Loading...
15723 70TH AVE W.PDF11111111111111 14926 15723 70TH AVE W ADDRESS: (i57Z--5 -7OTh f}VE L(� TAX ACCOUNT/PARCEL #: BUILDING PERMIT (NEW STRUCTURE) #: COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: ❑Conditional Waiver Study Required ❑Waiver CRITICAL AREAS #: DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: (b1-7 DCt PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit #'s): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE/ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc q11 STANDARD OWNER: Eh Hlji� EiL 777] DETENTION SYSTEM -WORKSHEET (5000 SF OR LESS ADDRESS: CALC. BY: G � l ,� ,�D•� Ave PHONE: - DATE: - IMPERVIOUS SUFACE AREA "L �S)3 PIPE DIA. PIPE LENGTH 215 ORIFICE FOOTING DRAINS SHALL NOT BE CONNECTED TO DETENTION SYSTEM OCKING LID (TYP.) L RIM ��2 IM ELEV.LELEV��� uc cw ivrvfrirc 6" Min. clearance r^� FINISHED 'Z / / FConc. Measured from top of RIM ELEV. GGRADE box or riser. UPPER CATCH BASIN 0.5% TO 1.0% SLOPE 904 V. ELEV.";9o'S7L? 9" MIN. CONTROL CS L11 TO CITY CONVEYANCE HNV. ELEV. Z OUTLET �T%9• CONTROL ORIFICE INV. ELEV17-1• 2'X2•x12" DEEP CONTROL CATCH BASIN (4"•6" QUARRY SPALLS OR EQUAL) COVER FROM CONTROL C Ea— CONTROLCB SHALL BE PERPENDICULAR TO SPREADER TRENCH— PERF. PIPE SHALL BE LEVEL & CAPPED AT ENDS RIPRAP OUTLET 1 ---1.5'----I SPREADER TRENCH 'TRENCH SHALL BE LINED WITH MIRAF1 & ON TOP WASHED DRAIN ROCK CITY STORM CONVEYANCE SYSTEM SPREADER TRENCH SHALL BE A MIN. OF 10' LONG AND PERPENDICULAR TO CONTROL CB. l t f, 23 2008 NOTES 1. CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHTLINE AND DETENTION SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS. APPROVED BY 2. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. ¢ J The outlet control orifice must be kept open at all times. Al DATE • �j Table 1 -- Detention Pipe Sizes " Impervious Surface Required Pipe Diameter Area Sq. Ft. Vol Cu Ft 15"' 18" 24" 30" �r 2000 50 40 28 16 10 ? 2500 62 50 35 20 13 3000 75 60 42 24 15 Required pipe 3500 87 70 49 28 18 iength in feet 4000 100 80 56 32 21 4500 112 90 63 36 23 5000 125 100 70 40 25 "NOTE: Use the next highest surface area to determine detention size if calculated impervious surface area is greater than 1/2 the value between numbers. (i.e., 2280 use 2500) I Table 2 -- Outlet Orifice Sizes I Impervious Surface Area Sq. Ft. Outlet Orifice Diameter (Inches) 2000-2999 5/8 3000-3999 3/4 4000-5000 718 ITable 3 -- Rectangular Catch Basin Requirements Detention Max. Size Catch Basin. pipe diameter knockout Type < 18" 20" Type I, CB 15 18" to 24" 26" Type IL, CB 16 24" to 36" 36" Type II, CB 19 19 (48" Basin) 36" to 42" 42" Type II, CB 19 19 (54" Basin) 'Source: Assoc. Sand & Gravel Co. Standards ALLLOWABLE STORM DRAINAGE DETENTION OR CONVEYANCE MATERIALS: • Reinforced Concrete (right-of-way) • Non -reinforced Concrete (non -right-of-way) • Aluminized Steel • Aluminum 16 GA or better • CMP As halt Coated • 12 ADS HDPE (Min. 2' cover required under paved areas) watertight • PVC-SDR 35, ASTMD-3034 or better • Ribbed PVC pipe, ASTM D-2444 • Ducticle iron pipe Class 50 - Tightlines system: • N-12 Smooth Wall • PVC-SDR 35, ASTMD-3034, or better • Hancor F-810 S:\ENGR\HANDOUTS\Drainage tables E21 Little G IAIST Pump Company Little Giant Pump Company P. O. Box 12010 Oklahoma City, OK 73157-2010 405.947.2511 • Fax: 405.947.8720 www.LittleGiant.com customerservice@Igpc.com 10SH-CIM � y 10SH-CIA-RFS INTRODUCTION Little Giant Submersible 10SH Series Sewage Ejector Pumps are recommended for use in basins or lift 'stations and suitable for pumping sewage, effluent, wastewater and other non -explosive, non -corrosive liquids. The. 10SH Series Sewage Ejector Pumps have 1-1/4" spherical solids handling capability. Automatic operation can be achieved with the use of the RFS Remote Float Switch. Other accessories such as basins, check valves and covers are also available. UNPACKING OleAiant pumps are carefully packaged, inspected and tested to insure safe operation and delivery. When you receive your pump, examine it carefully to determine that there are no broken or damaged parts that may have occurred during shipment. If damage has occurred, make notation and notify the firm from which you purchased the pump and they will assist you in replacement or repair, if required. SPECIFICATIONS Discharge: 10SH Series _2iym vertical Intake: 10SH Series:i 1.75" diameter opening Housing: Cast iron Volute: Cast iron Impeller: Vortex design nylon, with pressure relief vanes Motor: Split phase induction, 1750 RPM, with automatic reset thermal overload protection Hardware: 300 Series stainless steel Bearing: Double shielded bail Shaft Seal: Mechanical, spring loaded, stationary carbon with Nitrile boot and rotating ceramic seat Power Cord: 16 AWG 3-conductor copper stranded Cooling: The motor housing contains a cooling oil to provide cooling for the motor and to lubricate bearings and seals: These pumps are capable of operating with the motor housing partially exposed for extended periods of time,.. providing sufficient motor cooling and bearing . lubrication. However, for the best cooling and longest motor fife, the liquid level being pumped should normally be above the top of the cast iron motor housing. SAFETY GUIDELINES IV AWARNINGA WARNING: RISK OF ELECTRIC SHOCK. This pump is supplied with a grounding conductor and/or grounding type attachment plug. To reduce the risk of electric shock, be certain that it is connected to a properly grounded grounding type receptacle. Your pump is equipped with a 3-prong electrical plug. The third prong is to ground the pump to prevent possible electrical shock hazard. Do not remove the third prong from the plug. A separate branch circuit is recommended. Do not use an extension cord. When a pump is in a basin, etc., do not touch motor, pipes or water until unit is unplugged or shut off. If shut-off box is not accessible, call the electric company to shut off service to the house, or call your local fire department for instructions. Failure to follow this warning can result in fatal electrical shock. The flexible PVC jacketed cord assembly mounted to the pump must not be modified in any way, with the exception of shortening the cord to fit into a control panel. Any splice between the pump and the control panel must be made within a junction box and mounted outside of the basin, and comply with the National Electrical Code. Do not use the power cord for lifting the pump. The pump motor is equipped with an automatic resetting thermal protector and may restart unexpectedly. Protector tripping is an indication of motor overloading as a result of operating the pump at low heads (low riicr•.hnrnP ractrintinnl P.Yr P.CCIVP.IV hinh nr Inw vnitnnP innrioni intP wirinn innnrront mntnr nnnnaMinne nr Pump must be placed on a hard level surface. Never place pump directly on clay, earth or gravel surfaces. A check valve must be used in the discharge line to prevent backflow of liquid into the basin. The check valve should be a free flow valve that will easily pass solids. CAUTION: For best performance of check valves, when handling solids install in a horizontal position or at an angle of no more than 45°. Do not install check valve in a vertical position as solids may settle in valve and prevent opening on start-up. When a check valve is used drill a 3/16" hole in the discharg6 pipe approximately 1" to 2" above the pump discharge connection and below check valve to prevent air locking of the pump. WIRING Check local electrical and building codes before installation. The installation must be in accordance with their regulations as well as the most recent National Electrical Code (NEC). To conform to the National Electrical Code all pumps must be wired with 14 AWG or larger wire. For runs to 250', 14 AWG wire is sufficient. For longer runs, consult a qualified electrician or the factory. Pump should be connected or wired to its own circuit with no other outlets or equipment in the circuit line. Fuses and circuit breaker should be of ample capacity in the electrical circuit. See chart below. H.P. VOLTAGE FUSE OR CIRCUIT FBREAKER AMPS 1/2 115 20 1/2 230 15 REMOTE FLOAT SWITCH LEVEL CONTROL The RFS series pumps are equipped with a remote float switch level control. This level control is sealed in a polypropylene float cylinder. For automatic operation, the pump must be plugged or wired into a remote float switch. Pump will run continuously if plugged directly into an electrical outlet. When the level rises in the basin, the cylinder floats up with the level. When the cylinder position is at an angle of about 45' the switch activates and starts the pump motor. As the level draws down, the cylinder floats down and when it is again at an angle of about 45°, the switch deactivates, and the pump motor stops. NOTE: BE CERTAIN PUMP IS SECURE IN BASIN AND CYLINDER. FLOATS UNOBSTRUCTED WITHOUT TOUCHING THE BASIN WALLS OR PLUMBING. REMOTE FLOAT SWITCH INSTALLATION 1. The float switch consists of three parts: a. switch b. cord clamp c. clamp screw NOTE: If screw is lost, use a #10-16 x 1/2" long tapping screw. 2. Attach cord clamp to pump cover as shown in Figure 3. The clamp must be positioned as shown to allow free operation of float. Be sure to locate pump and switch power cords away from switch float. 3. A 3-1/2" tether length is recommended. When a tether length of 3-1/2" is used, a minimum basin diameter of 18" is recommended. The tether length is measured as shown in Figure 3. 4. After desired tether length is established hand tighten clamp screw. 5. TESTING: Without water in basin plug pump power cord into switch in -line -plug. Plug switch into outlet. Lift float and watch for pump to operate. Do not run pump for more than 5 seconds. OPERATION TESTING PUMP OPERATION RFS SERIES SEWAGE EJECTOR PUMPS 1. These pumps are equipped with a remote float switch. 2. These pumps are installed in a basin with a sealed cover, so switch operation cannot be observed. The sump cover usually will have. a spare hole that is plugged with a rubber plug. This plug can be removed and switch operation can be observed. 3. Plug power cord and remote float switch power cord into a grounded receptacle with voltage consistent with pump voltage as indicated on pump nameplate. 4. Run water into basin until pump starts. 5. Be sure gate valve in discharge line is open. 6. Allow pump to operate through several on -off cycles. wuiu reSun ni senoua ooany injury anaior property aamage. 2. DO NOT USE TO PUMP FLAMMABLE OR EXPLOSIVE FLUIDS SUCH AS GASOLINE, FUEL OIL, KEROSENE, ETC. DO NOT USE IN EXPLOSIVE ATMOSPHERES OR HAZARDOUS LOCATIONS AS CLASSIFIED BY NEC, ANSI/NFPA70. FAILURE TO FOLLOW THIS WARNING CAN RESULT IN PER- SONAL INJURY AND/OR PROPERTY DAMAGE. 3. During normal operation the pump is immersed in water. Also, during rain storms, water may be present in the surrounding area of the pump. Caution must be used to prevent bodily injury when working near the pump: a. The plug must be removed from the receptacle prior to touching, servicing or repairing.the pump. b. To minimize possible fatal electrical shock hazard, extreme care should be, used when changing fuses. Do not stand in water while changing fuses or insert your finger into the fuse socket. 4. Do not run the pump in a dry basin. If the pump is run in a dry basin, the surface temperature of the pump will rise to a high level. This high level could cause skin burns if the pump is touched and will cause serious damage to your pump. 5. Do not oil the motor. The pump housing is sealed. A high grade dielectric oil devoid of water has been put into the motor housing at the factory. Use of other oil could cause serious electric shock and/or permanent damage to the pump. 6. This pump's motor housing is filled with a dielectric lubricant at the factory for optimum motor heat transfer and lifetime lubrication of the bearings. Use of any other lubricant could cause damage and void the warranty. This lubricant is non -toxic; however, if it escapes the motor housing, it should be removed from the surface quickly by placing newspapers or other absorbent material on the water surface to soak it up, so aquatic life is undisturbed. INSTALLATION Pump must be installed in a suitable gas tight basin which is at least 18" in diameter and 30" deep, and vented in accordance with local plumbing codes. 10SH Series Sewage Pumps feature a 2" female NPT discharge. Pump can be installed with ABS, PVC, polyethylene or galvanized steel pipe. Proper adapters are required to connect plastic pipe to pump. Figure 1. 10SH SERIES CAUTION: This type of operation should be used only for emergency use or when a large volume of water is to be pumped. Pump must not be allowed to run dry. If pump is run dry, it may damage pump and void the warranty. MAINTENANCE AND SERVICE If pump does not operate properly, consult the Troubleshooting Chart. If trouble' can not be located with these steps shown, consult your pump dealer or take pump to a Little Giant authorized service center. CAUTION: When working on pump or switch, always unplug pump power cord in addition to removing fuse or shutting off circuit breaker before working on pump. CLEANING IMPELLER AND VOLUTE 1. Remove screws that hold volute to motor housing. 2. Remove volute and clean impeller and volute passage. Do not use strong solvents on impeller. 3. Be sure impeller turns freely after cleaning. 4. WARNING: DO NOT REMOVE IMPELLER. REMOVAL OF IMPELLER REQUIRES SPECIAL TOOLS AND IS TO BE DONE ONLY BY AN AUTHORIZED SERVICE CENTER.DO NOT REMOVE MOTOR HOUSING COVER. WARRANTY IS VOID IF MOTOR HOUSING COVER, IMPELLER OR SEALS HAVE BEEN REMOVED. ANY REPAIR ON MOTOR MUST BE DONE BY AN AUTHORIZED LITTLE GIANT SERVICE CENTER. Figure 2. FLOW- LITERS/MINUTE 0 120 240 360 480 Soo 720 0 20 40 s0 80 100 120 140 FLOW- GALLONS/MINUTE 8.75 7.5 say I' W ra 5 1 175 2.5 125 0 Model No. Catalog No. Listing(s) HP Volts Solids Size (dia. in.) Amps/ Watts GPM Q Head Shut Off P.S.I. Power Cord (ft.) Wt. (lbs.) Dimensions (H x L x W in in.) 10, 15' 20' 25' 10SH-CIM 511420 UUCSA 1/2 115 1-1/4" '11/900 100 80 55 20 28' 12.1 15 41.5 12.00 x 10.3 78.25 10SH-CIM 511480 UUCSA 1/2 208-240 1-1/4" 5.5/900 100 80 55 20 28' 12.1 15 41.5 12.00 x 10.3 x 8.25 10SH-CIA-RFS 511520 UUCSA 1/2 115 1-1/4" 11/900 100 80 55 20 28' 12.1 15 1 41.5 12.00 x 10.3 x 8.25 0 • Cameron Huebner 2 2009 15719 70'h Ave W 3L LDINQpEP RTMENT Edmonds, WA98026 Cl�IYC'�G r�'-0ND6 Phone: (206) 351-8716 Email: Cameron@hdco-cpa.com To: Jennifer Collins, Engineering City of Edmonds Engineering Division Re: Engineering Review Check #BLD20080306 Huebner Residence Response to letter dated September 30, 2009 STREET '0" FILE a. The pipe is 2 inch inside diameter PVC schedule 40. The total length of the pipe is 80 feet. b. There are 4 90 degree fittings. c. The difference in elevation is 10 feet. d. The maximum discharge at 10 feet is 100 gallons per minute. /FO BY ENGWEERNG #P2o Critical Areas Checklist CA File No: 200 -013� Site Information (soils/topography/hydrology/vegetation) WA qL. Site Address/Location I5723 'to- jE �� Conoom 1901t Z Property Tax Acomad-Number: DOS/ 3•-1O 000 2104 3. Approximate Site Size (acres or square feet): 174 970 so {� 4. Is this site currently developed? _ yes; X no. If yes; how is site developed? 5. Describe the general site topography. Check" all that apply. Flat: less than 5-feet elevation change over entire site. Rolling. slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distaru:e of 664eet). I- Y' slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a. horizontal distance of less than 33-feet). Other (please describe): 6. Site contains antes of year-round standing water. NO ; Approx. Depth 7. Site contains areas of seasonal standing water. Na : Approx. Depth - What season(s) of the year? 8. Site is in the floodway JAJ 0 floodplain of a watercourse. . 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? f LO Flows are seasonal? (What time of year? ). 10. Site is primaril): forested So+ rues - meadow ; shrubs mixedy� urban landscaped (lawn, shrubs etc) 11.' Obvious wetland is present on site. - For City Staff Use Only ao PA . SOS 1. Plan Check Number, if applicable? N/A 2 Site is zoned? Rom- \� 3. SCS mapped soil type(s)? _ 5 -Amer r� ��.�. ��nrl c,`zm sue 4. Critical Areas inventory or C.A. map indicates Critical Area on site? E s)W,am ii2z��-�% 5. Site within design((al1ted iearth-subsidence landsliderea `` hazard a? - ` An M��P t.na1 deNec-, • ,,y ck� E��on Ha.�ascl�-� DEI'ERMMII�iATIOI� -V STUDY REOUIRED WAMM 0 • #20 , ° $ City. of Edmonds Date Reed: �o Development Seaviees Department City Receipt #: O Planning Division Critical- Areas File M. t,^�tA-aC1��-Old Phone: 425.771.0220 Critical Areas Checklist Fee: $M5.00 10C. I see . Fax: 425.771.0221 Date Mailed to Applicant - The Critical Areas Checklist contained on this form is to be filled out- by any person, preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to deterinine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys) - A property owner, or his/her authorized representative, mist fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City`of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/hei is agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this applic on the behalf of the owner as listed below. SIGNATURE OF APPMANI'/AGENT DATE IO 47 y Property Owner's Authorization By my signature, I certify that I have authorized the above Applicant/Agent to -apply for the subject land use application, and grant my permission for the public officials and the staffof the.City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. SIGNATURE OF OWNER �l�C �• DATE lQ .3 Ar PLEASEPRINT CLEARLY Owner/Applicant: F_ O �4vE Bnl£R Name it '104�' ��� vJ Street Address Applicant Representative: CA►CR00, HvealMA- Name 1 S' 11 q -1 bkh' Qom' VJ Street. Address City State Zip City State Zip Telephone: (9 2!) 7V3- y3-7y Email address (optional): eAk0WCo—CP0'. Gen, Telephone: Email Address (optional): C4 m p hd co - �P . co M CITY OF EDMONDS CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 15723 - 70t' Avenue West Tax Acct. Number: 00513100002106 Determination: Study Required Determination #: CRA-2007-0136 Applicant: Cameron Huebner Owner: Ed Huebner CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED During review and inspection of the subject site, it was found that the site contains and/or is adjacent to an Erosion Hazard Area, pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify, and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area, the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose to submit the entire study with your specific development application. • Please review the minimum report requirements for all types of Critical Areas that are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). • Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study, and there is an approved list of consultants that you may choose from. You may contact the Planning Division for more information. • General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. STUDY REQUIREMENT - EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area: Erosion Hazard Areas include: • Those areas with Alderwood and Everett series soils on slopes of 15 percent or greater. • Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage. • Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. 0 • DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development within an Erosion Hazard Area must meet additional criteria. • For erosion hazard areas with suitable slope stability, the only critical area study needed is an erosion and sediment control plan prepared in compliance with the requirements set forth in Chapter 18.30 ECDC as part of the construction documents. This option is at the director's discretion, per Edmonds Community Development Code section 20.80.050. G. • In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer or other qualified professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. • Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.090. D. • Development standards are given in ECDC 23.80.060 and 23.80.070. ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as. an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. Jennifer Name / Signaturef/ Date NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. AT: Certrfzcate ofOccupaCY 3 70"' Avenue W PER INT Occupancy established by this certificate: No. Stories: 2 - B DEPARTMENT OF BUILDINGS :RNA/TIONAL RESIDENTIAL CODE SECTION R110 .Building Permit #:� BLD2008-0306 R3 a Dwelling Units: 1 f Yes ?� : .. Type of Construction: VB Owner of building: Edward -Huebner- /5-- The Single Family Residence at 1572i7othAvenue�W-� has�been^ii�spected and approved complying with the requirements of the 2006 edition of the International Residential Code as adopted=by the City for the group and division of occupancy and the use for which _ . the proposed occupancy is classified. Issued this 24th day of November. 2009 Chief Building Official e By: Any change of occupancy or use requires a b il, 0 x=. ng 'oermit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. DEPARTMENT OF BUI' PER INTERNATIONAL RESIDENTIAL AT: 15723 701h Avenue W f' i. Buildinc Occupancy established by this certificate: r R3 No. Stories: 2 Owner of building: The Sinale Familv Residence at 157 of the 2006 edition of the International Residential the proposed occupancy is classified. By: GS . IE.SECTION R110 Dwelling Units: 1 Yes �' {� Type of C on: VB An spected and approved complying with the requirements group and division of occupancy and the use for which Issued this 15t day of February, 2010 Chief Building Official Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. BUILDING PERMIT PERMIT #: BLD20080306 k PROP OWNER: HUEBNER. CAMERON STATUS: FINAL ADDRESS: 15723 70111 AVF W. EDMONDS BALANCE: $0.00 ISSUED: 9/5/21108 CREATED: 4/I5/2008 SCREENS: Select Screen... II= FUNCTIONS: Select Permit Function... �B= r 4.. '�INGI.F.I AN411 Y k1-1,'11*N(T NI''.VJ MESSAGES AND ALERTS I ype Expires By Created Description OWNERSHIP WAS CHANGED IN OCTOBER 2008 WITHOUT CITY MESSAGE Umbaugh 2/I/2010KNOWLEDGE. WE ISSUED THE C OF O UNDER PREVIOUS OWNER NAME EDWARD HUEBNER, ON 1 1/24/2009 RE -ISSUED C OF O UNDER CORRECT 'NAME ON 2/1/2010. UPDATED PERMIT TRAX. Go �s7a3 _ UTILITY EASEMENT j�5./ '1 GIN CLERK Civic Center Edmonds. Washinrrte•, IN CONSIDERATION of $1,040.00 in hand received and other benefits to accrue to the grantors herein, the undersigned, R.i.chard D. Howard and Joan Howard , hereby grant to the CITY OF o , aMunicipal Corporation,.a permanent easement for the installation, operation and maintenance of a utility over, across, through, and below the following described property; and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction and maintenance of said utility or utilities, together with the right of access to the ease- ment at any time for the stated.purposes. The easement and right-of-way hereby granted is located in the Cou-nty..of Snohomish, State of Washington, and is more particularly described as follows: A ten foot strip of land that is 5.00 feet on each side of the sanitary sewer as it now exists or as located in the future. Within the following described property: All that portion of Tract 21, Meadowdale Beach, according to the plat thereof recorded in Volume 5 of Plats, page 38, records of the Auditor of the County of Snohomish, State of Washington, described as follows: Beginning at a point on the South line of said Tract 21, which is 220.04 feet Easterly along the South line from the Southwest corner; thence North 1002130" East 179.30 feet, more or less, to the North line of that certain property described in deed recorded under Auditor's File No. 1613258; thence Easterly along said North line for 99.83 feet, more or less, to the East line of the West half of Tract 21; thence Southerly along said East line of said West half of Tract 21 for 178.70 feet, more or less, to the;..Sbuth line of said Tract 21; thence North 85°27'40" West along said South line 99.97 feet, more or less, to the true point of beginning. TOGETHER WITH a non-exclusive easement for ingress, egress, and utilities over and across the South 15 feet of the East 200.4 feet of the West 220.4 feet of Tract 21, Meadowdale Beach. TOGETHER WITH a temporary 10 foot construction easement over the aforementioned property. Said construction ease- ment will end upon completion of the construction of the sanitary sewer, or January 1, 1985, whichever comes first. 0. THE CITY agrees to restore to substantially the original con- dition such improvements as are disturbed during•the construction, maintenance and repair of said utility or utilities; provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. cYi ' o ajz o - O.CT 1.4.1983 KIRiL< �wxHS, o:i" °fasurr V l' 2 p� Deputy "VOL 1812 PAGE 980 aED • • CITY CLERK Civic Center, Edmonds, Washington DATED this 1—:S day of / / 19 STATE OF WASHINGTON) ss COUNTY OF SNOHOMISH) On this day personally appeared before me Richard D. Howard and Joan Howard to me known to be the individual(s) described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein! mentioned. 5�.A'd UNDER MY HAND AND OFFICIAL SEAL THIS 3rd October 19 83 �r (;N TAR��UBLI n a d of Washington residic.ya;~ •.• Edmonds -" t -- gi2tvc ::9 O M�'L CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 R90 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20080340 SIDE SEWER PERMIT (I -Single Family) Permit Number: ENG20080340 Expiration Date: 9/5/2009 Job Address: 15723 70TH AVE W, EDMONDS APPLICANT CONTRACTOR EDWARD L HUEBNER EDWARD L HUEBNER 15719 70TH AVE W 15719 70TH AVE W EDMONDS, WA 98020 EDMONDS, WA 98020 LICENSE k: EXP: N N JOB DESCRIPTION REPAIR N PROPOSE TO REUSE LATERAL LID NUMBER: GRINDER PUMP N PROPOSE TO REUSE SIDE SEWER Sewer Connection, New Service, SFR N N PROJECT CROSSES OTHER PRIVATE PROPERTY VERIFICATION OF RECORDED EASEMENTS COMPLETE INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and attorney fees by reason ofgranting this permit. CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT.1326 24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REQUESTS THIS APPLICATION IS NOT A PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN SPACE PROVIDED. FILECOPY ❑ INSPECTORCOPY ❑ APPLICANT COPY STATUS: ISSUED ENG2OO8O34O • Refer to City of Edmonds Side Sewer Information handout for approved pipe materials, inspections and other requirements. • A 6" cleanout with 12" locking cast iron lamphole cover is required at the property line. • Maintain 10' separation between the sanitary side sewer and the water service line. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • E-Sanitary Side Sewer Inspection • E-Engineering Final PARTIAL INSPECTION PARTIAL INSPECTION FINAL INSPECTION APPROVED DATE: INITIAL: NOTES: DATE: INITIAL: NOTES: DATE: INITIAL: .ce 1N�eel,,Q,r„sDraina�lan for Hueb er Resi V � s"CA, �0 7mQ0('S%-rE= 9997 DEED INE . ' I . 0 N a F I4 I .I b13 J w.`zJ @ soh £LAG I n'i X 3327 iv ee✓ "�' :r � I Q Type 11 Catch Bast v 48^ -> f ✓1 � N J5 HEIGiffe& ,01� 1ST FL.%�Sv51(7 2ND FL35r, , (O22 Detention pip 30" N-12 HDPE ( drainage line and detention pipe buried min of 2 feet 6 inch pine TO --r" / RIM1= 70TH AVE W —I- 100'+OR- _ Drainage pipe will be connected j pIIES ,S nNG RA�O� to existing srorm line on 701h Ave W �- 54 EXISTING CHAIN LINK FENCE 15723 70TH AVE W !it (3ARgt3E F: .3� 4 inch pipe J SHARED DRIVEWAY 99.97' EXISTING CRUSH ROCK DRIVE MAN HOLE OWNER WATER Off ED & JAN HUEBNER AT 17q A T FILEREY, 15719 70TH AVE W EDMONDS WA. 98026 _ 426 743,4374 HEIGHT CALCS. TPN #00513100002106 A = 336 B+ 344 HOUSE 1489 GO. FT. C+ 347.5 GARAGE 682 SQ. FT. D+ 346 COVERED DECK 186 = M�3•1yo SQ. FT. 1;A$, 375' ' •OPEN DECK 600 SO. FT. + 25' = 368.$70 EXISTING PLAY RIDGE HEIGHT HOUSE 64 SQ. FT. EAVES 258 SQ FT' o/k `�.��v •J �/o[o! -gzCDCD 2A croxx m x -P�� O r 0m Z F PZ 15719 70TH AVE W 2 STORY WOOD FRAME HOUSE I N i kY i SCALE 1" = 2(Y-V EASEMENT 2058688 (P: vLP 12009 BUILDING OEDMONS "w(�o T0l11 G1 LEGAL DESCRIPTION [date..' 9 ) 4 SNOHOMISH COUNTY ASSESSOR'S MAP FOR THE SW 114, SEC. 5, TWP. 27N., RGE. 04E., W.M. PLAT OF MEADOWDALE BEACH, RECORDED IN VOLUME 5, PAGE 38, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. PLAT OF STEELE PARK, RECORDED IN VOLUME 47, PAGES 256-257, RECORDS OF SNOHOMISH COUNTY, WASHI.NGTON. 1=5,, :.-M... . LOT AREA 16,389..SQ.-_.... _ DRIVEWAY PAD F'T _ Q _ 400 SO. FT. LOT SLOPE 0°lo -. SIDEWALK 14 M FT. r3UILDINQ. DEPARTMENT CRUSHED ROCK DRIVEWAY 800 SQ. FT. �{pr) TOTAL IMPERVIOUS SURFACES: 4,513 ; '"} F1 r:- x IN OF EDMONDS LOT COVERAGE 14.2 /o