Loading...
1122 EMERALD HILLS DR.PDF1111111111111111230 1122 EMERALD HILLS DR r CITY OF EDMONDS - SIDE SEWER PERMIT ; WATEWSEWER DEPARTMENT PERMIT .To 4610 Call 775-2525 for side sewer inspections BEFORE covering any portion of the construction. 1 (Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday inspections./ 1122 Emerald Hills Drive ADDRESS LOCATION OF CONSTRUCTION ........................ --------•--..-......---------- --......-.--.......-.................................... _....................................................... PROPERTY LEGAL DESCRIPTION ....................�.LO$ No. 35, Emeral.. Oil 1S Addition ..............................................................................•.....................-•-•---------•------------••--------•--------..---------.............----...•......---..........................----------••............-•••--......... ............................•------------------................-OWNER AND/OR BUILDER..........ay. Aildex.so.n CONTRACTOR'S NAME & ADDRESS ........ A11ied BaCkha�n 22821 85-t-1 P1 ,'J. n Edmondi39 I-jA§.1, �8C2D . -- - -- • -• ....... . ...... ..... .. ............................................................................................ Permission is granted......................R.'.�..1...1_......-.....-.-., 19..7 _, for repair and/or connection of a side sewer to the city sanitary sewer s T� in accordance with City of Edmonds ordinances. A TION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permit obtainable from the City Engineer's office. NOTE No. 3—Obtain full information regarding Ordinance 11.16.030 and Regulations governing. side sewers when you get permit. NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends in grade sharper than 1/s will be permitted. NOTE No. 5--Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appurtenances except to in- sert the pipe into the wye. DISAPPROVEDE] Date ............. ........................ By ................ Date-----��- . •.... By ................ Date ............... _................... By................ APPROVED [[�" Date ...... - -• a-•' -.••... . •--`•�................. By....... _.,a��:.�' .--w�� 'i Remarks:....... _ ...................................... _...........•--•------•-------......................----• •-- ,. -•-----------------..................................................... ......... .................................................................................... ................................ — BOTH Permit Copies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection — 1 I,.... 1%�!,f^!`Z............... hereby certify that the side sewer installation constructed under this permit (Owner of Contracting Firm Performing Construction) wa stalled in accordance with all ,governing ordinances of the City of Edmonds. �,,/ Dated this --------- a ------------- day of ...... Ai17-A-�-=-•-..................................... 19 71. Check BEFORE you dig for: Water ❑, Gas ❑, Telephone ❑, Power ❑, Sewer ❑, Other ❑ APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No ........................................... NEW CONSTRUCTION REPAIRS ❑ 4 (21 ....................... I ....... ..................... 0C) OWNER --------------------------- --------------------------------------------------------ON--------------------------- CONTRACTOR .... ........ ESC�S-(— ......... PERMIT No . . F:::;- LEGAL ............ ram ADDRESS(I22I ............................................................ ...... D ................ ION: LOT No ................................ -BLOCK No . ............................................ NAMEOF AD M F—P-' ADDITION ....... 1= ............................................................................................................................ ELF 0 cc • </n (!F.' CDEEP) Approved: DATE ........'7W........ By . .. . ...... . By 144 1-:41 .............. APPLICATION for The City of Edmonds SIDE SEWER. PERMIT EASEMENT No. ...................... .................... NEW CONSTRUCTION p REPAIRS p OWNER ....1--1-.f ...../ .�L t _ '.... CONTRACTOR .. �.f.•.ld..l / ,�f����`� V ;............................ PERMIT No... q.... 11 f:..........,f�:1c%... .�:. ,r ADDRESS ....,1.......:.. ` j•-•------ LEGAL DESCRIPTION: LOT No ......... . ....................... %BJLOCK No............................................. NAME OF ADDITION----....°� 4 a—=,=�rya..�%..J..f..l..l...r!............................. ---- dy A,PR 1 1974 By C V1 F k *z_ D f/l STREET FILE -q- 2 }- Ae --a- 2 Rlw 2q - n D, \aa eme Fo,i d, 0105 -Or. 11OX7,97 'o. w 717. 3::' /7