Loading...
1121 6TH AVE S.PDF111111111111 5391 1121 6TH AVE S co 0 r G1 N •r CITY of EDMONDS SIDE SEWER PERMIT F-! 771-3202 Tv tlx: 9 FILE PERMIT NO. 07346 M I For Inspection Call Address of Construction: "ih fSrP.. S • Property Legal Description ( Include all easements) : L--b•"{,� N�, r'1G•C.�. Owner and/or Builder: Contractor & License No: 'b —of F_ -(.."- l wue Single Family Residence Multi -Family Commercial M (No. of Units ) (No. of fixture Units ) Invasion into City Right -of -Way: No V. Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-800-424-5555) beforeany excavation.) Cross other Private Property: No Z Yes (If Yes, easement required, attach legal description and county easement number.) PLEASE REA THE S LISTED ON THE BACK I rtif have read and shall comply Date with the it s listed on the back. Permit Fee: 3a 00 Issued By: Trunk Charge: Date Issued: /�S Assessment Fee: Receipt No.: 4017 Partial Inspection: Comments Date Initial Final Inspection Approved: Date Initial Rejected: Reason ** PERMIT MUST BE POSTED ON JOB SITE ** Date . Initial White Copy - File Green Copy - Inspector Buff Copy - Applicant SIDE SEWER PERMITS "A " 1. Propefty owners`must obtain a permit to install side sewers on their property. A licensed side sewer contractor must be employed to construct side<sewers in the public right-of-way. 2. The side sewer c•bntractor assumes full•responsibility for each installation for one (1) year. 3. Commercial establishment requires a minimum of a six inch (6") side sewer line. 4. Side sewers may not be installed closer than thirty inches (30") to any structure. 5. Side sewer lines must be laid at a minimum grade of 2% (1.150) and maximum grade of 100% (.450). 6. No turn in side sewer greater than 450 (1/8 bend) is all.owed between cleanout. All 900 turns must be constructed of a 450 (1/8 bend) and wye with. removab.le cap for cleanouts. 7. No down spouts, footing drains or floor drains can be connected to side sewer system. 8. Pea gravel is required for bedding when installing sewer lines through other than granular soil. 9. Cleanouts are required at 30"-60" from each plumbing exit.li'ne and at,,minimum intervals of 100' along sewer line run. 10. Trenches within City right-of-way must be restored to original conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. 11. Cleanouts at property line and at house will have risers installed to within 12".of surface grade with removable cap. 12. Water test is required. 13. Side sewer must be left uncovered until inspected and approved by the City. 14. Inspection during normal working hours only. One (1) working day notice required. CITY .OF EDMONDS . = CaiL PRospect 0-1107 when. work _ CIVIC. CENTER —.WATER-SEWER DEPARTMENT Is ready Por inspection, (No Inepec tiwis Saturday, Bunday,or holidays:) N2 14:58 SLDE SEWER PER, ADDREss............1121.. Sixth:, Avenue:•_South:..••_••,••••. ......................................•--•---..................................:............................... OWNER......�dT?1�5.. ?.e... L.a. lf'.:.....:.......................................:. CONTRACTOR:...... Radford..&...SOTl......:.:_........................_.- Permission.is -granted ...... AM9U$1... 3Ig............... I�?.O..... for ...................... days; to REPAIR. or CONNECT a side sewer with City- Sewers in accordance with- application on file and governing ordinances. ATTENTION IS CALLED TO. THE FOLLOWING:- _ _ NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line: A licensed Side Sewer Contractor must be,etnployed to construct side sewer_1n street area. Do not cover any portion of sewer before It has been inspected; - __NOTE. No: 2—Obtain- full Information - regarding ,Ordinance 11:10:030 and Regulations governing side sewers when you get � permit. ._.NOTE No. 3—Top of`side.,sewer musthave�,at .least 30 Inches, coverage at property line�and -12 inches Inside property line; minimum grade of 2%. - .. No bends; In' -grade sharper'.than- % will be. perinitted. - NOTE•No. 4—Trenches Anstreet must be water settled and surface of street restored to original condition. Contractors shall. be responsiblefor,failure due to'Improper-. work- which may develop within one year`of completion.- - " NOTE No.5—It is unlawful to alter or :do any other,' work than is, provided for In the permit, or to do any work on the main- sewer :orIte, ap purtenances except to insert Ahe pipe into -'the wye. - - ' n z Il 1111111111211111111 MINE I 11 loss A c m O a C_ m c 7I I In