Loading...
1596 9TH AVE N.PDF1596 9TH AVE N Ar APPLICATION 's ' F_' kv The City of Edmonds kUI_ for SEDE SEWER PERMIT NEW CONSTRUCTION OWNER ...I" ..I . .. ..... .................. ADDRESS ........ Z..::; , ............. :-: ...... ............. is 0 9 a EASEMENT No------------- _- ID CONTRACTOR ......... ------- ............ PERMIT No..-.. LEGAL DESCRIPTION: LOT No../0_2�_ ... �LOCK No . ............................................ NAMEOF ADDITION .............................................................................................................................. Approved: DATE 3.�17:14; ............. By .. 4V- "�, 744:-t- i 17 �o o 4;" o o✓ O 4.o i J' `✓ -� �LC/ /�j �j �p L L O 44.1 IS ; �O /? �J /a �>— J4- % m i✓ Ts� G 9ii- •T Pam— G� /O " V N� �I v� h / [�✓ �.9 D / ��p /`7 C Per-�'Tf�� L J /V�� d /(/ 038 0--, V / Egg / 71 i g //v a /%G, �� /� 7•'a � /y ft.��/�c.% a � ,jL,4-.�F� �7--. �dc7f�✓ D E,O �OC� �./ CITY OF EDMONDS Call PRospect 0-1107 when work CIVIC CENTER — WATER -SEWER DEPARTMENT is ready for Inspection. (No Inspec, ��0 c) 878 SIDESEWER PERMIT[Iona Saturday, Sunday or holidays.)�r ADDRESS ......... 1596 ........... - 9th Avenue......North. .................................. ...........................•..................... ................................ OWNER ............RoY.... Laker•• CONTRACTOR ....... MCWI .Inc............ Permission is granted .................. Apr.i 1 3 Ip 6 8, for ........................ days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE` No. 1—The owners of the property may obtain a permit to construct sewer Inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer In street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full information regarding Ordinance 11.10.030 and Regulations governing side sewers when you get permit. V No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends In grade sharper than % will be permitted. NU'rE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 5—It Is unlawful to alter or do any other work than is provided for to the permit, or to do any work on the main sewer or its appur- tenances except to Insert the pipe into the wye.