June 15, 2012
Steele Home Services, Inc.
23631 Edmonds Way
Edmonds, Washington 98026
Attention: Mr. Dwight Steele
RE: Limited Geotechnical Reconnaissance
Chilelli Deck Replacement
16508 — 76`h Avenue West
Edmonds, Washington
Dear Mr. Steele:
KA Project No. 092-12007
ST&Z. REEp FILE
RESUS
JUN 2 5 2012
BUILDING DEPARnMENT
CITY OF EDMONDS
This letter presents the results of our site reconnaissance and geotechnical conclusions and recommendations
for the proposed deck replacement project. The scope of this limited geotechnical reconnaissance was
outlined in our Proposal Number G12-287WAB, dated May 21, 2012.
Introduction
It is our understanding that current project plans include a the replacement of an existing deck at the single
family residence located at 16508 — 76"' Avenue West in Edmonds, Washington as shown_ in the Vicinity
Map in Figure 1. The City of Edmonds requires a geotechnical study for the proposed deck project.
We have been requested to provide geotechnical engineering services regarding the planned site
improvements. The scope of this limited evaluation includes a limited background review of available
historical records and published geologic information for the site, a limited surficial reconnaissance of the
site slopes, and exploration of near -surface soil conditions with a shallow hand tool excavation in the area of
the planned deck foundations.
For our use in preparing this proposal we have been provided with plan sheet Al by tecinsfruct LLC, dated
May 9, 2012. We have also been provided with a letter from the City of Edmonds, dated May 10, 2012,
regarding critical areas and the need for a geotechnical report for this project. According to the City of
Edmonds letter, applicable Edmonds code for this project are ECDC 23.80.040.A.3 (Allowed Activities —
Geologically Hazardous Areas — Erosion and Landslide Hazard Areas) and ECDC 23.80.070.A.2
(Development Standards — Specific Hazards.— Alterations). The letter also indicates that the project site is
located within the mapped North Edmonds Earth Subsidence and Landslide Hazard Area (ESLHA).
The site is located near the southern portion of an area known as the Meadowdale Landslide and is within the
North Edmonds ESLHA as defined by Landau Associates in their report to the City of Edmonds in 2007. In
particular, the site is situated just beyond the top of the southern scarp of the landslide. The Landau
Ten Offices Serving The Western United States
11715 N Creek Parkway S., C-106; Bothell, WA 98011 • (425) 485-5519; Fax (425)485-6837
KA No. 092-12007
June 15, 2012
Page No. 2 of 6
Associates report defines this area along the top of the landslide as Zone D and provides recommendations
for geotechnical report requirements.
Zone D. This zone encompasses the active scarp of the landslide and incorporates ground that
is outside the currently active landslide area. The west part of this zone includes parts of the
slope that are actively failing as shallow debris slides. This zone also includes areas that can
potentially fail as large block failures. . The eastern part of this zone includes currently stable
ground that has not yet failed behind the present top of the landslide scarp. This area could be
subject to failure from a large block -type landslide failure or a series of shallower debris slides
occurring on the face of the bluff and the resultant bluff retreat over a period of years. Any
development near a designated landslide hazard zone will require consideration of the landslide
hazard, potential bluff retreat, and buffers (designated as a distance of 50 ft or the height of the
steep slope back from the top of the slope, whichever is greater, per the requirements of ECDC
23.80).(Landau Associates, 2007)
It is our understanding that due to the light structure being replaced, and the fact that there is no proposed
change to the footprint of the existing deck, the City is willing to accept a geotechnical report with less
stringent requirements for subsurface exploration, slope stability analysis, and geotechnical recommendations
than those recommended for Zone D in the Landau Associates 2007 report.
General Site Description
The project site is situated near the Puget Sound shoreline, north of downtown Edmonds in a residential
neighborhood. The site includes sloping ground, generally sloping down to the north and west. The site
currently includes a single family residence and existing deck. A lawn and other landscaping features are
located throughout much of the property.
Geologic Setting: The site lies within the central Puget Lowland. North of Olympia, Washington, this
lowland is glacially carved, with a depositional and erosional history including at least four separate glacial
advances and retreats. The Puget Lowland is bounded to the west by the Olympic Mountains and to the east
by the Cascade Range. The lowland includes deposits of glacial and non -glacial sediments.
The "Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington,"
prepared by James P. Minard (U.S.G.S., 1983) indicates that the site area is underlain by Glacial Till (Qvt).
In general, Glacial Till. consists of a very compact, unsorted mixture of silt, sand, gravel, cobbles and some
boulders.
Other materials mapped near the site include the Quaternary Whidbey Formation (Qw) located to the north
and west of the property, and generally include compact interglacial deposits of sand and gravel. Quaternary
Olympia Gravels (Qog) are located stratigraphically above the Whidbey Formation and include compact
interglacial fluvial deposits of gravel and sand. The Olympia Gravels are located northeast of the property.
Above the Olympia Gravels, the map indicates that Quaternary Transitional Beds (Qtb) are present. The
Transitional Beds generally include compact clay, silt and fine sand layers from ancient low -energy
depositional environments. These materials are generally located east and northeast of the project site.
Above the Transitional Beds, the map indicates the presence of Quaternary Advance Outwash (Qva).
Krazan & Associates, Inc.
Ten Offices Serving The Western United States
KA No. 092-12007
June 15, 2012
Page No. 3 of 6
Advance Outwash includes compact, poorly to moderately sorted sand with some gravel. This material is
shown on the map to be located east and northeast of the project site.
We also reviewed a geologic map by Mackey Smith (WA DNR and U.S.G.S., 1975), titled "Preliminary
Surficial Geologic Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King
Counties, Washington". This map indicates that the area to the north of the project site consists of
Quaternary Old Landslide deposits (Qols).
We reviewed the "North Edmonds Earth Subsidence and Landslide Hazard Map", created by Landau
Associates, Inc. (May 2006), for additional information regarding the local geology in the site area. The map
indicates the presence of a large landslide scarp north of the project site. In particular, the southern edge of
the scarp is located along the northern property boundary of the site. The existing residence and attached
deck are located outside of the southern edge of the landslide scarp. The northern edge of the proposed deck
project is approximately 16 to 20 feet from the top of the steep slope.
The site is located within the ESLHA, but outside of the active landslide area. A report by GeoEngineers,
Inc. (1985) noted that the installation of sanitary sewers and storm drains by the City of Edmonds had since
lowered groundwater levels in the area and reduced the landslide hazard risk. Even with a reduced slide
hazard, there still exists some risk of landsliding. We did not find documentation of other significant slides
in the area since the 1946-47 event, including the winter of 1996-97 when significant slides occurred
throughout the Puget Sound Region.
Site Reconnaissance
We visited the site on May 31, 2012 for a limited geotechnical site reconnaissance. The primary intent of the
site visit was to observe current surface conditions prior to preparing a letter for the planned deck
replacement project. During our site reconnaissance, we did not observe indications of recent instability on
the slope. The steep slope in the northern portion of the property was interpreted to be the edge of a large
landslide that was active as recently as the winter of 1946-47. Most of the property is gently to moderately
sloping down to the west. A Site Plan showing property boundaries, approximate residence location, and
approximate elevation contours is presented as Figure 2.
We explored the near -subsurface soil conditions in the planned deck footing areas near the western side of
the existing structure. Approximately 2 to 3 feet of loose, undocumented fill was encountered in the hand
auger explorations. Deeper fill areas are possible in the planned deck remodel area. We interpret native
Glacial Till to underlie the undocumented fill.
Conclusions and Recommendations
General: It is our opinion, from a geotechnical engineering standpoint, that the proposed deck replacement
project is feasible and should not adversely impact the overall stability of the site, provided that our
recommendations are incorporated into project plans.
The plans indicate that the deck will be a lightly loaded structure and recommendations for foundation
support were not included in the scope of work. However, due to the loose surficial soils encountered in our
Krazan & Associates, Inc.
Ten Offices Serving The Western United States
KA No. 092-12007
June 15, 2012
Page No. 4 of 6
shallow hand auger explorations near the proposed deck replacement footings, we are providing a few
general guidelines'for improved foundation support for the proposed deck.
The proposed deck should be supported on shallow footings bearing on the medium dense or firmer native
soils, or on structural fill extending to the medium dense or firmer native soils. Based on our explorations,
the medium dense or firmer native soils should typically be encountered at least 2 to 3 feet below the current
grade in the western portion of the deck area. It is possible that deeper areas of loose soils could be
encountered at the site. A representative of Krazan and Associates should be available to evaluate soil
conditions in the planned footing areas during construction, upon request.
Footings should have a minimum embedment depth bf 18 inches below pad subgrade (soil grade). Footing
widths should be based on the anticipated loads. Water should not be allowed to accumulate in footing
trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing
concrete.
Structural fill should be compacted to at least 95 percent of the maximum dry density based on ASTM Test
Method D1557. Footing excavations should be inspected by the geotechnical engineer to verify that the
foundations will bear on suitable material.
Site Stability: The site is in the ESLHA and studies indicate that there is some continued risk of landsliding.
We did not observe indications of recent instability at the site or on the adjacent slopes. We observed large,
mature trees and the absence of noticeable tension cracks on and near the pre-existing slide scarp along the
northern property boundary. Glacial Till is interpreted to underlie the site at depth, and is typically
considered to have good strength due to its very dense, granular nature.
Stormwater Runoff: The area of impervious surfaces will not be increased by the deck replacement project.
Stormwater is not currently allowed to concentrate from the existing deck area. The existing deck floor has
gaps, and water is dispersed throughout the landscaping below the deck. Based on current project plans, it
appears that stormwater runoff conditions at the site should remain unchanged.
Erosion Control: We recommend that the site soils be protected from erosion due to flowing water or wind.
Stormwater should not be allowed to concentrate near the top of slopes or be allowed to flow over the steep
slopes.
Erosion and sediment control (ESC) is used to minimize the transportation of sediment to wetlands, streams,
lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be
implemented and these measures should be in general accordance with local regulations. At a minimum, the
following basic recommendations should be incorporated into the design of the erosion and sediment control
features of the site:
1) Phase the soil, foundation, utility and other work, requiring excavation or the disturbance of the site
soils, to take place during the dry season (generally May through September). However, provided
precautions are taken using Best Management Practices (BMP's), grading activities can be
undertaken during the wet season (generally October through April), but it should also be known that
this may increase the overall cost of the project.
Krazan & Associates, Inc.
Ten Offices Serving The Western United States
KA No. 092-12007
June 15, 2012
Page No. 5 of.6
2) All site work should be completed and stabilized as quickly as possible.
3) Additional perimeter erosion and sediment control features may be needed to reduce the possibility
of sediment entering the surface water. This may include additional silt. fences, silt fences with a
higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems.
Conclusion: Provided that the geotechnical recommendations and construction specifications relevant to the deck
remodel are implemented during construction, it is our opinion that the proposed improvements should not
increase the potential for erosion and landslides within the project site, neighboring properties and other
critical areas.
Testing and Inspection
We are available on request to evaluate soil conditions during construction of the proposed replacement deck.
This activity is an integral part of our services as acceptance of earthwork construction is dependent upon
observation of the consistency of the soil and groundwater conditions, and making appropriate adjustments if
conditions vary from those indicated by out explorations.
LIMITATIONS
Geotechnical engineering is one of the newest divisions of Civil Engineering. This branch of Civil
Engineering is constantly improving as new technologies and understanding of earth sciences improves.
Although your site was analyzed using the most appropriate current techniques and methods, undoubtedly
there will be substantial future improvements in this branch of engineering.
In addition to improvements in the field of geotechnical engineering, physical changes in the site either due
to excavation or fill placement, new agency regulations or possible changes in the proposed structure after
the time of completion of the geotechnical letter may require the geotechnical letter to be professionally
reviewed. In light of this, the,Owner should be aware that there is a practical limit to the usefulness of this
letter without critical review. Although the time limit for this review is strictly arbitrary, it is suggested that
two years be considered a reasonable time for the usefulness of this letter.
The recommendations made in this letter are based on the assumption that soil and groundwater conditions
do not vary significantly from those disclosed during our field investigation. If any variations or undesirable
conditions are encountered during construction, the geotechnical engineer should be notified so that
supplemental recommendations can be made.
The conclusions of this letter are based on the information provided regarding any proposed construction. If
the proposed construction is relocated or redesigned, the conclusions in this letter may not be valid. The
geotechnical engineer should be notified of any changes so that the recommendations can be reviewed and re-
evaluated.
This letter is a limited geotechnical reconnaissance with the purpose of observing surficial geologic
conditions at the site to evaluate the impact of the deck replacement project. The scope of our services did
not include any environmental site assessment for the presence or absence of hazardous and/or toxic
Krazan & Associates, Inc.
Ten Offces Serving The Western United States
KA No. 092-12007
June 15, 2012
Page No. 6 of 6
materials in the soil, groundwater or atmosphere, or the presence of wetlands. Any statements, or absence of
statements, in this letter or on any exploration log, regarding odors, unusual or - suspicious items, or
conditions observed are strictly for descriptive purposes and are not intended to convey engineering judgment
regarding potential hazardous and/or toxic assessments.
The information presented herein is based upon professional interpretation utilizing standard engineering
practices and a degree of conservatism deemed proper for this project. It is not warranted that such
information and interpretation cannot be superseded by future developments. We emphasize that this letter is
valid for this project as outlined above, and should not be used for any other site.
We appreciate the opportunity to provide service to you on this project. If you have any questions, or if we
may be of further assistance, please do not hesitate to contact our office at (425) 485-5519.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
6/15/12
Michael D. Rundquist, P.E.
Senior Project Manager
JGL:MDR
Attachments: Vicinity Map and Site Plan
W as hi�`gf
co 7
2862
4sed Ge0'\o
Jeffrey G. League
Jeffrey G. League, L.G.
Project Geologist
Krazan & Associates, Inc.
Ten Offices Serving The Western United States
Vicinity Map N
(Not to Scale)
4SW
148th
Puget
Sound
525
Approximate ;
Site Area a
r
N
Q
176th St SW
N
Q
99
196th St SW
Edmonds, Snohomish County, Washington
16508 - 76th Avenue West, Edmonds, WA
OF
aIarZ & ASSOCIATES,INC.
Chilelli Deck Replacement Project, 16508 - 76th Ave W, Edmonds, WA
Date: June 2012 References: Based on Google Maps
Drawn By: JGL Figure 1 Project Number: 092-12007
Site Plan
(Not to Scale)
- - 70- — -
Elevation Contour Interval: 5 Feet
(Based on Snohomish County "SnoScape" imaging.)
Reference: Site Plan based on Snohomish County "SnoScape" imaging and Google Maps. I
Elevation Contour Interval: 5 Feet
(Based on Snohomish County "SnoScape" imaging.)
Reference: Site Plan based on Snohomish County "SnoScape" imaging and Google Maps. I
CITY OF EDMONDS
121 5 h Avenue North, Edmonds WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.EdmondsWA.gov
DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION
'nC. 18y"
Critical Areas Reconnaissance Report
Critical Areas File Number
CRA20120027
Determination
Study Required
Site Location _ _�
_16508 76rh Ave W, Edmonds
Tax Account Number
00513109700501
Property Owner
Donna. Chielli
Applicant
Dwight Steele / Steele Home Service, Inc.
Critical Areas Present
21-Geologically Hazardous Areas
2 Landslide Hazard Areas
I I -
Q ESLHA
Site Description
During review and inspection of the subject site, it was found that the site may contain (or be adjacent to) critical
areas, including a Geologically Hazardous Areas (Erosion'Hazard Area or Landslide Hazard Area, as well as within
the buffer of the Earth Subsidence and Landslide Hazard Area "ESLHA"), pursuant to Chapter 23.40 of the
Edmonds Community Development Code (ECDC). Geologically hazardous areas include areas susceptible to
erosion, land sliding, earthquake, or other geological.events. They pose a threat to the health and safety of citizens
when incompatible development is sited in areas of significant hazard. Such incompatible development may not
only place itself at risk, but also may increase the hazard to surrounding development and use. Cited sections of
the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at
www.EdmondsWA.gov.
The LiDAR map (inset) indicates that there is a steep
slope (approximately 48%) just north of the house.
The site is generally comprised of a rolling slope of
30% across the entire property rolling from west to
east. Soils on the property are identified as
Alderwood gravelly sandy loam series, which
classifies the site as a potential erosion hazard.
These slopes qualify as potential "geologically
hazardous areas." Projects proposed further than
65' from the top or toe of the slope (50' buffer + 15'
setback fromthe critical area) may not require a
geotechnical report to address critical areas issues
(of course, other departments may require a report
to address their codes).
Allowed Activities & Exempt Proposals
Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.220. Similarly, certain
development proposals may be exempt from Critical Areas requirements (ECDC 23.40.230). If you have any
questions about whether your proposed development qualifies as an allowed or exempt activity, please contact
a Planner for more information.
General Report Requirements
Critical Areas Reports identify, classify and delineate any areas on or adjacent to the subject property that may
qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific
development proposal. If a specific development proposal results in an alteration to a critical area the critical
areas report will also contain a mitigation plan. You have the option of completing the portion of the study that
classifies and delineates the critical areas and waiting until you have a specific development proposal to complete
the study. You may also choose submit the entire study with your specific development application. Please review
the minimum report requirements for all types of Critical Areas which are listed in ECDC 23.40.090.D. There are
additional report requirements for different types of critical areas (see below). Note that it is important for the
report to be prepared by a qualified professional as defined in the ordinance. There are options on how to
i complete a critical areas study and an approved list of consultants that you may choose from. You may contact the
Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in
ECDC 23.40.110 through 23.40.140.
Landslide Hazard Areas
Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas
will require a report by a licensed Geotechnical Engineer. Geologically hazardous areas include areas susceptible
to erosion, land sliding,, earthquake, or other geological events. They pose a threat to the health and safety of
citizens when incompatible development is sited in areas of significant hazard. Such incompatible development
may not only place itself at risk, but also may increase the hazard to surrounding development and use.
The criteria that are applied depend on the amount that the buffer is reduced. The buffer can be reduced to a
minimum of ten (10) feet (with an additional 15' building setback per ECDC 23.40.280) if a report is prepared that
meets the standards listed in ECDC 23.80.050). The alteration must also meet the requirements listed ECDC
23.80.060. In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design
standards listed in ECDC 23.80.070.A.3. Development is restricted within a Landslide Hazard Area and its buffer.
Projects that will intrude into these areas will require -a report by a licensed Geotechnical Engineer.
Page 12
Determination: Study Required
This review applies to the entire subject parcel. Depending on the location and project proposed relative to the
identified critical areas, certain studies and reports may be required. Please contact the Planning Division at'
425.771.0220 if and when you have a specific development proposal for this site in order to discuss the various
permits that will be required. Please note that tree removal on sites containing critical areas may first require a
tree cutting permit, and the illegal removal of trees may result in penalties and steep fines (ECDC 1&45.070,
ordinance #3828).
Gina Coccia, Associate Planner May 10, 2012
Name, Title Signature Date
Page 13
CITY OF EDMONDS
121 5th Avenue North, Edmonds. WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.EdmondsWA.gov
DEVELOPMENT SERVICES, DEPARTMENT • PLANNING DIVISION
Inc. 189"
DATE: May 10, 2012
TO: Donna Chilelli: 16508 76`h Avenue West, Edmonds WA 98026
RE: Planning Division comments for file BLD20120304 -- Chilelli Deck Replacement
......................................................................................:..................................................................:........ .
Greetings,
Thank you for submitting a building permit application for a deck replacement at 16508 76th Avenue West in the
RS-12 zone. I have reviewed the above building permit application for the Planning Division and it was found that
the following information, corrections, or clarifications will need to be addressed before the Planning Division
review can continue.
1. Deck Footprint: Please clarify that there is no proposed change to the footprint of the existing deck.
2. Critical Areas / Geotechnical Report: As you are aware, there is a steep slope on your property. Steep slopes
are a type of critical area (geologically hazardous area). Projects proposed on or near steep slopes, such as
this, require a geotechnical report to ensure that the critical areas (steep slope) are not adversely impacted.
We have a title in our code "Title 23 — Natural Resources" and chapters 23.40 (Environmentally Critical Areas
General Provisions) and chapter 23.80 (Geologically Hazardous Areas) of this title are applicable to your
project. Your geotechnical engineer will need to review ECDC 23.80.070.A.2 and ECDC 23.80.040.A.3 and
submit a report describing how the proposed deck replacement will meet these requirements of our critical
areas ordinaice.
3. Earth Subsidence and Landslide Hazard Area (ESLHAI: Please be aware that this property is located within the
mapped ESLHA, which may trigger other building permit requirements. Your permit coordinator
(425.771.0220) would be able to tell you if any additional requirements are applicable.
Please submit a written response to the above, alone with any revised plans to your Permit Coordinator: Linda
Thornquist. All code citations can be found at: www.EdmondsWA.gov. If you have any questions, please do not
hesitate to contact me. I look forward to working.with you on this project.
Sincerely,
gina coccia :: associate planner
City of Edmonds Development Services Department
121 5`h Avenue North, Edmonds WA 98020
425.771.0220 x 1778 1 coccia@ci.edmonds.wa.us
cc: BLD20120304
11 P a g e
8g0-,99_
STREET FILE
CITY OF EDMONDS
250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-0220 • FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works • Planning • Parks and Recreation • Engineering
June 21, 1994
Dr. and Ms. Goodrick
16508 - 76th Ave. W.
Edmonds, WA 98026
SUBJECT: YOUR LETTER DATED JUNE 14,1994
Dear Dr. and Ms. Goodrick,
Mailed 6/21/94
LAURA M. HALL
MAYOR
The Engineering Division received your letter on June 15, 1994. As indicated on the
telephone to Ms. Goodrick, the situation on 76th Ave. W. will continue to be monitored
by Engineering staff. As indicated in the same telephone conversation, it is very difficult
to make all sections of all roadways safe for all drivers.
If a means is developed that will increase the safety at 76th Ave. W., City staff will
certainly pursue its installation. It must be remembered, however, that obstructions
placed in the roadway often become hazards themselves, so typically, they are not
installed without due judgement and consideration.
Thank you for your interest and concern in this matter.
Sincerely,
GORDON C. HYDE
Engineering Coordinator
GCH/sf
Alberts
GOODRICK.DOC
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
t i 1 Ur LIJI'IUll03
PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION
:..�T FI
THIS PERMI
=Ws.
ST BE AVAILABLE AT THE JOB SITE FOR INSPECTION PURPOSES
Applicant to Complete Parts A• and B
A; Permit to be issued to: : i,Vo _�fo.
For Work at :(address or vicinity)
Type of Work to be done: 7-1,--,eF1VCAV- VGONQ" •_ ,E� . 01c- w•
(attach drawing when applicable)
Time Required -- Start: Finish:
Owner: ya, Co. Tf,Gi
Name
9 9
Mailing Address
-77¢
City State Zip Telephone Number
Contractor: S,81n-E ,45 xa ()(/E
Name State License Number
Mailing Address
City State Zip Telephone Number
BINDEMNITY: Applicant understands and by his signature to this application, agrees
to hold the City.of Edmonds harmless from any injuries, damages, or claims of any
kind or.description whatsoever, foreseen or unforeseen, that may be made against•
the applicant or the City of Edmonds, or any of its departments or employees,
including or not limited *to the defense of any legal proceedings including defense
costs, court costs, and attorney fees by'reason of granting this permit.'
Upon issuance of this permit, the contractor is responsible for workmanship and.
materials for a period of one year following the final inspection and: acceptance
;of the.restoration 'by.the Engineering Division.
Funds held from the Security Deposit (estimated.restoration fee) will -be held until
the final street patch is completed, at which time a debit or credit will.be
processed for issuance to the applicant.
Work is subject.to inspection and restoration in accordance with City Code. A
24-hour notice is required for inspection by Engineering. Call 775-2525, ext. 220.
I understand that this permit must be available at the job site for inspection,
purposes at -all times.
Signature:Date: %-Zf- 7,
Owner or Agent
I
TO BE COMPLETED BY ISSUING AGENCY:
Date Issued: Permit No.: %����35L Fee:',,4j �—
Security Bond:
Time Authorized: ?-6 c
Date r
F
60
Rev. lula10177 OPQUBLI.0 UTILITY DISTRICT N6.1 of $no-*,%mish County_ Iaja LA T h4 ( - -OUN'TYAREA
Location kya,W Win, A_ Date_ -i - 77 X W.O. No. S 94 Z. ---;, I
_LAW 1/4 2 'S 5 T 4- R Revision Scale -in = z0e_-_-0
Reason for work _Z K) r- e- A.,J=. A
Engineer As Built
UjG. File No.
ZZ, S Approvals
PERMIT REQUIRED
iType CITY 0E ECAd
I Date Granted I
I Transf-Cardl I Polo Dept. I
Map Post lCircuitMapi I
FOREIGN CONTACTS
Company I-W-1
J.RN.No.
—
Fees required Yes® NoO
Type 1EIEZ2. -+-- PMr.
Date 9 4 Amount 215.
EASEMENT
Grantor
DcOe'dranted
I Date Released For Construction
Date Work Completed By Foreman
Circuit Number 12 - 3 Z_ -Substation
2. IS F=
t'J - 5 '3 cog V
VGA LTA(5r--
XNST :51 rlsmvt &,wr.> rz-L4K1 CSC)Mr_pA
Wr,l::) TC) PlEt;�, 6,1. rzrk,14F_z� 4Nr>
^ ',: N 07 E r--;, .
ENVIRONMENTAL ANALYSIS
Exempt under District SEPA
procedures, Section I I I -A
Paragraph Jaz , ltemJ-5—
Date qZ ICI By C�AT>Mnis
Interpretation Referred To:
Date— BY
O.H. U.G. Cond
Add—
Remv-__,_�
Sewer
Gas
lBackhoe
' -----KV
ClotO�L_Plml
Clct FtPH
Ckt Ft
W.O. No. 23 S I '- '- I
i
•
STREET FILE
May 30, 1978
MEMO TO: Community Development Department
FROM: Leif R. Larson
Director of Public Works
SUBJECT: VARIANCE OF LOT SIZE REQUIREMENT FOR
SEPTIC TANK AT 16508 76TH AVENUE WEST
VARIANCE NO. V-43-78/ j
We have reviewed the subdivision, building permit and septic
disposal system application. We recommend approval.of the
variance for the following reasons:
1.. The total square footage in the two lots. of the
subdivision exceeds 40;000 square feet. This would,
therefore, make it possible to meet the criteria
of 20,000 square foot lot size for the purpose of
a septic tank.
2. The septic tank disposal system design meets the
minimum requirements of the City of Edmonds.
3. The lot arrangement has little bearing in this
case on the location of the proposed house and,
septic tank system. If the lot lines were changed
the house and septic disposal system would be
constructed in the same location as proposed at
the present time.
RHA:LRL:ej
�30
RHA Date `A m'n. Se Date
C ITY OF E D M 0 N D S
TO:
LU
~
Q
LU
SUSPENSE DATE:
MAYOR
As We Discussed
Investigate
and report
Take Appropriate
Action
Prepare Letter/Memo for
My Signature
Mayor's Signature
Previously Ref'd
Status of Action?
For your Information
Note & File
Return to:
MAYOR'S ADMIN. ASS'T.
CHIEF of POLICE
CITY ATTORNEY
CITY CLERK
COMMUN. DEVELOP. DIR.
FINANCE DIRECTOR
FIRE CHIEF
PUBLIC WORKS DIRECTOR
COMMENTS: r e v! e u,) Vof f-rx s c C-5 -Qaq..
` K�
FROM: Ee i,r /xf cd e
DATE:
';'r ,
CTA�T 10
C ,v
U
Ways
l
�CK-C.0
i.'bO CD00' 44 ;
VE4150F���87
,4,-
- • STREETFILE* �
May 30, 1978
MEMO TO: Community Development Department
FROM: Leif R. Larson
Director of Public Works
SUBJECT: VARIANCE OF LOT, -SIZE REQUIREMENT FOR,,
SEPTIC'TANK AT 16508 76TH AVENUE WEST
VARIANCE NO. V-43-78 --
We have reviewed the subdivision, building permit and septic
disposal system application. We recommend approval of the
variance for the following reasons:
1. The total square footage in the two lots of the
subdivision exceeds 40,000 square feet. This would,
therefore, make it possible to meet the criteria
of 20,000 square foot lot size for the purpose of
a septic tank.
2. The septic tank disposal system design meets the
minimum requirements of the City of Edmonds.
3. The lot arrangement has little bearing in this
case on the location of the proposed house and .
septic tank system. If the lot lines were changed
the house and septic disposal system would be
constructed in the same location as proposed at
the present time.
RHA:LRL:ej
.rj'�,:i+✓+ttsT� " � ' " 4+i&h�'r^"n '°" '�^`"'Y"�'�'^�+"� - ri'',*pP,r�aYV�'°L'�r
CITY OF EDMONDS `E IV E D Permit No.
RE
COMMUNITY SERVICES DEPARTMENT
RIGHT-OF-WAY CONSTRUCTION PERMIT SEp 1 , 1991 Issue Date I 1
A. • Owner: 1�Washington Natural Gas Company B. • Contractor:
mercer Street Name
Ieailin Address G 0M P Mailing Address .
eagle WA 98111 L1—►3,- 91
City State Zip City State Zip.
a
aTH ET FILE. _ State License Number Telephone Number
C. • Address or Vicinity of. Construction: 16510 and 16508 . 76 Avenue West
Type of Work to be Done: Permission is requested to Install' 2" PE IP Main in 76 Avenue W
and Services to 16508 and 16510 76 Avenue West. Per Attached
Drawing: 910=134 IR 6043-3 1
D. • Work in Connection With: ❑ Sub or Plat ❑ Single Family. ❑ City Projects
❑ Commercial ❑ Multifamily XX Utility
E. • Pavement Cut: ❑ Y N F. • Size of Cut: X
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and. by his signature to this application, agrees to hold the City of Edmonds
harmless from any injuries, damages, or claims -of any, kind or-descriptiop whatsoever, forseen or unforseen, that may
be made against the City of Edmonds, or any of itsrdepirtments or enr ldyee , i4luding or not limited to the defense
of any legal proceedings including defense costs, cour costs, and a%to �rCey ees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR 192KNIALHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces,`at which time a debit or credit will be
processed for issuance to the applicant. `•
• A 24 hour.notice is required for inspection; Please call Engineering: 171-3202 . .
• Work is to be inspected during progress and at completion.
• Restoration to be in accordance -with City Code.
• Street to be kept clean at.all times.
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with asphalt or City approved material prior to end of working day;
NO EXCEPTIONS.
I understand the above and that this permit must be available at the job site for inspection purposes at all times.
Signature:
Date: September 3, 1991
Owner or Contractor.
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY:
..I I {
Time Authorized Void after `1,i days.
Special Conditions:
Ewm SENIM- f WXwt A4AW
RELEASED BYA. Data ,,
PERMIT FEE: 3b .
Restoration Fee:
Receipt No.:
Fund III Fee:
Street Cut Dimensions:
INSPECTED BY.
Date
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
Erig. Div. March 1989
FIELD INSPECTION NOTES (Fund III - Route copy to Street Dept.)
Comments:
Diagram:
CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO
Partial Work Inspection by P. W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
Eng. Div. July
.CfTY of EDMONDS SIDE SEWER PERMIT
t;
rr14
For Inspection Call'771-3202 PERMIT NO. 07269
NO�+/�,rWORM,
• / • L.YINNWQO=LIE'
Address of Construction: r. (tQJD 0 �(��' 1g• �%-i
Property Legal Description (Include all easements):.
Lod q0- -7-7
Owner and/or Builder: N. 6_vane/c
Contractor & License No: 000rleY_
Single Family Residence X
Multi -Family (No. of Units )
Commercial (No. of fixture Units )
Invasion into City Right -of -Way: No Yes (If Yes, Right- of -Way
Construction Permit required. Call One -Call -Center (1-800-424-5555) before any
excavation.)
Cross other Private Property: No Y Yes (If Yes, easement required,
attach legal description and county easement number.)
PLEASE READ THE ITEMS LISTED ON THE BACK
I certify that I have read and shall comply
with the items listed on the back.
Permit Fee: 3o.00
Trunk Charge: 02�3.00
Assessment Fee:
Partial Inspection:
Issued By:
Date Issued: / 0(0)
Receipt No.: � L11
Comments
Final Inspection Approved: 3 -5 $S
Date Ini-t4hl
Rejected:,
Reason
** PERMIT MUST BE POSTED ON JOB SITE **
9
White Copy File Green Copy - Inspector
Date
Date Initial
Date Initial
Buff Copy - Applicant
The City of Edmonds
Side Sewer Drawing
MCAO.comw EASEMENT NO. ----------------------------------------
NEW CONSTRUCTION ❑ REPAIRS ❑ LID lqo..-2.1-(:) ----- ASMT. No
OWNER
r -------------------------------- CONTRACTOR --- P�--rFa-F-us r
--------------- PERMIT No.
JOB ADDRESS ---- -4
- ---------- ----- LEGAL DESCRIPTION: LOT NO. -A� ------- -------------------- BLOCK NO-
Q;'lDP �Z-)7740-7-77
4'lc.cLWlE
16.5
NAME OF ADDITION ------------- ----
---------------- ..................... ------ --------------------------- --------------------------------
L5'bp
4"C.O.W56
?'JDP 0'r W. C�*.Vjlc
CAP I-M
PWW4=1-1 1/75 (REVA 1/78)
N ME.ADOWDALE RD
PJot--- !L--.
1 Call 1-800-424-5555 48 hours prior
to construction to locate utilities
2 Survey not required
3 Lay direct burial warning wire
over all direct burial PE pipe
4 Install one pound anode for every
1000' of locating wire
5 FIELD LOCATE ALL 0-rkUTIE5
(2 5T 5W
G, MA\NTAI N A 5 ' HORIZONTAL- AND
3' VERTICAL CI.ENP,&NCE FROM ALL
CITY UTJLITIES
s i f
1
f
i 1 �
I. R. 6043-3
i
PE CAP
_
52 Co50
2
no
f4- GAUGE DETECT WIRE
05 9+0
170
I
280�
, 2" SDR-I l PIPE
2G O
EDMONDS
NE 7- 27-4-
r! '� r 158• Cv`�
15Co. G 8
-
" PE IP MAI N
EXT
" TO KO508 1(o
AU w
.1BL= 8 19
91 i
910-134
LOT 4
P.L. 2001
�, ,•, .,.j'•', 3'
LOT 5
LOT 6
,—S'TRA wr/ IAA rrL A' o5zoM
T®7,4L 25- s p P1• I, Y y'r)
OWNER/CON-►+"?,'ACTOR IS RESPONSIBLE
FOR EROSION CONTROL AND DRAINAGE
SOUTH ELEVATION SCALE: 1/4" = 1'-0" (1:48)
(E) Ccncrte
to remain (1 c
ire
Applicant shall repair/replace all damage to
utilities or frontage improvements in City
right-of-way per City standards that is caused
a Or cCCUrt. d-wring tho permitted project.
011
PROPERTY OWNER:
CHILELLI DONNA MARIA
ADDRESS:
16508 76TH AVE W
EDMONDS, WA 98026-4917
PARCEL# 00513109700501
LEGAL DESCRIPTION:
MEADOWDALE BEACH BLK 097 D-01 - LOT A CITY OF
EDMONDS SP S-25-87 REC UND AF NO 8711250070
/ BEING PTN LOTS 5 & 6 BLK 97 & VAC STREETS
Township 27 Range 04 Section 07 Quarter NE
ZONING: RS-12
SITE PLAN SCALE: 1" = 10'-0" (1:120)
)TE:
disturbed soils will be compost amended
STORMWATER MANAGEMENT
N/A
PROPOSED PROJECT
- < 50OFT LAND DISTURBANCE
- NO UTILITY CONSTRUCTION
OCCUPANCY GROUP: R-3
CONSTRUCTION TYPE: V - B
LOT AREA:
0.28 Acre (121197 SF)
PROJECT WITH THIS PERMIT:
REPLACE EXIST. DECK
LOT COVERAGE (measured to outside walls):
EXIST. STRUCTURE: 11429 SF
(NO MODIFICATION)
EXIST. DECK > 36"
above Ground
To be reel aced 861 SF
2,290 SF
TOTAL COVERAGE: = 18.8 % SF
EXIST. DECK < 36" 253 SF
To be replaced
IMPERVIOUS SURFACE
1978 BLDG ROOFTOP 1,931 SF
pis y77TOOL SHED ROOFTOP I f'r
CONCRETE DRIVEWAY: 1.605 SF
7GRAVEL WALKWAY: 207 SF
TOTAL:
.3ey3 SF
PROPOSAL:
REPLACE ALL DECKS 263 SF
BY EIPUNEERING
� �yT 7/,,
APPROVED_ BY PLANNING
G,�•a-t_ 07•�5•t2
Zone R'S • 1 'L. FILE Corner Flag UREET
Setbacks Required Actual
Front_,.
Sides 1.0 E U
Rear
Other JUN 2 5 2012
Hei tZ
BUIlAING DEPAR<iMENT
(P 11 S / 12 K-V—A-Z," P-cf(>Y't ciN Or- EDMONDS
C�jzotz-��o`f
tecinstruct LLC
A 0 8
Telephone (206) 553 9076
A No 6830 NE Bothell Way- Suite C PMB 181 Kenmore W 98 2
sun
ENGINEERING
OWNER:
Chilelli Donna Maria
SHEET
ADDRESS:
16508 76th AVE W, Edmonds, WA 98026
PARCEL NO.:
00513109700501
DESCRIPTION:
Deck Replacement
DATE:
05/09/12
TSCALE: as noted
[ENGINEER:
Roland Heimisch, P. E.