15729 75TH PL W.PDF111111111111
6051
15729 75TH PL W
ADDRESS: /S�z2 / Ts— 11bi
TAX ACCOUNT/PARCEL NUMBER:
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS(RECORDED)FOR:
CRITICAL AREAS:
DISCRETIONARY PERMIT
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE $:
SHORT PLAT FILE:
DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver
LID #: Zl/-O
LOT: BLOCK:
SIDE SEWER AS BUILT DATED: 7Z
SIDE SEWER PERMITS) #: 65V-7
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
FOR
WATER METER TAP CARD DATED:
LATEMP\DSTs\Fonns\Street File Checklist_doc
,'CITY OF EDMONDS
FORINSPECTIOn;. CALL • �p� u
PUBLIC .WORKS..DEPARONT ;.-� , Permit SLDE SEWER .PERMIT 'T7� - 2- Z5 Ext. 2-Q Issue Date
7-71-52;v� ZI-6
.PERMIT MUST BE POSTED ON JOB SITE
.-�i "'~
1. Address of Construction j S -72cj 7�� A. U. FYNNWOOD LINE-
2. Property Legal Description (include all easements) ��¢ 27
3. Single Family Residence Multi -Family No. of Units
Commercial
4. Owner and/or Builder AlozaA j 4X-2 ;O,�u
5. Contractor & License No. rQCJ�L�
6. Invasion into City Right -of -Way: No Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig (%'�j�''f)J� before
excavation).
1-800-454-5555
7. Cross other private property: Yes No Easement required -
attach legal description and county easement number.
READ THE FOL,LOWT,.NG AND SIGN:
a. Property owners must obtain a permit to install side sewers on
their property. A licensed side sewer contractor must be employed to
construct side sewers in the public right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
C. Commercial establishment requires a minimum of a six inch (6")
side sewer line.
d. Side sewers may not be installed closer than thirty inches (30")
to any structure.
e. Side sewer lines must be laid at a minimum grade of 2% (1.15°)
and maximum grade of 100% (450).
f. No turn in side sewer greater than 45° (1/8;bend) is0allowed
between cleanout. All 90 turns must be constructed of a 45 (1/•8
bend) and wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.. Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two (2) working
days notice required.
DATE:
I certify t at I have read
and shall comply with the above
PERMIT FEE:
CONNECTION,•FEt-
* PERMIT
DISAPPROVED By: Date:_
Date:
APPROVED By- Date
/4SP 9!! F. 96"M
T BE POSTED ON JOB SITE * Q
11
P4
Q4
w
P4
zi
r;. Z
m _
�
z°
U
E- In->
O
a
12
z
o
Q
a
�
O U
d
U W
�
z �
O w
U a
�
z
0.
VL
-
2' c'
r
_;,r7
Ga
W
0
a
_
� STREET FILE
FILE # n/a'.
FORM FOR ( PUM/FINAL) DECLARATION OF(k9dXW)K)W*CQEj,(NOKSIGNIFICANCE)
Description of proposal 499 cubic yards of fill
Proponent Norman E. Nelson
Location of Proposal 15729 75th Pl. W.
Lead Agency City of Edmonds
This proposal has been determined to QbUMVnot have) a significant adverse
impact upon the environment. An EIS �Wis not) required under
RCW.43.21C.030(2)(c). This decision was made after review by the lead
agency of a completed environmental checklist and other information on
file with the lead agency.
Responsible Official Duane V. Bowman
Position/Title Assistant Citj Planner / ?
W
Date May 9, 1984 Signature
15
•
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
I () p Public Works • Planning • Parks and Recreation • Engineering
8 9 0_ 19
January 17, 1994
Norman E. Nelson
15729 - 75th P1. W.
Edmonds, WA 98026
LAURA M. HALL
MAYOR
RE: Problems with venting of your plumbing fixtures at 15725 - 75th Pl. W.
Dear Mr. Nelson:
The City's sewer cleaning records show that the home at this address is
experiencing problems with the venting of some of your plumbing fixtures
when the City crew is conducting cleaning operations of the City sewer line
in front of this address.
The City's cleaning operation is essential for both you and your
neighbors. It cleans debris in lines to prevent plugs, prevents corrosion
and potential future collapse, and achieves a better flow characteristic in
the public sewer lines. We need to do this often -- perhaps even 3 times a
year -- in some critical areas. The City's cleaning operation typically
involves the utilization of a high pressure water jet.
The problem which occurs at the home is the result of a high pressure surge
through your internal plumbing system. A properly constructed plumbing
system is designed to easily vent this additional pressure without any
visible impact at your residence. An undersized venting pipe (or not
having enough vents) cannot handle the pressure surge, and the only release
that's available is then through your toilet (or another fixture). The
Uniform Plumbing Code typically requires a 2" vent, and further requires a
separate vent for each plumbing fixture which is connected to the sewer (a
toilet, a sink, a shower). Your home may not have an adequate venting
system (you either have a 1-1/4" vent, or not enough of them), and you
therefore may continue to experience the pressure surges or you may be
experiencing a plugged vent.
The City does not have a choice as far as discharging its responsibility in
cleaning the public sewer line. It is therefore up to you to take
corrective measures as to how to improve your own venting system.
The City has come up with two options that will remedy your problem:
Option 1: Upgrade stack vents for toilets and other fixtures which
are experiencing problems to required sizes:
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
Page 2
Option 2: Install a clean -out outside of house per attached
specifications. Enclose box so it can vent properly when
excess pressure is put on house lines. This option would be
the cheapest and simplest way of correcting this problem.
At the same time, it would allow access to sanitary sewer
lines if stoppage should occur. This vent clean -out would
allow a place for backup in lines to go before entering your
house and causing costly damage.
The City would appreciate your expeditious cooperation in this matter. The
City must continue proper maintenance of its sewer lines, but we obviously
do not wish to see continued problems occurring on your property because of
poorly designed vents. A plugged vent will be your responsibility to
correct these deficiencies.
We cannot keep notifying you each time we come out to clean the line. It's
up to you to have a plumbing system that conforms to code. Option 2 is a
relatively simple one to construct.
Should you have. any questions on these options, please call Everett Akau,
Scott Highland or myself at 771-3202, extension 317 or 318.
Sincerely,
RonV olland
Water/Sewer Supervisor
Enclosure
15725/TXTSEWER
N
(NJ
to
-T
L
of
0 040
ID%,
,9-
a_
I
0 STREET FILE 0
CITY OF EDMONOB
250 51h AVE. N. • EDMONDS, WASHINGTON 96020 • (206) 771.3202
COMMUNITY SERVICES
September 27, 1985
LARRY S. NAUGHTEN
MAYOR
PETER E. HAHN
DIRECTOR
Mr. and Mrs. Norman Nelson
157.29 .75th P1. W.
'Edmonds, WA. 98020
Dear Mr. and Mrs. Nelson:
SUBJECT: EXTRA SIDE SEWER CONNECTIONS
During the construction of the North Meadowdale
project, you were notified that each "extra" side sewer
connection would cost $900. In retrospect,.we felt that
each existing habitable house should receive a side sewer
connection without the additional fee.
The attached memo from the Community Services Director
is notification that the City will not attempt to collect
the additional charge from you in the future.
Thank you foryour cooperation in this matter.-.
Very truly yours,
JER Y W.`HAUTH; P.E.
Hydraulics Engineer
JWH/st
Attachment
' %chA(- onda M Dt
PUBLIC WORKS 0 PLANNING
• PARKS AND RECREATION • ENGINEERING
September 23, 1985
To: Jerry Hauth�
From: Peter Hahn
Subject: Meadowdale Sidesewer Connections
I have reviewed your September 9, 1985, memorandum, as well as the
letter that went out last year notifying property owners of the City's
policy on charging for additional side sewer connections. I agree with
your reccmwndation that, if we had had more time to make the decision,,
we would have allowed all existing houses to connect without additional
charge. The "extra" connections would have applied, therefore,,only to
additional lots which would be developed at a future time. The .
rationale for the distinction is that the existing houses had been, and
still are, paying the bi-monthly sewer charges.
I request that you take whatever measures are necessary to see that the
two cases which are affected by this policy clarification -- Nelson and
Walker -- are propertly notified and either reimbursed or "forgiven"
for the extra charge that may have been made or billed to them. I
assume Finance will have to be notified.
CC.
James Adams
f. sidesewe
,J .51 � - f3 • _ l�- .w` :'t• •T`Y`+'�P!n,i" 'R'M!��'_T O�'t�a "i s ;O�F� •�_9 �'• w.. iu...� .. . .`a• .= � w
... t .,. ..... tti . ,. ' v .t. ... ,J�t:.'�!�, :,;.#: i •?:_.:tT�.: G.`il%cry , ✓.a�i: r... t� m.�'v... .. •,7�t. r'��," t' "'f �•• ",'
City. of Edmo&
RIGHT-OF-WAY CONSTRUCTION..
Inc.. soci
C. Contractor:
Mailing Address:
State License #:
PERMIT Permit Number.
Issue Date:
A. ,Address or Vicinity of Construction: / jj r],;t 49 /-%`SM A /S f
B. Type of Work (be specific):'
D. Building Permit # (if applicable):
Contact:
Phone:
Liability Insurance: Bond: $
Side Sewer Permit # (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project `pl Utility (PUD, GTE, WNG, CABLE, WATER)
❑ Multi -Family ❑,. Single Family ❑ Other
INSPECTOR: INSPECTOR:
F. Pavement or Concrete Cut: ❑ Yes []No G. Size of Cut: x H. Charge $
APPLICANT TO READ AND SIGN
INDEMNITY." Applicant understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or claims of any,
kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or
employees, including or, not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
Two sets of construction drawings of proposed work required with permit application. .
A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in- accordance with City Codes.
Street shall be kept clean atyall times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by'the-City Engineer.
All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
I have read the. above statements and understand the permit requirementsand the pink .copy of the permit will be
available on site at all times for inspection purposes.
Signature: Date:
(Contractor or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: ^7
TIME AUTHORIZED: VOID AF�RE �e�a • a0 "9 / DAYS
SPECIAL CONDITIONS:
RIGHT OF WAY FEE: 41-0 . 0 d
DISRUPTION FEEIFUND 111:
RESTORATION
T OTAL FEE:
RECEIPT NO.:
ISSUED BY:
NO WORK SHALL BEGIN PRIOR TOPERMIT ISSUANCE Eng. 1997