16221 75 PL W-Storm Drain Imp. Letter (2).pdf/]) c . 1890 CITY OF EDMONDS GARY HAAKENSON MAYOR 121 5TH AVENUE NORTH ® EDMONDS, WA 98020 ® 425-771-0220 ® FAX 425-771-0221 Website: www.ci.edmonds.wa.us SCANNED PUBLIC WORKS DEPARTMENT Engineering Division December 17, 2009 Phyllis Lawson 16221 75th Place West Edmonds, WA 98020 RE: Storm Drainage Improvements at 1631175"' Place Nest Ms. Lawson, JUL 0 7 Yw Per your request, the City is hereby informing you that the construction of the storm improvement system at 1631175'1' Place West is complete. The following is provided in response to your letter of September 30, 2009: The storznwater diversion that I believe you are referring to (the above ground piping) was a diversion put in place by Mr. Pearson to allow for the construction of the storm system improvements per the approved plans. The diversion was temporary and the above ground piping has been removed as the storm system construction is now complete. Exhibits B & C to the Storzrzwater Agreement and Covenant are not construction drawings. A separate civil plan was submitted by Pearson for the storm system at 16311 75th Place West. The design was completed by a fain hired by Mr. Pearson and the plans were approved by the City. The engineer of record as noted on the plans is Todd W. Perbik, P.E. of Perbix Bylconen. Review of the proposed system was completed by City staff Don F. Fiene, P.E. and Lyle Chrisman. As previously communicated and provided for in the recorded covenant, the Pearsons, their successors and assignees agree to maintain, repair or reconstruct the storm system in perpetuity in order to convey stonnwater to the catch basin owned by the City (shown on Exhibit D of the agreement). City Public Works Department staff perforins regular maintenance inspections of the City's storm system adjacent to Pearson's private storznwater system. Maintenance inspections are typically performed on a weekly basis which is normally sufficient to deterinine that Pearson's system is not causing an impact to your property. Land use action bulletins were not required by City Code for the work performed by Mr. Pearson and therefore, a sign was never posted at the site. Incorporated August 11, 1890 Sister City - Hekinan, Japan 14 0?f�jfi No permits were required for the construction of the storm improvements and therefore inspections performed did not follow the typical permit process. Mr. Pearson was given authority to construct the storm improvements through the agreement between the City and Mr. Pearson, which was recorded against the property on September 19, 2001. In addition, the City approved plans for the storm system design on November 20, 2001. Please feel free to contact Jeanie McConnell at 425.771.0220, Ext. 1338 should you have any additional questions. Sincerely, ihi 4A) Robert S. English, P.E. City Engineer RE/j m c: Street files; j,C5 2� 7, Stn P1a' e; Wes and 16311 75t" Place West CADocuments and Settings\curtis\My Documents\Bngsec\Lawson Response Lettendoe