Loading...
16007 73RD PL W.PDFIIIIIIIIIIII 5849 16007 73RD PLACE W ADDRESS: TAX ACCOUNT/PARCEL NUMBER: 7g0,4i0c0002 ad BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DISCRETIONARY PERMIT # DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: DETERMINATION: ❑ Conditional Waiver ❑ Study Required ❑ Waiver SEWER LID FEE $: LID #: SHORT PLAT FILE: ����yy��� LOT: ' BLOCK: SIDE SEWER AS BUILT DATED. SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT P FOR: WATER METER TAP CARD DATED: LATEMP\DSTs\Forms\Street File Cheeklist.doc PLANNING DATA STREET FILE SINGLE FAMILY RESIDENTIAL Name: So V\ Date: ( D- 3 - p Site Address: ©0 -7 ,7T, Tax Parcel 60770y COC"00 a®O Project Description: IV e. f S'FR Plan Check #: �3 93 Reduced Site Plan Provided: (YE/ NO) Zoning: 1�.5_a0 'P19b Map Page: Corner Lot: (YES /O�j Flag Lot: (YES / �) Critical Areas Determination #: C 6 - I H-7 \ \ [a Study Required � \ SAo s cr , r �.t a,r� r -0.50 � ❑ Waiver v8 -1 �- SEPA Determination: b$JS 3-JI-o'7 i}anr+ bps Zr ko�se ❑ Exempt ❑ Needed (for over 500 cubic yards of grading) ❑ Fee ❑ Checklist ❑ APO List with notarized form Required Setbacks Street: Side: o- O n� t Side: Rear: Actual Setbacks Street: Side: 2 t- Side: O Rear: S �� Detached Structures: ❑ Rockeries: ❑ Fences/Trellises: ❑ Bay Windows/Projecting Modulation: L Stairs/Deck: ey-;Ar a f s - 57 Q s Buildin Hekht Datum Point: Datum Elevation: In. q ' Maximum Height Allowed: 3q t,e� e t -Ocb —S3 Actual Height: 33. M ' Other Parking Required: Parking Provided: Lot Area: caps fj FJ Per os-c-,., oar¢ 1) Maximum Lot Coverage: 3�10 Proposed: y, o Lot Coverage Calculations:L� '1 `i 9 Lqt> 8 ADU Created: (YES NO Subdivision: L0 a '�,� g ��� P�� - $ -- Legal Nonconforming Land Use Determination Issued: (YES / 10 Comments see iie q�} Vag ,�c.�. eA V -off -S� cam • V-og --7 a� ►+� v.or }� �3J 4i to -PnJ� LL- O e) --7,5 O Plan Review By: Planning Data Form 07-14-09.doc • STREET �F�ILE] SUNNING DATA Plan Review By. Planning Data Form 07-14-09.doc / mumm- GARY HAAKENSON CITY OF EDMON]DS MAYOR 121 5T" AVENUE NORTH • EDMONDS, WA 98020 • 425.771.0220 • FAX 425.771.0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering November 14, 2006 C (0 Fly Mr. Brian Issacson ET FILE 114 2"d Avenue South — Suite 103 STRE Edmonds, WA 98020 Subject: Determination regarding Critical Areas Checklist: CRA20060147 Dear Applicant: Enclosed please find a copy of the Critical Areas Checklist you submitted. ECEdVF BUILDING DEPARTMENT CITY OF rM,!0«3S The "DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page). IT IS VERY IMPORTANT FOR YOU TO RETAIN A COPY OF THIS CRITICAL AREAS "DETERMINATION" FOR YOUR RECORDS. Please examine this Determination for additional requirements. You may need to submit additional information such as an Environmental Checklist or Critical Areas Study. The Determination for the Critical Areas Checklist you submitted is a site -specific determination, not a project -specific determination. YOU MUST SUBMIT A COPY OF THE CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL PERMIT APPLICATIONS OR YOUR APPLICATION WILL NOT BE PROCESSED Permit applications include the following: Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. *Architectural Design Board Thank you, Planning Secretary • Incorporated August]], 1890 • Sistcr City - I-Ickinan. Japan -�� "I%I llu nC�vuf6CS, InC. AFC' P. o kT 6. F LA65 1�oc,q oa�1�.p �S lkRGS OiJ -Z 2. N14 NO. Info r, NT5 web, ( Ovrl>v PLC-AStr NaTC '1 }El5 tAP p is &PP"XiMA 1'E YrDR- SVRV&y ONL% P- &&UN Ft A&S hgBe PINK) MR61-60 `' W6TlAMb pELtn1•�A'I1lONe (}Nt�' BAND V'AGat'SD Wi�a -W8 ottAl-OkA�� AND 'f1k15 - tNVEST16pMoN WAS W M I M-0 to t'f:M'M S\J Mr S il'F— dNc'Y, pFF- SCf�e Ctt"Rkk oos WO-6 NU'r E)(3W64VC-D. 0►51 o lt6L 04BY wetland Act 98051 Ath Avenue S.E., 801te 108 EvereftMashln8ton 98200 425.337.3174 Plf APbox *weMandresoul=xpm Received Time Jan, 9. 10:10AM -C. J a7 - #PZu 0 City of Edmonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). • Date Received:_ I 0 ( N J n (e City Receipt #:_ do 9 V k Critical Areas File #: LO* 14 7 Critical Areas Checklist Fee: 135.00 Date Mailed to Applicant: &_ / a06 � A property owner, or his/her authorized representative, must fill out the checklist,. sign and date it, and submit it. to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in fording and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. p SIGNATURE OF APPLICANT/AGENT U DATE Property Owner's Authorization By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. SIGNATURE OF OWNER Owner/Applicant: 19, a P a n n rJ M,—LAJ_Srx (i cl-n_ )�44ame `9 S4)_ n 1 C ilk( Street Address City State I Zip Telephone: 4 a S— -7 SK 3 i�5 q Email address (optional): C' i N V)`-{ � (�) Ps 0Z CZ C. -S n-) C 047-1 1 DATE1.0 11 91 () `� Applicant Representative: Name Street Address City State Zip Telephone: Email Address (optional): 0 #P2 0 Critical Areas Checklist • CA File No: LAfk 010 i 41 Site Information (soils/topography/hydrology/vegetation) 1. Site Address/ Location % oci "' ,"� lei PL LJ E;_� M 0 n)s ,o? R-o off (, 2. Property Tax Account Number: C)D �- 2 0 cl Ono on a o o 3. Approximate Site Size (acres or square feet): r<, 000 SG� VT 6u'k j dQ4'(.Q kjV"_.e 01_1 4. Is this site currently developed? _ yes; _no. If yes; how is site developed? n (tc 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ; Approx. Depth: 7. Site contains areas of seasonal standing water: _K) D ; Approx. Depth: What season(s) of the year? _ yJ 1 A 8. Site is in the floodway NV3D floodplain of a water course. �uroF - F c-rn N t L L) 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? 1/"� (What time of year? ). 10. Site is primarily: forested ; meadow ;shrubs ; mixed_; urban landscaped (lawn, shrubs .etc) 4� 11. Obvious wetland is present on site: _ jam)y For City Staff Use Only 5�7 . 1. Plan Check Number, if applicable? 2. Site is Zoned? f> (L 19 g") - I 3. SC5 mapped soil type(s)? - A t AL- Is 2 2 s per ij 4. Critical Areas inventory or C.A. map indicates Critical Area on site? �r.; ,4 �-s �� ►� t"�k �1 `� l We -I ",;� L— :rlt hkjArA ;-'-ensr rLJoi,�., i! s� ry f ,s{i S I.I.I a �,N 1:kb.1,+ G•,S� v,r,, fs.r, 5. Site within designated earth subsidence landslide hazard area? `(ii DETERMINATION STUDY REQUIRED WAIVER Reviewed bv: 1,71is\� Date: CITY OF EDMONDS CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 16007 — 73`d Avenue W. Tax Acct. Number: 00790400000200 Determination: Study Required Determination #: CRA20060147 Applicant: Brian & Cindy Isaacson Owner: Brian & Cindy Isaacson CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED During review and inspection of the subject site, it was found that the site may contain critical areas, including Areas with Potential Wetlands, Landslide Hazard Area, Erosion Hazard Areas, and Fish and Wildlife Habitat Conservation Areas pursuant to Chapter 23.40 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas which are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study and an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. REPORT REQUIREMENTS — WETLANDS The site investigation has shown that the site may contain or be adjacent to a wetland. Wetlands are areas inundated or saturated by ground or surface water that support, under normal circumstances, vegetation adapted for life in saturated soil. • Wetlands are generally rated according to their size, condition, function, and vegetation types into four (4) different categories described in ECDC 23.50.010 and by use of the "City of Edmonds Wetland Field Data Form" by the critical areas consultant. • Buffer widths for wetlands vary depending on the category of the wetland as listed in ECDC 23.50.040.F. • In addition to the general requirements for Critical Areas reports referenced above, there are specific Critical Areas report requirements for wetlands that are provided in ECDC 23.50.030. • DEVELOPMENT PROPALS ASSOCIATED WITH WETLANDS Development proposals that encroach into wetlands or their buffers or building setbacks may be allowed through the approval of certain processes. • The width of a wetland buffer may be reduced through buffer enhancement if the criteria described in ECDC 23.50.040.F.3 can be met. The maximum amount that a buffer can be reduced through buffer enhancement is 50%. • A buffer may also be modified through a process called buffer averaging. The criteria applied to buffer averaging are listed in ECDC 23.50.040.F.4. The maximum amount that the buffer width can be reduced at any single location through buffer averaging is 50%. Development proposals that proposed encroachments into buffers beyond what is allowed through the above methods require a Critical Areas Variance, or a Reasonable Use Exception. If you think that you have a proposal that may require one of these processes, please contact a Planner for more information. Any time a development proposal requires an alteration to a wetland, a mitigation plan is required as part of the Critical Areas report. In addition to the General Mitigation requirements referenced above, mitigation requirements specific to wetlands are provided in ECDC 23.50.050. NOTE: There are specific performance standards for the subdivision of lands in wetlands and wetland buffers. These are listed in ECDC 23.50.060. STUDY REQUIREMENT — EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area. • Erosion Hazard areas include Alderwood and Everett series soils on slopes of 15 percent or greater. among others. • Landslide Hazard Areas are further defined in ECDC 23.80.020.A. • In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Erosion Hazard Areas (which are one of the Geologically Hazardous Areas) are provided in ECDC 23.80.050. • Note that Stable Erosion Hazard Areas may have limited report requirements at the director's discretion. At a minimum an erosion and sediment control plan prepared in compliance with the requirements in ECDC Chapter 18.30 shall be required. DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development is restricted within an Erosion Hazard Area. • Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer or other qualified professional. • Development standards are given in ECDC 23.80.060 and 23.80.070. STUDY REQUIREMENT — LANDSLIDE HAZARD AREA It appears that this property contains or is adjacent to a Landslide Hazard Area. • A Landslide Hazard Area is any area with a slope of forty percent (40%) or steeper and with a vertical relief of ten (10) or more feet (except areas composed of consolidated bedrock). • Landslide Hazard Areas are further defined and illustrated in ECDC 23.80.020.B. • In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Landslide Hazard Areas are provided in ECDC 23.80.050. 2 T PROPOSALS ASSOCIATED WITH L ►ZARD AREA; Development is restricted within a Landslide Hazard Area and its buffer. • Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. • The criteria that are applied depend on the amount that the buffer is reduced. • The buffer can be reduced to a minimum of ten (10) feet (with an additional 15' building setback per ECDC 23.40.280) if a report is prepared that meets the standards listed in ECDC 23.80.050. The alteration must also meet the requirements listed ECDC 23.80.060. • In addition, proposals to reduce the buffer to -less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. STUDY REQUIREMENT — FISH AND WILDLIFE HABITAT CONSERVATION AREAS Since the site is within a mapped fish and wildlife habitat conservation area, the City would like to preserve as much of the native vegetation as possible. DEVELOPMENT PROPOSALS ON A SITE WITH FISH AND WILDLIFE HABITAT CONSERVATION AREAS The applicant must submit a clearing/tree cutting plan with any development permit. Tree cutting and clearing of native vegetation shall be limited to the footprint of development. ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt. from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. Name nature mber 13, 2006 Date NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. 3 Updated as of July 6, 2006 Wetland Consultants: AKI Landscape Architects 4405 Seventh Ave. SE #301 Lacey, WA 98503 (360) 491-6900 Associated Earth Sciences, Inc. 911 5th Ave. Ste. 100 Kirkland, WA 98033 (425) 827-7701 B-Twelve Associates, Inc. 1103 West Meeker St. Kent, WA 98032 (253) 859-0515 Cantrell & Associates, Inc. 1510 Mill Ave. Bellingham, WA 98225 (360) 738-4725 Cooke Scientific Services, Inc. 919 NE 71st St. Seattle, WA 98115 (206) 525-5105 Entranco 10090 NE 8th Ste. 300 Bellevue, WA 98004 (425) 454-5600 HDR Engineering, Inc. 500 108th Ave. NE Ste. 1200 Bellevue, WA 98004 (425) 453-1523 Kleinfelder, Inc. 2405 140th Ave. NE Ste. A-101 Bellevue, WA 98005 (425) 562-4200 Krazan & Associates 19501 144th NE #F-300 Woodinville, WA 98072 (425) 485-5519 CITY OF EDMONDS PLANNING DEPARTMENT Landau Associates, Inc 130 2nd Ave. S Edmonds, WA 98020 (425) 778-0907 Pentec Environmental 120 Third Ave. S. Ste. 110 Edmonds, WA 98020 (425) 775-4682 Raedeke Associates, Inc 5711 NE 63rd St. Seattle, WA 98115 (206) 525-8122 A C Roth Env'I Services 115 North 49th St. Seattle, WA 98103 (206) 784-4755 (206) 713-2784 cell Shapiro and Associates, Inc. 101 Yesler Way, Ste. 400 Seattle, WA 98104 (206) 624-9190 The Jay Group 1927 5th Street Marysville WA 98270 (360) 659-8159 RH2 Engineering, Inc. The following are new 12100 NE 195th St. Ste. 100 names on the list Bothell, WA 98011 and their qualifications have (425) 951-5310 not yet been confirmed: Roy F. Weston, Inc. Golder Associates, Inc. 190 Queen Anne Ave. N Ste. 200 Greystone Environmental Seattle, WA 98109 (206) 521-7600 Schaaf & Wheeler 1001 4th Avenue Plaza Ste. 3200 Seattle, WA 98154 (206) 624-9932 Shannon & Wilson, Inc. 400 N: 34th St. Ste. 100 Seattle, WA 98103 (206) 632-8020 URS Corporation 2401 4th Ave. Ste. 808 Seattle, WA 98121 (206) 674-1800 Wetland Resources, Inc. 9505 19th Ave. SE Ste. 106 Everett, WA 98208 (425) 337-3174 L:Plan ning\Libra ry\Critical Areas 3 Party #P20 Critical Areas Checklist CA File No: �� C Site Information (soils/topography/hydrology/vegetation) 1. Site Address/Location _I (100J' K� Ifd PL 60 Q yn f S�, 4)h ?�-O o� 2. Property Tax Account Number: I?-Ct oy co non Roo 3. Approximate Site Size (acres or square feet): 000 50 V T kud d a4Q pfv�-Cc, 4. Is this site currently developed? _yes; no. If yes; how is site developed? (1 f 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15 % (a . vertical rise of 10-feet over a horizontal distance of 66-feet). _ Hilly: slopes present on site of more than 15% and Iess than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ; Approx. Depth: 7. Site contains areas of seasonal standing water: ) 0 ; Approx. Depth: What season(s) of the year? f} 8. Site is in the floodway 1—v 3flood lain of a water course. W Fltamp N C LC 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? V" (What time of year? ). 10. Site is primarily: forested ; meadow ;shrubs ; mixed ��; �nerS� clbs urban landscaped (lawn, shrubs -etc) 11m tiSL-\ 11. Obvious wetland is present on site: U For City Staff Use Only 1. Plan Check Number, if applicable? 2. Site is Zoned? P (-0 - 3. SCS mapped soil type(s)? 4- At A' wvaA • F-VCr(-*r fj,4-US . 15 -702 s W4( 4. CriticalAreasinventory e ,o'r C.AC(.-map i +ndicates Critical Area on site? /Y- mac' I , M," !ti^�► �, �o����{ Wry/ � L dsAS At �Z�A Afy-,,.S� Err Jr1 14i-oj./ A0 y L �5'ji i �t! � 4 6, 7 tyb,},' (/M S. Site within designated earth subsidence landslide hazard area? `(mac DETERMINATION STUDY REQUIRED WAIVER Reviewed by- Avz� Date: l i #P2U ED �41-1;� City of Edmonds Development Services Department Planning Division Phone: 425.771.022,0 oC.18go Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the. Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to . complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). Date Received: to [ I q 10 City Receipt #: 607 1 1 Critical Areas File #: 14-7 Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant: //— /,41- 006 4 A property owner, or his/her authorized representative, must fill out the checklist,. sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in fording and locating the specific piece of property described on this form. In addition, the applicant. shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, ,arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed beow. SIGNATURE OF APPLICANT/AGENT DATE loll � �O Property Owner's Authorization By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my pennission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. SIGNATURE OF OWNER Owner/Applicaint: Re P ry V n M ,�..� • .)Wlame U f Street Address Q COA 9gO o City State Zip Telephone: (jaS — y3.� 31 Z 9 Email address (optional): C. 1 N bN i P SLZQCSV-n t fap C$7Y1 DATE 10 In I .C)CO. Applicant Representative: Name Street Address City State Zip Telephone: Email Address (optional): *CITY OF EDMONDS 10 CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 16007 — 73`d Avenue W. Tax Acct. Number: 00790400000200 Determination: Study Required Determination #: CRA20060147 Applicant: Brian & Cindy Isaacson Owner: Brian & Cindy Isaacson CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED During review and inspection of the subject site, it was found that the site may contain critical areas, including Areas with Potential Wetlands, Landslide Hazard Area, Erosion Hazard Areas, and Fish and Wildlife Habitat Conservation Areas pursuant to Chapter 23.40 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas which are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study and an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. REPORT REQUIREMENTS — WETLANDS The site investigation has shown that the site may contain or be adjacent to a wetland. Wetlands are areas inundated or saturated by ground or surface water that support, under normal circumstances, vegetation adapted for life in saturated soil. • Wetlands are generally rated according to their size, condition, function, and vegetation types into four (4) different categories'described in ECDC 23.50.010 and by use of the "City of Edmonds Wetland Field Data Form" by the critical areas consultant. • Buffer widths for wetlands vary depending on the category of the wetland as listed in ECDC 23.50.040.F. • In addition to the general requirements for Critical Areas reports referenced above, there are specific Critical Areas report requirements for wetlands that are provided in ECDC 23.50.030. LOPMENT PR Development proposals that encroach into wetlands or their buffers or building setbacks may be allowed through the approval of certain processes. • The width of a wetland buffer may be reduced through buffer enhancement if the criteria described in ECDC 23.50.040.F.3 can be met. The maximum amount that a buffer can be reduced through buffer enhancement is 50%. • A buffer may also be modified through a process called buffer averaging. The criteria applied to buffer averaging are listed in ECDC 23.50.040.F.4. The maximum amount that the buffer width can be reduced at any single location through buffer averaging is 50%. • Development proposals that proposed encroachments into buffers beyond what is allowed through the above methods require a Critical Areas Variance, or a Reasonable Use Exception. If you think that you have a proposal that may require one of these processes, please contact a Planner for more information. • Any time a development proposal requires an alteration to a wetland, a mitigation plan is; required as part of the Critical Areas report. In addition to the General Mitigation requirements referenced above, mitigation requirements specific to wetlands are provided in ECDC 23.50.050. • NOTE: There are specific performance standards for the subdivision of lands in wetlands and wetland buffers. These are listed in ECDC 23.50.060. STUDY REQUIREMENT — EROSION HAZARD AREA It appears, that this property contains or is adjacent to an Erosion Hazard Area. • Erosion Hazard areas include Alderwood and Everett series soils on slopes of 15 percent or greater. among others. • Landslide Hazard Areas are further defined in ECDC 23.80.020.A. In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Erosion Hazard Areas (which are one of the Geologically Hazardous Areas) are provided in ECDC 23.80.050. Note that Stable Erosion Hazard Areas may have limited report requirements at the director's discretion. At a minimum an erosion and sediment control plan prepared in compliance with the requirements in ECDC Chapter 18.30 shall be required. DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development is restricted within an Erosion Hazard Area. • Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer or other qualified professional. • Development standards are given in ECDC 23.80.060 and 23.80.070. STUDY REQUIREMENT — LANDSLIDE HAZARD AREA It appears that this property contains or is adjacent to a Landslide Hazard Area. • A Landslide Hazard Area is any area with a slope of forty percent (40%) or steeper and with a vertical relief of ten (10) or more feet (except areas composed of consolidated bedrock). • Landslide Hazard Areas are further defined and illustrated in ECDC 23.80.020.B. • In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Landslide Hazard Areas are provided in ECDC 23.80.050. 4 VELOPMENT PROP( WITH LANDSL Development is restricted within a Landslide Hazard Area and its buffer. • Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. • The criteria that are applied depend on the amount that the buffer is reduced. • The buffer can be reduced to a minimum of ten (10) feet (with an additional 15' building setback per ECDC 23.40.280) if a report is prepared that meets the standards listed in ECDC 23.80.050. The alteration must also meet the requirements listed ECDC 23.80.060. • In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. STUDY REQUIREMENT — FISH AND WILDLIFE HABITAT CONSERVATION AREAS Since the site is within a mapped fish and wildlife habitat conservation area, the City would like to preserve as much of the native vegetation as possible. DEVELOPMENT PROPOSALS ON A SITE WITH FISH AND WILDLIFE HABITAT CONSERVATION AREAS The applicant must submit a clearing/tree cutting plan with any development permit. Tree cutting and clearing of native vegetation shall be limited to the footprint of development. ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. Mea Gruwell Name Wnature Date NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. rti 't DEPPARTAENT„:O.F BUILDINGS A PER INTERNATIONAL BUILDING`CODE SECTION 111 ' $�' _G _ AT: 16007 73`d Place W, Edmonds N -' ,*,' n B N. =r 4 �- ullding`Permif* BLD20090743 Occupancy established by this certificate: k:IR3"°r = Dwelling Units: "y 1 Yes Construction: VB No. Stories: 2 Basement. kc't ' �o '`; Type of Automatic sprinkler system provided: No Automatic sprinkleraystem required: No Owner of building: Brian & Cindy Isaacson, 9808 1:42 daPli'NEa#F.30.1.eBothell-.WWAa98011 The Single Family Residence at 16007 73`d Place W, Edmonds - - -has been inspected and approved complying with the requirements of the 2009 edition of. the International Residential Code s adoptedaby 'he!Ci' forthe group and division of occupancy and the useforwhich the proposed occupancy is classified. 1-14 Issued this 20th day of June. 2012 Chief Building Official By: Any change of occupancy or use requires a euilding permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. Western Engineers Inc. SURVEYORS • PLANNERS • ENGINEERS 13000 Highway 99 South • Everett, Washington 98204 (425) 356-2700 STORM DRAINAGE STUDY For BRIAN & CINDY ISAACSON 16007 — 73rd PLACE WEST EDMONDS, WASHINGTON BLD 20090743 (Building Permit) ISSUE DATE: MAY 2, 2008 REVISION DATE: February 24, 2010 PREPARED & REVIEWED B' BARRY R. CONSTANT, P.E. EDITED BY: JESSE JARRELL, P.E. FAX (425) 356-2708 BILE CLIENT: Brian & Cindy Isaacson WESTERN ENGINEERS, INC. 701 — 5`h Avenue, Suite 4770 Job No. 06-792XA Seattle, WA 98104 (206) 448-1011 RES_ MAR 0 5 R010 LAND USE CONSULTANTS • CIVIL ENGINEERS 9 LAND SURVEYORS • ENGINEERING CORPORATION 1. ATTACHMENT "A" DRAINAGE INFORMATION SUMMARY FORM Project Name: ISAACSON DRAINAGE REPORT Project Engineer: WESTERN ENGINEERS, INC. Project Applicant: BRIAN & CINDY ISAACSON EDMONDS, WA Project Total Area: 0.14 Acres Project Development Area: 0.14 Acre Number of Existing Lots: 1 Summary Table Draina e. Basin .Information;:.:-: -<-. ::..;:, TOTAL On -site Development Area 0.14 ac Type of Storage Proposed Ex. Plat Detention system Approximate Storage Volume 1,100 cf. Soil types ALDERWOOD-URBAN LAND COMPLEX Type C E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 1. EXECUTIVE SUMMARY The proposed project is located at 16007 — 73`d Place West in the City of Edmonds, Washington. More generally, the site is located in Section 5, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. Please refer to the Vicinity Map attached in the next section. The approximate 0.14-acre site is currently vacant land consisting primarily of residential lawn. The entire site in located inside a geologically hazardous area. The main hazard is landslides and the resulting landslide debris generally covering'the site. See Geotechnical Report issued March 31, 2008 by Terra Associates, Inc. authored by Charles R. Lie, L.E.G. and stamped by the company principal Theodore J. Scheppler, P.E. The site contains Alderwood-Urban Land Complex type soils. Please refer to the soil map and descriptions attached later in the geotechnical report. Other Geotechnical Reports have been listed in the above report. The planned development for the site includes the construction of 1 new single-family residence, which essentially covers most of the lot. No roadwork is proposed along the frontage except the addition of a driveway to connect the garage to the road. Since this is a landslide hazard area, with groundwater seeping from the hillside above the residence, we are proposing No storm water detention system. All of the past studies from a number of engineering companies have all recommended immediate removal of all storm water and groundwater from the area. The purpose of a detention system is to contain storm water and release it at the pre -developed rate, mimicking the natural runoff before the development. Installing a pipe detention system would negate any benefits derived from this system. Any chance of the detained runoff infiltrating back into the soils may have a grossly negative, long- term effect, to the area. Sewer service is provided from an existing sanitary side sewer and cleanout located near the northwest corner of the site. Excavation is required to provide the side service tap to the new residence. Water service will be provided by a new side service tap and a meter located just north of the new 30' driveway. At this time it is unknown if a NFPA 13-D fire suppression system will be installed. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc H STRETFV 1'! ;'. ESU9 APR 2 3 2010 2. EXISTING CONDITIONS 8LWNII p nM The approximate 0.14-acre site is currently vacant land. The entire site in located inside a geologically hazardous area. The main hazard is landslides and the resulting landslide debris generally covering the site. Due to the recent approval of a clearing and grading permit, through the City of Edmonds, the site has been roughly cleared and graded for the new single-family building permit. The entire site consists of stabilized soils overlaid with jute matting and hydroseed. Per site visit on January 91h, 2010, new grass growth has began on -site with no other significant vegetation. 3. OFFSITE ANALYSIS A site reconnaissance was done by Barry R. Constant, P.E. of Western Engineers Inc. on October 19, 2007 to verify the downstream flow paths. The weather was rainy with a temperature around 55 degrees. The approximate 0.14-acre site is currently vacant land. The entire site in located inside a geologically hazardous area. The main hazard is landslides and the resulting landslide debris generally covering the site. The site contains Alderwood-Urban Land Complex type soils. Please refer to the soil map and descriptions attached later in this report. A: Upstream Analysis Upstream flows into the site primarily consist of steady hillside `seeps' and runoff from upslope from the neighboring property to the east. These flows are considered major contribution to this landslide hazardous area and cannot be ignored. B: Downstream Analysis Please refer to the Downstream Analysis Map attached in the next page for a detailed description of the downstream drainage course. From the surrounding topography, and topographic aerial maps, it appears that the majority of runoff from the site travels west and into the existing underground conveyance system located along the east side of the private road (Lorian Woods drainage conveyance system). As the runoff enters into the existing conveyance system, the flow travels north and eventually turns west and enters into the underground detention system installed for the Plat. From the detention system, the flow outlets to the north and enters into the main drainage system on the north side of N. Meadowdale Road (city drainage system). The drainage system on the north side of N. Meadowdale Road conveys the majority of the runoff from the area, to the west where it eventually enters into Puget Sound approximately 200 yards west of the site. No visible offsite drainage problems were observed at the time of field inspection. Refer to the following pages for Downstream Analysis Map, Aerial Basin Map and USGS Map. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc Downstream Aerial Map E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 4. DRAINAGE PROPOSAL The planned storm water development for upstream flows includes a dedicated drainage conveyance system for the hillside seeps, upstream flows and extensive drainage around the new catchment / retaining wall. On -site drainage, for the new patio, residence and driveway will consist of perimeter roof and footing drains. The roof and footing drains are to consist of separate systems which will connect to the recently installed storm conveyance system located along the frontage of the site. The hillside seeps have been located in the field by Western Engineers, Inc. surveyors. As mentioned, in almost all of the previous reports, collecting this drainage and other upstream flows and keeping it from infiltrating into the landslide debris is paramount to the safety of the residence and future stability of the hillside. Through recent construction, a number of aluminum (or similar) trays fabricated, have been installed that will collect the water from the seep area and convey the drainage to the cities storm system and the storm system constructed for the Lorian Woods Plat. Upstream flows, that travel west along the south side of the property, have been bypassed around the site and connect to the cities storm conveyance system located in the center of the private road used to access the site. From there, the cities drainage system travels north, under the existing private road, where it eventually intersects with the existing city drainage system located at the north side of the intersection of the private road and North Meadowdale Road. All other upstream flows to the east of the site travel west, along the northern boundary line of the site, and connect to the private storm system for the Lorian Woods Plat. As the flow connects in to the private system for the Lorian Woods Plat, the flow travels west and then south into an existing detention pipe installed for the original plat (located on the property at the southwest side of the intersection of the private road and North Meadowdale Road). From the existing detention pipe, the flow travels north across North Meadowdale Road, and into the cities storm conveyance system. Refer to the updated civil drawings that represent the recently installed storm system along the north and south perimeters of the site. The catchment / retaining wall, located along the eastern boundary line of the site, is a geotechnical recommendation to protect the residence from any possible landslide debris from impacting the structure. This wall was designed by Reed & Associates based on a boring advanced onsite previously this year. The catchment wall will extend vertically 3-feet (minimum) above the existing grade where the wall is located. Extensive underground drainage, on the upper side of the wall, is planned to be constructed with the proposed building permit which will bypass any upstream flows entering the site. The upper wall drainage will provide geotechnical fabric against to upper wall or install washed drain rock as an alternative for ground water and rainfall runoff to enter the footing drain. See detail on sheet 5 of the revised civil plans. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 4. DRAINAGE PROPOSAL (continued) The new storm piping slopes are dependant on the final elevations of the upper portion of the soils above the wall. We recommend that the wall drain system on the uphill side has a clean -out located at the highest soil elevation on the wall (near the middle), and the perforated pipe sloped down gradient to each end of the wall. The pipe shall be continuous in nature from the clean out at the north end of the wall to the south end. The pipe, just at the south end of the wall, should become solid pipe and tight lined directly into the drainage conveyance system located along the southern boundary line of the site. See Geotech Report for further recommendations. As the catchment wall is integrated into the house foundation through the reinforced concrete patio surface itself (approx 12-16-inches thickness), the under patio drainage system must be installed prior to concrete placement in the patio area. See design drawings for specifics. We anticipate that the house foundation will be installed first, then the catchment wall and finally the patio surface. The contractor must also ensure that all patio and footing drains are installed prior to the concrete placement on the patio. Patio surface is sloped towards the drains at a 2 percent maximum. The high point in the patio drainage system is designed around the rooftop downspouts, which tie into the under patio drainage system. From the high point, near the northern end of the patio, the drainage flows to the south and into the storm conveyance system located along the southern boundary line of the site. Since this system can only be installed once, all care must to taken to ensure that the pipes and rooftop connections are installed correctly and of top quality materials. The residence will have two dedicated drainage systems that include rooftop runoff control, footing drains and foundation wall geotechnical drainage composite. All rooftop downspouts will be directed into an underground, solid, tight lined collection system separate from the footing drains (see sheet 5 in the drainage plans for details). A clean out shall be installed at the highest elevation point and at any other location the contractor deems necessary (more clean outs is better than less). The drainage plan shows the system, general in nature, as a pipe system directed to flow down gradient into a catch basin located on the west side of the residence at the private road. This is an existing catch basin at the roadway. We are relying on the expertise of the contractor to ensure that the system will be sloped to drain. This system shall be completely separate from the footing drains except at the connection catch basin, both pipes may enter the catch basin so long as the outlet elevation is below all house drainage elevations. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 4. DRAINAGE PROPOSAL (continued) The footing drains are the typical system (see detail on sheet 5 of the drainage plans or figure 3 in the geotechnical report). We also specify that a geotechnical composite fabric shall be installed on those portions of the outer foundation walls. See geotechnical report, Figure 3, for installation recommendations. As an alternative, the foundation wall can also have approximately 6-inches of washed drain rock placed outside the composite fabric, around the spread footing and around the perforated PVC footing drain pipeline. This pipe shall be located at the lower portions of the spread footings. In order to match the drainage calculations prided from the Plat of Lorian Woods, the roof drains for the new house will tie into the Lorian Woods drainage system near the north side of the new driveway pad. This drainage system will also convey runoff from the new driveway pad area. The Lorian Woods drainge system will then convey the runoff north and west into the existing detention pipe installed for the Plat of Lorian Woods. Total new runoff from the site directed to the Lorian Woods detention system total approximately 4,048 sf. This is roughly equal to the designed impervious surface area for the existing detention pipe which totals approximately 3,997 sf. (includes 2,700 sf, for new house, 315 sf. for new driveway and 982 sf. of street area which was never installed). Refer to the drainage calculations section for additional information. Due to the site proposing more impervious area that what was additionally designed for, the new impervious areas from the east patio area, catchment wall and south steps will bypass the Lorian Woods drainage system and enter into the City of Edmonds drainage system (located along the south side of the property). The total area expected to by pass the Lorian Woods detention system is estimated at 763 sf. Refer to the drainage calculations section for additional information. . Following the above recommendations are necessary to ensure that the residence and the surrounding area can remain as `dry' as possible. This will reduce future landslide hazards and possible structural problems with differential settlement of the residence. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 5. DRAINAGE CALCULATIONS Total Area of the Site = 5,897 sf. (0.135 Acres) As per the Soil Survey of the Snohomish County Area, the development area on site is primarily Alderwood gravelly sandy loam, which corresponds -to a Type C soil. For calculation purposes, a Type "C" soil was used. EXISTING SITE: Impervious area: Entire site consist of residential landscaping (grass). Pervious Area: Total - Impervious => 0.135 Ac. — 0.000 Ac. = 0.135 Ac. DEVELOPED SITE: Impervious area: New SFR (roof area) = 3,337 sf. Driveways and Front Steps = 711 sf. Concrete Patio Area = 588 sf. Catchment Wall = Ill sf. South Perimeter Steps = 63 sf. Total = 4,811 sf. (0.110 Ac.) Pervious Area: Total - Impervious => 0.135 Ac. — 0.110 Ac. = 0.025 Ac. *Rainfall 2- Year = 1.50 in.: 10- Year = 2.00 in.: 100- Year = 3.00 in. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 0 5. DRAINAGE CALCULATIONS (continued) Existing Plat Detention System Design Check: Refer to the attachment section in this report for the original drainage report for the Lorian Woods development. Note that in the drainage calculations section, the proposed impervious areas for lots 1 and 2 of the plat have been somewhat combined. It has been assumed that the site (lot 2) has been provided with 2,700 sf. of roof area and 315 sf. of driveway area (1/2 of total). 3,420 sf. of impervious area has been listed for street area. Note that the estimated "as - built" area of the existing private road, located along the frontage of lots 1 and 2, has been calculated at 2,438 sf. This is approximately 982 sf. less that originally calculated. Adding the excess street area not installed by the Plat of Lorian Woods, with the estimated house and driveway areas from the original calculations, the allowable impervious area designed to drain to the existing detention system totals 3,997 sf. The proposed amount of impervious surfaces proposed to enter into the Lorian Woods storm system has been estimate at 4,048 sf. (3,337 sf. of new house and 711 sf. of new driveway area). Though the proposed impervious area is slightly larger than the original impervious area calculated for in the existing detention pipe, the added 51 sf. of impervious area will have little to no effect on the allowable flows to enter into the pipe. Due to the proposed installation of a new patio, catchment wall and south step area, the runoff from these new impervious areas will bypass the Lorian Woods detention system and enter into the cities drainage system (located along the south boundary line of the site). The estimate area of these surfaces totals 763 sf. (588 sf. patio area, 112 sf. of catchment wall and 63 sf. of south perimeter steps). Note that the additional runoff added to the cities drainage system from these impervious areas will have little to no effect on the total runoff the existing city drainage system already contains. E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc i Lorian Woods PRD Original Drainage Report and Calculations E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc LORIA,N WOODS P.R.D. OWNER ROBERT AND JoANN ANDERSON 7370 North Meadowdale Road Edmond, WA 98020 (206)743-5774 DOWL ENGINEERS, INC. 15263 N.E. 90TH Street Redmond, WA 98052 (206)869-2670 July 10, 1990 W.O. #S11059 �Evjs�t� 7 -Zc �Q DATE: July 10, 1990 PROJECT: Drainage Study and Report Lorian Woods, PRD. Edmonds, Washington LEGAL DESCRIPTION: Lots 54, 55, 56 and all EXCEPT the East 120 feet of Lot 57, Meadowdale Beach Subdivision. OWNER: Robert and JoAnn Anderson 7370 North Meadowdale Road Edmonds, Washington 98020 INTRODUCTION: The project site is located south of North Meadowdale Road and east of the 74th Place West right-of-way in the Meadowdale area of Edmonds; Washington. The Anderson property includes Lots 54, 55 and 56 of the Plat of Meadowdale Beach and part of Lot 57. In plan it measures about 350 feet by 650 feet and includes approximately 5.3 acres. The Anderson residence is located on Lot 55 in the west center of the site. The eastern third of the property is a slope that gradually steepens toward the east. The upper slope climbs steeply to a bluff with its crest near Elev 250 to 300 off the site to the east. The central area of the property is a bench about 100 to 120 feet wide covered with grass, ivy and scattered trees. Grades on the bench vary from about Elev 120 in the north to Elev 150 in the south. The Anderson residence and a shed to the south are located on this bench. Several firs up to 47 inches in diameter and other large trees, straight-trunked and vertical, are located just south of the house. To the west the bench slopes down to the .74th Place West right-of-way. The grade change from the bench to the west property line ranges from ten feet at the north to about 50 feet at the south. Typical slope inclinations are in the range of 20 to 25 degrees with local areas as steep as 45 degrees. • The project provides for creation of nine additional building lots, single family residences. The 5.28 acre site presently has only the single residential home of the owners. Although currently zoned RS-20, actual density at completion will be 1.9 dwelling units per acre (gross area). Site planning further calls for approximately 148,000 SF (3.40 acres) of common open space. Specific location for building sites is based on topographic constraints, maintaining desired vegetation, privacy and view. EXISTING SITE DRAINAGE: In 1984, the City of Edmonds constructed under L.I.D. 210, certain improvements on the Anderson property, Interceptor Drains 1A and 1B. Refer to construction drawing sheet 9 of 30 dated April 1983 by Reid, Middleton & Associates, Inc. These interceptor drains were part of an area -wide drainage construction project to serve the North Meadowdale area. In addition to the collection systems, numerous subsurface interceptor facilities were provided. GEOTECHNICAL CONSIDERATIONS: An on -site geotechnical study was conducted by Terra Associates, Inc. summarized in their report dated June 6, 1989, and transmitted to the City of Edmonds Planning Department as part of this project's preliminary submittal and review process. Recommendations from that report have been included in the design criteria and basis for street, utility and site improvements. With respect to site drainage, the "Terra" report recommends extending the storm sewers to the end of the new roadway. This will provide an opportunity to install additional drainage at the toe of the east slopes and provide a place where lot owners can discharge their foundation drains and roof gutters. The storm sewers will be tightlined. The new storm drains will flow northerly and westerly to a detention system. From the detention system the storm water system connects to the existing storm drainage system on the north side of North Meadowdale Road. To pick up ground water seepage intercepted by the trench, drain rock bedding and perforated drain pipe will be installed in the excavations, as was done with the LID 210 storm sewers. The trench will be lined with filter cloth and backfilled with pea gravel, except within two feet of the surface. DESIGN PARAMETERS: Lots 3, 7, 8 and 10 have storm drain extensions that provide for all hard surface runoff interception. Surface runoff from the common area north and east of Lot 1 will flow northerly to the new gutter along the south side of North Meadowdale Road, then westerly into a catchbasin and the detention system for the North Basin. The area south of Lot 7 as well as the area west of the new access road and between Lots 3 and 10 will not be disturbed. As such, storm water flows will be allowed to exit the site undetained. The Q allowable leaving the site will be reduced accordingly. For purposes of system design, the major drainage basins established by Reid, Middleton and Associates for LID 210 were further detailed into the sub -basins appropriate for this project. These two were designated as the "North and South sub -basins." Calculations were made of expected improved surfaces at buildout and runoff therefrom determined. • The improved surface calculations are based on the approved PRD, which shows expected improvements, i.e., building footprints, driveways, roads, etc. Refer to the attached calculations for detail. In summary, detention requirements for the North Sub -Basin called for a closed -pipe system volume of 7-23 cubic feet, while the South Sub -Basin volume was found to be-IA-3-cubic feet. ��; ' :A SUMMARY OF CALCULATIONS: NORTH SOUTH BASIN BASIN Off -site -Existing - 10 yr. Q = 0. 17 c.f.s. Q = 0.23 c.f.s. On -site - Existing - 10 yr. Q = H49 c.f.s. Q = 0.23 c.f.s. Developed Condition - On -site - 10 yr. Q = 1_:80_ c.f.s. Q = 80 69-c.f.s. Detention - Q Allowable Q = 0.88 c.f.s. Q = 0.46 c.f.s. Volume Required 933. c.f. 443-c.f. Orifice Size -4:A" dia. 2.80" dia. v Gross Area 162,619 s.f. ✓' 67,360 s.f. ,� DOWL ILASKA ENGINEERS T E S T L A B F COMPUTATIONS Project Name Client Name N1 Prepared by: ()/ Dale Checked by: C) W.O. # Sheet I of Date up I WN La -4 Sucj 144. JI-1 E 717- --111-,-8-' C- U.rz.T s�`r� {ExLs���c��o_C�_ j DOWL 91LASKA ENGINEERS T E 9 T L A B F Project Name Client Name Prepared by: COMPUTATIONS W.O.# 1 fs 110 S 42t5 IQ C�)4F 127 7S (:� �< I Sheet Z of Checked by: Date 7 -7 ;—=LT LtLwc;,-r44 Sk-oflc- -7-k-- SEC, 11.1 _L4G; .2:.4 LAWA.11- 97 lZ It. . ' U. 1 dD O W L9LASK-A W.O.# ENGINEERS T E S T L A B COMPUTATIONS S\ 1 C-) S Project Name, , f Client Name Sheet 3 of LC)R Y�1 �op5 D S 6 Prepared by: Da a Checked by: Date • i � S � i -nL_ 1. 1 I • 1 doOWL tLASK-A, W.o.# ENGINEERS T E S T L A B COMPUTATIONS S Project Name Client Name Sheet � of �2� �oon5 A1"1C>E sots — Prepared by: Dat Checked by: Date Z -7 101= DES' �N:T_l i : _1 ti, AND - DETENTION VOL AREA • = - . i� RLLOW @.46b0+ , _. _ - - - -- C DEV=O 3500, y - '-- --- SNOCO 10 v,. - .;.. CEO 1.276@ ' =17 b385 92.2937 - —j-� - - T .OL.=213.5219 CF I -- Tl T 0F1=-srrs .©Ft-'S1TEF -7 -17.- - _ ATz he- 1 _ ---------- ---C-'rev:- ----.0 S.._--------- --'-' - -- - ------ - - - - .. - - ` -- - - -- - - '--- -- Y AND W 2.0 -� - - :-- - DETENTION V L. R •� _ _ �! RLLOW @.880 @ � E C DEV=0.3500 ✓ I— - - :--- - '- `- SNOCO 10- -- -- ---' -- VR=1, 00 877 $ 18 � - --= - - ---'- -; -- V . = e 10 .6402 CF F TESTLABDOWRSL *ALASK^ F_ COMPUTATIONS .• d ENGINEE Project Name Client Name Prepared by: Dat Checked by: -7 /1 o I �. rl) I Sheet -, of Date ;7 f-7 D O W L LASKA ENGINEERS T E S T L A B w.o. # COMPUTATIONS S 1 S Project Name Client Name Sheet of Prepared by: ate Checked by: Date I, U. O.UT. • : i , t�ASI KI I. O �-1 QALtW f-4-1s �.�Jo� 1o4,1a 109�19.5,0o U.88 S4UTl-� 83.g0 88,5 4 �-10 Oi : SHARP EDGE - ORIFICE VER2.1 - - - --- C=6. 62 - Q=O.8-000 ------- - H=5. 0000 :. DIA=3.8382 IN. �= ORIFICE VER2.1 C=O,.•62 b ;-Q=9. 4600 — H=4. 000 " .. DTI-�. r?h� . 1,1 • it I z I w W_ DOWL ALPksK_A -ENGINEERS T E S T L A B Project Name Client Name Prepared by: a - COMPUTATIONS R� Checked by: W.o.# Sheet-7— Of Date L w 4 e AEF�rlft 1-7 _T- L - URS, 7 risT_ 107 ! ;zr < i. t J, T 7F it I. i Le. F -71 • D 0 W L ALASKA ENGINEERS T E 8 T L A B Project Name Client Name. \ oon5 COMPUTATIONS W.O.# Sheetof by: 0I Checkedby: Date 1 C k L C- C- -L T- I C J! 2 0 4-G J7 r Y AND W 2.0 DETENTION VOL. AREA= 1.0300 Q ALL014=0.4600 C DEY=0.3000 SNOCO 10 QO=1.4887 T=13.9201 YS=461.1746 YOL.=142.5000 CF ........ .. .0 -1-7 71 A T2 E P--,. 1, 14 -C Y AND W 2.0 DETENTION VOL. AREA= 3.1400 0 RLLOW=0.8800 C DEY=0.3200 L-4 C'w1JC3x ;om SHOCO 10 It 1�? 11 CDqDMm--f 11 C:):= ;am 11 C:)umm 90=0.8758 T=25.7425 C)"Cr- 11 :Z(:�. M03 if CD - M r,..)wm YS=928.0828 --wx:w"x: -JCDCM- 11. C=) ..... — 11 CD W-4 WM—XW , LO(YM- 11. C=) CO-4 Lrl- �D"M CJIW Wmm=po Moom-cm mcoa)C:, Ln- W . CD-m-cm CDw W r cDa�(Mo CD CD n VOL.=932.5376 CF trkvf a i -, s1 i 0 Drainage Detail Sheets E: / 2006 / 06792A / Engineering / Targeted Drainage Report.doc 1QQ2 INTEGRATED DUCTILE IRON FRAME & GRATE TO MATCH BASIN O.D. MINIMUM PIPE BURIAL (3 VARIABLE INVERT HEIGHTS DEPTH PER PIPE AVAILABLE (ACCORDING TO MANUFACTURER PLANS!TAKE OFF) RECOMMENDATION ®VARIOUS TYPES OF INLET & OUTLET ADAPTERS AVAILABLE: 4" - 30" FOR CORRUGATED HDPE (ADS N-12, ADS SINGLE WALL, HANCOR DUAL WALL), SDR 35, SCH 40 DWV, CORRUGATED & RIBBED PVC WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) 1Q• 8"- 30" GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05, WITH THE EXCEPTION OF THE 8'- 15'BRONZE GRATES ©- 12" - 30" FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 7050-05 Q3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS. SEE DRAWING NO.7001-110-065 ®- DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HOPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC Q5 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0- TO 360'. TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO.7001-110-012, 7001-110-013, & 7001-11D-014. 6 • GRATES SHALL MEET H-10 LOAD RATING FOR 12' - 24' PED 7 - GRATES SHALL MEET H-20 LOAD RATING FOR 30" PED & 12" - 30" STD & SOLID 8 - ALL BRONZE GRATES, DROP IN GRATES, & 8" & 10' PEDISTD GRATES & SOLID COVERS ARE RATED FOR LIGHT DUTY APPLICATIONS ONLY 9 - DOME GRATES HAVE NO LOAD RATING NYLOPLAST DRAIN BASIN (a)ADAPTER ANGLES VARIABLE 0' - 360' ACCORDING TO PLANS A 18" MIN WIDTH GUIDELINE 8" MIN THICKNESS GUIDELINE TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS. (I) VARIABLE SUMP DEPTH ACCORDING TO PLANS (6" MIN ON 8" - 24", 10" MIN ON 30") 4" MIN ON 8" - 24" 6" MIN ON 30" THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321, A PART# I GRATE OPTIONS 8" 2808AG I PEDESTRIAN/STANDARD SOLID BRONZEI DOME DROP IN 10-1 2810AG I PEDESTRIAN/STANDARD SOLID BRONZE DOME DROP IN 12' 2812AG I PEDESTRIAN STANDARD SOLID BRONZE DOME DROP IN 15' 2815AG PEDESTRIAN STANDARD SOLID BRONZE DOME DROP IN 18" 2818AG PEDESTRIAN STANDARD SOLID NIA DOME DROP IN 24" 2824AG PEDESTRIAN STANDARD SOLID N/A DOMEJ DROP IN 30" 2830AG PEDESTRIAN STANDARD SOLID I NIA DOMEJ NIA DRAWN BY EBC MATERIAL DATE 1-23-06 APPO BY CJA PROJECTNOJNAME DATE 1.23-06 3130 VERONA AVE BUFORD, GA 30518 60, PHN (770) 932.2443 Nyloplast ��nyloplastuscom TITLE DWG SIZE A I SCALE 1:40 SHEET 1 OF 1 I DWG NO. DRAIN BASIN WITH STANDARD GRATE QUICK SPEC INSTALLATION DETAIL 7001.110-144 REV D �L TENCATE o00 i ra 000 ra nage Mirafi° 140NL Mirafi® 140NL is a nonwoven geotextile composed of polypropylene fibers, which are formed into a network such that the fibers retain their relative position. Mirafi® 140NL is inert to biological degradation and resists naturally encountered chemicals, alkalis, and acids. Mechanical Properties Test Method Unit Minimum Average Roll Value MD CD Grab Tensile Strength ASTM D 4632 kN Ibs 0.4 90 0.4(90) Grab Tensile Elongation ASTM D 4632 % 50 50 Trapezoid Tear Strength ASTM D 4533 kN Ibs 0.2(40) 0.2(40) Mullen Burst Strength ASTM D 3786 kPa(psi) 1205.E 175 Puncture Strength' ASTM D 4833 kN Ibs 0.2(55) CBR Puncture Strength ASTM D 6241 kN Ibs 1.1 250 Apparent Opening Size (AOS)2 ASTM D 4751 mm U.S. Sieve 0.25 60 Permittivity ASTM D 4491 sec-1 2.0 Flow Rate ASTM D 44 91 I/min/m 2 al/min/ft 5907.3 145 UV Resistance (at 500 hours) ASTM D 4355 % strength retained 70 ASTM D 4833 has been replaced with ASTM D 6241 2 ASTM D 4751: AOS is a Maximum Opening Diameter Value Ph sical Pro erties Test Method Unit Typical Value Weight ASTM D 5261 6W oz/ d 135.0 4.0 Thickness ASTM D 5199 mm mils 0.9 35 Roll Dimensions width x length) m ft 3.8 x 110 12.5 x 360 4.5 x 110 15 x 360 Roll Area -- m2 d2 418 500 502 600 Estimated Roll Weight -- kg lb 60 133 70 160 Disclaimer: TenCate assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice. ;� TENCATE materials that make a difference FGS000360 ETQR18 ,S TENCATE Miraf i ROpMt n roslon Protection TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by work- ing with our customers to provide advanced solutions. The Difference Mirafi® G Series Drainage Composite Makes: • Consistent and proven long-term perform- ance due to a multi -directional core config- uration providing a uniform flow path for water to escape. • Relief of hydrostatic pressure buildup against subterranean surfaces. • High -flow drainage capacity of up to three, times the flow capacity of aggregate or sand, assuring effective drainage for virtu- ally any drainage need. • High compressive strength core that with- stands installation and in -situ earth stress- es. • Cost savings due to the lightweight, easy to install 1.22m x 15.24m (4' x 50') panels. This saves the transportation cost of bring - Protective & Outdoor Fabrics Geosynthetics Aerospace Composites Industrial Fabrics Armour Composites Synthetic Grass ing aggregate to the construction site. TenCate Mirafi° G Series drainage composite G100N is produced from a high compressive strength core with a nonwoven polypropylene geotextile bonded to one side. The Mirafi® G Series drainage composite G10OW provides the added benefit of a woven monofilament polypropylene geotextile bonded to one side for higher clog resistance and long-term flow capacity. Mirafi° G Series drainage composite G200N, ideal for two-sided drainage applica- tions, is produced with Mirafi' N-Series non- woven polypropylene geotextile bonded to both sides of a high compressive strength pierced dimple core. APPLICATIONS TenCate Mirafi® G Series drainage composite G100N products are designed for use in high - flow, high compressive strength, vertical applications where single -sided subsoil drainage filter layer is needed. The flat side of the core fits directly against wall surfaces making it ideal for retaining walls, bridge abutments and other similar retaining struc- tures. Mirafi® G Series drainage composite Muafi' G Series Drainage Composite G20ON is designed for use where single or double -sided subsoil drainage filter, layer is required. Mirafi° G Series drainage compos- ite G20ON products are capable of collecting large quantities of subgrade water and con- ducting it to a discharge pipe or collection system. Ideal applications are placed against the excavation cut of a retaining wall or slope, landfill closure interceptor drainage and in trench drains. INSTALLATION GUIDELINES` Detailed installation instructions are available from your TenCate Mirafi® representative. These guidelines serve as a general basis for installation. Detailed instructions are available from your TenCate Mirafi• representative. ;A TENCATE materials that make a difference IJ t, ; TENCATE ME o00 iraf"lDrainage G 100N G-Series Drainage Composite G100N Drainage Composite is produced from a high compressive strength core with a Mirafi® 140NC nonwoven filter geotextile bonded to one side. Core Mechanical Properties Test Method Unit Typical Roll Value Thickness ASTM D 1777 mm in 10.16 0.40 Compressive Strength ASTM D 1621 kPa (ps9 862 18,000 Maximum Flow Rate 1 ASTM D 4716 I/min/m al/min/ft2 260 (21) Installed Vertically Flow Rate ASTM D 4716 I/min/m al/min/ft2 155 (12.5) Installed Horizontally Flow Rate' ASTM D 4716 I/min/m gal/min/ft2 30(2.4) In plane flow rate at 173 kPa (3600 psf) with a gradient of 1.0 2 Installed flow rate with soil overburden at a vertical gradient of 1.0 3 Installed flow rate with soil overburden at a horizontal gradient of 0.05 Geotextile Mechanical Typical Roll Value MD CD Properties Test Method Unit Mirafi®140NC Grab Tensile Strength ASTM D 4632 kN (Ibs) 0.49 (111) 0.49 111 Puncture Strength ASTM D 4833 kN Ibs 0.31 70 Apparent Opening Size (AOS) ASTM D 4751 mm U.S. Sieve 0.212 (70 Permittivity ASTM D 4491 sec' 1.9 I/min/M2 5698 Flow Rate ASTM D 4491 gal/min/ft 140 Physical Properties Test Method Unit Typical Value Roll Dimensions width x length) -- m ft 1.22 x 15.24 4.0 x 50 Roll Area -- m2 ftZ 18.6(200) Estimated Roll Weight -- kg (lb) 22.7 (50) Disclaimer: TenCate assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice. FGS000537 ETQR1 ;� TENCATE materials that make a difference L TENCATE Miraf i Test E- WRt Color black black black Compressive Strength ASTM D 1621 kN/m'((psf) 862 (18000; 810.16 2 (18000) 862 (18000) Maximum Flow Ra e' ASTM D 4716 I/min/m (( pm/ft)) 26 21)) 260 (21) 260 21 Installed Vertically2 y ASTM D 4716 I/min/m (�Pm/ft) 155 (12% 222 (18) 155 ( 2. ) Installed Horizontally' ASTM D 4716 I/min/m ( m/ft 30 2.4) 47 (3.8) 30 2.4) ' In plane flow tested at 173kPa (3600psO with a gradient of 1.0. 2lnstalled flow rate with soil or concrete overburden at vertical gradient of 1.0. 'Installed flow rate with soil overburden at horizontal gradient of 0.05. GEOTEXTILE FILTER Mirafi° Geotextile 140NC FW402 140NC MECHANICAL PROPERTIES Grab Tensile Strength (MD) ASTM D4632 kN (Ibs) 0.49 (111) 1.62 �2405 65 0.49 111 Grab Tensile Stren th (CD) ASTM D4632 kN (Ibs) 0.49 4111j 0.89 0 0.49 111Mullen Burst Strength ASTM D 3786 kPa (psi) 1516 22 3097 1516 22 Trapezoidal Tear Strength MD) ASTM D 4533 kN Psi s 0.21 47 0.51 15 0.21 47 Trapezoidal Tear Strength N) ASTM D 4533 kN s 0.21 47 0.33 (75 0.21 47 Puncture Strength ASTM D 4833 kN 0.31 €70 0.44 (100) 0.31 70 UV Resistance after 500 hrs ASTM D 4355 % strength 70 9 70 HYDRAULIC PROPERTIES AOS ASTM D 4751 mm (U.S. Seive) 0.212 (70) 0.425 (40) 0.212 (70) Permittivity Flow Rate ASTM D 4491 ASTM D 4491 sec' I/min/mol)gpm/ft2) 1.9 5698 (140) 2.1 5907 (145) 1 1.9 5698 (140) Percent Open Area COE-02215-86 o na na PACKAGING Roll Width m 1.22 4) 1.22 4) 1.22 4) Roll Length m 15.24(50) 15.24(50)) 15.24 50) Est. Gross Weight Area -- km2(�Ifttj fts) l j 227 6 2�O% ( ) 18 6 (2�00) 18.6 ((%) 01.07 365 South Holland Drive Tel 800 685 9990 Fax 706 693 4400 0*". �TENCATE Pendergrass, GA 30567 Tel 706693 2226 www.mirafi.com materials that make a difference /( Ihc.1S911 STREET FOILE CITY OF EDMONDS GARY HAAKENSO MAYOR 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.d.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering September 25, 2003 Mr. Oliver D. Finnigan, III 604 Front Street Celebration, Florida 34747 Dear Mr. Finnigan.: In response to a recent localized slide, City officials conducted a site inspection on September 16, 2003 and observed slide damage to have occurred all on private property west of Sequoia Ridge Lot 4, at or near Tract A and Lot 2 property of the plat of Lorian Woods in Edmonds, Washington. Accompanying City officials was a representative of Landau Associates, the City's professional geotechnical consultant. Landau Associates conducted a site reconnaissance and subsequently prepared a report (copy enclosed) that describes the observed slide. Note, the report suggests that there is a low probability of immediate risk from the slide damage particularly because the downslope private properties are currently undeveloped. The report recommends that property owners in the vicinity of the landslide be alerted to the condition of the slope. The purpose of this letter and the attached copy of the Landau Associates report is to notify you and other private property owners in the area, of the current situation as we know it, so that you may take whatever action you deem appropriate. During the course of the site reconnaissance, the investigation also discovered ground cracking at or near, the top of the ridge line of Lot 3 Sequoia Ridge. The ground cracks observed in this area are estimated to lie above your lot at Lorian Woods Lot 5, a currently undeveloped lot. The significance of this ground cracking was not thoroughly investigated by the City's geotechnical consultant. However, the presence of ground cracking suggests an unstable slope condition that could have a relatively high risk of landsliding sometime in the future, particularly during wet weather. Since you may be unaware of these conditions, the City recommends that you have your professional Geotechnical Engineer make a site inspection for an independent assessment of your property to provide recommendations about the possible future impacts of landsliding, preventative measures to property your property and any possible site restoration that may be adviseable for you to undertake to protect your property. Geotechnical reports and assessments for properties within this area are on file at my office and area available for review. • Incorporated August 11, 1890 ° Mr. Finnigan Page Two September 25, 2003 If your geotechnical engineer requires restoration or slope mitigation/improvements an approved permit from the City is required since all work must comply to City Ordinance #2661 which regulates the Meadowdale Earth Subsidence Landslide Hazard Area. Please contact me should you have any questions regarding permit requirements or other concerns at 425-771-0220 extension 1226. Sincerely, G4W4� Jeannine L. Graf Building Official, C.B.O. Cc: Duane Bowman, Development Services Director Dave Gebert, City Engineer - 25 7 7 c 610 U y i 2 Us 14:13 r..jUIIUUI LANDAU ,ASSOCIATES September 25, 2003 City of Edmonds, Development Services Department 121 5"' Avenue North Edmonds, Washington 98020 Attn: W. Don Fiene and Ms. Jeannine Graf RE: LANDSL1-0 )FVA1..UA"r10N IA')(EADOWDALE AREA - LORL4N WOOUS/SEQUOIA RIDGE PLATS EDMONDS, WASHINcroN Dear Mr. Fiene and Ms. Graf: This letter sununarizes our observations and recommendations related to a landslide that occurred on the steep slope, east of 73'd Place West, in the northeastern part of the Lorian Woods plat, extending upslope to the western edge of the Sequoia Ridge Plat. At the request of the City of Edmonds (City), Deborah Ladd of Landau Associates visited the site on September 16, 2003 along with City of Edmonds personnel Dave Gebert, Don Fiene, Jeannine Graf, Ann Bullis, Noel Miller, and Jim Kammerer. The purpose of our visit was to assess site conditions and identify any imminent hazard to City -owned facilities and the general public from the observed slide. As part of our visit, we also observed surface conditions on the ridge near the top of the slide. Our services were provided under Task Order No. 22 of our on -call Geotecluiical Engineering Services Agreement with the City. BACKGROUND AND OBSERVATIONS The landslide is located in the northeast part of the Lorian Woods plat, east of Lorian Woods Lot 2 and west of Lot 4 in the Sequoia Ridge plat. The landslide lies north of the Ciry's interceptor drainage system "IA" and immediately north of catch basins CB #6 and CB #3 in this system. The landslide extends west to near (or onto) Lot 2 (16007 73rd Place West) in the Lorian Woods plat. We understand that the landslide occurred sometime late on September 15 or early on September 16, 2003. At the time of our visit., we accessed parts of the slide area using the path used for monitoring . the interceptor drainage system. The ground surface on the path was slightly moist, but soils beneath a thin surficial layer were near dry. Areas of wct soil and seepage were observed near the path in areas where year-round seepage is typically present. Heavy rainfall was reported the night of September 15, 2003 by Edmond's residents. Overall rainfall for the weeks preceding the slide has been relatively low. ENVIRONMENTAL ( GEOTECHNICAL I NATURAL RESOURCES 130 2nd Avenue South - Edmonds, WA 98020 - (4Z) 778 C907 - sax (Q5) 778-64,N - wv w.landauinc.com SEArTLE - SPOKANE • TACOMMA - PORTLAND '��'.l5 17E 64UU LAIUAU AUL 1 AItJ IiIL Uyi1J/UJ 14:1J Y.JU3iUUi The landslide has combined block sliding and mudfloA- charactcrist:ics, with an estimated width of about 20 to 30 ft and a total length of 80 ft or greater. The landslide initiated near the top of the bluff, apparently from Lot 4, Sequoia Ridge. The slide initiation is about 20 to 40 ft (vertical) above the City's I nterceptor drainage system IA, CB #8 and about 20 fl north of this catch basin. 'The landslide debris extended about 10 to 20 ft below (west) of CB #6. The estimated elevation of the top of the slide is at about 210 to 220 ft elevation. Several seepage zones could be seen in the exposed bluff in the slide area. The failed soil zone is estimated to be about 3 to 5 ft thick (measured perpendicular to the slope fact). Below the landslide scarp (at the top of the slide), the landslide appears to involve the surftcial layer of soil on the slope along with small to large -sized trees and otter surficial vegetation. The mud flow and vegetative material is currently resting on the slope in the area near catch basins CB #6 and CB 48. The landslide occurred on private property, did not extend to public facilities other than near the City's interceptor drainage system, and did not impact any residences. Soils exposed near the top of the slide area appear to be of glacial origin and consist of outwash sand and gravel overlying fine-grained, silty and clayey- deposits. These conditions are similar to soils exposed in other parts of the Meadowdale area at similar elevations and are similar to conditions observed at other slides in the Lorian Woods/Sequoia Ridge area. The exposed soil after sliding was standing near vertical with a small, shallow, bench visible about 20 ft below the slide scarp. At the time of our visit, defined seepage paths had not yet developed and seepage was observed generally flowing around the mud and debris accumulation at the base of the slide zone. CAUSE, OF SLIDING The bluff in the Mcadowdale area is a known landslide hazard zone. The observed landslide is consistent with other naturally -occurring landslides along the Meadowdale bluff. Most landslides occur during or following an intense rainfall.event during the wet winter season. The observed landslide occurred during or after a short period of intense rainfall, but not during a period of extended wet weather such as typically occurs during the winter., It is possible that the very dry 2003 summer has led to ground cracking that contributed to the landslide occurrence at this time. It is our opinion that the landslide originated in native granular soil above a seepage zone on the steep part of the upper slope. The specific triggering event of the observed landsliding is not ]mown- It is Landau Associates' opinion that the landsliding was caused by a combination of infiltration from a heavy rainfall on the evening and early morning of September 15 and 16, 2003 combined with naturally occurring seepage near the contact between granular sand and gravel deposits and underlying fine-grained 0?.25/03 nEdm..aslwprecW7n114\LoiznWood:Sep%20039,dercv2.dx 2 LANDAuAssoclATEs 5 77 6109 u j i i ui 9 19 r.uu41uui deposits. Both heavy rainfall events and groundwater seepage are common contributing factors to slope failures in the Meadowdale area and throughout Puget Sound. The observed landslide was likely caused by natural groundwater seepage zones that are present in the steep portions of the slope. The lowest seepage zones observed during our visit were an estimated 20 ft above the nearest catch basin, CB ti8, in the City's interceptor drainage system. As discussed in Landau Associates' Drainage Evaluation Lorian Woods/Meadowdale. Area report (July 25, 2002), the City's interceptor drainage systems capture some of the localized surface water that would otherwise infiltrate the ground surface below the drainage system. The interceptor drainage systems do not reduce groundwater levels in the slopes above the systems or reduce seepage from these areas. Accordingly, it is our opinion that the observed landslide was not caused by or related to the City's interceptor drainage system. ]RISK TO CITY OF EDMONDS FACILITIES OR STRUCTURES FROM OBSERVED SLIDE No damage was observed in the existing system 1 A from the September 2003 landslide. The existing landslide does not appear to pose an immediate risk to any other City -owned facilities. However, there is a large accurintlation of very soft and wet soil in the lower part of this landslide. This soil could move furdier downhill if it becomes wetter due to surface water runon or precipitation. However, due to the presence of relatively heavy vegetation in the area, downslope movement is L-xpectcd to be limited. BLUFF CRACKING - SEQUOIA RIDGE PLAT During the site visit, conditions at the top of the bluff above and near the slide were observed. Observations were conducted of the area near the bluff top on the south and west part of Sequoia Ridge Lot 4 and along all of the west edge of Sequoia Ridge Lot 3. No cracks were visible on the ground surface on Lot 4 above the recent slide. However, observations of the ground surface directly above the recent slide area (e.g., within the zone about 3 to 10 A from the slope edge) were not done because of safety concerns_ Ground cracks and small holes were observed in a nearly continuous zone on the west edge of Lot 3 (Bosch residence). In some areas, more than one set of parallel cracks were visible. The ground cracks lie at variable distance away from the edge of the slope, varying from about 3 ft to greater than 10 ft. The ground cracks were observed as close as approximately 10 to 15 ft from the northwest comer of main structure and deck foundations for the Lot 3 residence. The ground cracking adjacent to other parts of the residential structure vary in distance from about 15 to 30 ft away. The ground cracks observed in this area are estimated to lie above Lorian Woods Lot 5, a currently undeveloped lot. 09f25103 1XEarm33A..praCW7411149 oriin woods Upt 2003 ahac rev 2 aoc 3 . LANDAU ASSOCIATES 77`c b40i LAkUA AU L I A I t J II,L uyi13/u6 14:14 r.uu3iuui Vegetation on the north part of Sequoia Ridge Lot 3 includes planted salal and other shrubs. Closer to the house, vegetation includes a well -watered lawn and vegetable beds. The ground cracking varied in distance from the existing structure and from the top of the slope. Most of the cracks showed vertical offset, with the ground surface lower to the west. The ground surface west of the cracks is slightly hummocky and slopes downward to the west. In some areas, concrete landscape retaining blocks had apparently been downset from their original placement, with vertical movement of these blocks estimated to vary between about 3 and 12 inches. The observed ground cracking indicates soil blocks that are no longer "connected" to the intact and undisturbed glacial soil mass east of the cracks. These soil blocks have a relatively high likelihood of movement outtivard and downslope. Based on the distance of observed cracking from the edge of slope, soil blocks of 3 ft to greater than 10 ft thick may be prone to downslope movement. Movement of the soil blocks can be slow or very rapid. Slow movement will be evidenced by increased cracking, opening and offset on cracks that occurs over periods of days, months, and years. Slow ground movement may cause cracks in patios, pavements, and structures that lie over the zone of movement. Rapid ground movement occurs when the soil strength between the soil block and the adjacent undisturbed ground is too low to support the weight of the soil block. Rapid failure of soil blocks occurs over a very short period of time, from a few seconds to a few minutes. There is typically no warning about when and where rapid soil movement will occur. Movement of these soil blocks is most likely during and after periods of high prccipitation in the winter season, but should be anticipated at any time of the year. This type of soil movement is likely to result in landsliding and debris flows sinular to what have been historically observed in the Lorian Woods / Sequoia Ridge area. Homeowners and landowners near the observed cracks in both Sequoia Ridge and Lorian Woods plats should anticipate a high likelihood of soil movement and landsliding from this area over the upcoming winter. R151K TO )ZESIDENTS AND GENERAL PUBLIC FROM OBSERvrD BLUFF CRACKS At the time of our visit, no immediate risk from the observed ground cracks to public safety was identified (because the downslope is undeveloped and the area is not readily accessible to, or used by, the public)_ However, the presence of ground cracking indicates an unstable slope condition that has increased risk of landsliding, particularly during wet weather and the upcoming rainy season. This situation creates a hazard to any person present immediately below the potential landslide area. We recommend that property owners in both Sequoia Ridge and Lorian Woods be informed of our observations and the likelihood of landsliding during the upcoming winter and in future years. The Sequoia Ridge Lot 3 homeownt,T (Bosch) should be informed that their current setback from the edge of slope (as defined by the recent cracking) to the structure and deck foundations at the 0925103 %\Edrmasl­vo607411raucr4n Woods Sent 2003 Aide rev Um 4 LANDAu ASSOCIATES northwest corner of the residence is approximately 10 to 15 11. Because the house has been built on deep piles, the presence of these cracks probably does not pose an immediate risk to the stricture. We recommend that the homeowner inform their gcotechnical designer of the presence of active ground cracking so that their designer can provide an assessment of the long-term risk to the structure. We also suggest that the Sequoia Ridge Lot 3 homeowners conduct regular observations of ground conditions to document rate of change of ground cracking. Increased numbers of cracks, opening of cracks, and downward movement of soil blocks are indications that the risk of active landsliding is becoming greater. The Lorian Woods Lot 5 owner should be informed that they could be directly impacted by soil movement and landsliding related to the observed ground cracks on Sequoia Ridge Lot 3. We suggest that information about landslide potential also be conveyed to other residents in the Lorian Woods plat, because large-scale landsliding originating from Sequoia Ridge Lot 3 could create safety concerns and i could affect common areas and potentially other lots. RISK TO CITY -OWNED PROPERTY FROM OBSERVED BLUFF CRACKS At the time of our visit, no immediate risk from the observed ground cracks to City -Owned property was identified. However, the presence of ground cracking indicates an unstable slope condition that has a relatively high risk of landsliding, particularly during wet weather and the upcoming rainy season. The City's drainage interceptor system 1 A Lies downslope of the observed cracks. Accordingly, we recommend that the City discontinue regular observations of this system and use extreme caution when making any other site visits or observations in the area. 1 � R R • 1 This letter was prepared for the exclusive use of the City of Edmonds. Within the limitations of scope, schedule, and budget, our services have been conducted in accordance with generally accepted geotechnical engineering practice. No other warranty, express or implied, is made as to the professional advice included in this report. 092510311EdTMaslrcr0d0T4%114uorimwnodsSeol2003sSdrrcv2.d0c 5 LANDAuAssoeIATES IANDI!U kS�OC�TES li?C U9i/51U3 4:IJ Y.UUl;uui We appreciate this opportunity to be of service to the City of Edmonds. Please call if you have any clues6on5 or if we may be of further service. LANDAU ASSOCIATES, INC. 4.",1 /'-w/ Deborah Ladd, P.E. Senior Engineer 041 "flae�— Dennis R_ Stettler, P.E. Principal* DU/DRS/ccy No. 074114.011 09R507 1N(amn35�wprocA074N 1 1 41lo63n woods Sept2003 3fi ae rev2.dx 6 LANDAU ASSOCIATES r O'BRIEN & ASSOCIATES A R C H I T E C T S MAR 0 9 2010�, 3/5/2010 ATTN: Patrick Lawler Plans Examiner — City of Edmonds, WA 121 5th Avenue North Fi E Edmonds, WA 98020 t I RE: Isaacson Residence Permit #BLD20090743 Response to Plan Review Comments letter dated December 7th, 2009 Pat, This letter serves to respond to the items you noted in the Plan Review Comments letter dated 12/7/2009. Your comments are shown first with my response following shown italicized and bold. The revisions on the construction documents are clouded with a revision bubble and noted as Revision #1. Only the revised sheets have Revision #1 on the title block: 1. See attached city's consulting engineers plan review number 01 comments. / have reviewed the comments and they were forwarded to the respective Civil, Geotechnical & Structural consultants for their use and response. Their responses and adjusted drawings are being submitted with this Architectural response. 2. Drainage behind the interior foundation is required by page 3 of the Landau document. The Sections have been revised to show the required interior foundation drains. Structural Engineering and Civil Engineering plans also have been upgraded to show this requirement. 3. The square footages on Sheet A-1 are incomplete and appear to be inaccurate. For the main and upper floor, the space calculated to 3,560 square feet. The garage came to 759 square feet, and the remainder of the basement needs to be calculated. Provide the math if the numbers substantially differ. The floor plans have been measured under the guidelines you outlined. Although the numbers you calculated are not substantially different than the totals / calculated with the computer, l am still forwarding Floor Plans indicating the location of measurement lines and the associated totals for your use and review. Sheet A-1 has been revised to show these proper square footage totals. 4. Provide a guard at the edge of the storage area to the future shop, as required per R312.1, raised floor surfaces. Garage Level — Sheet A-2 has been revised to show a wood framed 36" high guard wall fastened between the wood posts with gypsum board installed on the future shop side as required to comply with the code. 5. Identify on floor plans all required safety glazing locations. The safety glazing locations are now identified on both plans and elevations. 6. Missing fan in garage bath. The required fan has been added. 7. Missing fan in master bath toilet room. The required fan has been added. ARCHITECTURE - SPACE PLANNING - CONSTRUCTION MANAGEMENT P.O. Box 2907 - Issaquah, WA 98027 - (425) 557-0712 - FAX: (425) 557-0716 8. Construction note 1/A-4 incorrectly requires an insect screen on the dryer exhaust vent, which is prohibited by M1502.2 because of the potential fire hazard of lint building up. The note has been corrected. 9. Detail 9/A-10 calls for the subfloor to be glued and screwed. Screws do not provide the floor diaphragm nailing as required by engineering sheet S-0, and the note should indicate that the screws can't be used in place of nails. The structural engineer reviewed this at my request and found an alternate "Simpson" Series WSNTL #8 screw fasteners that have the required structural properties. Engineering notes on Sheet S-0 have been revised to reflect the screw fastener option. Since I prefer the diaphragm flooring screwed down instead of nailing to help reduce the chance of floor squeaks, I did not change the note on Detail 9/A-10. 10. Provide construction details for the short walls used as guards. Justify how they conform to the 200 lb. top of guard, and the 50 lb. per square foot loads required by code. The structural engineer has addressed this by adding new calculation sheet 14.2 and Section 7 on Sheet S-7. 11. Provide product data for waterstop to be used in foundation keyway per detail 4/S-6. The waterstop is now specified as 6" ribbed flat PVC Shape #679 as manufactured by Greenstreak or approved equal. The specification note has been added to the Section cuts as shown in Architectural Sections. The link to Greenstreak's product catalogue is http://www._greenstreak.comisubpacks/General Waterstop Catalog.pdf. . Please let me know if you require hard copy of this product information. We are anxious to proceed with the construction of this residence for Brian & Cindy. Hopefully, we have addressed all your items properly and look forward to your next review and the building permit. Should you have any questions, please don't hesitate to contact me. Michael O'Brien AIA, NCARB ARCHITECTURE - SPACE PLANNING - CONSTRUCTION MANAGEMENT P.O. Box 2907 - Issaquah, WA 98027 - (425) 557-0712 - FAX: (425) 557-0716 FUTURE SHOP 570.0 S.F. (UNFINISHED) PATIO 767.0 S.F. CRAWL SPACE p \ \ \ \ n \ \ STAIRS/ ,= 176:5 S. 1.1 LE 9 I FURNACE N P HTk I / I / I / LINE OF DECK ABOVE L- - - - - - - - - - - - - - - - - UTDOOR OOL SHED 4.4 S.F. GARAGE 773.4 S.F. GARAGE LEVEL - AREA CALLS. SCALE: 1 /8" = 1'0" MAIN LEVEL - A 5� • • 0 UPPER LEVEL - _�� EDGE Of MOOT 1MOV[ �' 1 F 5 VW.;-; FAX N0. REED &ASSOCIATES; PC. & ;ng. a MO. a3l'12121h St SW, tdmmnds,.WA no OMW (425) x78-2M FMc (425) 775-2073 6,208 Fol" FILE Subject: Isaacson Residence Lot 2, Lorian Woods, Edmonds, WA Job # 07-789XS Response to plain review cO maent letter (undated) by EECE. Edmonds plan check BLA20090743 6n. 06 2010 11:04PM P3 RESU MAR 0 9 2010 1 See additional information from the Geotechnical Engineer. 2. The GeotecludW 'Engrow indicted that soil design values way be increased 50% for IMpact loads- The wtaming walls.were checked for full height backfill and 1200 PSF bearing (sheets 33A, 33.2B), then for impact loads and 1800 PSF (33B, 33.2A0. The impact loads governed these walls and the mid foundation walls. 3. See addittiotW i dormation from the Geotechnical Engineer. 4. The ACI factors of 1.4 times the dead load and 1.7 times the live loads are applied in the design progmtas for both walls and grade beams. See the calculation printouts. The grade beam deflections, rotation and soil pressure are calculated using un-factored loads per ACI. 5• See revised foundation details 4/S5, 5/S6, 4/S8, 5/S8, 6/S8 and 08 for clear dimcnsions•that reflect ACI standards and those used in the calculations and as noted in the si amwal motes. .6. See revised structural notes to.reflect site class E as used in the.calculations. 7. The submitted calculations for both Walls and grade beams use grade 60 reinforcement steel for all main bars #5 and greater, and grade 40 for all main #4 bars. The temperature re-Morcement bars are detmmined by ACI standards for grade 40 and the member areas. S. See revised shear wall schedule for 1/4"'thick washers. 9.The gravity loads are supported by direct bearing of the foundation on 1200 PSF soil. The grade beams are used as tie beams and designed as load bearing as a redundant safety factor. Tie beams do not require shear reinforcement- FROM, : FAX NO. On. 06 20.10 11:04PM P4 10. See amended note #7 on the shear wall schedule. 11. See revised calculations sbeet#7 and shear wall schedule for Y2" diameter lag screws at 10" on centers. 12. For concrete beams poured integral with a reinforced slab and with the beam depth less than 1.6 times the width eccentricity is not significant. 13. See submitted sections one plan sheet S7 for shear wall top motions to rim boards and blocking. 14. See submitted sections on plan sheet S7 for shear wall top connections to rim boards and blocking. 15. See revised plan sheet S3 for beams marked B3 for these lightly loaded -conditions. 16. As indicated in the column/post schedule, (7)6 are seven 2X6 studs within the wall. 17. See the submitted Rafterroist schedule for floor joist connection to flush beams (1SU1.81/11.88)._ 18 See new section 10/S8 for typical interior bearing at walls and dropped beams. 19. See new section 11/S8 for floor joist connection at wall and beam. 20. See revised plan sheet S3.for post oallout. 21. See revised calculation sheet # 25A for net uplift at joist back span of -0.012 Kips' The U210 allows uplift of -0.46 kips. 22. Submitted section 1/S7 shows that B 13 is supported by low B 18.1he column/post schedule indicates the beam to -beam connection. 23. See the submitted calculation sheets 27D.and 28C for the design. 24. The collectors are wall top plate and the door headers. See submitted sections on plan sheet S7 for shear wall top connections to rim boards and blocking. 25. See revised plan sheet S4 for hanger call out. 26. See revised plan sheet S4 for hanger call out. 27. See revised section 7/S7 for beam details. The beam 16 is dropped to allow the beam 15 to bear directly on it with (2) TS22 connection. FROM • FAX NO. 06 2010 11:05PM P5 28: See revised plan sheet S4 for HU612 hang. The supporting beam may be dropped.- 29. See new detail i0/S8 for dropped beam and column/post schedule for flush beam connections. 30. See submitted sections on plan sheet S7 for shear wall top connections to rim boards and blocking. The collectors are the rim board and floor joists. 31. See .Architectural plans for stair clearances. 32. Submitted seedon7/S7 shows Rftl supported by the stud.watl to the floor flaming which is a beam at B11. 33. The wall length was not used in the design calculations and was marked. as a shear wall for redundancy and safety factor. See submitted calculation sheet #8. 34. All T # are noted in the Holdown schedule. 35. The collectors are the roof trusses as shown on submitted section 1/S8. See submitted sections on plan sheet S7 for shear wall top connections to rim boards and blocking. 36. See revised plan sheet S5 for in wall post call out. 37. See revised plan sheet S5 for in wall post can out. .38. See revised section 5/S7. 39. The 2X8 ledger is connected to the wall studs as noted on the submitted plans. 40. See revise Section 07 for•H-1 connection. , 41. The submitted typical yard •rung design calculation (Sheet 33.2A) does not use a slab to resist sliding. 42. The su bxp load is'from typical yard use: It applies more loads on the wall for a conservative design. 43. See revised foundation details 4/S6; 5/S6, 4/S8, 5/S8, 6/S8 and 8/S8 for clear dimensions that reflect ACI standards and those used in the calculations and as noted in the structural notes. 44. See revised section 7/S8 for joist direction and blocking and calculation sheet 30E for Kwik Bolt design. Washers are per structural notes. 45. See revised sections 3,5,6, on S8 for footing'hooks.per ACI.' ROOF %Q ATHM BI/ BLODU MM 1`I ,6/S/ u I I B FuMr I _e m O. 4m ( ice \ eSO ::_:.BI a TI (-- ,r_�r_--TI—_n_ �c 3— B4 �`5P n11, pu 11 II 111 `,Fc lie II I a Jt Ila u_ �f — = t_ c=JL=� alb---JL FA IB II I;a_ �_&IL---JI —Jill t0/57 ell t HRSET n I I l a ll it al t IAtf � � Blr—--II----SIB II lorr IIB _ — — —(IB 1 I I — I I B � s L---- J �—J� —{ L _ _ _ RO'SET 9�t �---------------- _ l itB I BI I g _� l` --T�6 r— -1 I Ia 10 S7 all & u. 1 g I I _-____ - - - - - - to $ II u 11 rr IIB MAl1 TIT1 lie �^ IB —--------=--------lo/sling gall well 4C4 n IB all JL T6 LII�LJAI lIiIeB -- ------ , 0v__ ------------ l ®_ 41ryA0—®mm0___ A1,L TO GI I D)e STIS I �7C I SO m 81 -I 1 B IRIC410 MM.125/12 j CQ g RFT g O I L J uaoal I I B) ojtJJ em 12 T'I Q c TI '� (2)6 s as ROOF S OTMG N/ BLOCM EOCES w/ J"OSB N'/6a o 4bC FA WAr TIP. WHERE W M IM HIGH ROOF FRAMING j L-Z4--6 R R Rwi r. w/ Pi rin mrcc GDO Slff6itlltlG w/ M=ED MM J' ose w/iod o VOC Da WAY MAIN 1 rVFI FI MR PI AN rv� Q 0 0 C-7.-? a T 3/57 I SPACE MRING WALL PER ZQ — n d n rC14 m S m clsr ._ I(a 013 -- - - IraHUeI IDW B11 __i 4 n a)s 3)5 27,404 ° e)4 (e) SW4 HUC410 T2 s/sl 4 9 5t Am ., 4)e 3• W �i• �` m ° E HU41RF ------------- ---- ---- -- /Sn �i y iv 4 HUC41 18 820 IB ��� .1Q� Q a U4101F �1 ° >A6 Q a GARAGE LEVEL PLAN W/ MAIN FLOOR & LOW ROOF FRAMING Sc4L. } =r-o- ►E^ SW4 CID, -(7)5 (3)6� m m AA __... TYP. FLOOR B ROOF SHEATHING W/BLOCKED EDGES o t1 �" �s-r I� •�y ?' o r2 9 9` • 2 -6'M2 6'■2 - O' w/(2) Is a war NOTE: 61 m AREA 0=Ts waLL & Fooma FmwDRcoma PER RE m" wAl Ou" vum 6o1E o= w/ Moffm Pum. 4 a",44 • rniimnATinm P( AM /�\ 0 571 LIU ,i- t ipt- 5- ( LAI �j L�u VC o7M tie 0 42 Xt. vv 16, .o3 L o7i en la 10 Ij E-S 0--yl 0' "C."l -7V Q 1 J ANN, FROM FAX NO. 06 2010 11:10PM P9 qj FROM 0 FAX NO. : �. 06 2010 11:08PM P8 eL , r OS S co Pax, etc l"U rJP 60 Fvr' krz--s 3 r/� 17 ZZ LLv t,.f F7o a 112 64- C4 pi C-1--, nr),k,),j 147- r- --�) 1-12 r Ro ('L- "-"v • Title : • Job # Dsgnr. Date: 9:43AM, 25 DEC 09 Description Scope: User. KW-0603603 Ver5.8.0,1-Deo-2003 (01983-2003 ENEOMALC Engineering Software Single Span Beam Analysis Page 1 Description Isaacson 07-789XS General Information Center Span 12.50 ft Moment of Inertia 1,050.000 in4 Left Cantilever ft Elastic Modulus 1,800 ksi Right Cantilever ft Beam End Fixity Pin -Pin Uniform Loads On Center Span... On Left Cantilever... On Right Cantilever... # 1 0.650 k/ft # 1 k/ft # 1 k/ft Query Values Center Location 0.000 ft Left Cant 0.000 ft Right Cant 0:000 ft Moment 0.00 k-ft 0.00 k-ft 0.00 k-ft Shear 4.06 k 0.00 k 0.00 k Deflection 0.00000 in 0.00000 in 0.00000 in Moments... Max + @ Center 12.70 k-ft at 6.26 ft Max - @ Center 0.00 k-ft at 12.50 ft @ Left Cant 0.00 k-ft @ Right Cant 0.00 k-ft Maximum = 12.70 k-ft Shears... Reactions... @ Left 4.06 k @ Left 4.06 k @ Right 4.06 k @ Right 4.06 k Maximum 4.06 k Deflections... @ Center -0.189 in at 6.24 ft @ Left Cant 0.000 in at 0.00 ft @ Right Cant 0.000 in at 0.00 ft Title : • Job # Dsgnr: Date: 10:37AM, 25 DEC 09 Description Scope : I-Der,9s0onware Single Span Beam Analysis Page 1 Description Isaacson 07-789XS 14.2BI General information Center Span 2.00 ft Moment of Inertia 5.360 in4 Left Cantilever ft Elastic Modulus 1,300 ksi Right Cantilever 1.50 ft Beam End Fixity Pin -Pin Uniform Loads On Center Span... On Left Cantilever... On Right Cantilever... # 1 0.100 k/ft # 1 Wit # 1 0.100 Wit Query Values 1�.:.>:_..'�Ls:� �.�._.1a:.-.J:.".:..e�._._.iv�.>..M... c..��_.w._.._...��a.3 Center Location. - ._a..l'i�_�_u__..•.-..�_�_ 0.000 ft Left Cant -•.a1'...✓�...i_...�._����_.u__._....�.....�__�-_.ni.Y.3:1.._�..... 0.000 ft _._.___-� Right Cant 2.000 ft Moment 0:00 k-ft 0.00 k-ft -0.11 k-ft Shear 0.04 k 0.00 k -0.16 k Deflection 0.00000 in 0.00000 in 0.00000 in Moments... Shears... Reactions... Max + @ Center 0.01 k-ft at 0.44 ft @ Left 0.04 k @ Left 0.04 k Max - @ Center -0.11 k-ft at 2.00 ft @ Right 0.16 k @ Right 0.31 k @ Left Cant 0.00 k-ft Maximum 0.16 k @ Right Cant -0.11 k-ft Deflections... @ Center . 0.002 in at 1.43 ft Maximum = 0.11 k-ft @ Left Cant. 0.000 in at 0.00 ft @ Right Cant -0.031 in at 3.50 ft •Title Job # Dsgnr. Date: 10:37AM, 25 DEC 09 Description Scope: - User. KW-OBM603 Ver 5 8 0. 1 -Dec-2003 Page (C)1983-2003 ENEhCALb Engineering Software Single Span Beam Analysis Description Isaacson 07-789XS 14.2BZ- 7ZA-k- General Information Center Span 2.00 ft Moment of Inertia 5.360 in4 Left Cantilever ft Elastic Modulus 1,300 ksi Right Cantilever 1.50 ft Beam End Fixity Pin -Pin Point Loads Magnitude 0.200 k k k k k Location 3.500 ft ft ft ft ft Query Values Center Location 0.000 ft Left Cant 0.000 ft Right Cant 2.000 ft Moment 0.00 k-ft 0.00 k-ft -0.30 k-ft Shear -0.15 k 0.00 k -0.15 k Deflection 0.00000 in 0.00000 in 0.00000 in Moments... Max + @ Center Max - @ Center @ Left Cant @ Right Cant Maximum = 0 0.00 k-ft at 0.00 ft -0.30 k-ft at 2.00 It 0.00 k-ft -0.30 k-ft 0.30 k-ft Shears... Reactions... @ Left 0.15 k @ Left -0.15 k @ Right 0.20 k @ Right 0.35 k Maximum 0.20 k Deflections... @ Center 0.019 in at 1.16 ft @ Left Cant. 0.000 in at 0.00 ft @ Right Cant -0.130 in at 3.50 ft lelelAf6p vrr i�r TV" ....... ... ".0 wr tin A A. r5 tol, 4, ll)F'Z, Y, r =531 LAI Title : . Job # Dsgnr: Date: 11:03AM, 27 DEC 09 Description : Scope : User.aw-0sosso3 Ver5.t3.0,,-D.%2003 $In �e $ an Beam Anal SIS Page 1 (c)1983 2003 ENEl2CALC Engineering Software 9 p Y Description 07-789XS Isaacson 18B General Information _..:L....—..m. _....�._....�.a—...___ .a _s..-v.__.... ��._._..+.,5.::::L::...�.-�c.4::....�.—.�....._....G,...w�._..a:—.a..___�r..<.:..sb'-�.�.... Center Span 15.50 ft Moment of Inertia 1,601.000 in4 ...�.ur_x...-.w�.:+....c ..�:..�.._r..L.._Y..i..� Left Cantilever ft Elastic Modulus 2,000 ksi Right Cantilever ft Beam End Fixity Pin -Pin Uniform Loads _.'SY' n - _.... On Center Span... - .. `".^ _.+':'•. .W.....:C:�_.:.'.ist:...._::<a...'.[..L.:+i>..L..:.c:.:.....c On Left Cantilever..: oii._..s.�v.�:..::�L;......,_:k,1L On Right Cantilever... # 1 0.080 Wit # 1 k/ft # 1 Wit Point Loads F,ui,_x._..b.a:�.;�-�_`:_._�r..].:1�...Rn,_a.:.,;._s;..e .. .:_.__e....:..ss_;s_...:.__.�_s:.-:...:..:._.;.:.�..._r...:s:.:.:_...-.. _..._._._..:L::.-..-�.__•__._.-...__r.=.. :.u�...... _.r____. :.�*' Magnitude 5.300 k k k k k Location 6.000 ft ft ft ft ft Query Values Center Location 6.000 ft Left Cant 0.000 ft Right Cant 0.000 ft Moment 21.75 k-ft 0.00 k-ft 0.00 k-ft Shear 3.39 k 0.00 k 0.00 k Deflection -0.23025 in 0.00000 in 0.00000 in Moments... Shears... Reactions... Max + @ Center 21.75 k-ft at 5.99 ft @ Left 3.87 k @ Left 3.87 k Max - @ Center 0.00 k-ft at 15.50 ft @ Right 2.67 k @ Right 2.67 k @ Left Cant 0.00 k-ft Maximum 3.87 k @ Right Cant 0.00 k-ft Deflections... @ Center -0.240 in at 7.30 ft Maximum = 21.75 k-ft @ Left Cant. 0.000 in at 0.00 ft @ Right Cant 0.000 in at 0.00 ft —_ U•C Fpy /� {•' �'/`.�.r.'- It...l`� ,/�� f f. '_.C( �.. �i�� ��?at�_�"�,!�,.! x..- z 5r•{ QUO G _ d 15- �-' r Poo P- .m '� F �r' �• 4 5 ,y • Title : 0 Job # Dsgnr: Date: 10:16AM, 27 DEC 09 Description : Scope : Single Span Beam Analysis Page 1 Description 07-789XS Isaacson 18.1A General information Center Span 18.50 ft Moment of Inertia 3,280.000 in4 Left Cantilever ft Elastic Modulus 1,800 ksi Right Cantilever It Beam End Fixity Pin -Pin Uniform Loads On Center Span... On Left Cantilever... On Right Cantilever... # 1 0.450 k/ft # 1 k/ft # 1 k/ft Point Loads Magnitude 0.600 k 0.6.00 k k k k Location 5.000 ft 17.000 ft ft ft ft Trapezoidal Loads Magnitude @ Left _ 0.050 k/ft k/ft k/ft k/ft Magnitude @ Right 0.050 k/ft k/ft k/ft k/ft Dist. To Left Side 5.000 ft ft ft ft Dist To Right Side 17.000 ft ft ft It Query Values fi Center Location 0.000 ft Left Cant 0.000 ft Right Cant 0.000 It Moment 0.00 Wt 0.00 k-ft 0.00 k-ft Shear 4.89 k 0.00 k 0.00 k Deflection 0.00000 in 0.00000 in 0.00000 in Moments... Shears... Reactions... Max + @ Center 23.01 k-ft at 9.08 ft @ Left 4.89 k @ Left 4.89 k Max - @ Center 0.00 k-ft at 0.00 It @ Right 5.23 k @ Right 5.23 k @ Left Cant 0.00 k-ft Maximum 5.23 k @ Right Cant 0.00 k-ft Deflections... @ Center -0.242 in at 9.23 ft Maximum = 23.01 k-ft @ Left Cant. 0.000 in at 0.00 ft @ Right Cant 0.000 in at 0.00 ft Title : • Job # Dsgnr: Date: 11:27AM, 27 DEC 09 Description : Scope : Single Span Beam Analysis Page 1 Description 07-789XS Isaacson 19C General Information Center Span 18.00 ft Moment of Inertia 3,955.000 in4 Left Cantilever ft Elastic Modulus 1,800 ksi Right Cantilever ft Beam End Fixity Pin -Pin Point Loads Magnitude 12.700 k k k k k Location 1.500 ft ft ft ft ft Trapezoidal Loads Magnitude @ Left 0.780 Wit 0.310 k1ft k1ft k/ft Magnitude @ Right 0.780 k/ft 0.310 Wit k1ft k/ft Dist. To Left Side ft 1.500 it It ft Dist. To Right Side 1.500 ft 18.000 ft ft ft Query Values Center Location 6.000 ft Left Cant 0.000 ft Right Cant 0.000 ft Moment 24.21 k-ft 0.00 k-ft 0.00 k-ft Shear -0.15 k 0.00 k 0.00 k Deflection -0.18310 in 0.00000 in 0.00000 in Moments... Shears... Reactions... Max + @ Center 24.25 ICA at 5.48 ft @ Left 15.11 k @ Left 15.11 k Max - @ Center 0.00 k-ft at 0.00 ft @ Right 3.88 k @ Right 3.88 k @ Left Cant 0.00 k-ft Maximum 15.11 k @ Right Cant 0.00 k-ft Deflections... @ Center -0.199 in at 8.37 ft Maximum = 24.25 k-ft @ Left Cant. 0.000 in at 0.00 It @ Right Cant 0.000 in at 0.00 It • Title : Job # Dsgnr: Date: 3:^56PM, 2t? t+AA.y 0,9 Description Scdpe • �L: �` ;r,_��c.,�,:= ?f;:. i'i ........... '?I .:.... r Pa e 1 Description 22D• ••••� 0 789': .. cnerl vra! Inforl'{tatior, ::.• ............ Center .Span 16.00 ft .......:...Moment of Inertia 738.000:.':.:.>•..::::.:.•...:.: •.:.......::.:.•:...•::_::::...:::.....::.:.....:.:.:_:...::.::.•.-.-.....•.:.:: Left Cantilever 3.00 it lastic Modulus 1,800 ksi learn Right Cantilever 3.00 ft End Fixity Pin -Pin Urliform Loads On Center Span... p C On Left Cantilever... ntil: ver.:.:::.>:.>:.:.> # 1 Right On Right Cantilever... 0.430 kilt # 1 0.430 Wit # 1 0.430 kilt poirit Loads Magnitude 1.050 k 1.050 k k k k Location -3.000 ft 194000 ft ft f ft ft Quely Values � Center Location _::�::••>•.�>:...:......»•::.:....:::..::.....::..-.:.,,-•: •:.....: _::�•..,;..::.....:.:......-.>•.......:::.......... 0.000 itLeft Cant 0.000 ft Right Cant _...:.>:::......>:.:...:..:...:..,..:.....;: 16.000 ft Moment• -5.08 k-ft: 0.00 k-ft -5.08 k-ft Shear 3.44 k 0.00 k -3.44 k Deflection 0.00000 in 0-00000 in 0.00000 in Moments... t Shears... Reactions... Max + @ Center 8•67 k ft at B.DO ft @ Left 3.44 k @ Left 5.78 k Max- @ Center -5.08 k-ft' at 0.00 ft G Right 3.44 k @ Right 5.78 k @ Left Cant -5.08 k_ft I Maximum 3.44 k @ Right Cant -5.08 k-ft Deflections... Maximum = 8.67 @ Center -0.266 in k ft at 8.00 ft @ Left Cant. 0.110 in at -3.00 ft ight Cant 0.110 in at 19.00 ft i t f � ao 6 Ler. uu 'tk'a. Lup rl 6, ie D" t- 7, > ---------- . ()L t&D L9 ; =r-S13 c5 cl C,) 0i !set, Jv 17 j7 TERRA (ASSOCIATES.*Inc. J:N O�S Consultants in Geotechnical Engineering, Geology SOLD( G ti and Environmental-Earih Sciences _ June 5, , 2009 Project T-840-I0- , Mr. Brian -Isaacson 9808 - 142nd Place SE, F-301 Bothell, Washington 98011 r ` Subject:-,. Supplemental Letter Geotechnical Summary. Proposed Isaacson Residence _ Lot 2, Plat of Lorian Woods -Edmonds, Washington References: 1. Geotechnical Report, Lorian Woods, •Project'No. T-840=10, prepared by Terra Associates, Inc.;`dated March.31, 2008 2, Supplemental Geotechnical Consultation, Project No. T-840-10, prepared by. Terra Associates,' Inc., dated Jurie 2, 2009 Dear Mr. Isaacson: . This letter: summarizes the discussion, of the geoiechnical aspects,.of.your new house. This summary is taken from the referenced letters and'is. organized im a, manner consistent with the City. of Edmonds' Earth Subsidence . and Landslide Hazard Area of North Edmonds, Procedures.and Permit. Submittal Checklist., 1. Structural Plans' - In our'letter dated June, 2, 2009,.-we state on page. 6: We have reviewed the geotechnical. aspects' of Sheets S-0, S71, S-2, S-6, and S4 of the structural plans - for the .Isaacson Residence prepared by .Reed and Associates, PS dated.April 9, .2009'.with a revision date of May_.26, 2.009. Based on our. review, our recommendations have been followed in preparation of the plans. 12525 Willows Road; Suite.101, Kirkland; Washington 98034 Phone (425) 821-7777 •Fax (425), 821-4334 Mr. Brian Isaacson. • June 5, 2009 . 2. Evaluation of Statistical,Probaliility. of Earth Moment within a 25-year Time Period In _ our, " report dated letter - dated June , 2, 2009` on Page,, ` 6, we ` � . -state: ' In our, report for the plat dated,1989, we state that,it is our'opinion that the return.period for the shallow. slides such as the slide.above.Lot 2 that,began in 2001 and continued -to reoccur through 2006 to be on'ihe order of 10, to 20 years. In, addition,. our. report discusses that -the-shallow_,,avalanches':and-debris flows 'do not.commonly. - reach . the lower area where the' House is. to "be located. " The proposed, catchment; wall is mitigation' for the anticipated future earth movements from the slope above the house. 3. Civil Engineers Plans In our letter dated June,2; 2009, we state on Page 6: r r estern Enineers dated February We hRve reviewed the, crvcl and temrirtry "erosion c�ntr�l rltns r era ed Ly W .9 . 28, 2009 and revised May. 13, 2009. Based on -,our review, our. recommendations have been incorporated. into 'the geotechnical aspects of the plans. ; 4. 2007 Landau Summary Report ; Terra Associates, Inc. discussed, this in our 'report -dated March 31, 2008. On,- Pages 3 and 4, we state: The site, is within the North Edmonds, Earth: Subsidence and- Landslide Hazard Area, as defined by Edmonds Community Development Code , Chapter ,19.10. Our previous study outlines the hazards associated with, development on the property.'. The hazards outlined in the referenced 2007, Landau Associates- study, are consistent with•the hazards outlined in our;previous.study. 'In the prepdrdtion of this report; we have reviewed the referenced 2007 Landau Report: Based 0i our.experience on -site and_our observations in the neighborhood, :we have identified the site'as,being within Zone B•as shown.on Figure 1 of the:2607 Landau report.' The slope immediately east and uphill from the "building site .lies within Zorie C and D. The risk of earth. movement in, the 2007 Landau Report fonZone B consists of. • Encroaching landslide' debris originating upslope ` Reactivation of landslide. debris causing ground failure; and movement • Landsides in ground that has not previously failed Based on our' observations on. the plat since; 1988, we.,concur.that the first two risks of gr' nd'movement are . possible. The' entire site consists of .earth that has moved at. ome time- in the past so the third risk is not applicable on this site. We'analyzed the probability of land sliding. and movement for,ourreport for the plat of Lorian Woods. .We.identified the hazards, of earth movement -in the area upslope from the building lot as, being 5 percent in a 25-year period. We identified the-'riskof rreovement'tivithin the building: lot as being•12'percent in a, 25-year period, Development of the lot .involves an. element of risk' that -the :homeowner, must accept. , Stewardship of the vegetation ' and . drainage facilities on the -site will be 'an, impo"rtani element of, the project over the. life . of the, house. Project No. T-840'- 10 Page No. 2. Mr Brian Isaacson . • June 5, 2009' ; Encroaching Landside Debris Originating Upslope We have, made periodic visits to the plat for geotechnical purposes over the past 20 years. Only one significant '. episode of movement has been documented -to have occurred on or adjacent, to the site in that period. This . movement is the slope failure" that occurred in the winter of 200512006 along the upper.,edge of the slope above the Plat of Lorian Woods. -This failure 'occurred immediately adjacent to a house built in -about 2000. The slope failure resulted in the retreat of the top, of the slope by approximately five to ten feet. We understand that the previous occupant of the house•has moved, the house is vacant, and that the,property has not been fully" evaluated by a geotechnical engineer. .The actualcause of the slope. failure has not been determined.: The 200512606' failure resembled a, toppling or calving of the upper 10 to 15 feet of the slope: All of the soil was either caught behind a cedar log that is* wedged behind a pair of stumps or it mounded up on the -upper portion of the slope immediately,northeast o . the building lot. The'soils from this failure that encroached. onto the building lot and - proposed f 8 proposed building envelope were eroded by:running water and redeposited as sediment lower on the site. Based on our observations on -site, -we, estimate the'volume of failed material as beings about 40 to,50 cubic yards. In the fall, of 2007; the older trees on the, slope above the lot were removed.' A report wds.prepared by Urban' Foresters that -cataloged the diseased trees 'on 'the 'slope.:,'We : expressed our, concurrence -with the tree management and replanting report; prepared -by Urban Foresters dated March 4, -2006. A significant, risk that occurs during. landslides is the action of the trees. ,The trees on. the site that were found to -be diseased or - damaged, have been removed. The restoration of the trees will result in trees that provide a "canopy, but have smaller trunks to reduce the potential for damage from trees that may'become involved in. earth movements. The top of the 'slope, east and, above -the site may be regarded as - a bluff top.. Based on the" observations documented in this report, we estimate that the retreat of ihe,top of the bluff may be on the order of.10 feet per 50-year period.' Unless the uphill neighbor provides mitigation for the recent bluff top retreat, further retreat of the bluff will occur. This'mode of slope, failure can be mitigated with a catchment wall above the proposed,house to stop the landslide debris rom im actin the house. Re ular removal o calved and •eroded soils will be f P 8 8 f required on the slope. above the house over. the life of the structure. We would'expect that the risk of this threat would be reduced in the future by improvements on the' uphill property. . `Provided the recommendations contained in this report: are incorporated into site development pldns, it.is our opinion that the�development will not increase the risk of instability or"the-rate of bluff top, retreat above the site: . 5. Unmitigated Risks On Page 5 of our reportdated Machf,31; 2008; we:.state:. ; Reactivation of Landslide Debris .Causing,.Ground Failure and Movement : In,regards to the risk of movement, of previously failed materials, the second mode -of failure -in the bullet list above, should be, noted that.the house on the lot immediately. south and downhill from the site, has been present since 1964 and 'has•'not. received' levels of damage that. have rendered it unusable. Beneaththe.'house, immediately 'east of the site are houses on'Tax Lots 00513105800500 and, 00100 that have been; present since 1934. Both of these houses are inhabited. While 'this: does not indicate the lack of movement, 'it does, illustrate , that the, magnitudes of movements that have occurred. have been manageable or, are .within. the tolerances of the. '- structures'- foundations. • Project No T-840-10 -Page No;-3 . APPLICANT/OWNER LIABILITY & LANDSLIDE ACKNOWLEDGMENT Brian G. Isaacson and Cindy Isaacson, as the building permit applicants and as the owners of Lot 2 Plat Recorded in Volume 51 of Plats, Pages 145 and 146, Records of Snohomish County Auditor, hereby declare: • That the accuracy of all permit submittal information is warranted by the applicants/owners in a form which relieves the City and its staff from any liability associated with reliance on such permit application materials. • While an application may reference the reports of prior public consultants to the City, all conclusions are those of the applicants/owners and their design professionals. • That the applicants/owners understand and accept the risk of developing in an area with potential unstable soils and understand the required temporary and permanent erosion control and site maintenance issues associated with specific geologic hazards or conditions of the site that may affect slope stability over time. • That the applicants/owners will advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures on the site, of the slide potential and on -going maintenance issues of the area and on the property. Dated this 15` day of June, 2009 STATE OF WASHINGTON ) ss: COUNTY OF KING ) APPLICANTS/OWNERS: Brian G. Isaacson 0 _I Cindy Isa cson I certify that I know or have satisfactory evidence that Brian G. Isaacson and Cindy Isaacson, signed this instrument and acknowledge it to be their free and voluntary act for the purposes mentioned in this instrument. DATED this 2"d day of June, 2009. STREET FILE Dorothy B. S '-gola, NOTARY PLIBLI My commission expires April 19, 2010 RECEIVEr JUN Q 5 2009 BUILDING CITY Cf Western 6Engineers Inc. 13000 Highway 99 South • Everett, Washington 98204 (425) 356-2700 FAX (425) 356-2708 SURVEYORS • PLANNERS • ENGINEERS KEtFILE May 21, 2009 I City of Edmonds 121 — 5`h Avenue North, 2❑d Floor Edmonds, WA 98020 425-771-0220 Subject: City Review Comments, Letter of Release of Liability Dear Sir: The City recently sent a review package to our client that requested a letter with specific language as a release of liability to the City of Edmonds. The design team for this project is: Western Engineer, Inc; Barry R. Constant, P.E.; Project Manager, Civil Engineer Terra Associates; Chuck Lie, Geotechnical Engineer Reed and Associates, Inc.; Wendel Reed, Structural Engineer Landscape Architect; Jennifer Lee, Licensed Professional As the lead design Professional Engineer providing services to our client, Mr. & Mrs. Brian Isaacson, my team and I have reviewed the geotechnical report and understand it's recommendations and have incorporated these design recommendations into the site civil design of this project. The design parameters that my team and 1 have designed for the civil drawings are using industry standard design measures to reduce the potential risk of injury or damage from any earth movement predicted in the report. Although the recommendations in the geotechnical report, will have been followed during the construction on this site, this engineer does not guarantee the long-term maintenance of these items. These maintenance items are under the control of the client and not under direct supervision by myself. Maintenance will be required as long as there are no installed permanent solutions to the landslide hazard area. And further: in my judgment, the plans and specifications prepared by the structural engineer conform to the recommendations in the geotechnical report. LAND USE CONSULTANTS • CIVIL ENGINEERS • LAND SURVEYORS • ENGINEERING CORPORATION • 0 That the risk of damage to the proposed development, or to adjacent properties, from soil instability will be minimized subject to the conditions set forth in the report and that the proposed development will not increase the potential for soil movement. Minimized shall mean that the applicant has utilized best available science and commonly accepted engineering and architectural practice to minimize, to the extent possible, the risks associated with development of the property. The risk of onsite soil movement in the building site area probability within the next 25- years is approximately 12 percent. This is based on long-term study by our team geotechnical engineer (Mr. Chuck Lie) who personally has studied this landslide hazard area for 20-years. By studying the various geotechnical reports issued for the site over the last 20-years and using common and standard engineering practices for the erosion and sedimentation control, as well as the long term drainage solutions engineered and incorporated into the site will minimize land movement activities. Please see letter from the landscape architect for additional information The upper catchment wall, as designed by Reed and Associates, Inc. with assistance from Chuck Lie has been designed to stop low velocity landslide activated soils from contacting the house structure. An onsite deep boring was advanced in the area of the proposed wall. This wall has three feet of exposed wall above a very deep soldier pile support structure. The site is designed to allow a small, lightweight powered or unpowered wheeled container to remove any soil spoils from the upper wall area and transport them down slope safely. This type of maintenance is not guaranteed by this letter. Please see letter from the landscape architect for additional information The Landscape Architect will provide deep-rooted planting that remove water from the loose upper soils on site. The landscaping will also provide small trees to provide the same function. Please see letter from the landscape architect for additional information The Landau Geotechnical report, dated 2007, identified certain areas as landslide hazards for this site and certain recommendations to reduce and minimize these hazards. Western Engineers in conjunction with Terra Associates have reviewed, designed and approved the site engineering for the house structure location and elevations, retaining walls and catchment wall above the retaining walls. We have reviewed all structural and retaining wall footing drains and provided an extensive underground drainage conveyance system capable of removing and directing any runoff away from the house structure and retaining walls, down slope directly into the City drainage system on the roadway below the new house. Reducing and removing storm water runoff from the soils onsite is the number one risk reduction factor associated with earth movement. No one has control over the potential for shallow or deep-seated earthquake induced land movement, but we have reduced the ability of the land to move on pressurized (water pressure) underground soils, which could enhance additional land movement. The attached soil boring water levels and the attached information regarding the piezometer reading all indicate that the existing ground water levels has been reduced over time. Please call me or any of the design team if you have questions regarding this letter. Sincerely, Western Engineers, Inc. Barry onstant, P.E. Project Manager AIS REED & ASSOCIATE6/3/09 Civil & Structural Engineering 8311 212th St. SW, Edmonds, WA 98026 ®� Office (425) 778-2793 Fax (425) 775-2073 6.3.2009 Brian & CinV Isaacson 9808 — 142n PL SE, F-301 Bothell, WA 98011 Re: R&A Job#07-789 SFR to be constructed at Lot 2, Plat of Lorian Woods, Edmonds, WA Permit #: BLD2007-0833 STRUCTURAL ENGINEER DECLARATION (City Ordinance #2661 and #3632) Dear Mr. & Mrs. Isaacson, This letter is our confirmation that we have reviewed the geotechnical reports for this project, understand its recommendations, and have explained to you the potential risks of loss due to possible slides on this site. We also affirm that we have incorporated the recommendations of the geotechnical report into the structural design of this project. In addition, we have worked closely with you, the geotechnical engineer, and the architect to reduce the potential risk of injury or damage that might be caused by any earth movement predicted in the report. If any further clarification is required or you have any questions, please feel free to call this office at (425) 778-2793 Sincerely, Wendell Reed P.E., CBO pE L L R co -o 30771 o��sS ANIST AL to3ICA EXPIRES 5-27- 1p STREET FILE RECEIVED JUN 0 9 2009 BUILDING WWRTIMENT C;';V Ci 07-789 • O'BRIEN & ASSOCIATES A R C H I T E C T S May 26", 2009 TO: City of Edmonds — Plans Reviewer RE: Isaacson Residence Lot #2 - Lorian Woods (PRD-1981-2) Lead Design Professional Designation and Statement This letter serves to identify me, Michael A. O'Brien as a licensed Architect in the state of Washington and as the "Lead Design Professional" for the applicant Brian and Cindy Isaacson. I have acted as the Lead Design Professional throughout the design process and am responsible for coordinating and incorporating the recommendations of the other design professionals Terra Associates (Geotechnical Engineers), Reed & Associates (Structural Engineers), Western Engineers (Civil Engineers) and R.W. Thorpe & Associates (Landscape Architects) onto the plans and into the submittal packet. I have reviewed the geotechnical report, understand its recommendations and have incorporated into the design the established measures to reduce the potential risk of injury or damage from any earth movement predicted in the report. Should you have any questions, please don't hesitate to contact me. Sincerely, ISTKEET FILE Michael Brien AIA, NCARB mobrien(cD.newwestservices.com JUN 0 8 2009 BUILDING DFPARVAENT CITY OF ARCHITECTURE - SPACE PLANNING - CONSTRUCTION MANAGEMENT 1315 NW Mall ST #4 / P.O. Box 2907 - Issaquah, WA 98027 - (425) 557-0712 - FAX: (425) 557-0716 "'Ts 'C-^. r. i"`:'y �s� fey' :;.-m-��'P!FXR �"' l�. i`..r J} ;�. �TZlf' .�-',� r � ... .� V-'.V'.', :/'�,'ti eL�`'S 7r""`' _•� ,1`'N"' .�,� ''}}���;� � �Y:: jy' ` -.,.fps.",..'P.rr�l r'it`„�y-p•� :.' J,�-,�, ..s. i M to L l s...-sT�. {- > %�y, F P ��, ��� d�^•�7.�/y` ,1' � � i �, w t , �- � -{� �rS�:tir.`i '\I. • ].•. MH:"...'::�i%.St.:',�:. {!•:;.rr. ..bw..-. i. .. r .u�Z . r.r. _-. ..-..c ..!♦.Y 1:L/ .. .. �-¢. liiw.r�i Y01 ..+F�-N..� .. �.. k .r ♦. .�.L'..1."i. �:� { Cityof Edmonds Building DepartmentAPrr�Ovrl a Vr P`LAN; R E C E V Y E 0 EECE GEOTECHNICAL REPORT Lorian Woods Lot 2 Lorian Woods Edmonds, Washington Project No. T-840-10 Terra Associates, Inc. StibtMi OCT 2 9' 200 BUILDING OF EDMONDSN Prepared for: 7` 5 Brian & Cindy Isaacson CITY COPY Bothell, Washington C���Led�-es s . RECEIVE . UN 0 !; 2099 BUILDING DEFAFT?.j-;J CITY OF EDMIQN,5a c'FbttI ees c March 31, 2008 RESUB _ JUN 12.2008r a ay �a.- � -•_ .c. i{ - F< 9 � �" r�yr+ :.t�•' � 4 F � . _�w :.:t•'� w �� �` N�j°'�; -� . X.AIT as TERRA ASSOCIATES, Inc. 4. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences March 31, 2008 Project No. T-840-10 Brian & Cindy Isaacson 9808 — 142nd Place SE, F-301 Bothell, Washington 98011 Subject: Geotechnical Report Lorian Woods Lot 2 Lorian Woods Edmonds, Washington References: 1. Geotechnical Report, Meadowdale Beach, Lots 54 through 57, Project No. T-840-1, prepared by Terra Associates, Inc., dated June 6, 1989 2. North Edmonds Earth Subsidence and Landslide Hazard Area Summary Report, Edmonds, Washington, prepared by Landau Associates, dated March 14, 2007 Dear Brian & Cindy: As requested, we have conducted a geotechnical engineering study for the subject project. The attached report presents our findings and recommendations for the geotechnical aspects of project design and construction. Our field exploration indicates the site is underlain by loose to medium dense colluvial soils, comprised of old landslide deposits. We previously prepared a draft report for .you dated September 14, 2005. In the intervening period, we have provided ongoing consultation services to you during conceptual design ' of your house. In addition, the City of Edmonds revised their building permit requirements and the referenced report by Landau was prepared for the city. I . o_uriopinion; ,!providedkthe ownei ,J&wi�lling I . cept, theii sk,associated°with74bui'1'ding-in Ffand lide'h' z;,— area as discussedin the referenced; report;- the soil and groundwater conditions are suitable for the planned development. The structure may be supported on a mat/raft foundation, consisting of a slab constructed over a grid of grade beams, bearing on the colluvial soils. The catchment wall shown on the current plans, should be adequate in protecting the property from soil instability that has been observed on the site slopes. With this wall constructed and the other recommendations outlined in this report implemented, in our opinion, the proposed development would;not increase the potential for soil movement. 12525 Willows Road, Suite 101, Kirkland, Washington 98034 Phone (425) 821-7777 • Fax (425) 821-4334 Mr. Brian Isaacson March 31, 2008 This report does not repeat the discussion regarding slope stability risks on and adjacent to the site that is contained in the referenced report. The owner must accept the risks of slope instability, .as discussed in the referenced report. Detailed recommendations addressing these issues and other geotechnical design considerations are presented in the attached report. We trust the information presented is sufficient for your current needs. if you have any questions or require additional information, please call. Sincerely yours, TERRA ASSOCIATES, INC. . 1 6w��Va� Carolyn Schep , er, E.I.T. Staff En Proj 3 ,3/-, e Theodore Principal ;DES 6/1810 cc: Mr. Michael O'Brien, AIA Mr. Barry Constant, P.E., Western Engineers Mr. Wendell Reed, P.E., Reed Associates Project, No. T-840-10 Page No. ii M 0 TABLE OF CONTENTS Page No. 1.0 Project Description..........................................................................................................1 2.0 Scope of Work ....................................... :......................................................................... 1 3.0 Site Conditions........:......................................................................:..:....................:........2 3.1 Surface................................................................................................................2 3.2 Soils..........................................................................:.......:.................................2 3.3 Groundwater................:.......................................................................................3 4.0 Geologic Hazards............................................................................................................3 4.1 Landslide Hazard................................................................................................3 4.2 . Seismic.....................................................................................................:.........3 4.3 Erosion.....................:.........................................................................................6 5.0 Discussion and Recommendations..................................................................................6 5.1 General...............................................................................................................6 5.2 Site Preparation and Grading.............................................................................7 5.3 Excavations .................................................. :............................. ........................8 5.4 Foundations........................................................................................................ 8 5.5 Slab -on -Grade Floors.........................................................................................8 5.6 Retaining Walls..................................................................................................9 5.7 Catchment Wall ................................................ 5.8 Drainage...........................................................................................................10 5.9 Slopes and Embankments.................................................................................11 6.0 Additional Services.......................................................................................................11 7.0 Limitations....................................................................................................................11 Figures VicinityMap .......... .....:....................................................................................................... Figure 1 ExplorationLocation Plan.............:.................................................................................... Figure 2 Typical Wall Drainage Detail..................................................................................:.......... Figure 3 Typical Soldier Pile Catchment Wall................................................................................. Figure 4 .Appendix Field Exploration and Laboratory Testing.................................................................... Appendix A City of Edmonds Piezometer Data................................................................................ Appendix B • Geotechnical Report Lorian Woods Lot 2 Lorian Woods Edmonds, Washington 1.0 PROJECT DESCRIPTION The proposed project is a single-family dwelling. We were provided with architectural drawings indicating the location of the home on the lot and elevations of the foundations. The home is. located in the western portion of the lot. The structure is a two-story, wood -framed building with its main floor framed over a garage and crawl space. .The garage floor will be constructed at grade. We expect foundation loads will be relatively light, in the range of 2 kips per foot for bearing walls and 25 kips for isolated columns. The site grading will consist of cuts of u.p to eight feet to achieve the garage elevation. Nominal cuts will be needed .to prepare the balance of the house site. There will be a catchment wall constructed on the east side of the property approximately ten feet west of the property line to protect the home from landslides. We previously prepared a report entitled Geotechnical Report, Meadowdale Beach Lots 54 through 57, Edmonds, Washington, Project T-840-1, dated June 6, 1989. This previous report was written as part of the plat recording process for Lorian Woods. Lorian Woods is located within an area that has been subjected to past earth movements. The risks of earth movements are addressed in our previous report and must be accepted by the homeowner. We also prepared a letter dated August 7, 2006 that addressed tree removal and maintenance on this site. The recommendations contained in the following sections of this report are based on our understanding of these design features. If actual features vary or changes are made, we should review them in order to modify our recommendations, as required. We should review final design drawings and specifications to verify that our recommendations have been properly interpreted and incorporated into project design. 2.0 SCOPE OF WORK Our original work was completed in accordance with our proposal, dated August 27, 2004. On November 8, 2004, we excavated 2. test pits to a. maximum depth of 11.5 feet below existing surface grades. On February 27, 2008, we supplemented this data by. drilling one 40-foot test boring. Using the information obtained, from the previous and current subsurface exploration, we performed analyses to develop geotechnical recommendations for project design and construction. Specifically, this report addresses the following: • Soil and groundwater conditions • Site preparation and grading • Excavations • Foundations • Slab -on -grade floors • Retaining walls/catchment wall • Drainage 0 March 31, 2008 Project No. T-840-10 It should be noted that the recommendations outlined in this report regarding drainage are associated with soil strength, design earth pressures, erosion, and stability. Design and performance issues with respect to moisture as it relates to the structure environment (i.e., humidity, mildew, mold) are beyond Terra Associates' purview. A building envelope specialist or contractor should be consulted to address these issues, as needed. . 3.0 SITE CONDITIONS 3.1 Surface The building site is located in the Lorian Woods development, south of North Meadowdale Road, near the 7400 block in Edmonds, Washington. The building site is located on Lot 2 and is currently developed. The approximate location of the site is shown on Figure 1. The portion of the lot containing the building site slopes down to the west at grades ranging from 10 to 50 percent. Along the eastern portion of the lot and east of the building site, the site slopes up with surface grades that are nearly vertical for short heights. The site is thickly forested with mature alder, maple, cedar, and fir trees. The large trees were removed from the site in the fall of 2007. Several.of the trees were chipped. The chips were used to mulch the site. The site.is bordered with undeveloped lots to the north and south, an existing residence along the top of the slope to the east, and an asphalt driveway servicing the Lorian Woods development to .the west. During our exploration, we observed surface water flowing across the building site area. The surface.water was flowing from the slope located east uphill of. the building area. The seepage had been partially controlled.by a City of Edmonds seepage collection system. In the winter of 2005/2006, there was a small landslide that originated uphill from the plat of Lorian Woods. This landslide damaged the upper end of the collection system. 3.2 - Soils The soils we observed in the test pits generally consist of 12 to 24 inches of topsoil overlying colluvial soils. The colluvial soils consisted of loose to medium dense silty sand with occasional gravel, organics, and blocks of silt. We observed- large -diameter,, nested logs in Test Pit TP-2 at a depth of approximately nine feet below existing surface grades. The soils.observed in the supplemental test boring were consistent with the soils observed in the previous test pits. The loose to medium dense silty sand with gravel, organics, and blocks of silt were observed, along with some layers of loose to medium dense sand with silt layers and gravel to a depth of 40 feet. At 40. feet, we observed hard clay that we interpreted to be transitional bed soils not impacted by the historic landsliding. Page No. 2 • March 31, 2008 Project No. T-840-10 For a more detailed description of the soil conditions observed at the test pits and :test boring, please refer to the logs attached in Appendix A. The approximate test pit and boring locations are shown on Figure 2. , The Preliminary Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King Counties, Washington, by Mackey Smith,1975, shows soils in the vicinity of the site consisting of Old landslides (Qols). The soils observed in the test pits and test boring are consistent with this classification. 3.3 Groundwater We did not observe groundwater seepage in. any of the test pits. However, we observed mottled, wet soils in the upper portions of test pits and layers of saturated sand material throughout the test boring. Perched groundwater levels and flow rates will fluctuate seasonally and typically reach their highest levels during and shortly following the wet winter months (October through May). City of Edmonds piezometer P-17 is near the southwest corner of Lot 2. The city has measured the depth to static water level over the past several years. The boring log for the piezometer and the city memo is attached in Appendix B. Oh February 27, 2008, we measured the groundwater in piezometer P-17 to be at a depth of 5.88 feet below top of casing. The top of the casing is about one -inch below the top of the monument cover. 4.0 GEOLOGIC HAZARDS 4.1 Landslide Hazard General The site is within the North Edmonds Earth Subsidence and Landslide Hazard Area, as defined by Edmonds Community Development Code Chapter 19.10. Our previous study outlines the hazards associated with development on the property. The hazards outlined inthe referenced 2007 Landau. Associates study are consistent with the hazards outlined in our previous study. In the preparation of this report, we have reviewed the referenced 2007 Landau Report. Based on our experience on -site and our observations in the neighborhood, we have identified the site as being within Zone B as shown on Figure 1 of the 2007 Landau report. The slope immediately east and uphill from the building site lies within Zone C and D. The risk of earth movement in the 2007 Landau Report for Zone B _consists of: • Encroaching landslide debris originating upslope • Reactivation of landslide debris causing ground failure and movement • Landsides in ground that has not previously failed Page No. 3 March 31, 2008 Project No. T-840-10 Based on our observations on the plat. since 1988, we concur that the first two risks of ground movement are possible. The entire site consists of earth that has moved at some time in the past so the third risk is not applicable on this site. We analyzed the probability of landsliding and movement for our report for the plat of Lorian Woods. We identified the hazards of earth movement in the area upslope from the building lot as being 5 percent in a 25-year period. We identified the risk of movement within the -building lot as being 12 percent in a 25-year period. Development of the lot involves an element of risk that the homeowner must accept. Stewardship of the vegetation and drainage facilities on the site will be an important element of the project over the life of the house. Encroaching Landside Debris Originating Upslope We have made periodic visits to the plat for geotechnical purposes over the past 20 years. Only one significant episode of movement has been documented to have occurred on or adjacent to the site in that period. This movement is the-slope#failureathat occurred in the winter of 2005/2006 along the upper edge of the slope above the Plat of Lorian Woods. This failure occurred immediately adjacent to a house built in about 2000. The slope failure resulted in the retreat of the top of the slope by approximately five to ten feet. We understand that the previous occupant of the house has moved, the house is vacant, and that the property has not been fully evaluated by a geotechnical engineer. The actual cause of the slope failure has not been determined. The 2005/2006 failure resembled a toppling or calving of the upper 10 to 15 feet of the slope. All of the soil was either caught behind a cedar log that is wedged behind a pair of stumps or it mounded up on the upper portion of the slope immediately northeast of the building lot.. The soils from this failure that encroached onto the building lot and proposed building envelope were eroded by running water and redeposited as sediment lower on the site. Based on our observations on -site, we estimate the volume of failed material as being about 40 to 50 cubic yards. In the fall of 2007, the older trees on the slope above the lot were removed. A report was prepared by Urban Foresters that cataloged the diseased trees on the slope. W`.pressedourconcurrenc wththe fremanagement =and replan in report ;prepared -by. "Forester d%a[ed-March 4, 2006. A significant risk that occurs during landslides is the action of the trees. The trees on the site that were found to be diseased or,damaged have been removed. The restoration of the trees will result in trees that provide a canopy, but have smaller trunks to reduce the potential for damage from trees that may become involved in earth. movements. The top of the slope east and above the site may be regarded °asZa=bluff*top. Based on the observations documented in this report, we estimate that the retreat of the top of the bluff may be on the order of 10 feet per 50-year period. U,nlessAtheIjuphill,neig . beraprovidespmiti'gatib fortthe -re ent ,,bluff,top retrea ,"1 rtl er"retreat of .thenbluffw<ill,occur�. This mode of slope failure can be mitigated with a catchment wall above the proposed house to stop the landslide debris from impacting the house. Regular removal . of calved and eroded soils will be required on the slope above the house over the life .of the structure. We would expect that the risk of this threat would be reduced in the future by improvements on the uphill property. Provided the recommendations contained in this report are incorporated. into site development plans, it is our opinion that the development will not increase the risk of instability or the rate of bluff top retreat above the site. Page No. 4 • Reactivation of Landslide Debris Causing Ground Failure and Movement March 31, 2008 Project No. T-840-10 In regards to the risk of movement of previously failed materials, the second mode of failure in the bullet list above, should be noted that the house on the lot immediately south and downhill from the site has been present since 1964 and has not received levels of damage that have rendered it unusable. Beneath the house, immediately east of the site are houses on Tax Lots 00513105800500 and 00100 that have been present since 1934. Both of these houses are inhabited. While this does not indicate the lack of movement, it does illustrate that the magnitudes of movements that have occurred have been. manageable or are within the :tolerances of the structures' foundations. To mitigate against possible shifting within the landslide mass, the house will be built on a rigid grid foundation. It is beyond the scope of construction on a single lot to mitigate the possible deep-seated movements that could occur into the future. If groundwater levels are found to rise in the permanent city piezometers, the neighborhood would need to as a group install drainage facilities such as horizontal wells to maintain the water table at or below the current levels. Provided the recommendations contained in this report are incorporated into site development plans, it is our opinion that the development will not increase the risk of instability on the site or on adjacent properties. 4.2 Seismic Based on the Edmond Municipal Code 23.80.020, the site is within a seismic hazard area. This classification is due to the presence of potentially liquefiable soils beneath the site. Our review of maps showing current faults shows that there are no known or suspected faults as being within three miles of the site. Current mapping shows that the closest faults are the South Whidbey faults that extend diagonally across south Whidbey Island and extend through the Mukilteo area north of the site. This mapping is based on information in the Map and Data for Quaternary Faults and Folds in Washington State prepared by the USGS, open file report 03-428. Based on our knowledge of soil conditions and local geology, per Chapter 16 of the 2006 International Building Code (.I site -_cola s4"E',,�Should be;used in .the project s"�stn c_ fural;de gn. Liquefaction is a phenomenon where there is a reduction. or complete loss of soil strength due to an increase in water pressure induced by vibrations. Liquefaction mainly affects geologically, recent deposits of fine-grained sands that are below the groundwater table. Soils of this nature derive their strength from intergranular friction. The generated water pressure or pore pressure essentially separates the soil grains. and eliminates this intergranular friction, thus eliminating the soil's strength. Based on our knowledge of the soil and groundwater conditions, it is our opinion that there is a risk for liquefaction to occur at this site. during an earthquake. The risk from liquefaction would exhibit itself as differential settlements in the building. The proposed building will be built on a rigid grid foundation to mitigate for possible lateral shifts due to land subsidence from landsliding. This mitigation will also mitigate against the risk of foundation settlement due to liquefaction. Page No. 5 March 31, 2008 Project No. T-840-10 4.3 Erosion Based on the Edmond Municipal Code 23.80.020, the site is within anerosion hazard area. This classification is based on slope inclination and the presence of seepage on the site. The site has had tree removal performed in accordance with a tree removal plan prepared by others. The site was mulched following the removal of the trees. We have not observed any signs of erosion related issues on the site over the course of the winter of 2007/2008 including a site visit following the heavy rains of the first week of December 2007. Development of the site will include a temporary erosion and sediment control plan. Erosion will be managed through the construction period using established BMPs. 5.0 DISCUSSION AND RECOMMENDATIONS 5.1 General As noted earlier, the site is in a mapped landslide hazard area. Relative risks of slope movement are discussed in our June 6, 1989, report and in the 2007 Landau Associates Summary Report. Provided the owner is willing to accept the risks associated with slope instability at the site, in our opinion, the site conditions are suitable for the proposed construction. We recommend the structure be supported on a mat/raft foundation, bearing on the existing colluvial soils or on structural fill placed above these colluvial soils. A surface swale should be constructed along the uphill side of the house above the proposed landslide catchment wall. The swale should span the entire width of the building area and discharge into the Plat storm system. The catchment wall indicated on the drawings should conform to the design recommendations outlined on Figure 4. The site soils contain significant amount of fines and will be difficult to compact as structural fill when too wet. The ability to use native soil from site excavations as structural fill will depend on the soil's moisture content and the prevailing weather conditions at the time of construction. If grading activities take place during the winter season, the owner should be prepared to import free -draining granular material for use as structural fill and backfill. No fill may be placed that will raise existing site grades. All soils excavated from this site and not used as backfill must be removed from the site. The large cedar log and accumulated soils along the upper slope should be removed. This work will need to be done using either by hand or light weight equipment. The soils and log should be removed from the site. Detailed recommendations regarding these issues and other geotechnical design considerations are provided in the following sections of this report. These recommendations should be incorporated into the final design drawings and construction specifications. Page No..6 • • 5.2 Site Preparation and Grading March 31, 2008 Project No. T-840-10 To. prepare the site for construction, all vegetation, organic surface soils, and other deleterious materials should be stripped and removed from the building area. Organic topsoil will not be suitable for use as structural. fill, but may be used for limited depths in nonstructural areas: Once clearing ' and stripping operations are complete, excavation can be initiated to establish desired grades. Final site grades should be either the same as existing site grades or lower. No fills should be placed on -site that result in raising existing site grades.. Soils excavated from the site that are not needed for foundation backfill must be exported from the site. Following excavation, all exposed bearing surfaces should be observed by a representative of Terra Associates. If excessively soft areas are observed and cannot be stabilized in place by compaction, the affected soils should be excavated and removed to firm bearing and grade restored with new structural fill. If the depth of excavation to remove unstable soils is excessive, use of a geotextile reinforcing/separation fabric, such as Mirafi 500X or equivalent, can be considered in conjunction with clean granular structural fill. Our experience has shown that, in general, a minimum of 18 inches of a clean, granular structural fill over the geotextile fabric should establish a stable bearing surface. Our study indicates that the colluvial soils contain a significant percentage of fines (silt -and clay -sized particles), which makes them difficult to compact as structural fill if they are too wet or too dry. Accordingly, the ability to use native soils from site excavations as structural fill will depend on their moisture content and the prevailing weather conditions when site grading activities take place. If grading activities are planned during the wet winter months, or if they are initiated during the .summer and extend into fall and winter, the owner should be prepared to import wet weather structural fill. For this purpose, we recommend importing a clean granular soil that meets the following grading requirements: U.S. Sieve Size Percent Passing 6 inches 100 No. 4 75 maximum No. 200 5 maximum* *Based on the 3/4-inch fraction. Prior to use, Terra Associates, Inc. should examine and test all materials imported to the site for use as structural fill. Structural fill should be pT' ced in uniform loose layers not exceeding 12 inches and compacted to a minimum of 95 percent of the soil's maximum dry density, as determined Fy—=eFi an Society for Testing and Materials (ASTM) Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction should be within two percent of its optimum, as determined by this ASTM standard. In nonstructural areas, the degree of compaction can be reduced to 90 percent. Page No. 7 • 5.3. Excavations March 31, 2008 Project No. T-840-10 All excavations at the site .associated with confined spaces (such as utility trenches) must be completed in accordance with local, state, or federal requirements. Based on current Occupational Safety and Health Administration (OSHA) regulations, the loose to medium dense colluvial soils would generally be classified as Type "C" soils. Accordingly, side slopes on temporary excavations. should be laid back at.a gradient of 1.5:1. (Horizontal:Vertical) or flatter.. If these slope inclinations cannot be achieved due to site constraints, temporary shoring may be required. Depending on the time of year and weather conditions when excavations take place, groundwater seepage may be encountered within excavations extending deeper than one -foot below existing surface grades. Based on our study, the volume of water and rate of flow into the excavation should be relatively light, depending on the time of year and the height of the exposed seepage face. Dewatering using conventional sump -pumps should be adequate in maintaining a relatively dry excavation. This information is provided solely for the benefit of the owner and other design consultants, and should not be construed to imply that Terra Associates, Inc. assumes responsibility for job site safety. It is understood that job site safety is the sole responsibility of the project contractor. 5.4 Foundations We recommend the structure be supported on a raft foundation consisting of a connected grid of grade beams that bear on the existing colluvial soils or on structural fills placed above these soils. No isolated column pads should be used for structural support. We recommend designing this foundation for a net allowable bearing capacity of il�!20ipounds�ver squa"re foo �(psf). For short-term loads, such as wind and seismic, a one-third increase in this & USI allowable capacity can be used. Foundation subgrades should be prepared, as recommended in Section 5.2 of this report. Perimeter foundations exposed to the weather should bear at a minimum depth of 1.5 feet below final exterior grades for frost protection. For designing foundations to resist .lateral loads, a base friction coefficient of 0.35 can be used. Passive earth pressures acting on the sides of the footings can also be considered. We recommend calculating this lateral resistance using an equivalent fluid weight of 250 pounds per cubic foot (pcf). We recommend not including the upper 12 inches of soil in this computation .because it can be affected by weather or disturbed by future grading activity. This value assumes the foundations will be constructed neat against competent soil and backfilled with structural fill, as described in Section 5.2 of this report. The values recommended include a safety factor of 1.5. 5.5 Slab -on -Grade Floors Slab -on -grade floors may be supported on subgrade, as recommended in Section 5.2 of this report. Fill should not be placed to raise site grades above the existing elevations to support slab -on -grade floors. If the main level. floor will be above existing site grades, we recommend the use of raised wood floors framed over a crawl space. Page No. 8 LI 0 March 31, 2008 Project No. T-840-10 Immediately below slab -on -grade floors, we recommend placing a four -inch thick capillary break layer of clean, free -draining, coarse sand or fine gravel that has less than three percent passing the No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the underlying soil and subsequent wetting of the floor slabs. The. capillary break layer will not prevent moisture intrusion through the slab caused by water. vapor transmission. Where moisture by vapor transmission is undesirable, such as covered floor areas, a common practice is to place a durable plastic membrane on the capillary break layer and then cover the membrane with a layer of clean sand or fine gravel to protect it from damage during construction, and to aid in uniform curing of the concrete slab. It should be noted that if the sand or gravel layer overlying the membrane is saturated prior to pouring the slab, it will be ineffective in assisting uniform curing of the slab and can actually serve as a water supply for moisture transmission through the slab and potentially affect floor coverings. Therefore, in our opinion, covering the membrane with a layer of sand or gravel should be avoided if floor slab construction occurs during the wet winter months and the layer cannot be effectively drained. Other methods are available for preventing or reducing water vapor transmission through the slab. We recommend consulting with a building envelope specialist or contractor for additional assistanceregarding this issue. 5.6 Retaining Walls The magnitude of earth pressure development on below -grade walls, such as basement walls, will partly depend on the quality of the wall backfill. We recommend placing and compacting wall backfill as structural fill. Wall backfill below structurally loaded areas, such as pavements or floor slabs, should be compacted to a minimum of 95 percent of its maximum dry density, as determined by ASTM Test Designation D-698 (Standard Proctor): In unimproved areas, the relative compaction can be reduced to 90 percent. To guard against hydrostatic pressure development, drainage must be installed behind the wall. A typical wall drainage detail is shown on Figure 3. With. wall backfill placed and compacted as recommended and drainage properly installed, unrestrained walls can be designed for an active. earth pressure equivalent to a*fluidjweighing-35 pcf. For restrained walls, an additional uniform lateral prgssurevofw1.00eips&should,A,be�included. _For evaluation of below -grade,, alls_under seismiy loading, a�'n additional uniform load equal to 8H psf, where H is the below -grade height of the wall can be used. These values?assume horizontal„backfill3condition��and�that no other su charge loading (such as traffic, sloping emu. embankments, or adjacent buildings) will act .on the wall. If such conditions exist, the imposed loading must be included in the wall design. Friction at the base of the wall foundation ad ­pass . iVFTMTh-pFe&sure will provide resistance to these lateral loads. Values for these parameters are provi ed in Section 4.4 of this report. 5.7 Catchment Wall A landslide catchment retaining wall. is to be built on the east side of the home.. Recommended soil parameters for design are shown on Figure 4. We recommend drainage board be placed as shown on Figure 3 to prevent hydrostatic pressure from developing behind the buried portion of the wall. Page No. 9 March 31, 2008 Project No. T-840-10 The catchment wall, as currently designed, should be adequate in protecting the property from soil instability discussed earlier in this report. With this wall and the other recommendations outlined in this report, implementing the proposed development will not increase the potential for soil movement, in our opinion. Any soil or sediments that accumulate above the catchment wall will need to be fully removed in a timely ` manner. We recommend that removal be planned to occur within one to two weeks of deposition. All soils from above the wall will need to be disposed of off -site. 5.8 Drainage Surface Final exterior grades should.promote free. and positive drainage away from the building area. We recommend providing a gradient of at least three percent for a minimum distance of ten feet from the building perimeter, except in paved locations. In paved locations,.a minimum gradient of two percent should be provided, unless provisions are included for collection and disposal of surface water adjacent to the structure. All downspout drains need to be collected in tightlines and be routed to the plat storm drainage system. We recommend the use of rigid pipe for all tightlines. Cleanups should be provided every 20 feet to facilitate maintainace of the drains. All downspouts and gutters should be kept clear and free flowing at all times. To prevent surface. water flowing off the adjacent hillside from impacting foundations, we recommend installing a surface swale along the uphill side of the catchment wall. The Swale should extend the entire width of the wall and convey surface water to an appropriate point of controlled discharge into the .plat stormwater system located in the street below the site. The collected surface water should not be discharged into the existing slope drainage system currently operating along the south side of the building site. A surface seepage collection system is being designed by We Engineers. The system will replace the upper portion of the former City of Edmonds seepage collection system that was damaged in the previous earth movements. The new system will rely on the use of surface collection troughs and flexible HDPE collection pipes. The use of surface pipes will facilitate maintenance and will allow flexibility of the collection system. The surface drainage system should be maintained on a regular basis. This will include shifting or adding troughs. All surface seepage and runoff collected on -site must be routed to the site storm drainage system. If water features are included in the final site layout along the house, the channels to carry surface water must be lined with a welded HDPE membrane. A detail for use in the design of surface water features is shown in the drawing entitled City of Edmonds Lorian Woods Drainage Collection prepared for the City of Edmonds by R W Beck, dated June 4, 2003. No infiltration of surface runoff should be allowed to occur. Subsurface We recommend installing a continuous drain along the outside lower edge of the perimeter building foundations. The foundation drains should be tightlined separately from the roof drainage system and discharge into the plat stormwater system located in the street below the site. Subsurface drains must be laid with a gradient sufficient to promote positive flow to the point of discharge. All drains should be provided with cleanouts at easily accessible locations. These cleanouts should be serviced at least once every year. Page No. 10 March 31, 2008 Project No. T-840-10 5.9 Slopes and Embankments All permanent cut slopes should be graded with a finished inclination of no greater than 3:1. No fill slopes should be created on the site. The existing near -vertical exposure of soil at the eastern point of the building envelope should be regraded through cutting to flatten the slope to a 3:1 slope or flatter. Upon completion of grading, the slope face should be trackwalked and appropriately vegetated or provided with other physical means to guard against erosion. Final grades at the top of the slope must promote surface drainage away from the slope crest. Water must not be allowed to flow uncontrolled over the slope face. If surface runoff must be directed towards the slope, the runoff should be controlled at the top of the slope, piped in a closed conduit installed on the slope face, and taken to an appropriate point of discharge beyond the toe. 6.0 ADDITIONAL SERVICES Terra Associates, Inc. should review the final project designs and specifications in order to verify that earthwork and foundation recommendations have been properly interpreted and incorporated into project design. We should also provide geotechnical services during construction to observe compliance with our design concepts, specifications, and recommendations. This will allow for expedient design changes if subsurface conditions differ from those anticipated prior to the start of construction. 7.0 LIMITATIONS We prepared this report in accordance with generally accepted geotechnical engineering practices. No other warranty, expressed or implied, is made. This report is the copyrighted property of Terra Associates, Inc. and is intended for specific application to the Lorian Woods Lot 2 project in Edmonds, Washington. This report is for the exclusive use of Brian and Cindy Isaacson and his authorized representatives. The analyses and preliminary, recommendations presented in this report are based on data obtained from the on - site test pits. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, Terra Associates, Inc. should be requested to reevaluate the recommendations in this report prior to proceeding with construction. Page No. 11 PT C!•'; ( r l PUGET SOUND !'- - cF� ' S. i ' � •�: - _� ..c-' f �c9 d -: ,cam-� i [+-• Y i1✓,rF 9- F.` -�c 9 �--.�7��r _ `�iiL ,'r � ,, \•�(� �:` C r i f{14+ z 2 k \ rE G HARBOUR i PA •1 E.R.,' F_ �rY `:I6•i j'S' �' 7 ; i.- c Y S" f G:1 ki X-" Lj S'`'4N. n ;'7TY r �;`. s. I L•-_ ' C^ a- -- - Q' Lll�(' SW �� 'Nw;� ; � '.• > „L y' -f' ; 4 x I::Lii. :•.W 4 ~� ?Itllj CT 1 � i. Ill. S. J o7}i 5T 1 a ' pow $i4 Sk 3-1 - Il0 RM/ \� C " � � 143r2J jl a; -4y` a 144THr S1 -' • BEACH' � ��1=5foa = _-_,;�:�� it ii FISHER .. _ 14[i( 11'' o-w a i 3' sp R6T,•- 1: iY2 ` I Sw '; S' �spfH PI SW ; HLACH Sk Ol_ tl'i 4$Pol _ `.,, G3 ' - T- )'..•rll. . ' 3 i ' �Z S ti i`3Ya�9t 3 1:1! D 5T Sk i1QRD 3 i = ' 3 IS?Ilfi NI ':1 sw 1 1 ] 56TH eta der f < i'1 tti' Q_ a❑ i I o 156TH , i '1•;"Y� .,�'�n����. 3, ='�•s � 3' 4 �-'iil CI f.�. • '. wr ✓/•t,/� KAnixoFI r 3:',� ° . c; . > ' ,�, ,R �n Y 15Eiili r �R �. 1 "•. . r •uRifil . ..1, - -- .'-36fii t — T - - tt v ..o 155T71F1 Sn S. :l: PI;KL._]60TH__ _ (7 SW i _ iI' i�E.-E 1i,151 PI iV< I '137ir i; 't xy r i 1 /// �,f )EFr7D PL .. J.:i:./ ••cr. `r.c s i 1` BROWN_ ��'/J� lW,l P, Sa . +O i B/1 /`� . - I64� ;x T3k'; PL }i�. .<c: �i S' y i' !, Sk � �� ! l -31L1 M1y S. r 1 P1, SW p�,,.,, - �;' Sk :.: a,l ! _ .16S7H, / "LI s a N o 1 Tw s:'V 3: [ • .�' '.;� '' 15cTlt rL V.4'l:Sa_t 1 F ar ,v1ESTH'Y ; Se• N > �'c S 76RH I PL < �=1tc J7 F �l k t> n trr c 7641H A S� SK A, r.. •i•" �. 't;v. F,L :6Grt!i'l Sk-—�ilrtti�il.� . � x ._ •.� •. .. '•_._. ._'.`_ter____ az REFERENCE: THOMAS GUIDE CD-ROM, KING/PIERCE/SNOHOMISH COUNTIES, 2004 NOT TO SCALE1 ,11 <: Terra VICINITY MAP LORIAN WOODS LOT 2 Associates, Inc. EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Pro Environmental Earth Sciences j. N o.T-840-10 Date MAR 2008 Figure 1 AIM NOTE: THIS SITE PLAN IS SCHEMATIC. ALL LOCATIONS AND DIMENSIONS ARE APPROXIMATE. IT IS INTENDED FOR REFERENCE ONLY AND SHOULD NOT BE USED FOR . DESIGN OR CONSTRUCTION PURPOSES. REFERENCE: SITE PLAN PROVIDED BY CLIENT LEGEND: I9 TP-1 APPROXIMATE LOCATION OF TEST PIT DATED SEPT. 2005 &B-1 APPROXIMATE BORING LOCATION -} Terra Associates, Inc. Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences f f ji 0 20 40 APPROXIMATE SCALE IN FEET EXPLORATION LOCATION. PLAN LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Proj. No. T-840-10 Date MAR 2008 Figure 2 12" MINIMUM 3/4" MINUS WASHED GRAVEL 12"T SEE NOTE SLOPE TO DRAIN ...EXCAVATED SLOPE (SEE REPORT TEXT FOR APPROPRIATE .;:. INCLINATIONS) ............. 4" DIAMETER PERFORATED PVC PIPE NOTE: 12" OVER PIPE 3" BELOW PIPE NOT TO SCALE MIRADRAIN G100N PREFABRICATED DRAINAGE PANELS OR SIMILAR PRODUCT CAN BE SUBSTITUTED FOR THE 12-INCH WIDE GRAVEL DRAIN BEHIND WALL. DRAINAGE PANELS SHOULD EXTEND A MINIMUM OF SIX INCHES INTO 12-INCH THICK DRAINAGE GRAVEL LAYER OVER PERFORATED DRAIN PIPE. Terra TYPICAL WALL DRAINAGE DETAIL 3• LORIAN WOODS LOT 2 CoAssociates, Inc. EDMONDS, WASHINGTON nsultants in Geotechnical Engineering Geology and Pro No. T-840-10 Date MAR. 2008 Figure 3 Environmental Earth Sciences 1• 9 PASSIVE PRESSURE ACTIVE PRESSURE B NOT TO SCALE LEGEND: 'H1 LANDSLIDE CATCHMENT HEIGHT (3 FEET MINIMUM) H PERMANENT RETAINED HEIGHT.(ft) D . FOUNDATION EMBEDMENT DEPTH (ft) o Terra .Associates, Inc. Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences TYPICAL SOLDIER PILE CATCHMENT WALL LORIAN WOOD LOT 2. EDMONDS, WASHINGTON Proj. No.T-840-10 1 Date MAR 2008 I Figure 4 • APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING Lorian Woods Lot 2 Edmonds, Washington On November 8, 2004, we explored subsurface conditions at the site by excavating 2 backhoe test pits to a maximum depth of 11.5 feet below existing surface grades. On February 27, 2008, we supplemented this data by drilling one 40-foot boring. The approximate test pit locations are shown on Figure 2. The Test Pit Logs and Boring Logs are presented on Figures A-2 and A-3. A geotechnical engineer from our office conducted the field exploration, maintained a log of each test pit, classified the soils encountered, collected representative soil samples, and observed pertinent site features. Our representative classified the soil conditions encountered, maintained a log of each test boring, obtained representative soil samples, and recorded water levels observed during drilling. During drilling, soil samples were obtained in general accordance with ASTM Test Designation D-1586. Using this procedure, a 2-inch (outside diameter) split barrel sampler is driven into the ground 18 inches using a 140-pound hammer free falling a height of 30 inches. The number of blows required to drive the sampler 12 inches after an initial 6-inch set is referred to as the Standard Penetration Resistance value or N value. This is an index related to the consistency of cohesive soils and relative density of cohesionless materials. N values obtained for each sampling interval are recorded on the Boring Logs, Figure A-3. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS) described on Figure A-1. Representative soil samples obtained from the test pits and boring were placed in sealed containers and taken to our laboratory for further examination and testing. The moisture content of each sample was measured and is reported on the Test Pit Logs and Boring Logs. Grain size analyses were performed on two samples. The results are shown on Figure A-4. Project No. T-840-10 Ah VW MAJOR DIVISIONS LETTER SYMBOL IRW TYPICAL DESCRIPTION Clean GW Well -graded gravels, gravel -sand mixtures, little or no GRAVELS Gravels fines. I �(D More than (less than 5 /o fines) GP Poorly -graded gravels, gravel -sand mixtures, little or O N no fines. u) N 50% of coarse fraction is GM Silty gravels, gravel -sand -silt mixtures, non -plastic o (, > W �, L larger than No. Gravels with fines fines. GC Clayey gravels, gravel -sand -clay mixtures, plastic fines. Z C E 4 sieve Q o rr 0 o N SANDS Clean Sands SW Well -graded sands, gravelly sands, little or no fines. o U) ca Z c More than (less than 5 /o fines) SP Poorly -graded sands or gravelly sands, little or no W Q a) � 50% of coarse fines. Q o "" U � fraction is smaller than Sands SM Silty sands, sand -silt mixtures, non -plastic fines. No. 4 sieve with fines SC Clayey sands, sand -clay mixtures, plastic fines. ML Inorganic silts, rock flour, clayey silts with slight J c o SILTS AND CLAYS plasticity. �o 0 co N CL Inorganic clays of low to medium plasticity, (lean clay). F o Liquid limit is less than 50% GL Organic silts and organic clays of low plasticity. 0 �Z N W o o Z_ LOcaa) Q = >i C a MH Inorganic silts, elastic. 0 -C `m SILTS AND CLAYS W m E CH Inorganic clays of high plasticity, fat clays. Z_ �° Liquid limit is greater than 50% W OH Organic clays of high plasticity. HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS AND SYMBOLS v7 w Standard Penetration Density Resistance in Blows/Foot I 2 OUTSIDE DIAMETER SPLIT SPOON SAMPLER z0 Very loose 0-4 2.4" INSIDE DIAMETER RING SAMPLER U) Loose 4-10 OR SHELBY TUBE SAMPLER W Medium dense 10-30 = 0 Dense 30-50 1 WATER LEVEL (DATE) Very dense >50 Tr TORVANE READINGS, tsf Pp PENETROMETER READING, tsf Standard Penetration W Consistency Resistance in Blows/Foot DD DRY DENSITY, pounds per cubic foot Very soft 0-2 LL LIQUID LIMIT, percent W Soft 2-4 = Medium stiff 4-8 PI PLASTIC INDEX v _ Stiff 8-16 Very stiff 16-32 N STANDARD PENETRATION, blows per foot Hard >32 Terra UNIFIED SOIL CLASSIFICATION SYSTEM Associates, Inc. LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences Proj. No. T-840-10 Date MAR 2008 Figure A-1 Logged by: BPK Date: 11 /08/04 Depth (ft.) 0 Test Pit No. TP-1 Soil Description Approximate Elev. 149 Moisture Content (12 to 24 inches TOPSOIL) Bluish -gray, tan, and reddish -orange silty SAND, occasional gravel and organics, scattered lenses of silty clay, moist to wet, loose. (SM) (colluvium) 5-1 Wet below 5.5 feet. Sandy below 8.5 feet. Hill Test pit terminated at 11.5 feet. No groundwater seepage encountered. 15 Moderate sidewall caving from 0 to 11 feet. Test Pit No. TP-2 31.4 20.3 29.6 27.8 CW Logged by: BPK Date: 11 /08/04 Approximate Elev. 140 Depth Moisture (ft.) Soil Description Content 0 (24 inches TOPSOIL and PEA GRAVEL) Bluish -gray, tan, and reddish -orange silty SAND, rare gravel, occasional 14.5 organics, scattered lenses of silty clay, moist, loose. (SM) (colluvium) 5 26.1 Wet below 5.5 feet. Medium dense below 6.5 feet. 282 37.8 Large diameter nested logs at 9 feet. 1 Q 28.6 Test pit terminated at 10.5 feet. No groundwater seepage encountered. No sidewall caving. 15 E�09Terra Associates, Inc. Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences TEST PIT LOGS LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Proj. No. T-840-10 I Date MAR 20081 Figure A-2 L • LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: _Edmonds, Washington Elevation: N/A 6 Pocket Penetromete A TSF n c — Soil Description Consistency/ ; 2 3 4 Observ. a� Relative Density Moisture Content % SPT (N) Well J= " a Wp 1----x ----- I WI • Blows/ft • 10 30 50 70 90 10 20 30 40 _ . J_ J. J... J..1...1. 1 .1...1 .... .1... .. J L . A. ... 1 Blue -gray silty SAND with gravel, fine to 2 coarse grained, wet. (Landslide debris) 1� Loose 3 5 --------------------------- ---------- 34:5 :X: I • , 6 Yellow, orange, gray, blue SILT with Loose 7 small sand layers, fine grained, wet. (Landslide debris) 37:5: I 7 8 o, 9 ------------- - ------------- --------- - ; ( 10 Brown SAND with silt, fine grained, 26.6: • I 1 2 ' . moist. X ( :e 11 'Soil becomes saturated. I F 12 Medium Dense 11.5 I ,13 ' 13 Soil has less silt. i o 14 I .. 'Soil has more silt. I 15 25:116- 11 --------------------------- ---------- 17 18 Tan SILT, moist. (Landslide debris) Medium Dense I.. I 19 20 --------------------------- ---------- I... 39.3; 15 ...... Brown SAND with silt, fine to coarse (....` I 22 grained, saturated with a 4-inch silt layer :. ... ..:.. .....:. . 2 inches from bottom of sampler. 23 Loose 24 I . I 'Continued on Next Page. I • 25 Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location Associates Inc. and should not be interpeted as being indicative of other areas of the site. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences • LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Approx. Elev: N/A Z Pocket Penetromete n TSF a m a Soil Description Consistency/ Relative Density 0 Moisture Content /o 1 2 3 4 . ,�! ., 8_ () Monitor Well ' Wp I ----- x ----- J WI • Blows/ft • 10 30 50 70 90 10 20 30 40 ... 1_1..11.-J.J i J.J- .-A J. .. .1 ... J.. p Brown SAND with silt, fine to coarse 1 27 grained, saturated. Medium Dense • I f 28 I. '. 29 --------------------------- ---------- .. 30 28.5` 2 I 31 .. 32 Grayblue CLAY, moist. Stiff I ; I ' 33 , 34 _ I 35 ------=------- ------ ---------- :. 36 37 .. . (... I .. Gray purple SAND with silt, fine grained, Medium Dense I i 38 wet. 39 I t 40 --------------------------- ---------- 41 Blue -gray CLAY, moist. Hard ;x; 42 Boring terminated at 41.5 feet. 43 .I, I . 44 t i 45 I 46 ( i i 47 48 49 r i 50 :.........:.. .. i.... �.... , . Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location Associates, Inc. and should not be interpeted as being indicative of other areas of the site. Consultants in Geotechnical Engineering, Geology g' g, and Environmental Earth Sciences �M�mm ���Mm �M�mm 0 0 APPENDIX B CITY OF EDMONDS PIEZOMETER DATA 12: 1,7,12007 15:20 PAX 425 778 �9 HANSEN AICLAUGHLIN • Q002 DRAFT TECHNICAL LANDAU MEMORANDUM ASSOCIATES TO: Don Fiene, P. E., Assistant City Engineer City of Edmonds Development Services Department, Engineering Division FROM: Dennis R. Stettler, P.E. DATE: January 24, 2007 R. PIEZOMETER INSTALLATION AND DRAINAGE RECOMMENDATIONS LORIAN WOODS SUBDIVISION EDMONDS, WASHINGTON INTRODUCTION AND PROJECT BACKGROUND This technical memorandum presents the results of a piezometer installation within a portion of the Lorian Woods Subdivision and an assessment of the groundwater conditions with respect to proposed modifications to the drainage system. The purpose of these services was to evaluate the current groundwater conditions and to provide consultation to the City of Edmonds (City) related to the design and construction of a replacement drainage system. The piezometer was installed on the paved shoulder of 73 d Place West, about 250 R south of the intersection of 73d Place West and North Meadowdale Beach Road. The piezometer location is shown on the Site and Exploration Plan, Figure 1. The Lorian Woods Subdivision is within the designated North Edmonds Earth Subsidence and Landslide Hazard Area, and control of surface water and groundwater in the area improves overall slope stability. Springs and groundwater seepage from the steep bluff on the east side of the Lorian Woods subdivision had been collected by a surface water collection system (Drainage System 1 A) constnicled at the base of the bluff by the City as a part of Local hoprovement District (LID) drainage improvements completed -in the 1980s. Landslides, originating on the bluff above the drainage collection system on and above Lot 2 and the adjacent.common area to the south of Lot 2 in the Lorian Woods Subdivision, have destroyed or damaged portions of the drainage collection system. The landslides are the result of a very steep bluff face and the presence of seepage on the bluff. The landslides are occurring above the drainage system and are not related to the presence or function of the drainage system (the drainage system is intended to improve slope stability conditions below the drainage system). The recurring Iandslides from above the drainage system, the presence of landslide debris, and leaning trees on the steep slope have created a hazardous work area for City workers to repair or replace the drainage system in its original location. The City is considering alternate drainage systems as a replacement for the existing system (Drainage System IA). This could include working with the property 130 2nd Avenue South . Edmonds, WA 98020 • (425) 778-0907 • fax (425) 776-6409 • www.landauinc.com 12/I7/2007 15:21 FAX 425 77 999 AANSEN MCLAUGHLIN • @003 ►. owner of Lot 2 to design a surface water collection system that would be built and maintained by the property owner as a part of the overall proposed property development. The private drainage system would then feed into the City system. Previous conceptual surface water drainage systems for this location have included consideration of a shallow groundwater drainage system. If shallow groundwater is present, it would be appropriate to construct a subsurface drainage component into the new drainage system to intercept groundwater and convey it to the City collection system. However, limited groundwater information was available to know the depth of groundwater near the proposed surface water drainage system, and the City requested that Landau Associates install a piezometer at this location in order to measure the groundwater level. SCOPE OF SERVICES Landau Associates'. scope of services included installation of a piezometer to monitor groundwater levels and consultation related to the design and construction of a replacement drainage system. Our services were provided in accordance with Task Order No. 06-05 under the On -Call Geotechnical Engineering Services Agreement between the City of Edmonds and Landau Associates. The scope of services included: • Drilling a boring to a depth of about 20 ft and installing a piezometer using a licensed well driller under subcontract to Landau Associates to monitor groundwater levels. • Coordinating the boring and piezometer installation by a Landau Associates geotechnical engineer, including locating the boring,, checking the boring location for buried utilities using the one -call public utility locate system, monitoring the drilling of the boring, preparing a log of the boring noting the soil and groundwater conditions, and observing the installation of the piezometer: • Monitoring the groundwater level in the piezometer three times after completion of the piezometer installation. After that time, the piezometer can be included with the system of other piezorneters in the North Edmonds Earth Subsidence and Landslide Hazard Area that are monitored by City personnel. • Preparing this technical memorandum that provides a log of the boring and monitoring well, the installation procedures, and the results of. groundwater monitoring. • Providing additional consultation related to design and construction of drainage measures. FrELD EXPLORATIONS Subsurface Conditions at the project site were explored on October 2, 2006. The exploration program consisted of advancing and sampling one exploratory boring and installing a piezometer (P-17) at the approximate location illustrated on the Site and Exploration Plan, Figure 1. The exploratory boring 0,24107 ma�uo�oc,sw�ni�,cazwwivia�r�ezaruunu�, an acc In A DrxjlkFT 2 J2/.17`/2007 15:21 F.4A 425 778&9 HANSEN BICLAUGHLIN 1�J009 i a' ; was advanced to a depth of about 21.5 13 below the existing ground surface (BGS) using hollow -stem auger drilling techniques. Holocene Drilling, Inc. of Graham, Washington, under subcontract to Landau Associates, advanced the boring. The exploration was located approximately in the field by hand taping from existing physical features and referenced to a site map provided by the City. The ground surface elevation at the exploratory boring location was interpreted from the elevation contours on the site map provided by the City (which is referenced to an arbitrary benchmark). The field exploration program was coordinated and monitored by a Landau Associates geotechnical engineer whoalso obtained representative soil samples, maintained a detailed record of the subsurface soil and groundwater conditions, and described the soil encountered by visual and textural examination. Each representative soil type observed in our exploratory boring was described using the soil classification system shown on Figure 2, in general accordance with American Society for Testing and Materials (ASTM) D2488, Standard Recommended Practice far Description of Soils (Visual -Manual Procedure). A summary log of the exploratory boring is presented on Figure 3. This log represents Landau Associates' interpretation of subsurface conditions identified during the field exploration program. The stratigraphic contacts shown on the summary log represent the approximate boundaries between soil types; actual transitions may be more gradual. The soil and groundwater conditions depicted on the summary log are only for the specific date and location reported, therefore, are not necessarily representative of other locations and times. Disturbed samples of the soil encountered in the exploratory boring were obtained at selected intervals using a 1.5-inch inside -.diameter Standard Penetration Test split -spoon sampler. The sampler . was driven up to 18 inches into the undisturbed soil abead of the auger with a 140-lb hammer falling a distance of approximately 30 inches. The number of blows required to drive the sampler for the final 12 inches of soil penetration, or part thereof, is noted on the boring log, adjacent to the appropriate sample notation. Samples collected in this mariner were taken to our laboratory for further examination and testing. Upon completion of drilling and sampling, a piezometer consisting of a 2-inch diameter, schedule 20 PVC well casing with a 10 R length of 0.010 inch machine slotted well screen was installed. Sand pack was installed around the screen section and bentonite chips were installed above the screened section extending up to the approximate Existing grade. The top of the piezometer was fitted with a monument cover installed flush with the pavement and the pavement patched with concrete. The borehole and piezometer (well) was installed in general accordance with the requirements of Washington Administrative Code (WAC) 173-160. 07Q4107 pEdmdUL2�)MjnctcW74111510201WVftPieminrtaMon bn.doc D _R_A_ F T 3 :1tLp 77%2007 15:21 FAX 425 7r8V9 HANSEN t1CLAUGHLIN U005 SOIL AND GROUNDWATER CONDITIONS Soil that was interpreted to be landslide debris was disclosed for the full depth of the boring (21.5 BGS). This condition was consistent with our expectations given the geologic history and the results of previous- explorations in the area. The soil included sandy clayey silt, fine to medium sand, silty fine sand, and fine sandy silt. Occasional wood fragments and organics were encountered in the boring. The soil generally ranged from very loose to loose and soft to stiff. Groundwater was encountered at a depth of 12 ft BGS at the time of drilling on October 2, 2006. Groundwater levels often need to stabilize after dnlling and the water level at the tirne of drilling is probably not as accurate as subsequent measurements. Three groundwater level readings were obtained between December 15, 2006 and January 18, 2007 and ranged from 5.5 to 6.6 ft BGS. The October reading could be due to a relatively low groundwater level following a relatively dry summer and early fall, or it could represent a groundwater level that had not fully stabilized at the time of the groundwater reading. November was an unusually wet month with significantly above normal precipitation. December and January represent relatively typical wet winter months. The groundwater readings taken in December, 2006 and January, 2007 probably represent relatively typical winter groundwater levels at this location. Groundwater levels can be expected to fluctuate according to the seasonal level of precipitation, the influence of the degree of surface water runoff and infiltration, and other factors. The. groundwater Ievels recorded at Piezometer P-17 are summarized in the table below. Piezometer P-17 can be added to the network of piezometers (Piezometers P-1 through P-16) in the North Edmonds area that are monitored by the City. Groundwater Measurement Results Date Depth to !Ground Water BGS October 2, 2006 12 December 15, 2006 6.6 December 29, 2006 5.5 January 18, 2007 5.8 A geotechnical report was prepared for the Lorian Wood Subdivision by Terra Associates (Terra Associates 1989) prior to development of the subdivision. A boring with a groundwater monitoring well . was installed as a.part of that study and was located an estimated 150 to 2.00 ft north of Piezometer P-17 along the present alignment of 73 d Place West. The groundwater was measured at a depth of 12.5 11 BGS at that location on March 15, 1989. (W24"7 11E&nd2t2XPMlaclSW74tt15V20 W1P1FMozoinslaIIUDn_hn.doc D R-A- F T 4 1,2,/77/2007 15:21 FAX 425 7789 HANSEN MCLAUGHLIN • ,• , 0 006 ASST,SSMENT OF GROUNDWATER CONDITIONS Groundwater seepage is emerging from the bluff face and from near the base of die bluff. This seepage condition results in areas of standing and flowing water and vet surficial soil conditions on Lot 2 and adjacent areas above (to the east of) 73'd Place West. A significant portion of the seepage appears to be flowing across the ground surface and is being collected in an informal manner along the east edge of the 73`d Place West pavement and discharged into a catch basin. An unknown amount of this groundwater seepage infiltrates back into the ground as it travels between its point of emergence as a spring on or near the base of the bluff and its present collection point at the edge of the road. It is desirable to intercept this seepage further upslope. This will both limit the amount of infiltration back into the landslide mass, as well as improve the surficial, wet conditions on Lot 2 and adjacent areas. However, damage to the existing Drainage System IA and the difficulty in replacing and maintaining such a system with City maintenance personnel is problernatic. We understand that the owner of Lot 2 is considering the installation and maintenance of surface drainage provisions that would intercept the groundwater seepage and the related surface water flow and convey it to the City's storm drain system. This approach has several advantages. The seepage collection system can be designed by the property owner to facilitate future development of Lot 2. Maintenance of such a system occurring on private property is best accomplished by the property owner. In addition to the benefits to Lot 2, such a system would reduce the amount of surface water infiltration back into the landslide mass and thus provide an effective replacement for the function of Drainage System IA. Landau Associates previously considered drainage improvements in this portion of the Lorian Woods subdivision to replace the general function of the City -installed drainage system that was located near the base of the bluff and that has repeatedly been damaged by upslope landslides. One approach considered was to install a subsurface groundwater drainage trench along the easterly edge of 73'd Place West to intercept suspected shallow groundwater flow. Given the typically wet surficial soil conditions on Lot 2 and adjacent areas, it was thought that the groundwater level may be very shallow at the location of the street and there could be benefits from the installation of a subsurface drainage trench (such as a gravel -filled trench with a perforated pipe that would drain to the downhill catch basin). The depth of any subsurface drainage system would be limited by the elevation of the downstream catch basin manholes (i.e., to allow a gravity drainage system). However, information on the actual depth of groundwater at this location was not available until the installation of the piezometer under this current study. The available information suggests that the winter groundwater level is presently on the order of 6 R BGS at the piezometer location. The groundwater level could fluctuate and we recommend that the City continue with groundwater depth measurements at Piezometer P-17 in order to assess longer -term U11241B7 4Edmdataipnoinear.W74%1151021AWIPlRVPiczctlstannWL,tm.d,c a DRAFT '12/j7/2007 15:22 PAX 425 7781W9 HANSEN MCLAUGHLIN • 007 conditions. Given the limitations on the probable depth of any subsurface drainage system along 73'd Place West, to allow gravity drainage and the current depth of the groundwater, it appears that a subsurface drainage system along 73Id Place West may be of limited benefit. In our opinion, greater benefit would be achieved by allowing the owner of Lot 2 to install and maintain improved surface water interception provisions on Lot 2 and adjacent common areas of the Lorian Woods Subdivision and conveying the collected water to the City storm drain system. We suggest monitoring the groundwater level in PieiometerP-17 before and after any drainage improvements upslope and then reassess whether drainage improvements in the street are warranted. We appreciate this opportunity to be of services to the City on this project. Please call if you have any questions regarding this technical memorandum or if we can be of further assistance. REFERENCE Terra Associates, Inc. 1989. Geotechnical Report, Meadowdale Reach Lots 59 to 57, Edmonds, ff"ashington. Prepared for Robert and Joann Anderson. June 6. DRS/rgm Attachments: Figure 1 — Site and Exploration Plan Figure 2 — Soil Classification System and Key Figure 3 —Log of Piezometer P-17 DUN= 6FdffwUt3 gOCtSW741115%D2DlVknMPleinln3UCliun_M.dX 6 DRAFT nr.q 1 VI N.MO �Agy9°r� Wt W.I�i O tr ,Itm4i14� u ani 'w� �wc4.t•. ta°N.•,,, rYKi.1n1 - ni si .�44i .+r.ar alp m4 e.en° a..an n ••�� ieLGn°b s.: MMDWDALE. BEACH RU. lu 1 � ton wu�vr —nW.lnr N t"wR��lwi - r�•Edstanla gsmcmY Sly 114. SWROY S. TWP T7 N. ROTE 1'E, W.U. SURVEY Nom ira4•:a+'. T05I5'HOTA PITCI'ci1rY3UtvE1: TNEIOf nu lWF_S SIIaVMpNTwe UwAREFon OF1aErtAL AL:e�IV2.1111 ms OILY. REFERENCES; .PUT OF L'OMMI waaM,C-o, /la m.er. R•1 I—g v°tUMM AM cunv[y 22QSa)OSi01 6ese MOP -U=. DIY O/EdMwde 2000 D 00 100 Loden Woods Drainage swlo to Feel Edmonds, Washington Legend e ENCASED MONUMENT RESAR E:Rt:O; C'AP p PKML M74WASHEC n Cs CATGF4WZIN a 'CBMM f ATCFi BMIN MAN1oLE O SUM STDRH DRAW MANHOLE' O SSW SWTARYSEWEn UANHOM CO'CLEANOUT A-1 'Llmi OLG. 1 YARD UGW • FOWER'TRANWORmEi o TJB TELF, mm4JUNCTION BOX 6 ,FORE HYDRANT WV WATER -VALVE w BCV aPRIN ITR C1RMML VALVE o GV GAS VALVE s .BIGN raa ROCKERY DECIDUOUS TREE CONIFER TREE OVERHEAD POWER UNE UND BRGRDUIjO.PoWcRUNE --1---• UNDERGROUNDTELEPHO►JEUNE OAS LINE' 57DRb1 DRNN 401E SANITARY SEWER LINE. _n ® PIQOMETER.INSTALJATIDN DATUMS: H.7nQOMALC14TUt6 ASSUM0 KTI.ALOATUk ASSUWQD eENC11MA*L e2nJ1'wmmfA&wATWTnlieN= 017R�-ICAT P.0 Di N. MF.Aaa4pilp n"a NFSr of iMEA3EC11CIPOP'72Hp PLWOJ'06fiF 11OIOI ELEVATION- e0.06FECT NOTE: UTMIES SNOT 1TIRE OASE0 GIVLE/I2M00E1CO1�7Np.STlSpSrIpEuSiDT►pOOn S�pffiTPr1LW1 1Lr•A.p mein xO1lA mWACEFEATLMSOmlwrlr. Lounaw UST . TIM L0r TA:0Tpnck m" cauummalL %TMWATOL Site and Exploration Figure Plan • r 4�17/2007 15:22 FAX 425 778�9 HANSEN DICLALiGHLIN • ID008 SO t Classification System uses MAJOR GRAPHIC LETTER ntVIRMNS QVUorii 1L;JiA0r%1 M TYPICAL r�rcrorr�rf —L§ �411131 6RAVELAND CLEAN GRAVEL �1?p'd � Iti . _ tj°• pc •. GW Well -graded gravel:-grevellsand mbdure s 810o or no fines g (): p a GRAVELLY SDIL (UtUe or no Ones) Poo dy graded gravel; grsveUaand nilxlun (s); IiWe.or no fines _o ..0 0.-w v, a GP GRAVEL WITH FINES -� GM' 0 n O (Morethen ref of coarse hacliDn retained Silly ry gravel; gravellsandlslN mirdure(s) z E M a N on No. 4 aiwa) (Appredable amount of Tines) Cteyey gravel; graveUsendlday rr ifte(s) GC iir 6 SAND AND _CLEAN SANG. "� _ SW Wel-graded and; gravelly sand; little or no lines Q e o 0 SANDY SOIL (l)!Ue or no fnes) Poorly graded sand; gravelly sand; little or no fines SP U (More than 56iU of rvarso fraction passed Silly sand; sandlsilt mixture(s)- SANQ WITH FINES S,M. -through No..A Steve) (Apprectable arnaunl of noes) Clayeynand;.sandldaymlxlure(s) SC` d'•� SILT AND CLAY Ml' lnorganlc sihand very One spud; rock f1dur; silty or daygy Me mod orcloyeysit wilhillghl.plieUcty n to E g CL Ifidigahlc clay of low to medium plasticity; gravelly day; sandy (Uquld limit less.than 50) day; silty day, lean day O.t_ z ;A d g Organic alit: orwrif. ,.sIlty_day of low plasticity E N i? r SILTAND CLAY MH Inorganic silk micaceous or diatomaceous fine send w 'p" •� Z S Inorganic.day of high ptasgdty;.tat clpy C..H: .E (Liquid lirnit greater than 5n) QH- Orgepic day of medium'lohlgh.prasildty;.organic.s8t HIGHLY ORGANIC SOIL PT Peol; humus; swamp sollwilh trigh organic content GRAPHIC LETTER OTHFR MATFRIAI :S evsarine cveenr11 rvnrrwr Mrc..+... �..... PAVEMENT corp' Asphaltwncrete pavement orPorllend camcnt pavement RDCK RK Ronk (See Rbdc Classification) WOOD {jl►[) t bad, ilarrWr, wood.chips DEBRIS �$ Coristrudlon debris, geibng1) .. _ _�. .. ...�........ w,,.,"w,,,. w oY. —R-4— uy ure umrrea Sou LeResulcRuon Wswm ano Am R1 ciaseumpilan methods. Dust tailor symbDls (e. SMQ., SP•for sand or9rnveg 1nd)cate`9oll wtti•ari raflmalod S i696 fines MulUpie:Ililler'ayrnbols (e.g;, MUCL) Indicate. borderline or•mulUple sakdasslOcsUDns. 2. Sall descriptions are based on the general approach presented 16 theSlandard Praepce fiorDescrlplfan and Idenit bUon of Sol13 (lruvar M&Quai Prpmdumj outlined 16 ASTM ID 2488. Where laboratorylndelr Iespnghas been conducted, soil dassifica.tions are based an the Standard Test Method -for Classbration oiSofisfotEngtnaering Pmpase�.es outlined to A37Ht D,2487, 3. Salldescription termiio(ogylsbaetrd onWsuate..11mstes;ti I the absence of laboralofy test data) at the percentages of each soft type and is donned as follows Primary ConsWtlelifi > sti 'GRAVEL "SAND;" "SILT," `CL:AY," etc, Sewndary CanstlWenls ? 3DW. and<S .livery:pravel>)r; 'Ve7 bandy; 'leery' silly'"etc > 15°bZd <sfslt, _}9rsyeUY."�arr8x". Ity"etc Additional Constduent,: > 6% and_r<ltitb-'yllilt gravel" 1Jih Sand; 'lvllh sll(;' e)c S%-'1r3i e'gravel; "trace sand." °trace alll:' Etc, at not noted. SAMPLER TYPE SAMPLE NUMBER & INTERVAL Code Description Code Description e b 3.254nch'D.D..2A74neh LD, split spoon 2.004nch D.D., 11.5D-ihch I.D. Split Spoon PP.- LEI d.5 Pocket PfeneDdmater.6f c Shalby Tuba Sample IdentifiiaGan N*In gr iV= Torvene,.tsf d Grab Sample �- Recovery Depth interval PID a 116D W=10 Phaioiordzetlon Detedar VDC sueening, ppm Moistµre.Content, 76 e t SingleTube°Core Barfel DoubleTukie Core Barrel 1� ]f— Sample Depltr.lntanrel D *i 120 Dry boulty, pd g Otter - See text U applicable t�J� -Zoo= ea M00ai smaII& than Nei 200 sisve, % 300-lb Hammer. 3D-Inch Droamp Portion ofSeniple Retained GS Grain Slze - See separefe'figirre for data 2 2 14 Hamrncr, 30 InCh prop forArdiive or AnMysle AL Atiarberg Umils --See separate figure for date 3 Pushed • � she GT Other Geotethrrlcal Telling 4 Rotosordc CA Chemlcal Analysis 5 AIt Rotary (Rack) Groundwater O Wash Rotary (Rock) Q Approximate vAier e(eiraDon at OmO..ni ddMng.(ATD) w otl.date noted. Gmundwater 7 Other:= See.lexi its liable ATD levhits�i aii 6Ucwate:due to pracippatco, seasonal condNmu, end other factors. Lorian Woods, PiEzmrieter Figure LANDAU InstAlatitin. Soil ClassifidE&O' h System and Key ASsociATEs Edmonds; WA 09 /17/2007 15:22 FAX 425 778�9 HANSEN MCLAUGHLIN 0 a00s P-17 SAMPLE DATA SOIL PROFILE GROUNDWATER Eno Drilling Method-_ Hollow -stem Auger Plezometer Detail it o o F o ,� E N Ground Elevation (ft).- 122 a m m o 41 m � o to U J `m 0 —o w SO rn ao rn m v F I! ID to a A 3 AC -As it Surface. 120 MG" 6 iib-hase- Gray. Otte sandy; clayey svLT haisl, : Flush=mounted monumerd with stllfj Ioek{rrg cap S1 b2 10 (SUDE DEBRIS) ST �' Grdy;:fine W msdiuht'SAND (motet, 5 Ioose. to rrtedlum den¢e}. 121291D S2� bZ A SMl ML Gray; silly; fine SANC't4 (ma sandy r $ Benlonile rhipc SI(.T (moist le vial. very loose l0 3- lodselsoA io%BHj 1/�06 t95 1-tneh beam of mares SAND wNh 121151 gravel S3 b2 0 2-Inch diameter, —10 lanehpteee`otnon-dacayedwood Schedule 20, PVC Well casing S4� b2 3 flit Q ATD t ' 15 2Irrch diameter. Schedule 20, PVC S5 b2 72 sQeen (0.010.inch ' siorsirx} 1QO WIncrease in drilling .. re.${6tenCe [d 3 20 -'Slit lnterbeds and orgeMcs Threaded end cap SB b2 .6 � o i Boring Completed 10/02/06 Total.Depth of Boring = 21.s (L 25 I 35 -� Notq: I. StraOgraphic contbcts r,<e.beaed on Meld Interpretatloneand.are approldmale. 2. Reference'la, aie text of 1h{s report ts;necgsrwy (or a.proper orrdgrstendlnp W subt;urlace condillons. 3. Refer to "5aILCIeselticeUon.Syrstem end Key" fittiire foi exttianat6n of graphics aniPsymhols. t_orian Woods, Piezorneter 1=igiire LAMAU Installation Log of Piezometer P-17 " ASSQCIATES 1 Edmonds;, WA • 12417/2007 15:20 FAX 425 7799 HANSEN MCLAUGHLIN a 001 CINDY L IS CSON. Cpq p.S. 114 Second Avenue South - Suite 103 Edmonds, WA 98020-3595 Phone: (425)778-3189 Fax: (425)778-44.99 From: To: Company: Phone: Fax: r Pages includi te� ! a.� c �/�np ng this cover page: Q Comments: )L X . ` Page 1 of 1 Chuck Lie From: Fiene, Don [Fiene@ci.edmonds.wa.usj Sent: Wednesday, January 02, 2008 2:41 PM To: Chuck Lie Subject: Public Request for Records Attachments: 2007 Readings PDF.PDF Chuck; Attached are the Piezometer Readings. Lorian Woods is Piezo # 17. Don Fiene 3/19/2008 MEADOWDALE PIEZOMETER READINGS V I R, -,! 117 BORING NUMBER 10 13 15 17 S-> DA TF DEPTH DEPTH DEPTH DEPTH DEPTH DEPTH DEPTH DEPTH: DEPTH DEPTH 01/02/07 36.83 AN -5 0 4.25 41.42 M-0 7.83 � .10M 01/23/07 37.00 5.08 43.42 8.08 02/06/07 37.25 5.50 44.83 8.00 1WI 02/20/07 37.33 5.17T E 45.75 8.25 6.17 iiA vo= 03/06/07 37.50 CZj No 5.17 45.50 8.00 6.08 T 71 03/20/07 37.50 .3 5.4 5.50 '1- 45.92 46.25 7.92 8.08 ERINW, 50, WIT, M"'Al 1 T 6.00 6.00 04/03/07 37.58 04/24/07 37.67 6.08 d-, 46.50 8.33 6.00 05/08/07 37.75 6 .4.2 i 46.75 f 800 6.25 .7 05/22/07 37.83 7.00 72.50 17.50 6.50 raj06/05/07 37.50 7.25 72.67 1p 17.50 6.50 "g, "7757,7 06/19/07 38.30 7.90 7238 8.42 6.50 07/03/07 38.17 8.00 73.00 8.58 6.50 07/17/07 38.25 10.33 -jR., 72.75 8. 50 6.83 MR 07/26/07 38.010 r 8 A 10.60 15.20 7.02 12/19/07 37.30 3.80 t 000 ..,3 ` IMF 760 6.40 ------------------- - --- ........... 0 _ - EDMos-lB. i .E. RA ASS CIATES, Inc. 1• �'r �'' F-C onsu'Itan P tt ec ical Engineering, Geol and En 'ro n 1 Earth Sciences APPTI(3,� .. s. June 2, 2009: . �. Project T-840.-10 Brian and.Cindy'Isaacson :9808'— 142nd Place SE, `F 301 Bothell, Washington. 98011 g► Subject:' SupplementalGeotechnical,Consultation ' OCT' 2: Proposed lsaacson Residence BUILDING ' � �MON SN7 uLCI7Yn�'0F 'E 10 Ql 0 � � Lot 2,. Plat of Lorian Woods CIT`I . Edmonds; Washington Per-iit,N6. BLD2007-0833 - Mr. and Mr I aacs n: Dear s s o QT EE,T FILE In,, accordance .with your request, Terra Associates,, Inc:..is 1 providing ongoing, consultation 'services to. regarding Lot 2 of Lorian Woods: We previously prepared'a report dated June 6, 1989.for the entire plat, and, a report dated.. March. 31, 2008 for your parcel. This letter addresses the. current, site developmerit plans, and`- responds'to:a memo writteri by Landau.Associates dated Ju1y.22, 2008. This letter -is an:addenduin to our, report dated March 31; 2008. Slope History Terra Associates, Inc: has made periodic observations on. the slopes on the' Lorian-Woods.Plat, since,1989. Figures 1 and 2, show the site following a ,slide event in January 2006.. This discussion summarizes our knowledge of events and. refers to the sources. of 'information.. The documents used in the. following discussion are. in the list of references attached to this letter; In this discussion, ,the slope below, west. of Lot 3 of Sequoia Ridge; is' the slope_ that is above,* east of•.L:ot.2 of Lorian: Woods. Immediately. south of Lot 2-of Lorian Woods is. a native growth/common area known as. Tract A. The next lot south of Tract A of Lorian Woods along' the toe of the -slope_ is Lot 5 .of=Lorian Woods:. The lot numbers are, shown on Figure.3. 1965 to 1989 Minor sloughing was observed 'on the eastern -slope of the Lorian Woods plat: None of the sloughed.. soils reached the toe of the slope where the proposed residence will be located: This is anecdotal information provided, to us by Dr. Anderson, the previous property owner. This copy inforiation is summarized in our report dated 1989. . 1984 The City of Edmonds seepage collection system.1A was installed along -the south margin of Lot 2 of Lorian. Woods. 1989 to 20.01. Terra Associates, Inc. representatives 'made periodic site visits to provide geotechnical services on adjacent lots. No slides -were observed on Lot 2 during.these site visits.. 12525 Willows Road, Suite 101, Kirkland, Washington 98034 Phone (425) '821-7777 - Fax' (425) 821 -43 34 Zrian;and Cindy Isaacson. 2009 May 2001 Slope failures along the western slope of Lot 3 of Sequoia Ridge are discussed in .a letter �by` Zipper Zeman.. Associates (ZZA)::dated May .21, 2001. " ZZA was providing geotechnical . . oversight of development activities. for the City of Edmonds. .. .2001 �� ,.the g'eoiechnicalMa '. Ina response. onse t.o a�ZZA letter dated May 2.. , 2.0.01, G.eoGrou P,N Northwest (GG � '''engineer -of record for the plat of. Sequoia Ridge reports in a --letter'dated May 25, 2061 ' that ,The . ' . slope • failures on ' Lot- 3 . are minor and -can be,,characierized as sloughing of`the suificial.foot of, soil . at: the .top of the slope. The sloughing .was, likely, caused by- a combination ' of the :natural slope .erosion processes that were occurring prior to the. land being cleared,, the'.over clearing and • ; disturbance' of . the- .top' .of , the slope :during: logging,, 'and the temporary 'stockpiling of erosion control mulch along the to the slope.".,Lot 3 of,Sequoia Ridge is -the Bosch. House.-. ;. Dec. 16,-2001 A,'slide occurred near Lot 2 of'Sequoia Ridge.. This material impacted the slope above Lot 5.of, . • Lorian. Woods. -This is ;discussed in je' tters by Landau dated' December'19; 2001 and GGN dated December 28, 2001.. Landau ,is providing geotechnical oversight services .of developments for the City of Edmonds. The Landau letter also discusses construction 'practices on Lot.3 of Lorian _ "Woods;: the .Bosch:House. There is a `concern expressed that temporary, soil stockpiles are to . close to the 'top. of the. slope and that. there .could be .further , slope, failures in the near future. Rainfall -'was described b`y Landau as being above.:average."for the preceding months and heavy ' ' for the day preceding_ the slide. Sept J6, 2003: A slide.occurred on Lot.4 of.Sequoia Ridge' -that reportedly impacted Lot. 2 of-;Lorian Woods and/or the native growth area 'adjaeent to Lot 2 of L'orian,Woods. This is discussed in a letter by . . .: '.Landau dated September 16, 2603. The weather,prior to the slide is described'as being:dry. At - ; the. time of • the. slide, the weather was described' as being a heavy rain;., Further —tension cracking ` was observed on Lot. 3 of Sequoia Ridge —The tension cracks were in a position. above Lot 5 of Lorian S.I. = Nov. a, 2004 " "Terra Associates, Inc: excavated two test pits.on Lot--2 :of Loiian'Woods: No fresh..deposits-of- landslide-debris were. rioted on, adjacent to, -or above the lot. Feb. 14; 2005 -. A:slide occurred .on Lot 3 of, Sequoia Ridge 'in the: area where -Landau -had expressed concerns in - 2003. This is. discussed in the.Landau letter dated. February 22, 2005'. The''slide does not.appear., to have damaged the drainage collection system. lA.. The letter, does, not describe which "lots on Torian.Woods were impacted by -the slide: ' " Jan 31- 2006. A slide. occurred along the .western slope of Lot_ 3 of Sequoia Ridge. _' The, slide. deposited materials Tonto the .slope immediately above Lot 2 of Lorian Woods:'. Drainage System lA was significantly damaged by the debris:' Terra Associates, :Inc. made 'a' site visit to Lorian Woods• . Lot 2 on. February 2, 2006.. None of the direct deposits of soil_ s from.the, slide impacted:the house footprint on Lot.. 2. of, Lorian .Woods:. The ..Landau memo reports. that the material that.,.slid appeared to be 'm_ aterial ,that initially failed in 2005 and .was re -mobilized by heavy. ,rains -and : seepage.. Based on the discussion in the Landau memo, no further'retreat of the top of "the slope._ - on the Bosch property was apparent... Catch:Basin 8;was,damage'd and pushed out of place by the 2006.earth movement. Figures 1 and 2 `show photos 'of the 2006 slide. impacts :on Lot..2 of Lorian - .•.. Wobds.' .... Project No T-840-10 'Page No. 2 ' riar;and Cindy Isaacson June 2; 2009. ; • From the discussion above, it appears that there' has "been: an increase in slide 'activity subsequent" to the development of the land above.Lots 1, 2, and 5,of Lorian.Woods. This can either be attributed to.disturbance. from the development activity or perhaps to. increased observations of the slope as a result. of the' development activities. In any -event, none of the direct deposits of.landslide debris have been observed nor reported_to have :.. directly impacted the envelope of the proposed Isaacson. House., To mitigate potential impacts ;due to the recent increase in' slope movements, a catchment •wall, will_ be placed above the proposed Isaacson residence to control materials that may encroach'on the house envelope in the future. Increased stewardship of the slope area can•be. expected to occur as homeowners, perform -maintenance work to preserve property values and the safety.of their. respective homes.. j In,..our report for the plat -dated 1989, we state that itis,,ouropinion that the return period for the, shallow slides described above to be on the order -of 10 to 20 years. In addition, our report discusses -that the shallow avalanches and.de'bris flows do not commonly reach the lower area where the house is to be located. Sloae`Cross Section Using survey information provided .by Western Engineers and -soil test borings from our files 'by :others; we developed. the attached cross section. The., schematic. location of the cross section is shown on Figure 3..: •The . generalized geologic section is shown on Figure 4. This ,geologic section is consistent with the sections drawn by others forthis vicinity.: The logs for the borings used to construct the cross section are.presented in Appendix"A. Appendix B is the survey ;information from Western _Engineers showing: the. surveyed location of the section Cedar Loy, Accumulated S1ok Sediments and General Slope Restoration �- v he house site 2 we -recommended that the cedar to located above t o report dated March 31 008 In our referenced p ,. g . . _ in the common area be removed: This log.has a diameter of. about three feet and�has been lodged on the slope for . many years. Prior to, 2006, it does not appear that there was any significant sediment accumulation above the log.: Some of the slide debris fr6iri the-2006 even(,hasaccut.nulated behind- uphill -of the log., : We have estimated that the amount; of soil that needs fo be removed is-�on the order of 30;'cubic yards: The soil. should 66"removed using a low.impact technique., It does not appear to feasible io use�a•trackhoe to remove theI. soil1. and the -log. -We recommend- that the contractor use a, vacuum truck to remove the soils.. This will limit the: number of Yorkers- required,- to. climb up the slope, and will .speed the "removal of the soil. -The soils should be removed io.*restore the , slope profile• i ' the, area of the log..The, exposed log can then be cut, into smaller'pieces 'and be removed: The in. situ stumps that have been supporting the log should remain intact on the slope -and, should 'not be physically. removed: A preconstruction meeting should-be"held to discuss the contractor's final plans. The slope above the. proposed house should be ,cleared of .all loose tree debris, logs, and dislodged stumps. The: ; woody material can be chipped on=site and, be reused as mulch for erosion control. In situ stumps should not be, removed unless approved for removal by the geotechnical engineer. There is, a short steep area immediately . adjacent to the eastern upper property corner that should be regraded to match adjacent slopes.:This short: steep area was created, through the removal of a stump during previous clearing activities. 'It is estimated that:five cubic yards of soil may need to be removed toreshape this local area., The excavated materials should be exported form the site unless it is suitable for reuse as structural fill and will_'fit in the stockpile area shown onthe current project plans. Project No T-84040 Page No.•3 , Brian,and Cindy Isaacson `-June 2'• 2009 .. '. All work •onthe slope should be done..under the full-time observation. of a`representative of the Geotechnical Engineer. = Catchment Wall Revisions In our 2008 report, we, presented design criteria for' a catchment wiidlf constructed with soldier: piles: Due: to the' projected costs of the soldier pile wall-, the project plans now show a.cantilever retaining wall designed using the same catchment wail'.and`retaining'wall foundation criteria.contained in our report. The wall"does not. have an ;access path as -shown on.previous drawings'..When sediments accumulate behind the, wall; they willneed.to be;, removed by hand using.a'wheel barrow or,through the use .of a vacuum truck.... . In addition to the catchment wall, the final house plans include concrete walls that are designed as retaining walls that extend to three feet above grade along the eastern uphill side of the house. In addition, no door openings:' were placed along the uphill side of the house. Groundwater Level Mdnitorin - " We have reviewed static water level measurements' collect ed by. Landau and by, the City of. Edmonds for - piezometer No. 17. This piezonieter is located near the southwest corner of the lot...: The Piezometer installation :•.is ,discussed. in the Landau memo dated, January 24; 2007. :The,depths are shown on the, memos. attached in A Pen dix,,C. The data`is. summarized'on Chart 1 in Appendix C., The data shows that the. static water level rises PP . P.. . . C in the wetter•winter months And declines in the dryer summer months. The proposed project should not cause. _ i t groundwater levels to rise on of adjacent to the lot: ; We understand that the City of Edmonds will continue to monitor thestatic water level on a regular basis.: . ern lA a e rain Sst w k n res onsibilit fo r the maintenance of Draina e S s tern 1 A. The We •understand that the. Isaacson s ha e to e Sy stern Y, ., g . . seepage pattern:on.the hillside appears .to havechanged froiri the•time that Drainage System lA was'installed. The primary seepage area is now. from the slope above the eastern extension of the. northern .property line of Lot 2 - -, • ,of Lorian, Woods. The discussion that follow's uses.the catch: basin' designations shown on the RW. Beck plans., . • dated June 4 2003: prepared for the City .of Edmonds. The .soil •movements that occurred. ' January of 2006 . destroyed the segment. of the system' above'-SDMH 6. SDMH.$ was physically removed from the hillside:by the: slide and was removed.fiom the site during subsequent site clearing activities... This is `shown in the photo 'attached `as Figure 1, Clearing activities ,associated with a previous �permit:for Lot 2 of Loiian Woods appear. to`have'�remo."ved SDMH:5 _and SDMH 7. On: April 9,. 2009, we .opened -the lid on SDMH 6 and -observed',' flow entering the structure from the.-8 inch . CMP that extended up to: SDMH $. There was a light trickle. of water froni the line that extended from SDMH 7 towards SDMH •6: It. appears that., SDMH 7 has been removed during previous clearing.., activities:, . We recommend that SDMH 6 be removed and be backfilled with a clean crushed rock. A slot trench should be . .. provided to allow any, seepage that. may,continue from .upper .trench lines to reach the footing drain of. the catchment wall: Project No -T-840-10 Page No. 4 Brian and Cindy Isaacson . June 2; 2009 During site grading, the. remaining pipe that drains SDMH 6 to SDMH 5 should be removed'and the trench be backfilled ,with structural fill. The. discharge •from SDMH 9, and the actual condition of SDMH .5. should be evaluatedduring: site grading. The: lateral system.to SDMH. 9 is above -grade for'most of its extent:'.,If the :evaluation" indicates •that the line should remain in place,'the pipe should. be replaced with HDPE.,butt welded pipe:. The diameter of the HDPE pipe does not need to be any larger than, four inches and may be placed on the surface in'a manner consistent with the upper drains being placed fof this project: The CMP between the location of SDMH 5 and CB #D,should,be exposed and be replaced'with a 12=inch PVC pipe to connect 11 with the lateral to-SDMH 9:. To, facilitate maintenance, .either, anew catch"basin. can be installed at the location:of SD,MH.5 oi;a cleanout:can be installed at the.elbow.that would replace SDMH 5:. -The :drains shownon Sheet. 4 of 6 of-, the plans prepared- by Western Engineering are' intended to replace the. formei system that was placed by- the city in the late 1080s.• The use .of flexible pipe on the surface and surface collection: pans should, facilitate maintenance:. Any damage to the system will be visible and -repairs can'then be made without the need for equipment.or trenches on the hillside: ; Sl6m Revegetation• Plans` The slope revegetation plans should proceed as soon -as possible following the removal of 'the cedar. log ;and slope restoration' work and placement. of.the drainage system described above. ' Fills drainage . These fills 'are u to promote the ho se Fills of 'u ' to two, feet will. be required in local areas around. g • P minimal in. -nature and will not decrease the',stability of the -site or adjacent, slopes: There will need to be a fill of UP. to five feet in, depth to create the landing for: the entryway stairs and a'frll of up to four feet in depth for the northwestern -edge of the, patio. along-the'back of,the house:, As shown': on_the'civil;plans, the cut.for'the house involves the removal of 450•yards'•of soil "and the placement of 50 cubic.yards-of,soil. Thus, thereis_a net-loss.of soil from the site of about 400. cubic yards. The proposed fills.. are' not in a location that .will create• slope instability issues. The short 2:1 •fill slope along the north elevation.of the .house from .the ,fill used to support the' northwestern corner; of the- patio is suitable.,for this site and will not:lead to slope instability issues. To address the possible 'settlements from the •fills used ,to create the- entryway stair's,. we recommend: that the' area be preloaded prior to, placement of the stairs arid,associated walls. The preload may Consist of Ecology -Blocks 'stacked-two.blocks:high- covering the -footprint of the.proposed,fril-. ..As an alternative, a.,tempora'ry stockpile .of backfill At least six feet high can be. placed at. the -entry fill location. This. -preload should, remain .in place for at, least four weeks prior to placernent.of the walls and fills needed to support the lower portion_ of the entryway stairs: A temporary fill stockpile area adjacent to the southwest corner -of the lot is permissible-.7his is below the toe of P Y P adjacent P , the eastem,slope'and,well.away from the slope that is present on the western margin of the plat ofLorian Woods. It -is our opinion that the use of the area for a temporary stockpile no(to exceed 50 cubic yards will not"decrease the stability of the'site slopes on or, adjacent. to, Lot 2: Unless approved by the geotechnical engineer, the stockpiled soils must be completely removed .the beginning of the season on October.1. : Y Y _ g g P. - . , Project No T-840-10 . Page.No. ,5: Brian -,and Cindy Isaacson June'21.2009 ' .. Structural Plans We have ,reviewed the geotechnical aspects of Sheets S-0, S' I,- S-2, 576; 'and- S78 of the structurah,plans for the Isaacson Residence prepared. by Reed. and Associates; PS dated April .9, 2009 with a're'vision date of May 26,. r.. 2009.' Based on our -review our"recommendations have been.followedin preparation of the plans: Civil Plans .. :. We have: reviewed the civil-arid'teinporary erosion"control plans prepared. by Western Engineers dated. February 28, 2009 and revised May"! 3, 2009. `Based on our review,,our, recommendations have been incorporated 'into the; geotechnical aspects of the plans: ` Architectural Plans We have reviewed the geotechnical' aspects of the architectural plans prepared by:O'Brien and Associates dated, . February 28, 2008 for Sheet Aland 'May 1'; 2009 for Sheets Al, A3, and A5. through A7.' Based on our review; our: recommendations have been incorporated into the geotechnical aspects of the plans_ , CLOSURE . ; City of Edmonds Required. Risk Statement It is our professional- opinion that the risk of damage:to the proposed "development or to the adjacent properties will be minimized subject to the conditions set forth in this and previous, letters an'' reports prepared -by Terra. , :Associates.. The .proposed "development will not increase the-, potential for soil movements Minimized shall'',-.... e- n'that the a licant has utilized best.' available. science and'commonl accepted en'ineerin and architectural ma Y g g PP P . practices to minimize, to the extent possible, the risks associated with development of the property Probability -of Earth Movements Within a 25-vear-Time Period' In our report for •the plat, dated 1989,, we. siate that- it is, our opinion that the ' retum: period for.the `shallow slides such as the slide. above Lof,, that began in2001` and continued i&ie6ccur through.2006 to be on the'order of 10• to 20 years. ;In„addition,,-our report discusses that the, shallow avalanches and debris, flows do not c•omnionly reach, the lower area where thehouse 'is to 'be. located. " Theproposed. catchment wall is mitigation for the : anticipated future earth movements.from the slope; abode the house: ; 'Project No T-840-10 - Page No. 6. 0. 0 Photo taken on February 2, 2006 from the southwest property corner Drainage structure 6 is in place. Drainage structure 8 was displaced by the slide. TERRA 0ASSOCIATES., 0 Geotechnical Consultants Luuo Lanasnae rnoto Isaacson Residence Edmonds, Washington Project T-840-10 1 Date June 2009 1 Figure 1 U Cd c O cd O c O 1=4 Cd cn E Cd O a� u.j 4-4 d O 0 V 0 O rn 'Ln W +' r' O =.. O t a Q-1 P., Lrl c ro c V m v c t U N 0 o� A GGN is GeoGroup Northwest boring location TAI is Terra Associates boring with year of the exploration LA is Landau Associates boring location Blue line is approximate location of generalized section shown on Figure 2 Refer to survey by Western Engineers for specific section location NoTERRA ASSOCIATES Geotechnical Consultants eomic Isaacson Residence Edmonds, Washington Project T-840-10 I Date June 2009 I Figure 3 GGN is GeoGroup Northwest boring location TAI is Terra Associates boring with year of the exploration LA is Landau Associates boring location Blue line is approximate location of generalized section shown on Figure 2 Refer to survey by Western Engineers for specific section location TERRA go ASSOCIATES Geotechnical Consultants zed Geologic Section J Isaacson Residence Edmonds, Washington Project T-840-10' Date June 2009 Figure 3 2 2 2 2 0+00 . 0+50 1+00 1.+50 2+00 ' :. ..: Z+5U 3+UU 3t�u _ .4rvv HV-'1"=40' SCALE: REFERENCE:,'' 'TA1-89=B-2 FROM TERRA ASSOCIATES, REPORT T-840-1, DATED JUNE 6,_1985 '. P-17•LA .. ._ FROM:LANDAU ASSOCIATES, DRAFT MEMO, DATED JANUARY 24, 2007 . . TAI-2008 B-1 FROM:.TERRA.ASSOCIATES, REPORT •T-840A0, DATED MARCH 31, 2008 " - B=3 "GGN ' FROM GEOGROUP NORTHWEST; REPORT, DATED "FEBRUARY 2, 20.08 Terra "- GENERALIZED: GEOLOGIC SECTION I ISAACSON HOUSE Associates, �IIC.: EDMOND_S WASHINGTON` Consultants in Geotechnical Engineering•. " Geology and ' � Prb - . - Environmental Earth,Sciences i .1 No.T-840' 1i Date JUNE 2009 Figure 4 9 0 APPENDIX A BORING LOGS • 0 BORING NO. 2 Logged By CRL Date 2/16/89 ELEV. 120± Graph us I CS Soil Description Depth (ft.) Sample (N) Blows W (%} q tsf u Ft. Concrete slab ml/ Grey silty fine SAND and clayey SILT, = 4 26 sm some orange stain 6 Grey silty fine SAND with clay Z T 5 33 10 3/15/89 Same, with some organics = 5 24 15 Same, with hard clay chunks & wood = 13 46 20 sm Grey silty fine to medium SAND = 10 19 25 No recovery r 21 30 ml Grey sandy SILT = 12 31 35 Grey SILT = 22 31 40 ml/ cl Grey clayey SILT with sandy zones = 17 37 2.5 45 Same I 31 24 3.5 60 ch Grey CLAY = 24 38 3.5 55 Same = 25 36 2.5 60 Grey CLAY, thin bedding = 35 35 4.5 65 CH Same LL=75; PI= = 95/9" 23 4.5+ BORING LOG TERRA ANDERSON PROPERTY ASSOCIATES MEADOWDALE BEACH EDMONDS Proj. No. 840-1 Date 3/89 Figure 9 Geotechnical Consultants ' BORING NO. B-3 Page 1 of 1 Logged By: K! Date Drilled: 5/18/99 Surface Elev. 255 feet Depth USCS Description Sample Blow Count per Water Content Other Tests & ft. Code 6-inches °'° Comments Type No. Sp _ ivy surface. SAND, dark yellowish brown, damp, fine grained Sand, verX loose . _ _ _ _ S1 1,1,1 (N=2) 16.6 SM SILTY SAND moist, medium dense, fine grained sand with - - - - 5,8,7 11.2 gravel, brown. S2 (N-15) 5 -- Sp --- --------- -- - - -- _ _ _ ----- SAND, damp, medium dense, fine grained sand, brown. � S3 27,12,13, (N=25) 9.3 Sample at 5 feet affected by water added to hole. SP As above, very dense, fine to medium grained sand, grayish brown. 54 15,25,26 (N-51) 6.6 10 Sp As above, moist, medium dense, silty sand tense at bottom of sample, brownish gray. SS 2,17 (N(N=29) 11.5 15 SP As above, dam dense; fine grained sand, P, Fain d, gmY• S6 12,17.29 (N=46) 12.9 20 $p As above, very dense, moist. T _ IL S7 19,27,33 04=60) 8.0 25 Sp As above, damp. S8 25,34,45 (N-79) 6.3 130 SP I As above, wet, very fine to fine grained sand, 5% fines. Bottom of boring: 31 feet. 35 Drilling Method: Hollow -stem auger (portable). Sampling Method: 2-inch-O-D. standard penetration sampler driven using a 140 lb. hammer with a 30-inch drop. Groundwater encountered at approximately 29 to 30 feet during drilling. LEGEND: = 2" O.D. Split -Spoon Sampler GROUNDWATER seal T 3"O.D. Shelby -Tube Sampler OBSERVATION WELL: measured water level 3` O.D. California Sample ID well tip (screen) .SOME.. BORING LOG 0 Group Northwest, Inc. PROPOSED RESIDENTIAL DEVELOPMENT SEQUOIA RIDGE SHORT SUBDIVISION GeoterLalnl tiatinecra, Geatoetsts, & Eaviroameatal Scientists EDMONDS, WASHINGTON JOB NO. G-1061 I DATE 5/20/99 PLATE A4 28,50 Groundwater S9 (N=50+) 24.5 ecoumtett:d at 29 to 30 feet during drilling. 1tilritvvr 10:14 VAA 440 110 44HU HANSEN UCLAUVHLIN • 10009 P-17 SAMPLE DATA SOIL PROFILE GROUNDWATER E.99 2 Draling Method' Hollow -stem Auger Piezometer Detail m m 6 6 Ground Elevation (ft)' 122 d t _ is Tiu E E a 'v O O_ c a v3 V a: iu o ICI rn o0 m N 00 m, t�3 3 AC hall &Urfa r GP: I -base I F1ush•movnled 12o Gray, One sandy, clayey SILT (moist, monumentwilh �j stiff) (S1-1DE DEBRIS) locking tap _ Si b2 10 Gray, R ie to medlurti•SAND'(nwfal, -- — 5 loose to medium dense). 1212810 52� b2 4 SNV—FraY.`silH, Rne &Wo tQ Gne ee0dy _ — 8entonua hip. ML SILT (moist (o web Very loose to. Ioosb1son to sum I/T 6 115 . 1-Inch loam of coarse SAND with 12/15/06 gravel S3b2 e 2-Inch diameter, Schedule 20, PVC 10 tenth ptecaof non decayed wood wen casing S4 b2 9 110 Q ATD 76 ?-Inch ®ameter, Schedule 20, PVC 55b2 2 screen (0.010•inch slot Size) 106 0 a ' Increase In drilling reslalanra w 20 - S01 Interbeds and organics Threaded end cap 3 Se x 5 J L _b2 Boring Completed 10/021011 Total Depth of Boring Y 21.6 IL a. C7 d s 25 g FN U W a Z 30 c f D 3s Notes; 1. Stral'rgraphic conlacia are based on field interpratailons and.ore approximate. 5 2. Reference to the lexr of this report Is neces rot e,Propor understanding of eubgurtace conditions. 3. Refer to "Soil Claesihcelion System end Keypure for expfena6on or graphics and v symbols. Lgrian Woods, Piezometer Figure LANDAU Installation Log of Piezometer P-17 ASSOCIATES Edmonds, WA LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Elevation: N/A Pocket Penetromete c TSF n m c — Soil Description Consistency/ ; _? 3 4 Observ. v m Relative Density Moisture Content % SPT (N) Well a E WpX----1 WI e . Blows/ft • 10 30 50 70 90 10 - 20 30 40 I_.I__. L_r._ I A-.,_. 1 I T Blue -gray silty SAND with gravel, fine to 2 coarse grained, wet. (Landslide debris) ''0 Loose 0 ! 3 18.2 ... i 4 ---------- i 5 -------------------------- 34.5 . 6, 6 Yellow, orange, gray, blue SILT with Loose 7 small sand layers, fine grained, wet. • . • . • (Landslide debris) 37.5. 7 g o, .. I 9 --------------------------- ---------- • I I i i0 Brown SAND with silt, fine grained, 2t3.6. 12 moist. x ;• I 'Soil becomes saturated. 12 Medium Dense 11.5 113 1 ' 13 'Soil has less silt. 14 "Soil has more silt. 15 25:1 x • 16 ------------------------- - - -------- - - 17 i 18 Tan SILT, moist. (Landslide debris) Medium Dense i I 19 I i , 20 --------------------------- --------- ; 39.3. 5 21 �: - • - Brown SAND with silt, fine to coarse 22 grained, saturated with a 4-Inch silt layer 2 inches from bottom of sampler. 23 Loose ; 24 i 'Continued on Next Page. 25 Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location Associates Inc. and should not be interpeted as being indicative of other areas of the site. Consultants In Geotechnical Engineering, Geology and Environmental Earth Sciences LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Approx. Elev: N/A Pocket Penetromete m n TSF c Soil Description Relative Density Relative Moisture Content % ; , 2 3 4 SPT (N) Monitor Well r a E Wp I-----x----- WI i Blows/ft • o 10 30 50 70 90 10 20 30 40 V 26 1; Brown SAND with slit, fine to coarse 27 grained, saturated. Medium Dense ; I28 29 ------------------------- -------- 30 28.5: 12 31 ' i 32 Gray blue CLAY, moist. Stiff 33 34 i 35 --------------------------- ---------- 33.4 : 21 .. i x 36 ....I 37 I ..• Gray purple SAND with silt, fine grained, Medium Dense 38 wet. 39 40 --------------------------- ---------- -24.9 '45 41 -T Blue -gray CLAY, moist. Hard x • 1 42 i I Boring terminated at 41.5 feet. I i 43 44 45 i 46 47 i - 48 49 I •. 1 1 50 .. .... !...:.... Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location Associates, Inc. and should not be interpeled as being Indicative of other areas of the site. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences 11 • APPENDIX B SURVEY FROM WESTERN ENGINEERS Q • rl t./ e_3 SCALE: 1" = 30' 6661 0 30 60 p 38764 STAB 1 I / 1 ` , I ` 0+00 1 i�00 1 6E N1 G�0. 3 O�50'j + N 70' S2' 16"W 1 i ' �1 1' i ; '' i '' '' '' / /' r'' ,' ,/� / '' / /' ,' /' , �J / i 1, 14.01' / Western , Engin a ers, 96 Inc. (425) 356-2700 SURVEYORS Y PLANNERS a ENGINEERS LAND USE CONSULTANTS CIVIL ENGINEERS o LAND SURVEYORS *** 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** TAXACCOUATNO.Q. 00790400000200 �x - 6j SMEADDRESS.- 16007 73RD PLACE W. EDMONDS, WA 98026 PROFILE EXHIBIT HAP FOR: BRIAN ISAACSON SW 114, SW 114, SEC.05, 727N., R.04E., W.M. SNOHOMISHC007Y, WASHINGTON DRAWN BY DATE REV. BY DATE PROJECT MANAGER SCALE JAJ 03/09/09 B.R. CONSTANT 1 "=30' DRAWING FILE NAME CHK. BY F.B. NO. JOB NO. SHT. NO. 06792APROF-2.DWG BRC — 06-792 A 10f2 • • 0 260 250 240 230 220 210 200 190 180 170 160 150 740 130 DATUM ELEV 120.00 • TOP OF SLOPE / (BOSCH HOUSE TOE OF SLOPE W p ~ "' J N 4 0 "' _� O hc V "' ¢ a � / ELEV= 158.5- AT SECTION) a - a - — ELEV= 146.0 ELEV= 133.0 GARAGE FF co � 0+00 0+50 1+00 1+50 2+00 12+50 3+00 SLOPEPROFM& SCALE. VERT.• 1'=30' HORZ. 1'=30' TAXACCOWA'O.Q.SITEADDRESS: 00790400000200 16007 73RD PLACE W. EDMONDS, WA 98026 • C0� �F WAS �w cn _z►�jnC, stern *Engineers.. (425) 356-2700 PROFILEEXHIBIT MAPFOR. • BRIANISAACSON SWI/4, SW114, SEC05, T272V, R.04E., W.M. -� SNOHOMISHC007T, WASHINGTON Q V SU RVEYORS o pLANNERS o ENGINEERS DRAWN BY DATE REV. BY DATE PROJECT MANAGER SCALE I STS ONAL LAND USE CONSULTANTS JAJ 03109109 B.R. CONSTANT - DRAWING FILE NAME 06792APROF-2.DWG CHK. BY BRC F.B. NO. — JOB NO. 06-792A SHT. NO. 2Of2 CIVIL ENGINEERS o LAND SURVEYORS *** 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** APPENDIX C STATIC WATER LEVEL DATA z 0 m a� a m 0 v CD CD a) CL U) v CD CY CD U) 0 v s 07 CD (D c m' CL Cr CD 0 m n. 3 0 a cn 10/10/2006 12/9/2006 2/7/2007 4/8/2007 6/7/2007 8/6/2007 10/5/2007 12/4/2007 v 2/2/2008 cD 4/2/2008 6/1 /2008 7/31 /2008 9/29/2008 11 /28/2008 1 /27/2009 3/28/2009 5/27/2009 Depth to Static Water Level in Feet cn 0) v CO in cn �n �n � �n m �n MEADOWDALE PIEZOMETER READINGS BORING NUMBER 4 6b 7 10 12 13 14 . 15 16 17 DATE-7 DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH- DEPTH: DEPTH: DEPTH: DEPTH 01/02/07 9.92 36.83 8.50 4.25 38.91 41.42 16.50 7.83 6.75 01/23/07 10.00 37.00 8.42 5.08 38450 43.42 17.25 8.08 7.00C. 02/06/07 10.08 37.25 8.50 5.50 38.67 44.83 17.83 8.00 7.25 02/20/07 10.08 37.33 8.67 5.17 38.00 45.75 18.17 8.25 7.67 6.17 03/06/07 9.92 37.50 7.83 5.17 38.00 45.50 18.58 , 8.00 7,25 6.08 03/20/07 9.92 37.50 8.2.5 5.43 39.00 45.92 18.33 7.92 7.33 6.00 04/03/07 10.00 37.58 8.25 5.50 38.92 46.25 18.67 8.08 7.42. 6.00 04/24/07 10.08- 37.67 8.50: 6.08 39.00 46.50 18.83 8.33 7.92 6.00 05/08/07 10.08 37.75 8.58 -. 6.42 3892 46.75 19.00 8.00 . 7.75 6.25 05/22/07 10.00- 37.83 8.42'- 7.00 39.00 72.50 19.67 17.50 22.33 6.50 06/05/07 10.17 37.50 8.83 - 7.25 39.75 72.67 19.50 17.50 22:50 6.50 06/19/07 10.18 38.30 11.50.. 7.90 38.50 72.38 19.58. 8.42 7.90 6.50 07/03/07 1042 38.17 8.58 : 8.00 3950 73.00 19.67 " 8.58 ' - 792 s 6.50 07/17/07 10;50 38.25 833 10.33 39:92 72.75 19.83: 8.50 8.08 6.83 07/26/07 10:40 38.00 8.50 10.60 38.20 19.80_ 15.20 20.00 7.02 12/19/07 9.90 37.30 7.50 3.80 37.90 0.00 18.90 7.60 7.40 6.40 0 0 } MEADOWDALE PIEZOMETER READINGS BORING NUMBER 4 6b 7 10 12 13 14 . 15 16, 17 DA TE. DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: 01/03/08 9.90 37.10 7.70 3.90 37.55 ' 0.00 18'.45 7.40 7.50 6.00 01/17/08 10.00 37.10 1�0.00 11.00 ottom oul 31.30 - f8.00 7.30 T60 ----- 02/14/08 10.46 37.20 8.28 4.77 35.63 17.60 18.31 7.99 8.00. 5.63 02/29/08 .10.6.2 37.26 - 8:68 5.13 31,06 37.14 18.36 8.20 8:09 5.97 03/17/08 10.56 37.47 8..48. 5.23 38.48 33.73 18.67 8.08 7.9.8.. 5.90 04/03/08 10.46 37.54 8.3<0 4.13 [38.04] 24.28 18:73 8.07 7.74 5.83 05/23/08 17.33 37.48 : 8.64 5.93 29.98 46.24 17.42 8.23 - 8.02 6.23 06/05/08 10.24 37.64 7.92 5.57 38.10 7.68 18.81 6.18 7.8.2 6.05 06/18/08 Bottom Out 37.83 8.83 6.47 38.13 23.58 .19.00 8.18 8.10 6.16 07/02/08 '10.14 ' 37.82 -878` 7.44 38:00 40.01 1.9.00- 8.29 8:14 6.74 07/16/08 10.71 37.95 9.04 4.39 38.44- 39.75 19.23 8.55 8.40 7.18 07/31/08 1072 37.93 894: 1.94 3'8 09 44.99 1926 8.62 8.56 7.75 08/15/08 10.68 38.00 8.90,' 1.91 3636 46.18 19.36 8.66 8.65 7.99 08/27/08 10:69 38.13 832 12.60 38.03 1.42 19.48 8.23 '8.52 - 8.14 10/22/08 Bottom Out 38..42 8.97 Bottom Out : 38.61 26.85 20.00 8.48 8.74 7.77 11/24/08 Bot om Out 38.25 8168"", 10.20 381.92" 13.11 20.00 8.32 8.34 6.76 --------------------------------- LJ y' IIn Notes: 1. All measurements are in feet 2. Depths taken on 1/17/08 are inaccurate. Water level indicator was malfunctioning. Received new system on 2/12/08 3. Cover was off (no protection from rain water) Bottom Out: Gauge probe has made contact with organic material at piezometer MEADOWbALE PIEZOMETER REAbINGS BORING NUMBER 4 6b 7 10 12 13 14 15 -16 17 DA TE: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: 01/16/09 6.69 = 37.79 8.26 7.00 38-94 15.06 19.33' 8.14 7.91 5.58 01/28/09 Bottom out. 37.63 8.71 3.60 3:8.80 37.08 19.06 , 8.26 8.22 6.32 02/19/09 Bottom out 37.89 8.82 3.25 38.28 20.81 19.27 8.30 '8.41' 6.76 03/11/09 Bottom out 36.80 4,12 3.23 37 64 20.53 19.38 8.42 8.26 6.89 04/03/09 9.86 38.04 - -7 49 `- 3.68 3413 ` . 0.58 19.35 , 5.94 7.44 5.18 ------------------------------- Notes: 1. All measurements are in feet 2. Depths taken on 1/17/08 are inaccurate. Water level indicator was malfunctioning. Received new system on 2/12/08 3. Cover was off (no protection from rain water) Bottom Out: Gauge probe has made contact with organic material at piezometer 40 Hug aU U/ U/;lap KU13E N I A. ANUEKSON, M.U. (bO9) 886-3/08 p.1 0 .r W-OS3,3 � OCT 2 2 2007 Aagust 30, 2007 614 Daniels Dr NE PERMIT COUNTER East Wenatchee, WA 99802.4036 509-886-3708 holos0).charter.net City of Edmonds 210 5 h Avenue N Edmonds, WA 98020-3146 425-771-0220 STR Attn.- Jeannine Graf E RE: Authorization for Drainage Installation work on Common Area Surrounding Lorian Woods Lot 2 — Isaacson Project Dear Ms. Graf: We, the undersignedl, have reviewed the common area grading and drainage installation plan prepared by Western Engineering, Inc. for Lot 2, Plat of Lorian Woods. and submitted to the City of Edmonds by tsrian and Cindy Isaacson on August 13, 2007. We, the undersigned developers of Lorian Woods, Edmonds, Washington, refer to the authority stated in Article VI, 6.1, of the Covenants, Conditions and Restrictions for the plat of Lorian Woods, Snohomish County, Washington; reserving to us the right "to contract ... or grant that property on which utilities or drainage easements are to be located _ .. for purposes of installation, maintenance, replacement or extension of utility services useful to the property" We, the undersigned, hereby acknowledge that the information cited above is correct and that we grant Brian and Cindy Isaacson, owners of Lot 2, plat of Lorian Woods, an easement to perform the grading and drainage installation work and subsequent maintenance over the common area legally described as Tract B, Plat of Lorian Woods, Snohomish County, Washington (parcel number 007904000144900), as shown a civil en g" aerinI plan prepared by Western Bering, Inc., to which reference is h by made. I� s-Dobert Anderson '� Joon m' derson evelopers, Lorian Woods Plat and graniors of Common Area Drainage Easements STATE OF WASHINGTON COUNTY OF DOUGLAS On this day personally appeared before me �•9J �^ �t 4n>�, tome known to be the individuals described in and who executed the within and foregoing instrument, and acknowledged that they signed as their free and voluntary act and deed, for the uses and purposes therein mentioned. UNDER N Y HAND AND OFFICIAL SEAL THIS 30TK DAB' OF AUGUST, 2007 hloi&Y PutHtc NOTARY PUBL i and for he State of stag "r wowrgtors Washington residing at 3 DERMCK TtL;lAO MAWS= tih' APPckni►►e^d_12KP� ,fen 8, 200i 4a TERRA ASSOCIATES, Inc. • o 81 Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences UR��� FILE Brian and Cindy Isaacson 9808 — 142nd Place SE, F-301 Bothell, Washington 98011 Subject: Supplemental Geotechnical Consultation Drainage Plan Review. Lot 2, Plat of Lorian Woods Edmonds, Washington I11 April 25, 2007 Project T-840-10 OCT 2 2 2007 PERMIT COUNTER References: 1. Geotechnical Report, Meadowvale Beach, Lots 54 through 57, Project No. T-840-1, prepared'by Terra Associates, Inc., dated June 6, 1989 2. Geotechnical Report, Lot 2, Lorian Woods, Project No. T-840-10, prepared by Terra Associates, Inc., dated September 14, 2005 3. Lorian Woods Estates Tree Removal, Forest, and Slope Restoration in Tract "A", Report on Conditions: Plans with Details; Related Documents, prepared by City Foresters, dated March 4, 2006 4. Land Use Application for Tree Removal, dated August 2, 2006 5. Supplemental Geotechnical Consultation, Tree Removal, and Maintenance, Project No. T-840-10, prepared by Terra Associates, Inc., dated August 7, 2006 6. Plans prepared for Brian Isaacson by Western Engineers, dated April 15, 2007 and April 17, 2007 Dear Mr. and Mrs. Isaacson: In accordance with your request, Terra Associates, Inc. is providing on going consultation services to you regarding Lot 2 of Lorian Woods. We previously prepared the referenced report for the entire plat, the referenced report for your parcel, and the referenced letter regarding Tree Removal for you parcel and adjacent areas. We have also reviewed the plans prepared by Western Engineers. Our review of the plans by Western Engineers has included conversations with Mr. Barry Constant as well as several site visits. 12525 Willows Road, Suite.101, Kirkland, Washington 98034 Phone (425) 821-7777 • FaX 14751 R?1-4-A14 Brian and Cindy Isaacson April 25, 2007 Terra Associates, Inc. has made observations on the slope above your lot on several 'occasions since 1989. We have observed that the drainage system installed by the City of Edmonds has been damaged by heavy erosion and that the seepage pattern has changed over the years. We understand that you will be assuming maintenance responsibility for the drainage system on and uphill of your house. In the past, the City of Edmonds performed the maintenance. A modified drainage plan was prepared by the city using lined surface swales however, the revised system was never built. The purpose of the drainage system is to collect groundwater that has seeped out at the surface in a series of springs. The intent of the system is to collect the seepage .and tightline it to appropriate discharge points. This will reduce the potential for the seepage from re -infiltrating the site soils. The plans prepared by Western Engineers reflect the need for the drainage system to remain flexible to allow for changes in the seepage rates and locations. As with any drainage system, regular maintenance will be required. We recommend that the high density polyethylene (HDPE) pipes used on the slope not be buried. This will allow for expedited visual inspection of the collector system and allow for timely repairs. All pipe used on this project must have smooth inner walls. The HDPE pipes should be provided with heat welded joints. The pipes should be placed to descend as close to the fall line as possible. The collector devices shown on the plans will require trash racks and regular maintenance to keep the collectors free of debris and sediment. The maintenance schedule will need to be monthly or following each heavy rain storm. Dense impenetrable brush such as Himalaya blackberries should not be allowed to grow in the area of the collector system. The surface collection drains shown on Section AA and BB should be lined with an HDPE liner at least 20 mils in thickness. Any joints in the liner will need to be made with the adhesive that is compatible with the HDPE and in accordance with the supplier's recommendations. All elements of the drainage system will need.to be maintained. Damage area will need to be either repaired and/or replaced in a timely manner. In addition to the drains shown on the slope a drainage swale will be constructed along the top of the retaining wall that is proposed immediately east of the proposed house. This proposed retaining wall will be provided with several feet of free board on the uphill side of the wall to serve as a collection point for soils eroded off of the slopes above the house over time. A pathway suitable for the transit of a small skid steer loader will need to be maintained .to allow removal of any accumulated sediments over time. The perimeter ' of the house will need to be provided with both footing drains and a tightline to collect downspouts. The downspouts should not be tied into the perimeter footing drainage system. The footing drains and downspout tightline should be tightlined separately away from the house a distance of at least ten feet and a vertical fall 'of at least one -foot before being joined into the final tightline to the plat storm drain system. All subdrains and subsurface drainage pipes will need to be provided with cleanouts. Cleanouts will need to be serviced on an annual basis. This may consist of advancing a TV along the pipe to verify the pipe is open and free of blockages or damage. Any blockages or damage must be repaired in a timely manner. Regular maintenance and on going stewardship will be required to maintain the slope area on and above your lot. Project No T-840-10 'n--. AT.. n • Brian and Cindy Isaacson April 25, 2007 We will prepare a separate letter that addresses the final house configuration and our supplemental recommendations for house construction and retaining walls. The conclusions contained in this letter are our professional opinions derived with a level ,of care and skill commonly exercised by other practicing professionals in this area at this time. Our recommendations apply only to Lot 2 of Lorian Woods and the slope areas immediately above and adjacent to Lot 2 of Lorian Woods. This letter has been prepared for the exclusive use of Brian and Cindy Isaacson and their authorized representatives. This letter does not address any other slope areas. We trust this letter is adequate for your current needs. If you have any questions, please call. Sincerely yours, TERYL, S, INC. CharlG. Project Manager cc : Mr. Barry R. Constant, P.E. Project No T-840-10 D--- AT- Z Brian and Cindy Isaacson May 21, 2008 The u ose . p rp of this s letter is -t.o address the draina a (elements of the proposed new, house on Lot 2. Our report / dated March 30, 2008; contains our recommendations, for the'. design and construction of the' proposed house. As -discussed in :our, report, the -design of the house cannot fully mitigate .the risks of encroaching landslide .debris. from above.the'house.' For`this reason,'the d'evelopmerit'plans include a catchment wall- above. the'house. The purpose,of,this wall is to. contain the. local soughing, calving'and erosion that is ezpected.to,occur from the.' headwall above the lot. We understand that, at this time,. you want to proceed with the initial installation of the -drainage improvements and startwith the'vegetation replacement plan. Last summer, you had a contractor remove selected trees. on the. `slope above and on your lot. One logthat'has.acted,as a'soil catchment-facility;remains on the slope above`your ..proposed house. We have recommended that the log and the soils'hehind the log be -removed prior to establishing the new vegetation on the slope and the, construction of your house:-.The'elements of the referenced drainage plan prepared, by Western Engineers that will be installed at this time are. the upper seepage collection drains and the. . lower tight line storm.drains along the northern and southern property -lines. These drains can,be installed prior .. to the construction of the house and upper catchment wall. The. house and wall drains -will then be routed into the . system once the house is built.; v Terra' Associates, Inc. has made observations on the slope' above,your lot on,'several occasions since .1989. 'We :have observed that ' the drainage system installed by the City Hof Edmonds in,.the 1980s. has been damaged, by :. heavy erosion and that the seepage pattern has changed over the years: We understand that you will be assuming maintenance responsibility for, the drainage system on andf uphill 'of your lot., In the past, the,City of Edmonds performed the maintenance. , The referenced plans prepared by ,Western Engineers~reflect the need for the drainage system to remain flexible to allow, for, possible changes in the seepage rates and locations. As :with any drainage system- regular maintenance .will -be required.- The high density, polyethylene (HDPE) pipes used- on the slope will not be buried. ' This. will, allow for rapid visual inspection of the collector system -and allow for timely repairs. All. pipes used on this project "must have..smooth inner walls. The `HDPE pipes should be provided with heat,welded joints. The pipes, should be. placed to descend as close to. the fall`line as.possible. The upper end of the collection pipes should be' anchored as showri 'on Figure T attached to this letter.. The -fence . -posts •shown on'Fi' gure.1 will be suitable for" maintaining alignment of the pipe below the intakes. In the event seepage patterns change overtime, either new pipes of inlets :will need to be.insialled or the existing pipes and inlets will need to be shifted to collect the new seepage zones. The collector devices shown on the plans will require trash racks and regular maintenance to keep the collectors free of debris and sediment. The -maintenance. schedule will need •to -be monthly or -following each heavy rain storm: Dense impenetrable brush such as Himalaya blackberries should not be allowed to grow in the area of the' collector system. The collection pipes should consist of 4-'inch diameter HDPE'pipes connected to collection ' cat ch basins 'that' t at consist 'of HDPE: Th e i es should be manifolded tothe catc' h_basinsabove grade _ P p ' to allow direct observation of the conne.ction ov er time. , The toll ector.catch-basins should be provided with removable lids to allow direct observatioris'irito the -interior of,the'catch basins aiid,to allow maintenance to occur. Project No T-840-10 ' Page No. 2 Brian and Cindy Isaacson May21; 2008 The surface collection drains shown on Section AA and BB' on the .western drawings ' should be lined with an HDPE liner at- least 20 mils in thickness. `. Any joints 4n.the liner will" need to be made with the adhesive that is. compatible. with the HDPE and in accordance with the supplier's recommendations: All elements of,the drainage system will need to be •maintained. Damaged areas ..will need to be either repaired and/or replaced in- a timely manner. Any soil that sloughs,off of the top of the slope onto -the slope above the, "proposed libusewill need to be. 'removed- in a. timely manner.as-well. 'No mechanized equipment should be used _ above the catchment wall: unless the equipment and its"proposed mode of operation. has been reviewed' b the Y geotechnical engineer.. " In addition to the drains shown on the slope, a,drainage•swale will,be constructed. along the topof the -retaining, wall that is,proposed immediately east of the house..'This retaining wall will', be,provided'with three feet'of free board on the uphill side" of the wall to serve as. a collection point for soils eroded off .of the' slopes above the house. The. catchment wall is ,shown on, the referenced drainage plans. 'A pathway suitable for the transit of a small skid -steer loader -or hand operated e' ipment:will need to. be maintained to. allow removal of any sediment that may accum ulate ' y ate over time. - ,The perimeter ;of the'• house will -need to- be' .provided with both ' footing drains and a tightline to ;collect downspouts. The downspouts should not be.tied•into the;perimeter footing drainage system. The footing -drains and- downspout. tightline should be tightlined separately away from. the house. a distance. of at least. l04eet and a verticat fall of at least one foot before being joined into the final tightline,to "the plat storm drain system. The drains' from,the proposed house -footprint, are'shown on the referenced,drainage plan in a conceptual' manner: The final house plans will show the locations of the "retaining,' wall, footing" drains and tight line§ :for, the ' downspouts.. The footprint of the house is relatively, fixed at this time. The proposed catch basins installed for the current work and.existing catch basins along the toe of the lot may be used for the final drainage system for the lot: All sub drains and subsurface drainage "pipes will ,need to be provided with cleanouts. ! Cleanouts will• need to be serviced°on an annual basis: This_mayconsist of video "inspection along the'pipe'to verify. the. pipe is open and ` free of blockage•or damage. Any blockage or damage must be repaired in a -timely manner. . Regular maintenance,and'ongoing•stewardship will be'required to'maintain the slope area-on.And above your lot.' = City of Edmonds Required Statement f ` In our, professional judgment, the plans and'specifications for'drainage submitted for the project conform -to the recommendations" in the geotechnical report, ;and' that, the risk of damage to the propose&, &velopment,`-or` to adjacent,properties, .from soil instability.will be minimized.subject;to the"conditions'set forth in our report, dated March 30, 2008; and the proposed development will not iricrease.the potential" for soil movement. Project,No T-840-.10" ` Page:No. 3 , Brian and Cindy Isaacson ' May21, 2008 Minimized: shall mean that 'the applicant has 'utilized best,available science and commonly accepted `engineering and architectural' pMaice to minimize; to. the. .exteiit .possible, the_' risks.. associated with, development, of the property. The erosion and sediment, control plans prepared by Western 'Engineering: are 'responsive to the site'conditions and repot findings: _ Identification of landslide hazards applicable to -.the site;•, the on -'site measures taken to correct or: reduce the hazards, as applicable,'and measures taken to mitigate potential impacts from the remaining hazards are discussed in our referenced report. -The primary risk -,on this -lot is the: encroachment of.soils from, the upper slope area ., above the . site. The., catchment. wall shown on: the drainage, plans L is intended to mitigate -for the -possible • encroachment. 'Ongoing. maintenance of the drainage facilities of the slope area discussed in: this letter,: our referenced report and the referenced, plans, prepared by Western Engineers are 'the responsibility of the home . •owner. r The risk.of large scale ,aeep..seated• remobilization of the larger landslide' mass is beyond the control of any" individual land .owner. The recommendations' contained in our reportdated March 30, 2008 are expected to' , - mitigate for large'scale movements that may have. occurred within the laiidside mass overlhe past 50 years . The conclusions contained, in•this letter are our professional opinions derived with a level' of care and skill , common y'exercised by other practicing'professionals in this area at this.time. Our'reco emendations apply only,. to Lot 2 of Lorian Woods and the' -slope areas immediately above and adjacent to Lot 2 of.Lorian Woods+. This letter has been prepared for the-. exclusive use. of Erian,and. Cindy Isaacson and their authorized representatives. This letter does not address any other slope areas.' •A'separate .letter will.be'prepared following a review. of the final plans for.the_house foundation on the site. - We trust this letter is adequate for your current needs. If you have any questions, please call. Sincerely yours,, TERRA A FV F C. Cha 'Lie Pro' age . 26 42 r;.�2�, heodore ; Pres N Attachments : Figure ipe ope Anchor co- : Mr. Barry• R. Constant; P.E., Western Engineers Mr. Michael O'Brien, AIA Project No ;T-840=10 Page No. 4 RETURN ADDRESS: City of Edmonds, City Clerk 121 Sth Avenue North Edmonds, WA 98020 200810090473 CONFORMED60PY PGS SNOHOMISHCOl1NT�,m pgSHINGTON COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS Reference #: Grantor(s): (1) 12.E b - Az, lase►, (2) '�° J "in n Additional on pg. Grantegs): City of Edmonds Legal Description (abbreviated): Sec Twn 7/ Ra 1 _Qtr—s OR Lot -2 Block_ Pisa Assessor's Tax Paruei iDgs): (1) ° z 6 4e Q h„ p� E c (Z)_ do 74�4e�,99Yo� __._,.Assessor's Tax Parcel X.D# not yet Assigned CITY OF EDMONDS APPROVED FOR RECORDING BY:_?DATE:Y,&AGE OF UndeX the .review procedures established pursuant to the State Building Code, incorporating amendments promulgated by the City of Edmonds, and as 4 prerequisite to the issuance of a building permit for the construction of a residential structure and attendant facilities, the undersigned OWNERS of property, do hereby covenant, stipulate and promi8e as follows: STREET FILE APPROVED FOP, RECO IN aY: DATE: GE PAOF_ 1. Descn .gon ofSub6 1?rooerty This covenant of notification and Indemnification/hold barmless relates to a tract of land at the Meet address of /(saD7 -734 PL W LVA 9FaAO (insert street address), Edmonds Snohomish County, Washington and legally described as: .4-<< dp 0 d O pica LV V-► a N V(J o o cl S P R J> LorU`h {Iynp�f�r Q/e vf.w�a� A �� � r K4 ��T' LO vl'av1 Cn/ac,� Sh 0 Gl +S�l �a1c h Wa Sn In J� 9 6a Q 22 b­f -1-f ? I,� c(Ircl �' � ►� Ire a j`4 5e KScZ.nes�'%'� y Re ti rf <r.n d To w H14 A 2. Notification and ovenant of Notification. The above referenced site (hereinafter "subject site") lies within an area which has been identified by the City of Edmonds as having a potential for earth subsidence or landslide hazard. 7%e ricks associated with development of the 'site have beep evaluated by technical coasnitants and engineers engaged by the applicant as a part of the process to obtain a building permit for the subject site. The results of the consultant's reports and evaluations of the risks assoeiated.with development are contained in building permiUrde number- RED _1a v zo gas (insert number) on file. with the. City of Edmonds Building Department, Conditions, limitations, .or prohibitions on development may have been imposed in, accordance with the recommendations of APPROVED Fo" RECORD ACM-�AAF Q L% PAGE OF the consultants in the course of permit issuance. The conditions, limitations, or prohibitions may require ongoing maintenance on the part of any owner or lessee or may require modifications to the structures and earth stabilization matters in order to address future or anticipated changes in soil or other site conditions. The statements and conditions proposed by the OWNERS' geotechnical engineer, geologist, architect and/or structural engineer are hereby incorporated by reference from the contents of the file as fully as if herein suet forth. Any future purchaser, lessee., leader or any other person acquiring or seeking to acquire an interest in the property is put cola notice of the existence of the content of the file and the City urges review of its contents. The file may be reviewed during normal business hours or copies obtained s.f the Building Department, City of Edmonds, 121 Sth Avenue North, Edmonds, 'Washington 98o2o. 3. Indemnification and Hold Harmle s. The undersigned OWNERS hereby waive any and all liability associated with development, stating that they have fully informed themselves of all risks associated with development of the property and do therefore waive and relinquish any and.all causes of action against the City of Edmond#, its officers, agents and employees arising from and out of such development. In addition, the ()MMRS on behalf of themselves, their successors in interest, heirs and' Ussigneea,. do hereby promise to indemnify and hold harmless the City of Edmonds, its officers, agents and employees from any loss, claim, liability or damage .of any kindor nature to persons or property either oil or Off the site resulting from or O"t of earth subsidence or landslide hazard, arising from or out of the issuance of any perm. t(s) authorizing development of the site, or occurring or 0 APPRQVE FOR RECO M ; BY: DATE: PAGE OF arising out of any falae► misleading, or inaccurate information provided by the OWNERS, their employees, or professional consultants in the course of issuance of the building permit. 4. Insurance Requirement In addition to any bonding which may be required during the course of development, the Community Services Director has/has not (strike one) specifically required the maintenance of an insurance policy for public liability coverage in the amount and for the time set forth below in order to provide for the financial. responsibilities established through the indemnification and hold harmless agreement above: S. CoveQaint to Touch and Concern the Land This covenant of notification and indemnifieation/hold harmless touches and concerns the subject tract and shall rur: with the land, binding, obligating and/or inaring to the benefit of future owners, heirs, successors and interests or any other person or entity acquiring an interwo%iQ property, as their interest may appear. This provision $hall not be interpreted to req®re a mortgagor or leader to indemnify the City except to the extent of their loss nor to obligate such persons to maintain the ins arance.above required. • • u APPROVEIP FOR RECORD G- BY, q4gDATE: PAGE OF STATE OF WASMNGTON ) COUNTY OF 4 IA q I CedW that I knoftave a sfactory evidence that signed this instrument and acknowledged it to be (h' a free and voluntary act for the purposes mentioned in thi, instrument. ' DATED this . �/� day of 2.0 0 yamZI . : o 0 P), p�; . _ NOTARY PNUC _ = i 0 -/6 --07 My commission ezpires: 0 0- o �t�+srs sss:�M� L�TEMMMLDlt4G M%..a.DOWICovENANi' TOTAL P.08 DONE this / /1z) day of 6 By STATE OF WA SE NGTON ) as: COUNTY OF DO (AS04S APPROVED FOR RECO By---am-DATE. PAGE OF A - 20 aZ. ARC=A n����f= cc t tt or have satisfactory evidence that signed this instrument and aclmowtedged it to be((�cr) tree and voluntary act for the purposes mentioned in this instrument. DATED this. _ day of20LL NOTAky PUBLIC • [WIG 'MY coRmisstOn expires: :'ram • °� 1e,'�°•'���� '���/iIFiWAS;0���� py RETURN ADDRESS: City of Edmonds, City Clerk FILE 121 Sth Avenue North SIKEET 8 Edmonds, WA 98020 200810090472 CONFORMED 60PY PGS SNOHOMISH CO(JNT�,1 I INGTON COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS Reference#: ,Bz,o Xv0708-u- _'s`" Grantor(s): (Z) Cif rQ acso„ Additional oe pg. Grantee(s): City of Edmonds Legal Description (abbreviated): Sec_<i_Twn -�2Z&_RnQtr�� OR Lot Block Plat Assessor's Tax Parcel 1D#(s): (l) o®9 90 YooaaG;Zoc (2) a a 7 9� yo 0 999 c o Assessor's Tax Parcel ID# not yet assigned CITY OF EDMONDS APPROVED FOR RECORDING BY: DAT1E:2&Z65PAGE OF Under the review procedures established pursuant to the State Building Code, incorporating amendments promulgated by the City of Edmonds, and as a prerequisite to the issuance of a building permit for the construction of a residential structure and attendant facilities, the undersigned OWNERS of Property do hereby covenant, stipulate and promise as follows: 1. Descrigtion of Subject Property. This covenant of notification and indemnification/hold harmless relates to a tract of land at the street address of 1Goa -2 -73 ^°� pl a ac. C._,GiqZ , Adds , f ✓.4 9 So za (insert street address), Edmonds Snohomish County, Washington and legally described as: 0C. 79O17/O—oogz0c Lo-f ;L Lor)t✓` LJoods Scc�ici:vil>�,` toric.n- GJ0ads ovan SAC. cam- __ T.—c-4• 1-3 Plc�J- yr &>Gods , Sn,, omi-,J - Co�..rk. j We-sknnh& (12arcG/ nc4mbe-- O07)G yacG 99g o0 r 5 e t Q r-o.: ns3��_e_ A5C-S cJU en 4. oc.,p r-d bW Rober 4- a - finders a/,IU , 2. Notification and Covenant of Notification. The above referenced site (hereinafter "subject site") lies within an area which has been identified by the City of Edmonds as having a potential for earth subsidence or landslide hazard. The risks associated with development of the site have been evaluated by technical consultants and engineers engaged by the applicant as a part of the process to obtain a building permit for the subject site. The results of the consultant's reports and evaluations of the risks associated with development are contained in building permit file number'sZA'Xao ems ? (insert number) on file with the City of Edmonds Building Department. Conditions, limitations, or prohibitions on development may have been imposed in accordance with the recommendations of • • [APPR VED R RECO 1N DATE. OF the consultants in the course of permit issuance. The conditions, limitations, or prohibitions may require ongoing maintenance on the part of any owner or lessee or may require modifications to the structures and earth stabilization matters in order to address future or anticipated changes in soil or other site conditions. The statements and conditions proposed by the OWNERS' geotechnical engineer, geologist, architect and/or structural engineer are hereby incorporated by reference from the contents of the file as fully as if herein set forth. Any future purchaser, lessee, lender or any other person acquiring or seeking to acquire an interest in the property is put on notice of the existence of the content of the file and the City urges review of its contents. The file may be reviewed during normal business hours or copies obtained at the Building Department, City of Edmonds, 121 Sth Avenue North, Edmonds, Washington 99020. 3. Indemnification and Hold Harmless. The undersigned OWNERS hereby waive any and all liability associated with development, stating that they have fully informed themselves of all risks associated with development of the property and do therefore waive and relinquish any and all causes of action against the City of Edmonds, its officers, agents and employees arising from and out of such development. In addition, the OWNERS on behalf of themselves, their successors in interest, heirs and assignees, do hereby promise to indemnify and hold harmless the City of Edmonds, its officers, agents and employees from any Ioss, claim, liability or damage of any kind or nature to persons or property either on, or off the site resulting from or out of earth subsidence or landslide hazard, arising from or out of the issuance of any permit(s) authorizing development of the site, or occurring or LPA PR V FOR RECO.: DATE: GE OF arising out of any false, misleading, or inaccurate information provided by the OWNERS, their employees, or professional consultants in the course of issuance of the building permit. 4. Insurance Requirement. In addition to any bonding which may be required during the course of development, the Community Services Director has/has not (strike one) specifically required the maintenance of an insurance policy for public liability coverage in the amount and for the time set forth below in order to provide for the financial responsibilities established through the indemnification and hold harmless agreement above_ 5. Covenant to Touch and Concern the Land. This covenant of notification and indemnification/hold harmless touches and concerns the subject tract and shall run with the land, binding, obligating and/or inuring to the benefit of future owners, heirs, successors and interests or any other person or entity acquiring an interest in property, as their.interest may appear. This provision shall not be interpreted to require a mortgagor or lender to indemnify the City except to the extent of their loss nor to obligate such persons to maintain the insurance above required. 0 +, ' +' +' ► DONE this A,L^-R— day of C�c�gc,,E- , 20Q-7. OWNER(S) By STATE OF WASHINGTON ) ss: COUNTY OF 1 I certify that I know or have satisfactory evidence that signed this instrument and acknowledged it to be 4R/hcr) free and voluntary act for the purposes mentioned in this instrument. DATED this day of 20 oT . ANY S• s 1 O\$sIQN V ms I.:ITEMYIBUMD INC1m EA DoNvcovENANT A :f ` NOTARY I.IC My commission expires: /�—/d SAO STATE OF WASHINGTON ) ss: COUNTY OF I certify that I know or have satisfactory evidence that signed this instrume t and acknowledged it to be (his, ge free and voluntary act for the purposes mentioned in this instrument. DATED this o day of Z , Zp ANY B. Sjy Ill = O = T O LAG = 2 L.XTEMMM LDINGXMEADOWICOYENANT NOTARY :Vol C Nay commission expires: LANDAU ASSOCIATES TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM EWMNMENM I GMffCW4= I EIVED TO: Jeannine Graf, Building Official AUG 2 0 2007 City of Edmonds Development Services Department, Building Division BUILDING FROM: Dennis R. Stettler, P.E. DATE: August 20, 2007 RE: COMPLETENESS REVIEW FOR STSREEINFLUME HAZARD AREA SUBMITTAL PACKAGE — PLAN REVIEW NOS. BLD2007-0833, BLD2007-0834 ISAACSON GRADING AND DRAINAGE —16007 73RD PLACE WEST EDMONDS, WASHINGTON This technical memorandum provides our assessment of the completeness of the geotechnical portions of the permit package for Grading and Drainage submitted to the City of Edmonds for the proposed referenced development within the Earth Subsidence and Landslide Hazard Area (ESLHA) of North Edmonds. This completeness review was accomplished in accordance with Landau Associates' On -Call Geotechnical Engineering Services Agreement with the City of Edmonds. The completeness review is not intended to be a thorough review of the submittal package. Instead, it is intended to be a cursory review to assess whether the submittal appears to contain the necessary information in order to complete a geotechnical peer review in accordance with Edmonds Community Development Code Chapter ECDC 19.10. The submittal package provided to us included: • An Erosion and Sediment Control Plan, an Existing Condition and Tree Plan, and a Drainage Plan. All three plan sheets were prepared by Western Engineers, Inc. and printed June 18, 2007. • A copy of the City of Edmonds Plan Review Corrections form for the project prepared by Jeannine Graf of the Building Department, dated August 15, 2007. On the basis of our cursory review, it appears that the submittal package is missing a number of items that are required for Building Department submittals for projects within the North Edmonds Earth Subsidence and Landslide Hazard Area. ECDC 19.10, and by reference ECDC 23.80, identify a number of specific submittal requirements. We are aware that this property was previously the subject of a tree clearing permit through the Planning Department. Although certain documents were provided as a part of that previous permit application, the current application for grading and drainage through the Building Department is a separate application and needs to be a complete submittal package. The applicant is referred to ECDC 19.10 and ECDC 23.80 for a complete outline of the required plan review submittal materials. The key missing elements are outlined in the Plan Review Corrections form prepared by the City of Edmonds for this submittal. In later peer review for this project, we will be 130 2nd Avenue South • Edmonds, WA 98020 • (425) 778-0907 • fax (425) 778-6409 • www.landauinc.com looking at the required geotechnical report to see that it addresses the slope stability and related site development issues that are identified in ECDC 19.10 and ECDC 23.80. On the Erosion and Sediment Control Plan is a note that states "Proposed grading based on existing site features. Base survey not accurate with current conditions." It is not known what is meant by that statement. The applicant is required to furnish a topographic map showing current conditions and contour lines on at least two foot intervals. If the existing base map does not accurately show the current conditions, then the base map should be redone prior to resubmittal. Proposed drainage features are shown on the Drainage Plan. Other features are shown without sufficient detail. For example, the Drainage Plan also shows a proposed footprint for a house, garage, retaining wall, along with what appears to be drains and drain pipes around the proposed house and garage. We assume that these features are not a part of the current permit submittal, since there are no details provided on these features. It should be made very clear what elements of the proposed plans are included in the current grading and drainage permit application and which are not. It would be appropriate to point out to the applicant that providing an application for only limited grading and drainage at this time, but not other elements of the planned property development, presents certain risks to the applicant. Review of development plans are benefited when the reviewer has a complete understanding of the overall development. This is particularly critical in the Earth Subsidence and Landslide Hazard Area where an appreciation of the planned overall site grading, retaining walls, foundations, and drainage is an integral part of understanding whether the proposed overall site improvements appropriately benefit or detract from long-term slope stability. Reviews that are conducted on a piecemeal basis run the risk that subsequent permit applications for the proposed additional grading, drainage, retaining walls, and structures that will be a part of the overall property development may disclose issues that would require rework of the drainage features that are a part of the current application. Please contact us if you have any questions regarding this completeness review and when you are ready for us to commence with our geotechnical peer review. DRS/rgm 08/20/07 NEdmdata\pmjects1074\7361FIIeRoom\R\issacsonDrainageCompletenessReview_tm.doc LANDAu ASSOCIATES 2 l;-arth Subsidence and Landslide Hazard Area Completeness Review Page 1 of 1 Graf, Jeannine From: Rhonda Moon [rgmoon@landauinc.com] Sent: Monday, August 20, 2007 8:58 AM To: Graf, Jeannine Cc: Dennis Stettler Subject: Earth Subsidence and Landslide Hazard Area Completeness Review Please find attached a technical memorandum regarding a Completeness Review for Earth Subsidence and Landslide Hazard Area Submittal Package - Plan Review Nos. BLD2007-0833, BLD2007-0834, Isaacson Grading and Drainage - 16007 73rd Place West, Edmonds, Washington. Please let us know if we can provide further assistance. <<Issacson DrainageCompletenessReview_tm. pdf>> Rhonda Moon Project Coordinator Landau Associates (425) 329-0299 8/20/2007 307-03-3 13 Western Engineers Inc. SURVEYORS • PLANNERS • ENGINEERS May 2, 2008 City of Edmonds 121 — 5th Avenue North, 2°d Floor Edmonds, WA 98020 425-771-0220 13000 Highway 99 South • Everett, Washington 98204 (425) 356-2700 a,.T FILE Subject: City Review Comments, Letter of Release of Liability Dear Mr. Fiene: FAX (425) 356-2708 _F. JUN 04 20-98 BU m-ME]Vr The City recently sent a review package to our client that requested a letter with specific language_ as a release of liability to the City of Edmonds. The design team for this project is: Western Engineer, Inc; Barry R. Constant, P.E.; Project Manager, Civil Engineer Terra Associates; Chuck Lie, Geotechnical Engineer Reed and Associates, Inc.; Wendel Reed, Structural Engineer Landscape Architect; Jennifer Lee, Licensed Professional As the lead design Professional Engineer providing services to our client, Mr. & Mrs. Brian Isaacson, my team and I have reviewed the geotechnical report and understand it's recommendations and have incorporated these design recommendations into the site civil design of this project. The design parameters that my team and I have designed for the civil drawings are using industry standard design measures to reduce the potential risk of injury or damage from any earth movement predicted in the report. Although the recommendations in the geotechnical report will have been followed during the construction on this site, this engineer does not guarantee the long-term maintenance of these items. These maintenance items are under the control of the client and not under direct supervision by myself. Maintenance will be required as long as there are no installed permanent solutions to the landslide hazard area. And further: in my judgment, the plans and specifications prepared by the structural engineer conform to the recommendations in the geotechnical report. LAND USE CONSULTANTS • CIVIL ENGINEERS • LAND SURVEYORS • ENGINEERING CORPORATION That the risk of damage to the proposed development, or to adjacent properties, from soil inctahility will ha minimi7M enhiact to tha onntlitinm cPt forth in the rPnort and that tha proposed development will not increase the potential for soil movement. Minimized shall mean that the applicant has utilized best available science and commonly accepted engineering and architectural practice to minimize, to the extent possible, the risks associated with development of the property. The risk of onsite soil movement in the building site area probability within the next 25- years is approximately 12 percent. This is based on long-term study by our team geotechnical engineer (Mr. Chuck Lie:) who personally has studied this landslide hazard area for 20-years. By studying the various geotechnical reports issued for the site over the last 20-years and using common and standard engineering practices for the erosion and sedimentation control, as well as the long term drainage solutions engineered and incorporated into the site will minimize land movement activities. Please see letter from the landscape architect for additional information The upper catchment wall, as designed by Reed and Associates, Inc. with assistance from Chuck Lie has been designed to stop low velocity landslide activated soils from contacting the house structure. An onsite deep boring was advanced in the area of the proposed wall. This wall has three feet of exposed wall above a very deep soldier pile support structure. The site is designed to allow a small, lightweight powered or unpowered wheeled container to remove any soil spoils from the upper wall area and transport them down slope safely. This type of maintenance is not guaranteed by this letter. Please see letter from the landscape architect for additional information The Landscape Architect will provide deep-rooted planting that remove water from the loose upper soils on site. The landscaping will also provide small trees to provide the same function. Please see letter from the landscape architect for additional information The Landau Geotechnical report, dated 2007, identified certain areas as landslide hazards for this site and certain recommendations to reduce and minimize these hazards. Western Engineers in conjunction with Terra Associates have reviewed, designed and approved the site engineering for the house structure location and elevations, retaining walls and catchment wall above the retaining walls. We have reviewed all structural and retaining wall footing drains and provided an extensive underground drainage conveyance system capable of removing and directing any runoff away from the house structure and retaining walls, down slope directly into the City drainage system on the roadway below the new house. Reducing and removing storm water runoff from the soils onsite is the number one risk reduction factor associated with earth movement. No one has control over the potential for shallow or deep-seated earthquake induced land movement hit we have redined the nhility of the land to move on nre.q.viri7.ed (water pressure) underground soils, which could enhance additional land movement. The attached soil boring water levels and the attached information regarding the piezometer reading all indicate that the existing ground water levels has been reduced over time. Please call me or any of the design team if you have questions regarding this letter. Sincerely, Western Engineers, Inc. Bari' R. Claanstant, P.E. Project Manager y Zb --0 E33 � Western STREET FILE. 13000 Highway 99 South Everett, Washington 98204 Engineers (425) 356-2700 FAX 425 356-2708 Inc. SURVEYORS • PLANNERS • ENGINEERS March 12, 2007 City of Edmonds 121 — 5`I' Avenue North, 2nd Floor Edmonds, WA 98020 425-771-0220 Subject: Isaacson Drainage Plan, Lorian Woods, Edmonds Dear Mr. Fiene: OCT 111007 PERMIT COUNTER Recently we attended meetings with the City staff to discuss the building permits and drainage plan for Mr. & Mrs. Isaacson's building lot in Lorian Woods, Edmonds. We are submitting this letter report for the drainage portion of the site plan for review, along with engineering drawings. Since this lot is an established, legal lot, we are providing this letter report to quantify the plans for the drainage system. Also see the TESC and grading plans in the attached drawing set. I performed a site visit to ascertain the viability of the existing drainage system on the hillside. This system was installed under the LID 210 (1984) for the City and for general utility improvements in the area. During a small landslide event (12-16-2007 and others more recent, dates not available) portions of this drainage system were damaged. During the site visit, I determined that some of the existing system is still functioning and would work for the proposed house on Lot 2. Please refer to the drawing set for drainage structure information. The current system that appears to function is CB's number 88, 89, 91, 92 and 93. Catch Basins numbers 94 and 95 were displaced during the landslide events. The French drains that were part of these.catch basins (CB 94 & 95) appear to be missing as well. We plan to use the remaining Catch Basins as drainage collection points for our proposed surface drainage system. Please refer to the Landau Report, dated July 25, 2002 for surface drainage recommendations. The site visit I conducted on March 7, 2007 results in the following observations. The French Drain and CB # 92 appear to be intact and functioning as designed. Flows were minimal, but there was water flowing through the system. This portion of the system will remain undisturbed. Some flows were entering CB # 93 but I believe that the flows were just `accidental' in nature. To clarify, this CB is in an area that some surface runoff just naturally slopes into. E: / 2006 / 06792 / Engineering / Drainage Letter 3-12-2007.doc LAND USE CONSULTANTS • CIVIL ENGINEERS • LAND SURVEYORS • ENGINEERING CORPORATION As shown on my sketch (attached below), there were 5 drainage flows that I discovered on the hillside. Three `major' flows were continual hillside seeps from the sandy layer that has been the water source since this area was first researched. These are labeled as 1, 2 and 3 and are located to the north side of the project. Two `minor' hillside surface flows appeared to originate from the top of the Sequoia Ridge area, well above the seep zone. These are labeled as 4 and 5 and are located near the middle portion of the project. Further research, up the hillside, may be necessary to determine the actual location of the source of these flows. Our overall plan is to install a new catch basin system located at the northeast corner of Lot 2, adjacent to the proposed retaining walls north end. This will allow the connection of the piping.from the 3 major seeps to flow directly into a structure. It will also allow a French drain to be installed on the uphill side of the landslide retaining wall. The 2 minor surface flows will be directed into the nearest catch basins via surface piping. The drainage plan is a `design / build' plan that will be constructed on the hillside after the landslide rubble has been cleared and the remaining danger trees have been removed. It is difficult to design a drainage system with a couple of tons of debris and/or trees in the way and where the site grading may change along with the source of surface runoff. The real key to reduce the possibility of future landslides is to reduce and remove the source of water on the hillside (Landau, 2002). To totally remove all surface water is impossible, but we can reduce the hillside seeps and surface flows as much as possible. We propose two methods to collect surface runoff. One is the Landau method of surface channels and the second is adjustable surface collectors with piping directly to catch basins. The Landau Report, dated July 25, 2002, recommended that all surface drainage should be captured and directed down slope, essentially lowering the groundwater levels and thence the hydrostatic pressure on the underlying landslide debris. The use of surface channels with impervious membrane and Articulated Concrete Pavers on top of the channels (see attached Landau design Figure 8) would direct these flows into CB's and then down slope to the street conveyance. Western Engineers, Inc. researched the articulated pavers and they do not exist in a form small enough so that the homeowner could ever move theirs. In their present form (each block is approximately 9" X 9" X 6" thick), the articulated block sheets (sheet size approximately 10' X 20') would need a large crane to position these on a surface channel. I propose to use 1-inch washed crushed rock as channel liner, instead of the pavers; this rock size can be shoveled into small buckets and easily moved when the homeowner performs maintenance on these surface channels. There's also the problem of how the hillside seeps and surface runoff gets into these channels without re -charging the underground landslide debris (see drawings on channel construction). The surface channels should be located as to collect as much rainfall surface runoff as possible in the upper areas of the slope (where steep becomes steeper), E: / 2006 / 06792 / Engineering / Drainage Letter 3-12-2007.doc f just below the seep elevation (see drawings). These channels can then be directed into the existing and/or proposed catch basins per the design drawings. It should also be mentioned that at the top of Sequoia Ridge area, all surface runoff should be re -directed to flow down the backside of the ridge where there is essentially minimal development, less steep slopes and more surface vegetation. This action alone will reduce / remove the 2 secondary minor runoff flows from this area. The surface piping shall be thin walled 2-1/2 inch diameter HDPE (or similar flexible hosing), butt -welded to form long, movable piping in order to adjust and re -adjust the inlet to the best location to capture the flows. The hillside seeps and upper ridge drainage can be captured by a `scoop' type device (aluminum weldment, see drainage plans) that will direct the main flows into the individual pipes. These scoops will have anchor tabs to use a rebar or similar spike device to anchor the scoops in place. With individual scoops it will be easier to capture these individual flows directly at the point source and still have the ability to change their location as the seeps may change location over time. The rooftop drainage for the residence is also a `design/build' situation, as we do not have the final house design in our hands. Using the preliminary design we have provided a general location of rooftop downspouts and clean -outs for the entire residence. These are tight lined directly to the new catch basins with notes on sizing and pipe slopes on the drawings. All of the above drainage will collect in the existing and proposed catch basins and routed to the west, down slope to the existing street drainage. During my site visit, there appeared to be two separate drainage systems in the exit road, adjacent to Lot 1 and 2. The proposed new catch basin located at the northeast corner of Lot 2 will be routed along the northern property line, west to the existing roadway. Another catch basin will direct the runoff just above the road into one of these two systems, an existing catch basin #88 or another new catch basin located inline with the secondary system. Homeowner maintenance and slope maintenance is another key to maintaining the drainage system on this slope. The homeowner will install and maintain replacement landscaping on the hillside. Use of landscape plantings that will require high amounts of water will ensure the roots go deep and stabilize the remaining hillside. The recommendations above are only for the LID 1 A system, as shown in the Landau Report. If you have any questions regarding this report please call me to discuss. Sincerely, Western Engineers, Inc. Barry R. Constant, P.E. Project Manager E: / 2006 / 06792 / Engineering / Drainage Letter 3-12-2007.doc TO: Mr: Barry'Constant, Western Engineers.. CC:._ .Brian and Cmdy.Isaacson Mr. Michael O'Brien : ' FROM Charles R. Lie, Terra Associates, Inc, DATE: July, 30, 2008 RRE: , Current Permit Application Lot.2,'Loriari Woods-." - 4 -10 `In ro'ect T 8 0 r `As c ates c: Te ra so For the current permit application, ahe scope of work will consist of: • The initial installation of the drainage improvements.. The elements that will be`installed at this time are;the.upper seepage collection. drains and the lower tight. line .storm drains : - along the northern and southern property lines.,. These drains can be installed prior `to the wall drains will then wall. � The house and a construction of the house and u ` er catchment.. , p be routedi t� the s� stem once -the house is built: • n o • The removal of a large log above your house envelope .that has become lodged between two stumps and has accumulated sediments eroded from the top of the. slope: • ..Removal`.of the sediments'. that have accumulated above the .cedar log .and'. shallow. accumulations of sediments on the slope above, the proposedhouse site. .The depth: of the, accumulated'-sedimenis• below the log is 'on the order. -of, one..foot in . thickness.: All—.. removal of soils will be dorie-either.b -hand or using lightweight equipmerit.to minimize disturbanceto the slope. - ` 'Initial 'replantingf of the.,hillside above -the' house and catchment. wall envelope to re establish the vegetation _during, this- growing season. ;Within the ,area .to be disturbed by the construction of the house and catchment :wall, hydro seeding and/or mulching allowed by;thetemporary erosion control plan will be done: ®®,® ES R. V AUG -- 8 2000 ' ��+ UILl�9P3 4�E°AATMENT' Page l oft F� e., $'.IL�':. Cf'TYF EDMONDS T, 840-10 s i t LANDAU M ASSOCIATES TECHNICAL MEMORANDU ENVOtOM�eJV�L I GEOIECF7WA I IlAItdN1 PE901AICE5 TO: Ann Bullis, Building Official RECE City of Edmonds Development Services Department, Building Division FROM: Dennis R. Stettler, P.E. (��� DATE: November 12, 2008 � NOV 14 Zoos ! 1 EE T FILE BUILDINC RE: GEOTECHNICAL PEER REVIEW FOR EARTH SUBSIDENCE AND LANDSLIDE HAZARD AREA SUBMITTAL PACKAGE — PLAN REVIEW NO. BLD2007-0833 AND 2007-0834 ISAACSON WET SEASON WORK REQUEST LOT 2 AND ADJACENT COMMON AREA - LORIAN WOODS EDMONDS, WASHINGTON This technical memorandum provides our geotechnical peer.review of a request by the applicant to conduct wet season earthwork. The request for wet season work was submitted to the City of Edmonds (City) for the proposed referenced development that lies within the Earth Subsidence and Landslide Hazard Area (ESLHA) of North Edmonds. The purpose of this geotechnical peer review was to review the request for wet season work and assess its compliance with City development and permit requirements as contained in Edmonds Community Development Code (ECDC) Chapters 19.10 and 23.80. This geotechnical peer review was accomplished in accordance with Task Order No. 08-23 of Landau Associates' On -Call Geotechnical Engineering Services Agreement with the City. We have received the following information forwarded by the City for review: Proposed Grading Plan Construction Sequence, Platt Checks 2007-0833 and 2007-0834, Lorian Woorls Grading and Drainage Improvements, 16667 — 73"t Place West and Lotian Woods Conutton Area, Edmonds, Washington, letter prepared by Terra Associates, Inc., dated October 14, 2008. In addition to the materials forwarded by the City, we also, referred to documents submitted for earlier reviews as documented in our geotechnical peer review technical memorandums dated December 28, 2006 related to tree clearing and July 22, 2008 and September 8, 2008 related to proposed grading and drainage for the subject project. The .City requires that earthwork during the winter season between October I and April 30 be restricted. The purpose of this restriction is to try to limit the potential for damaging disruption to the ground surface, limit erosion and sedimentation during this period, and to accomplish the work in a season that facilitates early reestablishment of vegetation for erosion control. Any earthwork within this time period requires approval from both the Geotechnical Engineer of Record and the City Building Official. The letter from Terra Associates, Inc. outlines a proposed construction sequence, including hand sewing grass seed, installation of the northern catch basins and drainage pipes, construction of shallow 130 2nd Avenue South - Edmonds, WA 98020 - (425) 778-0907 - tax (425)_778-6409 - www.landauinc.com A swales, removal of an existing silt fence and accumulated sediment along the western margin of the site, and construction of elements of the northern drainage system. Appropriate collection of seepage and surface water is beneficial to the overall slope stability. However, the process of constructing the proposed drainage improvements on the wet slope during wet weather conditions will also result in damage to existing ground cover and vegetation. This action could potentially increase the potential for surface water infiltration, and make temporary erosion and sedimentation control more difficult. In addition, any disturbed areas cannot be effectively revegetated until the next growing season. In our opinion, the suggestion to hand sow grass seed at this time of year would be ineffective. On the balance, it is our opinion that the proposed actions could present more problems than benefits. As such, we recommend that the proposed installation of the northern drainage system and other site improvements not be allowed until after the current wet season (after April 30, and preferably later in the summer). We suggest that the applicant be allowed to do site work in the wet season only to the extent that such work would help further stabilize the existing ground surface and provide improved temporary erosion and sedimentation control. Examples of limited site work that could be considered would be placement of mulch or erosion control materials in areas that currently have sparse vegetation and could be subject to further erosion and sedimentation during the wet season, and improvement to the existing silt fence or other temporary erosion and sedimentation facilities (including removal of accumulated sediment as appropriate) along the western margin of the site. Other site activities that would disturb the existing ground surface should be deferred until after the wet season. This technical memorandum has been prepared for the exclusive use by the City of Edmonds in evaluating the adequacy of permit submittal documents related to proposed implementation of portions of the Issacson grading and drainage pen -nit during seasonal wet weather restrictions on the subject property. The focus of this review was the geotechnical aspects of the application. The purpose of the review was to assess the adequacy of the application documents for compliance with City requirements contained in ECDC 23.80 and ECDC 19.10 and conformance with conventionally accepted geotechnical engineering practices. This geotechnical peer review by Landau Associates does not lessen the requirements for the applicant's geotechnical consultant and other design professionals to prepare an appropriate design for the site conditions.. We appreciate this opportunity to be of service to the City. Please contact us if you have any questions or if we may be of further service. DRS/rgm 11/13/O9 \\Edmdal4mjecis\074\136\FileRwmUR\GeotPeerRe iewWetSewm DRAFRm.doc 2 LANDAu ASSOCIATES TERRA ASSOCIATES ' Inc. RECEIVED A& ° Consultants in Geotechnical Engineering, Geology and OCT 17 2008 Environmental Earth Sciences EDiLDING cIT`( OFDEDMONDSNr FILI: it October 14, 2008 vProject T-840-10 Ms. Ann Bullis City of Edmonds 121 — 5th Avenue North Edmonds, Washington 98020 Subject: Proposed Grading Plan Construction Sequence Plan Checks 2007-0833 and 2007-0834 Lorian Woods Grading and Drainage Improvements 16007 — 73rd Place West and Lorian Woods Common Area Edmonds, Washington References: 1. Geotechnical Report, Meadowvale Beach, Lots 54 through 57, Project No. T-840-1, prepared by Terra Associates, Inc., dated June 6; 1989 2. Geotechnical Report, Lot 2, Lorian Woods, Project No. T-840-10, prepared by Terra Associates, Inc., dated September 14, 2005 3. Lorian Woods Estates Tree Removal, Forest, and Slope Restoration in Tract "A", Report on Conditions: Plans with Details: Related Documents, prepared by City Foresters, dated March 4, 2006 4. Land Use Application for Tree Removal, dated August 2, 2006 5. Supplemental Geotechnical Consultation, Tree Removal, and Maintenance, Project No. T-840-10, prepared by Terra Associates, Inc., dated August 7, 2006 6. Geotechnical Report, Lot 2, Lorian Woods, Project No. T-840-10, prepared by Terra Associates, Inc., dated March 30, 2608 7. Drainage Plans prepared for Brian Isaacson by Western Engineers, dated May 22, 2008 8. Geotechnical Plan Review; Drainage Plan Review, Project No. T-840-10, dated May 22-2008 Dear Ms. Bullis: This letter describes the current planned activities that will occur under the current permit application for the proposed Isaacson house. With the end of the growing season and the onset of the wet weather moratorium for site work, we have recommended deferring the following elements of the plan: 1. Placement of the southern elements of the drainage improvements. The southern drainage system will need to be modified to fit the revised catchment wall recommended by the City of Edmonds. 2. Minor grading/debris removal proposed above the house footprint to remove the accumulated erosion sediments. 3. Replanting of the hillside. 12525 Willows Road, Suite 101, Kirkland, Washington 98034 Phone (425) 821-7777 • Fax (425) 821-4334 Ms. Ann Bullis October 14, 2008 The work will be deferred until next spring when the next growing season begins and prior to the construction.of the proposed catchment wall. We recommend that the northern storm drainage system shown on the current plans be established. We are proposing a phased approach. The purpose of this work is to create an on -site discharge point for the seepage that is occurring on the site. This work will consist of placement of catch basins labeled DB-1 and DB-2 along the northern margin of their building envelope. Placement of these catch basins will not interfere with the construction of the proposed house or catchment wall. Placement of the catch basins on -site will reduce the amount of seepage that is currently flowing down the eastern edge of the road. The existing swales that were constructed last fall will be modified by hand excavations or using a mini.excavator to direct surface runoff and flows to the new catch basins. Any swales needed east of the proposed catchment wall will be hand excavated. New swales will be no deeper than 18 inches below existing site grades. If weather conditions permit, following or during the installation of the stonn drainage system described above, the northern seepage collection pans and tightlines on the slope will be installed as shown on the plans and described in our report dated May 22, 2008. The bulk of the seepage has been noted as being on the slope above the northeast corner of the building footprint. Due to the end of the growing season, it will likely not be possible to reestablish vegetation in areas disturbed by the placement of the upper seepage collection zone. The contractor will place jute matting or equivalent erosion control mats in areas where the foot traffic damages vegetation. The current erosion control plan shown on the project plans prepared by Western Engineers will be implemented. Temporary erosion control measures that were established last fall following removal of the trees under a separate permit will be modified to comply with the plans by Western Engineers. In summary, it is planned to: 1. Arrange a pre -construction meeting with the City of Edmonds. 2. Hand sow the grass seed specified on the current plans prepared by Western Engineers. 3. Establish the northern catch basins labeled DB-1 and DB-2. Soils excavated from these trenches that is not used as backfill will be removed from the site. Structural fill within the road right-of-way will ,be placed in accordance with the referenced geotechnical report. 4. Excavate shallow swales to direct the seepage and surface runoff from the northern portion of the site to the drainage basins. 5. Remove the existing silt fence and accumulated sediment along the western margin of the site,. The accumulated sediment within about five feet of the curb will be removed with a small excavator working from the paved area. The accumulated sediment will be removed from the site. No fill will be placed along the margin of the road. Any cut slopes created by the removal of the accumulated sediment will be made at a 3:1 or flatter. Disturbed areas will be mulched. Project No T-840-10 Page No. 2 e Ms. Amy BuIlls October 14, 2008 6. If weather permits, install the northern elements of the seepage collection system. A suitable weather window .will consist of a 10 period with no significant. storms in the weather forecast. All work east, uphill of the proposed catchment wall will be done with handheld equipment. 7. Terra Associates will make weekly and storm specific site visits to observe the condition, of the erosion control facilities. Any deficiencies will- be promptly brought to the attention of the lsaacson's, their contractor, and the City of Edmonds. Field memos will be submitted to the city on a weekly basis. 8. Terra Associates will make daily field visits during all work involving excavations on -site associated with this letter. We trust this letter is adequate for your current needs. If you have any questions, please call. Sincerely yours, TERRA ASSOCIATES, INC. Charles R. ie, L.E.G. Project Manager cc : Brian and Cindy Isaacson Mr. Barry R. Constant, P.E., Western Engineers Mr. Michael O'Brien, AIA Mr. Bill Johnson, JLEC Project No T-840-10 Page No. 3 R.W. THORPE & ASSOCIATES, INC. C-OT 24 2008 Seattle • Anchorage • Denver • Winthrop auLDINQQ�PF ARTI�ENT ee Planning • Landscape • Environmental • Economics cRvoF nnoN PRINCIPAL ASSOCIATES: W. Robert . Thorpc, AICP, President �� �� Icnnifer L.ce, RLA Consuhing Landscape Archi(ecr Stephen Speidel. ASLAT I ce Michaelis, AICP S __..Barbara Baker, AICP EE Project Monitoring Program for City file No. CU-06-104 (Related Building Application Nos. BLD20070833 & BLD20070834) Isaacson/ Portion of Lorian Woods Common Area - 16007 73rd Place West City of Edmonds Municipal Code Code Section 23.40.130.D - Mitigation plan requirements. Monitoring Program, The mitigation plan shall include a program for monitoring construction and for assessing a completed project. A protocol shall be included outlining the schedule for site monitoring (for example, monitoring shall occur in years one, three, and five after site construction), and how the monitoring data will be evaluated to determine if the performance standards are being met. A monitoring report shall be submitted as needed to document milestones, successes, problems, and contingency actions of the compensation project. The compensation project shall be monitored for a period necessary to establish that performance standards have been met, but not for a period less than three years. Requirements for monitoring project: 1. Construction monitoring 2. Completed project assessment 3. Site monitoring schedule with monitoring reports 4. Performance standards & contingency actions S. Maintenance Project overview The goal of the planting plan is to provide native plantings with low water needs to serve as vegetative cover on the slope. This objective will be evaluated using quantifiable monitoring performance standards. The first year will serve as a baseline for the plant performance standards. Plant survival should be 90 percent the first year and 80 percent by the third year unless plant recruitment has resulted in the same or greater percent cover than was designed. Plant mortality can be mitigated by good.plan.ting technique that includes making sure that containerized stock is installed deep enough and adheres to planting details included in the plan. In addition, each plant shall receive a 2-foot diameter ring of mulch to a height of 3 inches above the existing soil surface. A 4-inch diameter ring around the base of each plant shall be kept free of mulch. Wood chips or composted mulch is acceptable. The planting pit of each shrub and tree to the drip -line must be dug completely free of invasive weeds and grasses. If white sweet clover grows in the area it should be retained because clover can contribute considerable amounts of organic matter as well as nitrogen to the soil when incorporated. 705 Second Avenue Suite 710 • Seattle WA `k1' I04 • Telephone: (20()) b24A—}j��� i) t�$1)Jy(I��1`M11N nn(_a)rwta.com •. Project Monitoring Program for City file No. CU-06-104 (BLD20070833 & BLD20070834) Isaacson/ Portion of Lorian Woods Common Area 16007 73rd Place West 1. Construction monitoring In order to ensure proper planting techniques, quality of plant stock and adherence to the planting plan; construction observations will be made by a qualified professional. These observations will be made initially at the time of clearing and grading, again at plant delivery and installation, and once weekly or biweekly as construction is under- way. 2. Completed project assessment Upon completion of the planting project, an inspection by a qualified professional will be made to determine plan compliance. A written report or site observation summary will be submitted to the City of Edmonds describing whether proper planting techniques and planting notes have been followed. An "As Built" report section or plan sketch is to accompany the report to document that the plant quantity and overall general design layout was accomplished. This first monitoring site visit will establish sample plots for the baseline monitoring; determine the overall condition of the replanting area; examine the health and survival of the plantings; observe plant recruitment and identify weed problems. Vegetation should be sampled in the four main plots that run parallel to the site contours. Items such as plant health, species presence; and percent cover should be noted. The center and ends of the plots should be staked* and labeled in a manner that is easy to locate each year. Photo stations downhill and in front of each plot should also be marked by stakes*. (*permanent stakes from 2009 to 2012). These photos, taken from the same location each year, will document appearance, progress and changes in the vegetation. The vegetation will be assessed for species composition and percent cover. A sample will be taken in areas that have uniform vegetation and in areas where there are transitions between different community types. Data collected from this sample can be used to determine dominant species, recruitment of native species, presence of weeds, and the general health and character of the plantings. Plant species survival, health, and vigor should be visually evaluated. Invasive plant species will be identified. 3. Site monitoring schedule with monitoring reports At this time, planting is anticipated to be installed between the spring and fall of 2009. The monitoring period for the site will continue through 2012 (meeting the minimum three-year provision). Monitoring will- be conducted annually, in the fall, for the duration for the three-year period. Site observations each year will be submitted to the City of Edmonds or as needed, describing findings and recommendations should action be required. 4. Performance Standards & Contingency Actions The enhancement areas shall support at least 80% survivorship, and at least 80% coverage of the plants set forth in this plan. by the end of three years. The species mix 'r 705 Second Avenue Suite 710 • Seattle WA 98104 • Telephone 12M) „24-0231) • Fax (201,) t,25-0v30 • F- •tail odmin(u)rwta corn •: Project Monitoring Program for City file No. CU-06-104 (BLD20070833 & BLD20070834) Isaacson/ Portion of Lorian Woods Common Area 16007 73rd'Place West should resemble that proposed by the planting plans; adherence to obtaining all of the species shall be a criterion for success. Reproduction of volunteer native species may be used to establish areal coverage requirements. Following each monitoring, recommendations will be made for the replacement of plant mortality to meet the survival percentages allowed and to meet a species mix consistent with that of the approved landscape plan. If plant mortality exceeds the percentages allowed, new replacement plants (based on recommendations for plant quantities, plant size and plant species) will be planted. Any replanting will be done by the contracted landscaper and should be done during the fall maintenance visit. At each maintenance visit, mulch shall be replaced around each plant. Each plant shall receive a 2-foot diameter ring of mulch to a height of 3 inches above the existing soil surface. A 4-inch diameter ring around the base of each plant shall be kept free of mulch. Wood chips or composted mulch is acceptable. 5. Maintenance Maintaining the planting area includes removing invasive species that threaten plant survival. The planting areas will be maintained in the fall (and late spring if necessary) of each year for the three-year monitoring, period. Maintenance will include the removal of competing grasses and non-native vegetation from a 2-foot diameter ring surrounding a given plant. Weeds can be maintained by removing the weed with the roots or cutting back the weed. If maintenance contractors are hired they shall not pull out numbered stakes installed for monitoring purposes. Blackberry removal is an integral part of site preparation in and around the proposed planting areas/groupings. Weeding such as this is important during the first year as rootstock of blackberries can regenerate substantially. Weeding should be done monthly in 2009 until it is clear that weeding can be less frequent. Herbaceous weeds can be pulled by hand in late spring while the soil is loose and before flowers have formed. Reseeding large disturbed areas where weeds have been removed leaving large patches of bare soil or where erosion or other activities have caused large bare areas is recommended. Supplemental water is recommended from.June through September and/or during any other periods of drought. Sou rces: Avis Baseline Monitoring Report Cooke Scientific Services October 12, 2002 City Foresters, Inc. Appendix II City of Edmonds Municipal Code Section 23.40.130.D RWT/A Mercer Island Critical Area Study June & August 17, 2006 Wetland Resources Inc. 705 Second Avenue Suite 710 • Seattle WA 98104 • Telephone (200) 024-(,DQ • Eax' (206) Q5-0910 • E-Mail ndnun(o)rwta.com •: (Anderson) Owner Liability Landslide Acknowledgement Lorian Woods Lot 2 Drainage Installation Building Application Number: BLD20070834 • The accuracy of all permit submittal information is warranted by the Robert Anderson and Joann M. Anderson, Developers, Lorian Woods Plat and owners of common area drainage easements, and we relieve the City and its staff from any liability associated with reliance on such permit application submittals. • While an application may reference the reports of prior public consultants to the City, all conclusions are those of the design professionals whose reports are provided in the application. • That Robert Anderson and Joann M. Anderson, Developers, and owners of Lorian Woods common area drainage easements understand and accepts the risk of developing in an area with potential unstable soils and understand the required temporary and permanent erosion control and site maintenance issues associated with specific geologic hazards or conditions of the site that may affect slope stability over time. • That Robert Anderson and Joann M. Anderson, Developers of the Lorian Woods Plat, and owners of common area drainage easements will advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures on the site, of the slide potential and on -going maintenance issues of the area and on the property. Devetopei and Owner of Lorian Woods Drainage Easement Dated: e',7 Signed: Joann M/Anderson Developer and Owner of Lorian Woods Drainage Easement Dated: ) l') , - j - o STREET FILE • STATE OF WASHINGTON ) ss COUNTY OF DOUGLAS ) On this I " day of DU! v 2007 before me personally appeared Robert Anderson who being first duly sworn, acknowledged that he executed the foregoing instrument as his/her own free act and that he/she knew the contents thereof. NotatY Mft owe.a Wgd*Vft OE#*CK MAd RkV CCISCO . MY *PP& hire *6VIW Jun 3, 20M STATE OF WASHINGTON ) ss COUNTY OF DOUGLAS ) Notary Public J Print Name: /��✓Ict .� UL ids �,,,, Douglas County, Washington My Commission Expires: 3ur\i- On this ` day of UL;'u1,1P, r , 2007, before me personally appeared Joann M. Anderson who being first duly sworn, acknowledged that she executed the foregoing instrument as his/her own free act and that he/she knew the contents thereof. Nbtcry Ropc . stare Of WmWgton DERRICK TIGIAO FttANCISCO MY APPOInfinent Expires Jun 3, 2000 Notary Publi6 '-) j Print Name: 1�rTvp,I ,A � L, Douglas County, Washington My Commission Expires: 2 OCT z z 2007 PERMIT COUNTER (Isaacson) Applicant Liability Landslide Acknowledgement Lorian Woods Lot 2 Drainage Installation Building Application Number: BLD20070834 • The accuracy of all permit submittal information is warranted by Brian G. Isaacson and Cindy L. Isaacson, andwe relieve the City and its staff from any liability associated with reliance on such permit application submittals. • While an application may reference the reports of prior public consultants to.the City, all conclusions are those of Brian G. Isaacson and Cindy L. Isaacson and our design professionals. • That Brian G. Isaacson and Cindy L. Isaacson understand and accept the risk of developing in an area with potential unstable soils and understand the required temporary and permanent erosion control and site maintenance issues associated with specific geologic hazards or conditions of the site that may affect slope stability over time. • Brian G. Isaacson and Cindy L. Isaacson will advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures on the site, of the slide potential and on -going maintenance issues of the area and on the property. Signed:_,7'3o," 4)-S Brian G. Isaacson Applicant Dated: a.�,,4,�- 7-0007 Signed: w u_ d, 0,5=cdo-y'1 Cindy L. Isaacson Applicant Dated: 0 3, a oo t STATE OF WASHINGTON ) ss COUNTY OF KING ) On this �3 day of � , 2007 before me personally appeared Brian G. Isaacson, who being first duly swo i, acknowledged that he executed the foregoing instrument as his/her own free act and that he/she knew the contents thereof. Notary Pul�hc G' Print Name: Dorothy B. Shingola King County, Washington My Commission Expires: April 19, 2010 STATE OF WASHINGTON ) ss COUNTY OF KING ) On this day of ! , 2007, before me personally appeared Cindy L. Isaacson, who being first duly s rn, acknowledged that she executed the foregoing instrument as his/her own free act and that he/she knew the contents thereof. `$1 ,0,;�35io,�%'c�,,' Notary PublicY o .aOTq,��+q'%Cp Print Name: Dorothy B. Shingola M D; King County, Washington '; U) a - My Commission Expires: April 19, 2010 �i F'J,, .j, P ?�J.dL�.P..�..n:JYw.S.�.ir'. 1;. i.+16...9 _.tom.. .. ... .. ... - .. t .. � t � _. _... .al �.�_. ••f RECEIVE® L?s OCT 2 2 2007ST%mEET F"y rCoo FILE PERMIT COUNTER GEOTECHNICAL REPORT �frn� 1� tlr `s Lorian Woods Lot 2 Lorian Woods Edmonds, Washington Project No. T-840-10 Terra Associates, Inc.. Prepared for: Mr. Brian Isaacson Bothell, Washington September 14, 2005 wx TERRA ASSOCIATET, Inc. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences September 14, 2005 Project No. T-840-10 Mr. Brian Isaacson 9808 —142nd Place SE, F-301 Bothell, Washington 98011 Subject: Geotechnical Report Lorian Woods Lot 2 Lorian Woods Edmonds, Washington Reference: Geotechnical Report, Meadowdale Beach, Lots 54 through 57, Project No. T-840-1, prepared by Terra Associates, Inc:, dated June 6, 1989 Dear Mr. Isaacson: As requested, we have conducted a geotechnical engineering study for the subject project. The attached report presents our findings and recommendations for the geotechnical aspects of project design and construction. Our field exploration indicates the site is underlain by loose to medium dense colluvial soils, comprised of old landslide deposits. We did not observe groundwater seepage in either of the test pits excavated on -site. However, we did encounter a small amount of surface water flowing across the planned building area. In our opinion, provided the owner is willing to accept the risk associated with building in a landslide hazardous area as discussed in the referenced report, the soil and groundwater conditions are suitable for the planned development. The structure should be supported on a mat/raft foundation, consisting of a slab constructed over a grid of grade beams, bearing on the colluvial soils or on structural fills placed above these soils. This report does not repeat the discussion regarding slope stability risks on and adjacent to the site that is contained in the referenced report. The owner must accept the risks of slope instability, as discussed in the referenced report. 12525 Willows Road; Suite 101, Kirkland, Washington 98034 Phone (425) 821-7777 9 Fax (425) 821-4334 T' 1VIr. Brian Isaacson . September 1.4, 2005 Detailed recommendations addressing these issues and other geotechnical design considerations are presented in the attached report. We trust the information presented is sufficient for your current needs. If you have any questions or require additional information, please call. Sincerely yours, TERRA ASSOCIATES, INC. Bernard P. Knoll H, P.E. Geotechnical Engineer Charle Projec er Fb. Theodo Principal �h1AlG Ls q8r o Project No. T-840-10 Page No. ii TABLE OF CONTENTS Page'No. 1.0 Project Description......................................................................................................... 1 2.0 Scope of Work...................................................:............................................................ 1 3.0 Site Conditions.........:...................................................................................................... 2 3.1 Surface...................:........................................:.................................................. 2 3.2 Soils................................................................................................................... 2 3.3 Groundwater ............................. :......................................................................... 3 4.0 Discussion and Preliminary Recommendations.............................................................. 3 4.1 General...............................................................................................................3 4.2 Site Preparation and Grading..................:...........:.............................................. 3 4.3 Excavations .................................................. :..................................................... 4 4.4 Foundations....................................................................................................... 5 4.5 Slab -on -Grade Floors.:....................................................................................... 5 4.6 Retaining Walls.............................................:.................................................... 6 4.7 Drainage.............................................................................................................6 4.8 Slopes and Embankments.................................................................................. 7 . 5.0 Additional Services...............................:......................................................................... 7 6.0 Limitations ..........................................I............................................................................ 7 FiLyures Vicinity Map ............... :....... ...........:.................................. Figure 1 ......................................... Exploration Location Plan ..........................:...................................:.................................... Figure 2 . Typical Wall Drainage Detail..............................................................................................Figure 3 Appendix Field Exploration and Laboratory Testing....................................................................Appendix A Geotechnical Report Lorian Woods Lot 2 Lorian Woods Edmonds, Washington 1.0 PROJECT DESCRIPTION The proposed project is a single-family dwelling. Detailed building and development plans are currently not available. We understand that you plan on constructing the house in the western portion of the lot. We expect the structure will be a two- to three-story, wood -framed building with its main floor constructed at grade. Foundation loads should be relatively light, in the range of 2 kips per foot for bearing walls and 25 kips for isolated columns. Finish site grades are not known. Given the sloping topography, we expect site grading will consist of cuts up to six feet to establish desired drive and building floor elevations. We previously prepared a report entitled Geotechnical Report, Meadowdale Beach Lots 54 through 57, Edmonds, Washington, Project T-840-1, dated June 6, 1.989. This previous report.was written as part of the plat recording process for Lorian Woods. Lorian Woods is located within an area that has been subjected to past earth movements. The risks of earth movements are addressed in our previous report and must be accepted by the homeowner. This report does not address slope stability beyond recommendations that will retain the existing level of slope stability on the site. The recommendations contained in the following sections of this report are based on our understanding of these design features. If actual features vary or changes are made, we should review them in order to modify our recommendations, as required. We should review final design drawings and specifications to verify that our recommendations have been properly interpreted and incorporated into project design. 2.0 SCOPE OF WORK Our work was completed in accordance with our proposal, dated August 27, 2004. Accordingly, on November 8, 2004, we excavated 2 test pits to a maximum depth of 11.5 feet below existing surface grades. Using the information obtained from the subsurface exploration, we performed analyses to develop geotechnical recommendations for project design and construction. Specifically, this report addresses the following: • Soil and groundwater conditions • Site preparation and grading • Excavations • Foundations • Slab -on -grade floors • Retaining walls • Drainage t ' • • September 14, 2005 Project No. T-840-10 It should be noted that the recommendations outlined in this report regarding drainage are associated with soil strength, design earth pressures, erosion, and stability. Design and performance issues with respect to moisture as it relates to the structure environment (i.e., humidity, mildew, mold) are beyond Terra Associates' purview. A building envelope specialist or contractor should be consulted to address these issues, as needed. 3.0 SITE CONDITIONS 3.1. Surface The building site is located in the Lorian Woods development, south of North Meadowdale Road, near the 7400 block in Edmonds, Washington. The building site is located on Lot 2 and is currently unoccupied. The approximate location of the site is shown on Figure 1. The portion of the lot containing the building site slopes down to the west at grades ranging from 10 to 50 percent. Along the eastern portion of the lot and east of the building site, the site slopes up with surface grades approaching vertical in places. The site is thickly forested with mature alder, maple, cedar, and fir trees. It is our understanding several of the large diameter trees on the slope east of the building site will be removed and replaced with lower growing trees and bushes that root well in wet soils. The site is bordered with undeveloped lots to the north and south, an existing residence along the top of the slope to the east, and an asphalt driveway servicing the Lorain Woods development to the west. During our exploration, we observed surface water flowing across the building site area. The surface water was flowing from the slope located east of the building area. 3.2 Soils The soils we observed in the test pits generally consist of 12 to 24 inches of topsoil overlying colluvial soils originating from the hillside, east of the building envelope. We observed colluvium in both the test pits. The colluvial soils consisted of loose to medium dense silty sand with occasional gravel, organics, and blocks of silt. The colluvial soils observed in Test Pit TP-1 were loose and wet to approximately 8.5 feet below existing surface grades and moist below 8.5 feet. The soils in Test Pit TP-2 were loose and moist to a depth of approximately 5.5 feet, becoming wet below 5.5 feet and medium dense below 6.5 feet. We observed a large -diameter, nested tree in Test Pit TP-2 at a depth of approximately nine feet below existing surface grades. Both of the test pits were terminated in the colluvium at depths of 10.5 and 11.5 feet. The approximate test pit locations are shown on Figure 2. The Preliminary Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King Counties, Washington, by Mackey Smith, 1975, shows soils in the vicinity of the site consisting of Old landslides (Qols). The soils observed in the test pits are consistent with this classification. Page No. 2 • September 14, 2005 Project No. T-840-10 3.3 Groundwater We did not encounter groundwater seepage in any of the test pits. However, we observed mottled, wet soils in the upper portions of test pits. The conditions observed indicate that a perched water table develops at times during the wet winter season. Perched groundwater levels and flow rates will fluctuate seasonally and typically reach their highest levels during and shortly following the wet winter months (October through May). 4.0 DISCUSSION AND PRELIMINARY RECOMMENDATIONS 4.1 General As noted earlier, the site is in a mapped landslide hazard area. Relative risks of slope movement are discussed in our June 6, 1989, report. Provided the owner is willing to accept the risks associated with slope instability at the site, in our opinion, the site conditions are suitable for the proposed construction. We recommend the structure be supported on a mat/raft foundation, bearing on the existing. colluvial soils or on structural fill placed above these colluvial soils. For foundation backfill, we recommend minimizing the placement of fills on this site. A surface swale should be constructed along the uphill side of the house to prevent surface water from impacting the structure. The swale should span the entire width of the building area and discharge into the Plat storm system. The site soils contain significant amount of fines and will be difficult to compact as structural fill when too wet. The ability to use native soil from site excavations as structural fill will depend on the soil's moisture content and the prevailing weather conditions at the time of construction. If grading activities take place during the winter season, the owner should be prepared to import free -draining granular material for use as structural fill and backfill. Detailed recommendations regarding these issues and other geotechnical design considerations are provided in the following sections of this report. These recommendations should be incorporated into the fi-nal design drawings and construction specifications. 4.2 Site Preparation and Grading To prepare the site for construction, all vegetation, organic surface soils, and other deleterious materials should be stripped and removed from the building area. Organic topsoil will not be suitable for use as structural fill, but may be used for limited depths in nonstructural areas. We recommend that soils excavated from the site that are not needed for foundation backfill be exported from the site. Once clearing and stripping operations are complete, excavation can be initiated to establish desired grades. We recommend keeping all cuts for site development purposes to depths of six feet or less. Page No. 3 • • September 14, 2005 Project No. T-840-10 Following excavation, all exposed surfaces bearing should be observed by a representative of Terra Associates. If excessively soft areas are observed and cannot be stabilized in place by compaction, the affected soils should be excavated and removed to firm bearing and grade restored with new structural fill. If the depth of excavation to remove unstable soils is excessive, use of a geotextile reinforcing/separation fabric, such as Mirafi 500X or equivalent, can be considered in conjunction with clean granular structural fill. Our experience has shown that, in general, a minimum of 18 inches of a clean, granular structural fill over the geotextile fabric should establish a stable bearing surface. Our study indicates that the colluvial soils contain a significant percentage of fines (silt -and clay -sized particles), which makes them difficult to compact as structural fill if they are too wet or too dry. Accordingly, the ability to use native soils from site excavations as structural fill will depend on their moisture content and the prevailing weather conditions when site grading activities take place. If grading activities are planned during the wet winter months, or if they are initiated during the summer and extend into fall and winter, the owner should be prepared to import wet weather structural fill. For this purpose, we recommend importing a clean granular soil that meets the following grading requirements. U.S. Sieve Size Percent Passing 6 inches 100 No. 4 75 maximum No. 200 5 maximum* *Based on the 3/4-inch fraction Prior to use, Terra Associates, Inc., should examine and test all materials imported to the site for use as structural fill. Structural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of 95 percent of the soil's maximum dry density, as determined by American Society for Testing and Materials (ASTM) Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction should be within two percent of its optimum, as determined by this ASTM standard. In nonstructural areas, the degree of compaction can be reduced to 90 percent. 4.3 Excavations All excavations at the site associated with confined spaces (such as utility trenches) must be completed in accordance with local, state, or federal requirements. Based on current Occupational Safety and Health Administration (OSHA) regulations, the loose to medium dense colluvial soils would generally be classified as Type "C" soils. Accordingly, side slopes on temporary excavations should be laid back at a gradient of 1.5:1 (Horizontal: Vertical) or flatter. If these slope inclinations cannot be achieved due to site constraints, temporary shoring may be required. As noted above in the site preparation section, we recommend limiting excavation depths on -site for building construction to six feet. Page No. 4 • . September 14, 2005 Project No. T-840-10 Depending on the time of year and weather conditions when excavations take place, groundwater seepage may be encountered within excavations extending deeper. than one foot below existing surface grades. Based on our study, the volume of water and rate of flow into the excavation should be relatively light, depending on the time of year and the height of the exposed seepage face. Dewatering using conventional sump -pumps should be adequate in maintaining a relatively dry excavation. This information is provided solely for the benefit of the owner and other design consultants and should not be construed to imply that Terra Associates, Inc., assumes responsibility for job site safety. It is understood that job site safety is the sole responsibility of the project contractor. 4.4 Foundations We recommend the structure be supported on a raft foundation consisting of a connected grid of grade beams that bear on the existing colluvial soils or on structural fills placed above these soils. No isolated column.pads should be used for structural support. We recommend designing this foundation for a net allowable bearing capacity of 1,200 pounds per square foot (pso. For short-term loads, such as wind and seismic, a one-third increase in this allowable capacity can be used. Foundation subgrades should be prepared, as recommended in Section 4.2 of this report. Perimeter foundations exposed to the weather should bear at a minimum depth of 1.5 feet below final exterior grades for frost protection. For designing foundations to resist lateral loads, a base friction coefficient of 0.35. can be used. Passive earth pressures acting on the sides of the footings can also be considered. We recommend calculating this. lateral resistance using an equivalent fluid weight of 250 pounds per cubic foot (pcf). We recommend not including the upper 12 inches of soil in this computation because it can be affected by weather or disturbed by future grading activity. This value assumes the foundations will be constructed neat against competent soil and backfilled with structural fill, as described in Section 4.2 of this report. The values recommended include a safety factor of 1.5. 4.5 . Slab -on -Grade Floors Slab -on -grade floors may be supported on subgrade, as recommended in Section 4.2 of this report. Fill should not be placed to raise site grades above the existing elevations to support slab -on -grade floors. If the main level floor will be above existing site grades, we recommend the use of raised wood floors framed over a crawl space. Immediately below slab -on -grade floors, we recommend placing a four -inch thick capillary break layer of clean, free -draining, coarse sand or fine gravel that has less than three percent passing the No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the underlying soil and subsequent wetting of the floor slabs. Page No. 5 • September 14, 2005 Project No. T-840-10 The capillary break layer will not prevent moisture intrusion through the slab caused by water vapor transmission. Where moisture by vapor transmission is undesirable, such as covered floor areas, a common practice is to place a durable plastic membrane on the capillary break layer and then cover the membrane with a layer of clean sand or fine gravel to protect it from damage during construction, and to aid in uniform curing of the concrete slab. It should be noted that if the sand or gravel layer overlying the membrane is saturated prior to pouring the slab, it will be ineffective in assisting uniform curing of the slab and can actually serve as a water supply for moisture transmission through the slab and potentially affect floor coverings. Therefore, in our opinion, covering the membrane with a layer of sand or gravel should be avoided if floor slab construction occurs during the wet winter months and the layer cannot be effectively drained. Other methods are available for preventing or reducing water vapor transmission through the slab. We recommend consulting with a building envelope specialist or contractor for additional assistance regarding this issue. 4.6 Retaining Walls The magnitude of earth pressure development on below -grade walls, such as basement walls, will partly depend on the quality of the wall backfill. We recommend placing and compacting wall backfill as structural fill. Wall backfill below structurally loaded areas, such as pavements or floor slabs, should be compacted to a minimum of 95 percent of its maximum dry density, as determined by ASTM Test Designation D-698 (Standard Proctor). In unimproved areas, the relative compaction can be reduced to 90 percent. To guard against hydrostatic pressure development, drainage must be installed behind the wall. A typical wall drainage detail is shown on Figure 3. With wall backfill placed and compacted as recommended and drainage properly installed, unrestrained walls can be designed for an active earth pressure equivalent to a fluid weighing 50 pcf. For restrained walls, an additional uniform lateral pressure of 100 psf should be included. These values assume a horizontal backfill condition and that no other surcharge loading (such as traffic, sloping embankments, or adjacent buildings) will act on the wall. If such conditions exist, the imposed loading must be included in the wall design. Friction at the base of the wall foundation and passive earth pressure will provide resistance to these lateral loads. Values for these parameters are provided in Section 4.4 of this report. 4.7 Drainage Surface Final exterior grades should promote free and positive drainage away from the building area. We recommend providing a gradient of at least three percent for a minimum distance of ten feet from the building perimeter, except in paved locations. In paved locations, a minimum gradient of two percent should be provided, unless provisions are included for collection and disposal of surface water adjacent to the structure. Page No. 6 • • September 14, 2005 Project No. T-840-10 To prevent surface water flowing off the adjacent hillside from impacting foundations, we recommend installing a surface swale along the uphill side of the house. The swale should extend the entire width of the building area and be located to collect and convey surface water to an appropriate point of controlled discharge into the plat stormwater system located in the street below the site. The collected surface water should not be discharged into the existing slope drainage system currently operating along the south side of the building site. When site grading details become available, we can provide supplementary recommendations for design and construction of the surface swale. Subsurface We recommend installing a continuous drain along the outside lower edge of the perimeter building foundations. The foundation drains should be tightlined separately from the roof drainage system and discharge into the plat stormwater system located in the street below the site. Subsurface drains must be laid with a gradient sufficient to promote positive flow to the point of discharge. All' drains should be provided with cleanouts at easily accessible locations. These cleanouts should be serviced at least once every year. 4.8 Slopes and Embankments All permanent cut slopes should be graded with a finished inclination.of no greater than 3:1. Upon completion of grading, the slope face should be trackwalked and appropriately vegetated or provided with other physical means to guard against erosion. Final grades at the top of the slope must promote surface drainage away from the slope crest. Water. must not. be allowed to flow uncontrolled over the slope face. If surface runoff must be directed towards the slope, the runoff should be controlled at the top of the slope, piped in a closed conduit installed on the slope face, and taken to an appropriate point of discharge beyond the toe. 5.0 ADDITIONAL SERVICES Terra Associates, Inc., should review the final project designs and specifications in order to verify that earthwork and foundation recommendations have been properly interpreted and incorporated into project design. We should also provide geotechnical services during construction to observe compliance with our design concepts, specifications, and recommendations. This will allow for expedient design changes if subsurface conditions differ from those anticipated prior to the start of construction. 6.0 MMATIONS We prepared this report in accordance with generally accepted geotechnical engineering practices. No other warranty, expressed or implied, is made. This report is the copyrighted property of Terra Associates, Inc., and is intended for specific application to the Lorian Woods Lot 2 project in Edmonds, Washington. This report is for the exclusive use of Mr. Brian Isaacson and his authorized representatives. Page No. 7 r. September 14, 2005 Project No. T-840-10 The analyses and preliminary recommendations presented in this report are based on data obtained from the on - site test pits. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, Terra Associates, Inc., should be requested to reevaluate the recommendations in this report prior to proceeding with construction. REFERENCE: THOMAS GUIDE, CD-ROM, KING/PIERCE/SNOHOMISH COUNTIES, 2004 17Amn 3 a FIRi a a a ST.sw it NOT TO SCALE Terra VICINITY MAP LORIAN WOODS LOT 2 • •~•.•• ••• Associates, Inc. EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Pro No. T-840-10 Date SEPT 2005 Figure 1 Environmental Earth Sciences 1• 9 180 170 160 O TP-1 __--- 1 --- \ ��\� • ice/ ����---®--- • mama, a ;773rd p�A E wES B - oC6 T oCB I - - - - - - - - - - SURVEYED CONTOUR ELEVATION DIGITIZED CONTOUR ELEVATION NOTE: LEGEND: THIS SITE PLAN IS SCHEMATIC. ALL LOCATIONS AND ISTP-1 APPROXIMATE LOCATION OF TEST PIT DIMENSIONS ARE APPROXIMATE. IT IS INTENDED FOR REFERENCE ONLY AND SHOULD NOT BE USED FOR DESIGN OR CONSTRUCTION PURPOSES. 0 30 60 REFERENCE: SITE PLAN PROVIDED BY CLIENT APPROXIMATE SCALE IN FEET 'Terra EXPLORATION LOCATION PLAN go LORIAN WOODS LOT 2 Associates Inc. EDMONDS, WASHINGTON Consultants in Geotechnical engineering Geology and Pro No. T-840-10 Date SEPT 2005 Figure 2 Environmental Earth Sciences 1 9 12" MINIMUM 3/4" MINUS WASHED EXCAVATED SLOPE j (SEE REPORT TEXT FOR APPROPRIATE 6"(MIN.) / INCLINATIONS) 12" OVER PIPE � � t•��• t•� �•ll.� 1. 3" BELOW PIPE 4" DIAMETER PERFORATED PVC PIPE NOT TO SCALE MIRADRAIN G100N PREFABRICATED DRAINAGE PANELS OR SIMILAR PRODUCT CAN BE SUBSTITUTED FOR THE 12-INCH WIDE GRAVEL DRAIN BEHIND WALL. DRAINAGE PANELS SHOULD EXTEND A MINIMUM OF SIX INCHES INTO 12-INCH THICK DRAINAGE GRAVEL LAYER OVER PERFORATED DRAIN PIPE. Terra TYPICAL WALL DRAINAGE DETAIL �• �' LORIAN WOODS LOT-2 •• ••• Associates Inc. EDMONDS, WASHINGTON • Consultants in Geotechnical engineering Geology and Pro No. T-840-10 Date SEPT 2005 Fi ure 3 EnJironmental Earth Sciences 1 9 APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING Lorian Woods Lot 2 Edmonds, Washington On November 8, 2004, we explored subsurface conditions at the site by excavating 2 backhoe test pits to a maximum depth of 11.5 feet below existing surface grades. The approximate test pit locations are shown on Figure 2. The test pit logs are presented on Figure A-2. A geotechnical engineer from our office conducted the field exploration, maintained a log of each test pit, classified the soils encountered, collected representative soil samples, and observed pertinent site features. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS) described on Figure A-1. Representative soil samples obtained from the test pits were placed in sealed containers and taken to our laboratory for further examination and testing. The moisture content of each sample was measured and is reported on the test pit logs. Grain size analyses were performed on two samples. The results are shown on Figure A-3. Project No. T-840-10 w • MAJOR DIVISIONS LETTER SYMBOL TYPICAL DESCRIPTION Clean GW Well -graded gravels, gravel -sand mixtures, little or no GRAVELS Gravels fines. J rn More than (less than 5% fines) GP Poorly -graded gravels, gravel -sand mixtures, little or O cts N co rn 50% of coarse fraction is no fines. GM Silty gravels, gravel -sand -silt mixtures, non -plastic W °? > larger than No. Gravels with fines fines. Z CO Fn E 4 sieve GC Clayey gravels, gravel -sand -clay mixtures, plastic fines. Q o 0 LO N d SANDS Clean Sands SW Well -graded sands, gravelly sands, little or no fines. � Z (less than S P Poorly -graded sands or gravelly sands, little or no � = c More than 5% fines) fines. Q m s 50% of coarse O o"' fraction is Sands SM Silty sands, sand -silt mixtures, non -plastic fines. U g smaller than SC Clayey sands, sand -clay mixtures, plastic fines. No. 4 sieve with fines ML Inorganic silts, rock flour, clayey silts with slight . J •`21 o SILTS AND CLAYS plasticity. CL Inorganic clays of low to medium plasticity, (lean clay). �o O c"a N E o m Liquid limit is less than 50% OL Organic silts and organic clays of low plasticity. Wo .� Z LOcUW (r 5 ".N MH Inorganic silts, elastic. C0 6 SILTS AND CLAYS CH Inorganic clays of high plasticity, fat clays. W E _Z �° Cn Liquid limit is greater than 50% IL OH Organic clays of high plasticity. HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS AND SYMBOLS to (n Standard Penetration Density Resistance in Blows/Foot T 2 OUTSIDE DIAMETER SPLIT I W J SPOON SAMPLER 0 Very loose 0-4 2.4° INSIDE DIAMETER RING SAMPLER U) Loose 4-10 OR SHELBY TUBE SAMPLER W Medium dense 10-30 0 Dense 30-50 1 WATER LEVEL (DATE) U Very dense >50 Tr TORVANE READINGS, tsf Pp PENETROMETER READING, tsf Standard Penetration W Consistency Resistance in Blows/Foot DID DRY DENSITY, pounds per cubic foot Cn Very soft 0-2 LL LIQUID LIMIT, percent W Soft 2-4 = 0 Medium stiff 4-8 PI PLASTIC INDEX U Stiff 8-16 Very stiff N STANDARD PENETRATION, blows per foot .16-32 Hard >32 Terra UNIFIED SOIL CLASSIFICATION SYSTEM ' Associates, Inc. LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Proj. No. T-840-10 Date SEPT 2005 Figure A-1 Geology and Environmental Earth Sciences Test Pit No. TP-1 Logged by: BPK Date: 11 /08/04 Depth (ft.) 0 Soil Description Approximate Elev. 149 (12 to 24 inches TOPSOIL) Bluish -gray, tan, and reddish -orange silty SAND, occasional gravel and organics, scattered lenses of silty clay, moist to wet, loose. (SM) (Colluvium) 5 Wet below 5.5 feet. Sandy below 8.5 feet. 10 Test pit terminated at 11.5 feet. No groundwater seepage encountered. Moderate sidewall caving from 0 to 11 feet. 15 Test Pit No. TP-2 Moisture Content N 31.4 20.3 29.6 27.8 36 Logged by: BPK Approximate Elev. 140 Date: 11 /08/04 Depth Moisture (ft) Soil Description Content 0— /°� (24 inches TOPSOIL and PEA GRAVEL) Bluish -gray, tan, and reddish -orange silty SAND, rare gravel, occasional 14.5 organics, scattered lenses of silty clay, moist, loose. (SM) 5 (Colluvium) 261 Wet below 5.5 feet. Medium dense below 6.5 feet. 28.2 Large diameter nested logs at 9 feet. 10 Test pit terminated at 10.5 feet. No groundwater seepage encountered. No sidewall caving. 15 Terra Associates, Inc. Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences 37.8 28.6 TEST PIT LOGS LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Proj. No. T-840-10 Date SEPT 2005 Figure A-2 I�c.18o�0 L CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www dedmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Mr. & Mrs.jBrian Isaacson 9808 142"d Place Northeast, #17-301 Bothell, Washington 98011 Dear Mr. & Mrs. Isaacson: 1 GARY HAAKENSON MAYOR February 24, 2006 In response to a recent localized slide, City officials conducted a site inspection on January 31, 2006 andobserved slide damage to have occurred on private property west of Sequoia Ridge Lot 3. Slide debris may have encroached onto undeveloped property you own at Lot 2 Plat of Lorian Woods. Accompanying City officials was a representative of Landau Associates, the City's professional geotechnical consultant. Landau Associates conducted a site 'reconnaissance and subsequently prepared a report (copy enclosed dated 2/17/06) that describes the observed slide. The purpose�of this letter and the attached copy of the Landau Associates report is to notify you and other private property owners in the area, of the current situation as we know it, so that you may take whatever action you deem appropriate. The City recommends you visit the site with a professional Geotechnical Engineer for an independent assessment of your property to provide recommendations about any possible site restoration that may be advisable for you to undertake to protect your property. If your geotechnical engineer requires restoration, slope mitigation or improvements, an approved permit from the City is required pursuant to City Ordinance #2661 which regulates the Earth Subsidence Landslide Hazard Area of North Edmonds. Please note the slide debris from Sequoia Ridge Lot 3 also damaged portions. of the existing City drainage facility along the slope of the Lorian Woods plat. The City's geotechnical consultant is recommending that restoration of the drainage- system not be performed at this time pending further evaluation. If you have any questions about the City drainage facility contact Public Works Director, Noel Miller at 425-771-0235. Please contact me should you have any questions regarding permit requirements or other concerns at 425-771-0220 extension 1226 during normal City business hours. Sincerely, 044-41� Jeannine L. Gra Building Official, C.B.O. Cc: Duane Bowman, Development Services Director i Noel Miller, Public Works Director Dave Gebert, City Engineer • Incorporated August 11, 1890 • Sister City - Hekinan, Japan ' CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS. WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Inc. 18°1"I Planning • Building • Engineering Mr. & Mrs. Brian Isaacson 9808 142"d Place Northeast, #17-301 Bothell, Washington 98011 Dear Mr. & Mrs. Isaacson: GARY HAAKENSON MAYOR February 24, 2006 In response to a recent localized slide, City officials conducted a site inspection on January 31, 2006 and. observed slide damage to have occurred on private property west of Sequoia Ridge Lot 3. Slide debris may have encroached onto undeveloped property you own at Lot 2 Plat of Lorian Woods. Accompanying City officials was a representative of Landau Associates, the City's professional geotechnical consultant. Landau Associates conducted a site reconnaissance and subsequently prepared a report (copy enclosed dated 2/17/06) that describes the observed slide. The purpose of this letter and the attached copy of the Landau Associates report is to notify you and other private property owners in the area, of the current situation as we know it, so that you may take whatever action you deem appropriate. The City recommends you visit the site with a professional Geotechnical Engineer for an independent assessment of your property to provide recommendations about any possible site restoration that may be advisable for you to undertake to protect your property. If your geotechnical engineer requires restoration, slope mitigation or improvements, an approved permit from the City is required pursuant to City Ordinance #2661 which regulates the Earth Subsidence Landslide Hazard. Area of North Edmonds. Please note the slide debris from Sequoia Ridge Lot 3 also damaged portions of the existing City drainage facility along the slope of the Lorian Woods plat. The City's geotechnical consultant is recommending that restoration of the drainage system not be performed at this time pending further evaluation. If you have any questions about the City drainage facility contact Public Works Director, Noel Miller at 425-771-0235. Please contact me should you have any questions regarding permit requirements or other concerns at 425-771-0220 extension 1226 during normal City business hours. Sincerely, a4"--4 Jeannine L. GO" Building Official, C.B.O. Cc: Duane Bowman, Development Services Director Noel Miller, Public Works Director Dave Gebert, City Engineer • Incorporated August 11, 1890 • Sister City - Hekinan, Japan February 17, 2006 City of Edmonds Development Services Department 121 5d' Avenue North ' Edmonds, Washington 98020 Attn: Don Fiene Assistant City Engineer RE: BOSCH PROPERTY LANDSLIDE 16116 72ND AVENUE WEST EDMONDS, WASHINGTON LANDAU ASSOCIATES FEB 2 12005 Pv a!N_r`E_ RIib 1s1�1 ;ti s ti; Dear Mr Fiene: This letter provides a summary of our observations and recommendations related to a landslide observed on the northwest side of the Bosch residence at 16116 72"d Avenue West (also known as Lot 3 of the Sequoia Ridge Plat) in Edmonds, Washington. The purpose of our services was to observe the site conditions and to provide recommendations to the City of Edmonds (City) Building Official and Engineering Division staff related to our assessment of landslide conditions and the potential for an imminent hazard to City -owned facilities, the general public, or the private property residents. Our services were requested by Don Fiene, Assistant City Engineer, on January 31, 2006 and confirmed by Task Order No.. 06-01 under Landau Associates' On -Call and Emergency / Disaster Response Geotechnical Engineering Agreement with the City of Edmonds. BACKGROUND AND OBSERVATIONS Don Fiene, Assistant City Engineer; Ann Bullis, Assistant Building Official; Damon Roth, and Dennis Stettler of Landau Associates observed the above -described landslide on the afternoon of January 31, 2006. The landslide was viewed from below, looking up from 73`d Place West, and from the top, looking down from the yard of the Bosch residence at 16116 72"d Avenue West. Mr. Bosch spoke to us briefly during our site visit and provided some background information. Our observations were limited to brief visual observations. No measurements were taken and no attempts were made to closely examine I the slope or slide debris, other than what could be readily seen by standing at the bottom or top of the slope. We understand that the landsliding was observed by a resident of 73`d Place West on Monday, January 30, 2006, at about 4:30 p.m. The landslide was preceded by over a month of unusually wet weather with precipitation significantly above typical winter rainfall levels. ENVIRONMENTAL I GEOTECHNICAL I NATURAL RESOURCES 130 2nd Avenue South • Edmonds, WA 98020 • (425) 778-0907 • fax (425) 778.6409 • www.landaLAnc.com SEATTLE • SPOKANE • TACOMA • PORTLAND The landslide occurred at the top of a steep, northwest -facing slope immediately west of the northwest corner of the Bosch residence. The location of the current landslide corresponds approximately to the location of a previous landslide that occurred on about February 13, 2005, as documented in a letter by Landau Associates to the City dated February 22, 2005. On September 16, 2003, ground cracking was also observed by Landau Associates and City personnel at the top of the bluff at this approximate location. This ground cracking was documented in a Landau Associates letter to the City dated September 25, 2003. The previously observed ground cracking had been noted when Landau Associates and City personnel were onsite observing a landslide on the same slope that had occurred about 200 ft north of the current landslide location. Following the observation of ground cracking in 2003, sections of heavy tarp were reportedly placed over the ground by Mr. Bosch and secured in place by driven steel rebar. At the time .of our observation on February 14, 2005, the heavy plastic tarps were still in place, but the ground beneath the tarps at the location of the previous ground cracking had failed and slid downslope. At the time of our most recent observations on January 31, 2006, the plastic tarps were still in place over a portion of the top of the slope. The 2005 landslide created a headscarp that was estimated to be approximately 8 to 10 ft from the northwest corner of the house and about 5 to 6 ft from a porch. The upper portion of the 2005 slide 1 formed a steep scarp area, which flattened to a slight "bench" about 20 ft below the top of the scarp. Soil exposed in the upper portion of the slope appeared to be relatively dry at the time of our 2005 site visit. At the slight "bench," seepage and wet zones were observed in 2005 with seepage flowing downslope through the recent slide debris and ultimately emerging as surface water drainage that was intercepted by catch basins along the edge of 73rd Place West. Slide debris in 2005 had been deposited or flowed into the area at and below the "bench" and was mixed with the trees and undergrowth on the lower portions of the slope. The extent of the current landslide as observed on January 31, 2006, appeared to be within the general boundaries of the 2005 landslide. The top of the 2006 landslide did not appear to extend to the top of the 2005 headscarp and as such there appeared to be little to no additional loss of ground from the top of the bluff. Some of the material involved in the 2006 landslide may represent landslide debris and colluvium that had accumulated mid -slope on the "bench" observed at the time of the 2005 landslide. The 2006 landslide debris produced an accumulation of soft, wet soil mixed with organic material near the base of the slope on Lot 2 of the Lorian Woods subdivision. Seepage was observed coming down lower portions of the slope and emerging from the base of the landslide debris at the toe of the landslide. The 2006 landslide destroyed a drainage structure that formed a portion of the City's landslide drainage system in this area. Remnants of the dislocated drainage structure (including a large diameter 2/17/06 \\Edmdaza\projects\074\133\Fileroom\R\BoschLaudslide_lmdoc 2 LANDAu ASSOCIATES corrugated metal pipe that formed the collection structure) are present near the toe of the landslide debris. Segments of black, corrugated pipe was also observed near the base of the.slope. This pipe material did not appear to be a part of the City's drainage system. Mr. Bosch indicated that he had previously observed someone (thought to be the property owner from Lot 2 in the Lorian Woods subdivision) working on the slope to apparently try to intercept some of the seepage and springs emerging from the slope. ASSESSMENT AND RECOMMENDATIONS We offer the following comments and assessment to address the City's questions on whether the landslide and present condition pose an imminent hazard to City -owned facilities, the general public, or the occupants of the Bosch residence and downslope residences. This assessment is based on a limited observation of the site conditions and our experience with similar landslide conditions, and not on a detailed evaluation of the site conditions. Our limited assessment for the purpose of assessing imminent risk should not be construed as a replacement for a detailed geotechnical evaluation and recommendations developed by a licensed geotechnical consultant retained by the property owners to address the longer - term risk posed by the landslide hazard. The location of the recent landslide appears to be consistent with the general location of a landslide in 2005 and ground cracking observed in 2003. The 2006 landslide involved only surficial materials and there.was no evidence that the landslide represents a larger, deep-seated failure. The entire bluff in the Meadowdale area is a known landslide hazard zone. The observed landslide is consistent with other naturally occurring landslides along the Meadowdale Bluff. Springs and seepage emerge from this slope above the Lorian Woods subdivision and the slopes above these springs are subject to repeated landsliding and slope movement as the landslide headscarp continues to retreat. The landslide on this slope last year had removed the vegetation and exposed the soil on the upper portions of the slope to rainfall and erosion. Landslide debris from 2005 that had accumulated near the midpoint and lower on the slope had the opportunity to become wet from the recent heavy rainfall events and the rainfall was apparently sufficient to reinitiate the landslide, at this location. The observed landslide was likely caused by the heavy precipitation over the last month or more, possibly combined with natural groundwater seepage zones that are present in the steep portions,of the bluff. The seepage zones and the observed landslide are located well above a City interceptor drainage system and the landslide debris actually flowed down and destroyed a portion of the drainage system. The purpose of the City drainage system is to capture some of the localized surface water and water emerging from springs on the slope that would otherwise infiltrate into the ground below the drainage system. Implementation of the drainage system and other drainage improvements in the Meadowdale 2/17/06 \lEdmdata\projects\074\133\Fileroom\R\BoschLmdslide_ltr.doc 3 LANDAU ASSOCIATES I I area is thought to contribute Ito the overall increased stability of the Meadowdale landslide complex located downslope from the location of the interceptor drainage system. The interceptor drainage systems do not reduce the groundwater levels in the slopes above the systems or reduce the seepage from these areas. Accordingly, it is our opinion that the observed landslide was not caused by or related to the presence of the City's interceptor drainage system. , The landslide has impacted and destroyed some of the City drainage facilities located on the , lower portion of the slope. It is our opinion that the presence of the landslide debris and the recurring slope movement at this location make restoration of the City drainage system impractical at this location at this time. We suggest that this situation be re-evaluated for possible maintenance or improvements during drier weather in late spring or summer. The landslide occurred on private property and extended into adjacent private property. Therefore, the general public traveling on public rights -of -way would not be affected by this landslide. With respect to the Bosch residence, the 2006 landslide has not materially changed the slope condition as compared to the condition following the 2005 landslide. Landau Associates provided comments and recommendations in our February 22, 2005 letter following the 2005 landslide and the 2006 landslide does not alter the general findings or recommendations of that letter. The debris from this landslide extends into an undeveloped lot within the Lorian Woods subdivision. The owner of this property should be advised of this condition. Mudslides and landslide debris from the bluff above can impact any development on the property below and any `future development plans should consider and address this issue. This letter was prepared for the exclusive use of the City of Edmonds for specific application to the evaluation of public safety concerns related to the Bosch property landslide. Within the limitations of scope, budget, and schedule, our services have been conducted in accordance with generally accepted geotechnical practice. No other warranty, express or implied, is made as to the professional opinions and advice included in this report. We appreciate this opportunity to be of service to the City of Edmonds. Please call if you have any questions regarding this letter or if we may be of further assistance. LANDAU ASSOCIATES, INC. ;✓ L Dennis R. Stettler, P.E. Principal DRS/rgm 2/17/06 \\Edmdata\projects\074\133\Fileroom\R\BoschLandslide_itr.doc 4 LANDAU ASSOCIATES ,l7c. 189v f North Edmonds Earth Subsidence and Landslide Hazard Areas Map Legend f North Edmonds Earth Subsidence and Landslide Hazard Area (See ECDC 23.80.020 B.1 and ECDC 19.10) (Note: Boundaries are the approximate extent of previous landsliding; hazards are present adjacent to the landslide boundaries) Stem -Slope Areas:— - - - Slope of 40% or steeper and with a vertical relief of ten (10) ft or more i (See ECDC 23.80.020 B.2) L Minimum buffer equal to the height of the steep slope or 50 feet, whichever is greater (see ECDC 23.80.070 A.1) i (The buffer shown is the minimum buffer adjacent to the North Edmonds Subsidence/ --- and Landslide Hazard Area; a similar buffer would apply to steep slope areas, / but is not shown on this map for clarity) r-� 2 ft Topographic Contour_ Vertical datum: NAVD88 Parcel 0 100 200 Snie In Feet nr r � Map created by Landau Associates, Inc. (May 2006) Aerial photo: City of Edmonds Tbpographic contours and steep slopes data derived i from WAR data: City of Edmonds (February 21; 2005) i { 3. WA r STREET FILE r, COVE OCT 2 2 2007 PERMIT COUNTER i P t ij �;� 1 1 0 , R IV'F0� JUN 0 0 2009 BUILDING DEPARIMENi CITY OF EDMONDS i� Pursuant to Edmonds Community Development Code Chapter 19.10 sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area shall be designated on this map which indicates areas of earth subsidence and landslide hazards in excess of normal allowances. In order to designate the subject project development site located at 1C 00 - 22LJ ffctm. Qcs T Edmonds, Washington, the following maps, surveys or other noted items below were used: • Geotechnical Report Prepared by T eep f�sSocPad s� /nCe 5e&-.m6c-- 1% a00'5- • Land Survey Prepared bye, F _ rn (LL PDI iu T E Q .'5tJ v Iq, LOCO— ' "I certify under penalty of perjury that the site location designation has been made to the best of my knowledge and belief, following an investigation of all information and documentation in my possession as well as reasonably obtainable information in the possession of others, including public agencies. Any information which would tend to designate a differing location for the site is attached as a part pf my designation as well as all information upon which I reasonably relied." v �pl�tanfi Site Plotted by Date 8 G ' �p 1 Ycant Signed ;�3;A-, N?U, ti SggC Date s%i/6 Title o�.,;,P; �, CtiYno 1, )rM S 61(in lr0 —:;,Do 7 77J l e ♦ O �, K C hQ Ci �a Lc rs �o w. a htil^tr� L° a S r' wit fl s W"' Jr PR (> 4 RESUB JUN 04 2008 B*9r'0QFW0&'6r N • i Y, I North Edmonds Earth Subsidence and J Landslide Hazard Lr ��� a" r 4��t 1. VU01 sr Areas Map Legend North Edmonds Earth Subsidence and hL Landslide Hazard Area (See ECDC 23.80.020 B 1 and ECDC 19,10) (Note: Boundaries are the approximate extent of previous landsliding; hazards are present LF !. -� adjacent to the landslide boundaries) !F7 Y Slope of 40% or steeper and with a vertical relief of ten (10) ft or more 9. ' -. y/� (See ECDC 23.80.020 B.2) L Minimum buffer equal to the height / ' / 7. .1g, J of the steep slope or 50 feet, whichever R ` * i l, --I r7.. is greater (see ECDC 23.80.070 A.1) .k. (The buffer shown is the minimum buffer r7l L adjacent to the North Edmonds Subsidence. . . . . . . . "I ! . I, 4 and Landslide Hazard Area; a similar i. buffer would apply to steep slope areas, p7i J; but is not shown on this map for clarity) 2 ft Topographic Contour 7 Vertical datum: NAVD88 F-1 Parcel A� 41!- 0 100 200 Scale in Feet .7 ��i 0 Map created by Landau Associates, inc. (may 2006) 0 Aerial photo: City of Edmonds Topographic contours and steep slopes data derived JAI" '� ,'.: J• from LiDAR data: City of Edmonds (February 27, 2005) lt :., .::;... .1 REC . F gl' %/7 E 0 JUN 0 8 2099 BUILDING L)EPART.10EWI CITY OF m.'Jiol-os • • • • F Pursuant to Edmonds Community Development Code Chapter 19.10 sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area shall be designated on this map which indicates areas of earth subsidence and landslide hazards in excess of normal allowances. In order to designate the subject project development site located at 73 �o IPL•Edmonds, Washington, the following maps, surveys or other noted items below were used: • Geotechnical Report Prepared by • Land Survey Prepared by �►J��-'��,•�— "I certify under penalty of perjury that the site location designation has been made to the best of my knowledge and belief, following an investigation of all information and documentation in my possession as well as reasonably obtainable information in the possession of others, including public agencies. Any information which would tend to designate a differing location for the site is attached as a part of my designation as well as all information upon which I reasonably relied." Site Sign Title s STREET FILF. CITY OF EDMONDS 121 5TH AVENUE NORTH - Edmonds, WA 98020 - (426) 771.0220 - FAX (426) 771-0221 HEARING EXAMINER f.4c 159v In the Matter of the Applications of ) Brian and Cindy Isaacson ) For a Height Variance, a Critical Area ) Variance, and a Minor PRD Amendment Nos. V 08-53, V-08-72, and LL-08-75 FINDINGS, CONCLUSIONS, AND DECISION GARY HAAKENSON MAYOR SUA04ARY OF DECISION The Applicants' requests, including a height variance, a critical areas variance, and a minor planned residential development (PRD) amendment, relating to a proposed single-family residence at 16007 - 73`d Place West in Edmonds, Washington are GRANTED, subject to conditions.. . SUMMARY OF RECORD ftu : Brian and Cindy Isaacson (Applicants) requested a height variance (V-08-53), a critical area reasonable use variance (V-08-72), and a minor PRD amendment (LIA8-75) related to a proposed single-family residence at 16007 - 73`d Place West in Edmonds, Washington. Hearing Date: The City of Edmonds Hearing Examiner conducted an open record hearing on the requests on February 5, 2009.' Testimony: At the open record hearing, the following individuals presented testimony under oath: 1 _ Kernen Lien, Planner, City of Edmonds 2. Brian Isaacson, Owner/Applicant 3. Mike O'Brien, O'Brien & Associates Architects, Applicant Representative 4. Charles Lee, Terra Associates, Inc., Applicant Representative 5. Alvin Rutledge 6. Theresa Neal Exhibits: At the open record hearing, the following exhibits were admitted in the record: 1. City of Edmonds Planning Division Staff Report, dated January 23, 2009 ' Monday February 16, 2009 was a legal holiday and is excluded from the ten business day time frame for decision issuance. Findings, Conclusions, and Decision City of E&nonds Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 1 of 16 • Incorporated August 11, 1890 • Sister City - Hekinan, Japan 2. Lorian Woods Planned Residential Development Plat Map 3: Height Variance Application V-08-53 4. Statement in support of V-08-53 5. Height Variance Site Plans 6. Critical Area Variance Application V-08-72 7. Wetland Report 8. Planting Plan for Tree Cutting Permit Application File No. CU-06-104 & One Sequoia Tree Removed & Replaced under a new 2008 CUP 9. Monitoring Plan for Planting Plan 10. Minor PRD Amendment Application LL-08-75 . 11. Letter from Lorian Woods Homeowners Association 12. PRD Amendment Record of Survey 13. Zoning and Vicinity Map 14. CRA-2006-0147 15. Geotechnical Report: Terra Associates, Inc. June 6, 1989 16. Geotechnical Report: Terra Associates, Inc. September 14, 2005 17. Geotechnical Report: Landau Associates February 17, 2006 18. Geotechnical Report: Terra Associates, Inc. August 7, 2006 19. Geotechnical Report: Landau Associates December 28, 2006 20. Geotechnical Report: Terra Associates, Inc. March 31, 2008 21. Geotechnical Report: Terra Associates, Inc. July 8, 2008 22. Geotechnical Report: Landau Associates July 22, 2008 23. August 28, 2008 letter of incompleteness 24. MDNS for Lorian Woods PRD 25. DNS for CU-06-104 26. Adoption of DNS for CU 06-104 27. Hearing Examiner Recommendation on Lorian Woods PRD 28. Proposed Lorian Woods CC&R's amendment 29. Variance Map 30. Area calculations for proposed residence 31. Public notice affidavits 32. Neal Comment Letter, dated February 2, 2009 Findings," Condusions; and Decision City of Edmonds Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 2 of 16 _ . _..._. _ _.....0 - r 33. Tupper Comment Letter, dated February 4, 2008 34. Affidavit of Publication from The Everett Herald, dated January 21, 2009 Upon consideration of the testimony and exhibits submitted at the open record hearing, the Hearing Examiner enters the following findings and conclusions: FINDINGS The Applicants requested a height variance (file no. V-08-53), a critical area reasonable use variance (V-08-72), and a minor PRD amendment (LL-08-75) related to a proposed single-family residence at 16007 - 73`d Place West in Edmonds, Washington.' The Applicants request a nine -foot height variance from the maximum allowed 25 feet to a maximum structure height of 34 feet. The critical area variance is requested to allow development of a lot that is fully encumbered by critical areas and associated buffers. The minor PRD amendment would allow a minor adjustment to the southern property line, jogging the boundary line south 3.5 feet, increasing the size of the Applicants' parcel by 175 square feet, to maintain all structural elements of the residence within the lot boundaries. It would also allow minor modification to the PRD's CC&Rs to be effectuated to allow the eaves of the proposed structure to intrude into the required ten - foot building setback from the shared lot line to the north. Exhibit 1, pages 1-3; Exhibits 3, 4, 5, 6, 7, 8, 9, 10, 1]. and 12. 2. The subject property, which is currently undeveloped, is Lot 2 of the Lorian Woods PRD, located in a single-family residential neighborhood in northern Edmonds. The PRD was approved in 1990 prior to the Growth Management Act and critical area regulations. As explained by City of Edmonds Planning Division Staff (Staff); the restrictions on individual lots that could result from the critical areas on -site were not fully appreciated at the; time of PRD approval, as it predated adoption of critical areas regulations. Six of the ten lots within the PRD are developed with single-family residences. The Applicants bought Lot 2 in 2004. Exhibit 1, pages 5-6, Testimony of Mr. Lien; Exhibit 13. . 3. In preparation for site development, the City conducted a critical areas review (CRA- 2006-0147) of the site. Exhibit 14. Subsequent critical areas field studies revealed that the site contains a Category IV wetland and an associated Type Ns (seasonal, non -fish bearing) stream. According to the City's critical areas regulations, Category IV wetlands require a 35-foot buffer, and Ns streams require a 25-foot buffer. ECDC 23.50.010.F, ECDC 23.90.040.D. The stream and associated buffer are entirely located within the wetland and its buffer. The wetland and required 35-foot buffer encumber the entire parcel. Exhibit 7, seepage 24. 4. The Lorian Woods PRD is located within the North Edmonds Earth Subsidence and Landslide Hazard Area, as defined in the Edmonds Community Development Code. at Chapter 19.10. There is a history of landslides in the vicinity dating at least from the ' The subject property is Down as Tax Parcel Number 00790400000200. Exhibit 1, Page 3. Findings, Conclusions, and Decision City of Edmonds Hearing Emniner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 3 of 16 1940s, with activity in the immediate vicinity of the subject property as recently as January 2006. Lot 2 sits on a steep to moderate west aspect slope that runs from the eastern property boundary to 73r' Place West. Development of the subject property is constrained by slopes on -site and on the adjacent open space (Parcel A) to the east. - The proposed building site slopes down to the west at grades ranging from 10 to 50 percent. East of the building envelope, site slopes approach vertical grades. Exhibit 4, page 19; Exhibits 15 through 22; Exhibit 2, pages 7-9; Exhibit 1, page 9, .Exhibit 12; Testimony of Mr. O Wrien, Testimony ofMr. Lie. 5. In April 2007, the Applicants received approval of a conditional use permit (CU-06-104) for drainage improvements and tree removal from the site and the adjacent common area. As part of the review process for CU-06-104, a geotechnical analysis, planting"plan, and peer review of the geotechnical analysis and planting plan were conducted. In August 2007, the Applicants applied for a fill and grade permit (BLD-07-834 and BLD-07-833) for additional drainage work (on their site and the adjacent common area) to help stabilize the hillside above their building site in preparation for development. The planting plan prepared in conjunction with CU-06-104 was revised, underwent further peer review, and received approval during the review of the 2007 fill and grade permits. The Applicants applied for an additional conditional use permit (CU-08-36) in May 2008 to remove a sequoia tree not identified for removal under CU-06-104. Given that the sequoia would be removed in order to construct the proposed home, Staff advised the Applicants to withdraw the CU-08-36 application and address the tree removal under the instant critical area reasonable use variance application (V-08-72). Exhibit 1, pages 3-4; Testimony ofMr. Lien. 6. The subject property is zoned Single -Family Residential (RS-20). The minimum lot area for standard subdivision lots in the RS-20 zone is 20,000 square feet, and the minimum lot width is 100 feet_ The maximum residence height allowed is 25 feet. Edmonds Community Development Code (ECDC)16.20.030. Parcels surrounding the Lorian Woods PRD are zoned RS-20 and RS-12. According to Staff, the neighborhood is characterized by moderate to upscale homes, many of which have views of Puget Sound and the Olympic Peninsula. Exhibit 13; Exhibit 1, page 5. 7. Lot 2 is 5,897 square Beet in area. The longest of its four boundary lines is 104 feet long, with all other boundaries of much shorter lengths, resulting in a trapezoidal shape that would not satisfy the minimum 100-foot lot width requirement of the RS-20 zone. Its substandard area and width were approved for residential development via the City's PRD process in 1990. Exhibit 1, page 8; Testimony ofMr. Lien; Exhibit 12, page 2. 8. The land in and around the Lorian Woods PRD has been geotechnically observed by the same engineering firm periodically over the past 20 years. The Applicants consulted with this same firm to review and prepare geotechnical engineering for the proposed residence. Professional geotechnical recommendations for development of the site restricted the potential placement of the residence within the subject property. These recommendations include (but are not limited to): limiting temporary basement cuts to a height of eight feet, construction of a catchment wall to control .soils originating above Findings, Conclusion4 and Deedsion City of Edmonds Hearing Examiner Isaacson, Nos V-2008-53, V-W72, and LL-08-75 page 4 of 16 . . ........... ... the lot; prohibiting installation of a sliding glass door on the eastern main floor; and placement of bedrooms on an upper story to protect sleeping inhabitants in the event of a nighttime landslide. Site evaluation and more detailed geotechnical recommendations for grading, drainage, and other design elements are detailed in Exhibit 20..Testimony ofMr. O'Brien; Testimony ofMr. Lie; Exhibit 21; Exhibit 20. 9. Given these geotechnical constraints, the Applicants retained professional architects to design the residence to fit into the topography of the parcel with minimal impact and maximum safety. The location of the residence was situated as near to 73`d Place West as possible, both to minimize cutting into the slope and to minimize the length of the required driveway. Inclusion of the required catchment wall and an upper floor for primary bedrooms added to the height of the house. The required limitation to eight -foot cuts prevented the house from being sunk deeper into the site, as would have been done on a less steep parcel.-' Exhibit 4, pages 61-62; Testimony ofMr. O'Brien. 10, The Applicants' geotechnical consultants opined that, if the geotechnical engineering recommendations in the reviews they conducted are incorporated into site design and construction, development of the site as proposed would not increase the risk of instability on the site or on adjacent properties. Exhibit 20, pages 8-9; Testimony ofMr. Lie. 11. The City's geotechnical consultant, after reviewing the Applicants' geotechnical submittals, recommended that slope replanting and associated landscaping plans for the property be incorporated into the current permit process in order to protect slope stability. Exhibit 22, page 3. 12. The conditions of approval for the 1990 Lorian Woods PRD include condition number 22, which states: "The Applicants shall draft all private restrictive covenants prior to final approval of the plat." Exhibit 27, page 21, Staff testified that covenants, conditions, and restrictions (CC&Rs) were "recorded with the plat" because they were included in a note on the face of the recorded plat document and because they were considered by City Council at time of final plat review. Testimony ofMr. Lien. 13. Section 7.5.1 of the CC&Rs requires a minimum living area of 3,000 square feet, excluding the garage for every residence. Sections 7.5.2 through 7.5.4 establish minimum square footage for various rooms in the residences, including master and spare bedrooms and living rooms. Section 7.5.5 requires all portions of the structure, including eaves, to be located within the boundaries of each lot and to be set back ten feet from any shared lot lines. Finally, another section requires the roof to be finished with shakes or tiles. The Applicants argue that they are bound legally to comply with the CC&R provisions. Exhibit 4; Tesdmony ofMr. Isaacson. 3 The driving factor in restriction depth of cots to eight feet relates to worker safety during construction. Tesdmo y ofMr. Lie. Rindings, Conclusions, and Decision City of Edmonds Hearing Er ner Isaacson, Nos v 2008-53, V-08-72, and LL-08-75 page 5 of 16 14. According to Staff, the City generally does not enforce CC&Rs; however because the CC&Rs in the present case resulted from a PRD condition of approval from the hearing examiner, were submitted to the City Council prior to final approval for the PRD, and are mentioned on the face of the PRD that was signed by the City, Staff believes that in the standards established by the CC&Rs in the present case should be recognized as requirements for development of Lot 2. Testimony ofMr. Lien; Exhibit 1, page 7. 15. The CC&Rs' requirement for a three -car garage established the north -south dimension of the foundation. Room sizes were also driven by the requirements of the CC&Rs. The pitch of the roof (at 4:12) is the minimum pitch recommended in the roofing industry for the materials allowed by the CC&Rs. These factors contributed to the Applicants' ultimate inability to construct a residence in conformance with the 25-foot height limitation of the RS-20 zone. Testimony ofMr. O'Brien; Exhibit 4, page 61-62. 16. As proposed, the residence would impact 2,930 square feet ofthe Category IV wetland and 3,425 square feet of the associated buffer. Exhibit 7. 17. Hydrology of the on -site wetland crosses the site and drains to the City stormdrain in 73`4 Place West. The proposal would not alter this direction of flow; hydrology would still be directed to the City stormdrain, avoiding impacts to off -site properties related to flooding or increased site instability. Exhibit 7; Testimony ofMr. Lie. 18.. In its present, predevelopment condition, the small, urban, slope wetland has limited functions and values. Its hydrology emerges from seeps on the slope, 'and due to the steepness of the slope, drains quickly, providing little to no function for stormwater storage or flood flow attenuation. Being small and cut off from other critical areas, it provides minimal value as wildlife habitat. Because it is impossible to avoid impacts to the critical areas on -site, the Applicants proposed a mitigation plan based on enhancement of the remaining wetland and buffer areas through planting trees and shrubs on -site and in the adjacent open space off -site. A total of 38 trees, 245 shrubs, and 860 herbs/groundcover plants would be installed. The proposed mitigation plan is consistent with the mitigation sequencing recommended in the Washington Department of Ecology .manual Wetland Mitigation in Washington State, Part 1• Ago-gy Policies and Guidance. The plan includes monitoring. the plantings for survival for a period of three years. ' The mitigation would offset impacts from construction and result in increased overall functions and values of the on -site wetland, improving water quality and wildlife habitat. The plantings would stabilize the slope, reduce erosion (improving water quality off -site), and increase species diversity and vegetative structure, resulting in increased cover and forage opportunities for birds and small mammals. Exhibit 7. 19. The proposed single-family residence would contain 3,299 square feet in living area (excluding garage, stairways, and elevatorl making it the smallest residence in the PRD.4 4 TestimM from the Applicants' architect revealed that geotechmcal and CC&R requirements established the necessary minimum footprint for the proposed residence, and that the apparently "extra" 299 square feet could not be shaved off of the footprint of the residence, meaning that the 299 square feet did not represent "extra" impact to the critical areas. Testimony ofMr. O'Brien. Findings Conclusions, and Decision City of Erbnonds Nearing Ewminer Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 6 of 16 It was specifically designed to fit into the existing site topography, incorporating a "stair step" design keeping the living area as close to grade as possible. According to the Snohomish County website, its size would be consistent with existing homes in the surrounding neighborhood. The PRD itself was designed to be compatible with the natural constraints of the overall property through preservation of 74% of the overall site in open space. Exhibit 1, pages 10-11; Testimony ofMr. O'Brien; Exhibit 27, pages 5-6. 20. Due to its location on the slope, the proposed residence would not infringe on views of the surrounding properties. Exhibit 1, page 11, Testimony ofMr. Lien; Testimony ofMr. O'Brien. 21. Because of the previously discussed geotechnical site restrictions and the minimum dimensions of the garage required by the CC&Rs, the Applicants' architects were unable to design the residence such that all portions of the structure remained within the development envelope prescribed by the PRD: no portion of the structure — including eaves — is allowed to protrude into the required ten -foot setback from the shared property boundary with Lot 1(the site's north boundary). The ten -foot setback is required by subsection 7.5.5 of the CC&Rs. To remedy this conflict, the Applicants have proposed a minor PRD amendment, allowing an exception for Lot 2 from subsection 7.5.5. The Lorian Woods Homeowners Association approved the proposed minor PRD amendment. Exhibit 10, Exhibit 1, page 7; Testimony ofMr. O'Brien; Exhibit 28. 22. Similarly, the Applicants' architects were unable to design the residence such that all parts of the structure remained within the boundaries ofLot 2. As designed, a small portion of the eaves would protrude across the southern lot line into the adjacent open space parcel. Because such a protrusion is not allowed and because the residence cannot be moved within the parcel or reduced in size, the Applicants requested a minor amendment to the lot boundary (LL-08-75). As proposed, a 50-foot by 3.5-foot portion of Parcel A would be added to Lot 2 (for a total increase of 175 square feet). The proposed lot line adjustment necessitates approval of an amendment to the PRD's CC&Rs. On January 15, 2009, the Lori= Woods PRD homeowners' association agreed to the minor CC&R amendment, allowing alteration of the property line. Only the eaves of the structure would be located within this area, not the footprint of the building. Exhibit 10, Exhibit 11; Exhibit 12; Testimony ofMr. O'Brien; Testimony ofMr. Isaacson. 23. City Staff testified that reduction of Parcel A by 175 square feet would not be inconsistent with the conditions or requirements of the 1990 PRD approval. It would not change the number or orientation of lots, and it would not reduce any tenant or public use area within Parcel A, due to the presence of the slope. Staff recommended that approval of the variances be conditioned on prior recording of the lot line adjustment. Exhibit 1, pages 18, 21; Testimony ofMr. Lien. 24. While the PRD would allow 100% lot coverage, the proposed residence would have a footprint of considerably less than 100%. Exhibit ],page 6; Exhibit 5, Sheet 1. Findings, Conclusions, and Decision City of Edmonds Hearing Ekaminer Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 7 of 16 25. Construction of single-family residences is exempt from SEPA review pursuant to WAC 197-11-800(l)(b)(i). The exemption in WAC 197-11-800(6)(b) would apply to the height variance request, but not the critical area reasonable use variance request. The Lonan Woods PRD was reviewed for compliance with the requirements of the State Environmental Policy Act (SEPA) and a Mitigated Determination of Non -Significance (MDNS) issued on December 15, 1989 (Exhibit 24). Site work for the subject property underwent SEPA review for the tree removal applied for under CU 06-104 and a Determination ofNonsignificance (DNS) issued on March 21, 2007 (Exhibit 25). Relating to the instant applications, on December 29, 2008 the City of Edmonds adopted the DNS issued on March 21, 2007, on the grounds that the proposals would not result in any additional environmental impacts beyond those already evaluated under the adopted document (Exhibit 26). No appeals of the DNS adoption were filed. Exhibit 1, pages 4- 5, Testimony of Mr. Lien; Exhibits 24, 25, and 26. 26. Development of Lot 2 must comply with the mitigation measures imposed in the 1989 MDNS issued for the Lorian Woods PRD, which include the following: • Development of the subject property shall be subject to review under Chapter 19.10 of the Edmonds Community Development Code; • The Applicant shall submit an erosion control plan for review and approval by the City Engineer prior to issuance of any grading permit. • No grading shall take place on the property between the months of October to May. • All grading work shall be done during normal working hours of the City of Edmonds, 8 am to 5 pm Monday to Friday. • The Applicant shall be responsible for providing verification of the total amount of excavated material prior to finalizing the grading permit. A soils engineer shall monitor the site during grading. • Development of individual lots shall be subject to environmental review and compliance with Chapter 19.05 of the ECDC. All permits shall be subject to review by the City of Edmonds soils engineer. • Development shall conform to the recommendations found in the report from Terra Associates, Inc., dated June 6, 1989 and any recommendations from the City's consulting soils engineer, Landau Associates. Exhibit 24. 27. The Comprehensive Plan designation of the subject property is "Single Family - Resource". Staff identified the following Comprehensive PIan goals and policies as being applicable to the proposal: Residential Development B. Goal. High quality residential development which is appropriate to the diverse lifestyle of Edmonds residents should be maintained Findings, Conclusions and Decision City of Edmonds Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 8 of 16 • and promoted. The options available to the City to influence the quality of housing to all citizens should be approached realistically in balancing economic and aesthetic considerations, in accordance with the following policies: B.1 Encourage those building custom homes to design and construct homes with architectural lines which enable them to harmonize with the surroundings, adding to the community identity and desirability. B.3 Minimize encroachment of view of existing homes by new construction or additions to existing structures. B.6 Require that new residential development be compatible with the natural constraints of the slope, soils, geology, vegetation and drainage. City of Edmonds Comprehensive Plan (2006), pages 53-54, Exhibit 1, page 10. 28. Notice of Application and Notice of Hearing were published in the Herald Newspaper and posted at the subject site, as well as the Public Safety Complex, Community Development Department, and the Library. All notices were also mailed to residents and owners within 300 feet of the site, consistent with the noticing provisions of ECDC 20.91. Exhibit 1, page 5, Exhibit 31. 29. The City received written and oral public comments on the applications. One upslope neighbor expressed concerns regarding slope stability. Exhibit 32. This neighbor appeared at hearing and testified that from the documents and geotechmcai and architectural testimony at hearing, she felt the Applicants "are doing a good job" of designing with slope stability in mind. Testimony ofM& Neal. Additional oral comment addressed the fact that some of the geotechnical studies and earlier applications are more than one year old, and expressed concern that the instant applications — if approved — would only be valid for a period of one year. Testimony ofMr. Rutledge. Additional written comment expressed the opinion that the size and shape and location of Lot 2 should be considered self-created hardship on the part of the previous property owner (the PRD developer). Exhibit 33. 30. In response to the question regarding whether the size, shape, and location of Lot 2 should be considered self-created hardship on the part of the previous owner, Staff testified that approval of the PRD by the City was the act that created Lot 2 as a developable residential lot and that the Applicants had no part in creating the special circumstances constraining development of Lot 2. Testimony ofMr. Lien. Findings, Conctusions� and Decision City ofFdmonds Hearing Ecaminer Isaacson, Nos V 2008-53, V-08-72, and LL-08-75 page 9 of 16 - k CONCLUSIONS Jurisdiction: The Hearing Examiner has jurisdiction to hear and decide variance requests pursuant to Edmonds Community Development Code 20.100.010(B). Minor PRD amendments can be approved pursuant to ECDC 20.35.110.A Such a decision would normally be reviewed for approval administratively; however due to the interconnectedness of this application with the two requested variances, the matter is appropriately consolidated with them pursuant to ECDC 20.90.010(B) and decision authority in the matter is appropriately delegated to the Examiner by the Director. Criteria for Review: Variance Pursuant to ECDC 20.85.010, the Hearing Examiner may not grant a variance unless the following findings can be made: A Special Circumstances. That, because of special circumstances relating to the property, the strict enforcement of the zoning ordinance would deprive the owner of use rights and privileges permitted to other properties in the vicinity with the same zoning. 1. Special circumstances include the size, shape, topography, location or surroundings of the property, public necessity as of public structures and uses as set forth in ECDC 17.00.030 and environmental factors such as vegetation, streams, ponds and wildlife habitats. 2. Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure a scenic view, the ability to make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property, B. Special Privilege. That the approval of the variance would not be a grant of special privilege to the property in comparison with the limitations upon other properties in the vicinity with the same zoning; C. Comprehensive Plan. That the approval of the variance will be consistent with the comprehensive plan; A Zoning Ordinance. That the approval of the variance will be consistent with the purposes of the zoning ordinance and the zone district in which the property is located; E. Not Detrimental. That the variance as approved or conditionally approved will not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone; Findings Conclusions, and Decision City of Edmonds Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 10 of 16 F. Minimum Variance. That the approved variance is the minimum necessary to allow the owner the rights enjoyed by other properties in the vicinity with the same zoning. Criteria for Review: Critical Area Reasonable Use Variance Pursuant to ECDC 23.40.210.A.2, a reasonable use exception may be authorized as a variance only if an Applicant demonstrates that: 1. The application of this title would deny all reasonable economic use of a property or subject parcel; 2.. No other reasonable economic use of the property consistent with the underlying zoning and city comprehensive plan has less impact on the critical area; 3. The proposed impact to the critical area is the minimum necessary to allow for reasonable economic use of the property; 4. The inability of the applicant to derive reasonable economic use of the property is not the result of actions by the applicant after the effective date of the ordinance codified in this title or its predecessor, 5. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 6. The proposal minimizes net loss of critical area functions and values consistent with best available science; and 7. The proposal is consistent with other applicable regulations and standards. Further, ECDC 23.40.210.B states that a variance may be granted if the applicant demonstrates that the requested action conforms to all of the following specific criteria: L. . Special conditions and circumstances exist that are peculiar to the land, the lot or something inherent in the land and that are not applicable to other lands in the same district. 2. The special conditions and circumstances do not result from the actions of the applicant. 3. A literal interpretation of the provisions of this title would deprive the applicant of all reasonable economic uses and privileges permitted to other properties in the vicinity and zone of the subject property under the terms of this title, and the variance requested is the minimum necessary to provide the applicant. with such rights. .` 1•indings, Conclusions and Decision City of Fdmondr Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 11 oj16 4. Granting the variance requested will not confer on the applicant any special privilege that is denied by this title to other -lands, structures or buildings under similar circumstances. 5. The granting of the variance is consistent with the general purpose and intent of this title, and will not further degrade the functions or values of the associated critical areas or otherwise be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity of the subject property; and 6. The decision to grant the variance is based upon the best available science and gives special consideration to conservation or protection measures necessary to preserve or enhance anadromous fish habitat. Criteria for Review. Minor PRD Amendment: Lot Line Adjustment Pursuant to ECDC 20.35.110.A, minor changes to lot lines which do not change the number or orientation of the lots approved through the PRD process may be authorized if these changes ... are due to circumstances not known at the time the final plan was approved .... Minor location, siting, or lot line changes shall be performed through a lot line adjustment between a property owner of a specific lot and the homeowners' association as the owner of the open space. No change authorized by this section may case any of the following: a A change in the use, intensity or character of the development; b. An increase in the overall ground coverage of structures; c. A decrease in approved traffic circulation utility; and/or d. Any reduction in public use or tenant use areas which include but are not limited to perimeter buffers/setbacks, utility easements, required critical areas open space, usable open space, off-street parking, loading zones, right-of-way or pavement width. Conclusions Based on Findings: Critical Area Variance 1. Application of the standard prohibition for development of critical areas and ofthe 35- foot buffer for Category IV wetlands would deny the Applicants all reasonable use of their property, because the wetland and buffer encumber the entire site. No other use of the site would be consistent with the zoning of the underlying land or the PRD approval. The only option with less impact on the critical areas is not to develop the site, which would deprive Applicants of reasonable use. Findings Nos 2, 3, 4, 6, 7, and 18. 2. In addition to the site's encumbrance by wetland and associated buffer, it is severely constrained by steep slopes. While the PRD would allow up to 100% site coverage by structure, the Applicants propose a residence that fits within the building envelope identified as geotechnically feasible by credible professionals. The residence cannot be Rndings� Conclusions, and Decision City of Edmonds Hearing Examiner Isaacson, Nos. V-2008-53, V-08.72, and LL-08-75 page 12 of 16 moved within the building envelope nor compacted into a less spread out footprint due to the requirements to stair step the structure into the hillside and to keep cuts to a maximum of eight feet. The proposed impact to the critical areas is the minimum necessary to allow use of the site. The Examiner does not rely on the requirements of the CC&Rs to conclude that the record demonstrates compliance with the minimum necessary criterion for critical area variance approval. Findings Nos 3, 4, 7, 8, 9, 10, 16, and 24, 3. No action taken by any property owner after the effective date of the critical areas regulations has resulted in the Applicants' present inability to derive use of the site without variance approval. The existence of wetlands, stream, and steep slopes is not the result of any action by the Applicants or any former owners of the property. The City approved Lot 2 as a buildable lot in 1990, prior to adoption of the City's critical areas regulations. The Applicants did not take possession until 2004. Findings Nos 2, 3, 4, 8, 9, and 30. 4. With conditions ensuring that all geotechnical recommendations are followed during site preparation and construction, development of Lot 2 would not pose an unreasonable threat to public health or safety. Credible professional engineering testimony established that construction consistent with geotechnical recommendations would not increase the risk of slope instability. Runoff from the site would be captured and directed into stormdrains. The proposed plantings would stabilize the slope, provide enhanced water quality, and improve wildlife habitat for the remaining critical area. Findings Nos 8, 9, 10, 17, 18, and 26. 5. While the proposals would result in impacts to critical areas, this is allowed pursuant to the critical areas regulations. ECDC 23.50.010.E states, "Activities and uses that result in unavoidable and necessary impacts may be permitted in Category 3 and 4 wetlands and associated buffers in accordance with an approved critical areas report and mitigation plan." The City has reviewed and approved the Applicants' proposed planting/mitigation plan. Undeveloped portions of the site and off -site areas within adjacent Parcel A would be enhanced, resulting in smaller but overall higher functioning critical areas. The proposed mitigation plan is consistent with state recommended mitigation sequencing. Findings Nos 3, 16, 18, and 19. 6. Site slopes result in geotechnical limitations on development that by themselves constitute `special circumstances' for the purposes of variance application review. The Applicants (and previous owners of the property) are in no way responsible for the slopes and resulting geotechnical limitations. The Examiner does not rely on the size or location of the lot in concluding that special circumstances have been demonstrated Findings . Nos. 4,8,9,10,and 19. 7. Single-family residential development of Lot 2 would not constitute special privilege. The proposed residence occupies less of the site than may be developed according to PRD approval. The size of the residence would be smaller than existing residences within the PRD and comparable to existing residences in the surrounding neighborhoods. Findings Nos 2, 4, 6, 19, and 24. Findings, Conclusion& and Decision City of Edmonds Hearing Examiner Isaacson, Nos V-2008 53, V-08-72, and LL-08-75 page 13 of 16 • Height variance 1. Due to significant geotechnical limitations resulting from the steep slopes on -site, strict enforcement of the 25-foot maximum height restriction of the RS 20 zone would deprive the Applicants ofthe right to develop Lot 2. Geotechnical recommendations that restrict development of the site include the location of the building pad, the limitation to eight - foot maximum cuts, the requirement to install a catchment wall, and the requirement to place bedrooms on an upper floor in the event of a nighttime slide event. These factors, as established by credible engineering expert testimony, satisfy the requirement that special circumstances dictate the need for a height variance. But for the slopes and resulting geotechnical limitations, no height variance would be necessary. Neither the Applicants nor any previous owner of Lot 2 is responsible for the slopes and resultant geotechnical limitations. Findings Nos 2, 4, 7, 8, 9, 10, and 30. 2. Approval of the variance would not be a grant of special privilege. The variance would only allow residential use of an approved lot in a PRD in an RS-20 zone. Findings Nos. 2, 4, 6, and 19. 3. The variance would be consistent with the Comprehensive Plan. The residence would not impact views from surrounding residences. Findings Nos 20 and 27. 4. The variance would be consistent with the purposes of the zoning ordinance. One of the purposes of the zoning ordinance is to protect the character of residential uses within the City by regulating individual parcels of land to prevent unreasonable detrimental effects. ECDC 16.00.010(B)(3). One of the purposes of the residential zones is to preserve views. ECDC 16.10.000. The variance would be consistent with these purposes because it would result in development consistent with existing residences in the neighborhood, would not increase slope instability, and would not impact views. Findings Nos 10, 19, and 20. With conditions ensuring geotechnical recommendations are fully incorporated into design and construction, the height variance, which would allow construction of a residence on -site, would not be detrimental to the public health, safety, or welfare, or injurious to property or improvements in the vicinity. Stormwater runoff would be directed into stormdrains, consistent with the predeveloped condition. Credible evidence supports the conclusion that development of the lot would not increase risk of slope instability. Findings Nos 8, 9, 10, 17, and 18. 6. Due to the slopes and resulting geotechnical limitations on construction, the nine -foot variance would be the minimum necessary to allow the Applicants the right to develop their residential property. Geotechnical limitations directly resulting from the steepness of the slope limit the depth of cuts, require construction of a catchment wall, and require placement of bedrooms on an upper floor. These factors drive the need for a structure that is taller than 25 feet. The height of the residence would not adversely impact any surrounding properties because of the lot's placement on the slope. The size of the proposed residence would be compatible with other residences in the neighborhood. Findings Nos. 4, 8, 9, 10, 19, and 20. Frn&ngs, Conclusions, and Decision City ofE&nonds Nearing Examiner Isaacson, Nos., V-2008-53, V-08-72, and LL-08-75 page 14 of 16 Minor PRD Amendment 1. The proposed minor change to lot boundaries between Lot 2 and Parcel A would not change the number or orientation of any lot. There would be no change in use, intensity or character of development, no increase in coverage by structure, and no impact to traffic circulation. The 175 square feet that would be removed from open space use is not an area used by tenants or the public because of its location on a steep slope. The minor amendment would not, therefore, reduce required open space or tenant use areas. Findings Nos 21, 22, and 23. 2. With a condition requiring the lot line adjustment to be recorded before commencement of grading or building permit issuance, the minor PRD amendment would be consistent with ECDC 20.35.110.A. The significance of development limitation on Lot 2 was not fully appreciated at the time of its approval because the City's critical areas regulations had not yet been adopted The Lorian Woods homeowners' association is in agreement with the proposed amendment. Findings Nos 21, 22, and 23. DECISION Based on the preceding findings and conclusions, the requested height variance, critical area reasonable use variance, and minor PRD amendment related to a proposed single-family residence at 16007 - 7P Place West in Edmonds, Washington are GRANTED, subject to the following conditions: 1. The Applicants must obtain all necessary building permits. 2. The Applicants must comply with all the terms of any future permits, including compliance with all geotechnical recommendations accepted by the City. Development of Lot 2 is further required to comply with the original conditions of approval for the PRD as well as the mitigation measures required by the MDNS issued during PRD review. 3. The amendment to the Lorian Woods CC&Rs allowing eaves to extend into the setback from Lot 1 must be recorded prior to the issuance of building permits. 4. The Applicants or successors in interest must act on the approved variances within one year from the date of approval or the variances shall expire and be null and void, unless the owner files an application for an extension of time before the expiration and the city approves the application. 5. The Applicants shall submit Minor PRD Amendment documents to be recorded to the City of Edmonds' Planning Division for review prior to recording for review and acceptance by City Planning Division Staff prior to recording. 6. The Applicants must record the approved Minor PRD Amendment documents with the Snohomish County Auditor's office. Findings Conclzwon4 and Decision City bf Edmonds Heming Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 15 of 16 ................ • 7. After recoding the Minor PRD Amendment, the Applicants shall provide the City of Edmonds Planning Division with three copies of the recorded. documents with the recording number on them The City will not consider the Mnior PRD Amendment to have been completed until this is done. DECIDED this 2&.day of February 2009. Toweill Rice Taylor LLC City of Edmonds Hearing Examiners By: ♦ =76 : - ; , Findings, Conclusions, and Decision City of Edmonds Hearing Examiner Isaacson, Nos V-2008-53, V-08-72, and LL-08-75 page 16 of 16 <-r?c 189v CITY OF EDMONDS GARYHAAKENSON MAYOR 121 5TH AVENUE NORTH • Edmonds, WA 98020 • (425) 771-= • FAX (425) 771-0221 HEARING EXAMINER RECONSIDERATION AND APPEAL The following is a summary of the deadlines and procedures for filing requests for reconsideration and appeals. Any Berson wishing; to file or respond to a request for reconsiderationor an appeal should contact the Planning_ Division of the Development Services Department for further procedural information. REQUEST FOR RECONSIDERATION Section 20.100.010(G) of the Edmonds Community Development Code (ECDC) requires the Hearing Examiner to reconsider his or her decision or. recommendation if a written request is filed within ten (10) working days of the date of the initial decision by any person who attends the public hearing and signs the attendance register and/or presents testimony, or by any person holding an ownership interest in a tract of land which is the subject of such decision or recommendation: The reconsideration request must cite specific references to the findings and/or the criteria contained in the ordinances governing the type. of application being reviewed. APPEALS Chapter 20.105 of the ECDC contains the appeal procedures for Hearing Examiner decisions. Pursuant to Section 20.105.040(A� persons entitled to appeal include (1) the Applicant; (2) anyone who has submitted a written document to the City of Edmonds concerning the application prior to or at the hearing; or (3) anyone testifying on the application at the hearing. Sections 20.105.020(A) requires appeals to be in writing, and state (1) the decision being appealed, the name of the project applicant, and the date of the decision; (2) the name and address of the person (or group) appealing the decision, and his or her interest in the matter, and (3) the reasons why the person appealing believes the decision to be wrong. Pursuant to Section 20.105.020(BI the appeal must be filed with the Director of the Development Services Department within 14 calendar days after the date of the decision being appealed The appeal must be accompanied by any required appeal fee. TI(iVV iE LIIVIITS FOR RECONSIDERATION AND APPEAL The time limits for Reconsideration and Appeal run concurrently. If a request for reconsideration is filed before the time limit for filing an appeal has expired, the time clock for filing an appeal is stopped until a decision on the reconsideration request is completed Once the Hearing Examiner has issued his or her decision on the reconsideration request, the time clock for filing an appeal continues from the point it was stepped: For example, if a reconsideration request is filed on day five of the appeal period, an individual would have nine more days in which to file an appeal after the Hearing Examiner issues his decision on the reconsideration request. LAPSE OF APPROVAL Section 20.85.020(C) of the ECDC states, "[tjhe approved variance must be acted on by the owner within one year from the date of approval or the variance shall expire and be null and void, unless the owner files an application for an extension of time before the expiration and the city approves the application." NOTICE TO COUNTY ASSESSOR The property owner may, as a result of the decision rendered by the Hearing Examiner, request a change in the valuation of the property by the Snohomish County Assessors Office. • Incorporated August 11, 1890 • Sister City - Hekinan, Japan. r�4c.189v CITY OF EDMONDS 121 STH AVENUE NORTH -Edmonds, WA 98020 • (425) 771.0220 - FAX (425) 771-=1 HEARING EXAMINER OFFICE OF THE HEARING EXAMINER CITY OF EDMONDS, WASHINGTON Applicants ) BRIAN AND CINDY ISAACSON ) For a Height Variance, a Critical Area ) Variance, and a Minor PRD Amendment ) 1, Sharon A. Rice, the undersigned, do hereby declare: Case Nos. V-08-53, V 08-72, and LL-08-75 GARY HAAKENSON MAYOR DECLARATION OF SERVICE l . That I am a partner in the firm of Toweill Rice Taylor LLC, which maintains a professional services agreement with the City of Edmonds, Washington for the provision of Hearing Examiner services, and make this declaration in that capacity, 2. That I am now and at all times herein mentioned have been a citizen of the United States, a resident of the State of Washington, over the age of eighteen (18), and competent to be a witness and make service herein; 3. On February 19, 2009 I served a cry of the decision in case V-08-53, V-08-72, and LL-08-75 upon the following individuals at the addresses below by first class US Mail. Brian and Cindy Isaacson Steve Johnson, Lorian Woods HOA 114 Second Ave. S 745 Laurel Street Edmonds, WA 98020 Edmonds, WA 98020 Clerk of the Edmonds City Council 121 Fifth Avenue North, First Floor Edmonds, WA 98020 City of Edmonds Planning Division 121 Fifth Avenue North, First Floor Edmonds, WA 98020 Alvin Rutledge 7101 Lake Ballinger Way Edmonds, WA 98026 Theresa Neal 16116 — 72°d Avenue W Edmonds, WA 98026 Finis Tupper 711 Daley Street Edmonds, WA 98020 I hereby declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct: DATED TIES day of 2009 at Kirkland, Washington. Sharon A. Rice, Toweill Rice Taylor LLC Serving as Hearing Examiner for Edmonds, Washington • Incorporated August 11, 1890 • Sister City - Hekinan, Japan eWll TERRA ASSOCIATES Inc. 4 Consultarits iri-Geotechnical Engineering, Geol gy ( (� ap�• t �,•�p and ._. l� L� U 1�. 0- ty A�,l��"? ^,_ate!• i Owiiarth cie ces EECE. June 2, 2009 ` . Project T-840.-10 Brian and Cindy Isaacson :9808 '- 142nd Place SE, F 301 _ ® ' ED - Bothell, Washington 98011 ��►�° Subject: Su lemental Geotechnical Consultation g 200 J PP . OCT 2: . Proposed Isaacson Residence pEPARWENT Gl!iL"i,�a s,wr;; > !:T BUILDING MONDS . CITY/ -OF Lot 2,. Plat of Lorian Woods GTY of ED ... Edmonds; Washingtori Permit -No. BLD2007-0833 Dear Mr. and Mrs. Isaacson: 2 ST"t'-EET FI In,, accordance. .with your request, Terra Associates,, Inc:. isr providing ongoing. consultation 'services to_ you.. regarding Lot 2 of Loriari Woods: We previously prepared'a report dated June 6, 1,989 for the entire plat, and.'a report dated.. March- 31, 2008 for your' parcel.. This letter addresses the. current; site development plans and` - responds -to a memo written by Landau: Associates dated July.22, 2008. This letter -is an -addendum to our report dated March 31; 2008. Slope History Terra Associates, Inc: has ' made periodic observations 'on the slopes, on the'Lorian Woods Plat, since 1989. Figures 1 and 2, show the, site following a ,slide event in, January 2006- This discussion summarizes our knowledge of events and. refers to the sources, of iinformation.. The documents used in the,following discussion' are. in the .list of references .attached to this letter. In this discussion, ,the slope below, west. of Lot 3 of Sequoia Ridge; is'the slope. that is above,.east of.Lot ,2 of Lorian Woods. Immediately. south of Lot 2 of'Lorian Woods is, a native growth/common area known as. Tract A. The next lot south of Tract A of Lorian' Woods along -the' toe of the slope is Lot 5.ofLorian Woods:;. The lot numbers _are_ shown on Figure, 3. ' 1965 to 1989, Minor sloughing was observed 'on the east6m-slope of .the. Lorian Woods plat. None of the sloughed.. soils ieached the'.toe of the slope where the proposed residence will be located. This is anecdotal information piovided : to us by Dr. Ariderson, the previous property owner. _ This information is,summarized in our report dated 1989.. 1984 .'The City of Edmonds seepage collection system.1A was installed along the south margin of Lot 2 of Lorian. Woods. ; 1989 to 2001. Terra Associates, Inc. representatives made periodic site visits to provide geotechnical services on adjacent lots. No slides -were observed on Lot 2 during -these site visits.. 12525 Willows Road, Suite 101, Kirkland, Washington 98034 Phone (425) '821-7777 • Fax, (425) 821-4334 Brian and Cindy Isaacson • . June .2; 2009 -Ma 2001 " Sloe failures along, the western'slop e of Lot 3 of Sequoia Ridge are discussed in a letter'b .P g Y P. q g Y Zipper Zeman, .Associates (ZZA)::dated May .21, 2001. ZZA was providing geotechnical . . oversight of development activities. for the City of Edmonds. 1VIay 2001 In. a response to a,ZZA letter dated May 21; 2001, GeoGr`oup Northwest (GGN)�;.fh' geotechnical .'engineer•of,record for the plat of. Sequoia, Ridge reports" ni"a letter dated. May 25, 2061'that "The slope failures on Lot- 3. are minor and -can be; characterized as sloughing of the surficial ..foot of . soil - at the top of the, slope. The sloughing was, likely. caused by: a combination ' of the natural slope erosion, processes that were occurring prior to the. land being cleared,. the over clearing and disturbance of the top .of,the slope .during: logging, and the temporary stockpiling of erosion control mulch along the top'of the slope.". Lot 3 of Sequoia Ridge is the -Bosch. House. Dec. 167•2001 A.slide,occurred near Lof 2 of'Sequoia Ridge._ This.material impacted the slope above Lot 5.of. Lorian.Woods. This is -discussed in,letters by Landau dated'December`19,,..2001 and GGN dated December 28, 2001. , Landau, is, providing geotechriical oversight services .of developments. for the City of Edmonds. The Landau letter also discusses construction'practices on Lot.3 of Lorian _ "Woods;: the Bosch, House. There is a `concern expressed. that temporary soil stockpiles are to . close to -'the of the slope and that.there.could,be further,slope.failures in the near, future. Rainfall was described by Landau as being,above.:average. "for the preceding months; and heavy for the day preceding the slide.. Sept A 2003, A slide .occurred on Lot.4 of. Sequoia Ridge'- that 'reportedly impacted Lot. 2 of-Lorian' Woods ' and/or the native'growth area 'adjacenf to Lot 2 of L'orian:Woods. This is discussed in a letter by '.Landau dated September 16; 2003. The weather"prior to the.slide`is described'as being.dry. At the. time of the.,slide, the weather was described as, being a heavy rain.. `Further` tension eracking was observed on. Lot. 3 of Sequoia Ridge.. The. tension cracks were in a position. above Lot 5 of Lorian Woods.. Nov. 8.,1004 Terra.Associafes, Inc, excavated two test pits.op Lot,- 2 .of Lorian Woods: "No fresh._deposits,of landslide- debris were. noted on, adjacent to, or above the lot :Feb. 14; 2005 A: slide occurred.on Lot 3 of, Sequoia Ridge'in.the;.area where Landau -had expressed concerns in 2003. This is.disc issed in the:Landau letter dated. February 22, 2005. The'slide does, not.appear. to have damaged the drainage collection system,1A.. The letter.does not_ describe .which •lots on Lorian Woods were impacted by the slide: Jan 31; 2006 A slide. `occurred along the .western slope of Lot 3 of Sequoia Ridge. The, slide; deposited materials onto the.slope immediately above Lot 2 of Lorian Woods." Drainage System lkwas significantly damaged by the debris:. Terra Associates, ;Inc. made a':site visit to Lorian Woods' Lot 2 on. February 2, :2006.. None of the direct deposits. of soils frorn.the. slide impacted the house footprint on Lot; 2' of. Lorian ,Woods:.- The ..Landau memo reports that the material that" slid appeared to be "material ,that initially failed in 2005 and .was re -mobilized by heavy..rains and seepage_. Based on the discussion in the Landau memo; no further retreat of the top" of "the slope._ on the Bosch property was apparent:.. Catch -Basin .8:was_damaged and pushed out of place by the 2006.earth movement. "Figures 1 and _2 `show photos'of the 2006 slide impacts on Lot-.2 of Lorian_ Woods.'.. J ' Project No T-840' 10 , Page No. 2 Brian.and Cindy Isaacson June 2, 2009 ; From the discussion above, it .appears that there' has -been : an increase_ in slide "activity subsequent- to the development of .the land above.Lots .1, 2, and 5 of Lorian .Woods. This can either be attributed to disturbance- from- the development activity or perhaps to. increased observations of the slope as a result of the' development activities. In any event, none of the direct deposits of.landslide debris have been observed nor reported, to have' directly impacted the envelope of the proposed Isaacson, House.. To mitigate potential impacts ;due to the recent increase in' slope movements, a• catchment ,wall will be placed above the proposed Isaacson residence to control materials that may encroach 'on "the house envelope, in the future. ' Increased stewardship of the "slope "area can be . expected to occur as homeowners perform' maintenance work to preserve property values and -the safety of their. : respective homes`. ' In, -our report for the plat dated 1989, we state that it is our opinion that the return period for the shallow .slides" described above to be on the order•of 10 to 20 years. In addition, our report discusses -that the shallow avalanches and .debris flows "do not commonly reach the lower area where the house is to be located. Slope Cross Section Using survey information .provided by Western Engineers and- soil test borings from our files by others, we developed. the attached .cross section. The.:scheinatic.location of the "cross section is" shown'on Figure 3..' •The. . generalized geologic "section is shown on Figure-4. This,geologic section is consistent with the sections drawn by 'others forthis vicinity. ; The logs for the borings used to construct the�cross'se'ction are.presented in Appendix"A. "Appendix B" is the survey information from Western Engineers showing the. surveyed location of the section Cedar Lod, Accumulated Slope .Sediments and General Slope Restoration - , In our referenced.report dated March 31, 2008' we recommended that the cedar:log.located above the house site in, the common area be removed: This log, has a diameter -of -about three feet and has been "lodged on the slope'for :many years: Prior to, 2006, it does not appear that there was any significant sediment accumulation above the log. Some" of the slide debris from the. 2006 event, has accumulated behind'; uphill of the log." : We have estimated that • . the amount: of soil that. needs to be removed "is'"on the order of 30 cubic yards. -The soil should lie`removed using a low. impact technique. "It does not appear to.be feasible to use'a'trackhoe to remove the soil and the-log..We . recommend "that the contractor use a, vacuum truck to remove the soils... This will limit the. number of ;workers, required, to. clirrib up the slope and will .speed the. removal. of the soil.. The soils should be removed io.'restore the , slope profile in the, area of the log. The, exposed log can then be cut, into smaller'pieces 'and be removed: The -in. . situ .stumps that have been supporting the log should .remain intact on the slope and should riot be physically, removed: A preconstruction meeting should -be held to discuss the contractor's` final plans The slope -above the.proposed "house. should be .cleared of all loose "tree debris, logs, and'dislodged stumps' The= . ; woody rnaterial'can be chipped on -site and, be reused as mulch for erosion control. In situ stumps should not be, removed unless approved for removal by the geotechnical engineer. There is a short steep area immediately - adjacentto the eastern upper property corner that should be regraded to:match adjacent slopes. ,.This shomsteep . area was created, through the removal of a stump during previousclearing activities.: It is estimated that:five cubic yards of soil may need to be removed to reshape this local area'. The excavated materials should.be exported form the site unless it is suitable for reuse as structural fill and will fit in"the stockpile area shown on -the current project plans. Project No T-840-10 .: Page No. • 3 Brian and Cindy Isaacson , Jund- 2, 2009 All work on the slope should be done..iinder the full-time observation, of a representative of the Geotechnical Engineer. Catchment Wall Revisions In our 2008 report, we. presented design criteria for a catchment wall constructed with soldier: piles. Due. to the' projected,costs of the soldier pile -:wall, the project plans now show a cantilever retaining wall designed using the :same catchment wall -and retaining wall foundation criteria:contained in our report. The wall does :not ,have an :access path as shown on.previous drawing's: When sediments :accumulate the wall; they will,*eed.to be removed by hand using.a •wheel •bariow or,through the use of a vacuum truck.... In addition to the catchment wall, the final house plans include concrete walls that are designed as retaining walls that extend' to three feet above grade along the eastern uphill side of the house. .In addition, no door openings'& . Were placed along the uphill side of the house. i Groundwater Level Monitoring We' have reviewed static water..level measurements 'collected by. Landau and by, the City of: Edmonds for piezometer.No. 17. This piezornetdr is located'near.the southwest corner of the lot.:. The Piezometer installation is .discussed. in 'the Landau memo dated. January 24; Z007. The •depths are shown on the. memos_ attached in Appendix,C The data;is: summarized•on Chart 1 in. Appendix C.' The data shows that the static. water level rises _ f.. in the wetter`•winter months and declines:in the dryer surrimer,months. The proposed project should not cause. _ groundwater levels to rise on or'adjacent to the lot: ; We ,understand that the City of Edmonds will continue to moniior the. static water level on a regular basis.. Drainage System_lA We:understand that tlie.Isaacson's'have taken responsibility for the maintenance of Drainage System 1A: :Tfie :. seepage pattern on the .hillside appears to -have changed froin•the time that Drainage System lA was installed. . The primary seepage area is now. from the slope above the eastern extension of the northern .property line of Lot'2 `of Lorian. Woods. The discussion that follow's'-uses.the catch:basiridesignations shown on the •RW,Beck plans ., dated June 4; 2003 prepared for the City of Edmonds. ? "The. soil 'movements that -occurred.'in' January of destroyed the segment, of the• system above SDMH 6: . SDMH;8 was physically removed from the hill sid:&by4he:.slide and was removed from the site during subsequent site clearing, activities.. This is' `shown in the photo 'attached :as Figure I., Clearing activities associated with`a . , previous .permit •for Lot 2.of Lorian Woods appear: to' have removed SDMH:5 and SDMH 7. ; :.On April 9,: 2009, we opened the lid on SDMH 6 and observed'no flow entering the structure from the..,8-inch , CMP that extended up t.o SDMH 8. There was alight trickle: of water from the line that extended from SDMH .7 towards SDIVIH 6: If, appears that. SDMH� 7 has � been removed during previous clearing.` activities: , We recommend that SDMH 6 be removed and be backfilled with a clean crushed rock. A slot trench should, be. provided to allow any seepage that. niay';continue from :upper trench lines to reach the footing .drain of. the " catchment wall: Project No -T-840-10 -4 Page No . Brian and Cindy Isaacson . June 2 2009 During site grading, the- remaining pipe that drains SDMH 6 to SDMH. 5 should be removed 'and the trench be backfilled with structural fill. The- discharge ,from SDMH 9, and the actual condition of SDMH .5. should be evaluated during, site grading The: lateral system .to-SDMH 9 is- above=grade for'mostof its extent.'.• -If, the . evaluation indicates that the line should: remain in place,' the pipe should, be replaced with HDPE butt welded pipe:. The diameter of the HDPE pipe does not need to be any larger than four inches and may be placed on the surface in'a mariner consistent-with'the upper. drains being placed for this project: The' CMP between the location of SDMH 5 and CB #D,should•be exposed and be replaced with a 12=inch PVC pipe to connect with the lateral to SDMH 9: To, facilitate mmintenance, either. a new catch -basin. can be installed at the location.of SDMH,5 ora cleanout can be installed at the.elbow that would replace SDMH 5:.` . -The drains shown on Sheet 4 of 6 .of the plans prepared- by Western Engineering are, intended to replace the former system that was placed by the city in the late 1980s.• The use .of flexible pipe on the surface.and surface : collection; pans should facilitate maintenance:. Any damage to the system will be visible and -.repairs can'then be made -without the need, for equipment, or, trenches on the hillside: . Slope Revegetation Pians . The slope revegetation plans should proceed as 'soon as possible following the -removal of the cedar log ;and slope restoration' work'and placement. of.the drainage system described above. Fills Fills of 'up to two' feet will.,be required in local, areas around the .house, to promote drainage. These fills are minimal in nature and will `not decrease the". stability of the -site or adiacent,slopes: 'There will need* to of up. to five feet in. depth to create the landing for_ the entryway stairs and a'fill of up to four feet in depth for the northwestern -edge of the patio. along the back of the house:. -.As shown :on.the civil; plans, .the cut,for the house involves the removal of 450 yards�of soil and the placement of 50 cubic.yards of soil. Thus, there is,a net- loss .of soil: from the site of about 400. cubic yards. The proposed fills.. are' not in a location that .will create slope instability issues. The short 2:4, fill slope along -the north elevation' -of the .house .from .the,fill used. to support the'northwestera corner., of the' patio is: suitable_ for this site and will not lead to slope instability issues.: To address the possible " settlements from the fills used ,to create the -entryway, stairs,. we recommend that the'area be pre'loaded prior to placement of the stairs and.associated walls. Thepreload may consist of Ecology Blocks 'stacked fwo.blocks:high- covering the -footprint of the.proposed;fill:..A's.an alternative, a..tempora"ry stockpile .of backfill.at least six feet, high can•be.placed at, the -entry -fill location.: This. -preload should,remain.in place for at. least four weeks prior to placement -of the walls and fills needed to support.the lower portion of the entryway.stairs: "A temporary fill stockpile area, adjacent to the southwest corner of the lot is permissible., :This is below the toe of the eastem,slope''and, well. away fromthe slope that is present on the western margin of the plat of Lorian Woods. , It -is. our opinion that the use of the area for a temporary stockpile not; to exceed 50_cubic yards will not decrease the stability of the site slopes on' or, adjacent: to Lot 2. Unless approved by the geotechnical engineer, the . stockpiled soils must be completely rem oved.by.the beginning of the ,wet season on October. 1. _ Project No T-840-10 . Page No. 5: Brian and Cindy Isaacson Jund'2,.2009 Structural Plans We have .reviewed the geotechnidai aspects of Sheets S-O," S=1,. S-2, S-6, and- S78 of the structural-, plans :for the Isaacson Residence' prepared. by -Reed. and Associates; PS dated April.9, 2009 with= arevision date of 1VIay 2009.' Based on otir review, our recommendations have been'.followed in preparation of the plans: Civil Plans ; We have: reviewed .the civil 'arid temporary erosion -control plans prepared-by'Western Engineers'dated. February ' 28, 2009 .and revised May 13,,2009..Based on our.revie.w, our recommendations have been incorporated into the' geotechnical aspects:of the plans: Architectural Plans We have reviewed the'geotechnical aspects of the .architectural plans prepared' by O'Brien and Associates dated .. February 28,1008 for Sheet Al .arid May �l',: 2009-for Sheets A2, A3,. and A5. through' A7.' Based; on our review;.' our :recommendations have been incorporated into thegeoiechnical aspects of the plans:.' CLOSURE ; -City of Edmonds Required Risk Statement It is our. professional •opinion that the -risk of damage ;to the proposed development of" to the adjacent properties; will -be minimized subject to the conditions set.. forth "in this: and previousaetters -and reports prepared; by Terra Associates:.. 'The ..proposed "development "will not increase the ,potential for soil movements: Minimized' shall".. mean'that the applicant has utilized best,available. science and' commonly accepted engineering and architectural .practices to minimize, to the extent -possible, the risks associated with developmenttof_the property. Probability of Earth Movements Within a 25=-year-Time Period' .. . In our report for'the plat dated 1989.,'We, state that it is, our opinion that the'retuin�period for.the`shallow slides . such as the slide. above. Lot"I that.began" in 2001:. and continued,to, reoccur through .2006 to be on the order of 1,0- to 20 years. In, addition,, our report discusses that the, shallow avalanches -and debris flows do not commonly reach the lower area where the. house 'is to 'be. located. The' proposed: catchment wall, is mitigation for -the anticipated future earth movements from the slope, above the ,house: Project No T-84.0-10, -Page No. 6. Brian.and Cindy Isaacson . June' 2 2009 . • REFERENCES: ' t rir to a and'Site Conditions His o S S P GeoGroup Northwest,. Geotechnical Engineering Study, Sequoia Ridge,. Project G-1061; dated February 2, 2000 Response to Geotechnical Comments, Project;G-1061-C, dated.May 25,.2001 Mudslide/Debris Flow Evaluation, Project G-1061, dated December 28, .2001 Landau Associates; Geotechnical Engineering Services, Memo dated •December 19, 2001 ' ; .Geotechnical Services, Drainage Evaluation, Report dated July 25, 2002 Landslide Evaluation, Memo dated September 25;'2003 Bosch Property Landslide,. Memo dated February 22, 2005 Bosch Property'Landslide; Memo dated February, 17,.2006 ,.,Piezometer Installation and Drainage'Recommendations, .Draft -Memo, dated January24, .2007 North Edmorids,Earih Subsidence and Landslide -Hazard Summary Report; dated Marcy 14, 2007 R.W. Beck, City of Edmonds Drainage Collection, File No. EAC 06001, WO 11-00843 Drawings 1 and 2,.: : dated June 4, `2003 Terra Associates, Inc., Geotechnical Report,.Meadowvale..I§each,"L6ts 54 through 57, Project No:.T-8407'1,-. .'.:.,dated June 6,.1989 Geotechnical Report, Project, No.,T-840-10, dated Ma:r6h.31; 2008 Zipper-Zenian, Geotechnical Review, Proposed Bosch Residence, Project 1019; dated May 21, 2001 -, Previous Reports/Letters.by TerrwAssociates, Inc. regarding the proposed Isaacson House.*' Terra Associates, Inc.; Geote'clhical Report, Meadowvale Beach,. Lots 54 through 57, Project No..T=840-1, _ dated -June 6, 1989 . Geotechnical Report, Project No:'T-840-10, dated-Septembe"r 14; 2005 Supplemental Geotechnical Consultation, Tree Removal, and Maintenance, - Project No. T-840-10,.dati d August.7, 2006 Project.No. T-840-10 Page No: 8 •- • ]Photo taken on February 2, 2006 from the southwest property corner Drainage structure 6 is in place. Drainage structure 8 was displaced by the slide. TERM No ASSOCIATES Geotechnical Consultants Isaacson Residence Edmonds, Washington Project TT840-10' Date June 2009' Figure 1 I 0 Photo taken on February 2, 2006 from near the southwest property corner. View includes the uphill eastern half of the proposed house envelope. Soils deposited in house envelope are from erosion of the slide mass above house envelope. Geotechnical Consultants Isaacson Residence Edmonds, Washington Project T-840-101 Date June 2009 I Figure 2 • 0 GGN is GeoGroup Northwest boring location TAI is Terra Associates boring with year of the exploration LA is Landau Associates boring location Blue line is approximate location of generalized section shown on Figure 2 Refer to survey by Western Engineers for specific section location TERRA Generalized Geologic Section Location Isaacson Residence ASSOCIATES Edmonds, Washington Geotechnical Consultants IProject T-840-10 1 Date June 2009 1 Figure 3 0 0 GGN is GeoGroup Northwest boring location TAI is Terra Associates boring with year of the exploration LA is Landau Associates boring location Blue line is approximate location of generalized section shown on Figure 2 Refer to survey by Western Engineers for specific section location >--4 TERRA 90 ASSOCIATES Geotechnical Consultants eowaic section Isaacson Residence Edmonds, Washington Project T-840-101 Date June 2009 tion Figure 3 F [j F-1 tj -3 B .260 250 240 -------------------------- 7 TOP OF SLOPE' HOUSE) - - 210 200 T L 190 180 170. LU W — ---------------- ------ CL Z' --als, —77 Do] 60 z I j _.�'' 1� i LEGEND: 0 TAI-89-13-2 950 < > Qva,- Advance Outwash - -.7 146-0 W j46 -1 LA ' Qls Landslide Deposits. LU . -130. -IELEV=, 7,33.0. GARAGE FF I Whidbey Formation. 0 - . . . . . . . older latustrine deposits 110 L TAI-2008 'NOTE: R-1 From Station 1 +13 to 3+59, the ground surface .100 is shown is,from 6 survey by; Western Engineers: — 96 n 'The.,ground surface show' in dashed lines east' 7 .7 _T_ and west of these stations -is approximate mate and -is- -10 60 ? - 4::- b sed on our fi6ld'a observations. 50 4 0+00. - — - --------- 7 -col J_ A .,3+00 3+50 _4+00 6+50. 1+00 1.+50� 2+o6 2+50 SCALE: KV-1 '1=40' REFERENCE: EFERE_ TAI-89wB-2 FROM TERRA ASSOCIATES., REPORT T-840-1, DATED JUNE 6,1985 1AT8S, REP' -DRAFT j FROM -LANDAU ASSOCIATES, MEMO,'DATED JANUARY 242007,' TAI-2008 B.1 FROM TERRA ASSOCIATES,: REPORT T-840;1 0, DATED MARCH31, 2008 'R-3 GGN: FROM GEOGROUP NORTHWEST; REPORT, DATED FEBRUARY 2,2008 Terra -"GE'NERA . LIZ I ED. . GEOLOGIC SECTION ISAACSON HOUSE Associates-Ahc.'. EDMONDS, WASHINGTON Con6ultants in Gebtech nical 'Engirie Geology and Environmental Earth-Scjenc6� -840 16 00 Figure 4 Proj. N63 Date DUNE 2 9 • APPENDIX A BORING LOGS • 0 BORING NO. 2 Logged By CRL Date 2/16/89 ELEV. 120f Graph US CS Soil Description p Depth (ft.) Sample Blows W ( %) 4u tsf Ft. Concrete slab ml/ Grey silty fine SAND and clayey SILT, = 4 26 sm some orange stain 5 Grey silty fine SAND with clay 5 33 10 Same, with some organics 3/15/89 = 5 24 15 Same, with hard clay chunks & wood = 13 46 20 sm Grey silty fine to medium SAND = 10 19 25 No recovery r 21 30 ml Grey sandy SILT = 12 31 35 Grey SILT = 22 31 40 ml/ cl Grey clayey SILT with sandy zones = 17 37 2.5 45 Same I 31 24 3.5 60 ch Grey CLAY = 24 38 3.5 55 Same = 25 36 2.5 80 Grey CLAY, thin bedding = 35 35 4.5 85 CH Same LL-75; PI= = 95/9" 23 4.5+ BORING LOG TERRA ANDMSON PROPERTY ASSOCIATES MEADOWDALE BEACH EDMONDS Proj. No. 840-1 Date 3/89 Figure 9 Geotechnical Consultants BORING NO. B-3 Page I of l Logged By: KJ Date Drilled: 5/18/99 Surface Elev. 255 feet +!- Sample Blow Water Depth USCS Description Count per Content Other Tests & ft. Code Type No. 6-inches % Comments Sp ivy surface. SAND, dark yellowish brown, damp, fine grained SI 1,1,1 16.6 _sand very loose. _ _ (N=2) SM _ _ _ SILTY SAND moist, medium dense, fine grained sand with 5,8,7 11.2 gravel, brown. S2 (N-15) 5 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — S3 27,12,13 9.3 Sample at 5 feet Sp SAND, damp, medium dense, fine grained sand, brown. (N=25) afiec� b water y added to hole. SP As above, very dense, fine to medium grained sand, grayish S4 15,25,26 6.6 brown. (N=51) 10 Sp As above, moist, medium dense, silty sand lense at bottom of SS 9,12.17 (N=29) 11.5 sample, brownish gray. 15 1 20 1 25 130 Sp I As above, damp, dense; fine grained sand, gray. Sp I As above, very dense, moist. SP I As above, damp. SP I As above, wet, very fine to fine grained sand, 5% fines. Bottom of boring: 31 feet. 35 Drilling Method: Hollow -stem auger (portable). Sampling Method: 2-inch-0-D. standard penetration sampler driven using a 140 lb. hammer with a 30-inch drop. Groundwater encountered at approximately 29 to 30 feet during drilling. . 2,17.29 I S6 I I(N=46) I 12.9 l 1(N=60) ! 8.0 S7 I = I SS I 2(5N, 3 79) I 6J 28,50 Groundwater S9 (p1=50+) Z4.5 ecountered at 29 to 30 feet during drilling. LEGEND: = 2" O.D. Split -Spoon Sampler GROUNDWATER seal T 3" O.D. Shelby -Tube Sampler OBSERVATION WELL.: measured water level 3" O.D. California Sampler well tip (screen) .MMME, BORING LOG IN I Group Northwest, Inc. PROPOSED RESIDENTIAL DEVELOPMENT SEQUOIA RIDGE SHORT SUBDIVISION Geote Eavir meioeas, Geologists, tb, & EDMONDS, WASHINGTON £av'ummmul Scieotis� JOB NO. G-1061 DATE 5120/99 PLATE A4 IL/II/LVVI 10: LG CAA 443 118 44yy • I . HANSEN MCLAUGHLIN 0 P-17 SAMPLE DATA SOIL PROFILE Druling Method' Hollow -stem Auger f'• o % Ground Elevation (fl)• 122 w m Q) E m o l0 O a Cn U m o ul m m po N 3 —0 AC halt rta P L vet .base 120 Grsy, line sandy, clayey SILT (molsl, sum (SLIDE DEBRIS) St b2 10 � `Gray; Ane lu meafurA'SAND (nrolsl, --- loose to medium dense). 12129 5 S2� b2 4 SM/ Faray, Sr{ty, fine SAND lq line Bendy — — -- MI. SILT (moist to wet, very loose to. 1000/5011 to sty 11 its - Vnch seam of coarse SAND with 12115 gravel S3 b2 e 10009 GROUNDWATER Piezometer Detail monument with lacking cap 6entonile chips 2-inch diameter, Schedule 20, PVC 1 o well casing S4 b2 9 lanch plecaof non -decayed wood � 110 ATD I SS-FI 1:2 I 2 F-2o S8 M,I I b2 1 8 1 Boring Completed 10/02/06 Total Depth of Boring a 21.6 fl (-25 3 35 Notes; 1. Strefigraphic 2. Reference to 3. Refer to "Soil .I LANDAU ASSOCL4M Incrgasa In drilling reitdlanea Silt Interbeds and organics conlacle erg based on field Interpretations and.are approxlmale. the text of lhie report Is neces for p,propar undpratanding Of sub4Wace conditions. Cleasificellon.5ystern and )W' pure for explanation of graphics Arid symbols. -Inch diameter, Schedule 20, PVC seen (0.010•inch slolsize) Threaded end cap Lgrian Woods, Piezometer Figure Installation Log of Piezometer P-17 Edmonds, WA LOG OF BORING NO. 1 Figure No. A-3 Project: Loden Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Elevation: N/A m Pocket Penetromete a TSF n v Soil Description Consistency/ Relative Density __,i...._?____3__...4._. Observ. Well m Moisture Content % SPT (N) w a Wp-----x---- WI' a Blows/ft e m m 10 30 50 70 g0 10 - 20 30 40 0 CD Blue -gray silty SAND with gravel, fine to t t 2 coarse grained, wet. (Landslide debris) Loose o 3 18.2 t x 4 ---------- i 5 ------------------------- 34.5 . .6 , X •! i 6 Yellow, orange, gray, blue SILT with Loose i 7 small sand layers, fine grained, wet. • • . • (Landslide debris) 37.5: 7. l 9 --------------------------- ---------- 1 10 Brown SAND with silt, fine grained, 28.6. 12 moist. z • t ; 'Soil becomes saturated. I I l 12 Medium Dense ; 11.5 113 1 ' 13 'Soil has less silt. z • 14 i "Soil has more silt. 15 25:1 11 x I. ; 16 ------------------------- -------- i 17 t I 18 Tan SILT, moist. (Landslide debris) Medlum Dense t 19 20 --------------------------- --------- ; 39.3 5 21 • Brown SAND with silt, fine to coarse 22 grained, saturated with a 4-inch silt layer 2 inches from bottom of sampler. 23 Loose 24 i 'Continued on Next Page. 25 Terra Note: This borehole log has been prepared for geotechnical purposes. This Information pertains only to this boring location Associates, Inc. and should not be Interpeted as being indicative of other areas oI the site. Consultants In Geotechnical Engineering, Geology and Environmental Earth Sciences • • LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Approx. Elev: N/A Pocket Penetromete n TSF a L _m a Soil Description Consistency Relative Density Moisture Content % 1 2 3 4 SbT (hV r_ _ Monitor Well W p I-----x----- W I ® Blows/ft • o f 10 30 50 7 90 10 20 30 40 26 1s Brown SAND with silt, fine to coarse P7 grained, saturated. Medium Dense i 28 29 --------------------------- ---------- 30 28.5: 12 ' 31 ; . 32 Gray blue CLAY, moist. Stiff ; 33 ; . 34 35 --------------------------- ---------- 33.4 i 1 36 ....I !. I , 37 Gray purple SAND with silt, fine grained, Medium Dense 1 38 wet. 39 40 --------------------------- ---------- 24.9 45. 41 Blue -gray CLAY, moist. Hard x • 42 . I I Boring terminated at 41.5 feet. ; 43 t i 44 ! . . 45 • I , I 46 47 . 48 49 I i f • "I 1 50 !...:.... Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location Associates, Inc. and should not be interpeled as being Indicative of other areas of the site. consultants in Geolechnical Engineering, Geology and Environmental Earth Sciences 0 • APPENDIX B SURVEY FROM WESTERN ENGINEERS • C� ,-j t SCALE: 1 " = 30' 0 30 60 WAilia s� a� 38764 CI STE4 1 1 / I � I , , 1 \ � 1 \ 1 I 0+00 'Op / N� 9'Q7 6.150 /, N70'52'16"W/ ��':1. 14.01' ' „�, „ ,, I 1 r / , r ' 1 1 11 1 ram, / �/,/ / /, I i� • 1'1'W I I, TAXACCOUATNO.Q. 00790400000200 x6. �A SITEADDRESS.' 16007 73RD PLACE W. EDMONDS, WA 98026 Western PROFILEEXHIBIT MAPFOR. Engineers, (42s) BRIANISAACSON Inc. 356-2700 SW1/4, SWI/4, SEC.OS, T27N., R.04F, W.M. SNOHOMISHCOUNTY, WASHINGTON SURVEYORS Y PLANNERS a ENGINEERS DRAWN BY DATE REV. BY DATE PROJECT MANAGER SCALE LAND USE CONSULTANTS JAJ 03109109 B.R. CONSTANT 1 "=30' CIVIL ENGINEERS o LAND SURVEYORS DRAWING FILE NAME CHK. BY F.B. NO. JOB NO. SHT. NO. *#* 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** 06792APROF-2.DWG BRC - 06-792 A 1 of2 • 260 250 240 230 220 210 200 190 180 170 160 150 740 130 DATUM ELEV 120.00 • • L� TOP OF SLOPE / (BOSCH HOUSE / TOE OF SLOPE 2 LX Lo _ 00 U d "' N / J Q a E.o c+ x ZO _Q "' W / ELEV= 158.5t (AT SECTION) a � — — ELEV= 146.0 ELEV= 133.0 GARAGE FF to K to 0+00 0+50 1+00 1+50 2+00 2+50 3+00 0PEPROFILE.• SCALE. TAXACCOWM0.(S). SITEADDRESS. VER1 t'=3o' 00790400000200 16007 73RD PLACE W. HORZ. 1'=30' EDMONDS, WA 98026 c0� stern PROFILEEXHIM"MAPFOR. - �WA s- *Engin (42s) BRIANISAACSON � � o�eers,_ zInc, 356-2700 SWI/4, SWI/4,'SEC.OS, T27N., R.04E., W.M.- �o SNOHOMISHCOUNTY, WASHINGTON 38764 �,V OIST�SSfONALS SURVEYORS o PLANNERS o ENGINEERS DRAWN BY DATE REV. BY DATE PROJECT MANAGER SCALE G` LAND USE CONSULTANTS JAJ 03109109 B.R. CONSTANT - DRAWING FILE NAME CHK. BY F.B. NO. JOB NO. SHT. NO. CIVIL ENGINEERS o LAND SURVEYORS *** 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** 06792APROF-2.DWG I BRC — 06-792 A 2 of2 APPENDIX C STATIC WATER LEVEL DATA 10/10/2006 12/9/2006 2/7/2007 4/8/2007 6/7/2007 8/6/2007 10/5/2007 12/4/2007 v 2/2/2008 �D 4/2/2008 6/1 /2008 7/31 /2008 9/29/2008 11 /28/2008 1 /27/2009 3/28/2009 5/27/2009 Depth to Static Water Level in Feet .P cn 0) -I 00 � cn cn 6 M Ln � 6 M 6 d �,y y - _ a • • MEADOWDALE PIEZOMETER READINGS BORING NUMBER 4 6b 7 10 12 13 14 15 16 17 DA TE: DEPTH: DEPTH: DEPTH: DEPTH DEPTH: DEPTH DEPTH: DEPTH: DEPTH: DEPTH: 01/02/07 9.92 36.83 8.50 4.25 38.91 41.42 16.50 7.83 -6.75 01/23/07 10.00 37.00 8.42-, 5.08 38.50 43.42 17.25 8.08 7.00 02/06/07 10.08 37.25 8.50. 5.50 38.67 44.83 17.83:- 8.00 7.25 02/20/07 37.33 - 8 6.7. 5.17 38.,00 45.75 18.17 8.25 7.67 6.17 03/06/07 37.50 7.83. 5.17 38.60 - 45.50 18.58- 8.00 7.25 6.08 03/20/07 37.50 8.25- 5.43 39.00 45.92 18.33 7.92 7.33 6.00 04/03/07 37.58 8.25 5.50 38.92 46.25 18.67 8.08 7.42 6.00 04/24/07 K99 37.67 8:50 6.08 39.00 46.50 18.83 8.33 7.92 6.00 05/08/07 37.75 8.58 6.42 38.92 46.75 -`19.00 8.00- 7.75 6.25 05/22/07 37.83 8.42 7.00 39.00 72.50 19.67 17.50 22.33 6.50 06/05/07 37.50 8:83 7.25 39.75 72.67 19.50 17.50 22�50 6.50 06/19/07 10.18 38.30 11.50 7.90 38:50 72.38 19.58 8.42 7.90 6.50 07/03/07 10.42 38.17 8.58 ' 8.00 39.50 73.00 19.67 ' 8.58 7.92" 6.50 _ 07/17/07 10.50 38.25 .~ 8.33 . 10.33 39.92 72.75 19.83' 8.50 --8.08.' 6.83 07/26/07 10 40 38.00 8.60 ' 10.60 38.20 19.8G; 15.20 20 00 _ 7.02 12/19/07 9.90 37.30 7:50 3.80 37.90 0.00 ' 18.90 7.60 7.40 6.40 MEAbOWDALE PIEZOMETER READINGS BORING NUMBER 4 6b 7 10 12 13 14 15 16 . 17 DA TE. DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: 01/03/08 9.90 37.10 7.70 3.90 37.55 0.00 18.45 7.40 _.7.50. 6.00 01/17/082 10.00 37.10 10.00 11.00 bottornoul 31.30 18.00 7.30 7:60 ----- 02/14/08 10.46 37.20 8.28 - 4.77 35.63 17.60 18.31 7.99 8.00 - 5.63 02/29/08 10.62, 37.26 .8.68 5.13 33:.06 37.14 18.36 8.20 .-8 09 5.97 03/17/08 10.56 37.47 8.48 - 5.23 38.48 33.73 18.67 8.08 7:9.8 5.90 04/03/08 10.46 37.54 8:3'0: 4.13 -[ykb: ] 24.28 18.73 8.07 7:7�4 . 5.83 05/93/08 17.33 37.48 -8164 5.93 29.9& 46.24 17.42 8.23 8.02 6.23 06/05/08 '0 24 37.64 7 92 5.57 38.10 7.68 18.81 ' 6.18 7.8,2, 6.05 06/18/08 Bottom Out 37.83 8.83 .. 6.47 38.13 23.58 19.00 8.18 8.10 6.16 07/02/08 10.74 37.82 -:8:78 7.44 3.8.0,0 40.01 19.00 8.29 8.14 6.74 07/16/08 10.71 37.95 9.04 4.39 38.44 39.75 19.23 8.55 8.40 7.18 07/31/08 10.72 37.93 (8 94 1.94 38.09 44.99 1926 8.62 . 8-56 7.75 08/15/08 10.68 38.00 8.90 1.91 36:36 _. 46.18 19.36 8.66 8.65 7.99 08/27/08 10.69. 38.13 8..72: 12.60 38,03, 1.42 19.48 8.23 .8.52 8.14 10/22/08 Bottom- Out 38..42 8.97 Bottom Out 38.61! 26.85 20.00 8.48 8.74 7.77 11/24/08 Bottom Out 38.25 868<:., 10.20 38.92`__ 13.11- 2:000 8.32 `8:34 6.76 -------------------------------- 0 ----------- Notes: 1. All measurements are in feet 2. Depths taken on 1/17/08 are inaccurate. Water level indicator was malfunctioning Received new system on 2/12/08 3. Cover was off (no protection from rain water) Bottom Out: Gauge probe has made contact with organic material at piezometer f 40 MEAOOWE)ALE PIEZOMETER REAMN&S BORING NUMBER 4 6b 7 10 12 13 14 15 17 DA TE: DEPTH. DEPTH: DEPTH. DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH. DEPTH: 01/16/09 6.69 37.79 8.26 7.00 38.94 15.06 19.33 8.14 7.91 5.58 01/28/09 Bottom out 37.63 871 3.60 3.8.80 37.08 19.06. 8.26 '8.2.2 .6.32 02/19/09 Bottom out 37.89 8.82 3.25 3828 20.81 19.27 8.30 8.41 6.76 03/11/09 Bottom out 36.80 812. 3.23 37:64.' 20.53 19_.38. 8.42 8.26 6.89 04/03/09 9.86 '' . 38.04 7.49 ' 3.68 34:1`3 0.58 19 35. 5.94 7.44 5.18 Notes: 1. All measurements are in feet 2. Depths taken on 1/17/08 are inaccurate. Water level indicator was malfunctioning. Received new system on 2/12/08 3. Cover was off (no protection from rain water) Bottom Out: Gauge probe has made contact with organic material at piezometer 0 • ,March 31; 2008 Project No:: T-840-10 Brian.&'.Cindy Isaacson - 9808 142nd Place SE; F-301 " Bothell; Washington, 98011" Subject:. Geotechnical Report.. Lorian Woods Lot 2 Lorian Woods - Edmonds, Washington, References: 4. Geotechriical Report; ,Meadowdale.Beach, Lots 54'thr6ugh'57, Project No. T=8404,, prepared by'Terra Associates, Inc.; dated June,6, 1989 2: North Edmonds,Earth Subsidence and Landslide Hazard Area Summary Report, Edmonds; Washington, prepared by Landau Associates, dated March 14; 2007 Dear Brian.& Cindy: `As requested, we have• conducted a 'geoiechnical engineering study for.the subject project: The. attached report - presents, our. findings and recomrrieridations,for.the-geotechnical:aspects of.project design -and construction: Our' field exploration indicates the site 'is underlain by loose to medium'dense colluvialsoils, comprised of old 'landslide deposits. ,We- previously prepared a draft ;report for you dated-Septembeu 14, 2005. In the intervening period; we have, provided, ongoing consultation. services to you -during conceptual design'of your house:' In addition; the City :of Edmonds. revised their building permit: requirements, and the •referenced, report. by Landau was prepared for the city. In�our•opinion, provided the owner.is willing to accept the risk associated with building in a -landslide hazard'area as discussed, in the referenced, report, ,the soil . and- groundwater conditions _are�� suitable , for the.,.planned development: The,structure,'may,l%e supporfed'.on`a mat/raft.fouridation', consisting of:a slab,constructed.over•a grid of grade beams, •bearing on the'colluvial'soils: ` The catchment wall shown on the' current plans,, should be adequate in protecting the property from soil instability that has ,been observed on'tlie site slopes. With ,this wall constructed and the other recommendations outlined `in this report implemented, in our opinion, the, proposed• development would not increase the potential for soil movement 12525 Willows Road,'Su ite,10.1; Kirkland, Washington 98034 = Phone (425)821•-7777 ! Fax (425) 8214334 ' TABLE .OF.CONTENTS Page No.. 1.0 Project, Description:.:....:........................................:...............:.........................................1 2.0; Scope of Work ......................................:......-. :.:........:.....:......... 1 ' 3.0 Site Conditions .......'............ ' :. :........ :.....:.. : 3.1: .Surface... 2� 3.2 Soils :........:.................................. 2. 33 -Groundwater .......... ............... ... .. ........ 3 4.0 Geologic Hazards .....................::::::....::.... :..... ,......................................... 3.. 4.1 Landslide Hazard.:......:::....:............................................................. . 4:2 .. Seismic ................ ....... ........ ... .. ........................' .. 3 , " 4 3. Erosion . 5.0' Discussion and Recommendations.............................. ..:........:.:. ......... ..:.....:.............:6 - 5.1 General ..... 5.2. - Site Preparation and Grading ....:. ......... ...7 5.3 Excavations...,..;. . ....... ..... .........8 5A Foundations :.....:... ........ 8 ..................... ....... ..... 5.5 Slab -on -Grade Floors ' ........................ ...... ...... .8 _ 5.6 Retaining Walls :.................... :............. :......................... ......................................... 9 ' 5.7 Catchment Wall. :..' ...................................... . .......... .....9 ....... ............... ..... .:10. 5.8 Drainage 5.9 Slopes.and Embankments ...::...........:.:......... ...... :. 11 j . 6.0 Additional Services .................:. f................. Limitations .........:....: ..................................................11 Fs , Vicinity Map...: .::..::................ .............. : ...: :.... Figure 1. Exploration Location Plan ...::...:...:...:...:. .... :......... :......:. Figure, 2 .....:... ' Typical Wall%Drainage Detail .............: ...... . Figure-3 ...... ....... Typicaoer eatcmet Wall n.................. ......... ........... ................................. ure'4 .' - l.SldiPil:ChFig , .Appendix Field Exploration and Laboratory. Testing.... 1 ....................... .....:. ........... ..City of Edmonds Piezometer Data....:::........ Appendix A .............................................................. - ' • - . ;_.... Appendix B • . fF " � _. Geoteoh, ncal Report �; ' Lorian Woods lot-.2: "Loria, Woods Edmonds; Washington PROJECT DESCRIPTION The proposed project is a single, family, dwelling: We, were provided with architectural drawings indicating the , location'of the home on the lot and'elevations.of the -foundations: The -home, is. located in the. western portion 'of - ' : the -lot.: • The structure is a two-story; wood=framed building - with its- main floor framed over, a garage; :and crawl, space. .The garage.floor will Abe. constructed at grade. ; We expect foundation loads Will be relatively light, in the - ' range of 2 kips per foot for bearing walls and,25 kips fofisolated,columns. 'The site grading will consist of cuts . of up to eight -feet to- achieve the garage'elevation. Nominal, cuts" will; be, needed toprepare the; balance of the, house site. ' There will be 'a catchment wall constructed 'on.Tthe east side' of` the- property `approkimately ten feet -, west of the property line to protect•the,hor ' from landslides We previously.prepared areport entitled.Geotechnical Report, Meadowdale-Beach Lots 54 through 57, Edmonds; Washington; Project,T-840-1, dated June 6, 089. This previous report was, written as -part of�4he plat,recording �. process for. Loriari Woods-.',' Lorian Woods is located within an . area: that "has .been `subjected to past.�earth movements. The risks of earth movements, are addressed. in'our.previous,report andmustbe: accepted by. the ; homeowner.. We also' re ared aletter, dated Au ust 7, 2006 that:addressed,tree removal: and'maintenance.on this'site. - The recommendations contained in -the, following sections' of this report are, based on our understanding of these desi n features. If actual -,.features 'vary or'chap es'are made we should review them'm order . . g Y g .. , _ to modify our recommendations' as required: We should review -final design, drawings and 'specifications to 'verify that our recommendations have been properly.interpreted and incorporated into proieet design. 2.0 SCOPE. OF WORK Our original work • was com leted" in' accordance with Four r 1 _p p oposa ,dated August . 2004.- Y On November ,8, 2004; we excavated 2 test pits to a' maximum depth of 11.5 feet below existing surface grades. ` .On February 27, ` 2008, ,we , supplerriented this data .by drilling . one 40 foot; test boring: Using the information obtained- from the ' previous and'.curr`ent subsurface exploration, we performed analyses:to;develop geotechnical recommendations for.project design 'and construction. Specifically; this report addresses the following: Soil and- groundwater conditions • Site, preparation and grading To Excavations • ; .Foundations ' .. Slab -on -grade floors Retaining walls/catchment wall ' Drainage '' March 31,2008 r Protect No. T-840-10 " It should be noted that the recommendations outlined in this report regarding drainage are ,associated with soil strength; .design earth pressures,.erosion; and stability:. Design Iand performance.issues'with•respect-to moisture.:.,-:: :as itrelates to•the structure envirohment,(i.e., humidity, mildew, mold) are,beyond Terra Associates' purview: N - ,' building envelope specialist or contractor should be consulted to address these issues, as needed; 3.0 SITE.CONDITIONS 31: Surface - . f The building site is" located in .the"Lorian Woods -development;'south of North MeadoWdale Road, near the 7400 ' block in .Edmonds, Washington. The building site is located• on Lot 2. And' is currently' -developed: - The approximate location of the -site is shown -on Figure 1 ' Theporion"of;the- lot containingt•he buildin -site .slopes' down to the mest `at, grades ranging g from .10 to 50. . percent: •.Along the eastern poition�of the lot and east of the•building site; the site slopes up with surface,grades that are nearly vertical for short heights. The site. is .thickly forested with mature alder, maple, cedar, and fir trees. The large trees were .r moved fro m om the site in the fall of 2007. Several.of the trees were chi ed. The g ..PP. chips were used to mulch the -site: The site.is bordered,with undeveloped;lots•to,the north and south; an existing ' residence along the top of•the'slope to the east, and`an asphalt driveway servicing the'Lorian Woods deyelopmen"t to the west. During- our exploration,; we observed surface water flowing across the building ,site area, 'The, surface: water was flowing from the slope located.eastuphill of_the building area.. The -seepage had -been artially controlled. b - a Cit of Edmonds see a e . collections stem. In the winter of partially. Y. Y Pg Y 2. O2 - - _ .• , 0 5/ 006, there was, a small landslide that ,originated, uphill "from the. plat of Lorian Woods. This' landslide - ' damaged the upper end of the collection system 3.2• Soils The soils we, observed- in' the test pits generally. consist- of 12 to. 24 inches of topsoil •overlying colluvial soils: The, colluvial soils consisted'of loose to medium dense -silty sand with occasional gravel,.organics, and blocks of silt.: • We, observed • large -diameter, nested .logs in. Test Pit TP-2'at .a depth of approximately nine'feet below existing surface grades., The soils.,observed in the; supplemental'test boririg.were consistent with the soils observed in the _ previous test pits:.' The loose to medium dense-silty'sand with gravel, organics; -and blocks of silt -were -observed,` - along, with some -layers of loose to medium dense sand with silt layers and -gravel to a depth of 40 feet: At 40 feet; we observed hard clay that we interpreted to be transitional' bed ..soils not "impacted by the historic land'sliding: ; Pa'e N g o. "2 March 31, 2008 ' . Project No. T-840-10 For a more. -detailed description of the soil conditions observed at,the test pits and ,test boring, please refer to the - ' logs attached in Appendix A. 'The approximate test pit and boring locations are shown on Figure 2. The Preliminary Surficial,Geologic'Map.of the Edmonds East and Edmonds West Quadrangles, Snohomish and ' King Counties; Washin ton, b Macke Smith,, .shows soils in the'vicinit 'of the -site consisting of Old, . g Y. .. Y :: r. ,Y .. g landslides (Qol's). The soils.observed: in the;test'pits and test boring are consistent,with this classification. 3.3 Groundwater . ' We did,not observe groundwater seepage in any'. thep 'test its:. Howe ver,.we,observed mottled :wet soils in the . -.. . .. upper_ portions of test pits and' layers of saturated -sand material throughout the test -boring:. ;Perched groundwater levels and flow rates. -will fluctuate seasonally 'and typically -reach their highest, levels -during and shortly following: the wet winter months (October through May). . City of Edmonds piezometer-P-17 is near,the southwest` corner of Lot 2. The city. has measured -the depth.to static Water level overahe-past several _years.. The_,boring log; for the piezometer "and_the city,'memo is attached in Appendix B. _ Oh February 27, 2008, swe measured the' gioundwater-in-piezometer P-17 to' be at a depth of 5.88 feet below top of casing. The top of, the:casing is about one -inch below the.top of the•monument cover: 4.0 GEOLOGIC HAZARDS 4.1 .Landslide Hazard General The site is within -the North Edmonds Earth . Subsidence 'and Landslide Hazard Area, as defined by Edmonds Community 'Development Code Chapter. 19.10. Our previous" study 'outlines •the, hazards associated with ' development ..on the. property. The hazards ,outlined in. the referenced 2007 Landau Associates study are. - consistent with the hazards outlined in our previous study. In the preparation of this.report, we have 'reviewed the referenced 200TLandau Report. Based on our., experience on -site and our observations in, the neighborhood, we', - have identified the site as being within. Zone B' as shown on Figure l..of the 2007 Landau report.: The slope immediately east and uphill from the building site lies within Zone C and D. The risk,'of earth movement in the 2007 Landau Report for Zone B consists of: .:Encroaching ,landslide debris originating upslope • : Reactivation of landslide debris causing ground failure and movement • Landsides, in ground that' has riot previously_ failed Page No. •3 . i, March 31 `2008 Project No: T=840-10 Based on our observations on' the plat since 1988, we concur -that the first, two risks of ground movement are '- ossible. • The entire site .consists .of earth that has ,moved'at some time in the ast; so the third.risk is not P P - applicable on this site., We analyzed the probability. of landsliding and movement, for our report for the plat of - Lorian Woods., We identified the hazards of earih movement in the area up`slope •from the buildinglot as.being,5 percent in a'25=year; period. We identified the,risk_of movement within the building lot as being 12 percent .in "a 25-year period. Development of the, lot involves' an element''of risk .that ,the homeowner must accept.. Stewardship of the vegetation and drainage'facilities onthe•site -will be an important element of the project'over the life of the. house. Encroaching.Landside Debris Originating'Upslope We have made periodic visits to.the plat forrgeotechnical.purposes over the past 20 years. Only one significant, episode, of.movement, has been documented to, have _occurred on or., adjacent ,to the site in that period. This. movement is the slope failure. that occurred in the winter of 2005/2006 along the upper edge of the slope above the:Plat of Lorian Woods. ,This.failure occurred immediately adjacent to a house: built in about 2000. The slope failure resulted in the retreat of'. the top'of.the slope by approximately five'to ten feet., We. understandthat the previous occupant of the house has moved,'the house is vacant, and that the. property has not been fully evaluated ' by: a geotechnical, engineer. The actual cause. of the slope faila're.has not be'en-determined. The:2005/2006. ' failure resembled .a toppling or calving of the upper 10 to 15 feet of the slope. All of the soil was either caught - behind a cedar log tliat is wedged behind a .pair of stumps. or it mounded up on the upper portion -of the slope immediately northeast of the building lot. ;The soils'froin this failure that encroached onto the building'lot and tproposed building envelope were eroded by running: water and redeposited as sediment lower on the site. Based. on our observations on=site, we estimate the `volume of failed material,as being about 40 to 50.cubic yards. , In the, fall of 2007, the older. trees on'theslope 'above :the lot were removed: A report, was prepared by. Urban - . Foresters .that cataloged the diseased trees on the slope. We expressed our concurrence with the -tree management and replanting 'report prepared 'by Urban foresters dated March .4,. 2006. - A significant -risk that. occurs during' landslides is.the action of the trees., The trees on. the site that were e found to.be diseased or,dama d�have been . g removed: The restoration -of .the trees will .result in trees that provide a canopy, but,have .smaller trunks, to reduce . ' the potential for damage from trees that may become'involved in earth, movements. The top of the* slope east and above the site -may be regarded as a' -bluff top..: Based on -the observations'. '. documented in this report, we estimate that the.re'treat of the top of the bluff may be; on the order of 10. feet per 50-year�period..Unless the, uphill neighbor -provides mitigation for the recent bluff top retreat, further retreat of the bluff will occur.. This mode of slope failure can be mitigated with a catchment wall' above. the proposed house to stop the landslide debris from impacting the house: Regular removal .of calved and eroded soils will, be re uired-on the slope above the house over the life:of the structure. We would ex ect that thesis . 9 k of this threat would be reduced in the future b im rovetnents on the:d h illpropert � . - • Y. P P _ Y .. , Provided' the recommendations contained,,iri- this report are incorporated. into site development plans, it,is 'our• opinion that the development will riot,40crease the -risk of instability or the rate of bluff top retreat above?the site. . Page No 4 _ March 31, 2008 Project No: T-840-10 ' Reactivation of Landslide Debris Causing. Ground Failure and Movement In regards, to, the risk of movement,of previously failed materials, the. second, mode ' failure in the bullet list above, should be noted. that the house on the lotimmediately; south and downhill, frorri the. site has been present' since,1964.dnd- has not received levels of damage that have'rendered `it unusable. Beneath the house, immediately east, O.Nhe site are houses on Tax ,Lots 005:13105800500 and.00100 that have beer present.since'1934: Both, of , " these ,houses are, inhabited.'. While this .does not indicate the "lack .of movement; it does -illustrate that the magnitudes; of movements that have occurred have been, manageable or are within the tolerances of. the I .I7. structures"•foundations.'' .. 1 ' To mitigate against possible`shifting within the landslide mass,' the house will be'built on a rigid g'rid.foundation. It. is beyond the scope of construction on a single lot to mitigate the possible :deep. -sealed movements_that could .'' occur into nto the future. If oundwater levels are found to rise in the. ermanent cit iezometers neighborhood the nei h .. � • ,. -permanent , . YP would need. to as a group" install drainage facilities such as horizontal wells to maintain the, water table at or ' below the current levels'. Provided the rec m o rnendations contained in, this rare." . s e ort _,. p -incorporated into, site development plans,. it is our ; opinion that the development will not increase the risk of instability on the site or, on adjacent properties., 4.2 Seismic , Based on. the,Edmond Municipal Code •23.80.020, the site is'within a seismic. hazard area. This. classification is.. due to the, presence of potentially liquefiabfe soils "beneath the site. Our review -of maps showing current'faults shows that there"are no known or suspected faults as'being within three miles -of the site. Current mapping. shows that the closest faults are the South Whidbey` faults, that extend diagonally,..across south Whidbey Island. and extend: through the-Mukilteo area north of the site. This mapping is based on infofffi tiori in the Map and Data for Quaternary Faults and Folds in Washington State prepared by the USGS,. open'file report.03- 428. " ' Based.. on-, our knowledge of 'soil conditions and local geology, per Chapter 16 of the 2006 International Building Code (IBC), site class "B" `should be:used in the project's structural design. Liquefaction is a phenomenon where, there is a reduction. or complete loss rof soil strength due to:an increase in ' water pressure induced by vibrations..',Liquefaction mainlyaffectsgeologically. recent deposits of fine-grained ` sands that -are below the groundwater table. Soils of this nature derive. their strength from interanufar friction. The generated water pressure or pore, .pressure essentially separates 'the soil. grains ,.and :eliminates this intergranular, friction, thus eliminating the soil's.strength.:. Based on ' our knowledge of, the , soil . and groundwater; conditions, it is our 'opinion. that there is, a risk for liquefaction 'to occur'at:this site, during-;an'earthquake: %The risk from' rom-liquefaction would exhibit itself 'as differential settlements in the building. The.proposed building will be built. on id'id a riggrfoundation to mitigate for possible lateral _shiftsAdue,to land subsidence from landsliding..This, mitigation, will also'mitigate against the. ~ risk of foundation'settlement due to liquefaction. ' Page No 'S % March 31 '2008 Project No: T-840.40 ' 4.3 Erosion Based on the Edmond Municipal .Code 23.80.020; the,site is withiri"an:erosion:hazard area. This classification is based on slope inclinationI,and the presence of •seepage on the site. The site:,has' had tree removal performed in accordance with a'free removal plan; prepared by others:, The sitewas.mulched following.the'-removal of the trees.. -We have not observed ,any signs. of erosion. related issues-on`the site over.the• course of the winter of 2007/2008 including a site visit following the, heavy rains of the: first week of December 2007. - Development of the site will include a temporary erosion and sediment control -plan.. Erosion will be managed through the con'structiori. period using -established BMPs:. . 5.0 DISCUSSION`AND RECOMMENDATIONS 5.1 General, As noted earlier., the site is"in a mapped landslide hazard area Relative risks, of slope movement are discussed in, ; our --June ;61 1989, reportand in the 2007 Landau-,Asso6a' tes Summary Report. Provided the owner is,willing, to ' accept the risks, associated with slope instability at,tfie'site, in our opinion, the -site conditions are suitable for the :proposed construction.,: We fe' commend the structure 'be supported on a mat/raft' foundation, ^bearing . on the existing.colluvial soils or on structural fill placed above these colluvial soils:. ' ' A surface Swale should`be constructed along the uphill side of the house' above the proposed landslide.catchmeni wall...' The, swale should span the entire -width of the building area 'and- discharge ,into the .Plat,'torm system: The catchment wall indicated on the ,drawings should conform to the design recommendations outlined on Figure 4. The site soils contain significant amount of fines and will be difficult to compactas structural fill when too wet. :The ability, to, use native soil from site excavations as structural fill will,depend 'on the soil's moisture content and the prevailing.. weatherconditions of the time of construction. 'If grading activities take=place during the' winter season, the owner should be, prepared to import free=draining granular ,maferial for .use, .as. structural `fill . and backfill., No fill.may:be placed�that will raise existing site grades., All'soils excavated from ahissite and not used , as backfill must -be removed from the site.. ; The .large cedar log and accumulated- soils along the upper' slope should. be- removed. ,.,This; work will need to -be done using either'by hand or light weight equipment.., Thesoils and log should be removed from the' site.' - Detailed recommendations regarding these issues and other geotechnical design! considerations are rovided, in . the following sections -of this. report. These_ recommendations should be incorporated into -the finaledesigh. drawings.and construction specifications. _ i. Page No 6 March 31; 2008 Project{ No. T S40 ;10 5.2 Site Preparation and Gradingr, To .prepare, the site for .construction, all vegetation,, organic surface, soils, and ,other deleterious:materials should ; be, stripped and removed from the building area. Organic topsoil,will not besuitable for use as structural: fill, but, ,. may be used' for limited` depths in nonstructural areas.' Once'clearin and stripping,o erations are m , • Y, .... P _ gp,.. complete, -.. excavation can'be initiated,io establish desired grades Final site, grades should be either the same as existing site grades 6r4ower ,No fills should .be placed on -site that result in raising existing ,site grades. Soils ekcayated from the site. that are not .needed for foundation backfill ` ,must be exported from the site: '14 -Following. excavati{on,. all exposed ,bear"ing surfaces should be observed by'a, representative of Terra Associates. If.excessive I' soft areas 'are ;observed and ,cannot;be stabilized in place Eby compaction; the affected soils should be 'excavated and:removed- to firm bearing- and grade restored with new structural fill: If the depth. of excavation to "remove unstable soils'is excessive, use .of a„geot6xtile reinforcing/separation -fabric, such 'as Mirafi 500X' or equivalent; can-bei considered in conjunction ,with" ciean granular structural fill. Our'experience.has. shown that;' . '"in general, a minimum of 18 inches of a clean; granular structural fill `over the geotextile`fabric should'establish a stable bearing surface . Our study, indicates that the colluvial soils'contairi.a significant,percentage of fines (silt -arid clay -sized particles),: - which makes'. them difficult to .compact as structural fill if they 'are too wet or too dry... Accordingly, the•ability to, ' use native soils from. site,excavations,as structu'raL fill will de end on.their'moisture content and theprevailing- p weather condition's when site grading activities take place: \ If .grading activities: are' planned during the wet ,winter months; ; or if they. are initiated during the; summer and extend into fall and winter, the owner should be prepared to.import wet 'weather"structural fill.' For this purpose, we recommend importing a clean,granular soil that meets the following`.grading requirements: _V.S.. Sieve Size Percent Passing,,.,, �6inches il100 No: 4 75 maximum No. 200 "5 maximum* March 31,,.2008 ti Project No. T-840-10 5.3 Excavations'" ` All, excavations at` the site ,associated with confined spaces (such `a's utility trenches), must be' completed in accordance with .local, state; or -federal requirements.,, Based on current Occupational`, Safety',and Health Administration (OSHA) regulations, the loose to medium dense colluvial soils would enerall be classified as. ,generally ... Type "C" soils.' Accordingly, side slopes on temporary .excavations"should be laid back at a gradient of :1.5:1 (HorizontalNertical) or•.flafter If•these slope inclinations cannot be achieved due to site, constraints;'temporary ; shoring may be required; Depending -on the time of year and weather conditions when excavations take`place,,.groundwater seepage may be encountered within excavations,extending deeper..than',one-foot below existing, surface 'grades..: Based on our study, the.voluirie of .water and rate of flow,into the excavation should be'relatively.light, depending on the tune of '.year and the -height of the `exposed .seepage face. Dewater--ing' using ' conventi6d 1� surnp=pumps should be adequate'inmaintaining a,relatively dry excavation.' , ,., .This information is, provided solely, for the benefit of the. owner and other design consultants; and. should not be ' construed'"to :imply that Terra Associates; ;inc. assumes responsibility'for fob site safety., It is understood that job site safety -is the sole responsibihty.'of the project,contracto' > 5.4 Foundations We recommend the structure be supported on a raft foundation.consisting of.a connected grid of grade;beams that bear ogthe existing colluvial soils or on structural fills placed above these soils No isolated column pads".should '- be used for: structural support.•. We, recommend designing this ,foundation for a net allowable bearin .ca acit of'. 1,206. pounds per square foot (psf).; For short-term loads, such -as. wind.and seismic, a one-third' increase in'ihis allowable capacity can' be used Foundation subgrades should be prepared, as recommended in Section 5.2 of this report:.' Perimeter foundations' exposed to the weather should bear;at-; a. minimum depth- of It 5 feet below' final t_ exterior. grades for frost, rotection: For designing foundations to resist _lateral .loads, a base friction coefficient of.0:35 cah'be' used. Passive earth, pressures acting on the sides` of the, footings can also be ;considered. We recommend calculating. this... ateral resistance using an equivalent fluid .weight of 250 pounds :per cubic foot (pcf).. We recommend not `including -the, -upper 12 inches of soil in this computation'beeatise it :can be'affected by weather.or'disturbed, by,-futuie.grading activity. This value'assumes the foundations will;be constructed neat,againstcoinpetent soit and backfilled with structural fill ' as described in Section 5.2-of1his re port:, •The values, recommended include a safety factor of 1.5. ' 5.5- Slab -on -Grade Floor's-'"; < Slab-on=grade floors may besupported on "subgrade„ as recommended ;in Section 5'.2,6f this report: Fill should. ' not be placed to raise site grades above the existing elevations -to support slab -,on -grade floors'. If the main'level.' floor,will be above existing site grades, we.recommend the use of raised'.wood,floorsframed over a crawl -space: , _ ' - Page No. 8 ; March 31, 2008 Project No. T. 840-10, . Immediately below slab -on -grade floors;'we recommend placing afour-inch thick capillary break layer of clean, free -draining,,. coarse sand, or fine gravel thaf has less than -three percent passing the No: 200 sieve.' This material P p g will reduce the :potential for' upward capillary -movement of water through the underlying •soil and subsequent wetting of the floor slabs.' The;. capillary, .break, layer 'will not prevent moisture intrusion' through the slab caused_ by water,. -vapor transmission. Where moisture by. vapor transmission isundesirable, such as ',covered floor areas, a common practice is to place a durable, plastic membrane.onthe capillary break,layer'and'.then:cover'the.,membrane with 'a layer, of clean sand or fine gravel to, protect it from damage, during construction; and to aid iri uniform curing of the concrete slab. It should, be noted that if the sand or gravel layer overlying the membrane is,saturated•prior,to ' pouring'the slab, it -will be ineffective in.,assisting uniform curing, of,'the-slab and'can actually serve as a water supply, for .moisture transmission through the slab and, potentially affect floor coverings. _Therefore;. in our opinion, covering the membrane with a layer of -sand or gravel should be* avoided if floor slab construction occurs during the wet winter months. and the layer cannot be effectively drained. , -Other methods Are.. available' for preventing or,.reducing watervapor transrriission .through,' the slab:. We recommend consulting with a building envelopespecialist 'or. contractor for additional Assistance -regarding this ; ,P g g issue. 5.6 Retaining, Walls' . The magnitude of earth pressure development -on. below=grade walls, such as basement walls,'^will partly depend on the quality of the_ wall backfill., We recommend placing and compacting wall backfill as structural fill... Wall 'backfill below structurally loaded areas;'suc' h as pavements •or floor slabs, should be compacted to a,minimum of 95 ercent `of its ' maximum dr . density,: as 'determined b , A T p y y, y ASTM Test -Designation'D-698 (Standard Proctor): In, unimproved areas, the relative'compaction'can be reduced to.90 percent: 'To guard against, hydrostatic, pressure development, drainage must be installed behind the wall., Atypical wall drainage detail is shown on Figure 3: 'With wall backfill placed and compacted as recommended and drainage properly installed, unrestrained .walls can be designed for an active. earth piessure'equivalent to a'fluid weighing 35 pcf.: For restrained :walls, an,additional ' uniform lateral pressure- of ,100 psf, should be :included: For evaluation . of below -grade walls under seismic loading; an additional "uniform load -equal to. 8H psf; ,where His. the' below -grade height of the wall. can' be used: These: values assume a horizontal backfill condition and thavrio other surcharge loading (such as traffic; sloping . embankments, or adjacent buildings) will act .on the -wall. such conditions exist the imposed loadin must be g: _ � .P g • included in the 'wall•design::,Friction at the base,of the wall' foundation and passive earth 'pressure will provide resistance to. these. lateral Loads. Values for these .parameters are provided in' Section 4.4 of this report. 5.7 Catchment Wall ; ' A landslide catchment retainin . wall. is to be, built on..the east- side of. the. home. Recommended- soil parameters • g. r for design are shown on Figure ,4. •' We recommend, drainage board beplaced as shown :on Figure 3 to prevent hydrostaticpressure from developing behind, the buried portionof the wall. ' Page No. 9 March 31, 2008 Pro'ect No. T-840-10 , The catchment wall, as currently designed, should be adequate in protecting the property ;from soil instability discussed earlier -in "this report,. With this .,wall. and, the: other recommendations' outlined • in this, -report, ort implementing'the`pro posed development will not increase the potential for soil movement; in'.our;opinion: . ' Any, soil or' sediments` that accumulate above the catchment wall will need to be fully .removed in a timely manner-Ne recommend that removal be planned to occur -within orie'to two weeks of d6pogition.N All soils, from ' above the wall,will'need to be�disposed.of off site , 5.8 ' •Drainage , Surf ace Final'exterior grades should promote free•'and,positive`drainage'away from the building area.,,•We'recommend 1. ,. providing a , gradient of at least three percent for `a iiinimum, distance of ten feet from the building 'perimeter, except in paved locations. In paved'locations,:a minimum gradient of.two percent should be provided, unless. ' provisions are included for collection and disposal of surface water adjacent to the structure. All downspout drains 'need to'.be collected%in tightlines and.be.routed to the•plat storm drainage system: We recommend the use .of rigid pipe for. all tightlines. Cleanups' should be provided, every 20 feet to facilitate ' maintainace of the drains. All downspouts.and gutters should be kept clearand free.flowing at all times. To prevent surface, water flowing off the,adjacent, hillside from impacting foundations, we recommend installing ;. a surface swale along the uphill side of the catchment wall., The swale should -extend the entire'width-of the wall and convey surface. water 'to, an, appropriate point of controlled discharge into the. lat stormwater. system located in -the street below the Site. The collected surface water should'not be discharged into the existing slope drainage system currently operating along the south side of the building site. •A surface seepage collection system is, being designed by Western Engineers. - The -system :will replace the upper, ' ' portion .of the former City of Edmonds seepage' collection system that was damaged in the, previous .earth ..movements. The new system will rely on the'`use of .surface collection troughs and -flexible HDPE collection pipes: The use of surface pipes will facilitate maintenance and will allow flexibility .of the collection. system., The ' surface drainage `system should be maintained -.'on' a regular - basis:' . This .will' include shifting. or adding troughs. All surface seepage and, runoff collected on-site,inust be routed. to the site •storm drainage. system. If' ` 'water -features are included iwthe final site .fayou_ t'-along the' house, the channels to carry surface. water must be lined 'with a welded HDPE membrane. A detail'for use in'the design of surface water features is shown in the drawing entitled ,City,of Edmonds Lorian Woods Drainage Collection : prepared for the Ci y'of Edmonds 6y;R W ' ' • Beck, dated`June 4, 2003 ` . No infiltration of surface' runoff should be allowed to occur. Subsurface We recommend installing a continuous drain_ along the'outside lower edge of the perimeter building foundations. The foundation drains -should be tighthned separately from the roof drainage system and discharge into the plat storinwater'system located in the Istreet below the site. ',Subsurfacedrains must be laid with,a gradient Sufficient' . . 'to • promote. positive flow ,to the .point of discharge All drains : should ' be :provided with' cleanout's 'at, easily. accessible locations. .These cleanouts should be. servicedat least. once every year:'. ' Page No. 10 , ' March 342008 Project No. 'T-840-10' 5.9 ' Slopes and Embankments ; All permanent 'cut slopes should be graded• with .a finished inclination of no greater than 3:1." 'No fill slopes ' should be created on the site. The existing near -'vertical exposure of soil at the -eastern point of the.building ; envelope should be regraded through cutting to flatten. the slope to a 3:1- slope. or flatter.. Upon completion of, - grading, the slope face should be trackwalked and.appropriately vegetated or. provided with other physical means .: to guard against erosion. Final grades at the. top of the fslope•must-promote surface drainage awayfroinahe slope..- , ' crest. Water must not be'allowed to flow uncontrolled over the sloe face. If, n - p e runoff must be directed towards the slope, the runoff shouldbe controlled at the.iop of,the slope, piped in'a'closed conduit installed.on the slope face, and taken to an appropriate point of discharge beyond the toe.. 6.0. , ADDITIONAL SERVICES " .' Terra Associates, Inc. should review the final project designs and specifications -in oider'to'verify that earthwork and foundation-. recommendations have been-, properly - interpreted.; and incorporated into project design. We -should also provide geotechnical services during construction to observe compliance with our design concepts, ' specifications, and recommendations. This will allow for expedient design changes if subsurface conditions differ from those anticipated prior"to the start of construction. ; 7.0 LIMITATIONS . We prepared this report; in accordance with generally . accepted geoteclnical engineering practices. No other warranty,'expressed or implied, is made. This report is the copyrighted property of Terra Associates, Inc. and is intended foi specific application to the Lorian Woods Lot 2 project in Edmonds,.Washington., This report.is,for the exclusive use of Brian and Cindy Isaacson and his authorized representatives. . " The analyses and preliminaryrecommendations presented in this report are based- on data obtained' from the on - site test pits. 'Variations in 'sbil condition-s can occur, the riatu're- and extent 'of* which may not become evident until construction. .If variations "appear evident, Terra. Associates, Inc.:should be requested to reevaluate'the recommendations in this report prior'to proceeding with construction: . -Page No. `11- - 11tiTH ST SW ., , c4 /` �._� 51 itVS1:v' 0 � M*hi4wUrt' r i 4Frrr -" • R y _ - J'a/ - S' ice' .i6dLF ZOLIRSE'd- I l v 1, SEE 0? P 'r y., i., i - - --• - - -- - � -� - ,- r ';P"�7'C� ' \1�= -f� - �-" � i GaEf'9�UCN Cr -. =1,.�4,. .� � I— . - - -- - - '- j2 81wimr.ct k' 4 a.'1� O n PIYtE21 C' a, o 1Infim7 tT JfBVC�S P `t!'Otn rt r>f3fm riza ME11 �SffP sv�l , �y`'•. .; �, �\ ' ; / i. I �� � y/ � i 5t i' Jc,i;. -o�, 1 '� i' Z`orrly t •,•;` �coNt: f{j ; �� • 4l �� 1i' Hh tBOUR i ;4oG 71 i- �',,f, o�i. T'`'„�i.ti `.� 4r',r�`'/•rt 1rT'.r, a ?' {�'�, �t . ! of �Uf• r . O zi r. rll _T4 �_4[ "S _It? ilk �ci`?'->�•'��.. = 4 1 �i SY S ,af _-- _. _.- . _. _. _ - _ - __. %rOy ._ -Gv --_•. .5, i.N`�n•` Wia� S ; - "-F f�-1 -v'.t�l.y �� i� N r!~6� _ h� �. �.1i .f • A z i r ItQT -, ? T ci�?8Yn ` i•' r\SSL4 ti� l i` ,,.,_ k (' /` !'. e\�(- e`rU$SFS9i PICIlTC FT i 41 K ♦}YID!^ `'� I .fir i' TTTTira` r N r 1 r JI' ' (• � �\ ' r --- -- -'_ C' j� _E �. � ti r u•4'3Y v pal � � ,r`b: 1 �'"I "`w J32ub 13,RDST SW FT 51. a r {E. o� �' �J. ?• $W !._ .4� C n S7 Sti 'c J -13pJ / , p% 1- _ ��.. o jj 1 •ICEp 5 ( .c'•`i;• yti. I' T �g241G �'Iq,�c` r;,:rC rli 'n.`��3JrHJnj(.�_�"vY� �p3�� .r,y T`i6TlC':• r{J.' 4lll! 34 �- PUGET (( y 1 srJ { r ,b• CTIJ�O/N SW z + SOUND .. ' r ' ',a .'.. 4' � ° j I � {j . tea, � `{ .Q\. q- lrrcu r. ua , _ 1 �� Sr _ s i P1CNI si 1, r . 4 fffi j t� t 140 ST S14 3 C +a POIt�T` k it 3 }, I :3 s 33 = iEa R�)QJ S7 wI " /r i { , .•I s a a 1�1ST- S3 �a,i•= SyF j L4Kf �14c11D, alv Si .. _'n _ . ^ 'arSi 3r�_ •? __'a b�; �i� r, �l' ..� -' - 4 S1f I n. `?,< I '� 'NORMA i ,�43s ¢ 144111 St 6t' ?<'> ," .,-ar/ 1 I f� ,t iN fr I I9.ry- LiJ tL41i1,1 GI �.. ( { i L ! IM 1 fA _ J�iO BEACH I 1 1•bi,'.: I Orri nS/{ IuitlP _1t ,nJ n,j c4 j %! I I n _ .y RU s to l 1 � e'• t � �;, "•� 7 Ic 14i1 a' $ -1LOiF' I = ..Cll 7•11 rt .;vz FISHER 3{• F Jt } ;� 148T.14;1•r"M;,u,< S ST y Q' 1µ _I rl' c� a sr " tJ IHORM4r SW I rl u c' i 4551i „ 4..Oir BEACH rr B 51 �50 'r 'a, 'SN PL 1491h PI . Ski SW f ;�! - a4 � �y J N r ss, 7, _ 5T SN � ,r� a � -I� r II i 3 I n ST• �I,, . I �15 r ST SW�, . - . � ��q � � - i Jsrrrn M , Ltv Sa��calN s l.l' 1`2JD Sl SW +F• xy t r 1 3RD. 3'IF - 3 s-� �3 1S?uq �1. $7 SM i Ski, r541M i=1 j -156TH�1,r-- ffi:$'G47"� 6 .I a�''I Su . •Q tll{ r_n - rule of . .i �':JSJiw 51 a - tI}1� u't? ' .SW I �, 3•t ( 4..5•,c4'' ryL.� 156�H P/ 1 irti� n ,, > ; 40 jMFAnowrm LC - T3t a c ( 1n,sl .ce t587(I a, J. erg I ! ! 1_ .. ..c .— 4 . 1 - 4 J 1r 91ri r 141�RINE - f ,S69fii�i _ t �W --- T i- I ,. , sr PI H•�- it"N ' 159THfP1: SW. Ss 5N -- -- K E E f a • i �D� GJT I of 54 r� 160TH ST rnJ � SW i r=- r I 1� i v, !F Coln Pf"S1, x, ,> r�Pli 192uo r 161SS1. r (�❑ BROWNS 1`\' i 61SI ;, sl . j !:+`� J �J 163r'J6- ::I., ,_-:-i ltZlrl: lt'2dp {'L SW0 I, BA)` \ 1 4 a �= ^T s4 I ST i SW of ST 1w PL rR, .. iG3RD r sw m 1G4TN }PI. sw RQ.,�"� 1 �s a ° � sW o IF)rp s,flj, 3 ` ; 164TH.' i lfSTl1 I-_ i'L u tttaYsi •a.4�� 'n '' I' Ib471i�f 1 tf :J61. N. 5I� i,'; ¢' t• J i,1f5TH� PL<I, r1WO)DIvL J �. �J6�1H • .. - � ' ��_ ! o '-"s'-.:'t4'99 ' , SW o...i = FL -' c�5,131. , � 'a4•/� • / IVY ii-S4; . 166IM A`�It - `;�' , � ^. `1ti�>n✓ ' ! .. � e �a G . - . I} „66iti f'L' '.-:� ----, _'-_•:_.z— Y II.-L_-;.__�J_ REFERENCE. THOMAS GUIDE CD-ROM,.KING/PIERCE/SNOHOMISH COUNTIES, 2004 NOT TO SCALE Terra VICINITY MAP . LORIAN WOODS LOT 2 Associates, Inn. _ EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Pro No.T-840-10 Date MAR 2008 Figure Environmental Earth Sciences , 1' 1 CATCHMENT WALL - s LANDSLIDE DEBRIS- r SLOPE 4 LANDSLIDE , ANGLE IMPACT FORCE H 1 = 3' MIN. 22° /4K�FT -. H,1 ; 45 pcf 250 pcf PASSIVE PRESSURE. ACTIVE PRESSURE _ B ; NOT -TO SCALE LEGEND:' :. 'H1 .LANDSLIDE 'CATCHMENT. HEIGHT (3,,FEET MINIMUM) ` H ` PERMANENT RETAINED HEIGHT.(ft) D'.' FOUNDATION, EMBEDMENT DEPTH (ft) ; Terra TYPICAL SOLDIER PILE cATcHMENT'WALL ::r;;;:,• • .••.• Associates-,, IC.': LORIAN WOOD'LOT 2, EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and .11 Environmental Earth Sciehces '. Proj: No.T=840_10- Dat. -MAR 2008 Figure 4. 1 1 1 1 1 APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING Lorian Woods Lot 2 Edmonds, Washington On November 8, 2004, we explored subsurface conditions at the site by excavating 2 backhoe test pits to a maximum depth of 11.5 feet below existing surface grades. On February 27, 2008, we supplemented this data by drilling one 40-foot boring. The approximate test pit locations are shown on Figure 2. The Test Pit Logs and Boring Logs are presented on Figures A-2 and A-3. A geotechnical engineer from our office conducted the field exploration, maintained a log of each test pit, classified the soils encountered, collected representative soil samples, and observed pertinent site features. Our representative classified the soil conditions encountered, maintained a log of each test boring, obtained representative soil samples, and recorded water levels observed during drilling. During drilling, soil samples were obtained in general accordance with ASTM Test Designation D-1586. Using this procedure, a 2-inch (outside diameter) split barrel sampler is driven into the ground 18 inches using a 140-pound hammer free falling a height of 30 inches. The number of blows required to drive the sampler 12 inches after an initial 6-inch set is referred to as the Standard Penetration Resistance value or N value. This is an index related to the consistency of cohesive soils and relative density of cohesionless materials. N values obtained for each sampling interval are recorded on the Boring Logs, Figure A-3. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS) described on Figure A-1. Representative soil samples obtained from the test pits and boring were placed in sealed containers and taken to our laboratory for further examination and testing. The moisture content of each sample was measured and is reported on the Test Pit Logs and Boring Logs. Grain size analyses were performed on two samples. The results are shown on Figure A-4. IProject No. T-840-10 1 1 1 1 1 MAJOR DIVISIONS LETTER SYMBOL TYPICAL DESCRIPTION Clean GW Well -graded gravels, gravel -sand mixtures, little or no GRAVELS Gravels fines. C0 i (D m (o less than GP Poorly -graded gravels, gravel -sand mixtures, little or O ca N More than 5/o fines) no fines. (n 75 50% of coarse fraction is GM Silty gravels, gravel -sand -silt mixtures, non -plastic 0 W a) larger than No. Gravels fines. GC Clayey gravels, gravel -sand -clay mixtures, plastic fines. m Z ca .d) E 4 sieve with fines Q o 0 LLON d SANDS Clean Sands SW Well -graded sands, gravelly sands, little or no fines. U) Ca Z (less than SP Poorly -graded sands or gravelly sands, little or no c More than 5/o fines) fines. Q �� 50% of coarse O o " fraction is Sands SM Silty sands, sand -silt mixtures, non -plastic fines. 0 0 smaller than SC Clayey sands, sand -clay mixtures, plastic fines. No. 4 sieve with fines ML Inorganic silts, rock flour, clayey silts with slight o SILTS AND CLAYS plasticity. CL Inorganic clays of low to medium plasticity, (lean clay). �o O M N E o Liquid limit is less than 50% OL Organic silts and organic clays of low plasticity. W o �'V5 Z ca Lo a (D = a) MH Inorganic silts, elastic. m CO SILTS AND CLAYS W " Ca E CH Inorganic clays of high plasticity, fat clays. Z_ 0 (n Liquid limit is greater than 50% LL OH Organic clays of high plasticity. HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS AND SYMBOLS U) cn Standard Penetration Density Resistance in Blows/Foot 2„ OUTSIDE DIAMETER SPLIT I J SPOON SAMPLER 0 Very loose 0-4 2.4" INSIDE DIAMETER RING SAMPLER Un Loose 4-10 OR SHELBY TUBE SAMPLER = Medium dense 10-50 Dense 30-50 1 WATER LEVEL DATE (DATE) Very dense >50 Tr TORVANE READINGS, tsf Pp PENETROMETER READING, tsf Standard Penetration w Consistency Resistance in Blows/Foot DID DRY DENSITY, pounds per cubic foot > Very soft 0-2 LL LIQUID LIMIT, percent w Soft 2-4 = 0 Medium stiff 4-8 PI PLASTIC INDEX U Stiff 8-16 Very stiff 16-32 N STANDARD PENETRATION, blows per foot Hard >32 Terra UNIFIED SOIL CLASSIFICATION SYSTEM QSSOCIateS Inc. LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Proj. No. T-840-10 Date MAR 2008 Figure A-1 Geology and Environmental Earth Sciences Test Pit No. TP-1 Logged by: BPK Date: 11 /08/04 Depth eft) Soil Description Approximate Elev. 149 Moisture Content (12 to 24 inches TOPSOIL) 31.4 Bluish -gray, tan, and reddish -orange silty SAND, occasional gravel and organics, scattered lenses of silty clay, moist to wet, loose. (SM) (colluvium) 20.3 5 Wet below 5.5 feet. 29.6 Sandy below 8.5 feet. 21.8 10 36 Test pit terminated at 11.5 feet. No groundwater seepage encountered. Moderate sidewall caving from 0 to 11 feet. 15 Test Pit No. TP-2 Logged by: BPK Approximate Elev. 140 Date: 11 /08/04 Depth Moisture (ft.) Soil Description Content(pia) 0 (24 inches TOPSOIL and PEA GRAVEL) Bluish -gray, tan, and reddish -orange silty SAND, rare gravel, occasional 14.5 organics, scattered lenses of silty clay, moist, loose. (SM) (colluvium) 26 1 5 Wet below 5.5 feet. Medium dense below 6.5 feet. 28.2 37.8 Large diameter nested logs at 9 feet.. 1 28.6 Test pit terminated at 10.5 feet. No groundwater seepage encountered. No sidewall caving. 15 EiogTerra Associates, Inc. Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences TEST PIT LOGS LORIAN WOODS LOT 2 EDMONDS, WASHINGTON Proj. No. T-840-10 I Date MAR 20081 Figure A-2 r 1 1 1 11 LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Elevation: N/A Pocket Penetromete o TSF a c — Soil Description Consistency/ 1_ ? _I. _ .4 - Observ. a, Relative Density y o Moisture Content /o SPT (N) Well o. Wp ---x ----- I WI • Blows/ft • oE CU co 10 30 50 70 90 10 20 30 40 t I ! I i I I I Blue -gray silty SAND with gravel, fine to 2 coarse grained, wet. (Landslide debris) I0 . • .�.. Loose O 1 I I 3 1& 5-1 --------------------------- ---------- 345 ( 6 ;X: I I I I I I I ! g j �. I....I.... Yellow, orange, gray, blue SILT with Loose I I I 7 small sand layers, fine grained, wet. Landslide debris i 9 --------------------------- ---------- 10 Brown SAND with silt, fine grained, 2g':6 I " ;1 2 moist. I I i *Soil becomes saturated. I 12 Medium Dense 19.5 I 113 1 1 1 13 *Soil has less silt. z : ; o• �• • - 14 �....� �.._ .._ . *Soil has more silt. + + 1 15 25:1 j.1.- X: 16 --------------------------- ---------- 17 I t 1 I 18 Tan SILT, moist. (Landslide debris) Medium Dense •� + F 19 ; . , I ...; ;....�.... i .. 20 --------------------------- ---------- 15 .21 ,. ;. ..... a , .. t....l...... Brown SAND with silt, fine to coarse I 22 grained, saturated with a 4-inch silt layer I 2 inches from bottom of sampler. I i i ! 23 Loose ... i .. . I . . i I 24 I I �. �. ..�.. *Continued on Next Page. 25 +...J....�....t... Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location and should not be interpeted as being indicative of other areas Associates Inc. of the site. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences 1 1 1 I 1 II LOG OF BORING NO. 1 Figure No. A-3 Project: Lorian Woods Lot 2 Project No: T-840-10 Date Drilled: Feb 27, 2008 Client: Brian Isaacson Driller: Bortec Logged By: CS Location: Edmonds, Washington Approx. Elev: N/A Pocket Penetromete m n TSF n a Soil Description Consistency/ Relative Density Moisture Content o /o 1 2 3 4 Monitor Well £ n E Wp-----x ----- I WI • Blows/ft • o CU 10 30 50 70 90 10 20 30 40 26 Brown SAND with silt, fine to coarse 27 grained, saturated. Medium Dense € s € 28 I I .. 29 --------------------------- - ----- - --- �.. 30 i € 12 it I • 31 _ s.. I 32 Gray blue CLAY, moist. Stiff E 33 34 I 1 d € ! , 35 --------------------------- ---------- 33.k€ I 11 36 37 ; Gray purple SAND with silt, fine grained, Medium Dense I f 38 wet. 39 I R € € I 40 --------------------------- --------- - ) 45 q1 Blue -gray CLAY, moist. Hard x, ; ! • 1 ! 42 I Boring terminated at 41.5 feet. I I 43 44 45 I 46 F € 47 t 48 49 ( ! € I 50 .. ...... . Terra Note: This borehole log has been prepared for geotechnical purposes. This information pertains only to this boring location ASSOCI ateS Inc. and should not be interpeted as being indicative of other areas of the site. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences i� e. 1 11 1 1 I F APPENDIX B CITY OF EDMONDS PIEZOMETER DATA 11 ' 12:1,7/2007 15:20 FAX 425 778 4499 HANSEN NCLAUGHLIN (J 002 t DRAFT TECHNICAL 14 LANDAU MEMbRANDUM ASSOCIATES ' TO: Don Ftene, P. E., Assistant City Engineer City of Edmonds Development Services Department, Engineering Division FROM: Dennis R. Stettler, P.E. DATE: January 24, 2007 RE: PIEZOMET.ER INSTALLATION AND DRAINAGE RECOMMENDATIONS LORIAN WOODS SUBDIVISION EDMONDS, WASHiINGTON INTRODUCTION AND PROJECT BACKGROUND This technical memorandum presents the results of a piezometer installation within a portion of ' the Lorian Woods Subdivision and an assessment of the groundwater conditions with respect to proposed modifications to the dT-Wuage system. The purpose of these services was to evaluate the current groundwater conditions and to provide consultation to the City of Edmonds (City) related to the design ' and construction of a replacement drainage system. The piezometer was installed on the paved shoulder of 73"' Place West, about 250 f3 south of the intersection of 73T4 Place West and North Meadowdale Beach Road. The piezometer location is shown on the Site and Exploration Plan; Figure L The Lorian Woods Subdivision is within the designated North Edmonds Earth Subsidence and Landslide Hazard Area, and control of surface water and groundwater in ' the area improves overall slope stability. 1 Springs and groundwater seepage from the steep bluff on the east side of the Lorian Woods subdivision had been collected by a surface water collection system (Drainage System I A) constricted at the base of the bluff by the City as a part of Local Improvement District (LID) drainage improvements completed -in the 1980s. Landslides, originating on the bluff above the drainage collection system on and above Lot 2 and the adjacent common area to the south of Lot 2 in the Lorian Woods Subdivision, have destroyed or damaged portions of the drainage collection system. The landslides are the result of a very steep bluff face and the presence of seepage on the bluff. The landslides are occurring above the drainage system and are not related to the presence or function of the drainage system (the drainage system is intended to improve slope stability conditions below the drainage system). The recurring landslides from above the drainage system, the presence of landslide debris, and leaning trees on the steep slope have created a hazardous work area for City workers to repair or replace the drainage system in its original location. The City is considering alternate drainage systems as a replacement for the existing system (Drainage System IA). This could include working with the property 130 2nd Avenue South . Edmonds, WA 98020 • (425) 778-0907 • fax (425) 778-6400 • www.landauinc.com 12/17/2007 15:21 FAX 425 778 4499 RANSEN MCLAUGHLIN @ 003 1 owner of Lot 2 to design a surface water collection system that would be built and maintained by the property owner as a part of the overall proposed property development. The private drainage system would then feed into the City system. Previous conceptual surface water drainage systems for this location have included consideration of a shallow groundwater drainage system. If shallow groundwater is present, it would be appropriate to construct a subsurface drainage component into the new drainage system to intercept groundwater and convey it to the City collection system. However, limited groundwater information was available to know the depth of groundwater near the proposed surface water drainage system, and the City requested that Landau Associates install a piezometer at this location in order to measure the groundwater Ievel. SCOPE OF SERVICES Landau Associates' scope of services included installation of a piezometer to monitor ' groundwater levels and consultation related to the design and construction of a replacement drainage system. Our services were provided in accordance with Task Order No. 06-05 under the On -Call Geotechnical Engineering Services Agreement between the City of Edmonds and Landau Associates. The scope of services included: it 1 1 J I 1 • Drilling a boring to a depth of about 20 fl and installing a piezometer using a licensed well driller under subcontract to Landau Associates to monitor groundwater levels. • Coordinating the boring and piezometer installation by a Landau Associates geotechnical engineer, including locating the boring, checking the boring location for buried utilities using the one -call public utility locate system, monitoring the drilling of the boringi preparing a log of the boring noting the soil and groundwater conditions, and observing the installation of the piezometer: • Monitoring the groundwater level in the piezometer three times after completion of the piezometer installation. After that time, the piezometer can be included with the system of other piezorrieters in the North Edmonds Earth Subsidence and Landslide Hazard Area that are monitored by City personnel. • Preparing this technical memorandum that provides a log of the boring and monitoring well, the installation procedures, and the results of groundwater monitoring. • Providing additional consultation related to design and construction of drainage measures. FIELD EXPLORATIONS Subsurface'6onditions at the project site were explored on October 2, 2006. The exploration Program consisted of advancing and sampling one exploratory boring and installing a piezometer (P-17) at the approximate location illustrated on the Site and Exploration Plan, Figure 1. The exploratory boring 0124J07X""datalPi*CfSW7411iMZOtWIAMPlozolneulWan Im.doe 2 DRAFT 17/2007 1.5:21 FAX 425 778 4499 HANSEN DICLAUGALIN Q 004 was advanced to a depth of about 21.5 R below the existing ground surface (BGS) using hollow -stem auger drilling techniques. Holocene Drilling, Inc. of Graham, Washington, under subcontract to Landau Associates, advanced the boring. The exploration was located approximately in the field by hand taping from existing physical features and referenced to a site map provided by the City. The ground surface elevation at the exploratory boring location was interpreted from the elevation contours on the site map provided by the City (which is referenced to an arbitrary benchmark). The field exploration program was coordinated and monitored by a Landau Associates geoteclunical engineer who. also obtained representative soil samples, maintained a detailed record of the subsurface soil and groundwater conditions, and described the soil encountered by visual and textural examination. Each representative soil type observed in our exploratory boring was described using die soil classification system shown on Figure 2, in general accordance with American Society for Testing and Materials (ASTM) D2488, Standard Reconrrnended Practice for Description of Soils (Visual -Manual Procedure). A summary log of the exploratory boring is presented on Figure 3. This log represents Landau Associates' interpretation of subsurface conditions identificd during the field exploration program. The stratigraphic contacts shown on the summary log represent the approximate boundaries between soil types; actual transitions may be more gradual. The soil and groundwater conditions depicted on the summary log are only for the specific date and location reported, therefore, are not necessarily representative of other locations and times. Disturbed samples of the soil encountered in the exploratory boring were obtained at selected intervals using a L$-inch inside -.diameter Standard Penetration Test split -spoon sampler. The sampler was driven up to 18 inches into the undisturbed soil ahead of the auger with a 1404b hammer falling a distance of approximately 30 inches. The number of blows required to drive the sampler for the final 12 inches of soil penetration, or part thereof, is noted on the boring log, adjacent to the appropriate sample notation. Samples collected in this manner were taken to our laboratory for further examination and testing. Upon completion of drilling and sampling, a piezometer consisting of a 2-inch diameter, schedule 20 PVC well casing with a 10 ft length of 0.010 inch machine slotted well screen was installed. Sand pack was installed around the screen section and bentonite chips were installed above the screened section extending up to the approximate existing grade. The 'top of the piezometer was fitted with a monument cover installed flush with the pavement and the pavement patched with concrete. The borehole and piezometer (well) was installed in general accordance with the requirements of Washington Administrative Code'(WAC) 173-160. 0124107 dEdmtlAhMrajpq�E10741115WZ01WIPYR\PicZOlpyl�llllun Im.dac 3 I 12/17/2007 15:21 TAX 425 778 4499 HANSEN AICLAUGHLIN 9 005 1 1 1 1 1 1 1 1 1 1 1 1 1 SOIL AND GROUNDWATER CONDITIONS Soil that was interpreted to be landslide debris was disclosed for the full depth of the boring (21.5 BGS). This condition was consistent with our expectations given the geologic history.and the results of previous- explorations in the area. The soil included. sandy clayey silt, fine to medium sand, silty fine sand, and fine sandy silt. Occasional wood fragments and or were encountered in the boring. The soil generally ranged from very loose to loose and soft to stiff. Groundwater was encountered at a depth of 12 ft BGS at the time of drilling on October 2, 2006. Groundwater levels often need to stabilize after drilling and the water level at the time of drilling is probably not as accurate as subsequent measurements. Three groundwater level readings were obtained between December 15, 2006 and January 1.8, 2007 and ranged from 5.5 to 6.6 ft BGS: The October reading could be due to a relatively low groundwater level following a relatively dry summer and early fall, or it could represent a groundwater level that had not fully stabilized at the time of the groundwater reading. November was an unusually wet month with significantly above normal precipitation. December and January represent relatively typical wet winter months. The groundwater readings taken in December; 2006 and January, 2007 probably represent relatively typical winter groundwater levels at this location. Groundwater levels can be expected to fluctuate according to the seasonal level of precipitation, the influence of the degree of surface water runoff and infiltration, and other factors. The, groundwater levels recorded at Piezometer P-17 are summarized in the table below. Piezometer P-17 can be added to the network of piezometers (Piezometers P-1 through P-16) in the North Edmonds area that are monitored by the City. Groundwater Measurement Results Date _7 Depth `to Ground Water (ft, BGS October 2, 2006 12 December 15, 2006 6.6 December 29, 2006 5.5 January l$, 2007 5.8 A geotechnical report was prepared for the Lorian Wood Subdivision by Terra Associates (Terra Associates 1089) prior to development of the subdivision. A boring with a groundwater monitoring well . was installed as apart of that study and was located an estimated 150 to 200 ft north of Piezometer P-17 along the present alignment of 73'd Place West. The groundwater was measured at a depth of 12.5 li BGS at that location on March 15, 1989, a l2gip7 tlEdmdaLilproletls107aN 1SL29%W1PUR%P1Grotndn11Upn tM.dpc ® R-AL F T 4 12/17/2007 15:21 FAX 425 778 4499 HANSEN MCLAUGHLIN la 006 1 ASSESSMENT OF GROUNDWATER CONDITIONS Groundwater seepage is emerging from the bluff face and from near the base of die bluff. This ' seepage condition results in areas of standing and flowing water and wet surficial soil conditions on Lot 2 and adjacent areas above (to the east of) 73'd Place West. A significant portion of the seepage appears to be flowing acrossi the ground surface and is being collected in an informal manner along the east edge of the 73`d Place West pavement and discharged into a catch basin. An unknown amount of this 1 11 I Ll groundwater seepage infiltrates back into the ground as it travels between its point of emergence as a spring on or near the base of the bluff and its present collection point at the edge of the road. It is desirable to intercept this seepage further upslope. This will both limit the amount of infiltration back into the landslide mass, as well as improve the surficial, wet conditions on Lot 2 and adjacent areas. However, damage to the existing Drainage System IA and the difficulty in replacing and maintaining such a system with City maintenance personnel is problematic. We understand that the owner of Lot 2 is considering the installation and maintenance of surface drainage provisions that would intercept the groundwater seepage and the related surface water flow and convey it to, the City's storm drain system. This approach has several advantages. The seepage collection system can be designed by the property owner to facilitate future development of Lot 2. Maintenance of such a system occurring on private property is best accomplished by the property owner. In addition to the benefits to Lot 2, such a system would reduce the amount of surface water infiltration back into the landslide mass and thus provide an effective replacement for the function of Drainage System 1A. Landau Associates previously considered drainage improvements in this portion of the Lorian Woods subdivision to replace the general function of the City -installed drainage system that was located near the base of the bluff and that has repeatedly been damaged by upslope landslides. One approach considered was to install a.subsurface groundwater drainage trench along the easterly edge of 73'd Place West to intercept suspected shallow groundwater flow. Given the typically wet surficial soil conditions on Lot 2'and adjacent areas, it was thought that the groundwater level may be very shallow at the location of the street and there could be benefits from the installation of a subsurface drainage trench (such as a gravel -filled trench with a perforated pipe that would drain to the downhill catch basin). The depth of any subsurface drainage system would be limited by the elevation of the downstream catch basin manholes (i.e., to allow a gravity drainage system). However, information on the actual depth of groundwater at this location was not available until thw installation of the piezometer under this current study. The available information suggests that the winter groundwater level is presently on the order, of 6 ft BGS at the piezometer location. The groundwater level could fluctuate and we recommend that the City continue with groundwater depth measurements at Piezometer P47 in order to assess longer -term OlaV07 41EtlmdaW4p'ojgUel074ti1G1020�W1pi(i�PimiWNbD R—A— F T 5 ' 12/.17/2007 15:22 PAX 425 778 4499 HANSEN AICLAUGHLIN Q007 conditions. Given the limitations on the probable depth of any subsurface drainage system along 73'd Place West, to allow gravity drainage and the current depth of the groundwater, it appears 'that a subsurface drainage system along 73ta Place West may be of limited benefit. In our opinion, greater benefit would be achieved by allowing the owner of Lot 2 to install and maintain improved surface water interception provisions on Lot 2 and adjacent common areas of the Lorian Woods Subdivision and conveying the collected water to the City storm drain system. We suggest monitoring the groundwater level in Piezometer P-17 before and after any drainage improvements upslope and then reassess whether drainage improvements in the street are warranted. I We appreciate this opportunity to be of services to the City on this project. Please call if you have any questions regarding this technical memorandum or if we can be of further assistance. REFERENCE Terra Associates, Inc. 1989. Geotechnical Report, Meadowdale Bench Lots 59 to 57, Ed?nonds, Washi. ngton. Prepared for Robert and Joann :Anderson. June 6. DRS/rgm ' Attachments: Figure 1 — Site and Exploration.Plan Figure 2 — Soil Classification System and Key Figure 3 —Log of Piezometer F-17 0124107 HE�ntjlpt�uclsiU74\I1S1�201WIP1Rlplemlrula0t(p� lin.dpe 6 Iiy I A �■r M ON M M M M M m m M M M M M �AL.•u� C� �nwvOliW: i,rl lwi. twb orwt • N• Ow.a L�W r• µEADOWOALE BEACH Rif. Nmmwom".. ' ^"mau`itl' w..`•b'° 7 naa..,un d KL.,w• bpyy VA•cF■•Aw , bAatvbn .Itala.n,n �•• ,�an■ w 0 Le and ' • t.:.v `' a ENCASE➢ MONUMENT • REGAR 6.REOCAP N f PK{JAILWMI-WASHER a CB'CATGM,B(ISIN n,..lb. 0 'C13" CATCHBASIN MANHOLE a• t+,.. O SIAM sTorwDRAW MANHOLE ' At•wf• g , �=td.Lo ttr.+oLFLIa>rwu ..E ..+.� Sly. 19-5EOTIONA;TWF27'N.RGE 4'E•WJ4. SURVEY NOTE •ntat C..C, - � ' :a:."::,.., � FptwiMroreRtYsunvLtr.'t�tm' aw.m.. . rb.•c.+la Ivb..,u,m t - �.MLw.t.,.,_ '+fhYill DNTFrt9 MN'AiiEFal 0ElaiAL drFaOerer: PtxmOzrs ah0.Y. REFERENCES '.PUNT DF LGAfMj wuws jLrc.110. � ri.era Yw0i650�B _ � .art• 4 w,:+ .. / w+w.n Am cunt/ Y 22,D$.ws 61 iI- ! ••arc. NA• sail - ur.L.,•wn L,tb.Lat D SD IGO I Loden Woods-Dralnage- Scale in Feel Edmonds, Wsshinglon 2006 0 —ARY SEWEn MANhMLE' • CO CLE/WOuT A_4 'UGHTPGlE 1 _YARD LIGHT . ■ POWER • TRANSFORMER m TJB 'MLEPMONEJUNCTION 0=L 6. ,FDTE HYO.RAItT -� WV WA7M VALVE. r SCV SPRINKLER CONTROL VALVE o GV GAS VALVE a '.SIGN ® ROCKERY 'DECIDUOUS TRI=— •CONFER TIME OVERHEAD POWEn Lm L'?wERGROUNO. PD WcR UNE —,--- 'UNDERGROUNDTELEPHDNEUNE --+--- GAS LINE' STORM DRAU4 LINE SANITARY SEWERLINE PIEZOMETER-INSTALLATION DATUMS NOADDNFALCATULt ASM&D V n`-'t iLOAFUht-AaSW D ■Ef2CN4A}'0. e0CA =tADfAAA&TWMr&1L 39' DPAlr1_•li'AF P.G O—r N. NEA00AVAiE 11"n MUT OF tMEA3E'LTIOrI'0FT2A0 PL WrS Drop AOL■h! ELEVATIDf1'• 1DD.wPuT NOTE: U RFAFSFEQU AAEOA.sEn ON7HECGSCtryAFmy!OF LOW4AMGRQQ4 U TfU1V U A¢I(N !CK I I�.�LICP 6Y.'NI CAM ROAIDU7IUIY.IGCtTWG rEA=,FMW t au!FTA tl 13?J. VElaFteO�IDDitr - DO+ISFAUCADi1 CAU:'1-0o01t7.S96F A■i VOWMATAAL Figure Site and Exploration Plan ti 12/77/2007 15:22 hA% 425 778 4499 HANSEN AICLALIGHLIN 16008 Soil, Classification System uses MAJOR GRAPHIC LETTER nIVIStAMS cvnrieAI CiVMenni 11) TYPICAL n�c/rn�ori rtw� �Plhl GRAVEL AND CLEAN GRAVEL 'q' Qf''; GW Well -graded gravek-arevel/sand mixture(s); little or no lines o' ro. o_ C o D,. ..: GP -� 8 z GRAVELLY SOIL (Uttle or no floes) Poody graded.gravgl; graveUsand'MIKWM(s); IiGle or no fines vOi n of {More than 5 coarse fraction Silty gravel: gravaltsandlslll mixture(s) GRAVEL WITH FINES Gl{fl' z E,o a a retetained on No. 4 sieve) (Appreclable amount of fines) Clayey gravel; gravellsendday migture(s) GC' w e SAND AND CLEAN sANC. '(' SW Waft -graded sand; gravefly sand; tittle or no ones w 3 3 SANDY ,SOIL (Utue or no fines) Poorly graded sand; gravelly sand; 0ttie or no lines —' SP U (More than 50%of coarco (racoon passed Silty sand; sand/alit mixture(s)- SAND WITH FINES, '. SM • l6r669h No. "4!sieve) (Apprecfabie amount of Ones), Cleyeyaand;.sand/.daymixture(s) 'sc: NIL. IMultonle Alit .and very One bedd; rock four; silty or clayeyfne d" SILT AND CLAY send or clayey*01Wllh'Aght.plasgaly CL Q " [p 16 ftehlc clay of low io medivol" asticil mvall day; sand PI Yi B Y Y;' y (Uquld limit less than 50) day;s9ty Gay; tean.day' OL e d z 9 z o^ m Organic Sit: organic„snty_day, of low pia?ticdy . .. . Pg . q � . ;51LTAND CLAY (Mi H Inorganic s01; m racecus o►dlalgrneeeous rime sand CFt z (Liquid limit greater Ihan.5D) lnomanilc.clayoi'hlgAptasndty;.fatclay 3 -Orgenic day of medfnm'(o:h(gh,plastidty;.omanic.sill QH, HIGHLY ORGANIC SOIL PT Poo!; humus; F"mp sollwilhfiigti:organk content GRAPHIC LETTER nT114F0RRATF016r IQ 'eVAS6^1 evw�ri�i r�in,i.wt r, PAVEMENT C Or'P " A@ptraU cancrale pavement ori?ortlend cement pavement ROCK RK ftot:k (Sae Rock Ciassincarlgn) WOOD WD Mod, lumber, wood.ehlps DEBRIS DB Construction debris, g0rtinge SP•SM.for sand 'orgravag'Idale? 2 Sall descdollons are based tin the e 3. a 16°,C•end� 909Sr Additional Consgluenta; 8°J° and;+�16L6 - k 6°A Ab qual 1814Mwns are eased on 11195landotd Test Method-forClassifre teat data) of the percentages of each son type and is donned as nyT" `CLAY," etc:, ,°'fiery silty; "etc; " %aceillt,' etc., oi not noted. .Drilling ana.Sampling. Key Field and Lab Test Data SAMPLER TYPE SAMPLE NUMBER & INTERVAL Code Description Code Description a b 3;254nch O.D„ 2AUnch-I D,:Spm Spoon 2,004rich O.D., 1 5D-1pch I.D. Spit Spoon Sample IdenlificaGoq Niunber PP m 1.0 Podret Ponelydinalar; lei TU a t1.5 Torvane, tsl c d ShalbyTubo Grab Sample j— Recmiery Oepth Interval PID=16D PhotgionlratlohPeledorVOCscreening,ppm W =10 Moisture Con►enl, 56 e f Single Tube Core Bartel Douhle Tube Core'Barrrel �7 4 — Sample bepth interval D -120 Dry I7onelly, pd 0 Other - See laid 11 applicable ]PoAion of Sample Retained -200=00 Material smeller than Na 200 sieve, 6A PS Graln Size - See soparate'figurg for data 1 2 3004b Hammer, 304nch Drop Hammer, 3o-Inch Onip forArchlve orAnalysle AL Atlerberg Urrilta-See separate igura far dale 3 P P Pushed shed GT Other Geolechnical Teaing 4 Rolosonfc CA MIMI ;al Analysis 5 AlrRolary(Rack) Groundwater 6 Wash Rotary (Rock} Q Approxiniate vrater dlevaUon at t)tnp tit drilling (ATD) or on.dats noted. Groundwater other. -Sae text it a icable :ATD liivels can ffuctuate: duo to predp)latlpn, seasonal condn(ona, end •older factors. ASSOCIATES Lorlan Woods, P`Wwrfieter Figure installation' Soil C(assificatian System and Key Edmonds; 'WA 19/17/2007 15:22 FAX 425 778 4490 IIANSEN BICLAUGHLIN 1@009 �I P-17 SAMPLE DATA SOIL PROFILE GROUNDWATER • a a a Drilling Method' Hallow -stem Auger R(ezameter Detail o N ri m 9 rn Ground E(evbtlon (o)' 122 m > C E� E 3 a v J i rn oo m F 3 Grey, fine sandy; clayey SILT(moisl, Ault) , : monument with locking cap SM/ ML (SLIDE DEBRIS) Gray;.fine to medtum'SAND {motel, (cose.lo.medium dense). Gray; silly, fina SAND'•lq fne sandy SILT (mo[BI'16 WiL very loose to: locselsca to stil0 1-Inch seam orcoame SAND with gravel 12/2010 12J•15/ .• Sentonile chips 1-inct+ pier e`oi awood on•decayad ` 2-Inch diameter, Schedule 2g, PVC Well casing Q ATV 2-Inch diameter, Schedule 20, PVC screen (0.010•Inch 610161Ze). increase In drilling resiclance -Slit Interbeds and orgonles Threaded end cap Sinjtigraphlc contacts are:ed beson field Inlerpretailons-and.are apprornate, Reference.to Uie text of this report le;necassary rcr e.proper understending bf subsurface condlilons. Refer io "S'o11 ClessincaUen'Syslein end Key" figure for explanation of graphics aftWiymbols. Lodan Woods, Piezorneter Installation I LOg of Piezom 'ter P-17 Edmonds;, WA Figure 3 12/J7/2007 15:20 FAX 425 778 4499 1 CINDY L IS& HANSEN MCI.AUGHLIN -- W,1,03* 114 Second Avenue Southwite 103. Edmonds, WA 98020-3595 !Phone; (425)778-3189 Fax: (425)778-4499 From: To Company:. Phone: Fax: 5 _ Date: 'Pages including ncluding this cover page; 10. Comments: Op o-iror— 11001 Page 1 of 1 Chuck Lie From: Fiene, Don [Fiene@ci.edmonds.wa.us] Sent: Wednesday, January 02, 2008 2:41 PM To: Chuck Lie Subject: Public Request for Records Attachments: 2007 Readings PDF.PDF Chuck; Attached are the Piezometer Readings. Lorian Woods is Piezo # 17. Don Fiene 3/19/2008 MEADOWDALE PIEZOMETER READINGS BORING NUMBER 4 6b 7 10 12 13 14 15 16 17 DA TE: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: DEPTH: 01/02/07 9.92 36.83 8.50 4.25 38.91 41.42 16.50 7.83 6.75 01/23/07 10.00 37.00 8.42 5.08 38.50 43.42 17.25 8.08 7.00 02/06/07 10.08 37.25 8.50 5.50 38.67 44.83 17.83 8.00 7.25 02/20/07 10.08 37.33 8.67 5.17 38.00 45.75 18.17 8.25 7.67 6.17 03/06/07 '9°92 37.50 7.83 5.17 3.8.00 45.50 18.58 8.00 7.25 6.08 03/20/07 9.92 37.50 8.25 5.43 39.00 45.92 18.33 7.92 7.33 6.00 04/03/07 1'0:00 37.58 8.25 5.50 38.92 46.25 18.67 8.08 7.42 6.00 04/24/07 1008 37.67 8.50 6.08 39:00 46.50 - 18.83 8.33 7.92 6.00 05/08/07 10.08 37.75 8.58 6.42 38.92 46.75 19.00 8.00 7.75 6.25 05/22/07 10.00 37.83 8,42 - 7.00 39.00 72.50 19.67 17.50 22.33 6.50 06/05/07 10.17 37.50 8.83 7.25 39.75 72.67 19.50 17.50 22.50 6.50 06/19/07 10.18 38.30 11.50 7.90 38.50 72.38 19.58 8.42 7.90 6.50 07/03/07 11042 38.17 8.58 8.00 39.50 73.00 19.67 8.58 7.92 6.50 07/17/07 1050 ' 38.25 8.33 10.33 3.9.92 72.75 19.83 8.50 8:08 6.83 07/26/07 10:40 38.00 8.50 10.60 38.20 1.9.80 15.20 20:00 7.02 _______ 12/19/07 ___ 9`:90 37.30 7.50 3.80 37.90 0.00 18.90 7.60 7.40 6.40 STREET FILE RESUB JUN 04 2008 Wa& - or North Edmonds Earth Subsidence and r s. Landslide Hazard �: A����s,•: {�I °— Areas Ma ► -� i' r Legend ` I:. I ` North Edmonds Earth Subsidence and -�: Landslide Hazard Area .+ ! 14f (See ECDC 23.80.020 B.1 and ECDC 19.10) Note: Boundaries are the approximate extent ' :' ' :•, �' I ; �1 ) of previous landsliding; hazards are present 1 adjacent to the landslide boundaries) ' l �'' '�• t Stacj� vi0 f, r�i t:ci3: �' Slope of 40% or steeper and ��'I with a vertical relief of ten (10) ft or more (See ECDC 23.80.020 B.2) �-Zip — r ti Minimum buffer equal to the height tit f the slope or 50 feet whichever o e steep s op � ��, � �• I _ _ is greater (see ECDC 23.80.070 A.1) 1. I (The buffer shown is the minimum buffer L adjacent to the North Edmonds Subsidence' and Landslide Hazard Area; a similar buffer would apply to steep slope areas, but is not shown on this map for clarity) l 0 P •, 2 ft Topographic Contour Vertical datum: NAVD88 k� Parcel •;��`"),,-� :; t,( I 0 100 200y�fr' ` Stele In Feet Map created by Landau Associates, Inc. (May 2006) Aerial photo: City of Edmonds t. Topographic contours and steep slopes data derived from LiDAR data: Cityof Edmonds (February 27, 2005 ( ry ) �----- Pursuant to Edmonds Community Development Code Chapter 19.10 sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area shall be designated on this map which indicates areas of earth subsidence and landslide hazards in excess of normal allowances. In order to designate the subject project development site located at lock — pL,W . Edmonds, Washington, the following maps, surveys or other noted items below were used: • Geotechnical Report Prepared by • Land Survey Prepared by L--, • vl f lr Si-mF T�, :�ii1/S� w � ��5� v %.. DT I +-�v►� 6 iNc" Z�YLS� fs.�Gi. I "I certify under penalty of perjury that the site location I esignation has been made to the best of my knowledge and belief, following an investigation of all information and documentation in my possession as well as reasonably obtainable information in the possession of others, including public agencies. Any information which would tend to designate a differing location for the site is attached as a part of my designation as well as a)l information upon which I reasonably relied." Site Sign Title C. 189v North Edmonds Earth Subsidence and -Landslide Hazard Areas Map Legend North Edmonds Earth Subsidence and Landslide Hazard Area (See ECDC 23.80.020 B.1 and ECDC 19.10) (Note: Boundaries are the approximate extent of previous landsliding; hazards are present adjacent to the landslide boundaries) -- - Steep -Slope Areas: - - -- - - Slope of 40% or steeper and with a vertical relief of ten (10) ft or more (See ECDC 23.80.020 B.2) Minimum buffer equal to the height of the steep slope or 50 feet, whichever is greater (see ECDC 23.80.070 A.1) 1 (The buffer shown is the minimum buffer �• adjacent to the North Edmonds Subsidence' and Landslide Hazard Area; a similar buffer would apply to steep slope areas, but is not shown on this map for clarity) 2 ft Topographic Contour / Vertical datum: NAVD88 �— Parcel , Seale In Feet / J Map awded by Landau Associates, Inc. (May 2006) 7 Aerial photo:, City of Edmonds Topographic contours and steep slopes data derived i from LIDAR data: City of Edmonds (February 2!,' 2005) I •:rya: i 1-•, J�� 11.�1rj 1 l "ll t —tld— OCT 2 2 2001 M PERMIT COUNTER STREET FILE Is `f Pl�— T - fi Pursuant to Edmonds Community Development Code Chapter 19.10 sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area shall be designated on this map which indicates areas of earth subsidence and 1 landslide hazards in excess of normal allowances. In order to designate the subject project development site located at lln 00)33 LJ P(-Qre. !'k5 T Edmonds, Washington, the following maps, surveys or other noted items below were used: • Geotechnical Report Prepared by Mao A-SSDcPal-PSl 5ukmdCw- 1,Y1 0200,5' • Land Survey Prepared byP-, F _ rn 1 LL POI iu Tic Q `Tc.Ai u 19, 2 C)o- - "I certify under penalty of perjury that the site location designation has been made to the best of my knowledge and belief, following an investigation oCall information and documentation.in my possession as well as reasonably obtainable information in the possession of others, including public agencies. Any information which would tend to designate a differing location for the site is attached as a part of my designation as well as all information upon which I reasonably relied." Site Plotted by OlAndy ill 4'SCA0 CA Y) Date B'10A 1 /G U � Rpp i rcant Signed >3Fc.«.,, 9� dSccoC.�M Date S%/, Title o,.,A, ;�g d, 4 ! �on i nr. WrM S 61 Un Ir0 TT I e. . O i Lv r,a`h Wo o els PR D a od 7 ° .TERRAASSOCIATES, Inc. .4 A Consultants i•n Geotechnical Engineering, Geology and ''Environmental Earth -Sciences . June'4,.201.2 Project No. T-840-11 Brian and Cindy Isaacson ' 9808 - 142nd Place SE, F-301: Bothell, Washington '9801,1. ' Subject. Final.Letter Geotechnical -En gineering Construction Services .'Proposed Isaacsoii'Residence ; ' Lot2, Lorian-Woods ; Edmonds, Washington. City of Edmonds. Permit. # 2009-0743 References: 1: Geotechnical Report; Lorian Woods; Project No. T-840-10, prepared by"Terra`Associates,'Inc.; dated Marcli 31', 2008, 2..Supplemental Geotechnical Consultation, Project No. T-840-10, _ .,prepared by Terra Associates; hI c., dated June 2; 2009 '? ' . 3.. Supplemental Letter, Geotechnical.Summary, Project No. T-840-10, ". prepared -by Terra, Associates, Inc„ dated June.5, 2009; + oEVEL.ai'�Is�IT SEFVICES CiR . CITY Of_E©MONO . Dear Mr: and Mrs: Isaacson: As.requested, Terra Associates; Inc. (Terra) has provided geotechnical engineering services .during.construction of the,subject project. We have provided consultation services during the planning,.design; and permitting phases of this project. " The "referenced report and letters contain our recommendations and. discussion of the proj ect. The purpose of our work was —to verify, that the geotechnical elements of the project design have been'completed ' in accordance with.recommendations outlined in.our geotechnicaLreport for the project. Our work was provided • with periodic site • visit's'coordinated with- your, contractor, Mr.. Jim Arnold.' -We -have previously submitted our 'field 'observations in memos that were sent to you, the contractor, and the City of Edmonds. STREET . FIL 1'2525 Willows Road, Suite 101,.Kirkland, Washington 98034 Phone.(425) 82177777 Fa' )0425) 821 4334 Brian and'Cmdy Isaacson•, { June 4, 2012 The city required the.following elements in our observations services: 1. Soils (IBC 1704.7) ' The special inspections were conducted to verify compliance with,the, geotechnical recommendations in our referenced report and letters for the :project that, satisfy the requirements of IBC 1802 and the City of Edmonds requirements. • 2. Soil Bearing Verification Terramade periodic site visits during construction. Representatives of Terra Associates verified adequate bearing for the• foundations within the house footprint and for the upper catchment ;wall prior jo placement of concrete' Adequate bearing was observed in the footing excavations for an allowable bearing pressure of 1,500 pounds per.square foot:, , ' 3. ,Structural Fill Placement and,, Compaction/Placement Terra observed the placement of structural, fill within the footprint of the house, along the eastern margin of the house for the foundation of the catchment. wall,. and. behind the catchment mall. The lower -level basement wall was backfilled with site material compacted in place: Compaction testing and observations during fill placement indicated that adequate compaction was achieved. ' The upper basement wall. along the east margin.of the house'.was backfilled with crushed'rock chips that were compacted in place with a vibratory sled compactor. The upper catchment`wall .was backfilled with clean sand and compacted in placewith a vibratory sled compactor. ',These upper two walls were backfilled using a conveyer -belt boom truck to place material above.the house footprint. ;The backfill for ' the two upper walls consisted of free draining soils: 4. Foundation and Site Drains/Footing Drains . We, observed that • perforated . footin • drains- and a se crate ti htline for roof downs' out drains were P g. P g P . placed.' We also observed that the basement walls were provided with a drainage board manufactured.by Delta. Based on our, observations, the subsurface drains .and downspout tightlines were placed in accordance with our recommendations and the project plans. We observed that the upper seepage zones were --controlled during construction to reduce_ impacts on the area cleared , for construction : from, the accumulated seepage. The permanent site, drainage features include a swale along the top of the catchment' wall with two yard drains to collect_ surface runoff, the upper drainage network,.yard: drains in the' patio. area behind the house, and tightlines for the downspouts. -All elements of the drainage system will need to,be maintained overtime. This includes keeping gutters clear of.debris. Project No. T- 840 ,11 Page No. 2 Cindy Brian and C y Is June 4, 2012 ' 5. General Site Monitoring During Wet Weather.Construction ' We made periodic'site.visits during periods of time that site excavation or backfill operations were under. way. We observed that site activities did not create any site stability oferosion issues. We observed that visqueen was used to prevent erosion from precipitation'. During our -site visit, we did not observe. any ' ' off -site transport of sediments. 6. Temporary Erosion Control We made periodic site visits during eriods•of time that site excavation or backfill'o erationswere under p gP P . , way. We observed that site activities did not, create anyerosion issues.. Following our site visit on January 23, 2012. following a snow -melt -and rain event, erosion control observations were taken over by Mr. Jim Arnold..' No significant earthwork activities took place in the balance of the wet season: 7. Final Erosion Control ' Final erosion:. control will be complete with .the final re -vegetation plans. We have observed that the areas` cleared in the past work on -site prior to 20.11 � have been successfully re -vegetated. We have observed that the area disturbed for 'construction" in 2011/2012 have had plants placed to reestablish erosion control. These plants will need .to be maintained through the summer drought using hand, irrigation. We do -not recommend the installation of 'a dedicated irrigation' system. We understand that you `will place a permeable weed barrier fabric over the exposed soils to reduce, the potential for.erosion'while the new ground cover is being established: 8. Site Retaining Wa1URocke6 Construction . g , No rockeries" were 'constructed -as part of this permit. We observed that the site retaining walls were . . placed as planned. Due. to a conflict between" the. architectural plans, and the. structural plans, the contractor deleted the footing for the catchment wall that wrapped around. the southeast margin of the ' house. The structural engineer approved the variance from the plans in his memo'dated May 31, 2012. 9. Excavations/Grading/Site Preparation We made,periodic'site visits during each'step of the project excavation and grading. The soils exposed :in, - the excavation were :consistent with the soils anticipated from our explorations and experience on the site. rWe observed the grading and site preparation was consistent with our recommendations for.the project and the approved plans. 10. Final Letter This letter provides our final summary of the construction, observations. All discussion in our prior reports remains applicable to this project. '. Project No. T-840=11 Page No. 3 Daily Field Memo TERRA ASSOCIATES, Inc.Project rA!lr Consultants in Geotechnical Engineering, Geology No. T-840-11 and Memo No. 1 Environmental Earth Sciences Date 7-6-2011 Project: Isaacson House Subject: Pre Con Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Jennifer Lambert and Patrick Lawler —City of Edmonds Writer met with the above on site at 1 pm for pre con. We reviewed the special inspections required on the City of Edmonds Special Inspection and Testing Agreement for the project. The list of special inspections is attached to this memo Chuck Lie LIN City of Edmonds Copies to: Brian and Cindy Isaacson Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 CITY OF EDMONDS ° SPECIAL INSPECTION AND TESTING AGREEMENT ti 189� PERMIT # l% l "C/ / �` DATE: PROJECT SITE ADDRESS: , PROJECT NAME:li� SPECIAL INSPECTION AGENCY *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testingtinspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the . Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with pmpetence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION ❑ATTACHED DAPPROVED PLAN SHEET )kSoils (1704.7) oil Bearing Verification tructural Fill and Compaction/; -pi AtyAIEL�t oundation and Site Drains N X General Site Monitoring during Wet Weather construction emporary Erosion Control final Erosion Control ❑ Temporary Shoring ❑ Permanent Shoring ❑ Piling, Drilled Piers, and Caissons (1704.8, 1704.9) ❑ Pier Foundations (1707.5) 'WSite retaining wall/ rockery construction final letter from geotechnical engineer of record ` -V e-� -b L:\TEW\BUILDING\FORMS\Impection\Special Inspection Agreement Soils.&02109 1 1 1 1 F� 1 1 1 BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall -complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and- Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or r Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as. specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425471-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non -conforming items (how each was resolved or unresolved) • Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. L:\TEMPIBUn DING\FORMS\inspection\Special Inspection Agreement Soils.docl2/09 5. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities :. 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS : It is the duty of the contractor to notify the special inspector when work is. ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY, The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities t 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities 1. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. L:ITEW\BUIIAINGIFORMS%ispection\Special Inspection Agreement Soils.docl2/09 ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner name (please print or type) Signature Date General Contractor Company/Owner name (please print or type) Signature Date Special Inspector/Agency name print or type) Sign Architect/Engineer of Record name (please print or type) Date S- Z4— /I Signature Date Return the original signed agreement to the Building Division City of Edmonds Building Division 121 P Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION: City Official Signature Date Title: L:\TEMP%LTILDING\FORMS\Inspection\Special Inspection.Agreement Soils.docl=9 Daily Field Memo . TERRA ASSOCIATES, Inc. '•' •• • • AConsultants in Geotechnical Engineering, Geology " Project No. T-840-11 • and Memo No. 2 Environmental Earth Sciences Date 7-21-2011 Project: Isaacson House Subject: Pre Con Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Brett-PNWC Writer met with the above on site at 9 am. The mass excavation for the house is proceeding. The sub grade is being left one to two feet above final grade. Excavated soils are being removed from the site. The soils consist primarily of silts with some pockets of silty sands. There is some wood debris within the native soils. Cuts of up to 6 feet have been made, no seepage was present. Temporary cuts appear to be stable up to four feet in height for the vertical segment. We discussed the need to make cuts that will be WISHA compliant. At the southeast corner of the house it may be needed to use Ecology blocks to support the temporary cut. E blocks should be no higher than two high. The blocks can be dedicated to the backfill. The seepage collections system on the hill above the house is controlling most of the seepage. Some light surface flows persist above the house. It is OK to re- establish the surface swale on the dozer trail immediately above the house. The surface runoff from the swale needs to be directed away from the house into suitable discharge areas. The TESC fencing along the lower edge of the site is intact. A quarry spall entrance has been established. No off site flow of water was observed. TESC appears suitable for the existing conditions. The foundation forming is planned to start on Wednesday Aug 27th. The soils appear to be suitable for keyway construction. The foundation crew will need to exercise care to preserve the keyway during steel placement. Work should proceed in a timely basis. Chuck Lie LIN City of Edmonds Copies to: Brian and Cindy Isaacson Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 1 1 1 1 Daily Field Memo ASS®CIATES, Inc. JA .:TERRA •• , Consultants in Geotechnical Engineering, Geology Project No. T-840-11 and Memo No. 3 Environmental Earth Sciences Date 7-27-2011 Project: Isaacson House Subject: Pre Con Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Brett-PNWC Writer met with Brett on site at about noon. The mass excavation for the house is proceeding. I had postponed a routine weekly meeting with Jim Arnold at 10 am for this date and we rescheduled it for the 28`" at 10 AM. Brett called at about l l and reported that he had encountered seepage in the stair area excavation. I visited the site to observe the seepage. I recommended that the seepage be controlled with a sump and a pump to see if it is just a pocket of water. I also reviewed the exposed cut at the east side of the garage. It appears that there is sufficient room to cut it back to at least a 1:1, a single high eblock wall can be placed at the toe of the cut to reduce the horizontal extent of the open cut. The eblocks can be left in place in the backfill if they do not interfere with keyways or other construction elements. Brett and I discussed the use of native soils for backfill. The sandy site soils would be suitable for use as wall backfill as long as the walls have been provided with drainage panels such as mira drains. TESC measures appear to be suitable. No off site sediment or water flow observed. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By. Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 1 Daily Field Memo . TERRA ASSOCIATES, Inc. ••• , • • Project No. T-840-11 Consultants in Geotechnical Engineering, Geology • • and Memo No. 4 Environmental Earth Sciences Date 7-28-2011 Project: Isaacson House Subject: Pre Con Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Brett-PNWC Nick Hoffman -Terra Associates Writer met with Brett and Jim on site to review project progress and discuss seepage at 10 am on site Jim proposed the use of a lateral trench to drain water from the excavation in lieu of the sump. I recommended the use of the sump to see if it was a pocket of water that once removed would not re occur during the construction period. if a trench is used, I recommended that the trench be backfilled with crushed rock such as the stockpile of pea gravel sized crushed rock that Brett had imported and stockpiled at the driveway area. No pipe would be needed in the trench. The trench should be as deep as possible to capture water from keyways. The same crushed rock could be placed at the base of keyways, no pipes should be placed in the keyways. This crushed rock could also be used to provide a working surface on the bearing surfaces of footings if needed. The stability of the sidewalls of the keyways are the important element. Observation of the seepage conditions will need to continue to evaluate options for keyway construction in the lower areas of the lower floor where seepage has been observed. Spoils from the excavation continue to be exported. A stockpile of soils is present for use in backfill. TESC measures appear to be suitable. No off site sediment or water flow observed. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By: Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 TERRA ASSOCIATES, Inc.. Geotechnical Consultants 12525 Willows Road, Suite 101, Kirkland, Washington 98034 'Phone (425) 821-7777 a Fax (425) 821-4334 POOPING EXCAVATION EXAMINATION REPORT DATE FOOTINGS EXAMINED Z 1 ' PROJECT NO.i� .� PROJECT NAME: 1,- �i.D� f (/�PROJECT I-OCATION: CONTRACTOR: jLtl� Q(� REPRESENTATIVE: DESCRIPTION OF FOOTINGS COVERED BY THIS REPORT: J w� AV 1/�dl� I'" 1 n ' vjU e C-Vtjvd-wlobsl IV Our representative has examined only the footing excavations listed above. The results of this examination are only valid for a ' period of 48 hours. II any change in the subgrade conditions occurs, we should be promptly notified. Any loosened soils observed in foundation areas due to construction activity or rainfall should be removed prior to co ncr to placement. COPY TO: ' SIGNATURE TERRA ASSOCIATES REPRESENTATIVE Daily. Field Memo TERRA ASSOCIATES, Inc. • • �' � Consultants in Geotechnical Engineering, Geology Project No. T-840-11 and Memo No., 7 Environmental Earth Sciences Date 9-8-11-2011- Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 ' Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Concrete Crew Writer met with Jim on site at 1200 to observe footings in the upper area of the existing excavation. This is the crawlspace area that will be used for storage. Suitable bearing conditions were observed. Jim will have rebar stubbed out to the grade beams that support the deck area. The deck foundations are covered by a stockpile of soils at this time. The walls at the east side of the garage are having steel placed. Backfill for the east walls of the garage and storage area should be placed as soon as allowed by the structural - engineer. The backfill will need to be placed in lifts and compacted'as described in our report to provide support for the eastern perimeter footings. A sample of the stockpile south of the house was obtained for a sieve analysis to evaluate compatibility, of the soils with the proposed Delta drainage board. The footing memo for today is attached. The footing is scheduled to be placed on Friday Sept 9. TESC measures appear to be suitable. No off site sediment or water flow observed. The weather conditions will change later this month. The stockpiles may need cover and the silt fence will need maintenance. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By: Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 TERRA ASSOCIATES, Enc. Geotechnical Consultants 12525 Willows Road, Suite 101,`Kirkland, Washington 98034 Phone (425) 821-7777 •".Fax (425) 821-4334 1 FOOTING EXCAVATION EXAMINATION REPORT DATE FOOTINGS EXAMINED PROJECT NO. O PROJECT NAME: � Z r. &0 PROJECT LOCATION: ( TZ )i tit CONTRACTOR: 1 \\/vim f d REPRESENTATIVE: DESCRIPTION OF FOOTINGS COVERED BY THIS -REPORT: 1 ' Our representative has examined only the footing excavations listed above. The results of this examination are only valid for a period of 48 hours. If any change in the subgrade conditions occurs, we should be promptly notified. Any loosened soils observed in foundation areas due to construction activity or rainfall should be removed prior to concrete placement, M/ COPY TO: SIGNATURE C. TERRA ASSOCIATES REPRE NTATIVE� 7L, Z ' Daily Field Memo TERRA ASSOCIATES, Inc. .. • A Consultants in Geotechnical Engineering, Geology Project No. T-840-11 and Memo No. 8 Environmental Earth Sciences Date 9-49-2011 Project: Isaacson House" ' Subject: Site Visit Edmonds Permit 2009-0743 Location: _ Lorian Woods Contractor: Jim Arnold Weather: Sunny Present.ai Site: Jim Arnold Brett Writer met with Jim on site at 1400 to review drainage facility placement. At the time of my visit, the drainage board had been placed and the perforated footing drain had been placed along the uphill side of the perimeter wall footing. A separate tight line "was "placed along the north outside perimeter of the foundation for the downspout tight lines. Brett reported that the pipes would be marked to prevent the hookup of downspouts and surface drains to the perforated pipe. Brett also reported that during washed rock.placement, that the pipe would be checked for grade and alignment. The washed rock should overlap the drainage board by at least G inches. Drain placement appears to be suitable. All pipe is rigid pipe as recommended in the geotech report. OK to place rock and fabric and backfill. Terra will returnto do compaction tests on backfill during placement. The onsite stockpile of soil from the mass excavation meets the specifications for the Delta Board backfill. We understand that a jumping jack will be used. Following completion of backfill, the upper keyway will be ekcavated and "foundation forming will begin for eastern wall of house. Backfill and compaction is scheduled for Tuesday and Wednesday of this week. TESC measures appear to be suitable. No off site sediment or water flow observed. Chuck Lie City of Edmonds Copies to: , Brian and Cindy Isaacson By. Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101" ♦ Kirkland, Washington ♦ 98034 [ i 1 I I [I Ll Daily Field Memo A. TERRA ASSOCIATES Inc. ' •' •' • Project No. 840-11 � �" Consultants in Geotechnical Engineering, Geology. and Memo No. 9 Environmental Earth Sciences Date 9/21/2011 Project: Isaacson SFR, Subject: East Building Backfill Location: Edmonds, WA Contractor: Weather: Partly Cloudy Present at Site: As requested a Terra Associates,- Inc. representative was onsite to observe earthwork- activities from 10:45am to 11:15am., While onsite the following was observed: . • The contractor was placing fill along the east side of the basement wall. The contractor had placed'approx. 3' of fill prior to arrival. The fill was observed to over optimum moisture content and is pumping under foot. Density tests obtained on the backfill"showed compaction of less than the required 95%. • Chuck Lie of Terra Associates was informed of the fill conditions and is working with the, contractor to find a solution. Field Density Test Data Test Test Test Location. Depth (ft.)Type Soil; Moisture Content (%) Dry De1.nsity (PCF) Relative CompactionNo. M Remarks 1 Center of fill area -4' A . 19.7 105.4 90 Note: The above test results represent soil compaction at the specific locations and depths noted, and may not be representative of compaction at other locations or depths. By: Ricky Gagley Copies to: 12525 Willows Road ♦ Suite 101. ♦. Kirkland, Washington ♦ 98034 ♦ Telephone No. (425) 82'1-7777 1� Daily .Field Memo TERRA ASSOCIATES Inc. • • • •' • Project No. 840-1i .• Consultants in Geotechnical Engineering, Geology. �••. and Memo No. 10 Environmental Earth Sciences Date 9-23-2011 . Project: Issacson SFR Subject: Foundation Backfill Location: Edmonds WA Contractor: PNWC Weather: Partly Cloudy. Present at Site: Brett Arrival: 8:30 AM; 12:00 PM Departure: 9:45 AM; 12:30 PM Terra representative arrived on site as requested to perform in -place density tests on recently placed foundation backf ll. " While on site we observed the following: • Approximately 3' of on site sand with silt had been placed and compacted along the east side of the eastern footing wall. We previously documented fill in this area to be over optimum moisture conditions. The previous fill had been removed, amended with Portland cement' and 'then subsequently placed and compacted. The new fill appeared dense and unyielding (1/2" hand probe penetrations of less than''/z under the full weight of observer. Density tests performed on the fill.were at or above 956/o of,lab maximum dry density according to ASTM . —D-698. • A four —inch perforated PVC pipe bedded in clean one -inch rock and wrapped in filter fabric was in place at the base. of the footing wall along the north and east sides of the building. Wall drain panels were in place along -the outside of the north and east footing walls. • 12-18 of fill, near the SE corner of the building probed loose and will require further compaction. • We will be available for further observation and testing at the request of the contractor. Field Density Data Test No. Test Location De th • P (ft.) Soil Type Moisture . Content (%) Dry Density (PCF) Relative „ Compaction Remarks 2 6' north,' 5' east of 90 degree bend in east foundation wall SG A 16.5 111.4 95 3 15north of test #2 -1' SG A. 16.4 111.7 95 Note: The above test results represent soil compaction at the specific locations and depths noted, and may not be representative of compaction at other locations or depths. . By: Nicolas Hoffman Copies to: Email List 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 ♦ Telephone No. (425) 821-7777 Daily Field Memo ASSOCIATES, Inc. ; •:TERRA A project No. T-840-11 AT.T,A Consultants in Geotechnical Engineering, Geology and Memo No. . 11 Environmental Earth Sciences Date 9--27=2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: - Lorian Woods Contractor: 'Jim Arnold Weather: Sunny Present at Site: Jim Arnold . Writer met with Jim on site to review the backfill of the eastern garage/storage area wall. The bearing surface appears suitable for the placement of forms and steel. Terra to be on site prior to concrete placement to observe final bearing conditions. Some sloughing had occurred in the northern end of the keyway. Jim will have the crew hand excavate the sloughing out. We discussed TESC briefly. Jim plans on using visqueen to over the exposed soils for the next several weeks. TESC measures appear to be suitable. No off site sediment or water flow observed. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By: Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road.* Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily: Field Memo TERRA ASSOCIATES,,' Inc.. _ AA •A_ Project No. T-840-11 AT.• Consultants in Geotechnical Engineering,. Geology ' and Memo No. 12 Environmental Earth Sciences Date 9--30-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Wood's Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Brett Mc Donald Writer met with Jim on site to review final bearing conditions of the eastern perimeter house footings. The bearing surface appears suitable for the placement of concrete. The sloughed material in the keyway had been removed. The sloughing was on the.eastern side of the keyway. A hand written footing memo was left on site and is attached to this memo. We discussed TESC briefly. Jim plans on using visqueen to over the exposed soils for the next several weeks. TESC measures appear to be suitable.. No off site water flow observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years.ago. Jim was going to sweep the street to address some soil that had been tracked off site. Bret reported that he had crushed rock being delivered to freshen the rock pad entrance to the site. The existing and proposed measures are acceptable. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By: Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525. Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 TERRA ASSOCIATES, �n!co ' Geotechnical Consultants` 12525 Willows Road, Smite 101, Kirkland,'Washington 98034 Phone (425) 821-7777 • Fax (425) 821-4334 1 .FOOTING EXCAVATION EXAMINATION REPORT DATE FOOTINGS EXAMINED _�� r �/ PROJECT NO.• "7f�Q PROJECT NAME: PROJECT LOCATION: CONTRACTOR: REPRESENTATIVE: DESCRIPTION OF FOOTINGS COVERED BY THIS REPORT: 1 1 I Our representative has examined only the footing excavations listed above. The results of this examination are only valid for a ' period of 48 hours. If any change in the subgrade conditions occurs, we should be promptly notified: Any loosened soils observed in foundation /arreaas'ddue to construction activity or rainfall should be removed prior to concrete placement. I 'Llf l COPY TO: �l tM �/` vl� SIGNATURE G (mil vro.Ll TERRA ASSOC T S R PRESENTATIVE Daily Field Memo . TERRA ASSOCIATES Inc. '•' •� • ' Project No.. T-840-11 • •' Consultants in Geotechnical Engineering, Geology • and Memo No. 12' Environmental Earth Sciences Date 10-4-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: concrete crew members TESC measures appear to be suitable. No off site water flow observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The rock pad entrance had been freshened and the silt fences appear to be adequate. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The existing and proposed -measures are acceptable. The visqueen will need to be monitored and maintained.. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By:. Jim Arnold . Pacific Northwest Construxion Telephone No. (425),821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo TERRA ASSOCIATES, Inc. ,...,: A A Project No. 840-11 •A X .A Consultants in Geotechnical Engineering; Geology and Memo. No. 14 Environmental Earth Sciences Date 10-17-2011 Project: Issacson SFR Subject: East Retaining Wall Drainage . Location: Edmonds, WA Contractor: PNVVC Weather: Partly Cloud' Present at Site: Jim Arnold Arrival: 8:00 AM Departure: 815 AM Terra representative arrived on site as requested to observe the recently constructed footing drain on the east side of the eastern retaining walla While on site we observed the following: • A four inch perforated pvc drain pipe was in place on the east side of the'eastern retaining wall approximately at the top of the footing base. The pipe had been wrapped in filter fabric. A minor amount of mud and water had accumulated underneath the pipe. 'Jim indicated that 'washed rock would be placed under the pipe prior to covering it. • A representative of Terra Inc. will return to the site in the afternoon to observe that the pipe is bedded in washed rock and verify that the crushed rock backfill is being compacted in lifts as it is being placed. By: Nicolas Hoffman Copies to: Email List 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 ♦ Telephone No. (425) 821-7777 Daily Field Memo TERRA ASSOCIATES, Inc. .._.,: Project N0. T-840-11 Consultants in Geotechnical Engineering, Geology ' and Memo No. 15 Environmental Earth Sciences Date 10-17-2011 Project: Isaacson House Subject:, Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim and 2 crew -members Writer, was on site at 230 pm to observe backfill of eastern house perimeter wall. 5/8 inch chips had been conveyored in to the northeast and southeast corners. The rock was being moved by hand and wheel barrow to the center of the wall backfill area. A vibrating sled compactor was on site to rattle the crushed rock into place. Progress appeared to be satisfactory. TESC measures appear to be suitable. No off site water flow observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The rock pad entrance had been freshened and the silt fences appear to be adequate. The slopes above and around the house have been covered with visqueen.. Sand bags and other weights have. been placed to keep the visqueen in place. The existing and proposed measures are acceptable. The visqueen will need to be monitored and maintained. Chuck Lie I0 City of Edmonds Copies to: Brian and Cindy Isaacson Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo TERRA ASSOCIATES, Inc. A,A AA Tand Project No. T-840-11 �' Consultants in Geotechnical Engineering, Geology Memo No. 16 Environmental Earth Sciences Date 10-27-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods' Contractor: Jim Arnold Weather: Sunny -cool Present at Site: Writer was on site at1030 am to observe excavation progress. PNWC has been replaced with anew excavating contractor. A minitrack hoe was present on the bench for the patio/catchment wall. The excavation was nearly_ complete. Jim had reported that the width was about done and that some over excavation had occurred along the" northern end to remove wet soils. It will be OK to replace the over excavated soils with the crushed rock on site. Progress appeared to be satisfactory. Jim reported that the plan is to form the upper wall next week. No one was on site at the time of my visit., . TESC measures appear to be suitable. No off site water flow/sediment transport observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The, existing measures are acceptable. The visqueen will need to be monitored and maintained. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson Jim Arnold Telephone No.. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo . TERRA ASSOCIATES Inc. '•' •' • Project No. T-840-11 C� Consultants in Geotechnical Engineering, Geology and Memo No. 17 Environmental Earth Sciences Date 11-2-2011 Project: Isaacson House: Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Overcast Present at Site: Paul Sexton Writer was on site at mid day to observe excavation progress. The northern half of the keyway has been excavated and is caving. I advised Paul and Jim to shore the area. The use of wood shoring was discussed for temporary use: The eastern cut would need to be laid back to reduce the side wall sloughing. I stressed the need to keep all temporary cuts safe for workers. This will be an important element of the eastern temporary cut: Writer to return to see progress prior to concrete placement. TESC measures appear to be suitable. No off site water flow/sediment transport observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The existing measures are acceptable. The visqueen will need to. be monitored and maintained. Chuck Lie By: .City of Edmonds . Copies to: Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road'♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field -Memo A TERRA ASSOC IATES,'Inc. ,...A •. Consultants in Geotechnical Engineering,'Geology Project No. T-840-11 . and Memo No. 18 Environmental Earth Sciences Date 11-3-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Overcast Present at Site: Brian Isaacson and excavating crew'. Writer was on site at mid day to observe excavation progress. The northern half of the keyway has been excavated and has been both sloped back and provided with temporary shoring consisting of wood panels. The excavation is being pumped with a sump pump. The wood panels do not provide safe working space for crew but will help maintain the shape of the keyway. The structural engineer advised Brian and Jim that extra concrete can be placed in the keyway area to fill caved areas. Provided no further caving occurs, the northern half can be filled as is once the steel gets placed. The southern half of the key had not been excavated yet. Brian reported that the concrete crew would be on site at 9 am to set steel and pour concrete. Chuck Lie City of Edmonds. Copies to: Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦.98034 Daily Field Memo TERRA ASSOCIATES, Inc. ,•• .. •. Project NoT-840-11 •• Consultants in Geotechnicai Engineering, Geology and Memo No. 19 . Environmental Earth Sciences Date 11-4-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit2009-0743 Location: Lorian Woods' Contractor: Jim Arnold Weather: Overcast Present at Site:. Brian Isaacson and excavating crew; Jim'Arnold and concrete crew . Writer was on site at 845 to observe excavation progress. The northern half of the keyway has been excavated and has been both sloped back and provided with temporary shoring consisting of wood panels. The excavation is being pitmped,with a sump pump. The southern key was being excavated and was starting to cave, I advised the excavator to speak with Jim before proceed to far with the keyway with no concrete crew on site. I spoke with Jim as I left the site he reported that the concrete was scheduled for about 1 pm. Writer returned at 1200. Jim and Brian were on site. The concrete crew was arriving as I was on site. The southern half of the key way was being excavated while I was on site. Some light caving occurred and was removed while I was present. The soils exposed between the key way and the compacted crushed rock backfill for the house appear suitable for the support of the patio/footing as planned. Jim asked dif he could do two pours on the patio slab thickness, the possible cold join in the patio would need'to be discussed with the structural engineer. Brian and I walked up the slope. There is a tree that has fallen on the slope from tree cutting. I advised Brian to remove the tree and keep the slope accessible and visible for observations throughout the time he lives in his house. We'discussed the need for the surface Swale along the back of the catchment wall. This is on the plans. and will need -to be maintained over time. The catchment wall heights as planned appear to be OK. There will be a need to do some trimming of the slope immediately above the catchment.wall to establish grade and the surface Swale. Jim will shoot the area prior to forming the wall. Working safety is important. Final temporary slopes will need to be trimmed to provide a safe work area for the wall crew. OK to place concrete in the keyway., Jim is planning on pulling the temporary wood shoring as the concrete is being placed. If heavy caving occurs prior to placement of concrete, caved soils are to be removed from the keyway area and keyway backfill area. Concrete is scheduled for today. Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 1 1 1 1 L fl 1 Ll IJ Oul Fi Terra to return to verify bearing for the catchment wall footing/patio, for catchment wall drainage and catchment wall backfill. Supplemental site observations may be needed later. Terra to do TESC visits after significant rains. Jim Arnold to do routine TESC observations following the completion of earth moving/excavation. TESC measures appear to be suitable: No off site water flow/sediment transport observed.. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The existing measures are acceptable. The exposed soils will need to be covered with visqueen at the end of the shift today. The visqueen will need to be monitored and. maintained. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By. Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo TERRA ASSOCIATES Inc. f . 'A' Project No. T-840-11 A Consultants in Geotechnical Engineering, Geology A and Memo No. 20 Environmental Earth Sciences Date 11-8-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 . Location: Lorian Woods Contractor: Jim Arnold Weather: Partly sunny Present at Site: Jim Arnold Writer was on site at 1430 to observe the patio/catchment wall footing area. The area is formed up to the projection of the south wall of the house. Steel has been placed for about half of the patio/footing area and for the catchment wall. There is adequate bearing for the area that has been formed. Concrete is scheduled for Thursday or Friday.of this week. Terra to return to verify bearing for the southern end of the catchment wall footing, for catchment wall drainage and catchment wall backfill as well as deck footing along west side of house. Supplemental site observations May be needed later. Terra to do TESC visits after significant rains. Jim Arnold to do routine TESC observations following the completion of earth inoving/excavation. Contractor to make all temporary cuts comply. with W1SHA prior to entry to backfill zone of catchment wall. TESC measures appear to be suitable. No off site water flow/sediment transport observed. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other. weights have been placed to keep the visqueen in place. The existing measures are acceptable. The exposed soils will need to be covered with visqueen at the end of the shift today. The visqueen, silt fence, and rock entrance will need to be monitored and maintained. Chuck Lie . City of Edmonds Copies to: Brian and Cindy Isaacson Jim'Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 1 I 1 1 I t t Daily Field Memo ,TERRA ASSOCIATES, Inc. ..,.,: .. Consultants in Geotechnical Engineering, Geology Project No. T=840-11 � and . Memo No. 21 .,Environmental Earth Sciences Date 11-21-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Loriaq Woods Contractor: Jim Arnold Weather: Rain Present at Site: Jim Arnold and backfill crew Writer was on site at 0830 to 0930 to observe the drainage and backfill of the catchment wall. A perforated pipe wrapped in fabric is present at footing grade behind the wall. A conveyor truck is being used to tremie the backfill up over the house to the catchment wall. The plastic that covered the exposed soil above the catchment wall was removed. The sand backfill consisted of washed concrete sand. The first truck arrived at about 900 and was placed starting at the north end of the wall. A vibratory plate compactor is on site to compact the backfill to 90%. Terra will return to test the backfill compaction later in the day. Terra to do TESC visits after significant rains. Jim Arnold to do routine TESC observations following the completion of earth moving/excavation. TESC measures appear to be suitable. No off site water flow/sediment transport observed. The seepage from the upper portion of the site remains under control and in the tight line'placed two years ago. The upper collection tubs need to be cleaned to keep the drainage system operating. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The existing measures are acceptable. The exposed soils will need to.be covered with visqueen at the end of the shift today. The visqueen, silt fence, and rock entrance will need to be monitored and maintained. Chuck Lie By: City of Edmonds Copies to: Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101: ♦ Kirkland, Washington ♦ 98034 Daily Field Memo ..TERRAASS-®CIATES, Inc. A�MA . Project No. T-840-11 Consultants in Geotechnical Engineering, Geology ' and Memo No. 22 Environmental Earth Sciences Date 11-21-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Rain Present at Site: Jim Arnold and backfill crew Terra representative was on site from 12:40 to ] :10 to observe and test the backfill of the catchment wall. A conveyor truck is being used to tremie the backfill up over the house to the catchment wall. The sand backfill consisted of washed concrete sand. The backfill was being compacted in lifts with a walk -behind vibratory plate compactor. The fill appeared relatively dense and unyielding. Density tests performed during our visit will be recorded at a later date once results of the proctor sampled during our visit return from laboratory.analysis. Terra to do TESC visits after significant rains. Jim Arnold to do routine TESC observations following the completion of earth moving/excavation. TESC measures appear to be suitable. No off site water flow/sediment transport observed. The seepage from the upper portion of the site remains under control and in the tight line placed two.years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. The existing measures are acceptable. The exposed soils will need to be covered with visqueen at the end of the shift today. The visqueen, silt fence, and rock entrance will need to be monitored and maintained. By: Nicolas Hoffman Copies to:. City of Edmonds Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo . TERRA ASSOCIATES, Inc. • , ..'' • • Consultants in Geotechnical Engineering, Geology A Project No. T-840-11 , and Memo No. 23 Environmental Earth Sciences Date 11-22-2011 Project: Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lo.rian Woods Contractor: Jim Arnold Weather:Rain Present at Site: Framing crew Terra representative was on site from 12:10 to 2:40 to observe and test the backfill of the catchment wall and TESC. No new fill had taken place since our previous visit. During our visit we walked the site to observe TESC performance. In general; TESC measures appear to be suitable. No off site water flow/sediment transport observed. Runoff from visqueen appears to be infiltrating utility trenches with granular fills. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The.slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. All exposed soils related to construction were covered in visqueen. The plastic basins upslope-of the house are beginning to accumulate sediment and need to be cleaned. The silt fence down slope of the house has been damaged from construction activities and needs to be repaired. Copies to: City of Edmonds By:. Nicolas Hoffman Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo 7AAA TERRA ASSOCIATES Inc. '• • Project No. T-840-11. .A • •' Consultants in Geotechnical Engineering, Geology and Memo No. 24 . Environmental Earth Sciences Date 11-29-2011 Project: Isaacson House Subject: Site Visit TESC Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Overcast Present at Site: Framing crew Terra representative was on site from 08:00 to 08:30 to observe TESC. No new fill had.taken place since our previous visit. During our visit we walked the site to observe TESC performance subsequent to heavy rainfall over the weekend. In general, TESC measures appear to be suitable. No off site water flow/sediment transport observed. Runoff from visqueen appears to be infiltrating utility trenches with granular fills. The seepage from the upper portion of the site remains under control and in the tight line placed two years ago. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. All exposed soils related to construction were covered in visqueen. The plastic basins upslope of the house still need to be cleaned. The silt fence down slope of the house had been repaired since our previous visit. Copies to: City of Edmonds By: Nicolas Hoffman Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525.Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo TERRA ASSOCIATES, Inc. ,...,: •. , �" Consultants in Geotechnical Engineering, Geology. Project No. T-840-11 and Memo No. ' 25 Environmental Earth Sciences Date 12-23-2011 Project: Isaacson House Subject: Site Visit Deck and Entry Footings. Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold, Brian and Cindy Weather: Overcast Present at Site: Framing crew Terra representative was on site this afternoon to observe deck and entry way footings. The footing excavations had not reached bearing ground. Further excavation is needed to reach bearing ground. Jim to have the excavations covered by visqueen for the holiday weekend. In general, TESC measures appear to be suitable. No off site water flow/sediment transport'observed. Runoff from visqueen appears to be infiltrating utility trenches with granular fills. The seepage from the upper portion of the site remains under control. The slopes above and around the house have been covered with visqueen.. Sand bags and other weights have been placed to keep the visqueen in place. All exposed soils related to construction were covered in visqueen. The plastic basins upslope of the house need to be cleaned on a regular basis. The silt fence down slope of the house had been repaired since our previous visit. By: Charles R Lie Copies to: City of Edmonds . Brian and Cindy Isaacson Jim Arnold. Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦Kirkland, Washington ♦ 98034 Daily Field Memo . TERRA -ASSOCIATES Inc. A ''' ••' A �"Consultants in Geotechnical Engineering,. Geology. Project No. T-840-11 . and Memo No. 26 Environmental Earth Sciences Date 12-27-2011 Project: Isaacson House Subject: Site Visit Deck and Entry Footings Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Overcast Present at Site:. Framing crew Terra representative was on site this afternoon to observer,deck and entry way footings. The footing excavations had reached bearing ground. Further excavation is needed to reach bearing ground. Jim to have the excavations covered by visqueen until they have been poured and backfilled In general; TESC measures appear to be suitable. No off site water flow/sediment transport observed. " Runoff from visqueen appears "to be infiltrating utility trenches with granular fills. The seepage from the upper portion of the site remains under control. The slopes above and around the house have been covered with visqueen. Sand bags and other weights have been placed to keep the visqueen in place. All exposed soils related to construction were covered in visqueen. The plastic basins upslope of the house need to be cleaned on a regular basis. The silt fence down slope of the house had been repaired since our previous visit. By: Charles R Lie Copies to: City of Edmonds Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily.Field Memo TERRA ASSOCIATES, Inc. ,.,.,: , Project No. T-840-11 .• • Consultants in Geotechnical Engineering, Geology and, ' Memo No. 27 Environmental Earth Sciences . Date 1-23-2012. Project: Isaacson House' Subject:, TESC site visit. . Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Partly Cloudy Present at•Site: Framing,crew Terra representative was on site from 8:00 to 8:30 AM to observe TESC measures. In general, TESC measures appear to be suitable.. No off site water flow/sediment transport observed. Runoff from visqueen appears to be infiltrating utility trenches with granular fills. The seepage from the upper portion of.the site remains under control. The slopes above and around the house have been covered with visqueen with the exception of two areas. The two areas were located adjacent to the south and northwest sections of.the house. The areas should be covered with visqueen as soon as possible to prevent possible turbid run-off from projected upcoming rainfall. Sand bags and other weights have been placed to.keep the existing visqueen in place. The plastic basins upslope of the house need to be cleaned on a regular basis. The lower basin appeared to have been cleaned recently but was beginning to fill with sediment again. The silt fence down slope of the house was in fair condition. Copies to: City of Edmonds By: Nicolas R. Hoffman Brian and Cindy Isaacson Jim Arnold Telephone No: (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 Daily Field Memo . TERRA ASSOCIATES Inc. '•' •' • A� Consultants in Geotechnical Engineering, Geology Project No. T-840=11 . ' and Memo No. 28 Environmental Earth Sciences Date May 11, 2012 Project: Isaacson House Subject: site visit. Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Partly Cloudy Present at Site: Terra representative was on site at 9 am AM to observe project.progress. l . Provide upper terminations for the drainage board that is exposed on the uphill side of the catchment wall and along the north foundation wall of the house. This can be done by cutting the drainage board close to or slightly below grade and placing a piece of flashing over the top of the drainage board. The flashing can be nailed to the concrete and glued with construction glue to. the outside of the drainage board. This is to keep rocks and dirt from getting behind the drainage material. 2. Verify that there is 3 vertical feet of clear wall on the uphill side of the catchment wall. The drainage from the seepage above the wall should be directed into the yard drains through surface swales. It is ok for the drainage to infiltrate for the time being but for the long term it needs to go to the yard drains. 3. 1 would like to verify that the downspouts are connected to the tight line. This can be done by lowering a sewer camera down the downspouts to verify that the pipe is not perforated. It would be a good idea to camera all of the pipes now as well. 4.. I need to talk with Brian about final landscaping. One of our tasks is the final erosion control review, that usually occurs after the landscaping is put in. 5. I will need the memo from Wendell that modifies the foundation plan for the catchment wall. Copies to:. City of Edmonds By: Charles R. Lie Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland, Washington ♦ 98034 E lu, �I u P 1 u 11 I� r 1 1 I Daily Field Memo NTERRAAssocIA-�Es, Inc. .: 7 Project No. 840-11 Consultants in Geotechnical Engineering, Geology and Memo No. Environmental Earth Sciences Date 5-23-2012 Project: Issacson Residence Subject: TV of roof drain.lines/ tesc Location: Edmonds, WA Contractor - Weather: Overcast Present at Site: -Brian Issacson, Jim Arnold Arrival: 8:00 AM De arture: 9:00 AM.. Terra representative was on -site to observe TV of roof drain lines and erosion control measures. While on -site we observed the following: • We observed the inside of each roof drain downspout with a TV/camera: All of the downspouts were tied into tight- line pipe directed to the storm, drain system. The tight line pipe was partially crushed on near the entrance on the west side of the house. The plumber located the crushed section and indicated it was approximately.two feet below current grade Jim Arnold indicated the pipe would be fixed in the next day or two. • We walked the site with Mr. Issacson to observe final erosion control measures still needing to be addressed. Permanent ground cover needs to be put in place on the north,.south, and west sides of the residence. These areas were staked for,ornamental landscaping at -the time of our visit. Mr. Issacson indicated that the landscaping was scheduled to take place tomorrow and topsoil and/or mulch was to be placed over any remaining exposed.native soils. We recommended sloping topsoil away from the residence and any, hardscaped areas (eg. sidewalks). We recommended rerouting water flowing from the tight line pvc pipe on the slope east of the house. The pipe can either be tight lined to the existing storm structure off the NE corner of the house upon approval of the city, or shortened to flow into the existing swale routing water to the south end 'of the site. • Growth on the slope covering the majority of the east side of the property is well, established. The two lower tub basins were partially to'mostly full of sediment. The sediment was removed from the basins during our visit. The basins should be maintained on a weekly basis. The upper tub basins were free of sediment. By: Nicolas Hoffman Copies to: Email List 12525 Willows Road ♦ Suite 1.01 ♦ Kirkland, Washington 98034, ♦ Telephone No. (425) 821-7777 Daily Field Memo . TERRA ASSOCIATES Inc. � '• • �' • Project No. T-840-11 •" Consultants in Geotechnical Engineering, Geology .: ,. • and Memo No. 30 Environmental Earth Sciences Date May 30, 2012 Project: Isaacson House Subject: site visit. Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Weather: Partly Cloudy Present at Site: Terra representative was on site at about noon to observe final erosion control measures. The drainage mat along the north elevation of the house has been provided with flashing. New plants have been placed around the perimeter of the house. The weed barrier has not been placed yet.. By: Charles.R. Lie Copies to: City of Edmonds Brian and Cindy Isaacson Jim Arnold Telephone No. (425) 821-7777 12525 Willows Road ♦ Suite 101 4 Kirkland, Washington ♦ 98034 Daily Field Memo .TERRA ASSOCIATES, Inc.. . project No. T-840-11 .. Consultants in Geotechnical Engineering, Geology , A" and Memo No. 31- Environmental Earth Sciences Date June 3, 2012 Project: Isaacson House Subject: site visit. Edmonds Permit 2009-0743 . Location: Lorian Woods Contractor: Weather: Partly Cloudy Present at Site: Terra representative was on site at about ten AM to observe final erosion control measures. The loose soils along the edge of the pavement have been removed and replaced with crushed rock. The weed barrier has not been placed yet.. By: Charles R. Lie . Copies to: City of Edmonds Brian and Cindy Isaacson Jim Arnold Telephone No. (425.) 821-7777 12525 Willows Road ♦ Suite 101 ♦ Kirkland; Washington ♦ 98034 Daily Field Memo TERRA ASSOCIATES,. Inc. A _I ' Project No. T-840-11 �• Consultants in Geotechnical Engineering, Geology and _ Memo No. 5 • Environmental Earth Sciences Date 8-25-2011 Project: ' Isaacson House Subject: Site Visit Edmonds Permit 2009-0743 Location: Lorian Woods Contractor: Jim Arnold Weather: Sunny Present at Site: Jim Arnold Gordon, Shane-PNWC Writer met with Gordon and Jim on site to review site progress. At the time of the meeting, the keyway for the wall at the east side of the garage was being excavated. Heavy seepage was present. The soils exposed in the excavation will provide adequate bearing for the proposed footings. The keyways need to be protected. The upper keyway north of the garage has no caving of the side walls or seepage. The dewatering sump placed earlier is dry. The water in the garage area keyway is a pocket of water associated with a buried stump immediately south of the south end of the keyway. The stump remains green and is not decomposed. The stump is not exposed at footing grade. A clean sand has been imported from Cadman for use as cap break material. The cap break material must be protected during forming to maintain its drainage characteristics. The sieve provided by Cadman is attached to this memo. Forming is planned to start on Friday. A stockpile of soils is present for:use in backfill. The materials may be used for backfill provided drainage is provided with drainage panels against the walls. Terra to review the use of the material within the building footprint. TESC measures appear to be suitable. No off site sediment or water flow observed. Chuck Lie City of Edmonds Copies to: Brian and Cindy Isaacson By: Jim Arnold Pacific Northwest Construxion Telephone No. (425) 821-77.77 12525 Willows Road ♦ Suite -101 ♦ Kirkland, Washington ♦' 98034 CADMAN 0.0 10.00 1.00 GRAIN SIZE 0.1O 0.01 5ACCUMN 7 ° . v, J _"DATE SAMPLED: 6/lU2011 3/8'_ 9.50 0.0"PASSW n TIME: 1100 #4 4:75 0.4 " .0.0 100.0 0:1 99.9 ° SOURCE, D336 48 2.36 128.4 19.4 80.6 � SAMPLED BY: _ i�I�i® lt� # 16 . I".18 = 2 483.5 42.8 :. 527.5.2 TESTED -BY: Mario !" 30 . 429.4 64. . 35.2COMvENTS; 0.300 576.2 87.08 13.0 i SE_$8% 5.150 �E .7 97.5 O75 .9 9#20U 9.8 0.2 IN wr, 662.5 Mo� m cn O Cl 0 J L gismom ffmwml&. I� a PLANNED RESIDENTIAL DEVELOPMENT ' REPLAT OF LOTS 54, 55, 56, AND 57, OF THE PLAT MEADbWDALA �EACI CITY OF EDMONDS, SNOHOMISH COUNTY, WASHNGI`ON r SECTION 5, TOWNSHIP 27 NORTH, RANGES 4 EAST, LEGAL DFSCRIPTION , e.4SEMENT pROVI5 DNS ' .... LOTS 54,Y.56 AND 67 OFTHE PLAT OF MEADOWD)L. BEAD/ RECORDED INVOLUME 5 OF PUTS. DECLARANTS /1ESE4VE UNTO 'V EMSELYES THE WONT TO TRANSFER TITLE OR TO CONTRACT PAGE 08 AEL6R65 OF SNOHOANSH COUNTY, WASHINGTON, EXCEPT THE EAST IX7 FELT OF STUD , r 7 EAEOF OR•.TO 1tA5E OR BRAID-YW.T PBO(•ERTY UPON WHICH U11LIT1ES OR DnAWAGE LOT 57 ♦ • EAb`FA.IEHT9 AR�,IIKATEO OR ARE IDCJ.TED OFL ARE TO BE LOCATFJ] fHERHNAFTEA •RESERVED CAMIADN AREAS?•dA TD ORAN(. CONTRAL'i, OR L.I.A,SE EASEMAENiS. flt(R{T5 OR PERMIT$ FOR LMUTY SERVICE 70 ANY LRIUTY DISTRICT, URUTY COMPANY. OR PUBLIC BODY FOR FKIRPOSES AM TOGETHER WITH THE EASTERLY ONE HALF OF THE VACATION Of 7l1H PLACE WEST. OF INSTALLATION, MAANTOWN —MEPLAtEMEM OR EXTENSION OF UTILITY SERVICES ILSEF L EXCEPTING THERE FROM T1405'_ PORTIDRS OF SAID VACATED RIGHT•OF.WAY CONVEYED BY OOT %TO TW- PAQPERTY. TITLE 10 THE RESERVED COM40N AREAS 15 RESERVED TO DECLARANTS. ID CLAIM DEEDS RECORDED UNDER SNOHOMISIN COUNTY AUDITOR'S 115 NOS+ ;HEIR HEML[SUCCOI E656, AND AssnN5. UNTIL TRANSFERRED TO THE ASSOCIATION OR PUBLIC 9 s N e ! 10 3L T 9 D I O N 1 3 G S. •'•+ 6gOY. IISE'OR FJNJOY?IENj D.� TILE RESERVED COMuoN AREAS FOq ANY PURPOSE OR USES BY 011'[Qq OWNERS U PS%)FE59NE ONLY, AND NO RIGMS ev PBESCglP7IpN Oa ADVERSE P05 ES S�OTN AS TO THE REWYFD COMMON AREAS OR ANY PART THEREOF SHALL ACCRUE IN FAVOR OFANTJD,A MER DEDICATION r f TOGE HEMr I, •STOAu 6iWER EASEMENT AS RECORDED PER SNDHOWSH COUNTY • Al/OITTMS RR.E Nd. 6f06i]O.Vj.' BENEFITING I E CITY OF EOMONDS FOR THE WSTALUTION. KNON ALL PEOPLE BY TINLSE PRESENTS THAT WE THE UNDERSIGNED SEIRCALL THE OWNERS''. _ OPERATION A-0O MjFIB4 M Of STORM DRAINAGE FACILITIES. OF THE LAND HEREBY SUBDIVIDED, HEREBY DECLARE THIS SUBDIVISION TO SE.THE GRAPHIC • • M .' • ' t- REPRESEMATpN OF THE SUe0IV151DN MACE MEgE9T, N!0 DO HEREHH DEDICATE TO THE UZ* •+ TRAgIS -A• AND!T AAE AMRTHER SUBJECT TO ACCESS AND MAINTENANCE EASEMENTS FDR THE OF THE PUBLIC FOREVER ALL STREETS AND &VO4UES NOT S)DW'N AS•PRNATE W-REON AND f' PUBLIC SEWER..WATER AND STORM DRANAGE FAdUT1ES W4TWN SAID TRACTS. DEDICATE THE USE THEREOF FOR ALL PUBOC PIIRPO9ES Ndf 1916OiNSISTENT W'ITH,THE USE: 7W IEOF FOR PUBLIC FNIGHWAY PURPOSES. AND ALSO IRE A1GIff TO MAXE ALL NSCE.SSAAY: •'♦ rr • • -rRALT'A• (9&UB.IECT FURTHER TO "ON-EXCAbTVE 1NORESS AND EGRESS EASEMENTS IN THE SLOPES FOR CUTS AND PILLS 11P0T( W� l.DT5 9�IOYM HE7GLON IN THE ORIQWL �-wE: VKWfTl -OF THE VACATED PORTION OF 74TH PLACE WEST A=NG FR THE FOLLC1rANG GRADUD OF SAID AND ANMAI IES, O ND RMJT/ER DEDICATE TO THBUSEUFYYE PUBLIC '+ DOCULWHTS OF RECORD, P40HOWSH COUNTY AUDITORS FILE NOS D 1. EASEMENTS SHOWN ON THIS SUBDIVISION FOR ALC PIAUC PURPOSES &t NDICATED HFREL� 4 •OIOI %O %, . 10/0/ AO 5k �0/0/ d 0 S F5. INCLUDING BUT NOT LIMBED TO PARHL, OPEN ,SPACE. UTILITIES YIN D DRUNAOE UNLESS SHCH 9N/0 III a 'L A I EASEMENTS ARE SPECWIC ALY ICGNIIFIED 01, THIS U16DIVISION AS BENC,DEDICAATfD OR CONVEYED TO A PERSON OR DRTTY OTUIERTHAIC0IE PUBLIC. THIS SUBDWK DFDICATTON,YNAIVF OF CIA:MS AND AOIEEMENT.'llp HUD HARMLESS IS MADE FFF- CONSENT VINO IN ACCORDANCE W iH THEP%&RES QF SAID DINNERS. COVENANT )VRHI! OFWE BET OUR HAND$ANO•SEALS. ' r ♦ OWNERS. AND ALL PERSONS HANNG ANY PRESENT OF MASECV fr OYYNEIR9a^ INTEREST W _ _ AND ASSIGNS OWNERS OR OTHER PARTIES HANI/O ANY LANDS. AND THESUCCESSORSTHAT . • r CITY 51, HEREBY AGREE THAT CITY OF EDMONDS SHALL BE INE1D MMMILESS IN ALL RESPECTS SK • • •� M AM AND ALL CLANS FOR DAMAGES FOR 0,LIU TTVE RELIEF WHICH MAY SB OCGASIOJED NOW CR 1N THE FUTURE TO ADJACENT LAND OR IMPROVEMENTS BY REASON OF THE CONSTRUCTION, OPERATION AND MMAINTENAAr-E OF THE OAAINAGE SYSTEM, AND HEREBY WAIVE j�'�(j //�;Ri 1 0 AND• EXCLUDING ELY°6EDMONDS AN OR OMISS OM 1' 1A S MAR 9 2010 DAMAGE CAUSED ACTT O N OFOSA'AID CITY A� .ROR �VE RELIEF V*OCH N • THE OWNERS. OR THEIR SUCCESSORS DR ASSIGNS, MAY THEMSELVES HAVE NOW OR 1N THE FUTURE BY REASON OF THE CONSTRUCTION. MAINTENANCE AND OPERATION OF SAID DNMNAGE .DEDICATION OF•,TRAC7:S 'A' AND 'H" •�• 'COMMON AREA.' SHALL IAEAX ANT. •RHO ALL REAL PROPERTY OWNED BY THE ETHER WITH WOODS. FDMCN S. COVENANTS, CONDITIONS AND RESTRICTIONS FOR THE FLIT OF LDRIAN W0005, MONO(. WASHINGTON AS 'REGARDED PER ASSOCIATION FOR THE COY MOr-USE AND ENJOYMENT OF THE OWNERS, •''+ SNONOMISN COUNTY, AUDITORS FILE NO, INCLOPING THE LAWN AND OAR DENS ITRACT `A`AS SHOWN ON THE FACEDF.'THIS PUT}, PRIVATE DRIVE (TRACT •B`AS SHOWN ON THE FACE OF THIS PLAT "I'>`"• OTHER•THAX ANY STREETS OR OTHER AREAS HEREAFTER DEDICATED TO PUBLIC •,I " USE), WALKWAYS, GREENBELTS, AND RESERVE AREAS. THE COMMON AREAS TO • BE OWNED BY THE ASSOCIATION AT THE TIME OF CONVEYANCE OF THE FIRST TREASURER'S CERTIFICATE • • ` • I..Au I,:; •: •_ • ,: PROPERTE9, ARE DESCRIBED IN THE DECLARATION OF COVENANTS, CONDITIONS 1, KINe SIE UC-e •••• AND RESTRICTIONS FOR THE PLAT OF LORIAX WOODS, EDM ONO w HINGTON. AS RECOROCTI PER SNOHOMISH COUNTY, AUDITOR'S FILE N0.j.n'crA PIE iRE/SUREA OF SNO IS" COLW.WASHIN`G DO HEREBYCEMTIIFY INATALL. OF THE TAXES ON THE VRTWN DESCWBEO TRACT OFIAlA HAVE BFFI IN wljot55 WHE EOF WE SET OUR HANDS AND SEALS. • ••• FULLY PAID UP TO AHD INCLUOINO THE YEAR 1990. r.-/N.-90 7�IRMF �IFVR>c nn ,�: . �. 1 n a'� ♦vO♦. COUNTY' TRFJSUREP O W DEPUTY CCAINTY TREASURER APPROVALS EKAMINEDANOAPPRDVEDTMS�DAYOF 01-t'abcr- .191OAO. ACKNOWLEDGEMENT STATE OF WASHINGTON COUNTY OF SNOHOMISH ON TINS /I DAY OF M9w7.0 19" PERSONALLY APPEARED BEFORE ME •Lg+ O 0 ME KNOWN TO BE THE INDIVUDUAL(S) DESCRIBED HEREIN AND WHO EXECUTED FOREGOING INSTRUMENT, AIM ACKNOWLEDGED THATrM0L__ SIGNED THE SAME ASF{q/& FREE AND VOLUNTARY ACT AND DEED, FOR THE USES AND PURPOSES THEREIN MENTIONED. AND ON OATH STATED TINT THE)' WERE AUTHORIZED TO EXECUTE THE SAID INSTRUMENT WITNESS AND OFFIOAL SSEAL HERETO AFFUEDTHE DAY AND YEAR ABOVE WRIREII. ♦ NOlAAY PUB iL-•Q"�+1.AT - E OF WASHINvTON COUNTY OF '.iM_pM•RAC Ar RESIDING AT AQk*&AA a I ED ONO( L7TY ENGVlEER EXAMINED O APPROVED THIS jr OAY OF .19_q& AD. EDMONDS kLANNING DIRECTOR XAMY MD ROVED THIS IL DAY Mr b TY ED S UE ,CRY CLERK LAND SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT THIS PLAT OF LDRIAN WOODS IS BASED UPON AN ACTUAL SURVEY AND SUBDIVISION ON OF SECTION S. TDWNSMP 77 Wn7n RANGE A EAST OF W.M. THAT THE COURSES RECORDING CERTIFICATE AND DISIA14MS ARE SHOWN CORRECTLY THEREON: THAT THE MONUMENTS LULL BE SET AD THE LOT CORNERS WILL BE STAKED CORRECRY DN THE GROUND AS CONSTRUCTION IS RECORDING NO. COMPLETED AND TK AT I NAYE FULLY CDMPUED W,TH THE ""VON$. OF PIATTIM FILED FOR R_ S DAY O a 19 AT i�0i M. 9+ REGRAATIONS. V011IL1E �_ OF PLA �. PAGES E AT THE REQUEST OF DOW. ENGINEERS. I C R05 OF SNOHOMISH COLXVtt, WAS TON, �'.�' [/�I SIGNED � O. IN yZfa'1 u , Il) ♦ �lf��pPy( FUj. LICENSED LAND SURVEYOR NO 16n, v • 4 '+ SNOIIOIAISH CAUL AUDITOR DEPU ONOM ISE/N.I C I AUDUOR } DOWL fit E N U I N E E R E PAGE 2 OF 2 1--- 0 0 worms Tl LLJHIA�N PLANNED RESIDENTIAL DEVELOPMENT REPLAT OF LOTS 54, 55, 56, AND 57, OF THE PLAT MEADOWDAL•E REACH. CITY OF EDMONDS, SNOHOMISH COUNTY, W-ASRtNGION SECTION 5, TOWNSHIP 27 NORTH, RANGES 4 EAST, -W.M. % -^UR%,'E TABLE MCADO�,VALE' ........... .............. ............ 4- ......... a�zx........... .............. ............ ........... q'! ............. i ................. ;N % LEGEND P ,Awl .e c" srT cAv... IN; R—AL A tNAIKC- AADAL• All LE-:;FNI: 01" TRACT B Q) P 'Z77DRIVE RIV TRACT % TRACT "A' - L C) r 7 ...... .. ..... .5. K. DOWL -! 11 "' N a 0---u A D 0 V,! D L L A C 66 9 0 1 L-) 169-CO6 e Noy 03-0d 09:36am From- • a • 7-197 P.002/002 F-886 LAWYERS iinz CompANY OF WASHINGTON, INC LYNNmIW1u7RCt kgATRp I1FsttE �E11XYbF, YETIR Yrt17G11Al, KAI'OFIR.'E ?;w(tl6A.msi w ►tUINvcnhyLmtt.31'Ku IrtnftKLxkSte2ly IUCS.rYt11�4Sua•a YA M" flds s WA fxoM AbAN W-K WA "WJ T7y 1101M.•WI M�•� R71 try 4"117 he=4w fon enxas Pen)1D.urM P"M FM MUNIv AT mou@gT te� / Rabert A. and joa= M. Anderson Yma hEwfut o nErUFN to N— JOann M. Ant3e.,scm jw&on 16010 .. 73rd Place 3gest 01-1oft zo -R WA 4R(17' QUIT CLAIM DEED Ims PAM PROVKxi) FCA Rvmg30; 6 Lft; k-CORDED .96 JAN -3 P? d7 TiHEQRAWM pzbest A. Ar}derson and .Toam M. Anderson rar"Iq WlWdem(iuo of Gift woreyx mad yult dnlrtu to Ilm kdlm in tketrl L.arian Mates, L. I?.8 bad +cal atm _, situmca in dic cmanty of Salo a Wmhi"t, kWJlkReng aqy offeraNuirW li(il^_ Smolomish Int Z, Plat of LCityorian Floods, =.Plat of lots 54, 551 56 and 5.7 Plat CIE a Beach,717�27 of Bin°�r swish Cmmty, Washington. r $e 4 East, W,M, NO EXCISE TAX .bUE $2.00 Treasurer's Fee R®quired oadd'?r 'AN 4 1996 U ~1� Qf Deputy � 1 :^Ib.m• I my ny tscsretuyl INUIY]DUALAC.N WLLMt MCNr JtLMAt: ROIKESENTAIWE ACKM(7WLlit)0Eh1Errr poRm: Stilt W,thinfron •'.�, �• slfi4 �4` ,.,. rn�nlynr _ � ss. �'1--5�,�,��r� ��I1�y� inn• a �- *"IT r)' Cy{tltrrtc F al I CcKlly Ikd I klm- m hxvc jell.rnptnrr �,idrncc li.ol • . - ;'�-U?�AC;C_ V'* I l.: fir• ; .. 1_!. U c 4 i� ( (l, C.l :� ;r-t , . "—�— ^— Alpm j thix hlslmm nt, u s ,{� If Ihhrnerll. +wd ae(Inuu'tedktd it 1n be (trr, /her) on Oxlh Arelyd Mel (he f Ahtl W- sulhori{ed 10 tAtrulr lire Incnontt ril / tett� act !Irt the t= ■nd purport mvaitr,ed end wkr*whdsd II U tkc �rt Ibc lrrslr><ne;sd.,� of to 6. A '•�+f� t I IEC Mtl vUhlnlxry ray Of IVA pnrly (or the aces end pmpurw menliOnCd °n 'l the kilrOment. blwo MY'NT'.th1%tvp P;3lxir of Vwt ra t. MY Md^�'RIy C><p:rm f ) . r � t+mF) twNic IrF fee S1ic ld 1ve.hkr�lm Mr er>gi.nrr•cnt r,tfriw �J I l'''�( ., l,tvw.'f Mtoh .v IOL. V r y`Y UC • UTILITY EASEMENT IN CONSIDERATION of benefits to accrue to the grantors here in, the undersigned, Robert A. Anderson and Joann M. Anderson hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, operation and maintenance of a storm sewer over, across, through, and below the following described property; and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction and maintenance of said utility or utilities, together with the right of access to the easement at any time for the stated purposes. The easement and right-of-way hereby granted is located at the County of Snohomish, State of Washington, and is more particularly de- scribed as follows: A ten foot strip of land that is 5.00 feet on each side of the storm sewer as it now exists, or as staked in the field by the engineers. Within the following described property: tracts 54, 55, 56.and 57, Plat of Meadowdale Beach, as per plat recorded in Volume 5 of Plats on page 38, records of Snohomish County; EXCEPT the East 120 feet of said Tract 57; situate in the County of Snohomish, State of Washington. TOGETHER WITH a temporary 10 foot construction easement over the aforementioned property. Said construction ease- ment will end upon the completion of the construction of the storm sewer, or January 1, 1985, whichever comes first. THE CITY agrees to restore to substantially the original condi- tion such improvements as are disturbed during the construction, main- tenance and repair of said utility or utilities; provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon, or within the permanent easement. st- DATED this 5I day of STATE OF WASHINGTON) ) ss COUNTY OF SNOHOMISH) n this da personally appeared before me ! ,.'' and l�� [/ (� i ,� ;�fj{ �,1� to me known to be the ivi ual s descrY6e8 1n ancl uted the within and forgoing instrument, and acknowledged that signed the same as , free and voluntary act a deed, for the uses and purposes herein mentioned. 1 DER HAND AND F�CICIAL SEAL THIS DAY OF 19 : IC r;-ran or the S TAX ° v a§b;o5ton x k69 at REQUIR�p 3o623030 JUN241983 1, 94 PAGE 2826 C « W • -•- - 4:10:D After recording return to: Dr. & Mrs. Robert A. Anderson 7370 North Meadowdale Rd. Edmonds, Washinglon 9802E r•q EASEMENT AGREEMENT r, (Phyllis H. Wiggins) 2• V N GRANTORS, I,obert A. Anderson and Joann I, Anderson, husband and wife, in consideration of the consent of `Grantee, •Phy.xlis H. Cs) Wiggins, a single woman, to the vacation of a street }; right-of-way of 74th Place blest in the city o'& Edmonds, and effective upon the vacation of the said 74th N ace best by the C) city of Edmonds, and in consideration of Gra9teels giving C\� Grantors a view easement over Grantee's property'(as set forth I-;.q hereafter), convey and quit claim to Grantee, her heirs, ® successors, and assigns, a non-exclusive easement for ingress and eoress over, across, and upon that property in Snohomish County, Washington, legally described as: The easterly one-half (1/2) of the vacated right-of-way Of 74th Place {Jest from North beadowdale Road to the southerly line of Lot 3, Block 58, Plat Of Deadowdale beach recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington. Such easement shall be forthe benefit of and run with the land of Grantee, her heirs, successors, and assigns which property is located in Snohomish County, Washington, and legally described as Lots 1, 2, and 3, Block 58, of the said Plat of Meadowdale Beach. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. Grantee hereby gives and grants to Grantors, their heirs, successors, and assigns a view easement over and across Grantee's property as described hereafter. The purpose of the view easement is to allow Grantors, their heirs, successors, and assigns the right to maintain their existing views. Grantee for herself, her heirs, successors, and assigns agrees that Grantors, their heirs, successors, and assigns shall notify Grantee when there are limbs and trees which have grown into the existing views from Grantors' lots 1, 2, 3, and 4 of the proposed planned residential development plat of Lorian Woods Estates (which has received preliminary approval by the city of Edmonds in March 1990) which is located on Tracts 54, 55, 56, and 57 of the said Plat Of Meadowdale Beach EXCEPT the east 120.00 feet of the said Tract 57. Together, the Grantee and Grantors shall agree on the limbs and possibly trees to be removed so the views shall be maintained and the Grantee's landscaping plan also be maintained. The cost of removing any such limbs or trees shall be paid by the Grantors and shall be done at times convenient to both parties. Grantors shall also remove all debris from Grantee's property. If agreement cannot be reached between the parties.• a mediator will be employed until resolution is reached and the expense or this mediator shall be paid equally by Grantors and Grantee. Both the Grantors and Grantee have photographs on file. documenting the existing view. Such photographs are to be held with Lorian Association's records and in Grantee's safe deposit box. Grantee's heirs, successors, and assigns shall designate where photographs are kept by them; The view easement shall be a burden upon the land of Grantee and a benefit to the land of Grantors and shall run with the land with respect to both Grantee, Grantors, their heirs, successors, and assigns. The legal description of the property of Grantee is: Lots 1, 2, and 3, Block 58, Plat of t•leadowdale Beach, Recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington. The legal description of the land of Grantors which is benefited by the view easement is now: EASEMENT AGREEMENT - Page 1 of 2 VOL. 238'5)PAGE 1U62 NO EXCISE TAX REQUIRED OCT 121990 UM s ,nu3a • Tracts 54, 55, 56, and 57, Meadowdale Beach, according to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington, EXCEPT the east 120.00 feet of said Tract 57. Upon final approval and recording of the said Plat of Lorian Woods Estates, the parties agree that an Easement Agreement containing the volume and page number of the recorded plat of Lorian Woods Estates will be signed by both parties and recorded so that said Lots 1, 2, 3, and 4 of the Plat of Lorian Woods E�,.tdtes are Ally described. ert A. Anderson.. (Date) Phyll s4. Wiggins (DateJ/ nn M. Anderson (Date) STATE OF WASHINGTON) ) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me PHYLLIS H. WIGG TINS to me known to be the individual described in and who executed the within and foregoing instrument and acknowledged that she. signed the same as her free and voluntary act and deed for the uses and purposes therein mentioned. ZV EN under my hand and official seal this _ /l _ day pf;•_ , 1990. ti NOTARY PUBLIC in and for -the 5ta-te of Washington, Residing at'��1'l '. My Commission Expires: STATE OF WASHINGTON) ) BE, COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. ANDERSON to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _13 day of 1990. NOTARY PUBLIC in and for the S.t.t-e - - of Dashington, Residing •at 66--t✓— ; My Commission Expires: STATE OF WASHINGTON) ) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me JOANN M. ANDERSON to me known to be the individual described in and who executed the .within and foregoing instrument and acknowledged Lhat she signed the same as her free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _Z_1 day of 1990. NOTARY PUBLIC in and for�the 4S m 6 of Washington, Residing a.t'2t% G- My Commission Expires: EASEMENT AGREEMENT - Page 2 of 2 9010120 3 6 21 VOL. 2.385PAGE1U' G3 i • After recording return to: ���,,. 4:09:B Dr. 8, Mrs. Robeii A. Anderson (I 7370 North Meadowdale Rd. 0 �'• Edmonds, Washington 9BO26 EASEMENT AGREEMENT AND QUIT CI;Acam-.I�) DEED'. -' (Dale Fuller) �, N GRANTORS, Robert A. Anderson and Joann [��, Anderson, _�usband and wife, in consideration of the consent of ptantee,.Dale C� Miller, a single man, to the vacation of the s Ceet•righb=of- way of 74th Place West in the city cf Edmonds and offective upon the vacation of the said 74th Place West by the ci y of Edmonds, and in consideration of Grantee's giving Grantors a view easement (as iq set forth hereafter) convey and quit claim to Grantee, his heirs, successors, and assigns, a non-exclusive easement for ingress and egress over, across, and upon that property in Snohomish County, Washington, legally described as: The easterly one-hrlf (1/2) of the vacated right-of-way of 74th Place West from 162nd Street Southwest in the City of Edmonds to the northerly boundary line of Lot 11, Block 58, Plat of Meadowdale Beach, recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington. Such easement shall be for the benefit of and run with the land of Grantee, his heirs, successors, and assigns which property is located in Snohomish County, Washington, and legally described as Lot 11, Block 58, of the said plat of Meadowdale Beach. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. In. consideration for the above easement, and other consideration, Grantee gives and grants to Grantors, their heirs, successors, and assigns, a view easement over and across Grantee's property as described hereafter. The purpose of the view easement is to allow Grantors, their heirs, successors, and assigns the right to maintain the existing view. No additional trees will be planted by Grantee, his heirs, successors, or assigns which will have a maximum height greater than 30 feet total unless an agreement is first made to remove limbs from the tree or trees to maintain the view from Grantors' property_ Grantee gives and grants to Grantors, their heirs, successors, and assigns the right to selectively remove limbs of existing trees to maintain existing views as trees grow, but to remove the limbs in a way that will not detract from Grantee's landscaping. The cost of providing and maintaining the said view shall be paid entirely by Grantors, their heirs, successors, and assigns. The easement shall be a burden upon the land of Grantee and a benefit to the land of Grantors and shall run with the.land with respect to both Grantee, Grantors, their heirs, successors, and assigns. The legal description of the property of Grantee is: Lot 11, Block 5B, Plat of Meadowdale Beach, Recorded in volume 5 of Plats, page 3B, records of Snohomish County, Washington. The legal description of the land of Grantors which is benefited by the view easement is: Lots 54, 55, 56, and 57, Meadowdale Beach, according to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington, EXCEPT the east 120.00 feet of said Lot 57. Grantors, Robert A. Anderson and Joann M. Anderson, in further consideration fo- receipt of the above -described 1riew easement, convey and quit claim to -Dale Miller, a single man, the following described real property: NO EXCISE TAX REQUIRED EASEMENT AGREEMENT AND QUIT CLAIM DEED - PL�ge 1 of 2. OCT 12 5 PAGE1 ) G 4 i COMMENCING at the Southeast corner of Lot 11, Block 58 in the said plat of Meadowdale Beach; thence SB7035'43"E along the Easterly prolongation of the South line of the said Lot 15.50 feet to intersect the centerline of the said vacat8d 74th Place West, and the POINT OF BEGINNING; thence N16 59'17".E along said centerline 60.30 feet to intersect the easterly prolongation of the north line of said lot; thence S87 42'10"E along said line 1.17 .- feet; thence S1Bo03'22"1-1 60.61 feet to the POINT OF BEGINNING; SUBJECT TO a permanent non-exclusive easement for ingress and egress from 162nd Street SW to Lots 5, 6, 7, B, 9, and 10, Block 5B, of the said Plat of Meadowdale Beach, which easement is for the benefit of the said Lots 5, 6, 7, B, 91 and 10 which easement runs with the land and shall be a burden on the above -described property conveyed by this instrument to Grantee. alert A. `nderson (Date) Dale Miller (Date) Jdann M. Anderson (te) STATE OF WASHINGTON) ) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me DALE MILLER to me known to be the indiaidual described .in and who executed the within and foregoing instrument, and acknowledged that he signet] the same as his free and voluntary act and deed, for the uses and purposes therein mentioned. G N under my hand and official seal this 2__?_ day of `I --- -------� 1990. �. OTARY PUBLIC in and for th tat-e'.n :• of Washington, Residing at __n-s_YG_ My Commission Expires: �,� (• ; STATE OF WASHINGTON) ' ) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me ROB£RT A. ANDERSON and JOANN M. ANDERSON to me known to be the' individuals described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. v under my hand and official sea] his ar day...of. 1990. <� __ //,'N_. OTAf2Y PUBLIC n and for ;the rage: " f Washington, Residing gt,� My Commission Expires: EASEMENT AGREEMENT AND QUIT CLAIM DEED - Page 2 of 2 After Recording Return to: ; Dr. & Mrs. Robert A. Anderson 7370 North Meadowdale Rd. Edmonds, Washington 98026 r f• iv i EASEMENT AGREEMENT (Mary E. Janeway) h ° V GRANTORS, Robert A. Anderson and Joann M. nderson, husband and wife, in consideration of the consent of. Grantee, Mary E. Janewayr a single woman, to the vacation of the street t`( right-oE-way of 74th Place West in the city of E.dmortds, and C� effective upon the vacation of the said 74th Place West by the r-4 city of Edmonds, and in further consideration of Grantee's giving Grantors consent to remove certain trees on Grantees's property, convey and quit claim to Grantee, her heirs, successors, and assigns, a non-exclusive easement for ingress and egress over, across, and upon the following property in Snohomish County, ha.shington, legally described as: That portion of Lots 56 and 57, Meadowdale Beach, according to the Plat thereof recorded in Volume 5 of Plats, page 30, records of Snohomish County, Washington, described as follows: Beginning at the southwest corner Of said Lot 57; thence south B7 35'43" east along the southerly line of said Lot 57 10.00 feet; thence north 16 59117" east parallel with the westerly line of the said Lots 56 and 57, 1B0 feet; 8hence north 87°25'43" west 4.00 feet; thence north 16 59'17" east 85.0 feet; thence north 87°35'43" west 6.0 feet to intersect with the westerly line of the said Lot 56; thence south 16 59'17" west along the westerly line of said Lots 56 and 57 265.00 feet to the point of beginning; TOGETHER WITH the easterly one-half (1/2) of the vacated 74th Place West from the northerly line of Lot 6, Block 58, of the said Plat of Meadowdale Beach to 162d Street Southwest, LESS the westerly 11 feet thereof lying between the northerly boundary line of the southerly one-half (1/2) of Lot B, Block 58, of the said Plat of Meadowdale Beach, as projected easterly and parallel with the line between the said Lots 8 and 9 and the southerly boundary line of Lot 10, Block 5B, of the said Plat of Meadowdale Beach as projected easterly on the same bearing as the said line. Such easement shall be for the benefit cf and run with the land of Grantee, her heirs, successors, and assigns which property is located in Snohomish Countyr Washington, and legally described US: Lots 6, 7, and the north one-half (1/2) of Lot 8, Block 5B in the Plat of Meadowdale Beach, as described above. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. Grantee hereby gives Grantors permission to cut three cedar trees on Grantee's property as follows: (1) The multiple trunk cedar tree growing from a single old stump which is located near the northerly line of the said Lot 6, approximately midway between the easterly and westerly boundaries OIL! Lot 6; (2) One cedar tree near the northeasterly corner of Lot, 6 in the westerly one-half (1/2) of the vacated 74th Place i1Q@>t�'4jSE T; REQUIRED EASEVENT AGREEMENT — Page 1 of 2 OCT 12 19R. _9U 10120 3 6+ �OL.2��5PAGE��G6 orb 1 'Cr By (3) The cedar tree near the easterly end of the shed on Lot 7 located in the westerly one-half (1/2) of the vacated 74th Place West. The trees shall be removed in a careful, workmanlike manner with all parts of the trees and debris removed from Grantee's property without unnecessary delay. Grantors shall give Grantee or her representative notice of such intent to do the removal and Grantee or her representative shall allow the cutting to be done " at a reasonable time convenient to both parties. All costs of c tting, removal, and cleaning debris shall be paid by Grantors. obert A. Anderson -- Paul M 41illiams, Guardian of Mary E. ,7aneway Date: % ( �J_L'---------- Date: Joarin Pl. Anderson Date: d STATE OF WASHINGTON) ) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me PAUL M. WILLIAMS who signed this instrument, on oath stated that he was authorized to execute the instrument, and acknowledged it as the GUARDIAN OF MARY E. J AN D7AY to be the free and voluntary act of MARY E. JANEWAY for the uses and purposes mentioned in this instrument. E under my hand and official seal this (,-A day of 1990. OTARY PUBLIC in and ,for the—tate of Washington, Residing at _ My Commissicn Expires: STATE OF WASHINGTON) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. ANDERSON and JOANN M. ANDERSON to me known to be the individuals described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. G EN under my hand and official seal this � day 1990, NOTARY PUBLIC in and for the' StA:tc of Washington, Residing at My Commission Expires: EASEMENT AGREEMENT - Page 2 of 2 ��1o12,4) 41 VDL. 3b`JPASE�O�i� :nr•:L: NO EXCISE TAX WHEN RECORDED RETURN TO: REQUIRED L,VName ___ Dr. a Mrs. Robert A: Anderson OCT 12 199 Address 7370 North MeadawdaleRd. City, State, Zip _ Edmonds, Washington 980af p s,y, I '^'y1 By QUIT CLAIM DEED AND EASEMENT DePuly �! THE GRANTORS, ROBERT A. ANDERSON and JOANN M.. ANDERSON, husband Y and wife, for and in consideration of Grantees' consent to the vacation of 74th Place West by the city of Edmonds and, effective upon such vacation, Grantors convey and quit claim to Grantees, J. SHERMAN MILLS and FRANCINE H. MILLS, husband and wife, the ,following described real property, situated in Snohomish County, t -Washington, together with all after -acquired title of the Grantors therein: The westerly 11.0 feet of the easterly one-half (1/2) of the vacated 74th Place 41est in the city of Edmonds, Washington, between the northerly boundary, as extended easterly, of the south one-half (1/2) of Lot 8, Block 58, and the southerly boundary as extended easterly of Lot 10, Block 58, of the Plat of Meadowdale Beach, according to the Plat thereof, recorded in Volume 5 of Plats, page 3B, records of Snohomish County, Washington. Grantors further give and grant to Grantees: A non-exclusive easement for ingress and egress from 162d Street Southwest to the northerly line of the southerly one-half (1/2) of Lot B of the said Plat of Meadowdale Beach, over, upon, and across the easterly 4.0 feet of the easterly one-half (1/2) of the vacated 74th Place west; and TOGETHER WITH a non-exclusive easement for ingress and egress over, upon, and across the following additional property: That portion of Lots 56 and 57, Meadowdale Beach, according to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish county, Washington, described as follows: Beginning at the southwest corner of said Lot 57; thence south 67 35'43" east along the southerly line of said Lot 57 10.00 feet; thence north 16 59117" east parallel with the westerly line o� the said Lots 56 and 57, 180 feet; thence north B7 35'43" west 4.00 feet; thrdnce north 16 59'17" east 30.0 feet; thence north 87 35'43" west 6.0 feet to intersect with t$e westerly line of the said Lot 56; thence south 16 59'17" west along the westerly line of said Lots 56 and 57 210.0 feet to the point of beginning. Such easement shall be for the benefit of and run with the land of Grantees, their heirs, successors, and assigns which property is legally described as: The southerly one-half (1/2) of Lot 8, Lot 9, and Lot 10, Block 58, in the said Plat of Meadowdale Beach. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it, DATED: _ _--_44 /3 __ , 1990 / — ----- ) _3646 ' Robert A. Anderson (Datr.) Joann t4. F,nderson (Date) QUIT CLAIM DEED AND EASEMENT - Page 1 of 2 �010120 1�OL.2.�SCiPAGE�UG8 iSTATE OF WASHINGTON) ) ss. COUNTY OF SNOHOMISH) I On this day personally appeared before me ROBERT A. ANDERSON, to me known to be the individual described in and who executed the within and foregoing instrument and acknowledged it to be his free and voluntary act and deed for the uses and purposes mentioned in this instrument. G EN under my hand and official seal this _/3 day of .NOTARY PUBLIC in and for the�5trgte of Washington, Residing. at My Commission Expires: j STATE OF WASHINGTON) ss COUNTY OF SNOHOMISH) I On this day personally appeared before me JOANN M. ANDERSON to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that she signed the same as her free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal this _!-3 day of 1990. NOTARY PUBLIC in and for the State of Washington, Residing at 46-94-41—' My Commission Expires: _ 7­2 2 9010-120 Ta�� QUIT CLAIM DEED AND EASEMENT - Page 2 of 2 VOL. 23 8 _0MGE10 G 9 After recording return to: •I NO EXCISE TAX Dr. b Mrs. Robert A. Anderson REQUIRED 7370 North Meadowdale Rd. Edmonds, Washington 98026 OCT 121990 i j C(� EASEMENT AGREEMENT (Melvin E. and Margaret L. Ebert) p Sk hxiA It d ; er �-.,-+1.-�- r A- GRANTORS, Robert A. Anderson and Joann M. Anderson, husband rxputy G12 and wife, in consideration of the consent of Grantees, Melvin E. r-{ Ebert and Margaret L. Ebert, husband and wife, to the vacation of the street right-of-way of. 74th Place West in the city of Edmonds and effective upon the vacation of the said 74th Place West by the city of Edmonds, and in consideration of Grantees' giving Grantors a view easement (as set forth hereafter), convey and quit claim to Grantees, their heirs, successors, and assigns, a :. i non-exclusive easement for ingress and egress over, across, and ! upon that property in Snohomish County, Washington, legally described as: I (a) The easterly one-half (1/2) of the vacated right-of-way i of 74th Place West in the City of Edmonds from North Meadowdale Beach Road to the southerly boundary line ( of Lot 5, Block 58, Plat of I•feadowdale Beach, recorded in Volume 5 of Plats, page 38r records .of Snohomish County, Washington; and, i (b) That portion of Lots 56 and 57 of the. said Plat of Meadowdale Beach described as follows: Beginning at ! th8 southwest corner of said Lot 57; thence south 87 35'43" east along the southerly line of said Lot 57 10.00 feet; thence north 16059117" east parallel with the westerly line of tie said'Lots'' 56 and 57, 1B0 feet; thence norh 87 35'43" west 4.00 feet; thencs north 16 59117" east 85:0 feet; thence north 87 35143"•west 6.0 feet to intersect with She westerly line of the said: Lot 56;— thence south 16 59'17" west along the westerly ^' line of said Lots 56 and 57 265.00 feet to the -U point of beginning; TOGETHER WITH the easterly one-half (1/2) of the vacated 74th Place West from the northerly line of Lot 6, Block 58, of the said 1 Plat of Meadowdale Beach to 162d Street Southwest, LESS the westerly 11 feet thereof lying between the northerly boundary line of the southerly one-half (1/2) of Lot 8, Block 58, of the said Plat of ra Meadowdale Beach, as projected easterly and parallel with the line between the said Lots 8 and 9 and the southerly boundary line of Lot 10, Block 58, of the said Plat of Meadowdale Beach as projected easterly on the same bearing as the said line. such easement shall be for the benefit of and run with the land of Grantees, their heirs, successors, and assigns which property is located in Snohomish County, Washington, and legally described as Lot 5, Block 58, of the said plat of Meadowdale Beach. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. In exchange for the above easement Grantees give and grant to Grantors, their heirs, successors, and assigns, a view easemenL• over and across Grantees' property as described hereafter. The purpose of the view easement is to allow Grantors, their heirs, successors, and assigns the right to maintain the existing view. No additional trees will be'planted by Grantees, their heirs, successors, or assigns which will have a maximum height greater than 30 feet total unless an agreement is first made to remove EASEMENT AGREEMENT - Page 1 of 2. VOL. 2 3 $ '5'PAGEI. U 7 0 .0 • limbs from the tree or trees to maintain the view from Grantors' property. Grantees give and grant to Grantors; their heirs, successors, and assigns the right to selectively remove limbs of existing trees to maintain existing views as trees grow, but to remove the limbs in a way that will not detract from Grantees' landscaping. I,he cost of providing and maintaining the said view shall be paid entirely by Grantors, their heirs, successors, and assigns. The easement shall be a burden upon the land of Grantees and a benefit to the land of Grantors and shall run with the land with respect to both Grantees, Grantors, their heirs, successors, and assigns. The legal description of the property of Grantees is: Lot 5, Block 58, Plat of Meadowdale Beach, Recorded in Volume 5 of Plats, page 36, records of Snohomish County, Washington. The legal description of the land of Grantors which is benefited by the view easement is: Lots 54, 55, 56, and 57, Meadowdale Beach, according to the Plat thereof recorded in volume 5 of Plats, Page 381 records of Snohomish County, Washington, EXCEPT ; he�east 120.00 feet of said Lot 57. rt A. And (Date) lvin E. Ebert (Date) nn M. Anderson STATE OF WASHINGTON) ) 65 COUNTY OF SNOHOMiISH) te) Margaret L. Ebert (Date) On this day personally appeared before me MELVIN E. ESERT and MARGARET L. EBERT to me known to be the individuals described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. ......' GIVEN under my hand and official seal this _y _ day of 1990. NOTARY PUBLIC in and fortheState • of Washington, Residing at -ack G� My Commission Expires: ?—m =S ? STATE OF Y�ASHINGTON) ss. COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. ANDERSON and JOANN M. ANDERSON to me known to be the individuals described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed for the uses and purposes therein mentioned, ,y EN under my hand and officia'_?ems day of'`• 1990. /NOTARY PUBLIC in and for t tate of Washington, Residing .at My Commission Expires: _ EASEMENT AGREEMENT — Page 2 of 2. � �� 0120 a 6 6 YDL.2jSJPAGE�Oi'i I 1, Dr. -1 Mrs. Rnt:erl A. Anderson NO EXCISE TAXREQUIRED 7370 North Meadowdale Rd. ! Edmonds, Washington 98026, OCT 121990 ` EASEMENT 1MUW (Eugene H. Imamura) By 'Jeprty CZ-) GRANTORS, Robert A. Anderson and Joann M. Anderson, husband and wife, in consideration of the consent of Grantee, Eugene H. Imamura, a single man, to the vacation of the street right—of—way ® of 74th Place West in the city of Edmonds and effe.-tive upon the Cq vacation of the said 74th Place West by the city of Edmonds, r9 convey and quit claim to Grantee, his heirs, successors, and © assigns, a non—exclusive easement for ingress and egress over, acrossr and upon that property in Snohomish County, Washington, legally described as: The easterly one—half (1/2) of the vacated right—of—way of 74th Place West in the City of Edmonds from North Meadowdale Beach Road to the southerly boundary line of Lot 4, Block 58, Plat of Meadowdale Beach, Recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington. Such easement shall be for the benefit of and run with the land of Grantee, his heirs, successors, and assigns which property is located in Snohomish County, Washington, and legally described as Lot 4 of Block 58, of the said plat of Meadowdale Beach. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. // Albert A. Anderson (Date) Jo nn M. A63erson:e' L'(Da�� STATE OF WASHINGTON) _ COUNTY OF SNOHOMISH) ^' On this day personally appeared before me ROBERT A. AkDERSON to me known to be the individual described i•d and who exe4.ted the .within and foregoing instrument, and ack,owledged 'that he signed the same as his .free and voluntary ac�>- and deed, for the uses and purposes therein mentioned. G EN under my hand and official Se t s f day o •;; 1990. OTARY PUBLIC in and for th tdte: of Washington, Residing at My Commission Expires: STATE OF WASHINGTON) T ss. COUNTY OF SNOHOMISH) On this day personally appeared before me JOANN M. ANDERSDN to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that she signed the same as her free and voluntary act and deed, for the uses and purposes therein mentioned. EN under my hand and official seal this /4_F�_day•af•.• 1990. /ROTARY PUBLIC in and for t tat of Washington, Residing a My Commission Expires: EASEMENT — Page 1 of 1. 4CL.23�5PAGE� 0�2 0\ DISTRIBUTION EASEMENT ' E Z r� imanrw tzas Underground and/or Overhesd 5 �_ —77 R � — 7' / rHIS IMIENTURE hinds this �� daydQ(/� r� ,I9 _'fQ, be Iween Robert A. Anderson and Joann M. Anderson, husband and wife r.ranenlehod Io as r oraor. PUBLIC UIIUTY DtsTnYTNO 1 OF SNMIOI.IISH COUNTY . Ivrolnahr W—ad to a. orante.: and nererroh er nlansd to ■1 M-1paoos. NATNESSETH: WHEREAS, Wanlor i1 Ina ownor d Wnakl lands and premtaes alwlnd In the County of Snohomish stars d N'ashnyen, dr,.nbed as t ia,..s. Lots 54, 55, 56 and 57 of the Plat of headoudale Beach recorded in Volume 5 of Plats, page 3B, records of Snohomish County, Washington; EXCEPT the East 120 feet of said Lot 57. NO EXCISE TAX REQUIRED NOV 21990 cl� xIR r MIS, IM16-taIt UW I ar f raup +.J AND WHEREAS, the Granloe to dev 15 of acque.ng eenm -Phil and far^rtatlttb sues:. oe:I, uroar find won It- raid grids and pram-., r y , NOW. Thant FORE. con Av.lar end in fanlidnrot on of to ""'Of Ono Goltor (T-1 00) rut dtwr vatuado cuhsdoralurl, I 171 d .tr. oft n Irornbr apkrowl9tlped. Want, mnv.ya and OraMs to renantae. its open:,, emrfracam. Assess.- and ast;Vnt, ttw porpelual rgnl, prl iloga, and aLdhordy to eanslrtel, wiser brier, rmpmve. otw ntnd. rvr, aver ic, and merman Woenc dicinWWh mho Ittufdmtl s ennalsing cl poles ardor pbaubs brtmw undnptaund IaNless, or CamatnnIy . Ihe!wd, with n 113.ary bnar s. pays, ono unUgs. and to nw,u of Pfau: upon or warterd I!am such pouts or lar ia.s, 0.11-In moth ,hies, nwtalo h. pose -aunt. Iraralwrrwn. rid altar elocincal equgrnerd, commun,raton mms on(Vor ptYs, and dtwr nocewvy or rpwr-nrn oPPunmartees, aces, over, under and wan tho Idow j) dawbnd bnds and filameus uwhad rot in, Coumy d _SnohQRLL5.h . sad. al W W.hmglon. Ia•wrl That portion of the ❑bove—described property being a strip of land 7 feet in width lying 3-1/2 feet on each side of the centerline of the electrical facilities situated therein and located approximately as shown as the darkened area on Exhibit "A" attached hereto and by reference made a part hereof. n (opalhar with Ine right at inpnu to and .pnsa Iran tafl brds Ao adinceni lands of the Grarda, to, tho ptwp a conalntdlnp, own'-IrtGrnp, t.psldrq, r.new,n0. as.rnp. dhonp,rq. pabol,npand ga-mhO said knit. end the rphl .1 any 1— tb rerrtovv cad taciLlva I� Londe. An. the mm at as Taws I. PA rhdor blur a1 hush, limbs(. "" a other strowth tlardrtg or powirv.won Inn Ora,uor h.fhkh, in the opet.Rl d C✓anM.. tsmtaulu a ever era a danp.t to said Is- w In porn, or pmwy by rv- son d prmfnury to sad Iwto. CaneNor and twin, .ucasaon, or asa,prw d Orertwr hoist), coevnanl and agrits nit to oorWltta w pamin to b. vDr.Inoad any xt u nsz d any krW fin the .wntom .nllto,rt .p ar jd of the ur:otd. the oraAor and Ina her; Luxamon w Migns Of Crallor eovensnl and .give rid to do any olaslrO or ditctuu9. arty s.,p,oalvsp wilhln a divan- d Ines hundred r a) feel of .sal kna wYhc A prong nasonsok, rhos h swamp to the Giar,Ien, It it atsan:sas w t J9no, of kwordgn era to do. the rlptu, ilk. PrMegas W .alto-, nervb/paned shall Dinh- to be n Iorta tit uKh Ib at the Gooiest, It succrston m assvng. shad pennrnnty remora saidpdes. areas and ape„m0es I— tat, :aide, ,,hall dharnatie jav m rtenfly aaandan and kne. at twitch Itms at such dyes. fhb, prMI"g and . Ahodry henoy pusad ,has temdnm.. lt. oraAor also eovsrun. to and wen Car Grarses out (k rior is tewtuay, sausd arsd posaeassd Of ate Land alweta4: has a good and lewhd rip-, and paver to ass and mrw-,y aerne: In.l sane are Ins and dew d .n o srw.r-1...c.w - above etdaled, and trW Grantor real to ter wumA end 6.1.rW to fit, 1e aed eoeernard and the "I pare rsron thereof .gureal the Law(U (Lent rut danaWs Of ■l pnorre wwmerainf Any nnortWis on sad lard field by W No-pagoe a hembl pDoruruled to the ngts, hrntn pars ad to the Gins.. but in off other "aped s us sad monIts" out renntatn vd+rpei sd. IN YaK�;tOtFp kz .recv ed the day end Y+ IM n. II! ��_ ..� ert A. Anderson 'Joe , Anderson pp . u�0 t PL.L39L R02AAIL2 HICRA;4RLS OII AZVLSUL shoe L� Starr of Washington INDIVIDUAL ACKNOWLEDGEMENT County of �Lr� I cortiy that I know a havo sahslactory, evidonce that Robert A. Anderson and Joann hl. Anderson " slgnod this instrument and acknowtedgrod A tb bo his; har,•04r) hae and voluntary act for Iho usas and purposes marooned in Iho mteumom Dated :'ar�OSs':1 P U D ,kr: '•,• •: Notary 11c Y 'st .. •. (Seal or Stamp) Ir,•C... .. \� r Tnla NOiAFlY PUTAIC: ..............)AY aFpo,nlmml 1,,Pvd5 9 Ogzzz 7— Slats at Washington INDIVIDUAL ACKNOWLEDGEMENT County of ' I certifY that I know or have sallslactory ovidonco that and srgnod this Instrument and acknowledged it to bo (his, hor, their) f:'so and voluntary act for Ina uses ar•'d purposes mentioned In tha n ,b rr.om Da1-d Signature d Notary Puhk (Seal or Slarrsp) Tits. NOTANY PUDLIC My ax mmeal -.pies IFIEPt7ESENTATIVE ACNt 0WLEDGFMFNTI 51a1r of Wuh-,01on Courtly d I -44T ]nor I hmw or haw whdactory -vdanc- that mpr»d rha nslrumenl, on wIh staled Ihal the, She, th-y) )wH. Inns fulhorlred so eascule Ihv tnilrum-nl and acsnoW dyad n as IM 10IIKar, 7mm e.. Pr --am, -Ic ) and or )Nam- d pany on a -had d -t,o nen,m-n1 was a.-aAW1 to W IM Ire- en0 vdurury as d MN:h party la (h- u-ea and p„'post s m-non-d m Ire rntrum-rn Dawd Sry1S1u- d Notary P,bhc (Stet or Slamp) 7,11. NOTArtY PURL IC My appolNmenl argues -+ m Y 9 4 o 'o D c: m m m o c 5 M m X p ,61 L4 - - o O tm r, N n Q 011020 3 61 0 v 0 iC c "n o 0 ~ O h rn !n _ m cy > n rn Z 0 K 20 n N O � — � r O ,O � A 1"r x 1 C, � VOL. 239 u ImGEO149 •� r , pl EXHfBIT A r N. MGADOWDALF. RD. �+— ccwc,rco.•o•:ps � -_ __-- _ y 1'r•?. ! f t.r •. r'.rr ., ,a � i7riG 11 � .- all, v ( taw71 - d 2el sr 2 ^ TRACT TRACT "A" COMM011 AREA -- •` a'S t ps•s' • Y' ELEC7 RILhL F/,LIL171 C•5 - a ar..•aa. 1 TRACT • ' COMMON AREA n / r•,.ta ., r, c I ,�� 5 -- -- --� / 10 R c r /- !• 6 i UO SCALE I " F tar. ✓�h — - c ��rP '•.• wy I M E A D 0 W.0 A L E D E A C H sc .cr r�.c VOL. 2 9 91PA015 o 9011 �6ert A�3vgau M. jt„dirso� IDN. �dau+�4�� �. �3�0 E�wa�ds, tvli 9�0� DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS FOR THE PLAT OF LORIAN WOODS, EDMONDS, WASHINGTON . THIS DECLARATION is made on the date hereinafler set forth by Robert A. Anderson and Joann Irl. Anderson, husband and wife the owners of all that certain rent property contained within the plat of Lorin Woods, Edmonds, Washington, whit lat has been recorded in Volume =of plats, pages _J�through � records of Snohomish County, Washington, (sometimes referred to hereinafter as the Property*). 9010165006 Declarants hereby declare that all of the Property shall be held, sold and O conveyed subject to the following easements, restrictions, covenants, conditions, r—( reservations, charges, and liens (hereinafter collectively referred to as'Covsnants"), all of which are for the purpose of enhancing and protecting the value, desirability and attractiveness of the Property, The covenants shall run with and burden the Property and shall be binding upon all of the parties having or acquiring any right, title, or interest in the Property or any part thereof and shall be binding upon their hairs, successors, and assigns, and shall inure to the benefit of each owner thereof. ARTICLE DEFINITIONS 1.1 'Association' shall mean and refer to Lorian Homeowners' Association, a non-profit corporation organized under the laws of the State of Washington, its successors and assigns, organized and established to prceerve and maintain the private drive, cornmon areas and lots within the Property and to promote the health, safety, and welfare of the residents of the Properly. The term, Lorian, will refer to Lorian 1Voods. 1.2 "Declarants' shall mean Robert A. Anderson and Joann M, Anderson, his wife, and their h•:irs. 1.3 'Owner" shall.mcan and refer to the rrcord owner, whether one or more persons or entities, of a fee simple title 10 any lot which is a part of the Property, and contract purchasers, excluding those having such interest merely as a security for performance of an obligation and excluding contract sellers, 'Owner" shall also include any person or persons or entities holding a leasehold interest in any lot, 1.4 "Properties' and "Properly' shall mean and refer to all that certain real property located within the Plat of Lorian. 1.5 'Common area' shall mean any and all real property owned by the Association for the common use and enjoyment of the Owners, including the lawn and gardens (Tract A of the Plat of Lorian), private drive (Tract B of the Plot of Lorian other than any streets or other areas hereafter dedicated to public use), walkways, greenbelts, and reserve areas. The common areas to be owned by the Declaration of Covenants Conditions, and Restrictions Page 1 yU 10160 3 5 6 VDL, 38GPA0EUJ34 a .I • Association at the time of conveyance of llre first properties are described in Exhibit 'A' which is attached hereto and by this reference incorporated herein as if fully set 1 forth. I 1.6 "Lot" shall mean and refer to any plot of land shown upon the recorded Plat of Lorian recorded with the Snohomish Counly Auditor, and any additions thereto as may hereinafter be brought within the jurisdiction of the Association, excluding the common areas. Each separate platted lot counts as one Lot, even if it is combined with others under one ownership. 1.7 "lvlember' shall mean ariy person or entity holding membership in the Association and as further defined in Section 3.J., ' 1.8 'Development period' shall mean that period Declarants need to sell or assign nine (9) of the lots depicted on the Plat, or any shorter period as determined by Declarants, but no longer period than that ending December 31, 1995. 1.9 'Plat' shall mean the Plat of Lorian, as recorded with the Snohomish County Auditor, 1.10 Use of the singular herein shall include reference to the plural, and vice versa, and use of the masculine gender shall include reference to the feminine. AR71CLE 11 RESTRICTIONS ON USE OF PROPERTY BY OCCUPANTS 2.1 Permitted Uses, No lot within Lorian shall be used for any purpose except as her permitted in this Section 2.1. No building or• structure shall be erected, altered, placed, or permitted to remain on Lots 1 through 10 inclusively olher'than one detached single-family dwelling per lot, one (1) accessory building of I not more than one hundred (100) square feet in area, per lot, and a private garage for not more than three cars per lot. All building designs are subject to approval of the Architectural Control Committee. 2.2 No Tempornry Dwellings or Buildings. No trailer, basement, camper, lent, shack, garage, barn, other outbuilding, mobile home, recreational vehicle, or iany other structure of a temporary character shall be used on any lol as either a temporary or permanent residence or for any other use. 1 2.3 Nuisarice. No noxious or offensive activity or noise shall be carried on upon any lot or other portion of the Properiy, nor shall anything be done thereon which is or may become an annoyance or nuisance. No industrial or commercial use shall be conducted on or in any lot. 2.4 Derogalion of Law;. No owner shall Carr)' on any activity of any nature whntsoever on the Property that is in derogation or violation of the laws or Declaration of Covenants iConditions, and Restrictions Page 2 �IUXO.�O 3 56 VOL.PAGE Ot'D0S statutes of the State of Washington, Snohomish County, the City of Edmonds, or other applicable governmental body. 2.5 Construction. All structures shall be of new construction (except used brick, siding, or similar decorative materials may be used), and construction (hereon shall not be commenced until a building permit from the appropriate public agency is obtained, together with architectural control approval as provided in Article VII. No prefabricated dwellings shall be permitted. 2.6 pales of Como{elin, of nlntction and LnndscV-_ The work of construction of all building and structures shall be prosecuted diligently and continuously from commencement of construction until the structures are fully completed and painted. Unless an extension of lime is granted in writing by the Architectural Control Committee (see Article 7.1) for good cause shown, all structures shall he completed in external appearance, including finishing, painting, or staining, within two hundred seventy (270) days from the dale of commencement of construction, except concrete foundations or posts, piers or other supports, provided they are screened from view. Landscaping, as required under Article VII hereof, shall be completed within sir; (6) months of the date of completion of construction of an owner's dwelling. 27 Debris Control. All lots shall be maintained in a reasonably presentable condition. Debris, weeds, or other waste material ("debris") shall be removed or controlled on all lots, whether vacant or improved. If any owner does. not remove or control debris within thirty (30) days after written notice -to such owner from the Association, the Association shall have the right to enter onto the lot and remove or control the debris. The Association's costs of such removal or control shall be charged to the owner and shall be a continuing lien upon the lot, as well as the personal obligalion of the owner, and such lien may be foreclosed in accordance with Article IV hereof. t i 2.8 nrba e. No garbage, refuse, or rubbish shall be deposited or kept i on any lot except in suitable covered containers which shall be secured, fastened and protected from animals and screened or obscured from view by public and neighboring lots and shall be regularly hauled by or for the owner to a public or other suitable dump site, not within the Properly. This does nnl aoalw to compost conlniners. All equipment for the storage or d1sposal of trash, garbage, or other waste shall be kept in a clean and sanitary condition, 2.9 Ain_jim6. No animals, livestock or poul.try of any kind shall be raised, bred or kept on any lot. Except that a maximum of three (3) dogs, cols or other conventional household pets is allowed per lot, provided they are not kept, bred or maintained for any commercial purposes. The owner shall observe and obey all laws applicable to a resident of Snohomish County and City of Edn.onds, Washing on, pertaining to the care, contrul, and husbandry of animals and pets, 2.10 parkins Restrictions. Unless otherwise approved in writing by the Association, at no time after completion of construction of the owner's dwelling shall un owner keep or permit to be kept on any property or lot any house trailer, ! buck, camper, mobile home, boat trailer, boat, or any other motor vehicle unless i Declaration of Covenants Conditions, and Restrictions pagc3 Lav l�l�� 3 5 VOL, 9�3SGPAGEOJ36 housed within a garage or screened from view from streets, parking areas, and surrounding properties. See provisions for automobile parking in Article 115. 2,11 Clothesline. All exterior clotheslines shall be obscured from public view, and no article of clothing, or household linen, towels, or similar items, shall be permitted to hang on balconies, fences, or in view from the streets, parking areas, and other lots in the plat. 2.12 Guests. All owners are responsible at all times for the conduct of their guests, and the Association shall have the right to adopt rules and regulations with respect to the use of the Property, including common areas, by guests. 2.13 Noisy Vehicles. Motorcycles, motor bikes, trail bikes, or similar vehicles, are prohibited on all walkways end paths of the Property, whether licensed or unlicensed. Non -muffled motor vehicles of any type are prohibited. 2.14 ,igns. No sign of any kind shall be displayed to public view or the view from the other lots on the Property except for the following: 2,14.1 A sign, no larger than five (5) square feet, advertising the lot or unit for sale or rent; or 2-14.2 The signs used by a builder or builders to advertise the lot or unit during construction and sales periods; or 2.14.3 Such signs as may be required by law or by any legal proceeding. 2.14.4 A sign, no larger than five (5) square feet, showing the owners' name and/or street number. 2.15 Parkin . Each lot owner shall provide sufficient parking for at least one automobile for each bedroom by one of the following means: 2.15.1 A garage, either attached to or detaclied from the main struclure; 2.152 A paved exterior parking area. 2.16 Antennae. As long as cable television service is provided, no radio or television antennae shall be allowed. If cable TV is not available, the following provisions will be in effect. No radio or television antennae or transmitters shall exceed ten (10) feet above the roof ridge line of a dwelling, and no separate towers for such antennae or transmitters stroll bt: permitted; provided, however, that the Architectural Control Committee may further restrict or forbid the erection of am antennae if it detracts from any of the lots or common area. No satellite diihes will be permitted at any time. The ten (10) foot height is permissible only if it is not within the view of any other house on the property, 2.17 Fires. There shall be no exterior fires whatsoever except barbecue and as contrulled by the applicable governmental authority; provided, however, that exterior fires may be permitted during the construction or a dwelling c•n a lot by written permission of the Architectural Control Committee and the City of Declanntion of Covenants Conditions, and Restrictions Page 4 S�U10160 35 6 VOL. 2286PAGE 0b27 Edmonds. Fireplaces or stoves within houses or other permitted buildings shall not be used to burn trash, debris or discarded materials except wood which has not been treated with chemicals of any kind. 2.18 Automobile Reaair and Maintenance. There shall be no major overhaul repair performed on automobiles or other vehicles. Any automobile or other vehicle deemed to be in an inoperative condition in excess of three days and which causes an undesirable effect on the Properly may be removed by action of the Association at the cost of the owner. 2.19 Oil and Minin! Operations. No oil drilling, oil development operations, oil refining, quarry or mining operations of any kind shall be permitted on or in any of the Property, nor shall oil wells, tunnels, mineral excavations or shafts be permitted an ar in any of the Property. 2.20 ase ents. There is reserved to the Declarants and to the Board of Directors of the Association, their agents and employees, an easement in gross over each and every lot (all of which lots shall constitute the servient tenement) for entry and access at reasonable times and places for maintenance and construction of common areas, and for the performance generally of all their rights and duties as provided in this Declaration. 2.21 Exterior Maintenance. Each owner shall be obligated to provide exterior maintenance, including maintenance of landscaping and vegetation, of his. lot. Such maintenance shall include that area from the edge of the paving of the street serving the lot to the opposite lot line, and shall further include the planting and maintaining of grass and/or approved landscape plants in the nrea.between the side lot lines and extending from the edge of the paving of the street serving the lot to the opposite lot line. In the event an owner shall fail to maintain his lot and improvements situated thereon in a manner satisfactory to the Board of Directors of the Association, after approval of a two-thirds majority vote by the Board of Directors, the Association shall have the right, through its agents and cmployees, to enter upon said lot to repair, maintain and/or restore the property and the exterior of the buildings and any improvements erected thereon. The cost of such work shall be added to and be a part of the assessment to which the lot is subject, and, if unpaid, shall become a lien pursuant to Article IV which may be enforced according to Section 9.1. 2.22 Wenrions. No firearms of an) kind or nature including bows, slingshots, BB guns, air rifles, slings, traps, or any other like weapon shall be used within the Property except by appropriate governmental officials. 2.23 Prolection of Views. No shrubs, trees, or bushes shall be planted nor shall any existing shrubs, trees, or bushes be allowed to grow to a heiyltt or structure installed which impairs the view of the waters of Puget Sound, the Kitsap Peninsula, Whidbey Island, and the Olympic Mountains from any property within the plat. Neither will any structure be allowed to be built which impairs the view of the writers of Puget Sound, the Kitsap Peninsula, Whidbey Island, and the Olympic Mountains from any property within the plat. Pruning and selective tree removal on individual lots may be permitted by the Board of Directors if the Board of Directors decides such removal does not impact the general appearance of any individual. lot. Declaration of Cov,enanls Conditions, and Restrictions Page 5 PAGE 8 9U10160356 VOL.`�3b0U53 t Procedures for pruning or selective tree removal are described in the. following section. The common areas shall be used as green belts and for recreational purposes. The common areas shall be maintained in a controlled natural state subject to recommended wood lot management practices. Main trails through ' common areas will be developed and maintained for access to the common areas. Replanting of trees and shrubs may be made to enhance the nature of the common - - - areas and will emphasize native plants which have controlled growth patterns. 2.24 Tree Curtin and LimbinP Procedures, t l: The following procedures i i shall apply to both common areas and individual lots. Owners will contact all other i property owners and inform them of their plans. Owners shall obtain a tree cutting or Iimbing permit from the Board of Directors. Owners shall mark trees with I surveyors ribbon approximately :,ix feet above the ground. Surveyor's ribbon will be supplied by Board of Directors at time of application. Owners shall inform the Directors and other owners of (lie following: n. Number of trees to be cut and reasons for culling. b. Numbers of trees to be limbed and reasons for Iimbing. c. Type of trees involved. d. Location of trees involved. c. Proposed method of cutting or thinning. f. Ongoing maintenance plan for thinned trees. Owners shall make copies of a map available for other owners showing the locations of trees to be cut or limbed in relation to 1 streets, lot boundaries, houses, and other amenities. If the City of Edmonds has a tree ordinance, owners shall also comply with the provisions of that ordinance. I The Board of Directors may require a deposit for tree cutting or Iimbing, but shall inform all owners before doing so. Such deposit would ensure proper tree removal, cutting of branches, painting of cut trees (if desired), and clean up, and would be refunded when these tasks are completed. The permits will be valid for six (6) months and may be extended for three (3) months by the Board of Directors, No cut material shall be left in the common areas unless authorized by the Board of Directors. (Sec also Article 11, Section 2.7 on Debris Control.) ! The owner agrees to indemnify and hold harmless the Lorian Board of Directors, and any person serving nt the request of th-- Board from any and all actions, claims, damages, liabilities, and other expenses caused by or related to any activity incident to the permission granted i under the permit. i Declaration of Covenants { Conditions, and Restrictions Page 6 i `IU1��1C� 5 VOL.`�-J PAGC6UJJ9 0 • ARTICLE 111 THE ASSOCIATION 3.1 Membership. Every owner of a lot which is subject to assessment by the Association shall be a member of the Association. 3,2 An owner shall have one (1) vote for his lot, whether improved or not; provided, however, that if an owner owns more than one lot, he shall nevertheless have only one (1) total vote.. When more than one person is an owner of a lot, all such owners shall be members. The vote for each lot shall be exercised as the owners, among themselves, for any purpose, determine. In no event shall more than one vote be cast with respect to any lot. In the event that the owners of any lot disagree among themselves as to how the one vote for the lot shall be exercised with respect to a pending molter, any such person may deliver written notice of such dispute to the president or secretary of the Association, and the vote for that lot shall then be disregarded completely with respect to the matter or matters before the Association at that meeting. The right to vote may not be severed or separated from any lot, and any sale, transfer, or conveyance of said property interest to a new owner or owners shall operate to transfer the appurtenant vote without the requirement of any express reference thereto. ARTICLE IV ASSESSMENTS AND LIENS 4.1 Purpm of Assessments. A financially healthy Association, funded to Provide a growth and income to match community needs and progress, is essential for continued enjoyment of the community lifestyle and for the protection of the owners' investment. The assessment levied by the Association shall be used exclusively to promote the recreation, health, safety, enjoyment, and welfare of the owners and for the improvement and maintenance of the common areas and like properties and insurance and lazes thereon. Assessments shnll also include any additional charges determined by the Board of Directors to be owing by an owner because of action taken by the Board of Directors to enforce these covenants, conditions, and restrictions, 4.2 Duration of iLe and Personal Obliralion of AssessmcrU. Each owner of a lot with the Property hereby covenants, and each owner of any lot, by acceptance of a deed therefor or execution of a contract to purchase or ❑ lease agreement or like document for a lot, whether or not it shall be so expressed in such document, is deemed to covenant and agree to pay to the Association annual assessments, special assessments, together with interest, and any cost and reasonable attorney's fees which may be a charge upon a lot, against which each assessment is made. Each assessment, together with interest, and any costs and reasonable attorney's fees which may be incurred to collect said assessments, shall be a continuing lien ageinst the lot assessed and shall also be the personnl obligation of Declaration of Covenants Conditions, and Restrictions page 7 ;f U I .�.60 3 5 VOL. c �PAGE00 -10 R tite person who is the owner of such property at the time when the assessment fell due. 4.3 Annunt Assessment. 4.3.1 Lots. For one year following the date of this Declaration, the maximum assessment small be determined within one month after common space landscaping is complete. In that time estimates will be obtained for maintenance and upkeep of the common spaces and each owner will be assessed one ninth of that amount, except Declarants. Assessments will be payable in advance, and thereafter as set forth in Section 4.3 2, 4.3.2 Maximum Assessment Rates. 77he assessment rate for owners of lots shall not be increased or decreased by the Board of Directors of the Association in excess of ten percent (10%) in any one year, except such rate may be increased or decreased in a greater amount by a two-thirds vote of a quorum of the owners whether voting in person or by proxy at a meeting called for that purpose. Any additional charges added to the lot by the Board of Directors for the purpose of enforcing these covenants, conditions, and restrictions shall not be considered part of such ten percent (10%) limitation. 4.3.3 'Die Board of Directors of the Association may fix the annual assessment in an amount not to exceed the maximum of the nssessment rate set forth in Section 4.3.2, above. 4.4 Notice and Ouorum for Any Action Authorriled Noted Above Under Section 4. , Written notice of any meeting called for the purpose of taking tiny action authorized under Section 43 shall be sent to all owners not less than fifteen (15) days nor more than fifty (50) days in advance of the meeting. Written notice shall be considered delivered three (3) business days following deposit in the U.S. mail by first class mail, postage prepaid. At the first meeting called, lice presence of owners or their proxies entitled to cast twenty percent (209'o) of all votes of the ownership shall constitute a quorum. If the required quorum is not present, another meeting may be called subject to the same notice requirements, and the required quorum at the subsequent meeting shall be one-half of the required quorum at the preceding meeting. If a third meeting or additional meeting must be scheduled in order to attempt to have ❑ quorum present, such third or additional meeting shall not be held more than fifty (50) days following the preceding meeting. 45 Uniform Rafe of Assessment, Annual ussessmenis shall be fixed at a uniform rate for nil lot:; and may be- collected on a monthly or quarterly basis as determined in advance by the Board of Directors of the Association. 4.6 Effect of Nongsyrntnt of Assessments Spccinl Asscssn1en1or Additional Chereg—Remedies of the Associntion. Any assessment, special assessment, or charges established by the Board of Directors for failure of an owner to comply with these covenants, conditions, and restrictions not paid within thirty (30) days after the due date shall bear interest from the due date at the rate of Declaration of Covenants Conditions, and Restrictions Page 8 9010160 3 5 6VOL, 3 H PAGE O 5 1 !� t 1 1 twelve percent (12%n) per annum or at such other rate permitted by law which is i established by the Board of Directors of the Association. The Association may I bring an action at law or in equity against the owner personally obligated to pay the ! same or foreclose the lien against the lot and such charges, interests, costs. and ! reasonable attorney fees of such action shall be added to the amount of such assessment, special assessment, or additional charges. Such lien may be foreclosed pursuant to RCW Chapter 60.12 or a non -judicial foreclosure pursuant to RCW Chapter 61.24. 4.7 RstablishmertI of I i, Such amount rs established pursuant to Section 4.6 shall constitute a lien against the property of the owner upon a notice of such lien being recorded with the Snohomish County Auditor. Such lien shall continue in effect until foreclosed upon or upon the expiration of the period for which n judgment lien is vnlid in the State of Washington, whichever is sooner. 4.8 us c_nsion. The Board of Directors of the Association shall have the power to suspend the voting rights and the right to use the common areas of any owner or persons to whom the owner has delegated use pursuant to Section 5.2 for any period during which an assessment, special assessment, or charge established pursuant to Section 4.6 remains unpaid or during any period in which the owner is in violation of any of these covenants, conditions, and restrictions or any published rule or regulation of the Association. i 4.9 Exempt Property 7'he following property under this Declaration shall . be exempt from assessments created herein: (a) all common area properties; (b) all Declarants' property, which shall include any unsold lots and lot 4. ARTICLE V PROPERTY RIGHTS 5.1 0wner's Ensemenis of ninvmenI. Every ownershalI have a right and non-exclusive easement of enjoyment in and to the common areas which shall be appurtenant to and shall pass with the title to every lot subject to the following provisions: I 5.1.1 The right of the Association to suspend the voting rights and right to use of the common areas by an owner for a period as set forth herein; 5.1.2 The right of the Association to dedicate or transfer all or any part -of I the common areas to any public agency, authority or utili ty for such purposes and subject to such conditions as may, be agreed to by the members. No such dedication or transfer shall be effective unless an instrument signed by two-thirds (2/3) of the owners agreeing to such i jDeclaration of Covenants Conditions, and Restrictions Page 9 VOL. PAGE U � 2 9U10-16035� 1 t N y- t dedication or transfers has been recorded with the Snohomish County Auditor; 5.1.3 The right of the Association to limit the number of guests of owners; 5.1.4 The Association may borrow money for the purpose of improving or maintaining the common areas and all the owners' property may be used to secure repayment of such money only with the written consent of two-thirds (2/3) of the owners. i 5.1.5 The use of Community Paths shall be prohibited until adequate and safe access allowing ingress and egress is completed. Determination Of completion shall be by Declarants. 5.2 Deleention or I Is , Any owner of any lot may delegate, in accordance with the By-laws, his right of enjoyment to the common area and facilities to the members of his family or his tenants, guests or invitees, subject to the limitations herein and in the Articles of Incorporation, By-Inws and rules and regulations of the Association. ARTICLE VI RESERVE PROPERTY AND EASEMENT 6.1 lilit se enl. Declarants reserve unto themselves the right to transfer title or to contract thereof or to leas: or grant that property upon which utilities or drainage easements are located or are to be located (hereinafter "reserved common areas") or to grant, contract, or lease easements, rights or permits I for utility service to any utility district, utility company, or public body for purposes of installation, maintenance, replacement or extension of utility services useful to the Property. Title to the reserved common areas is reserved to Declarants, to their heirs, successors, and assigns, until transferred to the Association or public body. Use or enjoyment of the reserved common areas for any purpose or uses by or for the owners is permissive only, and no rights by prescription or adverse possession as to the reserved common areas or any part thereof shall accrue in favor of any owner. ARTICLE VII j ARCHITECTURAL CONTROL COMMITTEE 7.1 t blishment. An Architectural Control Committee of three persons shall be established by the Board of Directors of the Assoc.ntion. One member may be an architect who is not an owner, one of the two Declarants shall be a second j member and the third member shall be from the Board. T7 c Board member shall serve as chair of the Committee. Declarolion of Covenants Conditions, and Restrictions Page 10 �lU 101.60 3 5 6 YDL, 6PAGE U5. 3 • 0 7.2 Struclures, No building, fence, wall, pole, or structure of any kind shall be erected, placed, or allered on any lot, building site, or common area, within the Property until the plans, specifications, and plot plans thereof are submitted by the owner or his representative to the Architectural Control Committee and approved by the Committee. If such plans and specifications are disapproved (or, if conditionally approved, unless the conditions thereof be complied with) (lie project construction shall not be undertaken, or if undertaken, a violation hereof may be abated by legal proceedings by any party having an interest in the enforcement hereof irrespective of the time of completion thereof. Laches, estoppel, and the statute of limitations shall not be a defense to an action taken for the enforcement of any violation. The Architectural Control Committee shall in no way confirm or guarantee any assumed geological conditions, safety, or structural standards or ronstruclion methods. The. Architectural Control Committee shall, in good faith, exercise discretionary approval or disapproval on the basis of minimizing interference with enjoyment of adjacent properties, protecting property values, and enforcing improvement use and occupancy to a pleasing but not sterile or uniform combination. 7.3 ndscaping Pin. At the time of submittal of the plans and specifications required by section 7.2, an owner shall also submit a detailed landscaping plan for the ,object lot showing the location and common name of all proposed plantings. Owners of lots 1, 2, 3, 4, 5, 6, and 7 shall have the option of choosing the landscape plan for the strip of land between their lot and L,orian Drive. Owners of lots 8, 9, and 10 shall have the option of choosing the landscape plan for the strip of land between their lot and their access drives. (See Section 2.21, Exterior Maintenance.) Such landscaping shall be in accordance with tite overall landscape plans of the surrounding common areas. If individual ownerr do not exercise this option, the Declarants will landscape these areas in accordance with the overall landscape plan of the common areas surrounding these strips, No landscaping shall be installed except in accordance with the landscaping plan approved by the Architectural Design Board of the City of Edmonds and the L.orion Woods Architectural Control Committee; Said Committee! shall approve or disapprove said plan in the same manner as it decides on plans and sppecifications for strucluns pursuant to section 7.2 and the lime periods end rocedures of Iltal section shall also apply to landscaping plans, (See Article Lf, fection 2.24 Tree Cutting and limbing and Article V1II, Section 8.6 Land Clearing.) 7.4 Rules and Costs. The Architectural Control Committee shall consider and act upon all matters properly submitted to it. In furtherance of this function, the Architectural Control Committee may, by unanimous vote, from time to time and in its sole discretion, adopt, amend, and repeal rules and regulations to be known as the Architectural Control Committee Rules establishing its operating procedures and interpreting, detailing, and implementing the provisions of the instruments pursuant to which it is charged with responsibility. The Architectural Control Committer may establish a reusonable fee to be paid to it to cover its coils incurred in considering and acting upon matters submitted to it; the initial fee shall be Fifty (50) Dollars. Such fee shall be paid to the Association; A current copy of the Architectural Control Committee Rules shall be kept on file at the principal .'Declaration of Covenants Conditions, and Restrictions Page 11 �' � 10.160 3 5 Y0L. > 3 8 .G PAGE 0 U 4 office of the Association at all times, Such rules shall have the same force and effect as if set forth herein. Consent by the Architectural Control Committee to any matter proposed to it or within its jurisdiction shall not be deemed to constitute a precedent or waiver, impairing its right to withhold or grant approval as to any similar matter Ihcreaflcr.proposed orsubmitled to it for its consent. 7.5 Standards and C'rileri t. The Architectural Control Committee shall employ the following standards and criteria in approving or rejecting the plans submitted to it: 7.5.1 No single-family dwelling of lower than three thousand (3000) square feel of area on the main floors (exclusive of garages, porches, decks or other exterior features) shall be constructed on any lot. Each home shall have at least three bedrooms, living room, dining room, family room, kitchen, two and half bathrooms, and a three car garage-= attached or separate, 7.5.2 hfasicr bedrooms shall be at least 16 feet x 20 feet exclusive of closet and dressing areas. Master bath shall be at least 8 feet x 16 feet (or 128 square feet) and contain at least Five fixtures. 7.5.3 Additional bedrooms shall be at leas) 11 feet x 12 feet excluding closet space. 7.5.4 Living rooms shall be at bast 15 feet x 20 feet or 300 square feel. 7.55 No building shall be located outside any building envelope or nearer than ten feet to an adjacent lot line as marked on the Pint Mnp. For . purposes of this subsection (75), eaves, steps, and porches shall be considered part of a building. 7.5.6 The following additional criteria sliall be used by the Architectural Control Committee in evaluating proposals to maintain the very special and precious quality of this Planned Residential Development: (a) The harmony of the external design, color, and appearance of the proposal on the lot in regard to site. This will include slopes, soil conditions, ceisting trees, view, vegetation, roads and services. The P.R.D. has been designed to allow maximum use of each lot without restrictions due to other buildings. The City of Edmonds Architectural Design board has ruled that exteriors shall be cedar or redwood, roofs shall be shake or dark tile, and stone or brick work be decorative only and minimal. (b) Siting is imperative, Design plan:; will need to be nadc for each lot —not superimposed from scme other plan or location. Design criteria shall include the following: (1) Generouswir.dows and skylights. Declaration orCovenzrits Conditions, and Restrictions Page 12 I!U 10160 3 5 6 VOL. `>_3HPAH0545 a (2) Buildings should "float' off the side of the His (an architect will understand (his) and be visually attached to the ground by the use of decks and terraces as much as possible. (3) Foundations can be a combination of concrete walls and post -and -beam construction. (4) Plans with the following exterior design factors will be rejected: French provincial; post modernism; colonial columns; white paint. (c) Other effects of the proposal on surrounding property, including the view of the waters of Puget Sound, the Kitsap Peninsula, Whidbey Island, and the Olympic Mountains. (d) The compliance of the proposal with the spirit, intent, and Provisions of the relevant ordinances of the City of Edmonds, Washington 7•5.7 The Architectural Control Committee may grant a variance from the strict provisions of the standards and criteria contained in this section 7.5 upon a showing by an owner that a) strict enforcement of the standards and criteria would work an undue hardship upon the owner, b) such a variance will not substantially diminish (lie enjoyment of their Property by other owners, and c) such a.variance is in accord with the City of Edmonds approval of this plat. The applicant for a variance shall have the burden of proof. Any such variance granted shall be no greater than necessary, in the reasonable opinion of the Architectural Control Committee, to eliminate the hardship. The Architectural Control Committee shall be [lie sole judge of the necessity of a variance, and its decision shall be final, The failure of the Architectural Control Committee to reach a decision shall be considered a denial of the request for a variance. 7.6 1. nd tear' ti;- No native trees orsigrdficant ground cover with trunks or boles of eight (8) inches in diameter or greater, measured four (4) feet above ground level, shall be cut, removed, or limbed without the approval of the Architectural Control Committee. Any person wishing to cut, remove or limb such trees or significant ground cover shall submit a plan showing the location of the trees or round cover to be cut, removed, or destroyed, along with the location of the existing trees or ground cover to be retained. The applicant shall also submit a brief statement of the reasons supporting his request to cut, remove, or limb such trees or ground cover. Tltis shall apply to both individual lots and common areas.(See Article 11, Section 2.24. Tree Cutting and Umbing.) 7.7 Term. The Architectural Control Committee shall continue in existence until the last lot (except lot 4) within the Properly has been sold or transferred by Declarants, at which time the committee shall be succeeded by the Design.Review Committee as set forth in Section 7.9 hereafter. Declaration of Covenants Conditions, and Restrictions Page 13 �3U�016� 3 5 6 VOL.0 It s • 7.8 Linbiliiy. The members of the Architectural Control Committee shall have no personal liability for any nction by or decision of the CommiIf,, ray acceptance of a deed or execution of a contract to purchase or a lease agrecmcnt or like document for any lot, the owner of that lot agrees and covennnts not to maintain any action against the Association or any member of the Architectural Control Committee which seeks to hold the Association or that member personally or individually liable for damages relating to or caused by any action of or decision by the Committee. 7.9 Design Review C'or�mitlee, Upon the termination of the Architectural Control Committee, the Board of Directors shall have tite ri&ht to appoint by majority vote n Design Review Committee to fulfill the continuing obligations imposed upon the Architectural Control Committee by the terms or this Declaration_ The Design Review Committee shall be composed of three members Who shall be owners within or residents of the Property. The Design Review Committee shall have all the power and authority granted to the Architectural. Control Committee under the terms of this Declaration, and any reference to the Architectural Control Cummittee in this Declaration shall also refer to the Design Review Committee unless otherwise clearly stated or unless clearly indicated by the context of the reference. ARTICLE VIII UTILITIES AND ROADWAYS 8.1 1lnderground Utilities. All permanent utility systems, including water, gas, el<ciric, sanitary and storm sewer, cable television, and telephone, shall be underground exclusively. All owners shall be required to connect their lots or units to electric, water, sanitary sewer, and other utility lines as they become al,ailable to the Property. 8? R�igtt to on ect. There is reserved to the utility district or utility company providing utility service, the exclusive right to connect improvements upon the properties within the utility service lines, for which service the owner shall pay the then prevailing price for such connections as charged by such utility district ar company, 8.3 Water System. When in operation, so long as Edmonds municipal water system service is available, no private wells or individual water sources shall be created or used for the Property. 8.4 Sewage Disvosal. All selvage disposal shall be by means of the sanitary sewer system owned by the City of Edmonds, Washington, or any succeeding entity which owns the sewer system. M ndwn s. The private drive on the Property (depic(ed its Tract B an the Plat) has been conveyed by Declnrants 1•o the Association, which shall own it as P. pi-wate drive and commun area for all,otvners and shall maintain it to City of Declaration of Covenants Conditions, and Restrictions Page 14 .yam lti 160 3 5 VOL. 238 GPDGEO'' A 7 Edmonds standards for public roads so long as the Association owns it. Each owner is hereby granted a non-exclusive easement of ingress and egress over and across this rrivate drive on the Property (Tract B). Maintenance of such roadways shall be provided for as necessary or proper in the annual assessment or special assessments established by the Association, 8.6 Summon Areas. Common areas on the Property (depicted as Tract A) have been conveyed by the Declarants to the Association, which shall own them as common areas for all owners and shall maintain them in their natural state so long as the Association owns them. Except as prohibited by Article 5.1.5 and while under suspension pursuant to Section 4.8, each owner is granted a non-exclusive pedestrian easement of ingress and egress over and across the common areas of the property (Tract A). Maintenance of such common areas shall be provided ;or as necessary or proper in the annual assessment or special assessments established by the Association. The Association shall cause quarterly (each three months) inspection to be made of the common areas by maintenance landscapers to determine what maintenance, if any, is required. ARTICLE IX GENERAL PROVISIONS 9.1 Enforcement. The Association, the Declarants, and each owner of a lot subject to this Declaration,shall have the right.to enforce, by any proceedings at law or in equity, all Covenants now or hereafter imposed by the provisions of this Declalation; provided, however, that the Declarants' right to enforce the Covenants in the Declaration shall terminate at such time as Declarants shall cease to be the owner of a lot subject to this Declaration. Failure of the Association or an owner or Declarants to enforce any Covenant herein contained shall in no. event be deemed a waiver of the right of the Association, an owner, or Declarant to do so thereafter, 9.2 ev b' it . Invalidation of any one of these Covenants byjud�ment or court order shall in no way affect any other Covenants which shall remain to full force and efrecl, 9.3 Amendment, The Covenants of this Declaration shall run with the land for a term of twenty -rive (25) years from the dale this Declarntion is recorded, afterwhich time it shall be automatically extended for surcessive periods of ten (10) years. This Declaration may be amended during those first twenty-five (25) years by an imtrumenl signed by, not less than ninety percent (90 0) of the owners of all lots and thereafter by an instriment signed by not less than eighty percent (80%) of the own^rs of ail lots. Any instrument amending the covenants, conditions, and restrictions of this Declaration shall be recorded with the Snohomish County Auditor. In no event shall any amendment require more onerous restrictions than those herein as to any existing structure or lot, unless the same be unanimously approved by all owners. i l Declaration of Covenants ' Conditions, and Restrictions Page 15 i u PAGE 9 01016 0 3 5 6 Y OL. 2 80 15 S 9.4 Edmonds City Ordinance No 2661. /JI Property owners are advised that Edmonds City Ordinance No. 2661 (effective date March 11, 1988) pe!taining 10 the management of soils in file Meadowdale area should be read and understood. A copy of the ordinance is attached and made a pnrl of this declaration for advisory purposes only. Owners are particu;arly advised to review the sections in the ordinance requiring that owners may be responsible for repairing damage; that in Section 19,05,040, the site is declared to be a potential slide area; that the risk associated with development of llte site is set forth in a file with the City of Edmonds Building Department; that certain condilions or prohibitions an development may have been imposed by life City in the course of permit issuance; that references to the features in'lhe design will require maintenance or modifications to address anticipated soil changes. The covenants may incorporate by reference the statements and conditions in the form proposed by the Declarants' geotechniml engineer, geologist, architect and/or structural engineer, if any, as approved by the City of Edmonds. A copy of n report by Terra Associates (geolechnical engineers), signed by William Bailey, P.E:, will be made available to any owner so requesting an opportunity to review the same. According to Ordinance Section 19.05.050 bonds and public liability insurance may be required of the owner, the owner's contractor, and failure to provide such insurance may allow file City of Edmonds to revoke the certificate of occupancy and the vacation of file structure in accordance with the laws of the City of Edmonds. Owners are advised to fully review the said Ordinance 2661. 9.4.1 The Declarants, after consulting a geolo�,isl in the earl), 1960s, have observed that the following guidelines seem to have prevented any material erosion or sliding on the property: (a) Control all surface water. (b) Maintain vegetation. (c) Avoid cuts al the base of any slopes. (d) Avoid fills of more lhan.two feet every two or three years. That is, if an area needs a throe -foot fill, two feet could be added in one year, a period of threeyears should be observed while the two -foot fill settles and at the end of the three-year. period another foot of fill could br. added, The foregoing is not intended to set forth all guidelines for effective erosion control in the future and does not imply that following these guidelines will prevent all erosion. 9.4.2 The 013- of Edmonds Ordinance No. 2661 only requires that surface water be controlled and vegetation be maintained, Items (c) and (d) under 9.4.1 are not included. Nevertheless, owners should be advised to consider items (c) and (d) and any other practices which might be recommended hereafter by geologists, soil engineers, or others with expertise. Declaration of Covenants Conditions, and Restrictions �)U`10160356 Page 16 VOL. `4; � � G PIXE I' I " 9 9.4.3 The L.orian Woods' design considers all four of the above guidelines according to ilia Terra Associates' report. Review of the report should be made by each owner. 9.5 Attorney's Fees. In the event (he Association or Declarants shall bring any suit or action to enforce any provision contained in this Declaration or to collect any money due it hereunder or to foreclose a lien, the prevailing party in such suit or action shall be paid by the other party, all costs and expenses that said prevailing party shall incur in connection with such suit or action, including title reports and attorneys' fees in such amounts as the court may deem to be reasonable therein, and including attorneys fees incurred in connection with any appeal from a decision of the trial court or any intermediate appellate court. DATED this Irltday of MCie h 19 0, BERT A. AZNDfE�—�ON'~ C, J ANDERSON STa4TE OF H INGTON ss. COUNTY OV'SNOHOMISIJ ) On this day, before me, the undersigned, a Notary Public in and for tilt above County and State, duly commissioned and sworn, personally appeared R013ERT A. AND JO. NN M. ANDERSON, to be known to be the individuals described in and who executed the within and foregoing instrument, and acknowir-dged to me That he and she signed such instrument as their free and voluntary act.and deed for the uses and purposes therein mentioned. Given under my hand and official seal this 2 dq NOTARY PUBLIC in and for the State of Washington, residing ' at 1991111�- Declaration of Covenants Conditions, and Restrictions Page 17 9U56 VOL.` -6-s FAuub50 Retum Name and Address. Please ornn or ryoo mro+rrww Doetameent Titio(s) 1 2. 3 4 Gran or(s) 2 3 4 ❑ Additional names on page of document Grantee( 2. 3 4 ❑ Additional names on page of document. Legal description (abbreviated: I e lot, block, plat 1111151111111111110 . 200006220401 06/22/2000 12:56 PM Snohomish P.0002 RECORDED County section, township, range, qtr lgtr ) Additional lec7al is on page of document Reference Number(s) (Auditor File Numbers) of Documents assigned or released. p/d/ 65 oa G ❑ Additional numbers on page of document. A"essor's Property Tax Parc*UAccount Number ❑ Property Tax Parcel ID is not yet assigned ❑ Additional parcel numbers on page document The Auditor/Recorder will rely on the information prov►ded on the form. The staff will not read the document to vents the accuracv or completeness of the indexwno information Lorian Woods, Inc. Planned unit Development 7370 North Meadowdale Rd. Edmonds, WA 98026 Amendment to CCR 8.6 Approved by Homeowners March 2000 Each owner is granted a non-exclusive pedestrian easement of ingress and egress over and across the common areas of the property (tract A), and vehicular easement for them and their guests consistent with the approval of building plans of each property owner Maintenance 200006220401 I r ' • CHICAGO TITLE INSURANCE COMP 3002 COLBY AVENUE AMENDMENT NO. 3 EVERETT,.WASHINGTON 98201 Order No.: 5610647 SHORT PLAT CERTIFICATE Certificate for Filing Proposed Short Plat In the matter of the short plat submitted for your approval, this Company has examined the records of the County Auditor and County Clerk of SNOHOMISH County, Washington, and the records of the Clerk of the United States Courts holding terms in said County, and from such examination hereby certifies that the title to the following described land situate in said SNOHOMISH County, to -wit: SEE SCHEDULE A (NEXT PAGE) VESTED IN: BRIANOISAACSON AND CINDY ISAACSON, HUSBAND AND WIFE RUB MAR 09, 2010 abRPOIG49=6v EXCEP,TIONS:. SEE SCHEDULE B ATTACHED CHARGE: $250.00 TAX: $21.50 Records examined to February 24, 2010 at 8:00 A.M. By 1 SHPUTA/12-5-90/EK CHICAGO TITLE INSURANCE COMP Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE A (Continued) LEGAL DESCRIPTION PARCEL B OF CITY OF EDMONDS BOUNDARY LINE ADJUSTMENT NO.,LL-08-75, RECORDED UNDER AUDITOR'S FILE NUMBER 200906265002, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, MORE PARTICULARLY DESCRIBED AS FOLLOWS: LOT 2, PLAT OF LORIAN WOODS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 51,. OF PLATS _PAGE 145, RECORDS OF SNOHOMISH COUNTY, WASHINGTON TOGETHER WITH THAT PORTION OF TRACT 'A' OF LORIAN WOODS, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 51, OPPS 145 AND 146, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF LOT 2, OF SAID PLAT OF LORIAN WOODS; THENCE SOUTH 70052'16" WEST ON THE SOUTH LINE OF SAID LOT 2, A DISTANCE OF 34.00 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 19007'44" EAST, A DISTANCE OF 3.50 FEET; THENCE SOUTH 70052'16" WEST, A DISTANCE OF 50.00 FEET; THENCE NORTH 19007'44" WEST, A DISTANCE OF 3,50 FEET TO THE SOUTH LINE OF SAID LOT 2; THENCE NORTH 70052'16" EAST, A DISTANCE OF 50.00.FEET TO THE POINT OF BEGINNING; SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. CHICAGO TITLE INSURANCE COMPANY Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B This certificate does not insure against loss or damage by reason of the following exceptions: GENERAL EXCEPTIONS: A. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires for value of record the estate or interest or mortgage thereon covered by this Commitment. B. Rights or claims of parties in possession not shown by the public records. C. Encroachments, overlaps, boundary line disputes, and any other matters which would be disclosed by an accurate survey and inspection of the premises. D. Easements or claims of easements not shown by the public records. E. Any lien, or right to lien, for contributions to employee benefit funds, or for state workers' compensation, or for services, labor, or material heretofore or hereafter furnished, all as imposed by law, and not shown by the public records. F. Liens under the Workmen's Compensation Act not shown by the public records. G. Any service, installation, connection, maintenance or construction charges for sewer, water, electricity or garbage removal. H. General taxes not now payable; matters relating to special assessments and special levies, if any, preceding or in the same becoming a lien. I. Reservations or exceptions in patents or in Acts authorizing the issuance thereof; Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements or equitable servitudes. J. Water rights, claims, or title to water. K. THIS REPORT IS ISSUED AND ACCEPTED UPON THE UNDERSTANDING THAT THE LIABILITY OF THE COMPANY SHALL NOT EXCEED ONE THOUSAND DOLLARS($1000.00). SHPIATB/031044/suc CHICAGO 7TFLE INSURANCE COMPANY CHICAGO TITLE INSURANCE COMP Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B (Continued) EXCEPTIONS a 1. NO SEARCH HAS BEEN MADE AS TO PROPERTY TAXES AND ASSESSMENTS. PROPERTY TAXES AND ASSESSMENTS WILL BE SEARCHED UPON REQUEST. e 2. LIABILITY FOR METRO SEWER CAPACITY SURCHARGES. INQUIRIES REGARDING SEWAGE TREATMENT CAPACITY CHARGES SHOULD BE DIRECTED TO KING COUNTY DEPARTMENT OF FINANCE. FAX REQUEST, INCLUDING THE PROPERTY ADDRESS, TO (206)263-6073. c 3. RIGHT OF THE PUBLIC TO MAKE NECESSARY SLOPES FOR CUTS,OR FILLS UPON SAID PREMISES IN THE REASONABLE ORIGINAL GRADING OF STREETS, AVENUES, ALLEYS AND ROADS AS DEDICATED IN THE PLAT. a 4. RIGHT TO CONTINUE TO DRAIN ROADS AND WAYS OVER AND ACROSS ANY LOT OR LOTS WHERE WATER MIGHT TAKE A NATURAL COURSE IN THE ORIGINAL REASONABLE GRADING OF THE ROADS AND WAYS SHOWN ON THE PLAT RECORDED IN VOLUME 51, PAGE(S) 145 OF THE RECORDS OF SNOHOMISH COUNTY, WASHINGTON. a FOLLOWING THE ORIGINAL REASONABLE GRADING OF THE ROADS AND WAYS SHOWN HEREON, NO DRAINAGE WATERS ON ANY LOT OR LOTS SHALL BE DIVERTED OR BLOCKED FROM THEIR NATURAL COURSE SO AS TO DISCHARGE WATERS UPON ANY PUBLIC ROAD RIGHTS OF WAY, OR TO HAMPER PROPER ROAD DRAINAGE. THE OWNER OF ANY LOT OR LOTS, PRIOR TO MAKING ANY ALTERATION IN THE DRAINAGE SYSTEM AFTER THE RECORDING OF THE PLAT, MUST MAKE APPLICATION TO AND RECEIVE. APPROVAL FROM THE DIRECTOR OF DEPARTMENT OF PUBLIC WORKS FOR SAID ALTERATION. ANY ENCLOSING OF DRAINAGE WATERS IN CULVERTS OR RE-ROUTING THEREOF ACROSS ANY LOT AS MAY BE UNDERTAKEN BY OR FOR ANY OWNER OF ANY LOT SHALL BE DONE BY AND AT THE EXPENSE OF SUCH OWNER. r 5. EASEMENT PROVISIONS CONTAINED IN SAID PLAT AS FOLLOWS: DECLARANTS RESERVE UNTO THEMSELVES THE RIGHT TO TRANSFER TITLE OR TO CONTRACT THEREOF OR TO LEASE OR GRANT THAT PROPERTY UPON WHICH UTILITIES OR DRAINAGE EASEMENTS ARE LOCATED OR ARE TO BE LOCATED (HEREINAFTER "RESERVED COMMON AREAS") OR TO GRANT,.CONTRACT OR LEASE EASEMENTS, RIGHTS OR PERMITS FOR UTILITY SERVICE TO ANY UTILITY DISTRICT, UTILITY COMPANY OR PUBLIC BODY FOR PURPOSES OF INSTALLATION, MAINTENANCE, REPLACEMENT OR EXTENSION OF UTILITY SERVICES USEFUL TO THE PROPERTY. TITLE TO THE RESERVED COMMON AREAS IS RESERVED TO DECLARANTS, TO THEIR HEIRS, SUCCESSORS AND ASSIGNS UNTIL TRANSFERRED TO THE ASSOCIATION OR PUBLIC BODY. USE OR ENJOYMENT OF THE RESERVED COMMON AREAS FOR ANY PURPOSE OR USES BY OR FOR THE OWNERS IS PERMISSIVE ONLY AND NO RIGHTS BY PRESCRIPTION OR.ADVERSE POSSESSION AS TO THE RESERVED COMMON AREAS OR ANY PART THEREOF SHALL ACCRUE IN FAVOR OF THE OWNER. TOGETHER WITH A STORM SEWER EASEMENT AS RECORDED PER SNOHOMISH COUNTY 8306230307. BENEFITING THE CITY OF EDMONDS FOR THE INSTALLATION, OPERATION AND MAINTENANCE OF STORM DRAINAGE FACILITIES. CHICAGO TITLE INSURANCE COMPANY • CHICAGO TITLE INSURANCE COMP Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B (Continued) EXCEPTIONS c 6. OWNERS, AND ALL PERSONS HAVING ANY PRESENT OR SUBSEQUENT INTEREST IN THESE LANDS, AND THE SUCCESSORS AND ASSIGNS OF OWNERS OR OTHER PARTIES HAVING ANY INTEREST, HEREBY AGREE THAT CITY OF EDMONDS SHALL BE HELD HARMLESS IN ALL RESPECTS FROM ANY AND ALL CLAIMS FOR DAMAGES FOR INJUNCTIVE RELIEF WHICH MAY BE OCCASIONED NOW OR IN THE FUTURE TO ADJACENT LAND OR IMPROVEMENTS BY REASON OF THE CONSTRUCTION, OPERATION AND MAINTENANCE OF THE DRAINAGE.SYSTEM, AND HEREBY WAIVE AND RELEASE THE CITY OF EDMONDS FROM ANY AND ALL CLAIMS FOR DAMAGES, EXCLUDING DAMAGE. CAUSED SOLELY BY AN ACT OR OMISSION OF SAID CITY AND.INJUNCTIVE RELIEF WHICH THE OWNERS, OR THEIR.SUCCESSORS AND ASSIGNS, MAY THEMSELVES HAVE NOW OR IN THE FUTURE BY REASON OF THE CONSTRUCTION, MAINTENANCE AND OPERATION OF SAID DRAINAGE SYSTEM. b 7. COVENANTS, CONDITIONS, RESTRICTIONS, EASEMENTS AND LIABILITY FOR ASSESSMENTS CONTAINED IN INSTRUMENT, BUT OMITTING ANY COVENANTS OR RESTRICTIONS, IF ANY, BASED UPON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, FAMILIAL STATUS, MARITAL STATUS, DISABILITY, HANDICAP, NATIONAL ORIGIN, ANCESTRY, OR SOURCE OF INCOME, ASSET FORTH IN APPLICABLE STATE OR FEDERAL LAWS, EXCEPT TO THE EXTENT THAT SAID COVENANT OR RESTRICTION IS PERMITTED BY APPLICABLE LAW: RECORDED: OCTOBER 16, 1990 RECORDING NUMBER: 9010160356 z AMENDMENT AND/OR MODIFICATION OF SAID RESTRICTIONS: RECORDED: RECORDING NUMBER: APRIL 28, 1994 9404280348 o AMENDMENT AND/OR MODIFICATION OF SAID RESTRICTIONS: RECORDED: RECORDING NUMBER: AUGUST 31, 1994 9408310731 x AMENDMENT AND/OR MODIFICATION OF SAID RESTRICTIONS: RECORDED: RECORDING NUMBER: JUNE 22, 2000 200006220401 AE AMENDMENT AND/OR MODIFICATION OF SAID RESTRICTIONS: RECORDED: JULY 24, 2009 SHPLATB3/12.12.90/EK CI IICAGO TITLE INSURANCE COMPANY • 0 CHICAGO TITLE INSURANCE COMPA Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B (Continued) EXCEPTIONS RECORDING NUMBER: 200907240341 L 8, EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY AND WEST COAST TELEPHONE CO. PURPOSE: AN ELECTRIC DISTRIBUTION LINE AREA AFFECTED: PORTION OF REAL ESTATE UNDER SEARCH RECORDED: NOVEMBER 3, 1965 RECORDING NUMBER: 1821783 tr THE DESCRIPTION CONTAINED.THEREIN IS NOT SUFFICIENT TO DETERMINE ITS EXACT LOCATION WITHIN THE PROPERTY HEREIN DESCRIBED. N 9. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: GRANTEE: CITY OF EDMONDS, A MUNICIPAL CORPORATION PURPOSE: STORM SEWER AREA AFFECTED: A 10 FOOT STRIP OF LAND OVER PORTION OF REAL ESTATE UNDER SEARCH RECORDED: JUNE 23, 1983 RECORDING NUMBER: 8306230307 0 THE DESCRIPTION CONTAINED THEREIN IS NOT SUFFICIENT TO DETERMINE ITS EXACT LOCATION WITHIN THE PROPERTY HEREIN DESCRIBED. a 10. STATEMENT ON ACCESSORY DWELLING UNITS AND THE TERMS AND CONDITIONS THEREOF RECORDED UNDER AUDITOR'S FILE NUMBER 9804131116. 0 11. COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS AND THE TERMS AND CONDITIONS THEREOF RECORDED UNDER AUDITOR'S FILE NUMBER 980.7210184. it 12, EASEMENT AS DELINEATED AND/OR DEDICATED ON THE FACE OF THE SUBDIVISION MAP. PURPOSE: ACCESS AREA AFFECTED: PRIVATE ROADS LIABILITY TO MAINTENANCE AND/OR ASSESSMENTS PURSUANT TO ROADS WITHIN THE SUBDIVISION BEING PRIVATE ROADS. s 13. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:. SHPIAT133/121290/EK CHICAGO TITLE INSURANCE COMPANY 0 CHICAGO TITLE INSURANCE COMP T D Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B (Continued) EXCEPTIONS GRANTEE: PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY PURPOSE: ELECTRIC DISTRIBUTION LINE FACILITIES AREA AFFECTED: AS DISCLOSED ON EXHIBIT A ATTACHED THERETO RECORDED: NOVEMBER 2, 1990 RECORDING NUMBER: 9011020361 14. COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS AND THE TERMS, CONDITIONS AND PROVISIONS CONTAINED THEREIN: RECORDED: RECORDING NUMBER: OCTOBER 9, 2008 200810090472 15. COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS AND THE TERMS, CONDITIONS AND PROVISIONS CONTAINED THEREIN: RECORDED:. RECORDING NUMBER: OCTOBER 09, 2008 200810090473 nr 16. COVENANT TO BEAR PART OR ALL OF THE COST OF CONSTRUCTION OR REPAIR OF EASEMENT GRANTED OVER ADJACENT PROPERTY: PURPOSE OF EASEMENT: RECORDING NUMBER: DRAINAGE 201002240351 ao 17. COVENANTS, CONDITIONS, RESTRICTIONS, EASEMENTS, NOTES, DEDICATIONS AND SETBACKS, IF ANY, SET FORTH IN OR DELINEATED ON THE BOUNDARY/LOT LINE ADJUSTMENT RECORDED UNDER RECORDING NUMBER 200906265002. v 18. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF: GRANTOR: BRIAN ISAACSON AND CINDY ISAACSON, HUSBAND AND WIFE TRUSTEE: COMMONWEALTH LAND TITLE COMPANY BENEFICIARY: LORIAN ESTATES LP AMOUNT: $ 153,000.00 DATED: NOVEMBER 19, 2004 RECORDED: DECEMBER 13, 2004 RECORDING NUMBER: 2004121302.51 LOAN NUMBER: NOT DISCLOSED S H PLATES / 12.12.90/ EK CHICAGO TITLE INSURANCE COMPANY CHICAGO TITLE INSURANCE COMPA* Order No.: 5610647 SHORT PLAT CERTIFICATE SCHEDULE B (Continued) EXCEPTIONS THE AMOUNT NOW SECURED BY SAID DEED OF TRUST AND THE TERMS UPON WHICH THE SAME CAN BE DISCHARGED OR ASSUMED SHOULD BE ASCERTAINED FROM THE HOLDER OF THE INDEBTEDNESS SECURED. AA 19. COVENANTS, CONDITIONS, RESTRICTIONS, EASEMENTS, NOTES, DEDICATIONS AND SETBACKS, IF ANY, SET FORTH IN OR DELINEATED ON THE BOUNDARY/LOT LINE ADJUSTMENT RECORDED UNDER RECORDING NUMBER 200302200953. Aa THE COMPANY DOES NOT FIND THAT THE LOT LINE ADJUSTMENT WAS PERFECTED BY DEEDS FROM ANDERSON TO CHUNG, AND FROM CHUNG TO ANDERSON. LOT LINE ADJUSTMENTS DO NOT CONVEY TITLE, AND QUIT CLAIM DEEDS FOR THE CONVEYED PORTIONS OF TRACT A & LOT 3 WILL NEED TO BE RECORDED TO COMPLETE THE LOT LINE ADJUSTMENT PROCESS. Ac 20. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: PURPOSE: INGRESS, EGRESS AND UTILITIES AREA AFFECTED: THAT PORTION OF TRACT A LYING WITHIN THE EASTERLY ONE-HALF OF VACATED 74TH PLACE WEST RECORDED: OCTOBER 12, 1990 RECORDING NUMBER:. 9010120362, 9010120363, 9010120364, 9010120365, AND 9010120366 AD 21. PUBLIC AND/OR PRIVATE EASEMENTS, IF ANY, IN EXISTENCE, OVER, UNDER, ALONG AND ACROSS THAT PORTION OF THE REAL ESTATE UNDER SEARCH LYING WITHIN VACATED 74TH PLACE WEST. x 22. THE COMPANY'S LIABILITY FOR THIS REPORT IS LIMITED TO $1,000.00. THIS REPORT IS BASED ON THE COMPANY'S PROPERTY RECORDS, AND NO LIABILITY IS ASSUMED FOR ITEMS MISINDEXED OR NOT INDEXED IN THE PUBLIC RECORDS, OR FOR MATTERS WHICH WOULD BE DISCLOSED BY AN INQUIRY OF THE PARTIES IN POSSESSION OR BY AN ACCURATE SURVEY OR INSPECTION OF THE PREMISES. THIS REPORT AND THE LEGAL DESCRIPTION GIVEN HEREIN ARE BASED UPON INFORMATION SUPPLIED BY THE APPLICANT AS TO THE LOCATION AND INDENTIFICATION OF THE PREMISES IN QUESTION, AND NO LIABILITY IS ASSUMED FOR DISCREPANCIES RESULTING THEREFROM. THIS REPORT DOES NOT REPRESENT EITHER A COMMITMENT TO INSURE TITLE, AN EXAMINATION OF, OR OPINION AS TO THE SUFFICIENCY OR EFFECT OF THE MATTERS SHOWN, OR AN OPINION AS TO THE MARKETABILITY OF TITLE TO THE SUBJECT PREMISES. END OF SCHEDULE B SHPIAM/17r12r90/BK CHICAGO TITLE INSURANCE COMPANY 134993 Filed for Record By: MaX iSAACSON 1200 - 6" AVENUE, SURE I 9W SEAME. WA 98101 • :•• �� . I Illlll NIN illll 11iN IINI INS III NIN If III IIIII NlII IINI Iill NI! 50 GS S OH M N�COUNTr� i&INGTON QUIT CLAIM DEED OOTSM0000200 AND 007004000MOO SWI/4,SWI/4,SEC.O.T.27N..R.4E.,W.M. �-the COAKT.OAS. R66M A. AND JOANN M. ANDERSON, husband and wife, for and In cpmide.*n Rf,,a4utuai agreement, convoys and quit claims to, the GRANTEE, BRIAN AND CINJ>YISA,1CSOItthe owners, and ire heirs, future owners, sucoassons, and assigns of the fqIb".d6krbed present situated In the County of Snohomish, State of Washington, toget4r with all aft6iii1r AU(ted title of the Grantor ftraln: THAT POD TIO;N-QFTRA4'i> ',%OAIAN WOODS, AS PER PLAT RECORDED IN VOLUME 51 OF PLATS, PA13ES t,45 AND 146, RECORDS OF SNOHOMISH COUNTY, DECRIBEDASFQLj-OwS---...--1... COMMENCING AT THE QOUTWtAV CORNER OF LOT 2, OF SAID PLAT LORIAN WOODS. THENCE S. 70052'16'W ON-fiIE-60" UTfi**L*'[N*E OF SAID LOT 2, A DISTANCE OF 34.00 FEET, TO THE POINT OF BSdiNN!jild; THENCE S. 19007'44* E. A DIST .ANCEOF3.50FEE THENCE S. 70052'16*W. A DISTANCE OF 511061PSET; THENCE N. 19-01-44- W. A DISTANCE OF-S.*50 FIEFf."30 THE SOUTH LINE OF SAID LOT 2: THENCE N. 70152'16"E.ADISTANCkOF50.60F9T TQ-T*HE POINT OF BEGINNING. 6 % SITUATE IN THE COUNTY OF SNOHO?ASH STATA• ,F-"HINGTON. . ......... By acceptance of this deed, the Grantee hereby relea6v Md*Grantdr, Its heirs, future owners, successors, and assigns, from any and all liability fo$ #y6ove(des6ibod parcel herein conveyed. Dated this jFday of o0irgkr%&w,� 'w 0 GRANTQ83: S RPBER TA.ANDERSON N M. ANDERP GRANTEE: BY: 1*3'"-.— 2i BRIAN ISAACSON CINDY ISAAQ@ON DWOFILESERVER212008100792A 1 LEGAL DESCRIPTION 191A QUIT CLAIM DEEo PAGE I .. ... ... .. % ' mn*Teop '.mouwT�oF-�%l������� ` � I kriow or have satisfactory evidence that. ROBERT A. AND JOANN M. ANDERSON, are the per.ions who-oppeared before me, and said persons acknowledged that they signed this inAr Yrrienl and's.cknowledged K to be thwe free and voluntary act for the uses and purposes GIVEN under My han�"e-vtd official seal this day of -Y 2010. P. Notary PublIC? and for the State of Washington, vori Residing at: My Commission expires! - la STATE OF COUNTY OF appeared before me, and s5ild pertooslackwwlklged that they signed this instrument and acknowl"edged it to be thsr*fYee.a4 vokvdiry act for the uses and purposes mentioned In this Instrument GIVEN under my hand and official seal .2010. RZ MY ` u*G,ILESsmER2`M`mnp2A`LEGAL OE,m"pnv~`mAmmCLAIM DEs • Filed for Record By: ORMN k AACSON 1N10- ffTH AVENUE, SUITE 1900 SEATfLE. WA s5101 I III NIN INII NNI ll� IIAI NI4 IIIN Vlq IIIII INII NUI �l'► All SN .M, SH.0 5.q� SN , OP{ SH C SH N6TOW _.... _ .._ _.... _ _... _....--_-201002240351.001 NO EXCISE TAX REQUIRED FEB 2 4 101U KIRKE SIEVERS, sioli lb Ccwn TMOM DRAINAQF EASEMENT 00790400000200 AND 00790400098800 SW 114, SW 1144, SEC.B, T.27N., R.4E., W.M. KNOW ALL MEN by these presents that, ROBERT A. AND JOANN M. ANDERSON, the present owners, GRANTORS, for and In consideration of MUTUAL BENEFIT, receipt whereof Is hereby acitnowledged, owner of the following property: TRACT "A', LORIAN WOODS, AS PER PLAT RECORDED IN VOLUME 51 OF PLATS, PAGES 145 AND 146, RECORDS OF SNOHOMISH COUNTY, WASHINGTON; EXCEPT THE FOLLOWING DESCRIBED PORTION OF SAID TRACT'A'; COMMENCING AT THE SOUTH EAST CORNER OF LOT 2, OF SAID PLAT LORIAN WOODS. THENCE S. 70°52'16" W. ON THE SOUTH LINE OF SAID LOT 2, A DISTANCE OF 34.00 FEET, TO THE POINT OF BEGINNING;. THENCE S. 19°07'44' E. A DISTANCE OF 3.50 FEET; THENCE S. 70'52'16" W. A DISTANCE OF 50.00 FEET; THENCE N. 19°07'44' W. A DISTANCE OF 3.60 FEET, TO THE SOUTH LINE OF SAID LOT 2; THENCE N. 70°52'16' E. A DISTANCE OF 50.00FEET, TO THE POINT OF BEGINNING. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. SUBJECT TO ALL EASEMENTS, RESTRICTIONS AND RESERVATIONS. Do hereby grant, a permanent easement for drainage and maintenance as it now exists in January 2010, under, across, along and upon the following described portion of the above -described prey: BEGINNING AT THE NORTHWEST CORNER OF SAID LOT 2, LORIAN WOODS, AS PER PLAT RECORDED IN VOLUME 51 OF PLATS, PAGES 145 AND 148, RECORDS OF SNOHOMISH COUNTY, WASHINGTON; THENCE S. 08°59'03' W., ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF 104.00 FEET; THENCE N. 70052" 6' E. A DISTANCE OF 14.01 FEET; THENCE S. 19'07'44" E. A DISTANCE OF 3.50 FEET; THENCE N. 70"52'16" E. A DISTANCE OF 50.0 FEET; THENCE N. 19°07'44' W. A DISTANCE OF 3.50 FEET; THENCE N. 70°52'16' E: A DISTANCE OF 34.00 FEET; THENCE N. 18°00'34" W. A DISTANCE OF 55.20 FEET TO THE NORTHEASETERLY CORNER OF SAID LOT 2; THENCE S. 87°32'34" E. A DISTANCE OF 106.67 FEET TO THE EASETERLY LINE OF TRACT A; THENCE S. 02027'28' W: A DISTANCE OF 149,12 FEET; THENCE N. 87°32'34' W. A DISTANCE OF 160.53 FEET TO THE EAST LINE OF 79RD PLACE WEST (PRIVATE DRIVE); THENCE N. 01`45'47" E. A DISTANCE OF 45.29 FEET; THENCE N. 87007'57' W. A DISTANCE OF 26.82 FEET; THENCE N. 02°52'03" E. A DISTANCE OF 51.34 FEET TO THE BEGINNING OF A CURVE, CONCAVE TO THE EAST, HAVING A CENTRAL ANGLE OF 15'12'43, A RADIUS OF 135.00 FEET AND AN ARC LENGTH OF 35.84 FEET; PAW SERVER I M i 087M I LEGAL DES=FnON I TRACT A EASEMENT PAGE 1 OF 3 This map does not purport to show all highways roads or easements affecting said property; no liability is assumed for variations in dimensions and location. • 0 THENCE N. 16'04'48' E. A DISTANCE OF 35.42 FEET; THENCE S. 73'00'43' W. A DISTANCE OF 6.53 FEET TO THE POINT OF BEGINNING; SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. Said easement is appurtenant to and for the benefit of, BRIAN AND CINDY ISAACSON, the present owners, and its heirs, future owners, successors, and assigns of the Wowing described property: LOT 2, LORIAN WOODS, AS PER PLAT RECORDED IN VOLUME 51 OF PLATS, PAGES 145 AND 146, RECORDS OF SNOHOMISH COUNTY, WASHINGTON; TOGETHER WITH THAT PORTION OF TRACT'A' OF SAID PLAT, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTH EAST CORNER OF LOT 2, OF SAID PLAT LORIAN WOODS. THENCE S. 70*52*16' W. ON THE SOUTH LINE OF SAID LOT 2, A DISTANCE OF 34.00 FEET, TO THE POINT OF BEGINNING; THENCE S. 19'07'44' E. A DISTANCE OF 3.50 FEET; THENCE S. 70°52'16' W. A DISTANCE OF 50.00 FEET; THENCE N. 19'07'44' W. A DISTANCE OF 3.50 FEET, TO THE SOUTH LINE OF SAID LOT 2, THENCE N. 70'52'16' E. A DISTANCE OF '50.00 FEET; TO THE POINT OF BEGINNING. SITUATE IN THE COUNTY OF SNOHOMISH. STATE OF WASHINGTON. This easement shall run with the land and shall be binding on, and shall inure to the benefit of Ute parties, their heirs, successors, or assigns. Dated the t day of .2010. G S: BY BY R BERT A. ANDERSON JO t RSON GRANTEES: BRIAN ISAACSON CINDY ISAACSON STATE OF U)AS►I iN R1N1 t� ) SS COUNTY OF [ l D�jLd=&51 I know or have satisfactory evidence that, ROBERT A. AND JOANN M. ANDERSON, are the persons who appeared before me, and said person acitnowledged that dwy signed this Insbument and acknowledged it to be them free and voluntary ad for the uses and purposes marttiortsd in this Instrument. GIVEN under my hand and official seal this J day of ��4�vg2 r 2010. NotaryPublic t ar�Q f r the State of Washington, Residing at �, f4/ / u C My Commission expires:, /Z-OlzZ RAW SERVER 1200010079ZA / LEGAL DESCRIPnON I TRACT A EASEMENT PAGE 2 OF 7 This map does not purport to show all highways roads or easements affecting said property; no liability is assumed for variations in dimensions and location. • 0 ................__ ___ _701002240351,003 STATE OF � }SS COUNTY OF _ �� facC I know or have satin ory evidence that, BRIAN AND CINDY ISAACSON, are the parsons who appeared before me, and said person acknowledged that they signed this Instrument and acknowledged it to be there free and voluntary act for the uses and purposes mentioned In this Instrument. GIVEN under my hand and official seal this day of .2010. = Ql_ ' f/,t55/p�ra;r� //� NotaryPubilln nd forfhe State of Washington, 'c,� N O r y \� 1, z Residing at: 4��?i�-� y � a - ,(� ,, My Commiaslon expires: i-� < �0; 201002240351.004 l t` 11' C Q�, e NW CORNER or LOT 2 ) TRACT "A" COMMON AREA NE CORNER OF COT 2 f 06.67 . V ' rt 0 34.00 �N19'O7'44"W ~ LORIA9a10165006 •I % N70'52'16"E tA.01' g2t6"E/ (' N���O J.50 AF NO. 8' 148J. 51, PG- las I ' (VOL. h h 3.50' I T�7 26.62 ITRACT A" COMMON AREA mr LINE OF TRACT A`'��I �Rj g gl TRACT "A" COMMON AREA r---�" LEGEND ( I EA WENT LINE EXISTING LOT LINES LOT NUMBER PER PUT OE LORLAN WOODS - (VOL, 57, PC. 145-146) SCALE: f" = 30' I� 0 30 60 Western 425458-2700 •425-742-5500 $ .gineere, 425-350-8708 (Tax) jjl o. STORY BASEMENT •I300o N.r FOR A. MOO' XXWIT YAP : araaarr. VA. sourm BRIAN ISAACSON This map does not purport to show all highways roads or easements affecting said property; no liability is assumed for variations in dimensions and location. • 200907240341.001 Return Name and Address: Brian and Cindy Isaacson 9808142nd Place N.E., F-301 Bothell, WA 98011. Document Title: Amended Covenants Grantor: 311111111111111011111 1§71 COUNTYa'MINTONG5 Lorian Woods Homeowners Association Grantee: Brian and Cindy Isaacson, owners of lot 2 of Lorian Woods as per Plan recorded in Volume 51 of Plats , Pages 145 and 146, Records of Snohomish County Auditor, situated in the County of Snohomish, State of Washington. Reference Number (Auditor File Number): 9010165006 Tax Parcel Tax Account Number: 00790400000200 This map does not purport to show all highways roads or easements affecting said property: no liability is assumed for variations in dimensions and location. 0 200907240341.002 Lorian Woods, Inc. Planned Unit Development 7370 North Meadowdale Rd. Edmonds, WA 98026 Amendment to CCR 7.5.5. Approved by Homeowners January 2009 There shall be allowed a limited exemption for Lot 2 as referenced in the attached drawing marked as Exhibit A, This map does not purpon to show all highways roads or easements affecting said property; no liability is assumed for variations in dimensions and location. This map does not purport to show all highways roads or easements affecting said property; no IiabiI iry is assumed for variations in dimensions and location I fill g� 5 E R�p�gA 9 g �� AA�Agi �� x4 g $AIf�, g e� ■ a RRMM�M � � �� ■ 0 �� •RNM�N � I � �� ■ RRNN�N � I� • �" � g� � t.B>Avegm�.i�.� s�vviqilk �gv1A�g°� �!i 1atot �;��� g k •r Lgks I I t ' \ I lip, lag I I I � I I I I I 1 WE i� tot , Ia�IIIAAAA ag � a This man does not ournort to show all hiahways roads or easements affectins said property; no liability is assumed for variations in dimensions ana location. • 4:10:D After recording return to:. • Dr. 6 Mrs. Robert A. Anderson 7370 North Meadowdale Rd. w' Edmonds, Washington 98026 %� ? EASEMENT AGREEMENT (Phyllis H. Wiggins) N GRANTORS, Robert A. Anderson an Joann y.Andereon, husband and wife, in consideration of. the consent. of rtlntee,•PhyAlisi 9: CD Wiggins, a single woman, to the vacation of a atrdet I': right-of-way of 74th Place West in the city A Edmonds, and effective upon the vacation of the said 740.,%ace West by the O city of Edmonds, and in consideration, of Grn teels giving i Grantors a view easement over Grantee's prop6rty'(hs set forth r:{ hereafter), convey and quit claim to Grantee, her heirs, 0 successors, and assigns, anon -exclusive easement for ingress and egress over, across,.and upon that property in Snohomish County, Washington, legally deacribed.as: The easterly one-half (1/2) of the vacated right-of-way of 74th Place West from North Meadowdale Road to the southerly line of.Lot 3, Block 58, Plat of Meadowdale Beach recorded in Volume 5 .of Plats, page 38, records of.Snohomish County, Washington. Such easement shall be for the benefit of and run with the land of Grantee, her heirs, successors, and assigns which.property is located in.Snohomish County, Washington, and legally described as Lots 1, 2, and 3, Block 58, of the said Plat of Meadowdale.Beach. Grantors, .their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. Grantee hereby gives and -grants to Grantors,their heirs, successors, and assigns a view easement over and across Grantee's property as described.hereafter. The purpose.of the view easement is to.allow Grantors, their heirs., successors, and assigns the right to maintain their existing views. Grantee for herself,.her heirs, successors, and assigns agrees that Grantors, 1 their heirs, successors, and.assigna•shall notify Grantee when there are limbs and trees which have grown into the existing views from Grantors' lots 1, 2, 3, and 4 of the proposed planned residential development plat of Lorian Woods estates (which has. received preliminary approval by the city of Edmonds in March 1990) which is located on Tracts 54,.55, 56, and 57 of the said Plat of Meadowdale Beach -EXCEPT the.east 120.00 feet of the said Tract 57. Together, the Grantee and Grantors shall agree on the limbs and possibly trees to be removed so the views shall be �. maintained and the Grantee'.s landscaping plan also be maintained. The removing any such limbs.or trees shall be paid by the Grantors and shall be done at times convenient to both parties. Grantors shall also remove all debris, from G�nntee's property. l If agreement cannot be reached between the parties a mediator } will be employed until resolution is 'reached and the expense of I this mediator shall be paid equally by Grantors and Grantee. Both.the Grantors and Grantee have photographs on file documenting the existing view. Such photographs are to be held with Lorian Association's records and in C:a,ntee's safe.deposit box. Grantee's heirs, successors, and assigns shall designate where photographs are kept by .them. The view easement shall be a burden upon the land of.Grantee and a benefit to the land of. Grantors and shall run with the land with respect to both Grantee, Grantors, their heirs, successors, and.assigns.. The legal.description of the property of Grantee is: I' Lots 1, 2, and.3, Block 58, Plat of Meadowdale Beach, Recorded in Volume 5.of Plats, page 38, records of Snohomish County, Washington. The legal description of the land of Grantors which is benefited by the view easement is now:: NO EXCISO TAX REQUIRED [naaFSENT AGREEMENT. Page-1 of 2 ►'0L.2385eaGE10G2 OCT 1219� 90101.20 3 6 CaI t rr.f+ rf k' t E P Ir k i ��, ':::J.r:.�f,- After recording return to: ' 4:09:B, Or. 6 Mrs. Robert A. Anderson � -- 7370 North Meedowdele Rd,16 Edmonds,.Weshington 98026 EASEMENT AGREEMENT AND .QUIT CGj DEED , (Dale Miller) GRANTORS,. Robert A. Anderson and Joann Anderson, Xuebpnd and wife, in consideration of the consent of Uantee,,Dalte Miller, ,a single man, to ,the vacation of the speet Fight�of-way ...of 74th Place West in the city of Edmonds and tective upon the �^ vacation of the said 74th Place West by the ci y of Edmonds, and Q in consideration of Grantee's giving Grantors a.view easement (as set forth hereafter) convey and quit to Grantee,. his heirs, t successors, and.assigns,.a non-exclusive easement for ingress -and egre"se over, across, and upon that property in Snohomish County, O .. Washington, legally.desccibed as: The iaeterly one-half (1/2) of the vacated right-of=way . of 74th Place west from 162nd Street Southwest in the City of, Edmonds to the northerly boundary line of . recorded intlip Volumel5cof58, Plat of Plate, pageM38, wdale recordseofhSnohbmish. County, Washington. Such easement shall -be for the benefit of and run with the land of Grantee; his heirs, successors, and: assigns which property. is located.in Snohomish County, Washington, and legally described as Lot 11, Block 58, of the said plat of Meadowdala Beach.'. Grantors, their heirs, successors, and assigns shall not. be �. . obligated to maintain., repair, or improve the easement or any portion of it. In consideration for the above easement, and other consideration, Grantee gives and grants to Grantors, their heirs, successors, and assigns; a view easement.over and across Grantee's property as described hereafter. The purpose of the view easement is to allow Grantors, their heirs,.successors, and asaigns'the right to maintain the existing view. No additional trees will be planted by Grantee, his heirs,,successors, or assigns which will have a maximum height greater than 3C feet total unless an agreement is. first made to remove limbs from the tree or trees to maintain the view from Grantors' property. Grantee.gives and grants to Grantors, their heirs, successors; and assigns the right.to selectively remove limbs of existing trees to maintain existing views as trees grow, but to remove the limbs in a way that will not detract from Grantee's landscaping. The cost of providing and maintaining the said view,shall be paid ;. entirely by Grantors, their heirs, successors, and assigns. The easement shall be a burden upon the.land of Grantee and a benefit to the land of Grantors and shall run with the land with respect i to .both Grantee, Grantors, their heirs, successors, and assigns. The .legal. description of the.property of Grantee is: jLot'il, Block.58, Plat of Meadowdale Beach, Recorded iin Volume 5 of Plats, page 38, records of Snohomish i County, Washington. The legal, description of the land of Grantors which is benefited ' by the view easement'is: Lots 54, 55, 56, and 57, Meadowdale Beach, according. j to.the Plat thereof recorded in Volume 5 of Plate, page,38, records of Snohomish County, Washington, :EXCEPT the east 120.00 feet of said Lot 57. Grantors,_ Robert A. Anderson and Joann M. Anderson, in further consideration. for receipt of the above -described view easement, convey and quitclaim to Dale Miller, a single man, the following.. described real property: NO EXCI$B 7AX REQUIRE) ; EASEMENT AGREEMENT AND QUIT CLAIM DEED - Page l of 2' OCT I?, ., s. v61.2385PAGE10G4 wq%23., 9010120.369 In the said plat of Meadowdale Beach; thence S87o35143"E . along the Easterly prolongation of the South line of the said Lot 15.50 feet to intersect the.cenkerline of the said, vacatSd 74th Place West, and the POINT OF BEGINNING) thence N16 59117"E along,said.centerline 60.30 feet.to intersect the easterly prolongation of the north line. of said lott thence S87 421100E along said line..1.17 feed thence S18003122"W 60.61 feet to the POINT OF BEGINNINGJ. SUBJECT TO a permanent non-exclueive easement for ingress and egress from 162nd Street SW to Lots 5, 6, 7,.8, 9, and 10,.Block 58, of.the said Plat of Meadowdale Beach, which easement is for the benefit of the said Lots '5, 6, 7, 8, 9, and 10 which easement runs with the land and shall be a burden on the above -described property fj conveyed by this instrument to Grantee. �/� beet A" n�a� _ 9_9� =! R----117 '. Z_-Z o Jrson (Date) Dale Miller (Date) J ann M..Andecaon (date) STATE OF WASHINGTON) ss. COUNTY OF SNOHOMISH) On this day.peisonally:appeared before me DALE MILLER to.me known to be the individual described in and who executed the. within and foregoing instrument, and acknowledged that he signed the same as his free and voluntary act -and -deed, for the uses and purposes therein mentioned. (G N under. my hand .and official seal thiE ;Z2- day of. -- ---1 1990. OTR^PUBLIC in and for t4hta- of Washington, Residing at My Commission .Expires: STATE OF WASHINGTON) i sa. COUNTY OF SNOHOMISH) On this day personally appeared be-frnre me ROBERT A. ANDERSON and JOANN M. ANDERSON to me known to be the individuals described in and who executed the within and,foregoing instrument,and. acknowledged that they signed,the same as their free and voluntary act and deed, .for the uses and purposes therein mentioned. under my hand and, official seal hie a�. day,,,,nf, OTARY PUBLIC for rthe' Ye: of Washington, Res iding.hh' My Commission Expires: W EASEMENT AGREEMENT AND QUIT CLAIM DEED - Page 2 of 2 S�UlUl`�0.`g� VOL. 2385PAEEIOG5 t x G 01 After Recording Return toi ( tf Dr. 6 Mrs. Robert A. Anderson �. N 7370 North Meedowdele Rd. Edmonds, Washington 98020 EASEMENT AGREEMENT' - (Mary. E. Janeway) 0 GRANTORS, Robert A. Anderson and Joa:rn M. ONerstin, husband and wife, in consideration_ of the consent of G ntee, Mary E. Janeway, a single woman', to the vacation of the street right-of-way.of 74th Place West in the city. of Edmonds, and 0 effective upon the vaCation of the. said 74th Place West by the P-4 city of Edmonds, and in .further consideration of Grantee's giving Grantors consent to remove certain trees on Granteee'n property, convey and quit claim to Grantee, her heirs, successors,.and assigns,'a non-exclusive easement.for ingress and egress over, . across, and upon the following property in Snohomish County, Washington, legally.described as: That portion of Lots 56.and 57, Meadowdale Beach, according to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington, described as follows: Beginning at.the southwest corner of.said Lot 57; thence south 87 35143" east.along the sortherly line of said Lot 57 10.00. feet; thence north 16.59117" east parallel with the westerly line of the said Lots 56 and 57, 180 feet; ghence north e7o35-43- west 4.00 feet; thence north 16 591174 east 85.0 feet) thence north 87035143" west 6.0 feet to intersect with thS westerly line .of the said Lot 56; thence south 16 591170 west along the westerly line of said. -Lots 56 and 57 265.00 feet.to the point of beginning; TOGETBER. WITH the easterly one-half (1/2) of the vacated 74th Place West from the northerly line of Lot 6, Block 58, of the said Plat of Meadowdale Beach to 162d Street Southwest, LESS the.westerly ll:feet thereof lying.: between the northerly boundary line of the southerly one-half (1/2) of Lot 8, Block 58, of the said Plat of Meadowdale Beach, as projected easterly and parallel with the line between the said Lots 8 and 9 and the southerly boundary line of Lot.10, Block 58, of the said Plat of Meadowdale Beach as projected easterly on the same bearing as the said line. Such easement shall be for tho benefit of and run with the land of Grantee, her heirs, successors, and assigns which property is located in Snohomish County, Washington, and legally described as: . Lots 6, 7, and .the.north one-half (1/2)'of tot 8, . Block 58 in the Plat of Meadowdale Beach, as described above. Grantors, their heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any k. portion of it, i Grantee hereby gives Grantors permission to cut three cedar trees { on Grantee's property as follows: t (1).The multiple trunk cedar tree growing from it single old . stump which is located near the northerly line of the said Lot i, .ppproximately midway between the easterly and westerly boundaries of Lot 6; (2) One.cedar tree near the northeasterly corner of Lot 6 in the_westerlyone-half (1/2) .of '.the vacated 74th Place Fifbt;E7t SE 'eAX ; REQUIRED EASEMENT AGREEMENT -.Page :l of 2 OCT 1 219A0 9010120 3 6 4E 10L.2385POE1 OGG (3) The cedar.tree near the easterly end of the shed on k Lot 7 located in the westerly one-half (1/2) of the vacated 74th Place.West. . The trees shall be removed in a careful, workmanlike manner with all pacts of the.trees.and debris removed from Grantee's property a. without unnecessary delay.: Grantors shall give Grantee .or her cepresentative notice of such 'intent to do the removal and Grantee or her representative shall allow the cutting.to be done. at a reasonable time convenient to both parties. All costs of pober removal, and cleaning debris shall be paid by Grantors. Anderson Paul M. Williams, Guardian of Mary E.-Janewa 4 Sa J_ Da to s------=--=- Dates ..G�:. Joe M. Ands son Dates ------ -- STATE OF WASHINGTON) .) BE. COUNTY OF SNOHOMISH) On this day personally appeared before me PAUL M. WILLIAMS who signed this instrument, on oath stated that he was authorized to execute the instrument,.and acknowledged it.as.the GUARDIAN OF MARY.E. JANEWAY to.be the free and voluntary act of MARY E. JANEWAY for the uses and purposes mentioned in.this instrument. A:Fder my hand and official seal this (CA day of 1990. OTARY PUBLIC in and;for tfi Cate of Washington, Residing at %f My Commission Expires: STATE OF WASHINGTON) . sB. COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. ANDERSON and JOANN M..ANDERSON to me known to be the individuals described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses:and purposes therein mentioned:. . G EN under my hand and official seal this �_ day 8(sV..` NOTARY PUBL C in and !o[ .the' Stalbe of Washington, Residing at My Commission Expires: i i EASEMENT AGREEMENT - Page 2 of 2 �U 10 xQo $ (1 4 VOL. `�38JPAGElUG% 05: C NO EXCISE TAX WHEN RECORDED RETURN TO: REQUIRED . jaName --- — — — — — — — Dr. & Mrs. Robert A. Anderson OCT 12 Address 7370 North MeadowdWe Rd. CoCity, Stater Zip Edmondt, Washington 98026 MUM 0 QUIT CLAIM DEED AND EASEMENT. N THE GRANTORS, ROBERT A. ANDERSON and JOAIiN M. ANDERSON, husband p-1 and wife, for and in consideration of Grantees' consent to the vacation of 74th Place West by the city of Edmonds and, effective antors conveuit upon much J, SBERMAN.MILLSvacationt andGr FRANCINE H. MIy LLSand q, husbandclaimand*to wife# theGrantees ;following described real property, situated in Snohomish County,. Washington,.together with all after -acquired title of thel, Grantors therein: The westerly 11.0 feet of the easterly one-half (1/2) of thevacated 74th place west in the city of Edmonds, Washington, between the northerly boundary, as extended easterly, of the south one-half (1/2) of Lot 8, Block 58,.and the southerly boundary as extended easterly ly of Lot 10, Block 58, of the .'Plat.of Meadowdale Beach, according to the Plat thereof, recorded in Volume 5 Of Plats, page 38,.records of I Snohomish County, Washington. Grantors further.give and grant to Grantees: A non-exclusive easement for ingress and egress from 162d StreetSouthwest to the northerly line of the. southerly one-half (1/2) of Lot 6 of the said Plat of Meadowdale Beach, over, upon, and across the easterly 4.0 feet of the easterly one-half (1/2) of the vacated 74th Place West; and TOGETHER WITH a non-exclusive easement for ingress and egress over, upon,. and across the following additional property:. That portion of Lots 56 and 57, Meadowdale Beach, r acco ding to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington, described as follows. Beginning at 7 the southwest corner of said Lot.57; thence south.87 351430 east along the outhply line of said Lot 57 10.00 feet; thence north 1 .59117" east parallel with the westerly line og the said Lots 56 and 57, 180 feet; thence north 87 35141" uest 4.00 feet; thence north 16 59117" cast 30.0 feet; thence north 87 35143, west 6.0 feet.to intersect with tte westerly line of the said Lot 56; thence south 16 59 117" west along the.. westerly line of said Lots 56 and. 57 210.0 feet to the point of beginning. Such easement shall be for the benefit of and run with the.land of Grantees, their heirs, successors, and assigns which property is legally described as: The southerly one-half (1/2) of Lot 8, Lot 9, and Lot .10,.61ock 58,,in the said Plat of Meadowdale Beach. Grantor * their,heirs, successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. DATED: ✓-2 — ----- — 1990 7L 1-13- ?0 46 obert A. Anderson (Date) Jo Pnn M. Anderson at QUIT CLAIM DEED AND EASEMENT Page. 1 . of 2 . .0 8 9010320 36 5vo` 9* 1 STATE OF WASHINGTON) COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. who ANDERSON, to me known to be the individual described in an executed the within and foregoinq'instru.ment and acknowledged.it to.be his free and voluntary act and deed for the uses and. purposes mentioned in this instrument.. day of GI this —L!-- XEN under my hand and official. seal 1990. Ire. t NOTARY PUBLIC in and 077hg 111. on, Residing�at 2=1 of Washingt 21- My commission Expiress i STATE.OP WASHINGTON) so COUNTY OF SNOHOMISH) On this day personally appeared before me JOANN M. ANDERSON to me known to be the individual described in and who executed the within and foregoing instrument, and.acknowl edged. that she signed the same as her free and voluntary act anddeed, fo. r the uses and purposes therein mentioned. GIVEN under my hand and official seal this day of 1990.; . NOTARY PUBLIC in and forthe'-StIte of Washington, Residing at A2cnEtf:S�, My Commission Expires: =.tm ji7* . . . ......... -7 +.j Co 9010120365 0 1 UIT CLAIM DEED AND EASEMENT ASEM . ENT Page 2 of 2 VOL.2385PAGE10G9 After recording return to: NO EXCISE TAX Dr. & Mrs. Robert A. Anderson REQUIRED 7370 North Meedowdefe Rd. OCT 12 1990 Edmonds, wownston 98o26 EASEMENT AGREEMENT . fsit+ab (Melvin' E. and Margaret L. Ebert) b 0 GRANTORS, Robert A. Anderson and Joann'M. pndereon, husband Melvin E. and wife, in conaideretion.of the consent of Grantees, L. Ebert, husband and wife,'to the vacation of t..{ Ebert and Margaret the street right-of-way of 74th Place West in the city of Edmonds C and effective upon the vacation of the said 74th Place west by in of Grantees giving the.city of Edmonds, and consideration Grantors a view easement (as set forth hereafter), convey and. quit claim to Grantees, their heirs, successors, and assigns, a and non-exclusive easement for ingress and egress over, across, in Snohomish County, Washington', legally upon that property described se: (a) The easterly one-half,(1/2) of the vacated right-of-way of 74th Place West in the City of Edmonds from North Meadowdale Beach Road to the southerly boundary line of Lot 5, Block 58, Plat of. Meadowdale Beach, recorded in Volume 5 of Plats, page 18, records of Snohomish , County, Washington; and (b) That of Lots 56 and 57 of the said Plat of .portion Meadowdale Beach described as follows: Beginning at th� southwest corner of said Lot 571. thence south . 87 35'43" east along the southerly line of said. Lot 57 10.00 feet; thence north 16059'17" east ge said;f.ohx� -�\ with the westerly line of.t�' parallel 56 and 57, 180 feet= thence' nor h 87 35'43" 2 it 6 �Si`A` west 4.00 feet; thenc north 16'59'17" east feet: thence north 87fi35'43"-crest 6.0 feet t'�' ti' intersect with the westerly line of the said 56;-� h 16 59'17" westalong the ly ^r thence south wester line of said Lots 56 and 57 265.00 feet to the point of beginning; TOGETHER.WITH the easterly ':• one-half (1/2) of the vacated 74th Place West f[bin 00 the northerly line of Lot.6, Block 58, of the. a, Plat of Meadowdale Beach to 162d Street Southwest, { LESS the westerly it feet thereof lying between the N i northerly boundary line of the southerly one-half (1/2).of Lot 8, Block 58, of the said Plat .of t . Meadowdale Beach, .s projected easterly and .parallel . with the line between the said Lots 8 and 9 and the "southerly+ boundary line of Lot 10, Block.58, of the said Plat of Meadowdale Beach:as projected easterly on the same bearing as the said line. t. Such easement shall be for the benefit of and run with the land } '. of Grantees, their heirs, successors, and assigns which .property' is located in Snohomish County; Washington, and legally described as Lot 5., Block 58, of the said plat of Meadowdale Beach. Grantors, their heirs, succeesors,:and assigns shall not be obligated to maintain, repair, or improve the easement.or any portion cf it. In exchange for the above easement Grantees glue and grant to Grantors, their heirs, successors, and assigns, a view. easement The " over and across Grantees' property as described hereafter: the view easement is to'allow Grantors, heirs, purpose of .their successors, and aseigne'the right.to maintain the existing view. �. No additional trees will 'be planted by Grantees, their heirs, successors, or assigns which will have a maximum height greater . than 30 feet total unless an agreement is first made to remove EASEMENT AGREEMENT - Page 1 of 2• voL.23$5PavE1070 9010120 3 6.6 limbs from the tree or trees to ,maintain the view from Grantors' property. Grantees give and grant to Grantors, their heirs, successors, and assigns the right to selectively remove limbs of existing trees. to maintain existing views as trees grow, but to remove the limbo, in a way that will not detract from Grantees.' landscaping. The cost. of providing and maintaining. the.said view shall be paid entirely by Grantors, their heirs, successors, and assigns. The easement shall be a burden upon the land of.Grantees and a benefit to the land of Grantors and shall run.with the land with respect to both Grantees, Grantors, their heirs, successors,.and. assigns.. The legal description of.the property of Grantees is: - Lot 5, Block.58, Plat of Meadowdale Beach, Recorded ! in volume 5 of Plate, page 38, records of Snohomish I County, Washington. The legal description of the land of Grantors which is benefited by.the view easement is:. Lots 54, 55, 56, and 57, Meadowdale Beach, according. to the Plat thereof recorded in Volume 5 of Plats, page 38, records of Snohomish County, Washington, EXCEPT he ast 120.00 feet of said Lot 57. 7440 ert A. And rso (Date) ).evin E. Ebert �. (Date). nn M.�Anderson, (Gate) Margaret L. Ebert ~ (Date) STATE OF WASHINGTON) COUNTY OF SNOHOMISH).. On .this day personally appeared before me MELVIN E. EBERT and.MARGARET L. EBERT to me known co be the individuals described in and who executed.the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed; for the uses and purposes therein mentioned. �' '•>.• .GIVEN under my hand and official seal this 9 day o.t NOTARY PgP ,IC in and •for, the 'Gtats'-'�f of Washington, Residing at, � My Commission Expires: _yr2,3=2 STATE OF WASHINGTON) so.' COUNTY OF SNOHOMISH) On this day personally appeared before me ROBERT A. ANDERSON and JOANN M. ANDERSON to me known to be the.individuals described .in'.and who executed the within and foregoing instrument and. acknowledged that they signed the same as their free.and . voluntary act and deed for the uses and purposes therein mentioned. 6A -' under my hand and official se s _' day.cir. 1990. NOTARY PUBLIC in and for t tatg of Washington, Residing at My Commission Expires: _ EASEMENT AGREEMENT -.Page 2 of 2. •'` yu 10120 3 6 0 voi.'2.385PAGE1071 '.i 4:01 :T _ it: Li•1''YC>',nuitl.� l,•l ulll lU:. i.' . EXCISE TAX e Dr, 6 Mrs. Robert A, Anderson /�1 / -NO REQUIRED 7370 North Meadowdale Rd.. I ' Edmonds, Washington 99026 OCT 121990 :. EASEMENT, = itNvl( .(Eugene H. Imamura) £' co GRANTORS, Robert A. Anderson and Joann M. Anderson, husband and wife, in consideration of the consent of Grantee, Eugene H: Imamura, a single man, to;the, vacation of the street right-of-way O of 74th Place West in the city of Edmonds and effective upon the �j vacation of the said 74th Place. West. by the city of Edmonds, . convey and quit claim to Grantee, his heirs, successors, and P. 4 assigns,; a non-exclusive easement for ingress and egress over, . across, and upon that property in Snohomish County, Washington, . legally described aa: { The easterly one-half (1/2) of the vacated right-of-way ; of 74th Place West in the City of. Edmonds from North Meadowdale Beach Road to. the southerly boundary. line i; of Lot 4, Block 58, Plat of Meadowdale Beach, Recorded in Volume 5-of Plats,.page 38., records of Snohomish County, Washington. Such easement shall be for the benefit of and run with the land of Grantee, his heirs, successors,.and assigns which property is located in Snohomish County, Washington, and legally described as Lot 4 of Block.58, of the said plat of Meadowdale Beach. F. Grantors, their heirs,' successors, and assigns shall not be obligated to maintain, repair, or improve the easement or any portion of it. r yw. P art A: Anderson (Date) Jo nn M. A ertsi(bate) STATE OF WASHINGTON) ¢r>; { COUNTY OF SNOHOMISH)1'\r V t: On this day personally appeared .before )e ROBERTI. JIRDERSbN to me known to be the individual described rand who,execed the within and foregoing' instrument, and:acWgowledged'athat he signed the same as his free and voluntary act and deed, .for the uses and purposes therein mentioned. se P .p G EN under my hand and official t s J. day°'ofof -1��YS- --- '. t _ram_ +� •f OTARY PUBLIC nand for ,th' tete: •• i of Washington,. Residing at My Commission.Expires: STATE OF WASHINGTON) as. .r.r.- COUNTY OF SNOHOMISH) On this day personally appeared before me JOANN M. ANDERSON ; to me known to be the individual described.in and who executed the within.and.foregoing instrument, and acknowledged that she signed the'same as her free and voluntary act and deed, for the uses and purposes therein mentioned. EN under my hand and official seal this fp daya•afS••-;� rJ1990. OTARY PUBLIC. in and for. t at�l� `.. of Washington, Residing:a My. Commission Expires: EASEMENT -.Page 1.of 1. r1 4�U 10120367 voL.2385�ace1072 1 0, UTILITY EASEMENT IN CONSIDERATION of benefits to accrue to the grantors here- in, the undersigned, Robert A. Anderson and Joann M. Anderson , hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, operation and maintenance of a storm sewer over, across, through, and below the following described property; and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction and maintenance of said utility or utilities, together with the right of access to the easement at any time for the stated purposes. The easement and right-of-way hereby granted is located at the County of Snohomish, State of Washington, and is more particularly de- scribed as follows: .A ten foot strip of land that is 5.00 feet on each side �? of the storm sewer as it now exists, or as staked in the field by the -en - ithin the following described property: Tracts 54.,a_µ55, 56 and•57, Plat of Meadowdale Beach, as per plat -recorded in Volume 5 of Plats on page 38, records of Snohomish County; EXCEPT the East 120 feet of said Tract 57; situate in the County of Snohomish, State of Washington. TOGETHER WITH a temporary 10_foot construction easement over ,`he aforementioned.property...,___Said,.construction ease- ment will end upon the completion of the constructionof.:e.�n.� the storm sewer, or January 1, 1985, whichever comes first. THE CITY agrees to restore to substantially the original condi- tion such improvements as are disturbed during the construction, main- tenance and repair of said utility or utilities; provided the grantors, their heirs, or assigns shall not construct any permanent structure over, upon., or within the permanent easement. DATED this 31 day of STATE OF WASHINGTON) ) ss COUNTY OF SNOHOMISH) .,I Qn this da personally appeared before me I . I' andL / d,�+ to me known to be the ivi ual s descr e n an whcY executed the within and for6going instrument, and acknowledged that signed the same as i free and voluntary act a deed, for the uses and purpo es herein mentioned. DER HAND AND FKICIAL SEAL THIS DAY OF 19-4 . IC. an or the T o f ashigt'OF k �9 at REQUIRCD 23030� *' \ JUN 241983 OCT 15 1999 00:38 FR CHICGO TITLE 425 787 82450 914253562709 Tgm DaMiuHQi•4 made atUe�.a....... �a�.^�. -- dhr oL , . /� l�� i�,�r ............. A. D. , 19, IK-z... ►etea.w.....ab�w:I!! ..AI..e�.o�iessEi.v9� , .��s..r....7"d{.+lA/�. ............. ••..,..I...........................•..................... I ................. ... ......N.., ,........................•.................................................... ..................1 ......... hasetraAer taunt the Graatos. party of tit dust poet, PVZL1C UTUATT DOTlliCT NC. Vat !lr KOit M- COUNTY d gWiJ*UfW-.'CeQ+fJ�.ii�'��:/�otf.i:4i:r.4.... harotnaftor called the Oranba, parer of The o/cvhd Plum, sod /141Mr.w. odkoAao. called the Mortµllaa, Wtv of vial third pail; WITNCUCTNi Than, the Oaanor,,�forsad In coeat"es foe, of the even of .....d2M&.... M. ,Mdy/,eaa ........ . ........ ..... beilaes 13.....�..:�:........) sad oiber •olusbio coasideratione. rscatPt of which la har4pby ooltnowledgad, hoasby acov"o and gam+ to the Graaeae. its successors and Lesigne and Ito permitteee and lfcenRow, the right, pslvldeao, dal asoAdy to contract, orsca aide, ►mp"Ve, repair, operate and matntsln an elactric otstbution Minot Counts" of W ronwame~)a tine wish necessary OF Astsibution and stgsal wteos, eommunicattoa wtrea, and otbor goeeesary or cotaad«ntagp..rt.wanaoa, across, over anduponthe (allowing described !snide and promisee situated ' I- thr C:aaety of ...=IV. GUAFOAPM ................. dtate of Washtngtos. To -wit, 71o'a1c%1 -fW +new SS, A710A 400 A4eadowaeold Bdrpc .0 do c+�d✓�diny' >fo 'W-6♦ 411P e.- a V or a d: 0 /a fie de i� 6G✓vmd S 4/ �, cos �i�e iB� recoot�s ®t S�rohoiniJh Gda�r� j, 6fo�s �4 in y,� on TM caatrr Iles of skald tran+enlselaa And dlurihnttos line to he toasted as fotlowsA o4o n.w ss&Acao av^wr oae-fi'S, ♦l, �J %sCyY � .- r 7.a y is "lee-rAew or ox`� nWer/ ey %»�vt ua/ ee/sst.�c of /fie p arrrel .4wo-4700- Toptbe■ with do rlgjtl of Ingress to aal egeeso from said Londe across Adjacent Lands of the Qpauar, for the purpose og easeeswetlty, raao.uerwot3ag. rota sin& renq-tas, altertnip changing, patrolling and ope"Mug eatd Ilse. and the rlaht at say time to retasse eatdVMM wires dad appurtemneso from said lands. Also the rW as all noon to crotau h+as4 end ttmhes, and trim Alt tees. ■toadies or gramme upon veld lands, which. is the opldoa Of tits Console Cosaelt,ld a Wonoco or Pinup to eald Line. Ths.CW*tftr and the brigs, set:eeseors or 1i644rtu of Orastoe covenant and agree not to do Anyhlseang or discharge any aastasives Metdn a dlotawn sf ttttewe hundred (3001 feet of said Has without giving rsasenabir notice to writing to the Cirastae. its soeesaaars ae AIMS". of ilos ltion so to ds. Tar rife cage. prlTYa fed dad assort y hersalr grant■d ■bn11 contttws to he In force until eoc'h time as the Grantw, tte•sucso.suseta, or seelgna *ball pone.w.aety romow said poled. wires and appuetenaaces from odd laAAt. or "I otierwbe pormaaeody absartow said Ilan. is w►►ch tlma on auc4 righte, title. pai il"" and aathor" be Vaud shall tammlsmata. Awy weort«p am eafd land beid bytbe Mortgageo Id hereby esbardtsadd to the rights heroin gsattead t►ehs ciraotaa. We M all etersr ssaVasta Use ss.A nustgMe shaft rr.ueln uadtnpared. , i' ,, be Wmuft WMftMW. two lasti,wsasnt Ms been osacwted the day, and yeas fine ahewe ws'lrtial: MWW-f , 'V . *Mob,do ,. Received Time Dec, 10' ' 6:10M OCT 15 1999 00:38 FR CHICAGO TITLE 425 787 8245 TO 914253562708 < • t• ' iA r • .. I•• P 1G ,r de+sda•4 . x orrr rtt�ua aO bw*y o.ed4► ta:� as W. i r1GAI2:-_-. sold no tei w. ID to aw ladlTuta . e..aslb.s to sad wko �aeM.4 t>,a wtthhi In.tsm+u!a�.;�,,� 117 ,, dpw. tus hnoo" Y �G bw' md. retvioltap a0t sad d.adP Goe tta sad T•a la slits ea.ttaaM asow wi�ltlMols. - �' .►`a~` } i Olwa• WWW ug b.ad sad d&W swl taa dqi 'VA I, • A IN /e!1 rM. � 9. AT Oo0 " 4 no, id.tal a, 4. a, ZfOtw Pt►a:�4 ae b� Otlitil W wH► or to lmowe t0 to thr ladl�ldtilll.. dnoova ad to aed wan a..auMd tan W tl+f intro lmd. said aehaO•A•�•d t� •�„�,,, jip" a* OMM Y •• - - �'M .11d tdlmWl� .N sad draA, to taa' u" sad pli0:dM *mmh a sm.WAW RW asad sad OfWd anal 0111111 dap and "a ha this cWtldn.ta &W" wrttt rlr/�/. . 1M AM. ►a. TNi .r^YM CW .rrr11610r0M as s"a AT M = at a* coup".01 s --W __ mm- P"Co nu as gala 1 rR1 e dal n! d uet -_-� k 0. , f d11 ua O KT ov+s+d "�- A eZBeft RcR @. - -.. IQ aw jenom to a. mr ,wowa Y bal me1�soa !1� mad � �• az taa• eO.posa<ttmt• slut sxwu ad' Mh witMal OW Eaiadoiat la> sad .soh .elawwtadpdV that w' sr.r..�a �, tniflti p�trRd �O1awt•.7► ave .ud ea.d ei Yld corPrtdOo� *a wo sea pueC000iiiiiiiii lass" M=,U0 & . line +MK Yf * b �" ae� •d to .sash �a L+.trsa .sad last ia...at flkswd b te. e+ap�a a... mn'=w at w sad am gal*" a�tlbyd�w a.a1 Im a.oP .s,.ue IN �vr 'ololrs .rAK a .aw.rOw y�r' �aeiM. Arrn Received Time Dec,10. t 6:1OPM haig0 wwr I lk• 11 RN 11.re- z b '® h P. 05 ** TOTAL PAGE.05 ** Jennifer Lee, RLA 822.0 Ave NE Issaquah, WA 98029 June 4, 2012 City of Edmonds Kernen Lien, Associate Planner 121 59' Avenue North Edmonds, WA 98020 Dear Mr. Lien, This is to summarize the plant substitutions and plant re -locations to the approved August 2008 concept landscape plan. Front side of house (west) The weeping cedar was substituted with a Japanese Maple. Both of these tree types are ornamental. The location was moved from the front house entry and conflicting under ground utilities to an open location further north in front of the house. The Mimosa Silk tree was substituted with a similar size and ornamental flowering Chinese Fringe tree. Because the finish on the planter wall at the front porch staircase was unknown at time of landscape plan approval, and after approval a rockery finish was chosen and a plant screening was no longer desired to obscure the wall, the honeysuckle vines, of two varieties were planted nearby and not directly in front of the staircase's ornamental rockery planter as shown on the plan. The grading in front of the wall also allows for an informal path and access to the front yard and side path. The 3 Califomia Lilac shrub grouping at the south end driveway entry were substituted with 1-Dwarf Hinoki Cypress;1 Red Edge Hebe and 1 Dwarf Red Rhododendron in front of it in order to provide a corner accent. Approximately 4 Shore Junipers of similar low growing and drought tolerant characteristics substitute for approximately 4 Spreading Yews which were difficult to find all in stock or sold at plant nurseries. The Rock Soapwart groundcover at the drain near the stairs was relocated to spaces under and near the Chinese Fringe tree. An additional (1 Cotoneaster, 1 Sensation Lilac, 1 Barberry, 4 Nandina and approximately 4 Shore Junipers) 11.shrubs beyond the plan quantity were planted on the west side of the house. Back side of house (east) Several nurseries sold out of the Kerria Rose, so 5 Lilac Azaleas were substituted. Azaleas are included in the same genus as the adjacent rhododendrons behind the house. Different varieties of rhododendrons as well as the variety specified on the plant list were planted to meet the total number of Mrs. Furnival and Hallelujah Hall rhododendrons on the plan due to plant availability. The same mature plant size and growth.pattem were targeted. Because a planter box was removed and replaced with concrete patio area, after landscape plan approval, 10 shrubs and 2 strawberry trees could not be planted. An additional (2 Oregon grape, 3 Dwarf Viburnum) 5 shrubs and 2 vine maple trees were planted behind the house. North and south side of house An additional 1 Ninebark shrub and 1 Hinoki Cypress was planted on the north side of the house. 5 of the fems specified on the plan were transferred to the south to provide a grouping of pacific northwest planting on the re -graded/ disturbed area adjacent to the common area.existing vegetation. Sincerely, Jennifer Lee Cc: Jen Machuga, Associate Planner City of Edmonds Brian & Cindy Isaacson Chuck Lie, Terra Associates STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHMBCT JENNI ER.LEE CERTIFICATE No. 934 PROPOSEDPLANT SCHEDULE PSYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING Est. # COMMENTS TREES Per Chionanthus retusus Chinese Fringe Tree 1" Caliper Plan 1 substitution for Silk tree - Mimosa Acer circinatum Vine Maple 5 gal Per 2 native to moist woods one of the most airy and multicane Plan delicate western natives 0 3 plants beyond plan was planted substitution for Weeping •M Acer palmatum Red Japanese Maple 6' height Per 1 Alaska Yellow Cedar atro ur ureum Plan Hybrid cypress x Leyland cypress Cypress: fast growing, drought -tolerant Cupressocyparis 6' height Per 2 to moderate water, attractive conifer / leylandii Plan HC Chamaecyparis obtusa Hinoki cypressAA�k beyond 1 plant plan was planted SHRUB/TREE 3-2 due t no east small broad -leaf evergreen tree, attractive Arbutus unedo Strawberry tree 5 gal per planter flowers and bright red fruit- 8-12' ht. multicane Plan (1) takes little to regular water SHRUBS 21 showy blue flowers, dark green shiny d Ceanothus 'Victoria' California lilac 5 gal. 5' o.c. 15 evergreen foliage, looks good plus 1 lilac, 1 barber , year-round, no water near coast 1 viburnu ,2 nandi a, 1 cotoneaster I, rose (Kerria) Kerria japonica 5' gal. 5' o.c. 9 3-6' high, 5-10' wide, showy flowers, brit green foliage I'�:,Njapanese 5 azelea substitution little water once established \ Rosmarinus officinalis Rosemary 2 gal. 3' o.c. 7 little water once established Osmanthus delava Y i Osmanthus 5 al. 9 5' o.c. 6 graceful arching branches, white flowers, glossy leaves little water once established o Rhododendron Halleluja Hall 2 gal. 3' o.c. -9 rose -red flower, compact form, grows to 4' "Halleluja Hall" Rhododendron require soil that is fast draining & moisture retentive Rhododendron "Mrs. Mrs. Furnival 2 gal. 3' o.c. 12 I light pink flowers, compact form, grows + Furnival" rhododendron 2 ninebark 7 to 4' + Rosa Ru osa g Ramanas Rose 2 gal. 3' o.c. fragrant, repeat blooms, helps prevent erosion, prickly stems, extremely tough & hardy _ K Taxus Baccata Spreading yew 2 gal. 3' o.c. 24 hardy coniferous shrub J 'repandens' 12 yews little water once established 12 shore 3 o.c. juniper 6 substitution native plant, small shiny evergreen leaves, edible berries, self pollinating Vaccinium Sunshine Blue Evergreen huckleberry 2 gal. good woodland garden subject Viburnum tinus 'Dwarf' Spring Bouquet 2 gal. 3' o.c. 3 compact form, white winter/spring flowers, metalic blueberries Viburnum 2 plants GROUNDCOVER beyond plant list was planted red or pink fruit spread 10 15', somewhat ® Arctostaphylos uva-ursi Kinnikinick 4" pot 18" O.C. ±120 in a slow to establish. attracts wildlife 180 sq. ft. good groundcover on slope, some water area Gaultheria shallon Salal 4" pot 18" o.c. 150 1n a 60 sq. ft. 2-10'tall depending If in sun, poor soil area (21) or shade good soil (10) Polystichum munitum Sword fern 1 gal. 18,, O.C. ±130 in a needs shade, native 200 sq. ft. area established plants need little water Thymus Creeping Thyme 4" pot 18" o.c. ±60 in a 100 sq. ft. are substitution for Polytrichum ® Saponaria ocymoides Rock soapwart 4" 18" o.c, t20 In a dense and reliable pink blooms, very Pot 30 sq. ft, area hardy, infrequent water VINES ow growing, small glossy evergreen O Lonicera pileata Privet honeysuckle 1 gal. 18" o.c. "' 14 leaves, white flowers followed by violet-blue berries, good bank cover moderate summer water O Lonicera sempervirens Trumpet honeysuckle 1 gal. 18" o.c. .(5 of 7) rapid, low growing, coral -red Halls honeysuckle 2 of 7 ( ) flowers, red berries attracts birds moderate summer water STITu s An i N 900 ffodil, tulips, iris bulbs can be planted in small groupings in planting areas 1 EI(: az J Rh= 1 Dwarf red rhododendron, h= 1 Red edge hebe, HC= 1 Dwarf Hinoki Cypress, J= 12 Shore Junipers nb az= 5 azelea are substitutions HC lilac b HC= 1 Hinoki Cypress, 1 Sensation Lilac, ct=1 Cotoneaster, n= 2 Gulf Stream Nandina, b= 1 Barberry, n t og= 2 Oregon Grape, 3 Dwarf Viburnum, nb= 4 Ninebark, og= 8 Oregon Grape, hb= 4 Native Star og hb Huckleberry, 1 Green Japanese Maple & 1 Star Jasmine are additions Gravel Estimated Quan'tftyApimately 1,440 sq. ft. or 13 cubic yards at 3" depth River Rock Estimated Quantity: Approximately 50 sq. ft. or 0.15 cubic yards at 1" depth NOTE: DROUGHT TOLERANT OR DROUGHT HARDY PLANTS, MOST REQUIRING LITTLE WATER ONCE ESTABLISHED NO IRRIGATION PROPOSED PLANT NOTES 1. Contractor shall be responsible for familiarizing himself with all other site PLANT DETAILS improvements prior to starting landscape work. Existing \ Isaacson P roper y 12„ \ \ \ \ rs \ \ EDMONDS WA \ ( parce100790400000200 Lorian Woods Subdivision \ \ \ \ \ o PROPOSED WALL(S) _ � - ` \ \ \R.W. 91rhm"Pe \ \ \ \0 _ \ \ \ \ \ \ \ \ \ \ \ og 55 - + \ \ \ \& Associates, Inc. \ \ Rh Existing \ — \ \ ` — ; az \ a nb _ Seattle Anchorage Denver 20" M 14-6, az az PAH70 LATCHMEN o R nb WALLIF-OR MAINTENANCE)— Planning /4 Landscape Architecture �4 Exis g — +''r — — _ ' — _ _ _ _ \ \ \ Enviro nmental 3/4 Economics 1 Green :1•a. \ \ Japanese ::;;:;'' \ ROTENTIAL TERRACED— Maple VEG.-GARDEN ON LOT \ �42 ` \ _ L _ _ Star _ — 710 Hoge Building \ I — , Jasmine g 9 10' BUILDING -SETBACK LINE 705 Second Avenue / PATIO Seattle Washington 98104 --TYPICAL STORM/UTILITY LINE SEE C1VIL—ENG. PLA Telephone: 206.624.6239 `:z:: Fax: 206.625.0930 n \ \ ` \ E-Mail: planning@rwta.com YARD DRAIN #1 _ — _ _ _ ;• _ _$ , , 0 ! DINING OPTIONAL 2 WIDE BY 1 DEEP LINED 4' RM..�._:� 0� II hb\ RIVER ROCK-MTCH TO RUN - SEAL - \ BETWEEN YARD DRA•INI & 2 GUEST ABOVE A PORTION OF THE Plib R�POSEA M i �- KITCHEN °E" _ _ ( ED OOMigZ 'ti ? ?; ' \ `\ - s ,• �` UNDERGROUND STORM LINE t3 I E REPO it :: ''� -TaBE REVIEWED \ BY WESTERN ENGINEERING - - R M �,• \ ,, �,� YARD DRAIN 02 Existing nb O 1 _ HALL os ` — 2' WIDE GRAVEL PATH LIVINGRM-134 ON 0 AR N. Y1• L IF ELEV 1 _ { ENTRY \ \ TYPICAL STONE STEPS TS \ \ MIN. 18" WIDE / + -136 \ I \ CO RED I \ \ nb -" PLANTER Nat 1.130 °d (U:0.$) - \ FLAGSTONE VIEVIIING AREA �- b Po \ \ \ \ \ \ \ + } FAMILY RM UNTAIN �._, OPTbNA FO\ \ Q ti ` ` \ I + ---- \ _ il'Yae- I ----- ------ \ I =I= 2. Contractor shall use caution while excavating to avoid disturbing any TREE- DECIDUOUS OR CONIFEROUS �\ \ Appr g ` hi) Istin \ `C STATE OF \ og WASMNG MN RE-GliTrE M Qg 11ANDSCAPEARCHiTECT og ' JEMARLM \ pp r , C0MFic=► .fiat Exist! •�5 \ \ 911W �r \ n \ ISSUED : \ \ \ No. Description Drn Ck'd Apv'd Date ` ? ; POT NTIAL \ FRUI TREE GROV ON TRACT NoB oo' REVISIONS _ \ No. Description Drn Ck'd Apv'd Date ,Pth C t I I ° _ +1" j — I Y w 1 Rou h As built- JL N g 6/09/12 24- before you di If active utilities. C II 1-800-4 555 be o e a underground a existing Y 9• PR UNE AS DIRECTED T 3 v' General n r r i promptly advise Ge a al %� o cto s to t o utilities are encountered, c t a p pY p/ and Owner. T vV 12 GAUGE GAV. STEEL WIRE p I fin a - - _ ri until owner's al in in n water plant material u t l o e s r shall m and at 3. Contractor s a maintain _ p DOUBLE STAND Ct acceptance is received in writing. , 4. Contractor shall be responsible for providing the quantity of plants that are • • RUBBER HOSE- BLACK,1/2" DIA. represented by symbols on the drawing. 5. Contractor shall be responsible for computing specific quantities of 1 REBAR OR WOOD STAKE GRAVEL �-....vim ER groundcover and plant material utilizing on -center spacing for plants as shown on plant schedule and minimum planting distances as specified SET CROWN OF TREE AT below, is FINISH GRADE 6. Groundcover shall be planted in equilateral triangular spacing pattern at REMOVE BINDER TWINE AND ROLL the on -center distances as shown. Minimum planting distances shall be 15" TOP 1/3 OF BURLAP AWAY FROM from center of all trees. ROOTBALL PLANT 7. Submit one representative subsoil samples and One topsoil sample to a SET CROWN OF PLANT AT qualified testing laboratory or use soil samples collected by City Foresters. Ili �, 1� FINISH GRADE ROOTBALL Add soil amendments as recommended by soil testing lab. -1I FINISH GRADE 8. Backfill shall be clean, native material free of debris, gravel or wood TOPSOIL BACKFILL l� 2" MULCH SAUCER 2" HIGH chips. Backfill shall consist of one-third Kellogg Nitrohumus, one-third & FERTILIZER Olympia bend sand and one third native soil. lu ROUGHEN ALL SURFACES r , OF THE PIT illl FINISH GRADE 9. Imported topsoil shall be a mix of organic matter and soil (composted III = _ _° — — CUT NEW ROOT MASS sawdust, manure, sandy loam and loam soils), or existing on site=° IN TO STIMULATE NEW stockpiled soil. II _=III —i�= EXCAVATE DRAIN CHANNEL 8" WIDE ? ROOTS TOPSOIL 10. All plant material shall be fertilized per manufactures specifications. p p p 11. All plant material shall conform to AAN standard for nurser stock p Y N 2 TIMES ROOTBALL MIN. BACKFILL FIRST 6" WITH WASHED GRAVEL 7/8" BACKFILL REMAINDER WITH NATIVE SOIL CD II BACKFILL &FERTILIZER ' DIAMETER UNDISTURBED NATIVE SOIL 2 TIMES ROOTBALL latest edition. DIAMETER NDISTURBED NATIVE SOIL Source(s): + �;+ February 2008 Michael A. O'Brien, AIA NLRB O'Brien & AssoApril 2008n Plan 1 TREE DETAIL SHRUB DETAIL Western Engineers Grading & Drainage Plan Note: This Dian is based an the listed sources. 1 Landscape Plan JL RT 2/27/08 2 Landscape Plan JL RT 4/23/08 3 Landscape Plan JL RT 8/01/08 3 red Imes: additions/ a lions/ • ° — — — substitutions L• _ I \ \ ` \ RWTA JOB NO. 0510116C \ \ SHEET TITLE GROUNDCOVER ROOTBALL 2" MULCH III"r g III=iii co TOPSOIL BACKFILL & FERTILIZER UNDISTURBED NATIVE SOIL GROUNDCOVER DETAIL GENERAL NOTES: 1. LOCATION OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL 774E UTILITIES AND IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFIRM TO THE CURRENT EDITION OF WSDOT"S "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS SI TE. 3. ALL CONSTRUCTION IS SUBJECT TO INSPEC77ON BY THE CITY OF EDMONDS. THE CONTRACTOR SHALL CALL THE ENGINEERING INSPECTOR LINE (425-771-0220 EXT. 1326) TO SET UP A PRECONSTRUCTION MEE77NG ANS SHALL CALL 24 HOURS IN ADVANCE FOR ALL INSPECTIONS 4. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHALL BE SUBJECT TO THE INSPEC77ON OF THE CITY ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND U71LITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTA77ON AND COLLECTION FACIL177ES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UN77L CONSTRUC7ION IS COMPLETE AND THE P07ENTIAL FOR SITE EROSION HAS PASSED. Z ALL STORM SEWER PIPE SHALL BE CONCRETE (CP), NON -REINFORCED, ASTM C-14, CORRUGATED METAL 14 GA. GALVANIZED, ASPHALT COATED TREATMENT 1 OR BETTER, MEE77NG AASHTO M036: CORRUGATED ALUMINUM, 12 GA., 3"x1" CORR. (OR PVC ASTM D-3034) EXCEPT AS NOTED. 8. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 9. ALL ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. 10. ALL ROOF DRAIN STUDS SHALL BE MARKED WITH A 2x4 POST SHOWING DEPTH AND MARKED "DRAIN". 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR VANED GRATES. 12. ALL TYPE 11 CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS OUTSIDE OF THE PUBLIC R/W SHALL HAVE LOCKING LIDS OR GRATES. 13. STANDARD LADDER STEPS SHALL BE PROVIDED 1N THE CATCH BASIN MANHOLES EXCEEDING 5 FEET DEEP IN INVERT ELEVATION. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% OF MAXIMUM DENSITY BY STANDARD PROCTOR TEST (ASTM 698). 15. UTILITY TRENCH BACKFILLS SHALL BE COMPACTED TO 95X RELATIVE COMPAC77ON UNDER ROADWAYS AND 90% OUTSIDE ROADWAYS. 16. STORMWATER DETEN770NIRETEN77ON FACILITIES MUST BR FLUSHED AND CLEANED PRIOR TO ACCEPTANCE. 17. TEMPORARY SEDIMENTA77ON AND EROSION CONTROLS SHALL BE MAINTAINED FOR THE DURA77ON OF THE CONSTRUCTION. TYPICAL METHODS SHALL INCLUDE A TEMP. ROCK CONSTRUCTION ENTRANCE, CHANNELS FOR SURFACE RUNOFF, HAY BALES, SILT FENCE OR OTHER CONVENTIONAL METHODS. 18. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERENNIAL GRASSES PROMPTLY UPON COMPLE77ON OF GRADING. 19. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATE JUST PRIOR TO PAVING. 20. IN THE EVENT THAT FIELD COND177ONS DIFFER FROM INFORMATION PRESENTED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO CONSTRUCTION OF THE CONTESTED ITEM. PIPE SPECIFICATIOVS. - PLACEMENT REQUIREMENTS FOR CULVERTS AND STORM SEWER INSTALLATION SHALL BE AS INDICATED IN THE WSDOT/APWA SPECIFICATIONS SECTIONS 7-02 AND Z04, RESPECTIVELY, THE CITY OF EDMONDS STANDARDS, AND AASHTO SPECIFICATIONS. PIPE MATERIALS SHALL COMPLY WI7H SECTION 9-05 OF THE WSDOT/APWA SPECIFICA7ONS WITH THE FOLLOWING CLARIFICATIONS: 1. DOUBLE WALLED (SMOOTH INTERIOR) CORRUGATED POLYETHYLENE PIPE, MEETING THE REQUIREMENTS OF AASHTO M 252 IN 8 INCH SIZE AND AASHTO M 294S IN SIZES 12" THROUGH 36 ; IS AN ACCEPTABLE ALTERNATIVE FOR SCHEDULE A CULVERT PIPE, AS SHOWN ON WSDOT/APWA STANDARD PLAN B-17 AND FOR STORM SEWERS IN ACCORDANCE WITH THESE STANDARDS. THE ENDS OF THE PIPE SHALL BE BEVELED TO MATCH THE SLOPE. CORRUGATED POLYETHYLENE PIPE SHALL NOT BE USED WHEN BEVELED SLOPES ARE FLATTER THAN 4: 1. FOR ANY PIPE LENGTH SECTION THAT IS TO BE BEVELED ON THE END, THE MINIMUM LENGTH OF THE UNBEVELED PORTION OF THE PIPE SHALL BE 6 FEET. THE PIPE SHALL BE INSTALLED IN A DESIGN A TRENCH AS SHOWN ON STANDARD DRAWING 9-210. 2' MINIMUM COVER IS REQUIRED FOR BURIAL UNDER PAVED SURFACES. FOR BURIAL DEPTHS EXCEEDING 15 FEET, THE PIPE SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND THESE STANDARDS. 2. IN PRIVATE DEVELOPMENTS, THE USE OF NON -SMOOTH INTERIOR CORRUGATED POLYETHYLENE (AASHTO M-294, TYPE "C") CAN ONLY BE USED FOR FOOTING DRAINS. ACCEPTANCE ALTERNATIVES FOR STORM PIPE LABELED AS ADS N-12: -REINFORCED CONCRETE PIPE. -CORRUGATED HIGH DENSITY POLYETHYLENE PIPE (CPEP) -SMOOTH INTERIOR (SEE NOTE 1). -HIGH DENSITY POLYETHYLENE PIPE (HDPP). 3. MATERIALS AND SPECIFICATIONS ALL STEEL PIPES, CULVERTS, TANKS AND OTHER STEEL PARTS OF ANY STORM DRAINAGE SYSTEM SHALL BE GALVANIZED AND HAVE A TREATMENT 1 ASPHALT COATING OR BETTER AS SPECIFIED 1N THE WSDOT STANDARD SPECIFICATIONS SECTION 9-05.4(3). NOTE. ALUMINUM AND CONCRETE PIPES AND STRUCTURES DO NOT REQUIRE A TREATMENT 1 COATING. [EDDS INT 5-06 g 2] DRAINAGE NOTES: 1.) FIELD VERIFY EXISTING DRAINAGE CONDITIONS. CB194 AND CBJ95 (WITH PIPES) DISPLACED AND NON-FUNCTIONING. 2.) STAND PIPES ARE CLEAN OUTS FOR FRENCH DRAIN SYSTEM INSTALLED DURING LID 210. 3.) DAMAGED DRAINAGE PIPES AND STRUCTURES WILL BE ABANDONED AND REMOVED. 4.) STRUCTURES THAT EXIST AND IN USABLE CONDITIONS SHALL BE UTILIZED. 5.) ADAPT SURFACE DRAINAGE CHANNELS TO FLOW INTO STRUCTURES WHEN POSSIBLE OR USE COLLECTOR TRAYS- SEE DETAIL. 6.) MAINTAIN POSITIVE SLOPE ON ALL DRAIN PIPES (NO LOOPS TO COLLECT SILT OR SAND) Z) ALL PIPES SHOWN ON PLAN SHALL BE ON THE SURFACE- NO BURIED PIPES B.) PIPES SHALL BE ANCHORED IN PLACE TO PREVENT MOVEMENT RESIDENCE DRAIlVAGE NOTES: 1.) ROOF TOP DOWNSPOUT CLEAN-OUT'S (TYP) CONNEC77ONS TO TYPICAL DOWNSPOUT AT EACH CLEAN -OUT. 2.) SLOPE SYSTEM TO DRAIN. 3.) 4"0 PVC (TYPICAL) 4.) FOOTING DRAINS SHALL NOT BE DIRECTLY CONNECTED TO DOWNSPOUT DRAINS -(SEE GEOTECHNICAL LETTER FROM TERRA ASSOCIATES). SW 114, SW 114, SECS, T.27N., R.4E., W.M. CITY OFEDMONDS, WASHINGTON SCALE. 1 20' _ - _ _ _ _ _ _ _ _MOVABLE COLCTOR 1i?AYS WITH HD7sE _= = _ ; _ 1\ F \ \, \ \ _ - - - - - - - PIPE ATTACHED CONNEC77NG TOO - _ _ _ - _ _ _ - _ - - - - 240- - _ _ - - - - - - - - - ` ; . ,� NEAREST DOWNSLOPE YARD DRAIN (TYP)--- '8..'F \ _ - - - - ---------------- --- --- _--_-�___ ' ` APPROXIMATE LOCATION - - - \-----------====22" N---------------- -OF- - .�'` EX. LOG CONTRACTOR=----_ ------' ____ -- __= -- - - -230- - - _--------------- --- --- ------ --- _ - '� `� TO VERIFY ---------- --- _ - - ---------------------- -- ------ -12" A- \ - \'MINOR SURFACE FLOWSS'`'--------------- ------ `�`, \' _ \ \ . -- --------------- - - - \` © - SFF?S`` \ \ ` �, \ \---------_ - - - ---------- _ - - \ -- - - - - - - - - _ \ - _ \ 'SLOPE SURFACE CHANNELS_ --------------- -------- ------- \ _ - _ -- _ - - 1-'\ \ ' TO LOWPOINT AND INSTALL _ - - - - - - - - - _-------------- - \ - \------------------------- -` -- -- - - _ - -- \ \ 'COLLECTOR PAN ------------ ----- \ --•-__- ------------------- - - \ \ \ \ \ ��' - ' • \ ' ` -LID-210 DRAINAGE SYSTEM EAST OF CB HAS BEEN DESTROYED BY A LAND SLIDE (EXACT DATE UNKNOWN) _ 4' PERF` ``-- \ \ - --------------------- ----____--- \ STAND PIPES---'--------- ------------ \ - - \ `- PROVIDE ANCHORS ON SLOPE \ - \ \ \ \ \ --- - _------- ------ - -- \ \ _ _ _ rO SUPPORT PIPING - PERF N0, > - _ \ STAND PIPE - - - - - _ \ \ - - - - - - - - LOOPS OR LOW POINTS _ \ 6p, ` ` \ \ 12" A----- - -17tEES NOT SHOWN Wf7HIN CLEARING LI ITS HAVE BEEN - - -REMOVED PER TREE CLEARING PERMIT CU-06-104 AND- - _ -ALLOWED IN PIPELINES (TYP) KNOWN LANDSIDE/DEBRIS FLOW AREA- \ - - - - - - - -.SEQUOIA REMOVE AND REPLACE UNDER NEW C.U.P. - \ \ �\ 16" M- -- -- --- ----- -_ 24" COLLECTOR_== LID 210 CB#921SDMH#9-_ - - SYSTEM to _-- ----------- \ - --- - (ABANDONS - - - ------- \ \ \ CB#93/SDMH#6 - --_\ _ _ - -----178------ ----OR REMOVED)----------------- ` ------------- ``�`-----176------------- --------------- \ ---- \ ` DBII -24" _ !3 p _ _ ` \ \PROVIDE ANCHORS ON SLOPE 1 n SUPPORT -174 - - - - - - - - - -------------------- SE -172- - \ E DETAIL` . \ \ _ `_ - , - - - , PIPING - NO LOOPS OR LOW POINTS - - - - - - - - - - - - - - \ - _ 20" M-ON SHEET 5 . - - - _ ALLOWED 1(V PI ELlNES (TYP) - - -- - - -' - �. 1S _ ------------168------ \ ---- _ 48' G_---- - - - 0� ---- \ ------ - - - - - - - - \ \ _ --- _ - \ �` \-'---------- -----------------------164------- \ /--10' SETBACK �`, '�0. - - - - ----------------- ----16 EX. CB 1 1 _ _ ---- --- \ - - - - - - - - _ '----------------- - - \ RIM=119.95 26LF B"� SD r- P ` - - .EXACT LOCATION UNKNOWN.. _ _ _ - - - - - - - �`. `-IE 12" CMP S)=115.73 \ CONTRACTOR TO VERIFY ___------------- - _-_-__--_- \ ( 5=0.308 l - - - _46--- - \--------------------------- ` IE 12" CMP NW 115.67` - - T �- - - - - SLOPE ANCHORS FOR PIPES - _-- 12 F� -- - ----- ---------------------- \ -------- REQUIRED IF GREATER THAN -__ / I ' -144 - 'DB#3-24"1' "' - - - ---------- -- -- \ 20%_ SLOPE ON PIPE. - - _ _ (r-J LOT 2 \ \ I _SEE 5897 SF J \\--142---------- ONAHEET 5---------------- \ -- / L \ PHONE/TV/PUD_ _ - _ _ 26" c - _ L� (o, 14 ACRES) CONCEPTUAL- 140, I / _,EX. CB - - - -- / RIM 121.30 � '-_ \ � � -'' __BUILDING � � - - - - '' \ \� CIE 12" CMP (W)=11 9.12 \ ` - DB#2-24"(d FOOTPRINT '38- _ _ L - 53LF 8"0 SD- �� RIM=136.Of_ L----- ----- - ,S=0.191 \ \ IE=134.0 -_ -__ Ek-CVB \ - - - iW W ` \� PyONF\' �`' - L- - -=i--136-------------I RIM=13290� 22 H \ EX. SDMH g o rr i _ - RlM=120.67 G _ 8� 1?, G�-�1'Up _ �oO 33LF �"0SQ _ I L ; ` - _ _ _ _ IE 12'CMP(SW17`.90' IE 24" CMP I M=114.67 �" `�- D 1' - _ S=0.410 14" R - _ - - - - - - - - - - - - N 7E -12 "CMP(S) = 12 7.82-, \ S \ .02 8g - _ -1 4- - _ _ IE 12 "CMP{IV)=127.82 \ \ ,12 H IE 24" CMP (W)=114.77 1E 12' CMP (S)=114.82 EX. SS 1 S��F 55� Sp ` - - - _ _ �- - - - - - - - - -J EX. SSMH _ SS 12 °�'MP S _ Sp Scp0j8 ---- 2--- ----- -_ \ \ \� 00 4 9 CF - \ \ SS �¢ C #1, TYPE 1 SD S, p ' ' - - _ 29_LF 12" SD- -"130- - - - j- ` RIM=124.5f % So 0%89 O~S=f1 Q45 - g W \ PHOIv7y�PUp ` 5� %3 IE=120.48 _ _ C � 128- p 95LF 12"OCMP S=0.044 PIEZOMETER. \ pl �! ` SD 1 SA ' - S=0.045- - - - MONITORING _ 65LF 12 0 SD`� 1 LOCATION OT ' AD S = 104 \ S EX, SDMH#A 'VISITING PARKING AREA \ J 84LF 12'4CM.PG50 _ L74 EX. CB _ - - -` - \ I W I EX. CB jC ' G SS W --_RIM=130.64 RIM=115.52 `, � \' \ IE 8" DIP (SE)=112.81 \ -EX. CB-� \ S IE 4'ABS(S)= 129. 13 \ ---,,IE 12" CMP (E)=112.69 \ RIM=128.05 \ G 3, IE 12"CMP(NE)=128.17 OIE 12" CMP (W)=112.66 \ IE 12„ CMP (5)=123.63 o` ` SIE 6"PVC SW - ' 10 STORM DRAIN EASEMENT '-'� ( ) -12 7.46 IE 12 CMP (A)=123.40 E) . C \ PIEZOMMR \ SS AFN 8306230J07 IE 4" PVC (SE)=124.13 RIM=128.57 MONITORING -_ G IE 4" PVC (SE)=124.13 IE 12" CMP (N)=119.97 / I I \ LOCATION - !E 12" CMP (S)=121.07 NIG it \ I � \ \ RIM 1� 1:91 I IE 6" PVC�NE)=129.88 CALL 2 B USINESS DAYS BEFORE YO U DIG 1-800-424-5555 LORIAN WOODS HOMEOWNERSASSOCIA TION PROJECT APPROVAL DATE BY: MS. AMY ROSS, PRESIDENT CITY OF EDMONDS APPROVED FOR CONSTRUCTION BY: CITY ENGINEER DATE.• 6-k-7-Oq UTILITYCONFLICTNOTE: CAUTION.• THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 0 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WESTERN ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. BLD20070833 BLD20070834 Western Engineers, 66 Inc. LEGEND 0 -O- E - El �T .a n a XXP XXH XXR XXF XXM XXCH Vn11,W11nnirr74 JJ O •� d F 7 I_--J ------------------- ,APFROV AS NOTED INEERINU SS SD SD G W TAXACCOUNTNA(S). 00790400000200 CENTERLINE WESTERN ENGINEERS PER PLAT OF PROPOSED STORM DRAIN CATCH BASIN (CB) EXISTING STORM DRAIN CATCH BASIN (CB) PROPOSED STORM DRAIN BASIN STORM DRAIN MANHOLE (SDMH) STORM DRAIN CULVERT INLET SANITARY SEWER MANHOLE (SSMH) FIRE HYDRANT POWER POLE U77LITY POLE ANCHOR ELECTRIC JUNCTION BOX TELEPHONE PEDESTAL METAL SIGN POST WOOD SIGN POST MAIL BOX CONIFEROUS TREE DECIDUOUS TREE PINE TREES OF XX DIAMETER HEMLOCK TREES OF XX DIAMETER REDWOOD TREES OF XX DIAMETER FIR TREES OF XX DIAMETER MAPLE TREES OF XX DIAMETER CHERRY TREES OF XX DIAMETER BUILDINGS TO REMAIN EXIS77NG CONCRETE CONCEPTUAL BUILDING FOOOTPRINT PROPOSED PAVING EXIS77NG ROCKERY EXISTING CONCRETE RETAINING WALL PROPERTY LINE RIGHT OF WAY INDEX CONTOURS CONTOURS EDGE OF PAVEMENT EXISTING SANITARY SEWER PROPOSED STORM DRAIN EXISTING STORM DRAIN EXISTING GAS EXISTING WATER ROW CENTER LINE PRINTED OUG 18 '61111, AUG 17 2009 (WHLIDING' GLIPfat-dNiEN, WESTERN ENGINEERS SITEADDRESS.' 73RD PL W EDMONDS, WA SITE DRAINAGE PLAN FOR: (425) BRIAN & CINDYISAACSON 356-2700 SW 1/4, SW 1/4, SECS, T.27N., R.4E., W.M. CITY OF EDMONDS, WA SURVEYORS . PLANNERS . ENGINEERS DWN. BY DATE REV. BY DATE PROJECT MANAGER SCALE LAND USE CONSULTANTS VJT 02128107 20 JAJ 08117109 J. JARRELL 1 " = 20' CIVIL ENGINEERS 0 LAND SURVEYORS DWG. FILENAME CHK, BY F.B. NO. JOB NO. SHT. NO. *** 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** 06792oBASE.DWG JAJ 596 06-792-A 4 OF 6 LIA wasi-0040161"I Mmm 1 1 _ a SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING Est. # COMMENTS beautiful when viewed from above, pink TR E silk -like flowers, 10-25' tall leaf, flower and pod fall 3AIbizia Per 1 best planted from containers established julibrissin Silk tree - Mimosa 1" Caliper Plan (one year; bare root plants need skillful planting, watering) C cer circinatum Vine Maple 5 gal Per 2 native to moist woods one of the most airy and multicane Plan delicate western natives height 30-35', graceful sweeping Chamaecyparis Weeping Alaska 6' height Per 1 branches (moderate water) nootkatensis "Green Arrow" Yellow Cedar Plan Hybrid cypress x Leyland cypress Cypress: fast growing, drought -tolerant to moderate water, attractive conifer Cupressocyparis 6' height g Per 2 leylandii Plan or Thuja plicata Western Red Cedar needs no water once established HR B/TREE small broad -leaf evergreen tree, attractive Arbutus unedo Strawberry tree 5 gal multicane Per Plan 3 flowers and bright red fruit- 8-12' ht. takes little to regular water HS RUB.$ d Ceanothus 'Victoria' California lilac 5 gal. 5' o.c. 21 showy blue flowers, dark green shiny evergreen foliage, looks good year-round, no water near coast Japanese rose (Kerria) Kerria japonica 5 gal. 5' o.c. 9 3-6' high, 5-10. wide, showy flowers, bright green foliage little water once established 0 Rosmarinus officinalis Rosemary 2 gal. 3' o.c. 7 little water once established graceful arching branches, white Osmanthus delavayi Osmanthus 5 gal. 5' o.c. 6 flowers, glossy leaves little water once established Rhododendron Hallelu'a Hall 2 gal. T o.c. 9 rose -red flower, compact form, grows to 4' o "Halleluja Hall" Rhododendron require soil that tfast draining &moisture retentive Rhododendron "Mrs. Mrs. Furnival 2 gal. 3' o.c. 12 light pink flowers, compact form, grows + Furnival" rhododendron to 4' Rosa Rugosa RamanaS Rose 2 gal. 3 O.C. 7 fragrant, repeat blooms, helps prevent erosion, prickly stems, extremely tough 0 & hardy 1 Taxus Baccata Spreading yew 2 gal. 3' o.c. 24 hardy coniferous shrub - 'repandens' little water once established ' V�ccinium Sunshine Blue Evergreen huckleberry g rry 2 al. g 3' o.c. 6 native plant, small shiny evergreen leaves, edible berries, self pollinating good woodland garden subject . Viburnum tinus 'Dwarf Spring Bouquet 2 gal. 3' o.c. 3 compact form, white winter/spring Viburnum flowers, metalic blue berries GROUNDC4VER red or pink #6t: spread 10 15', somewhat Arctostaphylos uva-ursi Kinnikinick 11 4 pot 11 18 O.C. _12o in a �' 180 sq. ft. wildlife -slow to establish. attracts wll good groundcover on slope, some water °!area W_LJ Gaultheria shallon Salal 4" pot 18" o.c. a 0 in ±80 55in ft. 2-10' tall depending if in sun, poor soil (2') area or shade goad soil (10') Polystichum munitum Sword fern 1 gal. 18" O.C. 200 sq. in a ft. area needs shade, native established plants need little water Polytrchum Native Hair Cap Moss 4" pot 18" o.c. +60 in a 100 sq. ft. area tolerant of poor soil but needs good drainage Sa onaria OC moides p Y Rock soa wart p 4" pot 18" o.c. 0 in a ro sq. ft. area dense and reliable pink blooms, very hardy, infrequent water VINES Lonicera pileata Privet honeysuckle 1 gal. 18" o.c. 14 ow growing, small glossy evergreen leaves, white flowers followed by (D violet -blue berries, good bank cover moderate summer water 00 Lonicera sempervirens Trumpet honeysuckle 1 gal. 18" o.c. 7 rapid, low growing, coral -red flowers, red berries attracts birds moderate summer water PERENNIALS crocus, daffodil, bulbs can be planted in small groupings in planting areas tulips, iris - lry RE FAMILY RM i NO I ROOM, NO Gravel Estimated Quantity: Approximately 1,440 sq. ft. or 13 cubic yards at 3" depth River Rock Estimated Quantity: Approximately 50 sq. ft. or 0. 15 cubic yards at 1 " depth NO IRRIGATION PROPOSED I \ Existing \ 11'A 1 as �+ �''�+ a�,,,r \ 8O 1 1 __,___.... � ' \ . roPe rty 1211 - - \ \ \ - 76U N,\ \ \ ' `~`•'^\ `` �` `\ ED M ON DS, WA parcel 00790400000200 Lorian Woods Subdivision \ PROPOSED V1fAL-L(S) ` — \ R.W. & Associates, Inc. - -- — _ — — — --- \ Seattle • Anchorage • Denver Existing - , ` ' - _ ,7' GRAVEL PATH TO-.CATCHMEN ` \ '" 146. _ - �$°oo'3�i- ° J WALL -(FOR MAINTENANtrE� - Planning 0 Landscape Architecture Exis _ _ ` — + r ::r _ - _ _ - — _ _ _ _ \ \ Environmental 0 Economics - 48 e / :;/� \ 'S. •• ..;,;:,.:• '•`'"• :,, : -- R�0_TENTIAL TERRACED- -GARDEN -" PATIO " Y=.•7,. VEG.ON LOT ` \ 710 Hoge Building 142 g g 705 Second Avenue 10 BUILDING -SETBACK LINE— 1-- _ •'' — \ \ Seattle Washington 98104 TYPICAL STORM/UTILITY LINE - ° SEE C�ICJIL-EAIG. PLAN Telephone: 206.624.6239 — t Fax: 206,625.0930 E-Mail: planning@rwta.com YARD DRAIN #1 � _ • �, DINING 1- - __ _ __ ___.__._.___.._..... __.. _ •' _ - \ \ \ -_-_ ___ _ _ _ _-- _ _-_-- ti:.. - OI�TtOt,IAL 2' WIDE BY 1' DEEP LINED °I RM- ..,, ... y_ SEAL RIVER ROCK-DIT0�1 TO RUN_ BETWEEN DRAIN 1-& 2 :y `'' h'EN aY GUEST tJiCJJ \ O':•: KITCHEN \ \ ABOVE A PORTION OF THE PRO O M 1_36 UNDERGROUND STORM LINE -�. ../ f'•g,.' O ,.. POWDER 1 .'i :':• ! , \ \ ` -TO-BE REVIEWED i \ BY WE8TERN_ENGINEERINGtwit G': I -- - dam•••' YARD DRAIN #2 —_ - ; —.ems i HALL `'`•''` POTENTIAL Existin _ _�„ C FRUIT TREE," - i _ I i:. 2 WIDE GRAVEL PATH i LIVINGRM - \ i ; �►`''''' \ GROVE ON CT 134 — ti:'' ` i rna rD T• i'. Co {' • \ STATE OF I F *I—� \ INfTQN 13 2 INTRO/ _ �, j \ REGISTERED `' 1 -•• ,,,_ `�'�;• _ { i.._ _ )� ';, \j \ 4.SCAPE ARCHITECT TYPICAL STONE STEPS "+- ! co IN. 18" WIDE - --- __ - -136 ` + ,TEN IFER 1-EE CERTIFICA TE N0.934CO RED FLAGSTONE VtEWING AREA + - _ OPTI01 AL_FOUNTAIN -- _ `• • .,•'.r / rill • -~ — '+.w"�m-+•ram= _ PLANT NOTES _ 1 Fit �--, ' . N08°59`p `"'�•.'`_._ _ _ — 3„ E T . / 0 4 - e Q (7 . f with all other site --...:--_-- himself i hm familiarizing n am I •.. e for f res ponsible Contractor shall be r o - 1.0 n p _. Rhr tost starting landscape work.imrovements prioPLANT DETAILS � pyP '+yx7J. disturbing an o avoid dl t' t caution while exc avating In e ca Y Contractor shall use 9 ontr 2. C g ' DECIDUOUS '''•'•••+'' F _ active TREE DECIDU U '"•''•''" "'''""�•'' i _ (f a you o 1 before 4-5 55 b •: utilities Call 1 80 0 42 d utl C underground oun g• z8. existing and Y � G ex _._. g g I '-----------PRUNE- -- '_ 5 ctor A ra a utilities are encountered, contractor is to promptly advise General Cont •� #12 GAU GE GAV. STEEL WIRE Owner. 3. Contractor shall maintain and water pI nt material until owner's LDOUBLE STAND r G' _ _ =' acceptance is received in writing. p ' plants that areresponsible for providing the quantity of la Contractors be r g q tY p = ��`����' �`����• '' "'�' '� 4 C p p , re resented b symbols on the drawing. RUBBER HOSE- BLACK, v2° DIA. p. Y Y 5. Contractor shall be responsible for computing specific quantities of groundcover and plant material utilizing on -center spacing for plants as 1 REBAR OR WOOD STAKE GRAVEL / shown on plant schedule and minimum planting distances as specified i r SET CROWN OF TREE AT below. FINISH GRADE 6. Groundcover shall be planted in equilateral triangular spacing pattern at �° - -�_ _ the on -center distances as shown. Minimum planting distances shall be 15" _ TOP 1/3OF BURLAP AWAY FROM EMOVE BINDER TWINE AND LL i from center of all trees. z ROOTBALL PLANT ' 7. Submit one representative subsoil samples and one topsoil sample to a SET CROWN OF PLANT AT _ ualified testing laboratory or use soil samples collected by City Foresters. --_ ' FINISH GRADE 11 Add soil amendments as recommended by soil testing lab, �1 - FOOTBALL 8, Bckfill shall be clean, native material free of debris, gravel or wood FINISH GRADE -1- 2" MULCH .Chip I s. Backfill shall consist of one-third Kellogg Nitrohumus, one-third —_ — — -- --- TOPSOIL BACKFILL SAUCER 2" HIGH GROUNDCOVER Olympia bend sand and one third native soil. - - ' &FERTILIZER -FINISH GRADE j--ROOTBALL 1— - ----- ROUGHEN ALL SURFACES 9. Imported topsoil shall be a mix of organic matter and soil (composted I�� 1 OF THE PIT - �I° MASS 2" MULCH sawdust, manure, sandy loam and loam soils), or existing on site L- __ ___ _ I-- CUT NEW ROOTEW � _ — 0�80 0 TO STIMULATE NEW � stockpiled soil. EXCAVATE DRAIN CHANNEL 8" WIDE - ROOTS TOPSOIL Z •: t 10.'All plant material shall be fertilized per manufactures specifications. - =1ii MIN, BACKFILL FIRST 6" WITH WASHED GRAVEL 2 — T— BACKFILL & FERTILIZER a N 7/8" BACKFILL REMAINDER WITH NATIVE SOIL - P — - 11. All plant material shall conform to AAN standard for nursery stock, — `° M s" I -TOPSOIL 2 TIMES ROOTBALL `„�\- —'! BACKFILL & FERTILIZER latest edition. DIAMETER UNDISTURBED NATIVE SOIL 2 TIMES FOOTBALL" OOTBALL NDISTURBED NATIVE SOIL DIAMETER NDISTURBED NATIVE SOIL r' Source(s): — -------------- -- Michael A. O'Brien, AIA NCRB O'Brien & Associates Site Plan February 2008 (22 SHRUB DETAIL GROUNDCOVER DETAIL Western Engineers Grading & Drainage Plan April 2008 (J TREE DETAIL �- Note: This plan is based on the listed sources. \ ISSUED No. Description Drn Ck'd Apv'd Date 1 Landscape Plan JL RT 2/27/08 2 Landscape Plan JL RT 4/23/08 3 Landscape Plan JL RT 8/01/08 REVISIONS Existing 1No. Description ri ti n Drn Ck'd A v'd Date \ \ RWTA JOB NO. _05-1_0116C \ SHEET TITLE A OVED BY NNIN r -- —� EECE STREET FILE 81 E1 $rr _ 1 r ,..�. - iLDlt�;; DF-PA tTikh, FnM OS -1 PROPOSED PLANT SCHEDULE - SYMBOL BOTANICAL NAME COMMON NAME S I DECIDUOUS TREES _1 ) Acer rubrurn Red Sunset Maple V 0 'V Acer circinaturn Vine Maple 5 gal. multilc : - - C rcis canadensis X Eastern RedbUd i I" cell 3 Crataegus Washington Hawthorn ; I I I v cqil'r Is phaenopyrLIM or i or douglasii Black Hawthorn I - I PrunLIS SUbhirtella Autumn Flowering 1 12 'Auturnnalis' Higan Cherry V Call ) Rhus glabra Smooth Sumac ,11VERGREEN TREES - - Thuj . a plicata'Hogan' -_ Western Red Cedar Hogan . I Taxus CLISpidata 'Capitata' or Japanese Yew Cedrus decdara 'Descanso' Dwarf Cedar OPTIONAL NEW SEQUOIA TREE & PRELIMINARY PLA LORIAN WOODS HOME OWNERS ASSOCIATION & GE Seqouiadendron Giant Sequoia � giganteUrn Total I I . , , . I I / L .1 11 11 / R 7' , I I . - - - � - - - - - - - - - . .1 - - - . . � . I . I . / i 11 / . I I � ; � . , . I � : i I i 1 4 1 11 " I . . . i i I , � I / ! , I ! I i I 11 / � I � / i , � . " / �' I , .. , / i , � I I i � I ! i � f . � ! I I � I , , / f . I t / J .1 . � ; I i I i ; ; . 11 I 11 I f I 11 1_' I I I ; . . I - � I . I ; . . I I . I 11 I � " , ." � - , c . I 1 1 1 1 y . I I 11 . . ; I / i , . - / 11 , J 11 i I j . ) 11 � : 1 I I * I � 11 I . . t ; I I Z, �, I I 11 : 0 . ; ( ; : J T 7 i I SPACING I Est. # COMMENTS Ir I Ilklin 'rDCC -rA E)C:hAAI1K1 I . 41 2 j ­ I ) ( I I / / ! I I ; . Per Plan Per Plan Per Plan Per Plan - Per Plan 5 gal Per multi ... ane I Plan - I I 7 i 1 61 1 1 a, O.C. 4-6 Per heig it � Plan LING LOCATION SUBJECT TO TECII APPROVAL /101 I Per eini't Plan I � t . I ! I j I ` 1_ ; .. W � I F �/ / I i * t I � 11 . . ) � I I . ; j I 9 / I/ I , .? : ' / ". `­- k . . ; I I ( I 11 / ! I 11 I . ' I I i, OUTSIDE OF / f, s,.­_.� , . / � 811 A s , . I . / / 11 � � I I I I ;�� 1, / I � : ,I I I I : I . 0 . I . Q-__`�, I I / . 'I I , / i I / . ; . I ; . I . fall color most highly f / 11 1, I _,,:, .i I 0 , i . . I . I I . I I � -.11 i r '! , 11 t I / , I . � I I . � I / I Y'll., 1 4811 11 I I . . RESIDENTIAL LOT BLDG. ENV. U I i- am I "! ; ` . I 11. 11 TRA�T A / e . / . ;; � . I _j 11 I ... I i . I .. . . ! . . ----1-,Z-,+,1riPo Ir,w . . I . . . I maples -eliable red I 6 . �, N__.. LOT NO. 1 "', ,­ i I / 11 / / I 1 11 I . .� . f ; '2�11 M I I rated & i _"%� I / I / I 11 P IP: IP4 �1n----,_­,!--­ j i t, . native to moist woods 15 one of the most airy and delicate western natives - 1 rose to pink flower yellow fail color 1 white flowers, red fruit 1 double pinkish white in autumn, early spring & vvarrn spells in Jan & Fel: forms thickets, in the wild 5 spreads by underground ___ roots, needs little to no water female plant to min. imize allergies, fall color pyramidal form / . \ t ; . .: ; . . ; ; .0 j � i 2611 C I 1'_-s,­� ,;, . ; ts ? ! 1-r-rx/ lNurlu, 131-1 CO.WIf . 11 ; I I I i I I I ' I - � , / . I . ! . . i I I I I / : 1 ,, I I I I I ! . ? I : F t ASSESSOR . 1 ;7. / I ASSESSOR MAP I I I. 1. I ; ! I 4 1 , .-­�.. 'm ft _k / L115 1. A � � 1 2 1 '. ) Al;'- ./ f .--", ; .1 . . ! I I ;_ . I . / "%fta. ft / `, i / / I I i an I I 11 j 11 . ! i a -­.... I 1; /t��_ 11 ; i I ; �j 11 I --i . 4il " rft� . .'",_-., ,.' ! " ; ; I -1 I I I .. " I In . )Y,6j / ; / f ; i�o 6, I 0 I an � ". , ( ; I , I , I i / .1 I I i I I I I i I 11 I / . I I . z : ; . . ...... � - _rR Rost I Is' � . 11 I !. . // � 7 *7s­-_..ftI-_ I .. 111- 1, I � , . //­­ NOTE.'// It / I. i , J . ; I i I f . . wambeAtia f ; p I 11 I ; I ; i C-) i / . /V . / ? i I ! I I ;. . ; e .. . S I " / I I I : i , 4-..-. ftft� . I 1 7 i ; I : i , I I I . ! 7`C�9 / I � j . IT , 4. I / SEE CIVIL PLAN FOR P I, " i . j I / ­s,.. JIM 11 I / .! . � / ; I I I VAN I I / / �. . . 1�7 I . ; I / I - . I I I t 11 . ; I . ; I if I . _1/ S / . I . I 1, , i I I _ I 11 I ; i f . . I I ; I * I _��11 ----% i I i I I 11 . 1�� / AD , ' , I I . I I - / I I Js / it I f 1__41 ,,..-...<, Z, I I f I It POTENTIAL RETAININ111""' WA t.L- " / .1 11 i I i - 10 / . .1 I .1 *-,--.. , me , f I JUST P,LANTIN'( 7CCORPINGLY 11 / I i 11 I i : i . F i I . 1. I s . ; 11 : . . , I 11 y 11 - . . : b '"'-�. I "It NA...'Mm . I 11 I. / . / ®q 11M IN ®a = on 01111111,09MOMM 1®a . ..,L . ..i , , , /.. , 1 . "..Z ; . I ; . I j / � 4,11 = in atimmaism 6 k, . I I Nuo- ==M� =)I= memmumm N* us owswo6m L Cr) -A ' I i 11 / . ! t I I 11 ! I / I N 11 / .1 I •11 ; ; I r I I I 11 I / . 11 ) .. 11 , I I . ; . ' 't"""' I I I' 11 . 4 / , I I f . 11 , i i I I; . .1 I I I,---. I -.-----I.- I ! / 11--, - ! 7' 7 , / I I I I _� '\ 1 7'."I'll, i / 1 1. i I 11 . f � / / / �� 't 1' I ; 11 I I '' �. i I � .. I I I - . .; I . /i I I'll i I 0 / I . I ,I I ; I ; _1� i � ! 4 / I I I / I . / 11 .p .1 ", , , . I ; i 11- , i I . / � I . I I / " I / .1. / / I / I 1 1 1 ! I / I ! I i 11 I I I / N11 I '1� i / r, I / .1 / I i ; 11. 11 /11 I ; i N \ \\�, 7, - -, " . , / .;1i§ . ,� / ; 'i f / ; 11 " i I a I : 11 I : i � . I I , I. I ! / 1 I \ _N1, / / .1 . . . ! I I a I - I I . / , I I . ! I 11 ) " ; ! . " / 11 11 I I 11 I 11 . If / . ! I I i I I f . I I I % . / , \ I I / / �_, I ; ) )k 11 ! I ; I ! // 11 ; I I " '., , ! , �, If i : I j / I- I 11 I I � I .. . . i . � I I I - I I , . , - / ; I ; . i . I . . i I f I I r ! / I I I i / 1 4` - r-41 - , (Z) I j I 1 P i i I � .1 11 f � I � i I Ili , I- / - 11 OV , I I I I . i 11 0 ! 1 I I ; i ; A ,I 0 3 . . . I I 1 11 I I . j I . . ! I I I / ; I : I I . I I I i ; . . . .� I � - I I I . T EE TO BE i I i " I :: '--i LOT NaNO. 2 / 'Ili i i � ." , \ I - I 11 it /. I! - I 11 / II i . �, /' If / ./ "I f I .; i I 11 a q I i / I . I _. i I . low growing 10-25', fruit an ; 11 I I j . I / . I I / . REMOVED & REPLACED ­7 1 1 1 , I I I . . - , M I- :� / I :jo / i I ; � I � . .1 i � I" ! isonous 19 - i , '� t� '�v I : .1 oliage are po . - 4 1, I i : I / PER S0HOMISH I I , 11 1 77 . , I . . s height 15' in 20 yrs. � I I / I : \ " I . ASSESSOR MAP ff Is 11 I 11 k I t -1 /1 / / f I .1 .1 / I f . . . I : ; ! I I . j I 1 1 . I . I q I ­ j 11 / I 'v i : i ; I ­� i I I /. I I � / ;, I I , i a i I / . ; I I . I I I It � I IO rr / e I / i j ; / / I I , / : I :/ f f . / G A I I : I , I 41" R " V , I I I . 0 � ; I ; . 7 A 1 411 R 11 . IV / . i ! I f . n." rr i i I 11 i I I .1 ; A A L� .1 / I I, ; I ; I : I ; . : . 11 Note: <6'ht. or 1" cal. (Q I � I I I : \ / f / 11 I I " . ; 11 I I .. I . I : i I I / / � , . I I I I ­� I/ � . " / / . I 11 11 0 : 4 .1 .1 . I . -1 tree sizing due to ,F -A I .." I � I I/ I . 5 N ,o r I. / I ; ? 1! : i C;_� : r,� � I I i -.1 . f i I I I ! / i *�_......! i, .", 1 -29 ease of installation ; I,-.* : i .................... . f ............ ......... . ..... . .. .... ­.. ........ .. ,�,,�;/ \ ;. � ; - If I I 0 28 -i ------- - - .. ---­-­---­- -- - ­ - ­­ ... � ­ - /11 ; ! I I I ; \ M I : I �n slope area related to I . ? . I .. I. ;. 1 i I . 'I j " I I 11 i -1, / I '11 I . I J', I �'! I W. " i I I f I : .!. , , 1��ht of tree I . 0 /. . I : I I - I d I I I : �1 1 . . I I I . I . I 1. I I k- I j / - I / / , , I : 1 11 . . . :: I I ) I - A . . ; i i I / I ! i I I ; . I ; I �Ij / / / / I ! i , 1; - - LEGEND I 11 , NOTE: I I I' , ,.It, I �, '. I I I ; Co1-0- � I I \ /11 / - 1 . � I / ji., _V 11 rl-� SEE CIVIL & GEQTEC� FOR, I 1: " ,/ I/ kk I I im i i / / I I IF* , i ,I / SHRUBS : : : ; : : : I - CornLIS sericea Red -osier dogwood 5 gsh ! I. 5' D.C. 25 � spreads widely by creeping underground sterns and 1�1 : : i rooting branches adaptable I I _ .__ native oil moist ground ; ( e) . : i 7-10' high, I 0-15' wide EUonymus alata Winged Euonyrnus 59131. I 5' o.c. 10 red fall color, deciduous i i up to 20' in moist rich soil, U i i I up to 3' in dry sunny areas, Holodiscus discolor Oceanspray 2 gal. 3' o.c. 12 Cluster Of White flowers : i ____ ---.-. ay-JUIV attract birds I Lonicera involucrate Black twinberry 2 g I. 3' o.c. -_ 10 - fit honeysuckle family. ---..--.- used in native restoration sites I Mahonia aquifoliurn Oregon grape 5 g il. 60.0. 15 - .needs little water erect habil P p hysocarpLIS CapitatUS Pacific ninebark 2 g' 1 I. F &o.c. 15 to a' tail dense white flower clusters in spring or early I I /// i I i --- summer � _. - W, - RhamnLIS frangUla 'Asplenifolio' Aide r buckthorn - 5 gpi. i : :: : 5' D.C. --- ___ 10 - - -_ - 0 - fruit, suit to part shade, - i established plants need only . ___._ I - i : ____,,_.___mdff_R19_�ia1nff -wateerl'129- 1�nt Rosa nUtkana I Common wild rose 3' o. c. 12 deciduous, deep-rooted rhizomatous perennial shrub opl._,\ . : : _____ vigorous. very [tardy shrub vil Rosa rugosa Rarnanas rose 2 g�l. 3' o.c. 12 prickly sterns to 34tall, red -TU I __ tomato sll�l?.(� fruit .kt4%nj'. �_s %- Symphoriocarpos Snowberry 2 I : ; I I 3' o.c. 20 1 handsome clippped or , .�wvlek albus g�l. : UnClipped compact and round -- GROUNDCOVER/ I : I =w Arctostaphylos Liva-ursi Kinnikinick 4"' pot 18" o.c. ±140 red or pjn� fruit spread 10 15', �,,oi'newhat slow I to esiabliso ___ - 2-10'tall depending on in - = ______ .- GaLlItheiia shallon _____ Salal 4" Pi : i :ot 'I 8" a. c. - - ____ ±290 I un, poor 561 (2') or shade . ; a I - good soil (10') - MPolystichurn munitum Senor fern 1 g-11. I-.-,---- --..- il!:)u I - needs shade ed mix Process of applying grass seed mix - (70-80% perennial rye blend and 30 to 20- percent fine . d Areas ,fescue blend) in Slurry containing �vood fiber IT1LIlch, fertilizer, tackifier & water. W_ UAKIIIIIIAP fflF.11W . , ,\��,i­!"),- - ���, i7 I. __ _"­­� � \ ) // I I I I I , I I, , Jl__� I ....- TREE- DECIDUOUS OR CONIFEROUS : I : i .- PRUNE AS DIRECTED ......... . . . #12 GAUGE GA STEEL WIRE DOUBLE STA4 I ! z ' ­.... RUBBER HOSE- Bi-ACK, 112? DIA. i i : : ; : i --- I REBAR OR WOOD STAKE i ! : i I ........ SET GROWN OF TREE AT FINISH GRADE 1: ; i i ...- REMOVE BINDER TWINE AND ROLL , TOP 1/3 OF BURL P AWAY FROM ROOTBALL `� ., , . ......... ... I ..... . - ........ FINISH GRADE i 1 " i � , / / i I : ; _� ��Vl ... � / 11 / ,/ i : _ ..... .. .... I ........ ... -- L X.... - - I . ..... ........ .. �� Z Z * TOPSOIL BACKFILL . . . I , ,� .! ; . & FERTILIZER ; i .. , X/ ! X " X .. : : /,,/I..-, ", , 1:_.' ` : �11<,:x'\ : LK,�,,:,�-�-', �-, "-._.._.._.__..-ROUGHEN .._ , - ; , A ALL S�RFACES 1 4 'K,' -,'� ­'Ll.'I * , 1 , I., . ,, , 'i 1. .. OF THE PIT I i I i- I ; .'K%.I`\.. A. ­­. ­­. 1:; . ..... � I ­ ; . I -- �.-.-.�, " _... _.-_�;., , �.-.,._�.�,.,. i -.1 0 \ I = Lc,�,`M __ I .1 I,. 11111". . : � . ..�_ __. i IN *­111 - I : ��! .!.:. :i:�: , ___ : - - - ------ EXCAVATE DRAIN! CHANNEL 8" WIDE Is I \/..-.,Ili ! MIN BACKFILL FIRST 6" WITH WASHED GRAVEL ----..... :: ' !_ I ..._. � . 7/8" BACKFILL REMAINDER WITH NATIVE SOIL - I 2TIMES ROOTBALL ; __` : : I DIAMETER ! - - - - ------ UNDISTURBED NATIVE SOIL. , I 2 I '), _­ - " " ­_ " "' -, , , , , "" - . . ..... ....... .... . 1�1 i I ! i I i i I TREE DETAIL i �__ - PLANT -...- "' : r Z q I ,,��­ C 1 � "� I SET CROWN OF PLANT AT / .�. FINISH GRADE /" :r : i /_.. _�_ - " . ROOTBALL ? � ,- " "' i i ! �., '�_. ,.,,��, / .... .. 2 ^ S'UCER 2" HIGH - I I /, - - .1 k C" N. ,*? -;;�­�--'�� / : : I : : r .. . ....... .. ... .-GROUNDCOVER : ! / L­11�_ .1 - "­;­ - ­ 'r / . . ) �/ ./ ---FINISH GRADE : , : / ! _,­ : : : : / ROOTBALL . ­­ / . . I ... . : 1" / .... ..... I ............ . ... i! w..-. I t I . I I - . ................. ...... .,/, ;4 I. . ... i;1..:; ... ." - _... _... CUT NEW ROOT MASS I . .; ­_ , /, .,�," I '. TO STIMULATE NEW / " .1 " . , 11� / / ? I , ,6. .7< s- -'\� - " , -V_A. ... I... - , �>- -..-,Y,' / , - _2_­� _ _�__ "..___ � ' - � .. / / .., ROOTS , - .; lf-�­, !.,�7�11`-j4,.F' U 11 Z , i '--......TOPSOIL .�e _­­ - __ - .. - ..- , - , - , .... ... ..., . :!:,..:.� E_ I" - i = ?.:�_A . .. .... _..; .. ..... ...... I I ��< (0 .F� - : -,- : � i I .. 1k.11i �_ _�t _ I �1: BACKFILL & FERTILIZER , , ! 91- I 'I - .. TOPSOIL � to "I ...... . � .. ....... I., .-. ..��­ ... I .... j!!��:_�a . . ........ ,�.'%. ' VUNDISTLIRBED e­­ .. i ... .... ; i BACKFILL & FERTILIZER 1 \ 2 TIMES ROOTBALL NATIVE SOIL i .... . .. UNDISTURBED NATIVE SOIL ! ; . DIAMETER i i I : I SHRUB DETAIL i i GROUND OVER DETAIL z Sources: i ! . : : ? Western Engineers, Inc. Existing Condition & Tree Plan 4/16/07, Drainage Plan 4/18/08 Chenowith Land Surveying Snohomish County Assessor Map Jan 2004 Anderson Topography Map GFOUr Inc. 1989 (2' contour int.) with Boundary Survey based on Survey Recorded in Volume 22 of Surveys, Page 23, Records of Sno. Co. Tree Inventory M% b,! David City Foresters Note: This D an is based on t ie listed sources. the I . . : I . ' I - ­,. / I / . / ; ; I : I I � * q I ; I V I ; il ! j I . . TEMPORARY EROSION COfi4T 11 i. � . \ / r7 �� ... I I - 1, I ; ; . 10 .� I 11 . I i '$ / J1 I � " I_V, I I I / i ."I 4 � / , , I . m .1. ­; 11 � I C�l I Jj 1 " ' r � I i i I i -------- � � . I G R,OUND C OMMEN f) I ; 11 . ; I. i i i . .� ; � - - I . d i I . / i I � . 'i . I I , �.. li'l T ...... _T� .. . ... ............. . . ................ ...... .... ....... � ...... . 7 .. ....... _­­.. ­ ;..... ....... 11 I � / .: ! I ; : , L ........... . ........ . I - \ I I I -i i i I � I I : T_• ! I I I IP � 11 I � � � 1-1 . ..� I 1r , . I 0 If t I ! I 0 ; ; i ! i / , _\ / t_1 ;! / 1 j I ;.,, I .1 . � , . I - � � I I ::: : . I I sl ; t I � i . ................................. .. .............. . .. � ........ . . ...... -.1. I . .......... ­1 ....... . .. . . ........... . . . . 11 � . \ i F, .11 ; . / I � i I I . / / - . � '..; . .... . I . I Is 1 . I � I ; � i I : . I 1; , I - . . I � . 4 . . � . f - ; ! I �j, / I I It I I / , � : ! I 11 � ; I I" I I / ----_--_---- - .... .... . ......... . / � / I I I ; i . \ / , ; I : I ! i ; I : : � ; \ i I I f I : . � : I i I . i , , ; I � a ; I I � I I I : ; I � / Z i I - s z 11 : . � - I TOPOGRAPHY PER SO / ; . I .. 2 / I ; . / is i I ! / a . I � � i / I / ..... t i I NOTE: � / /X,- , 'I. I A A, 1 i : .:: $I ? I f Is ; 11 I . 1 , I"'I III PER SNOHOMIJH ! ,- ! i ; i . 1. - - .,: lil I" I I , . . I � lk � I . � I , , A I it i � i / ! ; j (,;) ,...I.I I � i : i , I . . I ' F LISTED. i 11 I , . . I• 1. .// / , / I I� f . . � !d 1. 11 11, . "i ; 0`1 � . i I I I t I .CO. AgSESSO� i I . I .'.1 I I t It i 11 1. . � i f I . I �. ; I .,.. 4 1 � I / - I J i / .. . t, f I / I , li . i . : I ; ; I i k _`­1 I :. _.. 7. - ...". I I ; .'' - . ! . i I ­ ; . . I . ! I I I I I , 1 � I I I , , .... I 1, � : I ' � , � , ; � I -1-'-`..-'-`Z'11 . i I i � ! � ; . ­. ! I I MAP -0,VVNLK : ; SEE CIVIL PLANS FOR I :.. `,.*,00,11' ..,.1'' i, 11 / / If -, I I I , I . I / . I - - I m . i ; I . ..:..:.1:.'1 .. I I J! i i , I ; I 11 � I I I � "......"... I : . . 11 . . ! a i . - .or ) 7 G I / . 1 . .."......, . I I ,;.... . I It VEL ' I rr, / , I A MAY REQUE�F ! I PROPOSED GRADING TES' � - / PATH I ) / /1' " .; i I , I I "I ! \Z I I P I , O.,CAT/CHMIE'NT I i � / t : . . I � I . : I : I I ,..:; -` - ; 11 . I ; : � I I . I ! ! I . i ; /1� !;i I � . � 1 . A: TO GRADE SLOPE 70 , I � ': r-...`,.1.-- I . . Yy/-%L-L (FOR AINTENANCE) / / ;.; , " I . , f, 11 I ,I ! ; * . T / � I / I I A / !; ? , . . i _�> I I ? / 'TO BE * , _A ; � __ . I , . . / i - � i ; 11 / . 1, W I ; (.o ; I . .; i Is , / / I : il__ : I .. 11 I ,- � 1.1 ! 0 1� I ) i If UNIFORM CONDITION . . ., 0 / .1 ; - I ;: i / I � ,..r_%_,V ! ; ., ; I ; I . .. 'I Is I. I F / / I ij 1.�/r/ ,.: I PARTOF I : �__­ --- - _. : - K_. � I F\ I , / i I ! " ! . .... .. ..... . .... .... I .... � ... .... _! ..... . .... .... . . . .... . .................................. � . .... ....... _ ... ­_1 ......... . � ..... I ........... . .. : � I � i .1'.IIi ,fA,s. I / . 1 2 PEIR, B L� .1 I .4. a,:, �-.-. I I I r` - / " • � . :. :1 :. 2 i . , " / I " ! �, ...".., I..."". I I I / i / I / .1 i ,. - -. . I I ! 'r . "... .", , ". . ./ / 11 I . / I � .1 ;1 , .. . I - " � J) i I ; : ; . . - I � I .- I ,,, t, � 1. % .1 I �. .: *.. J, i e . V I l/ �j ; ! / / I I / � ; i t Cj CI . .. I : . i I : i F:/ It / / .1' i ! .-C-1 Ili '-,.- - I . -, .261" A / 1, , I . . i i . I is i / Z��,4 ��­ I ; / I i: i, f I I .1 11 ; - . :. .; - / I I d I ; I 4 ? -, i � . .,.. "... ":. .1. E�t I I i I i " ; . / : , - � ! ; -__ ..,_ i .*­,­%-.­. 14h / I I I , . t. 1 I , ;, , / ; ; / I/ .811/ F / - 1 1 1 ; I d 1 j it I Z ! I . " - : ""' I . . 1 L_ .. I .1 / I , . I I 1. .1 - -'�-*::.�-,_.: - I i I \ . a . ­ -_ / I I �.,11 .,. !;I , , - -..-- ; 1. .1 i . t . I ... 11 1, - � " .� A / . I I : I � I ; . I . /I I I I . .. 1. _. . .;. .. I 11 I f /I ) / / 11; . " ... ": .. I . ... �...'�. - ... .. s I � i a / a .e . � ... * . " j;4 . ... , "". " - i ; - �, I � ) y / " I - . -` " . . , . . . , , - , . .. .1 - .. .I.: 11-1, ! I : , `� � / I _� I 11* . I . , I 11 I !.:..::.,.:.,]:�.,..::�.�...::.-,..: 1P, ,.":.. .,`;,;.'T- . �-_.%,_ I ,.,-:"-:,-.,- .1 k// 7T, if * I , ,� I !!!! / I , I i Y, ,, . I -( - / .., -...-..,-..*..,..,."'-.'-.'.,.,:.--.'.-,, _.; ,.-..: i I ; 11 � ��/ J'I / / , -, - .; - .. .. .:,.., - .:*..: ,.,. :,... I I , I . I I / . I , ; i i / / 4 .1 : .11 11 �j . .-,.:.*.-,.`--,.".,-`.., - - .: IV.: .-",.�: '. - -. `.'.",­­­� . ._'. I / , I I , ,�,` ..' . . . ... ; , / I ': VL-rj, / / 1I -, .�,' �-.T I., V. _ . I I .6 a . '' ': :: ,.,. -. - .... '�...... _.._...... ......... i I . I REPLACEMENT CALC. I , , " ..• _.. I .1 .... I.. ; I I / s, .; J I ' *.', • . , - � ..:j.":,...*.": �.�.:,.."..,.::":.",...:...-..:......,..,:.... 0 . . ; : i! I .• '.,? I I ; ,� / 1 - ..-.,...- .. I .... ­.....'­ 1A.:%,-�,:1.,--,-:` ... . i / , I 11 .-ii.... r� - .. .. I .., I � I\', ,; /I - I., I/ / � . _� . ; � I � I I I'll Is / I f 1// I" , For Tree to Be Removed I-- V,[........ . .. , , , , .. ."... .­ ., � I , � , I I .... ` : :. . . '.. i I .­_ _.. . I ;, I,.-,.:. "", ­.-:. -i�..'-..�.:..::�.:..�:�.'..;:........- '_-;,� _�.,. "..:",:,-,.::..,.,:..*.::,.*,-:.."T..,;:". I � , / IS 1 ­ :�........"!...'...., '..'.',',-*.I , w'..-.; -.,- f I•I I ; 1'� / Ir ; ! I / I; I � I . I . , .1 Ia I ... •-.11-.1.%1i:-1.---&-.­.-- t�N'-.,--.,-.�.::,..:-..... . . . . I F I ; ; '..". 11 � . j /I me - , . - . ... . t;i, . / 11 � / I / . - ... .. .. ... _ I / i a I ": .I "..., ls"'._-,: . ., _.... 1. 1. . I - .. .. .. I "I", , :.". . . i - I I / ( I .� . I I / i / sf I III ; ; 6 I I / . ..:�.. � . . "" � , I . � I i * / ; / "; / , " V/ " . el, , 1, " , ; - I ,- I I . . . - � 1. -:..- :*.,.",*".:,;,..,.,.-.-:,.,..;,-".,.t.'..:............*..,.: %1' I I � f ; 11 F . er / " ,a I -.:, ..:*-,. I i t , / f ; : / / . / � � / . ; , I , / I I '. I I/ i 14 � .... :`�:`-.I'.:.%:.,.­�:- " .1 I I 1W I : ! I Isf'l / . ; / I - ,/,I 'I H . f s! I I / I ./ i I f I I / / / I / 11 I It . , , I , , / 11 I ,k,, I 11 i ; / It , / / , ; i I : . I� . . / - I I I 11 ? / : I 01 i 11 1, � I / / I . P! I I , I . / I I /1, I , : I / 11 * , , /. / 1� / I I I /I / . ,/ . ! � s / -_ . I I " 1� // ; I I - / 11 I / I I I I , f ) . I / 11 / / _., " ; /I 1/ , / 1, / I / . I I � t// / e, i I I !I j / � / I / ry . / \ i i ; W, , . I / I / 11. i I / \ // 1, / :1 _I ; /" / .. / /I . I / ,".,� " ! / 911 W / I , I !// " 1. .; I �.,­,? I / ; ; I / " " I / . "" / I , , t. " / 11 / " "; 11 / i I 11 I I 11 f I Ill , / I I / / / I V, ! I MZ1 . . ) i. I : !: / 1� .. ­�'.---;;�� , / -- --- I .. . I I .. , 1! ! I / ., . , MMMMM in 11 i ,I "I .1 / I I = / I � . I � : ; / �. . = - / I ;i / i ' / / - / 1, , I I (D/ /I / .I- �. ,I, .1 1, ,.-, , / I - .. / ; ! " I ,,, ; . ..1; A 1* / . f / / / , / I : � � /I . /./ / / I I / / , � I / .11 ; , , ., i / Z , 1 - / .1 * . " I / . . I / / ; " . / /11 / -1 / '/ / I i i ?"t A . � ; I / / I e If " I / 11 ,, I , I ; 1 21 t / 11 " I I I . / -11 / / I /11 " " / / � , I ", , / / . If / . i / I I/ / • . /I I/ I '. I. , / / ", /I "I "I / / I I �; - t I ; . . 11 / i f / / ; I jr ;,, P.­ / I I .'I . I / / � . � I I I . I .r �, / .1 I 11 .1 I /I . If .. i / " '. � 11 I I I / ; � 11 / 11 , / / I / , �, ' TEMPO � . " "' / / /,. � " / I I . � I I I 11 , ,� ./ / / . I , If ) " - / I " I / / . I I I i, - / I , / I / / / 0 / ­.-, .,.­-�: -_____��_ � I It / I . . I � I / I 11 I I .. / �I � I .I / ! .i t / . . I 60---:,___ ,_,.L_-, , I- I I / I V . i .., I / I I / e - I .."'K " , I .. ..... - I . / , : CONTROL DIT ". I, -1/ IF I i , . .. 11 I , t: I I I , .�_,,, � / , , I I . , ; / I . * � :;7 , '. ­­­�- - . - , � I , i / / . "Ill . . " " . . I ' I I , . y ;I N : I � I -\ - I 11 " " 11 , 11 I! I i ;1 I / 2811 A . / , : / ," j I " I I / j / , ",", ------- - - -/ / , ' I /, 11 I I -1 . , ,,, .� ; % _�A;;� / / . ,,, I/ / �,� / j ;: i I, I I I " � I � , RMY EROSION " � / / I /I I 1, / , /' , 11 I / / I I-- I / / ,�_,"A"..-) . � 11- )"/�! I / .. ol - I /. I ! I. ;, i �, I/ / I / 11 / I f / � IN , I I z �_�. / I / I J, / / I , . . � I / I , / I / .11, If 1 j/ I / I . I 1i­,/ .. .1 . ; , � I Is '. . 10 i I ! 1� � I I / 'i I / I " I �'; 1.. // //I;1"II/o /I i/ j ! / I/ � ! ; / / / .,/ / / f, � / I : / .11 I 'SLOPE SURFACE CHANNELS To ./ /I /�/ r "I - e �e ../ I .1 / / / x I I / , . / :/ . / i .. � / / ! .1 /. I ... I I ­'-, . I " ff I I 'I / ; ; If / / .1 i I TRACT IA / i. 1, f 11 I I 1/1 . / It .1 .. I , . � I I 1/1 I i 0 ; s I i ; I I i � . I LOWPOINT AND INSTALL , I I t ! I � " ? / I I 11 / I I : I . ; 11 !I � . i - / PER SNOH,0MIZH M1, I" 11 . 11 I h ; ( i I : ? � : I I � , - / I , , /� I , , , . i I � / COLLECTOR PAN ! I : ! I Cil / i ! I � . .1 I i I I 7 .. , � t � ;2 ; - I . . I , A$SE,SSOR AP/OWNER/ / � . I I , . I I I � . I ji! ; I f I i . . / . I . ., ; .1 - / I r : I � /11 i . ; I I : : . . / ; If . , 11 / I ! V I 11 ; : I � i I . I I I i 11 f / i I I / i ,,, � / I/ ; 1 21f F ; I I t ; . I a , i � I I - � � .., ; . f ; I / I y U� T fs' I I / a " � i I . I . r I M,AY;REQ S � / " I , / sf I I ; . I I , I Z �. I / 4 i I 11 i I � . I j : ; I I ! 1. i / I .11 . I ; . ! : i F .1 i . IN F O'BE ' i I II I ; I � I ; I I . : t i ! I ; i i I I PLANT NOTES f I 11 ; i I - I I . a / I . o ! .� I � . : I . I 11 ; 1 I 11 ; ; I i I ! I ! ; / . . i I . i . . i . . : : I i ; 11 : . , ; j i I'l I . ! � / . OER;' .11 . ! ; f i I / I / ­ d / / I � / t, �, , i,� I I � ! . ..I I , I ; : .� I , I . I RE/T . , / I ; i ; , UTU 11 : - , . - , : ! I � .......... . I—- OPTIQNAL NEW1 SEQUOIA TREE & I i : , i , ; . I � I , j , / I s. �' P��T OFtOT'2if r !, 2 . , / ,f I . , I I / / ; ! ; I ; ! : : . I I I I I . ! - 11 1 i � 1. . � I I I I ; / . I .. 11 ; ; ! I i . ; . t 0 I . I I ., / III I f .i ` i I ; ? I i I I InON , � ,.; I . I � i ; . I I i ; / I : I 1� : , / � . ; ! � I I , improvements prior to starting landscape work, , * V I ! i , I i � 11 . I ; , ; , familiarizing himself with a other site , ( i 1' 1. Contractor shall be responsible for fr 11 t i ! : � I / I/ PRELI'MINARY P�AK,rING LOCA � , _ifi",i , " i ! , , , f I I . I I . I . � I / I i I j 1! i I j I I 11 I . ; I P 2. Contractor shall use caution while excavating to avoid disturbing any existing / _ ' 1 : � , I ;. . I I . � . � . I � I f .. ! . I ; i . ,I i . I , e I I I .1 I / ., I , � I � - I , i ; . I I / 0 � ' �� i I ; : I I 11 J' ; . I I � I underground utilities. Call 1-800-424-5555 before You dig, If active utilities are I SUPJECT TO LORIAN WI OPSHOME!1 - : .. I .; I i I / i / I ; , � I t . s I / . : ; . I I . I I ' : I I I ; I s I I encountered, contractor is to promptly advise General Conti -actor and Owner, ' ' . I . ! , i f I I f, !, 1 ! l iIj ;...I I .I I : i I .; , . ..I I i ! II: �3. Contractor shall maintain and water plant material Until owner's final acceptance is /"/ OWNERS ASSOPIATION & GEOTE�H APPROVAL , I /. ; �� I ; ! ; : : . i : ;I . I ; s A; � ! i . I I . / ii !. I ; � ! ! I . I I ...�Ii . ! I: received in writing. / : : ! . ; I 1 ; . 4 ) ; ( I � I i ! ; s I I I I I . � j . i . I ; ; i I I I � . I I . a ; i ; . I Ill i I i � . . I ; I : . ; I . 7 ; j , / : , ; ; I I I . 4 � f ! ; f . 11 ; S � I ! * , , , , � : . ; t : ; . ; . . ! i � , i ; . . � I � . I I ; � ; I ! : i A 4. Contractor shall be responsible for providing the quantity of plants that are I 11 i / . , / / ; ;' 'i i i ;; t; , � , � I I . . � f ; I I j / i I " . i � ! : I ; I. i I I , . . I . . ! I I I ) ; i 11 I represented by symbols on the drawing. I I , ; I , . I I . / i I � - : I . I ; ; � ! . . I i ; I I I / I r I I I t I I I � : . 11 / / I I I . I f i I . � I I I i ; I . i I . I . v , , . i � . , . , , : . 1 . 5. Contractor shall be responsible for computing specific quantities of groundcover arid I . •I/ . I I I � . : Z I I . I : : ; . ! , / / I : I . ; I I . ; I . . � I I ; F I / I I i I I I I : 'i i i i . . . � ! I . ; . I I . I : ! 11 ­­ ; . . � I . . I . . I ! . ; . . I .. ; I . . w I I � . I It i i . . I : : I . . I . � I : I . . . I I ; ; i i I -,_L� . i I 0 . I I I . I . ; � . . 11 I ? ! � . . I . plant material utilizing on -center spacing for plants as shown on plant schedule and I I / / i ! i . -.,. � I ; 1; 1, , : I : �' � I , ; I I I minimum planting distances as specified below. / / i ; i I I �' I' �4 1 � 1: : I � . I . I a . . ; ; ! ! ! 9 j I I I I i I : i i I ; i � ; ; I I . i I � . . I I I I I ! . i . I i ; I 1 1 I . •I I . 6. GrOUndcover shall be planted in equilateral triangular spacing pattern at / � 'If I ; ; I I I : 11 ; I � / . : I ; I I I I i ; 1. I i ; i - � t I ; I . . . . ; I � . . : I . . I ! t I I � I I ; ; : I 1. : the on -center distances as shown. Minimum planting distances shall be 15" from s ,/ . . i I ; ; F . * : , , 4 ; i : I ; ; � . ! � , ; ; . I � . . I a I ? t I i i 11 . ; I . S . I i I . . . ; ; ; 1 . . . I . . � ! I i , I i Il � I I I 1� ; It ...".: � � , I I ; I � 11 I .� , I � , � i ; . center of all trees. /. , I / 1: I • ; 1i � / I I � . � Il I I I , a a I ; I ; i I I . � . I . . : . . i " I . . I ._.� ! . j ! f I ; ; i i � I / I , ; i . I . I , I I 0 . � 'm 'i I 1 7. Submit four representative subsoil samples and one topsoil sample to a qualified I I / I, / I I . . I I I r 0", ; , ; 6 ! � . i , I i I I . .e I . .. s / I I . I i I : I I k � : s , , , , , i . . ; I I t � . I testing laboratory or use soil samples collected by City Foresters. Add soil � I ; . . I I i � , , I : � . � � '. ;I " I I . I I . ; I I I . I � I . I / I I : 1: i I z : ! I � I . . i ; I I I � . I . . I i I 11 .1 / I � I I ; I . ! ! : . . . I I; I I � . . " . I � , ; f ! . : I . . I � I Ii k � I I i . a i : �i I s, I ; � I I : . amendments as recommended by soil testing lab. / . I I I � i i I I I I . i I * I 11 ;I � I , I , , : I . . , , , t , . . I I . . r . � A 1 8. Backfill shall be clean, native material free of debris, gravel or wood chips. Backfill "..'. Is I=,, I . , � , . , I � 1 ! -* - , ( t I , / ; I , � � , , = 'Mamom"M* M =,I I : ! ; . I ; . i I . � . , " � . ; . � ; . I . . 20MOMM M �x nammm"" M ikm . I � . . 0 W W" ON 111A MINAUNIffift = ammmai = = W=M== RM wmw==�Im = ===am = !_ _,� . � . . .. I ; I 4�-_ I t I . 01310801021M . ===== mwl�� = low . ; � ; : ! I � , / '... .,. - = M 1115=4 ; , , ; � I � ® .L � I - � . , I � . i _� I i % . l I . s ; I I i 11 I � � ; I I � I I 11 I I I I : . . . I f I I z % N I � � I I I . I I . ; I � 4 � I I . . . . I . 9. Imported topsoil shall be a mix of organic matter and soil (composted sawdust, / I � C . I k . 2 . � I - third native soil. 4.11 / ol . I ! i � . ! . i I * , I 11 s li , 2 H ,�' . � ; . . . I ; . i ; ! i � . I . ; . \ � I . .1 I I t i I ; � . , i , , . ; I . . % I . . . ; . . 1 / I I ; I i ­� ; . ; I . !, I I /I , . I � , 1 � � i , i I \ � : ; . ; 11 4 I � � """' . 1 7'0 i . I . � � � shall consist of one-third Kellogg Nitrohumus, one-third Olympia bend sand and one / i / , / ./ " / ; � s t I i I , i , � .. manure, sandy loam and loam soils), or existing on site stockpiled soil. . . I I � . i ; . I � 1; / ; . . I I, . , / I J, / I . "! ; . i . I I � t 10. All plant material shall be fertilized per manufactures specifications. . , � ; ; � I ; I � Z . ; ; i It � . � . . , i I I ; I I : s , ! . I , / . I rQ ! . j i : � . ; �i i . I . I : ; � k , I I / . , ; I I s I . / ! � I i i . I . . . I I .1, ii -I material shall conform to AAN standard for nursery stock, latest edition. ; : . : , , I . `I 11. All plan / . / I ; I , I :, i : ,; - . . ! . . : . ; I : I I I I f . ! . .1 . � . I I . , I � I ; I . - . , - I - � I ; i , I I / . I i I ; . I 1 ! / , � � . , , I' I ; ? � j . 11 ! I ! . I : , 212 11 H . ! : I I I ! I I . / . / . � : I ; I I- - 11 11 ; : ; � V I . � . -Ij I I I , � � " " � I t � i'� I � * I I : I I s ! � / I q h . . . . � I I I I. t I ; . 0 . i I . I . I t. . ; I I ; I . i 2 t . /I p � I I � I . r') � I `iill . . i I : I I I I I , I I , � I _sI S i i� I, � li ; I ; I . I I t, ! ;. 0 1 n 10C2C2C%,q:1llU1 I _....___._.'.­. .._ . .. .. ...... ..__.._..__ .. . ...... ­­....., I—. ­..._._....­_.... r4% tPC; If ­f,-% rb r ly EDMONDS, WA parcel 00790400000200 Lorian Woods Subdivision Planning 0 Landscape Architecture Environmental 0 Economics SEAL 710 Hoge Building 705 Second Avelll.le Seattle Washington 98104 Telephone: 206.624.6239 Fax: 206.625.0930 E-Mail: planning@rwta.com STATE OF WASHINGTON REGISTERED LANDSICAPEARCHITECT JEN �E�: CERTIFICATE NO. WA, .. _. ­.1. ......- . ....... ....... . ­......_...__. _. � ........ - . ... ­ ... ..-- ISSUED ho­.be­s­cri'p* ... fion, '­ ­DmCk'd Aplv"dlll 111DIatel-1- ­11 ­.­...7 . . .. .. .. ............... � ...... I ..... ............ ­.......... .... � . ..... . . ... .. ................ I t : i " ­­T: - 1 'P antinPlan I . ..... . I ..... ! ... ..........n .. . ............... ..... � .. .. .... :4L.l.S.S.19T�1 1/22/06 . I I b5z1,0707. 2 (Planting Plan I j I I L i RT I RT 106/05/07 '...3'. !�.f��..­ .. ...... ­............_........., ... I 7 ­ '' ' " i ting Plan : JIL ; RT'1 RT'b-4*/"1'8'/*Oa i ; 1 � � .....! 1 ..... � ....... 1_ ... .. . .... ;---- _ - ....­ - - - ! . i - , * " - i - ­"­**** ­­ ... .. "', " , " i ! I . ! i ....­­­ .... .­..... ... ...I. -I......... ­.­.. . ....... .... .... .... �.., . . ­ I-— REVISIONS ... I ..... . . . . . . ......... � .... ... .... ­ �.."... � ...... ... .. .... . � ....... ..... .. ....... .... . ...... ... I . ......... ....... . ........ No. Description ......... 11! ............ ............ . ........... . ­­.....­D.rn 7Ck'd tA...pI..v..'.d........D...a...t..e . ....... .... . I ­.IIIP'...la..n..._t'ing Plan ...iJL i RT _R.....T 'j 04/0I7/11018 ..­­ ....i..- t.---" I. ..-; ... 2 Planting Plan !JL I RT1RTb8/01/0B ..-..... ,,..,.I ..... I . ...... � .. .. ............ �....-............-i....-....-,. ... .. ...... i ; � ; ......... .. .. i I .... . � ... .... .. .......... I I Z I i . i ! ; ­­­! ...... .. � ....... . ... � ......... .... ... . I—- .......I.I.I... I. -I. -I I ; ! "'! " ­­ �t ...... __ ..... ... . ..... . . . ; ! I i I � I I..--...-.-.....---.......,.....�.... ­ ­­_­ .... .. I.. _.....__ .--... - RWTA JOB NO. ........011.0.11.E .....-11............ SH EET TITLE Planting Plan for Tree Cutting Permit Application File No. CU-06-104 & One Sequoia Tree Removed & Replaced File No. CU-2008-36 Note: For Grading & Erosion Control Plan See Civil Engineers Plan GENERAL NOTES: � CONTRACTOR RESPONSIBILITY FOR SW 114, SW 114, SECS, T,27N., R.4E., W.M. I . 1. LOCATION OF EXISIING UTILITIES AND IMPROVEMENTS SHOWN ARE EROSION/SILTATION CONTROL: CITY OFEDMONDS, WASHINGTON . \` 33' M APPROXIMATE ONLY. IT SMALL BE THE RESPONSIBILITY OF THE CONTRACTOR IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL \ \ \`. \ \` \ TO DETERMINE THE EXACT LOCATION(S) OF ALL THE UTILITIES AND PLAN THAT STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO \ \ \ - - _ - _ - - - - - - - _ _ _ _ _ _ _ �' . �, IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE. PREVENT SOIL EROSION AND TO MAINTAIN WATER QUAl1TY. ANY AND ALL \ ' \ _ - ` - - - _ _ _ - - - _ _ _ _ _ - - - - _ - - _ _ _ - - - - - _ _ ` - - - - - - _ - - �� ' I'll, `' - 1 .� 2. ALL CONSTRUCTION SHALL CONFIRM TO THE 'STANDARD SPECIFICATIONS MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. \ \ \ ' ' ' ` _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- - - - _ _ _ _ - - - _ ` - _ - - - - ; _- _ _ _ ' - - - - -now • _ - '� - FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS - _ - - - _------------ -___ --_ - \ - _ _ - - - - - - - - - - --------------------------------- - - _ 200- _ _ _ _ .�' .� 240- - - LEGEND - ;, .� ADOPTED BY THE CITY OF EDMOND5 AND ANY REQUIREMENTS ESTABLISHED 1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDI AON$ THE ` , - , . , . \ ' , _ ; ` - _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ - _ _ _ - _ _ - - - - - - _ - APPROXIMATE LOCATION - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ - - _ _ - - _ _ = _ _ _ _ _ _ - - - - - - - _ - _ _ RUNE 1 ON THIS SITE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT \ ` \ , -- - - - - - - - - - - - - - - - - - - -22"R - _ _ - - - - - _ - - _ - - - �� - - - - - - - - - - - - - - _ - _ •L. - _ _ - _ AT CITY HEAR NGS \ _ - - _ _ - -_ _ _ - - _ - , `- OF IX. LOG. CONTRACTOR- - _ - - _ _ _ _ __ CENTS _ _ - _ ___ _EROSION DOES NOT OCCUR ON 7NE SIZE AND TMAt POLLUTED OR , ' \ _ _ __ - _ _ - - - _ _ - _ _ - - _ \ ' ' �'',' ' ' "TO yERIF� _- - _ - - - - - 3. ALL CONSTRUCTION tS SUBJECT TO INSPECTION BY THE CITY OF EDMONDS. OR ENTER INTO \ ` \ \ - - _ _ _ _ _ -- - - - - -_ _ _ - - _ _ , , _ - - - - - - - - - - - - - - - - - - - - - - 230_ - - - - - - - ` _ ` _ - -__^- FFlCIENT SILT -LADEN RUNOFF DOES NOT LEAVE 1ME SITE \ \ _ _ - - - _ _ _ _ _ _ - _ _ _ _ - \_ - _ -'190 _ �' _ , - - r `- _ - - - - _ _ _ - ` -- - _ _ - - _ (G4) GROUP FOUR SURVEYTHE CONTRACTOR SHALL NOTIFY THE CITI' OF HIS SCHEDULE IN SU ANY CREEK, STREAM, WETLAND OR ' WATER• BODY ON THE SITE \ \ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8 A - _ - - _ , -------- - - - - - _ _ _ _ _ - - - __------ --___ - TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. / , , \ \� �\ \---------- __ __-_2 A \ _ - \\' '-----------------. -- _ ____ ---_________---__ `_ -_____ - . ' \' _ (W) WESTERN ENGINEERS 4. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHAD. BE SUBJECT TO MINIMUM RE UIREMENT5 SHOWN ON THIS PLAN \ \ ` \ \ \ - - - - - - - - - - - - - - - - - - - - - - - \ \ _ _ -, ' ` - - - - - - - _ _ _ _ _ - _ _ _ _ _ - _ - - - - - - - - - _ _ _'- = THE INSPECTION OF THE CITY ENGINEER. 2. BEYOND THE Q \ _ -- - - - - - - - - - - - - _ _ - - - _ - \ - - - - - - - - - - - - - - - _ - - - - - - - _ - - - - \ \ - �. `� - � \ �220 - (P) PER PLAT DF LORAN W170DS THE CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING AND - - _ - _ _ _ _ _ ' \ - - - _ \ . \`,�'\ A, _ 5. THE CONTRACTOR SMALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR fMPLEMENIi�I APP OPRIA7E METHODS "BEST MANAGEMENT - \ \ - - - - - - _ _ _ - _ _ ` - _ _ _ - - - -- _ _ _ _ _ - - - - - -' - - - - - - - - - - - - - - - ^ ' _ \ \ '� \ \ \ _ STORM DRAIN CATCH BASIN (CB) ROAD AND UTILITY CONSTRUCTION. PRACTICES (GBMPs)R, FOR STORM WA 17:`R TREATMENT AND CONTROL - _ - - - - - - - - - - - - - - - - - _ - _ \ \ \ _ _ - - - - - - - - - - - - - - - _ _ - _ _ - - - - - _ - _ _ _ _ THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE \ ` _ _ _ _ - _ _ - _ _ _ - y8p _ \ \' -LOG AND ACCUMULATED LAND \ ❑ 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION AND COLLEC77ON -- DEPARTMENT OF ECOLOGY AND SNOHOAiiSH. COUNTY. - -- - - - - - - - - - _ _ _ - - - - _ _ ' ` ` - - - - _ _ _ - \ - - - - - - - - - - - - - - - - - - - - - - - " " - ` ` - - - - - - - - _ _ _ - - - - - WATER DOES NOT ENTER THE D \ � -- \ _ - _ \ \ ' . , , SUDS DEBRIS `'GEE t BE _ - - - - - - - - - - - _ - _ - - ' - - - FACILITIES TO INSURE THAT SEDIMENT-LADEN-1 ` ' ` - _ _ ` . 11 - - , REMOVED PER 1GE01 cCHN1CAL - - - - - ' - - - - - - - - _ _ O STORM DRAIN � MANHOLE (SDMH) \ - - � - - - 1/� - \ \ \ �RECOMMEN44_719d5. - NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION - _ _ -- ' ` _ - - _ _ ' 1 _ _ _ - - - - _ _ _ - - - - - _ PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL ,� THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND \ \ \ ' ` - _ _ - - - _ _ - ` - - _ - ` ' ` \ ` \ _ , , - _ _ _ _ - - - -210- - - _ - - - - - - - - - - - - - - - - - - - - STORM DRAIN CULVERT INLET CONSTRUCTION IS COMPLETE AND THE POTENTIAL. FOR SITE EROSION HAS ACTIVITIES TO THE PROJECT ENGINEER AND TO CITY OF EDMONDS. \ \ \ � ` - - _ _ - \ - ` ` ` \ ` ` ` - - - _ , - _ \ ` - _ - - - -------4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ` - IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES , - \ \ - \ -- `` -- -' - -1 1 `- ` ` - - \ \ ` \ \ `` \ - - _ _ - - _ _ _ _ _1.- - - - - - - _ _ _ _ _ _ ` `_ _ _ _ _ _ _ _ _ _ _ _ `` -^-'� PROPOSED DRAINAGE FLOW ARROW PASSED. ARE INEFFECTIVE AT CONTROLLING EROSION AND SILTA7ION, THE \ \ \ _ - - -- \ � _ \ - ------------------- `--`------------- __--- --- 7. ALL STORM SEWER PIPE SHALL BE CONCRETE (CPT, NON -REINFORCED, CONTRACTOR SHALL IMMEDIATELY REPORT TO AND CONSULT WITH THE - _ ` - _ _ \ ` \ ` - - - \ ` \ _ \ _ - - - 4 - _ _ - - - - - - - - - - - - - - ' - - - - - - - - - ASTM C-14• CORRUGATED METAL 14 GA GALVANIZED, ASPHALT COATED \ _ - \ \ \�\ _ ` \ ____ - -------------------- __------'--------- O . PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL \ \ � - _ - - _ _ - - - _ _ SANITARY SEWER MANHOLE (SSMH) TREATMENT i OR BETTER, MEETING AASHTO M036: CORRUGATED ALUMINUM, CONSTRUCTION ACTIVITIES, WITH 1NE EXCEPTION OF EROSION AND _ \ \ ' - \ ` ` \ \ ' -\ \ \ \ ` ` _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ` - - - - _ _ _ _ ` - ' - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - �� \ `� '1 f2 GA 3"x1" CORR. OR PVC ASTM D-3034 EXCEPT AS NOTED. S1LTA77ON CONTROL MEASURES, SHALL CEASE UN71L SUCH T1ME AS THE . ^ \ \ - _ _ _ _ _ _ _ _ _ - - - - - - -' _ _ FIRE HYDRANT \ `\\` 8. ROAD RESTORATION SWILL BE PER CITY OF EDMOND5 STANDARDS. WATER QUALITY IS BROUGHT UNDER CONTROL , , „ - _ - - - - TREES.;AOT SHOWN WITHIN CLEARING I�MfTS HAVE BEEN _ - - - _ - - - _ - '.;, \ I p \ `KNOWN LANDSIDE/DEBRIS FLOW AREA -REMOVED P :R TREE CLEARING PERMIT - - POWER POLE 9. ALL ROOF DRAINS SWILL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. \ \ - - - _ '" - , - - _ _ - - _ _ - CU-06-104 AND = - - - - - - - - - - - - - - - - - - - - - - - -O- 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER _ _ _ SEQUOIA RI MOVE AND REPLACE UNDER NEW C.U.P. INSTALL SILT FENCE (WITH FABRIC BURIED AT TOE \ 16 M_ _ = -1 - - =- ` - " - - _ �- UTILITY POLE ANCHOR 10. ALL ROOF DRAIN STUDS SHALL BE MARKED WMI A 2x4 POST SHOWING FORECASTS AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ' - ` \ \ \, \ _ _ ` - - - " ` - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ \ - \ \` TO INTERCEPT HILLSIDE SEEPS AND DIVERT FLOWS -- - ` - - _ a_ - _. _ _ ' _ _ ' - - - - - - - - - - - DEPTH AND MARKED 'DRAIN". ALL PROJECT ACTTWTIES IN AN71CIPA710h OF THE WEATHER. \ `\ \ I - - _ -- -- - , ` \ TO NORTH AND SOUTH �IRDUND CONSTRUCTION S/iE, - - - - - - - - "- - - - - - - _ = _ - "- - - - - - - - - - - - - - - - - - = - _ _ _ --_ - II METAL SIGN POST 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR GRATED. \ - _-- --_ _ - - __ - - _ __ _ -_ -- - -= _------------------------_ _ _ _ 12. ALL TYPE 11 CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS 5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs \ _ _ `" 'I-, \ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ a --- --,-------- POST OUTSIDE OF THE PUBLIC R/W SHALL. HAVE LOCKING LIDS OR GRATES SHALL BE STORED ON SITE AND SHALL BE IMMEDIATELY A VAfLABLE FOR ` ` - _ _ _ - - _ _ - " ` ` - - - 2 " - - - - - - - - - _ _ \ 178 D N -. �- _ � `, � ��',, � _ c MAIL 80X 13. STANDARD LADDER STEPS SHALL BE PROVIDED IN THE CATCH BASIN USE SUCH SUPPLIES AND MATERIALS SHALL INCLUDE 8UT NOT BE \ " ` - ' `SEE GEOTECH REPORT-MIN?Jf� , SE ` y - - _ _ - - - _ _ - ` 7ti- - - - - ' - - - - - - - - - - - \ 1 ------------------------ STRA STRAW OR OTHER MULCHING MATEF�IAL, SILT \ FTTLS NEAR NORTH PAITO \ SF 14 %\ ' ' - \ \ '' - - - - - - - - - - - - - - - - - - - - - - - - MANHOLES EXCEEDING 4 FEET DEEP. UNITED T0, \ _ �s�,-�' -- ,, - \-------- _`-`---''•74----------------------------------------------- - CONIFEROUS TREE FENCING AND STAKESy FILTER FABRIC, ETC. t MAX SLOPE). SF` - - - - - ` , �� - - �"- - - \ \ - - - - 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF \ (• _ ) /�-"� - - - -- - ' - - - _ ` ` - - - .. - - - - - - - - - - - - - _ _ _ - - - - - - - - 95X OF ASTM 698 -STANDARD PROCTOR TEST. \ _ _ _ _ '. _ - , \ - - _ - - - -172-- _ - - - - - - - - 20' M 15. UTILITY TRENCH BACKFILLS SWILL BE COMPACTED TO 95X RELATIVE 6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR ' - - ' " - - ` - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � DE SHALL MONITOR ALL EROSION CONTROL MEASURES AND SHALL \ \ \ I- � - _ - -' I `- � i ^ � \ ', ` �, _ \ \\-- - - _ - _ _ _ _ - - - _ _ _ _ _ _ DECIDUOUS TREE COMPACTION UNDER ROADWAYS AND 90R OUTSIDE ROADWAYS. i \ _ _ _ _ - - _ _ - ` ` �' ` _ - - _ - - - - - - - - - - _ _ - - - - - �'��- _ ---__ p� ?► '---- _ , �` \ `------ _ - _ _ - - XXP PINE TREES OF XX DLAMETER PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND \ / _ T 6. STURMWATER DETENTION/RETENTION FACILITIES MUST BR FLUSHED AND ' ` \ - - - _ - - _ _ _ _ - - - -166 - - - - - - - - SILTAAON CONTROL MEASURES ABOVE ALL OTHERS \ `� \ - _ '-------------- �48_ \ Q -,,�\ �� \\ --- `------__-- - --------_---------------------- CLEANED PRIOR TO ACCEPTANCE \ \ - _ - ' `�'.'? - sue\ _ - - - - _ _ _ _ - - - - - - - - - - - - - - - - - - - - - i 64 - XXH HEMLOCK TREES OF XX DIAMETER I Z TEMPORARY SEDIMENTATION AND EROSION CONTROLS SHALL BE MAINTAINED - - _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ \ - - � - \ ' ` ' \ 7 6z XXR REDWOOD TREES OF XX DIAMETER FOR THE DURATION OF THE CONSTRUCTION. TYPICAL METHODS SHALL - \ "I - ---_ - --- . - -` ----__ - - _ _ __---``---------------- --- OF _ ORANGE CONSTRUCTION FENCE AT LIMIT OF DRIPLINE f - _ _ _ `, _ ' , -'r +sF \ _ `SLOPE -INSTALL. INTERCEPTOR TRENCH XXF FIR TREES OF XX DIAMETER RUNOFF, MAY BATES, SILT FENCE OR OTHER CONVENTIONAL METHODS. - \ - � - - - _,_ r - z46--__ % -___-- -------------------t5g----------___-- OR BY ARBORISTS DIRECTION WHILE ONSITE (T1'P)- - - _ _ _ ` , , - - - \ - - - - -TO RE-QIRECT RUNOFF TO CATOH BASIN. - - _ - XXM MAPLE TREES OF XX DIAMETER 18. ALL DISTURBED AREAS SWELL BE SEEDED WITH PERENNIAL GRASSES - \ ' ' - - _ _ _ _ _ - _ . it--_I \ --- -------------------------1�6-------------------- ,_ - _ PROMPTLY UPON COMPLETION OF GRADING. � , - �\ \ - - _ _ _INTERCEPTOR TRENCH AT TOP OF SLOPE RE -DIRECT _ _ _ I - - I , •144 - - - _ I _\ _ _ _ `' F� _ - ' ` _ _ _ _ _ _ _ _ _ _ _ - ` - - - - - XXCH CHERRY TREES OF XX DIAMETER 19. CBS 1 SWILL BE A TYPE I. YARD DRAINS SWILL BE 180 OR 1200 HOPE \ TRENCH TO FLOW ACROSS SLOPE TO CATCH BASIN - ' - - _ ` - _ WINTER EROSION AND SEDIMENT I \ . , - _ _ _ - - - - - _ - ` - - - _ - , F.rr,>r.�,,,r SMOOTH WALL VERTICAL ORIENTATION - -- � ` - " ` - _ - - - _ - - - 2- - - - - - _ \ I - - - - - BUILDINGS TO REMAIN - , ' CONTROL AREA OUTSIDE OF _ - ' ^ 20. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET , . - . \ - _ - _ - _ , - - RE -VEGETATION OF HILLSIDE - 1 - �' - _ _ _ - _ _ _ _ - - _ _ _ _ _ AND CATCH BASIN FRAMES AND GRATE JUST PRIOR TO PAVING. PHONE/TV/PUD_ - - - - _ 2 C , / -- - _ \ - - - } - - - - - - - - - - - _ HI)'DROSEED AND/OR MULCH PRIOR TO _- \ M �---_ .. E - - - _ CONSTRUCTION MORATORIUM LWES. I -\ , � ', _ PROTECI IMLLS WIIHIN CLEANING LIMITS - INSIALL .0 EXISTING CONCRETE 21. IN TILE EVENT THAT FIELD CONDITIONS DIFFER FROM INFORMATION - - - _ _ _ _ _ _ - - PRESENTED IN THESE PLANS, THE CONTRACTOR SWILL BE RESPONSIBLE B1 - - - _ , - ` _ _ _ _ _ _ L _g+ _ - - - _ _ _ - - - '1-52 - - - - - - - - - - - EX. C8 � - - _ _ TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO `'I38- _ _ _ to ORANGE CONSTRUCTION FENCE AT LIMIT OF DRIPUNE a _ ` \ < L - - - - = -j - --�j �- - \ OR BY ARBOR..;TS DIRECTION WHILE ONSITE (TYP) _ I - CONCEPTUAL BUILDING FOOOTPRINT CONSTRUCTION OF THE CONTESTED ITEM.1%RIM f 20 67 _ ' ' < --"'�� ' - _ - _ _ _ ` \ _ L WAS 1E=114.85 w `EX. CE Py _ - L - - __�--136------------ �'\ ,t V � H `\\ _ -f50' EXISTING ROCKERY r ` ON \ 22. LAND SURVEYING AND TOPOGRAPHY INFORMATION FOR THIS P - r `` EXISTING CONCRETE RETAINING WALL PROVIDED BY CHENOWTH LANDSURVEYING. EX. SDMH \ k$` °' �F U I L` ` - - _ - _ - " ` mac` - - ----1 4--------------------- 1 \ 2„ H TRACTOR PROPERTY LINE _ _ I \ 1 PARKING AREA SHALL BE USED AS CON LAYDOWN AREA _ _ \ � EX. SSMH' `� - ' - - - - _ - - _ - L_ - - _ - - - _ - J �` , 'V _ \ \ \ WITH APPROVAL OF LORAN WOODS HOME OWNERS ASSOCIATION. _ , - RIGHT Of WAY EX. SSMH . - - ` - ` - , S - - `_NSF ` ` - _ - - 2 - - - - - - - - - " - - ` _ - - Ill _ MAY TEMPORARILY FENCED CONSTRUCTION). - - - - - - - - - INDEX CONTOURS ` 11 /\�`�-- - ( 8E TEMPORAR ED DURING CON 1 -__--_---`---_----- , ' • -I'FU SS SF�'� _ - - -130- - CONTOURS \ s `�S� - EX. C8 -� _ ' g.. W ��/ p 11N P _ _ _ - - - 'l// //// //// //// //// EDGE OF PAVEMENT . p 7 ` • _ - - 28 - _ I SEQUOA- TO BE1 REMOVED AND_ w / UP ---- �' `��P _ D '�-REPLACED UNDER 2008\CUP S T''� SS IXISTING SANITARY SEWER PIEZOMETER, L W, `--- �- �''` B/� \ - - MONITORING \ �p A S W \ \ S , r❑ C' C . \ \ . ,ph. - SF `----------------- 144---------- ' `, LOCATION O j� Vi�,��,� D EX. CB EX. SDMHA \`\ \ SD EXISTING STORM DRAIN T - ". !'�� \ ROW CENTER LINE . \ G _ `. ASP T CUT � � ` W _ G SS /,' - s y- \ ` _ _ _ \ /1/ ��// / \ G \ �.. - - _ T.E:S.C. LEGEND _ _ - ------ -- , \ ZF \ o Ss _ _ - _ _ - � - I �` PIEZOMFTER -T-� . % \ S 1fI `-- -_ 1399 1 ll �----------- ' \ MONITORING _ S `, � - - _ _ - ` - _ _ I ' ,` � ', � I / \ \ 1-1 LOCATION G --` _ Q CATCH BASIN INSERT _ TVIG11 / _ CLEARING LIMITS I " - - 9 ' I EX. CB zz/ , //// ' NCH . ` OR �I \ `� /�/�i / I - W/EROCKT CHECKS DAM STORAGE SPACE \ _ - - -' � NOTE.- ` FOOTING EL-13Z 75 - - -14 4 - - - - - - - _ _ _ \ � � � i \ ` � � SF - SILT FENCE FINISHED FLOOR EL=139. 79 _ - - - - - - - _ i 1.) PROI DOSED GRADING BASED ON EXISTING t - ` r i t , \ SURVEY/ACCURATE WITH CURRENT CONDIT10NS.� LAYDOWN AREA --- j - 7 42- - - - - - - - - - _ - - _ - j - - _ 1 2.) LID 210 WROVEMENIS MOSTLY REMOVgb . - - _ \ -1` - - - - - - - - - - - - - - - - - ,' DURING PERMj1TED TREE REMOVAL . 132.75- , 40 - / ' sm \ _ - - - FOOTING EL=134.25 - - - - _ WALKWAYS TS AIRS - -\- - _ ,� SCALE: f " - 20' FINISHED SLAB EL=135.7Q - _ FOOTING EL=132.00 OEM momommm . - - FINISHED SLAB EL=133.29 -0 � 0 20 40 ' �a ` _ �32.75' \ LAPr'� SCAPENOTES: o - 1.) PLANT VINE MAPLE WITHIN 5' OF COMPLETED SURFACE CHANNELS. DECK COLUMNS I k - � \ . 2.) CLEAR STUMPS AND DEBRIS FROM SLOPE. FOOTING EL=128.00 - 136------------------- - ` - - - - - - \\ , ', SITE G.RADWG NOTES: 1.) REMOVE TREES AND STUMPS AS REQUIRED. / � -� I. EaABAGE _ 2.) RE410VE LANDSLIDE DEBRIS AS NECESSARY. 11 I _ _ FOOTING EL= f 30.00 \ - - -`f _ _ 3.) GR40E SLOPE TO A UNIFORM CONDITION. c� 01 -- 105.00t DEPENDANT ON FINISHED SLAB EL=132.00 \ � 4.) L':+: SMALL BULLDOZER TO 'WALK' THE SLOPE LEAVING TRACK MARKS. ELEVATOR -MANUFACTURER \ 11 5.) 5.) BULLDOZER CAN CREATE SURFACE CHANNELS WITH BLADE ' ` - - - - - ` ` - - - ` - - - - - - - - 6.) BASED ON UNIFORM SLOPE INSTALL SURFACE CHANNELS CLOSE TO LOCATIONS SHOWN CONCEPTUAL. BUILDING FOOOTPRINT �� e�--�-�.� { f- � i Vs SS L - - -J 7.) A SINGLE SURFACE CHANNEL CAN BE CONSTRUCTED IF SRE SLOPES ALLOW. - - - 131.25' .il.il.il.il.il.il.ilYI, t t; _ hti91111T'EI1T ,�sc' art k`� = PROPOSED PAVING r ­.­ ­1111-- -- _ `;� ' �' GRADING, DRAINAGE AND EROSION _ - - `32 - - - - - ` - GULAR INSPECTION AND MAINTENANCE SCHEDULE IS _ _ _ DATUMS ANCENOTES. _ _ - - - - - - - - - - - " "Ik ,, . .` y s . 1.) AN NGOING RE REQUIRED FOR ' ` ;l .V�, SS PROPOSED SANITARY SEWER FROM GROUP 4 SL VfI' (1-18-88) DRAIIwwE SYSTEM. Tkj�5 - - - - _ _ - -�Y 1 .1. %t 1 `� (JOB ) 2.) GEOTECHNICAL MONITORING AND INSPECTION OF GRADING, DRAINAGE AND EROSION �'� �V CJ �� _---130- -- i +�'� "i t,, '4 aSrd li ,, ,t /� rn - ti' `- ,'i �>p,rt i i`z E, ` S '.4' A 1 �� 0 �c� PROPOSED GAS �p €,1."� } : 11fiRI�dL: CONTROL !S REQUIRED DURING CONSTRUCTION. _ ' PROPOSED WATER ASSUMED ELEVATION BENCHMARK STORM DRAIN �JI �I�WI ,�/1 ' v� 1 45_ _ , .. a , ,, -y t� )1 �nF�v � t �'i-r..,, 1t Z!� 1 t Jq# �`tt �-`' ` If - ��r. F 3.) PRE -CONSTRUCTION MEETING 1S REQUIRED WITH Gf07ECHNICAL ENGINEERING MANHOLE RIM IN N. MEADOWLaALE ROAD AT REPh, SENTATNE PRESENT. i1 y�rJV . D �\ -�2g--- - } "' '` ," I I ; "`` ' �.} INTERSECTION OF 73RD PLACE WEST U D S 0 S p S RIM-120.67 4.) EARTHWORK IS RESTRICTED BETWftN OCTOdER 1ST AND APRIL JOTH. EARTHWORK IN ��--�--SS c' , ri r �; C(� \ SD IE=114.85 THEE TIMES MUST BE APPROVED BY GEOTECHNICAL ENGINEER OF RECORD AND CITY OF ------------- SD u„ �, tr, ,� �t �' s p , r t MONDS BUILDING 0 c� .. r � SD --------- - ----- w r i x41i' �P t <<'f�i,I t Ytii lj, t rrj,'� r: LtifYi(11�{�Il m M FFICIAL t 1 G S ` - - - ' -„ rt `' �' } .. w': r` s ti ' .' ' '' S D LOCALE CORNERS OF LOT 2 FROM GROUP 4 SURVEY } T R ET E ,.11 �x ,t,;,. v s w S \ FOUND REBAR AND CAP LS18737 ON 3 CORNERS " 1 ARBORISTNOTE. 9 /��Ttl -- Sp sS a.)' o ( ! 1 f C \ ARBORIST TREE INFORMATION AND RECOMMENDATIONS - I t 1q s' SS \ \ TAKE PRESIDENCE OVER THESE PLAN SHEETS ;'•Ll(1-I111it r„"F+;�11Ti:r7::,1* ��'rv�, i�� �, / I. G - SSA �:.; _ fIOUSEDETAIL TAXACCOUNTNO.(S).• SITEADDRESS: SCALE. 1„--10' 00790400000200 BLD20070833 'SUM 0 3 �Qpg EDMONDS,WWA BLD20070834 LORIAN WOODS , . CITY OF EDMONDS GRADING QUANTITIES UTILITY CONFLICT NOTE: GRADING & T S C PLAN HOMEOWNER'SASSOCIATION APPROVED FOR CONSTRUCTION Cur.• 450 CU.YDS �� CAUTION.• .GRADING (425) CALL 2 B USINESS FILL• 5O CU.YDS• THE CONTRACTOR SHALL BE RESPONSIBLE FQR VERIFYING THE LOCATION, DIMENSION, AND Eng veers, BRIAN & CINDYISAACSON DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, 8Y Inc.3�6-2700 SW 1/4 SW 1/4 SECS T 27N R.4E W M LING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR 1 W.M. DAYS BEFORE C TROLING . THIS SHALL INCLUDE CALLING UTILITY LOCATE F }-800-424-55S AND CITY OF EDMONDS� WA '�J' (''� PROJECT APPROVAL (GRADING QUANTITIES ARE ROUGH CALCULATIONS WHICH � �} PO OLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS 1 0 U DIG i DATE i DO NOT ACCOUNT FOR SOIL SWELLING & SHRINKAGE)p 38764 �,4 T ALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES SURVEYORS o PLANNERS a ENGINEERS DWN. BY DATE REV. BY DATE PROJECT MANAGER SCALE BY.' 6Y: � J ST�rg• ti A5 SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND f� MS. AMY ROSS, PRESIDENT CITY ENGINEER DATE. ALL MATERIAL REMOVED FROM SITE SHALL BE HAULED TO A CITY s1OTAL ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL LAND USE CONSULTANTS VJT 02/28/07 11 JAJ 05113109 BARRY CONSTANT AS SHOWN APPROVED SITE. CONSULT WESTERN EhVNEERS, PC TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING C�VI L ENGINEERS a LAND SURVEYORS DWG. FILENAME CHK. BY ' F.B. N0. � JOB NO. SHT. NO. _ WITH CONSTRUCTION. *** 130D0 HWY 99 SOUTH * EVERETT * WA * 98204 *** � 06792aBASE.DWG N/A 06-792-A 2 OF 6 .. a THE TWELVE ELEMENTS OF CONSTR UCTION S WPPP SW 114, SW 114, SEC.5, T.27N., RAE., W.M. CITY OF EDMONDS, WASHEVGTON r TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES 1. ALL DISTURBED AREAS SUCH AS RETENTION FACILITIES, ROADWAY BACK -SLOPES, ETC. SHALL BE SEEDED WITH A PERENNIAL GROUND COVER GRASS TO MINIMIZE EROSION. GRASS SEEDING WILL BE DONE USING AN APPROVED HYDROSEEDER OR AS OTHERWISE APPROVED BY CITY OF EDMONDS. 2. TEMPORARY EROSIONISEDIMENTA71ON CONTROL FACILITY SHALL BE CONSTRUCTED PRIOR TO ANY GRADING OR EXTENSIVE LAND CLEARING IN ACCORDANCE WITH THE APPROVED TEMPORARY EROSION/SEDIMENTATION CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. J. ALL EARTH WORK SHALL BE PERFORMED IN ACCORDANCE WITH CITY STANDARDS. PRE -CONSTRUCTION SOILS INVESTIGATION MAY BE REQUIRED TO EVALUATE SOILS STABILITY. 4. IF CUT AND FILL SLOPES EXCEED A MAXIMUM OF TWO FEET HORIZONTAL TO ONE FOOT VERTICAL, A ROCK OR CONCRETE RETAINING WALL MAY BE REQUIRED. ALL ROCK RETAINING WALLS GREATER THAN FOUR (4) FEET IN HEIGHT ARE TO FOLLOW CITY SPECIFICATIONS AND TO BE DESIGNED AND CERTIFIED BY A CIVIL ENGINEER EXPERIENCED IN SOIL MECHANICS OR STRUCTURAL ENGINEER. 5. AREAS TO BE ROUGH -GRADED WITH FINISH GRADING TO FOLLOW NEAR PROJECT COMPLETION ARE TO BE SEEDED WITH ANNUAL, PERENNIAL OR HYBRID RYE GRASS. THIS INCLUDES PERIMETER DIKES AND THE SEDIMENT BASIN EMBANKMENT. HYDROSEED PREFERRED. 6. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION (CONSISTING OF RAPID, PERSISTENT AND LEGUME) WILL BE APPLIED. (MINIMUM 80# PER ACRE) THIS IS TO INCLUDE THE FOLLOWING: 20% ANNUAL, PERENNIAL OR HYBRID RYEGRASS 40% CREEPING RED FESCUE 40X WHITE CLOVER HYDROSEED PREFERRED. Z FERTILIZER: SHALL BE APPLIED AT 4001 PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE FEET) OR EQUIVALENT. 8. PREPARATION OF SURFACE: ALL AREAS TO BE SEEDED SHALL BE CULTIVATED TO THE SATISFACTION OF THE COUNTY INSPECTOR. THIS MAY BE ACCOMPLISHED BY DICING, RAKING, HARROWING OR OTHER ACCEPTABLE MEANS. 9. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED BY TEMPORARY SEEDING AND MULCHING, HYDROSEED PREFERRED. 10. WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. 11. THE SILTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE SUCH AS TO MEET MINIMUM COUNTY REQUIREMENTS. AS CONSTRUCTION PROGRESSES AND EXPECTED SEASONAL CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THIS PROPERTY. THEREFORE, DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AGGREGATE: BALLAST (WASH DOT STD.. SPEC. 9-03.9(1). ENTRANCE DIMENSIONS: THE AGGREGATE LAYER MUST BE AT LEAST 12 INCHES THICK. IT MUST EXTEND THE FULL WIDTH OF THE VEHICULAR INGRESS AND EGRESS AREA. THE LENGTH OF THE ENTRANCE MUST BE AT LEAST 100 FEET. PLACE GEOTEX77LE FABRIC UNDER ARMORED CONSTRUCTION ENTRANCES DURING THEIR CONSTRUCTION. MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAY OR ONTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 13. TEMPORARY SILTATION WILL BE REQUIRED. ONE METHOD OF CONSTRUCTION ACCEPTABLE TO THE CITY OF EDMONDS IS BY PLACING STRAW BALES ACROSS SWALES HELD BY TWO STAKES PER BALE. RIP -RAP SHALL BE USED ON BOTH SIDES OF BALES FOR EROSION CONTROL AS REQUIRED. 14. TEMPORARY EROSION SEDIMENTATION CONTROL FACILITIES SHALL BE CONSTRUCTED BY PLACING SILTATION CONTROL FILTERS AROUND SWALES (NATURAL OR MANMADE) AND SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT LAND CLEARING AND/OR CONSTRUCTION OF PERMANENT DRAINAGE FACILITIES ARE COMPLETED, OPERATIONAL AND THEN RETURNED TO ORIGINAL GROUND CONDITIONS. 15. CONSTRUCTION ACCEPTANCE WILL BE SUBJECT TO A WELL -ESTABLISHED GROUND COVER THAT FULFILLS THE REQUIREMENTS OF THE APPROVED CONSTRUCTION PLANS. 16. PROVIDE AND MAINTAIN THE TEMPORARY SEDIMENTATION COLLECTION FACILITY TO ENSURE SEDIMENT LADEN WATERS DO NOT ENTER THE NATURAL DRAINAGE SYSTEM. 1Z STRAW BALE BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL, CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED BALES, END RUNS AND UNDERCUTTING BENEATH BALES. NECESSARY REPAIRS TO BARRIERS OR REPLACEMENT OF BALES SHALL BE ACCOMPLISHED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL. THEY MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER, ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE STRAW BALE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 18. STANDARD APPROVED FILL PLACEMENT GUIDELINES SHALL BE FOLLOWED, INCLUDING: - VEGETATION AND TOP SOIL (ORGANIC) REMOVAL PRIOR TO ANY FILL PLACEMENT. - SCARIFICATION OF EXISTING NATIVE SOIL PRIOR TO FILL PLACEMENT - FILL PLACEMENT OF MAXIMUM THICKNESS OF 8" LOOSE LIFTS. - COMPACTIVE EFFORT AS REQUIRED TO ACHIEVE REQUIRED DENSIFICA7I0N. - FILL MATERIAL SHALL BE FREE OF DEBRIS (ORGANIC, RUBBLE, ETC.), BE RELATIVELY FREE DRAINING, HAVE A MAXIMUM PARTICLE SIZE OF 6 INCHES IN THE LARGEST DIMENSION, AND CONFORM TO SPECIFIC REQUIREMENTS OF THE GRADING PERMIT AND ENGINEERING CONSTRAINTS, 19. AFTER EACH LIFT HAS BEEN SPREAD EVENLY, IT SHALL BE COMPACTED TO A MINIMUM OF 95X OF MAXIMUM DENSITY DETERMINED IN ACCORDANCE WITH ASTM 698 (STANDARD PROCTOR.) OR BY GEOTECHNICAL REPORT RECOMMENDATIONS 20. THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE ACCOMPLISHED BY OVER -BUILDING THE SLOPES THEN CUTTING BACK TO FINAL GRADES, OR BY RUNNING THE COMPACTOR OVER THE SLOPE AS EACH FILL LIFT 1S BEING PLACED. ALL SLOPES SHALL BE COMPACTED BY THE END OF EACH WORK DAY. 21. FIELD DENSITY TESTS WILL BE MADE BY A QUALIFIED SOILS ENGINEERING FIRM. DENSITY TESTS SHALL BE TAKEN AT OR JUST BELOW THE SURFACE AT THE FREQUENCY AND AT LOCATIONS DETERMINED BY THE SOILS ENGINEERING FIRM. WHEN THE TESTS INDICATE THAT THE DENSITY OF ANY LAYER OF FILL OR PORTION THEREOF IS BELOW THE SPECIFIED DENSITY, THE PARTICULAR SECTION SHALL BE REWORKED UNTIL THE REQUIRED DENSITY HAS BEEN OBTAINED. 22. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING CONSTRUCTION. 23. A GRADING PERMIT ISSUED PURSUANT TO CHAPTER 33 OF THE UBC AND APPROVAL OF THE TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN SHALL HAVE BEEN OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS FOR ANY ON SITE GRADING WHICH IS NOT EXPRESSLY EXEMPTED BY SECTION 7003 UBC. 24. PRIOR TO ANY SITE CONSTRUC77ON TO INCLUDE CLEARING/LOGGING OR GRADING THE SITEILOT CLEARING LIMITS SHALL BE LOCATED AND FIELD IDENTIFIED BY THE PROJECT SURVEYOR/ENGINEER AS REQUIRED BY THESE PLANS. THE PROJECT SURVEYOR/ENGINEER'S NAME AND TELEPHONE NUMBER ARE: WESTERN ENGINEERS INC (425) 356-2700 25. PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL CONTACT THE INSPECTOR FOR LAND DEVELOPMENT DIVISION AT (425) 771-0220, TO SCHEDULE A PRE - CONSTRUCTION CONFERENCE. FIELD CHANGES (REVISIONS), NEED TO BE SUBMITTED AND APPROVED PRIOR TO IMPLEMENTATION IN THE FIELD. ENGINEERED AS-BUILTS SHALL BE REQUIRED PRIOR TO SITE APPROVAL. 26. THE OWNER IS RESPONSIBLE FOR ENSURING WATER QUALITY ON THE JOBSITE. PRIOR TO COMMENCEMENT OF SITE WORK, THE OWNER SHALL PROVIDE DOCUMENTATION THAT A QUALIFIED WATER QUALITY SPECIALIST HAS BEEN RETAINED FOR THE PURPOSE OF PROVIDING WATER QUALITY MONITORING DURING CONSTRUCTION. A CONTACT PERSON, ON CALL 24 HOURS A DAY, SHALL RE IMPFIED FOR RAPID RESPONSE TO WATER QUALITY EMFRGl PES PRIOR TO CONSTRUCTION, 1. CLEARING LIMITS: THE CLEARING LIMITS ARE INDICATED ON THE PLAN SHEET. FURTHERMORE, CLEARING AND GRADING WILL BE LIMITED TO ONLY AREAS THAT NEED TO BE DISTURBED FOR GRADING/CONSTRUCTION. FIELD MARKING THE CLEARING LIMITS SHALL BE COMPLETED PRIOR TO CLEARING AND GRADING ACTIVITIES. BMP'S: PRESERVE NATURAL VEGETATION (VEG) FIELD MARKING CLEARING LIMITS (CO 2. ACCESS TO THE CONSTRUCTION SITE SHALL BE LIMITED TO THE ROCK CONSTRUCTION ENTRANCES. THE CONSTRUCTION ENTRANCES SHALL BE EXTENDED TO PROVIDE ACCESS TO THE CONSTRUCTION VEHICLE/EQUIPMENT STAGING AND EMPLOYEE PARKING AREAS. BMP'S. STABILIZED CONSTRUCTION ENTRANCE (CE) 3. STORM WATER DETENTION: NOT REQUIRED. 4. SEDIMENT CONTROL WILL BE PROVIDED WITH SILT FENCE AND/OR ROCK CHECK DAMS LOCATED ALONG THE DOWN SLOPE OF THE CONSTRUCTION ACTIVITY TEMPORARY SEDIMENT POND(S) WILL BE UTILIZED AND RUNOFF WILL BE DIRECTED TO THE VEGETATED LAWN AREA ON THE SHORT PLAT. BMP'S: SILT FENCE (SF) ROCK CHECK DAMS (RCD) STRAW BALES CATCH BASIN INSERTS 5. TEMPORARY AND PERMANENT SOIL STABILIZATION WILL BE PROVIDED. TEMPORARY STABILIZATION WILL BE PROVIDED THROUGH THE APPLICATION OF STRAW AND/OR PLASTIC SHEETING TO EXPOSED, WORKED EARTH. STABILIZE EXPOSED SOIL WITHIN TIME FRAMES INDICATED IN WET WEATHER NOTES ON THIS SHEET. PERMANENT SOIL STABILIZATION SHALL CONSIST OF ESTABLISHING VEGETATION BY SEEDING OR PLANTING. BMP'S: STRAW COVERING PLASTIC SHEETING HYDROSEEDING 6. SLOPES SHALL BE PROTECTED FROM EROSION THROUGH COVER AND PREVENTION OF CONCENTRATED SURFACE RUNOFF FLOWS. BMP'S: STRAW COVERING PLASTIC SHEETING INTERCEPTOR SWALES DISPERSION TRENCH Z INLET PROTECTION SHALL BE INSTALLED IN ALL CATCH BASINS AND REMAIN UNTIL CONSTRUCTION OF ALL THE RESIDENCES WITHIN THE DEVELOPMENT HAS BEEN COMPLETED. NO UNFILTERED STORM WATER SHALL BE ALLOWED TO ENTER THE CLOSED CONVEYANCE SYSTEM. INLET PROTECTION SHALL BE INSPECTED REGULARLY AND THE FILTER FABRIC CLEANED/REPLACED AS NECESSARY. WHEN PROVIDING MAINTENANCE TO THE INLET PROTECTION, THE FABRIC SHALL BE REMOVED IN SUCH A WAY AS TO NOT ALLOW THE RETAINED SEDIMENT TO FALL INTO THE CATCH BASIN. BMP'S: INLET PROTECTION (IP) 8. ALL CHANNEL SLOPES SHALL BE CONSTRUCTED AND PROTECTED AGAINST EROSION IN ACCORDANCE WITH SNOHOMISH COUNTY ED.D.S. BMP'S: RIP RAP (QUARRY SPALLS) STRAW BALES 9. POLLUTANTS SHALL BE CONTROLLED AS DESCRIBED IN THE POLLUTANTS SECTION OF THIS SWPPP. 10. DE -WATERING: INTERCEPTION OF THE WATER TABLE IS NOT EXPECTED TO OCCUR. HOWEVER, SHOULD GROUND WATER FLOWS BE ENCOUNTERED, THE FLOWS CAN BE DIRECTED TO THE INTERCEPTOR SWALES AND CONVEYED TO THE VEGETATED FLOW PATH. BMP'S: INTERCEPTOR SWALES 11. ALL BMP'S AND SWPP ELEMENTS SHALL BE INSPECTED DAILY AND MAINTAINED AS REQUIRED. 12. PROJECT MANAGEMENT- THE PROJECT SHALL BE MANAGED IN A COOPERATIVE EFFORT BY THE PROJECT MANAGER, CONTRACTOR, ENGINEER AND THE CITY INSPECTOR. DURING THE CONSTRUCTION PROCESS, IF UNFORESEEN ISSUES ARISE THAT CANNOT BE RESOLVED ON SITE, CONSTRUCTION ACTIVITY (OTHER THAN SWPPP MAINTENANCE) SHALL BE HALTED AND THE COUNTY INSPECTOR AND THE PROJECT ENGINEER ARE TO BE CONTACTED AND INFORMED OF THE SITUATION. SUP RISK ASSESSMENT DECISION MATRIX LOW AND. HIGH VERYHIGH WINTER GRADING NO NO OR YES MAYBE REQURES NOT ALLOWED PROPOSED LEVEL 111 AREA DISTURBER LE1�'SA� 1 TO 5 ACRES 5 TO 20 ACRES MORE THAN 20 ACRES AVERAGE MORE THAN 8% BUT SLOPE AVERAGE LESS AVERAGE MORE THAN 8q BUT LESS THAN 157. NO SLOPE AVERAGE MORE TNAN 15X THAN 8% ALL AREAS ARE LESS THAN 15% GREATER THAN 33% SOIL EROSIO, LOW LOW MEDIUM HAZARD SCS SOIL TYPE A A OR B TYPE TC HIGH TYPE D (PER APPENDIX 'A' Pa-3044) (PERMEABLE SOIL) CRI17CAL AREAS GREA TER THAN GREATER THAN LESS THAN 114 MILE LESS THAN 114 MILE DOWNSTREAM OF 114 MILE 114 MILE FLOWS DIRECTLY TO ESA DISCHARGE POINT LEVEL SWPP REQUIRED LEVEL 1 LEVEL 11 LEVEL 111 LEVEL IN 1" REBAR FOR BAG REMOVAL FROM INLET DUMP STRAP LEVEL BOTTOM 1 FIT. MIN. GRASS OR ROCK 7SR%�l JS I 2' MIN. TEMPORARYINTERCEPTOR TRENCHSECTION NOT TO SCALE FILL SETBACK = H12 CUT SETBACK = H15 FILTER FABRIC MATER14L 2" x 4" DOUGLAS 2" x 2" x 14 GA. WWF FIR OR EQUAL PROVIDE 3/4" - 1-1/2" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OF FILTER FENCE FABRIC ON THE SURFACE NOTE PLACE 12" OF 3/4" - 1-112' WASHED ROCK OR PEA GRAVEL ON BOTH SIDES OF THE FENCE TO CREATE A BEVEL SHAPE. FABRIC SHALL COVER BOTTOM of 9" x 12" TRENCH AND EXTEND BEYOND THE LIMITS OF. THE GRAVEL IN ORDER TO MAINTAIN AN EXCESS OVERLAP OF 2" MINIMUM AS SHOWN. OPENING;: EQUAL TO SILT FENCING USDA SIEVE SIZE 70 F WIRE MESH BACKING R II it II 2' MIN GRADING SLOPE SETBACK DETAIL NO SCALE CATCHBASININSERT NOT TA SCALE FOAM EACH IMP STRAPS <PANSION RESTRAINT 14" NYLON ROPE, " FLAT WASHERS) ., , 11 co T 0 i N so II II II It � N u u u u BURY BOTTOM OF MATERIAL 4'-0" TYP. IN 8",x 12" TRENCH 6'-0" MAX. SILTFENCEDETAIL: NOT TO SCALE L = THE DISTANCE SUCH THAT 0 0 POINTS 'A AND B ARE 0 0 0 0 0 0° �' 0 0 EQUAL ELEVATION 0 00 FLOW O 0 d 2 1 0 0 0 0 0 Oo 0 ROCK CHECK DAM ROCK CHECK DAM NOT TO SCALE BLD20070833 BLD20070834 y�Pfffflj'Ik 4" CRUSHED (WASHED) ROCK COMPACTED SUB -GRADE PATH DETAIL s ,0 GENERAL NOTES: 1. LOCATION OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCAIION(S) OF ALL THE UTILITIES AND IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE SW 1149 SW 114, SECS, T,27N., R.4E., W.M. CITY OF EDMONDS, WASHINGTON !I� 2. ALL CONSTRUCTION SHALL CONFIRM TO THE CURRENT EDITION OF WSDOT'S "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS SITE. 3. ALL CONSTRUCTION IS SUBJECT TO INSPECTION BY THE CITY OF EDMONDS. THE CONTRACTOR SHALL CALL THE ENGINEERING INSPECTOR LINE (425-771-0220 EXT. 1326) TO SET UP A PRECONSTRUC77ON MEETING ANS SHALL CALL 24 HOURS IN ADVANCE FOR ALL INSPECTIONS. 4. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHALL BE SUBJECT TO THE INSPECTION OF THE CITY ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION AND COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL FOR SITE EROSION HAS PASSED. Z ALL STORM SEWER PIPE SHALL BE CONCRETE (CP), NON -REINFORCED, ASTM C-14: CORRUGATED METAL 14 GA. GALVANIZED, ASPHALT COATED TREATMENT 1 OR BETTER, MEETING AASHTO M036: CORRUGATED ALUMINUM, 12 GA., 3"x1" CORR. (OR PVC ASTM D-3034) EXCEPT AS NOTED. 8. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 9. ALL ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, 10. ALL ROOF DRAIN STUDS SHALL BE MARKED WITH A 2x4 POST SHOAMNG DEPTH AND MARKED "DRAIN". 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR VANED GRATES. 12. ALL TYPE II CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS OUTSIDE OF THE PUBLIC RIW SHALL HAVE LOCKING LIDS OR GRATES 13. STANDARD LADDER STEPS SHALL BE PROVIDED IN THE CATCH BASIN MANHOLES EXCEEDING 5 FEET DEEP IN INVERT ELEVATION. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 9595 OF MAXIMUM DENSITY BY STANDARD PROCTOR TEST (ASTM 698). 15. UTILITY TRENCH BACKFILLS SHALL BE COMPACTED TO 95X RELATIVE COMPACTION UNDER ROADWAYS AND 90.°R; OUTSIDE ROADWAYS. 16. STORMWATER DETENTIONIRETEN71ON FACILITIES MUST BR FLUSHED AND CLEANED PRIOR TO ACCEPTANCE I Z TEMPORARY SEDIMENTATION AND EROSION CONTROLS SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION. TYPICAL METHODS SHALL INCLUDE A TEMP. ROCK CONSTRUCTION ENTRANCE, CHANNELS FOR SURFACE RUNOFF, HAY BALES, SILT FENCE OR OTHER CONVENTIONAL METHODS. 18. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERENNIAL GRASSES PROMPTLY UPON COMPLE77ON OF GRADING. 19. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATE JUST PRIOR TO PAVING. 20. IN THE EVENT THAT FIELD CONDITIONS DIFFER FROM INFORMATION PRESENTED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO CONSTRUCTION OF THE CONTESTED ITEM. PIPESPECIFICATIONS• PLACEMENT REQUIREMENTS FOR CULVERTS AND STORM SEWER INSTALLATION SHALL BE AS INDICATED IN THE WSDOT/APWA SPECIFICATIONS SECTIONS 7-02 AND Z04, RESPECTIVELY, THE CITY OF EDMONDS STANDARDS, AND AASHTO SPECIFICATIONS. PIPE MATERIALS SHALL COMPLY WITH SECTION 9-05 OF THE WSDOT/APWA SPECIFICATIONS WITH THE FOLLOWING CLARIFICATIONS: 1. DOUBLE WALLED (SMOOTH INTERIOR) CORRUGATED POLYETHYLENE PIPE, MEETING THE REQUIREMENTS OF AASHTO M 252 IN 8 INCH SIZE AND AASHTO M 294S IN SIZES 12" THROUGH 36", IS AN ACCEPTABLE ALTERNATIVE FOR SCHEDULE A CULVERT PIPE, AS SHOWN ON WSDOT/APWA STANDARD PLAN 8-17 AND FOR STORM SEWERS IN ACCORDANCE WITH THESE STANDARDS. THE ENDS OF THE PIPE SHALL BE BEVELED TO MATCH THE SLOPE. CORRUGATED POLYETHYLENE PIPE SHALL NOT BE USED WHEN BEVELED SLOPES ARE FLATTER THAN 4: 1. FOR, ANY PIPE LENGTH SECTION THAT IS TO BE BEVELED ON THE END, THE MINIMUM LENGTH OF THE UNSEVELED PORTION OF THE PIPE SHALL BE 6 FEET. THE PIPE SHALL BE INSTALLED IN A DESIGN A TRENCH AS SHOWN ON STANDARD DRAWING 9-210. 2' MINIMUM COVER IS REQUIRED FOR BURIAL UNDER PAVED SURFACES, FOR BURIAL DEPTHS EXCEEDING 15 FEET, THE PIPE SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND THESE STANDARDS. 2. IN PRIVATE DEVELOPMENTS, THE USE OF NON -SMOOTH INTERIOR CORRUGATED POLYETHYLENE (AASHTO M-294, TYPE "C") CAN ONLY BE USED FOR FOOTING DRAINS. ACCEPTANCE ALTERNATIVES FOR STORM PIPE LABELED AS ADS N-12: -REINFORCED CONCRETE PIPE. -CORRUGATED HIGH DENSITY POLYETHYLENE PIPE (CPEP) -SMOOTH INTERIOR (SEE NOTE 1). -HIGH DENSITY POLYETHYLENE PIPE (HDPP). 3. MATERIALS AND SPECIFICATIONS ALL STEEL PIPES, CULVERTS, TANKS AND OTHER STEEL PARTS OF ANY STORM DRAINAGE SYSTEM SHALL BE GALVANIZED AND HAVE A TREATMENT 1 ASPHALT COATING OR BETTER AS SPECIFIED IN THE WSDOT STANDARD SPECIFICATIONS SECTION 9-05.4(3). NOTE: ALUMINUM AND CONCRETE PIPES AND STRUCTURES DO NOT REQUIRE A TREATMENT 1 COATING. (EDDS INT 5-06 g 2] DRAINAGE NOTES: 1.) FIELD VERIFY EXISTING DRAINAGE CONDITIONS CB194 AND C8195 (WITH PIPES) DISPLACED AND NON-FUNCTIONING. Z) STAND PIPES ARE CLEAN OUTS FOR FRENCH DRAIN SYSTEM INSTALLED DURING LID 210. 3.) DAMAGED DRAINAGE PIPES AND STRUCTURES WILL BE ABANDONED AND REMOVED. 4.) STRUCTURES THAT EXIST AND IN USABLE CONDITIONS SHALL BE UTILIZED. 5,) ADAPT SURFACE DRAINAGE CHANNELS TO FLOW INTO STRUCTURES WHEN POSSIBLE OR USE COLLECTOR TRAYS- SEE DETAIL. 6.) MAINTAIN POSITIVE SLOPE ON ALL DRAIN PIPES (NO LOOPS TO COLLECT SILT OR SAND) Z) ALL PIPES SHOWN ON PLAN SHALL BE ON THE SURFACE- NO BURIED PIPES 8.1 PIPES SHALL BE ANCHORED IN PLACE TO PREVENT MOVEMENT 1.) ROOF TOP DOWNSPOUT CLEAN -OUTS (TYP) CONNECTIONS TO TYPICAL DOWNSPOUT AT EACH CLEAN-OUTT, 2.) SLOPE SYSTEM TO DRAIN. 3.) 4"0 PVC (TYPICAL) 4.) FOOTING DRAINS SHALL NOT BE DIRECTLY CONNECTED TO DOWNSPOUT DRAINS -(SEE GEOTECHNICAL LETTER FROM TERRA ASSOCATES). SCALE: 1" = 20' 0 20 40 \ _ - -- - - ------ _ _ \ ------ -MOVABLE COL CIOR 1Tt4YS WRN HD>zE -_= _ 1\,F \. ',- \_ \ \ - - --- - - _. PIPE ATTACHED CONNECTING 700 ` ` , �` _ _ 240- -- IN INI ` \ \ \ \` \ \'- - ----- ------- - -- - - - - _ - NEAREST DOWNSLOPE YARD DRAIN e F IN APPROXIMAI'E\LOCAITON _ - -- ----_----- ---_____----- _- \ \ IN \\ --------------------22' _--- `�;� -OF EX. LOG. CONTRACTOR-----__- -----------__:__--_ _ -- - -230- - \\\ -------- - --- _ _ -- - - To VERIFY - ------ -------------- \ \ \♦--------------- 8" A.__ \ - `�_ \ MINOR SURFACE FLOWS \ --------------- ---- - ------ \\\ \\,-\-- ____--____-_\' ©-"p,QS-\\\\ .® \ VI, \\\ \\ `------------20---\ _ \\\\\ \\ \`\ ` -- ...- - -.. ------..'_-♦`\♦♦♦\♦\♦♦\♦ \ ``♦`♦ ♦♦- _.- -- �- ----------------- \�` -- ------------------- \\♦\ ' \; ♦ ;SLOPE♦SURFACE CHANNELS.---------- -__---__-----------___- IN IN\ ------------- -_ _ TO LOWPOINT AND INSTALL ------------------------ ``-- - - - - - \ \ \ - \♦\ \; ♦ 'COLLECTOR PAN _---------------------- ---___ \ \ - - - - - -- -- \ _ \ \ \ ' �\\ \' \ \ _ - _ \ \ \ \ \ -LID-210 DRAINAGE SYSTEM EAST OF CB HAS BEEN \ \ IN, \ ` �' \ >>p ` \ \ \ \ �' DESTROYED BY A LAND SLIDE (EXACT DATE UNKNOWN) IN IIN \ IN \\\ I\ STAND PIPES_ \ \\ ------ -- II \ \ \ - PROVIDE ANCHORS ON SLOPE \ _ \ \ N\ \ - _ _ _ _ _ _ - - - - - - - - - - _ _ • \ TO SUPPORT PIPING \ \` \ STAND PIPE - -TREES NOT SHOWN WITHIN CLEARING LI ITS HAVE BEEN - \ \ - ' - - - - LOOPS OR LOW POINTS ' - - _ ` . ` 12 q` _ ` : ` - - - - - -REMOVED PER TREE CLEARING PERMIT CU-06-104 AND-- IN,ALLOWED IN PIPELINES (11'P) \ KNOWN LANDSIDE/DEBRIS FLOW AREA - _ _ _ _ ,,E UOW REMOVE AND REPLACE UNDER \ \ \\ \ \ \\\ ` ♦�'16 M_-----_-__---__----24"COLLECTOR - ` - \ _-- \ \ `- \ - -- CB#921SDMH#9----_- -ID 210 - - - \ \ CB#99/SDMH#6 - - \ \ \ \ -178 -OR REAKM) - - - - - - - - - \ ,----�- \ \ ,-- \ \---------176------------.----- ---------------- \ \ DB#1-24°O , o \ _ _ _ _ - - \ - _ ` �� ' - - \ PROVIDE ANCHORS ON SLOPE TO SUPPORT ".-174 - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . --=� SEE DETAIL- \ -_ - - _k \ \ IN PIPING - NO LOOP -'-'-- - S OR LOW POINTS -172- \ \ \ - `OH SHEET 5 \ _ - • ALLOWED W PI EUNES (DP) ------ IN - - - - 7p- - - -' - \ \� \ \ - _ _ I-,- \``` _ \ _(PROPOSED_ WALL` - \ \ , - - _---_--_ ---------------- 1 IN 1160 \ --- _ \ - _ ---- - - - - - - i66- _ \\� \ _ _------------ \ _ \ -- 1 r� \ `_ _ \\ \\ IN, \-- ---------------16+----_- \ \ - _ - �--10' SETBACK _ _ \'\\'0\ N - - - _ _ _ ------------- --------------- `� \ \\ \� RIM=119.95 4�, 1 `�- ; ` \\\\ ---_ , ; ` \ \\\ EXACT LOCATION UNKNOWN ,._____------ - - - - - - - - - ` ' 1 E _12" CMF S)=115.73 26LF 8 0 SD _ �^ ` - - \ CONTRACTOR TO VERIFY ' _ _ _ - - - _ _ _ _ _ ` _ _ _ 1n \ \ \ \ ``` IE 12" CMP (NW)=115.67'- �(J Z` -r`T\ \ z46---- ---- i - _---------- ----- --------------- 'IN---____-- SLOPE ANCHORS FOR PIPES - \ '-- ----- _---------'----- 1 _ I •144----1- - ' \DB#3-24" --- ---- �. REQUIRED IF GREATER THAN l� LOT i \ \ _ - - _ _ - - - - - - - - - - - - - - `\ _ - - 20X_ _S_LOPE ON PIPE. - _ _ ( \ ` - - - _SEE HEET\ - - - _ _ 5,897SF J \ 142------ ----- ^ `ON�HEET'S\ ----------- \\ PHONE/N/PUD_ _ '- __ 26 C -_ (0.14 ACRES) 14p� // -- - W \ "-------- ` „ \ \ \ \ TEMPORARY S KPILt: PEA` \ \ R M=1'1y.z3D `' - - , \` ` _ /� _ _ _ \ ` - _ 13 1 -I - - - _ " \ \ ` - - - - O Urr OF_€MERNDS TH?ROYAL. \ \ \ \ . MONTHS ONLY, \ - -IE 12" CMP (W)--14 9.12 - DB#1 24"P1 / L 8 _ - - - - - L - - _ 53LF 8 M SD \ 50 \C�YDS MAX) \ _ - - - - - - - - - \ RIM-136.Of _ - - - - = -j , - - - -�- - , S=0.191 \ \ \ \ \ IE=134.0 _��- -=--136---------- E.` 4#8♦ �" H \ W RIM=13296 \ EX. SDMH - �Q ` 9B(r O�F�YjpU p 33LF •8" OSa _ L - _ _ _'\ _ IE 12 "CMP(SW)'�--12`, 96" - _ RIM=120.67 G _ _ _ - �? oclvlo S; _ _ / S-0.410 14" R - , _ , IE'-12"CMP(S)=127.82� \ IE 24' CMP E=114.82 _ SD Q -----------:----------- _ IE 24' CMP (W)=114.77�` _14-- I� ` IE 12"CMP(IV,�=127.82 \` j2"\Pi --- -_ IE 12" CMP (S)=114.82 EX. SSMH -SMALL RETAINING WALLS, 1'-5' TALL TO SUPPORT CONCRETE STEPS TO FRONT DOOR. -SMALL FILL BODY UNDER STEPS, SEE GEOTECH REPORT - SEE ARCHITECT DRAWINGS FAIR DETAILS. -LANDSCAPE PLANTER IN OPEN AREA BETWEEN WALLS. -STEPS NOT SHOWN FOR CLARITY. -SEE STRUCTURAL ENGINEERING DR4041G. FOR SPECIFICATIONS OF STEPS/RETAINING WALLS. -MINOR FEATHER FILLS AT RETAINING WALL. EDGES (LESS THAN 1-FOOT) TO GRADE OUT SURFACE AS NECESSARY 1, IN IN, \ ------------- \ IN.\ �l?H�IV�TV%PU p � N ------ -� S \\ It 4 AHS(S)=129.13 \.-�-` IE 12"CMP(NE)=128.17 I SIE 6"PVC(SW)=127.46 IEZOMMR \ P � \ SS \ \ MONITORING,,`\ \ LOCATION G ZZ \ EX. CB \ RIM=131.91 \ IE 6" PVC�NE)=129.88 BLD20070833 BLD20070834 LEGEND u 0 -b- -O- E - El IIT a 0 0 XXP XXH XXR XXF XXM XXCH F L--J ------------------- SS SD SD G W CENTERLINE WESTERN ENGINEERS PER PLAT OF PROPOSED STORM DRAIN CATCH BASIN (CB) EXISTING STORM DR41N CATCH BASIN (CB) PROPOSED STORM DRAIN BASIN STORM DRAIN MANHOLE (SDMH) STORM DRAIN CULVERT INLET SANITARY SEWER MANHOLE (SSMH) FIRE HYDRANT POWER POLE UTILITY POLE ANCHOR ELECTRIC JUNCTION BOX TELEPHONE PEDESTAL METAL SIGN POST WOOD SIGN POST MAIL BOX CONIFEROUS TREE DECIDUOUS TREE PINE TREES OF XX DIAMETER HEMLOCK TREES OF XX DIAMETER REDWOOD TREES OF XX DIAMETER FIR TREES OF XX DIAMETER MAPLE TREES OF XX DIAMETER CHERRY TREES OF XX DIAMETER BUILDINGS TO REMAIN EXISTING CONCRETE CONCEPTUAL. BUILDING FOOOTPRINT PROPOSED PAVING EXISTING ROCKERY EXISTING CONCRETE RETAINING WALL PROPERTY LINE RIGHT OF WAY INDEX CONTOURS CONTOURS EDGE OF PAVEMENT EXISTING SANITARY SEWER PROPOSED STORM DRAIN EXISTING STORM DRAIN EXISTING GAS EXISTING WATER ROW CENTER LINE ....,. LEGEND % CENTERLINE -O- POWER POLE BUILDINGS TO REMAIN C.O. CLEANOUT E- UTILITY POLE ANCHOR EXISTING CONCRETE D.S. DOWNSPOUT II METAL SIGN POST a (�l) WESTERN ENGINEERS n WOOD SIGN POST F L CONCEPTUAL BUILDING FOOOTPRINT o MAIL BOX - - (P) PER PLAT OF CONIFEROUS TREE „ PROPOSED PAVING ❑ EXISTING STORM DRAIN CATCH BASIN (CB) DECIDUOUS TREE EXISTING ROCKERY p PROPOSED STORM DRAIN CATCH BASIN (CB) XXP PINE TREES OF XX DIAMETER ummmomMalmmm EXISTING CONCRETE RETAINING WALL Q STORM DRAIN MANHOLE (SDMH) XXH HEMLOCK TREES OF XX DIAMETER PROPERTY LINE u STORM DRAIN CULVERT INLET XXR REDWOOD TREES OF XX DIAMETER - - RIGHT OF WAY ✓�.� PROPOSED DRAINAGE FLOW ARROW XXF FIR TREES OF XX DIAMETER - - - - - - -- - - - - - - - - - - - - - - -- - INDEX CONTOURS CONTOURS 0 SANITARY SEWER MANHOLE (SSMH) XXM MAPLE TREES OF XX DIAMETER Z// //// //// //// //// EDGE OF PAVEMENT XXCH CHERRY TREES OF XX DIAMETER -b- FIRE HYDRANT SS EXISTING SANITARY SEWER SD EXISTING STORM DRAIN - ROW CENTER LINE SW 114, SW 114, SECS, T.27N., R.4E., W.M. CITY OFEDMONDS, WASHINGTON 1-1 --------- \ \ \ .` `. \ \ III\ \\\ '`---- \ IN \\ -----' _ - \\\ \\ UPPER SLOPE \\ 11 \ \ ---------- - \ \ \ \ DRAINAGE IN, \ -------------- IE-139.5 -ISO` ` - - - _ _ IN, IN IN --------- --- ---- -- - If _ SEE ARCHITECTS DRAWINGS ��� - - I� SEE ARCHITECTS DRAWINGS _ _ _ _ \ ' _ - _ Sy�}Q11 FOR EDGE OF PATIO DETAILS _ _ `, _ _ , _ _ _ „ FOR EDGE OF PATIO DETAILS 0DB#1-24"0 - - - - - - - - _ \ 40, ` ` RIM-142.00 D.S \ - _ IE-139.00 NIN ' 26LF s 0SO ---144-------- ------ -- - __ D.S r - SLOPE ANCHORS FOR PIPES ' - - (' REQUIRED IF GREATER THAN _ l- 1 4 I - / \� - 20X SLOPE ON PIPE 1 C.O. AT FOUNDATION STEP 2 - - - - - ' - / I740 SEE DETAIL, SHEET fi ' USE 2-45' ANGLES AT EVERY INSIDE OR _ _ , DB#2 - 24110- / OUTSIDE CORNIER -1 HORIZONTAL OR VERTICAL, _ RIM-134.00 /D.S. -, ( NO 90' BENQS ALLdWWED (TYP). _ IE=131.00 I FOOTING DRAIN---- `38 _ - L - - - - - - ` ' If -�, I� - ----- 36------------------ - _ 10' 10,S , Y'° `--------' - �oa `' Wiz`!.! Gi•OF/ Sy� / ``` IN- _ ----�� 4------------- }_ - C01,TYPE I ' OUTSIDE EDGE _ _ RIM=124.5f - OF FOUNDATION ( S5(A- IE-120`48 C.O.(TYP) SD SD � FOOTING ,DRAIN S*D.O j� _ - - _ ------ 2------ - - So FOOTING DRAINROO X 12,r0 + _ JFfdIRi.�PIP�' {ka 11 ♦.' ``` __ yr f ( - i .i f ` `J (� 7 5' ri F dYyyi .F'1. i , 1� G �D ifto 0789 SD SD G SD - - _`FOOTING DRAIN,ti,�s _ SC SD tAS NECESSARY -5D SLt r SD D S C S - ?9LF �- - - - `k '7 t r > ,.-+SD r' - - - - - - -- - - - - - - - W " 0 4D "O S tQ S�.O D45 \ c 4 SD SD �, w , , @@QQ }(I�� 1 c� SD - 12 d 8,O4,q t, ?'A S1 x�Jf t{ t'ja 1 .SNP 1 , ( i ht� K Y�t�f ) t7 , ( h37� ,7D� �` G S -� h !� E S k.. t3 < EX. SDMH#A P S � W (PRI SD ss w V� 3 NEW CB r SS \ W RIM 128.0 (MATCH TO OX --- G \ �•i b� BELOW DRIVEWAY GRADE) SS IE(N)=124.95 12" G SS IE(S)-124.95 12" G \ S % IE(E)-125.45 6" (/ / S - SOOTING DRAIN GENERAL NOTES: PIPE INFORMATION NOTE: 1.) SEE GEOTECHNICAL REPORT - RECOMMENDATIONS TAKE 1.) ALL PIPE SHALL BE SCH 40 PVC - 4" 0 OR EQUAL PRECEDENCE OVER NOTES BELOW. EXCEPT AS SPECIFIED AS BELOW. 2.) FOOTING DRAIN LAYOUT SCHEMATIC. CONTRACTOR SHALL 2.) NO MIXING OF PIPE MATERIALS ALLOWED IN PIPE INSTALL DRAIN ADJACENT TO FOOTINGS PER DETAIL ON SHEET RUNS. 6. 3.). ALL PA T10 DRAINS - ZURN ZS405BS ROUND "TYPE 3.) INSTALL 4" 0 PERFORATED PIPE AT LOWEST LEVEL OF SS" STRAINER SLOTED OPENINGS - 4" 0 OR EQUAL - FOOTINGS DETAIL ON SHEET 6. 4.) BED PERFORATED PIPE IN WASHED ROUND ROCK 1/2" - 4.) ALL PATIO DRAINAGE UNDER SLAB PVC PIPE - SCH. 1" DIA. AT LEAST 9" DEPTH AROUND PIPE. 80 - 4" 0 5.) OUTLET SHALL DAYLIGHT IN CITY APPROVED LOCATION OR 5.) ALL C.O. - PVC SCH. 40 - 4" 0 BE DIRECTED INTO CONVEYANCE SYSTEM. 6.) SLOPE PATIO SURFACES 2X TO DRAINS (MIN.) 6.) NO CONNECTION ALLOWED BETWEEN FOOTING DRAINS AND ROOF TOP DOWNSPOUTS. Y.) ADD F'bt�riNt; DRAINS BY t✓ONr;l7E"1'7= S11=1�5/'1'7�i�A1NING L�Q��� WOODS ����1 CITY ©F�D�©ND�' WALLS TIE INTO EXISTING CB AT ROADWAY. rJ11 AIL C'('�l'Ti1 TMA1 APPROVEDFOR CONSTRUCTION ,,•� h 1¢� _ G'f;UT I)- CATCHMENT WALL FOOTING DRAINS 1.) SEE GEOTECH REPORT FOR WALL DRAIN RECOMMENDATIONS. 2.) INSTALL ON UPPER AND LOWER PORTIONS (LOWER AT A MINIMUM). 3.) 4"0 PERFORATED PIPE IN WASHED ROCK. 4.) SEPARATE OUTLETS INTO CATCH BASIN REQUIRED (TYP). 5.) SLOPE ALL DRAINAGE PIPE TO DRAIN TO YARD DRAINS - BASED ON FINAL ELEVATIONS AT WALL. 6.) ADJUST RIMS ON ALL CLEANOUTS TO GRADE PLUS 6". 4 p ict rVR "AU UMNO - - - - - - _ _ -(SEE GEOTECH REPORT) SD SCALE: 1" = 10' 0 10 20 --------- - - - -- SD _ CB NZ/ SDMH#9 - ------- PPEFT,SLOP�E \ ------------ CB193/SDMH16� ------- -_ - DRAINAGE, \ -- :K nu HOLE - _ - _ \ \ \ \ \ 5�--'------- SHED CLEAN SPALLS (4 .o. IN _ INSTALL ROCK AROUND- \ \ 'OUTLET OF FRENCH DRAIN. 'INSTALL TO CATCHMENT FOOTING DRAIN ELEVATION.-, (SLOT GRAVEL TRENCH - SEE DETAIL ONSHEET6). \\______________ -1'1LF S-0.045 - maw) IN IN \ Ct0(Typ)--------------- IE=13AO f \-----_____ CONTRACTOR TO INVESTIGATE LOCATION OF FRENCH DRAIN OUTLET - CONNECT TO DBA EXTEND PIPE USING SIMILAR MATERIALS- / \ . OR DEPENDENT ON EXISTING SITE CONDITION - REPLACE PIPE WITH 'FUSE WELDED 2" I.D. - HOPE FROM- / CB192ISDMH19 TO D8/3. SURFACE RUN PIPE TO DB13 USING SLOPE ANCHORS. / DB#3-24"0 ---- ,. RIM=142.00 (ABOVE GRADE) - - - - _ IE=IJZOO ',INSTALL D8 13 IN -LINE WITH 8" CMP \ _ - - - - - - - D.S. e. FROM SDMH19 (IF POSSIBLE). EXTEND \ ' 8"0 PIPE AS NECESSARY. 1` PEE -DETAIL - SHEET 6) \ \ S=0,19 i \ D.S. SD SD SD \ SD SD�LF 12"0 SD 0 S� .040 W \ \ SD w �-sD S D EX. SDMH#A VISITING P1 SS G \ w ` SS \ \ W G SS / G W G \` SS W Ss DRAINAGE NOTES: 1.) UNDERGROUND RUNOFF COLLECTION SYSTEM FOR ROOFTOP DOWNSPOUTS IS SCHEMATIC - UNLESS INVERT AND PIPE SLOPE SHOWN IN DRAWINGS 2.) INSTALL ALL DRAINS WITH POSITIVE SLOPE TO DRAIN BY GRAVITY 3.) BURY ALL ROOFTOP COLLECTOR PIPES WITH AT LEAST 12" COVER. (MIN.) OVER PIPE. 4..) SEE GEOTECH REPORT FOR DETAILS. 5..) CONSULTANTS INTENTIONS ARE TO CONNECT REMAINING LID-210A SYSTEM TO PROPOSED DRAINAGE SYSTEM. CONNECT FRENCH DRAINS INTO SYSTEM ABOVE BY SLOT TRENCH DRAINS - SEE GEOTECH REPORT. BLD20070833 BLD20070834 SW 114, SW 114, SEC. 5, T.27N., R.4E., W.M. CITY OF EDMONDS, WASHINGTON #5 EPDXY —COATED REBAR OR EQUAL - STAINLESS STEEL TIE WIRE. WRAP 3 TIMES. AROUND BOTH BARS AND TIE OFF WITH A MINIMUM OF 4 FULL TWISTS OF THE WIRE Q—OUT TO --r DO 11 OR 12. l '-O" MIN. UNDISTURBED GROUND SURFACE DPE PIPE )TES: PROVIDE PIPE ANCHORS WHEN SLOPES EXCEED 20% SPACE PIPE ANCHORS EVERY 15 FEET. PIPE ANCHOR DETAIL NOT TO SCALE SLIP-ON GRATING 24"0 DUCTILE IRON EL=143.00 ------------ 24 "0 i i i IT. i Usti SLOPE ADAPTER TO' 249 DOWN GRADIENT CREATE LOW POINT IN SURFACE CHANNEL FOR COLLECTOR TRAY INLET (ANCHOR IN PLACE) OUTLE i PIPE _\ RELATIVE ELEVATION-0' a �TY EXISTING GRADE) 1" OR 1-114" CRUSHED WASHED ROCK TO GRADE SURFACE DRAIN- GROSS SECTION SECTIONS A --A, B-B NOT TO SCALE USE THIN WALL HDPE CONTINUOUS PIPE CONNECTION POINT TO 4" HOPE REMOVABLE _ TRASH/DEBRIS SEDIMENT CLEAN AFTER EACH SCREEN STORM EVENT OR MONTHLY 6" 4" INLEr (3) HOPE ADAPTERS -� (ABOVE GADE) EL=142-00 i EL=139.00 4 PVC INLETS (2j APPROXIMATE SLOPE=329-50% 25' 4" INLET (2) HOPE ADAPTERS \(ABOVE GRADE) ­, ELF E_ EL=137.00 4" PVC INLETS (2) 8" STUB INLET (1) SLIP—ON GRATING 24"0 DUCTILE IRON EL=142.00 24"0 DRAINBASINNOTES: 1.) USE 24" NYLOPLAST DRAIN BASIN WITH 6" SUMP OR EQUAL - THIS PRODUCT MUST BE WATER TIGHT TO LIMIT ANY STORM WATER CONVEYANCE FROM ENTERING INTO ONSITE SOILS. 2.) DRAIN BASIN 12 1-8"N-12 INLET PIPE ADAPTER, 1-8"N-12 OUTLET PIPE ADAPTER. 3.) DRAIN BASINS i1 AND 13 SEE DETAIL ABOVE FOR INLET AND OULET PIPE SIZE AND TYPE. .p Q UPHILL SIDE r BURIED MEMBRANE-18" MIN. \----- 20 MIL. IMPERMEABLE MEMBRANE WITH WELDED JOINTS OR EQUAL 12" MIN. SLOPE ADAPTER TO 19% DOWN GRADIENT DB#3DETAIL Nor TO SCALE COVER SLOT TRENCH WITH NATIVE SOILS — 6" MIN. `ARRY1SPWASHED ALLS WRAP TRENCH IN MIRAFI FILTER FABRIC 140N (OVERLAP FABRIC 2' MIN.). �— DOWNSPOUT FROM ROOF 6 =4" PVC REDUCER (TYP) 4" PVC (SOLID PIPE) 4' PVC (SOLID PIPE) SLOPE TO DRAIN ROOFDOWNSPOUT DETAIL NOT TO SCALE 1. NO CONNECTION TO FOOTING DRAINS ALLOWED. 2. 4'0 PVC SOLID PIPE OR EQUAL. 3. SLOPE TO DRAIN. 4. DIRECT TO YARD DRAIN OR CATCH MIN ONLY. 5. NO OUTLET ONTO SURFACE SOILS ALLOWED. MIN. EXPOSED CONCRETE FOUNDATION CRAWL SPACE WASHED ROCK 4' MIN. UP FACE OF FOUNDATION OR USE TENCOTE/MIRAFI "G" SERIES— DRAINAGE COMPOSITE WASHED DRAIN ROCK (PEA GRAVEL OR EQUAL) xN1 4 0 PERFORATED PIPE (PVC OR EQUAL) (SLOPE TO DRAIN) CROSS SECTION C-C (FOOTING DRAIN) DETAIL NOT TO SCALE FOOTING DRAINS 1. NO CONNECTION TO ANY ROOF DRAINS ALLOWED. 2. 4"0 PERFORATED PIPE - SLOPE TO DRAIN. 3 INSTALL IN WASHED ROCK — PEA GRAVEL OR EQUIVALENT. 4. DIRECT INTO CATCH BASIN ALONG FRONTAGE 5. NO OUTLET ONTO SURFACE SOILS ALLOWED. HILLSIDE SEEP ZONE FLOC VARIES IN DEPTH AND LOCATION 1 114" CRUSHED WASHED ROCK ON TOP OF MEMBRANE - (THROUGHOUT CHANNEL LENGTH) 1 "0 HOLE (TYP) -+12" MIN. (TO STAKE IN PLACE) Z CONSTRUCT 6 TRAYS 2A'Igo SLOT Zg NCH DETAIL (ALUMINUM OR SIMILAR) p NOT TO SCALE *SUGGESTION ONLY— ANY FORM OF COLLECTOR WILL WORK THAT WILL CONNECT TO PIPING AND CAN BE WGURED IN PLA991 HILLSIDE SEEP COLLECTOR NOT TO SCALE BLD20070833 BLD20070834 g�APPROX• 0.50 5 o Q 1 EEP ZONE r---'� S.0.50 IMPERMEABLE MEMBRANE BURPED UNDER SEEP ZONE SURFACE CHANNEL SECTION B-B NOT TO SCALE GENERAL NOTES: 1. LOCATION OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL THE UTILITIES AND IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE 2. ALL CONSTRUCTION SHALL CONFIRM TO THE "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS SITE 3. ALL CONSTRUCTION IS SUBJECT TO INSPECTION BY THE CITY OF EDMONDS. THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHALL BE SUBJECT TO THE INSPECTION OF THE CITY ENGINEER, 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION AND COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL FOR SITE EROSION HAS PASSED. Z ALL STORM SEWER PIPE SHALL BE CONCRETE (CP), NON -REINFORCED, ASTM C-14, CORRUGATED METAL 14 GA GALVANIZED, ASPHALT COATED TREATMENT 1 OR BETTER, MEETING AASHTO M036: CORRUGATED ALUMINUM, 12 GA, 31x1" CORK (OR PVC ASTM D-3034) EXCEPT AS NOTED. & ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 9. ALL ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. 10. ALL ROOF DRAIN STUDS SHALL BE MARKED WITH A 2x4 POST SHOWING DEPTH AND MARKED "DRAIN". 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR GRATED. 12. ALL TYPE 11 CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS OUTSIDE OF THE PUBLIC R/W SHALL HAVE LOCKING LIDS OR GRATES. 13. STANDARD LADDER STEPS SHALL BE PROVIDED IN THE CATCH BASIN MANHOLES EXCEEDING 4 FEET DEEP. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% OF MAXIMUM DENSITY BY MODIFIED PROCTOR TEST. 15. UTILITY TRENCH BACKFILLS SHALL BE COMPACTED TO 95.E RELATIVE COMPAC77ON UNDER ROADWAYS AND 90% OUTSIDE ROADWAYS. 16. STORMWATER DETENTION/RETENTION FACILITIES MUST BR FLUSHED AND CLEANED PRIOR TO ACCEPTANCE 17. TEMPORARY SEDIMENTATION AND EROSION CONTROLS SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION. TYPICAL METHODS SHALL INCLUDE A TEMP. ROCK CONSTRUCTION ENTRANCE, CHANNELS FOR SURFACE RUNOFF, HAY BALES, SILT FENCE OR OTHER CONVENTIONAL METHODS. 18. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERENNIAL GRASSES PROMPTLY UPON COMPLETION OF GRADING. 19. CB11 SHALL BE A TYPE 1. YARD DRAINS SHALL BE 180 OR 12"01 HDPE SMOOTH WALL VERTICAL ORIENTATION 20. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATE JUST PRIOR TO PAVING. 21. IN THE EVENT THAT FIELD CONDITIONS DIFFER FROM INFORMATION PRESENTED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO CONSTRUCTION OF THE CONTESTED ITEM. 22. LAND SURVEYING AND TOPOGRAPHY INFORMATION FOR THIS PLAN WAS PROVIDED BY CHENOWITH LANDSURVEYING. As required ny Urdinance `3fi 2 the geotechnical engineer of record shall monitor this site during ConstrLiCtion for compliance with the recommendations in the <,eotechnical report including_ site excavation, shoring, soil support for foundation including piles, soil hearing capacity, subdrainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved _geotechnical report must he implemented by the owner. The geoteclnical engineer shall make written; dated reports on tine progress of the construction and submit the report to the Building Official on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations front the approved geotechnical repots andior approved plans or specifications shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of more than one. week. In addition to the geotechnical utonnoring, special inspections based on the provisions of fBC Section 1704 are required when specified on the approved plans. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer (reter to approved plan set). At the completion of final site «rading and all permitted structures, a final geotechnical report, prepared by the. geotechnical engineer shall be submitted to the Building Official. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing, during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related permit requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official - AP - OTED �ERING LEGEND Oat q CENTERLINE (W) WESTERN ENGINEERS (P) PER PLAT OF ❑ STORM DRAIN CATCH BASIN (CB) Q STORM DRAIN MANHOLE (SDMH) u STORM DRAIN CULVERT INLET Q SANITARY SEWER MANHOLE (SSMH) -6- FIRE HYDRANT -0- POWER POLE U77LITY POLE ANCHOR © ELECTRIC JUNCTION BOX OT TELEPHONE PEDESTAL a METAL SIGN POST .o. WOOD SIGN POST o MAIL BOX CONIFEROUS TREE 0 DECIDUOUS TREE XXP PINE TREES OF XX DIAMETER XXH HEMLOCK TREES OF XX DIAMETER XXR REDWOOD TREES OF XX DIAMETER XXF FIR TREES OF XX DIAMETER XXM MAPLE TREES OF XX DIAMETER XXCH CHERRY TREES OF XX DIAMETER BM RIM=120.67 IE=114.85 F7.�..177,7.1 BUILDINGS TO REMAIN EXISTING CONCRETE F_ -I CONCEPTUAL BUILDING FOOOTPRINT L __ I EXISTING ROCKERY EXISTING CONCRETE RETAINING WALL PROPERTY LINE - - RIGHT OF WAY - - - - - - -- - INDEX CONTOURS --------------- _ CONTOURS EDGE OF PAVEMENT SS EXISTING SANITARY SEWER SD EXISTING STORM DRAIN G EXISTING GAS W EXISTING WATER - ROW CENTER LINE *- r h � *jz arrrr�"rtiv' x4P 1iy" rszzt="�x�r "r"*' � � ��• x s� � � `" ,#� ' "'ssy�rY,'fi{i ';� �� � ����3��� 5z� yh�tly� x�`�i ���t'�; r e3S ~�• � .,, s, i b . y a �+ f , T `���Y.�e��a�'��rs.*.t�"18:x �k� �,{"9+��x�n�t �.�tYt%Sxi ,:^YS � �-+% �, x��xr t � a�l'�•�" x A 't� e� k� W, sR' r= pia � k ��c 'k s'4i z •'r ..",zwwx +t`r`��`C {., 5T ow t +Mi -P- IMIT APPLILCA'1�1UN WAS 1�EVIEWED BASED UN.. -lair: ,I:UYE Ur WUten 33" M S02'27'26"W 505.33' (P �,�* ���s,Y ��t r arts ,mfi� r''� l FOIE SHE PERMIT. ISSUANCE OF THE PERMIT DOES NOT GRANDFATHER )� N0224'17"E 505.33' (G4j E DEWATERING SYSTEM FOR FUTURE DEVELOPMENT. - NAG / THE Di2AI ' THE ADE UACY AND USE OF THIS SYSTEM IN FUTURE' PERMIT _ - Q _ 12 F ` _ - 5 nr w ass s T kalx ------ 2 \ \\ _ ------------ _ S WILL BE DETERMINED AT THE DATE OF FUTURE � _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ rj s; > J irk j5' y gPLICATION ---- ------------- oo- _ _ '� \ - - - 240 _ {,.�;�,��� ��lr� �� a gib +�'` ` n \'`•� \� `•` \ `\ ` ' "sY - - - - 8 F . Al; IOXIMATE LOCATION ------------- --------- _ _ 1. ,_,,., .: 4. HE DEVELOPMENT ACTIVITY PROPOSED IN - - ' - - - _ _ _ ' - \ - 4, PPLiCATION BASED UPON T _ _ - ____-- ____--- _ __ --__ - _ u- - - - - - - - - - - - \ .\ - - - - - _ - _ - a r^. „ula `+mot',?;" �'�a>`,* :.. ", 1: M = ---- - - - --- - \ '_ ', ''; LOG. CONIRACTOR_-------- __-_-- ___-- - - - - -5 4)a rtt �<t !1 < <„ \ . \ `. OF EX. ' D IMPACT ON SLOPE STABILITY. EACH _ ----- ..---------------- _ _ - 230 _ _ THE APPLICATION AN ITS _ _ - - - - _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ -- _ _ _ .K'f':. Sul 3,. rsu.: ds :' iM� !tj ;i::J•• 19 -_ PERMIT APPLICATION WILL BE JUDGED ON ITS OWN MERITS. \--- - --_ o � _ \� ,�` .� _ � _ - - --- ____-___ -__ � �, _EU-TU-R�-P _ _ --- "- -- _ � ;��� rk�,r r, ,.. sjj-------------------- ,. \ ♦ - - - - - '- - - - - � - ` - _ _ " -- - - - - - - - - - - - - ", . i•�x w rs� x.rrt.F } t'.z%.. �'�: ` --- - ----_ _ it _ _ _ - _ \ - - - - - ---- -220 -1,. ------------ \ \ ----- - \ \ \` ----- ----- g _ _ _ _ 'rr.y.. _ _ _ - _ §. o-hr f4 \ - - - - - - - \--------- \ _ 22 _ _ _ « 'l _ - -------------- \ _ 18" M. - i - 3 T \ ID-�10DRAINAGE� t - \ - - \L 2 Y T M , Y SSE EAST F 0 CB HAS BEEN \. \720. \14" M 'DESTROYED BY A LAND SLIDE (EXACT DATE UNKNOWN) \ _ - --- - ---_ ' VICINITY MAP"o CALL 2 BUSINESS DAYS BEFORE YO U DIG 1-800-424-5555 O "A63±' \ �itT , SS \ _ 1 ; \ PIEZOMETER _ \ \ \ MONITORING �� ` SS 140 \ _ G LOCATION , \ � 86.3' \ /may I TV/G \ ' \ \ �i�j/ ; \ EX. CB _ G \ NN I NOTE. o \�j N / 1 - - - i 1.) PROPOSED GRADING BASED ON EXISTING Ni ^o - i 1 t � EX. HOUSE / ', i SURVEY/ACCURATE WITH CURRENT CONDITIONS. Z / 1 - A A 11 2. LID 210 IMPROVEMENTS MOSTLY REMOVED \ ,' DURING PERMITTED TREE REMOVAL. `\/�/ '11/' \ _- / - - - _ _ _ _ - - _ - ---------------------',I /. / _ 70 \ ------ \ _ \ \ � / \ 1) -Any request for\ alternate design; mdi ofrc*ion\ \ �/ \ ,� - - _ variance-- or other\ \ administrative deviation \ \ _ �r \ ; " \ ---(hereinafter �`v\ariance")-, from --adopted codes,' EX, HOUSE '` ;� irfaitces or policies must be `Specifically reque n writing\ and be called but and - \ \ identified. Pro fees �or-such request shall -be ' - - - _ \ ' \ \ '� ., - 1 established by Counci halt` be paid' -upon - ` - _ - \ A A Lz/ \ , 1 _ _ _ _ _ - - _ _ _ - - - _ - -- ----- \/�/�/�__ �� I - - ----- p�AN NG submittal and are non-refundable. \ - ' - - - - -- - - , 2) Approval of any plat or plan coif - - - - - - - - - - - - - - - - - \ '` �ir�r�ii2�1/1�1�//� _ - �( DATUMSprovisions which do not comply with city code and \ I Terfi o _ _- - - - - '� � p nary_ address - shaN - - - -A�` \\ _ \` �` I �---be--clean Ws6fe_---------- FROM GROUP 4 SURVEY (1-18-88) for which a variance has not been specifically - - - - \ , _ _ _ _ _ _ _ _- - - \ \ \ \ I street during all- phaS6s 01- --- (JOB - \ -ctiristrucu(m- - (JOB 188-8020) identified, requested and considered by the \ \ - _ - - - - - " _ -- -_-- - _ --- _ _ - - appropriate city official in accordance with the STss9'»�y \ \ \ _ - __----- --------------_- appropriate provision of city code or state law does ss¢9¢, Faitur8--to;�aroperly Apo - ASSUMED ELEVATION BENCHMARK STORM DRAI1 ¢� es 1%use/f5uilding' �ntfmbers I MANHOLE RIM IN N. MEADOWDALE ROAD AT of approve any items not to code specification. 38e• \ \ ` " may resylt-in no inspection INTERSECTION OF 73RD PLACE WEST \ \ \` - , - - _ -' by -the City Inspector_ - _ _ _ _ - RIM=120.67- IE=114.85 Ct.frb signage is NOT acceptable. LOCATE CORNERS OF LOT 2 FROM GROUP 4 SURVEY_ _ ' FOUND REBAR AND CAP LS J18737 ON 3 CORNERS SCALE: 1" = 20' - --------- --------------------- RE t FILE ^^ 0 20 40 LORIAN WOODS HOMEOWNER SASSOCIATION PROJECT APPROVAL DATE BY.• MS. AMY ROSS, PRESIDENT CITY OF EDMONDS APPROVED FOR CONSTR UCTION BY: CITY ENGINEER DATE: A-_-2 --2- UTILITYCONFLICTNOTE: CAUTION.• THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY P THOLlNG THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR ONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 AND T POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS YSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WESTERN ENGINEERS, INC TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. BLD20070833 BLD20070834 SCOPE O.L WORK PROPOSED 1. INITIAL INSTALLATION OF DRAINAGE IMPROVEMENTS. ELEMENTS THAT WILL BE INSTALLED AT THIS TIME: A UPPER SEEPAGE COLLECTION DRAINS. B. LOWER TIGHT LINE STORM DRAINS ALONG NORTHERN AND SOUTHERN PROPERTY LINES 2. REMOVAL OF LARGE LOG ABOVEYHOUSE AND ACCUMULATED SEDIMENTS BEHIND LOG. f J. SHALLOW SEDIMENT REMOVAL ON SLOPE ABOVEY PTHS APPROX. 1-FOOT). REMOVAL BY HAND OR LIGHT WEIGHT EQUIPMENT TO MINIMIZE DISTURBANCE TO THE SLOPE ./i���� 4. INTTAL REPLANTING OF HILLSIDE, ABOVE HOUSE AND CATCHMENT WALL, IN ORDER TO ESTABLISH VEGETATION DURING GROWING SEASON. 5. AREA W17HINV I O�D*YICATC� WALL SHALL BE HYDROSEEDED OR MULCHED AS SHOWN ON TESC PLAN. SURVEYNOTES: THE TOPOGRAPHIC AND BOUNDARY INFORMATION SHOWN ON THIS PLAN IS BASED ON A FIELD SURVEY PREPARED BY GROUP FOUR, INC OF LYNNWOOD, WASHINGTON PER RECORD OF SURVEY AS RECORDED IN VOLUME 22 OF SURVEYS, PAGE 23, RECORDS OF SNOHOMISH COUNTY. WESTERN ENGINEERS, INC. (WEI), HAS RELIED UPON THE ACCURACY OF THIS INFORMATION IN THE PREPARATION OF THE PLAN. WEI CLAIMS NO RESPONSIBILITY AS TO THE ACCURACY OR COMPLETENESS. ENGINEER / SURVEYOR / WESTERN ENGINEERS, INC. PLANNER: 13000 HIGHWAY 99 SOUTH EVERETT, WA 98204 TELEPHONE #: (425) 356-2700 FAX J. (425) 356-2708 OWNER/APPLICANT:' BRIAN & CINDY ISAACSON 701 5TH AVE SUITE 4770 SEATTLE, WA 98104 LEGAL DESCRIPTION - LOT 2 OF LORAN WOODS, AS PER PLAT RECORDED IN VOLUME 51 OF PLATS, PAG 145 AND 146, RECORDS OF SNOHOMISH COUNTY AUDITOR, SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. TAXACCOUNTNO. (S): SITEADDRESS. �g a 00790400000200 73RD PL W EDMONDS, WA Western EXISTING CONDITION PLAN FOR: Engineers, (425) BRIAN & CINDYISAA CSON Inc. 356-2700 SW 1/4, SW 1/4, SEC.5, T.27N., RAE., W.M. CITY OF EDMONDS, WA SURVEYORS e PLANNERS a ENGINEERS DWN. BY DATE REV. BY DATE PROJECT MANAGER SCALE LAND USE CONSULTANTS VJT 02128107 12 VJT 10124108 BARRY CONSTANT 1 " = 20' CIVIL ENGINEERS a LAND SURVEYORS DWG. FILENAME CHK. BY F.B. NO. JOB NO. SHT. NO. *** 13000 HWY 99 SOUTH * EVERETT * WA * 98204 *** 06792aBASEDWG 596 06-792-A 1 OF. GENERAL NOTES: 1. LOCATION OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATIONS) OF ALL THE UTILITIES AND IMPROVEMENTS TO AVOID DAMAGE AND DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFIRM TO THE "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS SITE. 3. ALL CONSTRUCTION 1S SUBJECT TO INSPECTION BY THE CITY OF EDMONDS. THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY SHALL BE SUBJECT TO THE INSPECTION OF THE CITY ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION AND COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL FOR SITE EROSION HAS PASSED. 7. ALL STORM SEWER PIPE SHALL BE CONCRETE (CP), NON -REINFORCED, ASTM C-14, CORRUGATED METAL 14 GA. GALVANIZED, ASPHALT COATED TREATMENT 1 OR BETTER, MEETING AASHTO M036: CORRUGATED ALUMINUM, 12 GA., 3 xl" CORR. (OR PVC ASTM D-3034) EXCEPT AS NOTED. B. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 9. ALL ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM. 10. ALL ROOF DRAIN STUDS SHALL BE MARKED WITH A 2x4 POST SHOWING DEPTH AND MARKED "DRAIN". 11. ALL CATCH BASINS SHALL HAVE LOCKING LIDS OR GRATED. 12. ALL TYPE 11 CATCH BASIN MANHOLES AND ALL INLETS, CATCH BASINS OUTSIDE OF THE PUBLIC R/W SHALL HAVE LOCKING LIDS OR GRATES. 13. STANDARD LADDER STEPS SHALL BE PROVIDED IN THE CATCH BASIN MANHOLES EXCEEDING 4 FEET DEEP. 14. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% OF MAXIMUM DENSITY BY MODIFIED PROCTOR TEST. 15. UTILITY TRENCH BACKFILLS SHALL BE COMPACTED TO 95% RELATIVE COMPACTION UNDER ROADWAYS AND 90% OUTSIDE ROADWAYS. 16. STORMWATER DETENTION/RETENTION FACILITIES MUST BR FLUSHED AND CLEANED PRIOR TO ACCEPTANCE. 17. TEMPORARY SEDIMENTATION AND EROSION CONTROLS SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION. TYPICAL METHODS SHALL INCLUDE A TEMP. ROCK CONSTRUCTION ENTRANCE, CHANNELS FOR SURFACE RUNOFF, HAY BALES, SILT FENCE OR OTHER CONVENTIONAL METHODS. 18. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERENNIAL GRASSES PROMPTLY UPON COMPLETION OF GRADING. 19. CB11 SHALL BE A TYPE I. YARD DRAINS SHALL BE 180 OR 12.0 HOPE SMOOTH WALL VERTICAL ORIENTATION 20. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTED ALL MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATE JUST PRIOR TO PAVING. 21. IN THE EVENT THAT FIELD CONDITIONS DIFFER FROM INFORMATION PRESENTED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO CONTRACT THE ENGINEER FOR A FIELD CHANGE PRIOR TO CONSTRUCTION OF 774E CONTESTED ITEM. 22. LAND SURVEYING AND TOPOGRAPHY INFORMATION FOR THIS PLAN WAS PROVIDED BY CHENOWITH LANDSURVEYING. CONTRACTOR RESPONSIBILITY FOR EROSION/SILTATION CONTROL: IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. 1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE S17E AND THAT POLLUTED OR SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR WATER BODY ON THE SITE 2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING AND IMPLEMENTING APP OPRIATE METHODS "BEST MANAGEMENT PRACTICES ((BMPs , FOR STORM WATER TREATMENT AND CONTROL THAT MEET 174E R QUIREMENTS OF BOTH THE WASHINGTON STATE DEPARTMENT OF ECOLOGY AND SNOHOMISH COUNTY. 3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER AND TO CITY OF EDMONDS IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER, 5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO, STRAW BALES OR OTHER MULCHING MANIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC. 6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION CONTROL MEASURES ABOVE ALL OTHERS BM RIM=120.67 IE=114.85 IN SD "/)ff 1p nT'TA if SCALE. 1---10' S W 114, SW 114, SECS, T.27N., R.4E., W.M. CITY OF EDMONDS, WASH17VGTON 33" M '. IN, IN IN IN IN \ ---2 -`` -N 12 .�:�\ _ 40----- --_- LEGEND 7�", \ _ _\ ---.------ ------ ------ ______---------- _---__`---- - - - -.�LOCATION------------- _------- --__- CENT R 1 - ----------------=_22" M = - _-------- - --__-_ - \,�\\` OF EX. LOG. CONTRACTOR----------------- _-- ___---_ - - _ --__ - E LNE ---__ _ - ----- - - �` -� --------230 \ -- ; -TO VERIFY _- --__------------ -- -"-__----------- -- -190 - - --_ ___- --(G4) GROUP FOUR SURVEY \ .\-----------_ `-------- B,.A - ,`-------------------" - --- - _ -- \\\--------------- ----- \ - - \- \\ - _ '-------------- ___------ -------------------- IN,-`-- -"--- ' - (W) WESTERN ENGINEERS \ \ - - - - - - - - - "- - \ \ - _ \` '----------------- _ -220 - _----------__; `- P PER PLAT OF LORIAN WOODS _------------------ - _ ----- - _ 26"A \ ( ) ------------ - \ - - - _--- - ---- \ `----------------- ---- - _ - _ - \ \ - ' LOG AND ACCUMULATED [AND -------_-- ---------- ❑ STORM DRAIN CATCH BASIN CB - _ _ _ - \ _ SLIDE DEBRIS SHALL BE _ \ - \ , - _ - - _ - - _ - _ _ - - 22 \ \ ' _ -REMOVED PER GEOTECHNICAL - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - _ _ - _ -__ _ _ O� STORM DRAIN MANHOLE (SDMH) \ \ -� -------- - 20" A _ _ \ �RECOMME ATIOIVS. ------ -- --------- ------ - \ _ --__ �` - �- \ \ _210_ - - - - ---------------- _ u STORM DRAIN CULVERT INLET \ \ o• ` - \ \ __------------------ -- -- --- PROPOSED DRAINAGE FLOW ARROW \ \ '� \ - \� - \ \ A, `-- - ---------------------------------------------------- Q SANITARY SEWER MANHOLE SSMH \ - _ \ - - ---`--------------- \ \ \ - - _ --------__ - _ _ - _------------------------------------------= - FIRE \ \ - `---- ---- `-- - - - _ _-------- HYDRANT \ \ - - ` - ` - - - - -TREES NOT SHOWN WITHIN CLEARING LIMITS HAVE BEEN - \ \ - �6 - 1 \ -12' A \ _ -REMOVED PER TREE CLEARING PERMIT CU-06-104 AND - - "- POWER POLE \ \ \ _ - - - KNOWN LANDSIDE/DEBRIS FLOW AREA - - - - - - - - - - - - - - - - \ - - _ ---'` ---SEQUOIA REMOVE AND REPLACE UNDER NEW C.U.P. "----------------------"- - - ` 16 M----=___ _____--------------- - - - ------------------------- UTILITY POLE ANCHOR \ ` IC BURIED AT TOE) - -INSTALL SILT FENCE (WITH FABRIC \\ \ - - TO INTERCEPT HILLSIDE SEEPS AND DIVERT FLOWS - - - - `----_______________'_---_____=___------ - - --- - _ - - --- II M 1 ` - - - - ' - .TO NORTH AND 50UTH AROUND CONSTRUCTION SITE., - - -- - ` - _ _ - ` -_ - - - - - - - - _ - ' - - - - " - " ` METAL SIGN POST \\\\ - \\ _ _ - ---�\__ - - ---- ----- - - _ _---�-__� ---_ n WOOD SIGN POST 178--------------------------------------------- a ` 176-------------------------- MAIL BOX SF �� - \ - --------------------------------------- \\ ,y` N$F s� -` _ \�` _-----------174----------------_-------------------------------- � CONIFEROUS TREE IN I\ \ --- /�_SF -- - ----------172------------------ - - - - \ -- 20" M _ I. - - ---- \ \ -------- -- - - -'170- - ---------------------------- DECIDUOUS TREE \ IN,\ _ --__ ` - --- \-------_- `------------168---------- -- - --- _ -48" C_- - _ ---- \` \ \ - ----- _------ '------------------------------------ ------------- - XXP PINE TREES OF XX DIAMETER -166-- \ \ �48- 5--- I'll ----- -----_----------------------�164--------------------------------- XXH HEMLOCK TREES OF XX DIAMETER SETBACK ---------- - - _ - _ ------ --------------- Cg - - - - - - ------------------------------162 -------------- XXR REDWOOD TREES OF XX DIAMETER PROTECT TREES WITHIN CLEARING LIMITS - INSTALL - _ - _ _ -146 - - - - - - - - - - - - 1D- - - _ _ , \ `, - _ _ _ _ - ` - ` - - END SILT FENCE ON UPPER PORTION OF- - - - - - - -160- - - - - - - - - \� - ORANGE CONSTRUCTION FENCE AT LIMfT OF DRIPLINE % _ i - S - - - _ XXF FIR TREES OF XX DIAMETER `- � � � -___ � �'--_ _�� ��,\ � --SLOPE -INSTALL INTERCEPTOR TRENCH _-------- ____ - OR BY ARBORISTS DIRECTION WHILE ONSITE (TIP)- - _ _ _ - �,= _ _ = - _ q, _ �_� - - ' - - - - - - - ' - - _ _ ` \ _ - ` - - - - - _ _TO RE -:DIRECT RUNOFF TO CATCH_ BASIN. - - - - 1 �8 TREES OF XX DIAMETER I. ------ -- ----- ----------------------t56------------ XXM MAPLE ' \ - ` - - - -INTERCEPTOR TRENCH AT TOP OF SLOPE RE -DIRECT- _ - - - . _ IL IT- - - - ` _ - - - � - ' . \ , ' I N ` " F� _ _ - - ' ` - - - - - _ _ _ _ _ _ - ` - - - X XC H CHERRY TREES OF XX DIAMETER IN \ ` TRENCH TO FLOW ACROSS SLOPE TO CATCH BASIN _ - - ` ` - _ _ r--J WINTER EROSION AND SEDIMENT ` CONTROL - AREA OUTSIDE OF 1140 \ \ � ; _ _ _ - _ _ _ _ - \ , \ - - - - - - - - - - _ _ _ _ BUILDINGS TO REMAIN - - I RE-VEGETA OF HILLSIDE _ ENT ------- ------------ 154----- PHONE/N/PUD _ _ - - _ _ TION I _ HOUSE AND CATCHM - \ E� ` _ - 2 C - _ _ f, HYDROSEED AND/OR MULCH PRIOR TO 13�� - - " - WALL SHOWN FOR - - \ \ \ o a . p EXISTING CONCRETE EX. CB , ` ` - _ _ - _ _ j r - - _ _ CONSTRUCTION MORATORIUM DATES. - - ' "' I INFORMATIONAL - - - - \ - � PROTECT TREES WITHIN CLEARING LIMITS - INSTALL - _ - - - - - - - - + PURPOSES ONLY ORANGE CONSTRUCTION FENCE AT L1MIT OF DRIPLINE _ _ _ 5g - - - - - " < - �L= _ _ - - _ _ rr _ - - =J �- _ �(*A a �v.G , OR BY ARBORISTS DIRECTION WHILE ONSITE (TYP) - - - - - _ L - _ CONCEPTUAL BUILDING F0007PRINT W ` - -136- - - - - - I ofQ�t� v>l� V 22" H \ _ - pyONF �` ' - I I \ - -i 56- EXISTING ROCKERY \ - EXISTING \ G `S,C - �C \ / L� - - - " _ CONCRETE RETAINING WALL -PARKING AREA SHALL BE USED AS CONTRACTOR LAYDOWN _ - RIGHT OF W NE _ III OW AREA AY \ p EX, SSMH - - _ - ` - - - - ` - \ WITH APPROVAL OF LOR14N WOODS HOME OWNERS ASSOCIATION. EX. SSMH _ S� `SF - - _ _ - - - - - - - 2- - - - -- -- - - �---� - \ (MAY BE TEMPORARILY FENCED DURING CONSTRUCTION). - - - - - - - - - INDEX CONTOURS SS . _ - \ SS �`Slr' Ste. - - - - `� IN. I-"- ___-- i ro ------------------- 1, 1_ � CONTOURS \ �\ - - - _ 30- ` - " - %// //// //// //// EDGE OF PAVEMENT S S - -SF_ _ moo -kg fG g" W P NE TV/ c,0 13 � - � � B -'>2 SEQUOIA- � / PUD �D - D S� -- - SD - SS EXISTING SANITARY SEWER PIEZOMETER, P ` - - _ IIV_ _ _ X. C �. ---- MONITORING LA W `\ Sfs \ �D - \\---------------- 144---------- SD EXISTING STORM DRAIN LOCATION 1�'D EX, SSMH EX. CB OT // > I I\ \ - ROW CENTER LINE 1 k ASP AL CUT G G SS G luoia (r , -- ---- \ Rcr),o�:, c c IS to be 1 or ;t,.111� . Ic aMott u;(I Ius,a;l ddres_. IhiS TV/G �� or 1 �..Ilh ,il 1l.L' conslrf;c(ioff,f 1111 �•ariallc; • s1 s `lil�'cl;on ��iulc w1�i(�ilnit rii clri ��a(fn11 F 7 CONCEPTUAL BUILDING FOOOTPRINT I---J PROPOSED PAVING SS PROPOSED SANITARY SEWER Q PROPOSED GAS p► PROPOSED WATER SCALE: 1" = 20' 1 Eon 0 20 40 Tl A'rT TA/f0 FROM GROUP 4 SURVEY (1-18-88) (JOB 188-8020) ASSUMED ELEVATION BENCHMARK STORM DRAIN MANHOLE RIM 1N N. MEADOWDALE ROAD AT INTERSECTION OF 73RD PLACE WEST RIM=120.67 IE=114.85 LOCATE CORNERS OF LOT 2 FROM GROUP 4 SURVEY FOUND REBAR AND CAP LS 118737 ON 3 CORNERS \-142--`-- oA ss PIEZOMETER sS ' 140 MONITORING - G LOCATION ` EX. CB� // NOTE. 1.) PROPOSED GRADING BASED ON EXISTING SURVEY/ACCURATE WITH CURRENT CONDITIONS. 2.) LID 210 IMPROVEMENTS MOSTLY REMOVED DURING PERMITTED TREE REMOVAL. LANDSCAPENOTES: 1.) PLANT VINE MAPLE WITHIN 5' OF COMPLETED SURFACE CHANNELS. 2,) CLEAR STUMPS AND DEBRIS FROM SLOPE. SITE GRADING NOTES: 1.) REMOVE TREES AND STUMPS AS REQUIRED. 2.) REMOVE LANDSLIDE DEBRIS AS NECESSARY. 3.) GRADE SLOPE TO A UNIFORM CONDITION. 4.) USE SMALL BULLDOZER TO "WALK" THE SLOPE LEAVING TRACK MARKS. 5.) BULLDOZER CAN CREATE SURFACE CHANNELS WITH BLADE. - 6.) BASED ON UNIFORM SLOPE INSTALL SURFACE CHANNELS CLOSE TO LOCATIONS SHOWN ABOVE. Z) A SINGLE SURFACE CHANNEL CAN BE CONSTRUCTED IF SITE SLOPES ALLOW. GRADING, DRAINAGE AND EROSIONMAl1VTENANCENOTES: 1.) AN ONGOING REGULAR INSPECTION AND MAINTENANCE SCHEDULE IS REQUIRED FOR DRAINAGE SYSTEM. 2.) GEOTECHNICAL MONITORING AND INSPECTION OF GRADING, DRAINAGE AND EROSION CONTROL IS REQUIRED DURING CONSTRUCTION. 3.) PRE -CONSTRUCTION MEETING IS REQUIRED WITH GEOTECHNICAL ENGINEERING REPRESENTATIVE PRESENT. 4.) EARTHWORK IS RESTRICTED BETWEEN OCTOBER 1ST AND APRIL 30TH EARTHWORK IN THESE TIMES MUST BE APPROVED BY GEOTECHNICAL ENGINEER OF RECORD AND CITY OF EDMONDS BUILDING OFFICIAL. AMONSTNOTE.• ARBORIST TREE INFORMATION AND RECOMMENDATIONS TAKE PRESIDENCE OVER THESE PLAN SHEETS BLD20070833 BLD20070834 T,E.S.C. LEGEND CATCH BASIN INSERT CLEARING LIMITS INTERCEPTOR TRENCH W/ ROCK CHECK DAM SF SILT FENCE LAYDOWN AREA f V2\� PLANT SCHEDULE 1 ! /' /' r ! /` /" / /' /. / l' /' i it - - t I I I 1 I / / SYMBOL installed BOTANICAL NAME COMMON NAME SIZE SPACE er'08 COMMENTS DECIDUOUS TREES Plan Symbols r est. plant sch. Acer rubrum Red Sunset Maple 1" cal. Per 1 fall color most highly rated & (Acer x freemani) (Jeffersred Maple) Plan reliable red maples 40-w 50ht native to moist woods CN Acer circinatum Vine Maple 5 gal Per 15 one of the most airy and multicane Plan delicate western natives Cercis canadensis F! Eastern Redbud 1" cal. Per Plan 1 rose to pink flower yellow fall color 1!; to';() w P. ht Crataegus Washington phaenopyrum Hawthorn or 1" cal, Per 1 white flowers, or dou lasii Black Hawthorn Plan red fruit double pinkish white in autumn, Prunus subhirtella Autumn Flowering Per 1 early spring & warm spells in Jan 'Autumnalis' Higan Cherry 1"cal. Plan & Feb 25-35 w & ht. forms thickets, in the wild S Rhus glabra Smooth Sumac 1 to 5 gal. Per 5 spreads by underground Plan roots, needs little to no water female plant to min- imiz. allergies, fall color EVERGREEN TREES Thuja plicata Western Red Cedar 4-6' Per 1 pyramidal form 'Hogan' Hogan height Plan Cedrus deodara 'Aurea' Dwarf Cedar 4-6' Per Plan 3 to — height height /TRACT�A ASSEO40MISH/C0! PER „I S /R,MAP/ /! , 8 t I ' ! 4811C / / II SEE CNZ GtOTECH F R l r ! r •! ( r � 1EMP0AARYr/ERQ�SIg/N CONTRQU 1 1 ! 2 21i 11,1 C-0 ROU D- UER-REMENDS ! 1M N TE: ' / / /` ! I I i+ I ► I ' l lL l I I / SEECU(L PLA /FORLTAININ IC� ll L! L PLANTtG AJUSTED ACCO D1 GLY Fq0 ADE U , E WALL S�TBAC /CONSTRUTION �CCES/ !j I►i I JiiI iI i { I I :; • / �' mom. ea, t� m mmm�m m m j i /i mm� rm m m �ms�s� m�s m®s r a rem cif m mmmLs / L I I m ®i ®�" m II I �,., ail/:. X. O Seqouiadendron Giant Sequoia 8/10' Per 1 giganteum height Plan ! / / / ..: r01 r, RUBS / spreads widely by creeping underground ,:' 1 / •. r ... / II¢ / 5 gal. 5 o.c. 23 stems and rooting b,anches adaptable native , j I �%� y Corpus sericea Red -osier dogwood g p `� / % u i I• I ! 1 j ! i , I ': on moist ground rr / 7-10' high, 10-15' wde Euonymus alata Winged Euonymus 5 gal. 5' o.c. / I / / l / `. / ;l l / I I red fall color, deciduous ; r ! up to 20' in moist rich soil i up to 3' in dry sunny areas, Holodiscus discolor Oceanspray 2 gal. 3 o.c. 12 May -July / ; I / I / 1,_ 1 1 j I' cluster of l ! ! / II/'I` / d In honeysuckle family. / r `r I i +r 1 I Lonicera involucrate Black twin berry 2 gal. 3 o.c. � / ! I �•�1 I / ' I 1 0 used in native restoration sites ' � ,! ! •{ / � , 1 1 1�'�, o ! l / heeds little water 1 Mahonia aquifollum Oregon grape 5 gal. 5' o.c. 15 erect habit i p Ph socar us to 8' tall dense white flower clusters in I I / / , / ! Y p Pacific nmebark 2 gal. 3 o.c. \ I I' !;, . / / `.. I' G) ca itatus 15 spring or early summer ;� o/ to 5 8 tall red to black fruit, sun to part shade, ;.; j`.;•;. - , A YY1 Rhamnus frangula Alder buckthorn 5 gal. 5' o.c. g established plants need only / I T / 'Fine line' ! deciduous, deep-rooted ,.-'' ! / r o Rosa nutkana ' ` r ! / ! Common wild rose 2 gal. 3 o.c. r rr 12 rhizomatous perennial shrub vigorous, very hardyto 3-8 tall, ��.` - I / / �;'I\ rr Rosa rugosa Ramanas rose 2 gal. 3 o.c. 12 red tomato shape fruit .✓.�} I I / / ... I :. Symphoriocarpos clippped/unclipped L CISnowber ry 2 al. 3' o.c. 20 oalbus GROUNDCOVER/ red or pink fruit sl 10 15', somewha Arctostaphylos uva-ursi Kinnikinick 4" pot 18" o.c, ±140 to establish / / I I f 1/ / r I / F 2-10 tall depending on / I i ] Gaultheria shallon Salal 4" pot 18" o.c. t290 in sun, poor soil (2') L , / /! /' 1 / ' r r o / r d \ 26�� A // / I q�/„ /� f Pol stichum munitum Sword fern 1 al. " l l r I J ] Y 9 18 o.c. t150 needs shade .:-,:,::-:::•,•..�:: •: � ! %% � � ' ........../ / Hydroseed mix Process of applying grass seed mix (70-80% perennial rye blend and 30 to 20- percent fine ::= I f ! / QI fescue blend) in slurry containing wood fiber mulch fertilizer, tackifier & water. ! d � f ;I 1 I� j / 1 t 1 �+ ,• All ®'�?°� � �' �.. 0. •� l 1 / ` ^�_I'�TI ! I P f / : k• r qprox L ation %�/ , � �'{ A d / d ©!'� :r......... / / / e 2811Aif ' / ! ,f , ' r / / / J f / J I l � 16 /M ! r ' / / / / I I SLOPE SURFACE CHANNELS TO I �I / TRACT d // / I LOWPOINT AND INSTALL I , PER/ SN/OHOMISH COI IIf I e ' I / / COLLECTOR PAN �, i ! / A�SE,SSC�� I�AP/OWNERt / / / I i I B I r f i 12 F � , I 1 1 I ; I I �(; � ! MAY/REQU ST I / IN F`UTURE/TO/BCJ ;Pr ,(� ANT ! /OF OT 2/ I'ER/BLA I l l I! I , �m m mmom ®m m m m mmm� m ®' t m qi a m mmmm m m m (s m m mmim m m ®}m mom. - � m m 1 miir m �a f m m m I m m I®m m mNwaml m m t ml mm� m i� . Sources: Western Engineers, Inc. Existing Condition & Tree Plan 4/16/07, Drainage Plan 4/18/08 Chenowith Land Surveying Snohomish County Assessor Map Jan 2004 / 211 H , I I N Anderson Topography Map GFour Inc. 1989 (2' i .) / / 1 i i ; I with Boundary Survey based on Survey Recorde r J i I i I I } in Volume 22 of Surveys, Page 23, Records of Sr .60. f ??�2 �� H / + 1 1 I "-'I Tree Inventory Map by David Reich City Forester Note: This plan is based on the listed sources. } I + ! I I t ! J i I I i ( + 7 i 1 t S ( 1 1 1 1 Q' I 10, EDMONDS, WA parcel00790400000200 Lorian Woods Subdivision R.W. Thorpe & Associates, Inc. Seattle • Anchorage • Denver Planning 0 Landscape Architecture Environmental 0 Economics 710 Hoge Building 705 Second Avenue Seattle Washington 98104 Telephone: 206.624.6239 Fax: 206.625.0930 E-Mail: planning@rwta.com SEAL ISSUED No. Description Drn ck'd Aw'd Date 1 Planting Plan JL SS 11/22/06 2 Planting Plan _ JL RT .RT RT 06/001 5/07 06/05/07 3 Planting Plan JL RT RT 04/18/08 REVISIONS No. Description Drn ck'd ApWa Date 1 Planting Plan JL RT RT 04/07/08 2 Planting Plan JL RT RT 08/01 /08 1 —. As- Built JL 09/30/09 — _-__- ---...---10/08/09 RWTA JOB NO. 0 51. _0.1. 16 ......--.... - SHEET TITLE Rough As- Built Planting Plan Permit Application File No. CU-06-104 CU-2008-36 PL UJ Z�D7,og� 3 4 2DO O"8 ...-...... ......... .......... ... ... t ....-. .��. �... ....... ....... .. ........................ .. , SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING Est. # COMMENTS DECIDUOUS TREES Per fall color most highly Acer rubrum Maple Red Sunset Ma P 1" cal. 1 rated &reliable red Plan maples native to moist woods o Acer circinatum Vine Maple 5 gal Per 15 one of the most airy and multicane Plan delicate western natives Cercis canadensis Eastern Redbud 1" cal. Per 1 rose to pinkflowerPlan yellow fall color Crataegus Washington Hawthorn V cal. Per 1 white flowers, 0111 phaenopyrum or Plan red fruit or douglasii Black Hawthorn Prunus subhirtella Autumn Flowering Per 1 double pinkish white in autumn, early spring & 'Autumnalis' Higan Cherry 1" cal. Plan warm spells in Jan & Fe or forms thickets, in the wild s Rhus glabra Smooth Sumac 5 gal Per 5 spreads by underground multicane Plan roots, needs little to no water female plant to min VERGREEN TREES imize allergies, fall color pyramidal form Thuja plicata'Hogan' Western Red Cedar 6' 8' D.C. 1 AZZ Hogan Taxus cuspidate low growing 10-25', it and 'Capitata' or Japanese Yew 4-6' Per 3 foliage are poisonous height 15' in 20 yrs. Cedrus deodara height Plan 'Descanso' Dwarf Cedar OPTIONAL NEW SEQUOIA TREE & PRELIMINARY PLANTING LOCATION SUBJECT TO LORIAN WOODS HOME OWNERS ASSOCIATION & GEOTECH APPROVAL Seqouiadendron Giant Sequoia 8/10, Per 1 Note: cal, giganteum height Plan tree sizing due dto e o Lo-LC7 on slope area related to SHRUBS d e7 Cornus sericea Red -osier dogwood 5 gal. 5' D.C. 25 spreads widely by creeping underground stems and rooting branches adaptable native on moist around e 7-10' high, 10-15' wide . Euonymus alata Winged Euonymus 5 gal. 5' D.C. 10 red fall color, deciduous up to 20' in moist rich soil, up to 3' in dry sunny areas, U Holodiscus discolor Oceanspray 2 gal. 3' D.C. 12 cluster of white flowers . May-JuN attract birds I Lonicera involucrate Black twinberry 2 gal. 3' o.c. 10 In honeysuckle family. used in native restoration sites 1 1 Mahonia a uifolium q Oregon grape 9 9 p 5 al. 9 5' o.c. 15 needs abitlittle water erect habit (� Ph socar us ca itatus Y p p Pacific ninebark 2 al. 9 3' o.c. 15 whi r early r t lusters in sprinseng clusters in spring or early summer to 15-18' tall red to black kRh Rhamnus frangula Alder buckthorn 5 gal. 5' o.c. 10 fruit, sun to part shade, 'Asplenifoli0 established plants need only moderate surnmermterina. Rosa nutkana Common wild rose 2 gal. 3' D.C. 12 deciduous, deep-rooted rhizomatous perennial shrub vigorous, very hardy shrub w/ r r Rosa rugosa Ramanas rose 2 gal. 3' D.C. 12 prickly stems to 34tall, red tomato shape fruit S S m horiocar os albus Y p P Snowber ry 2 al. 9 3' o.c. 20 handsome clmpact n unclipped compact and round GROUNDCOVER/ red or pink fruit spread. ® Arctostaphylos uva-ursi Kinnikinick 4" pot 18" D.C. ±140 10 15', somewhat slow: to establish ® Gaultheria shallon Salal N, of P 18" D.C. ±290 tall sun, poodepending on In sun, poor soil (2') or shade good soil (10) ® Polystichum munitum Sword fem 1 gal. 18" o.c. ±150 needs shade Hydroseed mix Process of applying grass seed mix (70-80% perennial rye blend and 30 to 20- percent fine Disturbed eas fescue blend) in slurry containinq wood fiber mulch fertilizer, tackifier & water. PLANT DETAILS E- DECIDUOUS OR CONIFEROUS INE AS DIRECTED 2 GAUGE GAV. STEEL WIRE RUBLE STAND 3BER HOSE- BLACK, 1/2" DIA. -BAR OR WOOD STAKE CROWN OF TREE AT SH GRADE ROVE BINDER TWINE AND ROLL ' 1/3 OF BURLAP AWAY FROM )TBALL ISH GRADE 'SOIL BACKFILL ERTILIZER 1GHEN ALL SURFACES rHE PIT N ill III `— EXCAVATE DRAIN CHANNEL 8" WIDE MIN. BACKFILL FIRST 6" WITH WASHED GRAVEL 2 TIMES ROOTBALL DIAMETER 7/8" BACKFILL REMAINDER WITH NATIVE SOIL UNDISTURBED NATIVE SOIL TREE DETAIL PLANT SET CROWN OF PLANT AT —FINISH GRADE ROOTBALL —SAUCER 2" HIGH ROUNDCOVER FINISH GRADE OOTBALL III — CUT NEW ROOT MASS — TO STIMULATE NEWROOTS J z TOPSOIL I)I u Hi--m�� BACKFILL &FERTILIZER T�. BACKFOILL tD & FERTILIZER 2 TIMES ROOTBALL —UNDISTURBED NATIVE SOIL UNDISTURBED NATIVE SOIL DIAMETER SHRUB DETAIL GROUNDCOVER DETAIL Sources: Western Engineers, Inc. Existing Condition & Tree Plan 4/16/07, Drainage Plan 4/18/08 Chenowith Land Surveying Snohomish County Assessor Map Jan 2004 Anderson Topography Map GFour Inc. 1989 (2' contour int.) with Boundary Survey based on Survey Recorded in Volume 22 of Surveys, Page 23, Records of Sno. Co. Tree Inventory Map by David Reich City Foresters Note: This plan is based on the listed sources. / EXISTING TREES TO REMAIN OUTSIDE OF RESIDENTIAL LOT BLDG. ENV. SYMBOL 0 Deciduous Evergreen Source: Western Engineers I I I I I e 1 I ' e TF e IIIPE / +M/ IN P/ ,2 1 i V el el �I el / / PLANT NOTES / 1. Contractor shall be responsible for familiarizing himself witt improvements prior to starting landscape work. 2. Contractor shall use caution while excavating to avoid distL underground utilities. Call 1-800-424-5555 before you dig. If a encountered, contractor is to promptly advise General Contrc 3. Contractor shall maintain and water plant material until owr received in writing. 4. Contractor shall be responsible for providing the quantity of plants that are represented by symbols on the drawing. 5. Contractor shall be responsible for computing specific quantities of groundcover and plant material utilizing on -center spacing for plants as shown on plant schedule and minimum planting distances as specified below. 6. Groundcover shall be planted in equilateral triangular spacing pattern at the on -center distances as shown. Minimum planting distances shall be 15" from center of all trees. 7. Submit four representative subsoil samples and one topsoil sample to a qualified testing laboratory or use soil samples collected by City Foresters. Add soil amendments as recommended by soil testing lab. 8. Backfill shall be clean, native material free of debris, gravel orwood chips. Backfill shall'consist of one-third Kellogg Nitrohumus, one-third Olympia bend sand and one third native soil. 9. Imported topsoil shall be a mix of organic matter and soil (composted sawdust, manure, sandy loam and loam soils), or existing on site stockpiled soil. 10, All plant material shall be fertilized per manufactures specifications. 11. All plant material shall conform to AAN standard for nursery stock, latest edition. TREE TO BE LEGEND PROPOSED DRAINAGE CUMUTILITIES FOR DEWATERING SLOPE SEE CIVIL ENGINEERING -` PLANS ... --- ----- --- EXISTING PLAT LINES EXISTING SUBDIVISION BOUNDARY LINE AREA TO BE LOT 2 BOUNDARY LINE ADJUSTMENT TO BE LOCATED BY SURVEYOR EXISTING CONTOUR — — — — — LINES (2' INTERVAL) REPLACEMENT CALL. For Tree to Be Removed Min replacement ratio: 2:1 Proposed replacement ratio: 2:1 min (see also the quantity of trees propo: onceat LandscaDe Flan 7/23/08) it I I I I 11 I' / I I I B � I + I t ( 1 i + 12 "MI ►J t I ' i' I', 1 1 l i t 112' I J I I I I 1 ' I 1 I I I t 1 I I I r t Il l! + J I I I L e � .�.� I• � ,L ! r + I r ! l t ttt r I !I� t 4111 y/F / r I /8,y F /W IffPV ,FACE CHANNELS TO / I AND INSTALL R PAN / / t t l I I I I le r( 1 I I 11 I I / / / / ( ! ► I + ► i I I l i I J 1 t I t t t ! ► I I 4 �7r\di, � I I I I I I J I I � r► R'LA'`�'" I I 1 / / I r I I I I � ► I + t l l abP� I I I I e I I I 1 I r I I I I I + 1 J I ( 1 I I i 1 + I f ., _.. I..I. I I t I I I I i I 11 I 1 1 1+ ;I• I . m/ W®M/ /mmmwpb�...I (.I I iI ! I + I I�I .®I I low � I + I I 1 1.r" / I 1 tI +T II I I�ss/12n I I I H 2/2 H I I + I + I II + I 0I ' "I / 1 10' EDMONDS, WA parcel00790400000200 Lorian Woods Subdivision R.W. Thorpe & Associates, Inc. Seattle - Anchorage • Denver Planning 0 Landscape Architecture Environmental 0 Economics SEAL 710 Hoge Building 705 Second Avenue Seattle Washington 98104 Telephone: 206.624.6239 Fax: 206.625.0930 E-Mail: planning@rwta.com STATE OF WASHINGTOi d REGISTERED LANDSCAPE ARCHITECT JENNIFER LEE CERTIFICATE NO. VO4 ISSUED No. Description Drn Ck'd Apv'd Date 1 Plantinq Plan JL SS RT 11/22/06 2 Planting Plan JL RT RT 06/05/0-7 0/05/07 3 Planting Plan JL RT _ RT 4/18/08 REVISIONS No. Description Drn Ck'd Apv'd Date 1 Planting Plan JL RT RT 04/07/08 2 Planting Plan JL RT RT 08/01/08 RWTA JOB NO. 0510116 SHEET TITLE Planting Plan for Tree Cutting Permit Application File No. CU-06-104 & One Sequoia Tree Removed & Replaced File No. CU-2008-36 Note: -' For Grading & AUGFQ 2008 Erosion Control WILDING EPARTMEN CITY OF EDMONDS Plan See Civil Engineers Plan SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING Est. # COMMENTS TREES beautiful when viewed from above, pink silk -like flowers, 10-25' tall leaf, flower and pod fall Per 1 best planted from containers established Albizia julibrissin Silk tree - Mimosa 1" Caliper Plan (one year; bare root plants need skillful planting, watering) c cer circinatum Vine Maple 5 gal Per 2 native to moist woods one of the most airy and multicane Plan delicate western natives height 30-35', graceful sweeping Chamaecyparis "Green Weeping Alaska 6' height g Per 1 branches (moderate water) nootkatensis Arrow" Yellow Cedar Plan Hybrid cypress x Leyland cypress Cypress: fast growing, drought -tolerant Cupressocyparis 6' height g Per to moderate water, attractive conifer leylandii Plan 2 or Thuja plicata Western Red Cedar needs no water once established SHRUB/TREE small broad -leaf evergreen tree, attractive Arbutus unedo Strawberry tree 5 gal Per 3 flowers and bright red fruit- 8-12' ht. multicane Plan takes little to regular water SHRUBS d Ceanothus 'Victoria' California lilac 5 gal. 5' O.C. 21 showy blue flowers, dark green shiny evergreen foliage, looks good year-round, no water near coast Japanese rose (Kerria) Kerria japonica 5 gal. 5' o.c. 9 3-6' high, 5-1 O' wide, showy flowers, bright green foliage little water once established Rosmarinus officinalis Rosemary 2 gal. 3' o.c. 7 little water once established Osmanthus delavayi Osmanthus 5 gal. 5' o.c. 6 graceful arching branches, white flowers, glossy leaves little water once established o Rhododendron Halleluja Hall 2 gal. 3' o.c. 9 rose -red flower, compact form, grows to 4' Halleluja Hall Rhododendron require soil that is fast draining & moisture retentive Rhododendron "Mrs. Mrs. Furnival 2 gal. 3' o.c. 12 light pink flowers, compact form, grows + Furnival" rhododendron to 4' + Rosa Rugosa Ramanas Rose 2 gal. 3' o.c. 7 fragrant, repeat blooms, helps prevent erosion, prickly stems, extremely tough & hardy - Rh Taxus Baccata Spreading yew 2 gal. 3' o.c. 24 hardy coniferous shrub 'repandens' little water once established 0 Vaccinium 'Sunshine Blue' Evergreen huckleberry 2 gal. 3' o.c. 6 native plant, small shiny evergreen leaves, edible berries, self pollinating good woodland garden subject Viburnumtinus'Dwarf Spring Bouquet 2 gal. 3' o.c. 3 compact form, white winter/spring Viburnum flowers, metalic blue berries GROUNDCOVER red or pink fruit spread 10 15% somewhat Arctostaphylos uva-ursi Kinnikinick 4" pot 18" o.c. ±120 in a slow to establish. attracts wildlife 180 sq. ft. good groundcover on slope, some water area ±50 in a FFM Gaultheria shallon Salal 4" pot 18" o.c. 80 sq ft 2-10' tall depending if in sun, poor soil (2') area or shade good soil (10') ® Polystichum munitum Sword fern 1 gal. 18" o.c. +130 in a needs shade, native 00 sq. ft. area established plants need little water Polytrichum Native Hair Cap Moss 4" pot 18" o.c. +60 in a tolerant of poor soil but needs — 100 sq. ft. area good drainage ® Saponaria ocymoides Rock soapwart 4" pot 18" O.C.o.c. 0 in a dense and reliable pink blooms, very 0 sq. ft. area hardy, infrequent water VINES Lonicera pileata Privet honeysuckle 1 gal. 18" o.c. 14 ow growing, small glossy evergreen leaves, white flowers followed by violet -blue berries, good bank cover moderate summer water Lonicera sempervirens Trumpet honeysuckle 1 gal. 18" o.c. 7 rapid, low growing, coral -red flowers, red berries attracts birds moderate summer water PERENNIALS crocus, daffodil, bulbs can be planted in small groupings in planting areas tulips, iris Gravel Estimated Quantity: Approximately 1,440 sq. ft. or 13 cubic yards at 3" depth River Rock Estimated Quantity: Approximately 50 sq. ft. or 0.15 cubic yards at 1" depth NOTE: DROUGHT TOLERANT OR DROUGHT HARDY PLANTS, MOST REQUIRING LITTLE WATER ONCE ESTABLISHED NO IRRIGATION PROPOSED PLANT NOTES 1. Contractor shall be responsible for familiarizing himself with all other site improvements prior to starting landscape work. 2. Contractor shall use caution while excavating to avoid disturbing any existing underground utilities. Call 1-800-424-555 before you dig. If active utilities are encountered, contractor is to promptly advise General Contractor and Owner. 3. Contractor shall maintain and water plant material until owner's final acceptance is received in writing. 4. Contractor shall be responsible for providing the quantity of plants that are represented by symbols on the drawing. 5. Contractor shall be responsible for computing specific quantities of groundcover and plant material utilizing on -center spacing for plants as shown on plant schedule and minimum planting distances as specified below. 6. Groundcover shall be planted in equilateral triangular spacing pattern at the on -center distances as shown. Minimum planting distances shall be 15" from center of all trees. 7. Submit one representative subsoil samples and one topsoil sample to a qualified testing laboratory or use soil samples collected by City Foresters. Add soil amendments as recommended by soil testing lab. 8. Imported topsoil shall be a mix of organic matter and soil (composted sawdust, manure, sandy loam and loam soils), or existing on site stockpiled soil. 9. 2" depth mulch in all planting beds 10. All plant material shall be fertilized per manufactures specifications. 11. All plant material shall conform to AAN standard for nursery stock, latest edition. Source(s): Michael A. O'Brien, AIA NCRB O'Brien & Associates Site Plan February 2008 Western Engineers Grading & Drainage Plan April 2008 Note: This plan is based on the listed sources. PLANT DETAILS 2 TIMES ROOTBALL DIAMETER TREE DETAIL Existing Nk C S \__\ \ \ \ _ \ urn ro p e \ \ \ \ \ N, rty \ \ I C2" ----_ 60 \ \ \ \ \ \ \ \ EDMONDS, WA parcel 00790400000200 Lorian Woods Subdivision / So 1,48 PROPOSED -WAL-L(S) 1 ' - ` ` \ \ R.W. Thorpe a Associates, Inc. \ \•_ Existing 20" ` 1 6. ` ` _ „� + + ` ` ` �7`GRAVEL PATH T0.CATCHMEN \ \ \ \ ` Seattle • Anchorage • Denver WALL -(FOR M_AINTENANrrE� —— _ Planning 0 Landscape Arc hitecture _ -1 44 Exis g Environmental 0 Economics :. ..•. 4811 ::�{ POTENTIAL TERRACED- _ \ PATIO - _ 142 - , / 1 _ :. VEG.-GARDEN ON LOT \ , :: _ _ 710 Hoge Building 10 BUILDING—SETJ3ACK LINE ( / — — — _ _ _ _ — _ \ \ 705 Second Avenue Seattle Washington 98104 TYPICAL STORM/UTILITY LINE SEEVIL-€AIG. PLAN ° �z� 6 — _ 0 �I— — Telephone:206.624.6239 ` \ Fax: 206.625.0930 o E-Mail: planning@rwta.com YARD DRAIN #1 - _ �'LO ./ DINING f;r OI'T•-OVAL 2' WIDE BY 1' DEEP LINED RM RIVER ROCK-DITC-H TO RUN SEAL - BETWEEN YARD DRAIN 1-&_2o wn, GUEST ' • \ ABOVE A PORTION OF THE PROPEL) f' i `-- �M1 KITCHEN 42 136 UNDERGROUND STORM LINE REF, r' ` -TO_BE REVIEWED o OO POWDER ! ._. ... .... O ROOM BY WESTERN —ENGINEERING./ •:.••••• \ f \ YARD DRAIN #2 26Sti --134 2' WIDE GRAVEL PATH Y _ _ 1 r.. 132 - ` — TYPICAL STONE STEPS+— ^ ` - MIN. 18" WIDE �, + '•130 . FLAGSTONE VIEWING AREA + OPTIO AL FOUNTAIN ` _ _ _ _ d _ c 1 .ti J :E- DECIDUOUS OR CONIFEROUS INE AS DIRECTED 2 GAUGE GAV. STEEL WIRE RUBLE STAND IBER HOSE- BLACK, 1/2" DIA. :BAR OR WOOD STAKE CROWN OF TREE AT SH GRADE LOVE BINDER TWINE AND ROLL 1 /3 OF BURLAP AWAY FROM )TBALL SH GRADE U, SOIL BACKFILL :RTILIZER IGHEN ALL SURFACES 'HE PIT AVATE DRAIN CHANNEL 8" WIDE BACKFILL FIRST 6" WITH WASHED GRAVEL BACKFILL REMAINDER WITH NATIVE SOIL UNDISTURBED NATIVE SOIL Z ti z 2 TIMES ROOTBALL \ DIAMETER L2 SHRUB DETAIL R 0 GROVE ON -� �IIIIIIIII�� N� .. 11111� � � �► }} f 5 •� I' 8 �■.•J:"f."1 milmlvffip PLANT SET CROWN OF PLANT AT FINISH GRADE ROOTBALL —2" MULCH SAUCER 2" HIGH —FINISH GRADE CUT NEW ROOT MASS TO STIMULATE NEW ROOTS TOPSOIL BACKFILL & FERTILIZER NDISTURBED NATIVE SOIL WIN Rh GRAVEL FAMILY RM \1\ _ 'f1 1-IIII III - - - - - - - - - - - - - aim 910 104.00, _: 39Q ROUNDCOVER DOTBALL MULCH 811�— TOPSOIL BACKFILL & FERTILIZER \NDISTURBED NATIVE SOIL E� GROUNDCOVER DETAIL �7r STATE OF WASHINGTON RE-013fERED WIDSCAPE ARCHITECT ` JENNIFER LEE CI-RTIFrICA`CE NO. 9M ISSUED No. Description Drn Ck'd Apv'd Date 1 Landscape Plan JL RT 2/27/08 2 Landscape Plan JL RT 4/23/08 3 Landscape Plan JL RT 8/01/08 \ ` REVISIONS - Existing 11 W \ No. Description Drn Ck'd Apv'd Date — �ry \ AiE OF ASHINGTON GISTERREED CAPEARCHITECT lou- JEN FER LEE 0 4' 8' CERTIFICATE NO.934 1/811 = 1' RWTA JOB NO. 0.5__ 10116 C___ SHEET TITLE AUG - 8 2008 BUILDING DEPARTMENT CITY OF EDMONDS AV oz, g,: �U AUG - 8 2008 BUILDING DEPARTMENT CITY OF EDMONDS 157.75'-,, Ou (5\ rn +146.75v 0 PROPOSED CONCRETE CATCHMENT/RETAINING WALL 1 2.8 PROP-QaED— 14.6.601 I' 0() CONCRETE PATIO -----__ 752 S.F. AA EDGE OF ROOF INCL. GUTTER L------------------------ ---------------------- .......... ............... -7 — — — — — — - LOT 2 6 61208 SF C) Q) (� ' PRO OSED CONCRETE 0 (0 STE S AND WALKWAY PROPOSED RESIDENCE 2 I BUILDING PAD ARE :2,487 S 361160 --T ELEC 21 '0 METER--. (51 - '6 EDGE OF ROOF INCL. GUTTER -------------------- 0 0 4zj/ /PRO OSED PROPOSED L / COWRED I Q) 114j/ DECK 0/ '�/ J PO PH PROPOSED 279 S.F. -n P�H/T-V/- Ll- I 1 0 0 0 9/ GARAGE C)/ S 1311.50'- /SS 001, No 8 05 9,0,3,, -I- fil H/-T-V6— ss - L-- / EDGE OF ROOF INCL. GUTTER-w- 1do33.00' 0 G T PROPOSED G NCRETE PLANTING T 0 SS EN PS PROPOSED CONCRETE 34 ALL EXPOSED SURFA(,ES TO, BE COVERED DAYS 7 F. 6 OWNER/CONTRACTOR IS RESPONSME FOR EROSION CONTROL AND hDaAwkc-7 F— c* DRIVEWAY +132.25' S PROPOSED STONE -FACE DRIVEWAY SLOPE: 8.3%-13.6% 7'10.111 G RETAINING WALL 30'0" MAX. 4" SLEEVE UNDER DRIVE, - - - - -- W Q EXIST'G J0_ WATER < VALVE BOX Applicant shall repair/replace all damage to G utilities or frontage improvements in City right-of-way per City standards that Is caused or occurs during the permitted project. G SS VOTE: SEE DRAINAGE PLAN SHEET 5 OF CIVIL DRAWINGS FOR STORM DRAINAGE LAYOUT & CONNECTIONS 1, MICHAEL A. O'BRIEN HAVE REVIEWED THE GEOTECHNICAL REPORT, UNDERSTAND IT'S RECOMMENDATIONS ANS HAVE INCORPORATED INTO THE DESIGN THE ESTABLISHED MEASURES TO REDUCE THE POTENTIAL RISK OF INJURY OR DAMAGE FROM ANY EARTH MOVEMENT PREDICTED IN THE REPORT. AGENCY NOTES Owner & Project Contacts: Brian & Cindy Isaacson 114 Second Ave. S. Edmonds, WA 98020 (425) 825-1002, Legal Description: Lot 2 of Lorian Woods as per Plat recorded In Volume 51 of Plats, Pages 145 and 146, Records of Snohomish County Auditor, situated In tho county of Snohomish, state of Washington Parcel / Tax Account #: 007904000002100 Address: 16007 73rd Place West Edmonds, WA 98026 (Lot 2 - Lorlan Woods PRD) Applicable Codes: • 2006 International Residential Code • 2006 International Fire Code • 2006 International Mechanical Code 2006 International Fuel Gas Code • 2006 Uniform Plumbing Code • 2006 Washington State Energy Code • 2006 Washington State Ventilation & Indoor Air Quality Code • Edmonds Zoning Code • Earth Subsidence and Landslide Hazard Area (ESLHA) Ordinance #3632 Type of work: New Single Family Residence w/ associated decks, front porch, patio and catchment wall Zoning: Single Family Residential RS-20 Occupancy/Use: Single Family Residence R-3 Type of Construction: V-B No fire sprinklers Lot Square Footage: 6,208 s.f. (0.142 acres) Lot Impervious Areas: 41811 s.f. Lot Coverage 2,494 s.f. house footprint + 279 s.f. deck + 97 s.f. front porch 2,870 s.f. total lot coverage (46.23%) Square Footage: Main Level: 1,961.1 s.f s-f" 1 Upper Level: 724.0 s.f. .LLL=- 6 U �ev�' Z: 8_ Total living srpace: 3i,685.1 s.f. 5_1 s.f. 1 living Garage: 773.4 s.f. Future Shop (aarage Level): 570.0 s.f. Garage Level Stairs, bath: 176.5 s.f. Covered Front Porch: 88.3 s.f. .Decks (2): 377.9 s.f. Rear Patio: 707.0 S. f. Z Loads: now Lc."' oo�Design (See Sheet S-Oa of Structural Roof Dead Loud: 25 PSF Drawings) Floors Live Load: 40 PSF Floors Dead Load: 10 PSF Wind Speed: 85 MPH (Exposure C) Seismic: D Soil Bearing Pressure: 1200 PSF Type of Heat: Gas -fired forced air system Maximum Allowed Height of Maximum Height Allowed per Zoning Code = 25' Structure: plus 9' Height Variance Granted per Height Variance V-08-53 dated 2/19/09 34'0" allowed Average Grade: 137.394' Highest Point of Structure: (roof ridge): 171.29'(33'10.3/4" above average grade) VISITING PARKING AREA DATUM POINT ELEVATION EXIST"G STORM DRAIN, MANHOLE AP D nil NGINEERING J'�u� [RIM ELEVATION: 133.46' ROVED BY LANNING 6 Zone �D )Corner flagjQ Setbacks RegWred Ffent Q SWN Rc.v e Heiaht '-*D q f 0-see CIVIC-$. Foe- STREET FILE ALL ,AVERAGE GRADE HEIGHT CALCULATION NE CNR 142.80.. NW. C N R 132.101+ 132.251/ 2 = 132E175w SW CN,R 133.002 SE CNR 136.60' + 146.60' l 2 = 141.601 549.5752/ 4 137.394 1 0 AVERAGE GRADE RESUIM4 MAR 18 2011 0 C4 CD L0 C'4 r- M <1 U (0 C\I LU X 0 M 0 OD 13: 0) X C\I C/3 15 CT cuN U) L0 ch U-) Z G:� C\I Lo 0-) LO CD 0 Lv 0 'D 0 OF < a) EF E2 a' W Z W cn W AdhfiEd Z U) LU r) 0 cal Cn LU <rn 0 0 C, 00 J 0- Z < < S 72 65 ry- 0 C15 0 I r-, J C\F Z 0 C:) co 0 0 -i LU IFJ