Loading...
17201 72ND AVE W.PDFIIIIIIIIIIII 5624 17201 72ND AVE W --T—� ADDRESS: TAX ACCOUNTMARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) CRITICAL AREAS:- 7- rZ01 DETERMINATION: E] Conditional Waiver 0 Study Required Waiver DISCRETIONARY PERMIT #'S-- TED: 4 DRAINAGE PLAN DA Qjp&C,"101f) PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER):_ 19q,2-0195,? PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE S: LID #:-6� SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: (,0/19A4 SIDE SEWER PERMIT(S) #: )4�6ic) GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED:.. OTHER: L-ATEMP\DSrs\Fom,s\Strcct File Checklist.doc APPLICATION The City of Edmonds for EASEMENT NO - -------------------------------------------- SIDE SEWER PERMIT rib NEW CONSTRUCTION REPAIRS LID NO. ----- ASMT. NO. OWNER ----- Wt-'��/? ---- J.0 ------------------------------ CONTRACTOR ...... . ..... JQHNSACYt'� ----------- ------------- . ........................... PERMIT NO. JOB ADDRESS --- ----- LEGAL DESCRIPTION: LOT NO . ........... E5 -------------------- BLOCK NO . ........................ ........... 0 ................................................................................................................................................... -- ........... t-32. DATE.. X V 7 ........ By ------- 0�v�-Aelr - ------------------------- c APPLICATION n Th ''City -of Edmo As for -SI[IDE SEWERPERMT NEW CONSTRUCTION REPAIRS EASEMENT No . ............. ....... Z_ ID A, OWNER. ...... pl.Al ..................................................... CONTRACTOR .... ........................................... PERMIT No.: ADDRESS ...... P_,ala ......... ..... LEGAL DESCRIPTION: LOT No. ................................... BL40CK No . ..... ........................... .......... NAME OF ADDITION 4�ZL A)V d,21; LL_57- .................. .... ...................................................... .............. 7.r t4 aFcEiVED ' 2�1 1974 M AY_ - q" /vc, Ye slh��o S" saz'j, k. c, -.4 u-, Approved: DATE ................................................. By ................................ ............ ........ .............. CITY OF EDMONDS SIDE SEWER PERMIT WATER -SEWER DEPARTMENT PERMIT 0 .G Call 775-2525 for side sewer inspections BEFORE covering any portion of the constru tion. Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday inspeections.) 172M - 72rd P.var.i.,.c Ppst ADDRESS LOCATION OF CONSTRUCTION ............................................................ .................................................. . ....................................................... Lot 9, Rc��nda7u,2 PROPERTY LEGAL DESCRIPT91ON ........................................................................... .............................................. -------------------------------------------------- - ---------- - ---------- - ------------------------------------------------------- I --------------------- 14-1) ... ---------------------------------- 0 ----- ... . ............ ................................... . ....................................................... -------- --------------- OAX.7NER,&AND/OR BUILDER ............ --------------------------- ­ ... * ... ­ ' U --.7�]MACTORI'S NAME ADDRESS --------------------------------- ------------------- * ----------------------------- ----------------------- * ---------- - ----------- * -------------------------------------------- ......... ..... sanitary sewer Permission is granted ---- ----- ­1 19.1�., for repair and/or connection of a side sewer to the city system in accordance with City of Edmonds ordinances. AT--VNTION IS CALLED TO THE FOLLOWING: No. 1—The o ners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permit obtainable from the City Engineer's office. NOTE No. 3—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside -property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 5--Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appurtenances except to in- sert the pipe into the wye. DISAPPROVEDE] Date --- - ----- ......................... By .... ....... Date .............. ..... --- ---------------- Date -----_-------- ------------------- By ---------------- 14"A ............ ....................................................... APPROVED Date.._ ----------- BY --- - ---- ... . . . .................. Remarks: ....... . ....... ......... A ---------------- - -- - -------------------------------------- ........ / --------- - ------------------------------------------------------ - --------------------------------------------------- ..................................................................... ............................................................................................................................. . ............................................. BOTH Permit Copies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection I ....................................................................................... ... I hereby certify that the side sewer installation constructed under this permit (Owner of Contracting Firm Perfcrrning Construction) nstalled in accordance with all governing ordinances of the City of Edmonds. Datedthis ............................ day of ................................................................. 19 ......... Check BEFORE you dig for: Water E], Gas E], Telephone E], Power E], Sewer El, Other El v . ......... ..... .... ........ 40 #P20 City. of EdWog�' Development SeJVC4§ D;ytrol Planning Division Phone: 425.771.0220 eg Fax: 425.771.02,1 0J40 0\ ne Critical. Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. Tle purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). E Date Received: V11Y10 /' City Receipt#: 7 Critical Areas File M Q 0-1 - QC6 I CriticalAreas Checklist Fee: $135.00 Date Mailed to Applicant: A property owner, or his/her authorized representative, must fill'but the checklist�. sign and date it, and submit it to the City. The City will review the checklist make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant. shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their prelin-dnary assessment of the site. The undersigned applicant, and his/her/its heirs; and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false', misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I cer* that the information and exhibits herewith'subn-�tted are true and correc . t to the best of my knowledge and that I am authorized to file this a plica 'on n the behalf of the owner as listed below. SIGNATURE OF APPLIcANT/AGENT 7M DATE Property Owner's Authorization By my signature, I cer* that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials an the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting a endant application. SIGNATURE OF OWNER DATE PLEASE PRINT CLEARLY Owner/Applicant: M A�-k LoewE-0 Name ,; � --)" () -; , � — 9 Street Address CEDAMOAJ65 city State Zip Telephone: 7 Applicant Representative: ,55A /T1 E- Name - - - Street Address City State Zip Telephone: Email address (optional): Email Address (optional): #P20 CA File No:CPA7,0D Critical Areas Checklist Site Information (soils/ topography/ hydrology/ve.getaiion) 1. Site Ad&ess/Location: /7POI -z;214-D A 0E. Li. 2. Property TixAccount Number: 3. Approximate Site Size (acres or square feet): 000 :5G) F-T. 4. Is this site.currently developed? _Z`yes; — no. — If yes; how is. site developed?. SlkJ&L E FAM I ��z 1e5S10ej-VCE- 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical ris e* of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over. a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). -Other (please describe): 6. Site contains areas of year-round standing water: A-)10,WE ; Approx. Depth: 7. Site contairL§ areas of seasonal standn water: NOMF Approx. Depth: What season(s) of the year? /47A 8. Site is in the floodway tJ 0 floodplain M0 of a water- course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? A/QL,5- Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn, shrubs etc) 11. Obvious wetland is present on site: - W/J 65'_ F City Staff Use Only 1. Plan Check Number, if a )licable? 2. Site is Zoned'? (D Z S__ 3. SCS mapped soil type(s)? A Idirt, v v e,_e U,�(v 5aida �Octnj 4. Cxitical Areas inv map indicates Cri ical Area on site? -7 CV -1dift W S . -2 . ao6lp ccQ((�n Aa 0(16L*=!U1 JZ � I 5. Site within designated earth subsidence landslide hazard area? 4(s DETERMINATION STUDY REQUIRED WAIVER Reviewed by: ('VIAN�AK Date: #P20 CA File No:CPA UD-7 m:)q Critical Areas Checklist Site Information (soils/ topograkphy/ hydrology/ vegetation) 1. Site Address/ Location: / 7�201 —V 'j-0 A V�:: . Lj . 00 2. Property Tax Account Number: q�, MCMq 3. Approximate Site Size (acres or square feet): lq4 00 0 :5c) F-T. 4. Is this site currently developed? yes; _ no. If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-fe'et over . a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: 100PE ; Approx. Depth: 7. Site contains areas of seasonal standin water: NONE Approx. Depth: What season(s) of the year? — A/ 8. Site is in the floodway L0 floodplain PO of a watercourse. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? - AAX 85- Flows are seasonal? (What time of year? 10. Site is primarily: forested ; meadow ;shrubs mixed urban landscaped (lawn, shrubs etc) 11. Obvious wetland is present on site: OWE' F ity Staff Use Only Ci 1. Plan Check Number, if a )ficable? 74 1 2. Site is Zoned? S 11 j C (0 5 3. SCS mapped soil type(s)? A y e,-c aca utdv - 50AW(I to ct nn 4. Critical Areas inv'e0tory or C.A. map indicates Cri�ical Area on site? 12,ni�r-,61P ero((�n La:ZW — i -n Fr. �, 4 :371r. , L f , 5. Site within designated earth subsidence.landslide ha area? 14 6 DErERMINATION i A WAIVER Date: 6 #.P2.0 City of Edmonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.02�1 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Appli cation for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). 0 Date Received: V11Y10 CityReceipt#: 7L=4=V.1 Critical Areas File #: 9,h Ob-4 -OC61 Critical Areas Checklist Fee:. $135.00 Date Mailed to Applicant A property owner, or his/her authorized representative, must fill out the checklist� sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, . the applicant. shall include other pertinent information .(e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs; and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees,. arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information ftimished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this a plic n the behalf of the owner as listed below. SIGNATURE OF APPLIcANT/ AGENT DATE Property Owner's Authorization By my signature, I certify that I have authorized the above ApplicanttAgent to apply for the subject land use application, and grant my permission for the public officials an the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting a dan application. SIGNATURE OF OWNER DATE PLEASE PRINT CLEARLY Owner/Applicant: M Ar�k LoiFwE--AJ Name. CZ�2 0 9 1� Street Address 5 city State Zip Telephone: "/,Q 5 - 7 7 Z,2- Applicant Representative: 'cZ A Name Street Address City State Zip Telephone: Email address (optional): Email Address (optional): CITY OF EDMONDS CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 17201 72 nd Ave. W Tax Acct. Number: 00559800000800 Determination: Study Required Determination #: CRA-2007-0081 Applicant: Mark Loewen Owner: Mark Loewen CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED During review and inspection of the subject site, it was found that the site contains and/or is adjacent to critical areas, including Geologically Hazardous Areas and Fish and Wildlife Habitat Conservation Areas, pursuant to Chapters 23.40 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify, and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area, the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose to submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas that are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study, and there is an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. STUDY REQUIREMENT — EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area. Erosion Hazard Areas include: 0 Those areas with Alderwood and Everett series soils on slopes of 15 percent or greater. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage. Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development within an Erosion Hazard Area must meet additional criteria. For erosion hazard areas with suitable slope stability, the only critical area study needed is an erosion and sediment control plan prepared in compliance with the requirements set forth in Chapter 18.30 ECDC as part of the construction documents. This option is at the director's discretion, per Edmonds Community Development Code section 20.80.050.G. In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer or other qualified professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.090.D. 0 Development standards are given in ECDC 23.80.060 and 23.80.070. STUDY REQUIREMENT — LANDSLIDE HAZARD AREA It appears that this property contains or is adjacent to a Landslide Hazard Area. A Landslide Hazard Area is any area with a slope of forty percent (40%) or steeper and with a vertical relief of ten (10) or more feet (except areas composed of consolidated bedrock). 0 Landslide Hazard Areas are further defined and illustrated in ECDC 23.80.020.B. In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Landslide Hazard Areas are provided in ECDC 23.80.050. DEVELOPMENT PROPOSALS ASSOCIATED WITH LANDSLIDE HAZARD AREAS Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. 0 The criteria that are applied depend on the amount that the buffer is reduced. 0 The buffer can be reduced to a minimum of ten (10) feet (with an additional 15' building setback per ECDC 23.40.280) if a report is prepared that meets the standards listed in ECDC 23.80.050. The alteration must also meet the requirements listed in ECDC 23.80.060. In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. STUDY REQUIREMENT — FISH AND WILDLIFE HABITAT CONSERVATION AREAS Since the site is located within a mapped fish and wildlife habitat conservation area, the City would like to preserve as much of the native vegetation as possible. DEVELOPMENT PROPOSALS ON A SITE WITH FISH AND WILDLIFE HABITAT CONSERVATION AREAS The applicant must submit a clearing/tree cutting plan with any development permit. Tree cutting and clearing of native vegetation shall be limited to the footprint of development. 2 ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. Michael Cluaston. Planner June 11. 2007 Name Signatu(e Date NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. 3 I-- r_�- PLANNING DATA SINGLE FAMILY RESIDENTIAL ii STREET=FILE I Name: Date: q151-2-60 7 Site Address: Avt YV Plan Check #: 2— Project Description: Reduced Site Plan Provided -/?ES )/40) Zoning: ba+ tio dtye1epkL+ 1"44wl M ay e: q L9 -*7 ,,Pag Corner Lot: (YES NO) 1 ArleA Flag Lot: (YES / R 'eritical 6reas Determination #: �11e-rwsia" Te4e-;*r�4-F 21C&tudy Required 11 waiver C1 0. t'>-:?0 -r--/) --b-ee_l7 SEPA Determination: ??-,p V t ge4 ^ e,. 4t,1Wfe4*, --ty? e-- Exempt Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Requireol Setbacks. Street: Side: Side: Rear: Actual Setbacks,. Street: Side: 10/ Side: 10 Rear: (0.5/ Detached Structures: f Rockeries: El Fences/Trellises: 11 Bay Windows/Projecting Modulation: El Stairs/Deck: . . . . . . . . . . . . . Height Datum Point: Datum Elevation: 10 Maximum Height Allowed: Actual Height: ;7q.q 1�21-7. other Parking Required: Parking Provided: Lot A�ea: 1-73(AO Maximum Lot Coverage: 35% Proposed: .Lot Coverage Calculations: S( o ADU Created: (YES / NO) Subdivision: Legal Nonconforming Land Use Determination I ssued: (YES Comments Plan Review By: Planning Data Form 04-11-06.doc Dennis M. Bruce, M.S.C.E., M.B.A. July 14, 2007 City of Edmonds c/o Mark & Jana Loewen 2202998 1h pl. W. Edmonds, WA 98020 c� G07 ItRE?"77 FILE P.E. Geotechnical /Civil Engineer Subject: Geotechnical Evaluation and Recommendations Rear Deck Foundation — Top -of -Slope Proximity 17201 72nd Ave. W, Edmonds, Washington RECEIVED fill 2 5 2007 .o'­o L_ DEVELOPMENT SERVICES CTR. CITY OF EDMONDS This engineering report resents the results of a geotechnical evaluation of the Loewen property at 17201 72n?Ave. W. Edmonds, Washington. This evaluation was required due to Mark Loewens concerns and City. of Edmonds requirements for deck post foundation and too -of -slope issues. REFERENCES: • Site Plans (by owner) • Expansion for new addition (plans submitted by owner) • Site photographs by D. Bruce, P.E. BACKGROUND: This engineer understands that Mark and Jana Loewen have submitted plans for a house addition (to the north of their existing house) at 17201 72nd Ave. W. It is understood that City of Edmonds is currently reviewing the house addition plans. Separately, Mark Loewen expanded his easterly deck and ' installed new deck posts and foundation piers. This deck addition was done without a specific permit. The City of Edmonds required a geotechnical evaluation of the top -of -slope condition as well as the proximity of new deck posts footings. EVALUATION: This engineer performed an initial on -site evaluation on June 25, 2007 (see photographs). Several soil test holes (hand dug to 38 inches) verified very dense, native, sub -grade s . ands with gravels easily providing 3,000 p.s.f. bearing.capacity.. This SOILS - FOUNDATIONS e SITE DEVELOPMENT INSPECTION e DRAINAGE * DESIGN& PERMIT a LEGAL P.O. Box 55502 - Shoreline, WA 9815i5 (206) 546-9217 - FAX (206) 546-8442 City of Edmonds c/o M & J Loewen July 14, 2007 Page 2 engineer has done extensive work in the vicinity of this residence and has observed the stable and excellent foundation performance of these native sands and gravels. At the June 25, 2007 evaluation, it was unclear how deep the concrete deck post footings were installed. This engineer directed Mark Loewen to dig additional holes to allow for evaluation of the concrete post footings. Follow-up geotechnical evaluation observed the concrete footings for several of the deck posts (see photographs). All exposed footings revealed competent concrete placed at more than sufficient size to allow for deck post bearing. Additionally, the bottom of the footings were verified to be well founded in dense, native, sub -grade soils. None of the east side deck footings were near the "zone of influence" for the top -of - easterly slope. In other words, the deck post footings did not adversely impact the top - of -slope to the east. Thus, geotechnically, the new deck post footings are approved, as constructed. DRAINAGE CONCERNS: During the on -site evaluation, this engineer observed existing gutter downspouts that are currently "dumping" on splash blocks immediately adjacent the house. This condition is not good. Discussions with Mark Loewen have indicated that when the house addition plans are approved and new construction begins the entire house gutter system will be properly tight lined to eliminate the "dumping" near the house and at the top -of -slope. This engineer requires that all house stormwater discharge be properly tight lined and routed to either 1) any approved existing City of Edmonds storm system or 2) the boftom of the easterly slope. Geotechnical inspections recommended to verify proper drainage mitigation. SUMMARY: Geotechnical investigations have verified extremely dense, native, sub -grade soils and proper deck post footing installations. City of Edmonds C/o M & J Loewen July 14, 2007 Page 3 The location and alignment of the new deck posts do not adversely impact the easterly top -of -slope or slope face itself. Drainage improvements for the existing residence and future addition are required. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer DMB:abj cc: M & J Loewen Al 44 S%. VX '14 a�4 R IV DRMWAYS=PL3:*3*'3'%-. &(AXDRrVZWAYSWPEA=WXDi4% SETBACKS: FROVT2W(lXSli)Blo'(2).R4CX2o'(sI IMPERV. SURPACR AREA: DRA'EWAY& WALIMAYS 9t7.coSQ. FT. 4 WS"NO BlnLDING j936693 SQ. Pr.(%V/ NEW BUILDING 1494.9* SQk Fr.(IV/EAVRS) - - 4368A?SQ. Fr. HMCtfrcALC-9; AVLORADE -(A297.n'#B283.7S'#C289,7S�DW9.25')14-292.3715. MAX RIDGE -L%3;7,9 EXESTINGSLA13:298.11W. EXT.ySrFL-2W.i3'.2,4DFL3o&33',;UDGE.2j?,Ul. . '% 10 - - - - - - MnNaCMADC PVDFOSCC COVACE A W75V M5.75 C 2ag.75 14.2se7a � 0 , Lli < F Wcow Dfi#*W 6y r cn % \ - - - - - - % ------- It - - - - I I., I J, I 006nNG F*MMNT ------------- . It - - - - - - - - - ----- < Z< X Om Izz i cl W z z S, Z 0() 0 9 M.S.C.E., M.B.A. Dennis M. Bruce, P.E. November 14, 2007 Geotechnical /Civil Engineer City of Edmonds c/o Mark Loewen 22029 98thPI-W Edmonds, WA 98020 Subject: Geotechnical Evaluation — Foundation Recommendations Loewen House Addition Project 17201 72nd Ave. W, Edmonds, Washington Plan Check No. 2007 - 0652 RECEIVED BUILDING DEPT. This engineering reportpresents the results of a geotechnical evaluation of the Loewen property at 1720172 n Ave. W, Edmonds, Washington. This evaluation was required due to owner / contractor concerns, as well as City of Edmonds requirements. REFERENCES: 0 Geotechnical Evaluation and Report for rear deck dated July 14, 2007 by D. Bruce, P.E. 005, revision July 20, 2007 by "Unknown" House Addition Plans dated April 2, 2 designer Structural Designs by Custom Design Engineering City of Edmonds Comment Letter dated September 17, 2007 BACKGROUND: As stated in the July 14, 2007 geotechnical report, this engineer evaluated the deck construction foundation and proximity to top -of -slope. A follow-up examination verified extremely dense native sub -grade sands and competent deck post foundations. It is understood that Mr. and Mrs. Loewen propose to construct a major house addition, as indicated on the project plans. City of Edmonds requires a geotechnical report for the entire house addition. STREET FILE SOILS * FOUNDATIONS e SITE DEVELOPMENT * INSPECTION * DRAINAGE 0 DESIGN& PERMIT 0 LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 City of Edmonds c/o Mark Loewen November 14, 2007 Page 2 EVALUATION: In order to augment the previous site geotechnical information, 2 additional soil test holes were dug by this engineer on October 21, 2007 (see Site Plan for additional test hole locations). Both test holes revealed similar sub -grade conditions to the previous findings, namely: 0" to 6" Roots and organic surficial soil 6" to 38" (bottom of test holes) Very dense native sands and gravels No groundwater was encountered in either of the 2 test holes. Both test hole walls remained vertical and stable. No sloughing or caving occurred. CONCLUSIONS I RECOMMENDATIONS: Based on the findings of this investigation, and experience with similar sites in the area, the property at 17201 72nd Ave. W, Edmonds, Washington is geotechnically approved for the house addition project, subject to the following: * Geotechnical verification of footprint layout prior to concrete placement. Standard reinforced continuous and spread footings. Allowable bearing pressure: 3,000 p.s.f. Equivalent fluid pressure of 35 p.c.f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. 0 Geotechnical inspections by this engineer prior to any foundation concrete placement. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have ' minimum widths of eighteen (18) and twenty-four (24) inches, respectively, and should be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. Depending on the final site grades, some over -excavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over 0 9 City of Edmonds c/o Mark Loewen November 14, 2007 Page 3 excavated hole, the width of the over -excavation at the bottom must be at least as wide as the sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Coefficient of Friction Passive Earth Pressure Where: Design Value 0.55 350 p.c.f. (1) p.c.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE: Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided these soils can be re -compacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. City of Edmonds cto Mark Loewen November 14, 2007 Page 4 PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: Parameter Active Earth Pressure* Passive Earth Pressure Coefficient of Friction Soil Unit Weight Where: Design Value 35 p.c.f. 350 p.c.f. 0.55 125 p.c.f. (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot deflect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. 0 0 City of Edmonds clo Mark Loewen November 14, 2007 Page 5 Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXC"ATION AND SLOPES: At the time of this investigation and report, it is understood that no excavation is proposed deeper than 4 feet below existing grade. Thus, temporary shoring is not required. If, however, excavation depths exceed 4 feet, additional geotechnical investigation and recommendations are required. In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 2H: 1 V. It is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed City of Edmonds c/o Mark Loewen November 14, 2007 Page 6 rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. No groundwater was observed in either of the 2 test holes during the fieldwork. Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes -to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. GENERAL EARTHWORK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and cleared of all surface vegetation, all organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. NOTE: Specific clearing limits to be established at pre -construction meeting with City of Edmonds. Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation prior to placement of any structural fill. All structural fill should be placed in horizontal lifts with a moisture content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: City of Edmonds c/o Mark Loewen November 14, 2007 Page 7 Location of Fill Placement Beneath footings, slabs or walkways Behind retaining walls Beneath pavements Minimum Relative Compaction 95% 90% 95% for upper 12 inches of Sub -grade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site Soils If grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy and thus are not highly moisture sensitive. Grading operations will be difficult when the moisture content of these soils greatly exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and "pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material.may be acceptable if the upper organic materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: 7 nd No drainage problems were evident with the existing Loewen residence at 17201 2 Ave. W. It is essential that the current splash blocks for the existing house be replaced with an improved drainage system that does not "dump" storm water onto the steep slope adjacent the house (see July 14, 2007 report). City of Edmonds clo Mark Loewen November 14, 2007 Page 8 Geotechnical inspections required to verify proper drainage system is installed with no adverse geotechnical impacts. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. SLOPE SETBACKS — FIELD VERIFICATION: The current house site plan (July 20, 2007 revision) lays out the existing and addition house footprint. The location and alignment of this footprint is geotechnically acceptable, subject to field verification prior to any concrete placement. It is understood that this engineer will perform the field verification. INSPECTIONS: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: • Foundation footprint layout — with regard to adjacent slope • Soil cuts • Foundation sub -grade verification • Any retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation • Temporary and permanent erosion control — final completion report SUMMARY: The proposed Loewen house addition project is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspections during construction. STATEMENT OF MINIMAL RISK: The plans and specifications for the Loewen house addition project have been reviewed by this engineer and conform to the recommendations of the analysis and report and, provided that those conditions and recommendations are satisfied during the construction and use, and inspected and verified by this engineer, the area disturbed by construction will be stabilized and remain stable and will not increase the potential for City of Edmonds c/o Mark Loewen November 14, 2007 Page 9 soil movement, and the risk of damage to the proposed development and from the development to adjacent properties from soil instability will be minimal. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. EXWE'S DMB:abj Dennis M. Bruce, P.E. Geotechnical / Civil Engineer February 12, 2008 File No. 08-022 Mr. Mark Loewen 22029 98th Place West Edmonds, WA 98020 Subject: Geotechnical Engineering Evaluation Proposed Addition 17201-72 "d Avenue W, Edmonds, WA Dear Mr. Loewen, 1JanGB* ;C 0 H P 0 R A T 4 0 Iotechnical & Earthquake Engineering Consultants FEB 19 2008 13UILDING DEPARTMENT CITY OF EDMONDS As requested, PanGEO Inc. completed a geotechnical engineering study to assist you and your design team for the proposed addition project at 17201- 72 nd Avenue W in Edmonds. This study was performed in general accordance with our mutually agreed scope of work as outlined in our February 1, 2008 proposal, and subsequently approved by you on February 5, 2008. Our service scope included reviewing readily available geologic and geotechnical data, conducting a reconnaissance of the site, observed two hand excavated test pits at the site, and developing the conclusions and recommendations presented in this report. SITE AND PROJECT DESCRIPTION The subject property is located at 17201 — 72 d Avenue W in the City of Edmonds, Washington (see Figure 1, Vicinity Map). The subject property is an iffegular-shaped lot and borders to the west by 72 nd Avenue West and to the existing single-family residences to the north, south, and east. The western portion of the site is generally level and is currently occupied by an existing two-story house with a daylight basement. The eastern portion of the site slopes down toward east with inclinations of about 25% to 35% percent. The slope portion of the site is heavily vegetated with blackberry, bushes, and some trees. We understand you plan to construct a new entrance and a new two-story addition with a basement on the north side of the existing house (see Figure 2). Based on the available design drawings, the new addition will be approximate 22 feet by 39 feet (see Figure 2). We also understand that the new addition above the basement will be a lightweight wood -frame structure. 2021 A Minor Avenue E Seattle, WA 98102 Tel (206) 262-0370 STREET FILE Fax (206) 262-0374 Mr. Mark Loewen Proposed Addition — 1720172 d Avenue W, Edmonds, WA February 12, 2008 To construct the new addition, excavations up to about 6 feet deep will be required on the west building line. The conclusions and recommendations in this study are based on our understanding of the proposed development, which is in turn based on the project information provided. If the above project description is incorrect, or the project information changes, we should be consulted to review the recommendations contained in this study and make modifications, if needed. SUBSURFACE EXPLORATIONS Because of anticipated shallow depth of glacial till soil at the site, two test pits (TP- I and TP-2) were hand excavated at the site to explore the depth to the very dense glacial till at the proposed addition site. The approximate test pit locations were measured from existing site features and are indicated on Figure 2. The test pits were hand excavated by the property owner to a depth of about 3 Meet below the existing ground surface. An engineer from PanGEO observed the test pits conditions after excavations had been completed, and documented the soils exposed in the test pits. The relative in -situ density of cohesionless soils, or the relative consistency of fine- grained soils was estimated from probing the bottom and sidewalls of the test pits. The test pit excavation was backfilled with the excavated soils by the owner. SUBSURFACE CONDITIONS According to the Geology Map of the Edmonds East and part of The Edmonds West Quadrangle, Washington (James Minard, 1983), the project area is underlain by Vashon Glacial Till (QVt). Vashon Glacial Till is described as generally consisting of a very dense, heterogeneous mixture of silt, sand and clay with gravel and cobbles. The Glacial Till deposits are expected to exhibit low compressibility and high strength in its undisturbed states. The hand excavated test pits confirmed the mapped stratigraphy. In summary, the test pits encountered near -surface fill over glacial till. . The descriptions of these two soil units are summarized below: UNIT 1: Fill — This unit was encountered from the surface to about 6 to 8. inches in TP- I and TP-2, respectively. The fill observed generally consisted of medium dense, brown to dark brown, silty sand with some roots and gravel. UNIT2: Glacial T111— Glacial till consisted of dense to very dense, brownish gray to gray, silty sand with some to numerous gravel was encountered below the fill and extended to the bottom of the test pits at 3 Y2 feet. In its undisturbed state, this unit is anticipated to exhibit high strength and low compressibility characteristics, but could become easily disturbed and soften when exposed to excessive moisture. 08-022 17201 72nd Ave W Rptdoc 2 PanGEO, Inc. Mr. Mark Loewen 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 Plate 1. View of Test Pit TP- 1, looking down Plate 2. View of Test Pit TP-2, looking down Groundwater/seepage was not observed in the test pits. However, the potential presence of groundwater seepage atop of glacial till and within the sandy or gravelly layers of the glacial till in the wet season cannot be ruled out. It should be noted that groundwater/seepage conditions will vary depending on the season, intensity of the rainfalls, local subsurface conditions, and other factors. Generally, the water level is higher and seepage rates are greater in the wetter winter months (typically October through May). SITE RECONNAISSANCE AND STABILITY During our site visit, we also conducted a visual reconnaissance of the sloping portion of the site to observe signs of recent or past instability and potential indicators of future instability. During our reconnaissance of the slope area in the eastern portion of the site, we did not observe existing erosion scars or indications of previous debris flows, slump block failures or indications of deep- seated or global instability. However, the slope is likely mantled by one foot to two feet of loose to medium dense, weathered native till soil that could be susceptible to erosion or shallow sloughing if surface vegetation is not maintained. Based on the results of field exploration and site reconnaissance, it is our opinion that the site is stable in its present condition. It is also our opinion that the proposed addition will not decrease the site stability, provided that the recommendations presented in this report are properly incorporated into the design and construction of the project. GEOTECHNICAL DESIGN RECOMMENDATIONS SEISMIC DESIGN PARAMETERS AND LIQUEFACTION ASSESSMENT We anticipate that the seismic design of the new addition will be accomplished using the 2006 or later editions of the International Building Code (IBC), which specifies a design earthquake having a 2% probability of occurrence in 50 years (return interval of 2,475 years). The 08-022 17201 72nd Ave W Rpt.doc 3 PanGEO, Inc. Mr. Mark Loewen 0 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 following parameters, which are consistent with the 2002 USGS seismic hazard maps, are recommended for the seismic design of the building: Spectral Spectral Design Control Design PGA Site Acceleration Acceleration Site Spectral Periods (SDs/2.5) Class at 0.2 sec. (g) at 1.0 sec. (g) Coefficients Response (sec.) Parameters Ss S, I Fa F,, SDS SDI To I Ts C 1.22 0.43 1.0 1.37 0.81 0.39 0.10 0.48 0.33 LIQUEFACTION ASSESSMENT Soil liquefaction is a condition where saturated cohesionless soils undergo a substantial loss of strength due to the build-up of excess pore water pressures resulting from cyclic stress applications induced by earthquakes. Soils most susceptible to liquefaction are loose, uniformly graded sands and loose silts with little cohesion. The dense nature of the glacial till underlying the site effective precludes the development of liquefaction. Therefore, special seismic design associated with soil liquefaction is not needed for this project. BUILDING FOUNDATIONS We anticipate that the foundations supporting the new addition will be situated about 2 feet deep along the east wall and about 6 feet deep along, the west wall below the existing grade. Based on the subsurface conditions observed in the test pits, dense to very dense glacial till is anticipated to be present at footing subgrade. As a result, the new addition may be supported on conventional spread and continuous footings bearing on the undisturbed glacial till. We recommend using an allowable bearing pressure of 3,000 pounds per square feet (psf) to evaluate the capacity of the existing footings and to design the new foundations. The recommended allowable bearing pressure is for dead plus live loads. For allowable stress design, the recommended bearing pressure may be increased by one-third for transient loading, such as wind or seismic forces. Continuous and individual spread footings should have minimum widths of 18 and 24 inches, respectively. Exterior foundation elements should be placed at a minimum depth of 18 inches below final exterior grade. Interior spread foundations should be placed at a minimum depth of 08-022 17201 72nd Ave W Rptdoc 4 PanGE0, Inc. Mr. Mark Loewen 0 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 12 inches below the top of stab. The new footings should have a minimum of 6 feet horizontal setback distance from the slope face. Footings designed and constructed in accordance with the above should experience total settlement of less than one inch and differential settlement of less than V2 inch. Most of the anticipated settlement should occur during construction as dead loads are applied. Lateral Resistance — Lateral loads on the building structure may be resisted by passive earth pressure developed against the embedded portion of the foundation system and by frictional resistance at the bottom of the footings. For footings bearing on the dense native soil or compacted structural fill, a frictional coefficient of 0.45 may be used to evaluate sliding resistance developed between the concrete and the compacted fill. Passive soil resistance may be calculated using an equivalent fluid weight of 350 pcf, assuming properly compacted structural fill will be placed against the footings. The above values include a factor of safety of 1.5. Unless covered by pavements or slabs, the passive resistance in the upper 12 inches of soil should be neglected. Footing Drain — Footing drains should be installed around the perimeter of the new footings, at or just below the bottom of the footings. Under no circumstances should roof downspout drain lines be connected to the footing drain systems. Roof downspouts must be separately tightlined to appropriate discharge locations. Cleanouts should be installed at strategic locations to allow for periodic maintenance of the footing drain and downspout tightline systems. Footing Subgrade Preparation - All footing excavations should be trimmed neat. The adequacy of footing subgrade should be verified by a representative of PanGEO, prior to placing forms or rebar. Any loose soils at the footing subgrade should be over -excavated and replaced with structural fill or lean mix concrete. The over -excavation width should extend at least one-half the over -excavation depth beyond the edge of footing. The contractor should be aware that the site soils are moisture sensitive, and can become disturbed and soft when exposed to inclement weather conditions. As a result, depending on the weather condition at the time of footing construction, it may be necessary to place 2 to 3 inches of CDF or lean -mix concrete on the exposed footing subgrade to protect against moisture. FLOORS SLABS It is our opinion that conventional concrete slab -on -grade floors are appropriate for this site. The floor slabs may be founded on the undisturbed till deposits or on newly placed structural fill. Interior concrete slab -on -grade floors should be underlain by a capillary break consisting of at least 4 inches of compacted 1/4-inch, clean crushed rock (less than 3 percent fines). The capillary break material should also have no more than 10 percent passing the No. 4 sieve and less than 5 percent by weight of the material passing the U.S. Standard No. 100 sieve. The capillary break 08-022 17201 72nd Ave W Rptdoc 5 PanGEO, Inc. Mr. Mark Loewen 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 should be placed on a subgrade that has been compacted to a dense and unyielding condition. A I 0-mil polyethylene vapor barrier should also be placed directly below the slab. Where concrete slabs will be subjected to traffic, such as at the driveway and garage areas, we recommend that a 6-inch layer of well graded crushed rock, such as Crushed Surfacing Base Course (WSDOT 9-03.9(3)) or Gravel Borrow (WSDOT 9-03.14(l)), be provided below the slabs in -lieu of the 4-inch thick clean crushed gravel. The well graded crushed rock should be compacted to a minimum of 95 percent of its maximum dry density. BASEMENT WALL DESIGN PARAMETERS Basement walls should be properly designed to resist the lateral earth pressures exerted by the soils behind the wall. Proper drainage provisions should also be provided behind the walls to intercept and remove groundwater that may be present behind the wall. Our geotechnical recommendations for the design and construction of the retaining walls are presented below. Lateral Earth Pressures — The basement walls may be designed for a static lateral earth pressure based upon an equivalent fluid weight of 40 pcf. A uniform pressure of 5H psf should be added to reflect the increase loading for seismic conditions, where H corresponds to the buried depth of the wall. The recommended lateral pressures assume level backslopes and that the backfill behind the wall consists of a free draining and properly compacted fill with adequate drainage provisions. Walls retaining sloping backfills or surcharge loads should be desi gned for higher forces. If surcharge loads or building foundations will be located within a horizontal distance equal to the height of the wall, lateral earth pressures will need to be increased based upon the type and magnitude of surcharge. Wall Foundation — See the Building Foundations section above Surcharge — Surcharge loads, where present, should also be included in the design of retaining walls. We recommend that a lateral load coefficient of 0.3 be used to compute the lateral pressure on the wall face resulting from surcharge loads located within a horizontal distance of one-half wall height. Lateral Resistance — Lateral forces from wind or seismic loading and unbalanced lateral earth pressures may be resisted by a combination of passive earth pressures acting against the embedded portions of the foundations and by friction acting on the base of the foundations. Passive resistance values may be determined using an equivalent fluid weight of 350 pcf. This value includes a factor of safety of 1.5, assuming the footing is poured against recompacted native soil or properly compacted structural fill adjacent to the sides of footing. A friction coefficient of 0.45 may be used to determine the frictional resistance at the base of the footings. The coefficient includes a factor safety of 1.5. If more lateral resistance is needed, battered pin piles may be used. 0"22 17201 72nd Ave W Rpt.doc 6 PanGEO, Inc. Mr. Mark Loewen 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 Wall Drainage — Provisions for wall drainage should consist of a 4-inch diameter perforated rigid PVC drainpipe behind and at the base of the wall footings, embedded in 12 to 18 inches of pea gravel. Alternatively, a composite drainage material, such as Miradrain 6000 may be used in lieu of the pea gravel. The drainpipe at the base of the wall should be graded to direct water to a suitable outlet. Wall Backfill — In our opinion, the existing on -site soil contains excessive fines and should not be used as wall backfill. The wall backfill should consist of imported free draining granular soils, such as Gravel Borrow (WSDOT 9-03.14(t)) or clean recycled concrete. In areas where the space is limited between the wall and the face of excavation, pea gravel may be used as backfill without compaction. Wall backfill should be moisture conditioned to within about 3 percent of optimum moisture content, placed in loose, horizontal lifts less than 8 inches in thickness, and systematically compacted to a dense and relatively unyielding condition and to at least 95 percent of the maximum dry density, as determined using test method ASTM D 1557. Within 5 feet of the wall, the backfill should be compacted to 90 percent of the maximum dry density. Damp Proofing — The exterior of all basement walls should be protected with a damp proofing compound. INFILTRATION EVALUATION OF ON -SITE SOILS Infiltration testing was not performed in the test pits due to presence of the dense, compact till at shallow depth. As such, it is our opinion that infiltration of storm water runoff is not feasible at the site. If on -site storm water runoff treatment is needed, a detention system may be required for. For the roof downspout controls, in our opinion, a downspout dispersion system may be used. The dispersion system should have a minimum of 15 feet setback distance from the structures. A possible location of the roof downspout dispersion system is shown on Figure 2 for reference. The on -site storm water treatment system (if needed) and the roof downspout dispersion system should be designed by a civil engineer. CONSTRUCTION CONSIDERATIONS OVERVIEW The main geotechnical aspects of the project construction will include: 0 Site preparation; 0 Temporary excavations; * Foundation preparation; 08-022 17201 72nd Ave W RpLdoc 7 PanGE0, Inc. Mr. Mark Loewen 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 0 Installation of floor slabs, and 0 Site drainage and erosion control The following briefly discusses relevant geotechnical considerations for the anticipated construction operations. SITE PREPARATION Site preparation for the proposed project include striping and clearing of surface vegetation and excavations to the design subgrade. All stripped surface materials should be property disposed off - site or be "wasted" on site in non-structural landscaping areas. Following site clearing and excavations, subgrade where structural fill, foundations, slabs, or pavements are to be placed should be compacted'and observed by a representative of PanGEO. The subgrade soil in the improvement areas, if recompacted and still yielding, should also be over - excavated and replaced with compacted structural fill or CDF/lean-mix concrete. TEMPORARY EXCAVATIONS AND EXCAVATION SHORING As currently planned, an approximately 6-foot deep excavation will be required along the west wall of the new addition. All temporary excavations should be performed in accordance with Part N of WAC (Washington Administrative Code) 296-155. The contractor is responsible for maintaining safe excavation slopes and/or shoring. All temporary excavations deeper than 4 feet should be sloped or shored. It is our opinion that unsupported open cut excavation is feasible since sufficient space is available. For planning purposes, we recommend that temporary excavations be sloped no steeper than 1/4H: IV. If groundwater seepage is encountered or the ground conditions are different than those described in this report, the slopes may be flattened based on field observations. The cut slopes may also need to be flattered in the wet reasons and should be covered with plastic sheets. We also recommend that heavy construction equipment, building materials, excavated soil, and vehicular traffic should not be allowed within a distance equal to 1/3 the slope height from the top of any excavation. FOUNDATION PREPARATION Based on the subsurface information encountered, we anticipate dense till soil to be present at the foundation level. If fill or loose/soft soils are encountered at the foundations levels, they should be over-excavate'd to the bearing native soil and the resulting over -excavation should be backfilled with compacted structural fill or CDF/lean-mix concrete. It should be noted that the native till soil may be softened if exposed to excessive moisture and traffic disturbance. 08-022 17201 72nd Ave W Rptdoc 8 PanGEO, Inc. Mr. Mark Loewen 0 0 Proposed Addition — 17201 72"d Avenue W, Edmonds, WA February 12, 2008 Saturation and subsequent yielding of the prepared footing subgrade due to inclement weather, disturbance, and poor drainage will require removal of the soft soil areas and replace with well - compacted structural fill or CDF/lean-mix concrete. To protect the footing subgrade under the unfavorable weather and disturbance, a layer of CDF/lean-mix concrete may be placed immediately after footing excavation. MATERIAL REUSE Based on the test pits excavated at the site, the on -site fill and till soil should not be used as structural fill and wall backfill but may be used in non-structural areas if they can be compacted to the required degree in the dry season. The on -site soil should not be used as fill and backfill in the wet season. If use of the existing soils is planned, the excavated soil should be stockpiled and protected with plastic sheeting to prevent softening from rainfall. STRUCTURAL FILL AND COMPACTION In the context of this report, structural fill is defined as compacted fill placed under roadways, stabs, pavements, or other load -bearing areas. Based on our understanding of the project, we do not anticipate the need for large quantities of structural fill. However, where needed, structural fill should consist of imported well -graded granular material, such as Gravel Borrow (WSDOT 9-03.14(l). The structural fill should be moisture conditioned to within about 3 percent of optimum moisture content, placed in loose, horizontal lifts less than 8 inches in thickness, and systematically compacted to a dense and relatively unyielding condition and to at least 95 percent of the maximum dry density, as determined using test method ASTM D 1557. EROSION CONTROL In our opinion, the potential for erosion at the site can be adequately mitigated by employing best management practices (BMPs). During construction, erosion control should include measures for reducing concentrated surface runoff and for reducing the potential of off -site sediment transport by protecting disturbed or exposed surfaces. As a minimum, erosion control along the crest of the steep slopes located along the northern and eastern property lines should be in -place prior to construction. The temporary erosion and sediment control (TESQ plan should include the following: • Where practical, maintain vegetation buffers around cleared areas. • The ground surface within the construction area should be graded to prevent ponding of water and to prevent runoff from reaching site slopes • Adequately cover soil stockpiles and temporary cut slopes with plastic sheeting. • Hydroseed or place straw in areas where grading is completed. • Divert water away from the top of slopes. 08-022 17201 72nd Ave W Rpt.doc 9 PanGEO, Inc. Mr. Mark Loewen 0 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 - Use silt fences and/or straw bales around the site perimeter. If possible, stage construction such that the amount of exposed soil and exposure time is minimized. PanGEO should review the TESC plan to verify our recommendations are incorporated into the design. The erosion control measures should be inspected on a regular basis to verify they are functioning as intended. WET WEATHER EARTHWORK In our opinion, the proposed site construction may be accomplished during wet weather (such as in winter) without adversely affecting the site stability, so long as the work area is provided with adequate ditching and drainage to prevent the accumulation of stormwater in foundation areas. In addition, surface water must not be allowed to flow over site slopes. Due to the fine-grained, cohesive nature of the site soils, the site is vulnerable to softening during inclement weather, typically requiring extra expenditures for over -excavation and replacement of the softened areas. Consequently, earthwork construction performed during the drier summer months likely will be more economical. Winter construction will require the implementation of best management erosion and sedimentation control practices to reduce the chances of off -site sediment transport. The site soil contains a high percentage of fines, especially at the anticipated footing subgrade, and is considered to be moisture sensitive. Any subgrade soils that become softened either by disturbance or rainfall should be removed and replaced with clean crushed rock or lean mix concrete. General recommendations relative to earthwork performed in wet conditions are presented below: Site stripping, excavation and subgrade preparation should be followed promptly by the placement and compaction of clean structural fill, capillary break material, or base course material. Footing subgrades must be protected from softening from rainfall or earthwork disturbance. This may be accomplished by placing four inches of crushed rock or two inches of lean mix concrete along the footing alignments. 0 The size and type of construction equipment used may have to be limited to prevent soil disturbance. During wet weather, the allowable fines content (material by weight passing the #200 sieve) of the structural fill should be reduced to no more than 5 percent, based on the portion passing3/4-inch sieve. The fines should be non -plastic. 08-022 17201 72nd Ave W Rptdoc 10 PanGEO, Inc. *Mr. Mark Loewen 0 0 Proposed Addition — 1720172 nd Avenue W, Edmonds, WA February 12, 2008 The ground surface within the construction area should be graded to promote run-off of surface water and to prevent the ponding of water. 0 Bates of straw and/or geotextile silt fences should be strategically located to control erosion and the movement of soil. As a minimum, erosion control along the downslope (north and east) property lines should be in place before construction. SURFACE DRAINAGE Adequate drainage provisions are imperative to improve the performance of the structures and other site improvements. We recommend both short and long term drainage measures be incorporated into the project design and construction. Surface runoff can be controlled during construction by careful grading practices. Typically, this includes the construction of shallow, upgrade perimeter ditches or low earthen berms to collect runoff and prevent water from entering excavations or from flowing over the site slopes. All collected water should be directed under control to a positive and permanent discharge system. For post -construction, erosion can be controlled by revegetating disturbed areas and controlling surface water runoff. Permanent control of surface water should be incorporated in the final grading design. Adequate surface gradients and drainage systems should be incorporated into the design such that surface runoff is directed away from structures and away from site slopes. All collected water from surface runoff and from downspouts should be routed into a suitable discharge system, and should not drain into retaining wall or footing drain systems. ADDITIONAL SERVICES To confirm that our recommendations are property incorporated into the design and construction, PanGEO should be retained to conduct a review of the final project plans and specifications, and provide construction monitoring of the foundation elements. The City of Edmonds, as part of the permitting process, may also require geotechnical construction inspection services. PanGEO can provide you a cost estimate for construction monitoring services on a later date. We anticipate that the following additional services will be required: Review final project plans and specifications Verify implementation of erosion control measures Observe and verify foundation subgrade Verify the adequacy of subsurface drainage installation Confirm the adequacy of the compaction of structural backfill Other consultation as may be required during construction 08-022 17201 72nd Ave W Rptdoc I I PanGEO, Inc. Mr. Mark Loewen 0 0 Proposed Addition — 1720172 d Avenue W, Edmonds, WA February 12, 2008 Modifications to Our recommendations presented in this report may be necessary, based on the actual conditions encountered during construction. CLOSURE We have prepared this report for use by Mr. Mark Loewen and the project design team. Recommendations contained in this report are based on a site reconnaissance, a review of pertinent subsurface information, a subsurface exploration program, and our understanding of the project. The study was performed using a mutually agreed -upon scope of work. Variations in soil conditions may exist between the locations of the explorations and the actual conditions underlying the site. The nature and extent of soil variations may not be evident until construction occurs. If any soil conditions are encountered at the site that are different from those described in this report, we should be notified immediately to review the applicability of our recommendations. Additionally, we should also be notified to review the applicability of our recommendations if there are any changes in the project scope. The scope of our work does not include services related to construction safety precautions. Our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. Additionally, the scope of our work specifically excludes the assessment of environmental characteristics, particularly those involving hazardous substances. We are not mold consultants nor are our recommendations to be interpreted as being preventative of mold development. A mold specialist should be consulted for all mold -related issues. This report may be used only by the client and for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both off and on -site), or other factors including advances in our understanding of applied science, may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 24 months from its issuance. PanGEO should be notified if the project is delayed by more than 24 months from the date of this report so that we may review the applicability of our conclusions considering the time lapse. It is the client's responsibility to see that all parties to tl�is project, including the designer, contractor, subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the contractor's option and risk. Any party other than the client who wishes to use this report shall notify PanGEO of such intended use and for permission to copy this report. Based on the intended use of the report, PanGEO may require that additional work be performed and that an updated report be reissued. Noncompliance with any of these requirements will release PanGEO from any liability resulting from the use this report. 08-022 17201 72nd Ave W RpLdoc 12 PanGEO, Inc. Mr. Mark Loewen 0 0 d Proposed Addition — 1720172' Avenue W, Edmonds, WA February 12, 2008 Within the limitation of scope, schedule and budget, PanGEO engages in the practice of geotechnical engineering and endeavors to perform its services in accordance with generally accepted professional principles and practices at the time the Report or its contents were prepared. No warranty, express or implied, is made. We appreciate the opportunity to be of service. Sincerely, 0 Tct Rym- 0"& aq i Michael H. Xue, P.E. Senior Geotechnical Engineer Attachments: Figure 1: Vicinity Map Figure 2: Site and Exploration Plan Siew L. Tan, P.E. Principal Geotechnical Engineer 08-022 17201 72nd Ave W RpLdoc 13 PanGEO, Inc. Mr. Mark Loewen Is Proposed Addition — 17201 72dAvenue W, Edmonds, WA February 12, 2008 REFERENCES Dennis, B., Geotechnical Evaluation and Recommendations, Rear Deck Foundation — Top of Slope Proximity, 1720172 nd Ave W, Edmonds, Washington, consultant report dated July 14, 2007. Dennis, B., Geotechnical Evaluation — Foundation Recommendations, Loewen House Addition Project, 17201 72"d Ave W, Edmonds, Washington, consultant report dated November 14, 2007. International Building Code (2006). Minard, J., (1983). The Geology Map of the Edmonds East and part of The Edmonds West Quadrangle, Washington. 08-022 17201 72nd Ave W Rptdoc 14 PanGEO, Inc. Approx. Scale: 1" = 1/2 mile Proposed Addition VICINITY MAP RinGE@ 17201 — 72nd Avenue W 1 0 C 0 0 V 0 R A T 2 0 Seattle, Washington Project No. 08-022 JFiguTe No. file.grf wl file.dat 2/12108 (16:27) MHX Legend: GM TP-1 Approximate Hand Excavated Test Pit Location Note: Base map modified from site plan provided by Mr. Mark Loewen. Proposed Addition F�nGE@ 17201 - 72nd Ave W 1 0 C 0 0 P 0 N A T 0 D Edmonds, Washington roperty NTS SITE AND EXPLORATION MAP No. 08-022 re 2 'IM Job # 602 SNOHOMISH HEALTH DISTRICT DIVISION OF SANITATION 3011 Rockefeller Avenue, Everett, Washington STREET FEE APPLICATION FOR A SEWAGE DISPOSAL SYSTEM PERMIT (Submit 3 Copies) Permitto be issued to:-.. ..... Awk ............................ -------------- --------------------------- ............................................ 17MI 72nd Ayeme For installation at: (street address) ............... ---- ----------------- -------- We -at -------------------------------------------------------- -------------- Addition or Subdivision ...... RObinCISLIA, -------------------------------- ------------- -------------------------------- Lot .... S ......... Block ------------------ Type of Building: New--XX-.-- Existing ------------ Single family residence ------ 164- Number of bedrooms ------ .... 3__ --------- Other: (specify -type or use) ------------------------------------------------------------------------------------------------------------ - ---------------- -------------------------- Builder ........ ftan Parker ...... -590i EhInneY N* seatie --------- m ------------------ --------------------------- ------ ------- Address ---------- ----------------------- - ----- -------- ---------------------- Designer___A"__V&a1e tea Asweig - - ------------------------------------------- . Address --- 7301 .... Mb-Ple ----- SoMp— .... Eflumcis ... ...... SoilLog Hole No. ---_--_-------- ------- I—— ................................................. 120 48" U BM S& SIV -------------- ------------_--------------- ---------------------------------------------- ------ ........ : -------------------- ........ .................................... Soil Log Hole No. 2 ------ 0_01.3" ------- --------- 5_"__32".___JA_.Rrn.to --- Gray --- Sa--SVgr ---------------------------------------- 32 - 14 ------ CemoaAied..Sand ---------------------------------- :--: ------------------------------------------------------------- Elevation of Water Table, if encountered. (Distance from. ground surface) ------ 11CM .................. ­1 .......................... Corrections to control surface water if needed --------- __ bm ------------- .......... __ ---- ...... ------------------------- ......................... Specify if any removing or grading of topsoil in field area ... ------ nme ----------------- -------------------------------------- ----------- ....................................................................................................... ------------------------------------------- _ --------------------------------------------------- Percolation: Test Hole No. I —Average Rate ------- 34,6 ------------------_ ---------- ........ (Fall in minutes/inch-bottom 6" test hole) Test Hole No. 2 --Average Rate ....... ------------------------------------------ (Fall in minutes/inch-bottorn 6" test hole) Test Hole No-.�,�8— Average Rate ------ i - --------------------------------- �w ------ (Fall in minutes/inch-bottorn 6" test hole) Average percolatiofi' rate on which to base drain field design ---- 3*J..___j3dAA=h ------_----- ------------------ Septic tank requirements based on present rules and regulations: Septic Tank Size .......... W.0_: ......... gallons. Amount of Square Feet of Disposal Field ------ �06 ------------------ -------- Signature — Designer ----- --------- -------------------------------- --- Date --- ---------- I ............ r DO NOT WRITE BELOW THIS LINE (To be completed by Issuing A ncy) Permit issued (date)---- --------- ------------------- ------------------ Permit Number ------ ------------------ ---------------- Remarks: .................. ..... __ ... ........................................... BROWN 7 ND A VE 7zol 750 FVALK P)-sml, Fj- a W, 6 T N o rok 3TAN 1Z),4t1VA 5901 PqlNlVey IV. 56-A771-4- , WA:SW. Pe1P\Co4AT1,c'N TE'sTs - c:v m /IV IINCq 0,4TA 0 - 12,, Dx, 8,Q,,V 5A - -51 - I- 4 1, 13 P Al -.5A -5 1 Q"' 5A "5 RAI �A, bK- 1 -0 - SA - 'S I/q rL LO 1-1.13 T6 L-IP-4y A P- IV E 7,:,2 - 4 o CEMEAIT.- s'iND. / NOTE: L-Z iV .4 ,A A fiVr- 2P A �k4 #T P-4 6 T PI-AIV el / 11-201 FT- OF -rrzENr-H Ar.EA IN 2 .4ATJX4- 5 p Pp-,3v/ T I HT L ov JDR4Ps A f f�q 3. FOU�v c�0&(TcuWs of= 0 V T T PPAINPr'J-D AR�A- 7301 - 179th S. W. EDMONDS, WASH114GTON PR 6-5880 PERCOLATION TEST PLOT PLANS PLAT DEVELOPMENT COORDINATOR 60Z .14 F�F 7L REGARDING: 17201 - 72nd Avenue West 3 - 0 7/a5_ (address) R E C 0 R D 0 F C 0 N T A C T S' DATE NAME, PHONE NO., & COMMENTS ADDRESS of CALLER 5/1/74 W. V. Johnson Certified Letter No. 406204 sent requiring hook-up within 60 days. 5/21/74 Came into office and obtained permit #4790. 6/19/74 Connection cowleted. M"W n S7,--�ZET* HLE ACTION TAKEN Letter received., INITIALS TE TE TE JI, M'"IMORS' 31 1.bmijg n. s.N i- 4 X S a :olvdMIS I D3H,,,',*.t: JW q�pog!,?!.�p, ol. q; POA! �S �Sa�p N 0 Aj, 10 4. 110 El P <4 RECEIPT FOR CERTIFIED MAIL-300 (plus tage 303 '710.5 MA I --'OR TE JOHNSON, W. v. CD c\j 17201 72ND AVE W 0 E0MONDs, WASHINGTON 98020 > 11111,1111 btKWII;Zb rurt Auu, I,__ :'60WS —WhOm to arld date delivered ........... With delivery to addressee 0111Y . ........ 1 5 650' 2. Shows to whom, date and Where delivemd 350 .. With delivery to addressee,only : .. ...... ELIVER TO ADDVESS_ff_E� �ONLYI 856 —SPE—C, �AL:D11. I �VIR Y fee . .... .. r-q.i re�d) 50d PS Form NO INSURANCE CO Apr. 1971 3800 VERAGE PROVIDEO­�;�, (See other side) NOT FOR INTERNATIONAL MAIL oP01 1070 0-307-406 I v 1. LUT #8,.KUJJlNDALE V22 FZ32-63- la.EASEMENTS: N/A 2. PROPERTY TAX ACCOUNT NUMBER: 005598-000-oo8-oo. 3. VICINITY MAP (SEE THIS PAGE). 4. NEW CONSTRUCTION: 17201172ND AVE W EDMONDS, WASH. 98026. 5. OWNER:MARK & JANA LOEWEN - 17201172ND AVE W EDMONDS, WASH. 98026. 2o6.999-7156. 6. STRUCTURAL ENGINEER: ALEX K. MOROSEOS, PE iloo6 6oTH AVE W. MUKILTEO, WA. 98275 343-7517. 7. LEAD DESIGN PROFESSIONAL/CONTACT PERSON: MARK LOEWEN 209.999-7156. �8. ZONING: RS-12,12,000 SQ.FT. LOT SIZE, 30% LOT COVERAGE Moo.00 SQ. FT. 9. PROPOSED LOT COVERAGE = 3,145.25/17,368.61 = 18%. io. EXISTING BASEMENT = 1104-00 SQ. FT. PROPOSED UNHEATED STORAGE = 303.25 SQ. FT. ii. EXISTING 1ST FLOOR = LIV: 1,183.67 SQ. FT., NEW LIV = 36o.25 SQ. Fr. TOTAL LIV = 1,543.92, NEW GARAGE: 921.00 SQ. FT., EXISTING DECK = 496-33 SQ. FT.,, NEW COVERED PORCH: 184-00 SQ. FI. TOTAL: 3,145.25 SQ. ITT. 12. NEW 2ND FLOOR = 1,128.27 SQ. Fr. 13. MECHANICAL SYSTEM: ft000 BTU (8o% EFF.) GAS FURNACE. 2ND FURNACE 6o,000 BTU (GAS). 14. HOTWATER TANK: (2) 5o GAL GS-650 YBRT (8o% EFF.) FOR DOMESTIC. 15. WIND EXPOSURE B, SEISMIC ZONE 3, SOIL: 2000PSF. 16. OCCUPANCY: GROUP R, DIVISION 3. 17. THIS BUILDING IS TYPE VB. 18. COMPLIANCE PATH: COMPONENT PERFORMANCE APPROACH OR PRESCRIPTIVE GLAZING IV. ig. GLAZING U VALUE = .40 U VALUE OR SMALLER, DOOR U VALUE =.20, CEILING R VALUE=38, WALL R VALUE=21, FLOOR R VALUE 30, SLAB R VALUE=lo MANUAL WINDOW VENTS W/ LABELED EXHAUST FAN OR METERED AIR AT FURNACE. 20. COMPLY WITH IBC 2003', IRC 2003', IMC 2003', IFC 2003', UPC 2003, VIAQ 2003, WSEC 2004. 21. LOT SLOPE = 22% E-W. 22. DRIVEWAY SLOPE: 13%. MAX DRIVEWAY SLOPE ALLOWED 14% 23. SET BACKS: FRONT 25'(1), SIDE lo'(2), BACK 20'(1). 24. IMPERV. SURFACE AREA: DRIVEWAY & WALKWAYS 917-00 SQ. FT. + EXISTING BUILDING 1956.93 SQ. Fr.(W/ EAVES) + NEW BUILDING 1494-94 SQ. FT.(W/ EAVES). = 4368.87 SQ. FT. 25.+fMUkiTUALL; 29=375, Ivii" FXLUING SLAB; 0 -13, 26. PROIDE F&T STOPS PER IBC. 27. MAX HEIGHT-25', MEASURED FROM AVERAGE ELEVATION OF UNDISTURBED SOIL AT CORNERS OF EXTENDED BUILDING RECTANGLE, SUBJECT TO FIELD CHECK BY BUILDING DEPARTMENT. 28. TRANSIT SHALL BE SET UP FOR INSPECTOR AT FRAMING INSPECTION TO CHECK HEIGHT OF STRUCTURE. 29. LOT LINE & SET BACK STAKES MUST BE IN PLACE AT TIME OF FOUNDATION INSPECTION. 30. ADDRESS NUMBERS (6" HEIGHT ON APPR. CONTRASTING BACKGROUND) SHALL BE POSTED PLAINLY VISIBLE & LEGIBLE FROM STREET OR ROAD FRONTING PROPERTY. 31- PROVIDE FIRE ESTINGUISHERS PER IFC STANDARD lo-1. 32. ALL NEW EXTENDED, RE -BUILT OR RELOCATED ELECTRICAL UTILITY & OR SERVICE SHALL BE PLACED UNDERGROUND. 33. ACCEPTABLE TIGHTLINE MATERIAL SCH 40 PVC OR EQUIV, SDR 35, N-12(ASTM D3TM D3034)- 34. ANY REQUEST FOR MODIFICATION, VARIANCE OR OTHER ADMINISTRATIVE DEVIATION (HEREINAFTER VARIANCE) MUST BE SPECIFICALLY CALLED OUT & IDENTIFIED. APPROVAL OF ANY PLAT OR PLAN CONTAINING PROVISIONS WHICH DO NOT COMPLY WITH CITY CODE & FOR WHICH A VARIANCE HAS NOT BEEN SPECIFICALLY IDENTIFIED, REQUESTED & CONSIDERED BY THE APPROPRIATE CITY OFFICAL IN ACCORDANCE W/THE APPROPRIATE PROVISION OF CITY CODE OR STATE LAW DOES NOT APPROVE ANY ITEMS NOT TO CODE SPECIFICATION. 35A. PLUMBING FIXTURE COUNT EXISTING:, SHOWER-1, WATER CLOSETS i, LAVATORY-1, HOT WATER TANK-1, EXPANSION TANK-1, FLOOR DRAIN-1, BACKFLOW PROTECTION DEVICE-o, PRESSURE REDUCTION VALVE-1, GREASE TRAP-o, WATER SERVICE LINE-1, HOSE BIB-2, DRINKING FOUNTAIN-o, BIDET-o,URINAL-o = lo. EX ISTING FITURED THAT WILL BE MOVED: DISHWASHER-i, CLOTHES WASHER-1, SINK(KIT, LAUN) -1, WATER CLOSET-2, SHOWER 2, LAVATORY-2 = 9 36B. NEW: WATER CLOSET-2, SINK(KIT, LAUN) -1, SHOWER-1, LAVATORY-1, = 5- 37. GAS FIXTURE COUNT: FURNACE-2, HOT WATER TANK-1, COOKTOP-i, BARBAQUE-i, DRYER-i, FIREPLACE-l= 7. COVER SHEET: Pi SITE PLAN & BUILDING HEIGHT CALCS VICINITY MAP, PROJECT INFORMATION ARCHITECTURAL: Ai ELEVATIONS A2 BASEMENT FLOOR PLAN A3 FIRST FLOOR PLAN A4 SECOND FLOOR PLAN A5 ROOF PLAN A6 FOUNDATION PLAN A7 1ST FLOOR FRAMING PLAN A8 2ND FLOOR FRAMING PLAN Ag ROOF FRAMING PLAN Alo DETTAIL STRUCTURAL DRAWINGS: Si STRUCTURAL NOTES 'fop DATUM POiNTO 302.10' DOU6 (z. 30 1 527.99 ft� )FOOED DKIVEN 25' 495.33 EXIOTINd DRIVEWAY .1 t It FROP05EO, ADI)ITION", PRO 05 EXIOTING CAKPOKT TO 13E KEMOVED ADD W.M. pc 6 Ok GA5 LINE ------------ ---------- _4 -------------------- Zone Setba BL(Luired Actual Front Sides P,ear 22 Other ; 7q, L/ �jjt ZT/4.02 ft EXISTING RESIDENCE EXIOTING51"LA51-1 13LOCK5 (5TILL U15ED) ------ EX15TING GRADE I`KOF05ED GRADE by !sAL�'r=&zN8V_E A 297.75 f32V5.-/--6 1) 299.25 /4=-249a.�k-.(vzl5_ IMPERVIOU5 CALCULATION5 (5_0_L[D.5URFACE!5) EX151TING 5UILDING ROOF OUTLINE: 2174.02 5Q. FT, (CON5TK. IN 1963) 912. EX15TING DECK.-tee,.02 5Q. FT. (CON5TK. IN 1965) EX15TING DRIVEWAY: 496.335Q. FT (CON5TK. IN 1965) EX15TING PATIO: 54.00 5Q. FT (CON!5TK. IN 1963) TOTAL EXISTING IMPERVIOUS: 2925.37 60. FT. PKOFOOED ADDITION ROOF OUTLINE: 1022.64 5Q. FT. PROP05ED COVERED PORCH: 120.83 5Q. FT. rr\urL)or-v L.)r\iyi:,vv/"\T: 527. 9- 5u. F FROF05ED PATIO: 49.595Q. FT. TOTAL PROPOSED IMPERVIOUS: 1721.05 5Q. FT. LOT COVERAGE:5145.25 5Q. FTA7368.615Q. FT. = 16% T SLOPE: 22% E-W % EXISTING DECK j/ ---------- t ----------- 1� -------------- A" 1?__� 1604 I OCALE 1" 10'-0" e Braeniar Dr S' 01h. > WC35 My Pork Perrim011e part, 19rith cq Taro � Z - __ z ul z u 4.2.07 REVISIONS: 7.20.07 1.10.08 PRINTED 1.10.08 TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES MW Mki 0=4 Ilk 'A WKS Wilt [a), 1. LOA 14ILTEK FA13KIC 6ONTINUOUO THROUGH 7/6" WA5HEP GRAVEL,, IN GKAVEL-LINEP TRENCH i, f MOUND ON 130TH 61PE5 OF 2x the spacing of City of Edmonds Requirements FENCE AT THE OURFACE 13UKY 130TTOM OF FILTER FADKIC IN TRENCH FILTER FENCE PETAL NOOCALE FILTER FA13KIC ILOW -------------------- �7i ------------- A r1A M ROCK CHECK W-n 5ECTION NOOCALE 1. Maintain natural vegetation for silt control where possible. 2. Temporary erosion sedimentation control facilities shall be constructed by placing siltation control f Iters around swales (natural or manmade) and shall be maintained in a satisfactory condition until such time that land clearing and/or construction of permanent drainage facilities are completed and operational. Facilities shall then be removed and the site restored to the original or final design condition. 3. As ccnstruction progresses and expected seasonal conditions dictate, more siltation control course of construction, it shall be the obligation of the contractor to address any new conditions that may be created by his activities and to provide additional facilities, as may be needed, 4. ESC Minimum Requirement - Stablization of Exposed Areas. All soils exposed by land disturbing activities shall be staliblized by suitable application of BMPs, including, but not limited to, sod hydroseeding, or other vegetation, plasitic covering, or mulching. All EIMPs shall be selected, designed and maintained in accordance with the Manual. The exposed soils shall be stabilized according to an approved timetalbe. (Typically, no soils shall remain exposed for more than two (2) days from October 1 through April 30 and no more than seven (7) days from May 1 through September 30) 5. Construction Access Route. Construction vehicle access shall be, whenever practicle, limited to one route. Access points shall be stabilized with quarry spalls or cruched rack to minimize the tracking of sediment onto public roads. If sediment is transported onto a road surface, the roads shall be cleaned thoroughly at the end of each day. Sediment shall be removed from roads by shoveling or sweeping and transported to a controlled sediment desposal area within 24 hours. Street washing shall be allowed only after sediment is removed in this manner. 6. ESC Minimum Requirement - Manintenance. All erosion and sediment control BMPs shall be regularly inspected and maintained by th owner to ensure continued performance of their intended function. All maintenance and repair sahll be conducted in accordance with the manual. 7. ESC Minimum Requirement - Cut and Fill Slopes. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. In addition, slopes shall be stabilized in accordance with ESC Requirement No. 2. 8, ESC Minimum Requirement - Storm Drain Inlet Protection. All storm drain inlets made operable during construction shall be protected so that storm water runoff shall not enter the conveyance system without first being filtered or otherwise treated to remove sediment, 9. ESC Minimum Reauirement - Protection of Adiacent Prouerties. Adiacent orooerties shal be orotected ALL EXPOSED SURFACES TO BE COVERED WITHIN 2 DAYS OWNER/CONTRACTORS IS RESPONSIBLE FOR EROSION CONTROL AND DAMAGE TEMPORARY CONSTRUCTION ENTRANCE REQUIRED 1\ ) AS NOTED INEERING MAR 13 20C-3 BUILDING DEPARTMENT Cl-ry OF FL)�fDNDS ....... I ......... I FILTER FENCEJ o � RESUB UILDING DEPARTMENT BUILDING DEPARTMENT CITY OF EDMONDS Mug rm STREE x @ NU ` ~ � . �