, including dead and live loads, should be no greater than 2,000 psf for footings. The preparation of the subgrade soils and the placement of crushed rock base should be verified by a geotechnical engineer before the footings are poured. • The minimum depth to bottom of perimeter footings below adjacent final exterior grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. • The minimum width should be no less than 16 inches for continuous footings, and no less than 24 inches for individual footings, except those footings supporting light -weight decks and porches. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 13 A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 3/4 inch or less and the differential settlement across building width should be 1 /2 inch or less. Lateral loads on buildings can be resisted by the friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backflled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 300 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward behind the foundations for a horizontal distance at least twice the depth of the foundations below final grade. A coefficient of friction of 0.55 between the foundations and the subgrade soils may be used. These are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the building. SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used, should be placed on firm subgrade soils prepared as outlined in the SITE PREPARATION AND GENERAL EARTHWORK and the BUILDING FOUNDATIONS sections of this report. The slab -on -grade floors may be poured on the crushed rock base described in the BUILDING FOUNDATIONS section. The rock spall fill and the crushed rock can also serve as a capillary break to prevent moisture from migrating upward through the concrete floor slabs. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 14 DRIVEWAY PAVEMENT Performance of driveway pavement is critically related to the conditions of the underlying subgrade soils. We recommend that the subgrade soils within the driveways be treated and prepared as described in the SITE PREPARATION AND GENERAL EARTHWORK and STRUCTURAL FILL sections of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive flexing or deflection should be over -excavated and re -compacted or replaced with a structural fill or crushed rock placed and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. We recommend that a 4-inch-thick minimum, compacted, crushed rock base (CRB), consisting of 7/8-inch-minus crushed rock, be used for the driveway. The crushed rock base should be topped by 3-inch-thick Class B asphalt concrete (AC). DRAINAGE CONTROL Site and Driveway Grading The onsite surficial soils can be saturated quickly and heavy runoff and near -surface groundwater may be encountered during periods of heavy rain. To minimize potential difficulties for site grading work due to storm runoff and groundwater seepage during construction, one or more lines of ditches or interceptor trench drains should be installed, as required, along the uphill side of the site to intercept storm runoff and near -surface groundwater flow. Water thus collected should be direct into a nearby storm inlet covered with a filter sack. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 15 Excavation of Building Footprint Excavation of building footprints, if encountering groundwater, should have the bottom of excavation sloped and ditches excavated along the bases of cut banks to direct groundwater seepage to flow into a sump pit from which water can be pumped out of the pit into a storage/settling pond onsite. The over -excavation of the building footing should be backfilled per recommendations under the BUILDING FOUNDATIONS section of this report. Runoff over Impervious Surfaces Storm runoff over impervious surfaces, such as roofs and paved driveway, should be collected by underground drain line systems connected to downspouts and by catch basins installed in the driveway. Stormwater thus collected should be tightlined to discharge into a storm sewer or a suitable onsite stormwater disposal facility such as infiltration trenches. Building Footing Drain A subdrain should be installed, around the perimeter footings of the new residence. The subdrain should consist of a 4-inch-minimum-diameter, perforated, rigid, drain pipe, laid a few inches below bottom of the perimeter footings of the new garage. The trench and the drain line should have a sufficient gradient (0.5% minimum) to generate flow by gravity. The drain line should be wrapped with a filter fabric sock and completely enclosed in clean washed gravel. The remaining trench may be backfilled with clean onsite soils. Water collected by the perimeter footing subdrain systems should be tightlined, separately from the roof and surface stormwater drain lines, to discharge into a storm sewer or a suitable stormwater disposal facility such as infiltration trenches. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 16 Surface Drainage Water should not be allowed to stand in any areas where footings, slabs, or pavement is to be constructed. Finish ground surface should be graded to flow away from the proposed residential building. We recommend the finish ground be sloped at a gradient of 3 percent minimum for a distance of at least 10 feet away from the buildings, except in the areas to be paved. Cleanouts Sufficient number of cleanouts at strategic locations should be provided for the underground drain line systems. The underground drain line systems should be maintained periodically to prevent clogging. LIMITATIONS This report has been prepared for the specific application to the subject project for the exclusive use by Mrs. Wendy Priest and her associates, consultants and contractors. We recommend that this report, in its entirety, be included in the project contract documents for information of and estimating and bidding purposes by prospective contractors and for compliance to the recommendations in this report during construction. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on soil conditions encountered in the test pits, our engineering analyses, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care LIU & ASSOCIATES, INC. March 15, 2011. Wendy Priest Residence L&A Job No. 11-004 Page 17 and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. The actual subsurface conditions encountered during construction may vary from those encountered in the test pits. The nature and extent of such variations may not become evident until construction starts. If variations occur then. Liu & Associates. Inc.. should be retained to re-evaluate the recommendations of this report. and to verify or modify them in writing prior to further construction. CLOSURE We are pleased to be of service to you on this project. Please feel free to call us if you have any questions regarding this report or need further consultation. Six plates attached 1C3NAL' ' MES 7l t7t Yours very truly. LIU & ASSOCIATES. INC. L 'A :�C� J. S. (Julian) Liu, Ph.D., P.E. Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. EDMOND'S' UIDERWATE'R / �' PARK Cam► BR4CKE7S , J LANDINGiAWt / r r'• _ r, sy. PO f srena. N H DAYTON r MAPLE ,c ' I o UNION DR - OVERLOOK FK PC a -i,I'Sk �3 .,2 d s n} ZPt91 wr-v -mil li`:'.md a *ram- / rn a 185TH .._ 185TH S% Q Q PL 5'li c " - T Sw 6' N IE5iH o •P r Nt1TT, '� n s+ ti SM PL 186TH 5SW / j STJ FK 1PL SW : 187T ST SW j f �§ tr r ti b 2. (Iy�s �i \ �. �sT s+ ? i 188TH e 8 ST SW'! Fig-- �. s p II89TH S SW �f3,es H r �I� r, I r �-•`•-----i -- ja 1.., WATER IST i3 Y_ PL I rH ST SW a{ 1 OTNy57 SWI ST ��Su �9 zl "- n._,% 191ST ST '64i0 5u �3 9ioT� l 192ND ST_ I SW. .. �I_.. �-=�.-.-. ��_.. ;� q ,, -•ii<+{;r — 4 -Y,�OC i - acTx -- S7 pFORESTEL � / T QeiP� �' ~N`\D DR t9Sry 9t su I 4Ej a "'��' �+ I 5T Y 1'N71i T i w P 4* io, S~rFM 3 E+HCfL51Mn T \ �I 195TN 196Tr ST { a I SW PUE�ET PUG DR ST SW r E600 ';cU 4 r MELODY LN WY j :6 G,s, au s �� t41rH Nj E S s, sxz'a �,s ^ Y, p HINDLE_Y Y fW1AND MY "° c�� j ST :y c,• f r BROOKMERE _ L4_ ,�?I� on98rN� ma �-DR WKMERE ST - x t4 3j reL S+ ' ja s of z� � < ST 9W: ��°.b. MAp�. 1SPE S j ST uElZ' - - r .:r lmxtR L v15Tx ; sUti A1N VISTA _ 206TH ; � ST, SW �g JER LN Pl. �0 1n H f,`,' ' [J F s� a AllkfA ¢ ' [ASME ?O'ST • .• a ..OfU 11Y i oai..kava `wroL < . SIERRA�� AfLY < • ,-r�, < J.r ' " PROJECT ;<..:._ It� , WY i - :.. c GLEtI � tiE+ ERFJ _ zxr^ ar, IvEY a' • 2 M �T .. i _ �� y SITE OTR� SPRAGUE IST A V HtWING81� , > I RP -.. o< fIl� rn,ELL . H [ 2Q7'Hf AIN f� _ _ ST I _, ��fDLs�, i S r uvlS •Alta[ "r r 9T.00 9a . s _ . _ . r — - �� 1 10 %Paar ST NlCiW CIR S wtL n r iQ$i< r:i f ZP c i 209TH PL i� gi' 54 I STRyIt1L,_ �SW 2 of z,o ALDE T a L:ItH/SRK LL �1° CEDAR ST ' t PL fv C Y FS _ OIL � » 1) � ' : , PARK Rp v� ��� d : ��. ST � � SW HOWELL WY y. fA > �s aacew lV ^ N ,4w p 1 ¢ s SPRUCE d ST j a 'i� Etn, tpp v� 3 MARSH Z .'�' <qi'F . P RL Q fn L s y PIOH : .o `FHE(�L 1 ' m 213TH Si OR C 214TH PL SWI HMOCK. ¢ i NEHLOCK w. n o y`N•a m '7^ WY \\ _ ST 21a H LH s " S < O � 215TH ST a s. 215IH 5T 41 1 -$ ERBE < SEAH(Nti = c LAUREL uircrt in 215TH Si PL S1r > 215TH s `as xl SW _--T._.^: _. .. OR .. b $T SY tf5i<h - -3 ... y 1 .. (a } 215TN oL PIfi r ST 21 if sr w _ m. E ST ¢ _.5 r-. PT 7wx 216 i DL s:,w o = <j �I FORS F ` �i`4, _ h > s r 21ITH ST SW ` ' n a+ -!3 CJ ZI } PIAKAH th u, LN ,, < co ' ` x } 217TH PL SY ?+s - { FIR Z i < 218TH ST SW i 26 1 FIR PL F R ST a E y]216T1i < ._..l i j :avi .dt"5y Ir.",� ..i„ z o a •}m 1 U la j 19THI x7 s; �O 2 COOLA EU4< < � � i T � �1 � r s a n9rH Sr E ^ ST WY EItb1 ST '" y 1224TH I•= ^'• a �i SST f ; r �! '<I SW a 3l. (3jt,3:,< iTH F� `L'�'': VICINITY MAP LIU & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056 DALEY STREET GeotechnicaI Engineering • Engineering Geology Earth Science EDMONDS, WASHINGTON JOB NO. 11-004 I DATE 3/7/2011 I PLATE 1 of DALEY ST 8M 198.31 CHISLED SO. TOP CURB I CO. T I - ® 70.00' / I S 88'38'56" E IELD o PIPE I o TP I � I I �I I �I W N O 0 r o � z I _ 201.9 ( I O ' i I M AGE I 1" _ 20, 200.2 CONIC. o N 1 1 P-1 EXIST. HOUSE 2o1.61 i #1056 36. , 1 � 0 00to N � 200.78o CONC. 201.5 I r" O I I � y 58.1' 201 1 5.93' -- 201.2 6. PROPOSED HOUSE GE 202�7 203.44 70.00' ALLEY WAY (V, N 88'38'25" W "-{i— 1.0 VOL 2 PG 39 SITE AND EXPLORATION LOCATION PLAN LIU & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056 DALEY STREET Geotechnical Engineering Engineering Geology Earth Science EDMONDS, WASHINGTON JOB NO. 11-004 DATE 3/7/2011 1 PLATE 2 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL COARSE- MORE THAN 50% OF GRAVEL GP POORLY -GRADED GRAVEL GRAVEL WITH GM SILTY GRAVEL GRAINED COARSE FRACTION SOILS RETAINED ON NO 4 SIEVE FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SP POORLY -GRADED SAND MORE THAN 50% MORE THAN 50% OF SAND SAND WITH SM SILTY SAND RETAINED ON THE COARSE FRACTION NO. 200 SIEVE PASSING NO. 4 SIEVE FINES SC CLAYEY SAND FINE- SILT AND CLAY INORGANIC ML SILT CL CLAY GRAINED LIQUID LIMIT ORGANIC OL ORGANIC SILT, ORGANIC CLAY SOILS LESS THAN 50% MORE THAN 500k SILTY AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY PASSING ON THE LIQUID LIMIT ORGANIC OH ORGANIC SILT, ORGANIC SILT NO. 200 SIEVE 50% OR MORE HIGHLY ORGANIC SOILS PT PEAT AND OTHER HIGHLY ORGANIC SOILS NOTES: SOIL MOISTURE MODIFIERS: t FIELD CLASSIFICATION IS BASED ON VISUAL EXAMINATION DRY - ABSENCE OF MOISTURE, DUSTY DRY TO OF SOIL IN GENERAL ACCORDANCE WITH AST, M D2488-83. THE TOUCH 2, SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED SLIGHTLY MOIST - TRACE NIOiSTURE, NOT DUSTY ON ASTM D2487-83. MOIST - DAMP, BUT NO VISIBLE WATER 3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH BASED ON INTERPRETATION OF BLOW -COUNT DATA, VISUAL WET - VISIBLE FREE WATER OR SATURATED, APPEARANCE OF SOILS, AND?OR TEST DATA. USUALLY SOIL IS OBTAINED FROM BELOW WATER TABLE LIU & ASSOCIATES, INC. UNIFIED SOIL CLASSIFICATION SYSTEM Geotechnical Engineering Engineering Geology Earth Science PLATE 3 Logged By: JSL TEST PIT NO Date: 2/17/2011 1 Ground El. t Depth ft. USCS CLASS. Soil Description Sample No. w % Other Test OL Dark -brown, slightly silty, fine SAND, loose, organic, with fine t ---- roots, moist (TOPSOIL) Rusty brown medium -dense silty fine SAND, trace gravel moist 2 ------------------------------------------- SW Gray, medium -dense, gravelly, medium to coarse SAND, moist 3 ---- SP ---------------------------------- Gray, medium -dense, fine SAND, moist 4 5 6 7 ---- SW ---------------------------------- Gray with yellowish stains, medium -dense, medium to coarse SAND, trace to some gravel, moist 8 9 Test pit terminated at 8.0 ft; minor speck of groundwater @ 3.0 ft. 10 t1 TEST PIT NO. 2 Logged By: JSL Date: 2/17/2011 Ground El. t Depth ft. USCS CLASS. Soil Description Sample No. w % Other Test OL Dark -brown, loose, silty fine SAND, with fine roots, organic, moist 1 ---- ---ITOPS_OIL/FILL _ ___________ --- SM Light -brown to light -gray, loose, gravelly, silty fine SAND, trace 2 of gravel, moist (FILL) 3 ---- OL ---------------------------------- Dark -brown, loose, silty fine SAND, with fine roots, organic, moist (RelIcTCPS(il9------------------------ 4 ____ SM/SP — Light -brown to light -gray, medium -dense, gravelly, slightly silty, medium SAND, moist 5 ---- SM ---------------------------------- Gray, medium -dense, silty fine SAND, moist 6 7 ---- SP ---------------------------------- Gray, medium -dense, fine SAND. moist 8 9 10 Test pit terminated at 9.5 ft; groundwater not encountered. LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science TEST PIT LOGS WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 1 DATE 2/21/20111 PLATE 4 72 Z� �ul 72 `�13J\ • Q 7,7Q G � 5 9 ,� a� j��i 0 a. ,' • , � ��'O'� Q tip �e O_ n�,•__. �. OD Ll U & ASSOCIATES, INC. ................ Cieotedillieal I:ttgincering - Engineering ( eolog Larth Scion" t �c� 11 ., Z INFILTRATION TRENCH - SINGLE DISPERSION PIPE WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 1 DATE 3/14/2011 1 PLATE 5 u) � z �� v va o 0 LC1U & ASS®CIATES, INC. (kvwchnicalLngincering Engineering (iodog; FarthScicnc: 7Z 59 h-NA INFILTRATION TRENCH - MULTI DISPERSION PIPES WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 DATE 3/14/2011 1 PLATE 6 APPENDIX Laboratory Test Results Wendy Priest Residence LIU & ASSOCIATES, INC. 100 90 8C 7C T LU Z 6C LL Z 5C LU CK UJ 4C IL 3( 2( tD(L- 5^M �L-F,- I ASTM C1 17/136 Particle Size Distribution Report Ui —7 T 4 4 F T 7- --c 10 01 500 1UU IV I — GRAIN SIZE - mm % GRAVEL % SAND % FINES I % COBBLES FINE CRS CRS-T- SILT J CLAY I . , MEDIUM FINE I , 0.0 1 0.0 —0.0 1 0.0 0.6 1 69.6 .23.5 1 6.3 SIEVE SIZE PERCENT FINER SPEC.* PERCENT PASS? (X--NO) NIO 100.0 #4 0 99.4 #200 29.8 0.0332 nun. 18.7 0.0213 rrun. 14.7 0.0125 mm. 10.7 0.0089 min. 8.1 0.0063 mm. 6.8 0.0031 mm. 5.7 0.0013 mm. 4.3 Loamy sand 'IT-2 Soil Description Atterbern Limits PL= LL= PI= Coefficients D85= 0.317 D60= 0.184 D50= 0.144 030= 0,0757 D1 5= 0.0221 D10= 0.0115 CU= 16.00 cc= 2.71 Classification USCS= AASHTO= Remarks (no specification provided) Sample No.: 9728 Source of Sample: Ncgt1kcsidence-11-004 Location: Client* Lui & Asociates Project: 2011 Laboratory Testing -rF=S'r"C-- I.-MRMRATC.InY, INJC. P-001 ee3-08cc Project No. 0911-28 Date: 3-14-2011 Elev./Depth: 4.0' Nick Averill Z_ U- Z W W M D- 3f 21 ASTM C117/136 Particle Size Distribution Report -- r z 1 rr I I I 1 i I 3it Ivv IV j-- GRAIN SIZE - mm % GRAVEL COBBLES FINE ' CRS_. % SAND CRS. MEDIUM _ FINE % FINES SILT - CLAY _ 0.0 6.5 19.1 6.3 14.1 39.3 11.4 3.3 SIEVE SIZE € PERCENT FINER SPEC.* PERCENT PASS? (X=NO) 1-1/4 in. 100.0 1 in. 94.7 5/8 in. 91.7 1/2 in. 85.6 I 3/8 in. 82.3 #4 74.4 #10 68.1 440 54.0 4200 14.7 0.0343 mm. 7.2 0.0219 mm. 5.4 0.0127 mm. 4.5 0.0090 mm. 4.5 0.0064 mm. 3.7 0.0031 mm. 2.9 0.0013 turn. 2.0 I Soil Description Loamy sand w.' gravel TP-1 Atterberg Limits PL= LL= Pl= Coefficients D85= 12.3 D60= 0.637 D50= 0.347 D30= 0.153 D15= 0.0764 DlO= 0.0512 CU= 12.44 Cc= 0.72 Classification USCS= AASHTO= Remarks F.M.=0.43 (no specification provided) Sample No.: 9727 Source of Sample: Priest Residence - 1.1-004 Location: TF- 2 °Client: Lui &Associates Project: 2011 1.,aboratory"Testing CASCACE TES"I-INC_ L,0.e0FATORY, r INC. 14R4.J.MD, WAOIs^.K3TCT.' B�J034 I^�81 ; �s6800 1 Project No: 0911-28 Date: 3-14-2010 Elev./Depth: 3.5' Textural T'rlangle U.S..A. 100% day ._. - So 10 80 20 TO Clay 30 /' 80 40 s 0 4 c so Slit s0 '. 01� cloy 4® 40 Sand so clay f Clay ilty *am lay 30 Sandy lay loom TO loom / oem 80 10 Silt 80 loam Sit! 100% sand s0 80 TO 80 s0 40 30 20 ' 10 100% silt P WCO VA saw Shaded area is applicable for design of infiltration BMPs Figure 3.27 USDA Textural Triangle Source: U.S. Department of Agriculture 3-74 Volume 111 — Hydrologic Analysis and Flow Control BMPs February 2005 PROJECT INFO: •1 .a , c 1056 DALEY STREET EDMONDS, WA 98020 DPD# WENDY PRIEST 315 DALEY STREET EDMONDS, WA 98020 ERIK S. DAVIDO, P.E. DAVIDO CONSULTING GROUP, INC. 15029 BOTHELL WAY NE, SUITE 600 LAKE FOREST PARK, WA 98155 PH: 206-523-0024 FAX: 206-523-1012 VERTICAL DATUM - NAVD 1988 HORIZONTAL DATUM - NAD 83/96 PER WASHINGTON STATE COORDINATE SYSTEM N ZONE RTK LINETYPE LEGEND: - m STORM DRAIN FOOTING DRAIN - - - PERFORATED PIPE DRAINAGE NOTES: ABBREVIATIONS: BOW = BACK OF SIDEWALK CB - CATCH BASIN EDP = EDGE OF PAVEMENT FF = FILTER FENCE FG - FINISHED GRADE FGTOEW = FINISH GRADE AT TOE OF WALL FGTOPW = FINISH GRADE AT TOP OF WALL FH = FIRE HYDRANT IE = INVERT ELEVATION LF = LINEAL FEET PERF = PERFORATED PVC POINT OF VERTICAL CURVE PM POINT OF VERTICAL INTERSECT SO = STORM DRAIN SDCO - STORM DRAIN CLEANOUT SS - SANITARY SEWER SSCO = SANITARY SEWER CLEANOUT SSMH = SANITARY SEWER MANHOLE SSS = SANITARY SIDE SEWER STA = STATION TOC = TOP OF CURB TOP - TOP OF PAVEMENT TYP = TYPICAL W = WATER WM = WATER METER N 10 5 0 10 20 SCALE IN FEET 1. GEOTECHNICAL ENGINEER TO INSPECT SOIL AT BOTTOM OF BOTH INFILTRATION TRENCHES PRIOR TO INSTALLATION OF PERFORATED PIPE AND GRAVEL. 2. CONTRACTOR SHALL VERIFY SITE GRADES AND MODIFY ON -SITE STORMWATER SYSTEM AS NECESSARY. 3. ANY STORMWATER DESIGN CHANGES SHALL BE SENT TO DCG FOR REVIEW PRIOR TO CONSTRUCTION. 4. HOPE STORM DRAIN PIPE SPECIFIED WHERE 2' OF COVER CAN NOT BE ACHIEVED. WHERE 2' OF COVER IS POSSIBLE STANDARD PVC CAN BE USED. GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2010 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S -- REPRESENTATIVE OF ANY DISCREPANCIES, 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. II. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, UTIUTIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FlLL PER GEOTECHNICAL REPORT. 14_ SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS NTH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILUNG. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 29 LF 4' SO FND 1/2" PIPE 4'0 DRYWELL C FG 201.00t TOP 199.00t - I O 6' IE 196.50 BOTTOM 194.50 26 LF 4" SO O 2.00% GRAVEL INFILTRATION TRENCH 1 CB TYPE 1 4.5'WX35'LX6'D RAFFIC-RATED LID GRATED TDOWN TURNED TEE TOP TRENCH 198.50 W/ MESH SCREEN ON TEE ( BOTTOM TRENCH 192.50 BD RIM 199.75 FG 200.00 6" IE (S) 197.34 6" PERF PIPE IE 197.04 6' IE (E) 197.24 S S 1 _ s - 35 LF 4" PERF S I PIPE 0 0.00% SURFACE SLOPE 10 LF 6" " (TYP) SO 0 2.00% S45 D LF LF 600" 6" SDCO A 61MIE 99.85 197 04 e J. `�10 . e m 12' AREA DRAIN RIM 201.25 "t• 4" IE 199.50 (EMERGENCY OVERFLOW FOR TRENCH 2)A 9 CB TYPE 1 i GRATED LID 50 LF 4" DOWN TURNED TEE / SD 02.002 W MESH SCREEN ON TEE RIM 202.00 Ij ( 4" IE E) 197.32 I 4" IE (W) 197.32 6" IE (S) 197.22 m A 4' SDCO & D RIM 202.00 6" IE 197.98 33 LF 4' ' - SO 0 2.00% A 6" SDCO D RIM 201.75 6' IE 197.12 LLLI! I 4" DOWNSPOUT CONNECTION (TYP) 10 LF 6" 1i SO 0 2.00% sa Jo m 13 LF 4" SD 0 2.00% 6" TEE 6' IE 197.12 J GRAVEL INFILTRATION TRENCH 2 I 5'WX40'LX5'D TOP TRENCH BOTTOM TRENCH CH19 195.00 g FG 201.75 0 6" PERF PIPE IE 197.12 4" SDCO e RIM 199.85 O 6" IE 197.04 4" SDCO e RIM 201.00 4" IE 198.50 0 I I I - 4" PERF FOOTING DRAIN 4" DOWNSPOUT CONNECTION (TYP) I I - FG 202.00 I 6" SDCO I RIM 201.75 6" IE 197.12 0 I L40 LF 6" PERF . PIPE 0 0.00% CITY OF EDMONDS I I I I I I VOL 2 PG 39 I I I I I � I BLOCK 43 iASE MAP/TOPOGRAPHY PROVIDED BY I THERS. DCG CANNOT BE HELD LIABLE( I I FOR ACCURACY. CONTRACTOR SHALL (FIELD I I I VERIFY- GRADES, UTILITIES, AND.( ALL OTHER FEATURES AND I (CONDITIONS. 26 IFISTING CONDITIONS ARE NOT 25 I 24 23 S SHOWN PftD/OR PLANS CANNOT 8Jq �CONSTRUCfEb AS SHOWN. CONTACT DCG PRIOR TO CONSTRUCTION. goo z O �VmWrH cn Qo iF P=8§0 yWy��O�Z Z m3'am z r z W J Q z N P 0a$ O u a�� 2 y C) � U O L) A No_0 �3 3 U 0 0 o e$ u 112 P vM z itrQYg.a DAy7OO 9O� • � tv �` �tas.c�gO per= 887ONA1. E� O 04 O 00 rn Q F- LLLJ LI O LLI Z Z U w�° w0 g O 0- >. ?i W LLI LLJ LIJ �Qp HLLIZ L LJ Ld W � O �� dN 0 M Ld } LLI ' J U j 0 o Lf) i a O PROJECT TG� MANAGER: DESIGNED TG BY: DRAWN TG BY: CHECKED ED BY: SCALE: SCALE AS SHOWN DATE: REV. SHEET 1 6/8/2011 A OF 2 2 SHEET NUMBER CO a � <yj Z �WJWw W •I .�1 � Z J NOTE: Z cYi>aZ USE OF THIS SYSTEM RESIDENCE APPROVEDBY THECITYAE ENGINEER L oWom� wh O o WF CLEANOUT WITH 45'azx�`W-'LL BEND AND CAP w I� CO / ROOF ➢RAIN pza�z� \ // ROOF GUTTER I uc�i�iv�o I 5' MIN. PIPE DIAM. PER C01 NOT TO EXCEED 100' BETWEEN 14x14"x6" s' cs PER PLAN m<oWz CLEAN OUTS CONCRETE MIN I JU CLEANOUT (WYE WITH CAP COLLAR r AND LOCKING LAMPHOLE COVER) RUNOFF SPREADER TRENCH < LEVELING COLLAR I W a A CONCRETE LEVELING COLLAR VARIES ❑.ERVATION WELL 12"+/- zJ 1-- W p w LOCKING LAMPHOLE COVER U a z 12" MIN. WATER TIGHT CAP - m RISER CONCRETE PAD 1 SLEEVEC C7 6" RISER 1' MIN -� a" OR fi" SIDE SEWER OBSERVATION WELL WITH I 1' MIN METAL CAP AND LOCK GENERAL CLEANOUT DETAIL 6" WYE AND 45' FINE MESH SCREEN v� AND 1/8 BEND 6" CITY STUB III—L= U �I —I 11=�=1 I �ll 1�—I I In I 1=1 I I 12" +/- : 4" OR 6" SIDE SEWER =I I o ly� -1 �,-I,_- — i QO v ASPHALT SURFACE CLEAN OUT DETAIL AT PROPERTY LINE 12" LOCKING LAMPHOLE COVER z PIPE DIAM. PER PLAN (EAST JORDAN IRON WORMS CO.) �� 6" RISER 12"� C SLEEVE (MODEL #: 00366108) f PER COloc 3/4' TO 1-1/2' WASHED ROCK PVC CAP WRAP TRENCH ENTIRELY WITH U O� FILTER CLOTH O TIE r TYPICAL GL ANOUT UNDER ASPHALT NOTE: Q u r OR CONCRETE SIDE SEWER JOINTS SHALL BE 'z GASKETED SD CLEANOUT A TYPICAL INFILTRATION TRENCH B S' DAV� PER CITY OF EDMONDS STANDARD DETAIL E6-2 COl PER CITY OF EDMONDS STANDARD DETAIL E5-2 CO1 4�Q•'�Of_W�wy._�O 1 3 House � RootD ss /pNA1.0 CatchBa* NOT REQ'D FOR - / FOOTING DRAINS N O Do RodDayrapod tbw I Q DRY WELD. We F�wa1 w o cw� PLAN VIEW f Roa i Ul Of M w zo. NTS I SQ oo EJ CL } w LIJ Q }w W z¢ F- w w LZOZ WL R oaf Domspat - Q N Mack Ceder of 1 III W } House OsedW oral tter mead ns J SpashBlodc Topsad Fka wIwIthSuft Q r , � .:v,� s•. :,�i: .v is STThI. z O In now o u O Fk*Mesh Sam PIPE DIAM. PROJECT CatchBas(n PER PLAN MANAGER: TG NOT REQ'D FOR .4� - DESIGNED TG FOOTING DRAINS 481neh Diameter BY: Sift of Hole Fdtedwiat DRAWN TG Llnedwkh f i3•TlXashed BY: FlReFaaic DraPiRO1tG CHECKED 159ndrt BY: ED Mim 1'd)wv GUISO et SCALE: SCALEASS . , DRY WELL H Igf QwndwatTw TSW9 DATE: IRZ,l SHEET SECTION i 2 6/8/ !011 2 DRYWELL SHEET NUMBER �� PER 2005 DOE SWUM FIGURE 3.4 C0� - C O 2 l PROJECT INFO: ABBREVIATIONS: Water Meter: Line to home to be PROJECT ADDRESS: BOW = BACK OF SIDEWALK minimum 24" below finish grade. 1056 DALEY STREET CB =CATCH BASIN . EDMONDS, WA 98020 EOP = EDGE OF PAVEMENT DPD# FF = FILTER FENCE FG = FINISHED GRADE 10 5 0 10 •20 OWNER,/.APPLICANT: FGTOEW = FINISH GRADE AT TOE OF WALL WENDY PRIEST FGTOPW =FINISH GRADE AT TOP OF WALL S 315 DALEY STREET FH =FIRE HYDRANT SCALE IN FEET fiileil DtiW EDMONDS, WA 98020 IE = INVERT ELEVATION LF = LINEAL FEET ENGINEER: PERF = PERFORATED SURFACE SLOPE ERIK S. DAVIDO, P.E. PVC = POINT OF VERTICAL CURVE O. DAVIDO CONSULTING GROUP INC. PVI = POINT OF VERTICAL INTERSECT :.,.._, ........ ........... IF RE -USING EXISTiNGSEWER LATEI . 15029 BOTHELL WAY NE, SUITE 600 SD STORM DRAIN CQP1131TION i�liST BE IdERIED RY �ITY'S LAKE FOREST PARK, WA 98155 SDCO = STORM DRAIN CLEANOUT PUBLIC.WORK8 DEPT, C.ONTACTEDI ONDS PH: Zos-523-0024 SS =SANITARY SEWER Electrical Service Feed: From SEWER DIVISION d.25-7i1-t)235 . FAX: 206-523-1012 SSCO = SANITARY SEWER CLEANOUT SSMH = SANITARY SEWER MANHOLE Pedestal underground t0 meterbase DATUM & BENCHMARK: SSS = SANITARY SIDE SEWER minimum 24" below finish grade. VERTICAL DATUM - NAVD 1988 STA = STATION - 29 LF.. 4" SD HORIZONTAL DATUM - NAD 83/96 PER TOC = TOP OF CURB WASHINGTON STATE COORDINATE TOP = TOP OF PAVEMENT SYSTEM N ZONE RTK TYP = TYPICAL W =WATER Utlllty LOCatIOnS added 7-1 g-201 FND.1%2" PIPE 1i�" WM = WATER METER by Rick Godsalve as requested by 4'0 DRYWELL LINETYPE LEGEND: I FG zol.0ot \ City of Edmonds. rn� TOP 199.00f -- so STORM DRAIN 0RN FOOTING DRAIN PERF PERFORATED PIPE DRAINAGE NOTES: 1. GEOTECHNICAL ENGINEER TO INSPECT SOIL AT BOTTOM OF BOTH INFILTRATION TRENCHES PRIOR TO INSTALLATION OF PERFORATED PIPE AND GRAVEL. 2. CONTRACTOR SHALL VERIFY SITE GRADES AND MODIFY ON -SITE. STORMWATER SYSTEM AS NECESSARY. 3. ANY STORMWATER DESIGN CHANGES SHALL BE SENT TO DCG FOR REVIEW PRIOR TO CONSTRUCTION. 4. HDPE STORM DRAIN PIPE SPECIFIED WHERE 2' OF COVER CAN NOT BE ACHIEVED. WHERE 2' OF COVER IS POSSIBLE STANDARD PVC CAN BE USED. GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2010 WSDOT/APWA STANDARD SPECIFICATIONS__ FOR ROAD, BRIDGE__AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2: STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL -GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. -M AL�. nisTtAlMen 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED GoMraST an��� FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND. SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE, AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL' FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL. REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL. NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 26. - CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 6" IE .196.50 . BOTTOM 194.50 WATER SEWEN INSPEG1I0'. R-EQ'p. GALL 425-171-41220 07 1 326 26 LF 4" SD 0 2.00% ---� CCCANWT t2&,tkkAlYLl�U I I . _ 50 LF 4" SD CAD 2.00%. I I= oe!� s COrZ-f'KA&C'rLTD Weft U3, Y04 MUST We qtc f✓ss ro C6 . I A 4" SDCO CO RIM 202.00 6" BIE 197.98 33 LF 4" SD 0 2.00% A CB TYPE 1 GRATED TRAFFIC -RATED LID DOWN TURNED TEE w / \A17C14 ' C('ACT'A1 MI TCC 40 LF .6" PERF PIPE 0 6.007. 23 GRAVEL INFILTRATION TRENCH 1 4.5'WX35'LX6'D TOP TRENCH 198.50 B BOTTOM TRENCH 1.92.50 CO FG 200.00 6" PERF PIPE IE 197.04 35 LF 4" PERF ----.__;. S PIPE 0 0.00% 45 LF 6" Gas Line: To be installed by Gas SD ®2.00% Company: Minimum 1811 below finish grade. 4" SDCO RIM 199.85 6" IE 197-04 4" SDCO A . - - RIM 201.00 CO 4" IE 198.50 I I I - 4" PERF FOOTING DRAIN . I I 4" DOWNSPOUT z O 5 W it m Q 0 0 z U 0 O 0 00 N M CONNECTION (TYP) O O 00 . Cn �C I— 0 W Vi FG 202.00 WO UCH Z W� W tnQ W O�0- Ce CL>_� w�Ww Uj Ca PP SY GIIVEERING 0 J �_Q D 6" SDCO <C p I--- W Z �-- RIM 201.75 CD I W 0 Z W W Q 6» IE 197.12 I � Q Uj J Q O U W W1 0 x O IL PROJECT STROM FILE MANAGER: TG DESIGNED By: TG DRAWN TG RESUB BY: JUL 12 2011 CHECKED ED BY: I BUILDING OFEDMONDS E DT SCALE AS I SCALE: SHOWN DATE: REV. SHEE' 1 ASE MAP/TOPOGRAPHY PROVIDED BY 6/ 8/ 2011 A OF THERS. DCG CANNOT BE HELD LIABLE 2 IFOR ACCURACY. CONTRACTOR SHALL FIELD VERIFY GRADES, UTILITIES, AND I SHEET NUMBER I ALL OTHER EXISTING FEATURES AND I CONDITIONS. IF CONDITIONS ARE NOT S SHOWN AN PLANS CANNOT B CONSTRUCTED AS SHOWN, CONTACT C01 DCG PRIOR TO CONSTRUCTION. a. 0 I= -a ww a ZJ;C<ow _0 Q 0M W� N (n ZZ � WWZ� a m Z i W 9 N O W Ii�QWF � w z Y J V QQZ" F W � W p O WW FF-- aZU WO�C9�C9 DUFF--Z JZ 0QW9d9 aaQ5o5 } oQw msm m W o � z Q o p CL W W o J Z o�M aa�. O P�M (� N w Z � O `r' O ASPHALT SURFACE 1 CLEAN OUT DETAIL AT PROPERTY LINE — >°.°�°" o — '°o°o J000°c PIPE DIAM. PER PLAN H o 12 LOCKING LAMPHOLE COVER EAST JORDAN IRON WORKS CO..)°o ��°�°� 6" RISER""12" PVC SLEEVE (MODEL #: 00366108) 3/4" TO 1-1/2" WASHED ROCK PER C01 PVC CAP o000o WRAP TRENCH ENTIRELY WITH ogo FILTER CLOTH TYPICAL CL ANOUT UNDER ASPHALT NOTE: .,►-, nnn►nnrT'r- SIDE SEWER JOINTS SHALL BE Roof Dwnspmt hi.wk Cater of Willi I" Carrel IH6Lsq ovedlow. or 01her means 811ash Block i'o sdi p Flwh w ith Safe fkyw Fine Mesh Screed PIPE DIAM. ' PER PLAN Cetch 8wi tl NOT REQ'D FOR FOOTING DRAINS 481nch Dlwr0er 41 min. Side d Hole le Filiedwit %2-:3P LirtedvrHhWashed Filter F6bric Drain Flock Icy MM. f> abwa,io�,al DR Y WELL High Groundwatm Table SECTION DRYWELL rc PER 2005 DOE SWMM FIGURE -3.4 C01 �a'N a �o W N a N n>_'S wp J W w er- w l.— LLJ Q l­_ Ld Ld Z L J Ld �y rP V �/ �C> LdLd }- __j Q w U w (O O LO o a PROJECT TG MANAGER: DESIGNED TG BY: DRAWN TG BY: CHECKED ED BY: SCALE: SCALE,. AS SHOWN STR ��� FILE DATE: REV. SHEET 6/8/2011 A OF 2 RECEIVED SHEET NUMBER JUN 0 9 2011 BUILDING DEPARTMENT 0 2 CITY OF EDMONDS 3� zo 1I Temporary Sediment and Erosion Control: Silt Fence will be placed on the North Property Line and return to the North ends of the existing fences. 8" Straw Wattle will be placed on East and West Property Lines. Proposed Driveway will be covered with 4" of 2" Crushed Rock, to act as construction access. The --� Storm Inlet will be covered with filter sock. The filter will be kept clean and checked frequently. Refer to Geotechnical Report. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused or occurs during the permitted project. _ OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL .AND DRAINAGE HA-ur-, sLkvA: "4A-r TI c-1 ry 1016,14-r- om- 'W+vy is cLIFF-AN of Aiy vIL' W, rztESWI--tIN(rl P"M Daley St. (,o►J STrZtAc.'rt oN n1=�1t��/. i 0 I i Silt Fence installed as `` cone_ recommended Ir I in Geotech iI' i - I� ► i Report. I I II I i i II I� Ili Conc. � !;I I Existing House is Existing ; Garage i Straw Wattle i Conc. !II jlj I I I! I II i' I III I I ; I Existing i I I Wood Fence, 3' High Existing I I Other CMU Retaining Wall i 1 Owners, I I ' East, South, li 70'-01 T! ; & West I I. cis I & Vacated Alley Way Wendy Priest 1056 Daley St. Edmonds Wa. 98020 Parcel Number: 00434204301500 Existing Impervious Surface: Pre 1977 : 3,160 Sq Ft Lot Coverage: 31.07% New Impervious Surface: 3,669 Sq Ft Lot Area: 8225 Sq Ft Height Calcs Zoning: RS-6 A=+101.7-' ';2Coo.0 B=+l 21 Seismic: Use Group 1, Site Class D. _ C = +� 201 ' S Soil Report: Soil Classification Group1, Design Bearing Capacity, Average = +482-.65'2,->o-S 7 2,000 Lbs. Per. Sq. Ft. Refer to Geotechnical Report. Actual = +1a4�-.b' --a-Ito- 7 1 Maximum = +427,65' 2z s �7 Lowest Footing = +849-.W' t ci -7- S-% 40" Below Finish Grade Scale: 1" = 20' A Grading Plan: Existing grade will be maintained. If any unforeseen excavation has to be done, it will be done in accordance with the Geotechnical Survey's recommendations. The only planned excavation is the foundation cut and driveway grading, this will involve aprox.350 Yards, to be hauled off site. Refer to Geotech Report for details. Lowest footing: +99.35. Finished Floor: +104.45. IF iEall lltit SEM-l3 LATE ,., I OI I NflJOT Of VERMD I y (MY$; PUBL$ ,- ft 50tiff CONTACT E nn. Van Aft4q0AJ AO" 771-0235 Benchmark Elevation Daley St. Top of Curb + 100' Sewer Cleanout Water Meter Utility Pole--.,,,,,, •,,,r City Right of Way 10' a Property Corner Proper � Property Corner Elev. + 102.5' Elev. +101.9 0 0 Cone. Existing Wood Fence, Demo ICone. I I Existing House 81_0 z I I r I I I Existing Garage 6) L W Cone, 6 Existing Wood Fence, Other I Owners, I East, South, ► & West I 3' High Existing I CMU Retaining Wall 70'-0" ----. --- ----- _ V Property Corner Property Corner ` Elev. +105.7' - - - - - - - - Elev_+105,1' - - - - Vacated Alley Way w r�T� s�n.VIC.� t,tNF Mks-r ►tr�P.i✓r� R 5'cRAll-rNT Benchmark Elevation �� p T' Daley St. Top of CurbA8' / or-6 TN'�:N � oNc� one l� ► 1�rE 1"�'En' Sewer Cleanout (,Water Meter 3 Utility Pole City Right of Way 10' Property Corner o7 \Property Corner Elev. + 402--a' - ° Elev. +601- ry e1NF+C1�% t�t.l�N 2U0, g-/ �0 o �.Z S� ��IzC)v,05 nD WATT � Coriye>��,,,Ela9,,, `I�j ., Elev.-w�2-4' �Icr' l.►ro>✓ �►�'�Qt� Lorie �'�( -Elev. A t�91-� ACR Wal Elev. B Sets ks Eft Mtr0� Ut New Concrete u 2 000 22-1" ]Franc------ ' Driveway i �I �� DrivewayGrade Proposed. Sides I 7 0, 12' Wide Min Garage 528 R q Rear S Ft z Other He C_L t0N0" t2EWu1 � APP OVED - PLANNING a 5' t-,-T7-kI Elev. C +103.4' 2,01.5 0 0 Co o -- Covered Porch 16 Sq Ft " 58'-1" w Proposed Residence 1940 Sq Ft Proposed Deck 72 Sq Ft Elev. Dr 402.8 3' High Existing 4, CMU Retaining Wall o 70'-0" V Vacated Alley � Property Corner Property Corner/' Elev. +495.7` , Elev. +•455. y Wa y APPROVED BY ENGINEERING Date: 7/1 LI /l i 4 ft-Ftlt -r•o OMP41AZAG,C t'U*-') r-bt2 tat�AlTIUIU(ki. DSC-e1NEi;�IK1C� ,I L� t STREET I �— LLJ W G7 N 00 0) �t >' •cC V _0 too in Qi `- W O 4, 0 V Plan: 1940 I Date: 04/13/11 I Job ,#• 20100138 FL Job ,• 114038 /V& Job,•11114 Sheet: P 'Ll RECEIVED ®IL .SUN 0 q 2011 BUILDING DEPARTMENT CITY OF EDMONDS