Loading...
1239 8TH AVE S.PDFIIIIIIIIIIII 8691 1239 8TH AVE S City .0 Edmonds RIGHT-OF-WAV CONSTRUCTION :..e: PERMIT Perm;t Numbet: �- t " Issue Date: iM A. Address or Vicinity of Construction: 1239 8 Ay S 49615843) 18 --ammm— C) C3 B. Type of Work (be specific): Install Service 9 p . 1 9 C. Contractor: Washington Natural —Gas Mailing Address: 1122 75 St SH Eyp-ratt State License #: 98203 D. Building Permit # (if applicable): Contact: Mariamne Kingsbury Phone:. 35fi-7500 R759fi Liability Insurance: Bond: $ Side Sewer Permit # (if applicable): _ E. ❑ Commercial ❑ Subdivision ❑ City Project [2 Utility (PUD, GTE, WNG, CABLE, WATER) ❑ Multi -Family ❑ Single Family ❑ Other `' INSPECTOR: I1SPECTOR: F. Pavement or Concrete Cut : Kl Yes UNo G. Size of Cut: *' x H. Charge $ APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees io li6ki the City of Edmonds harmless (romp injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costa, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANS ,P AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMA ED';�S7'OR qiO qN-EgES�WIL�.BErHELDP UNTIL .THE;F,INAL ,STREET PATCH —" IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. / A 24 hour notice is required for. inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy of the permit will be. available on sit at all ti es for inspection purposes. Signature:'- Date: 6-19-96 ntraeto or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY °APPROVED BY: Iwl�t TIME AUTHORIZED: VOID AFTER A* DAYS SPECIAL CONDITIONS: RIGHT OF WAY DEPOSIT DISRUPTION FEE/FUND III - RESTORATION FEE: PERMIT FEE: TOTAL FEE: COMMENTS: RECEIPT FEE: DATE: ISSUED BY: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. 1994 FIELD INSPECTION NOTES Comments Diagram; (Fund 111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: w M M !Naftnwil GM !� M� A Vvh#wxjton Energy Company Q - Watermain depth ,' / 2 gas main Addendum to: City of Edmonds Right of Way Permit Application Submitted by: Mariamne Kingsbury Engineering Aide Washington Natural Gas 1356-7500 X7596 "I If - act . -W- Water -G- Gas -SS- Sever -& Water hydrant Q Water valve Washington Natural Gas Company 1122 75th Street S.W., Everett, Washington 982b3; (206) `355-3331 `ty w M • M M� M� Natw6lGw AVVhIwgtonEnerWG v&w • 1 it Watermain depth (� 2 gas main Addendum to: City of Edmonds Right of Way Permit Application Submitted by: Mariamne Kingsbury Engineering Aide Washington Natural Gas 0356-7500 X7596 -W- Water -G- Gas . -SS- lever -& Water hydrant p Water valve Washington Natural Gas Company 1122 75th Street S.W., Everett, Washington 982d3, (206)'355-3331 '�1' APPLICATION for The City of Edmonds �' � � ' .�� t-� SIDE SEWER PERMIT EASEMENT No........................................... NEW CONSTRUCTION ❑ REPAIRS ❑ OWNER ........... Paul ...Brittle -----••---•----••-•----•..................................... CONTRACTOR.............-------------------•---.........................---.................................. PERMIT No....................... ADDRESS .......1.2.3.9-..-... 8,t_h Ave._.-.S... LEGAL DESCRIPTION: LOT No ............................. ............ BLOCK No ............................................. • • NAMEOF ADDITION----------------••----...............---......---..............----....................--•---...................----•-................... Dye Tested On Sewer 1972 Approved: DATE................................................ By................................-•---................................. STREET FILE APPLICATIONfor The City of Edmonds SIDE SEWER P=w" ttU (- c'2- R�,,-D NEW CONSTRUCTION 0 REPAIRS (3 -c-a- 2 CL,CZII OWNER................................................................. CONTRACTOR ................................................ b( --- c ----------- & --5 ADDRESS ...... Z:2 ... 7 --- 5� ------------------ !;F ............ - ............................... LEGAL DESCRIPTION: LOT No . ............. NAME OF ADDITION ................................. EDMONDS EATMENIT PLAW EASEMENT No..... ..................... PERMIT NO. --� . .................... BLOCK No . .......................... Approved: J� - 1 0 , S- - 14 DATE..... --------- BY ---- �---67 ......... J, .., ....... ......................