17130 TALBOT RD.PDF1111111111 lill 13534 17130 TALBOT RD Drainage and Grading Plan for the 13card Now Reoldence & Drive/Parking City of Edmomdo County of 5mohomieh Mark & Lettic l3eard 16920 Talbot Rd. Edmondo, WA 9b026 (425) 771-6014 Revised March 20, 2000 A\�j OY f �rOT_ �VIASJ 930'. 7_16-1 I Expipas I'LA k-->l 0 -0 :1 Pcoiom 5uild 5ervioem , Itic. Enoinecrine & Comotruction Mamaocmemt Phone. /Fax: (360) 793-9659 28119 -120th 5t. 5.E., Monroe, WA 98272 Pager: (425) 290-076& E-Mail: rheidc@premicrl.net beard Reoidence TABLE OF CONTENTS 1. Purpose and Scope 2. Existing Site Conditions 3. Developed Site Conditions 4. Design Philosophy 5. Erosion Sedimentation Control 6. Upstream and Downstream Analysis 7. Erosion Risk Assessment 8. Grading Quantities Appendix: Legal Description Site/Basin Map, and SCS Map Site Existing and Developed Hydrographs Conveyance Capacity Calculations Grading Quantities Report Soil Logs 1. Purpose and Scope The purpose of this report is to address the changes to the existing drainage that will be caused by the construction of a new home and associated driveway. This development will change the runoff characteristics of the site. The addition of impervious surfaces could increase the rate and volume of stormwater runoff. Without the provision for mitigating measures downstream drainage's could be adversely impacted. In addition, during construction, on -site erosion could result in sediment being transported downstream with associated negative impacts. Temporary and permanent water quality measures are proposed to mitigate potential impacts. 2. Existing Site Conditions The SCS soil types from Snohomish County Map Sheet #50 is Everett and Alderwood (map symbols 4/6). Everett is a Group A soil and Alderwood is a group C soil. Soil logs confirm the front part of the lot at the bluff is a deep sandy soil and further back from the bluff is a very hard layer at 3.5 feet down. At the bluff caving of the test hole was noted due to the sandy nature of the soil. Appropriate trench sideslopes should be proposed to minimize hazards associated with sandy soils. The test hole adjacent to the existing house showed some seepage at the top of the hard dense sand layer. This could be expected at the interface with the overlying loose sand. Refer to the AES report previously submitted for a full discussion of these conditions. The site is 0.5 acres on the gently sloping portion back from the steep slope and has an existing house, garage with associated a/c drive. The house has been there at least 10 yrs. The area of development is all developed with house paving or landscaping. Flows from the site would sheefflow to the west, down the steep bank to the railroad r/w and then to the beach. Most flows now infiltrate in the fine sand and no erosion channels are evident. 3. Design Philosophy The design is in accordance with requirements of the City Drainage Handout and articulated at the City of Edmonds Counter for projects with over 5000 s.f. of impervious. 2, 10, and 100 yr precipitation amounts have been used as specified in the City Code. Given the existing developed state of the lot it was agreed modeling the existing condition as meadow/pasture instead of forested was I reasonable. I was to attempt to meet the "existing" condition with the 10 and 100 yr flows. The minimum size orifice allowed is 5/8". Existing and developed areas were modeled using a SCS based hydrograph program called Hydragraphs for Windows, version 6.0, by Hydraflow. The Cn values for Group A and Group C soils were averaged to get a site specific value to reflect the site soils shown on the SCS map and confirmed by the soil logs. The peak flows, were mitigated by designing a detention tank that would store the difference between the design "existing" pasture condition, and the developed condition within the limitations of the primary 5/8" orifice. The 100 yr release is met due to the use of a secondary as well as primary orifice. The tank designed is a 5' diameter, 45' long tank with 36" access and sump risers welded to it. This will allow the entire structure to be welded and asphalt treated with only one coupling band. It is important to minimize seepage adjacent to the steep bluff so a liner is specified under the tank. Footing drains will be combined with the tank discharge in a 6" HDPE pipeline going down the face of the steep bluff. The pipe will be installed in accordance with an agreement with Burlington Northern RR for discharge to their easement. Blocking normally used for pressure piping is now specified. The cables required by the BNRR agreement provide 100% redundancy since the pipe is designed to handle all the stress of the weight of water and pipe in a completely plugged, or fully flowing pipe with the associated impact at the bottom T. Water quality for the paving will be accomplished by use of a floatable separator at the paving, then combination with roof water and further separation in the tank due to the orifice discharge. Following is a summary of the hydrograph results. Lot Drainage "Existing" Pasture Developed Mitigated by Tank 10 yr. 0.02 cfs 0.12 cfs 0.02 cfs 100 yr. 0.08 cfs 0.23 cfs 0.08 cfs 4. Developed Site Conditions The developed site conditions will consist of a new residence, and modified access drive. All impervious surfaces will be captured and piped to the detention tank. I 5. Erosion Sedimentation Control Straw bales will be provided at the discharge of the spreader T to the existing ditch. Silt fence will be provided at the west edge of the areas of disturbance before the steep slope to the beach. Seeding, straw and jute netting have been specified at the slope disturbance where the pipe daylights. Permanent erosion control will be provided by pavement of the access drive, a floatable separator at the drive, and flow through the detention tank direct to the toe of the slope. Quarry spalls have been specified at the discharge. 6. Upstream and Downstream Analysis The site has about 165' of area upslope between the lot boundary and Talbot Drive. No evidence of concentrated flows were evident crossing the lot line. Any sheefflow will be picked up as part of the drive flow to the catch basin and be piped through the detention tank direct to the toe of the slope. The downstream system starts at the west edge of the property with sheefflow to the west to the Railroad easement. There is a culvert under the railroad tracks near the dispersed site discharge that takes the flow under the tracks and then out into the Puget Sound Tidelands. Given the size of the culvert and no proposed increase, there should not be any adverse downstream impacts from this project. 7. Erosion Risk Assessment Slope, Soil lype and Relative Risk of Erosion during Construction Slopes in the area of development are 0-8%. The soil type in the areas of development are Group A and C. Erosion hazard for these soils given these slopes are considered slight. The erosion hazard of the Everett bluff is considered moderate. Given the collection and mitigation of all impervious flows, piping to the foot of the slope, and dispersal there, the risk of erosion from this site is slight. During construction the risk of erosion due to concentrated flows is moderate due to the steep slopes along the bluff. However, the specified containment of all flows to the tank and tank construction at the beginning of the project along with the silt fence at the area of disturbance will act to disperse flows, and the detention system will trap silt, but these measures must be installed and maintained. Location of Critical Areas and Related NGPA Areas Puget Sound is to the west. The site borders a steep slope in excess of 33% at the bluff. The discharge pipe will run on the surface of the bluff after daylighting from the tank. I I , Risk to Fishbearing Streams or Bodies of Water from Proposed Construction The runoff from the site going to the Sound to the west is limited to treated flow which will be similar to the existing. With the adequate erosion control measures proposed for this project there should be no adverse impact to this waterbody. Potential for Slides or Ground Movements There are no features evident on this site indicating a great potential for slides or natural ground movements. Leaks in the drainage system that could saturate the bluff could change this evaluation. Sources of Erosive water other than Rainfall No other concentrated sources of water from upstream exist. No evidence of any channels or ditches providing water to the development were evident. Conclusion The risk for erosion for this site will be greatest during construction and build -out. BMP's will be specified to keep erosion potential at a minimum. Given the Type A and C soils with the proposed landscaping and asphalt, and the flow direct to the toe of the slope, this should be achieved at a high level for minimal risk. With proper installation and maintenance of BMP's it should be possible to keep material transported off site at their pre-existing levels. Upon completion of the project, areas of greatest risk will be disturbed areas and concentrated discharge points for collected rainwater. As such these should be kept at a minimum. To mitigate these occurrences all areas should be mulched/planted such that this risk is minimized prior to the rainy season with constant re-evaluation of risk. All dispersion trenches or other areas of potential point discharge are to be armored/mulched such that erosion at these points are minimized. 8. Grading The grading quantity was calculated as 2449 c.y. cut using an ACAD14/Eagle Point 99, tin -to -tin computer model for grades shown on the architectural plans, and will be the amount necessary to meet height limitations. Appendix: Site/Basin Map, SCS Map and USGS Quad Map zaam - Zzaz Ay Ale. "7zlvzzlc -IYIIOII;f-f lopf, r r z 111 91 1 W7 -,Vz,;rz AIZ-rr 6 r- INVIA 0 Awff ojfLZT-f IV 1 11,42 M. LLI w 41,M, 7, 4 Z� ,ry All-f cn cn LD a17- iiia 1,5' 4 . 11A.0 k� Xz pw z aV. 44U. Ze-f, JYe. 7-Z7-Z ivy 's/ -7 ez mr, gyp- f OWN BY _Z�'.1VAW CHKO BY DATE 7-A�'-,91 I J09ND. SCALE-Z"'-�5V SHEET - / - OF Appendix: Site/Basin Map, SCS Map:: r-.Q —I-- 45 Oor. -ntlr. TI —,--I I rL 1+ C-.<) TPIP ell 10, AMU YY q I - All 40 V 54 V, )Q �7 -19 C-) A Ain - 06 pop" 1 11 q,lv 0 rTr—T IF T PIP WT , Ln T. If 41 1�1 tl vi C 7 LI) WJ 'Ve 00 ;-F--,4y,! N Ai Zj pt, Mj Emu W -iLn 14 T 7 4 Y". w �Fw -) - I " ; ij ai All 'O'i -A jesul SUIOF) Appendix: Site Existing and Developed Hydrographs I ( 'Z'O� co K o (1, -A p (- Z--- tv vv;\ JQ JQ G�Yoq 61".) ez 477 (1-1 4-7 4�3 -1; C) SA), 'o. C seL A� 0 OA): C TO .0 c-, 1�- Co Irbf O'C',CA V/ C— 0 C) eL C_P,� D"C�-T C- 4k Legend Runoff Combined ChannelReach Diversion Pond Route IProject: c2000beard.GPW I IDF: SAMPLE.IDF 1 3 hyd's 1 03-14-2000 TR55 Tc Worksheet Page I HYd. No. 1 Pasture Model - Pre -Existing Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 225.0 ft Two-year 24-hr precip. = 1.50 in Land slope = 7.6 % Travel Time ........................................ 16.1 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 % Surface description = Paved Average velocity = 0.00 fus TravelTime ........................................ 0.0 min Channel Flow Cross section flow area = 0.0 sqft Wetted perimeter = 0.0 ft Channel slope = 0.0 % Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ min Total Travel Time, Tc ........................ 16.1 min TR55 Tc Worksheet Hyd. No. 2 Developed Condition Storm frequency= 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 92.0 ft Two-year 24-hr precip. = 1.50 in Land slope = 5.4 % Travel Time ........................................ 9.0 min Shallow Concentrated Flow Flow length = 112ft Watercourse slope = 0.5 % Surface description = Paved Average velocity = 1.44 ft/s Travel Time ........................................ 1.3 min Channel Flow Cross section flow area = 0.0 sqft Wetted perimeter = 0.0 ft Channel slope = 0.0 % Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ... ..................................... = min Total Travel Time, Tc ........................ = 10.3 min Page I 11 Hydrograph Summary Report Page 1 , Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description I SCS Runoff 0.02 6 492 648 10 Pasture Model - Pr 2 SCS Runoff 0.12 6 480 1,862 10 Developed Conditio 3 Reservoir 0.02 6 1194 1,862 10 2 L 79.34 728 Detention Pipe Proj. file: c2000beard.GPW OF file: SAMPLEADF FRun date: 03-14-2000 Mydrograph Plot Hyd. No. I Pasture Model - Pre -Existing Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage. area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.00 in Storm duration = 24 hrs English Peak discharge = 0.02 cfs Time interval = 6 min Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 16.1 min Distribution = Type A Shape factor = 484 Total Volume = 648 cuft 1 - SCS Runoff - 10 Yr - QP 0.02 ds 0.020- 0.015- Hyd. 1 0.010- CY 0.005- 0.000 L__+ 1 03 lb 115 �O _'5 Time (hrs) Hydrograph'Plot Hyd. No. 2 Developed Condition Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.00 in Storm duration = 24 hrs English Peak discharge = 0.12 cfs Time interval = 6 min Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.3 min Distribution = Type A Shape factor = 484 Total Volume = 1,862 cuft 2 - SCS Runoff - 10 Yr - QP 0.12 ds 0.15- 0.10- Hyd. 2 CY 0.05- 0.001 0 5 10 15 20 25 Time (hrs) .Hydrograph Plot Hyd. No. 3 Detention Pipe Hydrograph type = Reservoir Storm frequency = 10yrs Inflow hyd. No. = 2 Max. Elevation = 79.34 ft Storage Indication method used. English Peak discharge = 0.02 cfs Time interval = 6 min Reservoir name = Detention Tank Max. Storage = 728 cuft Total Volume = 1,862 cuft 3 - Reservoir - 10 Yr - QP 0.02 cfs 0.15- / Hyd. 2 0.10-- 0.05- / Hyd. 3 0.00 j 0 10 20 �O 40 50 Time (hrs) Hydrograph Summary Report Page I Hyd. No. Hydrograph type (origin) Peak flow (Cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph des6ription 1 SCS Runoff 0.08 6 486 1,635 100 ---- Pasture Model - Pr 2 SCS Runoff 0.23 6 480 3,376 100 — — -- Developed Conditio 3 Reservoir 0.08 6 540 3,376 100 2 80.16 853 Detention Pipe Proj. file: c2000beard.GPW OF file: SAMPLEADF Run date: 03-14-2000 Hydrograph Plot Hyd. No. 1 Pasture Model - Pre -Existing Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs English Peak discharge = 0.08 cfs Time interval = 6 min Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 16.1 min Distribution = Type IA Shape factor = 484 Total Volume = 1,635 cuft I - SCS Runoff - 100 Yr - QP = 0.08 ds 0.08- 0.06- Hyd. 1 0.04- CY 0.02- 0.00 0 5 10 15 20 25 Time (hrs) , Hydrograph Plot Hyd. No. 2 Developed Condition Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs English Peak discharge = 0.23 cfs Time interval = 6 min Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.3 min Distribution = Type A Shape factor = 484 Total Volume = 3,376 cuft 2 - SCS Runoff - 100 Yr - QP 0.23 ds 0.25- 0.20- 0.15- Hyd. 2 CY 0.10- 0.05- 0.00 0 5 10 15 2 5 Time (hrs) Hydrograph Plot Hyd. No. 3 Detention Pipe Hydrograph type = Reservoir Storm frequency = 100 yrs, Inflow hyd. No. = 2 Max. Elevation = 80.16 ft Storage Indication method used. English Peak discharge = 0.08 cfs Time interval = 6 min Reservoir name = Detention Tank Max. Storage = 853 cuft Total Volume = 3,376 cuft 3 - Reservoir - 100 Yr - QP = 0.08 ds 0.25- 0.20- Hyd. 2 0.15- CY 0.10- 0.05- Hyd. 3 0.00, 0 10 �O 3�0 40 50 Time (hrs) , Reservoir Report Reservoir No. 1 - Detention Tank Pond Data Pipe diameter = 5.00 ft Stage / Storage Table Stage Elevation ft ft 0.00 75.50 0.50 76.00 1.00 76.50 1.50 77.00 2.00 77.50 2.50 78.00 3.00 78.50 3.50 79.00 4.00 79.50 4.50 80.00 5.00 80.50 Pipe length = 45.0 ft Invert elevation = 75.50 ft Contour area Incr. Storage Total storage sqft cuft cuft 00 0 0 00 46 46 00 80 127 00 97 223 00 107 330 00 114 444 00 ill 555 00 107 662 00 96 758 00 80 838 00 46 884 Culvert I Orifice Structures [A] [131 [C] [D] Rise in = 6.0 0.6 1.8 0.0 Span in = 6.0 0.6 1.8 0.0 No. Barrels = 1 1 1 0 Invert El. ft = 75.50 75.50 79.50 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi -Stage = - Yes Yes No Stage / Storage / Discharge Table Weir Structures [A] Crest Len ft = 1.6 Crest El. ft = 80.25 Weir Coeff. = 3.00 Eqn. Exp. = 1.50 Multi -Stage = Yes Page I English [13] [C] [D] 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Civ A Civ B Civ C CIv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfS cfs cfs cfs cfs cfs cfs 0.00 0 75.50 0.00 0.00 0.00 0.00 0.00 0.50 46 76.00 0.47 0.01 0.00 0.00 - 0.01 1.00 127 76.50 0.68 0.01 0.00 0.00 - 0.01 1.50 223 77.00 0.83 0.01 0.00 0.00 --- 0.01 2.00 330 77.50 0.96 0.01 0.00 0.00 0.01 2.50 444 78.00 1.07 0.02 0.00 --- 0.00 - 0.02 3.00 555 78.50 1.18 0.02 0.00 --- 0.00 - - --- 0.02 3.50 662 79.00 1.27 0.02 0.00 0.00 - - - 0.02 4.00 758 79.50 1.36 0.02 0.00 0.00 - - - 0.02 4.50 838 80.00 1.44 0.02 0.05 --- 0.00 - - 0.07 5.00 884 80.50 1.52 0.02 0.08 0.59 - --- 0.69 Appendix: Conveyance Capacity Calculations 6" PVC Pipe Discharge Worksheet for Circular Channel Project Description Project File c:\haestad\fmw\typculvt.fm2 Worksheet 6" Pipe Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.010 Channel Slope 1.0 % Diameter 6.00 in Results Depth 6.0 in Discharge 0.73 cfs Flow Area 0.20 ft2 Wetted Perimeter 1.57 ft Top Width 0.00 ft Critical Depth 0.43 ft Percent Full 100.00 Critical Slope 0.009287 ft/ft Velocity 3.71 ft/S Velocity Head 0.21 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 0.78 cfs Full Flow Capacity 0.73 cfs Full Flow Slope 0. 0 10000 ft/ft 03/14/00 Design Build services, Inc. FlowMaster v5.10 03:53:53 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 6" PVC Capacity Rating Table for Circular Channel Project Description Project File c:Xhaestad\fmw\typculvt.fm2 Worksheet 6" Pipe Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Constant Data Mannings Coefficient 0.010 Channel Slope 79.0 % Diameter 6.00 in Input Data Minimum Maximum Increment Discharge 0.23 0.78 0.25 cfs Rating Table Discharge Depth Velocity (cfs) (in) (ft/S) 0.23 0.8 15.53 0.48 1.1 19.33 0.73 -1.4 21.86 03/14/00 Design Build Services, Inc. FlowMaster v5.10 04:16:25 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of I s I �-s I z:,o "K �) CL ctlz--,_ IX2, C kx"VA. 42 e7 Ap 02— TA�"ros uo-,�_- ry.N ss cc, s 4,c 4c, 2;-z OA(_ C. 0.0,5A 41400 1,6 So x, X�L Go 6oA-t-z,,,. -c- L,:k t S5,).t- . JL LAA el ':;7b-o 0, a,�� L 0 0 - 11w) Te-I -, 'IV 41.4i --7 4,L,7 Ln '3'2- 0, > Driscopipe - A Division of Phillips Petroleum Page I of 3 D il)RISCOPIPE, I �.� 1 .1 .�� SIZE and DIMENSIONS Standard 1PS* Dimensions & Workina Pressure Ratinas (W 3/4" - 8" SDR 7-15.5 I DR7 WPR 267 osl OD-- Size - --- Weight (lbsift) (lbs/ft) Mwulm�- Mum N��K "I, ��EUUUI NELL.U. N OR 13.5 (WPR = 128 psi) is available for 2" through 36" sizes iron Pipe Sizes; commonly known as "steel pipe sizes" Pressure ratings are for water at 73.4 T DR (Dimension Ratio) = OD/ min. wall thickness Contact your local Driscopipe distributor for availability of pipe diameters and DRs not listed 1,n the previous tables. A cXc,e-'LA�;� 2" - 8" SDR 17-32.5 Size DR 17 WPR = 100 psi OR 21 WPR = 80 psi 111--� WPR = 64 psi Q=151--/ WPR = 50 psi IPS* Pipe size OD Size (in) Min. Wall (in) Weight (lbsift) n. Wall (in) Weight (lbsift) In. Wall (in) Weight (lbsift) n. wall In Weight (lbsift) 2" 2.375 0.140 --U.706— 0.43 - 3" T3-- --G.T67-- --T.77 0. 13 _5 --U-3(F 4" 4.-) 0.26-5 5" 5.563 0.327 ---2-.3T— 0.265 1.93 --O-.2T'4---,---T-.5T— --G-.r7T— --F.2T-- 6" — —T175— 02.),.) 2.23 7" —T4Tg-- —7XF--- ---ff.T40---' 3.16 U.274 2-M 8" 3. 79 ron Pipe Sizes; commonly known as "steel pipe sizes" Pressure ratings are for water at 73.4 T DR (Dimension Ratio) = OD/ min. wall thickness Contact your local Driscopipe distributor for availability of pipe diameters and DRs not listed in the previous tables. IV'-26" SDR 77-1.5-5 DR11 WPR = 160 psi DR 15.5t WPR=110psl Weight Weight (lbsift) �=WUIMEUWIIM�M�M�=�Wtl "INUU, MELUM =UAQ, N�=Uffilm�� MIAMI MEM lm�- MA1. M, Sul Um ���=Ufful OVAL, lm�- ��=MHA Ihq://www.driscopipe.com/1000/1000size.httn 03/13/00 � I Driscopipe - A Division of Phillips Petroleum Page 1 of 2 1000 Data Sheet series Customer Benefits High quality DriscopipeO 1000 is manufactured from extra high molecular weight, high density PE 3408 polyethylene pipe grade resin. This black, weather -resistant pipe exhibits... Outstanding Chemical & Corrosion Resistance High Environmental Stress Cracking Resistance Excellent Flow Characteristics Toughness & Ductility Flexibility & Ease of Installation Abrasion Resistance Fatigue Endurance Reliability Suggested Applications: Acid/Caustic Lines Hazardous Wastes Organic Chemicals Agriculture High Purity Processes Petrochemicals Aquaculture Ice Rinks Pulp/ Paper/ Wood Brine Industrial Piping River Crossings Coal Slurry Inorganic Chemicals Salt Mines De -watering Irrigation Sugar Mills Dredging/ Sand/ Gravel Leachate Collection SX Acid Mining Fertilizer Marinas Tailings Fly Ash Metal (Cu, Fe, Al, etc.) Temporary pipelines Hard Rock Disposal Mining Utility piping And Many Others... Typical Physical Properties* of Driscopipee 1000 (PE 3408) Polyethylene Pipe Resi PropertV Tes-t Method Unit Value Density ASTM D 1505 gms/CM3 0.955 Mel, Index ASTM D 1238 (190/2.16) gms/10 min. 0.11* Environmental Stress Cracking Resistance --Condition A,B, & C, Fo ASTM D 1693 hrs. >5000 (molded specimen) --Compressed Ring, Fo ASTM F 1248 hrs. >3500 (extruded specimen) Tensile Strength, Ultimate ASTM D 638 psi 5000 —Type IV Specimen (2"/min) Tensile Strength, Yield ASTM D 638 psi 3200 —Type IV Specimen (2"/min) Elongation at Break ASTM D 638 % 750 --Type IV Specimen (2"/min) Impact Strength (IZOD) --Specimen thickness 0. 125" Vicat Softening Temperature Brittleness Temperature ASTM D 256 In -lb./ 42 in. notch Method A ASTM D 1525 oF 257 ASTM D 746 oF < -180 Ihttp://www.driscopipe.com/1000/1000data.htm 03/13/00 Driscopipe - A Division of Phillips Petroleum Page 2 of 2 Flexural Modulus ASTM D 3350 psi 135,000 Modulus of Elasticity (Young's Modulus) ASTM D 638 psi 130,000 Hardness ASTM D 2240 Shore D 65 Coeff. of Linear Thermal Expansion ASTM D 696 in/in/*F 1.2 x 10-4 Thermal Conductivity ASTM D 177 Btu -in / 2.7 ftA2/hrs/*F Hydrostatic Design Basis (RDB) ASTM D 2837 —73*F psi 1600 --- I 40OF psi 800 Material Cell Classification ASTM D 3350 345464C Material Designation PPI Recommendation PE3408 Average Melt Index with a standard deviation of 0.01 'This list of typical physical properties is intended for basic characterization of the material and does not represent specific determinations or specifications. The Physical properties values reported herein were determined on compression molded specimens prepared in accordance with Procedure C of ASTM D 1928 and may differ from specimens taken from the pipe. This Document reports accurate and reliable information to the best of our knowledge but our suggestions and recommendations cannot be guaranteed because the conditions of use are beyond our control. The user of such information assumes all risk connected with the use thereof. Phillips Petroleum Company and its subsidiaries assume no responsibility for the use of information presented herein and hereby expressly disclaim all liability in regards to such use. I More Information Data Sheet Brochure Size and Dimension Sheet FM Approved Pipe and Fiftings Fittings Pricing, Availability, Selection, etc. Home Paq Ihttp://www.driscopipe.com/1000/1000data.htm 03/13/00 Appendix: Grading Quantity Report jUser Name: rick Proj.ect: Concept 2000 Beard Residence Prismoidal Volume Results Prismoidal Volume Results Original Surface Model: topolines lFinal Surface Model: final Cut Compaction Factor: 0.00 Fill Compaction Factor: 0.00 Raw Cut Volume: 2449.47 cu yd Compacted Cut Volume: 0.00 cu yd Total Cut Volume: 2449.47 cu yd Raw Fill Volume: 9.10 cu yd Compacted Fill Volume: 0.00 cu yd Total Fill Volume: 9.10 cu yd Date: 01-24-00 Time: 14:09:07 Page: 1 am PROPOSED NEW HOUSE Mae q7L;. EP-2 . . I " I --�\`M M 'q I DRIVEWAY WON EP- 1 -7 HOUCE TO 13E EP-31 REMOVED Ir j Ij I -in =LAW CP 10 LEGEND P.1 N Approximate location of exploration pit 101- 0 40 80 SCALE IN FEET ASSOCIATED EARTH 4#44MMMSCIENCESs INC SITE AND EXPLORATION PLAN BEARD RESIDENCE EDMONDS, WASHINGTON G95003A 1 1/9 GURE I EXPLORATION PIT LOG Number EP-1 Topsoil; loose, moist, black with sod. Loose, moist, brown -gray, gravelly, fine SAND with some sift, roots, some wire debris. Old topsoil at base. (Fill) Loose, moist, red -brown, silty, fine SAND. Loose to medium dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND. Loose pockets. Dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND with some silt. BOHF @ 10' Note: No seepage; caving 0-8'. � 1 0 Number EP-2 4" Sod. Loose, moist, dark brown and red -brown, organic -rich, gravelly, fine SAND with some sift, abundant roots. (Fill) Loose, moist, red -brown, gravelly, fine SAND with wood. (Old Regolith) Medium dense with loose pockets, moist, yellow -brown,, gravelly, fine to medium SAND. Stiff to hard, moist to wet, light brown, sandy SILT, brecciated. BOH C 101 Note: Light seepage at T; caving Tto 5'; light spalling at seepages. Subsurface conditions depicted represent our observation at the time and location of this exploratory hole. modified by geologic Interpretation, engineering analysis, and judgment. They are not necessarily representative of other times and location. We vvIH not accept responsibility for the use or Interpretation by others of Information presented on this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 KirkNmd, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 EXPLORATION PIT LOG J 0 5 io 15 a Number 5 10 Number EP-3 15 Subsurface conditions depleted represent our observation at the time and location of this exploratory hate, modified by geologic Interpretation, engineering analysis, and judgment. They are not necessarily representative of other times and location. We will not accept responsibility for the use or Interpretation by others of Information presented an this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 rl% W- - ver) ?000 �ICES C-rR. 'Nos VY/7. ..'AMMURl-ATION. rn �'. � mi, At 0. Thq-,�fty., & �11-' S kA P-MENT M" SIDE SEWER PERMIT NEW CONSTRUCTION REPAIRS E] LID NO. AS OiNEk"' - ------------------------------------------------------------------------ -------- ---------------- CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO—W f:,-* . .............. -T LE A-L-DESCR-IPTION: L ADDRESS - -------------------------------- 7.4`k--�a(P ...... F?---CDLz) JO-9, - ------- -- - ------ G OT No.'[-N�T'TtS-CHED ------- BLOCK NO. ............................................ ...................................................................................... NAME OF ADDITION ............................... ........................................................................... 77 3: mv CITY 0 F EDMONDS SIDE SEWER PERMIT WATER -SEWER DEPARTMENT �0, PERMIT 7 - V! . . ......... side sewer inspections BEFORE covering any' portion of the construction, -2525 Call 775 for (Inspection will be provided within 24 hours after requst. inspecti NO Sat., Sun., or holiday ns. j o-- Ficnd 16920 TaIL :4, , ADDRESS LOCATION OF CONSTRUCTION ........ ----------------- ------------------------------------------------------------- ------ ------ ------ ----------------------------- ATTACHED % PROPERTY LEGAL DESCRIPTION ------------------------------- — ------------- -------------- ---------- -------------------- ------- ------------------------------ -- ----------------- .......... ----- . .................................................. OHN EATCHELDER .. ........................... : .................................... OIVNERAND/OR BUILDER ....... ... . .......................... . .................................. . ........................................ ............... !:;7 Owner (2WTUACTOR'S NAME & ADDRESS ....................................................................................... . .............................. . .. . ... .................................... ............... July 1, 74 ............................................ . ... t ..... ....... -ion Is granted. _19.. for repair and/or connection of a side sewer to the city sanitary sewer system in accordance with City of Edmonds ordinances. 7:, A( . _)rION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the property may obtain a permit to construct sewer inside Property line. A licensed Side Sewer contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permit obtain ble fr m. the City Engineer's offi a 0 ce tNOTE No. 3—Obtsin full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2 No bends sharper than 'A will be permitted. in grade NOTE No. 5—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do; any work on the main sewer or its appurtenances except to in- sert the pipe into the wye. DISAPPROVEDDate..._ ... By ...... ........ Date .................. ... . ..... ................ Date ............... . ................... By ................ APPR OVED Date --- - ---- -------------------- ............. BY ------------ ........ .. . . ....................... ................................................................ 4 ------------------ Remarks: ....... . .................................. . ... ...... ............................. ................. . .............................. ........................ ............................ o ....................... .............................................................. ------ . ............................. .......................................................... . .................................. . ........................................ BOTH Permit Copies MUST Be Signed By Owner of Firm Performing C onstruction PRIOR To Request For Inspection ....................................................................................... ... hereby certify that the side sewer installation constructed under this permit (Owner of Contracting Mrrn PerfGrming Construction) W( stalled in accordance with all governing ordinances of the City of Edmonds. Datedthis ............................ day of ................................................................ 1_9 ......... Check BEFORE you dig for: Water E], Gas E], Telephone Power Sewer Other "Sy ------ ------------------ .. .... ------ ----- ---------- 4., IN Ir -4- IZ, I The City of Edmonds OWNER /7 JOB ADDI�Z�S ---- - ----- 120 -------------- ;�/ APPLICATION for SIDE SEWER PERMIT NEW CONSTRUCTION REPAIRS E] EASEMENTNO . .......... --------------------------------- LID NO. ....... . ASMT. NO. ----------------- CONTRACTOR --- --------------------------------------------------------------- ---------------- PERMIT NO. LEGAL DESCRIPTION: LOT NO. .4- ----------------------------------- BLOCK NO - ---------------------- --------- RE- CEIVIEO �10 - � E -1 1 9 74 Approved: DATE............................................ By ............................................................ / ` . N n�� � �W� ` 0��� w ," �Tr UAL ~^ xrATs c� v:AxowG7nw /�vcuv^n' owmwm'm AND ' -- n� ^u STATE. «'v`, o^� TAXES' TOTALSPECIAL GENERAL �-, BUILDIN 2� V--' --___ ..--' ..~---'Ll- .~" "` -- - m"� °« -'7"- _ , - nm \ | :R | ( L-_1__--- , \ —/ ----- 3~4~74 ` ) SEC 07 TWP 27/RGEO�p4TH N �37,�� FT TH N � RT-lI� R�R El/4 CH N��^�� I0477 � IOI� OD FT T0 TpR T N 7FT TH S AL6 uov` r.`" ~ q8IT.�5 7 F\ |n ' �5* � IO� �// ou ` ''' EL� I�? \ * ' N ` %SU T T0 \r»LM \ W�Y 5� FT ~S S FT OF ���' i iAxp^,sn OF NW !BELOW 'y �! - » o Alba BURLINGTON NORTHERN RAILROAD STREET FILE 146 A'Oa 2000 First Interstate Center 999 Third Avenue PERMIT SERVICES Seattle, Washington 98104-1105 Telephone: 1-800-67&0145 APPLICATION FOR RIGHT-OF-WAY OCCUPANCY PERMIT Name: —MAR-14 4"r:;, OIXTA ;�6eA.Izr> Date: (2 17- 19 95' (Or Permit Holder) Address: j(o0t,?_�o TA�_�,:) —% -t70_A.T> or'31>s ' I klA_S�A I �9)nZ4;E -1-11 - Qpo w4, Contact Name: L EF-- V 1, 6 (z C- i A r&.�.9 Tel: ^&Imv - 9 .5 t; - Station: 'GeA-r-T-Ls (Nearest City) County: I "e-, State: WA i.960 ' 150074A Line Segment: MP: eF -it z I Survey Station: (If you have the above iaformation, please complete.) Is the work to be performed within 50 feet from the track? X Yes No How many feet from the track will the work be performed? /0 F67U r Total cost of project: `-'�>EZ' AT-T':A.C�AAi5T") Percentage of project done within 50 feet of tracks: Area To Occupy: 717-E -Feet by -Feet Purpose: '5Ct9?E OF Wo—zzj4 I. (,,ble A77- e-:.4 (M t 6_5 W4,T'S�V_' C,0"pTZkS;"r_, L,04-iDS hi -510 1�,&" te- - T,,.1 ki Q I �J G-t 71:> A f4 S�AA:1�7- i �4C-% Anticipated date to begin work: The cost of the Right -Of -Way Occupancy Permit is $300.00 for the first ten (10) year period hereof, due when the Permit has been signed by the Permittee and is returned for execution to the Burlington Northern Railroad, and $150.00 for each subsequent ten (10) year period. Also, Railroad Protective Insurance is required when work is within 50-feet of the track. This insurance will be offered when the Permit draft is sent. There will also be an ADDENDUM attached which is necessary when hiring a contractor and or subcontractor, which will require as our Application letter indicates, proof of General Liability, Auto, and Workers Comp. SIGNATURE: fi:2z -AT&zi4 t7e��- D A T E: i z - I -z '��e & Title) BNRR File: -1-A 4,53,07— )Z:;;4):) IA1710 7'#/S Plr-S WlElC-A14FvOrZ 1 9 OUT-r-,ALI,' —Ft*pp— 13T*H6;zc—, NOW. op Ir "4Y �4< v -4- 1 . . _a,�Araj> 4400SE; 2.0.-TA L a 07 rZ.V - q;%.Zocv AME'. F.A1477- �0. _­ ME rZ.-FEUX A LONd-i "MS 7riZACK- -.Fo)z. buz SAA1614T -WALL -'I PF -&''AT'wALL IL 00- J6 c vi rz T. fa..'pi WILL tF,�NTUALLX0--* o P, I -P S_ - el i J4 PS AezS. A. PAW*G; 1,EE* KIEM I C� SW OFAMS ri CITY OF EDMONDS-__ AGREEMENT FOR CONSULTANT SERVICES FOR REVIEW OF AN EXISTING CRITICAL AREA STUDY Mark Beard, hereinafter referred to as "Proponent," HongWest & Associates Inc., hereinafter referred to as "Consultant," and the City of Edmonds, Washington, hereinafter referred to as "the City," for and in consideration of mutual promises contained herein, agree and contract as follows: The City's Planning Official has determined that a Critical Area may exist on or near the subject property, pursuant to Edmonds Community Development Code (ECDC) Section 20.15.B. Ii. The City is in receipt of a critical area study which describes items in accordance with ECDC Section 20.15.B. 150 and directs independent peer review of the study. 1113. Paragraph 1113 shall be applicable only the life of this contract. The work of the Consultant and the critical area study review are for the purpose of providing the City with information and analysis, independent from the Proponent and the owner of the subject property. To that end, the Consultant shall, during the. life of this agreement, perform no other services for Proponent with respect to the subject property. In addition, the Consultant shall not perform services for the Proponent with respect to other property or proposed developments without full disclosure thereof to the City. Proponent specifically agrees not to communicate with, the Consultant, except for such communication as may be necessary for the Consultant to carry out the performance of this agreement. Any such communication between the Proponent and Consultant shall be carried on only in the presence of or with the prior approval of the City. Ill. Proponent agrees to pay to Consultant in the manner set forth in Section VII below the reasonable costs of having the critical area study reviewed. The Consultant has been recommended and selected by the City. Proponent understands and agrees to pay Consultant for actual time and materials expended in accordance with the scope of services set forth in Attachment "A" hereto, provided, however, that the total to be received by the Consultant for review of the critical area study shall not exceed the sum of $ 900. Progress payments are to be issued to Consultant in accordance with the provisions of Sections VII and IX in this agreement. IV. The Proponent agrees to cooperate reasonably with both Consultant and the City so as to cause the efficient and prompt review of the existing critical area study. The City agrees to make available to the Consultant all relevant information in the City's files. The proponent and their professional(s) will cooperate in the review of the Critical Area Study. V. The scope of services contemplated by this agreement shall consist of peer review of a critical area study which shall be delivered to the City on or before May 16, 1995. ' VI. Consultant shall prepare and deliver to the City up to 5 copies of the review of the critical area study. Vil. Proponent shall, within ten (10) days of the signing of this agreement: (a) Deposit with the City of Edmonds funds sufficient to pay for the cost of review of the critical area study, but not less than $ 900. subject to the provisions of subparagraph (b) below; Page I of 4 CA((YR))((#))Ct((I)ATr-)).CRITICAI.\CONTRACT E (b) Agree to disbursement from time to time of funds on deposit in said account to pay for Consultant services. covered by the Agreement. VIII. If the Proponent fails.to deposit funds with the City as specified in Section VII of this agreement within the required ten days, this agreement shall terminate. Ix. Consultant agrees to submit invoices for services and costs to date on a monthly basis along with a description of services rendered and a project progress report. The Consultant shall submit the original invoice to the City and a copy to the Proponent. The City shall pay the invoiced amount from the assigned account described in paragraph VII of this agreement within thirty (30) days of receipt if the *work covered by the invoice has been satisfactorily completed. X. In the event the City, in its sole opinion determines there is a need for changes in the scope of work in Attachment "A," the City shall obtain from the Consultant an estimate of , the total added charges and shall seek the Proponent's written approval, which shall not be unreasonably withheld. This Agreement shall then be amended to cover these changes, and the funds deposited accordingly to cover the changed scope of work. Failure to obtain such approval from the Proponent and to obtain an increase in the funds deposited to cover the proposed changes at the time of amendment, shall be grounds for suspension of work until agreement is reached. M. The parties hereto agree that the peer review of the critical area study and all supporting material therein submitted by the Consultant in the course of performing services under this agreement shall be, in the hands of the City of Edmonds, as public records and not subject to copyright. Consultant further agrees to make research notes and any other work products produced in performing this agreement available to the City for reproduction, upon completion of the critical area study, or sooner upon request by the City. mi. Unless otherwise specified within this, Agreement, this proposal shall be governed by the laws of the City of Edmonds and the State of Washington. MIL (a) The parties intend that an independent Consultant/City relationship will be created by this Agreement. No agent, employee, or representative of the Consultant shall be deemed to be. an employee, agent, or representative of the City or Proponent for any purpose. Employees of the Consultant are not entitled to any of the benefits.the City provides for City employees. The Consultant will be responsible for the acts of its employees, agents, and subcontractors during the performance of this Agreement. The Consultant further agrees to testify at any hearing concerning the project or the critical area study only if requested to do so by the City, unless pursuant to court order. (b) In the performance of the services herein contemplated, the Consultant is an independent contractor with the authority to control and direct the performance of the details of the work, subject to applicable regulations. However, the results of thework contemplated herein must meet the approval of the City, and shall be subject to the City's general rights of inspection and review to secure the satisfactory completion thereof, as required by ECDC Chapter 20.15.B. XIV. The Consultant shall not discriminate against any employee or applicant for employment . because of race, color, religion, sex, or national origin. Xv. The,City reserves the right to suspend or terminate this agreement on ten (10) days written notice to the Consultant and Proponent. If terminated or suspended, -Consultant shall be Page 2 of 4 CA((YR)X(#))Ct((DATE)).CRrrICALXCONTRACr 40 entitled to receive reasonable compensation for services rendered to the date of termination or suspension. The Consultant shall then invoice the City for all work performed in a satisfactory manner through the effective date of termination, and shall be paid by the City, subject to the limitations on liability contained in Paragraph IX; provided that if the termination is due to the fault of the Consultant, no payment shall be due. XV1. The Proponent reserves the fight to suspend or terminate this Agreement on ten (10) days written notice to the Consultant and City, and withdrawal of all related building, zoning, subdivision, and/or shoreline permit applications. If terminated or suspended, Consultant shall be entitled to receive reasonable compensation for services rendered to the date of termination or suspension. XVIL In the event that any legal action is necessary to enforce the terms of the Agreement, the prevailing party shall be entitled to recover from the other party a sum for reasonable attorney's fees, including reasonable attorneys fees incurred prior to the filing of the action. XVIR. Consultant agrees to report to the City any situation that might involve a possible conflict of interest in connection with the performance of the Agreement. The Consultant shall not have a financial interest in the proposal other than fees due under this Agreement. The Consultant will not perform any work or provide any services to any person in connection with or related to the Proposal, except as provided' in this Agreement. The Consultant has listed in Attachment "B" all present contracts or work for the Proponent. M. The Proponent agrees to provide the Consultant with a legal description of the project site, reproducible site plan or plans, copies of any relevant site studies produced by other consultants,'and such other information as required by the Consultant. The Proponent agrees to cooperate reasonably with both the City and Consultant so as to facilitate the efficient and prompt preparation of the critical area study. XX This Agreement, including the Attachments hereto, represent the entire agreement and understanding between the parties, and any negotiations, proposals, or agreements are intended to be integrated herein and to be superseded by this written Agreement. ATTACMVIENTS CA((YR))((#))Ct((DATE)).CRMCAL%CONTRACr Page 3 of 4 EXECUTED by -the parties hereto this /Z day of 19 CITY OF EDMONDS: B Laura Hall Mayor ATTEST/AUTHENTICATED: 6AI-K-11 ' I Rhonda March City Clerk CONSULTANT, By name: RA, 1t,4_ Go I'ZL4 &I'%_ fitle:- Va -; _e P#.* PROPONENT, name: fide.:_ APPROVED AS PLANNING MANAGER: By' By Scott Snyder Rob -C.have, Manager (City Attorney Planning Division Attachments: "A" - Scope of Services "B" Consultant/Proponent Contracts/R0ationships P �� OFA Page 4 of 4 CA((YR)X(#))CJ((DATE)).CRMCAL%CDNTRACr ATTACHMENT "A" Scope of work for Hong West & Associates in reviewing the Mark Beard project: Located at: 16920 Talbot Rd. Edmonds 1. Review the geotechnical report prepared by Associated Earth Sciences (AES) for conformance with the City of Edmonds Critical Areas Ordinance. 2. At a minimum the report prepared by AES should evaluate the subsurface soil and groundwater conditions in order ' to determine the general site slope stability, drainage characteristics, erosion potential, and to provide general recommendations for site development. 3. Review the methodology used, including, excavating test pits, laboratory tests or representative soil samples and ge'otechnical engineering analysis. 4. Provide analysis of the recommendations pertai ning to setbacks from top of slope. SPIRODOC CA FILE NO. Critical Areas Checklist* - Site Information (soils/topography/hydrology/vegftation)- 1. Site AddressfUcation: lro9zo -rAL�-ear 2. Property Tax Account Number: Q-1 a-1 041 (34-7-00 3. Approximate Site Size (acres or square feet): �M,200:5r- -0 SM. ;ZOW - 4. Is this site currently developed? X yes; —no. If yes; how is site developed? �Sp4te txwtiN - -one Skfot�e - 1- zaml.T- - I e4rqO4"e 5. Describe the'general site topography. Check all �at apply. VIU*r- L>_ Flat: Rolling: Hilly: Steep: less than 5-feet elevation change over entire site. slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). 14P F7-. VtSS W ezo r-T. slopes present on.site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe):. 1&BACA $L.UFV: T-0 13tU$EV- 6. Site contains areas of year-round standing water: fjo Approx. Depth: 7. Site contains areas of seasonal standing water: No Approx. Depth: What season(s) of the year? 8. Site is in the floodway- WO floodplain of a water course. 9.14Cke contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? (What time of year?,, 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) )( 11. Obvious wedand is present on site: M 0 For City Staff Use Only 1. Site is Zoned? ks- a 2-, SCS mapped soil type(s)? fe ff�,A.. _V 3. .-Wedandinvento orC.A. map indicates wetland present on site? 11149. ry 4. Critical Areas inventory or C.A. rnap indicates Critical Area on site? !�7-teeg :5.. Site within designated earth subsidence landslide hazard area? Ifle :6.. Site aesignat6d,dn the'Environinent.ally Sensitive Areas Map? DETERMINATION Rcv0Q/"/93 0 City of Edmon& 'e Alist Criti'da"I"'Ate-aS, Ch" C The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds -prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine wh6ther'any' potential Critical Areas are or may be present on 'the subject property. The..,, information needed to complete the % . Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City. will review the checklist, make a p��cursory site visit, and make a determination of"the subsequent steps necessary to complete a development permit application. ' I - '-1 With a signed copy of this form, the applicant should also submit a vicinity map o . i plot plan for individual lots of the'parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shaU include other pert inent infonnation (e.g. site plan, topography Map,. etc.) or studies in conjunction With this Checklist to mist staff in completing their prelirnina ry. assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). 'F—O-w—n-e-r"V Applicant: tAAF*-- vA-=Algv Name Street Address E:C>tA0t4r.1G -1-11 -CP04 City, State, ZIP Phone Signature Date Applicant Representative: UWE 4SE(C-b , A9CA%TEK-,-r Name Street Address -eEA7M-Z-,' q��MC4�> tq3J3--q43S" City, State, ZIP Phone /?) � f?) ^J; t- q-1q.qc1 Signature Date City of Edmonds Critical Areas'Determination Applicant: Mark Beard Determination CA-94-191 Project Name: Permit Number: 4104200 Site Location: 16920 Talbot Rd. Property Tax Acct I FT� Project Description non -project specific A site inspection of the property has revealed a steep slope which may be as steep or steeper than 30% and there is more than 20 feet of vertical elevation gain. Based on the above findings, it is determined that there is potential for critical areas on or adjacent to the site. A Critical Areas Study is required to delineate the boundaries of the potential critical area, its buffers and setbacks. For the steep slopes, a licensed surveyor must create a topographic map of the site which indicates all areas which slope 30% or more and have a vertical gain of 20 feet or more within the 30% slopes. The map must also show the location of the steep slope buffers and setbacks. All critical area studies shall'be performed as three party agreements with the city selecting the -consultant and the'property owner or applicant paying the fees. If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact aCritical Areas or its buffers, a conditional waiver may be issued on a project by project basis. Kirk Vinish Name Signatui­Q�/ Septeniber 26, 1994 Date CA FILE NO. Critical Areas Checklist Site Information (soils/topography/hydrology/vegetation) 1. Site Address/Location: 141AZO MAL--Eor 7_o4-C;, 2. Property Tax Account Number. QL_1 04-1 lbdr-Lo 0 3. Approximate Site Size (acres or square feet): C6jZC0:5F- -0 ;2.10W - t 4. Is this site currently developed? eS; —no. If yes; how is site developed? i!�jte 4aWUN - Vtre. t+_0CX - 15�r- - I d4Xq4� 5. Describe the general site topography. Check all dw apply. — Flat:* Ir less than 5-feet elevation change over entire site. yo Rolling�. slopes on site generally less than 15% (a vertical rise of 10-feet over a "'FIAT- sp horizontal distance of 66-feet). Ko Pr.ZtSS W Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). '5U,T-T7- Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): BEACkk 16LQ'FN= 170 13&11ZtZ- 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: NO Approx. Depth - What season(s) of the year.? 8. Site is in the floodway WO floodpWn of a water course. 9. �*e contains a creek or an area where water flows across the grounds surface?. Flows are year- round? Flows are seasonal?. (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wedand is present on site: M 0 V" 0*11nm City of Edmonds . Critical Areas Determination Applicant: Mark Beard Determination #: CA-94-191 Perrait Number: Project Name: Site Location: 16920 Talbot Rd. Property Tax Acct #: 1 0727 04104200 Project Description: non -project specific A� site inaction of the Rrope!ly has revealed a stM sl2ga..w �ich may be as steep or steeper than .. W.W.W.P.- 30% and there is- -more than 20 feet of vertical elevation gain. Based on the above findinas, it is determined that th�ential for critical areas on or ad;ace-t to the site. A Critical Areas Study is required to delineate the bound ries of the potential criticaf area, its buffers and setbacks. For the steep slopes, a licensed surveyor must create a t�q�ographic map of the site which indicates all'areas N�&ch slope ' 50% or more and �*ave a vertical gainof26-1�ei r 4;re"Zithin the'-3 )0% slopes. The map must also show the location of the steep slope buffers and setbacks. All critical area studies shall be performed as three party agreements with the city selecting the cg'n;ZYiW�a� the' 1p�6�p�eiit-yz6`NGe_�r or applicant pa in e e6e."' If the property owner wishes to apply for a specific development permit which they feel would not unpact the'Crifical'Areas, lbbated-bri tfie site,' tHe�`ffi`a'y'­sUAmTt'th"e'ir propo'sial-Idtifie' Planning Department for review. If the Planning Department finds that the proposed development permit "'d will not adversely impacilaT�nticir ea7ii—o-ri'liks u. ers, a conditional 'waiver may be issue on a rr6j"��6t by'p r6ici Ui­sT9`­' /V, - Kirk Vinish 06: / September 26, 1994 Name Signatura�/ Date IM PLANNING DATA SITE ADDRESS: 16 ? 2- 0 -r4b. � el DATE: r-q5-- ZONING: P 5 - I z PLAN CHK#: f5-- Z06 PROJECT DESCRIPTION: SETBACKS: Required Setbacks: Front: Z- r Left Side: 10 Right Side: (0 Rear: 2- Actual Setbacks: Front: Sl Left Side: 13 Right Side: I Rear: CORNERLOT 41b Yes/No) LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED A10 (Y/N) LOT COVERAGE: Maximum Allowed: 35-z Actual: BUILDING HEIGHT: . Maximum Allowed: Actual Height: Datum Point: Datum Elevation: SUBDIVISION: CRITICAL AREAS #: SEPA DETERMINATION: � . C/Z(— tq LOT AREA: OTHER: Plan Review By:— March 12, 1981 '6;A MEMO TO: RHONDA MARCH JACK MITCHELL FROM: MARGARET SUBJECT: ACCOUNT #302-03400 - Mr. Batchelder Property, Addres�s�; 16920 Talbo*t Rd Edmonds., Wa. I talked with Mr. Batchelder in Jan., 1981 concerning Mr. Deuterene, the renter in his house. He said the renterr,�was moving and wanted us to turn off the water. I informed Mr. Batchelder that the account was del iquent and we would turn the account off for non-payment but if he paid the bil I there was nothing we could do about turning off the account. We turned off the account, with a bill of 156.51 owing, on the 14th of Jan and he came in - and paid the bill in full on the 16th, (ali except the previous renters closing bill of 53.13.). He said they would be moving Jan-. 31, 1981 and would then call us for a closing. This information I passed on to Mr. Batchelder which seemed to satisfy him at this time. He wanted us to al so bi 11 the previous renter for the past due amount on her closing. The renter had never si gned up for this account , it was in Mr. Batchelder name. She sent in two separate checks to cover this closing and both were returned for insufficient funds. Since the checks did come from her and to please Mr. Batchelder, I did send her a new bill, informing her of her checks and received no answer. This is as far as I went on this account for I was moved to the Work Order Desk at this time. Mr. Bathelder asked to speak to the supervisor on 3/11/81. 1 took the call. Prior to taking the call I had talked with Wayne Tanaka who gave me further information on the lien law. The utility charge of $21 could be filed for. However, Jack and I agreed that the number of staff who have been involved over. a period of time in resolving this exceeded the amount of the A bill and to drop the $53.13 from his bill. I advised Mr. Batchelde-ril, of this determination. ....._-��I&nda Plarch 3/11/'81 REGARDING: 16920 Talbot Road STRE-)) E Ea T F � L E (address) R E C 0 R D 0 F C 0 N T A C T S DATE NAME,, PHONE NO.J. & ADDRESS of CALLER COMMENTS ACTION TAKEN INITIALS 5/l/74 John Batchelder Certified Letter No. 406416 sent Letter returned. Not claimed at TE 19419 27th Ave. NE requiring hook-up within 60 days. P.O. Referred to Jack for delivery. 6/24/74 Seattle., Certified Letter No. 406455 sent Letter received. Called office. TE wk - 587-5616 requiring hook-up within 60 days. No one in. 6/2S/74 Jack returned call. Has finan(�ial Ken to call when letter is typed TE problem. May have to install sewer and is to take out permit. himself. Requested ext. to 8/l/74. 7/1/74 Came into office and signed Letter TE of Ext. to 8/1/74 and obtained permit #4928. 7/12/74 Requested ext. to 8/12/74. Contractor Ext. granted and letter signed. TE cannot install until mid -August. 8/7/74 Connection completed. TE 0 CITY of EDMONDS 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works July 12, 1974 Mr. John Batchelder 19419 - 27thAvenue N.W. Seattle, Washington Re: Property at 16920 Talbot Road, Edmonds Dear Mr. Batchelder: In reference to your receipt of a Certified Letter of May 1, 1974, reqUesting' you to connect your property to the Edmonds sanitary sevier within sixty days; due to the hardship stated by you and indicated below, You are herewi th al I owed an extension to August 12, 1974? - sewer connection - in order to make the SUbject Time Extension Requested Because: Contractor will not be able to install side -sewer until mid -August. Sincerely, q F E N D S j J.H RB GILBO Director JBM:te ACKNOWLEDGED BY PROPERTY OWNE PROPERTY ADDRES MAILING ADDRES ALKNOWLEDGEMENT DATE: CITY of EDMONDS 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works June 25, 1974 Mr. John Batchelder 19419 - 27th Avenue N.W. Seattle, Washington Re: Property at 16920 Talbot Road, Edmonds Dear Mr. Batchelder: In reference to your receipt of a Certified Letter of May 19 1974, requesting you to connect your propert-y to the Edmonds sanitary sewer within sixty days; due to the hardship stated by you and indicated below, you are herewith allowed an extension to Auqust..l, 1974, in order to make the subject sewer connection: Tfine Extension Requested Because: At the Dresent time, the owner is financially unable to make the sewer commiction. In addition, the May 1,_1974, Certified Letter was received by the owner on June 24. Sincerely, —.-CITY MONDS J ERB GILBO Director JBM: te ACKNOWLEDGED BY PROPERTY OWNER: PROPERTY ADDRESS: MAILING ADDRESS: ACKNOWLEDGEMENT DATE: I �1 I DATE HOUR TO J WHI OU WERE OUT M t, 7 PHONE AREA CODE PHONE NUMBER TELEPHONED RETURNED CALL LEFT PACKAGE PLEASE CALL WAS IN PLEASE SEE ME E WILL CALL AGAIN WILL RETURN IMPORTANT 47 SIGNED LITTLE'S OFFICE SUPPLIES 1 11 PHONE 782- 10501 ROUTING FORM Lin Low 2. ,4. A 5. [Message: /0 'elvp,4 -c I or, '15W Date: EL-7-72 Z-�-7 Ks� 4 % Q) s- 0 Q) C =5 0 r— 4-) QV 4SC-0 OZO L :040 lIVW 1VNOIIVN831NI HOJ ION I L61 008C UJ �ps jaqjo OaS) VHnSNI ON —03QIAOHd 35VH3AO3 33N -1 Sd W 4-) ..... ...... ... .... ... ...... (pal!nbui "I 014x") A83A[130 JV133dS Pos . ......... . ...... - .... AlNO 33SS3HGOV 01 83AI13G 'A' 617 S9 . C.- ...... — Aluo aassaippe O� fAaAllap 41-M S33IA83S' pajaAtlap ajag/A pue, alup 'W041A 01 S..qS Z ld1333H . ....... AJUO a8SS�Jppe 01 AJaAklap I im . . 41 s 0 S.- I munl3a pajaAllap alep pue woq* ot A% q d S333 WN011100 82A S33IA93S UNOM a 31va Ho )48VWISOd 3dO3* d!Z G V ViS "O'd (V (INV 133HIS 01 lN3S c1li J:tt m .6.0 , , 0 C) W 6 7M 4-3 4-) 0 cy� CL % t 0 CL crl ag CD m a2elsod snid) odc—nm 631311H33 HOA Ldl333H '44 s- :0 74 cu 'si e 'MYSENDEM'lai6 I ns� e r, LLI -,PLEASE,-:�FURNISH��SEkVi6i�- -mbj&' b'-, §W- `6 14 E 0 -4) E E� 6� C7, 4.3 _j ShdW.'�icldm�s� �7- N I uj %cn:� f x Q�a resse'&-.��';.`., U ji B R, -f di �kre' or icie% ese 10 0 CIQ z 2 ii - s ,[..REGIST LL. 2 c:, SIGN RE 0 T, 0 z < 14 4e 4-) (L 4J 0 ;7) CERTIFIED NO;,— 1 - c� . - L. - m 17�. S.: :-- 'az -A M e: C> < E GNATURE- OF:ADDRESSEE'SL* ly Rs 'S iL L S -E. IINSURED "114 .':POST4 's, 'SliQYI: WHER9:,PF�l. DATE DELIVERED - VEREP.. 10TIC jOTItE" T v, 9 0 v *ON �Ly AYZ� ,;i T' Lsl� % Date: October 22, 2001 To: Teresa Stone From: Debbie Karber Subject: Customer Ref und Please prepare a treasurer's check in the amount of $760 payable to the following: Mark & Oleta Beard 16920 Talbot Rd Edmonds WA 98020 $560 Tran Code 7040 BARS# 001.000.000.273.70.00 Receipt #18492 $200 Tran Code 7050 BARS# 001.000.000.273.74.00 Receipt #18492 City of Edmonds UMMASMNT City of Edmonds PAGE 1 10/19/01 07:40- Print Master File Account Details Account: 3-08775 Screen 1 Tenant Information Owner Information 01 Name BEARD MARK S-T j AJ 10 Name 02 Care of 11 Care of 03 Addr 1 16920 TALBOT RD 12 Addr 1 04 Addr tA e-ve--r.-L 13 Addr 2 05 City EDMONDS 14 City 06 State WA 07 Zip 98026-5051 15 State 16 Zip 00000 08 Phone 425) 17 Phone (000) 000-0000 09 Status A 19 Water 0.00 ===Meter Reading Information== 20 Surcharge 0.00 18 Locatio,n 16920 TALBOT RD 21 Sewer 0.00 Current Previous 22 StrmDrain 0.00 27 Curr 0 28 Date 08/23/01 29 06/26/01 23 Swr Tax 0.00 30 YTD 2 31 Rdng 404 32 404 24 Previous Due 0.00 35 LTD 843 33 Rdng 0 34 0 25 Current Due 0.00 -- -- Dates 26 Balance 0.00 38 Extension Dt 00/00/00 39 Acct Setup 00/00/00 40 Last Pay 09/27/01 41 Last Bill 09/20/01 42 Due Date 10/20/01 36 Meter #: 6701 37 Location N OF DR N MTR Screen 2 Misc Codes Rate Codes Units ***Meter Info***. 01 Status A 14 Water 001 5/8 R 15 1.00 28 Meter BrndSR 02 Type 13 16 SurchargeOO1 TAX 17 1.00 29 Meter #: 6701 03 Cycle 02 18 Sewer 000 NOCHG 19 1.00 30 ID'Meter 04 In/Out 1 20 StrmDrain001 STMDR 21 1.00 31 Type M A 05 Sort Cd 0000. 22 Swr Tax 001 TAX 23 1.00 32 # Readings 1 06 Est Flag N 24 Misc 000 NOCHG 25 0.00 33 Meas Code HCF'' 07 #Tenant 1 26 Penalty 27 0.00 34 Install Dt 10/15/82 b8 #Owner ' 35 Shutoff Dt 00/00/00 09 Respon? T 36 Route 303 37 Sequ 2200 10 Penalty Y 38 Codes AE1AL 11 Past No'te T 39 ADDR CODE 1 00 12 Shut Note T 4"0 ADDR CODE 2 00 13 Account Info ? 41 Hist Memol 42 Hist Memo2 (It,ACE Tk-AkS CACC�OL)N)'T- f.,\ 1z V,j I L- L- '2 &- I �j C) S t-N-r- -T-(-� r- S P� t-x 6:� A,DD(Zess CKIeuj tAOUSE APr&P- OCmo) TKerz.<--- N 6L-lj oil �SIAOUL-D Bc- 1,N 0 (-- M(ZGC— F-0 R co - C- C r"J C- 4 A P, G Al :UMMASMNT City of Edmonds PAGE 2 10/19/01 '07:40 Print Master Pile Account Details Account: 3-08775 Cons Water Consumption 2001 ---------------------------------------------------------------------- 2000 1999 1998 1997 1996 1995 06 0 January 2 14 0 16 February 0 March 0 14 16 19 April 0 May 0 15 15 15 June July 0 15 35 26 August September 0 46 30 35 October November 16 23 31 December UTILITY SERVICE ORDER Today's Date Account Number Pulled Meter -Meter Written By 17�1 /t,, R6quested By Service Address T_ Water Service Date Turn -On- Turn -Off - C/B Read Location of Meter Reread Reread Leave D/H Edit/Cust. Current Read Date Current Read Previous Read Date Previous Read Consumption m7[ i i Read by uate Notes Closing Bills Sent To: Name ea kd Street Address city ovo State Zip Date New Meters Installed I I Size 3124 . Lock C] Unlocked Residential x Apartment Units Office Units Commercial Units Sprinkler Other Sewer Avail. Unavail. Meter Charge $ FS Connection $ H20 Connect $ __�Loo. $ Street Cut Total Receipt Permit Screen 1 ***Tenant Information"* ***Owner Information"' 01 Name 09Name 02 Care of 10 Care of 03 Addr 1 11 Addr 1 04 Addr 2 12 Addr 2 05 City 13 City 06 State 07 Zip 14 State 15 Zip 08 Phone 16 Phone 33 Meter #: 36 Acct Setup Date 34 Location Screen 2 **Misc Codes" ***Rate Codes*** "Units" 01 Status 14 Water 15 0.00 23 Meter #: 02 Type 16 Surcharge TAX 17 0.00 25 Type M A 03 Cycle 18 Sewer RSEWR 19 0.00 26 # Readings 04 In/Out 27 Meas. Code HCF 07 # Tenant 28 Install Dt. 08 # Owner 30 Route 09 Respon? 31 Sequ. 32 Codes D:udsvordtword FILE eTREET CITY.- OF. EDMONDS.. BARBARA FAHEY MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works Planning/Building Parks and Recreation Engineering Wastewater Treatment Plant C. January 28, 1998 Lee Kierig 957 N. Shoshone Hamilton, MT 59840 Re: Permit Application #97-51 @16920 Talbot Road/Beard Residence This letter is in response to your written request * received by my office on January 20, 1998 requesting the i ' ssuance of the.above reference. permit'application prior to the expiration date to avoid paying new plan review fees. Your request was forwarded t , o the City Engineer for a decision, since the last remaining. item'for permit approval is a drainage issue. Unfortunately, he has declined to allow this permit to be issued without an approved drainage plan.and Burlington Northern approval. Under Edmonds Community Development Code Section 19..00.010 permit applications. are valid for 180 days from the' date of 'submittal and only one extension for an additional 1.80 days is permitted by the Building Official. This application was received on' February 19, 1997 and extended on August 19,1997. The fina.1 expiration date for this application is February 19, 1998. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee� The plan review fee in this case is $1580.00. Furthermore,. it is probable that the State Building Code Council will be adopting the 1997 Uniform- Building Code and State Energy Code in June of 1998. In order to be vested under the 1994 Code that your project is ' currently governed by, full plan review and building, permit fees must be paid prior to the adoption of the new code. All development applications in the Stateof Washington are governed by specific application time frames for vesting purposes and these . timelines cannot be changed. If you have any questions'you may. contact me at 771-0220. Thank you. �eann�ineGra Building Official cc: Mark and Letie Beard EXPAPPL.DOC 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 14 January 1998 City of Edmonds Building Dept. Ms. Jeannine Graf 121 5th Ave. N. 14,V Edmonds, Wash. Re: Beard House D4Fpr 16920 Talbot Road Dear Ms. Graf: Per a telecon wi th your office this p.m., I am writing in regard to the above named project. We are currently in a 'holding pattern' on this project that has a current file in your department. We are trying to exact an agreement with the BNRR concerning our drainage design that goes through their property and under the track. This will be for our storm out -flow. I spoke with Mr. Christman who referred me to the building dept. for an answer to our question regarding the status of our permit. We expect to come into an agreement' with the BNRR directly, but it might not happen before our current permit comes due on Feb. 19, 1998 for renewal fees. Mr. Beard has currently paid in excess of $2,000.00 to keep this project current. We are wondering if there is some way for us to get on with portions of the project while we wait for the BNRR to complete their paper dance. We are committed to an agreement with them as it is our only way to satisfactorily discharge our out -flow. Notwithstanding, we will not actually connect to that system until late Summer or early Fall. We would like to be able. to get started in.this early Spring. We would like to avoid another $1,000.00 charge if at all possible. Your help and, kind consideration in this matter would be greatly- appreciated. Please call me at 4.o6-363-o983 if you have any questions. We are not looking, in any way, to circumvent any requirements ... only to find a way for us to begin or roll some of the previous fees into this context where we expect to follow through with this project. Thank you for your time. sri'nc, ely,_ LEE KIERIG ARCHITECT E --A A.. T W. STREET FILE. d S TAr r L, U 0 &16 112 Co P. eo ila4s 22 January 1996 Comm. Services Mr. Lyle Christman 250-5th Ave. N. Edmonds 1LZe:7?2 0 EN(31NLL_JiA1t4'3 Re: Telecon 19 Jan. 1*996 8 Detention system waiver request JAN 2 4 .1996 BEARD House 95-206 Dear Mr. Christman: Per our telecon, referenced above, I am submitting this letter,, on behalf of our project, to request a waiver on the requirement for a storm water detention system as prescribed by Edmonds city code. As is the case for detention systems, their purpose is to regulate 'the discharge rate of excess run-off when that discharge is into a public storm sewer system. The regulated discharge is intended to alleviate a surge that, when combined with others tied to the system, might tend to overload the capacity of t'he system. This is normal to prudent engineering and exists as a precaution to causing flood problems. In our case, we will not connect to the public system. We have asked f or and have been granted permission by the BNRR to directly discharge our run-off into an existing drainage way that currently provides direct access to the Sound. Moreover, our system is privately funded and does not fall into the category of public welfare protection which is the case for the public system. BECAUSE our run-off has immediate access to an unobstructed discharge, the BNRR has granted their approval for use of their 24" culvert and does not require a regulated discharge. I trust that this request will be approved as we are not affecting the life, health, safety and welfare of the public whose domain is outside these private works. Thank you for your kind attention. Please call me if you have any further.interests. Si erely, j L rig AR 4ITECT 0111 STREET FILE PLANNING DATA SITE ADDRESS: 19 ?Z-0 Pj DATE: (—(-5--16 ZONING: PC, /Z PLAN CHK#: I? �_-,70 a PROJECT DESCRIPTION: �� tz� P, SETBACKS: Required Setbacks: ' t 0 Front: . z_ 6-. Left Side: Right Side: -!A- Rear:Z Actual Setbacks: Front: 57 Left Side: I Right Side: Rear:_ 5 CORNERLOT A/0 —(Yes/No) LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED / __ 1/0 (Y/N) LOT COVERAGE: -ell Maximum Allowed: Actual: BUILDING HEIGHT: Maximum Allowed: ActualHeight: 110 1011-4 Datum Point: PO U.1e Datum Elevation:- q 7, 5— SUBDIVISION: CRITICAL AREAS #: 1?4( — , ? / SEPA DETERMINATION: LOT AREA: 7, 7—ro 0 0 0 OTHER: Plan Review RECEIVED -0F11Y 7v- G NOV 3 0 1995 PERMIT COUNTER SUBSURFACE EXPLORATION, GEOLOGIC HAZARDS AND GEOTECHNICAL ENGINEERING REPORT RECEIVED FEB 15 2000 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS BEARD RESIDENCE EDMONDS, WASHINGTON Mark Beard PROJECT NO. G95003A JAWARY 1995 ASBOCIATEO AMMANEARTH SCIENCES, INC 911 - 5th Avenue, Suite 100, Kirkland, WA 98033 (206) 827-7701 FAX (206) 827-5424 SUBSURFACE EXPLORATION9 GEOLOGIC HAZARDS AND GEOTECHNICAL ENGINEERING REPORT BEARD RESIDENCE EDMONDS, WASHINGTON January 30, 1995 Project No. G95003A 1. PROJECT AND SITE CONDITIONS V This report presents the results of our subsurface exploration, geologic hazards and geotechnical engineering study for the proposed new Beard residence. The approximate locations of the explorations accomplished for this study are shown on the site and exploration plan, Figure 1. In the event that any changes in the nature, design or layout of the project are planned, the conclusions and recommendations contained in this report should be reviewed and modified, or verified, as necessary. ' ME a I ' I -- - 4Q$J The purpose of this study was to provide subsurface data to be utilized in the design and development of the proposed new home construction. Geotechnical engineering studies were conducted to determine the depth to the foundation bearing strata, the type of suitable foundation, the allowable foundation soil bearing pressure, anticipated foundation settlement, floor support recommendations and drainage considerations. Geologic hazard evaluations were also completed to determine if mitigations would be required for potential seismic, landslide, and erosion hazards and a minimum top of slope setback distance. This report summarizes our current field work and offers development recommendations based on our present understanding of the project. 1.2 Authorization Written authorization to proceed with this study was granted by Mark Beard by executing our proposal dated January 5, 1995. This report has been prepared for the exclusive use of Mr. Beard and his agents, for specific application to this project. Within the limitations of scope, schedule and budget, our services have been performed in accordance with accepted geotechnical engineering and engineering geology practices in effect in this area at the time that this report was prepared. No other warranty, expressed or implied is made. It must be understood that no engineering design or geologic analysis can yield a guarantee of stable slopes. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. 2.0 PROJECT AND SITE DESCRIPTION This report was completed with an understanding of the project based on a topographic survey dated April 22, 1993 prepared by Darrell Ford and Associates, and undated development plans prepared by Lee Kierig, Architect. The project site was located in a residential neighborhood west of Talbot Road atop a west -facing marine bluff in north Edmonds, Washington. The property was roughly rectangular and measured approximately 100 feet north -south by about 260 feet east -west. An existing residence and detached garage occupied the central portion of the property, and it is our understanding that these structures will be razed prior to construction of the new residence. According to the present plans, the new structure will be a two-story home with a partial basement, and will be constructed at essentially the same location as the existing structure. Most of the property was relatively flat to gently sloping down to the west. The western -most 40 feet of the property was along the marine bluff that was about 80 feet in height, and sloped steeply down to the west at a gradient of about 100 percent. The bluff was heavily vegetated with small saplings, blackberries, vines and other brush. A Burlington Northern railroad right- of-way with two sets of tracks ran along the base of the bluff. No surface water was- o*bserved on the site or on the upper portions of the bluff at the time of our field work. Also, no evidence of recent slope movement was noted at the time of our study. According to the client, a drainage ditch was located along the railroad grade. This ditch is periodically brushed out and cleaned by the railroad. Apparently, following the removal of vegetation along the toe of the slope, some shallow sloughing of soils usually occurs in this area. 1 3.0 SUBSURFACE EXPLORATIO Our field study included excavating three exploration pits, using a track -mounted excavator. The pits permitted direct, visual observation of subsurface conditions. The materials encountered were studied and classified in the field by an engineering geologist from our firm. Selected samples were then transported to our laboratory for further visual classification and testing, as necessary. All exploration pits were backfilled immediately after examination and logging. The various types of sediments as well as the depths where characteristics of the sediments changed are indicated on the exploration logs presented in the Appendix. Our explorations were approximately located in the field by measuring from known site features shown on the site and exploration plan, Figure 1. Because of the nature of exploratory work below ground, extrapolation of subsurface conditions between field explorations is necessary. It should be noted that differing subsurface conditions sometimes may be present due to the random nature of deposition and the alteration of topography by past grading and filling. The nature and extent of any variations between the field explorations may not become fully evident until construction. If variations are observed 1 2 I at that time, it may be necessary to re-evaluate specific recommendations in this report and make appropriate changes. 4.0 SUBSURFACE CONDITIONS Subsurface conditions at the project site were inferred from the exploration pits, the visual reconnaissance of the site, review of the Edmonds Quadrangle Geologic Map, and a review of the supplied topography. Within the property boundaries, the stratigraphy encountered included fill soils overlying natural deposits of gravelly sand, and sandy silt. These units are described in the following sections in the order they were encountered from the surface, followed by our observations of the hydrology of the site. 4.1 Fill Soils Fill soils (those soils not naturally placed) were encountered in two of the three exploration pits. The fill consisted of loose, moist, dark brown to brownish gray, gravelly fine sand with some silt and abundant roots. The fill was encountered at the surface (beneath a topsoil horizon) and extended to depths ranging to 2-1/2 feet in EP-2, to 4-1/2 feet in EP-1. ,T�e q11ality ill materials m be variable and is undc thickness and compaction of the f gy ,Therefore, if fill is encounfe-r-ca �duringconstructioh at the site it should be considered 4.2 Gravelly Sand Underlying the fill soils, and near the surface where the fill was absent, all three of the exploration pits encountered a loose to medium dense to dense, moist, brownish gray to yellow brown, gravelly fine to medium sand with some silt. This unit was encountered from 4-1/2 feet to below the 10 foot termination depth of EP-1, and from 2-1/2 to 6 feet in EP-2. In EP-3 this unit was encountered at the surface (beneath a topsoil), and it extended to below the 5 foot termination depth of this pit. The gravelly sand was interpreted as advance outwash that was deposited by'meltwater streams emanating from an advancing glacial ice sheet. These sediments were overridden by the glacial ice and consolidated to a dense state by the weight of the ice. The loose to medium dense character of the near surface portions of this unit is attributed to weathering, and the development of roots within this unit. 4.3 Sandy-5i Underlying the gravelly sand, a stiff to hard, moist to wet, light brown, mottled, brecciated, sandy silt with trace gravel was encountered in EP-2. The silt extended from 6 feet to below the 10 foot termination of EP-2, and was interpreted to underlie the entire site at depth. [ - I I 11 I I I I I 17, _1 -1 I r I 1-1 The sandy silt was interpreted as glacial sediment deposited in a pr'oglacial lacustrine Oake) environment created in front of, or within an advancing ice sheet. The stiff to hard state of this material is also attributed to glacial consolidation. 4.4 Hydrology No surface water was observed at the site, and in general the near surface sandy soils at the site appeared to be well drained. Light ground water seepage was encountered at a depth of 7 feet in EP-2, within the sandy silt unit. The amount of seepage was minor, considering that our explorations were conducted following a two month period (November -December 1994) with above average rainfall. Fluctuations in ground water levels at the site will occur due to the time of the year and variations in rainfall. Random seepages could also occur during the wetter times of the year in isolated areas within the fill soils. 4 7 I January 30, 1995 Project No. G95003A H. GEOLOGIC HAZARDS AND rvHTIGATIONS Our interpretation of geologic hazards on the property is based on the stratigraphy encountered, as well as the slope and hydrologic conditions observed during our field reconnaissance. Potential hazards include those related to seismic (earthquake) activity, landslide or mass -wasting hazards, and erosion hazards. The potential risk of these hazards and their mitigations are discussed in the following paragraphs. 5.0 SEISMIC HAZARDS AND RECOMMENDED MMGATIO Earthquakes occur in the Puget Sound region with great regularity. The vast ma ority of these events, are small and are usually not detected without instruments. However, large earthquakes do occur as evidenced by the 1949, 7.2 magnitude event in Olympia, and the 1965, 6.5 magnitude event in Seattle. The 1949 earthquake appears to have been the largest in this area during recorded history. Evaluation of earthquake return rates indicate that an earthquake of the magnitude between 5.5 and 6.0 could occur within the next 8 to 12 years in the Edmonds area. Generally, there are 4 types of potential geologic hazards associated with large seismic events: 1) surficial ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground motion. The potential for each of these hazards to adversely impact the proposed project is discussed below. 5.1 Surficial Ground Rupture The majority of large earthquakes that have occurred in recent times in the Puget Sound area are sub -crustal events with epicenters ranging from 50 to 70 kilometers in depth. No surficial faulting, or earth rupture, have been documented to date within two miles of the Beard property, according to previous geological mapping by the U.S. Geological Survey (Yount 'and Gower et al, 1991, U.S.G.S. Open file report 91-147). Therefore, it is our opinion, based on existing geologic data, that the risk of surface rupture impacting the proposed project is low. 5.2 Seismically Induced Landslides The greatest risk of seismically induced landslides within the Puget Sound region occurs within unconsolidated sediments along steep slopes (greater than 40% gradient). The marine bluff on the west side of the property does slope steeply, however the slope is interpreted to be underlain by consolidated glacial sediment5j Tli—eref&—eff-i ...opinion. that, the risk, of seismicall ' YJ Filff6ced landslid�� affecting .. !�e pLop qsed home is lQw,, -roVided that the _�Iopq setbaqk 6i I I 7 f lmen6ti6h- ' p repoorit are followed. 5.3 Liquefaction Liquefaction is a process in which soil loses strength during vibratory shaking, which can result in large ground deformations. The weight of a soil is supported both by grain -to -grain contact of soil particles and by the pressure of water in the pore spaces between the particles. Vibratory shaking can disrupt the grain -to -grain contact, increase the pore water pressure and result in a decrease in the soil shear strength. The soil is said to be liquefied when nearly all of the weight of the soil is supported by its pore pressure alone. Soils most susceptible to liquefaction are loose sediments, composed of mostly fine sand to coarse silt, that are in areas with high ground water. [TTe —pore-ntiAl-ffirliqueficffoif -affatiff g--the-developmeFn on tlfe- —property-W—consid&W �Iow, due ro-tite7-consolidated-state-and/or-coarse-granular-nature-of-stratigraphy-encountetdd-afi-d-the lack of adverse ground water conditions. 5.4 Ground Motio Based on the stratigraphy and visual reconnaissance of the site, it is our opinion that earthquake damage to the proposed new home would be caused by the intensity and acceleration associated with the seismic event and not any of the above discussed geologic hazards. This opinion assumes that all structures are founded on a suitable foundation bearing strata, and constructed according to the top of slope building setback limits outlined in the following section. Structural design of the buildings shoulil-J61low ifie lit_est--Un_if5F­mBWrdi Code (UBC) standards. for �Seismi7cZone 3 and take into consideration stress caused, by seismicatly -ind u-ced earth shaking.. 1 6.0 MASS WASTING HAZARDS AND MMGATION The marine bluff along the west side of the site sloped at gradients as high as 100 percent over a vertical height of about 80 feet, and present a moderate landslide risk. The greatest risk from landslide damage-Qccurs down -slope of the failure, to structures directly Ln th-e-path-of-the-slid-e. he Ian , �sli�e risk tl�erefore 'shoula not affR_ttfi&­—prqposed new home, if it is set back a'suitable- distance back from the top of the slope. Based upon the site stratigraphy, hydrology, and Oppe- rgr�dients, we recommend a 'Minimum 40 foot top. of slope building setback for the new ho- m-e-. In add itio-n—to the —above b u fl-d in igsetti-ack reco m mendifidn-,-aIrr—unof f -ffo—m M p—ermeablie —su ifici—es should be collected- and tightlined into.a suitable storm. water drainage system during Pd, after con stiMi '—onof lfi�eproj ect., , Under no circumstances and at not time I should water'be disch arged. I on or above steeply sloping areas. Likewise, fill'br debris must not be pIa&&ITadJ­aceni to or on Lthe steep j1ope.jV_nc6ntroIled filfing over 'the top of-tl�e-sFope—wilV�romote-la�dslidig-6r-d6b-ris- Iflow activity. 1 6 I I Continued cleaning of the ditches at the toe of the slope by railroad maintenance crews within their right-of-way could trigger shallow debris flows, as has been reported in the past. Although we did not observe any evidence of soil movement during our site reconnaissance, the owner should periodically monitor the condition of the slope. If there ever is a question regarding the condition of the slope, please contact our firm and/or the railroad about their maintenance practice along the right-of-way. 7.0 EROSIGN HAZARDS AND MMGATION The near surface soils encountered at the Beard property possesses a moderate to high potential for erosion from concentrated flow, such as uncontrolled storm water drainage. To mitigate the erosion hazard potential and offsite sediment transport, we would recommend the following: 1) Storm water from impermeable surfaces, such as driveways and roofs, should be tightlined into a suitable storm drainage facility or discharge via tightline to the toe of the bluff, and not be directed onto or above the west marine bluff. 2) Silt fences should be placed along the lower elevations of disturbed areas. 3) Soils which are to be reused around the site should be stored in a manner that would reduce erosion, such as covering with plastic sheeting, using low stock -piles in flat areas, or the use of hay bales/silt fences. 4) Areas stripped of natural vegetation during construction should be replanted as soon as possible or otherwise protected. 5) The existing vegetation along the bluff should be left in its present state and at no time should vegetation be removed from the bluff. 7 January 30, 1995 Project No. G95003A M. PRELEMINARY DESIGN RECONMIENDATIONS 8.0 INTRODUCTIO Our exploration indicates that, from a geotechnical standpoint, the parcel is suitable for the proposed new home construction, provided the recommendations contained herein are properly followed. In general, the glacially consolidated sediments (gravelly sand or sandy silt) that underlie the site from approximately 3-1/2 feet to 5 feet below surface grade will be capable of ,�- — - __ __­__­� _�X providingysuitable support for conventional- spread footing foundations'. -66uldalso"b'e su'vvoked on -the natural bearin . ir sedimen . ts or structural fill that overlies natur,-d co—nsid- The contractor should be:aware that filled areas exist and.are.not Fred—suffibli for foundation 'suovort., FBased on our xploration, t — Rke-st-fill-ed-ifeas —occurwthe�-west­of -the existing residence, with little or no fill to the east of the existing structures. The -filled areas will FfN__uife-ddEp­pned- ootings or removal and replacement of the existing fill material with structural -f Iiia— fill'pflor'? to constructing a new -foundation. JTffie ill y 5e capa6lF of Upp—ortffig a slib--dn- -k—rad[E-flo—or, 15-ut-this-sh-offild-Ke —revi—ewed-it-tfie time of construction. 9.0 SITE PREPARATI �jite-preparation-w.ill-inclo,d�z the demolition of the existing structure. t-The'debris from thisl qpSration-sliQuIld-be __taken to an offsite disposal area and-ifie —resulfi—ng depression -should be excavated to medium den'se,' natural sediments and then backfilled with structural filIF Within fhe ­Tnew b-uil-di—ngarea the upper organic topsoil lay .r should be stripped and the remaining roots grubbed. Any existing trees, brush, debris or other deleterious material should also be removed. Areas where loose surficial soils and fill soils exist beneath the building footprint should be considered as unsuitable and this material should either be removed and replaced with structural fill or recompacted to its full depth. Since the density of soils is variable, random soft/loose pockets may exist and the depth and extent of stripping can best be determined in the field by the field engineer. 10.0 STRUCTURAL FILL All fill should be placed in accordance with the recommendations outlined in this section. Prior to filling, topsoil, organics, and loose soils should be excavated from the subgrade as advised by the field engineer. After overexcavation/stripping has been performed to the satisfaction of 8 the geotechnical engineer, the upper 12 inches of exposed ground should be recompacted to 90 percent of the modified Proctor maximum density using ASTM:D 1557 as the standard. After recompaction of the exposed ground is tested ' and approved, structural fill may be placed to attain desired grades. Structural fill is defined as non -organic soil, acceptable to the geotechnical engineer, placed in maximum 8 inch loose lifts'with each lift being compacted to 95 percent of the modified Proctor maximum density using ASTM:D 1557 as the standard. The contractor should note that any proposed fill soils must be evaluated by Associated Earth Sciences, Inc. prior to their use in fills. This would require that we have a sample of the material 48 hours in advance to perform a Proctor test and determine its field compaction standard. Soils in which the amount of fine-grained material (smaller than No. 200 sieve) is greater than approximately 5 percent (measured on the minus No. 4 sieve size) should be considered moisture -sensitive. Use of moisture -sensitive soil in structural fills should be limited to favorable dry weather conditions. If fill is placed during wet weather or if proper compaction cannot be obtained, clean, free -draining gravel and/or sand should be used. Free draining fill consists of non -organic soil with the amount of fine-grained material limited to 5 percent by weight when measured on the minus No. 4 sieve fraction. A representative from our firm should inspect the stripped subgrade and be present during placement of structural fill to observe the work and perform a representative number of in -place density tests. In this way, the adequacy of the earthwork may be evaluated as filling progresses and any problem areas may be corrected at that time. It is important to understand that taking random compaction tests on a part-time basis will not assure uniformity or acceptable performance of a fill. As such, we are available to aid the owner in developing a suitable monitoring and testing program. 11. 0 FOUNDATIONS Spread footings may be used for building support when founded on stiff/dense natural soils (approximately 3-1/2 feet to 5 feet below present surface grade), or approved structural fill bearing on the natural sediments. For building support, structural fill and recompacted natural soils should be compacted to a minimum of 95 percent of the maximum dry density as defined by ASTM D-1557. Structural fill placement must be inspected by AESI to verify suitable subgrade preparation and compaction. We recommend that an allowable bearing pressure of 2,000 pounds per square foot (psf) be utilized for design purposes, including both dead and live loads. An increase of one-third may be used for short-term wind or seismic loading. Perimeter footings should be buried at least 18 inches into the surrounding soil for frost protection; interior footings require only 12 inches burial. However, all footings must penetrate to the prescribed bearing stratum and no footing should be founded in or above loose, organic, or existing fill soils. I I I I I 12.0 FLOOR SUPPORT Slab -on -grade floors may be used over the stiff/dense natural sediments or approved structural fill. In each case, the upper 12 inches of subgrade must be compacted to a minimum of 90 percent of the modified Proctor maximum density as determined by ASTM:D 1557. A polyethylene plastic vapor barrier and pea gravel capillary break layer should be used under floors likely to receive an impermeable floor finish or where passage of water vapor through the floor is undesirable. Based on American Concrete Institute recommendations, we suggest placing a two to three inch layer of clean sand over the vapor barrier to protect the vapor barrier and to allow some moisture loss through the bottom of the slab to reduce warping in the curing process. Sand should be used to aid in the fine grading process of the subgrade to provide uniform support under the slab. 13.0 DRAINAGE CONSIDERATIONS tAll basement retaining walls and perim t r 0-0 iig­w_a1l_ssfio__uld_Fe, —provi7de—dwi7th —adri-alin at —the Ffooting elevation. Drains should consist'of ri id, perforated,.PVC pipe' surrounded, by� washM 9 b,pea gravel. �elvvel �of thieeifo-rations in the- Vesfiould be —set appr6x_imatet� 2 inches below __perl pi W .,,the bottom ' o he footing an the drains should be constructed with sufficient iradient to allow gravity-dfizharge '�way iffoim' the building. All basement/retaining walls should be- rtned;,with a� �tnimuM f27iiFcli__thiZlZ —washe-d7fr—avef "an et provided over the full -height of thd� wall, which'ti6s:into the,footing drain. 1 pl' n- anning-;' exteifo �gradiesadj�acent to �wall�s�l�o�uldbe ikiliEd-6wnward aw—ay ffo—mNe —structure to achieve positive surface drainage. Roof and surface runoff should notdischarge into the footing drain system but should be handled by a separate, rigid tightline drain. Both footing and downspout/pavement drainage should then be tightlined to a suitable storm water drainage system, or to the toe of the marine bluff to the west of the site. 14.0 PROJECT DESIGN AND CONSTRUCTION MONITORING We are available to provide additional geotechnical consultation, as the project design develops and p��ssibly han recommen- 11fiat7Associa—ted' Earth-Sciences,-,,Iq;z.,-,Orform.a.ge�Qtcqhiit I offile qq,, revie;� o iw!�desigpcomp etiog- _pW� pA__FJqJf__ _ __ _L_ In this way, our earthwork and foundation recommendations may be properly interpreted and implemented in the design. We are also available to provide geotechnical engineering.and monitoring services during construction. The integrity of the foundation depends on proper site preparation and construction procedures. In addition, engineering decisions may have to be made in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not 10 I i part of this current scope of work. If these services are desired, please let us know and we will prepare a proposal. We have enjoyed working with you on this study and are confident that these recommendations will aid in the successful completion of your project. -If you should, have any questions, or require further assistance, please do not hesitate to call. Sincerely, ASSOCIATED EARTH SCIENCES, INC. George H. Bennett, C.P.G. Engineering Geologist A VRonald A. Paikir, P.-G. Principal GHB/ld G95003A.1 WP.1/10/95 Id 11 /+ 268 0 P, 01 SION Bruce L. Blyton, P.E. Senior.Project,Engineer =dh CP va co 0 0 co PROPOSED �EW HOUSE EP 2 ow> <'nO I DRIVEWAY MO 1; C EP-1 *not I HOU4 TO BE 4EP-3, REMOVED j irLs Ij em OLAW , 10 P-1 0 Approximate location of exploration pit '01- 0 40 80 I I i SCALE IN FEET ASSOCIATED EARTH /4=MM SCIENCES, INC %9 4v SITE AND EXPLORATION PLAN BEARD RESIDENCE EDMONDS, WASHINGTON G95003A 1/95 FIGURE I- EXPLORATION PIT LOG 0 Number EP-1 5 10 15 Topsoil; loose, moist, black with sod. Loose, moist, brown -gray, gravelly, fine SAND with some silt, roots, some wire debris. Old topsoil at base. (Fill) Loose, moist, red -brow n, silty, fine SAND. Loose to medium dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND. Loose pockets. Dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND with some silt. BOHF @ 10' Note: No seepage; caving 078'. 0 Number EP-2 5 10 15 4" Sod. Loose, moist, dark brown and red -brown, organic-dch, gravelly, fine SAND with some sift, abundant roots. (Fill) Medium dense with loose pockets, moist, yellow -brown,, gravelly, fine to medium SAND. Stiff to hard, moist to wet, light brown, sandy SILT, brecclated. BOH 0 10' Note:'Tight seepage at T; caving Tto 5'; light spalling at seepages. Subsurface conditions depicted represent our observation at the time and location of this exploratory hole. modified by geologic Interpretation, engineering analysis, and judgment. They are not necessarily representative of other times and location. We wig not accept responsibility for the use or Interpretation by others of Information presented on this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 EXPLORATION PIT LOG 0 5 10 15 Number EP-3 4" Topsoll/sod. Loose to medium dense, moist, red -yellow-brown, gravelly, fine SAND with some sift, abundant roots, loose pockets to 3', becomes dense below 3-1/2'. BOH Q.5' Note: No seepage; no caving. n Number 5 10 15 Subsurface conditions depicted represent our observation at the time and location of this exploratory hole, modified by geologic Interpretation, engineering analysis, and judgment. They are not necessarily representative of other times *and location. Wevvillnot accept responsibility for the use or Interpretation by others of Information presented on this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 i 33HS 3M 'ON 80f As A a,7 R/ IX IV -�71W,7 ,�4 IN .7 .�Wyp-,.e relVP77dY� AZ ey, Z7 71 ,7 Z7 W. 7-, V., r 7 0 F Z ,e .!F,�71a,O�jV - 7,71*r" ZRIV11WI-FWA7 -J r ' f47,ff1;W1-'Pl �7 7 J71yl yAW�r .,Jj'Vr X7 .7,717 av . / J,2 6 WX 7j--, ' 7z v Ire fle7 -711407 .77/ pj 12 LD CD L I L w rq 0 7 70 c 0 7 La pM-3 MI) r-.0 T, I t - r % ,7,1 G�- k e VVI� IV' tr f ad JILL aw. Af di t iw Of A A A , f.0 . It 11,zffo /v W 4%,111 7, ig rl�y -mig-tctm of N Lf) M01, k.ji r-4 Lo 17 AT r) y"; ff �X w LO Air U-1 N I- r-, LO b, R:� A7, iLO ob .4 LO M. 1. 41 Z, .. 60 M t tj tA Ole .jQ 4A fM� 14 jesul sulo Appendix: Site Existing and Developed Hydrographs I � -2,0� co (Z— go. (L-�L p 7 I CL E 00 Lo Lo (D Lo r- tm a zw I V� 2,o T" t VV\ lie, Toko C-Kyoo� Mo �Lk 0%.,, 0, (v V,(,- tx,:, V, s5l�G 477C.1 L L e, t C L, `7 1 O)r co Cbf 0.. 0 C- 0.? J5 t\ Legend Runoff Combined ChannelReach Diversion Pond Route IProject: c2000beard.GPW I IDF: SAMPLE.IDF 1 3 hyd's 1 03-14-2000 1 TR55 Tc Worksheet Hyd. No. 1 Pasture Model - Pre -Existing Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 225.0 ft Two-year 24-hr precip. = 1.50 in Land slope = 7.6 % Travel Time ........................................ 16.1 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.0 % Surface description = Paved Average velocity = 0.00 fus Travel Time ........................................ 0.0 min Channel Flow Cross section flow area = 0.0 sqft Wetted perimeter = 0.0 ft Channel slope = 0.0 % Manning's n-value = 0.015 Velocity = 0.00 fus Flow length = 0.0 ft Travel Time ........................................ = min Total Travel Time, Tc ........................ = 16.1 min Page I TR55 Tc Worksheet Hyd. No. 2 Developed Condition Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.150 Flow length = 92.0 ft Two-year 24-hr precip. = 1.50 in Land slope = 5.4 % Travel Time ........................................ 9.0 min Shallow Concentrated Flow Flow length = 112ft Watercourse slope = 0.5 % Surface description = Paved Average velocity = 1.44 ft/s Travel Time ........................................ = 1.3 min Channel Flow Cross section flow area = 0.0 sqft Wetted perimeter = 0.0 ft Channel slope = 0.0 % Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ = min Total Travel Time, Tc ........................ = 10.3 min Page I Hydrograph Summary Report Page 1 . Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 0.02 6 492 648 10 — Pasture Model - Pr 2 SCS Runoff 0.12 6 480 1,862 10 — — — Developed Conditio 3 Reservoir 0.02 6 1194 1,862 10 2 79.34 728 Detention Pipe Proj. file: c2000beard.GPW OF file: SAMPLEOF Run date: 03-14-2000 Hydrograph Plot Hyd. No. 1 Pasture Model - Pre -Existing Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage. area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.00 in Storm duration = 24 hrs M lei 0. a M 13 English Peak discharge = 0.02 cfs Time interval = 6 min Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 16.1 min Distribution = Type IA Shape factor = 484 Total Volume = 648 cuft I - SCS Runoff - 10 Yr - QP = 0.02 ds Time (hrs) 5 / Hyd. 1 Hydrograph Plot Hyd. No. 2 Developed Condition Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.00 in Storm duration = 24 hrs English Peak discharge = 0.12 cfs Time interval = 6 min Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.3 min Distribution = Type A Shape factor = 484 Total Volume = 1,862 cult 2 - SCS Runoff - 10 Yr - QP = 0.12 ds 0.15- 0.10- Hyd. 2 CY 0.05- 0.001 Ile 0 10 15 �O �5 Time (hrs) Hydrograph Plot Hyd. No. 3 Detention Pipe Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 Max. Elevation = 79.34 ft Storage Indication method used. English Peak discharge = 0.02 cfs Time interval = 6 min Reservoir name = Detention Tank Max. Storage = 728 cuft Total Volume = 1,862 cuft 3 - Reservoir - 10 Yr - QP 0.02 ds 0.15- Hyd. 2 0.10-- Or 0.05- 0.00 Hyd. 3 0 10 20 �O 40 50 Time (hrs) Hydrograph Summary Report Page i Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 0.08 6 486 1,635 100 — Pasture Model - Pr 2 SCS Runoff 0.23 6 480 3,376 100 — --- — Developed Conditio 3 Reservoir 0.08 6 540 3,376 100 2 80.16 853 Detention Pipe Proj. file: c2000beard.GPW OF file: SAMPLEADF Run date: 03-14-2000 Hydrograph Plot Hyd. No. 1 Pasture Model - Pre -Existing Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs English Peak discharge = 0.08 cfs Time interval = 6 min Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 16.1 min Distribution = Type IA Shape factor = 484 Total Volume = 1,635 cuft 1 - SCS Runoff - 100 Yr - QP = 0.08 ds 0.08, 1 - I I I I M 1102 0 0. CY M N Time (hrs) / Hyd. 1 Hydrograph Plot Hyd. No. 2 Developed Condition Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 0.50 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs English Peak discharge = 0.23 cfs Time interval = 6 min Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.3 min Distribution = Type A Shape factor = 484 Total Volume = 3,376 cuft 2 - SCS Runoff- - 100 Yr - QP = 0.23 ds 0.25- 0.20- 0.15- Hyd. 2 CY 0.10- 0.05- 0.00 0 5 1'0 1'6��2 0 �5 Time (hrs) Hydrograph Plot Hyd. No. 3 Detention Pipe Hydrograph type = Reservoir Storrnfrequency = 100yrs Inflow hyd. No. = 2 Max. Elevation = 80.16 ft Storage Indication method used. [a [a 0. 0 A M English Peak discharge = 0.08 cfs Time interval = 6 min Reservoir name = Detention Tank Max. Storage = 853 cuft Total Volume = 3,376 cuft 3 - Reservoir - 100 Yr - QP = 0.08 cfs Time (hrs) / Hyd. 2 / Hyd. 3 Reservoir Report Reservoir No. I - Detention Tank Pond Data Pipe diameter = 5.00 ft Stage I Storage Table Stage Elevation ft ft 0.00 75.50 0.50 76.00 1.00 76.50 1.50 77.00 2.00 77.50 2.50 78.00 3.00 78.50 3.50 79.00 4.00 79.50 4.50 80.00 5.00 80.50 Pipe length = 45.0 ft Invert elevation = 75.50 ft Contour area Incr. Storage Total storage sqft cuft cuft 00 0 0 00 46 46 00 80 127 00 97 223 00 107 330 00 114 444 00 ill 555 00 107 662 00 96 758 00 80 838 00 46 884 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 6.0 0.6 1.8 0.0 Span in = 6.0 0.6 1.8 0.0 No. Barrels = 1 1 1 0 Invert El. ft = 75.50 75.50 79.50 0.00 Length ft = 50.0 0.0 0.0 0.0 Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi -Stage = -- Yes Yes No Weir Structures [A] Crest Len ft = 1.6 Crest El. ft = 80.25 Weir Coeff. = 3.00 Eqn. Exp. = 1.50 Multi -Stage = Yes Page 1 English [B] [C] [D] 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C CIv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs efs 0.00 0 75.50 0.00 0.00 0.00 0.00 0.00 0.50 46 76.00 0.47 0.01 0.00 0.00 0.01 1.00 127 76.50 0.68 0.01 0.00 --- 0.00 --- 0.01 1.50 223 77.00 0.83 0.01 0.00 0.00 0.01 2.00 330 77.50 0.96 0.01 0.00 0.00 --- 0.01 2.50 444 78.00 1.07 0.02 0.00 0.00 - 0.02 3.00 555 78.50 1.18 0.02 0.00 0.00 - --- 0.02 3.50 662 79.00 1.27 0.02 0.00 0.00 - 0.02 4.00 758 79.50 1.36 0.02 0.00 0.00 0.02 4.50 838 80.00 1.44 0.02 0.05 0.00 0.07 5.00 884 80.50 1.52 0.02 0.08 0.59 --- --- 0.69 Co. kq_s� Appendix: Conveyance Capacity Calculations 6" PVC Pipe Discharge Worksheet for Circular Channel Project Description Project File c:\haestad\fmw\typculvt.fm2 Worksheet 6" Pipe Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.010 Channel Slope 1.0 % Diameter 6.00 in Results Depth 6.0 in Discharge 0.73 ds Flow Area 0.20 ft2 Wetted Perimeter 1.57 ft Top Width 0.00 ft Critical Depth 0.43 ft Percent Full 100.00 Critical Slope 0.009287 ft/ft Velocity 3.71 ft/S Velocity Head 0.21 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 0.78 cfs Full Flow Capacity 0.73 cfs Full Flow Slope 0.010000 ft/ft 03/14/00 Design Build services, Inc. FlowMaster v5.10 03:53:53 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 6" PVC Capacity Rating Table for Circular Channel Project Description Project File c:\haestad\fmw\typculvt.fm2 Worksheet 6" Pipe Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Constant Data Mannings Coefficient 0.010 Channel Slope 79.0 % Diameter 6.00 in minimum maximum increment Discharge 0.23 0.78 0.25 cfs Rating Table Discharge Depth Velocity (cfs) (in) (ft/s) 0.23 0.8 15.53 0.48 1.1 19.33 0.73 1.4 21.86 03/14/00 Design Build Services, Inc. FlowMaster v5.10 04:16:25 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page I of 1 71, rl 7D� 14. I _U C 06)3 C*n)--.,,"r)C) d vp L: � C7- 0 -27 Oct 1'7- 1�7 ,rvc-1 WnD 7/-7 Driscopipe - A Division of Phillips Petroleum Pagel of3 ejup M01,9510811y4mas SIZE and DIMENSIONS Standard 1PS* Dimensions & Working Pressure Ratings (WPR)** 3/4" - 8" SCIR 7-15.5 10"-26" SUR 7-15.5 28"-36" SDR 7-15.5 2" - 8" SDR 17-32.5 10"-26" SDR 17-32.5 28"-54" SDR 17-32.5 3/4" - R" SDR 7-15.5 j P1 --DR7- WPR = 267 psi DR 9 WPR = 200 psi WPR 160 psi -- i MEW DR 13.5 (WPR = 128 psi) is available for 2" through 36" sizes Iron Pipe Sizes; commonly known as "steel pipe sizes" Pressure ratings are for water at 73.4 T DR (Dimension Ratio) = OD/ min. wall thickness Contact your local Driscopipe distributor for availability of pipe diameters and DRs not listed in the previous tables. p d-Z C., Cx---,-A 2" - 8" SDR 17-32.5 Size wr% if WPR = 100 psi DK 21 WPR = 80 psi QLR � WPR - 64 psi Qf� �-51 WPR = 60 psi --Wn. IPS* Pipe Size OD Size (in) Min. wall (in) Weight (lbsift)- Min Wali (in) Weight (lbsift) Min. Wall (in) Weight (lbs/ft) wall (in) Weight (Ibs/ft) 2" 2.375 0.140 0.43 - - - 31, 3.5 0.206 --T9T---ff.T6T----U.-77---O-.T35- 0.62 U. 108 0.51.11 --TgT- 4" 4.5 --V.265- --T.3T- --0-1rT- ---r26-- -U.T73--- r3Y-- 5" --S.T6T- U.327 U.214 13-7 --U.MT- 177 6" 6-.623- - U.39U --T .34 U.3 1.) 2.7 U.255 --- 2-23- 7" --T.T2-5-- -V.41V- --T.TF- --G.T4U- I I --T.39- --0.22T TOT --TD3- 81, T.623-----U3U7---Y6-5-- U.411 4.64 1 0. _3 _3 2 --T79F-F7U� Iron Pipe Sizes; commonly known as "steel pipe sizes" ** Pressure ratings are for water at 73.4 *F DR (Dimension Ratio) = OD/ min. wall thickness Contact your local Driscopipe distributor for availability of pipe diameters and DRs not listed in the previous tables. 1.0"-26" SDR 7-1.5.5 7 7 WPR = 267 psi DR9 WPR 200 psi Now �ENLUMJ[=i Wall (in)_ Noun =0111 on-BLIM M-MEM lm�- MAZA N�����MEAWMM W-�MNLRAIM�� EWA"$ 'A�- �MLLM== Effillu, 0 �=Mul mum �,Wju- el .w Ih4://www.driscopipe.com/1000/1000size.htm 03/13/00 IDriscopipe - A Division of Phillips Petroleum Page 1 of 2 1000 series Data Sheet Customer Benefits High quality DriscopipeO 1000 is manufactured from extra high molecular weight, high density PE 3408 polyethylene pipe grade resin. This black, weather -resistant pipe exhibits... Outstanding Chemical & Corrosion Resistance High Environmental Stress Cracking Resistance Excellent Flow Characteristics Toughness & Ductility Flexibility & Ease of Installation Abrasion Resistance Fatigue Endurance Reliability Suggested Applications: Acid/Caustic Lines Hazardous Wastes Organic Chemicals Agriculture High Purity Processes Petrochemicals Aquaculture Ice Rinks Pulp/ Paper/ Wood Brine :ndustrial Piping River Crossings Coal Slurry norganic Chemicals Salt Mines De -watering Irrigation Sugar Mills Dredging/ Sand/ Gravel Leachate Collection SX Acid Mining Fertilizer Marinas Tailings Fly Ash Metal (Cu, Fe, Al, etc.) Temporary pipelines Hard Rock Disposal Mining Utility piping And Many Others... Typical Physical Properties* of DriscopipeO 1000 (PE 3408) Polyethylene Pipe Resi Property Tes-t Method Unit Value Density ASTM D 1505 gms/cm3 0.955 Mel, Inde. ASTM D 1238 (190/2.16) gms/10 min. 0.11+ Environmental Stress Cracking Resistance —Condition A,B, 9, C, Fo ASTM D 1693 hrs. >5000 (molded specimen) —Compressed Ring, Fo ASTM F 1248 hrs. >3500 (extruded specimen) Tensile Strength, Ultimate ASTM D 638 psi 5000 —Type IV Specimen (2"/min) Tensile Strength, Yield ASTM D 638 psi 3200 —Type IV Specimen (2"/min) Elongation at Break ASTM D 638 % 750 —Type IV Specimen (2"/min) Impact Strength (1ZOD) ASTM D 256 !n-lb./ in. notch 42 —Specimen thickness 0. 125" Method A Vicat Softening Temperature ASTM D 1525 oF 257 Brittleness Temperature ASTM D 746 oF < -180 Ihttp://www.driscopipe.com/1000/1000data.htm 03/13/00 Driscopipe - A Division of Phillips Petroleum Page 2 of 2 Flexural Modulus Modulus of Elasticity (Younes Modulus) Hardness Coeff. of Linear Thermal Expansion Thermal Conductivity ASTM D 3350 psi 135,000 ASTM D 638 psi 130,000 ASTM D 2240 Shore D 65 ASTM D 696 in/in/OF 1.2 x 10-4 ASTM D 177 Btu -in / 2.7 ft^2/hrs/*F Hydrostatic Design Basis (HDB) ASTM D 2837 —73*F psi 1600 -- 140*17 psi 800 Material Cell Classification ASTM D 3350 345464C Material Designation PPI Recommendation PE3408 Average Melt Index with a standard deviation of 0.01 'This list of typical physical properties is intended for basic characterization of the matedal and does not represent specific determinations or specifications. The Physical properties values reported herein were determined on compression molded specimens prepared in accordance with Procedure C of ASTM D 1928 and may differ from specimens taken from the pipe. This Document reports accurate and reliable information to the best of our knowledge but our suggestions and recommendations cannot be guaranteed because the conditions of use are beyond our control. The user of such information assumes all risk connected with the use thereof. Phillips Petroleum Company and its subsidiaries assume no responsibility for the use of information presented herein and hereby expressly disclaim all liability in regards to such use. More Inforniation Data Sheet Brochure Size and Dimension Sheet FM Approved Pipe and Fittings Fittings Pricing, Availability, Selection, etc. Home Page Ihttp://www.driscopipe.com/1000/1000data.htm 03/13/00 Appendix: Grading Quantity Report lUser Name: rick Project: Concept 2000 Beard Residence Prismoidal Volume Results Prismoidal Original Surface Model: topolines Final Surface Model: final Cut Compaction Factor: 0.00 Fill Compaction Factor: 0.00 lRaw Cut Volume: 2449.47 cu yd Compacted Cut Volume: 0.00 cu yd Total Cut Volume: 2449.47 cu yd lRaw Fill Volume: 9.10 cu yd Compacted Fill Volume: 0.00 cu yd Total Fill Volume: 9.10 cu yd Volume Results Date: 01-24-00 Time: 14:09:07 Page: 1 co PROPOSED NEW HOUSE 'u 67 "1 V, EP-1 U, >8 EP-2 <W01 $13RIVEWAY —7 40, 1-. us IV am J as ca �% HOUSE TO BE REMOVED j Ir r Ij J69 GRAMP LEGEND ,P. I m Approximate location of exploration pit 0 40 so I I I SCALE IN FEET ASSOCIATED EARTH /MMM SCIENCES, INC SITE AND EXPLORATION PLAN BEARD RESIDENCE EDMONDS, WASHINGTON G95003A 1 1/95 1 FIGURE I 0 Number EP-1 5 10 EXPLORATION PIT LOG Topsail; loose, moist, black with sod. Loose, moist, brown -gray, gravelly, fine SAND with some silt, mots, some wire debris. Old -topsoil at base. (Fill) Loose, moist, red -brown, silty, fine SAND. Loose to medium dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND. Loose pockets. Dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND with some silt. BOHF @ 10' Note: No seepage; caving 0-8'. 0 Number EP-2 5 10 15 4" Sod. Loose, moist, dark brown and red -brown, organic -rich, gravelly, fine SAND with some sift, abundant roots. (Fill) Loose, moist, red -brown, gravelly, fine SAND with wood. (Old Regolith) Medium dense with loose pockets, moist, yellow -brown,, gravelly, fine to medium SAND. Stiff to hard, moist to wet, light brown, sandy SILT, brecclated. BOH C 10' Note: -light seepage at T; caving 31 to 51; light spalling at seepages. Subsurface conditions depicted represent our observation at the time and location of this exploratory hole, modified by geologic Interpretation, engineering analysis, and Judgment. They are not necessarily representative of other times and location. We YAR not accept responsibility for the use or Interpretation by others of information presented o6 this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 EXPLORATION PIT LOG Number EP-3 4" Topsoll/sod. Loose to medium dense, moist, red -yellow -brown, gravelly, fine SAND with some sift, abundant mots, loose pockets to 3', becomes dense below 3-1/2'. BOH 9.5' Note: No seepage; no caving. Number Subsurface conditions depicted represent our observation at the time and location of this exploratory hole, modified by geologic Interpretation, engineering analysis, and judgment. They are not necessarily representative of other times and location. We will not accept responsibility for the use or Interpretation by others of Information presented on this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 PLANNIMr-, DATA SITE ADDRESS: DATE: ZONING: PLAN CHK#: PROJECT DESCRIPTION: CORNERLOT —(Yes/No) SETBACKS: FLAG LOT____If_______(Yes/No) Required Setbacks: Front: IP Left Side:_,�.*_RIght Side: 1,9 Rear: Actual Setbacks: -fa— Front: —. Left Side: a . Right Side: /0 Rear:-52- mw Street map checked for additional setback required? , ;F (Yes/No) LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) LOT COVERAGE: 1�01040 I Maximum Allowed: Actual: BUILDING HEIGHT: Maximum Allowed: Actual Height: /i Datum Point: Datum Elevation: A.D.U. CREATED?: SUBDIVISION: CRITICAL AREAS #: Y4f - SEPA DETERMINATION: LOT AREA: OTHER: ------- ---- Plan Review Ckfi1W%PanW*V$nd&Ldoa ulml May 19,1995 HWA Project No. 95084 City of Edmonds 250 5th Avenue North Edmonds, Washington 98020 Attention: ]�Ar. Ydrk Vinish STREET FILE 1,6?20 1?14-1X01-;V Subject: CRiTicAi AREA STUDY - PuER REviEw Beard Residence - 16920 Talbot Road Edmonds, Washington EONGWEST &ASSOCIATES, INC. Geotechnical Engineering Hydrogeology Geoenvironmental Services Testing & Inspection Reference: Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report, Beard Residence, E&nonds, Washington, by Associated Earth Sciences, Inc., January 30, 1995. Dear Mr. Vinish: In accordance with your request, Hong West & Associates, Inc. (HWA) has completed a geotechnical peer review associated with the proposed new home construction at 16920 Talbot Road in Edmonds, Washington. As part of this study, we visited the sit e and reviewed the consultant's methodology, conclusions, and recommendations as surnmarized in the report referenced above. Particular emphasis was placed on recommendations relating to the City of Edmonds Critical Areas Ordinance (Ord. No. 2874, rev. No. 3014). Authorization for this project was received from Mr. Kirk Vinish of the City of Edmonds on May 10, 1995. Methodology The City has requested we review the consultant's methodology and evaluate whether the subsurface exploration, laboratory testing, and analysis was sufficient to adequately -. address slope stability concerns, drainage characteristics, erosion potential, and to provide recommendations for site development. Based on our review of the consultant's report� it is our opinion that the subsurface investigation performed was adequate to characterize the soil and groundwater conditions across the site. An appropriate number of excavations were advanced to sufficient depths, and detailed soil descriptions and groundwater conditions were recorded. In addition, the consultant reviewed and utilized appropriate geologic references. A review of the referenced report suggests that an appropriate level of geotechnical engineering analysis 19730-64th Avenue West Lynnwood, WA 98036-5904 Tel. 206-774-0106 Fax. 206-775-7506 May 19, 1995 HWA Project No. 95084 was performed in order to reach conclusions and present recommendations on site earthwork, foundation design, site drainage, erosion control, and slope stability. Critical Areas Ordinance We have reviewed the City of Edmonds Critical Areas Ordinance and revisions. According to the ordinance, a Steep Slope Hazard is any slope with an inclination of 40 percent (2.5H: IV) or greater, measured over at least 10 feet of elevation change. For such slopes, a buffer of 50 feet is required. This buffer can be reduced to 10 feet if a Critical Area Study is prepared which indicates no adverse impacts from the proposed development. Building setbacks from the edge of the buffer must be a minimum of 15 feet. However, the Critical Area Study can waive these requirements (buffer and setback) if the steep slope is 20 feet or less in height. The City of Edmonds has requested HWA to determine whether the referenced report meets the requirements of a Critical Area Study. The consultant has identified an area along the northwest property margin which meet& the definition of a Steep Slope Hazard. Since this slope is greater than 20 feet in height, a Critical Area Study can recommend a setback of no less than 25 feet from the top of the slope (10 foot buffer with 15 foot setback from buffer). The consultant has recommended a minimum setback of 40 feet from the top of the slope. We agree that a setback larger than 25 feet is warranted in this case. We feel the consultant has adequately addressed potential impacts of the proposed development on the steep slope. The consultant acknowledges a moderate risk of landsliding. The consultant has clearly indicated that this risk win not be increased due to the proposed development, provided the recommendations in the report are followed. In our opinion, recommendations presented for surface and groundwater drainage and erosion control are appropriate. It is our further opinion that the recommended setback appears to be adequately justified in the referenced report. Summary It is our opinion that the referenced report meets the requirements for a Critical Area Study as specified in the City of Edmonds Critical Areas Ordinance. It should be noted that the scope of services performed by HWA was limited to a site reconnaissance and review of the referenced document. Field studies and/or verification of calculations were not performed; accordingly, we can offer no assurances regarding the performance of the site. In addition, the services performed consist of professional opinions made in accordance with generally accepted geotechnical engineering principles and practices. 95084RDOC 2 HONG WEST & AssociATEs, INc. May 19,1995 HWA Project No. 95084 * C) We appreciate this opportunity to be of service. If you have any questions, or if we can be of finther service, please do not hesitate to call. Sincerely, HoNG WEST& Assomms, INc. C: 310 q Andr6 D Mar6, P.E. Geotechnical Engineer al a Ur P-4 Mr. r, 11 95084R.DOC 3 HoNG WEST& AssociATEs, INc. 0 -f-'? C. 18 9,3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering May 6, 2003 Mr. and Mrs. Beard 16920 Talbot Road Edmonds, WA 98026 Re: Address Change request Dear Mr. and Mrs. Beard; GARY HAAKENSON MAYOR S HEET FILE This letter is to inform you that your request for an address change has been approved by the City. Your address has been changed from#@94,200053"Ilt-o iAoNk"o 17130 Talbot Road. I will inform all City Divisions including Gtilit'y Billing, Public Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced 911 emergency purposes and all other 'interested parties of this correction. We apologize for the inconvenience this may cause you and greatly appreciate your cooperation. S i erely Lara Palmatier Permit Coordinator Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\Ternp\IDST's\Master Letters\Address Change Incorporated August 11, 1890 Sister Citv - Hekinan. Jat)an t N CITY OF EDMONDS SIDE SEWER AS -BUILT ADDRESS PERMIT 16920 TALBOT RD, NUMBER 9557 HOMEOWNER CONTRACTOR MARK BEARD DATE 10/17/01 DRAWN ISMAEL ABILA I BY C-'9Q) .18 CITY OF EDMONDS 121 5TH AVENUE NORTH , EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering April 28, 2003 Mr. and Mrs. Beard GARY HAAKENSON MAYOR 16920 Talbot Road Edmonds, WA 98026 Re: Address Change requestlo Dear Mr. and Mrs. Beard; "t� 'V This letter is to inform you that your request for an address change has beD.-gp ..4moved by the City, Your address has been changed from 16920 Talbot Road t6 17132 Talb�i� Road. I will inform all City Divisions including Fire, Police, Utility B Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced 911 emergency purposes and all other interested parties of this correction. We apologize for the inconvenience this may cause you and greatly appreciate your cooperation. Sincerely, Lara Palmatier Permit Coordinator Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\Temp\DST'sWastei�'Letters�Address Change Incorporated August 11, 1890 Sister City - Hekinan, Japan it, C. I SO) CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwaci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering January 5, 2009 MEMO TO: Snohomish County Assessor's Office GARY HAAKENSON MAYOR This letter is to inform you of an address correction. Please change the following Street (Situs) Address and the Taxpayer Address: From 16920 Talbot Rd To 17130 Talbot Rd We apologize for the inconvenience this may cause you and greatly appreciate your cooperation. Occupancy: Residential Tax ID Number: 27040700104200 Subdivision: SEC 07 TWP 27 RGE 04 if you have any questions regarding this letter, please contact me at 425-771-0220 or Harri son@ci.edi-nonds. wa. Lis Respectfully, Senior Permit Coordinator Edmonds Building Department Cc: File 00e, 4% c-.1 S ()"I CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering May 6, 2003 TREF' Mr. and Mrs. Beard 16920 Talbot Road Edmonds, WA 98026 Re: Address Change request Dear Mr. and Mrs. Beard; GARY HAAKENSON MAYOR This letter is to inform you that your request for an address change has been apprg by the City. Your address has been changed from 16920 Talbot Road t6^47,430' Road. I will inform all City Divisions including Fire, Police, Utility BilfiRg, Public Works and Building. It is your responsibility to inform the Post Office, the Phone Company for Enhanced 911 emergency purposes and all other interested parties of this correction. We apologize for the inconvenience this may cause you and greatly appreciate your cooperation. S' ce�el Lara Palmatier Permit Coordinator Cc: Fire Department Police Department Utility Billing Public Works Building Official/Street File L\Temp\DST's\N4 aster Letters\Address Change Incorporated August 11, 1890 f-:1. . T.- I - I. of EbAf 0 Ot 121 5TH AVENUE NORTH EDMONDS WA 98020 (425) 771-0220 CITY OF EDMONDS http://www.ci.edmonds.wa.us RCW 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFICANCE Description of proposal: Construction of a New Single Family Residence C Proponent: Mark Beard 16920 Talbot Road Edmonds, WA 98026 ddress if any. t RP IDS Location of -proposal, including street a' -*lr6 92'01T affb�.o Lead agency: CITY OF EDMONDS The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. xx There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Coniments must be submitted by 2000.. Responsible Official: Position/Title: Phone:" Address: Karissa Kawamoto Planner 425-771-0220 City of Edmonds 121 5th Avenue North Edmonds, WA 98020 Dafe: �,�Ioljltolhb Signatur;xv,41(�,/ xx You may appeal this determination to Robert Chave, PI ing Manager, at 121 5th Avenue North, Edmonds, WA 98020, no later than 14y,�' �2 2000, by filing a written appeal citing the specific factual reasons for thd appeal. The appeal submittal must also include the required fees and mailing list. Please contact the Planning Division for specific submittal requirements.. xx Posted on 2000, at the Edmonds Public Library, Edmonds Community Services BuildingJand the Edmonds Post Office. xx Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist. I Pagel of3 00-59 SEPADOC CREATED ON 03/22/00 2:45 PM M 'ailed to the following along with the Enviromnental Checklist: ;xx Environmental Review Section Department of Ecology P.O. Box.47703 xx. Burlington Northem-Santa Pe Railroad Olympia, WA 98504-7703 2900 Bond Everett, WA 98201 xx Department of Fish & Wildlife xx Attn.: Richard E. Johnson Mark Beard Regional Habitat Manager 16920 Talbot Rd. 16018 Mill Creek Boulevard Edmonds, WA 98026 Mill Creek, WA 98012 kX National Marine Fisheries Service Attn.: Steve Landino WA. State Habitat Branch Chief 5 10 Desmond Drive SE Lacey, WA 98503 Attachments pc: i File No. Plan Check 00-59 SEPA Notebook Page 2 of 3 00-59 SEPA.DOC CREATED ON 03/22/00 2:45 PM _A CITY OF EDMONDS CHECKLIST Purpose of Checklist. - asc The State Environmental Policy Act (SEPA), clx��Vlff-RCW, req �s all governmental agencies to consider the environmental impacts.of a proposal before making etkions. An OviroDmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the 4—uatiw-of-ffie—environment * The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instrudionsfor Appficants. This environmental. checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to detern-tine whether the environmental impacts of your proposal are significant requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your p . roposal, write "do not know" or does not apply". complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do. them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or. provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklistfor nonprojedproposals. Complete this checklist for nonproject proposals, even though questions* may be ans ered does not apply." w IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (pan D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposer," and "affected geographic area," respectively. .A. BACKGROUND 1. Name of proposed project, if applicable: 1 &3!7 e*7 A-Mlljt4 2. Name of applicant: mitalen- /hC-A/Zr> 3. Address and phone number of applicant and contact penon: 'TA LES0 rZr.> D WA -Q & I Q W A bQ 2 C WK., 10& 01,7. *2 -%o I Page I of 24 CHUTDOM-NOV-93 MASMSPEA 4. 'Date checklist prepared: I o - zoo o 5. Agency requesting checklist: City of Edmonds. C6::) Proposed timing or schedule (including phasi if ap licable): (STAFF COMME I. Do you have any plans for future additions, expansion, or further activity. related to or connected with this proposal? N yes, explain. Al 42 (STAFF COMMENTS) S.. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 0 MEN A 9. Do you know whether applications arc pending for governmental approvals of other proposals directly affecting the property covered by your proposal? N yes, explain. (STAFF COMMEN Page 2 of 24 cHrLT.Dmi-Nov-93 MASrFR%PEA 10. List any government approvals or permits that will be needed for your proposal, if known. C> 4�!ro kee AJ r/",o r (STAFF COMMENTS) 11 Give brief, complete description of your proposal, includi ng the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. /'0V -:z e z-*— f C' Z'o 00 (STAFF COMMENTS) 12. Location of the propoisal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. N a proposal would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checkfisL -7-ift f V—C-:) z AJ )A UP '(STAFT COMMENTS) Page 3 of 24 CHUTDOCU-NOV-93 MAMMSM TO BE COMPLETED B. APPLICANT ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one)-Qolling, hilly, b. C. U t 4'em F-:> (STAFF COMMENTS) (STAFF COMMENTS) mountainous, other: __-j What general types of soils are found on the site (for example, clay, sand, gravel, peat, muckY know th I ification of agricultural soils, S �fy ;the:,Xd note any prime farmland. (STAFF COMMENTS) Are there indications or history of . unstable soils in the immediate vicinity? If so, descriw (STAFF COMMENTS) Pap 4 of 24 CHKLT.DCGI-NOV-93 MAMMSPEA Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source of fill. AJO u-4 I 00gr A0, GIU.0 - Pao A�e IsAvOL-Vt V�;ADD -C-JL F I I (STAFF COMMENTS) co Could erosion occur as a result of clearing, construction, or use? generally describe. J.'w P�� (STAFF COMMENTS) zwo About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? --7 (STAFF COMMENTS) Proposed measures to reduce or control erosion, or other impacts to the earth, if any* (-ZOO (STAFF COMMENTS) 2. AHL Mat types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when,the project is completed? 9 any, generally describe and give approximate quantities if known. EGEL Ex (STAFF COMMENTS) Page 5 of 24 CHUTDC01-NOV-93 MASMRWRA b. Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe. (STAFF COMMENTS) Proposed measures to reduce or control emissions or other impacts to the, if any: (STAFF COMMENTS) 3. WATER Surface: Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropn7e, state what st�=r Aver it flows into. (STAFF COMMENTS) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available. plans. (3) Estimate the amount of fill and dredge material thatmould be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source Of rill material. (STAFF COMMENTS) CKLT.DMI-NOV-0 MAMMSPEA Pap 6 of 24 (4) Will � the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. (STAFF COMMENTS) Does the pro I lie within a 100-year floodplain? If so, note location on the site plan. PU'S (0 (STAFF COMMENTS) (6) Does the proposal involve any discharges of waste materials to surface waters?� 9 so, describe the type of waste and anticipated volume of discharge. (STAFF COMMENTS) Ground: (1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. (STAFF COMMENTS) Par 7 of 24 CHKLTDOLNI-NOV-93 MASMSPRA (2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemiC21L..; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. (STAFF COMMENTS) C. Water Runoff (including storm water): Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if k nown). Where will this water flow? Will this water flow into other waters? N so, describe. ka'"Ops?- 1594w-., I Oak pcvwks sutrxcrs WIL'L M-TAIAP C-6 A, 06 rCsj T ptofu -ro �-w-r or- BLUFr- T4,ow a Pu&rx�r i;;v-kjm-0- Lvv (STAFF COMMENTS) (2) Could waste materials enter ground or surface waters? N so, generally describe. (STAFF COMMENTS) d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: vs-TEoTi o Av L apfz v 4k-izcx e. ip a itAxp rL C/ nz� (STAFF COMMENTS) Pap 8 of 24 CHKLT.DOCU-NOV-93 MASUWEA 4. Plants a� Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other. evergreen tree: fir, her. AwoaZiz shrubs grass pasture crop or grain wet.soil plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eelgrass, milfbil, other. other types of vegetation: (STAFF COMMENTS) b.- C. What kind and amount of vegetation will be removed or altered? "0 NO e- e- ;&ifA Aj List threatened or endangered species known to be on or near the site. (STAFF COMMENTS) Par 9 of24 CHKLT.DMI-NOV-0 MA9=%SMA d. Proposed landscaping, use of or other materials to preserve or enhance vegetati on on the site, if any: (STAFF COMMENTS) 5. Animals a. Check or circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle4s:o:n:g�Wirds�bther. mammals: deer, bear, elk, heavier, other. /V10 V25; fish:. bass, salmon, trout, herring, shellfish, other: 16)4" (STAFF COMMENTS) b. List any threatened or endangered S des known to be on or near the site. ;0,0 A-) (STAFF COMMENTS) C. Is the site part of a migration route? If so, explain. (STAFF COMMENTS) Page 10 of 24 CHUTDOMI-NOV-93 MAMRNSPRA d. Proposed measures to preserve or enhance wildlife, if any: (STAFF COMMENTS) 6. Energy and Natural Resources a. What kinds of cncrkxAelectrl"atural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whethe . it will be used for heating, manufacturing, etc. c, P7� -7.,4 _/ (STAFF COMMENTS) b. Would your project affect the pot eintial use of solar energy by. adjacent properties? If so, generally describe. (STAFF COMMENTS) C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to duce or control energy impacts, if any: IV4 (STAFF COMMENTS) Page I I of 24 CHUTDC01-NOV-93 MAMERWRA 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe. X)o (STAFF COMMENTS) (1) Describe special emergency services that might be required. (STAFF COMMENTS) (2) Proposed measures to reduce or control environmental health hazards, if any: A.) (STAFF COMMENTS) b. Noise (1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? zC)0 AJ (STAFF COMMENTS) Pap 12 of 24 CHKLT.D=t-NOV-93 MAMR%SMA (2) What types and levels of noise would be created by.or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. -R�) (STAFF COMMENTS) (3) Proposed measures to reduce or control noise impacts, if any: Fox J e>,L)- (STAFF COMMENTS) 8. Land and Shoreline Use a. What is the current se of the site and adjacent properties? (STAFF COMMENTS) b. Has the site been' used for agriculture? H so, describe. (STAFF COMMENTS) 61 7- 99V /K CHKLTDOCNI-NOV43 Page 13 of 24 MAMR%SPEA C. Describe any structures on the site. d. (STAFF COMMENTS) Will iknv dnichire-% hP demnlishpd? Tf qn- what? (STAFF COMMENTS) e. What is the current zoning classification of the site? (STAFF COMMENTS) E What is the current comprehensive plan designation of the site? g. U applicable, what is the current shoreline master plan designation of the site? (STAFF COMMENTS) Par 14 of 24 CHKLT.D=I-NOV-93 MAFM\SPRA Has any part of the site been classified as an qven*ironmentally-s�ps�iveqq area? If so, specify. JL 09 �- A-AJ 10 Zo a:� L 1 100, (STAFF COMMENTS) 1,40a .41f JflAIVI-k AW AI L Approximately bow many people would reside or work in the completed project? (STAFF COMMENTS) j. Approximately bow many people would the completed project displace? (STAFF COMMENTS) k. Proposed measures to avoid or reduce displacement impacts, if any: (STAFF COMMENTS) L Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans� if any: 4-1 42 L--p-r> (STAFF COMMENTS) Page 15 af24 CHKLMDOCNI-NOV-93 MASMR%PRA 9. Housing 'a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. .4 (STAFF COMMENTS) b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low- income housing. (STAFF COMMENTS) c. Proposed measures to reduce or control housing impacts, if any: (STAFF COMMENTS) 10. , Aesthetics a. What is the tallest height of any proposed structure(s), not. including antennas; what is the principle exterior building material(s) proposed? F-40 AV AVA. 40 6& 0.4 ZZ --01,e IA.) 2L' 9= A:t 4rpc 15>' 45 AJ &W-- (STAFF COMMENTS) Page 16 of 24 CHUT.D001-NOV-93 MASFERWRA b. What views in the immediate vicinity would be altered or obstriucted? (STAFF COMMENTS) C. Proposed measures to reduce or control aesthetic impacts, if any: 12 o� 5057 6WA--?^�, Le.� 15- c-,,, C.- . r ac) (STAFF COMMENTS) 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? (STAFF COMMENTS) b. Could light or glare from the finished project be a safety hazard or interfere with views? A) eD (STAFF COMMENTS) C. What existing off -site sources of light or glare may affect your proposal? (STAFF COMMENTS) Pap 17 of 24 CW.LTD=I-N0V-" MAMUNSMA d. Proposed measures to reduce or control light and glare impacts, if any: (STAFF COMMENTS) 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? (STAFF COMMENTS) b. Would the proposed project displace* any existing recreation uses? H so, describe. (STAFF COMMENTS) C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Ak�� (STAFF COMMENTS) Page ISOM CHKLTDCOI-NOV-93 MASMSPEA 13. Historic and Cultural Preservation 2. Are there any places or objects listed on, or proposed for, national, 'state, or local preservation registers known to be on or next to the site? If so, generally describe. (STAFF COMMENTS) b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. (STAFF COMMENTS) C. Proposed measures toreduce or control impacts, if any: 1§7 (STAFF COMMENTS) i 14. Transportation . 2. Identify public streets and highways serving the site, and describe proposed access, to the existing street system. Show on site plans, if any. ZA 7-- /> .-/2 '02-1 -A=P-Xf -.5 6V Al '6TAX (STAFF COMMENTS) Pap 19 of 24 CHXLT.DCC%1-N0V-" MASMSPEA b. h site currently served by public transit? If no, what is the approximate distance to the nearest transit stop? (STAFF COMMENTS) c. How many parking spaces would the ompictcd project have? How many would the project eliminate? -644 C- 7 4-, /0 /-1 i�- (STAFF COMMENTS) d. e. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). (STAFF COMMENTS) Will the project use (or occur in the immediate vicinity of) water, ran, or air transportation? N so, generally describe. Xt a (STAFF COMMENTS) CWLT.D=I-N0V-93 MAMMSPEA Page 20 of 24 How many vehicular trips per day would be generated by the completed project? N known, indicate when peak volumes would occur. (STAFF COMMENTS) g. Proposed measures to reduce or control transportation impacts, if any: 00 AJr 9 , . I (STAFF COMMENTS) 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. AleD (STAFT COMMENTS) b. Proposed measures to reduce or control direct impacts on public services, if any. (STAFF COMMENTS) Pap 21 of 24 CHKLT.DOCI-NOV-93- MAWERWRA 16. Iffilities refuse sc Circle utilities currently available at the site: C atural gas �ryw septic system, other. (STAFF COMMENTS) Describe the utilities that are proposed for Ahe project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. (STAFF COMMENTS) Page 22 of 24 CHKLTDOCNI-NOV-93 MASMSPILA RECEIVED NOV 3 0 1995 PERMIT COUNTER SUBSURFACE EXPLORATION9 GEOLOGIC HAZARDS AND GEOTECHNICAL ENGINEERING REPORT I RECEIVED FEB 152000 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS BEARD RESIDEMCE I EDMONDS9 WASHINGTON PREPARED FOR Mark Beard PROJECT NO. G95003A JAMARY 1995 ABSOCIATEO EARTH ArAffmikill BCIENCES. INC 911 - 5th Avenue, Suite 100, Kirkland, WA 98033 (206) 827-7701 FAX (206) 827-5424 SUBSURFACE EXPLORATIONO GEOLOGIC HAZARDS AND GEOTECHNICAL ENGINEERING REPORT BEARD RESIDENCE EDMONDS, WASHINGTON January 30, 1995- Project No. G95003A 1. � PROJECT AND SITE CONDITIONS This report presents the results of our subsurface exploration, geologic hazards and geotechnical engineering study for the proposed new Beard residence. The approximate locations of the explorations accomplished for, this study are shown on the site and exploration plan, Figure 1. Inthe event that any changes in the nature, design or layout of the project are planned, the conclusions and recommendations contained in this report should be reviewed and modified, or verified, as necessary. The purpose of this study was to provide subsurface data to be utilized in the design and. development of the proposed new home construction. Geotechnical engineering studies were conducted to determine the depth to the foundation bearing strata, the type of suitable foundation, the allowable foundation soil bearing pressure, anticipated foundation settlement, floor support recommendations and drainage considerations. Geologic hazard evaluations were also completed to determine if mitigations would be required for potential seismic, landslide, and er�sion hazards and a minimum top of slope setback distance. This report summarizes our current field work and offers development recommendations based on our present understanding of the project. 1.2 Authorizatiom Written authorization to proceed with this study was granted by Mark Beard by executing our proposal dated January 5, 1995. This report has been prepared for the exclusive use of Mr. Beard and his agents, for specific application to this project. Within the limitations of scope, .Schedule and budget, our services have been performed in accordance with accepted geotechnical engineering and engineering geology practices in effect in this area at the time that this report was prepared. No other warranty, expressed or implied is made. It must be understood that no engineering design or geologic analysis can yield a guarantee of stable slopes. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. . I 2.0 PROJECT AND SITE DESCRIPTION This report was completed with an understanding of the project based on a topogmphic survey dated April 22, 1993 prepared by Darrell Ford and Associates, and undated development plans prepared by Lee Kierig, Architect. The project site was located in a residential neighborhood west of Talbot Road atop a west -facing marine bluff in north Edmonds, Washington. The property was roughly rectangular and measured approximately 100 feet north -south by about 260 feet east -west. An existing residence and detached garage occupied the central portion of the property, and it is our understanding that these structures will be razed prior to cons . truction of the new residence. According to the present plans, the new structure will be a two-story home with a partial basement, and will be constructed at essentially the same location as the existing structure. Most of the property was relatively flat to gently sloping down to the west. The western -most 40 feet of the property was along the marine bluff that was about 80 feet in height, and sloped steeply down to the west at a gradient of about 100 percent. The bluff was heavily vegetated with small saplings, blackberries, vines and other brush. A Burlington Northern railroad right- of-way with two sets of tracks ran along the base of the bluff. No surface water was observed on the site or on the upper portions of the bluff at the time of our field work. Also, no -evidence of recent slope movement was noted at the time of our study . . According to the client, a drainage ditch was located along the railroad grade. This ditch is periodically brushed out and cleaned by the railroad. Apparently, following the removal of vegetation along the toe of the slope, some shallow sloughing of soils usually occurs in this area.. 3.0 SUBSURFACE EXPLORATION Our field study included'excavating three exploration pits, using a tra&-mounted excavator. The pits permitted direct, visual observation of subsurface conditions. The materials encountered were studied and classified in the field by an engineering geologist from our firm. Selected samples were then transported to our laboratory for further visual classification and. testing, as necessary. All exploration pits were backfilled immediately after examination and logging. The various types of sediments as well as the depths where characteristics of the sediments changed are indicated on the exploration logs presented in the Appendix. Our explorations were approximately located in the field by measuring from known site features'shown on the site and exploration plan, Figure 1. Because of the nature of exploratory work below ground, extrapolation of subsurface conditions between field explorations is necessary. It should be noted that differing subsurface conditions sometimes may be present due to the random nature of deposition and the alteration of topogra phy by past grading and filling. The nature and extent of any variations between the field explorations may not become fully evident until construction. If variations are observed K at that time, it may be necessary to re-evaluate specific recommendations in . this report and make appropriate changes. 4.0 SUBSURFACE CONDITIONS Subsurface conditions at the project site were inferred from the exploration pits- ' the visual reconnaissance of the site, review of the Edmonds Quadrangle Geologic Map, and a review of the supplied topography. Within the property boundaries, the stratigraphy encountered included fill soils overlying natural deposits of gravelly sand, and sandy, silt. These units are described in'the following sections in the order they were encountered from the surface, followed by our observations of the hydrology of the site. 4.1 Fill Soil . Fill soils (those soils not naturally placed) were encountered in two of the three exploration Pits. The fill consisted of loose, moist, dark brown to brownish gray, gravelly fine sand with some silt and abundant roots. The fill was encountered at the surface (beneath a topsoil horizon) and extended to depths ranging to 2-1/2 feet in EP-2, to 4-1/2 feet in EP-1. The quality, thickness and comvaction of the fill 4.2 Gravelly Sand Underlying the fill soils, and near the surface where the fill was absent, all three of the exploration pits encountered a loose to medium dense to dense, moist, brownish gray to yellow brown, gravelly fine to medium sand with some silt. This unit was encountered from 4-1/2 feet to below the 10 foot termination depth of EP-1, and from 2-1/1 to 6 feet in EP-2. In EP-3 this unit was encountered at the surface (beneath a topsoil), and it extended to below the 5 foot termination depth of this pit. The gravelly sand was interpreted as advance outwash that was deposited by'meltwater streams em ' anating from an advancing glacial ice sheet. These sediments were overridden by the glacial ice and consolidated to a dense state by the weight of the ice. The loose to medium dense character of the near surface portions of this unit is attributed to weathering, and the development of roots within this uniL 4.3 Sandy Sil Underlying the gravelly sand, a stiff to h . ard, moist to wet, light brown, mottled, brecciated sandy silt with trace gravel was encountered in EP-2. The silt extended from 6 feet to belo; the, 10 foot termination of EP-2, and was interpreted to underlie the entire site at depth. 3 The sandy silt was' interpreted as glacial sediment deposited in a proglacial lacustrine Oake) environment created in front of, or within an advancing ice sheet. Ile stiff to hard state of this material is also attributed to glacial consolidation. HE No surface water was observed at the site, and in general the near surface sandy soils at the site appeared to be well drained. Light ground water seepage was encountered at a depth of 7 feet in EP-2, within the sandy silt unit. Ile amount of seepage was minor, considering that our explorations were conducted following a two month period (November -December, 1994) with above average rainfall. Fluctuations in ground water levels at the site will occur due to the time of the year and variations in rainfall. Random seepages could al . so occur during the wetter times of the year in isolated areas within the fill soils. 4 January 30, 1995 P "ect No. G95003A r0i H. GEOLOGIC HAZARDS AND MMGATIONS Ou r interpretation of geologic hazards on the property is based on the stratigraphy encountered, as.Vell as the slope and hydrologic conditions observed ' during our field reconnaissance. Potential hazards include those related to seismic (earthquake) activity, landslide or mass -wasting hazards, and erosion hazards. The potential risk of these hazards and their mitigations are discussed in the following paragraphs. 5.0 SEISMIC HAZARDS AND RECOMMENDED MMG Earthquakes occur in the Puget Sound region with great regularity. The vast majority of these events are small and are usually not,detected without instruments. However, large earthquakes do occur as evidenced by the 1949, 7.2 magnitude. event in Olympia, and the 1965, 6.5 magnitude event in Seattle. The 1949 earthquake appears to have been the largest in this area d-uning recorded history. Evaluation of earthquake return rates indicate that an earthquake of the magnitude between 5.5 and 6.0 could occur within the next 8 to 12 years in the Edmonds area. Generally, there are 4 types of potential geologic hazards associated with large seismic events: 1) surficial ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground motion. The potential for each of these hazards to adversely impact the proposed project is discussed below. 5. 1; Surficial Ground Ruptu The majority of large earthquakes that have occurred in, recent times in the Puget Sound area arel sub -crustal events with epicenters ranging. from 50 to 70 kilometers in depth. No surficial faulting, or earth rupture, have been documented to date within two miles of the Beard property, according to previous geological mapping by the U.S. Geological Survey (Yount and Gower et al, 11991, U.S.G.S. Open file report 91-147). Therefore, it is our opinion, based on existing geologic data, that the risk of surface rupture. impacting the proposed project is low. 5.21 Seismically Induced Landslides The' greatest risk of seismically induced landslides within the Puget Sound region occurs within unconsolidated sediments along.steep slopes (greater than 40% gradient). The marine bluff on thewest side of the property does slope steeply, however the slope is interpreted to be I underlain 5 5.3 Liquefaction Liquefaction is a process in which soil loses strength during vibratory shaking, which ca. . n result in large ground deformations. The weight of a soil is supported both by grain -to -grain contact of soil particles aind by the pressure of water in the pore spaces between the particles. Vibratory shaking can disrupt the grain -to -grain contact, increase the pore water pressure and result in a decrease in the soil shear strength. The soil is said to be liquefied when nearly all of the weight of the soil is supported by its pore pressure'alone. Soils most susceptible to liquefaction are loose sediments, composed of mostly fine sand to coarse silt, that are in areas with high ground water. of adverse ground water conditions. 5.4 Ground Motion Based on the stratigraphy and visual reconnaissance of the site, it is our.opini . on that earthquake damage to the proposed new home would be caused by the intensity and acceleration associated with the seismic event and not any of the above discussed geologic hazards. This opinion assumes that all structures are founded on a suitable foundation bearing strata, and constructed 6.0 MASS WASTING -HAZARDS AND MMGATIoN The marine bluff along the west side of the site sloped at gradients as high as 100 percent over a vertical height of about 80 feet, and present a moderate landslide risk. The greatest risk from flow activity. 6 Continued cleaning of the ditches at the toe of the slope by railroad maintenance crews within their right-of-way could trigger shallow debris flows, as has been reported in the past. Although we did not observe any evidence of soil movement during our site reconnaissance,' the owner should periodically monitor the condition of the slope. If there ever is a question regarding the condition of the slope, please contact our. firm and/or the railroad about their maintenance practice along the right-of-way. The near surface soils encountered at the Beard property possesses a moderate to high potential for erosion from concentrated flow, such as uncontrolled storm water drainage. To mitigate the erosion hazard potential and offiite sediment transport, we would recommend the f6llowing: 1) Storm water from impermeable surfaces, such as driveways and roofs, should be tightlined into a suitable storm drainage facility or discharge via tightline to the toe of the bluff, and not be directed onto or above the west marine bluff. 2) Silt fences should be placed along the lower elevations of disturbed areas. 3) Soils which are to be reused around the site should be stored in a manner that would reduce erosion, such as covering with plastic sheeting, using low' stock -piles in flat areas, or the use of hay bales/silt fences. A) Areas stripped of natural vegetation during construction should be replanted as soon as possible or otherwise protected. t �5) The existing vegetation along the bluff should be left in its present state and at no time should vegetation be removed from the bluff. 7 January 30, 1995 , Project No. G95003A M. PRELBUNARY DESIGN RECONMIENDATIONS AMR I Our exploration indicates that, from a geotechnical standpoint, the parcel is suitable for the proposed new home construction, provided the recommendations contained herein are properly followed. In general, the glacially consolidated sediments (gravelly sand or sandy silt) Ihat underlie the site from V proximate -1/2 feet to 5 feet below surface grade will be capable of j! 3 -f ' - ' "q ---i - ---;- 1--il e -4 �qygq Based on our exploration, th c eMsWriffina-re--as- o1cc`UW-0q911�15V11A' existing residence, with little or no fill to the east of the existing structur . es. s su 6or a a uppoifing, a' of.1he existing structure. in w u t e ne il ing area the upper organic topsoil layer`*s"ho'u'ld"be stripped and the remaining roots grubbed. Any existing trees, brush, debris or other deleterious material should also be removed. Areas where loose surficial soils and fill soils exist beneath the building footprint should be considered as unsuitable and this material should either be removed and replaced with structural fill or recompacted to its full depth. Since the density of soils is variable, random so . ft/loose pockets may exist and the depth and extent of stripping can best be determined in the field by the field engineer. I toxf 14 0 "A 1141101AM All fill should be placed in accordance with the recommendations outlined in this section. Prior to filling, topsoil, organics, and loose soils should be excavated from the subgrade as advised bythe field engineer. After overexcavation/stripping has been performed to the satisfaction of 8 the geotechnical engineer, the upper 12 inches of "posed ground should be recompacted to 90 percent of the modified Proctor maximum density using ASTM:D 1557 as the standard. After recompaction of the "posed ground is tested and approved, structural fill may be placed to,attain desired grades. Structural fill is defined as non -organic soil, acceptable to the geotechnical engineer, placed in maximum 8 inch loose lifts with each lift being compacted to 95 percent of the modified Proctor maximum density using ASTM:D 1557 as the standard. The contractor should note that any proposed fill soils must be evaluated by Associated Earth Sciences, Inc. prior to their use in fills. This would require that we have a sample of the material 48 hours in advanc'e to perform a Proctor test and determine its field compaction standard. Soils in.which theamount of fine-grained material (smaller than No. 200 sieve) is greater than approximately 5 percent (measured on the minus No. 4 sieve size)' should be considered moisture -sensitive. Use of moisture -sensitive soil in structural fills should be limited to favorable dry weather conditions. If fill is placed during wet weather or if proper compaction cannot be obtained, cleanj free -draining gravel and/or sand should be used. Free draining fill consists of non -organic soil with the amount of fine-grained 'material limited to 5 percent by weight when measured on the minus No. 4 sieve fraction. A representative from our firm should inspect the stripped subgrade and be present during placement of structural fill to observe the work and perform a representative number of in -place density tests. In this way, the adequacy of the earthwork may be evaluated as filling progresses and any problem areas may be corrected at that time. It is important to understand that taldng random compaction tests on. a part-time basis will not assure uniformity or acceptable performance of a fill. As such, we are available to aid the owner in developing, a suitable monitoring and testing program. Spread footings may be used for building support when founded on stiff/dense natural soils (approximately 3-1/2 feet to 5 ' feet below present surface grade), or approved structural fill bearing on the natural sediments. For building support, structural fill and recompacted natural soils should be compacted to a minimum of 95 percent of the maximum dry density as defined by ASTM D-1557. Structural fill placement must be inspected by AESI to verify suitable subgrade preparation and compaction. We, recommend that an allowable bearing pressure of 2,000 pounds per square foot (psf) be utilized for design purposes, including both dead and live loads. An increase of one-third may be used for short-term wind or seismic loading. Perimeter footings should be bunted at least 18 inches into the surrounding soil for frost protection; interior footings iequire only 12 inches burial. However, all footings must penetrate to the prescribed bearing stratum and no footing should.be founded in or above loose, organic, or existing fill soils. 9 Slab -on -grade floors may be used over the stiff/dense natural sediments or approved structural fill. In each case, the upper 12 inches of subgrade must be compacted to a minimum of 90 percent of the modified Proctor maximum density as determined by ASTM:D 1557. A polyethylene plastic vapor barrier and pea gravel capillary break layer should be used under floors likely to receive an impermeable floor finish or where passage of water vapor through the floor is undesirable. Based on American Concrete Institute recommendations, we suggest placing a two to three inch layer of clean sand over the vapor barrier to protect the vapor barrier and to allow some. moisture loss through the bottom Of the slab to reduce'warping in. the curing process. Sand should be used to aid in the fine grading process of the subgrade to provide uniform support under the slab. 1-910B OM Q NUMON RIMAINSWOR -vel of tn.e perforations in the pipe should be set approximatf the drains should be constructed with sufficient Paw!yrii2m the building. exterior grades adjacent to walls should be slop6d"downward 'a--*w-'a-'y'7jr�o�"'-m-��'tWiie�.-s"�t'�r-'�ulcture to achieve positive surface drainage. Roof and surface runoff should not discharge into the foot . ing drain system but should be handled by a separate, rigid tightline drain. Both footing and downspout/pavement drainage should then be tightlined to a suitable storm water drainage system, or to the toe of the marine bluff to the west of the site. 14.0 PROJECT DESIGN AND CONSTRUCTION MONITORING We are available to provide additional geotechnical consultation as the project design develops and oss I changes from that upon which this rqport is based. 4: �e: In this way our earthwork and foundation recommendations may be properly interpreted and implemented in the design. We are also available to provide geotechnical engineering and monitoring services during construction. The integrity of the foundation depends on proper site preparation and construction procedures. In addition, engineering decisions may have to be made in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not 10 I part o , th s current scope of work. If these services are desired, 'please let us know and we will prepare a proposal. We have enjoyed worldng with you on this study and are confident that these recomm I endations will aid in the successful completion of your project. If you. should have any questions, or require further assistance, please do not hesitate to call. Sincerely, AS SOCIATED EARTH SCIEENCES9 INC. Gorge H. Bennett, C.P.G. Engineering Geologist Ronald A. Park-dr, P.G. Principal GHBAd G95003A.1 WP.1/10/95 Id 001 � - W- - 1EXPIRES Bruce L. Blyton, P.E. Senior Project Engineer I/ f 11W m 10 PROPOSED NEW HOUSE U, EP-2 as I I DRIVEWAY "o -7 'V\, EP-1 1.0 wx I'm I N I . . I r 40M ft —1-� HOUSE a 'ro oE. ir LEGEND P-1 0 AppmMuft Imaltion of exowa*m pit ev le 0 40 so SCALEI FEET ASSOCIATED EARTH SCIENCESS INC 1100 - SITE AND EXPLORATION PLAN BEARD RESIDENCE EDMONDS, WASHINGTON G95003A 1/95 TFIGURE I. 0 .EXPLORATION PIT LOG' 0 Number EP-1 5 10 15 Topsoil; loose, moist, black with sod. Loose, moist, brown -gray, gravelly, fine SAND with some sift, mots, some wire debris. old topsoil. at base. (Fill) Loose, moist, ired-brown, slity, fine SAND. Loose to medium dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND. Loose pockets. Dense, moist, brown -gray to yellow -brown, gravelly, fine to medium SAND with -some slit. BOHF Q 10' Note: Wo seepage; caving 0-8'. n . Number EP-2 10 4" Sod. Loose, moist, dark.brown and red -brown, organic -rich, gravelly, fine SAND. with some sift, abundant mots. (Fill) Loose, moist, red -brown, gravelly, fine SAND with wood. (Old Regolith) Medium dense with loose pockets, moist, yellow -brown,, gravelly, fine to medium SAND. Stiff to hard, moist to wet, light brown, sandy SILT, brecclated. BOH 10' Note: Light seepage at 7'; caving Tto 51; light spalling at seepages. Su bsurface conditions depicted represent our observation at the time and location of,IhIs exploratory hole. modified by geologic - Interpretation, engineering analysis. and judgment. They are not necessarily representative of other times and location. We vAl not accept responsibility for the use or Interpretation by others of Information presented on this log. Associated Earth Sciences Inc. 911 Fifth Avenue, Suite 106 Kirklarid, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 EXPLORATION PIT LOG Number EP-3 0 5 10 is Number 5 10 Subsurface conditions depleted represent our observatlan'at the time and location of this exploratory hole. modified by geologic Interpretation, engineering analysis. and judgment. They are not necessarily representative of other times and location. We VAII not accept responsibility for the use or Interpretation by others of Information presented. on this log. Associated Earth Sciences, Inc. 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 Phone: 206-827-7701 Fax: 206-827-5424 Reviewed By Beard Residence Edmonds, Washington Project No. G95003A January 1995 a, 9 0 - 119 4 " City. of Edmon& Critic''al "Are*as* Checklist The Critical Areas Checklist contained on this form is to be filled out by any per son preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. - The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, - or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a p�ecursory site visit, and make a determination of 'the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applica. ' nt should also submit a vicinity map or plot plan'for individual lots of the parcel with enough detail that City staff can find, and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site -plan, topography Map, etc.) or studies in conjunction with this Checklist to assist staff in completing their prelirninary' assessment, of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to. -the best of my knowledge (fill out the appropriaie column below). FO--w—ner"V Applicant: Street Address . ar_>tAOW1DG , . -1-11 -CP04 City, State, ZIP Phone Signature Applicant Representative: UVE Y-twke I AFzCA�TF16--r Name G S ri - .,B �A Street Address City, State, ZIP Phone Date Signature Date CA FILE NO. 14 iLci L, Critical Areas Checklist Site Information (soils/topography/hydrology/vegetafion) 1. Site Address /Location: 16D9ZO -rAL--BUr 2. Property Tax Account Number: cna-i 04�i 3. Approximate Site Size (acres or square feet): *Z'QZC0:5F- ROW - 't 4. Is this site currently developed? X yes; no. If yes; how is site developed? 'Si!414 vne. efoty. 1- eAr qai=.Pte 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. I Yo Rollinj slopes on site generally less than 15% (a vertical rise of 10-feet over a L&.r horizontal distance of 66-feet). 14P FT. WSE, W ezo ;::T. Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). 1!>LUV:-r— Steep: grades of greater than 30 % present on site (a vertical rise of I 0-feet -over a horizontal distance of less than 33-feet). Other (please describe): 1_5BAVA ELOFV: T-0 IWIZUr­ 6. Site contains areas of year-rou nd standing water: Approx. Depth: 7. Site contains area-, of seasonal standing water: No Approx. Depth: What season(s) of the year? 8. Site is in the floodway WO floodplain of a water course. 9.14eke contains a creek or an area where water flows across the grounds surface?' Flows are year- round? Flows are seasonal? .. (What time of year? 10. Site is primarily: forested meadow _; shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: "o DETERMINATION F-v 09/29/9.3 it—L7, LP# -A-j- 4J" do 1J.To %0V cil i rr, FIL Rece v I 'et) FES 16,2009 DEV&LONENT CITY Oe SERVIC', E64jk,D;ks CrR, s VIY/7 2,WC/./Yvsvw bull waviviiiiiii� moo i AA%:2- ON JIMCAM mmids F-WqIKENIT NO. SIDE S4k PERAUT ........... . ..... TF 0 REPAIRS 0 1% W CONSTRUCT[ N Ac Uc>A�-A ..................... ....................... ..................................... ....... ........ . ....... NO, JOB!iDDRES5z ........... ............................................ ........ --------- ------ NO. ........ 5q, ............. NAME OF ADDITION ....... -- .......... ........ Ab, 73 Lps ills's As Li Is M SM 5: 1 ca ca 14 7. A VllqF!pi�; _4 " 00K -�t tis. DATE RECEIVED Sj PERMIT EXPIRES USE PERMIT ZONE CITY OF EDMONDS NUMBER JOB SUITE/APT# ADDRESS / � (I jklAj- xfl� CONSTRUCTION PERMIT APPLICATION Y..7,0 OWNER AME/NAN E20F BUSINES )VI-Aa z- 0 / & �A i§& A& PLAT NAM E/SUBDIVI SION NO. LOT NO. LID NO. LID FEE $ W MAILING ADDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved 0 RW Permit Required 0 0 46 Street Use Permit Req'd 0 EXISTING — PROPOSED Inspection Req lied 0 Sidewalk Required 0 -0, CITY ZIP TELEPHONE RAO f_ b S VA, '125-771 b6`1 REQUIRED DEDICATION FT Underground Wiring required 0 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED A EC2 /-f A i -, J YES C3 NO 0 9 ADDRESS REMARKS z z x U OWNEFUCONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE a Z, I b L 1-311 V LL____ eydl-le CITY Zip E ONE LEPH 17 z NAMPENGINEERING REVIEWED/DATE ADDRESS Ix FIRE REVIEWED BY DATE Lu CITY ZIP r,2//.� TELEPHONE �7, -�WVM-V z 0 061410-h; U. VA RIANCE OR CU SHORELINE OR ADB#­ INSPECTION STA LICENSE NUMBER tAVIHAI ION DATE CHECKED BY REQ*D IPBOND OSTED YES []NO SEPA REVIEW' SIGN AREA HEIGHT j PROPERTY TAX A CCO NT PARqL NO. 0 COMPLETE EXEMPT. ALLOWED PROPOSED ALLOWED PROPOSED EXP, NEW RESIDENTIAL PLUMBING I MECH LOT. COVERAGE. ALLOWED i5R6PbSED REQUIRED SETBACKS (Fr.) FRONT REAR PROPOSED SETBACKS (FT.) FRONT 'UR SIDE REAR :SIDE ADDITION 0 COMMERCIAL o COMPLIANCE OR CHANGE OF USE z z PARKING, LOTAREA PLANNING, REVIEWED BY DATE C] REMODEL APARTMENT E]. SIGN REO'D PROVIDED' f-I REPAIR GRADING FENCE X CYDS FT) REMARKS OTHER DEMOLISH TANK XO GARAGE REOTAININ13 WALL RENEWAL, CARPORT :RY R CKr z (TYPE OF USE. BUICANESS. OR ACTIVITY) EXPLAIN: CHECKEbi3Y TYPE 0$.LQONSTRUCTION C OCCUPrA G NUMBER OF IUMBER OF DWELLING CRITICA AREAS ILI H w a SPECIAL INSPECTOR AREA OCCUPANT o STORIES UNITS MBE NU R LOAD REQUIREDE3' ES DESCRIBE^RKTOBEDPNE I& r fit PlEmARKS z -PROGRtSS:INSPECT16N9 P'ER'UB1C',106/FINAL INSPECTION REQ D o VALUATION FEE PLAN CHECK FEE HEAT SOURCE GLAZING % LOT SLOPE % BUILDING PLAN CHECK NO: VESTED DATE PLUMBING MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO 1`_ 0 E DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. t CHARGE OKI 2 M PERMIT APPLICATION: 180 DAYS W PERMIT LIMIT* I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS ENG. INSPECTION FEE OF IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY LANDSCAPING 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY RECEIPT x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT DEEMED To MODIFY. WAIVE OR REDUCE ANY REQUIREMENTOF ANYCITY ORDINANCE 0 NOR LIMIT IN ANY WAYTHE CITY'S ABILITYTO ENFORCE ANYORDfNANCE PROVISION. X, RECE/Py TOTAL AMOUNT DUE gg I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the T'LOIN ISNDOIFNG THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid. and �e IN V LAT 0 TH LABOR CO;S�OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. 0 OLI W KME S COMPEN ATION INSyAAqCE AND RCW 18.27. G ATURE DATE S, TtjjE pWZNER E DATE SIGNED (425) RALS "SI - /N A-) W_ 11-_A� a Z-1 '�� / IPF14 j 771-0220 -.,j RELEASED BY DATt A"ENY10h EXT)333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE - YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSEScOR 5198 r --,NNW DATE RECEIVED PERMIT EXPIRES CITY OF EDMONDS USE ZONE �12 PERMIT NUMBER CONSTRUCTION PERMIT APPLICATION JOB fPUITE/APT# ADDRESS OWNER NAME/NAME-OF BUSINESS 0 1 C-�+4, 964EI-) PLAT NAM E/SUBDI VISION NO. LOT NO. LID NO. / 6­(- 12, 84 U LCC MAILING ADDRESS LID FEE $ z 0 -T I-� , I �jt v 0 PU BLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved 0 Rvy Permit Required 0 . Street Use Permit Req'd 0 CITY ZIP TELEPHONE EXISTING - PROPOSED Inspection Required Sidewalk Required Underground ,CDMOA,0�-), WA 71 01 REQUIRED DEDICATION- FT ng required EI­ t- . NAME /--(ZA ME, Sl LINE SIZE NO. OF FIXTURE 2 EQUIRED YEPW NO 0 cc W Uj ADDRESS REWRKS z F: OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE a cc A t/t,:7 z /,V C77 -7,D W 'rAll; CITY ZIP TELEPHONE IVA �Z5-3673-91723 N� ig r,_ ENGINEERING REVIEWED/PATE tl A /,j x -4 t J "t /, L 4 ADDRESS 2 / :5 9 1 FIRE REVIEWED BY DATE Lu CITY ZIP I r-i 1 /5 1 )vs-1 TELEPHONE S UL VARIANCE OR CU SHORELINE OR ADB# INSPECTION REO'D OSTED STATE LICENSE NUMBER EXPIRATION DATE CHECKED 13Y lo-z-Z000 ri, _JPBOND -t:rYES-'-C:rNO SEPA REVIEW SIGN AREA HEIGHT -j PROPERTY TAX ACCOUNT PARCEL NO. COYP ETE EXEMPT ALLOWED PROPO§ED ALLOWED PROPOSED W 072- 7 - Ll 1 0 7, Q(V-2 1171 E NEW RESIDENTIAL PLUMBING MECH q R X LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT UR SIDE REAR­ 4 ADDITION COMMERCIAL COMPLIANCE OR Y A", / ///, � 171 2 k'Z CHANGE OF APARTMENT PARKING REO'D PROV IDED LOT AREA., ..P N NG,REVIEWED BY "dATE REMODEL SIGN � FENCE n REPAIR CYDS X FT) I REMARKS Q��EMOLISH TANK OTHER Z It V, GARAGE o ROETAINRING WALL RENEWAL CARPORT R CKE Y 0 mv­,rr:� 1/-, Ac:� I') (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: S P C D y *CHE E TYPE.0 =ROCTION ICOQE, OCCUPANT GROUP NUMBER OF NUMBER OF DWELLING CRITICAL AREAS w 0 SPECIAL INSPE9TOR C U PANT TOAD M 0 STORIES UNITS N UMBER R QUI m REQUIRED XYES 'I JIM/ .9) DESCRIBE WORK TO BE DONE I a M REMARKS z 'PR 1RESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D_ OC :�,' I I 1� r-;2- - "/,-,j i&,Y7 uq �:: EAT SOURCE' GLAZING % LOT SLOPE % PLAN CHECK NO: VESTED DATE Q-0 _.S THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS uu PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION W ;APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS N INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- , I I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT;AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION: AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNATURE (OWNER OR 1��NT�(� DA TE SIGNED VALUATION FEE PLAN CHECK FEE '/1 V_� 17 BUILDING PLUMBING MECHANICAL GRADING/FILL STATE SURCHARGE ENG. REVIEW FEES ENG. INSPECTION FEE I:ANIMCAPtNG-�_'. INSPECTION. FEE ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PLAN CHECK DEPOSIT RECEIPT IRECEIPT r') TOTAL AMOUNT DUE CALL FOR INSPECTION (425), 771-0220 EXT 333 771-0221 FAX - /6 �/7 I I z_ / r " � ­�, APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid. and receipt is acknowledged in space provided. zFICIA� DATE OR ELEASED BY DATE' ORIGINAL -FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR CD Cd 'mmMll 0J L'J Ln C) C:) C:). C:) Z �UV Q'I H I a I r� P0 PrION6 t I ST oc�e, e, .�'p C� <Z> 0. e'�� '�? <11�� 0 0 <e C*1 �51_ PrIsmolcial, VoLume Resu(ts Original, Surface Moole(l topol,lnes Final, Surface Moclet, f naL Cut COM Factorl 0.00 % Fitt COMPPOICCI:Cttiolonn F a ctor, 0100 % Raw Cut Votume, 2449,47 cu yol Compacteel Cut VoLume, 0.00 cu yd Totat Cut Votume, 2449,47 cu yol Raw FILL Votumei 9.10 cu yd Compacteol FILI VoLume, 0.00 cu yd Total. FILL Votume, 9,10 cu yd STAKED AND ENTRENCHED STRAW BALE (WOOD STAKE) BINDING TWINE T' COMPACTED SOIL TO PREVENT PIPING . FILTERED RUNOFF 4 SEDIMENT LADEN RUNOFF STRAW BALE DETAIL NOT TO SCALE Cj \0, @ tX 1+ 66 "�\'<e <) C e) v----N 45-*43'lV 00 _4_5*_4_3'10`_W 292,43\FT Q� q- @ 4) SHEETFLOW 6 � \\-\W OR 0;5� 'Sp rd z6v� DRIVE CROSS SECTION NOT TO SCALE R-10' 5EI/4/ 66c, I/ TLUP 21 N/ R 4 E/ UJ'M. -00 - - <Z9 ONI1`0 / C' SHEETFLOW EX. GARAGE SHEETFLOW Li SHEETFLOW C5 AV S .2 SHEE TFLOW I _Q� C) n Zo 0 o FIRE AND I ADDRESS SIGN UIRED U-) 0 y 165.00 FT TO PUGET SOU�) (EXISTING) S 45*43'10" E 185.00 FT EASEMENT I L-------- -------- --- Genera I Notes: 1. All work and materials shall conform to City of rEolmonds Standards andlor W5r_)0T/APWA Standard epeci ficati Otis as applicable. 2. No part of the drainage system shall be covered, concealed, or put to use until It has been tested, Inspected, and accepted by the Cit�. 3.4pproximate locations of existing utilities have been obtained from available recorcI5 and are shown for convenience. The contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown. if conflicts arise during construction, tine contractor shall notify the public works inspector and any chatiees required shall be approved by the City enginser prior to commencement of related construction on the project. 4. All storm c1ra in work must be staked by survey for line and grads prior to starting construction. 71( -rp C &A/c, IN &"P-4 o F 0 E-S / 6 A/ a V e-R--S 04 Lz- 0 /—' 4 1,146 C5, -S 4---? P E - 7_E_S(ZIP63c�:_ -/-z) j 16 /1/ C' le-V 7�7 X, 0 4-6" QUARRY LO SPALLS 12" DEPTH J TEMP. CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE I FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC WIRE MESH SUPPORT FENCE TO WIRE. r—FOR SILT FILM FABRICS. .41p. iL L Emmooffinumas son moss an IIIIIIIIIIIIII110 IRM !! ENERNMUMENNUMSE H, M mom EvffiW­R". \-77777'c - ----- BURY BOITOM OF FILTER MATERIAL IN 8 BY 12" TRENCH WIRE MESH SUPPORT FENCE FOR SILT FILM FABRICS -_ FILTER FABRIC MATERIAL — PROVIDE WASHED GRAVEL BACKFILL OR COMPACTED NATIVE SOIL AS DIRECTED BY ENGINEER BURY BOTTOM OF FILTER — MATERIAL IN 8" BY 12" TRENCH 2" BY 2" WOOD POSTS, STANDARD OR BETTER OR EQUIVALENT 04 LO —8" MIN. SEC11ON SILT FENCE DETAIL ENGINEERING APP,;',_:)\4AL AS NOTED NOT TO SCALE /Vio C"I I" SITE 4TH E LA C14 0 Z 04 UJ C) cli vlclnit� �Iap SCALE 1 1000' Ene inser: RD. Heide, F.E. Desien 5uil6 Services, Inc.. Soil T�pe: SCS sheet 50 - Type 41(o Alderwood -9 House Site Applicant: Mark 5eard 1(oe20 Talbot Rol. Edmonds, WA 'Ba02(o (425) 223-1014 (425) Ill-&014 Soil Cover: Landscaped w/ Existing House and Garage. Grading: 244S c.�. out/ S c.�. fill Calculated w/ Eagle Point 'BIB Legal Description: A PORTION OF GOVERNMENT LOTS:.-, '- 3, IN SECTION -1. TOLLNSHII= 21 NORTH, RANGE 4 E, W.M, CITY OF EDMONDS, SNOHOMISH COUNTY,, %-_5HINGTON. SEE DRAINAGE REPORZT FOR FULL DESCRIPTION. Project Notes. Proposed house elevation FF- 64, Grade a Foundation 02.5 UNO. Excavated material to be spread oA around the building during backfilling and seeded/covered with straw within 24 hre. Excess material is to be taken to a permitted dump site, Propert� ' lines from 5ounclary Surve� Property Description on 1-20-IBI surve� by Darrell Ford 4 As.�oc. Topo lines and datum taken from TOPOGRAPHY MAP for Mark G. 4 Oleta J. 5eard, by Darrell Ford 4 Assoc. Drawing 0 133-013. Vertical Datum City of Edmonds Sewer District Manhole 200+- of S'19 Prop. Line 4 on Talbot Road IE 66.64'. Site 5M SE propertS corner e N side of Easement. Elev. 134,11'. 1. New parking to slope to new drain. Downspouts and footing drains to be piped to detention tank- 2. Detention Pipe 5' Dia x 44' lone to be installed as shown and detailed on sheet 2. 3. Catch basin grate to be coverec; with filter fabric during construction. 4. Pipeline over bank to be per 5NRR Agreement. Details are on sheet 2. 5. ALL SLOPE DISTURIBANCE Is to be seeded, strawed with 3" min. cover, and all steep slopes are to have jute netting placed over straw and staked as required to prevent movement. Construction SeQuenc 1. Install all slit Pence and other erosion control measures as shown on the plan. Meet with DESIGN 5UILD SERVICES, INC: Engineer and City of Edmonds Inspector and confirm all Erosion control measures are adequate. 2. Demolish existing structures, excavate for detention tank, new house and parkTne. Cover all stockpiles Win 24 hra and insure ang water coming from the plies does not cause erosion to adjacent areas. Install detention tank and discharge pipe to toe of bluff at time of excavation. All excavation discharge is to be routed to tank. F'rior to system completion provision is to be made to pump to exIstine C15's In access easement. Following backfill of foundation all disturbed areas are to drain to temporar� catch basins tied Into downspout stubs. NO DRAINAGE TO SLOPE. 3. Four Foundations, place footing and downspout drains, and drive catch basin, t9ing into detention tank and discharge pipe. 5ackfill around all footings and rough grade site. Straw or gravel all exposed areas. Grade drive to cat--h basin. Place slit fabric on grate on catch basin. 4. Complete all construction and landscaping. 30 days after stabilization of all ground surfaces remove slit fence and clean catch Lasin and detention tank. Inspect discharge pipeline, clamps, cables, and dischares T/quarrq roc�' dissipation pad. Repair a.s necessarg. 5. Homeowner to check and clean s4item yearly or after significant rainfall events to Insure continued operation of the system.. Any repairs are to be made immediately. 6ummar� of New Impervicus Areas: 5U!Io1!n!2/5!dewaIkS 4,7671 5S, V . Fa rkine 4,143 s,f, ------------------------ Tota 1 121 E 10 .5, f. ­01E��r NNW -IV OF ILE V) I-_ Z 0 V) Z 0 5; LJ Ld V) Ld W :g CA CIO NL (P a) Q) C'_D S_ Z: \�) (P vl� X Q) Q) 0-) W IL C\1 \S� C-4 1:�) �_D IL Q) LIU Add - DRAWN: RDH DESIGNED: RDH APPROVED: RDH DATE: 1 �26�00 PROJECT NO. 20002 SCALE: 1 "= 20' SHEET I OF 3 5EI/4/ 5ec, I/ T.UJP 21 N/ R 4 E/ ui,m. 1/2" VENT HOLE 611 PVr FACTORY TEE C14 EXHIBIT 11cli K - JalkT!5 W IL4, 6e, SW-r-r ;=L15 eD I f= I-JE CAM 7 ..M415 rl r-ET WILL� I -AY 61�4 !A=d..%4J9- 44AVM -A OP OF: a-AH le.. So A<,* 17_> ."1_VSMr XDLCAWL. -VOR 0 ALI- S iPwr= ==;z;-1 I 9A-rr=s A-r o0r' 0 6 ro �-J. WA'rG'7. 15 =%r4aP.`rl5-=P TIM f-er row 7p` !lrg A =-=A. 0 lAJ t L4= W 'rZ:V . L4 -K*9 F5 ID 545 1 G, �4 e)y rAL_P� ;zi:�,. ew?& go' 15 L) 2411 3211 b" PVC PLUG FROM DRIVE 21 r M,4X L -TO DETENTXQN- N11,—ADAPTER OR PIPE JOINT (01, OR all PVC PIPE FAC COLLAR roll PVC PIPE AS REQUIRED TYPE I C5 FLOATA5LE MATERIAL 5EFARATOR NOT TO SCALE REFERENCE AGREEMENT WITH 5NRfR GE 82.5 36" CMP ACCESS RISER OVERFLOW 80.5 4" D.S. DRAINS & 6" DRIVEWAY CB IE 79.5 � -_7 PROVIDE 6" WELDED STUB WELD ALL CONNECTIONS 6" 60' FOOTING DRAINS RESTRICTOR PLATE w/ 5/8" ORIFICE CUT IN PLATE, MACHINE DRILLED, SHARP EDGE ORIFICE. Installation of the pipeline will -'De difficult due to steep slope in which the pipe will be laid. Any damage to the slope due to construction must be repaired to its original condition. A large load on the concrete anchor which supports the pipe on the top of the slope will result due to this installation. This anchor should be moved as far away from the face of the slope as possible to maximize its support capability. The pipeline should be designed to withstaad the weight of the water within the pipe. See detail below commonly used to support and hold the pipe in place which should be used for this installation. If the pipeline fails, it will be the owners responsibility to reinstall the pipeline. If damage occurs to the railway property due to the failure of the pipeline. the property owner will be respon�ible for damages. The property owner must not deposit grass clippings, yard waste, trees or other debris on the slope at any time. Double cable with clamps spaced at 20'-3 0' intervalls. I WX -7/f A' M. 6-&�V. TIZA FtS W x L0 L& X C"LE CLAmrm5 5 EC X, - X L CLAMP DETAIL 71nad�dition to the clamps,- Xc-L%.v� pk-, Clarence Johnson - Field Engineer Z 2 Z0 6. 1 ",IN 6" Z Z FIFELINE DET,41Le NOT TO 5CALE ROUND SOLID LOCKING LID Xca �l X 4" D.S. DRAINS YxO.064" METAL PIPE SUPPORT IE 80.0 F_ 7 ANCHORED 10 CMP WALL PROVIDE 4" WELDED STUB NO-E: ALL STEEL PARTS AND SURFACES MUST BE GALVANIZED & ASPHALT COATED (TREATMENT #1 OR BETTER). COMPLETE CORROSION PROTECTION MUST BE ASSURED. 45'LF 60" CMP 0 0.507. W/ ASPHALT TREATMENT i E 75.50 1 4 —12" Smooth Coupling Band for Smooth Pipe material to be ASTM A 36 1/4" plate galvanized after fabricatio C;5" per ASTIVI A 12 #s 6[s'to be all holes 119/32 X 1/4" 3/4 diam. pipe stakes \D 41/2" 7 coupling band 12" 112" or 24"coupling band Plate Detail coupli ng ban collar (2" pipe) 1/41' C 1/41' plate (see detail) material to be ASTM A 36 galvanized after 11/2" x 6' st kes —IQ fabrication per ASTM flatten to point each side of culvert A 153 Anchor Assembly DETENTION TANK ACCESS DETAr� standard type 2-60" diam. ---frame locking lid CE3 concrete top slab eccentric opening (marked "DRAIN") ++ mounted over 24" diam. 36" CMP riser + A - -" ctlu 1OCKinc M.H. frame & cove'i see K.C.R.S. dwg. no. 2-022 compacted pipe bedding M.H. steps 12" O.C. weld or bolt standard M.H. steps PLAN NTS maintain 1 " gap between bottom of -slab & top of riser — Provide pliable gasket to exclude dirt riser, 36" diam. min., same material & gage as tank welded or fused to tank Max detention tanK SECTION NTS_ NOTES: Use adjusting blocks as required to bring frame to grade. 4" - DRAIN 2. All materials to be aluminu . m or galvanized and asphalt- coated (Treatment 1 or better). BED BOTTOM HALF OF TANK 36" CMP STUB IN PEA GRAVEL. PROVIDE POSITIVE DRAIN TO DISCHARGE LINE. PROVIDE 20 MIL LINER UNDER TANK TO TOP OF PEA GRAVEL. NOTE: LEAKAGE TO SLOPE COULD FAIL BANK 000 DETENTION PIPE w/ RESTRICTOR NOT TO SCALE V) Z 0 V) W L , W1. Cq Q) Q) Q) (P 6 (P Q) 0I) -4P 'o-) X Q) Q) 0-) Lu (L \R� IL LL1 Q) Ad& DRAWN. RDH DESIGNED: RDH APPROVED: RDH DATE: 1/26/00 PROJECT NO. 20002 SCALE: N/A SHEET 2 r 01 a cl) U) -0 0 > 0 0 m 0 m > m m u) m > m r- c- X 6 :::E m M 0 Z: = M < m —q M z p 0 11101 1 co *" — u �u �u �u 0 0 0 0 0 0 0 -n N) 0 Drainage Profile 4 DetaiI6 Mark 4 Lettie 5earal 16920 Talbot Rd, Edmond5, WA 9a02(o (425) 1114014 4*01:mi�n '�,l BLOCKING "W'50 B E N D S MUM& mxxxm VERT.BM CUST, A D L 11 —1/'r I a 1 2.0' VIC 7—.5—' 22-1/7 11 2.2' 311C "" 2.Cr 317 17 2.6' 2-W 4V 30 3.11 VIC 2.(r 1 2.2* 314' 2Jr 1 /2' 25 2.9'- 31,C 2.0* MY 41 3.5* 31,C T 2.(r 4S 4-11' r qqp 4R-S.. V YVI Canetruction Manaeement 27934 GIST 2011S 120th 5t, 5-E., Monroe/ WA 130212 Phone/Fax.- (3roo) le3-9(059 I REVISIONS (P m 4�- Z- A -tll m �u 't CD C) Z C' C�b 0 PrIsmolclat Volume Results X0 /\u 1W I'D c' 0 Original Surface Mocleti tcpotlnes Final Surf ace Moole(i f naI, Cut Compaction Factori 0.00 X Fill Compaction Factori 0.00 % Raw Cut Vo(umei 2449,47 cu yol Compacteol Cut Volume, 0.00 cu yd Total Cut VoLumet 2449,47 cu yol Raw FILL Votumei 9,10 cu yd Compactecl FILL Votumei 0.00 cu yd Total FILL VoLumei 9.10 cu yd STAKED AND ENTRENCHED STRAW BALE (WOOD STAKE) BINDING NE COMPACTED SOIL TO 7 PREVENT PIPING . FILTERED RUNOFF SEDIMENT LADEN RUNOFF Xy STRAW BALE DETAIL NOT TO SCALE SHEETFLOW -.90 TO PUGETSOU SHEETFLOW 'q"' KHEETFLOW 0/ -90 I L— — — — — — — — Genera I Notes- 1. All work and materials shall conform to City of Edmonds Standards andlor 11151DOT/AF111A Standard Specifications as applicable. 2. No part of the drainage system shall be covered, concealed, or put to use until it has been tested, inspected, and accepted by the City. 3. Approximate locations of existing utilities have been obtained from available records and are shown for conventence. The contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown. If conflicts arise during construction, the contractor shall notify the public works inspector and any changes required shall los approved by the City engineer prior Lo 0 0 commencement of related construction on the project. R n 4. All storm drain work must be -staked loy survey for line and grade prior to startIng construction. INNNe'o -X T-f te 6 /"J D es 167 1�j 0 a "z--s C- Z�s 4 tt- 0 �414 INI A 67 I-V 01 4e:V V1 7 r),C� 17-J ye-P7-5-& 1.5" MIN. COMP. DEPTH CL "B" ASPHALT 1.5" MIN. COMP. DEPTH CSTO 6" MIN. COMP. DEPTH GRAVEL BORROW9 DRIVE CROSS SECTION NOT TO SCALE X, R-10' 'N M 0 4-6" QUARRY U) SPALLS —12" DEPTH C7 6�� TEMP. CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC WIRE MESH SUPPORT FENCE TO WIRE. I r—FOR SILT FILM FABRICS. WIRE MESH SUPPORT FENCE FOR SILT FILM FABRICS -. FILTER FABRIC MATERIAL — PROVIDE WASHED GRAVEL BACKFILL OR COMPACTED NATIVE SOIL AS DIRECTED BY ENGINEER BURY BOTTOM OF FILTER -- MATERIAL IN 8" BY 12" TRENCH� 2" BY 2" WOOD POSTS, STANDARD OR BETTER OR EQUIVALENT C) 04 to —8" MIN. SECTION vlalnit� I*Wlap SCALE 1 " = 1000' Applicant: R.D. Peide, P.E. Mark 5eard Desien 5u!ld &erviaes, h"Ic.. 16>1B20 Talbot Rd. Ecimon6s, WA (BO02(o (42 E�) 2 2 3 - -1014 Soil Type: SCS sheet 50 - T�pe 4/6,41derwood a House Site Soil Cover: Landscaped w/ Existing House and Garage. Gradine.- 24413 c.�. cut/ S c.q. fill Cal��ulated w/ Eagle point aa Legal Description: < A PORTION OF GOVERNMENT LOTS_ 1' 3, IN SECTION -1. TOWNSHIP 2-1 NORTH, RANGE 4 E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY., �,�,WlNr-:;TON. SEE DRAINAGE REPORT FOR FULL DEScRIpTION. Project Notes - Proposed house elevation FF a4, Gi �;ounclatlon 52.5 UNO. Excavated material to be spread ot around the building during backfilling and seeded/covered with straw within 24 hre. Excess materl I Is to be taken to a permitted dump site. Property ' lines from 5oundarg SurveQ Property Description on T-20-SI survey by Darrell Ford 4 Asi or- Topo lines and datum taken from TOPOGRAPHY MAP for Mark G. 4 Oleta J. 5eard, by Darrell ord 4 Assoc. Drawing 0 W-013. Vertical Datum City of Edmonds Sew,ir District Manhole 200+- S.Wly of S'ly Prop. Line 4 on Talbot Road IE Sa.S4'. Site IBM S.E propertt" corner e N side of Easement. Elev. S4.11'. 1. New parking to slope to new drain. Downspouts and footing drains to be piped to detention tank. 2. Detention Pipe 5' DIa x 44' lone i o los installed as shown and detailed on sheet 2. 3. Catch basin grate to be covered with filter fabric during construction, 4. Pipeline over bank to be per 5N'1!1,R Agreement. Details are on sheet 2. 5, ALL SLOPE DISTUR5ANCE Is to ke seeded, strawed with 311 min. cover, and -all steep slope$ are to have juts netting placed over st,aw and staked as required to prevent movement. Construction Sequence 1. Install all silt Fence and other eros on control measures as shown on the plan. Meet with DESIGN IBUILD SERVICES, INC: Engineer and ",Ity of Edmonds Inspector and confirm all Erosion control measures are adequate. 2. Demolish existing structures, exca,(,,ate for detention tank, new house and parking. Cover all stockpiles Win 24 hrs and insure any iater coming from the plies does not cause erosion to adjacent areas. Install detention tank and ollac, iaree pipe to toe of bluff at time of excavation. All excavation discharge to to be routed to tank, firlor to system completion provision is to be made to pump to existing C,5's In access easement. F�'Alowlne backfill of foundation all disturbed areas are to drain to temporary catch basins tied Into 1�n'ownspout stubs. NO DRAINAGE TO SLOPE. 3, Four Foundations, place footing ind downspout drains, and drive catch basin, qne into detention tank and discharge pipe. 5ackfill ar.-�und all footings and rough grade site. straw or gravel all exposed areas. Grade drive to cat,r-.h basin. Place silt fabric on grate on catch basin. 4. Complete all construction and lan,"iscaping. 30 days after stabilization of all ground surfaces remove silt fence and clean catch 1:,1sin and detention tank. Inspect discharge pipeline, clamps, cables, and dischares T/quarry rocrVeAlselpation pad. Repair as necessary, 5.14omeowner to check and clean sy �tem gearig.or after significant rainfall events to Insure continued operation of the system. An� repaire gre to be made Immediately. 5ummar� of New Impervicue, Areas: RSC151VF' D l5uildine/eiclewalks 4 'i, MAR 2 4 .i� CT SE,,11ICES CTR- - - - - - - - - - - - - - - - - - - - - - - - y 0 EE)MO D Tota 1 :'0 s.f. Z 0 Z 0 o W W W 00 CID Q) (P r (S) X Q) Q) Q) C-4 \S� LU M Q) DRAWN: RDH DESIGNED: RDH APPROVED: RDH DATE: 1426�C PROJECT NO, 20002 SCALE: 1"= 23 ENGINEERING APPROVAL AS NOTED SILT FEP4CE DETAIL NOT TO SCALE SHEET OF M 1/2" VENT HOLE 611 PVr FACTORY TEE C14 11C11 JF30 EXHIBIT T-OLY �7�yuewF_ rim C-OrqT-. 4=r_0i,1 Dt-r—Q low -r.&NK - Jai t4T!5 W I", 61F, -r--,WT"r r-LIS eD IF WE CA�47 CH15 7-1 r-q WILL, LAY O�J 4K. 44AVC� -A 75�1 rr T B�X 1. slp�' op, S7A- JOW-r , :o, pe- J,, 1117 WII.;L- exoss— W Y__ *;Far I CIN 51AL;,= r"Atgll-le IS sto AL%- jPjf-S -rS;tM I I4A-rr=S A-r A.'-r' W 1 WAIrs,z. Is VIMIW."Irecp TV Per �-o w ip`�Iro AMPOZ64 aX4La S;QS-r1114Qv " fWiM041 is, ouwr V- V_= M TZV V" 9-AJU4 W- W S r-^ WLS L) k-r.. 1.5 AL_kC7Sr $Y *V_AXr) 4410use �R� . L. U_ r-. Y-t SV_1 I C-1 J 4A MdA tr,55 ellr TAL-� o 2411 10 R31111111111M 0 3211 6" PVC PLUG FROM DRIVE 2'_ M,4X TO DETENT�QN "���ADAPTER OR PIPE JOINT 6" OR 8" PVC PIPE AC COLLAR 6 11 PVC pipe AS REQUIRED TYPE I C5 FLOAT,45LE MATERIAL 6EFARATOR NOT TO SCALE 5EI/4/ 5ec. I/ TUJF 21 N/ R 4 E/ W,M. . .. ......... ... Installation of the pipeline will -be difficult due to steep slope in which the pipe will be laid. Any damage to the slope due to construction must be repaired to its original condition. A large load on the concrete anchor which supports the pipe on the top of the slope will result due to this installation. This anchor should be moved as far away from the face of the slope as possible to maximize its support capability. The pipeline should be designed to withstamd the weight of the water within the pipe. See detail below commonly used to support and hold the pipe in place which should be used for this installation. If the pipeline fails, it will be the owners responsibility to reinstall the pipeline. If damage occurs to the railway property due to the failure of the pipeline. the property owner will be respon�ible for damages. The property owner must not deposit grass clippings, yard waste, trees or other debris on the slope at any time. Double cable with clamps spaced at 20'-30'intervalls. I Wx -7/t 6' f It- . 6^t-v. --s rsz^ Pts X x L 711 ClkiLg CLAM r5 3' 5EC_ X_X .19 4C'3r' CLAMP* DETAIL I rn��a d d i �ti o�n t o th e c I am p s, X, c L% _�d L b + Clarence Johnson - Field Engineer fREFEfRENCE AGfREEMENT WITH 5NfRfR GE 82.5 36" CMP ACCESS RISER 10 OVERFLOW 80.5 4" D.S. DRAINS & 6" DRIVEWAY CB IE 79.5 PROVIDE 6" WELDED STUB a WELD ALL CONNECTIONS 6" 6" '6" 6" FOOTING DRAINS Z RESTRICTOR PLATE w/ 5/8" ORIFICE CUT IN PLATE, MACHINE DRILLED, SHARP EDGE ORIFICE. FIFELINE DETAILe NOT TO SCALE ROUND SOLID '-OCKING LID \,�; X, X V'xO.064" IVETAL PIPE SUPPORT IE 80.0-1 ANCHORED -0 CMP WALL NOTE: ALL STEEL PARTS AND SURFACES MUST BE GALVANIZED & ASPHALT COkTED (TREATMENT #1 OR BETTER). CDAPLETE CORROSION PROTECTION MUST BE ASSURED. stcof,ior-'4'i 09-k rt-,cE rks"es,�Ap,fw EV)CkF-C19.15o h 4�4�'LF 60" CMP @ 0.50% w/ ASPHALT TREATMENT #1 4" DRAIN 4" D.S. DRAINS PROVIDE 4" WELDED STUB 75.50 4 Smooth Coupling Band for Sm nth Pina material to be ASTM A 36 1/4" plate galvanized after fabrication\ per ASTM A 123 1 all holese 3 1 1 , 01 m / X11 4'ldiam. 755�ts to be 1119/32 X 1/4" 7/8". 17/8" 1211— Plate Detail (0 112: pipe stakes coupling b Ind of or 24"coupling band coupling band collar (2" pipe) 1/4! 1/411 plate (see detail) material to be ASTM A 36 galvanized after 11/2" x 6' stakes fabrication per ASTM' f I atte ni �tp 0Int-_J_D\__ A 153 --each side -of culvert Anchor A7�r`;!embly - DETENTION TANK ACCE SS DETAk standard type 2-60" diam. CB concrete top slab frame locking lid (marked "DRAIN") ++ mounted over 24" diam. 36" CIVIP riser eccentric opening + A s a" aid locking M.H. frame & covei see K.C.R.S. dwg. no. 2-022 compacted pipe bedding M.H. steps 12" O.C. weld or bolt standard M.H. steps PLAN NTS maintain I" gap between bottom of -slab & top of riser — Provide pliable gasket to exclude dirt riser, 36" diam. min., same material & gage as tank welded or fused to tank max detention tank SECTION NTS NOTES: 1 .-Use adjusting blocks as required to bring frame to grade. 2. All materials to be aluminu . m or galvanized and asphalt co-ated (Treatment 1 or better). BED BOTTOM HALF OF TANK IN PEA GRAVEL. PROVIDE POSITIVE 36" CMP STUB DRAIN TO DISCHARGE LINE. PROVIDE 20 MILLINER UNDER TANK TO TOP OF PEA GRAVEL. NOTE: LEAKAGE TO SLOPE COULD FAIL BANK 60'0 DETENTION PIPE w/ RESTRICTOR NOT TO SCALE _7 Z 0 W C3 C-4 cj) 12) X Q) LU <1 CID [L M C LL1 Q) Adti. DRAWN: RDH DESIGNED: RDH APPROVED: RDH DATE: 1 �26�00 PROJECT NO. 20002 SCALE: N/A SHEET 2 0 CO w -u a > 0 0 0 x > -u M x > 0 -.1 -u 0) > M r- c- M ;u " G) :E rr, 0 z z M 0 < M I M z p 1101 0 1 1 co *" U x X x 0 0 0 0 0 0 0 -61" " 0 0 Drainage Profile 4 DetaiI6 Mark 4 Lettie 5earcl 16920 Talbot Rol., Edmoncl5, WA 9502(o (425) 111=6014 2 0 - r- at - 9 Conetruction Management 2011e - 120th 5t, 6-E.., Monroe, WA c-)0212 Fhone/Fax.- (3&0) -1c33-e&5c3 ��W 3 VERMAL BLOCKING VERT-BEND CUST., A D L a FA 2.0' 3/,V 1.5, 22-1/7 11 2.2- 314- 2.(r I w 17 2.6' 31,C 2.0 4V 130 3.1" 31-C 2.(r 11-' 1 /'r 11 2.2" 314' 2.v 22-1/2' 25 2.9' 314' 2.01 W, 41 3.50 2-0' 4V 68 1 4.16 .cj _279M I ST'EV�� REVISIONS (P� M E—H a Z- A 4�11 M �K A/ A) 1:4/ v�\ N1 I P/1105ff N 'I yf-.5' 0- 49 A rp3b" -- let t I pd, I ILL N lilt J- I Koo n1p oo Ile lfly'�f. . 0/1 *70PAO 11 JAR, L44 13 k zz;�'Xz -..!" �Aiooe "IAl a,,* f -!!QE',r1AV 7 0 JJJ N A&` iVO4A;C- ,&Agq6c-u AOSM50--g' '200 S�= ,1:/.. 14'4 1. . f :1 AV� I STREET FILE RECmvED 110/.'If 3 0 1995 PERMIT COUIVTCp AAWW. SCALE: lelzl� APPROVED BY: DRAWN DATE: t�f— REVISED DRAWING NUMBER 1140 X 04 FRLNM ON Ito. 1000H CLI"pnw ,6 t-71-q 4 -D RECEivEo NOV 3 0 1995 PERMITCOUNTER STREET FILE �- t� t -2 I -A A-7 %q - 77 F/r A ol L �ML jz� 7-0 A LG jvv C, 5f) 7� &EA IS 550 3 Vt CO A=, PP,T-(D -771 5r- D,Zl T-A (0 M 3,7 1 i %so C A ico st INK �fu cl C7 e.- 00 40 U0, q