16515 74TH PL W.PDF111111111111
5956
16515 74TH PL W
STREET FILE
CITY 0` E\PMONDS
DEPARTMENT OF PUBLIC WORKS
250 Fifth Avenue North, Edmonds, Washington
SEPTIC TANK INSTALLATION PLAN
(Submit in Triplicate) Por. N. 200 ft. , Tr 88, Meadowdale
16 1 4th Pl Beach
ADDRESS OF PROPERTY................5...5. � 7 • W' . PACIS.f....... Lot No....................... Permit No......345.
Owner ................
Ed Merrill
......................... ._....._
Address .. _ - Same
. ...... -_... --
......... Phone..7-009...
Builder....
---- ..S.ame.,as_.above. _...
Address ........................ _......
.......--------....--------- Phone------......... --....--
Designer ...M...B.. Neyring -- ---- ...... .. __ ----------- Address...P.0. --Box-- _ :0...Tyrmwood-------------- Phone. .7.7.8...3101...
Installer .... NOrthend--Septic..... ....... ___ .......... Address ... .MO ---- _2l0tbS.W......Edmonds....... Phone..776-05.58...
I hereby certify the accompanying drawing is an accurate representation of the system installed at the listed
address. I also certify all recommendations and restrictions (concerning plumbing stub elevations, maintenance of
grades, fills, surface drains, etc.) listed by me on my sewage disposal system permit application dated ................
............. .have been complied with.
l
---------------------- ..................... .1...
Signature of Designer Date
TO BE FILLED IN BY CITY ENGINEER ONLY
Accepted ......................... L-'....- o
Date...../.- 13C..-�'
NotAccepted ................. ........_......................... Date ._.. ..................-----....
Signature of Sanitarian.......�es
.Conway, Assistant ty Engineer
Remarks:....Based upon digner's certification..
INSTRUCTIONS: Use the reverse side of this form for the drawing. Use a scale which will permit the greatest
detail and still contain the entire site on one page.
ATTENTION HOME OWNER:
Your septic tank has limitations! It was designed and installed to care for an average -size family. Over-
loading the septic tank or disturbance of the drain -field inay seriously impair satisfactory operation. Points to
remember:
1. Have your tank checked periodically to see if pumping is necessary (2%s-3 years).
2. Do not channel ground water, surface water, footing drains or downspouts into the tank or drainfield.
3. Do not excavate, fill, place a structure, driveway or. patio in, on, or over the drainfield.
4. Limit toilet fixture disposal to sanitary wastes and toilet tissue.
5. Detergents and bleaches used in normal household quantities will not harm the action of the septic tank and
disposal field.
Builder: As -Built Designer:
'Ed K-10-jll • • M. B.Meyring
165$5 =`74th PL. W.` ED MER'RILL• P. 0. Banc 32
Edmonds, Washington Lynnwood, Wash.
Por. of N 200 ft., Tr. 88, Meadowdale Bch.
Installer:
Northend Septic SNO. CO. WASH.
7220 - 210th S.W. October 1969
• G
Edmonds, Washington
Address: 16515 - 74th Pl. W. Edm. Wash. _
Permit No,: #345 {..
'/7/. 36
7
NN q N w
%
Ai
N
N Fin. FlY
30
Jca/e . l - 30 AL
• `-5i�: 4a�d �o.��/ .. emu/ _ ..�
PPS/ -,uY /5 Zo t
..(mob 68 //7'
/088
Meyring Surveyors, Inc.;'
o� T/2�hch Lynnwood, Washington 778-3101
639
• 1' 7:11
`i CITY OF EDMONDS
DEPARTMENT OF PUBLIC WORKS
250 Fifth Avenue North, Edmonds, Washington
APPLICATION FOR A SEWAGE DISPOSAL SYSTEM PERMIT
(Submit 3 Copies)
Ed Merrill-------------------------------
Permit to be issued to: •--- - - _.-.
For installation at: (street address) -------------- 16515..-..%4th..Pl..-W..,... Edmondst-.Wash-...---------------------------.--.------.---
Addition or Subdivision... ein.................................... .... or, --- Of-.N.....200ft..Lot...... 88..... Block....Meadowdale
Beach
Type of Building: New.--.......-- Existing ----- X.---- Single family residence ..-- I........ Number of bedrooms.-------- 4.............
Other: (specify type or use)-----rel/l:Sl!✓l l---._-W --/._�p------ :SVS' ?C17L-----------------------------------
Builder.---Ed.Merrill--------------------------------------- ----------- .... --Address.....1..65�5.--.14th--Pl..--W.---9--.Eck. s--Wash
Designer----- MO B.•.--Meyring------------------------ -------------- --------- Address._..PO.---Box--- 32-,--- Ly=wood,..Wash -. -
Soil Log Hole No. 1---- ___ ..Qro30inch.... sandy.--elay..loam...,..-.30-48 inch. clay •.loam; - ... - -- .
------------------------------------------------------------48inch_,- -"_hard ... pan .----------------- ...... .---------------- .....................................................
SoilLog Hole No. 2------- - -------------------same-------------- --------------...........--- .........----- ---------------..........------------------------•--
Elevation of Water Table, if encountered. (Distance from ground surface) ...................none.........................................
Corrections to control surface water if needed ...........................none ....................................................................................
Specify if any removing or grading of topsoil in field area ..... ........... none ........ ,..........................................
....................
Percolation:
Test Hole No. 1 —Average Rate ............ ...... ................. .... (Fall in minutes/inch-bottom 6" test hole)
Test Hole No. 2—Average Rate.........i0.......................................... (Fall in minutes/inch-bottom 6" test hole)
Test Hole No. 3—Average Rate .............6 ................... .------------- ...... (Fall in minutes/inch-bottom 6" test hoe)
Date Taken.- Average percolation rate on which to base drain field design ...........7
_...._...- ---%------- p
Septic tank requirements based on present rules and regulations: �/ ��o
/oo0
Septic Tank Size. ..... .- 007 .........gallons. '
Amount of Square Feet of Disposal Field ----------- 564....... ._ ....
Signature — Designer i
g g �--w-----��'��-L�1/t� ------ - ------ Date....... Ju].y.22nd,--.1968.----
DO NOT WRITE BELOW TH S LINE (To e mpleted¢ Issuing Agency)
/ y V
Permit issued��(ddate)---- 9{/ Permit Number ------ 3s�?
Remarks: ...... l/1xti .l.- < � .co
---------------------------•-----------------...-------------------------------------•----••---------------------...:-----•---------------•-----...............•-•----•-------•-----....------•---
SEWAGE DISPOSAL PERMIT
Septic Tank./ No. .......
.................... gals. �CITY OF EDMONDS
sDepartment of Public Works
ft.
Disp. Field..�'�.. ........... q.
Other............... .................................
1�7 to install/
-4 ..................................................... is hereby authorized
........ . .............................
Name ....... ............... repair sewage disposal system at
........................................... .................................................................
............. ........ ...... ...
Date issued on ..... •-7 .......... * - --------- ........ ....... Ix ------ ...
Permit expires one year from date of issue
DO NOT COVER BEFORE APPROVED BY DESIGNER OR SANITARIAN
I hereby certify this system was installed under my supervision and control and complies with all provisions of the City
of Edmonds Resolutions.
Signatureof Installer ..................... ....................................................... Date..................................
Approved Disapproved [-I Date.., .... ........... By.... ......
Remarks: ................................................................................................ .................................................................................................................
SANITARIANOR DESIGNER ..................................... .................. ....................................... Date.......-..-..............:.......................-........
This permit shall be pos i ted in a reasonably conspicuous place ..on the job until inspection has been completed.
�,7
path rL. W.9 Ed Morrill c Box
i
Portion cf N 200ft. Tract 88, M nr
JV,Iy, � y68
0
Was;; .
INSTUL AS SHUs:h fiEnRON
NOTE r
ArIy d GV ;-U-:-Yi
. from this
Q la,r' W tho'lt
cons e,.tat i ar)
w-Ath the ;dos
nor t;al'. ry"�ko
accSp:tapxc of
the in?'ta.11af ?
the dosip.t r.
Al "I all ,{,rots
t.o be eementc-.
in
Q to tho capt ic
Z Task Mar"rr.UI,a..
Meyr°ing Survayo s, -TAQ,
Lymvyood. Wash. PR 81 .3101
Builder:'
Ed Merrill
16515'= 74th Pl. W.-
Edmonds**' Wash.
.9
i
IRMS10 SANITATION DGN Des gAer:
�M.ID . . Meyrin9
ED MRELL* o P.O. Box' 32
Lynnvood, Wash.
Portion of N 200.0 ft.,Tract 88,,Meaaowda1e..Bch.
WASH.,
SNO. CO.
June 1969
Address:.16515 74th Pl. W., Edmonds, Wash.
WrG'. VIA 0 1/15��4
D1
9
aT,
D
0:
:SPECIFICS
564 qi
in. treh,
8k7
-lin. fto-
s -at Lines e*
too
--lin fti'
Soil Hole No. 'l-O"-0"S64dy loam .7f
No..2-0%48," s64dyjoam
No. 3-0"-48" sandy loath
No., 4-0"-12" clay losm, 12 %M' SC
No. 5-0"-481.1, sc'&. clay.-,--.,
No
. 6 -pll-;-48'� sandy Io lay
NOTE: ti
I -All ankle joints shall be cemented
2- Batter boards shall be reijutred'- throi 6�6
Ut. for.
grade control
3- P-Box shall be located on Sol i
Meyring Surveyors,,Inc.
Lynnwood, Wash. PR 8-3101
68-117
SnohomishOnllne Government Information & Services
County4*
Washington
Structure Information
Close Window
General Description
Parcel Number 00513100008803 (R01)
Structure Class Dwelling
Structure Type 2 Story
Year Built 1950
Exterior Features
Foundation Conc or CB
Exterior T l I Plywood
ROOF Type: Gable Pitch Medium Cover Built Up
Interior Features
Bedrooms 4
Full or 3/4 Baths 1 1/2 Baths l
Heat Electric Baseboard
Fireplace Masonry fireplace
Floor Area
Floor 1 Base SF 1227 Finished SF 1227
Floor 2 Base SF 931 Finished SF 931
Garage(s) & Carport(s)
None
Other Features
http://web5.co.snohomish.wa.uslpropsyslasr-tr-propinqlPropinfoO5-StructData.asp?parcel... 10/15/2010
Close Window
http://web5.co. snohomish.wa.us/propsys/asr-tr-propinq/PropInfoO5-StructData.asp?parcel... 10/15/2010
CITY OF EDMONDS
250 5th AVE. N. • EDMONDS, WASHINGTON 98020 • (206) 771.3202
COMMUNITY SERVICES
March 26, 1986
Mr. William E. Dunn
16515 - 74th P1. W.
Edmonds, WA 98020
SUBJECT: SEWER CONNECTION AND RATES
Dear Mr. Dunn:
LARRY S. NAUGHTEN
MAYOR
PETER E. HAHN
DIRECTOR
I write to inform you that since all property owners in the Meadowdale
sewage system L.I.D. now have the ability to connect to the City's
sewage system, the bi-monthly utility charge for sewerage will be
increased to $14.91 in accordance with Ordinance No. 2551. The City
Council took this action at the February 11, 1986 Council meeting.
We remind you that the L.I.D. was formed and the sewer system built
because of the health district's concerns regarding contamination
problems resulting from septic tanks. This is still a concern, and we
encourage all owners to connect to the system.
If we can be of any assistance, please call.
Sincerely,
0;6:0�y 4rv��
ROB= J. ALBERTS, P.E.
City Engineer
RJA/st
PUBLIC WORKS 0 PLANNING 0 PARKS AND RECREATION 0 ENGINEERING
CITY OF EDMONDS
PUBLIC TkORKS DEPARTMENT
SIDE SEWER PERMIT
FOR INSPECTION CALL
2R15112-H/5 Ext. ZZU
Permit I� . _ VAN
Issue Date •i f A
PERMIT MUST BE POSTED ON JOB SITE
W 70w�,.�;, v %- �� � .L;ICNNWOOD LINE
1. Address of Constructio7777An y�� _.
.j
2. Property Legal Description (include all, easements)
U 3. Single Family Residence Multi -Family No.,of Units
Commercial
4. Owner and/or Builder
5. Contractor & License No. ,� �,f _$"'� !J _S �� f c
6. Invasion into City Right -of -Way: No V Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig ��3�4� IZ 511M4I) before
1-f0U-�d24-555
excavation).
7. Cross other private property: Yes No Y Easement required -
attach legal description and county easement number.
READ THE FOL.LOWI.NG AND SIGN:
a. Property owners must obtain a permit to install side sewers on
their property. A licensed side sewer contractor must be employed to
construct side sewers in the public right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
C. Commercial establishment requires a minimum of a six inch (6")
side sewer line.
d. Side sewers may not be installed closer than thirty inches (30")
to any structure.
e. Side sewer lines must be laid at a minimum grade. of 2% (1.150)
and maximum grade of 100% (450).
f. No turn in side sewer greater than 450.(1/8,bend) is allowed
between cleanout. All 90 turns must be constructed of a 450 (1/8
bend) and wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than.granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k. Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two (2) working
days notice required.
DATE: -7, %CS — rJ q ��� ti/•��
I certify that I,-h"ave read
and shall comply with the above
-+ PERMIT FEE`:' 7,D — DISAPPROVED BY: Date:
W :r- tr&-i 11r 40",vS- 0" B Date:
CONNECTION FEE: APPROVED By: ,f Date • 0
w
* PERMIT MUST BE POSTED ON JOB SITE
The City of Edmonds Side Sewer Drawing
EASEMENT NO- ------------ ------
NEW CONSTRUCTION Ej REPAIRS El LID NO. -2-10 ----- - ASMT. NO. ------------------
OWNER ..... GRETC-tift _j:).Q?At4 ----------- --------------------------------------- CONTRACTOR ---- Lu-T--z-'s
JOB ADDRESS ----- 74.7 ................ PERMIT NO.
65- 1- ---_---------- LEGAL DESCRIPTION: LOT NO. -A ------------------------------- BLOCK NO. --------
---------------- --_------------- ------------------------ ---- ---------------------------------------------------------
( NAME OF ADDITION -------------
35 -
V%p.1 Rom PICORMSR K 450 66MV) 41co.
t
13.5'
st!-! SP 2t 6" 44V
C, azd
C R
L
a 45'op
or to
cl,
01
c P'll
16.515 74W taw t
CL;
0 JL.2n
Cb
-90
Uing
WQ Er aI&Q -c 9 crc:
wal J22%
M AL?r,;c
R.-- F'R #
, 0.0
�19 4 9
A
W cl)
-Anroved:
V.ft/78) DATE 10 92A ...... B
..............
STREET FILE
CA FILE NO. vl4'5(p
Critical Areas Checklist
Site Information (soils/topography/hydrology/vegetation)
1. Site Address/Location: 1v25- 1 S --7 `1 ' (. v
2. Property Tax Account Number: S/ 3 j o(,,,n U ri 3 - C) j
3. Approximate Site Size (acres or square feet): %k Qt r ,-- `t-
4. Is this site currently developed? yes; no.
If yes; how is site developed? i r\!E) � _ a V%I\ � 0 ►^� 2
5. Describe the general site topography. Check all that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a
/ horizontal distance of 66-feet).
V Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise
of 10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe): ,2 ro a,rn- e `,►�e
6. Site contains areas of year-round standing water:Approx. Depth:
7. Site contains areas of seasonal standing water: C ,-x ; Approx. Depth:
What season(s) of the year?
8. Site is in the floodway r` o e floodplain of a water course.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? L� e Flows are seasonal? (What time of year? ).
10. Site is primarily: forested •meadow ;shrubs ; mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is present on site:
Rev oiroaroa
890 ]99-
City of Edmonds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable
City staff to determine whether any
potential Critical Areas are or may be
present on the subject property. The
information needed to complete the
Checklist should be easily available from
observations of the site or data available at
City Hall (Critical Areas inventories, maps,
or soil surveys).
An applicant, or his/her representative,
must fill out the checklist, sign and date it,
and submit it to the City. The City will
review the checklist, make a precursory site
visit, and make a determination of the
subsequent steps necessary to complete a
development permit application.
With a signed copy of this form, the
applicant should also submit a vicinity map
or plot plan for individual lots of the parcel
with enough detail that City staff can find
and identify the subject parcel(s). In
addition, the applicant shall include
other pertinent information (e.g. site
plan, topography map, etc.) or studies in
conjunction with this Checklist to assist
staff in completing their preliminary
assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
,)1(11rr 1s�She,r��
Name
I �' -> I " -7 4 t' P I . l,"'.)
Street Address —7 i3- cj
City, State, ZIP Phone
Signature Date
Applicant Representative:
Name
Street Address
City, State, ZIP
Signature
Phone
Date
*
City of Edmonds
Critical Areas Determination
Applicant: Morris & Sheryl Melong Determination #: CA-94-56
Project Name: Permit Number:
Site Location: 16515 74th Place West Property Tax Acct #: 5131-000-088-03
Project Description:
Non -Project Specific
Waiver Criteria (all criteria must be found to apply):
XXX There will be no alteration of the Critical Area or its required buffers;
XXX The development proposal will not impact the Critical Area in a manner
contrary to the goals, purposes, objectives and requirements of the
Critical Areas ordinance;
XXX The development proposal meets the minimum standards of the Critical
Areas ordinance;
XXX The.above findings are based on the following conditions of approval:
During review and inspection of the subject site on April 5, 1994 it was found that the site
contains Alderwood-Everett Series Soils, has been identified as one which has Steep and
Unstable Slopes on the Critical Areas Map, is considered Geologically Hazardous pursuant to
Chapter 20.15B of the Edmonds Community Development Code, and contains a Category 3
stream. Based on these findings, a Critical Areas Study will be required to determine the
extent of the Geologically Hazardous Area. There are two categories of Geologically
Hazardous Areas present (see 20.15B.070.A3): Erosion Hazard Areas, and Steep Slope
Hazard Areas.
The preliminary report that the Planning Department requires prior to submission of any
developent permit application is a topographic survey prepared by a Licensed Land Surveyor
combined with a soils report prepared by a Geotechnical Engineer which delineates the two
categories of Geologically Hazardous Areas on site.
1. Erosion Hazard Areas occur with Alderwood Soils located on slopes greater than 15%.
2. Any slope over 30% with more than 10-feet of rise will be classified as a Steep Slope
Hazard Area. A 50-foot buffer is required from both the top and the toe of the slope.
i
All Critical Areas Studies must be completed under a three party contract where the City hires
the professional required, and the applicant pays for the study (pursuant to ECDC Section
20.15B.150. The applicant may suggest qualified professionals for the City's approval.
After the Critical Area Study(ies) are complete, and the location and classification of the
Critical Areas are mapped, the applicant may move forward with their development plans.
Each Geologically Hazardous Area category has a specific level of information which must be
submitted before any development may occur in those areas.
1. Erosion Hazard Areas: An Erosion Control Plan approved by the City
of Edmonds Engineering Department.
2. Steep Slope Hazard Areas: Any development which is not identified as an
exception pursuant to ECDC Chapter 20.15B
must receive a Reasonable Use Exception
(Variance process pursuant to ECDC
20.15B.180A).
If the property owner wishes to apply for a specific development permit which they feel
would not impact the Critical Areas located on the site, they may submit their proposal to
the Planning Department for review. If the Planning Department finds that the proposed
development permit will not adversely impact a Critical Areas or its buffers, a conditional
waiver may be issued on a project by project basis.
Name Signature
� "iy�'�f'Sa�`^i':�.i�� .Y:-i47ikxr'`: �.1�� 19 y5. �p�� �ik'.iOF`.y's . ,vim '1 {. nJ•4%��._ t .'
.>-� �%� `*�u,,�'.t"JY1 '��T�� WM. �'�T '9iji ;1."�A'T�F. '.'S'ti t.ilt�i i,lt!)• � ..'1•- � .'.A
City of Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT Permit Number.
ra.m STREET*FILE C-
4 i` Issue Date: .l 41
A. Address or Vicinity of Construction: 16515 74 Pl W ( 9418268 )
18
9p 1B. Type of Work (be specific): Install New Service
-9
C. Contractor: Washington Natural Gas Company
Mailing Address: 815 Mercer St, Seattle WA
State License #: 98111
D. Building Permit # (if applicable):
Contact: Frank Swan
Phone: 224-2278
Liability Insurance: Bond: $
Side Sewer Permit # (if applicable):
E. ❑ Commercil ❑ Subdivision ❑ City Project E] Utility (PUD, GTE, WNG, CABLE, WATER)'
❑ Multi -Family ❑ Single Family ❑ Other
INSPECTOR: INSPECTOR:
F. Pavement or Concrete Cut: ❑ Yes ®No G Size of Cut, n t' -- t' '- H. Charge $
APPLICANT TO READ AND'. I4
INDEMNITY: Applicant understands and by his signature to this application, agrees to h' e the City ojEdmonda har —drte(�n&tdep
mages, or
claims of any kind or description whatsoever, foreseen or unforeseen, that maybe made a inst the City of Edmonds, a jartments or
employees, including or not limited to the defense of any legal proceedings including defense co�ta, and attorney jeer by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT.
Construction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
~I have read the above statements and understand the permit requirements and the pink copy of the permit will be
available on site atg11es for in prtion purposes.
' 1994
Signature: Date: May 19�,,
(Contractor or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: I AJH RIGHT OF WAY DEPOSIT
TIME AUTHORIZED: VOID AFTER DAYS DISRUPTION FEE/FUND 11
SPECIAL CONDITIONS: yA��: to G. C-uTsRESTORATION FEE:
„i ;'PERMIT FEE: �12 00
COMMENTS:.
, TOTAL.YEE:
RECEIPT FEE:
DATE: ISSUED BY:c.:�
Q.
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991
t -1..
FIELD INSPECTION NOTES
1-
Comments:
Diaaram
CONTRACTOR CALLED FOR INSPECTION
Partial Work Inspection by P.W.:
Work Disapproved By:
FINAL APPROVAL BY:
(Fund 111 - Route copy to Street Dept.)
❑ YES ❑ NO
Date:
Date:
.NI,Pt- 1'NG to window
in depth
_ nk
Q, " gas main
Addendum to :
City of Edmonds
Right of Way
Permit Application
Submitted by: ;t TCHELL S. •LANKFORD .
Engineering Aide .
Washington Natural Gas
# 1.521=5246
�C:) c
Key:
-w-
water
-g-
gas
-ss-
sewer
-6-
watex hydrant
O .
watc.'valve
315 1869), Scald WA SS) I 1 (206) 622-'767
STREET FOIE
16515 74th �' October 31, 1979
M E M O F O R R E C O R D
The following is a list of calls received during the
heavy rains during.November of 1978 and March 1979. Some
were only for covered inlets, others for plugged drains and
creeks. During the week of October 22 to October 26, 1979
all of these addresses were checked for possible plugged
or trouble problems. Nothing was found to cause a problem.
These addresses were checked by Leadman Bill Stroud.
I�Ii-'1� s G%
y
Street Foreman
OEOTECH
CONSULTANTS, INC_
ECEC
10928 — 59th Avenue West
Mukilteo, Washington 98275-4813
Attention- Saeed Soleimanpour
Subject: Geotechnical Engineering Reconnaissance
Proposed Serene Creek Subdivision
166XX — 74th Place West
Edmonds, Washington
Dear Mr. Soleimanpour:
13256 Northeast 20th Street, Suite 16
Bellevue, Washington 98005
(425) 747-5618 FAX (425) 747-8561
February 3, 2006
._
n 6�
t;ub
PEA'! d
JN 05231
We prepared a Preliminary Geotechnical Engineering Study for the proposed project dated August
29, 2005. Several comments, discussions, and recommendations regarding the development were
included in the report. Slope stability assessments regarding residences on site slopes were one of
the main geotechnical engineering considerations in the study. We did not make extensive
assessments regarding streets because their layout was not known when our study was prepared.
We recently received a plan, SL-01 that was prepared by Site Development Associates and dated
October 31, 2005, that shows the proposed layout of streets for the project. We understand that
..Ibe: City of. Edmonds has requested that an assessment of the streets be done. Our assessment is
Tbntairied in this letter.
There is one main street that will enter the site at its southwestern corner and extend northeasterly
through the site. A smaller side street will branch off the main street near the middle of the site.
Only relatively small to moderate excavations are needed for the side street, and we believe that it
will have very good stability as planned. Some large excavations are planned for the southern
portion of the main street. Very little grading is proposed for the northern portion of the main street.
The northern portion will be set back about 15 to 50 feet from the top of the steep slope that exists
at the northwestern side of the site.
The southern portion of the main street is located on the southwestern portion of the site. This
portion is only moderately sloped, and we noted in our study that the stability of the slope was
suitable because of the moderate inclination. Based on our previous assessment of this moderate,
southern slope (as noted in our study), and because an excavation for the southern portion of the
main street will be made to lower the grade of the slope, we believe that the proposed location and
grading of the southerr portion of main street is very adequate. However, a rockery that will be 2 to
14 feet in height is proposed along the upslope side of the southern portion of the main street. It is
our professional opinion that rockeries for this project be limited to 6 feet in height due to soil
conditions. Therefore, a retaining structure will need to be constructed along the upslope side of
the main street where a vertical wall of 6 feet or more is needed. We can readily provide specific
geotechnical engineering parameters for the wall design once final plans for the plat are completed.
We performed a stability analysis of the steeper slope on the northwestern side of the site for the
preparation of the study. Our analysis indicated that some soil instability could occur on these
steeper slopes, with the top of the instability occurring near the top of the steeper slopes. We
ECEC
February 3, 2006
JN 05231
Page 2
recommended that the residences located on steeper slopes be designed to buttress the slope and
provide stability to the structure. Because the proposed main street will be located behind the
buttress -designed residences and away from the top of the slope (where our analysis found was
the edge of potential instability), it is our professional opinion that the location of the northern
portion of the proposed main road is adequate. In summary, both portions of the proposed main
street, which combine to comprise the entire main street, are suitable as planned in our
professional opinion.
The specific pavement design for the streets on the site will be needed once traffic counts for the
streets are known. However, we believe that standard asphalt and crushed rock thicknesses will
likely be similar to other subdivision streets in the Puget Sound area. The preparation of the
subgrade may have to include the importation of pit -run gravel or similar material if the on -site soil
is wet during pavement installation. Weather will likely play a significant role in determining the
necessity of the gravel. This is a typical pavement subgrade constraint for the Puget Sound area.
We trust that this report meets your immediate needs for the proposed development. Please
contact us if we can be of further service.
DRW: esn
Respectfully submitted,
GEOTECH CONSULTANTS, INC.
N
D. Robert Ward, P.E.
Principal
Z/3�6
GEOTECH CONSULTANTS, INC.
As )ciated Earth Sciences, 7 _c.
Ltd NJ
ad
Cegm6ny25 Ve ,of SenAce
January 31, 2006
Project No. KE05360A
Elite Construction Engineering Consortium, Inc.
10928 59`h Avenue West
Mukilteo, Washington 98275
Attention: Mr. Saeed Soleimanpour, P.E., M.S.C.E.
Subject: Proposed Roadway
Serene Creek
16612 74`h Place West
Edmonds, Washington
Dear Mr. Soleimanpour:
At your request, we have prepared this letter to comment on geotechnical issues concerning the
proposed location and construction of a roadway through the planned Serene Creek
subdivision. It is our understanding that a new roadway will connect 76" Avenue West and
74`'' Place West. The roadway will be two lanes along 76`' Avenue West, but will narrow to
one lane when it connects to 74`h Place West. We understand that portions of the roadway will
have a gradient of up to 12 percent and will generally conform to existing topographic features.
Site conditions and the results of the original subsurface exploration are presented in
Associated Earth Sciences, Inc.'s (AESI's) report entitled "Subsurface Exploration, Geologic
Hazard, and Preliminary Geotechnical Engineering Report, Serene Creek, 16612 74`h Place
West, Edmonds, Washington" dated September 2, 2005.
Geotechnical Issues
As documented in our report, the site contains steep slopes and is located within a known slide
area. The risks associated with the placement of a roadway can, in our opinion, be mitigated
by adhering to the recommendations presented below.
Cut Slopes
Wherever possible, the roadway should be cut into subgrade soils. Due to the presence of
steep slopes, loose fill, and previous slide material, the use of fill material to establish grades
should be limited. We.reviewed a preliminary site layout plan, provided by Site Development
Associates, LLC, dated October 31, 2005, and observed that proposed roadway elevations to
the south of Lots 5, 6, and 7 range between 4 and 16 feet below existing site grades, but are
generally less than 3 to 4 below existing grades across the remainder of the property.
Kiddand Office • 911 Fifth Avenue, Suite 100 • Kiddand, WA 98033 • P (425) 827-7701 • F (425) 827-5424
Everett Office • 2911 1/2 HewittAvenue, Suite 2 • Everett, WA 98201 • P (425) 259-0522 • F (425) 252-3408
www aeseeo.com
Roadways cut into subgrade soils to the depths listed above will likely be supported by native,
medium dense soils. Loose pavement subgrade soils, if encountered, should be either removed
or recompacted to a firm and unyielding condition. Where fill is required, we recommend that
subgrade soils first be keyed and benched per the recommendations in our geotechnical report.
Structural fill should then be placed and compacted as per the Structural Fill section of the
geotechnical report.
Retaining Walls
Grading associated with roadway construction will likely result in steep slopes adjacent to the
road that requires retaining wall support. Retaining walls for these slopes may be
preliminarily designed using the recommendations found in the Lateral Wall Pressures section
of the geotechnical report. We recommend that we be allowed to review our recommendations
and modify them, if needed, to reflect actual wall design plans when they are available.
Pile foundation systems may be required for support of retaining walls where landslide debris
mantles the site (generally anticipated on the west side of the road). The piles must extend
through the fill/landslide debris and into the bearing soils. The specific need for pile support
and the design parameters for this type of wall can be provided by AESI once the road/wall
layout is established.
Surface Drainage
The silts and silty sands forming the landslide debris are relatively impermeable, and water
will tend to perch atop/within this stratum. Perched water below pavement sections can, over
time, weaken pavement subgrades and cause damage to the pavements. Final road grades
should promote free and positive drainage away from pavements at all times. We recommend
that a gradient of at least 1 percent be provided unless provisions are included for collection
and disposal of surface water adjacent to the roadway.
The preliminary site layout plan provided to us indicates that all storm drainage from the
roadways and proposed structures are to be tightlined and conveyed to a water quality and
detention facility. We understand that the facility will connect to the existing storm drainage
system located in 76`' Avenue West.
Underground Utilities
It is our understanding that underground utilities will be installed under portions of the
proposed roadway. Underground utilities may consist of, but are not limited to, power, water,
communication, gas, storm, and sanitary sewer lines. Underground utility trenches should be
backfilled in accordance with the recommendations found in the Structural Fill section of the
geotechnical report and with applicable City of Edmonds roadway/utility standards. Structural
backflll is defined as non -organic soil, acceptable to the geotechnical engineer, compacted to at
least 95 percent of the modified Proctor maximum density using American Society for Testing
and Materials (ASTM):D 1557 as the standard.
Kirk6nd Office • 911 Fifth Avenue, Suite 100 • ", WA 98033 • P (425) 827-7701 • F (425) 827-5424
Everett Office • 2911 1 /2 Hewitt Avenue, Suite 2 • Everett, WA 98201 • P (425) 259-0522 • F (425) 252-3408
WlV W.ae1W VO.rnM
Drainage of the pipe zone bedding material may be required if significant ground water
seepage is encountered in the utility trench(es). Utility drainage would generally consist of
backfilling the trench with free -draining aggregate and providing a continuous perforated
collection pipe at the trench base. The perforated pipe would connect to the storm system at
the lower end of the roadway. Additional details of the utility drain can be provided by AESI
as the road and utility plans are developed.
Soils in which the amount of fine-grained material (smaller than the No. 200 sieve) is greater
than approximately 5 percent (measured on the minus No. 4 sieve size) should be considered
moisture -sensitive. Use of moisture -sensitive soil in structural fills and utility backfill should
be limited to favorable dry weather and optimum subgrade moisture conditions. The on -site
soils generally contained significant amounts of silt and are considered moisture -sensitive. If
fill is placed during wet weather or if proper compaction cannot be obtained, a select import
material consisting of a clean, free -draining gravel and/or sand should be used. Free -draining
fill consists of non -organic soil with the amount of fine-grained material limited to 5 percent by
weight when measured on the minus No. 4 sieve fraction.
Pavement Design
The proposed roadway may be designed using the recommendations found in the geotechnical
report and guidelines presented in the American Association of State Highway and
Transportation Officials (AASHTO) Guide for Design of Pavement Structures, 1993.
Alternatively, applicable City of Edmonds standard road sections may be used.
Closure
If you have any questions or if we can be of additional help to you, please do not hesitate to
call.
Sincerely,
ASSOCIATED EARTH SCIENTCES, INC.
Kirkland, Washington
Bruce L. Blyton, P.E.
Principal Engineer
BL.B/Id - KE05360A5 - Projects\2005036MEMP
Kiddand Office • 911 Fifth Avenue, Suite 100 • K"d, WA 98033 • P ( (425) 827-7701 • F (425) 827-5424
Everett Office • 2911 1/2 Hewitt Avenue, Suite 2 • Everett, WA 98201 • P (425) 259-0522 • F(425) 252-3408
www.aesmo.com
• ?/CJf�/ /•✓ �lC 6
�' ��l c l�-d s � d t G �/�U. v/t,�•� —o.� .rho �-�G�cerG�/2C�
/vD (�% (/L'/vorwf O-✓fY�r/S�o/� G1/,A'y�1.r �o� aer/G.r .l
/9/9ww 2% Anoy, Nwr/off SOX
/,qSIiC/t',✓G(1 G — % G o
o //p M
1-,Pi4vd jw vlote
a �f�ftd A^�(�C/L orc0�✓• SG,� 1I,QG ��C /�'Ir.�GG✓l��Ca/
CITY OF EDMONDS
121 - 5TH AVENUE NORTH, EDMONDS, WA 98020
PLANNING DIVISION
ADVISORY REPORT
FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS
To: Ron McConnell, Hearing Examiner
From: 2!Lzf TwtA+rttt (10Z Ott/ ))
Meg Gruwell
Senior Planner
Date: APRIL 25, 2006
File: AP-06-35
SERENE CREEK SEPA APPEAL
Hearing Date, Time, And Place: May 4, At 3:00 P.M.
Council Chambers
Edmonds Public Safety Building
250 — 5th Avenue N.
TABLE OF CONTENTS
Section Page
I.
INTRODUCTION...:...........................................................................................................2
A. Appellant/Appeal Information...................................................................................................2
B. Recommendations......................................................................................................................2
II.
FINDINGS OF FACT AND CONCLUSIONS...................................................................2
A. History ........................................................................................................................................2
B. Appeal Issues..............................................................................................................................3
III.
APPEALS AND RECONSIDERATION............................................................................ 7
........................
A. Request for Reconsideration........................................................................... ...7
B. Appeals......................................................................................................................................7
C. Time Limits for Reconsideration and Appeals..........................................................................7
IV.
ATTACHMENTS .... :.......................................................................................................... 8
V.
PARTIES OF RECORD......................................................................................................8
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 2 of 8
I. INTRODUCTION
A. Appellant/Appeal Information
I. Appellant: Carolyn A. Lake of Goodstein Law Group, PLLC, for Saeed
Soleimanpour of ECEC, Inc. (see Attachment 2).
2. Site Location: 16515 — 74th Place W. and the two acre lot to the west of it across
741h Place W., which fronts on both 741h Place W. and 761h Avenue W. (see Attachment
1).
3. Request: Appeal of staff determination to issue a Determination of
Significance (DS) for the proposed Serene Creek project, which includes a contract
rezone to change the existing zoning from Single-family Residential RS-20 to RS-12,
together with a Planned Residential Development to develop a 2.84 acre site with nine
lots (file numbers R-05-169 and PRD-05-168). The proposal also includes constructing a
public through road from the terminus of 74th Place W. to 76th Avenue W., two private
access roads, 4,000 cubic yards of grading, street vacation and a formal subdivision (see
Attachment 2).
4. Review Process: Hearing Examiner conducts public hearing and makes final decision.
5. Major Issues:
a. Compliance with Edmonds Community Development Code (ECDC) Section 21.15A,
Environmental Review (SEPA).
b. Compliance with Edmonds Community Development Code (ECDC) Section 20.91,
Public Hearings and Notice.
c. Compliance with Edmonds Community Development Code (ECDC) Chapter 20.105,
Appeals and Court Review.
B. Recommendations
Based on the statements of Fact, Conclusions, and Attachments in this report staff
recommends DENIAL of the appeal, upholding the issuance of a Determination of
Significance for the proposed nine -lot Serene Creek project.
II. FINDINGS OF FACT AND CONCLUSIONS
A. History
1. Chronology
a. Facts:
(1) On December 12, 2005, Saeed Soleimanpour, as agent for ECEC, Inc., filed an
application for a contract rezone (file R-05-169) and a Planned Residential
Development (PRD) (file PRD-05-168) for the proposed Serene Creek project.
(2) On January 9, 2006, Meg Gruwell, Senior Planner with the City of Edmonds,
sent a letter to Mr. Soleimanpour stating the items needed to complete the
application.
(3) On January 11, 2006, the applicant held a neighborhood meeting as required by
ECDC 20.35.080.A.2 at the Meadowdale Clubhouse and was given several
concerns from the neighbors.
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 3 of 8
(4) A letter stating that the application was complete was sent out on March 15,
2006. No hearing dates were set since the letter explained that an Environmental
Impact Statement (EIS) would need to be done to address the increased density
on the site.
(5) On March 16, 2006, the City issued a Determination of Significance (DS) and
request for comments on the scope of the EIS (see Attachment 3). This review
was done pursuant to the State Environmental Policy Act (SEPA). The deadline
given to appeal was March 30, 2006.
(6) The City has received several letters of comment (see Attachment 6) on the DS,
including from the Washington State Department of Fish and Wildlife, Douglas
Grier, the Brookacres Homeowners Association, Janice Conner, Larry
Quisenberry, and Robert McCoy. Earlier letters of comment on the project were
received from Douglas Grier, Marge Plecki and Michael King. Laurey Tobiason
filed a letter on behalf of the applicant after the DS was issued.
(7) On March 30, 2006, the applicant delivered a written appeal, together with the
fee and adjacent property list, to the Planning Division (see Attachment 2).
b. Conclusion:
(1) The appeal of the Determination of Significance was a timely appeal.
B. Appeal Issues
1. Issues raised by the Appellant:
a. Summary of Statements by the Appellant: (See Attachment 2)
(1) The appellant wants the city to do peer review instead of an EIS, or would like a
reduced scope EIS.
(2) The appellant seeks to have the DS withdrawn and a Mitigated Determination of
Nonsignificance issued.
(3) As part of the appeal letter, the appellant has described the project and its
location and surroundings. Further, they address how the project in their view
provides public benefit, and how they believe it is consistent with the state
Growth Management Act the Edmonds Comprehensive Plan and the City
development regulations.
(4) In subsection D of the letter, the appellant states why they believe the DS is in
error, including that the applicant has proposed measures to ensure the protection
of the Earth (slopes), Water, Plants and Animals (critical areas and open space)
and Transportation. They believe since the City issued a DS that they did not
consider relevant environmental factors before reaching its decision. They
believe that the City's decision was clearly erroneous given the applicant's
offered mitigation conditions and SEPA's requirements to focus EIS only on
actual impacts which have a significant environmental impact. Further, they
believe that since their offered mitigation conditions comply with the City's
regulations, plans and codes, the requirement for an EIS is an error. They
mention that a decision could be "arbitrary or capricious" even if not clearly
erroneous, and without support, they state that the City's DS decision is arbitrary
and capricious.
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 4 of 8
2. City Attorney Comments:
a. Fact:
(1) The City Attorney's office has provided a legal brief (see Attachment 5)
addressing the above legal points.
3. Planning Division Comments:
a. Facts:
(1) The site is zoned Single -Family Residential (RS-20) and is in the Comprehensive
Plan as "Single Family — Resource."
(2) The Comprehensive Plan states that the three zones which are compatible with
"Single Family — Resource" are RSW-12 and RS-12, both of which require a
minimum of 12,000 square feet per lot, and RS-20, which requires 20,000 square
feet per lot.
(3) As seen in Attachment 3, the City is planning for a reduced scope EIS, to address
only those issues felt to be pertinent.
(4) The City has discussed with the Mr. Soleimanpour that we feel our regulations
and codes would provide adequate environmental protection to address a
subdivision or PRD on this site, provided that it was developed in accordance
with the existing zoning.
(5) This site is in an area known as Meadowdale. In February 1979 the Edmonds
City Council passed Resolution No. 428, which was a moratorium on the
issuance of all building permits and approvals of planned residential
developments, subdivisions and short subdivisions in the Meadowdale area of
Edmonds (see Attachment 4). This area was described as located generally north
of 1681h Street SW. The reasons given were because of the high potential for
landslides due to steep slopes, sand and clay soil formations and the quantities of
ground water percolating through the soils due to the lack of storm and sanitary
sewers, among others.
(6) Subsequent to the moratorium, the City hired Roger Lowe Associates Inc. to
study the Meadowdale area, and they wrote the report entitled "Final Report
Landslide Hazards Investigation Meadowdale Area," which was published in
October 1979. , That report documents the many landslides in the Meadowdale
area and the geology and hydrology that led to them.
(7) According to the Lowe report, the subject parcels are mapped as having hazards
from ground failure in material that has not previously failed, with the type of
failure anticipated being debris slides, with a 2 percent probability of occurrence
during a 25-year period.
(8) In 1984, the city passed Ordinance 2445, which lifted the moratorium. This
ordinance notes that the city had addressed the hazards to the extent possible
through public works designed to reduce ground water levels by the
improvement of public storm and sanitary sewerage. It required that applicants
for subdivisions or planned residential developments provide a covenant stating
that the applicant will inform those they sell or pass the land to of the risks
associated with the area, and a statement waiving the right of the owner to assert
any claim against the City by reason of or arising out of issuance of a permit or
other development approval by. the City for their property.
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 5 of 8
(9) Despite the efforts to dewater the hillside through the public improvements,
landslides have continued to occur in the Meadowdale area.
(IO)Landslides have been reported in the last ten years to the north at Lorian Woods,
just south of North Meadowdale Road on 73rd Place W; at the far north end of
751h Place W., just before the County Park; and west of 16202 - 72"d Avenue W.
(I 1)A landslide was reported by the adjacent property by Mr. Grier at 16431 — 74`h
Place W on February 7, 2006, that covered the city's basin #25. In an e-mail to
Dr. Grier, Noel Miller, Public Works Director, states that the slide occurred
within Mr. Fong's property, which is at 7406 -164`h Place SW, or adjoining
private property.
(12)Dr. Grier's property to the north has been the site of several landslides, which are
outlined in a report by Vince McClure, dated February 20; 1987. These include
slides in 1984 and 1985 which occur near the time that a sewer line is discovered
to be broken, is bypassed, and the bypass fails.
(13)Mr. Soleimanpour has been concerned enough about the ability of this site to
support his project that he has hired two geotechnical consultant firms to review
the site.
(14)On page 4 of the Geotech Consultants Inc. report submitted by the applicant, it
states "Based on conversations with the other project consultants, we have
decided that it is best not to construct any residences on the very steep
northwestern slope. Residences will only be constructed where the slope
inclination is 40 percent or less, which is on the western side of the site."
(15)The city measures slope for purposes of determining Landslide Hazard areas as
defined in ECDC 23.80.020.13, which delineates the slope by establishing its toe
and top and averaging the inclination over at least 10 feet of vertical relief or 25
feet of horizontal distance.
(16)Using the above method for measuring slope, the slope of proposed lot 8 (which
extends down to the 76`11 Avenue W. right-of-way) is a 46-foot drop for a 65-
percent slope.
(17)The slope on proposed lot 9, which also extends down to the 761h Avenue right-
of-way, is a 40-foot drop and a 46-percent slope.
(18)When the appellant has discussed which lots would be eliminated if the zone
were not changed, lots 8 and 9 have consistently been the lots that would be
dropped from the main parcel. The lot at 16515 — 74th Place W. would only have
one house on it and not two.
(19)The two geotechnical reports submitted by the applicant had field work done in
June, July or August 2005. Neither noted substantial groundwater.
(20)The City Engineering Division has requested the applicant to loop 74t11 Place W.
to meet 76th Avenue W. to provide better access.
(21)Neighbors have expressed concerns that additional traffic would be added to 74`h
Place W. if the road was looped.
(22)The Jay Group was hired by the applicant to study the creek that runs through
the site. They determined that is a perennial stream that does not support fish
(Stream type Np) and requires a 50-foot buffer.
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 6 of 8
(23)The applicant is proposing a "top of ridge" edge to the buffer that is in places
less than the required 50-foot buffer.
(24)The current proposal takes access from 76't' Avenue W., and has homes within
25 feet of the right-of-way of 761h Avenue W. on proposed lots 8 and 9. To
strengthen that slope, the applicant is proposing to remove the soils along 76`h
Avenue W. that are not stable soils and replace them with retaining walls and
structural fill. The vegetation along 761h Avenue W. would be removed if this
occurs.
b. Conclusions:
(1) The site is in an area of known geological instability. The site has steep slopes
that qualify as landslide hazard areas. The site has a stream and though the
geotechnical reports did not find much groundwater on the site, the site
exploration was done during the drier summer months.
(2) if the rezone were to be approved, the additional two building lots that the RS-12
zone would allow in the larger parcel would be placed on the relatively steep
western slope. The city conservatively believes that allowing additional density
will result in more marginal land being developed and will increase the chance
of homes being damaged.
(3) Allowing these additional homes to be added and potentially put in harm's way
is a significant adverse environmental impact.
(4) The City has discussed with the Mr. Soleimanpour that we feel our regulations
and codes would be adequate to address a subdivision or PRD on this site that
complied with the existing zoning. It is the environmental impacts of the
proposal to add increased density that have not yet been evaluated adequately.
(5) The site is currently in compliance with the Comprehensive Plan, since the RS-
20 zone is compatible with the "Single Family — Resource" designation.
(6) When determining which properties to approve for rezones, physical suitability
of the site is one of the factors the City Council must review. Staff would like to
have adequate information for them to base their decision on, and would like that
information not to have the appearance of bias.
(7) Likewise, staff would like to have a review of the proposed looping of the road
by a transportation expert to determine the advantages and disadvantages of that
proposal.
(8) Thirdly, staff would like a qualified consultant to review the proposed stream
buffer proposal, to determine if the ridgeline is an adequate buffer. Also, in
evaluating habitat and soils, staff would like to consider the proposal to strip the
hillside along 76`h Avenue W. and replace it with structural fill and retaining
walls. Although it is being touted as a benefit in stabilizing the slope, it also has
an environmental cost in removing existing vegetation that likely provides
habitat to wildlife.
(9) With no rezone, staff would concur with the appellants that current City
regulations would adequately address the environmental impacts and allow them
to be mitigated so that a mitigated determination of nonsignificance would be a
correct determination. Adding three additional lots requires less developable
land to be used and potentially increases the likelihood that catastrophic damages
would be incurred due to landslides. The solutions proposed to mitigate these
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 7 of 8
hazards may cause environmental impacts in themselves. Staff therefore finds
that the proposal is likely to have a significant adverse impact on the
environment. This is not to rule out that further studies might conclude that the
project can be approved with mitigation measures, but only to state that those
studies are needed if a rezone is proposed.
IIL. APPEALS AND RECONSIDERATION
The following is a summary of the deadlines and procedures for filing reconsiderations and appeals.
Any person wishing to file or respond to a recommendation or appeal should contact the Planning
Department for further procedural information and fee information.
A. Request for Reconsideration
Section 20.100.010.E allows for the Hearing Examiner to reconsider his decision or
recommendation if a written request is filed within ten (10) working days of the date of the
initial decision by any person who attends the public hearing and signs the attendance register
and/or presents testimony or by any person holding an ownership interest in a tract of land
which is the subject of such decision or recommendation. The reconsideration request must
cite specific references to the findings and/or the criteria contained in the ordinances
governing the type of application being reviewed.
B. Appeals
The decision of the hearing examiner on appeals of staff decisions that do not involve project
permit applications shall be appealable to the city council pursuant to the process specified in
ECDC 20.105.040. Section 20.105.020.A & B describe how appeals of a Hearing Examiner
decision or recommendation shall be made. The appeal shall be made in writing, and shall
include the decision being appealed along with the name of the project applicant and the date
of the decision, the name and address of the individual or group appealing the decision, their
interest in the matter, and reasons why the appellant believes the decision to be wrong. The
appeal must be filed with the Community Development Director within fourteen (14)
calendar days after the date of the decision being appealed.
C. Time Limits for Reconsideration and Appeals
The time limits for Reconsiderations and Appeals run concurrently. If a request for
reconsideration is filed before the time limit for filing an appeal has expired, the time "clock"
for filing an appeal is stopped until a decision on the reconsideration request is completed.
Once the Hearing Examiner has issued his decision on the reconsideration request, the time
clock for filing an appeal continued for the point it was stopped. For example, if a request is
filed on day 5 of the appeal period, an individual would have 9 more days in which to file an
appeal after the Hearing Examiner issues his decision on the reconsideration request.
AP-06-35.doc / April 27, 2006 / Staff Report
Saeed Soeimanpour / ECEC Inc.
AP-06-35
Page 8 of 8
IV. ATTACHMENTS
1. Zoning and Vicinity Map
2. Letter of Appeal submitted by Carolyn A. Lake of Goodstein Law Group, PLLC, dated March 30,
2006
3. Determination of Significance and request for comments on the scope of the EIS, issued March
16, 2006
4. City of Edmonds Resolution No. 428
5. Memorandum of Law, prepared by W. Scott Snyder and Bio F. Park
6. Comment Letters received from:
Douglas Grier, dated February 4, 2006, and April 3, 2006
Michael King and Margaret Plecki, dated March 1, 2006, and March 28, 2006
Brookacres Homeowners Association, dated April 3, 2006
Larry Quisenberry, received April 6, 2006
Janice Conner, dated April 6, 2006
Ginger Holser of State of Washington Department of Fish and Wildlife, dated March 20, 2006
Robert McCoy (e-mail), dated April 20, 2006
Laurey Tobiason, dated March 17, 2006
V. PARTIES OF RECORD
Carolyn Lake
Saeed Soleimanpour
Edmonds Planning Division
Goodstein Law Group LLC
ECEC Inc.
1001 Pacific Ave., Suite 400
10928 - 59d' Ave. W.
Edmonds Building Division
Tacoma, WA 98402
Mukilteo, WA 98275
Robert & Edeltraud Suchert
Laurey Tobiason
Douglas Grier
540 — 12`h Ave. N.
Tobiason & Co., Inc.
16431 — 74`h Pl. W.
Edmonds, WA 98020
506 NE 73rd St., Suite I
Edmonds, WA 98026
Seattle, WA 98115
Brookacres Homeowners Assoc.
Michael King & Margaret Plecki
Larry Quisenbeiry
16711 — 76`h Ave. W.
16621 — 76`h Ave. W.
Edmonds, WA 98026
Edmonds, WA 98026
Janice Conner
Ginger Holser
Robert McCoy
16525 — 74`h Place W.
WA Dept. of Fish & Wildlife
16510 — 76'h Ave. W.
Edmonds, WA 98026
16018 Mill Creek Blvd.
Edmonds, WA 98026
Mill Creek, WA 98012
AP-06-35.doc / April 27, 2006 / Staff Report
a
O:S
,l'�. N
v
s�
. A. A.�
= . RS-20L.
Zoning Vicinity Map
RS-20 RS-6 RM-3 M BP ® CG2
\\ RS-12::] RSW-12 RM-2.4 10 BN CW MU
RS-10 1' RS-MP RM-1.5 W BC � MP P
RS-8 CG ® MP2 :{ OS
164Tf
.wre pair `t�e;l to west
16�4T
RS-20 .
N Of E1)
A .ti
Rezones
PRD lac. 199"
ATTACHMENT 1
File No. AP-2006-35
ATLOG-35
GOODSTEIN
LAW GROUP
1001 Pacific Ave, Ste 400
Tacoma, WA 98402
Fax: (253) 7794411
Tel- (253) 7794000
Hand Delivered
Robert Chave, Planning Manager
City of Edmonds, Planning Division
121 5th Avenue North - 2nd Floor
Edmonds, WA 98020
March 30, 2006
Carolyn A Lake
Attorney at Law
cla��,gondueinluw com
MAR 3 p D
DEyE[Opm ft6
C!ry 0 R��� S CTR
Re: SEPA Appeal - Determination of Significance (DS) for Serene Creek PRD
Dear Mr. Examiner:
On behalf of our client ECEC, Inc.& Saeed Soleimanpour, we appeal the 16 March 2006 Decision
by the City of Edmonds SEPA Responsible Official to issue a Determination of Significance (DS)
for the request by ECEC, Inc.; Attention: Saeed Soleimanpour, for the approval of the Serene Creek
Planned Residential Development (PRD), along with the proposed Contract Rezone for rezoning
from large lot RS-20 to large lot RS-12; Planned Residential Development; Formal Subdivision;
Street Vacation of a very small section of the 74`s Place West dead end; and Official Street Map
Amendment (cumulatively, "DS").
Parallel to this appeal, and just as important, we also seek dialogue with the City of Edmonds
Planning Department. Our goals are two fold.
1. Peer review. First, we seek to explore whether the City and project applicant can reach
agreement on a peer review process in lieu of an EIS. We believe that this process fully
meetsSEPA's goal of protecting against significant adverse environmental impacts, especially given
the Project Applicant's agreement to provide significant proposed environmental mitigation
conditions as part of the site's design. The mitigating conditions were previously provided to the
City in the form of terms of the project's proposed concomitant Zoning Agreement, and are
attached to this appeal for ease of reference.
WAC 197-11-330 Threshold determination process. An EIS is required for proposals
for legislation and other major actions significantly affecting the quality of the environment.
The lead agency decides whether an EIS is required in the threshold determination process,
as described below.
(1) In making a threshold determination, the responsible official shall:
(c) Consider mitigation measures which an agency or the applicant will
implement as part of the proposal, including any mitigation measures required
by development regulations, comprehensive plans, or other existing
environmental rules or laws.
060330 SEPA appeal Itr CityEdmonds.doc
ATTACHMENT 2
File No. AP-2006-35
kobert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 2 -
2. Reduced EIS Scope. Second, to avoid pursuing this appeal, we seek agreement for a reduced
EIS scoping which better meets the intent of the EIS process as defined by WAC 197-11-408,
"Scoping."
(1) The lead agency shall narrow the scope of every EIS to the probable significant
adverse impacts and reasonable alternatives, including mitigation measures. For example, if
there are only two or three significant impacts or alternatives, the EIS shall be focused on
those."
(2) To ensure that every EIS is concise and addresses the significant environmental
issues, the lead agency shall:
(c) Eliminate from detailed study those impacts that are not significant
See: WAC 197-11408, "Scoping." Emphasis added.
We will contact City Planning Staff to explore these appeal alteratives shortly. In the meantime,
this appeal is filed to pursue our available remedies in the event agreement can not be reached on
these alternatives.
This appeal is timely filed pursuant to EMC 20.15A.240 and EMC 20.105.010.5, and the requisite
$230.00 filing fee is provided.
A. CONTENTS OF APPEAL
Pursuant to EMC 20.105.020.A, we provide the following information.
1. The decision being appealed, the name of the project applicant and the date of the decision.
We appeal the DS issued by the City of Edminds and described above for the Project known
as Serene Creek PRD, for which ECEC, Inc.; Attention: Saeed Soleimanpour, is the project
applicant, with issue date of March 16, 2006.
2. The name and address of the person appealing, and his or her interest in the matter.
Appellant is ECEC, Inc.; Attention: Saeed Soleimanpour, who is the project applicant. The
Appellant's representative is:
Carolyn Lake
Goodstein Law Group PLLC
1001 Pacific Avenue Suite 400
Tacoma WA 98402
060330 SEPA appeal Itr CityEdmonds.doc
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 3 -
3. The reasons why the person appealing believes the decision to be wrong.
The appeal grounds are noted in Section B, C and D below.
4. Persons to be notified under EMC 20.105.020.B, including correct names and addresses.
EMC 20.105.020.13 provides, "If no public hearing has been held earlier, the person
appealing shall also provide a list of property owners as specified in ECDC 20.95.010 and
whom must be notified by the community services department."
It is our understanding that a public hearing was held on this matter on or about January 11,
2006, in which case the requisite list of property owners to be notified has been previously
provided and is on file with the City. Nonetheless, we provide the attached list of the names
and mailing addresses, as shown on the records of the county assessor, of the owner of
property and the street addresses of the property which is within 300 feet of the boundaries
of the project site.
S. The specific nature and intent of the relief sought:
We seek remand to the City of Edmonds SEPA Responsible Official for withdraw of the
DS, and issuance of a MDNS consistent with the comments provided herein.
B. GENERAL BASIS FOR APPEAL
In its DS, the City's Responsible Official determined that this proposal is likely to have a significant
adverse impact on the environment, and that an Environmental Impact Statement (EIS) is required
pursuant to RCW 43.21.030(2xc). This decision is error, and the appeal should be granted.
In addition, the lead agency had identified the following areas for discussion in the EIS:
EARTH - geology, soils, topography, unique physical features, erosion; WATER — Surface
water movement/quantity, runoff/absorption, ground water movement/quantity/quality;
PLANTS AND ANIMALS — habitat for and numbers or diversity of species of plants, fish,
or other wildlife; TRANSPORTATION — transportation systems, vehicular traffic, and
traffic hazards
As part of this appeal, we also dispute the Responsible Officials' scoping. This decision also is
error, and the appeal should be granted.
C. PROJECT LOCATION & OVERVIEW
Understanding the context of the proposed project and its substantial proposed mitigation is
essential to an accurate analysis of its environmental impacts, and supports the granting of this
appeal. Therefore we briefly review the location of the proposed project, and describe our client's
060330 SEPA appeal ltr CityEdmonds.doc
va/.W/VO inu i4:Jo i'M L'JJ tfiv%gix wvu_.. - __e ti---
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 4 -
proposed environmental mitigation measures in detail before we finther discuss the basis for this
appeal.
Project Location
The project address is 16515 74`h Place West, and in addition includes the two acre lot to the west
across 74ih Place West which fronts onto both 74'h Place West and 7e Avenue West in the City of
Edmonds. The total area of each parcel is approximately 23,764 and 100,077 square feet
respectively.
The Serene Creek PRD site is a small isolated area located at the southern boundary of the City of
Edmonds designated "Critical Landslide Area." The adjacent streets of 76'h Avenue West, 75
Place West and 74'h Place West, lot pattern, about 30 feet elevation difference of the site relative to
the lower 70 Avenue West street, natural landmarks such as stream and the existing sloped
contours and vegetation on the southeast open green space, which will remain intact, and define the
natural boundaries of the Serene Creek PRD.
Surrounding Neighborhood
The immediate neighborhood consists of a mixture of large lot RS-20 and large lot RS-12 at
present. More specifically, the western adjoining PRD which is a gated community, and is located
across the street from the Serene Creek PRD on the west side of 76`h Avenue West; and the bluff
properties to the north, along and on the west side of 75'h Place West; and a development two
parcels over to the northeast and east of 16515 74`h Place West and many more developments in the
area are zoned RS-12 shown on the Zoning Map. Some of these rezoning have been approved very
recently.
Zoning
The Serene Creek PRD site is within the Single Family- Resource on the City of Edmonds
Comprehensive Plan map. Serene Creek PRD site is within a Single -Family Residential Large Lot
RS-20 zone, next to an existing Contract Rezoned Planned Residential Development which is
within a Single -Family Residential Large Lot RS-12 zone. Both Serene Creek PRD site and the
existing gated community, which is also based on a "Contract Rezone" planned residential
development (PRD) are on a "Critical Landslide Area" map.
Historically the RS-20 zone designation was used as a way of controlling development in steep
slope areas of the City of Edmonds and hence to reduce hazards of such building activities. With the
adoption of the Critical Areas Ordinance and the Edmonds Community Development Code (ECDC)
chapter regulating Building Permits in Earth Subsidence and Landslide Hazard Areas, the City has
new means of controlling development on steep or critical areas applicable to all zonings, while
ensuring that the buildings are built securely enough to stay on the slope if the earth should slide.
Therefore, Single -Family Residential Large Lot RS-20 can be rezoned to Single -Family Residential
Large Lot RS-12, as long as the development meets all other safety criteria.
060330 SEPA appeal hr CityEdmonds.doc
V01 JV/ VV 111U 1Y.J.7 �'I1A LVV • V��aa vvv��.. �.au w•• v v l-
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 5 -
Slopes
The Project proponent has proposed significant environmental measures to ensure the protection of
the site's slopes, which measures exceed the City's regulatory requirements. Given these offered
mitigation conditions, no EIS should be required.
Two prominent local geotechnical engineering consultants have been hired to ensure proper project
environmental conditions are included to address the site's slope safety: Associated Earth Sciences,
Inc. (AESI); and "GEOTECH Consultants, Inc.". The two independent geotechnical engineering
reports both indicate positive approval for a well engineered residential construction on this PRD
site.
The Project applicant proposes that the most conservative combined design parameters and
recommendations of these two geotechnical engineering consultants will be followed jointly and
meticulously to control the rain; stream and underground water; as well as reducing the surcharge
load on the hills by shaving off and exporting the top few feet layers of soil. These measure will
also serve the purpose of minimizing the slope of the new public access road, "Serene Creek Way".
The engineered control and conveyance of surface and underground water, reduction of the soil
surcharge loads; along with the construction of new retaining walls, construction of the homes on
deep concrete and steel piling system (approximately 45 feet deep in order to lock into the good
stable sub -soil) will further enhance the existing factor of safety of the slope stability in the event of
an earthquake of high magnitude or any other unforeseen natural event.
Furthermore, two elite civil engineering firms, "Cross Sound Engineering" and "Site Development
Associates, LLC" have been hired to perform the site development phase of this PRD with the
primary objectives of minimizing the environmental impact by allocating over 42% (forty percent)
of the total area to open green space, minimizing the impervious road surface, minimizing the road
gradients for an easier future use by the emergency vehicles and local residents and an efficient
control of the rain and runoff water as well as the underground water collected by the footing
drains.
Crltkal Areas / Open Space
The Project proponent has also proposed significant environmental measures to ensure the
protection of critical areas and which exceed the City's regulatory requirements. Given these
offered mitigation conditions, no EIS should be required.
Watercourse. A very small water course, which is no more than two inches deep and a maximum of
one foot wide, flows across the southern portion of 16515 74a' Place West and the southeastern
comer of the two acre parcel. The water course is apparently fed by the ground seepage of the
surrounding land and generally runs year round although it trickles very little in the dry times. It is
non -fish bearing and has been classified as class 11 by wetland biologists at The Jay Group in
060330 SEPA appeal ltr CityEdmonds.doc
uaiaviuo---
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 6 -
Marysville, Washington. This classification requires a 50 feet setback according to the most recent
regulations adopted by the City of Edmonds.
Open Space, Approximately 52,000 (fifty two thousand) square feet of the total of 123,841 (one
hundred and twenty three thousand and eight hundred and forty one) square feet of the PRD area
have been dedicated to common native growth land to preserve the creek and nature as well as
providing and preserving a serene natural old growth buffer zone with the neighbors to the, south,
east and west. The Jay Group which specializes in wetland biology and landscape architecture will
perform the landscaping design, plant selection, the native growth and stream restoration with the
primary objective of enhancing the existing overall site condition.
Transportation
The Project proponent has also proposed significant environmental measures to enhance the area's
vehicular and pedestrian safety, and which exceed the City's regulatory requirements. Given these
offered mitigation conditions, no EIS should be required.
The Serene Creek PRD will enhance traffic and pedestrian safety in the immediate neighborhood.
The Project will provide well needed linkage of the 74m Place West which currently is a dead end,
under -maintained and hazardous narrow (one lane) public road to the 76th Avenue West which is a
two lane main public road The elimination of the dead end will contribute to the saving of lives in
the times of emergency by facilitating the traffic for ambulance, police and fire trucks as well as
reducing the driving risks for the neighbors, particularly in bad freezing weather conditions.
Public Benefits
The Project satisfies the criteria of ECDC Sec. 160. 1 0.000.0 and Sec. 16.10.000.1) to provide
public gain. These include:
1. The new road (Serene Creek Way), that is a part of the proposed Serene Creek PRD, will link
the 764' Avenue West to the 74m Place West and eliminate the 74th Place West dead end, which
first and foremost improves the emergency traffic flow and all other vehicular traffic safety, and
will enhance the quality of the existing public road system.
2. The construction of the water main loop, that is a part of the Serene Creek PRD, will provide
continuity between the water mains on the 74a' Place West and 76* Avenue West, respectively.
This loop will provide more flexibility for the Water Department repair crews to maintain water
service to most of the neighborhood during major repairs in the immediate area of these two
roadways.
3. The installation of street lights along Serene Creek Way, which is a part of the Serene Creek
PRD, will improve public safety in the immediate area.
4. The construction of new retaining walls and sidewalks along the 761s Avenue West, that is a
part of the Serene Creek PRD, will improve the public roadway and public safety by increasing
060330 SEPA appeal Itr CityEdmonds.doc
Val JV/ too LAM lu. Vv ■•tin -.-- -------
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 7 -
the sight distance and enabling the pedestrians to keep off the road. However, it must be noted
that it seems to be safer if the City of Edmonds would allow the sidewalk to be installed on the
west side of the 76'b Avenue West.
5. The construction of the Serene Creek PRD will ultimately further stabilize the slopes on the
east side of the 761' Avenue West at no cost to the City of Edmonds.
6. The approval and completion of the Serene Creek PRD will save that portion of the Capital
Improvement Projects (CIP) funds of the City of Edmonds that would have ordinarily been
spent for improvement projects, including: develop sidewalks, install street lights, install
retaining walls along the east side of 76`h Avenue West and construct the "Serene Creek Way"
as a public road;
7. improved neighborhood property value and security.
8.Increased property tax base.
Project's Consistency with State GMA
The Growth Management Act (GMA) and the City of Edmonds Comprehensive Plan support infill
development to accommodate the forecasted population growth. 'There is a high demand for
residential lots in the City of Edmonds. Therefore, throughout the City of Edmonds there has been
pressure to infill areas that are underdeveloped as raw land becomes scarcer.
The Growth Management Act (GMA) requires 4 dwelling units per acre as the minimum urban
residential density in urban areas such as Edmonds; any less than 4 units constitutes sprawl. All land
within the urban area must be designated at appropriate urban densities. Any new residential land
use pattern within an Urban Growth Area (UGA) that is less dense is not a compact urban
development pattern, constitutes urban sprawl, and is prohibited. Even at Land Use of Single -
Family Residential Large Lot RS-12 zoning, the Density of 3.7 dwellings per acre is less than the
minimum GMA requirement of 4 dwelling units per acre. Large Lot RS-20 zoning would allow
only 2 dwelling units per acre which is half of the minimum GMA requirement of 4 dwelling units
per acre. The Serene Creek PRD includes 9 dwelling units on a total area of 2.845 acres, which
results in 3.2 dwellings per acre, hence (9/2.845= 3.2 dwellings per acre). A total of 11.4 dwelling
units may be stipulated by the minimum GMA requirement based on the following calculation:
(123,841/ 43,560= 2.845 Acres; 2.845x 41dwelling units per acre per GMA] = 11.4).
As the Best Available Science Report and updated critical areas regulations indicate, the intent of
the City of Edmonds is to take a conservative approach to protecting critical areas. The goal is to
obtain enhanced protection of resources within the city, while recognizing infill development must
continue to occur. Relatively large buffers are proposed, but these are balanced by the ability of
existing developed areas to continue infill activity in exchange for enhancing critical areas buffers,
which is the cardinal theme of the Serene Creek PRD design.
060330 SEPA appeal ltr CityEdmonds.doc
UJ/JV/VV Inu L'J: V1 rnnv---
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 8 -
Project's Consistency with Edmond Comprehensive Plan
The proposed Serene Creek PRD is entirely consistent with the City of Edmonds Comprehensive
Plan of March 2005.
Growth Management sections (A. General) and (B. Goal):
1. Maintain the character of the community while strategically planning for a positive change
in this specific area, per section (A).
2. Blend in with the adjacent and neighboring RS-12 zoning hence, not creating an island of a
different zoning character, per section (A).
3. Provide and/or exceed the highly sought after residential types and architectural designs, per
section (A).
4. Encourage the maximum of citizen participation in the neighborhood meeting which will be
monitored by City Officials to incorporate all comments and receive all points of view, per
section (B.1).
5. Provide ample Open Green Space, per section (B.2).
6. Increase the residential property tax base which is a long term income for the City of
Edmonds and the Snohomish County, per section (B.3).
7. Provide Light (including direct sunlight), per section (B.4a); Privacy, per section (B.4.b);
Views, Open Spaces and other natural features, per section (B.4.c); and Freedom from air,
water, noise and visual pollution, per section (B.4.d); and ECDC Sec. 16.10.000.B
(Purposes).
8. Promote as much as possible a balanced mixture of income and age groups, per the criteria's
of sections (B.5); and ECDC Sec. 16.10.000 A (Purposes).
9. Contribute to the City of Edmonds cooperation with surrounding communities for ensuring
that the regional growth policy is consistent with the stated local policy, per section (B.6);
ECDC Sec. 16.10.000.A (Purposes).
State Goals:
1. Encourage development in the urban areas where adequate public facilities and services
exist and can be implemented and enhanced efficiently per section (A. Urban Growth).
2. Reduce the inappropriate conversion of undeveloped land into sprawling, low -density
development per section (B. Reduce Sprawl).
3. Encourage efficient traffic flow by providing the linkage between the dead end 74`s Place
West and the 76"' Avenue West per section (C. Transportation).
4. Encourage availability and preservation of existing housing stock per section (D.
Housing).
5. Encourage economic development, opportunity, all within the capacities of the existing
public services, and public facilities per section (E. Economic development).
6. Landowners of the Serene Creek PRD will dedicate and develop a portion of their private
land as a public road (called: "Serene Creek Way"), which will not only provide an easier
access to the houses in the area, but also it will link the dead end 74`h Place West to the
main road 76`h Avenue West and provide a bypass to the narrow one lane and steep 74th
060330 SEPA appeal Itr CityEdmonds.doe
Vai aoi vo inu iu: vi rr%n LJJ / . -AA �+vvuo. _� �^�^ �• v t
Ip Robert Cbave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 9 -
Place West in the freezing and emergency times; in exchange for the City of Edmonds
vacating the most Northern portion of the 70 Place West dead end (without any monetary
exchange between the City of Edmonds and the adjacent landowners and/or Serene Creek
PRD), to the adjacent neighbors. This proposed vacated portion lies outside the new and
improved public road and right of way, and of course after the installation of proper "road
curve" signs, warns public from driving into the side yard of the most northern lot in the
Serene Creek PRD and the private driveway of the house owned by Mr. and Mrs. Grier, at
1643170 Place West, located at the end of the existing dead end, per section (F. Property
Rights).
7. Saeed Soleimanpour and ECEC, Inc. trust that every effort will be made by the officials of
the City of Edmonds to minimize the length of time required to process this Land Use
Application, and make the dream of "Serene Creek PRD" a predictable reality and allow
the undersigned applicant to plan construction in the early spring months of 2006, per
section (G. Permits).
8. Discourage the incompatible use of this land, per section (H).
9. Encourage the retention of more than 42% Of the entire Serene Creek PRD area for open
green space and recreation of the residents by increasing access to the creek and providing
a park like atmosphere by cleaning up and maintaining the creek and its' surroundings
within the PRD, per section (I. Open Space and Recreation).
10. Protect the environment by cleaning up the land and improving the water quality by
restoring the stream to its' natural condition and maintaining the required SO feet buffer
zone around the stream, per section (J. Environment).
11. Encourage the involvement of citizens in the planning process by unveiling and
introducing the Serene Creek PRD at the neighborhood meeting. The neighbors within the
300 feet radius of Serene Creek PRD will be notified by the City of Edmonds officials.
The comments of the neighbors along with the comments of the City of Edmonds officials
will be incorporated in the design to the extent possible, in an attempt to create a win -win
situation for all parties involved, per section (K. Citizen Participation).
12. Ensure that those public facilities and services necessary to support development of Serene
Creek PRD shall be adequate to serve the development at the time the development is
available for occupancy and use without decreasing current service levels below locally
established minimum standards, per section (L. Public facilities and services). In fact, the
development of Serene Creek PRD will enhance and improve the existing public facilities
and services in the following ways:
A. The linkage of the dead end 74a' Place West to the 70h Avenue West by
construction of the public road (Serene Creek Way), that is a part of the Serene
Creek PRD, will enhance the traffic flow and the quality and safety of the existing
public road system.
B. The construction of the water main loop, that is a part of the Serene Creek PRD,
will provide continuity between the water mains on the 70 Place West and 76`h
Avenue West, respectively. This loop will provide more flexibility for the Water
Department repair crews to maintain water service to most of the neighborhood
during major repairs in the immediate area on these two roadways.
C. The installation of street lights along Serene Creek Way, which is a part of the
Serene Creek PRD, will improve public safety in the immediate area.
060330 SEPA appeal ltr CityEdmonds.doc
UJ/JU/Ud '1'nU la:UL rAA Cod 8/04411 wwaoctu .,on v.vur
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page -10-
D. The construction of new retaining walls and sidewalks along the 7e Avenue West,
that is a part of the Serene Creek PRD, will improve the public roadway and public
safety by increasing the sight distance and enabling the pedestrians to keep off the
road. However, it must be noted that it seems to be safer if the City of Edmonds
would allow the sidewalk to be installed on the west side of the 7e Avenue West.
E. The construction of the Serene Creek PRD will ultimately further stabilize the
slopes on the east side of the 76s' Avenue West at no cost to the City of Edmonds.
Regional Goats:
1. Maintain more than 42% of the total Serene Creek PRD area as open green space, per
section (A).
2. Provide sidewalk which in its' own accord will provide an effective, no cost form of
mobility. It is also a long term investment for the neighborhood, since the sidewalk could
accommodate a safe city transit or school bus stop in the future and keep the pedestrians off
the roads as well, per section (B).
3. Create major short term and minor long term economic opportunities by providing
construction and maintenance jobs, while contributing to the urban growth management by
optimizing the population density, per section (C).
4. Conserve the environment by devoting over 42% of the total Serene Creek PRD area to open
green space, cleaning up and protecting the natural stream by maintaining the required 50
feet buffer zone, per section (D).
5. Avoid concentrating development by allowing one less lot in the Serene Creek PRD, and
devoting that extra lot to common open green space, per section (E).
6. Contribute to the Puget Sound region and specifically countywide urban growth
management efforts by providing eight additional home sites and hence, preventing
sprawling. The Serene Creek PRD will attract potential new residents of the State of
Washington, Snohomish County and the existing residents of the neighboring cities and
counties who are looking for a better place to live, per section (F).
Project's Consistency with City Development Regulations.
Per ECDC Section 20.40.010, the Serene Creek project is consistent with the City's development
Regulations and criteria for rezone. The Project is consistent with:
1. City of Edmonds Comprehensive Plan revised in March 2005.
2. Zoning Ordinance of the City of Edmonds Community Development Code
(ECDC).
3. Surrounding Area. The proposed zoning change is consistent with the existing zoning of
the surrounding and nearby properties. The Serene Creek PRD will harmonize with and
enhance the residential small town character of Edmonds that its citizens so strongly desire'
to retain.
4. Changes in the character of the immediate and surrounding area which justifies the rezone.
060330 SEPA appeal ltr CityEdmonds.doc
u3/3u/ub i'nu la:ua rnA Loa rra4y11 v Wuo-. - v.vur
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page- 11 -
5. Suitability._ The length of time that the property has remained undeveloped compared to
the surrounding area, and adjoining neighboring parcels with the same recently approved
rezone from Large Lot RS-20 to Large Lot RS-12.
6. Value. The relative gain to the public safety and welfare as well as increase in property
value to the surrounding property owners and increase in tax base for the city and county
from the tune new houses.
The Serene Creek PRD also is consistent with the Edmonds Community Development Code,
(ECDC); Sections: [16.10.000; 1620.000;16.20.010;16.20.020; 1620.0501; [17.80,000; 17.80.010;
17.80.0301;119.40.000; 19.40.005; 19.40.010; 19.45.000; 19.45.0051; [20.35.090; 20.40.000;
20.40.010; 20.40.020; 20.40.030; 20.60; 20.65; 20.70; 20.75.035; 20.75.040; 20.75.050; 20.75.060;
20.75.065; 20.75.070; 20.75.080; 20.75.110; 20.75.120; 20.75.130, 20.75.1401;123.40.90;
23.80.000; 23.80.010; 23.80.020; 23.80.040; 23.80.050; 23.90.000; 23.90.010; 23.90.0401.
D. CITY'S DS AS APPLIED TO THIS PROJECT IS ERROR AND NOT CONSISTENT
WITH .SEPA
1. Overview of SEPA.
"SEPA is a legislative pronouncement of our state's environmental policy." Anderson v. Pierce
County, 86 Wn. App. 290, 300, 936 P.2d 432 (1997). It requires local. governments to fully consider
the environmental and ecological effects of major actions. See RCW 43.21C.030; Lassila v. City of
Wenatchee, 89 Wn.2d 804, 813, 576 P.2d 54 (1978).
Before processing applications for a land use project, SEPA requires local governments to make a
threshold determination of whether the project is a "major action[] significantly affecting the quality
of the environment." RCW 43.21C.030(2)(c); see also WAC 197-11-330.1 A major action
significantly affects the environment "whenever more than a moderate effect on the quality of the
environment is a reasonable probability." Norway Hill Pres. & Prot. Assn v. King County Council,
87 Wn.2d 267, 278, 552 P.2d 674 (1976)).
2. EIS Criteria Not Triggered
The "lead agency" (here, the City) uses an environmental checklist to review a project's "proposed
activities, alternatives, and impacts ... in accordance with SEPA's goals and policies." WAC 197-
11-060(1). The responsible official then renders a "determination of significance" (DS) or a
"determination of nonsignificance" (DNS). A DS requires intensified environmental review through
preparation of an environmental impact statement (EIS). WAC 197-11-360. Conversely, a DNS
' WAC 197-11-330 specifies the criteria and procedures for determining whether a proposal is likely to have a
significant adverse impact. For example, the lead agency s "responsible official" must take into account that the
proposal may have a significant adverse impact in one location but not in another; that several marginal impacts when
considered together may result in a significant adverse impact; and that for some proposals, it may be impossible to
forecast environmental impacts with precision. WAC 197-11-330(3).
060330 SEPA appeal Itr CityEdmonds.doc
U3/ 3U/ UO AM 10: U" rnn
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 12 -
means that no EIS will be required. WAC 197-11-340. SEPA only requires an EIS for "major
actions having a probable significant, adverse environmental impact." RCW 43.21C.031(1).
Courts recognize that not an actions are "major actions significantly affecting the quality of the
environment," such that an EIS is required, see Eastlake Community Council v. Roanoke
Associates, Inc., 82 Wn.2d 475, 49I, 513 P.2d 36 (1973). Courts also recognize that "SEPA does
not demand any particular substantive result in governmental decision making," Stempel v.
Department of Water Resources, 82 Wn.2d 109, 118, 508 P.2d 166 (1973); we Eastlake Community
Council v. Roanoke Associates, Inc., supra at 497 & n.6.
Here, as described above, the Project proponent has proposed significant environmental measures to
ensure the protection of Earth (slopes), Water, Plants and Animals (critical areas and open space
which exceed the City's regulatory requirements), and Transportation (Roads, and safety). Given
these offered mitigation conditions, no EIS should be required.
3. Record Does Not Support an EIS.
To support its decision to require an EIS for this project, the City must demonstrate that it actually
considered relevant environmental factors before reaching its decision.2 The record must
demonstrate that the City adequately considered the environmental factors "in a manner sufficient to
be a prima facie compliance with the procedural dictates of SEPA." Lassila v. City of Wenatchee,
89 Wn.2d 804, 813, 576 P.2d 54 (1978); see also Anderson v. Pierce County, 86 Wn. App. 290,
302,916 P.2d 432 (1997) (citing Norway Hill Pres. & Prof. Assn v. King County Council, 87
Wn.2d 267, 274, 552 P.2d 674 (1976)).
Further, the decision to issue a DS is to be based on information sufficient to evaluate the proposal's
environmental impact. Anderson v. Pierce County, 86 Wn. App. 290, 302, 936 P.2d 432 (1997)
WAC 197-11-335.
Here, the meticulous design and the applicant's offered mitigation conditions do not support that the
City actually "considered the environmental factors" "in a manner sufficient to be a prima facie
compliance with the procedural dictates of SEPA". As required. The decision to issue a DS is error.
4. City's decision is Clearly Erroneous.
The SEPA Decision is reviewed under the "clearly erroneous" standard. A decision is clearly
erroneous when, "although there is evidence to support it, the reviewing body on the record is left
with the definite and firm conviction that a mistake has been committed." Anderson v. Pierce
County, 86 Wn. App. 290, 302, 936 P.2d 432 (1997) (citing Norway Hill Pres. & Prot. Assn v.
King County Council, 87 Wn.2d 267, 274, 552 P.2d 674 (1976)).
The clearly erroneous test from subsection (d) involves applying the law to facts. See Samuel's
Furniture v Dept of Ecology, 147 Wn.2d 440, 451, 54 P.3d 1194 (2002); 7 Wash. State Bar Ass'n,
Z WAC 197-11-444 lists relevant environmental elements.
060330 SEPA appeal !tr CityEdmonds.doc
U3/3U/Ub *1'HU 1D:U4 MAA L.7J f'f U9411 �avwoa.ctu a.n�r v�vuN v---
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 13 -
Real Property Deskbook sec. 11 l .4(9), at 111-25. Under that test, a decision is clearly erroneous if
the revbiewing body is left with a definite and firm conviction that a lower tribunal made a mistake.
Citizens to Pres. Pioneer Park LLC v. City of Mercer Island, 106 Wn. App. 461, 473-74, 24 P.3d
1079 (2001) (citing Schofield v. Spokane County, 96 Wn. App. 581, 586, 980 P.2d 277 (1999)).
The "clearly erroneous" standard provides a broader review than the "arbitrary or capricious"
standard because it mandates a review of the entire record and all the evidence rather than just a
search for substantial evidence to support the administrative finding or decision. See Ancheta V.
Daly, supra at 259, 260; Department of Ecology v. Kirkland, 8 Wn. App. 576, 580, 508 P.2d 1030
(1973), affd on other grounds, 84 Wn.2d 25, 523 P.2d 1181 (1974); Williams v. Young, 6 Wn. App.
494, 497, 494 P.2d 508 (1972).
Judicial review under the "clearly erroneous" standard set out in RCW 34.04.130(6)(e) also requires
consideration of the "public policy contained in the act of the legislature authorizing the decision"
See Ancheta v. Paly, supra at 260-61. Consequently, that public policy is "a part of the standard of
review." See Schuffenhauer v. Department of Employment Security; 86 Wn.2d 233, 235, 543 P.2d
343 (1975).
[3-5] We feel that the "clearly erroneous" standard of review set out in RCW
34.04.130(6)(e) provides an appropriate scope of review in the area of "negative threshold
determinations" under SEPA. That standard will allow a reviewing court to give substantial
weight to the agency determination as required by RCW 43.21 C.090, yet at the same time it
will allow a reviewing court to consider properly "the public policy contained in the act of
the legislature authorizing the decision or order. "
Norway Hill Pres. & Prot_ Assn v. King County Council, 87 Wn.2d 267, 274, 552 P.2d 674 (1976)).
Here, given the evidence in the record of the Applicant's offered mitigation conditions, the City's
decision to require an EIS is clearly erroneous in light of SEPA's public policy to (1) focus EIS
only on actual impacts which have a significant, environmental impact (WAC 197-11-402) and (2)
which take into account the mitigation measures offered by the project applicant (WAC 197-11-
330).
S. City's DS Decision Not Based Adopted Policies and is Error.
Under RCW 43.21C.060, the State Environmental Policy Act (SEPA), any governmental action
may be conditioned or denied: PROVIDED, That such conditions or denials shall be based upon
policies identified by the appropriate governmental authority and incorporated into regulations,
plans, or codes which are formally designated by the agency (or appropriate legislative body, in the
case of local government) as possible bases for the exercise of authority pursuant to (SEPA)....
Such action may be conditioned only to mitigate specific adverse environmental impacts which are
identified in the environmental documents prepared under this chapter. These conditions shall be
stated in writing by the decision maker (sic).
060330 SEPA appeal Itr CityEdmonds.doc
oJiauioo inu 1u;V%
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 14 -
SEPA provides that any governmental action may be conditioned or denied provided that such
conditions or denials are based on policies identified by the appropriate governmental authority and
incorporated into regulations, plans, or codes, which the agency or legislative body designates as
possible bases for the exercise of authority under SEPA. RCW 43.21 C.060; Victoria Tower P'ship
v. Seattle, 59 Wn. App. 592, 599, 800 P.2d 380 (1990) (citing Cougar Mountain Assocs. v. King
County, I I I Wn.2d 742, 751, 765 P.2d 264 (1988)), cf. Cougar Mountain, l l 1 Wn.2d at 752.
Here, given the evidence in the record which verifies the extent to which Applicant's Project and
offered mitigation conditions comply with the City's regulations, plans, and codes, the City's
decision to require an EIS is clearly erroneous.
6. City's DS Decision is Arbitrary and Capricious
In an appropriate case, an administrative decision could be "arbitrary or capricious," e.g., where
there is no evidence in the record to support it, and yet not be "clearly erroneous." See Stempel v.
Department of Water Resources, 82 Wn.2d 109, 114, 508 P.2d 166 (1973). Both standards of
review are applicable to " threshold determinations," and therefore, a determination that is "arbitrary
or capricious" but not "clearly. erroneous" also is reversible and can not be sustained. Norway Hill
Pres. & Prot. Assn v. King County Council, 87 Wn.2d 267, 274, 552 P.2d 674 (1976)).
E. CONCLUSION
The preliminary design of the Serene Creek PRD is based on the two independent geotechnical
engineering analyses performed by Associated Earth Sciences, Inc., (AESI), and Geotechnical
Consultants, Inc.; stream classification performed by The Jay Group, wetland biologists and
landscape architects; and three independent civil engineering analyses performed by Saeed
Soleimanpour, P.E., Cross -Sound Engineering and Site Development Associates, LLC..
The wealth of this environmental analysis demonstrates that the proposed Serene Creek PRD design
will not only avoid any significant adverse environmental impacts, but also will enhance the
stability of the slopes on and around the undeveloped land.
Furthermore, the Serene Creek PRD once completed will increase the traffic and pedestrian safety
in the immediate neighborhood: The well needed linkage of the 74tb Place West which is a dead
end, under -maintained and hazardous narrow (one lane) public road to the 7e Avenue West which
is a two lane main public road. The elimination of the dead end will contribute to the saving of lives
in the times of emergency by facilitating the traffic for ambulance, police and fire trucks as well as
reducing the driving risks for the neighbors, particularly in bad freezing weather conditions.
The Serene Creek PRD will fulfill the GMA while not building on the critical areas and allowing
ample buffer zone for common use and protection of the natural features of the site. The Serene
Creek PRD will enable the City of Edmonds to follow its historical trends regarding population,
housing units and households growth target to 2025 and hence receive recognition from the State
for meeting such growth capacity to meet the projected population growth.
060330 SEPA appeal ltr CityEdmonds.doc
uJ/ Ju/ uo Tnu la: ua rAA cao s j v-ti ..----------- -.--••
Robert Chave, Planting Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 15 -
SiAcrely,
• GtIdstein Law Group, PLLC
�—Iolyn A. Lake
Attorney for Appellants ECEC, inc.; Saeed Soleimanpour
CALAII
Acknowledgement.
Under penalty of perjury under the laws of the State of Washington, the appellants ECEC, Inc. and
Saeed Soleimanpour have read the appeal including all attachments and the list of persons to be
notified and believe the contents to be true.
Signed:
Saeed S leimanpour, Appellan . f' _
At: h1 t,1 Wi Washington on 30 March 2006.
(city)
Attachments:
1. Mitigating Conditions Offered by Applicant In addition to Compliance with City
Development Regulations
2. Mailing List of Property Owners within 300 feet.
060330 SEPA appeal Itr CityEdmonds.doc
UJ/ JU/ VV LJ3U L"J. VJ vvv..Y---- ...... ... .. � .-
Robert Chavc, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page - 16 -
Attachment One.
Mitigating Conditions Offered by Applicant In addition to Compliance with City
Development Regulations
(The Fundamental elements of the Contract Rezone):
All the terms included in the preliminary Serene Creek PRD site plan (SL-01; Approved by Mr. Bill
Helsley, P.E., on 10/31/2005), and the following terms are hereby made a part of this Contract
Rezone:
Serene Creek PRD project promotes high quality residential development which is appropriate to
the diverse lifestyle of Edmonds residents, in accordance with the following guidelines:
a. Architectural design of the Serene Creek PRD will blend in with the surroundings, adding to the
community identity and desirability. The nonstructural elements of the building such as decks,
lights, rails, doors, windows and window easements, materials, textures, and colors will be
coordinated to cant' out a unified and harmonious design concept.
b. After completion, no further addition to the existing buildings will be allowed without the review
and approval of the City of Edmonds and Serene Creek PRD architectural committees based on the
Edmonds Community Development Code and the Serene Creek PRD Covenant and restrictions.
c. The Serene Creek PRD will not encroach on view of the existing homes. In fact it will improve
their views. Furthermore, although the Washington State Law does not provide any protection
against loss of view as a result of any horizontal expansion of a neighboring property by the
construction of new additions, the Serene Creek PRD covenant and restrictions will prohibit its
resident homeowners from any addition that may obstruct any horizontal and/or vertical views of
the neighbors within the PRD; however, the City of Edmonds approved additions that meet the
covenant and restrictions are allowed.
d. The Serene Creek PRD by maintaining open green spaces within and around the PRD upholds
the fundamental protection of residential privacy for its residents and neighbors.
e. The Serene Creek PRD will further stabilize and enhance the property values by improving the
land, view, traffic and public safety.
f. The Serene Creek PRD will protect the private properties from adverse environmental impacts of
development including noise, drainage, traffic, slides and will minimize any momentary
inconvenience due to temporary disconnection of utilities for new water, electricity, gas, stone and
sanitary sewer hookups.
g. The Serene Creek PRD will be designed to be compatible with the natural constraints of slopes,
soils, geology, vegetation and drainage; it will also orient the houses in such a way to get the best
use of solar energy for natural light and auxiliary heat gain.
h. The Serene Creek PRD is a well coordinated development that will preserve the trees,
topography and other natural features of the site.
i. The houses will be constructed on reinforced concrete and/or steel foundation piling systems with
a combination of steel, concrete and timber structural members with a combination of stone, stucco,
and wood siding finishes to best blend in the structures with the surrounding nature while providing
060330 SEPA appeal W CityEdmonds.doc
Robert Chave, Planning Manager
City of Edmonds, Planning Division
March 30, 2006
Page -17-
a sound structural and foundation strength and stability, as well as creating a far more stable slopes
than the existing slopes.
j. The shape of the buildings, the orientation of the buildings, the location of the doors and windows
will be designed in such a way to optimize the conservation of energy. Also most efficient (highest
R-value) building components to control heat loss and/or heat gain will be utilized based on
mechanical engineering analysis and application of heat transfer principles. The expertise of the
JGL Acoustics Inc. will be used in the noise and vibrations reduction analysis of the houses in the
Serene Creek PRD.
k. The energy needs of the completed Serene Creek PRD project will be mainly electric; natural
gas; efficient wood burning stoves and fireplaces as allowed by the City; and passive solar energy
for natural light and heat gain.
1.. The Serene Creek PRD buildings will be engineered to be advanced smart and efficient.
060310 SEPA appeal Itr CityEdmonds.doc
1 a4 E041
O�
O
CITY OF EDMONDS
Fir 1g90 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
WAC 197-11-980 Determination of significance and scoping notice (DS)
DETERMINATION OF SIGNIFICANCE
AND REQUEST FOR COMMENTS ON SCOPE OF EIS
Description of proposal: Application for a contract rezone to change the existing zoning from Single-
family Residential RS-20 (minimum lot size 20,000 square feet) to RS-12 (minimum lot size 12,000 square
feet), together with a Planned Residential Development to develop a 2.84 acre site with nine lots (File
Nos.: R-05-169 and PRO-05-168). The proposal also includes constructing a public through road_ from
the terminus of 74"' Place W. in a horseshoe down to 76"' Avenue W. and two private access roads.
Grading anticipated for the road and other plat improvements is estimated at 4,000 cubic yards. The final
project will include a street vacation and a formal subdivision. The site contains a type Np stream, a
category 4 wetland, and landslide hazard areas and is subject to the city's Environmentally Critical Areas
provisions_
Proponent: Saeed Soleimanpour, P.E., I ECEC Inc.
Location of proposal, including street address if any: 16515 - 74'" Place W_ and the two acre tot to
the west of it across 74'h Place W- which fronts on both 74th Place W. and 761" Avenue W.
Lead agency: ,CITY OF EDMONDS
EIS Required: The lead agency has determined that this proposal is likely to have a significant adverse
impacts on the environment_ An Environmental Impact Statement (EIS) is required pursuant to RCW
43.21.030.(2)(c) and will be prepared. An environmental checklist or other materials indicating likely
environmental impacts can be reviewed at our offices.
The lead agency has identified the following areas for discussion in the EIS: EARTH - geology,
soils, topography, unique physical features, erosion-, WATER - surface water movement/quantity,
runoff/absorption, ground water movement/quantity/quality; PLANTS AND ANIMALS - habitat for and
numbers or diversity of species of plants, fish, or other wildlife-, TRANSPORTATION - transportation
systems, vehicular traffic, and traffic hazards.
Scoping: Agencies, affected tribes and member of the public are invited to comment on the scope of the
EIS_ You may comment on alternatives, mitigation measures, probable significant adverse impacts, and
licenses or other approvals that may be required. The method and deadline for giving the city comments
are: By letter submitted before 4:00 p.m., April 6, 2006.
Responsible Official: Meg Gruwell
Position/Title: Senior Planner - Planning Division
Phone: 425-771-0220, extension 1330
Address: City of Edmonds, 121 5th Avenue North, Edmonds, WA 98020
Date: 3/ Signature: -
XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue
North, Edmonds, WA 98020. by filing a written appeal citing the specific reasons for the
appeal with the required appeal fee, adjacent property owners list and notarized affidavit form
no later than March 30, 2006_ You should be prepared to make specific factual objections.
Contact Meg Gruwell to read or ask about the procedures for SEPA appeals.
Page I of ATTACHMENT 3
R-05-169 DS DOC
3ASA SEPA Fite No. AP-2006-35
Ii
XX
Posted on March 16, 2006, at the Edmonds Public Library, Edmonds Community Services
Building, and the Edmonds Post Office.
Distribute to "Checked" Agencies on this form, along with a copy of the Checklist.
Mailed to the following along with the Environmental Checklist_
XX
Environmental Review Section XX
Department of Ecology
P_O. Box 47703
Olympia, WA 98504-7703
XX
COMCAST XX
Outside Plant Engineer, North Region
410 Valley Ave NW #12
Puyallup, WA 98371-3317
XX
Department of Fish & Wildlife XX
16018 Mill Creek Boulevard
Mill Creek, WA 98012
XX
Tulalip Tribal Council XX
6700 Totem Beach Road
Marysville, WA 98270
XX
City of Lynnwood
Attn.: Senior Planner
P.O. Box 5008
Lynnwood, WA 98046
Attachments
pc: File No. R-05-169 and PRD-05-168
SEPA Notebook
I � IWIO J
I16]20
1�0 fQ�
Edmonds School District No. 15
Attn.: Bret Cadslad, Planning and Property
Manager
20420 68th Avenue West
Lynnwood, WA 98036-7400
National Marine Fisheries Service
Northwest Regional Office
7600 Sand Point Way NE
Seattle, WA 98115-0070
Applicant: Peed Soleimanpour, P.E.
10928 - 59' Ave. W .
Mukilteo, WA 98275
Owner: Robert & Edeltraud Sucherl
450 - 1211' Ave. N_
Edmonds. WA 98020
All
Page 2 of 2
R-05-169 DS.DDC
3/1 5/06.SEPA
CITY OF EDMONDS
ENVIRONMENTAL CHECKLIST
St. 18
Purpose of Checklist:
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions_ An environmental impact statement (EIS) must be prepared for all proposals with
probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help
you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to
help the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparatio0& an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can_
You must answer each question accurately and carefully, to the best of your knowledge_ In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts_ if you really do not know the answer, or if
a question does not apply to your proposal, write "do not know" or does not apply"_ Complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if
you can. If you have problems, the govermnental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land_ Attach any additional information that will help describe your proposal or its environmental effects_ The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there
may be significant adverse impact.
NOTE: Projects generating new traffic will be required to submit a Traffic Study prepared by a licensed Professional Civil Engineer.
Specific requirements for the "Craffic Study may vary depending upon the project, and will be provided by the City Engineer upon
request. Please contact the Engineering Division at 425-771-3202 for specific study requirements. City review of the Traffic Study
may require assessment of the "Development Project Peer Review" fee of $45 plus the cost of the review.
Use of checklist for nonprojeet proposals:
Complete this checklist for nonprojeet proposals, even though questions may be answered "does not apply." IN ADDITION, complete
the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonprojeet actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
A. BACKGROUND paes;k
1. Name of proposed project, if applicable: e.re—h PP__DeVe L pMe-*,A
2. Name of applicant: , . rtCe°Ci
. l 54,,e�o Lei r+�a✓1PotAr 6C CC , L
ki
Address and phone number of applicant and contact person:
scpa chcckliu - pub ic;8. 30.2001
4. Date checklist prepared: ) ( /1?/ 2,005
5. Agency requesting checklist: City of Edmonds 6. Proposed tinting or schedule (including phasing, if applicable): Pet-►►i l- j C C o sl&r t tLe— fo- n not
(S�ortPL,.-t, ScA6Jiy;5iov\ (Ciy'L/Sewer/S(Xr✓cy"--J) CO^StV't&C 'o� aid Stope
5+oL6 izatioh 5kc tt 6e isstAed in Apr;t of loot &. Tie- SL b([jv ss;;o-,
Cohs`►'v..c��or. �ro�eyt S�.a// DP_ �owtn/e.�e� W � �'1.�.� Six (6) ►�on/'iS �ey�tE
(STAFF COMMENTS)
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
Wore .
(STAFF COMMENTS)
8. List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
-7--Ae- .6,s b�.,, CLwss;�,ed as Cafeg0Vy ff (-two) a.L4CRv-d(',j th
b-e vnost YrecPJ
qu�det�►.Ps o� Ci
K or EJk,,.o-1dS,
WIS
ror 5-0f Fe-t Btu.CEt
r on Gott. S2 idsM
S. ore./
�L.�,,. ++12 of
� totwL
a Y' a -A,. A(- �i�
i� r.. i a i t �a i1 / . �o /
f rn nap-- G✓O�w..
.�G iO
I b►
(STAFF COMMENTS) i C�V%
&,-e ^f.D°'r''
5b L\w�w�, 35 t-0-
Cj
. Aqo ;.,nna fit. Ku. K0 r t...,,c-, `rtr �; u _,v;,r .. (�pn•� ..
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by Your proposal? If yes, explain.
(STAFF COMM
Page 2 of 24
xpa chmktist - public8. 30.2001
Cp,n`tY'u.G� 12�Zov.�
d
10. List any government a
Q Lartie- Lat RS
o t
pprovals or pernuts that will be needed for your proposal, if known.
Cpr� vm ,
-l2 KGZON� Ero.,. Pr�c;SfiJe5_10 ;0 ror...,.al St�lb�✓;S,oH
S; lFeS For w total o F
RD; (l+) oFF; UaI Sty -
(STAFF COMMENTS) All
A-e Y,Y-. .
Lots ; ^ a -PCu VA„e d
-Ly-e,et Va.cat; o+�
11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page. } D-
Sey-ere C+rP.�K PRD IS Gl Ct LOI.S , COvily GI �ijovke-J Ss"i1e F4—.1y
de_to-c,keJ tA,; ts; ,"he koµses w1'11 be 2- S-r e5 w;ii, A"UIL+ 6
Ate" e of 4000 S Q A,,vye Feet" U�ir�s S po ce l.J; A, 3 Ce,,r 66-'t .S ; K0-'x
lm ay;ou 4�0 KS�✓aa B
—� S S u r �. c.e peer- 1. o us e- � i �nrl �k.d; •-•� -�4.e_ D ri �e.t,.ia.�l , 1
Roof 1;,,e- shalt be 4S00 >:rZg, M,,,�a.,�,., of 380o FTZ; S;-kt
y r S aPP ro y;rv%6.4t17 I X3,'7 6 0 ; �-; 4% a F tie. en4ie a rem.. 1 S d" c`.+t
to DQ2•-N °►rezM S, ace-; P-eTok e- Would allow /o Cots bui one- lot i S d'eJ"(.- fed
-tb o er. rpm S � S. ,r w� f�� ��R� W;l � L�..l� fi,✓o w�aih'(w�C
(STAFF COMMENTS)
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
11,�1s- --I +t PLaGe I�Jid -Nc parcel IDS OOS-/3/ 0000 8A3 $� ' 910.u''eS
( d�✓e%Ped U64 -1�� P'k 7f el 1.D'e 00s73/0000Sao6 Vlk;Ch iS a.U^roS5
f roy.% l6S(5 �1�t �' A. Wo-s " Dv% ''7Ll-�' PVestANort�, of Ibbl� ��. � J
Calvi 1/y..) KV✓ flit SE6Troral g, -T�1t./AI5HJP 9.7NI RRA16E 4C t.% MJ
(S"I'AFF COMMENTS)
Page 3 of 24
scpa chmkfist - pubhcl 30.2001
TO BE COMPLETED BY APPLICANT
R. ENVIRONMENTAL ELEMENTS
1_ Earth
a. General description of the site (circle one)_ Flat, rolling, hilly, steep slopes, mountainous, other:
I t i S a C 0,--b; - o..+,o, c, E FLa-t roll%..9 , 1,:11„t $ So ..e Ste�� S(°Pe-S .
(STAFF COM M ENTS) tb..,o+,.s.., q.29y�rs; ,tc, t:ti.3,Zoov.
t-11 ir,\S �. t,c nl,y y�nc wv a Stie-'s" Z G M; iw 7.i.ti,.e.�, ( lv'�- s..
Ali+"L 1 Lrs(ti Sl .wcc, �M. , •BLit G/t dyF.'l.5'z !'� !Z ,Yt •� 4s,
i
b_ What is the steepest slope on the site (approximate percent slope)? So / �TtieSe �'reA S GI-r�
all y C .Led to opel-, 9►1'e4— ,-'f4er-eb,-e IJo bui lkj S
(STAFF COMMENTS) 4 ' - 5 3,7, i 1 c, i� ,,rn, .
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If yop -
know the classification of agricultural soils, specify them and note any prime farmland.
sa-,,,d , 9 rwveL , 54,. 7 S; l -t , 5a-6 04z, R s; I b G ,
J
No F 6-'r' La,C .
(STtU F COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity.? If so, describe.
-W -, How eve G e-o tec",h; C.J St-wl ; o. < Cor, (; v VR r , 1/e1r..
5W19w Ar h, {'l.p Soia o� ►'�.� 5 te
heSo,-e-_l9 +�'7 dye Lb UVAGv.+ir41(e) dru_�e`
w c kew-. �i s�o Wen, wws F;�d i'� ►� 10 per Snok",, . s!.
(STAFF COMMENTS) kl - rt, , :s ��• �t {, x o✓d S
il / N? i..4.t � n^.ti l.�sL1 h i- t'y./J
7
�,cA. (\ZL1,r (NMSI'dzti .Ct.ic :i �1� p ypyti, i- tk ten, a, 16-431 -74rfty , .,-k.e—
1 , vtn.d ►K [ �'i S� i.s 2S . 1,mC #, csi N,A.It .f it+ UYLL iwc y� �t Kul _ .{w i nr� h tK A
Jcic�, fir -.
scpa ch-dust - puHic:8.W2001
Page 4 of 24
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
of fill. J L
e,,re be h�oS�/ `� So; I e X;>,or-L For g ✓0.J1 M 'L 0 re (e Eke 5 f O
SUfC�.aY'y�_ Lo�,.c1, t� F�.r�P.t� �r.._b�t.�Ce� -i�L_ �jg� S`�u,b►1,� � �i.rtiG.�����
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Y ✓-y'Zj�l G �% / 7. L� l.. �:�% C.7 a .9 t e cl, ✓, 1 c, 1 t'-1 ✓\ Air., S
(STAFF COMMENTS
YO-i. Af, ro Sa.uc dtut g±?! -
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
4 Z o f to-t L o--re-, o
L
(STAFF COMMENTS)
i). Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
YOP�✓' �►�Ut��_e G�d� Stnf �A(� G,r.�- I�(n�y�''oN�nd >„/r-.�i'w- Colle��;p►-.
��c}ew.S for Cortlrol_�hA� Flows (�roPp (0v' cJ
7� d "S;Le- W a. ld Se o ro
(STAFF COMMENTS) Velebd *oh�Tip4e-s
A tz `s �5;x 4 � ...:,� �... ti-.1 p+a. �; b,
�.n'I► �x .tip .-.w-A � �-. �;,,_, �t-e nt� �-.ems+-...,ri .� 1'►K � ka,..'r-.� r�f,�+ -
2. AIR
a.
What types of ernissions to the air would result from the proposal (i.e., dust, automobile, odors, and
industrial wood smoke) during construction and when the project is completed? If any, generally describe
and give approximate quantities if lknown. ✓t bJ i ll
�i�.r� �•�S L rwL c. io tit �Pra o� I here ia� —L h� ho✓��el Ce••S tY t�'o•. Mc. c�,�+�erl Sw.oKe c�a�„t f No;S� g; - )LASt. !?,,t 6e40VJ
(STAFF COMMENTS)
F� 1 ; S 114.fWla 14S
Page 5 of 24
xpa chcckrm - public: 8.30.2001
b. Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe.
(STAFF COMM
C. Proposed measures to reduce or control emissions or other impacts to the,
1i�flany:
L1
/f 0 07 }�ri +. �S l ✓ �' b t lS; i t l �n[ ; L h i ►� Fe iYT—
��t1V� �C Yv+;r►irntZ.a� SiTt� I��G.(,�� Irv�_(}Q.✓'✓�a�.( 5�,.1rfr�C�
(STAFF COMMEN
3. WATER
a. Surface:
Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into. o
VpS. L✓g- wo„tt� t:Ke- % CeOl if Se,re�� G�e�K�`, �,.I�i��.
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans. ��,, -jam% I `
/� w� 1� Or f� �y1�l 6!° Qw��—/�C ! '��� ���I4ti✓ed / 5Q 1 e.-I
h u FFe r- � �O f ✓�/e!/ L L.L S-trp ts.,��.�L:_I �__i7� lP1t ti P o f t6a s &C
(STAFF COMMENTS
_�: r .tw l + l l �wt t. pctY ft,j ✓t A^( v7 f +Y IL/Iv + �^ n c nru tL, Ii h la 1 Afle -j
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
(STAFF COMMENTS)
Pagc 6 of 24
sqm ch-Misi - public 8.30.2001
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year Iloodplain? If so, note location on the site plan.
(STAFF COti1ME
(6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge.
(STAFF COMMENTS
b. Cround:
(1) Will ground water be withdrawn, or will water be discharged to ground water? Give general
description, purpose, and approximate quantities if known.
No. & - IiNe. Caoti,j dira;r,s lsL�I( Co11P�,f apt ro��
Imo. lA k&y' av-o t&r. J OAj C,gw
Stor. A+La ` woa�j --- 'S_S ie ,,,. f-g
(STAFF COMME
wpa chcckfia - pubk:8.30.2001
Page 7 of 24
(2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if
any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural;
etc.). Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
NO,n e� .
(STAFF COMMENTS)
C. Water Runoff (including storm water):
d.
(1) Describe the source of runoff (including storm water) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters?
If so, describe.
A l l 5- ay-' b✓alP.r ►'1,t n t Cro►, -t(.e- roo roz, J
Will he Co I (P P,l i,n� _�,� -�.�p S�Is � ., CA.Jo►xe; w;ft, 11
Y2o^ b (F Le'a 1&/; l ( �6'e
C4KV9 1-b :&.e 0 Y\ - S ; be a - e.,,ka , 'Zr) I, Sys >`'e" of
KS C)r 3-/n J. 11 t Lt....t Z - '0" Irk lP.-.ti,Sed Lb— B�t� , �, �'(/ ✓`n iv.g�(
(STAFF COMMENTS)_
(2) Could waste materials enter ground or surface waters? If so, generally describe. /
10- 7�Lo (��-c�t°� ✓► n ✓ .� �A l �a Gt�, . u .-�--� .TPe, h 4. P C
(STAFF COMMENTS)
(Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
V
(STAFF COMMENTS) A1r.t� 5t- -' Ara.� A
Page 8 of 24
-p. d.,tnu - pen, s.w.2oo1
4. Plants
a. Check or circle types of vegetation found on the site:
Ydeciduous tree: alder, maple, aspen, other:
evergreen tree: fir, cedar, pine, other:
shrubs
grass
pasture
crop or grain
_y wet soil plants:cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, nulfoil, other:
other types of vegetation:
(STAFF COMMENTS
b. What kind and amount of vegetation will he removed or altered?
o PRD PV��tzj
s
(STAFF y 1COMMENTS) A � 6-tf w) �
�.-a�,5*�t ,
lv t A
C. List threatened or endangered species known to be on or near the site.
in 0
(STAFF COMMENTS)
Page 9 of 24
uW d6 -Uist - pubbc:9.30200I
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site,
if any:
t,J; Cln 'Cl...� o b i P�'f i✓ P S o f rN�'n.i �• . Z ��_(��n,
(STAFF COMMENTS)
5. Animals
a. Check or circle any birds and animals that have been observed on or near the site or are known to be on or
near the site:
birds: hawk, heron, eagle, songbirds, other:
manunals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other:
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
Do No t Yno t^j
(STAFF COMMENTS) Nta,-�., P- Wat 5 ,.,,& ;.6 k
C. Is the site part of a migration route? If so, explain.
7O ND kt� Q t,✓ .
(STAFF COMMENTS)
Page 10 of 24
S" d--►i-t -w:s.w.xar
d. Proposed measures to preserve or enhance wildlife, if any: �] }
f3/ �(tiS���/►�-v4 `J'e_ P/X..V.."t N -k,'-' 1_"�'ti-U5 -6
o Y ►tee-►r o F t� J�R! �L A�,, _tz}1 QL/P�rk-- f—
otaI PRD
(STAFF COMME
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
ma;hJ!, e-1e ldc- 1,►5-a4 Ga�j, vod Sfo✓e-s if all wed
r+ /i,✓ �ork �g__� SS�yP S o LAV- &*.emit-j -1
(STAFF COMMENTS)
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe.
(STAFF COMM
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any: -Me, SI,a?e 0.4 -d.e 6►.:I�i.� S
1/�hqDtJp�S
:Ae- k; 4 L e�s�" 11i la Jaz Coy- a 11 61 I
—Set-e[�ly�—lae 12^c-e S
-a: �5-�—�-�� e.�t 6 !, ��_��Jeflec�.s+cg w►a.� er, n I i o .. -t�.e y�az.�..
(STAFF COMM F NTS) MKS a� Fitt �iK•)��•, Lsi
Page t I of 24
s�pa cbmkW - p,"ica. 30.2001
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? 1f so describe.
(STAFF COMMEN
(1) Describe special emergency services that might be required.
CSC abn-s -C
(STAFF COMMENTS)
(2) Proposed measures to reduce or control environmental health hazards, if any:
use— 0 ( Ste,. S'o 1-4 le- ►n�,nela
(STAFF COMMENTS)
b. Noise
(1) What types of noise exist in the area which may affect your project (for example: traffic, equipment,
operation, other)?
Ia ,-r L&L/ ��
(STAFF COMMENTS) _ r—to ,d
Page 12 of 24
xV. ch-kfist - puW:8. 30 2001
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise
would come from the site_
�—�-�-
o F d.�,.o...J, .
occo: a+4s� 1 '� �F G Norse o�
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any: L L
1„/orK l�ra_��fi'�o A �,:a4es7 ��6�7 STi�•�ctr�
on t—e- S;te - J
(STAFF COMMENTS) Mti,f t.,
8. Land and Shoreline Use
a. What is the current use of
of the site and adjacent properties?
te, ve LO Ap 6 t k r ALrg_,_)
.�c
(STAFF COMM ENTS) 1pgy
b. Has the site been used for agriculture' If so, describe.
(STAFF COMMENTS) L, �cm� zn - o � w� L4ie.A
Page 13 of 24
scpa ctak&n - pubGc:8.10.2001
C. Describe any structures on/the site. �
1 — I f .i / „lt __ .— -- `
(STAFF COMMENTS)
d. Will any structures be demolished? if so, what?
Y&S S"r 7 �r �' jam+. t�e- I,✓es t, dl,w 10 t% M e
_A0101 -s_>° .
(STAFF COMMENTS)
e. What is the current zoning classification of the site?
LcLge Lot RS4,0
(STAFF COMMENTS) S�lt_fz.n'�. 2c;'s�z,.+.xt ins 20)
f. What is the current comprehensive plan designation of the site?
U Y60.v. t71Ye-0. — 12 e S ry .-x fQ S -2. 0 p 1� S -1 2 Z o..;..�
(STAFF COMMENTS) '?,-A I, - Fa,•.;L, SoKr C9-
g. If applicable, what is the current shoreline master plan designation of the site?
-Do (Jot f4yL.)
(STAFF COMMENTS) 3V-T a.oA i:c� h;z
Page 14 of 24
WP dhcctku - pubbc:8.30.2001
h_ Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
}
J 1,& s) � l s 6 -L-, � lr t b (_J u S'� d e- .�((� 7C ✓ a IDS %�YLG .
a
(STAFF COMMENTS)Ydj - S:re ki ti A4a N,. i �+�a., a c:lcyv,-� d , r�• (u e
CT
A s t c-,t huA
i. Approximately how many people would reside or work in the completed project?
In -b L- o PeoP tp— (Wilt re—s- k-_i,, A Q to s s.
(STAFF COMMENTS) JAJ nt ho.aaitaac
j. Approximately how many people would the completed project displace?
�ov,\.t°
(STAFF COMMENTS) dc4- W A;sp1AuA
k. Proposed measures to avoid or reduce displacement impacts, if any:
NIIA
(STAFF COMMENTS)
Proposed. measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
(STAFF COMMENTS) P'apo m •t y� f►�R' h A new hz�✓,r.A
Page IS of 24
s" chcckhu.- p+Wrc:8302001
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, muddle, or low-income
h/o�using.
1 (�l+^i[S 0.�>
GtLl,Ptt t o CoV\'<, %v,� e- +�P it 0,-ti0,0d
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income
housing.
(STAFF COMMENTS) Age) r 'V4 V-44-A -I►u� M fi
r- 1►u,, � 1,
e x; \J} M It, 5 tS - 2q-- P,. 1 1 1 : �. c—aa��e - ►• 'u s, � c ,
C. Proaosed measures to reduce or control housinv imnacts_ if anv-
also mv�-t Yc.;,ry i 'Lr n F 67 MA 11
iA L1 1. �'l M /b5^+(��C�Y-�==��R.��"-1-(-�{ fP►� � b1`� b 1 t `4-� �.ifC�-i--����
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed? /� J
��inC�w_,__:r__..,,.. n f �.5 �O,v f�� fl Ve Z �L P��a � �i .`r, � ►��d�
(STAFF COMMENTS)
Ct -4 Gd
Page 16 of 24
sepa checklist - pubtic8.30200I
b. What views in the immediate vicinity would be altered or obstructed? II
�p.rig j �. ��rf So.�„p V'��ls r•tiu,�i b �pv. h � ,AC�_I
(STAFF COMMENTS)
wQ c Lfn4 j. 11.E OCT-tr ... !( ��a t l� `' ✓�Wr � 11 uicd l3ll�+i< �� is < S l cam' S k �c
Y
C. Proposed measures to reduce or control aesthetic impacts, if any: ,, / )
B e,st A r� � � e-(� + A.NC& ` �%S�ia�tALt_�v,�a h...,&4 r'r; p- d 1 N
(STAFF COMMENTS) / 'fH I,-:. LS Gr. A� k�.►� t Q��:f,. B�
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
Do KIA %v�4- -.) -
(STAFF COMMENTS) S trcz, l�►,t t (; i 1 cvci I:.yi ry a� ,•c h„. c, . , ,4, Aw- -
b. Could light or glare from the finished project be a safety hazard or interfere with views?
(STAFF COMMENTS) AQArl j*4- ,••arc itzr ,y.o< 4./4,-W.
C. What existing off-si(e sources of light or glare may affect your proposal?
7 o N of V-",)
(STAFF COMMENTS)
Page 17 of 24
scpa cb«kfio - ";c:8. 30.2001
d. Proposed measures to reduce or control light and glare impacts, if any:
(STAFF COMME
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
Q'o c' ,X\ P KS &I 6e f «-k FN I Span y\'e
19
(STAFF COMMENTS) 1----a1 6-1,1, (n22tti o41K k�A MIA0,+As4 &, ",q A" u�ttfr.
b. Would the proposed project displace any existing recreation uses? If so, describe.
01)
(STAFF COMM
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
(STAFF COMMENTS
Page 18 of 24
scpa checklist - public:8.302001
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers
known to be on or next to the site? If so, generally describe.
N/ 0
(STAFF COMMENTS)_
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance
known to be on or next to the site.
No _
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts, if any:
A) /A
(STAFF COMMENTS)
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
Ayeht&e 1..1eSt ov. tLe- WgSlLe►-n be uy4eLni i-y pa,
�AVe�ue
�
weSt ,-,A " Serene Ay ` w��U� t 7'v be developed 1
,7 rl• �(�- 4 �t o►a t-ke- e . ate r,,. r-Ae,,r&l 1011L.,
(STAFF COMMENTS) Ar ,— o s Mcu }, e�r�r� .�, n, •�P.. /�lr� r.�, �s c ,ti.¢zn+� fl.�,r;,,
Page 19 of 24
s" d ckfia - pubticl.30 2001
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
(STAFF COMMENTS) ' L ,Y-Itt
C. How many parking spaces would the completed project have? How many would the project eliminate?
(STAFF COM M ENTS) S,L< (z,,.l, ho.•ci arc ,�4�rca h lw.c L SQacri av ,
J
-5- lit n.hc lot? M,ia tare 19 F�v palci ,i+ti a.: ;,i, lac
ex:if,y,n k-S iF le&&,- Z &.,A 41A-< ;.�i ►sc e+.r.,
d. Will the proposal require any new roads, streets, or improvements to existing roads or streets, not including
driveways? If so, generally describe (indicate whether public or private).
a �.► r76 r4 ✓ w t z hest J -' I &Ue t 's1,
(LC(PiSS QQ . A lS o 41, e PQ.D_G✓+ 11 Jinx- no>:!Ler'
ey'lt�� ire '74 T� �L��e� t �s S�u.n o-{'l.e_ S.fe-?� -
(STAFF COMMENTS) A1aM >G ;ter .�+� be aurrn.n.�p Imo. A+te P,.c pQa+-A fti,,.,; 4,,
I, -a i4 t GmJA1 At ct l
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
(STAFF COMM ENTS) ,r l.1px �•, ty,- Iwai ra:1 -H,I hru+ t :. c to I-&< -w-f, r �k f"t ��j A'C Li
Page 20 of 24
wp d— tiu - puw;L-. a 301001
How many vehicular trips per day would be generated by the completed project? if known, indicate when
peak volumes would occur.
(STAFF COMMENTS) A��I:G�r ;S �t.Ly pc L''h,� �✓" kid ,n u, �ui.,t=G�c.. pa,w..
g. Proposed measures to reduce or control transportation impacts, if any:
hfsi_w_i_,_-� tt �pYemp CrP� (�_ "" a.Cr�,',-�► 1-b `4
Lu liC >a��_�a h eLi—d S r 1 FT �._yP Q t L�i10 t'1 T
L; v` k�'.tis 110 . 7c FT ; �t s 7P_ 7 fwe; -ems
N
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, health care, schools, other)? If so, generally describe.
No
(STAFF COMMENTS) Yli - mod, i✓ y, { wA.y:� ,, s
b. Proposed measures to reduce or control direct impacts on public serv!c7
, ' ny:
1� Not K� j s %Ya t,✓ewe✓ t l.� a d1� �: Qua n � L z e
C-4111 S �. a I Plro v; f��S o,.r,e A � o F ,1-1A.
(STAFF COMMENTS)
Page 21 of 24
xpa cbecklist - public:8.30.2001
16. Utilities
a. C s ilable at the site: 01"t'i'i (IDIr'ls, valet, refuse serNice telephone,
sanitary sewer Ji st , other:
All tA- A 4"e-s Are—A,Va I� �12 O►n � %�f! � 1 `A GP wYiS�
(STAFF COMME
I). Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the inunediate vicinity which night be needed.
P, res o�. ���' �L�� i,,��-t wall ► ey�L�vx F�
�--1 I'M Aw i-rr�— ��—t . • r �✓�r, e �� G��
(STAFF COMME
C. SIGNATURE
The above answers are hue and complete to the best of my knowledge. I understand that the lead agency is relying on them to
make its decision.
Signature of Proponent
I / /a- t/� o o �—
Date Submitted
op,
s" checklist - pubbc:8.30.2001
Page 22 of 24
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the
environment.
When answering these questions, be aware of (tie extent the proposal, or the types of activities likely to result from the proposal,
would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in
general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of
toxic or hazardous substances; or production of noise?
11
�S
Pile- t+,-i L"_t Piv. P �� ��e a- G 1��� B w� /� l A �•. �` f
Proposal measures to avoid or reduce such increases are:
V S e, O [ AC; GI
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
Al o -Ln 2 r o fa( P-
3. How would the proposal be likely to deplete energy or natural resources?
iD ID
Proposed measures to protect or conserve energy and natural resources are:
Serre�e-
Page 23 of 24
wpa cl-&b t - pudic:8.30.2001
4. flow would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or
under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered
species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
N/A
�pc:.:,i,.q- ,J,tl � :�..�'�A � �ll.�✓ ��.,,1 £1�,�.,,,-�,1-� Lnh•s�! A+`�� r�gw�+--ry:_
5. [low would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land
or shoreline uses incompatible with existing plans? / / I
Lt Wtl1 0.�iOt.✓ a ��rj�2tr �P�.St O(- hOw\.PC 0ry �a•-ye- I.o�" Z�►�i�
bay; LA 2.S — k-)- e UV 6, Fab- LIe
a LS .
Proposed measures to avoid or reduce shoreline and land use impacts are: / �
A (t O Cr��; r.A, 4�a� � � -6 8�a � Ck, no A O I- Ile FR P Y-01 e ct
-- Z'P�P r� �(►�2►n cirG,� d
6. How would the proposal be likely )to increase /demands on transportationor public services and utilities?
e. In cy-ec se d 42mllvsdS ,Lv(e- rnai,,L1 '' or" + -,v u-b-16 e--s
of
Proposed measures to reduce or respond to such demand(s) are:
Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the
protection of the environment.
Page 24 of 24
xpa chccldiv - public:9.30-200l
O.S
RS-1�22�
'CO :W
A�
Jk
.:
4_ RS-20
Zoning Vicinity Map
zj RS-20 NO RS-6 aY RM-3 ✓ 6 BP ® CG2
\\ RS-12 RSW-12 RM-2.4 BN ® CW MU
RS-10 Y RS-MP RM-1.5 BC 8 MP1 P
RS-8 OM CG ® MP2 Q OS
i�
164TH
N yOF EOy0
= Rezones
C--.J PRO zoc. i ayo
He R-05-169/PRD-05-168 Attachent 1
i
--NW1/4,-- W1/4 ".SECTION 8, TOWNSHIP 27N, RANGE 4E, W.M. LEGAL DESCRIPTION
LEGEND
- . - NORTH 200 FEET Of TRACTS) 88. MEADOWDALE BEACH.
THER
E)EXISTINGR.O.W" 10 BE VACA7fD .-"""_". RESERVED AREA FOR BLDG ACCORDING TO THE' PUT (OF RECORDED IN VOLUME S
OF PLATS. PAGE(S) 7 ® FOOTPRINT ANYWHERE WITHIN THIS WASHINGTTON, EXCEPT 7HEED RECORDS FEET.SNOAS MEASURED
MGC� D.
O ZONE
ASPHALT CONCRETE w 3 200 SOUMELOTS t AND 1 WILL BE ALONG THE NORTH LINE Of RIMER 88: AND EXCEPT THE
TYPE 1 CATCH BASIN WESTERLY LINE OF TRACT 88,R OR ROAD PURPOSES;ED A] RIGM ANGLES 10 C AND
`� ^• \ 1 CONCRETE EXCEPT THE fOLLOWMG DESCRIBED PORTION: THENCE
AT
...�... ....:.. _ Q Of SAID TRACT 88 NC
TYPE 2 CATCH BASIN THE NORTHWEST CORNER HE E
1 - - . - / \• N `:%z, -CONCRETE RElweauG wn[l STORMBRAIN
EASTERLY ALONG P.K NORTH LINE FOR 50 FEET: THENCE
SOUDiWES1FJRLY 10 A POINT ON THE WESTERLY LINE Of
TRACT 88. SO FEET SOURfEASTERLY FROM THE NORTHWEST w `o
RA= RESERVED FOOTPRINT AREA CORNER OF TRACT BB: THENCE NORTHWESTERLY ALONG THE z
- -- - CONIFEROUS TREE 10 Of RCMOV[D WESTERLY LINE OF TRACT 88 FOR SO FEET TO THE O
-+�`� 1 _ _- -"- - - - ' 1 CONIFEROUS
NORfFIWESf CORNER Of TRACT 88 AND THE POINT OF
jJ ` D ..I _ 1 LA.- LOT AREA BEGINNING. a
{ AND
�� V A. ` g CIPEN GREEN 1 J DECID[/OUS TREE 10 B[ REMMD
N - O - _ SPACE MATCH THAT PORTION2orNTTRAACT 990.T PLAT Of MEADOWDAL BE EACH.
�' /f
__F A ° 3.170 Sf -_ - �jZ> ROCKCRY WALL 1 1 ss /!i' ( O LYING SOUTH OF THE FOLLOWING DESCRIBED LINE-
�efL A = 8.713 SI _. ___ .0 7.429 .f �`/ [l 7•j f EXISTS
4Q 4/ '• ROAD BEGINNING AT THE INTERSECTION OF THE EASTERLY MARGINAL
-+: X ^ 4 ( //�\� �` ��i� / ', , LINE M 75TH PLACE WEST WITH THE NORTH LINE Of SAID
(TRACT 90'.
p.( - — r'l / 1 _-_ r L� 1 �'�" " -x -.} THENCE SOUTHERLY ALONG SAID EASTERLY MARGINAL LINE Of
75TH PLACE WESf.ANO THE ARC OF A CURVE 10 THE RIGHT.
( fi RA-S.[III SF.-- SAID CURVE HAVING A RADIUS OF 145229 FEET. AN MC
(y` . (►L_.' DISTANCE 137 W FEET.
`Jp•2' C Gf M
VF. i �,` THENCE CONTINUING SOUTHERLY ALONG SAID EASTERLY T T
p� " 1 - WWGAI LINE OF 75TH PLACE WEST AND THE ARC Of SAID m w m
�' CURVE 70 THE RIGHT_ AN ARC D151ANCE OF 123.36 FEET TO O
THE POINT Of TANGENCY OF SAID CURVE. SAID ANGENT
V 1 sE BEARING SOUTH 24'AN
15' WEST; 0 0
THENCE SOUTH 2CIS' WEST D CONTINUING ALONG THE i a r l
O •�'.: / i \ O EASTERLY MARGINAL UNE OF 76TH AVENUE WEST. 55.2 FEET:
\,, �•- - t�,y Y _ THE POINT OF BEGINNING OF SAID BOUNDARY LINE.
-- - rr THENCE NORTH 6fi26'19- EAST 132.84 FEET 70 THE END OF a w a
-� I', SAID LINE. AS PER PUT RECORDED M VOLUME 5 OF PLATS 7 0
. .,S ^!t �� e _ 1 ' ON PAGE 38. RECORDS OF S SNOHOMH COUNTY: o w oo i
' 1 \ EXCEPT ANY PORTION THEREOF LYING WITT1M THE RIGHT OF w
1 i WAY of 767H AVE. W. 2 > l SITUATE IN THE COUNTY OF SNOHOMSH. STATE Of
WASHINGTON-
XXXX''"�j�j t Q • I\ EXISTING R.0"ED w. f — VERTICAL DATUM:EXISTING
TO BE VACAT- -
-•�' ` - • .. - CRf f K BASED ON CRY Of EDMONDS SANITARY SEWER PLANS. SHE
_ -� BENCHMARK 5 THE INVERT ELEVATION OF A 10' DUCTILE
\ X ( IRON PIPE MEASURED AND THE CENTER OF PIPE CHANNEL OF
MANHOLE NO. 22 PER CITY OF EDMONDS SEWER PLAN 'LID
210 PAGE 15.
v4
f ..� OPEN/GREEN
lJ�
( SPAOPEN/GREEN¢ ELLv: 150.00'
_ R.D. �
172 ZTItERY BASIS OF BEARING'
:� \•, •. \ WAI76.187 Sr I .0 i
'./ �.... \ (TIP)
THE BASS OF BEARING FOR THIS SURVEY IS THE CENTERLINE
.. �� AS `� ? \ \ OF 76TH AVENUE W. PER SURVEY RECORDED UNDER REC- -
NO. 9411D15DD2
m
OPEN/CAR N \ \ z '•1 4 \' \ • ` \ ,oD \ o $
\ SPACE \' ` p4..91 sF, \ \` I c � O o
' , \ i b 1 -0.966 Sr h AQ ��\ 1 f' 1 PRD NOTES_ + r
\ 6 454 S B I. THE PROPOSED STRUCTURES WILL BE 7WO-STORY WITH A DAYLIGHT _
i /�1 BASEMENT WHERE POSSIBLE (MAXIMUM THREE LEVELS). EACH m c
\ --Tb\ O \ RESIDENCE WILL HAVE A THREE CAR GARAGE.
\RA-3.SB3 ST ` l _ Qni
. \ U.-7 `.J - - ^_4 lB0. \ ^ - \ ..� 2. THE HOUSE FOOTPRINTS HAVE BEEN SITUATED WITH THE OBJECTIVE O z
-1` \\ -1 OF MINIMIZING THE SHE IMPACTS AND THE AMOUNT OF PROPOSEDID
' '!
\ \ m \ 'z1.' �. \\� ,� ; f �,♦ \ J- ROAD SURFACING. �; 9 r
' \• /� 3" PROPOSED SETBACKS FOR THE PRD ARE THE FOLLOWING: $
- -. \ • • ` - \:y2 /o ` -- 7 w \. \ I. FRONT: IW SETBACK FROM PRIVATE ROAD WITHIN THE PRD m a e
FROM: 15' SETBACK FROM PUBLIC ROAD WITHIN THE PRD >
\�. 't SIDfWALX \_ OS •\\ '-- \ 6. SIDE 5- MINIMUM (TO- FROM ADJACENT STRUCTURES) h - O
_ _ -A c REAR: 10' MINIMUM FROM PROPERTY LINE
z 7eB i .\. RA=3.165 sr o _
" RUNE \ \\ \ •. ) �- ' ( REM. 15' MINIMUM FROM PUBLIC ROAD R.O.W.
\ \ . \ ' 1 DRIVEWAY: 20' SETBACK FROM THE ROAD
rI A h 2 PUBLIC ROADS: 25- SET BACK FROM EXISTING PUBLIC ROADS
OCfENTUN7 \� \
4. MAXIMUMIMPERVIOUS SURFACE PER L07 SMALL BE 4.500 SOVARE
i- FEET. M "VAULT LOCATION _ .\\\\` �1 \\;\•MINIMUM 3,800 SUME FEET- MNERVIOUS SURFACE
N„ w
t (if REQUIRED) �\ ` 1 V+ \A\ \ \\ k �� IF'Fi� \ ). ) INCLUDES HOUSE. DRIVEWAY AND WALKWAYS-
t %� \ • J 25. 1. 5. ALL STORY DRAINAGE FROM THE ROADWAYS. RETAINING WALLS AND
{ s - \J THE PROPOSED STRUCTURES w41 BE TIGHT -LINED AND CONVEYED
70 p e 3 « a �� ` - o o 6•- . GREEN
�--��FF�� R=3.388 Sf _ BUFFER A WATER DUALITY AND DETENTION FACILITY- THIS FACILITY WILL w e
. - \' CI \� \ • \ R A-2,897 Sf I LA • 7.7tA SF - �"�
A CONNECT 70 THE EXISTING STORM DRAINAGE SYSTEM LOCATED IN
76TH AVENUE W.
- vt ;� PA-3.573 Si N LA=5.314 St
- = V p
A - 6.350 5/ \ b F r
�\; 1 6" STREET LIGHTS well BE IS7ALED FOR THE DEVELOPMENT,
_ �� •\ _ , `i -'yam s/ �l \ 7. A 5- SOOI ALX WITH CURB AND GUTTER WILL BE ADDED TO 76TH
A R.A : 7,677 sf ` �\\• 1
1 A 5 913 SF \'
AVENUE W. A CONCRETE RETAINING WALL ADJACENT TO THE z
SIDEWALK WILL ALSO BE CONSTRUCTED IN ORDER TO ACCOMMODATE
4
THE EXISTING GRADES ADJACENT 10 THE PROPOSED SIDEWALK. Q
1 \
A WATER
J
o <O + [ NC 8. PROPOSE MRfND1NAY BECONSTRUCTED
CONNECT THE E7t{STWG NA ER HMNN$TIN
.\ \ _ -• RETAINING
OETEN 110N/ a•,-8.�< ta- F •:; _ - 1 MOLL 747H PLACE W. AND 76TH AVENUE W.
WATFFt`OUALiTY \ n - sz� 9" THE EXISTING SANITARY SEWER LACE LOCATED IN RITE PROPERTY WILL
U
aEOiw NO VAULT - - r •; { \' f -� _ ,3, ._ - - BERELOCATED IN THE PROPOSED ROADWAY AND WILL CONNECT 70 THE EXISTING SYSTEM IN 76M AVENUE W"
\ wALI O
10, MAXIMUM ROAD SLOPE 5 12-OOX FOR THE PROPOSED DEVELOPMENT. i
11, A 5W BUFFER IS PROPOSED FROM THE EXISTING CREEK- BASED ON
CONVERSATIONS WITH THE CRY OF EDMONDS. THIS DUFFER WILL BE <
-
SER
o .. �CK Of 50 OR Al THE TOP Of THE RIDGE
ADJACENT DCFINEDI T THEO THE REE'
12. RETAINING WALLS SHALL B ROCKERY WALLS OR CONCRETE RETAINNG I
_ WALLS" CONCRETE WALLS SHALL BE SIMILAR IN TMSH TO THE
_ - CONCRETE RETAIMNG WALLS LOCATED Al THE NORTH AND WEST OF i^
q� 191ST STREET S.W. AND 76TH AVE. WEST INTERSECTION IN EDMONDS.
�
PERMIT Fes. fI li\.? -- CwALK 76TH AVE W.
Z 13. THE TOTAI L07 COVERAGE FOR ER7KDtNG FooTPRINfs WILL BE LESS
1 ) 11«S
TAINT OREOtlAt TO 4200 SF MICR 5 EOUNKIM 10 35% Of
0
_. _
.. .. ." ." 12.000 SOLIARE FEET"
14. ALL UTILITIES WILL BE UNDERGROUND WITH THE ASSOCIATED
20 .0- 20 40 EASEMENTS AS REOUIRED FOR LFHL_TY COMPANY ACCESS _V t -O
scale feet I
R:\P.o}ecls\170 (CCCC)\001-05 (Se•ene C.ee�}\G-a ,sne e+s �S�-CIO I.e�g - Sc ate: 70 I
I
RESOLUTION NO. 428
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, IMPOSING A MORITORIUM ON
ISSUANCE OF ALL BUILDING PERMITS AND APPROVALS OF
PLANNED RESIDENTIAL DEVELOPMENTS, SUBDIVISIONS AND
SHORT SUBDIVISIONS IN THE MEADOWDALE AREA OF
EDMONDS.
WHEREAS, large undeveloped areas of the City
located generally north of 168th.Street Southwest, and known
as the "Meadowdale area" are not presently served with
sanitary and/or storm sewers, and
WHEREAS, there exists a high potential for landslides
in the Meadowdale area due to such factors as the steep slopes,
the sand and clay soil formations, and the quantities of ground
water percolating through the soil due to the lack of storm
and sanitary sewers, and
WHEREAS, previous landslides have been reported in
the Meadowdale area and the geological and hydrological
conditions present suggest that there will be future land-
slides unless corrective action is taken, and
WHEREAS, human factors may aggravate conditions as
a result of excavations, removal of vegetation, diversion of
water and introduction of more water into the ground in the
absence of sewers, and
WHEREAS, the City Engineer has conducted a study
based on available data and has concluded that no new construction
or development should occur in the Meadowdale area until
ATTACHMENT 4
_1_ File No. AP-2006-35
adequate study and planning have been done including the
follows:
1. Detailed analysis of landslide hazard areas
and potential for damage.
2. Designation of areas contributing directly and in-
directly to existing and potential landslide hazards.
3. Study of feasibility and costs estimates for
minimizing hazards through construction of:
a. Sanitary sewers;
b. Storm sewers;
C. Subsurface drains;
d. Mechanical stabalization;
e. On site and non-structural solutions possibly
including grading/excavation control zones, low density
(hazard) areas, clearing control zones and landscaping
guidelines, and
WHEREAS, the City Council, after notice having been
duly given, held a public hearing on February 27, 1979, to
consider imposing a moritorium on issuance of all building
permits and approvals of planned residential developments,
subdivisions, and short subdivisions in the Meadowdale area
until adequate study and planning had been done to prevent
and/or minimize the .hazards in the area, and
WHEREAS, at said public hearing all persons who
desired to speak were afforded an opportunity to do so, and
WHEREAS, the City Council finds that any additional
-2-
development in the Meadowdale area presents a high potential
of contribution to potential landslides and thus constitutes
a real and immediate danger to the public health, safety,
welfare, property and lives., and .
WHEREAS, until detailed study of the hazardous
areas and solutions for controlling and eliminating the
hazards are made, no building permits or approvals for
planned residential developments, subdivisions or short
subdivisions should be granted by the City, now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, HEREBY
RESOLVES AS FOLLOWS:
Section 1. No City Department or official
shall issue, approve or process. an application for any
building permit, planned residential development, subdivi-
sion or short subdivision which has been filed with the City
on or after February 27, 1979, for that area commonly known as
the Meadowdale area, located generally north of 168th Street
Southwest in Edmonds and more particularly depicted on the
map which is labeled Exhibit "A", attached to this Resolution,
and incorporated in full by this reference, until the study
authorized hereinafter is completed and remedial action is
implemented.
Section 2. The Department of Public Works and
- the City Engineer shall conduct a detailed study and analysis
of the landslide potential in the Meadowdale area and possible
solutions therefor, including but not limited to the following:
CRIC
1. Detailed analysis of landslide hazard areas
and potential for damage.
2. Designation of areas contributing directly and/or
indirectly to existing and potential landslide hazards.
3. Study of feasibility and costs estimates for
minimizing hazards through construction of:
a. Sanitary sewers;
b. Storm sewers;
C. Subsurface drains;
d. Mechanical stabalization;
e. On site and non-structural solutions which
may include grading.and/or excavation control
zones, low density (hazard) areas, clearing control
zones and landscaping guidelines. Said study shall
be completed and the results thereof reported to the
City Council not later than October 16, 1979.
Section 3. The City Clerk is directed to place this
matter on the October 16, 1979, agenda for review of the
continuing necessity of the moritorium imposed by this
Resolution.
APPROVED:
MAYOR, H. H. HARRISON
ATTEST/AUTHENTICATED:
T ` CLERK,
FILED WITH THE CITY CLERK: February 27, 1979
PASSED BY THE CITY COUNCIL: February 27, 1979
-4-
MEADOWDALE -.
,.,1 •., � PARK
r
/ ' h
/ I5 TN' ST
r?�
157XN•Sl
Z.
r / J
~
I
//.� i/•/:��•'. SW ./-
•
16oiHPLSW
PL SW
ingDockSDOfl Fish
'�
16h
'! 162Nb/ •� // /i-yj ''/�� // ?
� 162N0 PL SW
1163RD
,.^ %�,•;;' // /'�/4 /
ST SW
///
164T�t ST SAY � -�—
164TH
j/I
ST
d,' // SW
(� 3
/ /i�•/ /� 165711 P ` o Q 3
6TH PL SW
MEADOW DALE
a ELEM SCHOOL
iJ:ei
. __ )
Q
r i
•�
(n
y r I OO
IA
i ST SW
h!
City of Lynnwood: _
Treatment Plant s r
AyA
.f,• r
168TH
Sewage
Mfg0Ok
a
l
BERTOL�
•� z>
JR HID�OCH 1* l'
O (}f'
i
Atth�l.tt'ccFeelld F .
j•
9`f �u
�
O
....
w
�
't
76TH AVE W
3 ; 6 TH p .
MEADOWDALE 6
IV
Q
s W
o�
c^90
I ;
CL
<J
.�
S
172ND ST SW �
^ D
a
PVp?N
J sfq s�
i
PR p
• 09
17zND ST SW
ny 173R0 ST SW
173RD ST SW "' Q
IlZ N�Y0/
-
P�°Ty sT SW
a
174TH ST SW
DT
z 3
4
u
175TH ST SW
,ERICK PL
n m
175TH&TSW f t a
_
4
z
FIGURE 6
CRITICAL AREA, INITIAL DELINEATION
(CROSS —HATCHED)
1" c 1000
I The applicants/appellants seek a contract rezone and approval of a Planned Residential
2 Development ("PRD") to develop 9 dwelling units on a 2.84 acre site in the Meadowdale area of the
3
City. The site is located on lots now known as 16515 74th Place West and the two acre lot to the
4
west of it, across 74th Place West fronting both 74th Place West and 76th Avenue West. Most of the
5
6 lots sit on slopes with the steepest being approximately 83%. Part of the site has been designated as
7 "landslide hazard area" because it is located within an geologically hazardous area, and is subject to
8 the City's Environmentally Critical Areas provisions. The landslide hazard and geologically
9 hazardous areas, which are defined in and governed by Chapters 19.10 and 23.80 ECDC, are areas in
10
which large scale earth movement and smaller scale sloughing are historical and geological facts.
11
12 They have been the subject of numerous studies and evaluations. Photographs and video tapes of
13 historic and recent landslide events will be presented at the hearing.
14 The site is currently zoned as Single-family Residential RS-20, and the applicants/appellants
15 seek to change the underlying zoning through a contract rezone to a Single-family Residential RS-12.
16
The project also includes construction of two private access roads and a public through road from the
17
terminus of 74th Place West in a horseshoe down to 76th Avenue West. Grading anticipated for the
18
19 road and other plat improvements is estimated at 4,000 cubic yards. In addition, the
20 applicants/appellants seek a street vacation and formal subdivision. The site contains a type Np
21 stream and a category 4 wetland.
22 On December 12, 2005, applicants/appellants submitted the SEPA Environmental Checklist
23
and application to the City. After reviewing the Environmental Checklist and attached information,
24
25 the City issued a Determination of Significance and Request for Comments on Scope of EIS. In the
26 DS, the City identified the following areas for discussion in the EIS: EARTH - geology, soils,
27 topography, unique physical features, erosion; WATER - surface water movement/quantity,
28 runoff/absorption, ground water movement/quantity/quality; PLANTS AND ANIMALS - habitat for
(629459.D0C;1/./) OGDEN MURPHY WALLACE, P.L.L.C.
CITY'S MEMORANDUM - 2 1601 Fifth Avenue, suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
and numbers or diversity of species of plants, fish, or other wildlife; TRANSPORTATION -
transportation systems, vehicular traffic, and traffic hazards. The DS was issued on March 16, 2006,
and pursuant to ECDC 20.15A.240, ECED, Inc. and Saeed Soleimanpour timely appealed its
issuance to the Planning Manager on March 30, 2006.
III. ISSUE
Under RCW 43.21C.031, will the contract rezone and PRD of appellants' Serene Creek
project have a probable significant adverse impact on the quality of the environment when the
project seeks to increase density and develop areas some of which are located within landslide
hazard area?
IV. LEGAL ANALYSIS
A. ENVIRONMENTAL CONCERN AND PROTECTION ARE THE STATED
POLICIES AND PURPOSES BEHIND SEPA.
SEPA was enacted with environmental protection in mind. See RCW 41.21 C.010 and
41.21 C.020. It commits our state to policies of environmental concern and protection. Id. SEPA is
our legislature's recognition that human survival and satisfaction depend on the biological and
physical environment, that environmental components are fragile and interdependent, and that
human behavior, particularly population growth, high density, urbanization, industrial expansion,
resource utilization and exploitation, and new technology, threaten environmental quality. Richard
L. Settle, The Washington State Environmental Policy Act § 3.01 (Rel. 14 Dec. 2002).
SEPA encourages harmony between man and environment, seeks to prevent or eliminate
damage to the physical environment, fosters public health and welfare and enriches understanding of
ecological systems and natural resources. Id. Under SEPA our courts have recognized that the
maintenance, enhancement and restoration of our environment is the pronounced policy of this state,
1629459.D0C;1/./I
CITY'S MEMORANDUM - 3
OGDEN MURPHY WALLACE, PI L_C-
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
li
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
deserving faithful judicial interpretation. Id. at § 6.01. SEPA's policy is not only to prevent
environmental degradation but restore environmental health. Id.
The City in issuing a DS and requiring preparation of an EIS for this Project is complying
with the stated policies and purposes of SEPA. It seeks to prevent further harm to the fragile
landslide susceptible land on and near the Project by thoroughly and carefully reviewing the affects
that higher density and development would bring to this fragile area. Just as SEPA was enacted to
protect the environment, public health and welfare, the City is requiring an EIS for this Project for
the same reasons.
A wide range of factors qualify as probable significant adverse impact on the quality of the
environment requiring preparation of an EIS. Settle at § 13.01. Therefore, wide discretion should be
afforded to the Responsible Official making a positive threshold determination in good faith. E.g.,
I id.
B. THE DECISION OF THE GOVERNMENTAL AGENCY MUST BE ACCORDED
SUBSTANTIAL WEIGHT IN THIS PROCEEDING.
The threshold determination by the City must be given substantial weight by the Hearing
Examiner throughout this proceeding. See RCW 43.21C.090; WAC 197-11-680(3)(a)(viii). This is
an action challenging a determination by a governmental agency to require an EIS; therefore
pursuant to RCW 43.21C.090, the decision of the governmental agency must be accorded substantial
weight. Moss Y. Bellingham, 109 Wn. App. 6, 13-14, 31 P.3d 703 (2001); Indian Trail Property
Owner's Assn v. City of Spokane, 76 Wn. App. 430, 442, 886 P.2d 209 (1994).
The City determined that an EIS is required under SEPA before any other approval may be
given to appellants' Project. While applying the proper standard of review, the Hearing Examiner
must be mindful throughout this proceeding of settled practice during review to accord substantial
weight and deference to a responsible official's good faith threshold determination. See Id.
s629459.DOC;I/./)
CITY'S MEMORANDUM - 4
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.44 7.7000/Fax: 206.4 4 7.0215
PA
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
C. STANDARD OF REVIEW FOR A POSITIVE THRESHOLD DETERMINATION IS
DIFFERENT THAN ONE FOR A NEGATIVE THRESHOLD DETERMINATION.
A different standard of review applies when reviewing an agency's positive threshold
determination (requiring an EIS) than when reviewing a negative threshold determination (not
requiring an EIS). See Short v. Clallam, 22 Wn. App. 825, 829-30, 593 P.2d 821 (1979). Whereas
"clearly erroneous" is the proper standard of review for negative threshold determinations, the proper
standard of review for positive threshold determination is "arbitrary or capricious." Id. at 831.
Considering SEPA's central policy of environmental full disclosure and deliberation, courts
have held that scrutiny of determinations of nonsignificance requires closer scrutiny than
determinations of significance. See Norway Hill Pres. & Prot. Ass'n v. King County Council, 87
Wn.2d 267, 552 P.2d 674 (1976). The court in Norway Hill established the `clearly erroneous'
� standard of review for negative threshold determinations only. Id. at 275. The court's reason for so
doing was that an incorrect determination of no probable significant impact is contrary to SEPA's
mandated public policy of environmental consideration, and thus a higher standard of review was
justified. Id. The court in Norway Hill did not establish new standard of review for positive
threshold determinations. See Short v. Clallam, 22 Wn. App. at 830. The standard of review for
positive threshold determination has always been and remains the highly deferential arbitrary or
capricious standard. Id.
Unlike in negative threshold determinations, the City has not acted contrary to SEPA's
mandated public policy of environmental consideration when it issued a DS and required preparation
of an EIS for this Project. Id. In analyzing the appropriate standard of review for a positive
threshold determination, the court in Short distinguished the standard of review set by the Norway
Hill court, and explained that positive threshold determinations actually "foster the environmental
full disclosure goals of SEPA." Id. Therefore given the substantial weight that must be accorded to
(629459.D0C;1/./)
CITY'S MEMORANDUM - 5
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
l
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
governmental agencies' threshold determinations, the court concluded that the proper standard of
review for a positive threshold determination remained arbitrary or capricious. Id. at 832. Likewise,
the standard of review during this appeal of the City's positive threshold determination must be
arbitrary or capricious. See Id.
As petitioners in this appeal, the appellants have the burden of proving that the City acted
arbitrarily or capriciously when it issued a DS and required preparation of an EIS for this Project.
Basing a decision on disputed evidence is not arbitrary or capricious. Saldin Sec., Inc. v. Snohomish
County, 134 Wn.2d 288, 297, 949 P.2d 370 (1998). Where there is room for two opinions, action is
not arbitrary and capricious when exercised honestly and upon due consideration though it may be
felt that a different conclusion might have been reached. Buechel v. State Dept. of Ecology, 125
Wash.2d 196, 202, 884 P.2d 910 (1994). For appellants to prevail, they must show that the positive
threshold determination issued by the City's Responsible Official was `willful and unreasoning,
taken in disregard of facts and circumstances,' and nothing substantial in the record supports it. See
Id. This the appellants cannot do.
D. THE CITY'S POSITIVE THRESHOLD DETERMINATION MUST BE UPHELD
BECAUSE THE SERENE CREEK PROJECT WILL HAVE A PROBABLE
SIGNIFICANT ADVERSE IMPACT ON THE QUALITY OF THE ENVIRONMENT.
1. The Serene Creek Project is partly located within an area of the city of Edmonds that is
designated as "Critical" and known for catastrophic landslides.
The proposed location for the Project is partly within an area of the city of Edmonds that is
designated not only as an earth subsidence and landslide hazard area, but also as an environmentally
I critical and geologically hazardous one. See Staff Report. Recent landslides have been frequent in
the area, including one on the property just to the north of the Project at 16431 74th Place West. Id.
It is undisputed that the Project is proposed on areas that are prone to landslides.
1629459.DOC;1/./I
CITY'S MEMORANDUM - 6
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.44 7.7000/Fax: 206.447.0215
l
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Although the City has codes in place regulating residential developments in such areas, a
SEPA review and threshold determination is a condition precedent to any such development. See
RCW 43:21C.031. Compliance with City development codes is in addition to, rather than in lieu of,
compliance with SEPA requirements. Id.; see, e.g., ECDC 19.10.030(B)(2) and 23.40.020(C) and
23.80.070(B). Likewise merely because appellants are proposing mitigation measures to comply
with codes, it does not mean that such measures are sufficient to forgo preparation of an EIS when
their Project still poses a probable significant adverse impact on the environment. Furthermore,
accepting mitigation measures in a vacuum provides no administrative basis to evaluate the
effectiveness of the measures proposed.
Appellants are seeking a contract rezone of the site from RS-20 (one dwelling unit per 20,000
square feet) to RS-12 (one dwelling unit per 12,000 square feet), which would permit increased
density in the area. An increase in density through a rezone would affect traffic, adequacy of roads
and capacities for sewer as well as other public utilities; therefore, an EIS is needed to evaluate their
adverse significant impact on the quality of the environment. The additional road sewer
improvements will themselves have to be constructed in the landslide hazard area, some perhaps on
offsite areas yet to be determined or evaluated.
In addition due to the critical nature of the area in which the Project is proposed, the City's
Responsible Official has correctly determined that increasing density in the area poses a probable
significant adverse impact on the environment. Higher density will augment pressure on an already
fragile surrounding environment through both development of residences and the infrastructure
necessary to support them. And although appellants claim their development will in fact increase
stability of the slope, preparation of an EIS is nevertheless required in this situation to substantiate
I such a claim.
1629459. DOC;1 /./)
CITY'S MEMORANDUM - 7
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2. Preparation of an EIS is required to determine how significantly will appellants' proposed
measures to increase soil stability for the Project adversely impact the environment.
Appellants have proposed several innovative measures that they claim will increase stability
of the Project site, however they failed to consider the adverse impact of these same measures on the
environment. They claim that they will be jointly and meticulously following the recommendations
and design parameters of their geotechnical engineering consultants "to control the rain, stream and
underground water; as well as [to reduce] the surcharge load on the hills by shaving off and
exporting the top few feet layers of soil." See Appellants' SEPA Checklist at 5; see also Appellants'
SEPA Appeal Letter at 5. The City rightfully would like an EIS prepared to examine the
consequences to the surrounding environment as a result of "shaving off and exporting the top few
feet layers of soil."
Additional measures proposed by appellants to enhance safety of the slope stability are
control and conveyance of surface and underground water; construction of new retaining walls; and
construction of the homes on deep concrete and steel piling system approximately 45 feet deep into
the sub -soil. Id. Again, all of these proposed measures have probable significant adverse impact on
the quality of the surrounding environment, and required the preparation of an EIS.
SEPA rules do not permit the set-off of a proposal's favorable environmental effects against
its independently significant adverse environmental impact. WAC 19-11-330(5). Under WAC 19-
11-330(5), a threshold determination must not balance whether the beneficial aspects of a proposal
outweigh its adverse impacts, but rather, must consider such adverse impacts independently in the
determination. For example, proposals designed to improve the environment, such as sewage
treatment plants or pollution control requirements, may also have significant adverse environmental
impacts that must be considered during a threshold determination for the same. Id.
1629459. DOC;10)
CITY'S MEMORANDUM - 8
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.44 7.02 15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
This is the case on point withrappellants' plans to "shave off' and export the top few feet
layers of soil, to control and convey surface and underground water, to reduce the soil surcharge
loads, to construct new retaining walls, and to construct the homes on deep concrete and steel piling
system approximately 45 feet deep into the sub -soil. These measures have their own probable
significant adverse impacts on the quality of the environment supporting the Responsible Official's
decision to issue a DS and require preparation of an EIS under SEPA. See Id. Examples of such
potential impacts are the effects on vegetation, ground and storm water caused by the removal of "the
top few feet layers of soil" and the noise and vibrations caused during the construction of "deep
concrete and steel piling system." In this case, one of the purpose for an EIS is to provide the
scientific information necessary to evaluate appellants claims of benefits and mitigation.
3. Even though some of the measures proposed by appellants may be beneficial to the public
and environment, and EIS is still required if elements remain that will have probable
significant adverse impact on the quality of the environment.
Appellants claim that the Project will create open space and benefit transportation, utility
service, street lighting, pedestrian and emergency access, public safety, save the City money, increase
property value and tax base. See Appellants' SEPA Appeal Letter at 6-7. Some of these benefits are
not factors to be considered in a threshold determination. Nevertheless as referred to in the above
paragraph, none of these benefits, alone or combined, eliminates or mitigates the probable significant
adverse impact on the environment that the Project will create. None will alleviate the higher density
created by the rezone, and none will ensure future Serene Creek PRD residents and neighbors against
the threat of erosions and landslides that this development could increase.
Measures proposed by appellants may prove to be sound and indeed enhance the stability of
the surrounding slopes. However a rezone will increase density, which will not only multiply any
adverse impact on the environment, but also diminish the benefits resulting from such measures.
Increase in density will result in more pilings in the sub -soil and more houses on steeper dangerous
{629459. D0C;1 /./I
CITY'S MEMORANDUM - 9
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
slopes which are less suitable to building and more prone to landslides. An increase in density
through a rezone will have probable significant adverse impact on the quality of the environment.
As a result, even if all the benefits that appellants claim the Project will create are considered,
they cannot mitigate many of the probable significant adverse impacts presented by the Project to
eliminate the need for an EIS. See Sisley v. San Juan County, 89 Wn.2d 78, 84, 569 P.2d 712
1(1977). Balancing benefits against negative impacts is appropriate during the permitting process, but
not during threshold determination. Cf. id.
4. Significant adverse impact on the quality of the environment may be on either "relative"
or "absolute" basis.
Our courts have recognized that adverse impacts on the environment may be "significant,"
thus triggering the need to prepare an EIS, on either `relative' or `absolute' basis. See Narrowsview
Pres. Ass'n v. City of Tacoma, 84 Wn.2d 416, 526 P.2d 879 (1974). `Relatively,' appellants' Project
might significantly affect the environment because it will produce adverse environmental impacts not
produced by existing activities and uses in the area. See Settle at § 13.01. `Absolutely,' appellants'
project might significantly affect the environment because of the quantitative extent of its impacts,
including the cumulative effects of the action together with existing activities. Id.
Likewise on an `absolute' basis, the fact that there are nearby areas zoned RS-12 with
approved PRD is neither dispositive nor persuasive evidence that appellants' Project will have no
probable significant adverse impact. Even actions that qualitatively conforms to existing uses and
impacts, may be environmentally significant because its impacts, alone or in combination with those
of other similar actions already in existence, might be the "straw that breaks the camel's back." Id.
Either relatively or absolutely, in this case SEPA requires preparation of an EIS before appellants can
proceed with their Project.
1629459.DOC;1/./I
CITY'S MEMORANDUM - 10
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel- 206 447 7000/Fax 206 447.0215
I E. THE GMA NEITHER REQUIRES 4 DWELLING UNITS PER ACRE AS THE
MINIMUM URBAN RESIDENTIAL DENSITY NOR FINDS THAT LESSER
2 DENSITIES CONSTITUTES SPRAWL.
3
Nothing in the GMA establishes a bright line rule that urban residential density requires 4
4
5 dwelling units per acre and that anything less constitutes urban sprawl. See Chapter 36.70A RCW;
6 cf. RCW 36.70A.3201. The 4 dwelling units per acre ("dua") rule for urban density was created by
7 the Central Puget Sound Growth Management Board (the "Board") in Bremerton v. Kitsap County.
8 See CPSGMHB No. 95-3-0039, 1995 WL 903165 (Oct. 6, 1995). The Washington Supreme Court
9 rejected this bright line rule and declared that "growth management hearings boards do not have
10
authority to make "public policy" even within the limited scope of their jurisdictions, let alone to
11
12 make statewide public policy." Viking Properties, Inc. v. Holm, 155 Wn.2d 112, 129, 118 P.3d 322
13 (2005).
14 Since the Viking. Properties decision, a Superior Court has signed an order reversing a
15 decision by the Board that had found that the city of Normandy Park's R-20 land use designation
16
failed to meet the GMA requirements. City of Normandy Park v. CPSGMHB, No. 05-2-27090-0
17
KNT. Normandy Park's R-20 land use designation is similar, if not identical, to Edmonds' RS-20
18
19 land use designation for purposes of comparative use in this appeal. Therefore, Edmonds' RS-20 is
20 not per se inconsistent with the GMA.
21 Furthermore even if the 4 dua were still the standard for urban density, a rezone from RS-20
22 to RS-12 would not result in 4 dua. Appellants concede that even at RS-12, 4 dua cannot be
23
achieved. See Appellants' SEPA Appeal Letter at 7. RS-12 would also constitute urban sprawl
24
25 under the bright line rule, and any argument that appellants' Project is consistent with GMA would
26 equally fail.
27 F. NEITHER THE GROWTH MANAGEMENT ACT NOR THE CITY'S
COMPREHENSIVE PLAN REQUIRE THEIR LISTED GOALS TO BE MET AT
28 THE EXPENSE OF THE ENVIRONMENT.
1629459.DOC;1/1/ OGDEN MURPHY WALLACE, P.L.L.C.
CITY'S MEMORANDUM - 11 1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Like SEPA, policies and purposes of both the Growth Management Act (the "GMA") and the
City's comprehensive plan include concern and protection of our environment. See RCW
36.70A.010 and 36.70A.020(1). Even under the old 4 dua bright line rule, environmentally sensitive
areas were exempt. See Futurewise v. natcom County, WWGMHB No. 05-2-0013, 1995 WL
2341612 (2005). Compliance and consistency with the GMA and the City's comprehensive plan are
not substitutes for compliance and consistency with SEPA. Cf. RCW 43.21C.031. Again as
similarly stated above, the Project must comply and be consist with the GMA and the City's
comprehensive plan in addition to, not in lieu of, complying and being consist with SEPA. Id. No
statute or rule lists consistency and compliance with GMA or comprehensive plan as an exception to
SEPA. See Chapter 43.21C RCW and 19-11 WAC.
G. POLICIES AND PURPOSES OF SEPA IS TO MINIMIZE SIGNIFICANT ADVERSE
IMPACT ON THE QUALITY OF THE ENVIRONMENT, THEREFORE THE
HEARING EXAMINER SHOULD ERR ON THE SIDE OF REQUIRING AN EIS.
In light of the directive in RCW 43.21C.030, that policies, laws and regulations be interpreted
and administered in accordance with the policies set forth in SEPA, doubt whether the issuance of
the DS was proper or not must be resolved in favor of "concern and protection for the environment."
This is consistent with the wide discretion afforded to Responsible Officers, substantial weight
accorded to the governmental agency's decisions and the `arbitrary or capricious' standard
I established for reviewing positive threshold determinations.
I values:
The court in Sisley noted the following on the issue of full consideration of environmental
The most important aspect of SEPA is full consideration of
environmental values, RCW 4321C.030(2) and this policy is carried
out by the EIS procedure. However, the need for an EIS does not
mean a proposed project cannot be built. It merely assures a full
disclosure and consideration of environmental information prior to
the construction of the project.
(629459.D0C;1/./1
CITY'S MEMORANDUM - 12
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.447.7000/Fax: 206.447.0215
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
89 Wn.2d at 89. (Emphasis added.)
Similarly, the court in Norway Hill, in acknowledging the legislature's directive that concern
and protection for the environment be fully considered by governmental decision -makers, set a low
threshold for positive determinations: an EIS must be prepared whenever more than a moderate
effect on the quality of the environment is a reasonable probability. 87 Wn.2d at 277-78.
V. CONCLUSION
For all of the reasons set forth above and based upon the Staff Report, testimony and exhibits
that the City expects to produce at the hearing, the City respectfully submits that the appeal must be
denied. Not only has the City of Edmonds met the procedural requirements of SEPA, but the City's
Responsible Official has also correctly determined that appellants' Serene Creek Project will have
probable significant adverse environmental impacts. Given the burden of proof and standard of
review for this proceeding, the appellants cannot prove otherwise. The appeals should be denied and
the DS for the Project should be upheld.
RESPECTFULLY SUBMITTED this 16th day of April, 2006.
(629459.D0Q1./)
CITY'S MEMORANDUM - 13
OGDEN MURPHY WALLACE, P.L.L.C.
By:
W. Scott Snyder, WSBA #
Bio F. Park, WSBA #
Attorneys for Respondent
City of Edmonds
OGDEN MURPHY WALLACE, P.L.L.C.
1601 Fifth Avenue, Suite 2100
Seattle, Washington 98101-1686
Tel: 206.44 7.7000/Fax: 206.447.0215
Douglas Grier, MD
16431 74th Place West
r< T"Edmonds, WA 98026
2006
February 4, 2006
Edmonds City Planning Board
121 Fifth Avenue North
Edmonds, WA 98020
Dear Planning Board Members -
A recent information meeting was held in the Meadowdale area for a proposed rezoning
of the undeveloped property on 74th Place West in Meadowdale. Robert Suchert is the
owner of the properties and has a site lay out plan now called Serene Creek. The
proposed development is in contradiction to the desires of the all of the surrounding
neighbors, as was expressed at the meeting, and directly threatens my property. The
proposed plan reveals two houses to be constructed on a small plot just south and east
of my house. The two houses to be constructed are approximately 5 feet from my
property line and has the potential of undermining the ledge that my house currently
resides upon. The building and excavation of a foundation that is directly above the
slope of my property places my house ' at substantial risk of destabilization. The
proposal reveals the excavation of the toe of the slope above my residence and the
ensuing potential of increased water drainage and slope destabilization is unpredictable.
The neighbors and myself oppose this property development based on rezoning from
RS20 to RS12 without any benefit to its surrounding neighbors. High density housing
developments in Edmonds in an area where houses enjoy greater surrounding
properties is counter to the reasons that homeowners choose Edmonds to live. Placing
two houses that undermine and jut out over the slopes above my property is threatening
and unpredictable in its resultant soil destabilization. My foundation and property was
constructed in 1982 and there were no problems with my property until the mid 80's
when the LID was placed through my property and due to design flaws, failed at the first
rainy season. This caused significant solid erosion below my foundation and was
mitigated by the City after a three year litigation. The second event that has troubled
my property occurred when the City allowed Mr. Fong to build a residence above the
slope of my property and did not insure that he maintain his slope and without permitting
tied into the City's LID using brittle PVC pipe instead of polyethylene. The ensuing
break in the pipe above my property caused a second landslide in 1996 resulting in
water and soil runoff onto my residence. This event led to a second litigation which
again the City required1egal defense and settled eventually.
Continued...
ATTACHMENT 6
File No. AP-2006-35
Page 2
February 4, 2006
I am asking that the City prevent creating two new excavations that are directly within
feet of my property line and would potentially lead to a third litigation if damages ensue.
Please notify me when the Planning Board or City Council hears these proposals as I
would like to be included in the deliberations prior to granting permits for the proposed
development. Thank you for your consideration.
Sincerely,
Douglas H. Grier, MD
cc: Mayor Haakenson
cc: Karen Willie, Esquire
Gruwell, Meg
From:
Douglas Grier, MD
Sent:
Monday, April 03, 2006 8:26 AM
To:
Gruwell, Meg
Cc:
Haakenson, Gary
Subject:
R-05-169/PRD05-168
This letter is composed to provide input toward the proposed zoning change and development
of the property 16515 74th pl, w. Robert Suchert/ Saeed Solieimapour. The planning board
meeting is scheduled for April 6th. I reside at 16431 74th place, west, directly adjacent
to the development. I attended the informational meeting 2 months ago and would like to
clarify my position on the development and to state that I am vigorously opposed to the
development as it is proposed. During the meeting several assumptions were made that my
neighbors and myself oppose. Not once prior to or subsequent to that meeting has
residents feedback or concerns been addressed. I have no intention to vacate the right of
way at my driveway, feel that high density housing is not in my interest, nor that this
development improves the neighborhood. Any statements by the developer about
communication or agreement with the proposed plan is untrue. Mr. Solieimapour's statement
that the vacant property as it now stands is hazardous in its current state is
disingenuous at best. As the property has been owned by Mr. Suchert for 30 years without
a dollar put toward maintenance or improvements speaks for itself. They are not "white
knights" coming to improve the property, but rather trying to maximize profits_ His
personal assurance that the best measures will be taken to develop the site is negated by
their actions to see off plates to other builders. Adding a sidewalk on 76th Avenue from
nowhere to nowhere for a couple hundred feet does nothing for the neighborhood. Changing
the zoning to high density RS-12 serves only to maximize his profits at the expense of
every residence surrounding. The reason I chose to live in Edmonds in this location was
for its privacy and low car traffic. Shoehorning 9 houses on the lot is a business plan
best suited for other communities where large developments on small lots is the norm. The
site plan is incomplete in that it has intentionally left my house off the map. My
foundation is a mere 20 feet below the proposed excavation of the upper site where one
house now resides. My foundation rests on a ledge in a hazardous slope zone. The plan to
dig back into the slope above my house is inherently unsafe and can create earth movements
in the near or distant future. Who will be responsible for damages when the developer has
left the project? The unwary future homeowners? The city for granting permits? One
house placed over the existing foundation appears reasonable but squeezing in another
house within feet of my residence is unconscionable. The plans as they now exist are not
even based on soil borings to determine depth required for the foundations. Six weeks
ago, a 15 cubic yard bluff slide occurred just north of my property on my neighbor Mr.
Fongs' bluff. The cause was devegitation and excessive water runoff during this rainy
season. The planning board granted Mr. Fong the right to clear off the trees in 1994 by
deceiving the city that he had permission from his downhill neighbor. Subsequent slope
and LID drain failures led to litigation. Assurances by Architects and soil geologists
have not prevented further damages. I am requesting that the city deny the proposed
zoning change and proposed plat development in the interest of the surrounding neighbors,
the city, and the Great Blue Herons who are currently nesting on the site. Thank you for
your consideration.
Douglas Grier, M.D.
16431 74th pl, w
Edmonds, WA 98026
1
Page 1 of 1
Gruwell, Meg
From: Marge Plecki
Sent: Wednesday, March 01, 2006 8:13 AM
To: Gruwell, Meg
Cc: daveandmartha.orvis@verizon.net-, Haakenson, Gary; Spellman, Jana; Moore, Maud;
michaelppp98@yahoo.com; electpeggy@comcast.net; Marge Plecki; rrwambolt@msn.com;
deannadawson@yahoo.com
Subject: proposed Serene Creek PRD
Dear Ms. Gruwell,
We spoke to you about the notification we received regarding the proposed Serene Creek PRD. Attached
is a letter describing our concerns about the this proposal and our request to be notified of all meetings,
hearings, and decisions regarding this request for change in the City's zoning ordinances concerning the
properties involved in this project. If you require a hard copy of this letter, please let us know and we
will be happy to provide one.
Thank you,
Marge Plecki and Michael King
16711 76th Avenue West .
Edmonds
3/ 1 /2006
Michael King &Margaret Plecki
16711 76`h Avenue West
Edmonds, WA98026
425-787-6728
February 24, 2006
Ms.Meg Gruwell
City of Edmonds Planning Department
Edmonds, WA
Subject: Serene Creek PRD
Dear Ms. Gruwell,
We wish to comment on the proposed Serene Creek PRD on parcel numbers
0051300009006, 0051300008803, and 0051300008804. We were unable to attend the
public meeting on January 11, 2005, and request that we be included on the notification
list of any application filings, public meeting notices, and decisions made by the City of
Edmonds concerning this project.
We are extremely concerned about the planned Serene Creek PRD. It is our
understanding that under current zoning, the subject properties could create five single-
family parcels. It is also our understanding that the ECEC, Inc/Saeed Solemanpour group
would like to change both the City's Comprehensive Plan and current zoning to nearly
double the density of housing to 9 very large single family homes. We cannot identify
any benefit to the general public or local community that would warrant such an extreme
change in zoning and land use.
Except for the older Brook Acres PRD, 20,000 square foot or larger parcels
surround the project and defines the character of the community. We believe a major
change in the City's Comprehensive Plan and zoning ordinance should require a
significant benefit to the local community. This project only creates problems for the
community.
This density of housing is particularly unwarranted with the limited street access
and traffic conditions, the lack of sidewalks, and the lack of any traffic controls. The 76`h
Avenue West access road to the property is problematic in that it is located in close
proximity to a blind curve on a hill. Increased road traffic and the increase in pedestrian
traffic is a safety issue for the community. Also, there is limited space for a turn lane,
which would be warranted for this project. The limited sidewalk development will only
create a hazardous condition for pedestrians. Recent sidewalk studies by the City place a
priority need for a sidewalk from Meadowdale Beach Road to Meadowdale Road. The
addition of a short segment of sidewalk on this road, as shown on the proposed site plan,
will force pedestrians to cross the road at a hazardous location to utilize the new
sidewalk. It would create a segment of sidewalk rather than a continuous walkway.
The project site is located in the City's special landslide hazard study area. An
increase in housing density in this area will only serve to magnify the problem. Not too
long ago the City held a public meeting about this landslide area and at that time the City
was suggesting that the construction of a fence or even a small tool shed would require
specific geotechnical studies in this area. A major subdivision in this hazardous landside
area would require significant site mitigation efforts with no guarantee that an engineer
can adequately reduce the risk of a landslide. The site plan shows a number of houses
located on steep slopes. The topographic map for these houses show the need for
significant cut and fill operations on potentially unstable hillsides. We are concerned for
the safety of residences down slope from these planned homes. The planned new
sidewalk will require the construction of a major retaining wall along the road with a
steep slope up -gradient. Unstable soil conditions up -gradient of this retaining wall could
be an issue. We are also concerned about a large retention pond in a hazard area. It is
never a good idea to pond water in a hazard zone.
There are a number of other issues that this project raises, such as emergency
vehicles on the 76`h Avenue West access road, which appears to have a 12% slope. There
is also a negative impact on residents regarding the proposed streetlights at the top of the
highest points in the area. These streetlights will result in significant unwanted artificial
lights that will block the views of the stars and disturb the current tranquility of the area.
For the reasons outlined above, and others not listed, we feel the City should reject this
project and maintain the current RS-20 zoning. Under current zoning, there is adequate
profit to be realized by this corporate entity that now owns these parcels.
We also feel the notification area for commenting on this project should be
increased because of the impact the project will have on the greater community. For
example, our neighbors who live on the same block of 76`h Avenue West as we do did not
receive a public notice of this proposed change, and they will be as impacted as anyone
else who lives on this block. We would appreciate knowing what the specific benefit to
the community is that would warrant such an extreme change in zoning and in the City's
comprehensive plan. Thank you.
Sincerely,
Michael King &Margaret Plecki
Email: mplecki@u.washington.edu, hydrodynamics@rconnect.com
cc. Mayor Gary Haakenson
Council President Deanna Dawson
Mr. Michael Plunkett
Mr. Richard Marin
Mr. David Orvis
Mr. Ron Wambolt
Ms. Peggy Pritchard Olsen
Ms. Deanne Dawson
Ms. Mauri Moore
Michael King &Margaret Plecki
16711 76`h Avenue West
Edmonds, WA98026
425-787-6728
March 28, 2006
Ms.Meg Gruwell
City of Edmonds Planning Department
Edmonds, WA
Subject: Serene Creek PRD: Request to expand scope of EIS
Dear Ms. Gruwell,
00
We wish to comment on the scope of the EIS for the proposed Serene Creek PRD. As we
noted in a letter to you on February 24, 2006 we have specific concerns about this
proposed PRD. We feel that the current draft of the EIS scope is inadequate.
Specifically, we believe that the EIS needs to include the following items:
1. Impact of water retention pond: Please include the impact that a water retention
pond will have on the landslide area. An underground retention pond will increase the
likelihood of a landslide due to increased water saturation of unstable soils. If the
retention pond is above ground, there is a critical visual impact. Please address both of
these possibilities in the EIS.
2. Pedestrian safety: There is a well -established record of pedestrian safety issues on
this portion of 76`h Avenue West. A study was done by the City of Edmonds as part of
the Comprehensive Plan and this section of 76`h Avenue West was identified as a number
one priority. The addition of a short segment of sidewalk on this road, as shown on the
proposed site plan, will force pedestrians to cross the road at a hazardous location to
utilize the new sidewalk. It would create a segment of sidewalk rather than a continuous
walkway. Please address the impact on pedestrian safety in the examination of the
pedestrian walkway.
3. Access for emergency service vehicles: It is our understanding that access roads for
emergency service vehicles should not exceed a 12% grade. The current plan for this
project indicates that the slopes will be greater than 12%. Please address this issue in the
EIS.
4. Visual impact: The EIS should address the negative visual impacts of the project.
Specifically, the retaining wall on 76`h Avenue West, the water retention pond location,
and the streetlights located on the highest point in the neighborhood are some of the
features of this proposal that have negative visual impacts and need to be included in the
scope of the EIS.
5. Economic impact: This proposed subdivision in the midst of an RS-20 zoning area
and will have an impact on the property values of the surrounding parcels in the
neighborhood. Please address this economic impact specifically in the EIS.
6. Public benefit: It is our understanding that a re -zoning requires the establishment of
benefits to the public. We cannot identify any such benefit, and the scope of the EIS
should specifically include what the benefit to the public is that would warrant such a
change in zoning.
We request to be informed of any decisions or changes in the scope of the EIS. We
welcome the opportunity to meet with you to go over what support documentation for the
above issue.
We also request copies of the City of Edmonds Landslide maps and studies that cover the
subject property, and copies of Soil Engineer Reports that have been prepared for the
subject property. Please let us know the cost of coping the reports, and when we may
come to your office to pick them up.
Sincerely,
Michael King &Margaret Plecki
Email: mpleckina u.washin tog_n.edu, hydrodynamicsna.rconnect.com
� APR 0 4
pLA 2006
ING p pf.
�o�a Cep �
HTML editor
Senior Planner Gruwell,
APR 0 6 2006
EDMONDS CITY CLERK
ff'¢®
APR 1 0 2006
PLANNING DEPT.
My name is Larry Quisenberry and I would like to address the proposed land
use action being considered by your department, File number R-05-169/PRD-
05-168. The proposed land use is described as follows; Application for
contract re -zone to change from RS-20 to RS-12 and to develop 2.84 acres
with 9 lots.
I would like to address the application not only as a member of the immediate
neighborhood which will be affected by the proposed changes and plans for
development, but as a concerned resident of the community of Edmonds.
There are 3 main points I have that I think are salient to the argument against
granting this proposed action.
First and foremost is the impact this will have on the environment in this
pristine and unique corner of Edmonds. My family and I were fortunate
enough recently, to view an eagle soaring above the proposed development
location. I am not relating this to illustrate the majestic nature of this scene,
but to demonstrate a real and pragmatic reality of the impact development on
this property will have. This eagle was hunting on this land; if this land is
developed, the eagle's native habitat will be adversely affected and it will, at
best, have to find other hunting grounds on which to rely. Additionally, there
is a stream that runs through this area which doubtlessly supports its own
unique ecosystem.. Development of this 2.84 acre piece of land can only have
negative consequences on this ecosystem and the flora aid fauna that make it
up.
My second point goes to the unfettered nature of the exploitation that this
development will represent. Clearly; this application belies a plan
to maximize to the fullest extent the amount of proceeds that can be realized
with the development of the land. The desire to cut the minimum lot size the
land is currently zoned for almost in half is clearly exploitive in nature. The
city of Edmonds has an opportunity to take a stand for doing the right thing by
declining the application on the grounds that the city is not interested in lining
6
developer's pockets with gold at the expense of the charm and environmental
collective consciouess its citizens.
My third anf nal point relates to the pragmatic implications this
http://mailcenter.comcast.net/wm/toolbar/notheme.html 3/29/2006
HTML editor rage L or l
development will have on the immediate neighborhood as well
as those neighborhoods that lie near this proposed land use. The proposal to
connect 76th Avenue with the road that runs above 76th will not only increase
the traffic burden of the area from the proposed 9 new residents and probable
addition of 18 more vehicles, but other vehicles traveling this area as well.
This area of 76th Avenue is already very dangerous to navigate due to several
blind corners and a complete lack of sidewalks. People taking walks and
those riding bikes quite literally risk their lives navigating this section of 76th
Avenue. There are very few "escape" routes should a car come around one of
these corners at the wrong time - if more cars are added, probabilities of these
occurrences taking place will naturally increase and someone will end up
getting hurt.
In summary, I urge the Planning and Land Use department of the City of
Edmonds to deny this application. I appeal to the City's sense of
responsibility to its citizens and neighbors to do the right thing and
disallow this attempt to exploit some of the most precious resources the city of
Edmonds has; its land and its charm.
Thank you for your attention in this matter,
Sincerely,
.Larry Quisenberry
16621 76th Ave. West
Edmonds, WA 98026
LarryQ&Amgen.com
LarrvO(&comcast.net
(425) 835-0335
(206) 930-4817
http://mailcenter.comcast.net/wm/toolbar/notheme.html 3/29/2006
Janice Conner
16525 74" PI. W
Edmonds, WA 98026
(425) 742-6069
April 6, 2006
Ms. Meg Gruwell
Senior Planner — Planning Division
City of Edmonds
121 51h Avenue N
Edmonds, WA 98020
APR 0 6 2006
DEVELOPMENT SERVICES
RE: Serene Creek PRD, Saeed Soleimanpour, P.E./ECEC, Inc.
File Nos.: R-05-169 and PRD-05-168
Dear Ms. Gruwell:
The purpose of this letter is to comment on the areas for discussion in the EIS and to
oppose the contract rezone to change the existing zoning from Single-family Residential
RS-20 to Single-family Residential RS-12.
EIS:
l . 741h Place W as shown on the attached site map is designated by sign to be a "Private
Lane" and is a narrow lane that allows for only one vehicle to travel in either in or out
direction at any one time. The Serene Creek PRD, if given the rezone will severely
impact this lane and will only compound the traffic hazard at the intersection where
the lane meets the traffic coming up off of Meadowdale Beach Road and the local
traffic coming down 741h Place W.
2. 741h Place W topography on the downhill side is extremely steep, and would require
considerable footage of retaining walls in both height and length along the east side of
the proposed development.
3. The area is habitat for a number and diversity of species of plants, fish and other
wildlife including residential nesting Blue Herons.
4. The development is situated in the previously designated 2% Meadowdale Slide
Zone, thus the few homes, the better.
Rezone:
While there are a few RS-12 zones in the surrounding area, the majority have a single
road in/out with a turnaround. The area that the developer uses to substantiate his
argument for the rezone is the PRD-1976-1 known as Brook Acres and is a one way
in/out and a gated community, thus impacting no one other than those in the
development.
2. I oppose the density of this development and the traffic impact it would provide on
74` Place W.
3. I specifically chose to build in the Meadowdale area because it was RS-20 and the
privacy that the lane affords was also a major factor in the decision. I own two lots,
which were aggregated to only one parcel now being 1.5 acres - 16525 74`h Pl. W.
One house on 1.5 acres versus the developers plan of seven on two acres! .
4. The one way in/out lane also gives a measure of security against theft as someone
looking to steal from or damage property does not choose a location with such
limitations on escape.
I do not oppose the right of an owner to build on his or her property, but do oppose the
impact of higher density on the other neighbors/owners and the adverse impacts on the
community and immediate environment. Leaving the zoning as is would still give a
reasonable return on investment to the developer even with fewer Single-family homes.
In my opinion, while I do not suggest that I speak for Dr. Grier, I believe he will be
impacted on two sides, one of the homes planned referenced as #1 at 5,455 SF is directly
above his residence at only 10 feet from his property line. The mass and excavation for
this home is of serious concern. Construction a few years ago, once again above his
residence directly northeast caused major erosion of his property.
A win -win solution could be provided by the planned residential development being a
gated community accessed only off of 761h Avenue W. The planned residence referenced
as #4 could be re -sited or eliminated to provide for an adequate turnaround. Location
known as 16515 74'h Place W remaining at RS-20 still allows for demolition of the
existing structure and reconstruction of a larger residence. Even when taking into account
the initial purchase, demolition and construction of a residence priced in the high
$900,000 range, if not more would provide a return on investment. The developer is
showing a platting of reasonably large homes, several of which are only 10 feet apart!
The neighbors that attended the recent briefing held by the developer at the Meadowdale
Club House left with the impression the developer was only interested in "just
maximizing profits". I believe a profit can be realized under existing zoning. All of the
mitigation he planned would be required by the City in order to build in a slide -prone
area. The neighborhood is solidified against any such rezone.
Sincerely,
4an onner
Enclosures
Cc: Mayor Gary Haakenson
RECEPWrz)
DEVELOPL4ENT SERVICES
OjRID
1 tour
16612
16621
16630
K 14 1,,
2-ds 14"/
�16515
16711
16706
16717
16721 7421
16827 1 16901
16525
7314 7306
1
16520 \ 16510 116500
I
16605
16618 16612 16606
16611
— r
16623 16624 16622 16620 16616
16703 c: c� G4rcl ctSe-c
16742
16711
16719
7417
16727 L16748
\ 7307 RM-2.4
7440
7411 L
16833 16905
7414�6
16907
1691g 10
16917 7418
1
7227 OS
7217
7211
7203
Zonis and VicinityMa RECEIVED
g p APR 0 fS, 2006
w P< iv6kv ? La,, e ' el lk Gil DEVELOP!. ENT SSA!l1S=S
ram', ` °=., R - •'°` � L� c"�-G, ',�.✓� y:�,fct c�I� ci
J Attachment 1
V-2004-100
STArF a "
m i
44Rn ,3=
n
3y1 /889
STATE OF WASHINGTON
DEPARTMENT OF FISH AND WILDLIFE
16018 Mill Creek Boulevard • Mill Creek, Washington 98012 • (425) 775-1311 FAX (425) 338-1066
March 20, 2006 4�4F
City of Edmonds
Meg Gruwell
121 5`h Ave N
Edmonds, WA 98020
Dear Ms. Gruwell:
SUBJECT: Determination of Significance; Serene Creek PRD (R-05-169/PRD-05-
168), Snohomish County
The Washington Department of Fish and Wildlife (WDFW) reviewed the above -
referenced Determination of Significance (DS) on March 20, 2006 and offers the
following comments at this time. Other comments may be offered as the project
progresses.
Item 3.a.2 states that the stream will be cleaned of trash and restored. WDFW will
require a Hydraulic Project Approval (HPA) be obtained for this work.
Thank you for the opportunity to provide these comments. If you have any questions,
please contact me at (425) 379-2305.
Sincerel ,
i
Ginger Holser
Area Habitat Biologist
GH:gh
Page I of I
Gruwell, Meg
From: Kyra McCoy
Sent: Thursday, April 20, 2006 8:55 PM
To: Gruwell, Meg
Cc: Haakenson, Gary
Subject: rezoning of the Suchert property on 76 Ave West
Dear Ms. Gruwell,
My name is Robert McCoy and I live at 16510 76th Ave. West. My property is directly west of the Suchert
property. I am very concerned over the rezoning of this property and have several issues. First and foremost is
the prospect of additional water runoff. I am directly downstream of this property and am fearful of the adverse
effects of additional runoff. It is April 20th yet portions of my yard are to wet to walk on. My yard and bank can
not absorb any additional water_ Secondly, I am concerned about public safety. This stretch of road has no
sidewalks, a hill, and a sharp corner with low visibility. Several neighbors and myself jog here as well as my
children biking. I'm afraid the additional traffic high density housing will bring will also make this stretch more
dangerous. Thirdly, high density housing will certainly violate the rural quality of our neighborhood. Rezoning
does not fit the character and likely will decrease all of our property values. Overall, high density housing can
only hurt the safety and quality of our neighborhood as well as destabilize the slide area further. I see no benefit
in this rezone other than for the developer.
Thank you,
Robert McCoy
4/21 /2006
Tobiason & Company, Inc.
Land Use Consulting / Landscape Arcbitectztre
March 17, 2006
Meg Gruwell
City of Edmonds
Planning Department
121 5`h Avenue North
Edmonds, WA 98020
Subject: Proposed Serene Creek PRD Subdivision; Response to March 15, 2006 Letter
Dear Ms. Gruwell:
I am assisting Saeed Soleimanpour and ECEC, Inc. in their efforts to obtain approval of the
Serene Creek PRD Subdivision. It was a pleasure meeting you Thursday morning to discuss the
project, and your letter to him. I'm hoping we can agree to an alternative to the preparation of an
EIS for this project.
The proposal is a rezone from RS20 to RS 12, and it was agreed that the comprehensive plan
supports this rezone. The purpose of an EIS would be to fully assess the environmental impacts
of the project. In this case, the primary concern is the structural capacity of the soils on site, as
well as impacts to soil stability on adjacent sites. This has been extensively studied by two
reputable geotechnical firms; you have these reports in your possession (Associated Earth
Scientists, Inc. and Geotech Consultants). While there is no reason to doubt the adequacy of
these studies, the applicant agrees to finance additional peer review by the City's own
geotechnical engineer to verify that the proposal will not cause significant, unmitigatable
environmental impact.
A full and proper review of the environmental impacts of this project on the stream, the steep
slopes, the soils, and the existing road system can be accomplished through conventional project
review and the issuance of an MDNS. The extraordinary effort required to prepare an EIS is
unmerited for a small and common project such as this. We urge you to hold your Determination
of Significance, and allow us the opportunity to address your concerns outside of the EIS
process.
We have reviewed the opposition letter from the neighbor to the north, Dr. Grier, whose home is
located at 16431 74`h Place West. His concerns regarding landslide are understandable and we
share them. This is a problem shared by all property owners in this area, and in much of the
Puget Sound region. Any development of this site will require careful analysis of its structural
capacity and hydrology. It is inaccurate to suggest that an increase or decrease in the number of
units alone has a direct relationship with impact to the stability of the slope. A lower density
project could easily have greater impact to the slopes; it is not necessary to perform an EIS to
506N.E. 73rd Street, Suite 1A • Seattle, WA 98115 • (206) 522-1024 • Fax (206) 522-1049 • Laurey@Tobiason.biz
demonstrate this. The geotechnical reports demonstrate that the proposal can be safely
constructed. '
Density is relevant in terms of compatibility. The homes in this area can be characterized as
"single family detached residences on large urban lots". The 9 lot proposal is compatible with
this. While this project would represent a higher density than some adjacent lots, the proposed
density is similar to the newer plats nearby, such as Brookacres Estates, Haines Wharf and
Haines Point. It must be expected that, as land values have increased, newer subdivisions will
utilize the land more intensely.
We discussed better ways of addressing project impacts at our meeting with you. In addition to
funding peer review of the geotechnical and hydrological studies, we agreed to develop cross
sections of the site and elevations to demonstrate and further analyze the appearance of the final
product. Additionally, we can provide a full discussion of the treatment of the slopes to maintain
the existing character, the prevention of erosion and landslide and the preservation of views for
adjacent properties.
Importantly, the changes this project brings to the neighborhood are not simply the addition of
more homes and people. This project will provide significant benefits: a safe exit and an
alternative route for fire and emergency vehicles to 74`h Place West, which is currently a
hazardous, substandard dead end road; safe pedestrian sidewalks within the plat and along its
frontage on 76`h Ave. W.; resolution of existing landslide and sink hole concerns which
compromise the safety of the adjacent public roads and properties; looping of utilities; adding of
street lights; providing geotechnical and hydrological review of the area to determine methods of
protecting the hillsides; the provision of retaining walls necessary to accomplish this; the
dewatering of the hillside to prevent potential landslides; and the placement of the stream and
buffers (including buffering beyond the code requirements) in permanent Native Growth
Protection Area tracts.
We appreciate your attention to this request, and look forward to hearing from you. We urge you
to initiate the peer review of the geotechnical reports in a timely manner as time is of the
essence. Feel free to call me directly if you have any questions I might answer.
incerely,
OBIA & COMPANY, Inc.
Laurey Tobi on, President
Principal Planner/Landscape Architect Cert. #305
Cc: Saeed Soleimanpour
=
Associated
Earth-
Geotechnical Engineering
Science's,�'
Inc.
_iO
,-
Subsurface Exploration, Geologic Hazard,
�:'�`
and Preliminary Geotechnical Engineering Report
Water Resources
SERENE CREEK
'V.c`� �14-Ui✓..
f`�sw
`
Edmonds, Washington
Prepared for
Solid and Hazardous. Waste
®
Elite�Construction
Engineering Consortium, Inc.
,r
Project No. KE05360A
September 2, 2005
Ecological/Biological Sciences
Geologic Assessments 0
y
Associated Earth, Sciences,•Inc.
September 2, 2005
Project No. KE05360A.' .
Elite Construction Engineering Consortium, Inc.
10928 59"' Avenue West `
Mukilteo, Washington 98275
Attention: Mr. Saeed Soleirnanpour, P.E., M.S.C.E.
Subject: Subsurface Exploration, Geologic Hazard, and -
Preliminary Geotechnical Engineering Report
Serene Creek
16612 74" Place West
Edmonds, Washington _
Dear Mr. Soleimanpour:
We are pleased to present the. enclosed copies of the above -referenced report.. This report
summarizes the results of ' our subsurface exploration, geologic hazard, and preliminary
geotechnical engineering studies and offers recommendations for the preliminary design and
development of the proposed project. At the time of this report, site grading, structural plans,
and'construction methods have not been finalized and the recommendations presented herein
are preliminary.
We have enjoyed working with you on this study and are confident that the recommendations
presented in this report will aid in the successful _completion of your project. If you "should
have any questions or if we can be of additional help -to you, please do not hesitate to call.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington
Bruce L. Blyton, P.E.'
Principal Engineer
BLB/Id - KE05360A4 - Projects\2005360\KE\WP
_Kirkland 911 Fifth Avenue, Suite 100 • Kirkland, WA 98033 • Phone 425 827-7701 -,Fax 425 827-5424
Everett 291 11/2 Hewitt Ave., Suite 2, • Everett, WA 98201 • Phone 425 259-0522 • Fax 425 252-3408
SUBSURFACE EXPLORATION, GEOLOGIC HAZARD, AND
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT
SERENE CREEK
Edmonds, Washington
Prepared for:
Elite Construction Engineering Consortium, Inc.
10928 59' Avenue West
Mukilteo, Washington 98275
Prepared by:
Associated Earth Sciences, Inc.
911 5' Avenue, Suite 100
Kirkland, Washington 98033
425-827-7701
Fax: 425-827-5424
. September 2, 2005
Project No. KE05360A
c
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds Washington Project and Site Conditions
I. PROJECT AND SITE CONDITIONS
1.0 INTRODUCTION
This report presents the results of our subsurface exploration, geologic hazard, and preliminary
geotechnical engineering study for subdividing the subject property .for construction of new
single-family residences. The property is located at 16612 74`h Place West in Edmonds,
Washington (Figure 1). We were provided with a conceptual development plan that proposed
between six and seven single-family residences to be constructed on the property. At the time
of this report, site grading, structural plans, and construction methods have not been finalized
and the recommendations presented herein are preliminary. As the nature, design, and
locations of the site improvements and lots are planned, the conclusions and recommendations
contained in this report should be reviewed and modified, or verified, as necessary.
1.1 Purpose and Scope
The purpose of this study was to provide subsurface data to be utilized in the preliminary
design and construction of the residences and site improvements at the above -referenced site.
Our study included a review of available geologic literature, observing the excavation of 10
exploration pits and 6 exploration borings, and performing geologic studies to assess the type,
thickness, distribution, and physical properties of the subsurface sediments and shallow ground
water conditions. A geologic hazards assessment and a geotechnical engineering study were
also completed to determine suitable geologic hazard mitigation techniques, the type of suitable
foundations, allowable foundation soil bearing pressures, anticipated foundation settlements,
erosion considerations, drainage considerations, and construction recommendations. This
report summarizes our fieldwork and offers geologic hazard mitigation and development
recommendations based on our present understanding of the project.
1.2 Authorization
Written authorization to proceed with this study was granted by Mr. Saeed Soleimanpour of
Elite Construction Engineering Consortium, Inc. (ECEC). Our study was based on multiple
site visits and accomplished in general accordance with our scope of work letters dated June 1
and June 17, 2005. This report has been prepared for the exclusive use of ECEC and their
agents for specific application to this project. Within the limitations of scope, schedule, and
budget, our services have been performed in accordance with generally accepted geotechnical
engineering and engineering geology practices in effect in this area at the time our report was
prepared. No other warranty, express or implied, is made. It must be understood that no
recommendations or engineering design can yield a guarantee of stable slopes. Our
observations, findings, and opinions are a means to identify and reduce the inherent risks to the
owner.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/(d - KE05360A4 - Projects 120053601KD WP Page 1
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Project and Site Conditions
2.0 PROJECT AND SITE DESCRIPTION
This report was completed with an understanding of the project based on our discussions with
Mr. Saeed Soleimanpour with ECEC. The number of lots to be placed on the property has not
yet been established. We understand that six or seven multi -story, single-family residences are
to be constructed on -site. We anticipate that the residences along the western property
boundary will not extend more than one story above grade, but will contain daylight
basements. The proposed residences are expected to utilize slab -on -grade floors and wood -
frame construction. We expect that the development will be accessed via 76`' Avenue West
and utilize a single -lane roadway with a turnaround at the north end of the development. We
anticipate that rockery walls will be constructed along the roadway due to steep slopes along
the proposed alignment.
The property is located between 740' Avenue West and 76`h Avenue West, adjacent to 16612
74`h Place West in Edmonds, Washington. The approximately 2-acre parcel generally slopes
down to the west and is situated within the previously mapped Meadowdale Slide Area. The
total elevation change across the property was on the order of 60 feet. The property contains
steep slopes, defined by the City of Edmonds as slopes greater than 15 percent, in the southeast
corner of the property and along the north and west property boundaries. Locally, we
observed slope faces on the order of 40 to 50 percent. The middle third of the property was
relatively flat. Topographical features can be observed on the Site and Exploration Plan,
Figure 2.
The property is accessed via a roughly graded road entering the southwest corner of the
property from 76`h Avenue West. A sewer alignment crosses the property on the north end of
the site. Visual observations indicate that the sewer is about 8 feet deep. Also observed on -
site was a shallow, approximately 3-foot-wide creek crossing the southeast quarter of the
property. The creek is located at the toe of a 50 percent slope forming the southeast corner of
the property. The site contains a moderate growth of native vegetation consisting of maple and
evergreen trees, ferns, and overgrown weeds and short grass. We did not observe significant
erosion or landslide features while we were on -site.
3.0 SUBSURFACE EXPLORATION
Our field study included excavating 10 exploration pits and 6 exploration borings to gain
information about the site. The various types of sediments, as well as the depths where
characteristics of the sediments changed, are indicated on the exploration logs presented in the
Appendix. The depths indicated on the logs where conditions changed may represent
gradational variations between sediment types. Our explorations were approximately located
in the field by measuring from known site features shown on the undated site plan and survey
provided by ECEC.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
WIN - KE05360A4 - Projects 00053601KEIWP Page 2
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Project and Site Conditions
The conclusions and recommendations presented in this report are based on the subsurface
explorations completed for this study. The number, locations, and depths of the explorations
were completed within site and budgetary constraints. Because of the nature of exploratory
work below ground, extrapolation of subsurface conditions between field explorations is
necessary. It should be noted that differing subsurface conditions may sometimes be present
due to the random nature of deposition and the alteration of topography by past grading and/or
filling. The nature and extent of any variations between the field explorations may not become
fully evident until construction. If variations are observed at that time, it may be necessary to
re-evaluate specific recommendations in this report and make appropriate changes.
3.1 Exploration Pits
Exploration pits were excavated with a trackhoe. The pits permitted direct, visual observation
of subsurface conditions. Materials encountered in the exploration pits were studied and
classified in the field by a geotechnical engineer from our firm. All exploration pits were
backfilled immediately after examination and logging. Selected samples were then transported
to our laboratory for further visual classification and testing, as necessary.
3.2 Exploration Borings
The exploration borings were completed by advancing a 4'/4-inch, inside -diameter, hollow -
stem auger with a truck -mounted drill rig. During the drilling process, samples were obtained
at generally 5-foot-depth intervals. The exploration borings were continuously observed and
logged by a geotechnical engineer from our firm. The exploration logs presented in the
Appendix are based on the field logs, drilling action, and inspection of the samples secured.
Disturbed but representative samples were obtained from the exploration borings by using the
Standard Penetration Test procedure in accordance with American Society for Testing and
Materials (ASTM):D 1586. This test and sampling method consists of driving a standard 2-
inch, outside -diameter, split -barrel sampler a distance of 18 inches into the soil with a 140-
pound hammer free -falling a distance of 30 inches. The number of blows for each 6-inch
interval is recorded and the number of blows required to drive the sampler the final 12 inches
is known as the Standard Penetration Resistance ("N") or blow count. If a total of 50 is
recorded within one 6-inch interval, the blow count is recorded as the number of blows for the
corresponding number of inches of penetration. The resistance, or N-value, provides a
measure of the relative density of granular soils or the relative consistency of cohesive soils;
these values are plotted on the attached exploration boring logs (Appendix).
The samples obtained from the split -barrel sampler were classified in the field and
representative portions placed in watertight containers. The samples were then transported to
our laboratory for further visual classification.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/Id - KE05360A4 - Projects120053601KEMP Page 3
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Project and Site Conditions
4.0 SUBSURFACE CONDITIONS
Subsurface conditions on the parcel were inferred from the field explorations accomplished for
this study, visual reconnaissance of the site, and review of applicable geologic literature. The
approximate locations of the explorations are shown on Figure 2. As shown on the field logs,
subsurface soils generally consisted of medium dense silty sands and stiff to hard sandy silt
interpreted as landslide debris overlying very stiff to hard silts and dense sands interpreted to
be the Whidbey Formation. Fill was encountered overlying these soils in exploration boring
EB-4 and in exploration pits EP-6, EP-7, and EP-8. Fill is expected to be encountered across
most of the flat portion of the property. The following section presents more detailed
subsurface information.
4.1 Stratigraphy
Topsoil
Topsoil consisting of loose, moist, dark brown, silty sand was encountered in most of the
explorations. The topsoil ranged in thickness from about 6 to 12 inches. This material is
unsuitable for structure or pavement support.
Fill
We observed uncontrolled fill soils on the flatter portion of the site. Fill was observed
between 2 and 10 feet below existing site grades. The fill appeared loose and generally
consisted of sand with varying amounts of silt and gravel. Relic topsoils were generally
observed at the fill/native ground contact indicating that the topsoils had not been stripped
prior to the importation of the fill. This material, as well as the relic topsoils, is generally
unsuitable for structure or pavement support.
Landslide Debris
Sediments encountered below the topsoil layer generally consisted of stiff to hard silts with
interbedded fine sand layers and medium dense, fine to medium sands with varying quantities
of silt and silt interbeds. We interpret these sediments to be representative of old landslide
debris observed throughout the Meadowdale Slide Area. Area landsliding generally consisted
of large slumps that occurred during the ablation of the Puget Lobe of the Vashon ice sheet and
lowering of the level of Puget Sound. Smaller landslides have been active in the area since
original movement, but no evidence of recent movements were apparent on this site. The
landslide sediments were encountered in all of our explorations and generally extended
between 13 and 20 feet below existing grades. Landslide debris is not expected to be suitable
for the support of foundations.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/!d - KE05360A4 - Projects120053601KEMP Page 4
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Project and Site Conditions
Whidbey Formation
Below the slide material, we encountered stiff to hard silts and dense sands with interbedded
silt deposits. Exploration borings EB-1 through EB-5 all encountered the above sediments to
the bottom of our explorations. We interpret these sediments to be representative of the
Whidbey Formation. Whidbey Formation soils consist of medium -bedded sand, silt, and clay
with the particle size of the material varying from clay to coarse sand. The sorting is generally
good within each individual bed.
We consider the clean, free -draining sands we observed within the formation to be suitable for
use in structural fill applications if suitable moisture conditions are achieved. The silty soils
we observed in the lower portion of the formation are considered to be moisture -sensitive and
are not recommended for use as structural fill. The silt and silty sands can only be used in
non-structural fill applications and only if suitable moisture conditions are achieved. Wet soils
will require drying during favorable dry weather or admixture treatment to be considered for
use as structural fill. We consider the Whidbey Formation to be suitable for support of pile
foundations, but piling will be required to reach this geologic unit.
4.2 Hydrology
Shallow ground water was not encountered in the exploration pits except for in the location of
EP-8 where seepage was encountered at a depth of 11 feet. The local ground water surface
was encountered at depths of approximately 22 to 25 feet in exploration borings EB-4 and EB-
6 at the time of our field study in June/July 2005. It should be noted that fluctuations in the
level of the ground water may occur due to the time of the year, variations in the amount of
precipitation, and changes in site development. Seepage may also occur at random depths and
locations in unsupervised or non -uniform fills and slide debris materials.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/td - KE05360A4 - Projects120053601KEMP Page 5
f
Subsurface Exploration, Geologic Hazard,
Serene Creek and Preliminary Geotechnical Engineering Report
Edmonds, Washington Geologic Hazards and Mitigations
II. GEOLOGIC HAZARDS AND MITIGATIONS
The following discussion of potential geologic hazards is based on review of the City of
Edmonds maps of environmentally critical areas, and upon our site explorations and landslide
analyses. The subject site is classified by the February 28, 1985 GeoEngineers, Inc.
(GeoEngineers) supplemental Landslide Hazard Map as having hazards from debris slides with
a 2 percent probability of occurrence during a 25-year period in material that has not
previously failed. No hazard was assigned to previously failed landslide debris located within
the interior of the site. Visual observations of the existing slopes did not show evidence of
recent slope movement, such as bowed trees or landslide scarps. We find the GeoEngineers'
site assessment to be in general conformance with our on -site observations. As shown on
Figure 2, the site contains steep slopes along the northern and western property boundaries.
As with most steep sites, the potential for moderate to severe erosion hazards or shallow debris
flow landslides are high if site slopes are devegetated or surface water runoff is diverted onto
or concentrated on the slopes. The recommendations in the following sections address
landslide and erosion hazards.
5.0 LANDSLIDE HAZARDS AND MITIGATION
5.1 Slope Stability Reconnaissance
Based on our reconnaissance, the slopes in question appear to have a low to moderate risk of
movement in their current configuration and show no obvious indications of recent deep-seated
instability. Several large -diameter fir and deciduous trees likely exceeding 50 years in age are
established on the slopes and do not show bowing at their base, indicating the downslope creep
rate of the colluvium is relatively slow.
In our opinion, based on the current observed slope conditions and the lack of ground water
seepage from the slopes, the City steep slope buffer may be reduced to allow for construction
of lightly loaded, single-family residences on or adjacent to the slopes located within the east -
central and western portions of the site, provided that the residences are founded on deep
foundations extending at least 15 feet into the Whidbey Formation. Pile foundations should be
designed as discussed under the section on Foundations.
5.2 Stability Analysis
To evaluate the stability of the slopes under the existing and post -development conditions, the
computer program Slope W, Version 3 by Geo-Slope International was utilized. The model
used the Bishop method of a rotational failure mechanism. Input parameters for the analysis
consisted of slope geometry, geology, and ground water conditions of the slopes interpreted
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/ld - KE05360A4 - Projects 120053601KEI WP Page 6
Subsurface Exploration, Geologic Hazard,
Serene Creek and Preliminary Geotechnical Engineering Report
Edmonds Washington Geologic Hazards and Mitigations
from our field reconnaissance, explorations, and estimated soil strength parameters. The slope
geometry was developed from a topographic map of the site prepared by Pacific Geomatic
Services, Inc.
In general, the calculated factor of safety is the ratio between the available soil shear resistance
and the gravitational forces that tend to produce a slide. When the soil strength is equal to the
slide -producing forces, a factor of safety of 1.0 would exist, and the slope would be in a state
of incipient movement. An acceptable factor of safety would depend on the level of risk
deemed acceptable by the owner and the City of Edmonds. A static factor of safety of 1.5
would be considered suitable with respect to generally accepted geotechnical engineering
practice. During short-term seismic loading, considering a potential ground acceleration of
0.2g, a dynamic factor of safety of 1.1 is generally considered acceptable.
The soil stratigraphy for the stability model is based on the geologic field reconnaissance and
exploration logs completed for this project. The locations of the cross sections studied
(Sections A -A', 13-13% and C-C') are shown on Figures 3 through 5, respectively. The Section
A -A' location chosen to be representative of the general overall slope conditions for the
northern portion of the property and Section B-B' representative of the southern portion of the
slope were evaluated. Section C-C' through the steepest portions of the property (north of
Section A -A') was also evaluated. The soil properties used in the slope stability analysis
employ the Mohr -Coulomb model and are presented in Table 1. The soil densities and other
soil properties are estimated based on our experience with similar soils and correlation with
published information.
Table 1
Soil Properties Used in Slope Stability Model
Angle of
Internal
Moist Unit
Cohesion
Friction
Seismic Ground
Soil Type
Weight (lbs/ft')
(lbs/ft2)
(phi)
Acceleration
de Material
120
100
26
0.2g
FS'i
Whidbey Formation
130
300
34
0.2g
In general, our slope stability analysis evaluated the risk of landsliding within the surficial fill
and landslide debris, and deep-seated global landsliding extending through the underlying
Whidbey Formation.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/1d - KE05360A4 - Projects120053601KDWP Page 7
Subsurface Exploration, Geologic Hazard,
Serene Creek and Preliminary Geotechnical Engineering Report
Edmonds Washington Geologic Hazards and Mitigations
Our computer analysis generally showed factors of static safety of at least 1.5 for shallow -
seated slip surfaces through the existing fill and landslide debris along Sections A -A' and B-B'.
Static factors of safety between 1.1 and 1.5 were calculated for the fill/landslide debris along
Section C-C. The stability analysis indicates that static factors of safety are well above 1.5 for
deep-seated slip surfaces passing through the Whidbey Formation. The analysis indicates
seismic factors of safety are near incipient movement, and shallow -seated landsliding within
the landslide debris is possible during strong earthquakes. Seismic factors of safety greater
than 1.1 against landsliding are present within the Whidbey Formation during strong
earthquakes.
In general, the factors of safety determined by the computer model are likely conservative
when compared to actual field conditions. This conservatism comes from the compounding of
"worst -case conditions" (i.e., slope angle, unit weight, and phi angle) in the computer model,
and the inability to model the positive effects of weak soil cementing, tree roots, established
drainage, and other features.
Based on the results of our analysis, it is our opinion that stability of the existing slopes during
static conditions will support construction of the proposed residences, with the exception of the
steeper sections of the slope near Section C-C. Regrading this slope to shallow angles similar
to those of Section A -A' will likely result in suitable static factors of safety. The analysis also
indicates that during strong seismic events, factors of safety against slope instability are near
incipient movement and landsliding is possible. Therefore, site grading and foundation
construction would need to be designed such that the slopes are both unloaded and buttressed
sufficiently to improve seismic factors of safety to 1.1 or above. This could be accomplished
by restraining slopes with foundation and retaining walls, and by removing soil from slope
crest areas and filling near the toe of the slopes. The proposed daylight foundation cuts will
act to unload the slope and increase stability. These issues will require further slope stability
modeling and analysis as the design plans are refined.
The site slopes should be suitably stabilized during construction provided that shoring walls or
shallow cut slopes (1.5HAV [Horizontal: Vertical]) are utilized. To provide sufficient long-
term slope stability will require that foundation walls for the western residences adjacent to the
steep slopes are designed to account for both static and seismic earth pressure loads, and that
retaining wall and foundation loads are carried by augercast pile foundations. The augercast
piles should extend through the fill/landslide debris and into the Whidbey Formation.
Recommendations for shoring and pile support are included in the Preliminary Design
Recommendations section of this report.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/!d - KE05360A4 - Projects 12005360WDWP Page 8
il
Subsurface Exploration, Geologic Hazard,
Serene Creek and Preliminary Geotechnical Engineering Report
Edmonds Washington Geologic Hazards and Mitigations
5.3 Slope Stability Mitigation
The aforementioned slope geometry and geologic conditions present a moderate landslide
hazard risk for the site. To mitigate landslide hazards at the site, we recommend that the
construction plans also include the following measures:
1. Control of storm water crossing the site to prevent discharge of water on or above the
steep slopes.
2. Structural fill should not be added to or placed above the crest of site slopes. Proper
grading, compaction, and benching of subgrade soils where fill soils are placed.
3. Permanent slopes in cut and structural fill must be limited to 21-1:1V. In areas where it
is not feasible to construct a 21-1:1V slope, engineered walls should be constructed.
4. Limit site clearing only to areas to be developed.
6.0 EROSION HAZARDS AND MITIGATION
The subject property has a moderate to severe potential for erosion when the area is
devegetated. To mitigate and reduce the erosion hazard and potential for off -site sediment
transport, we would recommend the following:
1. Surface water should not be allowed to flow across the site over unprotected surfaces.
2. All storm water from impermeable surfaces, including driveways and roofs, should be
tightlined to a suitable system that does not discharge water on or above steep slope
areas.
3. Silt fences should be placed and maintained around the downslope perimeter of the
proposed construction areas throughout the entire construction phase of the project until
permanent landscaping and permanent storm water collection facilities have been
installed.
4. Soils that are to be reused around the site should be stored in such a manner. as to
reduce erosion from the stockpile. Protective measures may include, but are not
necessarily limited to, covering with plastic sheeting, the use of low stockpiles in flat
areas, or the use of straw bales and/or additional silt fences around pile perimeters.
5. Areas stripped of natural vegetation during construction should be replanted as soon as
possible or otherwise protected.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects 1200536011M WP Page 9
e
Subsurface Exploration, Geologic Hazard,
Serene Creek and Preliminary Geotechnical Engineering Report
Edmonds, Washington Geologic Hazards and Mitigations
6. Temporary construction entrances should be constructed with quarry spalls to mitigate
tracking of sediments onto adjacent streets in accordance with City of Edmonds
regulations.
7. Interceptor swales with check dams and/or sumps should be constructed to help control
storm water runoff.
8. Temporary sediment catchment facilities should be cleaned out and maintained
periodically, as necessary, to maintain their capacity and function.
9. Site development should occur during the dry season, if possible.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects120053601KEMP Rage 10
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds Washington Preliminary Design Recommendations
III. PRELIMINARY DESIGN RECOMMENDATIONS
7.0 INTRODUCTION
Our explorations indicate that, from a geotechnical standpoint, the parcel is suitable for the
proposed development provided the recommendations contained herein are properly followed.
Near -surface soils generally consisted of loose silts and sands or medium dense to stiff
landslide debris. Due to the relatively deep depths required to encounter bearing soils, we
anticipate the use of piling for foundation support. We understand that the distribution of
foundations loads of the proposed residences will be typical; loads on the order of 2 kips per
lineal foot of foundation can be expected. In our opinion, the Whidbey Formation soils
observed at depth are suitable for providing suitable bearing support provided that piles are
sufficiently embedded within these soils.
Due to the presence of landslide debris mantling the site, foundation excavations will require
the use of shoring or shallow excavation cuts to maintain the current stability of site slopes.
Grading on and adjacent to site slopes should be limited to cuts to avoid impacting site
stability. To achieve adequate factors of safety against site slope instability during seismic
loading may require grading improvements and use of retaining structures. The need for these
improvements should be based upon additional slope stability modeling incorporating the
planned site grading and building foundations.
8.0 SITE PREPARATION
Site preparation of planned building and road areas should include removal of all trees, brush,
debris, and any other deleterious material. Additionally, the upper organic topsoil should be
removed and the remaining roots grubbed. Areas where loose surficial soils exist due to
grubbing operations should be considered as fill to the depth of disturbance and treated as
subsequently recommended for structural fill placement.
Loose topsoil and non-structural fill should be stripped down to the underlying, medium dense
silty sand and stiff to hard silt soils. Since the density of the soil is variable, random soft
pockets may exist and the depth and extent of stripping can best be determined in the field by
the geotechnical engineer or his representative. We recommend that road areas be proof -rolled
with a loaded dump truck to identify soft spots; soft areas should be overexcavated and
backfilled with structural fill.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 • Projects120053601KEIWP Page I I
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
8.1 Temporary Slopes
In our opinion, stable construction slopes should be the responsibility of the contractor and
should be determined during construction. For estimating purposes, we anticipate that
temporary, unsupported cut slopes in the unsaturated, medium dense sands and stiff to hard
silts can be made at a maximum slope of 1.5H :1 V . As is typical with earthwork operations,
some sloughing and raveling may occur and cut slopes may have to be adjusted in the field. In
addition, WISHA/OSHA regulations should be followed at all times.
8.2 Moisture -Sensitive Soils
The on -site soils contain a high percentage of fine-grained material which makes them
moisture -sensitive and subject to disturbance when wet. The contractor must use care during
site preparation and excavation operations so that the underlying soils are not softened. If
disturbance occurs, the softened soils should be removed and the area brought to grade with
structural fill. Consideration should be given to protecting access and staging areas with an
appropriate section of crushed rock or asphalt treated base (ATB).
If crushed rock is considered for the access and staging areas, it should be underlain by
engineering stabilization fabric to reduce the potential of fine-grained materials pumping up
through the rock and turning the area to mud. The fabric will also aid in supporting
construction equipment, thus reducing the amount of crushed rock required. We recommend
that at least 10 inches of rock be placed over the fabric; however, due to the variable nature of
the near -surface soils and differences in wheel loads, this thickness may have to be adjusted by
the contractor in the field.
9.0 STRUCTURAL FILL
Due to the slopes on the site, structural fill will likely be required to establish desired grades.
However, placement of fill above or on the upper portion of site slopes is not recommended.
All references to structural fill in this report refer to subgrade preparation, fill type, placement,
and compaction of materials as discussed in this section. If a percentage of compaction is
specified under another section of this report, the value given in that section should be used.
9.1 Subgrade Keying and Benching
Where fill is approved to be placed on slopes steeper than 5H:1V, the base of the fill should be
tied to firm, stable subsoil by appropriate keying and benching, which would be established in
the field to suit the particular soil conditions at the time of grading. The keyway will act as a
shear key to embed the toe of the new fill into the hillside. Generally, the keyway for hillside
fills should be at least 8 feet wide and cut into the lower, dense sand or stiff silt. Level
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/!d - KE05360A4 - Projects 120053601KE1WP Page 12
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
benches would then be cut horizontally across the hill following the contours of the slope. No
specific width is required for the benches, although they are usually a few feet wider than the
dozer being used to cut them. All fills proposed over a slope should not exceed a depth of 2
feet or should be restrained by use of a retaining structure. All fills should be reviewed by our
office prior to construction.
We also recommend that fill areas on site slopes be equipped with subfill drains. Subfill drains
may consist of a 1- to 2-foot-thick section of free -draining aggregate placed below the fill and
covered with a geotextile fabric. The aggregate should be compacted to 95 percent of the
modified Proctor maximum density using ASTM:D 1557 as the standard or to a firm and
unyielding condition as determined by the geotechnical engineer or his representative. The
subfill drains will prevent development of hydrostatic forces beneath or behind the fill body.
9.2 Fill Subgrade Preparation
After overexcavation/stripping has been performed to the satisfaction of the geotechnical
engineer/engineering geologist, the upper 12 inches of exposed ground should be recompacted
to 90 percent of the modified Proctor maximum density using ASTM:D 1557 as the standard
or to a firm and unyielding condition as determined by the geotechnical engineer or his
representative. If the subgrade contains too much moisture, adequate recompaction may be
difficult or impossible to obtain and should probably not be attempted. In lieu of
recompaction, the area to receive fill should be blanketed with washed rock or quarry spalls to
act as a capillary break between the new fill and the wet subgrade. Where the exposed ground
remains soft and further overexcavation is impractical, placement of an engineering
stabilization fabric may be necessary to prevent contamination of the free -draining layer by silt
migration from below.
9.3 Structural Fill Placement and Compaction
After the recompacted ground is tested and approved or a free -draining rock course is laid,
structural fill may be placed to attain desired grades. Structural fill is defined as non -organic
soil, acceptable to the geotechnical engineer, placed in maximum 10-inch loose lifts with each
lift being compacted to at least 95 percent of the modified Proctor maximum density using
ASTM:D 1557 as the standard. In the case of roadway and utility trench filling, the backfill
should be placed and compacted in accordance with current local or county codes and
standards. Where fill is placed on sloping ground, the top of the compacted fill should extend
horizontally outward a minimum distance of 3 feet beyond the locations of structures or
pavement edges before sloping down at an angle of 2H:IV, 1
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/ld - KE05360A4 - Projects 120053601KDWP Page 13
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds Washington Preliminary Design Recommendations
9.4 Moisture -Sensitive Fill Materials
Soils in which the amount of fine-grained material (smaller than the No. 200 sieve) is greater
than approximately 5 percent (measured on the minus No. 4 sieve size) should be considered
moisture -sensitive. Use of moisture -sensitive soil in structural fills should be limited to
favorable dry weather conditions. The on -site soils generally contained significant amounts of
silt and are considered moisture -sensitive. In addition, construction equipment traversing the
site when the soils are wet can cause considerable disturbance. If fill is placed during wet
weather or if proper compaction cannot be obtained, a select import material consisting of a
clean, free -draining gravel and/or sand should be used. Free -draining fill consists of non -
organic soil with the amount of fine-grained material limited to 5 percent by weight when
measured on the minus No. 4 sieve fraction.
9.5 Structural Fill Testing
The contractor should note that any proposed fill soils must be evaluated by Associated Earth
Sciences, Inc. (AESI) prior to their use in fills. This would require that we have a sample of
the material 72 hours in advance of filling activities to perform a Proctor test and determine its
field compaction standard. A representative from our firm should inspect the stripped
subgrade and be present during placement of structural fill to observe the work and perform a
representative number of in -place density tests. In this way, the adequacy of the earthwork
may be evaluated as filling progresses and problem areas may be corrected at that time. It is
important to understand that taking random compaction tests on a part-time basis will not
assure uniformity or acceptable performance of a fill. As such, we are available to aid the
owner in developing a suitable monitoring and testing frequency.
10.0 SHORING RECOMMENDATIONS
The following recommendations can be used for design of cantilever soldier pile walls. We
anticipate that soldier pile walls will be required during planned excavations along the western
property boundary. Soldier pile walls would allow for top down construction and would retain
the slope during construction.
We recommend that a conventional shoring wall be designed to withstand lateral soil pressures
based on "active" lateral earth pressure conditions. This design pressure, based on a level
backslope, can be modeled by an equivalent fluid with a unit weight equal to 40 pounds per
cubic foot (pcf) triangular distribution. The 40-pcf load acts over the lagged portion of the
wall above the excavation level and over 2 pile diameters for the portion of the pile shaft
embedded in the slide debris sediments below the excavation level. Due to arching effects,
timber lagging can be designed for 60 percent of the calculated lateral earth pressure. Lateral
loads imposed by traffic, equipment, or backslope surcharges adjacent to the shoring should be
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/!d - KE05360A4 - Projects 120053601KEIWP Page 14
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
added to these values. The use of active lateral earth pressure for design does assume lateral
displacement on the retained side of the shoring system equal to approximately 0.01 times the
slope height. Some lateral deflection of the shoring walls should be expected and
corresponding slight settlement of structures located within a horizontal distance of two times
the shoring wall heights could occur. If settlement -critical structures are present within a
lateral distance equal to twice the wall height or if the shoring is structurally restrained from
yielding, at -rest lateral earth pressure should be used for design. The at -rest lateral earth
pressure can be represented by an equivalent fluid with a unit weight of 60 pcf assuming no
surcharges and a level backslope. Careful pile installation, excavation, and lagging installation
to minimize ground loss will reduce potential movements. Further, complete backfilling of the
lagging is essential to the successful performance of the shoring system.
Structural concrete should be used in the bottom of the soldier pile holes up to the bottom of
the planned excavation if the soldier piles are to support permanent building loads. Lean
concrete or controlled density fill (CDF) with at least 100 pounds per square inch (psi)
compressive strength can be used above the planned excavation base where it will need to be
removed to install lagging between the beams. Once the beams and concrete are in place and
the concrete is cured, the excavation can proceed. Timber lagging should be installed from the
top down as the excavation progresses. Excavation should be just adequate to allow
installation of lagging; overexcavation should be avoided. Any void spaces between lagging
and the cut face should be filled with pea gravel or CDF as soon as practical.
Lateral "passive" soil resistance of 350-pcf equivalent fluid may be relied upon to resist lateral
movement of the piling within the Whidbey Formation. This resistance acts over 2 pile
diameters.
If desired, the soldier piles used for shoring could be incorporated into permanent structures
and could be used to support compressive and uplift loads in addition to lateral loads. Axial
load capability of the piles will be dependent on pile diameter, length, pile tip elevations, and
other factors that are not known at this time. Soldier piles should be installed at least 15 feet
into the Whidbey Formation. Axial compressive capacities of soldier piles 18 to 24 inches in
diameter of 20 to 50 tons per pile are typical. Higher compressive capacities could be
achieved with larger -diameter piles.
We recommend that we be allowed to observe shoring installation operations as they are
completed. In that way, we can confirm that the soil conditions encountered are consistent
with our observations and assumptions used to formulate our recommendations.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects120053601KEMP Page 15
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds Washington Preliminary Design Recommendations
11.0 FOUNDATIONS
To mitigate post -construction settlements, pile foundation systems are recommended for
support of the proposed structures above the landslide debris mantling the site. We evaluated
several pile types, including both driven and drilled pile foundations. For this project, we
recommend the use of drilled augercast piles along the western property boundary to support
the structures while resisting lateral forces in the slide material encountered during our
explorations. Structures on the eastern half of the property may be supported with either
augercast or small -diameter pipe piles. In all cases, the piles must extend through the
fill/landslide debris and into the bearing soils observed at depth. For foundation design in
accordance with the 2003 International Building Code (IBC), the following geotechnical
parameters should be used:
Site Class C from Table 1615.1.1
Ss = 122% (Figure 1516[l])
Si = 43 % (Figure 1516[2])
Fa = 1.0 (Table 1615.1.2[1])
F,, = 1.4 (Table 1615.1.2[2])
The following sections provide both small -diameter pipe and augercast pile recommendations
based on preliminary development plans provided by the client.
11.1 Pipe Pile Foundations
Pipe pile foundations should only be considered for structures on the east side of the property.
Vertical foundation loads can be supported by steel pipe piles driven through the fill and
landslide debris, and gaining bearing support within the underlying Whidbey Formation.
Lateral soil pressures will be accommodated by passive pressure against foundation grade
beams or through use of battered piles. Because of the variable nature of the subsurface soils,
we estimate pile lengths to be on the order of 15 to 30 feet for the proposed residential
structures. However, pile lengths could vary considerably from this range depending on pile
size, hammer size, soil density, moisture, and consistency, and other factors. We recommend
that an experienced contractor install all piles.
Axial Pile Capacities
Table 2 presents allowable axial capacities for different pile sizes. Pipe piles should consist of
3- or 4-inch nominal diameter, galvanized steel pipe driven to the prescribed refusal criteria
during sustained driving with the noted hammer type. Allowable design loads may be
increased by one-third for short-term wind or seismic loading. Anticipated settlements of pile -
supported structures will generally be on the order of 3/ inch.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects 120053601KEIWP Page 16
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
Table 2
Pipe Pile Design Parameters
Allowable Axial
Pipe
Minimum
Refusal
Compressive
Diameter
Wall
Hammer Size
Criteria(')
Load')
(inches)
Thickness
(Ibs)
(seconds)
(kips)
3
Schedule 40
650
12
12
4
Schedule 40
850
16
30
Refusal is defined as less than 1 inch of penetration in "X" seconds under constant driving.
Allowable load may require verification by load tests.
Pile Inspections
The actual total length of each pipe pile may be adjusted in the field based on required
capacities and conditions encountered during driving or drilling. Consequently, use of the
presented soldier and pipe pile capacities in the design requires that all piles be inspected by a
qualified geotechnical engineer or engineering geologist from our firm who can interpret and
collect the installation data and examine the contractor's operations. AESI, acting as the
owner's field representative, would determine the required lengths of the pipe piles and keep
records of pertinent installation data. A final summary report would then be distributed
following completion of pile installation. The City of Edmonds will likely require pile
inspections and possibly load tests, especially for pipe piles as they are considered a "code
alternate" within most Puget Sound municipalities.
11.2 Augercast Piles
Augercast piles may be used to support vertical foundation loads and will also provide limited
lateral foundation resistance. If obstructions are encountered at depths where removal is not
feasible, it might be necessary to modify the pile layout to replace piles that cannot be
completed according to the original design. Observation of pile installation by AESI is
important to verify that the subsurface conditions observed at pile locations are consistent with
the observations in our subsurface explorations, and consistent with assumptions made during
preparation of the recommendations in this report. The City of Edmonds will likely require
such inspections of foundation piles.
The augercast piles will gain support from end bearing and skin friction in the Whidbey
Formation beneath the slide debris. Augercast piles are formed by drilling to the required
depth with a continuous -flight, hollow -stem auger. Fluid grout is then pumped down the
hollow stem under pressure as the auger is withdrawn. Appropriately designed, reinforcing
steel cages are then lowered into the unset grout. A single reinforcing bar is installed for the
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects120053601KEMP Page 17
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
full length of the pile for transfer of uplift loads. Since the grout is placed under pressure,
actual grout volumes used are typically 15 to 50 percent greater than the theoretical volume of
the pile. Actual grout volumes for piles constructed through some types of fill and soft,
yielding soils can be much more. The pile contractor should be required to provide a pressure
gauge and a calibrated pump stroke counter so that the actual grout volume for each pile can be
determined. Typically, a nine -sack, minimum 4,000 psi grout mix is used for augercast piles.
Once complete, the piles would then connect to a pile cap and grade beam support system for
the building foundation. Typical allowable capacities for the proposed augercast piles are
given in Table 3. Allowable design axial compressive loads may be increased by one-third for
short-term wind or seismic loading. Anticipated settlement of the pile -supported foundations
will generally be on the order of t/2 inch.
Table 3
Augercast Pile Recommendations
Minimum
Embedment Into
Vertical
Whidbey
Compressive
Lateral
Depth of
Uplift
Pile Diameter
Formation
Capacity
Capacity
Fixity
Capacity
(inches)
(feet)(')
(kips)
(kips)()
(feet)13l
(kips)(4)
14
15
50
3.4
7
10
18
15
75
6.5
9
20
24
15
100
10.4
12
35
"' Thickness of old slide material was observed to be up to 20 feet.
al Allowable lateral capacities are for fixed -headed conditions (incorporation_ into pile caps and grade beam system), and 'h inch of
deflection at the ground surface. Greater lateral capacities are possible for greater allowable deflections.
rit The depth of fixity does not include the code -required 20 percent increase for reinforcing cage design.
1'1 Uplift capacity is based on minimum pile length of 35 feet.
Piles with lateral spacing less than 6 pile diameters from another pile along the direction of
force should be considered to be in the zone of influence and the lateral capacity and the
reduction factors presented below should be used. If the lateral contribution of the piles is
critical to the design of the structures, we can provide a comprehensive lateral pile analysis.
Such an analysis would present lateral pile capacities taking into account the interaction
between piles.
Based on the loose conditions of the soils through which the augercast piles are to be
excavated, care should be taken in construction planning to allow grout time to set prior to
drilling adjacent piles. Typically, 24 hours of set time is recommended for piles closer than 3
diameters or 10 feet, whichever is greater.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects120053601KEIWP Page 18
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
Group Effects
Where piles are installed in groups and subject to lateral loading, reductions in lateral capacity
to account for group effects should be included in design. The effects of group performance
should be considered where piles are spaced closer than 6 pile diameters center -to -center and
are aligned in the direction of loading. Piles should not be spaced closer than 3 diameters
center -to -center to achieve full vertical and uplift capacity. If piles are staggered in the 'Y'
and "y" directions a minimum of 3 pile diameters, there is no reduction in lateral loading.
For the determination of individual capacities for load application parallel to the line of
spacing, the following spacing and reduction factors presented in Table 4 should apply. The
last pile in a row can be assumed to develop the full lateral capacity.
Table 4
Lateral Reduction Factors
Pile Spacing
Reduction Factor
6 diameters
1.0
5 diameters
0.8
4 diameters
0.6
3 diameters
0.4
Lateral Soil Forces on Augercast Piling
The augercast piles for the western residences should be designed to resist lateral, downhill
soil forces equal to a 40-pcf equivalent fluid density within old slide material. This soil force
acts over 2 pile diameters on the portion of the pile shaft that is embedded in the slide debris.
Below the slide debris in the Whidbey Formation, lateral passive soil resistance equal to
350-pcf equivalent fluid may be used. The passive resistance acts over 2 grouted pile
diameters.
12.0 FLOOR SUPPORT
We understand the floor slab will be structurally supported on piles and grade beams. Crawl
space -type construction may alternatively be used. Slab -on -grade floors should be supported
on a 4-inch layer of washed pea gravel to act as a capillary break. The capillary break rock
should be covered with a 10-mil plastic vapor barrier. These features are recommended to
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
Mid - KE05360A4 - Projects 00053601KE1WP Page 19
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
reduce the potential for wet slab conditions. If crawl space construction is used, the soil below
the floor system should be covered with a vapor barrier to reduce dampness.
13.0 LATERAL WALL PRESSURES
All backfill behind walls or around foundation units should be placed as per our
recommendations for structural fill and as described in this section of the report. Horizontally
backfilled walls which are free to yield laterally at least 0.1 percent of their height may be
designed using an equivalent fluid equal to 40 pcf. Similar walls with up to 2H:1V slopes
above the walls should be designed using an equivalent fluid equal to 55 pcf. Fully restrained,
horizontally backfilled, rigid walls which ,cannot yield should be designed for an equivalent
fluid of 60 pcf. Restrained walls with up to 2H:1V slopes above the walls should be designed
using an equivalent fluid of 75 pcf. If parking areas are adjacent to walls, a surcharge
equivalent to 2 feet of soil should be added to the wall height in determining lateral design
forces.
Due to the presence of steep slopes and landslide debris encountered across the property, we
recommend adding a seismic surcharge to the walls. We recommend that a seismic surcharge
equal to a uniform pressure distribution of 5H pounds per square foot (psf), where H is the
height of the wall and the resultant force is applied at one-half the wall height.
The lateral pressures presented above are based on the conditions of a uniform backfill
consisting of structural fill compacted to 90 percent of ASTM:D 1557. A higher degree of
compaction is not recommended as this will increase the pressure acting on the walls. A lower
compaction may result in settlement of the slab -on -grade above the walls. Thus, the
compaction level is critical and must be tested by our firm during placement. Surcharges from
adjacent footings, heavy construction equipment, or sloping ground must be added to the above
values. Footing drains should be provided for all retaining walls as discussed under the section
on Drainage Considerations.
It is imperative that proper drainage be provided so that hydrostatic pressures do not develop
against retaining walls. This would involve installation of a minimum, 1-foot-wide blanket
drain for the full wall height to within 1 foot of the final grade using imported, washed gravel
or an approved drainage mat against the walls.
13.1 Passive Resistance and Friction Factor on Grade Beams
Due to the presence of landslide debris, foundation walls, and retaining walls used to support
cut slopes should be constructed on pile foundations. Lateral forces may be resisted by a
combination of the lateral pile resistance and passive earth pressure acting on the foundation
grade beams.
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
WIN - KE05360A4 - Projects 12005360WEI WP Page 20
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds Washington Preliminary Design Recommendations
For the east residences (away from steep slopes), grade beams cast against medium dense soil
or compacted structural fill may be designed for passive resistance against lateral translation
using an equivalent fluid equal to 250 pcf. The passive resistance value includes a factor of
safety equal to 3 in order to reduce the amount of movement necessary to generate passive
resistance. We do not recommend relying on passive soil resistance in the landslide debris for
the western residences adjacent to the steep slopes. For the western residences, passive soil
resistance should only be relied upon for the portion of the piling embedded within the lower
Whidbey Formation sediments.
Since the structures will be pile -supported, we do not recommend using base friction to resist
lateral loads.
14.0 DRAINAGE CONSIDERATIONS
The silts and silty sands forming the landslide debris are relatively impermeable and water will
tend to perch atop/within this stratum. Additionally, traffic across these soils when they are
damp or wet will result in disturbance of the otherwise firm stratum. Therefore, prior to site
work and construction, the contractor should be prepared to provide temporary drainage and
subgrade protection, as necessary.
All retaining and foundation perimeter footing walls should be provided with a drain at the
footing elevation. Drains should consist of rigid, perforated, polyvinyl chloride (PVC) pipe
surrounded by washed pea gravel. The level of the perforations in the pipe should be set down
approximately 2 inches below the bottom of the grade beam and the drains should be
constructed with sufficient gradient to allow gravity discharge to an appropriate discharge point
away from steep slopes. In addition, all retaining walls should be lined with a minimum, 12-
inch-thick, washed gravel blanket or approved drainage mat provided over the full height of
the wall to within 1 foot of final grade and which ties into the footing drain. Roof and surface
runoff should not discharge into the footing drain system, but should be handled by a separate,
rigid, tightline drain. In planning, exterior grades adjacent to walls should be sloped
downward away from the structures to achieve surface drainage. The 2003 IBC specifies the
ground surface should be sloped away from the buildings at a minimum gradient of 12H:1V
for a distance of at least 6 feet measured perpendicular to the walls.
15.0 PROJECT DESIGN AND CONSTRUCTION MONITORING
At the time of this report, site grading, structural plans, and construction methods have not
been finalized and the recommendations presented herein are preliminary. We are available to
provide additional geotechnical consultation as the project design develops and possibly
changes from that upon which this report is based. We recommend that AESI perform a
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/ld - KE05360A4 - Projects120053601KE1WP Page 21
Subsurface Exploration, Geologic Hazard, and
Serene Creek Preliminary Geotechnical Engineering Report
Edmonds, Washington Preliminary Design Recommendations
geotechnical review of the plans prior to final design completion. In this way, our earthwork
and foundation recommendations may be properly interpreted and implemented in the design.
This plan review is not included in the current scope of work and budget.
We are also available to provide geotechnical engineering and monitoring services during
construction. The integrity of the foundations depends on proper site preparation and
construction procedures. In addition, engineering decisions may have to be made in the field
in the event that variations in subsurface conditions become apparent. Construction monitoring
services are not part of this current scope of work. If these services are desired, please let us
know and we will prepare a cost proposal.
We have enjoyed working with you on this study and are confident that these recommendations
will aid in the successful completion of your project. If you should have any questions or
require further assistance, please do not hesitate to call.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington
4
Edwardo Garcia, P.E.
Senior Staff Engineer
Attachments: Figure 1:
Vicinity Map
Figure 2:
Site and Exploration Plan
Figure 3:
Section A -A'
Figure 4:
Section B-B'
Figure 5:
Section C-C'
Appendix:
Exploration Logs
Bruce L. Blyton, P.E.
Principal Engineer
Z1,15-
September 2, 2005 ASSOCIATED EARTH SCIENCES, INC.
EG/td - KE05360A4 - Projects120053601KEIWP Page 22
APPENDIX
.0
.Y
O
gg -
—g!,
[P L 'S V
1-7
to
—7�
fm
f� '3T ';,V i6 !4T FL
1.32111., rL -,v
LW
ZA- --f
L L S'
Z
6 23. 112 I
4A
F'L.
< P L
I- , M 01
S1 I QF.
PL SV
i65i!
PL SV
163TH PL
PL
ITE A L
YFIELOS,
I A,
r L ','j
77 rt,
PM _ '� _ +6'Z .:• , .t4:, p �7 _� ifi,i„ �� J ( t-. \l`h. jet'
-J Z.
XE10010AL;
i PL SU
AZAFIELOS
C", 'Z' PL
ijl 6PTil PL
j
6,
PL
ST 1721Jl;isr SV
D N�-
----------- . . ............. L 17221,0 E::
17' P.L
v) `v
r- PL
L
su
4TH
ST P L sle"
Z 74711 S, T
175 T11
J
F=,
4
1757
777777-7-77
ils is
P LL
PL Ll
-j
vi. w COUNTY.17 "Til
C) Will
r.— im Ile �Tlj
tf fit Pt PL 14-
IL SV
1781 PL EJSW
L '�
PL tin
N
NOT TO SCALE
Associated Earth Sciences, Inc. VICINITY MAP FIGURE 1
SERENE CREEK DATE 7/05
C'
EDMONDS, WASHINGTON
PROJ. NO. KE05360A
0
o
'o p
Well -graded gravel and
Terms Describing Relative Density and Consistency
LL
$�$o
cw
gravel with sand, little to.
Densi SPT4blows/foot
d 5'
in '.
o
no fines
V Loose 0 to 4
Coarse
>
o >
W)
Loose 4 to 10
Grained Soils
° ° ° ° °
° °
Poorly -graded gravel
m
_0
v
° o ° ° °
GP
and gravel with sand,
Medium Dense 10 to 30 Test Symbols
0
0 Nt
6
00 0..j
00° o °
little to no fines
Dense 3o to 50
Very Dense >50 G = Grain Size
`V
o Z
k"
° ° ° ° °
M =Moisture Content
Consistency SPT(%lows/foot A
'
p •
Z
Silty gravel and silty
= Alterberg Limits
o
(a
t
•
GM
gravel with sand
Very Soft 0 to 2 C = Chemical
Fine-
—`° cc
•
, p
Soft 2 to 4 DO =Dry Density
Grained Soils
c
oar jT
Cr
Medium Stiff 4 to 8 K = Permeability
=
Stiff 8 to 15
tY
H t2
Clayey gravel and
Very Stiff 15 to 30
M
oc
clayey gravel with sand
I
Had >30
o
u
Component Definitions
`o
Well -graded sand and
t
Descriptive Term Size Range and Sieve Number
CD
:
SW
sand with gravel, little
Boulders Larger than 12"
uc_....
::-:-:-:
to no fines
Cobbles 3' to 12'
—'
d LL
=
Gravel X to No. 4 (4.75 mm)
' =' '
Poorly -graded sand
o >
U
=
SP
and sand with gravel,
Coarse Gravel T to 3/4'
Fine Gravel 3/4' to No. 4 (4.75 mm)
m
o It
m 0
little to no fines
Sand No. 4 (4.75 mm) to No. 200 (0.075 mm)
�
o
0 Z
Coarse Sand No. 4 (4.75 mm) to No. 10 (2.00 mm)
H
y
SM
Silty sand and
Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm)
silty sand with
Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm)
v
o a i
.:.:
gravel
Silt and Clay Smaller than No. 200 (0.075 mm)
u�
in
�'
_
SC
Clayey sand and
(3) Estimated Percentage Moisture Content
RH
rn
clayey sand with gravel
D Absence of moisture,
Percentage by Dry
Component dusty, d to the touch
Weight ry. dry
Trace <5 Slightly Moist - Perceptible
Silt, sandy silt, gravelly silt,
>
o
ML
silt with sand or gravel
Few 51010 moisture
>
Little 15 to 25 Moist - Damp but no visible
U)
L
With Non -primary coarse water
Clay of low to medium
N
U
constituents: > 15% Very Moist - Water visible but
C _j
CL
plasticity; silty, sandy, or
Fines content between not free draining
Z
H
v, E
gravelly clay, lean clay
5%and 15% Wet -Visible free water, usually
(a
from below water table
a
3
_ —
==
Organic clay or silt of low
Symbols
m
_3
_ —
oL
plasticity
Blows/6' or
0
o
Sampler P portion of 6"
Type
Cement grout
/
j Sam
surface seal
clayey silt, silt
o
jElastiCsilt,
MF1
with micaceous or
ler T
2'� OD • p yPe
Split -Spoon a Description
8entonite
g
diatomaceous fine sand or
, at
Sampler
P
seal
H
silt
3.0' OD Split -Spoon Sampler
(SPT) '
: Filter pack with
Clay of high plasticity,
rn
C7 o
3.25' OD Split -Spoon Ring Sampler t.I
: blank casing
v
-o to
CH
sandy or gravelly clay, fat
Bulk sample _
3.0' OD Thin -Wall Tube Sampler
= section
=Screened casing
m
y J
clay with sand or gravel
(including Shelby tube)
orH drotp
C9
v
Grab Sample
filter k
i01iOrganic
clay or silt of
o Portion not recovered
End cap
t`
J
off
medium to high
t11
plasticity
Percenta e d wei ht t°l Depth of ground water
�►
(SPT) Standard Penetration Test
1
(ASTM D-1586) ATD = At time of drBGng
>,
y
Peat, muck and other
(3) $z Static water level (date)
In General Accordance with
2 76
PT
highly organic soils
Standard Practice for Description t� Combined USCS symbols used for
and Identification of Soils (ASTM D-2488) fines between 5% and 15%
-b ul sues in rms report are oasea on visual field and/or laboratory observations, which include density/consistency, moisture condition, grain size, and
plasticity estimates and should not be construed to imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification
methods of ASTM 0-2487 and D-2488 were used as an identification guide for the Unified Sol Classification System.
a
3
Associated Earth Sciences, Inc. FlcuRe
(Exploration Log Key A_1
n
1
2
3
4
4i
6
7
8
9
10
11
12
13
14
15
16
17
18
19
LOG OF EXPLORATION PIT NO. EP-1
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
_Loose, moist dark brown silty SAND.
Old Slide Material
Very stiff to hard, moist, gray -brown, SILT with sand, trace to few gravel (blocky texture).
Grades to trace gravel.
(thin fine sand interbeds)
Bottom of exploration pit at depth 10 feet
No caving. No ground water.
a20
0
N
Serene Creek
E
Edmonds, WA
co
Associated Earth Sciences, Inc. project No. KE05360A
Logged by: EG
Approved by: � June 2005
a
F-
U,
Y
LOG OF EXPLORATION PIT NO. EP-2
F
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
that for interpretation. This summary applies only to the location of this trench at the
a
read together with report complete
time Subsurface conditions may change at this location with the passage of time. The data presented are
o
of excavation.
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
Fill/Old Slide Material
1
Loose, moist, brown, silty SAND, few gravel.
2
3
Medium dense to dense, moist, orange -brown to gray, silty SAND, few gravel, some thin roots.
4
5
6
7
8
9
Very stiff, moist, gray with orange mottling, fractured silt with sand, trace gravel.
10
11
12
13
14
15
Medium dense, moist to wet, gray -brown, SILT, few sand, gravel (possible ash, volcanic debris at
16').
16
17
Bottom of exploration pit at depth 17 feet
18 -
No water. No caving.
19
0
26--
N
E Serene Creek
N Edmonds, WA
Associated Earth Sciences, Inc. Project No. KE05360A
Logged by: EG
a Approved by: June 2005
U
Y
LOG OF EXPLORATION PIT NO. EP-3
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
together with that report for complete interpretation. This summary apn plies only to the locatioof this trench at the
a
read
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
o
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
1
Old Slide Material
Dense, moist, SAND with gravel, few silt.
2
3
Dense to very dense, moist, silty SAND with gravel and cobbles.
4
5
6
Whidbey Formation
Very dense, moist, silty SAND with gravel.
7
8
Bottom of exploration pit at depth 8 feet
9
No caving. No water.
10
11
12
13
14
15
16
17
18
19
Serene Creek
E
Edmonds, WA
Associated Earth Sciences, Inc. Project No. KE05360A
Logged by: EG
Approved by: June 2005
N U
Y
LOG OF EXPLORATION PIT NO. EP-4
x
L
This log is partof the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
n.
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
o
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
Loose, moist, dark brown -black, silty fine SAND, few gravel.
1
Fill/Old Slide Material
Loose, moist, brown, silty SAND, few gravel, frequent thin roots, some buried trees.
2
3
4
5
Old Slide Material
Medium dense/stiff, moist, tan -brown, silty SAND/sandy SILT, few gravel.
6
7
8
9
Very stiff, moist, mottled orange -brown, SILT, few sand, trace gravel (blocky to fractured structure).
10
11
12
Few gravel.
13
Stiff, moist, orange -brown (oxide staining), sandy SILT, few gravel.
14
15
16
17
18
19
Bottom of exploration pit at depth 18 feet
No water. No caving.
0
0
N
d
E
m
V)
'a
0
to
C3
0
U
U
Y
Serene Creek
Edmonds, WA
Associated Earth Sciences, Inc
Logged
Approvedd by::
Project No. KE05360A
June 2005
LOG OF EXPLORATION PIT NO. EP-5
i
L
This log is part of the report Prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
together with that report for complete interpretation. This summary applies only to the location of this trench at the
C.time
read
of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
p
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
1
Old Slide Material
Stiff, moist to wet, gray, SILT with sand, few gravel, fractured.
2
3
4
5
6
7
Very stiff, moist, brown, SILT, few fine sand, trace gravel.
8
9
10
11
12
Bottom of exploration pit at depth 12 feet
13
No water. No caving.
14
15
16
17
18
19
0
0
N
E Serene Creek
Edmonds, WA
a
Q Associated Earth Sciences, Inc. Project No. KE05360A
N Logged by: EG
a Approved by: ® ® ® June 2005
U
Y
LOG OF EXPLORATION PIT NO. EP-6
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
o
a simpification of actual conditions encountered.
DESCRIPTION
Fill
Soft, wet, dark brown, SILT, few fine sand.
1
Topsoil
2
Old Slide Material
Very stiff, moist, tan -brown, SILT, few fine sand, trace gravel (fractured).
3
4
5
6
Stiff, moist, tan/brown, SILT with sand and some gravel.
7
8
9
10
Medium sand and fractured silt.
11
12
Bottom of exploration pit at depth 12 feet
13
No water. No caving.
14
15
16
17
18
19
020
0
N
E Serene Creek
Edmonds, WA
'a
Associated Earth Sciences, Inc. Project No. KE05360A
Logged by: EG
Approved by: June 2005
0.
U
Y
LOG OF EXPLORATION PIT NO. EP-7
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for com lete interpretation. This summary applies only to the location of this trench at the
C
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
o
a simpification of actual conditions encountered.
DESCRIPTION
Fill
Loose, wet, gray -brown, silty, medium SAND, few gravel, occasional thin roots.
1
2
3
Fill
Stiff, moist, tan, SILT, few sand, trace gravel (old pipe in sidewall of trench).
4
5
Old Slide Material
Stiff, moist, tan, SILT, few sand, trace gravel.
6
7
8
Buried tree roots.
9
10
Grades to with sand and gravel.
11
(jumbled - sand, silt, gravel)
12
13
14
Very stiff, moist, mottled orange -brown, SILT, with sand and gravel.
15
16
Grades to sandy.
17 .
Bottom of exploration pit at depth 17 feet
18
No water. Slight caving of trench.
19
020
o
E Serene Creek
Edmonds, WA
a'
Associated Earth Sciences, Inc. Project No. KE05360A
0 Logged by: EG
Approved by: June 2005
U
Y
LOG OF EXPLORATION PIT NO. EP-8
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
The
o
time of excavation. Subsurface conditions may change at this location with the passage of time. data presented are
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
1
Fill
2
Medium dense, moist, red -brown, gravelly SAND, few silt.
3
4
5
Fill
6
Stiff, moist, gray, SILT, some sand and gravel.
7
Relic Topsoil
Old Slide Material
8
Medium dense, moist, orange -tan, gravelly SAND, few silt.
9
10
Grades to gravelly, wet.
11
12
Bottom of exploration pit at depth 12 feet
13
Seepage observed at 11'. No caving. 'Fills observed to —10' between exploration pits EP-8 and EP-1, brick, wood
debris.
14
15
16
17
18
19
0
2^ -
N
E Serene Creek
Edmonds, WA
a
Associated Earth Sciences, Inc.
o
Logged by: EG Project No. KE05360A
o
ii Approved by: June 2005
L)
U
Y
LOG OF EXPLORATION PIT NO. EP-9
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
location the
read together with that report for com Fete interpretation. This summary applies only to the of this trench at
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
o
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil
1
Old Slide Material
Medium dense, moist, brown, silty SAND with gravel, some thin roots.
2
3
Very stiff, moist, gray -brown, SILT, some sand, trace gravel (fractured).
4
5
6
7
8
9
Bottom of exploration pit at depth 9 feet
10
No caving. No water.
11
12
13
14
15
16
17
18
19
020
a
N
E Serene Creek
U) Edmonds, WA
Associated Earth Sciences, Inc. Project No. KE05360A
Logged by: EG
N
M Approved by: June 2005
U
Y
LOG OF EXPLORATION PIT NO. EP-10
r
n
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
Subsurface may change at this location with the of time. The data presented are
o
time of excavation. conditions passage
a simpification of actual conditions encountered.
DESCRIPTION
Topsoil
1
Old Slide Material
Loose, moist, brown, silty SAND with gravel and thin fibrous roots.
2
3
4
Dense, moist, gray, silty SAND with gravel.
5
6
Very stiff, moist, gray, SILT, some sand, trace to some gravel.
7
8
9
10
Stiff, moist, gray -brown, mottled, sandy SILT, few gravel.
11
12
13
14
Bottom of exploration pit at depth 14 feet
15
No water. No caving.
16
17
18
19
Serene Creek
Edmonds, WA
Associated Earth Sciences, Inc.
Logged
Approvedd by:: MURNU
Project No. KE05360A
June 2005
Associated Earth Sciences, Inc.
Exploration Log
® RN N a
Project Number
Exploration Number
Sheet
KE05360A
EB-1
1 of 1
Project Name Serene Creek Ground Surface Elevation (ft)
Location Edmonds WA Datum N/A
Driller/Equipment Date Start/Finish 7/12/05 7/12/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
t
N
a
.276
n�
c
O
6
>
`m
Blows/Foot
2
tq
F�
n
S E
T
m%
�E
0
o
m
a�
o
rn
DESCRIPTION
10 20 30 40
O
Topsoil
Loose moist dark brown silty fine SAND few gravel.
Recent Slide Material
Stiff, moist, brown, sandy SILT, few gravel and interbedded medium sand.
5
S-1
s
♦1
10
--------------------------------
Old Slide Material
10
Hard, moist, brown, SILT, some sand, trace gravel.
9
S-2
16
40
24
15
Hard, moist, mottled gray/red-brown, SILT, few sand, trace gravel.
10
S-3
1s
A
L57
38
Hard, moist, mottled gray with oxide staining, sandy SILT, trace gravel.
9
S-4
15
A3
20
20
----------- Whidbey Formation------------
S-5
Very stiff, moist, gray, massive SILT with interbedded sand lenses_
10
2
11
15
S-6
7
12
29
17
25
Medium dense, moist, gray, silty medium SAND with sandy silt interbeds.
12
S-7
19
40
21
30
Hard, moist, blue -gray, sandy SILT with thin sand interbeds, trace
9
S 8
organics.
11
�2
14
- 35
S-9
8
14
40
26
Bottom of exploration boring at 36.5 feet
No free ground water encountered.
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) No Recovery M - Moisture Logged by: EG
m Y OD Split Spoon Sampler (D & M) ❑ Ring Sample S? Water Level() Approved by:
® Grab Sample Q Shelby Tube Sample 1 Water Level at time of drilling (ATD)
Associated Earth Sciences, Inc.
Exploration Log
0W ® N U
Project Number
Exploration Number
Sheet
KE05360A
EB-2
1 of 1
Project Name Serene Creek Ground Surface Elevation (it)
Location Edmonds WA Datum NIA
Driller/Equipment Date Start/Finish 7/12/05,7/19/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
L
a
a�
c
�,
a�
N
Blows/Foot
►�
n
S E
m�
� E
ar
0
T
(ry
DESCRIPTION
O
5
m
m
L
O
10 20 30 40
Topsoil
Loose moist dark brown silly fine SAND few gravel.
Recent Slide Material
Medium dense, moist, light brown, gravelly silty SAND.
S-1
8
A
18
10
5
Grades to silty fine SAND, trace gravel, scattered cobbles.
8
S 2
1
Ali
8
Grades to very stiff, wet, brown, sandy SILT, trace gravel.
8
S-3
s
. 1
10
10
--------------------------------
Old Slide Material
S-4
Hard, moist, brown -gray, sandy SILT, trace gravel.
10
7
1s
21
--------------
Whidbey Formation
15
Hard, moist, blue -gray, sandy SILT, trace gravel.
14
S-5
21
�44
23
20
Very stiff, moist, blue -gray bedded SILT with few sand and thin fine sand
10
S-6
interbeds.
11
�24
13
25
Dense, blue -gray, silty fine SAND with some organic debris.
14
S-7
23
4
22
30
S-8
11
12
30
18
Bottom of exploration boring at 31.5 feet
No free ground water encountered.
35
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) n No Recovery M - Moisture Logged by: EG
m Y OD Split Spoon Sampler (D & M) U Ring Sample Q Water Level Q Approved by:
® Grab Sample 0 Shelby Tube Sample 1 Water Level at time of drilling (ATD)
Associated Earth Sciences, Inc.
Exploration Log
® ® MN U
Project Number
Exploration Number
Sheet
KE05360A
EB-3
1 of 1
Project Name Serene Creek Ground Surface Elevation (ft)
Location Edmonds, WA Datum N/A
Driller/Equipment DateStart/Finish 7/19/05,7/17/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
�
tD
cL
L
c
— N
a>
�
J
tD
N
Blows/Foot
N
a
0
S E
T m
rn 5,
0 cn
9 E
a
m
o
m
`m
t
DESCRIPTION
3
10 20 30 40
°
Topsoil
Old Slide Material
Medium dense, moist, brown, silty SAND, some gravel and organics.
S-1
10
12
•
28
16
5
Hard, moist, brown, SILT, some sand, trace gravel.
18
S2
18
AL30
22
S-3
s
•
8
17
10
S-4
7
e
A
19
11
--------------y --
Whidbey Formation
15
Dense, wet, gray, silty fine SAND, trace gravel with thin silt interbeds.
11
S 5
12
• 3
23
20
S-66
Medium dense, wet, gray, silty SAND.
10
• 2
12
--------------------------------
14
25
Hard, moist, blue -gray SILT, with fine sand and thin sand interbeds, trace
18
S'�
organics.
22
A
88
46
30
Dense, blue -gray, medium to coarse SAND with thin silt interbeds.
15
S $
24
49
25
Bottom of exploration boring at 31.5 feet
No free ground water encountered.
35
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) 0 No Recovery M - Moisture Logged by: EG
01 Y OD Split Spoon Sampler (D & M) U Ring Sample Q Water Level (). Approved by:
IN Grab Sample 0 Shelby Tube Sample 1 Water Level at time of drilling (ATD)
As§ociated Earth Sciences, Inc.
Exploration Log
® ® NN a
Project Number
Exploration Number
Sheet
KE05360A
EB-4
1 1 of 1
Project Name Serene Creek Ground Surface Elevation (ft)
Location Edmonds WA Datum NZA
Driller/Equipment Date Start/Finish 7/19/05,7/19/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
r
y
T
U—
—0
0-a
c
O
�-�
a>
>
J
=
N
Blows/Foot
N
cL
S E
m>
�E
T �'
DESCRIPTION
o
"
m
°
10 20 30 40
Fill
Loose to medium dense, moist, brown, gravelly silty SAND.
S-1
9
6
11
5
5
Loose, moist, brown, medium SAND with gravel, few silt.
3
S 2
2
. 5
3
S-3
2
•3
1
10
--------------------------------
Recent Slide Material
S-4
Medium dense, wet, brown/black, silty SAND, little gravel.
2
5
1
11
Grades to brown, medium SAND with few silt and gravel.
6
S-5
5
.
7
12
15
Old Slide Material
13
S-6
Dense, wet, brown, silty SAND with gravel.
14
41
27
Scattered cobbles.
20
Dense, wet, brown, medium SAND with sandy silt interbeds (possible
2
S7
perched groundwater).---------------------1
8
A38
Whidbey Formation
=
30
25
S-8
Very dense, wet, medium to coarse SAND, some sandy silt interbeds.
014
50/
Cobbles, hard drilling.
30
S-9
0/
5oi
Bottom of exploration boring at 31 feet
Perched water at 21'.
35
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) No Recovery M - Moisture Logged by: EG
Y OD Split Spoon Sampler (D & M) D Ring Sample SL Water Level Q Approved by:
® Grab Sample 0 Shelby Tube Sample -T Water Level at time of drilling (ATD)
Askciated Earth Sciences, Inc.
Exploration Log
® ® MN ®
Project Number
Exploration Number
Sheet
KE05360A
EB-5
I 1 of 1
Project Name Serene Creek Ground Surface Elevation (it)
Location Edmonds, WA Datum N/A
Driller/Equipment Date Start/Finish 7/12/05,Z/12/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
N
_
�o
t
c
o
az
>=
J
N
Blows/Foot
2
to
,-
n
S E
N 5,
� n
E
d
'
m
T In
0 rn
DESCRIPTION
f0
_o
m
t
°
10 20 30 40
Fill
Medium dense, brown, silty SAND with gravel.
--------------------------------
Old Slide Material
Medium dense, moist, light brown, silty SAND with gravel.
$ 1
12
13
30
17
5
S-2
1 �
♦2
15
Grades to medium SAND, trace gravel with silt interbeds.
7
S 3
8
. 1
8
10
S-4
Stiff, moist, light brown, sandy SILT.
7
11
A24
13
15
S-5
——————————— — — — — —— — — — —— —
Whidbey Formation
13
29
A
L60
Very dense, wet, gray, bedded silty SAND.
31
20
Dense, moist, gray, interbedded SILT and fine SAND, trace organics.
5
S-6
13
�44
31
25
Grades to silty SAND with interbedded SILT and sandy SILT.
y
S-7
13
29
16
30
S 8
Hard, moist, blue -gray, sandy SILT with thin sand interbeds, trace
8
organics.
14
30
16
35
S_9
13
27
53
26
Bottom of exploration boring at 36.5 feet
No free ground water encountered.
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) No Recovery M - Moisture Logged by: EG
3" OD Split Spoon Sampler (D & M) Ring Sample V Water Level () Approved by:
® Grab Sample Q Shelby Tube Sample 1 Water Level at time of drilling (ATD)
Astociated Earth Sciences, Inc.
Exploration Loci
® ® NN U
Project Number
Exploration Number
Sheet
KE05360A
EB-6
1 1 of 1
Project Name Serene Creek Ground Surface Elevation (ft)
Location Edmonds, WA Datum N/A
Driller/Equipment Date Start/Finish 8/1 D/05 8/10/05
Hammer Weight/Drop 140# / 30" Hole Diameter (in)
N
U O
C
O
n
N
>
m
3
BIOWS/FOOL
V1
a
S E
`` >
C� cn
o
m
m
t
0
T im
DESCRIPTION
6
3
O
10 20 30 40
Forest Duff
Old Slide Material
5
S-1
Dense, moist, brown to gray, gravelly silty SAND.
16
(Dense, moist, brown, gravelly silty SAND [landslide debris))
23
•43
20
10
S-2
Medium dense, moist, brown, sandy SILT with fine sand interbeds.
7
10
�23
13
15
S 3
Brown, gray, with inclined bedding.
6
5
A
7
12
Whidbey Formation
Moist, brown, medium SAND, trace silt.
20
S 4
Medium dense, moist, gray, sandy SILT with fine-grained sand lenses.
7
6
. 12
6
25
S-5
Wet.
i
4
s
A1
10
30
S-6
Green/gray.
7
8
19
=
11
35
S-7
Dense, wet, gray, fine-grained SAND with thin silt lenses.
y
14
�23
19
Bottom of exploration boring at 36.5 feet
Ground water seepage at 26' and 32'.
Sampler Type (ST):
m 2" OD Split Spoon Sampler (SPT) No Recovery M - Moisture Logged by: EG
3" OD Split Spoon Sampler (D & M) U Ring Sample S_Z Water Level Q Approved by:
® Grab Sample Shelby Tube Sample 1 Water Level at time of drilling (ATD)
A
-uxao lye
i
sa i n � -
' i ._.-c9 —i•. E-rcca}etn,w) _---__. ��--.-. (\'J � �.�.� `,- --,` '. __ '—� ss- 1 f -_
ca
pli
I .-% •� -, �'' l � !fir � I � - \-�_-_ '-`_. \, \ ---- _.. -�\ .� i �
WNCNwax
l
O
60
Mar
a 9 ■ EP-8- ----- ----
EP-5` _ j , \ O 1 _1Ad 0
LEGEND
■ EP-10 APPROXIMATE LOCATION OF
Oer
l EXPLORATION PIT
., -■ EP-4 _E6-3 -- - `• • EB-4 APPROXIMATE LOCATION OF
■ EP-1 EXPLORATION BORING
nmT
/1• , � I,* ER-6- ---' � ?yam...--- _CEP-
-rl.a(2<?vN)—J.?t—
86A99• ml /34YE(g4= of )
d — -- ewe amc
—rorru, / t
amen) ads• • Q wiw
rvurm I/
Reference: PGS, Inc. Lv 1 -
Associated Earth Sciences, Inc. SITE AND EXPLORATION PLAN FIGURE z
® ® ® ® SERENE CREEK SATE 8105
EDMONDS, WASHINGTON PROJECT NO. KE05360A
190
180
170
160
p
w
UJ 150
z
0
140
w
J
w
130
120
110
'7
N � to D wOOO N
T T T T
HORIZONTAL DISTANCE (FEET)
VERTICAL EXAGGERATION = 1x
B'
i
190
180
170
160
150
140
130
120
110
m
Associated Earth Sciences, Inc. GEOLOGIC CROSS SECTION B-B' FIGURE 4
SERENE CREEK ' DATE 08/05
® ® ® ® EDMONDS, WASHINGTON PROJECT NO. KE05360A
i
E
.3
CV
C
190
190
�
O
w
180
180
LL
LU
w
W
tO
wZ
coL
W�
�O
W?Ch
170
170
160
Fill
_"_
164
Hard, Moist,
16
,-.
Tan Silt, few Sand, Trace Gravel with
40
w
scattered Fine Sand Interbels
150
w 150
v
(Old Slide Material)
57
i
35
z
—
\
I
140
140
Very Stiff to Hard, Blue -Gray Silt,
4U
\
W
some Sand with Fine Sand Bedding
ASSUMED SOIL
25
\
CONTACT LINE
\
130
130
(Whidbey Formation)
7YP
40
\
120
\
120
110
110
N C(D CD
O f�V
�'
Q CD
CEO co
N N N
HORIZONTAL DISTANCE (FEET)
VERTICAL EXAGGERATION = 1x
Associated Earth Sciences, Inc. GEOLOGIC CROSS SECTION C-C' FIGURE 5
® ® ® ® DATE 08/05
�•
SERENE CREEK
�'' EDMONDS, WASHINGTON PROJECT NO. KE05360A
OEOTECH
CONSULTANTS, INC.
13256 Northeast 20th Street, Suite 16
Bellevue, Washington 98005
(425) 747-5618 FAX (425) 747-8561
August 29, 2005
JN 05231
ECEC
10928 — 59th Avenue West
Mukilteo, Washington 98275
Attention: Saeed Soleimanpour
Subject: Transmittal Letter — Preliminary Geotechnical Engineering Study
Proposed Residential Development
16612 — 74th Place West
Edmonds, Washington
Dear Mr. Soleimanpour:
We are pleased to present this preliminary geotechnical engineering report for the proposed
residential development to be constructed in Edmonds, Washington. The scope of our services
consisted of exploring site surface and subsurface conditions, and then developing this preliminary
report with regards to the stability of the site slopes and foundation considerations. This work was
authorized by your acceptance of our proposal, P-6764, dated June 1, 2005.
The attached preliminary report contains a discussion of the study and our recommendations.
Please contact us if there are any questions regarding this preliminary report, or for further
assistance during the design and construction phases of this project.
DRW: esn
Respectfully submitted,
W
LTANTS, INC.
D. Robert Ward, P.E.
Principal
AT- �� C !4 /►dill
1
GEOTECH CONSULTANTS, INC.
PRELIMINARY GEOTECHNICAL ENGINEERING STUDY
Proposed Residential Development
16612 — 74th Place West
Edmonds, Washington
This preliminary report presents the findings and recommendations of our preliminary geotechnical
engineering study for the site of the proposed residential development to be located in Edmonds.
No formal plans for the development were available at the time this report was prepared. However,
based on discussions with Mr. Saeed Soleimanpour, we understand that the property will be platted
into seven residential lots. A driveway for the lots will access from 76th Avenue West at the
southwestern corner of the property. The southeastern corner and northern tip of the property will
be left undeveloped. It is likely that four lots will be located in the more flat to gently sloped, central
portion of the site, with three lots located on the western, sloped portion of the site.
SITE CONDITIONS
SURFACE
The Vicinity Map, Plate 1, illustrates the general location of the site in the Meadowdale area of
Edmonds. The site is nearly four sided, having longer dimensions on the western and eastern
sides. The southern end is wider than the northern end. The western side of the site is bordered
by 74th Place West, while the eastern side is bordered by 76th Avenue West. One distinguishing
site feature is a stream that flows downward to the south/southwest on the southeastern portion of
the site. Near the southeastern corner of the site, a steep slope descends westward approximately
20 to 45 feet down to the stream. An approximate 10-foot-tall, moderate slope rises to the
west/northwest from the stream on the western side of the stream. A relatively flat ridge nearly
parallels the stream, and descends gently to moderately from 74th Place West to the southwest to
the southern property line. The area west of this ridge is somewhat flat to gently sloped. Adjacent
to this area, along the western side of the property, the ground slopes mostly moderately downward
to the west to the western property line, having inclinations less than 40 percent. At the north end
of the site, a steep slope having an inclination of approximately 60 percent declines to the northern
property line from the somewhat flat area. A very steep, approximately 8- to 15-foot-tall slope.
declines downward to the west and north below the western and northern property lines. The very
steep slope to the west ends at 76th Avenue West, while the very steep slope to the north ends in
an adjacent residential property. It is very apparent that these very steep slopes were created
because of an excavation. We found a topographic map for the area from the 1940's that indicated
that 76th Avenue West was in -place when the map was published. Therefore, the steep slope near
this street is likely at least 60 years old. We did not observe indications of instability of this steep
slope.
Most of the site is generally densely vegetated. The western slope and the ridge area near the
south and central portions of the site are mostly covered with a mature forest that includes some
large evergreen trees. These trees appear to be growing very vertically, indicating that the slopes
they are growing on are relatively stable. Several deciduous trees are growing in other areas.
However, the flat area on the northeastern portion of the site contains few trees; it may have been
cleared recently.
GEOTECH CONSULTANTS, INC.
ECEC JN 05231
August 29, 2005 Page 2
Although the site is not developed, a sanitary sewer is located at the top of the moderate and steep
slope on the northwestern portion of the site. This sewer extends down the moderate slope near
the western -central portion of the site, connecting to a sewer in 76th Avenue West. There are no
other formal developments on the site, but it appears to us that grading was done on the central
portion of the site in the past. In addition, a small dirt trail, wide enough for a vehicle, traverses the
moderate western slope near the southwestern portion of site; also an indication of past grading.
SUBSURFACE
The subsurface conditions were explored by excavating ten test pits and six borings at the
approximate locations shown on the Site Exploration Plan, Plate 2. No explorations were done on
the steep slope areas at the southeastern or northern portions of the site due to access difficulties
and because these areas were not in a development plan at the time this report was prepared. Our
exploration program was based on the proposed construction, subsurface conditions encountered
during exploration, and the scope of work outlined in our proposal.
The test pits were excavated on June 3, 2005 with a trackhoe. A geotechnical engineer from our
staff observed the excavation process, logged the test pits, and obtained representative samples of
the soil encountered. "Grab" samples of selected subsurface soil were collected from the backhoe
bucket. The Test Pit Logs are attached to this report as Plates 3 through 10.
The borings were drilled on July 11 and August 10, 2005 using a track -mounted, hollow -stem auger
drill and a portable Acker drill (this drill system utilizes a small, gasoline -powered engine to advance
a hollow -stem auger to the sampling depth.) Samples were taken at 5-foot intervals with a
standard penetration sampler. This split -spoon sampler, which has a 2-inch outside diameter, is
driven into the soil with a 140-pound hammer falling 30 inches. The number of blows required to
advance the sampler a given distance is an indication of the soil density or consistency. A
geotechnical engineer from our staff observed the drilling process, logged the test borings, and
obtained representative samples of the soil encountered. The Test Boring Logs are attached as
Plates 11 through 16.
Soil Conditions
The explorations encountered three generalized soil strata. One soil type, generally the
uppermost soil found in the central and the ridge area of the site, is unengineered fill. This
soil was found to mostly consist of silty sand and sand. It was found as deep as 10 feet.
Below the fill, and/or near the ground surface in the explorations, was a native, medium -stiff
to stiff, sometimes medium -dense, mostly sandy silt soil with intermixed sand. This silt was
mostly found to depths of about 12 to 15 feet, although it was only found to be
approximately 6 feet deep near the top of the steep northern slope in a test pit and
approximately 30 feet deep in a test boring near the base of an approximately 35-percent
slope near the northwestern portion of the site. This soil was found to have some significant
fracture planes and inclined bedding; therefore, we believe that this soil layer was involved
in an ancient landslide (thus geologically termed colluvium). The soil below this colluvium
was very similar in composition to the colluvium, but was much stiffer/denser and did not
appear to have been involved in a landslide.
GEOTECH CONSULTANTS, INC.
ECEC
August 29, 2005
Groundwater Conditions
JN 05231
Page 3
Little groundwater seepage was observed in a few of the explorations at depths greater
than 10 feet. The explorations were left open for only a short time period, thus the seepage
levels on the logs represent the location of transient water seepage and may not indicate
the static groundwater level. Groundwater levels encountered during drilling can be
deceptive, because seepage into the boring can be blocked or slowed by the auger itself.
It should be noted that groundwater levels vary seasonally with rainfall and other factors. It
is possible that groundwater could be found between the fill soils and the less permeable silt
soils, or near the lower levels of the colluvium, or in sand layers in the colluvium during the
normally wet winter and spring months.
The stratification lines on the logs represent the approximate boundaries between soil types at the
exploration locations. The actual transition between soil types may be gradual, and subsurface
conditions can vary between exploration locations. The logs provide specific subsurface
information only at the locations tested. Where a transition in soil type occurred between samples
in the borings, the depth of the transition was interpreted. The relative densities and moisture.
descriptions indicated on the test pit and boring logs are interpretive descriptions based on the
conditions observed during excavation and drilling.
The compaction of backfill was not in the scope of our services. Loose soil will therefore be found
in the area of the test pits. If this presents a problem, the backfill will need to be removed and
replaced with structural fill during construction.
STABILITY ANALYSIS
As noted earlier, we believe that the upper native soils at the site was likely involved in a landslide.
Based on our experience and published geotechnical information, native silt soils are found to have
a low cohesion value and a low friction angle. However, the colluvium silt at this project site
appears to have more shear strength than a typical, newer colluvium material. We assumed that it
has a low cohesion value of 50 psf. To determine soil friction angle of the colluvium at the site, we
performed a slope stability analysis of the approximate 15-foot-tall, steep slope that is just above
76th Avenue West. Because this slope has apparently been relatively stable for at least 50 years,
we assumed that it has at least a safety factor of 1.1 (a safety factor of 1.0 is considered borderline
stable). Using the WINSTABL computer program, which was developed by Purdue University and
uses a Modified Janbu analysis, we determined that the friction angle for the colluvium soil to be 26
degrees for a safety factor of 1.1.
We then performed stability analyses on two areas of the western slope; one where the slope
inclination is just less than 40 percent near the northwestern portion of the site, and another near
the southwestern portion where the slopes are in the range of 25 percent. The soil parameters
assumed and determined for the colluvium soil was used in the analyses, along with much higher
soil parameters that we assumed for the very stiff/dense lower soils. The assumed cohesion and
friction angle for the very stiff/dense soils are 100 psf and 38 degrees, respectively. We found that
for a static condition, a safety factor of approximately 1.3 exists for the northwest slope, while a
safety factor of approximately 1.8 exists for the southwest slope. A printout of these two analyses
are included with this report
GEOTECH CONSULTANTS, INC.
ECEC
August 29, 2005
CONCLUSIONS AND RECOMMENDATIONS
GENERAL
JN 05231
Page 4
THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A
GENERAL OVERVIEW ONLY. MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE
CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY RELYING ON THIS REPORT SHOULD
READ THE ENTIRE DOCUMENT.
The explorations conducted for this study generally encountered up to 10 feet of relatively loose fill
soil in the flatter, central portion of the site. Below the fill in the central area and near the ground
surface in the more sloped western side, the explorations generally encountered up to 15 feet of a
mixture of native, medium -stiff to stiff silt and medium -dense sand; however, one test boring
revealed this soil to a depth of approximately 30 feet. Although the stiffness/density of this soil was
moderate, it appears, based on its appearance and consistency, that this soil was likely involved in
a landslide (colluvium). The forest cover on the western slope indicates that it has been stable for
quite some time. Based on the forest cover, and the moderate stiffness/density of this soil (which
is much stiffer/denser than most colluvial soils that we have encountered in the Puget Sound
region), we believe that the landslide occurred quite some time ago, likely 500 to 10,000 years ago.
The soil encountered in the explorations below this likely colluvial soil consisted of very stiff/dense
silt and sand.
It is our professional opinion that the site is suitable for a residential development from a
geotechnical engineering standpoint. However, there are some significant geotechnical
engineering issues that need to be addressed to make the project safe and suitable from a
geotechnical engineering standpoint. The most significant issues are addressed below.
The colluvial soil is suitable to support loads associated with residences in areas where the ground
is relatively flat, which is in the central portion of the site. It appears that this soil is located near the
ground surface in a portion of this central area, but some unengineered fill soil up to as deep as 10
feet is located over the colluvial soil. The fill is not suitable to support residence loads. Therefore,
where the fill is located, either it should be removed and replaced with structural fill below the
foundation level of the new residences, or it could be left in place and the residences supported on
a pile foundation. Because the area of the fill is relatively flat, we believe that the most economic
pile foundation in the fill area is driven steel pipe piles. These piles provide a very good vertical
capacity in relation to the weight of a residence. The piles provide only minimal lateral capacity, but
only little is needed because of the flatness of the area.
Another significant geotechnical engineering consideration for this project site is the northwestern
and western slopes. Although competent soil was revealed relatively close to the ground surface
near the top of the northwestern slope, it has a very steep inclination. Based on conversations with
the other project consultants, we have decided that it is best not to construct any residences on the
very steep northwestern slope. Residences will only be constructed where the slope inclination is
40 percent or less, which is on the western side of the site. Although the western slope has more
moderate inclinations, it is underlain by the colluvial soil. Our stability analyses indicate that a
concrete pier foundation is needed for all or most of the residences on the western slope. It may
be possible to support the southernmost residence where the slope inclination is the least on . a
more conventional foundation, but that cannot fully be determined until the actual residence layout
is completed. At least the two northernmost residences on the western slope will have to be
supported on concrete piers, with the one furthest to the north likely having the most and/or largest
piers. Due to the colluvial soil and the potential for soil movement of the residence if it were placed
GEOTECH CONSULTANTS, INC.
ECEC JN 05231
August 29, 2005 Page 5
on a conventional foundation, the downslope piers will have to be closely spaced and extend well
into the stiff/dense soil below the colluvium. The actual spacing and depth of the piers will need to
be determined after the residence layout is completed. The closely spacing of the piers will provide
lateral support for the residences, deterring any downslope or lateral movement of the residences.
The amount of steel in the closely spaced piers will be considerable. However, this foundation
system will provide for the welfare and safety of the residence and its inhabitants if any movement
of the slope were to occur. As noted earlier, it does not appear as though the western slope that is
inclined less than 40 percent has moved in the recent past; however, the residences need to be
designed for this potential, (but probably unlikely) movement.
The existence of the fill soil on the central portion of the site and the colluvium on the western slope
portion will increase foundation costs for a residence in comparison to a site where competent soil
is located approximately 3 to 4 feet below the ground surface and conventional footings can be
used (which is relatively common). Although estimating the additional costs of foundations at this
site is very difficult at this stage of development, and contractors should be consulted for more
accurate costs, we estimate that the foundation costs of half of the residences in the flat, central
area will be approximately $20,000.00 more than a conventional foundation. For the western
residences, the southernmost foundation may be approximately $20,000.00 more than
conventional, but the northernmost residence's foundation will likely be approximately $50,000.00
to $75,000.00 more than conventional. More accurate costs can be determined by a contractor
once the residence layouts are completed and a more thorough geotechnical engineering analysis
can be done.
The City of Edmonds has a potential soil movement map of the Meadowdale area, of which this site
is at its southern end. This map was apparently updated in 1984. The map indicates that most of
the site, with the exception of the northwestern end, has a 2 percent potential for shallow soil
movement in a period of 25 years. This calculates to a return period of approximately 1,200 years.
Because we did not observe indications of surface soil movement, we believe that the map is
relatively accurate. However, the map indicates that for the northwestern slope, there is a 30
percent chance of deep soil movement in 25 years. This calculates to a return period of
approximately 75 years. Based on competent soil found near the ground surface in explorations
located near the top of the northwestern slope, we do not believe that this assessment of soil
movement for this area is accurate.
Where on -site soil is sandy, it may be reused as structural fill and/or wall backfill. However, the
colluvial soil will generally not be suitable for these uses.
Geotech Consultants, Inc. should be allowed to review more specific development plans and to
then provide more specific foundation and other recommendations. Such a review and further
design study would be additional work beyond the current scope of work for this study, and it may
include revisions to our recommendations to accommodate site, development, and geotechnical
constraints that become more evident during the review process.
SEISMIC CONSIDERATIONS
The site is located within Seismic Zone 3, as illustrated on Figure No. 16-2 of the 1997 Uniform
Building Code (UBC). In accordance with Table 16-J of the 1997 UBC, the site soil profile within
100 feet of the ground surface is best represented by Soil Profile Type Sp (Stiff Soil). Under the
2003 International Building Code (IBC) the Soil Class would be D. The site soils are not
GEOTECH CONSULTANTS, INC.
ECEC JN 05231
August 29, 2005 Page 6
susceptible to seismic liquefaction because of their relatively dense and fine-grained nature, and
the absence of near -surface groundwater.
EXCAVATIONS AND SLOPES
Excavation slopes should not exceed the limits specified in local, state, and national government
safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in
unsaturated soil, if there are no indications of slope instability. However, vertical cuts should not be
made near property boundaries, or existing utilities and structures. Based upon Washington
Administrative Code (WAC) 296, Part N, the soil at the subject site would generally be classified as
Type B. Therefore, temporary cut slopes greater than 4 feet in height should not be excavated at
an inclination steeper than 1:1 (Horizontal:Vertical), extending continuously between the top and
the bottom of a cut.
The above -recommended temporary slope inclination is based on the conditions exposed in our
explorations, and on what has been successful at other sites with similar soil conditions. It is
possible that variations in soil and groundwater conditions will require modifications to the.
inclination at which temporary slopes can stand. Temporary cuts are those that will remain
unsupported for a relatively short duration to allow for the construction of foundations, retaining
walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet
weather. It is also important that surface water be directed away from temporary slope cuts. The
cut slopes should also be backfilled or retained as soon as possible to reduce the potential for
instability. Please note that sand and loose soils can cave suddenly and without warning.
Excavation, foundation, and utility contractors should be made especially aware of this potential
danger. These recommendations may need to be modified if the area near the potential cuts has
been disturbed in the past by utility installation, or if settlement -sensitive utilities are located nearby.
All permanent cuts into native soil should be inclined no steeper than 2.5:1 (H:V). Fill slopes
should also not be constructed with an inclination greater than 2.5:1 (H:V). To reduce the potential
for shallow sloughing, fill must be compacted to the face of these slopes. This can be
accomplished by overbuilding the compacted fill and then trimming it back to its final inclination.
Adequate compaction of the slope face is important for long-term stability and is necessary to
prevent excessive settlement of patios, slabs, foundations, or other improvements that may be
placed near the edge of the slope.
Water should not be allowed to flow uncontrolled over the top of any temporary or permanent
slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation
to reduce erosion and improve the stability of the surficial layer of soil. Topsoil is often placed on
regraded slopes to promote growth of vegetation. Proper preparation of the regraded surface, and
use of appropriate topsoil is necessary to prevent the topsoil from sliding off the slope. This is
most likely to occur following extended wet weather if a silty topsoil is used. On steeper slopes, it
may be necessary to "track walk" the slope or cut small grooves across the slope prior to placing
the topsoil.
Any disturbance to the existing slope outside of the building limits may reduce the stability of the
slope. Damage to the existing vegetation and ground should be minimized, and any disturbed
areas should be revegetated as soon as possible. Soil from the excavation should not be placed
on the slope, and this may require the off -site disposal of any surplus soil.
GEOTECH CONSULTANTS, INC.
ECEC
August 29, 2005
DRAINAGE CONSIDERATIONS
JN 05231
Page 7
Foundation drains should be used for residences where (1) crawl spaces or basements will be
below a structure, (2) a slab is below the outside grade, or (3) the outside grade does not slope
downward from a building. Drains should also be placed at the base of all earth -retaining walls.
These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then
wrapped in non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its
highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor
or the level of a crawl space, and it should be sloped for drainage. All roof and surface water
drains must be kept separate from the foundation drain system. For the best long-term
performance, perforated PVC pipe is recommended for all subsurface drains.
LIMITATIONS
The analysis, conclusions, and. recommendations contained in this report are based on site
conditions as they existed at the time of our exploration and assume that the soil and groundwater
conditions encountered in the test pits and borings are representative of subsurface conditions on
the site. If the subsurface conditions encountered during construction are significantly different
from those observed in our explorations, we should be advised at once so that we can review these
conditions and reconsider our recommendations where necessary. Unanticipated soil conditions
are commonly encountered on construction sites and cannot be fully anticipated by merely taking
soil samples in test pits and borings. Subsurface conditions can also vary between exploration
locations. Such unexpected conditions frequently require making additional expenditures to attain
a properly constructed project. It is recommended that the owner consider providing a contingency
fund to accommodate such potential extra costs and risks. This is a standard recommendation for
all projects.
This report has been prepared for the exclusive use of ECEC, and its representatives, for specific
application to this project and site. Our recommendations and conclusions are based on observed
site materials and engineering analyses. Our conclusions and recommendations are professional
opinions derived in accordance with current standards of practice within the scope of our services
and within budget and time constraints. No warranty is expressed or implied. The scope of our
services does not include services related to construction safety precautions, and our
recommendations are not intended to direct the contractor's methods, techniques, sequences, or
procedures, except as specifically described in our report for consideration in design. Our services
also do not include assessing or minimizing the potential for biological hazards, such as mold,
bacteria, mildew and fungi in either the existing or proposed site development.
ADDITIONAL SERVICES
In addition to reviewing plans for the project, Geotech Consultants, Inc. should be retained to
provide geotechnical consultation, testing, and observation services during construction. This is to
confirm that subsurface conditions are consistent with those indicated by our exploration, to
evaluate whether earthwork and foundation construction activities comply with the general intent of
the recommendations presented. in this report, and to provide suggestions for design changes in
the event subsurface conditions differ from those anticipated prior to the start of construction.
However, our work would not include the supervision or direction of the actual work of the
contractor and its employees or agents. Also, job and site safety, and dimensional measurements,
will be the responsibility of the contractor.
GEOTECH CONSULTANTS, INC.
ECEC
August 29, 2005
JN 05231
Page 8
During the construction phase, we will provide geotechnical observation and testing services when
requested by you or your representatives. Please be aware that we can only document site work
we actually observe. It is still the responsibility of your contractor or on -site construction team to
verify that our recommendations are being followed, whether we are present at the site or not.
The following plates are attached to complete this report:
Plate 1 Vicinity Map
Plate 2 Site Exploration Plan
Plates 3 - 10 Test Pit Logs
Plate 11 -15 Test Boring Logs
Appendix Slope Stability Analysis
We appreciate the opportunity to be of service on this project. If you have any questions, or if we
may be of further service, please do not hesitate to contact us.
DRW: esn
Respectfully submitted,
GEOTECH CONSULTANTS, INC.
D. Robert Ward, P.E.
Principal
GEOTECH CONSULTANTS, INC.
yBpO
20
T"
Qy
�j.GN
4 S�AI'N.W15H
COUNTY AIRPORT
HINT 0R
21
• oq
y9 t'�
22
IlH
5T SN nv�
1N
z
HARBOUR: POINTEa
Q`
o
pal
P
V
r^
LT
E ,Rl
]2157 Sl
�`D>
POINj�
41� A
2
SWNAftBOUR
a
5'-"
r as" ri qqW
27
y
sI
HAIINEY RD-
Rr
m d1c
'
CyrC
� x:: ��,
'q'
•►
y115'L
�
wn
Sh
ST
PU7ET
s'Iw
' 137TN P "
�.sr
�'N PL H '
136TH
- A
mr ~
Psni SN
•IP < a
("
�
a PL'Sv
r
) AA t(��
7 )
Sr L�f', L'
c rt sr
d ' s n.� :
Knl ar10 n 1
': 1'%9N'y1 1
iunauu a
-
p i PS
SERENE 34
32
>y sr +'+ 140
ST PICNIC PO
N R �J4���
EfroEA
1ao $ a; < t
`
tsr sr sN 33
uxF
51
142M
N
ST
NORMA
,E Q
EACH'
44 1T
., ..�,� =
200
5lu
SERENE
;i
,,�
�
'
_
=
.6<N S< O
y
faa'
:
Aa a Q
U <
f FL �•,n wsi
s
z FISHER
1
'
>
1
Q
R
nn r< ar
5200
SY v ^
Sw 9 t
S1 Sf 50TH <��
__
'�
<' 1N PL SN <'
rm.
Y 1. a ,� SE
1
1�yTH
sM 1191T PL Sll /2W
BEM
SM PL 'CT;'
1� Rz a
170Ii(•
P<
i
s
L
3 1
1
bFAoo►n1LE
$
_
t
<TZ
152
Fs a
ST
a'
SM
ISZND
Is2m
1
PL SW..
tdl.
�3
----
15671sw
<
1s.�
sErH sr sw
51,8
1
a
s ..
,`
17 _
_.• -
sN
g
N
14
k f
Y PL SY
N
,
rr
[
p.
=
PARY t 3 v
i
< >
157TN
ST SW
1
�y7 3
�
6BTH
_._..
d
1I
158rN
rt
>
<
a
V
NEALI KWE
�t
14M
4F,C7dN� SITE
F6
NST
s
a a
Sw
C
I61Sf
P(Iq�l
L E 1 �pN,.LIY
-
NR
,
-
, �,
�+
3
B:4I' /' .
T
Sw $
---
0
163RD
L SW
614
RSw
165TH PL Sr.�:.�,:.
> g a 1
N
164
ST
-
i Sy
J} Q I
nhL-_
Tt91f�
_ 16
,Pl165
tstN
_ IrA Cl) L
GEOTECH
CONSULTANTS, INC.
(Source: The Thomas Guide, Snohomish County, Washington,
N
1998)
VICINITY MAP
166xx - 74th Avenue West
Edmonds, Washington
Job No: Date: Plate:
05231 1 August 2005
I NO,
'00..
.00
.•
.000•'
C
TP-4
TP-6
0
B-6
B-2
•' j
venve�est �••�''�-•�'•
P ;
U
TP-7
TP-8 j
0 TP-9
� 1
1
i 1
B-3
TP-1 1
0 1
j
�TP-10
B-5 1
1
i
TP-3 j
0 TP-2
0
GEOTECH
CONSULTANTS, INC.
SITE EXPLORATION PLAN
166xx - 74th Avenue West
Edmonds, Washington
Job No:
Date:
Plate:
05321
August 2005
No Scale
2
5
10
15
`IO< TEST PIT 1
�1ti��yoPti���a�ti� cc:,
6 -5 Description
n-brown SILT, blocky, low plasticity, very moist, stiff (Colluvium)
becomes less blocky, with occasional rusted fracture planes
with bedding planes, occasional fine sands
* Test Pit was terminated at 10 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
* No caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: I Plate:
05231 Aug.2005 JMJ 3
5
10
04'`�o�ti���aa,�ti� 5G5
G
TEST PIT 2
Description
FILL Brown, silty SAND, fine- to medium -grained, occasional roots, moist, loose (FILL)
Orange -brown, silty SAND, fine- to medium -grained, moist, loose to medium -dense
SM - becomes tan -brown, medium -dense to dense
- becomes dense, partially with gravel
und
Tan -brown with orange mottling SILT, fractured, non -plastic, very moist, mixed with
moist, tan -brown SAND (Colluvium)
ML - silt becomes fine, more sandy
SP - becomes clayey, hard (not colluvium)
* Test Pit was terminated at 17 feet on June 3, 2005.
* Slight groundwater seepage was observed at 17 feet during excavation.
* Slight caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: I Plate:
05231 Aug.2005 JMJ 4
5
10
15
TEST PIT 3
45 Description
Tan -brown SAND, fine- to medium -grained, moist, loose
7SP
IGray-brown, silty SAND, with gravel, fine- to medium -grained, moist, ��e_dium-
dense, fractured, mixed with tan -brown SAND (Coiluvium)
!_Pm
1,11,11
Gray -brown, silty SAND, with gravel, fine- to medium -grained, moist, dense
Test Pit was terminated at 8 feet on June 3, 2005, due to trackhoe reach
limit
No groundwater seepage was observed during excavation.
Slight caving was observed above 3 feet during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by. Plate:
05231 Aug.2005 I imi 1 71
{��,\�l <
o oe,� o-�
�a�ti
G
5
10
15
5 TEST PIT 4
G
�5 Description
Brown, silty SAND, with large tree roots, fine- to medium -grained, very moist, loose
(FILL)
FILL
Gray, sandy SILT to silty SAND, non -plastic, fine-grained, with lenses of sand, fine-
SM to medium -grained, very moist, loose (landslide debris?)
ML
Gray -brown with orange mottling SILT, low plasticity, blocky with iron stains on
fractures, very moist (Colluvium)
ML
- becomes massive (not colluvium)
- becomes sandy, non -plastic, stiff
- becomes silty, low plasticity, very stiff
" Test Pit was terminated at 18 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
* No caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by. Plate:
05231 Aug.2005 I JMJ I 6
5
10
15
5
10
15
CICD
9�4 Go 1 a0 �5
0
TEST PIT 5
12" of Topsoil
Description
Tan -brown SILT, highly fractured, low plasticity, very moist, stiff (Colluvium)
becomes more brown, massive, very stiff (not colluvium)
* Test Pit was terminated at 12 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
* No caving was observed during excavation.
SILT
TEST PIT 6
Description
moist. medium -stiff
)rown SILT, massive, low plasticity, fractured, very moist, stiff, mixed with
rown SAND, fine- to medium -grained (Colluvium)
* Test Pit was terminated at 12 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
" No caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: Plate:
05231 Aug.2005 I JMJ 7
5
10
TEST PIT 7
Description
rown, silty SAND, trace gravel, fine- to medium -grained, very moist, loose (FILL)
Orange -brown SILT, low plasticity, slightly fractured, very moist, stiff (Colluvium)
becomes tan -brown, occasional sand lenses
- tree root
- becomes very stiff, with heavy orange mottling (not colluvium)
- no mottling, more sandy
* Test Pit was terminated at 17 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
* Moderate caving was observed above 7 feet during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: Plate:
05231 Aug.2005 1 JMJ f 8
5
10
15
10
15
4o����a�roti� G5
Go
12" of Topsoil
TEST PIT 8
Description
Orange -brown SAND, with gravel, fine- to medium -grained, moist, loose (FILL)
FILL
FILL pray 61L 1, low plasticity, very moist, stiff (FILL)
nge-brown SANU, tine- to medium -grained, moist, loose
sp
- becomes tan -brown, wet, medium -dense
w^r o ti� aa%%e, 5
* Test Pit was terminated at 12 feet on June 3, 2005.
* Moderate groundwater seepage was observed at 11 feet during excavation.
* Moderate caving was observed during excavation.
TEST PIT 9
Description
nge-brown, silty SAND, with roots, fine- to medium -grained, moist, loose
an -brown SILT, fractured, low plasticity, very moist, stiff (Colluvium)
becomes massive, very stiff
* Test Pit was terminated at 9 feet on June 3, 2005.
• No groundwater seepage was observed during excavation.
* No caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: I Plate:
05231 Aug.2005 I JMJ 9
5
10
15
° o��e� a�'0%G �G5
9 G
TEST PIT 10
Description
range -brown, silty SAND, with trace gravel, roots, moist, loose
- becomes gray -brown, dense
Gray -brown SILT, low plasticity, slightly fractured, very moist, stiff
Gray -brown SILT, low plasticity, fractured, very moist, stiff, mixed with tan -brown
SAND (Colluvium)
* Test Pit was terminated at 14 feet on June 3, 2005.
* No groundwater seepage was observed during excavation.
* No caving was observed during excavation.
GEOTECH
CONSULTANTS, INC.
TEST PIT LOGS
16612 - 74th Place West
Edmonds, Washington
Job Date: Logged by: Plate:
05231 Aug.2005 1 JMJ 1 10
5
10
15
20
25
30
35
40
<� o� BORING 1
�
SSG Description
16
40
57
35
26
29
40
1 25
1 40
ML
Gray -brown, sandy SILT, with shards of very stiff gray silt, fractured, low to
1 non -plasticity, very moist, stiff (Colluvium)
20 Gray SILT, with occasional thin sand lenses, low plasticity, very moist,
very stiff
ML
3 1 - with orange mottling
-i
9 - becomes hard
I
* Test boring was terminated at 36.5 feet during drilling on July 11, 2005.
* No groundwater seepage was encountered during drilling.
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job IDAauqust
te: Logged by: Plate:
05231 2005 JMJ 11
5
1 10
1 15
1 20
1 25
30
BORING 2
Description
II1111
IIIIII
111111
111111
18 1 K ; SM Orange -brown, silty SAND, trace gravel, fine- to medium -grained,
moist, medium -dense
II IIII
16 2 II I111
- becomes tan brown, no gravel
II I111
II1111
22 3 ML Tan -brown SILT, distorted bedding, fractured, low plasticity, very moist,
medium -stiff (Colluvium)
37 4 loll ' ' Tan -brown, silty SAND, fine-grained, moist, dense
1
SM
1
I II IIII
II1111
44 51 Gray -brown SILT, laminated, low plasticity, very moist, very stiff
ML
24 6
IIIIIII
Gray SILT, low plasticity, interbedded with silty sand, fine- to
24 7 ' ' ' ' ' medium -grained, very moist, stiff
IIIIIII
IIIIIII
1 I
SM
I I
IIIIIII
I I11111
1111111
IIIIIII
24 8
* Test boring was terminated at 31.5 feet during drilling on July 11, 2005.
* No groundwater seepage was encountered during drilling.
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job Date: I Logged by: Plate:
05231 August 2005 JMJ 1 12
41
G° 1�0 �a
5
10
15
20
25
30 1
35
40
28
40
28
19
BORING 3
456,
Description
1 M Tan -brown SILT, low plasticity, very moist, medium -stiff (Colluvium)
2 ML - becomes very stiff, laminated
11M,
m
1 49
- becomes less stiff, with steeply inclined bedding planes
Tan -brown, silty SAND, fine- to medium -grained, very moist, dense
- becomes gray
7
Dark gray -brown SILT, low plasticity, very moist, hard
ML
8 SF Gray SAND, fine- to medium -grained, wet, dense
* Test boring was terminated at 31.5 feet during drilling on July 11, 2005.
* Groundwater seepage was encountered at 30 feet during drilling.
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job Date: I Logged by. Plate:
05231 1 August 2005JMJ 1 13
BORING 4
4�':CYO
CP
Description
Topsoil
5
FILL Tan -brown SAND, fine- to medium -grained, moist, loose (Fill)
3 3 Gray to brown, silty SAND, fine- to medium -grained, wet, loose
10 16 41
17 5 Tan -brown SAND with sift, fine- to medium -grained, moist, medium -dense
15— . ........
41 6 f becomes silty, very moist, dense
SP
SM J
20
38 7
Gray -brown SAND, fine- to medium -grained, moist, dense
25—
50/4" 8 L! _PJ:
77:77. becomes coarse, wet, very dense
3050/5"
—
* Test boring was terminated at 30 feet during drilling on July 11, 2005.
* Groundwater seepage was encountered at 28 feet during drilling.
35
40
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job jDate: Logged by. Plate:
05231 August 2005 imi 1 14
10
15
20
25
30
35
40
o til'(( a'`e, o�y{400ti e BORING 5
4Go�ti `�,Saro� �� 4� 5a � �SG� Description
30
26
16
26
1111111W11111
44
29
30
53
1 11111
11 1 1 1 1
II1111
1 SM Tan -brown, silty SAND, fine- to medium -grained, moist, medium -dense to
dense
IIIIIII
IIIIIII
2 'IIIIIII
IIIIIII
IIIIIII
Gray SAND with silt, fine- to medium -grained, moist, medium -dense to
SP very dense
SM
6 111111
111111
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
. IIIIIII
IIIIIII
7 IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
II
II
SM
ML
11
8 II
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
IIIIIII
9
IIIIIII
IIIIIII
* Test
* No gi
Gray, silty SAND, interbedded with sandy silt, very moist, medium -dense
to dense
boring was terminated at 36.5 feet during drilling on July 11, 2005.
-oundwater seepage was encountered during drilling.
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job Date: I Logged by. Plate:
05231 August 2005 JMJ 1 15
5
I
r
10
15
20
25
30
1
35
40
1 43
BORING 6
Description
11111110
SMI
Brown to gray, gravelly, silty SAND, fine- to medium -grained, slightly moist,
dense
EN111r!M!"
1 17
1 12
1 15
19
33
Brown, sandy SILT, with fine-grained sand interbeds, fine-grained,
moist, medium -dense (Co/luvium?)
3 I I I (I I I - becomes brown/gray with inclined bedding planes
411 Brown SAND, medium- to coarse -grained, moist, medium -dense
SP
vray, sanuy an- i , wim nn"rameu sanu lenses, non-plasuc, moist,
medium -dense (Colluvium?)
5 111 rMjI I- becomes wet
g 111111111- becomes green/gray
Gray SAND, fine-grained, wet, dense
1
7 ......... - silt lenses
* Test boring was terminated at 36.5 feet during drilling on August 10, 2005.
* No groundwater seepage was encountered during drilling.
GEOTECH
CONSULTANTS, INC.
BORING LOG
16612 - 74th Place West
Edmonds, Washington
Job Date: Logoed by: Plate: 66
05231 Au ust 2005 GDB
vto
U Stem dope
Salty factors
1131
1.32
1.32
1.32
1.32
1.32
1.32
1.32
1.32
Profile.out
l�
** PCSTABL6 **
by
Purdue University
modified by
Peter J. Bosscher
University of Wisconsin -Madison
—Slope Stability Analysis —
Simplified Janbu, Simplified Bishop
or Spencers Method of Slices
PROBLEM DESCRIPTION full steep slope
BOUNDARY COORDINATES
4 Top Boundaries
7 Total Boundaries
Boundary X Left Y-Left X-Right Y-Right Soil Type
No. (ft) (ft) (ft) (ft) Below Bnd
1 0.00
125.00
100.00
125.00
1
2 100.00
125.00
122.00
140.00
1
3 122.00
140.00
186.00
164.00
1
4 186.00
164.00
301.00
168.00
1
5 0.00
95.00
100.00
95.00.
2
6 100.00
95.00
186.00
150.00
2
7 186.00
150.00
301.00
154.00
2
ISOTROPIC SOIL PARAMETERS
2 Type(s) of Soil
Page 1
Profile.out 3
!D
Soil Total Saturated Cohesion Friction Pore Pressure Piez.
Type Unit Wt. Unit Wt. Intercept Angle Pressure Constant Surface
No. (pcf) (pcf) (psf) (deg) Param. (psf) No.
1 120.0 135.0 50.0 26.0 0.00 0.0 0
2 130.0 145.0 100.0 38.0 0.00 0.0 0
A Critical Failure Surface Searching Method, Using A Random
Technique For Generating Circular Surfaces, Has Been Specified.
2500 Trial Surfaces Have Been Generated.
50 Surfaces Initiate From Each Of 50 Points Equally Spaced
Along The Ground Surface Between X = 95.00 ft.
and X = 103.00 ft.
Each Surface Terminates Between X = 185.00 ft.
and X = 192.00 ft.
Unless Further Limitations Were Imposed, The Minimum Elevation
At Which A Surface Extends Is Y = 0.00 ft.
5.00 ft. Line Segments Define Each Trial Failure Surface.
Following Are Displayed The Ten Most Critical Of The Trial
Failure Surfaces Examined. They Are Ordered - Most Critical
First.
* * Safety Factors Are Calculated By The Modified Janbu Method * *
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.06
125.04
2
105.04
125.55
3
109.99
126.24
4
114.91
127.10
Page 2
Profile.out
�/O
5
119.81
128.13
6
124.66
129.33
7
129.47
130.70
8
134.23
132.24
9
138.93
133.94
10
143.57
135.81
11
148.14
137.84
12
152.63
140.03
13
157.05
142.37
14
161.38
144.87
15
165.62
147.51
16
169.77
150.31
17
173.81
153.25
18
177.75
156.32
19
181.58
159.54
20
185.30
162.88
21
186.47
164.02
*** 1.310 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.39
125.26
2
105.33
126.01
3
110.25
126.91
4
115.14
127.96
5
120.00
129.15
6
124.81
130.49
7
129.59
131.98
8
134.31
133.61
9
138.99
135.38
10
143.61
137.30
11
148.16
139.35
12
152.66
141.54
13
157.08
143.87
14
161.44
146.33
15
165.71
148.93
16
169.91
151.65
17
174.02
154.49
18
178.04
157.46
19
181.97
160.56
20
185.80
163.76
21
186.07
164.00
*** 1.315 ***
Page 3
Profile.out
�D
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.71
125.49
2
105.69
125.97
3
110.65
126.64
4
115.58
127.48
5
120.47
128.50
6
125.32
129.70
7
130.13
131.07
8
134.89
132.61
9
139.59
134.33
10
144.22
136.21
11
148.78
138.26
12
153.26
140.47
13
157.67
142.84
14
161.98
145.37
15
166.20
148.05
16
170.32
150.89
17
174.33
153.87
18
178.24
156.99
19
182.03
160.25
20
185.70
163.65
21
186.05
164.00
1.317 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.55
125.38
2
105.50
126.10
3
110.42
126.98
4
115.32
128.00
5
120.18
129.17
6
125.00
130.48
7
129.78
131.94
8
134.52
133.54
9
139.21
135.28
10
143.84
137.16
11
148.41
139.18
Page 4
12
152.92
1, 34
13
157.37
143.63
14
161.74
146.06
15
166.04
148.61
16
170.26
151.29
17
174.40
154.10
18
178.45
157.03
19
182.41
160.09
20
186.28
163.25
21
187.18
164.04
*** 1.318 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.88
125.60
2
105.87
125.93
3
110.84
126.46
4
115.79
127.19
5
120.70
128.11
6
125.58
129.22
7
130.40
130.51
8
135.18
132.00
9
139.89
133.67
10
144.53
135.53
11
149.10
137.56
12
153.59
139.77
13
157.98
142.16
14
162.28
144.72
15
166.47
147.44
16
170.55
150.32
17
174.52
153.36
18
178.37
156.56
19
182.09
159.90
20
185.67
163.39
21
186.27
164.01
*** 1.320 ***
Failure Surface Specified By 21 Coordinate Points
Point X-Surf Y-Surf
Page 5
Profile.out
No. (ft) (ft)
1
101.04
125.71
2
106.03
126.09
3
110.99
126.66
4
115.94
127.43
5
120.84
128.38
6
125.71
129.52
7
130.53
130.85
8
135.30
132.36
9
140.00
134.05
10
144.64
135.93
11
149.20
137.98
12
153.68
140.20
13
158.06
142.60
14
162.36
145.16
15
166.55
147.89
16
170.63
150.77
17
174.60
153.81
18
178.45
157.01
19
182.17
160.34
20
185.77
163.82
21
185.90
163.96
*** 1.321 ***
Failure Surface Specified By 20 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
101.20
125.82
2
106.19
126.18
3
111.16
126.73
4
116.11
127.48
5
121.02
128.42
6
125.89
129.55
7
130.71
130.87
8
135.48
132.38
9
140.18
134.08
10
144.81
135.96
11
149.37
138.01
12
153.84
140.25
13
158.22
142.66
14
162.50
145.24
15
166.68
147.99
16
170.75
150.89
17
174.70
153.96
18
178.53
157.17
Page 6
Profile.out
19 182.23 160.54
20 185.59 163.85
*** 1.323 ***
Failure Surface, Specified By 20 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
101.04
125.71
2
105.99
126.44
3
110.91
127.33
4
115.80
128.36
5
120.66
129.55
6
125.48
130.89
7
130.25
132.37
8
134.98
134.00
9
139.65
135.77
10
144.27
137..68
11
148.83
139.74
12
153.32
141.94
13
157.74
144.27
14
162.09
146.74
15
166.36
149.34
16
170.55
152.07
17
174.65
154.93
18
178.67
157.91
19
182.59
161.01
20
186.13
164.00
*** 1.323 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.23
125.15
2
105.21
125.59
3
110.17
126.19
4
115.11
126.97
5
120.02
127.91
6
124.89
129.02
7
129.73
130.29
Page 7
Profile.out
8
134.52
131.73
9
139.25
133.34
10
143.93
135.10
11
148.55
137.02
12
153.09
139.10
13
157.57
141.34
14
161.96
143.72
15
166.27
146.26
16
170.49
148.94
17
174.62
151.76
18
178.65
154.72
19
182.57
157.82
20
186.39
161.05
21
189.78
164.13
*** 1.323 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
100.71
125.49
2
105.63
126.38
3
110.53
127.41
4
115.39
128.57
5
120.22
129.86
6
125.02
131.27
7
129.77
132.82
8
134.49
134.49
9
139.15
136.29
10
143.77
138.21
11
148.33
140.26
12
152.83
142.42
13
157.28
144.71
14
161.66
147.12
15
165.98
149.64
16
170.23
152.28
17
174.40
155.03
18
178.50
157.89
19
182.53
160.86
20
186.47
163.94
21
186.57
164.02
*** 1.323 ***
Page 8
Profile.out
Y A X I S F T
0.00 37.63 75.25 112.88 150.50 188.13
X 0.00
37.63 +
A 75.25 +
-
*
..14
X 112.88 +
.....1.
-
10.*
-
12..
-
......12.
-
31..
-
18..
1 150.50 +
.......912..
-
61..
-
........512.
-
31..
-
.......911.
-
........12
S 188.13 +
...*..1*
225.75 +
F 263.38 +
Page 9
V�D
S:My F�cton
1.77
1.77
1.79
1.79
1.79
1.79
1.79
1.79
1.79
LtsS Srf-EP, sa��
1� oIr Sw�
Profile.out
** PCSTABL6 **
by
Purdue University
modified by
Peter J. Bosscher
University of Wisconsin -Madison
-Slope Stability Analysis -
Simplified Janbu, Simplified Bishop
or Spencers Method of Slices
PROBLEM DESCRIPTION
BOUNDARY COORDINATES
7 Top Boundaries
13 Total Boundaries
Boundary X-Left Y-Left X-Right Y-Right Soil Type
No. (ft) (ft) (ft) (ft) Below Bnd
1
0.00
136.00
100.00
136.00
1
2
100.00
136.00
114.00
142.00
1
3
114.00
142.00
127.00
144.00
1
4
127.00
144.00
143.00
152.00
1
5
143.00
152.00
196.00
166.00
1
6
196.00
166.00
242.00
172.00
1
7
242.00
172.00
275.00
172.00
1
8
0.00
120.00
100.00
120.00
2
9
100.00
120.00
127.00
129.00
2
10
127.00
129.00
199.00
153.00
2
11
199.00
153.00
226.00
164.00
2
12
226.00
164.00
242.00
166.00
2
13
242.00
166.00
275.00
166.00
2
Page 1
Pxofile.out
V�D
ISOTROPIC SOIL PARAMETERS
2 Type(s) of Soil
Soil Total Saturated Cohesion Friction Pore Pressure Piez.
Type Unit Wt. Unit Wt. Intercept Angle Pressure Constant Surface
No. (pcf) (pcf) (psf) (deg) Param. (psf) No.
1 120.0 135.0 50.0 26.0 0.00 0.0 0
2 130.0 145.0 100.0 38.0 0.00 0.0 0
A Critical Failure Surface Searching Method, Using A Random
Technique For Generating Circular Surfaces, Has Been Specified.
2500 Trial Surfaces Have Been Generated.
50 Surfaces Initiate From Each Of 50 Points Equally Spaced
Along The Ground Surface Between X = 50.00 ft.
and X = 150.00 ft.
Each Surface Terminates Between X = 170.00 ft.
and X = 250.00 ft.
Unless Further Limitations Were Imposed, The Minimum Elevation
At Which A Surface Extends Is Y = 0.00 ft.
5.00 ft. Line Segments Define Each Trial Failure Surface.
Following Are Displayed The Ten Most Critical Of The Trial
Failure Surfaces Examined. They Are Ordered - Most Critical
First.
* * Safety Factors Are Calculated By The Modified Janbu Method * *
Failure Surface Specified By 19 Coordinate Points
Point X Surf Y-Surf
Page 2
Profile.out
No. (ft) (ft)
1
98.98
136.00 .
2
103.91
135.19
3
108.89
134.67
4
113.88
134.44
5
118.88
134.50
6
123.87
134.86
7
128.82
135.5Z
8
133.74
136.46
9
138.58
137.69
10
143.35
139.20
11
148.02
140.99
12
152.57
143.06
13
157.00
145.38
14
161.28
147.97
15
165.40
150.80
16
169.35
153.87
17
173.11
157.16
18
176.67
160.67
19
176.93
160.96
*** 1.771 ***
Failure Surface Specified By 19 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
96.94
136.00
2
101.91
135.43
3
106.90
135.11
4
111.90
135.05
5
116.69
135.25
6
121.87
135.70
7
126.82
136.41
8
131.73
137.37
9
136.58
138.59
10
141.36
140.05
11
146.06
141.76
12
150.66
143.70
13
155.16
145.88
14
159.55
148.29
15
163.80
150.92
16
167.91
153.77
17
171.87
156.82
18
175.66
160.08
19
176.47
160.84
Page 3
Y/,
Profile.out
v6z
*** 1.772 ***
Failure Surface Specified By 19 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
94.90
136.00
2
99.74
134.77
3
104.66
133.86
4
109.63
133.27
5
114.62
133.02
6
119.62
133.09
7
124.60
133.50
8
129.55
134.23
9
134.44
135.28
10
139.24
136.66
11
143.95
138.35
12
148.54
140.34
13
152.98
142.63
14
157.26
145.21
15
161.37
148.07
16
165.27
151.19
17
168.96
154.56
18
172.43
158.17
19
174.16
160.23
*** 1.776 ***
Failure Surface Specified By 16 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
101.02
136.44
2
106.02
136.31
3
111.02
136.43
4
116.00
136.80
5
120.97
137.41
6
125.89
138.27
7
130.77
139.37
8
135.59
140.71
9
140.33
142.28
10
145.00
144.09
11
149.56
146.12
Page 4
Profile.out
12
154.02
148.38
13
158.37
150.85
14
162.59
153.54
15
166.67
156.43
16
170.16
159.17
*** 1.780 ***
Failure Surface Specified By 19 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
94.90
136.00
2
99.72
134.69
3
104.62
133.70
4
109.58
133.04
5
114.57
132.71
6
119.57
132.71
7
124.56
133.04
8
129.51
133.71
9
134.41
134.70
10
139.24
136.02
11
143.96
137.65
12
148.57
139.60
13
153.04
141.84
14
157.34
144.38
15
161.47
147.20
16
165.41
150.29
17
169.12
153.63
- 18
172.61
157.21
19
175.48
160.58
*** 1.783 ***
Failure Surface Specified By 20 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
94.90
136.00
2
99.82
135.14
3
104.79
134.54
4
109.78
134.20
5
114.78
134.12
Page 5
Profile out
6
119.77
134.31
7
124.75
134.76
8
129.70
135.47
9
134.60
136.45
10
139.45
137.68
11
144.23
139.16
12
148.92
140.89
13
153.51
142.87
14
157.99
145.09
15
162.35
147.54
16
166.57
150.22
17
170.64
153.12
18
174.56
156.22
19
178.31
159.53
20
180.81
161.99
*** 1.783 ***
Failure Surface Specified By 19 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
101.02
136.44
2
105.96
135.69
3
110.94
135.22
4
115.94
135.03
5
120.94
135.13
6
125.92
135.51
7
130.88
136.17
8
135.79
137.12
9
140.64
138.34
10
145.41
139.83
11
150.09
141.60
12
154.66
143.63
13
159.11
145.91
14
163.42
148.44
15
167.58
151.22
16
171.57
154.22
17
175.39
157.45
18
179.02
160.89
19
179.81
161.72
*** 1.784 ***
Failure Surface Specified By 20 Coordinate Points
Page 6
Profile.out
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
92.86
136.00
2
97.67
134.64
3
102.56
133.60
4
107.51
132.88
5
112.49
132.49
6
117.49
132.42
7
122.49
132.67
8
127.45
133.26
9
132.37
134.16
10
137.22
135.38
11
141.98
136.92
12
146.62
138.76
13
151.14
140.91
14
155.51
143.34
15
159.71
146.05
16
163.72
149.03
17
167.54
152.27
18
171.13
155.75
19
174.49
159.45
20
175.36
160.55
*** 1.788 ***
Failure Surface Specified By 21 Coordinate Points
Point
X-Surf
Y-Surf
No.
(ft)
(ft)
1
94.90
136.00
2
99.83
135.18
3
104.80
134.60
4
109.79
134.27
5
114.78
134.19
6
119.78
134.35
7
124.76
134.77
8
129.72
135.43
9
134.64
136.35
10
139.50
137.50
11
144.30
138.89
12
149.03
140.53
13
153.67
142.39
14
158.21
144.48
15
162.64
146.80
16
166.95
149.34
Page 7
Profile.out
17
171.13
152.08
18
175.16
155.03
19
179.05
158.18
20
182.77
161.52
21
184.13
162.86
*** 1.790 ***
*0
Failure Surface Specified By 19 Coordinate Points
Point
X Surf
Y-Surf
No.
(ft)
(ft)
1
96.94
136.00
2
101.72
134.55
3
106.60
133.45
4
111.55
132.70
5
116.53
132.31
6
121.53
132.28
7
126.52
132.61
8
131.47
133.30
9
136.36
134.34
10
141.16
135.73
11
145.85
137.47
12
150.41
139.53
13
154.80
141.92
14
159.01
144.62
15
163.01
147.62
16
166.79
150.89
17
170.32
154.43
18
173.59
158.22
19
175.31
160.54
*** 1.790 ***
Y A X I S F T
0.00
37.84
75.68
113.52
151.36
189.20
X 0.00
Page 8
Pzofilo'nnt
---
---'
2
........ 31'
—.—.31.°
---31..
........ *314^
......... 314..
-.-.--124.'
.......... 544.*.
........... 314..
.----'124.
............114.
............. 611
...'....''... 611
...............
�
Page 9
�yo