Loading...
17528 TALBOT RD.PDF11111111111111 13444 17528 TALBOT RD ADDRESS:/ 75 ZO ­775"112a 7- /Zd TAX ACCOUNT/PARCEL #: BUILDING PERMIT (NEW STRUCTURE) #: )0t,9 2-0/2�— 07-3? COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: Conditional Waiver )(Study Required Waiver — CRITICAL AREAS #: DETERMINATION: Conditional Waiver Study Required Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit Vs): PLANNING DATA CHECKLIST DATED: Ll SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USEIENCROACHMENT PERMIT #: FOR: 'WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forrns\Jana's Street File Checklist 5-14-08.doc City of Edmonds Critical Area Notice of Decision Applicant: , OAS 4 Property Owner: 01 k) W ZI W S Critical Area File #: Z'O I Z - 00 3 -2- Permit Number: 0 -7 3 Site Location: 1-772-8 7&)bo� pv Parcel Number: 00 5-�Vv 0000 -3 10 C) Project Description: #�,tAj S- Ele. F� Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a -Critical Area or its required buffer. The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. The proposal is exempt pursuant to ECDC 23.40.230. EJ Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. ritical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1. __,ZThe proposal minimizes the impact on critical areas in accordance with ECDC 23.40-.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public, health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purpo ses of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordancewith ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. /' T he proposal is consistent with other applicable regulations and standards. F� Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). C( s4ur�' Reviewer "- 0, � � bignature Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 PLANNING DATA STREETFILE SINGLE FAMILY RESIDENTIAL Name:n�a� (AJ I�D:003�jqqO,0007�,Jo Site Address: 6 o Date: Plan Check # C)J Project Descriptior�; S Fye- - Reduced Site Plan Provided: ES NO) Zoning: 1 Map Page�_� Corner Lot: (YES Flag Lot: (YES Critical Areas Determination ff: '?_0 I C)0'� &]!�Study Required d12- (,�160vc 4N59 fsk C-L)s El waiver SEPA Determination: /Va shil br—E xempt A El Needed. (for over 500 cubic yards of grading) 0LJ5L 0 WAPJ 0 Fee 0 Checklist 0 APO List v�th��otarized form Required tbacks Str et:1 Sid (3 Actual Setbacks Street: Side: Side: Rear: 970 El Detached Strudures: MON6 Rockeries: fA_Jv'-J *0 t��.�Trellises: 4o /,e/'t4Q ie\ Bay Windows/Projecting Modulation,: El stairs*/Deck: Height Datum Point: ty) Datum Elevation: 9"2 QA T Maximum Height Allowed: -2-06 Actual Height:, Other Parking, Required: Parking Provided: ?,-t- Lot Area: A/S-V> L� Maximum Lot Coverage: 35% Proposed: 0/' Lot Coverage Calculations: U ADU Created: (YES 00 Subdivision: TIq Legal Nonconformi ng Land Use Determination Issued: (YES /�O) coruments L--Vt - A- 6 3 16Y 6 'cu� C 1 6 -�_'7 -r z cl 2 06, 6YA i� Plan Review A, PtannUiq Data Form 04-11-06A�c je Thftity:!'of Edmonds APPLICATION for SIDE SEVEM PE T NEW CONSTRUCTION �� REPAIRS LG (��b L (Ki EASEMENT'No . .......................................... A OWNER ...0" ....... . ......... C.R.pusr/"�d ............................ CONTRACTOR ..... %5/ .. ?4?K.. ...................... ............ PERbUT No.... ADDRESS .......... :;Oej!l? ��O-t ..... /�7 .................. LEGAL DESCR=ION: LOT No . ..... ........ ........................ BLOCKNo . ............................ ION ...... NAME OF ADDIT ... 4F�91ekl ..................................................................... a f 019to Approved: DATE .... ............................... Q ........ By ........... OF EDMONDS t� OCITY CIVIC -CENTER— WATER -SEWER DEPARTMENT Call PROSPect 6-1107 when work is ready for inspection. (No inspee- tions Saturday, Sunday holidays.) N2 3661 or SIDESEWER PERMIT ADDRESS. ------_------ 17.528 .. laJItat ... Road .............. OWNER ................... Ergd ... Chri$liall ----_------- ------_--_---------- CONTRACTOR ....... agni-5afe ................................................. Permission is granted --- hpri-1_15 . . .................. 19 .... 7.0, for --------------_------- days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: ,Jv0TE No. I —The owners of the property may obtain a permit to construct sewer inside Property line. A licensed Side Sewer Contractor must ') be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. ­_jTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 Inches coverage at property line and 12 Inches Inside property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 5--It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or Its appur- tenances except to Insert the pipe Into the wye. 12 L -4 A.- 4r t-4 if -If -Ir 0'q F October 15, 2012 Denny and Holly Onslow 621 Wellington Avenue Seattle, Washington 98122 Subject: Geotechnical Design Recommendations 17528 Talbot Road Proposed Residence Edmonds, Washington File No. 20718-001-00 INTRODUCTION AND PROJECT UNDERSTANDING GMENGINEER��r Plaza 600 Building 600 Stewart Street, Suite 1700 Seattle, Washington 98101 206.7208-2674 STREET FILE This report presents the results of our geotechnica.l design recommendations for the proposed residence located at 17528 Talbot Road in Edmonds, Washington. We understand the City of Edmonds provided plan review comments for the project in a letter dated October 2, 2012. GeoEngiheers, Inc. (GeoEngineers) previously provided geotechnibal recommendations with regard to environmentally critical areas at the site in a letter dated August 2, 2012. As discussed in our previou s letter, subsurface condition s at the site ,generally consist glacial till, consistent with geologic mapping. According to the plans, the proposed residence will be located in the same general vicinity as the existing residence, although slightly further to the northwest. The pro . posed residence will be supported on columns .and shallow foundations, independent of the foundation system supporting the existing residence. Portions of the basement of the existing residence will be retained for use as a crawlspace and storage. A deck will also be constructed on the northwest (downslope) side of the residence. PLAN REVIEW - We understand that the City of Edmonds has identified the need for a geotechnical confirmation of the structural design assumptions noted on project plan sheet S1.0. We have reviewed the project structural and civil plans. Our geotechnical recommendations presented in the following sections are consistent with these plans. RESUB OCT 19 2012 BUILDING DEPAR�-MENT CITY OF EDMONDS 17528 Talbot Road Proposed Residenectober 15, 2012 Page 2 CONCLUSIONS AND RECOMMENDATIONS Earthquake Engineering 2009 IBC Seismic Design Information We recommend the use of the following 2009 International. Building Code (IBC) parameters for soil profile type, short period spectral response acceleration (Ss), 1-second period spectral response acceleration (Si) and seismic coeff icients (FA and Fv) for the project site. 2009 SBC-Parameter Recommended Value Soil Profile Type D Short Period Spectral Response Acceleration, Ss (percent g) 121.1 1-Second Period Spectral Response Acceleration, S, (percent g) 42.5 Seismic Coefficient, FA 1.02 Seismic Coefficient, Fv 1.58 Shallow Foundations The following sections provide recommendations for design of shallow foundations, which in our opinion are appropriate for support of the proposed improvements. Perimeter foundation drains should be included, as discussed in the "Drainage and Waterproofing" section below. Allowable Bearing Pressure For foundations bearing on undisturbed dense native soils or structural fill extending down to these soils, the foundations may be designed using an allowable soil bearing pressure of 2,000 pounds per square foot (psf) for isolated spread footings and continuous footings. � The allowable soil bearing value is a net value that applies to the total of dead and long-term live loads and may be increased by up to one-third for wind or seismic loads. Settlement Provided all -loose soil is removed and the subgrade is prepared as recommended under Construction Considerations below, we estimate the total settlement of shallow foundations will be on the order of 1/2 to I inch. The settlements will occur rapidly, essentially as loads are applied. Size and Embedment We recommend that the exterior footings be founded.a minimum of 18 inches below the lowest adjacent grade, for frost protection. Interior footings should be founded a minimum of 12 inches below top of slab. Continuous wall footings and in . clividual column footings should have.minimurn widths of 24 inches. Lateral Resistance Lateral foundation loads may be resisted by passive resistance on the sides of footings and by friction on the., base of the shallow foundations. The allowable passive resistance on the sides of the footings may be computed using an equivalent fluid density of 300 pounds per cubic foot (pcf) (triangular distribution). These values are appropriate for foundation elements that are poured directly against undisturbed.dense soils or :7 F—t I GEoENGINEER P, File No. 20718-001-00 ctober 15, 2012 Page 3 17528 Talbot Road Proposed Resideno . 0 surrounded by structural fill. . For shallow foun.clations supported, on native soils or structural fill, the allowable frictional resistance may be computed using a coefficient of friction of 0.4 applied to vertical dead -load forces. The above coefficient of friction and passive equivalent fluid density values incorporate a factor of safety of about 1.5. Construction Considerations If soft or loose soil is present at the foundation subgrade elevation (as discussed above), the soft areas should be removed and replaced with structural fill at the direction of GeoEngineers. In such instances, the zone of structural fill should extend laterally beyond the footing edges with a horizontal. distance at least. equal to the thickness of the -fill. The condition of all subgrade areas should be observed by GeoEngineers.to evaluate if the work is completed in accordance with our recommendations and that the subsurface conditions are as anticipated. Slab -On -Grade Floors We recommend that the basement floor slabs be constructed as slab -on -grade. Subgrade Pre0aration The exposed subgrade should be evaluated after site grading is complete by probing. The exposed soil should be firm and unyielding, and without significant groundwater. Disturbed areas should be re -compacted if possible or removed and replaced with compacted structural fill. Design Parameters Conventional slabs may be supported on -grade provided the subgrade soils are prepared as recommended under the "Subgrade Preparation" above. We recommend that the slab be founded on either undisturbed native soils'6r on structural fill placed over the native soils.. For slabs designed as a beam on an elastic foundation, a modulus of subgrade reaction of 200 pounds per cubic inch (pci) may be used for subgrade soils prepared as recommended. The capillary break layer below the slab should consist of 4 inches of clean crushed gravel, with a maximum particle size of 11/2 inches and negligible sand or silt. We recommend that a vapor retarder be placed over the capillary break layer in the basement and in the garage to retard migration of moisture through the floor slabs. The vapor retarder should consist of a heavy plastic sheet, such as 10-mil. plastic sheeting intended for this purpose, and include sealed seams. The contractor should be made responsible for maintaining the integrity of the vapor retarder during construction. RetainingWalls General The project will include basement retaining walls for the proposed residence, and may also include miscellaneous retaining walls to support grade transitions on the site. ­7 1 - GMENGINEER�� File No. 20718-001-00 17528 Talbot Road Proposed Residen'Ortober 15, 2012 Page 4 Design Parameters The, retaining wall foundations should be designed using the recommendations previously presented for sh I allow foundations. Retaining walls should be backfilled with a 12-inch wide zone of drainage aggregate, with a perimeter foundation drain at the base of the drainage zone, as discussed in the "Drainage and Waterproofing" section below. For miscellaneous retaining walls on site, weep holes can be used instead of a fou . ndation drain, provided the weep holes do not conflict with the aesthetic requirements for the walls. The lateral soil pressures acting.on the retaining walls depend on. the nature, density and configuration of the soil behind the wall and the.amount of lateral wall movement which can occur as backfill is placed. For walls that are free to yield at the top at least 0.1 pe�cent of the height of the wall, soil pressures will be less than if movement is limited. Assuming that the walls are backfilled and drainage is provided as discussed ab - ove, we recommend that yielding walls supporting horizontal backfill be designed.using active earth pr�ssures. Non -yielding walls supporting horizontal backfill be designed using at -rest earth pressures. ..R6tainingWall Design P.�rarneters'. Unit Weight (pcf) 125� Friction Angle (degrees) 35 Active Earth Pressure (pcf) - triangular distribution 35H At Rest Earth P ressure (pcf) - triangular distribution 55H Sel smic Pressure (psf) - uniform distribution 7H Drainage and Waterproofing We recommend that perimeter foundation drains be installed around the basement of the new.residence and garage, as well as around the accessory building. As discussed above in the "Retaining Walls" section, either foundation drains or weep holes should be provided for the miscellaneous retaining walls on site. For the in -ground trampoline . , an area drain should also be provided. The drains should be provided with cleanouts and should consist of a 4-inch-diameter perforated pipe placed on a 4-inch-thick bed of, and surrounded by 6 inches of, drainage aggregate enclosed in a non -woven geotextile fabric such as Mirafi 140N (or approved equivalent) to,prevent fine soil from migrating into the drain material. Gradation recommendations for the drainage aggregate are presented below in the "Earthwork" section of this report. We recommend that the perforated drain pipe consist of either heavy -wall solid pipe (SDR-35 polyvinyl chloride [PVC], or equivalent) or rigid corrugated smooth interior polyethylene. pipe (ADS N-12, or equivalent). We also recommend against using flexible tubing for drainpipes. The drains should be sloped to drain by gravity, if practicable, to a suitable discharge point. Werecommend that the cleanouts be covered.and be placed in flush -mounted utility boxes. Water collected in roof downspout lines must not be routed to the foundation. drain lines. GMENGINIEIER�.� LL File No. 20718-001-00 i7528 Talbot Road Proposed Residen jo ctober 15, 2012 Page 5 LIMITATIONS We have prepared this report for the exclusive use of Denny and Holly Onslow and their authorized agents for the proposed residence at 11528 Talbot Road in Edmonds, Washington. Our report and interpretations should not be construed as a warranty of the subsurface conditions. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood. Our services were provided for a proposed residence that will extend into an environmentally critical area setback. However, all construction on or near slopes involves risk, only part of which can be mitigated through . qualified engineering and construction practices. Favorable performance of structures in the near term does not imply a certainty of long-term performance, especially under conditions of adverse weather or seismic activity. Any electronic form, facsimile or hard copy of the original document (email, text, table and/or figure), if provided and any attachments are only a copy of the original document. The original document is stored by GeoEngineers and will serve as the official document of record. Please refer to Attachment A titled "Report Limitations and Guidelines for Use" for additional information pertaining to use of this report. :% GEoENGINEER�.� File No. 20718-001-00 17528 Talbot Road Proposed Residpil ctober 15, 2012 Page 6 10), Ol We trust that this report provides the information you require. Please contact us if you have any questions regarding the inf6rmation and recommendations presented in this report. Sincerely, -GeoEngineers, Inc. -t ,AY D o 4�42L' Timothy D. Dailey, PE o McFadden, PE, LEG Project Engineer, Principal TDBJJM:csv Attachment: Attachment A.Report Limitations and Guidelines for Use Disclaimer Any electronic form, facsimile or hard copy of the original document (em*ail,.text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and willserve as the official document of record. Copyright@ 2012 by GeoEngineers, Inc. All rights reserved. GEoENGIN-EER��r File No. 20712-001-00 ATTACHMENT A Report Limitations and Guidelines for Use 17528 Talbot Road Proposed Residele October 15, 2012 Page A-1 ATTACHMENT A REPORT LIMITATIONS AND GUIDELINES FOR USE' This attachment provides information to help you manage your risks with respect to the use of this report. Geotechnical Services Are Performed For Specific Purposes, Persons and Projects This report has been prepared for the exclusive use by Denny and Holly Onslow and their authorized agents. This report May be made available to agencies for review. This report is not intended for -use by others, and the information contained herein is not applicable to other sites. GeoEngineers structures our services to meet the specific needs of our clients. For example, geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction contractor or even another civil engineer or architect that are involved in the same project. Because each geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique, prepared solely for the specific client and project site. No other party except Denny and Holly Onslow and their authorized agents may rely on the product of our services unless we agree in advance to such reliance and the additional party of reliance agrees, in writing,. to be bound by the terms and conditions under which these services have been performed. this is, to provide our firm with reasonable protection against Open-ended liability claims by third parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of scope, schedule and budget, our services have been executed in accordance with our Agreement with the Client and generally accepted geotechnical practices in this area at the time this report was prepared. This report should not be applied for any purpose or project except the one originally contemplated. A Geotechnical Engineering Or Geologic Report Is Based On A Unique Set Of Project -Specific Factors This report has been prepared for evaluation of the proposed residence at 17528 Talbot Road in Edmonds, Washington. GeoEngineers considered a number of unique,, project. specific factors when. establishing the scope of services for this project and report., Unless GeoEngineers specific ally indicates otherwise, do not rely on this report if it was: m not prepared for you; m not prepared for yo'ur project; m not prepared for the specific site explored; or m completed before important project changes were made. 1 Developed based on material provided by ASFT, Professional Firms Practicing in the Geosciences; www.asfe.org. 17528 Talbot Road P roposed Resid October 15, 2012 Page A-2 For example, changes that can affect the applicability of this report.include those that affect: m- the function of the proposed structures; • elevation, configuration, location, orientation or loads of the proposed structures; • composition of the design team; or • project ownership. If important changes are made after the date of this report, GeoEngineers should be, given the opportunity to review our interpretations and recommendations and provide written modifications or confirmation, as appropriate. Subsurface Conditions Can Change This geotechnical or geologic report is based on conditions that existed at the time the study was performed.' The findings and. conclusions 'of this report may be affected by the 'passage of time, by m.anmade events such as construction on or adjacent to. the site, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuati ons. Always contact GeoEngineers before applying a report to determine'if it remains applicable. Most Geotechnical And Geologic Findings Are Professional Opinions Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site. Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field data and then applied our professional judgment to. render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. Our report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions. Kil Geotechnical Engineering Report Recommendations Are Notfinal Do . not over -rely on the preliminary construction recommendations included in this report. These recommendations are not final, because they were developed principally from GeoEngineers' professional judgmen t and opinion. GeoEngineers' recommendations can be finalized only by observing actual subs.urface'c6nditions revealed during construction. GeoEngineers cannot assume responsibility or liability for this report's recommendations if we do not perform construction observation.. Sufficient monitoring, testing and consultation -by GeoEngineers should be provided during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities are completed in accordance with our - recommendations. Retaining GeoEngineers for construction observation for this project is the most effective, method of managing the risks associated with unanticipated conditions. F'77­77 z) GEoENGINEER File No. 20718-001-00 17528 Talbot.Road Proposed Residelle October 15, 2012 Page A-3 A Geotechnical Engineering Or Geologic Report Could Be Subject To Misinterpretation Misinterpretation of this report by other design team members can result in costly problems. You could lower that risk by having GeoEngineers confer with appropriate members of the design team after submitting the report. Also retain GeoEngineers to rev iew pertinent elements. of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce that risk by having GeoEn gineers participate in pre -bid and preconstruction conferences, and by providing construction observation. Do Not Redraw The Exploration Logs Geotechnical engineers and geologists prepare final 'boring and test pit logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a ge . otechnical engineering or geologic reports . hould never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but.recognize that separating logs from the report can elevate risk. Give Contractors A Complete Report And Guidance Some owners and design professionals believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give contractors the complete geotechnical engineering or geologic report, but preface it with a clearly Written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage. them to confer with GeoErigineers and/or to conduct additional study to obtain the specific,types Of information they need or prefer . A pre -bid conference can also be valuable. Be sure contractors have sufficient time to perform additional study.: Only then* might an owner be in a position to give contractors the best i - nformation available, while. requiring �them to at . least share the financial responsibilities stemming from unanticipated conditions. Further, a contingency for unanticipated conditions should, be included in your project budget and schedule. Contractors Are Responsible For Site Safety On Their Own Construction Projects Our geotechnical recommendations are not intended to direct the contractor's procedures, methods, schedule or. management of the work site. The contractor is solely responsible for job site safety and for managing construction operations to minimize risks to on -site personnel and to adjacent properties. Read These Provisions Closely Some clients, design professionals and contractors may not recognize that the geoscience practices (geotechnical engineering or geology) are- far less exact than other engineering and natural science - disciplines. This lack of understanding. can create unrealistic expectations that could lead to - disappointments, claims and disputes. GeoEngineers includes these explanatory 'Jimitations". provisions in our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how these "Report Limitations and Guidelines for Use". apply to your project or site. Geotechnical, Geologic And Environmental Reports Should Not Be Interchanged The equipment, techniques and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical or geologic study and vice versa. For that reason, a 777 7`�'7-7'77. GWENGINEER��r File No. 20718-001-00 17528 Talbot Road Proposed Resido October 15, 2012 Page A-4 geotechnical engineering or geologic report does not usually relate any environmental findings, .conclusions or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Similarly, environmental reports are not used to address geotechnical or geologic concerns regarding a'specific project. Biological Pollutants GeolEngineers' Scope of * Work specifically excludes the investigation, detection, prevention, or assessment of the presence of Biological Pollutants in or around any structure. Accordingly, this report includes no interpretations, recommendations, findings, or conclusions for the purpose of detecting, preventing, assessing, or abating Biological. Pollutants. The term "Biological Pollutants'� includes, but is' not limited to, molds, fungi, spores, bacteria, and viruses, and/or any of their byproducts. 77, —7= 7,,,- =7 �777-- GEo ENGINEERS File No. 20718-001-00 GEoENGINEER��r Plaza 600 Building 600 Stewart Street, Suite 1700 Seattle, Washington 98101 206.7208-2674 August 2, 2012 STREET FILE Denny and Holly Onslow 621 Wellington Avenue Seattle, Washington 98122 Subject: Geotechnical Engineering Services Revised Critical Areas Report RECEIVED 17528 Talbot Road Edmonds, Washington 4UG 27 2012 File No. 20718-001-00 DEVELOPMENT SERVICES COUNTER INTRODUCTION AND PROJECT UNDERSTANDING This letter presents the results of our geotechnical engineering services for the proposed residence located at 17528 Talbot Road in Edmonds, Washington. The site is shown relative to surrounding improvements on the Site Plan, Figure 1. We completed our services in general accordance with our proposal dated July 23, 2012. This letter has been revised from the version issued July 27, 2012 to include recommendations regarding on -site infiltration of t stormwater. According to preliminary plans, the proposed residence will be located in the same general vicinity as the I existing residence, although slightly further to the AX northwest. The proposed residence will be supported on columns and shallow foundations, independent of the foundation system supporting the existing residence. V Portions of the basement of the existing residence will be retained for use as a crawlspace and storage. A deck will also be constructed on the northwest (downslope) side of the residence. We understand that the City of Edmonds has identified Photograph 1. Looking down from top of steep slope toward BNSF ra ilroad tracks and Puget Sound the need for a geotechnical assessment due to the 13e-0 Z-017, 0-73'rs—' 1 0 17528 Talbot Road Proposed Residence I August 2, 2012 41 Page 2 Is erosion and landslide hazards at the site, based on the Critical Areas Determination from the city dated May 24, 2012. The city of Edmonds Municipal Code (EIVIC) Chapter 23.80 specifies a landslide hazard area buffer of 50 feet. In addition EIVIC Chapter 23.40.280 specifies a 15-foot building setback. This letter is intended to serve as a Critical Areas Report for the project to address the geologically hazardous areas requirements specified in EIVIC Chapter 23. SITE CONDITIONS The site is a narrow rectangular parcel 0.62 acre in size, oriented in a southeast -northwest direction, as shown on the Site Plan, Figure 1. The site is bounded by Talbot Road on the southeast, the BNSF railroad on the northwest and residential properties on the other two sides. The site generally slopes down from southeast (Elevation 87 feet) to northwest (Elevation 45 feet) with grades of up to 25 percent across most of the site, with a sharp drop-off at the northwest edge of the property. There is a grade difference of approximately 30 feet from the top to the bottom of this steep slope area, which extends beyond the property line. Photograph 1 on the previous page shows this steep slope area from above, and Photograph 2 to the right shows this steep slope area from below, at the level of the BNSF tracks. g 0�; The existing residence is located in a gently -sloping area of the site. Vegetation on the upper portion of the site includes trees and landscaping extending to the top of the steep slope. Vegetation on the steep slope generally Photograph 2. Looking up from base of steep slope toward site consists of vines, brush, and several deciduous trees with pistol -butted trunks (one tree with a pistol -butted trunk is visible in Photograph 2). There is also a large pile of accumulated yard waste that was dumped on the slope in previous years, as shown in Photograph 3 below. Stormwater drains for the site have been collected into a tightline that extends to the base of the slope (as shown in Photograph 2), where the tightline discharges into a ditch along the BNSF railroad tracks, eventually draining through a culvert into Puget Sound. Regional Geology We reviewed the "Geologic Map of the Edmonds East and part of the Edmonds West quadrangles, Washington" by J.P. Minard, dated 1983. The geology in the vicinity of the site is mapped as glacial till. Photograph 3. Accumulated yard waste on slope GEoENGINEER File No. 20718-001-00 I I 1 0 17528 Talbot Road Proposed Residence I August 2, 2012 Page 3 We also reviewed the online Washington State Department of Natural Resources surface geology database. Based on this mapping, the site is located in an area of transition between glacial till and advance outwash, with the advance outwash located at a lower elevation and west of the glacial till. Glacial till is generally a medium dense to very dense, unsorted mixture of clay, silt, sand and gravel deposited below glaciers. In the greater Seattle area, glacial till is often underlain by advance outwash and glaciolacustrine deposits. Advance outwash is generally a dense to very dense well sorted sand and gravel with occasional silt lenses, deposited from streams emanating from advancing glaciers. The glaciolacustrine deposits generally consist of very stiff to hard silts and clays deposited in pro -glacial lakes. Environmentally Critical Areas The City of Edmonds Municipal Code (EMC) defines slopes of 15 to 40 percent as erosion hazards and slopes greater than 40 percent as landslide hazards. Based on this definition, most of the site is classified as an erosion hazard area, with only the far northwest edge of the site classified as a steep slope hazard area, as shown on the Site Plan, Figure 1. Based on our review of a draft inventory map prepared for the City of Edmonds, this is also how the site has been mapped by the city. The Washington State Department of Ecology Coastal Atlas shows the upper portions of the site mapped as stable, with the steep slopes mapped as unstable. GEOLOGIC RECONNAISSANCE We visited the site on July 24, 2012 to complete a geologic reconnaissance of the site and adjacent steep slope area. Subsurface Conditions We observed several open excavations on the property and completed hand holes around the site to evaluate the subsurface conditions. Based on our observations, the undisturbed native soils on the gently -sloping portions of the site are glacial till, consistent with the geologic mapping. Most of the steep slope area is overgrown with vegetation and inaccessible. However, we were able to use a ladder to climb down the slope at the south edge of the site, as shown in Photograph 2. We observed that the soils on the face of the slope generally consisted of sand with variable silt and gravel content. The face of -the slope is highly disturbed, with numerous voids due to burrowing by large animals (possibly otters). Although we could not see areas of undisturbed native soils, the soils appeared to be advance outwash, consistent with the geologic mapping. Slope Stability We observed that there are several small rockeries on site that are in generally poor condition. The rocks are rounded and it appears that the poor conditions of the rockeries are due to poor construction, rather than instability. We did not observe signs of instability in the gently -sloping portions of the site. We observed that there are several deciduous trees on the steep slope with pistol -butted trunks. We did not observe signs of seepage on the steep slope. Although we observed numerous areas of exposed, loose soil on the steep slope, it is difficult to determine what is due to slope instability and sloughing, and what is due F­ GEoENGINEER��r File No. 20718-001-00 17528 Talbot Road Proposed Residence I August 2, 20:12 Page 4 Is to animal burrowing. However, it appears that the slope has experienced numerous small, surficial slope failures in the past, which is consistent with steep slopes in the Greater Seattle Area. As previously noted, we observed a large amount of yard waste piled on a portion of the slope, as shown in Photograph 3. In our experience, this tends to increase the weight on the slope and can result in an increased risk of slope failure. We generally recommend this practice cease and that the yard waste be removed from the site. However, given the limited access available to this area, it is not likely feasible to haul the yard waste off site. CONCLUSIONS General The following sections describe our conclusions and recommendations, including a landslide hazard area buffer reduction. The adoption of these recommendations is consistent with EIVIC Chapters 23.80.060 and 23.80.070 and will not increase the risk to the site or adjacent properties, nor impact other critical areas. The predevelopment condition of the slope will be maintained or improved by adoption of these recommendations. Environmentally Critical Areas Erosion Hazard Area The upper landscaped portion of the site is a low risk of erosion hazard. We recommend, however, that appropriate erosion control best management practices (BIVIPs) be used during construction and appropriate landscaping installed for permanent stabilization of the site. In accordance with EMC Chapter 23.80.070, A.2, it is our opinion that the proposed residence and site redevelopment will not increase surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions, decrease slope stability on the site or adjacent properties; and will not adversely impact other critical areas. Landslide Hazard Area - Minimum Buffer and Building Setback Based on our observations of the steep slope area, it is our opinion that this area has a significant risk of ongoing instability, likely characterized by continuing shallow surficial slope failures that result in debris moving clownslope toward the BNSF tracks and encroachment of the top of slope into the yard area above. We recommend that the owner not place additional yard waste on the slope and periodically inspect the tightlines to confirm that they are connected properly and are not discharging concentrated water onto the slope. Additionally, we recommend that the owner continue to keep the gate in the chain link fence locked to prevent access to the landslide hazard area. In accordance with Edmonds City Code 23.80.70 A.1, it is our opinion that a minimum buffer of 35 feet should be used for the landslide hazard area, along with a building setback of 15 feet, per EIVIC Chapter 23.40.280. The recommended buffer and building setback are shown on the Site Plan, Figure 1. Per EIVIC Chapter 23.40.280, uncovered decks are allowed in the building setback area. This buffer of 35 feet is slightly greater than the height of the slope, and it is our opinion that this reduced buffer and building setback are consistent with protection against property damage or injury from landsliding. GEoENGINEER File No. 20718-001-00 17528 Talbot Road Proposed Residence I August 2, 2012 0 Page 5 0 Stormwater Management Subsurface conditions at the site consist of glacial till and it is our opinion and experience that a design infiltration rate of less than 0.25 inches per hour is typically appropriate for glacial till. However, it is also our opinion that on -site infiltration would likely increase the risk of slope instability in the landslide hazard area. We therefore recommend against on -site infiltration of stormwater. Stormwater should be collected and directed to the storm sewer system or else tightlined to the base of the steep slope area. LIMITATIONS We have prepared this report for the exclusive use of Denny and Holly Onslow and their authorized agents for the proposed residence at 17528 Talbot Road in Edmonds, Washington. Our report and interpretations should not be construed as a warranty of the subsurface conditions. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of'geotechnical engineering in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood. Our services were provided for a proposed residence that will extend into an environmentally critical area setback. However, all construction on or near slopes involves risk, only part of which can be mitigated through qualified engineering and construction practices. Favorable performance of structures in the near term does not imply a certainty of long-term performance, especially under conditions of adverse weather or seismic activity. Any electronic form, facsimile or hard copy of the original document (email, text, table and/or figure), if provided and any attachments are only a copy of the original document. The original document is stored by GeoEngineers and will serve as the official document of record. Please refer to Attachment A titled "Report Limitations and Guidelines for Use" for additional information pertaining to use of this report. File No. 20718-001-00 GWENGINEER�� 17528 Talbot Road Proposed Residcnce August 2. 2012 0 Page 6 We trust that this report provides the information you require. Please contact us if you have any questions regarding the information and recommendations presented in this report. Sincerely, GeoEngineers, Inc. Timothy D. Bailey, PE Bo McFadden, PE, LEG Project Engineer Prin cipal TDBJJM:smi Attachments: Figure 1. Site Plan Attachment A. Report Limitations and Guidelines for Use Disclaimer. Any electronic form, facsimile or hard copy of the original document (email, text, table, and/orfigure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve asthe official document of record. Copyright@ 2012 by GeoEngineers, Inc. All rights reserved. 60�.' GEoEINIGIIINIEER�� File No. 207IS-C-01-00 !1 11 atz- �� 1 12 Q, fj 11 11 I CL ­� Notes ecN LANDSLIDE HAZARD AREA PROPOSED DECK EXISTING HOUSE PROPOSED HOUSE (PRELIMINARY) FOOT PRINT FOOT PRI�T V LOT 30 'T 777�77 7, I r LZX 1J, _J_ 0 _j 'j, 4;� �Adi �111111 j 112 LF 4'1 SD @ 2" _�6 X V 212.31, N.5455107 Y L 3 15-FOOT RECOMMENDED 35-FOOT BUFFER BUILDING 061 SETBACK 41, ro 1. The locations of all features shown are approximate. 2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Reference: Base drawing "Sheet C3.0, Site Plan of Onslow Residence" by Mcclellan Architects dated 7-19-2012. 20 0 20 "Mm� — FEET Site Plan Onslow Residence 17528 Talbot Road Edmonds, Washington GWENGINEER��r Figure 1 0 .0 0 ATrACHMENT A Report Limitations and Guidelines for Use 17528 Talbot Road Proposed Residence 1 August 2, 2012 Page A-1 0 ATTACHMENT A REPORT LIMITATIONS AND GUIDELINES FOR USEJL This attachment provides information to help you manage your risks with respect to the use of this report. Geotechnical Services Are Performed For Specific Purposes, Persons and Projects This report has been prepared for the exclusive use by Denny and Holly Onslow and their authorized agents. This report may be made available to agencies for review. This report is not intended for use by others, and the information contained herein is not applicable to other sites. GeoEngineers structures our services to meet the specific needs of our clients. For example, a geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction contractor or even another civil engineer or architect that are involved in the same project. Because each geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique, prepared solely for the specific client and project site. No other party except Denny and Holly Onslow and their authorized agents may rely on the product of our services unless we agree in advance to such reliance and the additional party of reliance agrees, in writing, to be bound by the terms and conditions under which these services have been performed. This is to provide our firm with reasonable protection against open-ended liability claims by third parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of scope, schedule and budget, our services have been executed in accordance with our Agreement with the Client and generally accepted geotechnical practices in this area at the time this report was prepared. This report should not be applied for any purpose or project except the one originally contemplated. A Geotechnical Engineering Or Geologic Report Is Based On A Unique Set Of Project -Specific Factors This report has been prepared for evaluation of the proposed residence at 17528 Talbot Road in Edmonds, Washington. GeoEngineers considered a number of unique, project specific factors when establishing the scope of services for this project and report. Unless GeoEngineers specifically indicates otherwise, do not rely on this report if it was: • not prepared for you; • not prepared for your project; • not prepared for the specific site explored; or • completed before important project changes were made. 1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences; www.asfe.org. 17528 Talbot Road Proposed Residence I August 2, 2012 0 Page A-2 0 0 For example, changes that can affect the applicability of this report include those that affect: • the function of the proposed structures; • elevation, configuration, location, orientation or loads of the proposed structures; • composition of the design team; or • project ownership. If important changes are made after the date of this report, GeoEngineers should be given the opportunity to review our interpretations and recommendations and provide written modifications or confirmation, as appropriate. Subsurface Conditions Can Change This geotechnical or geologic report is based on conditions that existed at the time the study was performed. The findings and conclusions of this report may be affected by the passage of time, by manmade events such as construction on or adjacent to the site, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuations. Always contact GeoEngineers before applying a report to determine if it remains applicable. Most Geotechnical And Geologic Findings Are Professional Opinions Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site, Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field data and then applied our professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. Our report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions. Geotechnical Engineering Report Recommendations Are Not Final Do not over -rely on the preliminary construction recommendations included in this report. These recommendations are not final, because they were developed principally from GeoEngineers'.professional judgment and opinion. GeoEngineers' recommendations can be finalized only by observing actual subsurface conditions revealed during construction. GeoEngineers cannot assume responsibility or liability for this report's recommendations if we do not perform construction observation. Sufficient monitoring, testing and consultation by GeoEngineers should be provided during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities are completed in accordance with our recommendations. Retaining GeoEngineers for construction observation for this project is the most effective method of managing the risks associated with unanticipated conditions. GEo ENGINEER��r File No. 20718-001-00 17528 Talbot Road Proposed Residen6e I August 2, 2012 Page A-3 A Geotechnical Engineering Or Geologic Report Could Be Subject To Misinterpretation Misinterpretation of this report by other design team members can result in costly problems. You could lower that risk by having GeoEngineers confer with appropriate members of the design team after submitting the report. Also retain GeoEngineers to review pertinent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce that risk by having GeoEngineers participate in pre -bid and preconstruction conferences, and by providing construction observation. Do Not Redraw The Exploration Logs Geotechnical engineers and geologists prepare final boring and test pit logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering or geologic report should never be redrawn for inclusion in architectural or other design drawings., Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk. Give Contractors A Complete Report And Guidance Some owners and design professionals believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give, contractors the complete geotechnical engineering or geologic report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with GeoEngineers and/or to conduct additional study to obtain the specific types of information they need or prefer. A pre -bid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might an owner be in a position to give contractors the best information available, while requiring them to at least share the financial responsibilities stemming from unanticipated conditions. Further, a contingency for unanticipated conditions should be included in your project budget and schedule. Contractors Are Responsible For Site Safety On Their Own Construction Projects Our geotechnical recommendations are not intended to direct the contractor's procedures, methods, schedule or management of the work site. The contractor is solely responsible for job site safety and for managing construction operations to minimize risks to on -site personnel and to adjacent properties. Read These Provisions Closely Some clients, design professionals and contractors may not recognize that the geoscience practices (geotechnical engineering or geology) are far less exact than other engineering and natural science disciplines. This lack of understanding can create unrealistic expectations that could lead to disappointments, claims and disputes. GeoEngineers includes these explanatory "limitations" provisions in our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how these "Report Limitations and Guidelines for Use" apply to your project or site. Geotechnical, Geologic And Environmental Reports Should Not Be Interchanged The equipment, techniques and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical or geologic study and vice versa. For that reason, a GWENGINEER��r File No. 20718-001-00 17528 Talbot Road Proposed Residence I August 2, 2012 Page A-4 P� 0 geotechnical engineering or geologic report does not usually relate any -environmental findings, conclusions or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Similarly, environmental reports are not used to address geotechnical or geologic concerns regarding a specific project. Biological Pollutants GeolEngineers' Scope of Work specifically excludes the investigation, detection, prevention, or assessment of the presence of Biological Pollutants in or around any structure. Accordingly, this report includes no interpretations, recommendations, findings, or conclusions for the purpose of detecting, preventing, assessing, or abating Biological Pollutants. The term "Biological Pollutants" includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and/or any of their byproducts. LJ GMENGINEER�� File No. 20718-001-00 COUGHLINPORTERLUND& is I November 14, 2012 :E Storm Water Reviewer City of Edmonds, WA 121 5' Avenue North Edmonds, WA 98020 RE- Onslow Residence, 17528 Talbot Road Site Storm Water design Dear Reviewer: The Storm Water design for the Onslow Residence at 17528 Talbot Road has been designed per City of Edmonds Development Information bulletin #E72. The parcel is approximately 0.62-Acres in the northwest area of the city. It fronts onto Puget Sound. All of the surface water from this site currently runs directly to Puget Sound through a swale and culvert under the railroad tracks. The existing site has a small piped collection system that is tight -lined to the bottom of a steep slope on the western edge of the property. This system currently collects surface water from roof and driveway areas, and discharges it to the Swale and culvert at the railroad, similar to all the other properties in this area. Current lot impervious coverage is approximately 6,800-SF including the existing house and asphalt driveway. The existing driveway is about 3, 1 00-SF in area. The existing house and driveway were built in 1958, per Snohomish County records. The proposed development will demolish most of the existing house, and build a new one on essentially the same footprint. The existing basement will remain, and most of it will form the basement of the new house. The new house and site improvements will have slightly more coverage, about 4,600-SF total, and the driveway will be replaced, in -place (exempt area). Due to the steep slope at the west of the property, the geotechnical engineer has recommended not infiltrating water on the site, (see the critical areas report by GeoEngineers, dated August 2, 2012). For this reason low impact, infiltrative storm water measures have not been applied to this site. Roof drains, site area drains and footing drains will be connected to the existing storm pipe on the south edge of the property. The slight increase in impervious coverage (less than 1,000-SF) will result in an almost negligible change in run off from the site (see attached calculations). Surface water collected from roof and pavements will be collected and routed to the existing pipe down the hill, this pipe will be intercepted before it goes over the steep slope and directed in a new 6-inch pipe across the neighboring property to a City of Edmonds storm system (@ CB #2-219) south of the neighbor's property. This system is piped down the slope, and crosses the railroad for discharge in Puget Sound. The remainder of the existing storm system from this site to the railroad will be abandoned or removed from the point of connection with the new system to the railroad. The owner J1 n an easement for the new pipe across the neighboring property. NOV 2012 "U"Olm3 DEP crry; 01: el) `IRTMEwr 3TH'EET FILE MOOVJJS 413 PINE STREET - SUITE 300 - SEATTLE. WA 98 101 - P: 206/343-0460 - R 206/343-5691 7 __r3,FL-- Onslow Residence, 17528 Ta1@Rd 2 0 November 14, 2012 During construction TESC measure will be applied as appropriate for season and the type of work under way see the TESC plan and details (C2.00 & C2. 1) in the drawing set. A straw wattle barrier will be installed downstream of the disturbed area, and the existing drive will be maintained for site access. Weather and site dependent changes to this plan may be needed during construction. Vegetated areas disturbed during this re -development will be restored with Compost Amended Soil per City of Edmonds Policy, as detailed in Handout #E72C. When complete, surface water from the new and replaced impervious surfaces will be tight -lined to new offsite system that will connect to an existing City of Edmonds storm system, for discharge to Puget Sound. The slight increase in impervious coverage over the existing site conditions will not result in any significant change to surface water rates or quantities discharged from the site. Due to the steep slopes, infiltrative low -impact storm water mitigation measures are not proposed, based on geotechnical engineer's recommendations. Please contact me if there are any questions regarding the site and drainage design of this project. Sincerely, C:oughlin fFPo r Lundeen, Inc. Kenneth A. Wiersema P.E. COUGHLINPORTERLUNDEEN ZWV, W6WW%mMUlMrUK I tKLUMUMILM inc. M m vi S: CA > 10 OR D m z 0 r) !o. a% a. c� M �j m 00 m 0 rt 0 0 r m D OrQ D :3 m cx Go A m (D 0 0 3 A 11) co m R=5679.65 SSMH A--0*27'30" (LID IS MARKED - - - - - - - - - - - - "WATER METER") WFIR TREES AND SHRUBS 6"JDEC ON SLOPE CLF IS 1.2's 44.72 45.17 OF PL 4, 2 CED 48.1 _T_ Fl R- 6'SEWER EASEMENT REC. NO 2114679 10' MINIMUM SIDE SETBACK (SIDE SETBACKS MUST TOTAL 35' FOR BOTH SIDES) MH R z U Ln l 2 D 3.� 61DEC -12?�]'_E AR_ SETBACK kSS-_�52- , �, �41 0 , �51 55�15 55.1 L=54.85 R::=1860.08 A== 1 '41 #22 'i o"qON[- 45�68, ,16.45 _16"CON 47.7 0 47.58 - 48. 4960 5o' CLIF IS 0 0. 0.33 OF PIL 51 1.06 5 52.69 5,135, - �3,5 \\40 SSMH(R) t 55.61 56.87 55.37 /10 UUN 0 r 6-3- 61 �6� 67 lo, mil 7-x 4 x.63.6 A SIDE S L4 4 'Co 4' X 63. �04.141 (SIDE 16XCON F,4 36 65.67 01 MUST 6087 -4. FOR B 6568 6 5.66 Ul Ul 65 7 65.63 &6-LS.C_AP WOOD 7 X66 66.83 RE=86.3 PUMPHOUSE x 66.55 66 95 PIERCE m 0 66.74 '16. 1 17530 TALBOT RD 1-STORY HOUSE CS rn 66.96 6, 65.97 PCL# 00594400003200 1> 0 56,5 00 m ONSLOW 66.33 � �" i"; .1� 0) (.4 RE=83.1 17528 TALBOT RD RE= 4" CO 67.47 1-STORY BRICK HOUSE cq 66 73 I)Arr, (Zr) PT C) PCL# 00594400003100' 1,1,5 - FFE=68.6 4" 17 XO 0 p Irri 1- E TIL Ln I> PCL# 69.927 0 27.2 0 z z 68,38 A > I 6&99 PLANTER jo 8.27 "1 0 N) p 68.43 ul 70.21 FFE=68.4 1 ON--- 68. 23.9 7M3 - 68.7 68.36 68,40 70.61 9 f 0 "co 71.19 < 7 4 "CON I io� - --N) 301, 0 0) 11 C N --ph. (A 7 _J 7 1 cy) 71 40 72.78 14 C-0 79.56 3. 2 Ra: "CON Z: % 8 Eb m _Vc 76),7q' '0 ASS �C N TCED 2 2 J �,-.6 CED - 5 54 I- " i - ____ CLIF IS 0. 5,'l 10-1 D 25' STREET SETBACK A. 4 & 0.7�E- I r -PL QN Z 1 co "CON-- 7 1 6 D IEC A A�4 - I-L cn -A F 87.24 C% COL V. EDbE 8 sc El COLJ (,o COL A x - 8 5 5`0- 53 UP EB 87.69 80.43 16 LSCAPE li'o- E7, Is 6 87.46 CLF is 0.1 83.Z X__ 86: 1--x &00 1.98 3.84 85. 118 IL 0 80.30 & 0.9'E/ OF PIL 182.06 82.79 EYPAD )),85.21 Vo A 4-9- Ui ..87. 88.23 < ao.nn 2 5'UTILITY ASEMENT PER PLAT (D W(RY1 LANE S IPE 7 / ___T_ x K_ 82.25 84.35 86.21 87.64 88 38 03 Cn (D I --I m m 0 L<. m CC) (o X. 0 m cn ". 0 < 1p 3 -0 5F 00 CD cn n c 4 CD 0 co w 6) n COUGHft PORTER LUNDEEN STRUCTURAL CIVIL SEISMIC ENGINEERING C3 z 0 C, C�l C Z C" cp 9,01- 9 Deck is p C� VF \5 orous, -A C. 0-61 Drain located S54 LOT 30 below. 155,07 ILI 'Porous' )cated 0 MIT A- --6!Q—T Nii-;-L I� —ip LI � -Y. Q, T A—�)r 4�_ 75 n V Z) Nj 4 uj IN < �5 \\, N�' 0 z F-- 0 Z 0< -2 Lr- 0 W 4,43t :j af < _Z5 L, 1? 41 M 0 -0 , 'r� 11� kL Z 0 Nrl en C" C) 00 00 < C� 0 IS$ F IN 10 112 LF 41 SD @ 2" M �9 A-- C 'X-C UL G 3 455'07'W /T 32 Misc Walks and 272J1' 0 3 U C: site stairs z 1 11 so 137-SF z CP s", -"P" J all- Sj C) z 0A New House & Garage 4,438-SF Replaced Drive 3,038-SF C� Misc Paving & Stairs 137-SF Total impervious -7,660-SF Pnoject: Onslow Residence, Edmonds, WA Desis 2 Project No: Client Checked By. Sheet 413 PINE STREET - SUITE 300 - SEATTLE, WA 98 101 - P: 206/343-0460 F: 206/343-5691 www.cplinc.com I of EbAf City of Edmon& Site Classification Worksheet 11 4''0 Page I of 2 /,7,. 1 %916 The project's Site Classification will dictate the specific stormwater management requirements applicable to your site. Completing this worksheet will help determine the amount of regulated impervious surface and whether your project falls into the classification of a Small Site (Category I or Category 2), or a Minor Site. Please reference the GlossaLy (Pp. 10- 11), Figures D and E, (pp. 8-9), and Examples (pp. 11-12), to assist with completion of this worksheet. 1) Is Permeable Pavement' Proposed For Use on this Site? El Yes Y No Refer to Stormwater Supplement Chapter 5.1 If YES, the subject area is to be considered impervious for initial site classification purposes. Include total permeable pavement area in the calculation of Non -Regulated, Replaced and/or New impervious surface areas in the table below. 2) Determine the Amount and Type of Existing & Proposed Impervious Surface for the Site Refer to Stormwater Supplement Chapter 2 and Fig. C Line 1: Identify the Non -Regulated Impervious Surface Area. Line 2: Identify the Replaced Impervious Surface Area, dividing the total between Exempt and Regulated; either or both may be zero. Note: For project classification purposes, Replaced Impervious may only be considered exempt under certain conditions. Refer to the Glossary and Figure D. Line 3: Identify the New Impervious Surface Area for your project. All impervious areas created post -July 7, 1977 or after the date of annexation into the City are regulated & should be included in this total unless they can be categorized separately as a Replaced -Regulated area. Line 4: Enter the sum of the total Replaced -Regulated plus the total New impervious areas. Line 5: Identify the total area currently mitigated by an existing city -approved stormwater management system. Line 6: Enter the sum of the value in Line 4 less the value in Line 5 to identify the total Regulated area in which stormwater controls have not yet been applied. Line 7: Identify the total area proposed to be mitigated through the use of Low Impact Development Techniques. Line 8: Identify the total area proposed to be mitigated through conventional Stormwater Management Techniques. ** Provide a copy of the following table on the drainage plan sheet for the proposed project ** Line Type Area (square feet) 1. Non -Regulated None Exempt Regulated 2. Replaced 3,085-SF Driveway 13,715-SF Replaced House 860-SF House & Walks 3. 4. New (Post 1977) 4 4 4 4 4 4 4 4 4 + Total Regulated Impervious Area Mitigation required if in excess of 200 4,575-SF 5. 6. Total Area Mitigated by Existing Stormwater Management System(s) Regulated Area Not Yet Mitigated O-SF 4,575-SF 7. Area Proposed to be Mitigated by Low Impact Development Techniques O-SF 8. Area Proposed to be Mitigated through Conventional SWM Techniques 4,575-SF Note: Due to steep slopes, geotechnical engineer recommends not using infiltrative storm water measures on this site. I (e.g. porous asphalt, porous concrete, paver blocks, concrete open celled paving grids, or plastic lattices filled with turf or stone) Revised on 310512012 E72-SWM—Erosion—Control-03.05.12.doc Page 5 of 12 City of Edmo7ds Site Classification Worksheet Page 2 of 2 OV ED4f 3) Determine the Total Area of Land Disturbing Activity 18,000 sf Refer to Stormwater Supplement Chapter 8 14) Determine the Quantity of Grading, Fill and/or Excavation 341 -cy I 5) Will the project convert 3/4 Acre or More of Native Vegetation to Lawn or El Yes El No Landscaped Area? 6) Identify the Watershed the Existing Site Runoff Discharges to Refer to Stormwater Supplement Chapter 2.3 Based on Site Location and Watershed Map — Figure-C. Check all that apply. A. FX-1 Direct Discharge B. El Creek or Lake Basin ci Edmonds Way Basin 50 Puget Sound Basin ci Puget Sound Piped Basin DETERMINE PROJECT CLASSIFICATION USING THE INFORMATION ABOVE AND THE PROJECT CLASSIFICATION CHART (Figure B, pg 4) N Small Site - Category 1 El Small Site - Category 2 El Minor Site Stormwater Supplement Stormwater Supplement Stormwater Supplement Chapter 5 Chapter 5 Chapter 6 Revised on 310512012 E72-SWM—Erosion—Control-03.05.12.doc Page 6 of 12 Figure-C City of Edmonds WatershedS2 FIGURE 3 CITY OF EDMONDS WATERSHEDS Creek or Lake Direct Discharge (includes Edmonds Way Basin) M" Approximate site 7 location 0 1,0W 2.000 4,OW 6A00 8,000 Feet 1 in 2,000 ft No warranty of any sort, including accuracy, fitness, or merchantability accompany this product. Creek lev it G66""* P-4 45 9 Creek Us Creek /�-4— �4& JtL1I I I L N A larger version of the Edmonds Watershed Map is available in the Development Services Office and on the City of Edmonds website at ci.edmonds.wa.us. Revised on 310512012 E72-SWM—Erosion—Control-03.05.12.doc Page 7 of 12 Figure-D What Qualifies as Replaced Impervious Surface? Determining Replaced Impervious Surface Area (Small and Minor Sites Only) Yes, Driveway, Most of new house Is the tmpervious Area being is on existing removed and replaced with new No Area is NOT considered REPLACED footprint slight impermeable surface in the impervious surface area expansion of house same footprint? coverage Refer to Figure E for regutaffon of Now InWar vtous %tface *eas Yes Yes,House Was the existing impervious area created dates to prior to 7/7/1977 1958, Per or County prior to the date the parcel was annexed from Records Snohomish County? No k Yes Is parcel zoned I � Yes Single -Family Residential? No Afea is considered REGULATED REPLACED impervious surface area House Area is considered EXEMPT REPLACED Impervious surface area Driveway ON Does the replaced impervious area replace an existing driveway, walkway Dr patio in the same footprini AND will it remain the same use after replacement? No Revised on 310512012 E72-SWM—Erosion—Control-03.05.12.doc Page 8 of 12 10 0 Figure-E Regulation of NEW Impervious Surface Areas for Determining Site Classification Does the site have any existing impervious surface areas that were created on or after �CNo after July 7, 1977'? Yes Have City -approved stormwater controI63 been applied to all of the existing Yes Impervious areas? For example, does the site have an existing stormwater management system that collects stormwater runoff Irom all of the exisfing impervious surfaces? No Does the existing impervious area (not managed by an existing stormwater system) exceed 2,000sf? No All impervious surface areas created on or after July 7,19772 Plus All impervious surface areas proposed with the project will be regulated as Now Impervious Surface Area Were the existing Yes impervious areas constructed pdor to the parcel being annexed into the City? I No Only those areas proposed vith the project that are to be converted from pervious surfaces (native vegetation, etc) to impervious surfaces and permeable pavements will be regulated as Now Impervious Surface Yes Was a waiver from the requirement to install a stormwater management system granted for the existing Impervious area? No Yes Note: For the purpose of this flowchart, it is assumed that all existing impervious surface will remain after the proposed project is complete. If any existing impervious surface will be demolished for this project, the project may contain a combination of new and replaced impervious surface. See Glossary, p. 10- It. Mitigation requirements are based on the total cumulative impervious area created on a project site since July 6, 1977, the effective date of the City's first drainage control ordinance. For parcels that were annexed into the City after this date, the date of annexation shall substitute for the effective date of the City's first drainage control ordinance. For annexed parcels, a functioning Snohomish County -approved stormwater management facility can substitute for a City -approved facility. Revised on 31051.101.1 E72-SWM—Erosion—Control-03.05.12.doc Page 9 of 12 .11/14/12 12:51:34m Coughlin, Porter, Wdeen Inc. page 1 Onslow Residence 17528 Talbot Road BASIN SUMMARY BASIN ID: NAME: Proposed 100-yr SBUH METHODOLOGY TOTAL AREA ....... ;: 0.41 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 3.20 inches AREA..: (q_!_'2_4-Kdk6i9 TIME INTERVAL .... : 10.00 min CN .... : 90.00 98.00 TC .... : 30.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: ;-0_.'2_0_Cfs, VOL: 0.09 Ac-ft TIME: 480 min -BASIN ID: 1�01G--old,1 NAME: Existing 100-yr SBUH METHODOLOGY TOTAL AREA ....... : 0.41 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 3.20 inches AREA..: _Adfe.§ 0 _. 11 -5 A-c-- A_:�47, TIME INTERVAL .... : 10.00 min CN .... : 90.00 98.00 TC .... : 30.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: LO:� VOL: 0.08 Ac-ft TIME: 480 min L, W\ rcw's-v v0v J vk_1 < '40 v 4, PA - F--r'�tto-oluus, 111 3 Z-S- 'SF AJ A -A-) 00 Neti "Pe'gitc,"s 1! 1 0� 5 F 6, 2-4- - 4e- 100_7�_5tce, #E72 City of Edmonds Development Information STORMWATER MANAGEMENT (SWM) DRAINAGE SYSTEM DESIGN, AND EROSION & SEDIMENT CONTROL REQUIREMENTS Stormwater runoff from development, redevelopment, and construction sites is regulated under Edmonds Community Development Code (ECDC) Chapter 18.30, including Exhibit A: Edmonds Stormwater Code Supplement (Supplement) and 2005 Department of Ecology Manual Overall Stormwater Management Approach This handout contains an overall summary of the requirements and options available to assist an applicant in designing, constructing, and maintaining stormwater Best Management Practices (BMPs) in the City of Edmonds to meet the intent of ECDC 18.30. The Stormwater Code Supplement is available for use in our Development Services Department as well as on the City's Website (www.edmondswa.gov . Please refer to the Supplement for a more detailed explanation of each requirement. Applicants are encouraged to use the Classification Worksheet on page 5 of this handout to help determine the requirements for their project. Step I — Determine Applicability The first step is to determine if the Stormwater Management code applies to your project. Use Figure -A, page 3, in this handout to establish whether your project or site meets any of the criteria for "applicability". Step 2 — Determine Your Project Site's Classification and Watershed Determine if your site is classified as a Large Site Project by using Figure-B, page 4. If you have a Large Site Project, you do not have to fill out the Classification Worksheet, page 5 of this handout. If you do not have a Large Site Project, use the Classification Worksheet, page 5 and Figure-B, page 4, to determine whether your project is considered a Small or Minor Site Project. For Small Site Projects, you will further need to determine whether it is a Category I or a Category 2 project. Next, identify the watershed for your Small or Minor Site project using the City of Edmonds Watershed Map, Figure-C, page 7. This will clarify some of the site -specific requirements in Step 3. Step 3 — Determine the Minimum Requirements Needed and Where on the Site They Apply found on page 2 of this handout. For specific site requirements for each classification refer to Stormwater Code Supplement. Step 4 — Plan Your Site and Select BMPs Plan your site and select BMPs as described in the Supplement to meet or exceed the minimum requirements for your project. Step 5 — Submit Reports and Plans for Review Submit all required reports and plans for review. The handout for the appropriate classification of your project (Large, Small or Minor Site) will provide information regarding the submittal requirements. The stormwater submittals will be reviewed concurrently with all other permit submittals. Revisions to reports and plans may be required per City of Edmonds review. Step 6 — Construction Erosion & Sediment Control Measures must be inspected and approved by the City's Engineering Division prior to the start of construction. The project shall be constructed per approved plans. Any changes proposed to the approved plans must be submitted to the Engineering Division for review and approval prior to construction. Step 7 — Operate and Maintain BMPs The minimum requirements are based on the Operate and maintain BMPs as required by the project classification determined in Step 2. A approved submittals. summary of the Minimum Requirements can be Revised on 03.05.2012 E72-SWM—Erosion—Control-03.05.12.doc Page I of 12 Overview of Stormwater Management Minimum Re(juirements Depending on the type, location, and size of the proposed project, different combinations of these minimum requirements apply. The following is a brief list of the overall Minimum Requirements for Large, Small, and Minor sites. Please refer to the Stormwater Code Supplement for additional information. LARGE SITES — Stormwater Supplement Chapter 4 A project or overall development involving I acre or more of land disturbing activity would potentially require the following Minimum Requirements: 1. Preparation of Stormwater Site Plan 2. Construction Stormwater Pollution Prevention Plan 3. Source Control of Pollution 4. Preservation of Natural Drainage Systems and Outfalls 5. Onsite Stormwater Management/Low Impact Development Techniques 6. Runoff Treatment 7. Flow Control 8. Wetland Protection 9. Operation and Maintenance 10. Offsite Analysis and Mitigation 11. Financial Liability SMALL SITES — Category I and 2 - Stormwater Supplement Chapter 5 Small Site Minimum Requirements, Ws 1-11 listed below, may be required for projects that involve: 02,000 square feet (sf) or more of regulated new plus replaced impervious surface; or B) 7,000 sf or more of land -disturbing activity; or Q50 cubic yards (cy) or more of grading, fill or excavation; or D) Conversion of 3/4 acre or more of native vegetation to lawn or landscaped area; or E.) Causes an increase of 0. 1 cubic feet per second (cf/s) or more in the 100 year flow frequency from a threshold discharge area. 1. Preparation of Stormwater Site Plan including: 2. Erosion and Sediment Control Plan 3. Source Control of Pollution 4. Preservation of Natural Drainage Systems and Outfalls 5. Onsite Stormwater Management/Low Impact Development Techniques 6. Runoff Treatment MINOR SITES — Stormwater Supplement Chapter 6 7. Flow Control 8. Wetland Protection 9. Operation and Maintenance 10. Offsite Analysis and Mitigation 11. Financial Liability A project that involves 500 sf or more of new development or redevelopment including land - disturbing activity or a utility project that causes land disturbance, and is not considered a Large or Small Site Project, must employ Minor Site Construction Stormwater Pollution Prevention Practices. Additional Requirements may be imposed to meet the intent of the Stormwater Code based on site specific factors. Note: Terms in bold italics are described in the Glossary on pages 10-11. Definitions are found in ECDC Chapter 18.30.010 and the Stormwater Code Supplement. The information presented in this handout (E72) should not be used as a substitute for City codes and regulations. The Edmonds Community Development Code (ECDC) may be viewed at www.edmondswa.gov The applicant is responsible for ensuring compliance with the fees and regulations that are applicable at the time of submittal. If you have a specific question about a certain aspect of your project, please contact the Engineering Division at 121 Fifth Avenue North, (425) 771-0220. Please note that other local, state, and/or federal permits or approvals may be required. Revised on 03.05.2012 E72-SWM—Erosion—Control-03.05.12.doc Page 2 of 12 Figure -A Determining Applicability of Stormwater Management Code ECDC Chapter 18-30 If any of the descriptions in thg Blue Boxes apply to your project or project site, the Stormwater Management Code applies. Does your Project Site require the issuance of a City permit under any of the following: ECDC Title 18 - Engineering Division ECDC Title 19 - Building Division A Stormwater Permit2 No Are you submitting a Subdivision application per ECDC Chapter 20.75? 1 No Does your Project site involve any of the following: 500 square feet or more of land - disturbing activity, new impervious surface, or replaced impervious surface? A utility or other construction project consisting of 500 lineal feet or more of trench excavation? Is located in, adjacent to, or drains into (currently or as a result of the project) a Critical Area or a Critical A No Stormwater Management requirements of ECDC Chapter 18.30 are not applicable to your Project or Site 1 Yes Yes Stormwater Yes Management requirements of ECDC Chapter 18.30 are applicable to your Project or Site. Note: The definitions of the terms in italics are found in ECDC Chapter 18.30.010 and the Stormwater Code Supplement. This chart provides an initial screening for determining the applicability of ECDC Chapter 18.30. The results from using this chart do not substitute for a determination of applicability by the Public Works Director or Designee per ECDC Chapter 18.30.030 and the relevant portions of the Supplement. If ECDC Chapter 18.30 is applicable to the proposed project and it does not require any other City -issued permit, a Stormwater Permit and associated fees will be required. Revised on 03.05.2012 E72-SWM—Erosion—Control-03.05.12.doe Page 3 of 12 Figure-B Project Classification If you have determined that the Stormwater Management Code applies to your project (Figure -A), follow the Blue boxes in the chart below to determine the Classification of your project. Does the project involve I - acre or more of land - disturbing activity' ? Is the project part of a larger common plan of development or sale where the total disturbed area for the entire plan will total I -acre or more of land -disturbing activity? Does the Project involve one or more of the following: 2,000 square feet (sf) or more of new impervious surface, regulated replaced impervious surface or new plus regulated replaced impervious surface? OR 7,000 sf or more of land -disturbing activity? OR >50 cubic yards or more of either grading, fill, or excavation as defined in Chapter 18.40.000 ECDC? No Minor Site Project: See Stormwater Supplement Chapter 6 for specific requirements Large Site Project: See Stormwater Supplement Yes Chapter 4 for specific 0 requirements. Does the project create or add 5,000 square feet or more of new impervious surface, regulated replaced impervious surface or new plus regulated replaced impervious surface? OR No Convert 3/4 acre or more of native vegetation to lawn or landscaped area OR No Through a combination of creating effective impervious surface and converted pervious surfaces, causes an increase of 0. 1 cubic feet per second in the 100-year flow frequency from a threshold discharge area as estimated using an No approved model? Category 1 Small Site Project: See Stormwater Supplement Chapter 5 or specific requirements Yes Category 2 Small Site Project: See Stormwater Supplement Chapter 5 for specific requirements Notes: Terms in bold italics are described in the Glossary on pages 10- 11. The definitions of the all terms in italics are found in ECDC Chapter 18.30.0 10 and the Stormwater Code Supplement The Classification flowchart assumes the project in question meets the applicability requirements of ECDC 18.30.030. Land -disturbing Activity: Any activity that results in the movement of earth, or a change in the existing soil cover (both vegetative and non -vegetative) or the existing soil topography. Land disturbing activities include, but are not limited to grading, filling, excavation, and compaction associated with stabilization of structures and/or road construction. Revised on 310512012 E72-SWM—Erosion—Control-03.05.12.doc Page 4 of 12 BURLINGTON NORTHERN RR L=45.43 (100' RAILROAD ROW) R=5679.65 SSIMH MARKED (ii", I (' ! - L==54.85 A---0'27'30" -­ �g ... . ...... R=j VVA I'El- e m:.lJ-e 860.08 *41 '22;1 1,8)'FIR TREES AND SHRUBS f ON SLOPE I CLF IS 1.2'S 44.72 48 OF PL A-405 ........ . .......... .. 45.17 4 .18 . . ............ ........ . ......... .......... . ....... JO CED 45.08/ ................ 46.45 EQE .... .............. I - 11111. 11511CON 4 8. 7- 47.*8 .. .......... ...... -, -: 'zz 6'.DE ­7 ........... "7\' ....... ... 6'SEWER EASEMENT-e-�' ....... ....... 49.60 49.(51 CLIF IS REC. NO 2114679 z ................ 4-1Z.- 0.2'N 49.51 ...................... ............................... . . Cn 5033 OF PL .25' REAR ................................................ . ..... 5-1 ................. 01 2 ---GRASS� ..................... --'52 ....................... - ...... .......... 52.69 . . . ............. 5-3- ...... . ........ 53.5� ............... 53.35 ............ . . ... . .......... 53, .5398 ... . ......... . ....... 54.10 54 10' MINIMUM 5.13. ...... ...... 55.6 515 ......... SIDE SETBACK 55.37 (SIDE SETBACKS ..... .... ... - /-. 56.87 .......... MUST TOTAL 35' 6.58 0 q.,2 .. ........ FOR BOTH SIDES) ..... ... ........... . . . ...... 59. 592 6-1 �:S F w. 60-9 ........ X.. 6 N ...... 6.2. ............ . .. .... o r- / ..;; -, ' "I ...... ...... 0. ...... ............ .......... 63.61 6 10' M I N I M U M ........... x ........... . . ........ U :,.X-63.67 SIDE SETBACK -.4 C x 4.14 (SIDE SETBACKS _v.75 ............ 64+- ................ CON W MUST TOTAL 35' 65.6 A 6 4.36 65.68 66-5 ..... ...... : 11 Ln Cn 60.87 FOR BOTH SIDES) 5. ;�P -�'. " ; 1, � 01 65.77 65.63 E 8T - WOOD m x Xjl.�.A� 66.83 DI MPHOUSE lu RE=86.3 0 63.40 00, 0 x66 �75 66.95 67.21 CS 67.17 rri 66.74 / L4 17530 TALBOT RD 0 97 CS 1-STORY HOUSE 66.80. r 67 PIERCE L4 Im 66 65.IJ7 PCL# 005944000032 55.5 00 m ONSLOW 66.33 17528 TALBOT RD RE=86-0 7C P RE=83.1 0 1-STORY BRICK HOUSE 67.47 Co 66.73 2465 SO. FT. 0 PCL# 00594400003100 rri 11.5 EWING FFE=68.6 L4 17522 TALBOT RD 0 m ...... irri > 1-STORY HOUSE .9 EM TILE\-, Col. PCL# 00594400003000 69-9Z 27.2 - - 0 r r 0 0 0 z 68.99 ........... < > ....... . ...... PLANTER .27 68.43 0 CD J 9.61 70.21 1 7i FFE=68.4 ON-�, '66 .6 .-Eig -k�� 68 �,9 vdom 23.9 j ... ......... - ...... .... 70.63 613.4,0 4 70 ... . ..... .. ..... . . .. . . .......... I . .. ........ . 0 .37 '.:A . . ..... .. ... . ..... ..... a N 71.19 --- - -------- - ...... . ........... . . ...... . .. 4, 19 . ......... [N 24"dbN' 0) .......... X 126"C ;o 00 72.40 '?d x;.:.. - �11 . ............. . ......... 72.78 A 4 1...., : . - .......... ........ I . . . . . . . . . . 79.56 C), ........... .......... -R 0 1 2 731 7 6 q (A ON" _24. Mr. C 16 GED .. ... . . ..... ...... �-7 'IX:�X GRASS cow" 2.ZCON -CED 90 7 8. T ka, ;8 Q-CED CLF IS O.!�-N 25' STREET .7 4- 0 SETBACK .0 x....86.39 r QF- L ..... ...... 10: CON 4 6"CON' 6 D 4 n C% COL 14JEb CO 87.0 9 UP W�Xxx -'�*OXX .......... ............ A OHP/T :���jfj ; 1'...." 17 SCAPE -99 x87.80 ... . ..... ........ L .. .... %0 0 CLF I$ X83.2 & 0 'Ej" NEW N) 60.30 -9'E f j" PL i 8206 8279 P D,, Sr 21 FIF '.7 * 4 -'. 9� 88.23 '68.81 ul ............... n" W(R)- 2 1"HOLE (NO MON) TALBOT RD 5'UTILITYZASEMENT PER PLA TI/ IN CONC CASE, (DEDICATED PUBLIC ROW) LANE.STRIPE.- DN 1.0 x -A ? 84.35 T- 86.21 87.64 8878 9.13 82.2 S35-04'53"W 80.57 5 C p LEAD PLUG W/NAIL 00 Go w Ln 4� IN CONC CASE, 351.24'(MEASURED) .. ............ dp/ DN 1.0 x 88.32 351.47'(PLAT) 89.28 .. . ............ ....... ......... . ................... . 3.71 86.30 80.89 89.52 .......... MAILBOX----' 82.66 ....................... Alin' -m'�32 X89.92 lk m r% MI LEGEIVIU AREA DRAIN CON CONIFEROUS TREE PL PROPERTY LINE WINDOW WELL DEC DECIDUOUS TREE (P) PAINTED UTILITY LOCATION ASPHALT (ASPH) 0 DECORATIVE STONE 119 CATCH BASIN DWY DRIVEWAY (R) RECORD DATA BUILDING LINE ECd ELECTRICAL CONDUIT (BURIED) BUILDING CORNER CENTERLINE ROCKERY CONCRETE SURFACE (CONc) EM ELECTRICAL METER RE ROOF ELEVATION .4 FOUND MONUMENTIN CASE SD/SS STORM DRAIN/SANITARY SEWER A ASPHALT WALK (9� CONCRETE RETAINING WALL FFE FINISHED FLOOR ELEVATION SSMH SANITARY SEWER MANHOLE CONCRETE CURB G GAS MAIN TCd TELEPHONE CONDUIT (BURIED) CONC,/IRON PIPE GM GAS METER TRAFFIC FLOW DIRECTION @ HOSE BIBB CHAIN LINK FENCE (CLF) IE INVERT ELEVATION UPO UTILITY POLE (WOOD) COLUMN (BRICK) 0----0 LIGHT POLE (WOOD) W WATER MAIN CONG. STAIRS I-SCAPE LANDSCAPED AREA EB WATER METER CEDAR TREE OHP/T OVERHEAD POWER/TELEPHONE WATER VALVE 20 0 10 20 1 i ME ME IN FEET I inch = 20 ft. SITE NOTES ZONING: RS-20 176TH _j LLI < F- SITE 05 03 Co 196TH AVE SW FAA NO SCALE llwt� I I SITE ADDRESS: ZONING AGENCY: 17528 TALBOTROAD CITY OF EDMONDS EDMONDS, WASHINGTON 98026 DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION 121 5TH AVENUE NORTH TAX ACCOUNT NO.: EDMONDS, WA 98020 00594400003100 (425) 771-0220 SETBACKS: CURRENT SETBACK REQUIREMENTS SUBJECT TO SITE PLAN REVIEW. CURRENT SETBACKS MAY DIFFER FROM THOSE IN EFFECT DURING DESIGN/CONSTRUCTION OF EXISTING IMPROVEMENTS. THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY BY THE GOVERNING JURISDICTION INDICATES THAT STRUCTURES ON THIS PROPERTY COMPLIED WITH MINIMUM SETBACK AND HEIGHT REQUIREMENTS FOLLOWING CONSTRUCTION. FLOOD ZONE: THIS SITE APPEARS ON NATIONAL FLOOD INSURANCE RATE MAP, DATED NOVEMBER 8, 1999, COMMUNITY PANEL NO. 53061C130E, AND IS SITUATED IN ZONE "X", AREA DETERMINED TO BE OUTSIDE 500 YEAR FLOOD PLAIN. HORIZONTAL DATUM: NAD 83/91 VERTICAL DATUM: NAVID 88 AREA: SITE AS SHOWN CONTAINS 26,873 SQUARE FEET OR 0.6169 ACRES, MORE OR LESS. SUBSTRUCTURES: BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORDS MAPS FURNISHED BY OTHERS AND VERIFIED WHERE POSSIBLE BY FEATURES LOCATED IN THE FIELD. WE ASSUME NO LIABILITY FOR THE ACCURACY OF THOSE RECORDS. FOR THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL TO DESIGN CONTACT THE UTILITY OWNER/AGENCY. TELECOM M U NI CATIONS/A BER OPTIC DISCLAIMER: RECORDS OF UNDERGROUND TELECOMMUNICATIONS AND/OR FIBER OPTIC LINES ARE NOT ALWAYS AVAILABLE TO THE PUBLIC. BRH HAS NOT CONTACTED EACH OF THE MANY COMPANIES, IN THE COURSE OF THIS SURVEY, WHICH COULD HAVE UNDERGROUND LINES WITHIN ADJACENT RIGHTS -OF -WAY. THEREFORE, BRH DOES NOT ACCEPT RESPONSIBILITY FOR THE EXISTENCE OF UNDERGROUND TELECOM MUNI CATI ONS/FIBER OPTIC LINES WHICH ARE NOT MADE PUBLIC RECORD WITH THE LOCAL JURISDICTION. AS ALWAYS, CALL 1-800-424-5555 BEFORE CONSTRUCTION. UTILITY PROVIDERS: SANITARY SEWERS, STORM DRAINAGE, WATER CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION 121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX: (425) 672-5750 POWER: SNOHOMISH COUNTY PUD 1802 75TH STREET SW MAILING ADDRESS: PO BOX 1107 EVERETT, WA 98206 (425) 347-4300 TELEPHONE: VERIZON 2312 WEST CASINO ROAD EVERETT, WA 98204 (425) 356-4009 NATURAL GAS: PUGET SOUND ENERGY 355 110TH AVENUE NE BELLEVUE, WA 98004 (206) 425-2000 (888) 225-5773 SANITARY SEWERS, WATER OLYMPIC VIEW WATER AND SEWER DISTRICT 23725 EDMONDS WAY EDMONDS, WA 98026 (425) 774-7769 FAX: (425) 670-1856 DESCRIPTION: LOT 31, PLAT OF TALBOT PARK, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 12 OF PLATS, PAGE 107, IN SNOHOMISH COUNTY, WASHINGTON. TITLE REPORT REFERENCE: THIS SURVEY WAS CONDUCTED ACCORDING TO THE DESCRIPTION SHOWN,, FURNISHED BY FIRST AMERICAN TITLE INSURANCE COMPANY, COMMITMENT NO. 4229-1479644-A, DATED NOVEMBER 19, 2009. THE EASEMENTS SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT. NOTE: EASEMENTS CREATED OR RESCINDED AFTER THIS DATE ARE NOT SHOWN OR NOTED HEREON. TITLE REPORT SCHEDULE B EXCEPTIONS: ITEMS CIRCLED ARE SHOWN ON MAP. (-­� ANY AND ALL OFFERS OF DEDICATION, CONDITIONS, RESTRICTIONS, EASEMENTS, FENCE LINE/BOUNDARY kl�j- DISCREPANCIES, NOTES AND/OR PROVISIONS SHOWN OR DISCLOSED BY PLAT OF TALBOT PARK RECORDED IN VOLUME 12 OF PLATS, PAGE(S) 107. 3. COVENANTS, CONDITIONS, RESTRICTIONS AND/OR EASEMENTS: RECORDED: JULY 09, 1948 RECORDING NO.: 885328 EASEMENT, INCLUDING TERMS AND CONDITIONS CONTAINED THEREIN: GRANTED TO: CITY OF EDMONDS ZONING: UTILITY OR UTILITIES RECORDED: SEPTEMBER 25,1969 RECORDING NO: 2114679 CERTIFICATION: SURVEY IDENTIFICATION NO.: 2012007.00 REGISTERED LAND SURVEYOR NO.: 30448 SURVEYOR'S ADDRESS & COMPANY: BUSH, ROED & HITCHINGS, INC. 2009 MINOR AVENUE EAST SEATTLE, WA 98102-3513 TELEPHONE: (206) 323-4144 DATE OF PLAT OR MAP: - DARRELL C. NANCE, P.L.S. NO. 30448 THE ABOVE CERTIFICATE IS BASED UPON WORK PREPARED IN ACCORDANCE WITH GENERALLY ACCEPTED PROFESSIONAL SURVEY PRACTICE. WE MAKE NO OTHER WARRANTY, EITHER EXPRESSED OR IMPLIED. C. 05 WA 0 W ly- 304-48 R E I V E D 61 GIST L L AUG 2 7 2012 DEVELOPMENT SERVICES COUNTER 0 �e V) C) _j < 0- LLI LL CL -j LL LL LU L) D U) LLI co 12� LU w 4' 17' IL ILL ILL 10 tn D S54-5��&"E V, fIr CO IM 0 0 , - A 0 0 Cox A, A 04 CO 0 \I I ,, 671.3- r '41 0 Y/ �10? U 7, cl: L ffq TREWS I f DECIC Ih I z o w a 0 Q!f M FS �e w- /I I En w- U.) AG 7a 0 67.3 6110 51&; LIJ cn a: 7L W Z U) :3 g 0 b co 0 z z V) 0 T DEC /7// ZII 01 P k +69 L0 too \Nn C +%,I . Ld to 04 0 1 b P Lo I Ab -Z N NIT) g L N.' -31 18 I ;z;J 41 ---------------------- LIT 30 CjD .1 1 1 �69.79 70.21 +!f9 6- -6i. -7 69.104- PROPOSED HOME 5 FIF 69.83 69.0+1 1 )s D1 01 81-0 1/?" N 4 'DEC DEJ cDI 7j\ 0 A ��50. C 141- �,6 U _1 -5 t; A ---------------------------------- EAVE ---------------- 1 1 #'CO - N 0- N 0 U) Z r- ( "I Uj __j cn c,4 w 0 z Cj w W Ir @ SITE PLAN 1 11=201-011 Cy 0 C I" < Y� 0� N,,� 0 \B9- ­L6 > oAe� , - "', -0, I'll N -N,, \< Lq 77 41 - -fi72. Ml 11 1 -1 _)I LJ F= 15 1`, ( - \TP, -J\ ? a- .0 0� y/,X= N a. 00 1j\ X (I- \ PROPOSED \\ I LLJ V" < GARAGE 10 FIF = 70.25 t-� ccl- CnII v D.11 - - - - 0 P-\,, 3: LIJ z AH N� 2 to 9.29/ k j Z Ln > �2 DFAVE f-1 OP, 00 -0c) 04 Q => "f `) 1 0 0 M Ld LLI D tF68.8 /2<4N -84- - 0 v 4­- \ M I I +69.0 T -1 --83- CB Rl� @ 82.6' IS -7 t HEIGHT, CALC A// DATUM POINT, w -Lw ACTU ELEV &2 A t, Cn -i X -- 0- 1 0 -JE1 b L, -, 'I 0 0 0 1 09-- 1\ < I => *The City of Edmonds joeo #V�, f(Vif-w, aPPrOvb- issue permits fDr, or 1p4pect (W(efies- APPrOV81 of these plans or Inspection oAd eipproval of the work Included In these pjorj� &a not constitute City qpvM of Of rockefts Is prohlblW. OotlWit t�6 * City Of Edmonds under oe �i*0016i!Whces 8nd In certain situations p6r,110% 18 .40.020.w 1A \jyj 85'-10 U 86 Q D -T -T - TELEPHONE/CABLE -09 -03 - GAS -V -V -WATER - E - E - ELECTRICAL POWER - 9T - 3T - STORM WATER LINE PURVEYOR: GAS: PUGET SOUND ENERGY POWER: SNOHOMISH PUD WATERISEWER: CIITY 0 F EDMONDS N -JOI 0 U 2 5' 2 5' MAXIMUM DRIVEWAY SLOPE i ALLOWED 149/6 01 -A. -t- /k4,Z -7-0 7o L,014-h � ) rOVtJ Vnd-w.aAy 0 U aw UY0 < CIO ILL LU rA MIC16 LL ru U IL) B9- LU 00 U) L1j co w t z EAVE F- Uj if] coLL L-LI -------------------------------------------------- ? 0 LL t1j LL 0. 0 af L) C) 0 LOT 30 0 (L* 0 L 4-d) > 0 LO rA -4 0. /L�)4�- 31 -nii LV L 7/ Y --- C 1 00 -3. .5 3.6 1.411 L 04 9­ r 41 11N.,14 -1. &17 69 0. 0� L1\ IV) CRAWL PROPO 1<11 < h 2� EXIST y f GARAG V) 66.3 GRADE 60.6 locy C FF 70 U� U) Lj D 7 < z 0 F-1- 6 )\- < 162CY LL U Wo �2 PROPOSED F1 it t �,( HOME M D I I I. .. 0 FIF 69.83 0 29CY 16C 12 rlry 7 5C FILL 1-111 4r.Y z C� 64� FILL Cy U) 0 -HLL ILL T F 3C > Ld P- w -85- x DE� L Do I �j DS, OF CO j < CL im LLJ -84- 0 18.5cy U T -6-11\ '*' 47 rER 7 C13 RI @ 82.6'IS I f HEIGHT CALC L -31 DATUM POINT, N1 AGTU ELEV LI LOT 32 0 S2 - 0 EAVE ---------------------------------------------------------- o- f I I M I El I I I 9 1 at 113 C3 L'i :3 3- Lf) < _j 0 CL LC) LLI a� M " 1-1 I P 0 Lr) < < In cn LOT COVERAG E LOCATION AREA HOME/GAR 4,438 DECKS 663 EXTSTAIR 40 TOTAL 5,141 SF IMPERVIOUS AREA LOCATION AREA HOME/GAR 4,438 CONCWALK 97 DRIVE(RCpIaCka) 3,085 EXTSTAIR 40 TOTAL 7,660 SF LOT A REA 26,873 35% ALLOWABLE 9,406 SF SITE INFO: OWNER: DENNY & HOLLY ONSLOW PARCEL #: 00594400003100 ADDRESS: 17528 TALBOT ROAD SEE SHT A3.1 FOR HEIGHT LIMITS ON EXTERIOR ELEVATIONS HEIGHTCALCS A 63 B 72.75 C 63.7 D 68.8 268.25 67.06 Average Grade 92.06 Maximum Height 89.33 Actual Height ENGINEERING DIVISION APPROVE A NOTE Date: CUT & LCULA IONS WEST OF SHORELINE SETBACK CUT= 10 CY FILL = 87 CY TOTAL = c)7 CY CUT = 42 CY FILL = 350 CY rj-�2 TOTAL = 392 CY 11rFAI, qA0J-CC'T cvr-� 15z- G11 = q3-7 C 5 Civil MO((- %V1fiXMa+%0nP PROJECT NORTH N 2605 WESTERN AVENUE SEATTLE, WA 98121 PH: 206-728-0480 FX: 206-728-04.76 WWW.MCCARCH.COM COPYRIGHT 2012 McCLELLAN ARCHITECTS PROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 CLIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 ISSUE: 2012-08-27 PERMIT SET 2012-09-24 PLANNING RESPONSE #1 2012-10-16 ARCH & STRUCT RESPONSE#1A 2012-12-06 ENGINEERING RESPONSE #2A Zone V,- 7-0 ZLZf - Corner -Flag_ Setbacks Reauired Actual Front C Sides 1*J Rear W �,� �31-o 91) 25 3 ..2ci 1 3 e 7- �688 � REGISTERED -L,--�.ARCHITECT 'EGAN McCLELLAN ATE OF WASHINGTON DATE: W 16 OCTOBER 2012 SHEET TITLE: M SITE PLAN SHEET: M SITE GRADING PLAN 1 11=201-011 Applicant shall repair/replace all damage to Ufliftles or frontage improvements In CRY ised right.ol-way per city standards that is cau- - - or occurs during the permitted prc*t. TRUE NORTH N RESUB M DEC 0 7 2012 BUILDING ENT S CITY OrPRODS 9UE�) 2-0 12- - 0 -7 '3 �- _X 9NALF A' A: L R;,; D o V' W DO NOT DISTURB EX x. SANITARY SEWER VIDEO 4 INSPECT PRIOR TO REUSE. PROVIDE REPORT TO CITY INSPECTOR OF . 49 SEWER CONDITION. %Arbh' ME46?) Y 03T T EX HEDGE VERIFY SIDE SEWER A"! y A Y, 4, CONDITION. CAP AND MARK FOR LATER J/ v, "S" RECONNECTION V 86.0 P' ;J 2), ly / �/'/ / /.I....- "?� 1 1Y,22 ZA019T !�0 4 YNA OCATION 7vv "UAr D;/ APPROXIMATE -A ANOON,��,\ 4406, ',00J,67 OF FX OUTFAIL AT rb Sjp.RNVP[1PE 81 W Q 0;1 EWANSTALZAIIVN f P D PROPERTY LIN, Iz S C3.O/l, REMOVE EX HEDGE ;�`7/ TREE." Sv 4M0 V A jo� 4 4UMPHOUSE C',I F jS DEMO PUMP- REMOVE EX HOUSE N", HOUSE A, x 0F PLI SEE ARCH'L FOR PRPTECT 6 FECT w PARTIAL REMOVAL DURING ST REMOVE EX TELEPHONE BASEMENT WALLS w4; 0 - ry DRAR i-SCAPEI COORD W/ PURVEYOR "ZI TAL80T.,.RD ZFOR NEW SERVICE -k' 41b; 1� F1 _91k U, pq�., 00 _X W/ SNOHOMISH PUD Pf '2, L REMOVE EX POWER COORD Z -TEMPORARY 1000, REMOVAL f P POWER AND PERMANENT N. T11 t 'R DGE 100, EMOVE EX ,6E 66 xxxx4- e L) EASEMENT ON 4, EX 4" SD TO 4P xv,: # 0 (ASSUMED DISCHARGE (RECO SEWER RD) 101 ED OVER PIPE) ECT CENTER LOCATE AND PROT FOR REUSE 08p/ 4 CAP AND ABANDON AM EMSSED SURFACES TO /7 Mc!) 'A 7 / V' 2 W3 PIC xxxxxi 7A1,60' P0 V J- 9.. z/ 01 Pal x 00 5 �v - - ---- UID 1.1141.1)1C.P1V.11vP ....... ........ F, .I? Pik I? Pik P Applicant shall repair/replace all damage to -4 416- N) z/ 0i"'! 5 A1,2Y 2 P 9"t Utilities or frontage improvements In City CS RZ.,Y - 52- 1 -o�-way per City standards that is CAUMI 0 j right 4, b 5 X.: xXx:� b/ 1_4 0 A' < I MAINTAIN EX DRIVE FOR r.nN(JP1 Iffinm or occurs during the Permitted projact. IIIIIIIIIIIA0001:01=1101cl 0 VA ile : 0 !v 'Allft 0 0 EVA -1,P0, 1E FOR 1DWNEQJCONTRA0TOR IS �!"Ic EROS01 COUfROL Ai�b DrYdiNIAGE 4, 5ee % ed C Z -�W e5C ttAN SEE SHEET C2.1 FOR GENERAL AND TESC NOTES .............. A\ 4 R, LEGEND EXISTING REMOVE PROPOSED ASPHALT PAVING ASPHALT TREATED BASE (ATB) CONCRETE PAVING BUILDINGS 7/7 F777 F_- GRAVEL La �A RIP RAP CONSTRUCTION ENTRANCE SAWCUT LINE CONSTRUCTION LIMITS SITE FENCE STRAW WATTLE STORM CB W/PROTECTION CURBING ROCKERY CCC-0 Q= TREE W/PROTECTION vk"� CONTOUR (INDEX) .......... M; ............. CONTOUR - WATER LINE .............. vi .............. ............... W STORM DRAINAGE LINE—SP;— SANITARY SEWER LINE ............. S .. ............. ............. . ....... .. .. POWER............... P ............... .............. P ............. TELEPHONE LINE —T— —T GASLINE .............. .............. ............. G .............. WATER METER/VALVE/FHFF-. 1'11HO- >w r -I "r �� STORM CB/MH L J Y V A \VV i o SANITARY SEWER MH/CO "_�' x x GAS VALVE/METER V,1 [,:'2 X X STREET LIGHT ASSEMBLYe,) .......... >< TELEPHONE RISER/MH X AA DATUM ARCHITECT VERTICAL) NAVD 88 McCLELLAN ARCHITECTS HORIZONTAL) NAD 83/91 2605 WESTERN AVENUE SEATTLE, WA 98121 (206) 728-0480 CONTACT: REGAN McCLELLAN LEGAL DESCRIPTION ENGINEER LOT 31, PLAT OF TALBOT PARK, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 12 OF PLATS, PAGE 107, COUGHLIN PORTER LUNDEEN IN SNOHOMISH COUNTY, WASHINGTON. H TE7 7nr) 00594400003100 SHEET INDEX C1.00 DEMOLITION PLAN C2.00 TESC PLAN C2.1 0 TESC DETAILS C3.00 CIVIL SITE PLAN C3.1 0 CIVIL SITE DETAILS C3.20 SITE SECTION -tl,) FIIIL JIRLLI, J I SEATTLE, WA 98101 (206) 343-0460 CONTACT: KEN WEIRSEMA; PE SURVEYOR BUSVi, ROID AND �`IIKNNGS 2009 MINOR AVENUE EAST SEATTLE, WA 98102 (425) 822-4171 CONTACT: DARRELL NANCE APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 1-2�j 10, 1 1 Z- 2605 WESTERN AVENUE SEATTLE, WA 98121 PH: 206-728-0480 FX: 206-728-0476 WWW.MCCARCH.COM COPYRIGHT 2012 McCLELLAN ARCHITECTS 0 413 PINE STREET - SUITE 300 SEATTLE, WA 98 101 P: 206/343-0460 F: 206/343-5691 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION PROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 CLIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 ISSUE: PERMIT SET 2012-12-06 Z� PERMIT CORRECTIONS 26�77V 1 Z10G) I z =;I -.5_1 I "Oj :1 "1 DATE: 14 NOVEMBER 2012 SHEET TITLE: DEMO RESUB PLAN DEC 0 7 2012 oUILDING P WENT OrTy OF SHEET: n-14 NG DIVISION &Z -,,70/2-- 073S-- Call before you DI 9. 8-1 -1 or 1-800-424-5555 UNDERGROUND SERMCE (USA) EX SWALE M RAI eq <' 01 OF f-11 DO NOT DISTURB EX SANITARY SEWER VIDEO /;o INSPECT PRIOR TO REUSE. PROVIDE REPORT TO 5 CITY INSPECTOR OF <5�)- h,9 x, 7 SEWER CONDITION. 1-YA YET,6q) U015T LOTA, 175* Ft. P Xt )ES -0 71 (V 0 LIMITS OF CONSTRUCTION V A MAINTAIN VEGETATION 0 BEYOND LIMITS/ C) RTHWORK All A, 0VO X, A 11Y,22 .7,40,Y)f 0 It 4/1 A ­f/I J J A/I I, —EX BASEMENT TO CAAR AND REMAIN. COORDINATE A 10- 4 GRUB FOR W/ ARCH'L AND 'Z` 49 b, CRAWL SPACE, Ilk STRUC'L x A�- OF P, 41V TREE PROTECTION SEE DETAIL(:�) 2, cy. h" v BOE=68.33 PROVIDE STRAW WATTLE f 13 EE STRUC'L OR OTHER BARRIER FOR FOOTINGS BELOW TRENCH EXCAV6TION N ........... > "v"? aov s", i 7 'ROL STRAW WATTLE 0 X i SEE DETAIL i v f V.— EX EASEMENT ON C2.1 41 14% 441, IS < ER (ASSUMED UNA I ENTERED OVER PIPE) -TRE STOCKPILE 0 4/e$ -E1 PROTECT6 L ISEE IDE� SEE STRUC'L FOR N, (IF NEEDED) 41 DO NOT DISTURB NEW FOUNDATION LA SEWER IN OLD BASEMENT X "N x -s"O"Ry P, OUSE 1�f- 1Y A, 7, A tt� z . 4""'n"c "'i". OF TREE PROTECTION '4 4A ot"'Of., 0i, i 11 2,ip '51, 'rr v SEE DETAIL fit. 74(,;8('J15T!,(P' t.) In v* KAAIKITAINI PY r)PIVP 1 7 p < CONSTRUCTION ACCESS. "1<1 70 F— SWEEP P:yt k" 0 c AS NEEDED TO P, FROM o' PREVENT TRACKING 0 SITE. REMOVE FOR FINAL CONDITION. n 4i < XXXXX" Al TREE PROTECTI z-- "-:I SEE DETAIL Xx c .1 Y.4 &/ o PROVIDE INLET PROTECTION SEE DETAIL �y C 2. 1, .-Ax 'y XX xXxv, Tts "i -.826 N) X L Ay' 6.1 2'�P L 0 UW0k 41 EARTHWORK QUANTITIES. &I EAST OF SHORE LINE SET BACK CUT 42 (CY) FILL 350 (CY) W ST OF SHORE LINE SET BACK '0 CUT 10 (CY) FILL 87 (CY) NOTE: THE QUANTITIES SHOWN ARE PRELIMINARY ESTIMATES ONLY AND INTENDED FOR MUNICIPAL PERMITTING AND REVIEW FEES. THE CONTRACTOR SHALL IGNORE THESE QUANTITIES, THEY ARE EXCLUDED FROM THE BID DOCUMENT INFORMATION. THESE VOLUMES SHALL NOT BE USED BY THE CONTRACTOR AS A BASIS FOR ANY CONTRACTUAL INFORMATION. THE CONTRACTOR SHALL PREPARE THEIR OWN EARTHWORK QUANTITIES BASED ON THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, SPECIFICATIONS, AND THE GEOTECHNICAL REPORT. LEGEND 11 10 20 40 Rom-sm mmm SCALE 1 In =20' EXISTING REMOVE ASPHALT PAVING ASPHALT TREATED BASE (ATB) CONCRETE PAVING BUILDINGS GRAVEL w RIP RAP CONSTRUCTION ENTRANCE SAWCUT LINE CONSTRUCTION LIMITS SITE FENCE STRAW WATTLE STORM CB W/PROTECTION @ CURBING ROCKERY TREE W/PROTECTION CONTOUR (INDEX) ............. /v^ ............. CONTOUR — _Aj— — WATER LINE .............. vi .............. ............... 'N STORM DRAINAGE LINE —cc; — SANITARY SEWER LINE ............. S,3 ............. ............. 11 . .. ..... .. POWER............... p ............... .............. p .............. TELEPHONE LINE —T— — T GAS LINE .............. G .............. ............. .............. WATER METER/VALVE/FHFF--- STORM CB/MH L J SANITARY SEWER MH/CO GAS VALVE/METER STREET LIGHT ASSEMBLYc, TELEPHONE RISER/MH D' ALL EXPME-D SURFACZ5 TO of ijjff;jm 2 DAY3 ENGINEERINQ DIVISION D NOTE A Date: It PROPOSED APPROVED FOR CONSTRUC11ON CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION 2605 WESTERN AVENUE SEATTLE, WA 98121 PH: 206-728-0480 FX: 206-728-0476 WWW.MCCARCH.COM COPYRIGHT 2012 McCLELLAN ARCHITECTS 413 PINE STREET - SUITE 300 SEATTLE, WA 98 101 P: 206/343-0460 F: 206/343-5691 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION PROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 CLIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 ISSUE: PERMIT SET 2012-12-06 ZL PERMIT CORRECTIONS W4 ;6 77 ONAL z DATE: 14 NOVEMBER 2012 SHEET TITLE: RESUB TESC DEC 0 7 2012 PLAN BUILDING DgARIUENT crry OF MONDS SHEET: TOE IN SHEETING IN 4"X4" BUILDING PAD TRENCH A MINIMUM OF 80 SETBACK FROM TOP OF CONVEY RUNOFF TO MAX APPROVED LOCATION. LLJ GENERAL NOTES SLOPE. BACKFILL WITH 10, WASHED ROCK. 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD MIN 4' SETBACK PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL FROM TOP OF SLOPE. PREFORMED CHAINLINK MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: 8' MAXIMUM PANELS WITH CLAMP ADJACENT 1.6" 0 GALVANIZED PANELS TOGETHER - CURRENT INTERNATIONAL BUILDING CODE (IBC) CD METAL SUPPORT POST--------' POSTS AND RAILS - 2010 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION 10' MAX 6'-8' ON CENTER - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN SPACING, MIN 5' HEIGHT (CURRENT EDITION) A, 3' MIN BARRICADE FENCING------------- 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD (ORANGE CONSTRUCTION FENCE) 2' POST BURIAL -y� DETAILS, UNLESS NOTED OTHERWISE MIN 4' HEIGHT SURROUND TREE DEPTH OR GROUP OF TREES AT DRIP 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. LINE OR AS SHOWN ON PLANS >: TERMINATE AT LEVEL ARE -A. PROVIDE ENERGY DISSIPATION :w: NOTES: 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL FOLD UNDER 4" AND AT TOE WHEN NEEDED. GOVERNING AUTHORITY. STAPLE AT 12" INTERVALS. 1. A 4 FOOT HIGH TEMPORARY FENCE MUST BE PLACED AT THE DRIP LINE OF TREES PRIOR TO THE COMMENCEMENT OF ADING INSPECTOR TO GET BOTH THE INSPECTION AND 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" CLEARING OR EARTHWORK. NOTIFY THE CLEARING AND GR NOTES: E INGS FOR WRITTEN APPROVAL OF FLAGGED TREES AND TEMPORARY PROTECTION FENCING AROUND TREES TO BE SAVED PER TH 77 DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAW INGS SHALL APPROVED CLEARING AND GRADING PLAN. y y le v `e `e SUBMITTAL TO THE 0 WNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF ASBUILT DRAW 1. TIRES, SANDBAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC SHEETING. il 11 1, 1 Ill'I 1, 11, A I I I )1 1, BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 2. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12" AND BE WEIGHTED OR TAPED. 2. NO STOCKPILING OF MATERIAL AND NO VEHICULAR TRAFFIC ARE ALLOWED WITHIN THE LIMITS OF THE TEMPORARY FENCING. FILLING, EXCAVATION, AND CLEARING MUST BE ACCOMPLISHED BY HAND METHODS ONLY. SUPPORT FENCE WITH- N WIRE 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 3. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MIL. 3. ROOTS OF TREES TO BE SAVED WHICH ARE DAMAGED DURING CONSTRUCTION MUST BE TREATED IN THE FOLLOWING CONCRETE BLOCKS p 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY WAY: FOR DAMAGED ROOTS OVER 1" IN DIAMETER, MAKE A CLEAN, STRAIGHT CUT TO REMOVE THE DAMAGED PORTION OR MErAL STANDS OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED 4. DUE TO RAPID RUNOFF CAUSED BY PLASTIC SHEETING, THIS METHOD SHALL OF THE ROOT ALL EXPOSED ROOTS WILL BE TEMPORARILY COVERED WITH DAMP BURLAP OR WOOD SHAVINGS TO APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY PREVENT DRYING AND COVERED WITH EARTH AS SOON AS POSSIBLE. TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN'AND TO FURTHER DISCOVER AND CONCENTRATED RUNOFF. PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS 4. SEE SHEET C__ FOR LOCATION OF EXISTING TREES TO RECEIVE TEMPORARY FENCING. PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY 5. IF EROSION AT THE TOE OF SLOPE IS LIKELY, A GRAVEL BERM, RIP -RAP, LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF 5. SEE SPECIFICATIONS FOR PRUNING, WATERING AND OTHER MAINTENANCE REQUIREMENTS NTS RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. NTS NTS PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 1 0 Tree Protection Construction Fence 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE Weighted Plastic Sheeting if= C UNDERGROUND UTILITIES LOCATION SERVICE (811 OR 1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING DIRECTIONS FOR US EROSION/SEDIMENTATION CONTROL NOTES WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 1. REMOVE DRAIN GRATE 1. THE CONTRACTOR SHALL CONTACT THE CITY OF EDMONDS WITHIN THE 48 HOUR PERIOD PRIOR TO COMMENCING ANY 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. LAND ALTERING ACTIVITY. 2. INSERT FILTER 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL 2. THE CONTRACTOR SHALL CONTACT THE CITY OF EDMONDS OF COMPLETETION OF ANY CONTROL MEASURES WITHIN 48 THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN 3. REPLACE GRATE TO HOURS OF THEIR INSTALLATION. STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. HOLD IN POSITION Ah%�, 3. THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OR ANY SILTATION OR EROSION DAMAGES TO ADJOINING 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT SPECIFICATIONS SURFACES OR DRAINAGE FACILITIES RESULTING FROM THE LAND ALTERING ACTIVITIES GEOTECHNICAL REPORT. 1. FILTERS TO BE A MIN 3' DEEP 4. A COPY OF THE APPROVED TESC PLAN MUST BE ON SITE AT ALL TIMES. 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC 2. CONSTRUCTED OF WOVEN POLYPROPYLENE 5. THE CONTRACTOR SHALL AT ALL TIMES PROTECT SENSITIVE AREAS THEIR BUFFERS, AND ADJACENT PRIVATE MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER PROPERTIES, AND PUBLIC RIGHT OF WAYS OR EASEMENTS FROM DAMAGE DURING GRADING OPERATION. THE 3. ALL SEAMS DOUBLE STITCHED CONTRACTOR SHALL RESTORE, TO THE STANDARDS IN EFFECT AT THE TIME OF PERMIT ISSUANCE, SENSITIVE GEOTECHNICAL REPORT. 8" 10" DIA. AREAS, THEIR BUFFERS, PUBLIC PROPERTIES AND IMPROVEMENTS DAMAGE I D BY THE CONTRACTOR OPERATIONS VARIES Y-5" 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED 4. PERMEABILITY - 40 GAL PER MIN SQ FT AT NO ADDITIONAL COST TO THE OWNER. AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 5. REUSEABLE OR THROW -AWAY 6. APPROVh OF THIS EROSION/SEDIMENTATION CONTROL (ECS) PLAN DOES NOT CONSTITUTE AN APPROVAL OF 15, SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS, FOUNDATION DRAINS SHALL BE PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE MAINTENANCE CHANNELS, RETENTION FACILITIES, UTILITIES, ETC). INDICATED ON THE PLANS. NOTES: 1 . REMOVE WHEN FILLED TO HALFWAY MARK 7. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO USE FRONT END LOADER OR OTHER UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL 1 STRAW WATTLE/ROLL SHALL BE MANUFACTURED FROM RICE STRAW If 1"x1"X18" STAKE INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. EQUIPMENT FOR REMOVAL CONSTRUCTION IS APPROVED. AND WRAPPED IN TUBULAR PLASTIC NETTING. NETTING SHALL HAVE v A STRAND THICKNESS OF 0.03" AND A KNOT THICKNESS OF 0.055 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL 2. CLEAN AND REUSE OR REPLACE 8. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND A WEIGHT OF 0.35 OZ PER FOOT AND SHALL BE MADE FROM 85% BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING HDPE, 14% ETHYL VINYL ACETATE AND 1% COLOR FOR UV INHIBITION. LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE -Tro 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE J-I DURATION OF CONSTRUCTION. 2. STRAW WATTLE/ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE IMPROVEMENTS INDICATED ON THESE DRAWINGS. STAKING OF THE WATTLE/ROLL IN A TRENCH, Y-5" (VARIES) DEEP, 5w mvt 0 vk 9. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND DUG ON CONTOUR. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER OR AROUND WATTLE/ROLL. EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND st'r, cli-vt THE DRAINAGE SYSTEM, LEAVE THE SITE OR VIOLATE APPLICABLE WATER STANDARDS. STANDARDS. S4*4 NTS 10. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. 3. STRAW WATTLE/ROLLS MUST BE PLACED ALONG SLOPE CONTOURS. NTS 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED (E.G. ADDITIONAL SUMPS, PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS Inlet Protection RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS. Straw Wattle/Roll Detail FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 11. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE TO ENSURE THEIR CONTINUED FUNCTIONING. NEEDED REPAIRS TO TESC MEASURES SHALL BE MADE IMMEDIATELY. ANY hbDITIOV�L. WSc- R`5tt5u�65 USGJ� STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 12. ANY AREA STRIPPED OF VEGETATION, INCLUDING ROADWAY EMBANKMENTS, WHERE NO FURTHER WORK IS ANTICIPATED omS-1,51t4q-rwtTff crryop &-vm0KD5 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK FOR A PERIOD OF 15 DAYS, SHALL BE IMMEDIATELY STABILIZED WITH AN APPROVED ESC METHODS (E.G. SEEDING, MATERIALS ARE REQUIRED. MULCHING, NETTING, EROSION BLANKETS, ETC.) 6TA-10Wb Pr-AA1 u-5 U- W5D6-r �'bVT-A- I L/P - 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. CONSTRUCTION SEOUENCE NOTES 13. ANY AREA NEEDING TESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN A G 24. FINISHED GRADE SHALL SLOPE . AWAY FROM BUILDING WALLS AT MINIMUM 2% SLOPE FOR A MINIMUM 1. SCHEDULE A PRE-CONSTRUCITON MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. FIVE (5) DAYS. DISTANCE OF 10 FEET. 14. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH 2. REVIEW ESC NOTES. GOR WITHIN THE 24 HOURS FOLLOWING A STORM EVENT. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS IN NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER 15. AT NO TIME SHALL SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. 3. CALL FOR UTILITY LOCATES. 0 & CONVEYANCE LINES SHALL BE CLEANED AND PROTECTED PRIOR TO PAVING. THE CLEANING OPERATION SHALL CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL. 1 NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER 5. HAVE EROSION CONTROL MEASURES INSPECTED BY C ITY OF EDMONDS CITY ENGINEERING INSPECTOR. (ALL 16. MAINTAIN EXISTING PAVEMENTS ON SITE OR INSTALL STABILIZED CONSTRUCTION ENTRANCES AND WASH PADS. SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO STABILIZED SITE ACCESS SHALL BE ESTABLISHED OR INSTALLED AT THE BEGINNING OF CONSTRUCTION CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/CR DEVICES AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT FROM THE FIRE MARSHAL. SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.) ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. (RCW 46.61,655). 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. ODURING THE TIME PERIOD OF OCTOBER 1 THROUGH APRIL 31, ALL PROJECT DISTURBED AREAS THAT ARE TO BE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO & LEFT UNWORKED FOR MORE THAN 12 HOURS SHALL BE COVERED BY ONE OF THE FOLLOWING COVER MEASURES: EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING 7. DEMOLISH EXISTING STRUCTURES MULCH, SODDING OR PLASTIC COVERING. SAID UTILITIES. 8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO 18. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REQUIRED, FAST GERMINATING GRASSES SHALL BE APPLIED 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE AT AN APPROPRIATE RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY 80 POUNDS PER ACRE). REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S STABILIZED PER EROSION CONTROL NOTES BELOW) REPRESENTATIVE PRIOR TO BACKFILLING. 19. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS. THICKNESS OF TWO INCHES. LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S 10. STABILIZE AND REVEGETATE ENTIRE SITE. 20, INSTALL CATCH BASIN PROTECTION ON ALL NEW CATCH BASINS. APPROVED FOR CONSTRUC11ON REPRESENTATIVE AND CITY. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED 21. CONTRACTOR SHALL CLEAN ALL EXISTING AND NEW CATCH BASINS AND SHALL REMOVE SEDIMENT FROM CITY OF EDMONDS 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR SWALE PRIOR TO PROJECT COMPLETION. CONTRACTOR SHALL NOT FLUSH SEDIMENT DOWN STREAM. FOAM AS A CUSHION BETWEEN THE UTILITIES. 22. ALL TEMPORARY EROSION CONTROL FACILITIES, SUCH AS ROCK CHECK DAMS, SILT FENCES, COLLECTION DITCHES, DATE: Z. (INCLUDING ALL APPURTENANCES) SHALL BE REMOVED PRIOR TO FINAL ACCEPTANCE. BY: 1A AA E GI RING tIVISION a4�_ v\6 2_605 WESTERN AVENUE 3EATTLE, WA 98121 :1H: 206-728-0480 ::X: 206-728-0476 NWW.MCCARCH.COM 'OPYRIGHT 2012 McCLELLAN ARCHITECTS 413 PINE STREET - SUITE 300 SEATTLE, WA 98 101 P: 206/343-0460 F: 206/343-5691 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION ROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 LIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 ;SUE: PERMIT SET 2012-12-06 zi PERMIT CORRECTIONS 26577 '�'GI S T 01' L I I Z100 z )ATE: 14 NOVEMBER 2012 3HEET TITLE: TESC DETAILS 3HEET: RESUB DEC 0 7 2012 OUILDING D1 ,W,AR1MENT CITY OF E MONDS ._x SWALE RPkROAD 0\ Call A kF before you D19. 0 10 20 40 'm w�wzmwm 8-1 -1 or low, k\\\\\\q 1-800-424-5555 UNDERGROUND SERVICE (USA) SCALE 1 =20' LEGEND EXISTING REMOVE PROPOSED 0, 2.N Al ASPHALT PAVING BASE (ATB) ASPHALT TREATED Q DO NOT DISTURB EX 0I ; SANITARY SEWER VIDEO CONCRETE PAVING INSPECT PRIOR TO REUSE. 0, WOV '5eV PROVIDE REPORT TO PO BUILDINGS ------ ...... riTv wcnrr_,Tno. nu -VTrT—Trrjr1-Q I vrv- V1 / f 1") "1 . ... ; I . —V U-N ZZZ AR? SEWER CONDITION. GRAVEL IWAT R w.-TE'v) 7W fSIVE -511510,K11 OP FL BOTH SIOES) _x, x. . . . . . . _UST LOT�/ J��T! RIP RAP CONSTRUCTION ENTRANCE j z 4" SIDE SEWER 1-7 x SAWCUT LINE PER CITY OF EDMONDS ST Al CONSTRUCTIO P!PE CRO S A0 N LIMITS S PIPE CROSS NG -A. 4" SSq6 6" SD IE 510.95± ;itl //� I , /. I / 1 11 1 r,� ., IM TO RADE CORD) SITE FENCE 2 8" SS IE=49.8 (RE . . . . . . IE=6T± /4 & 6 L;K �U Ot /V 'I !Z522 .7,4180T STRAW WATTLE b2ft �z (;HAljF y J UA: ?y k/ If ., I v IT V I VU Iliv 9440� 9, V (6 STORM CB W/PROTECTION @ 7/ 7 h DRAI CURBING 1P W DE, ROOF LINE (TYP) ;zj jm bK" K,� RIM=65± ROCKERY SDCO CONNECT Al RIM=51.5± (EX GR.___ I 1 6 Al TREE W/PROTECTION J N, IE=50.9 ;�-EX PIPF, �4"PVC 6 'F=69.83 ........... ............. _100— "A // ( ", �N\ I/ el 01 /w 04� CONTOUR (INDEX) RESTORE TRENCH V CONFIRM f,- W/ ARCH PER AGREEMENT CONTOUR —98- 4 iLF 6"4' WITH NEIGHBOR SD (n) 117 "ONFIRMx". WATER LINE PLANTIN 7 LF EX L, -COORDINATE UTILITIES lcr W/ ARCO F6.0 HAND EXCAVATE FOR/NEW ADr7A C� m 7q CTf)OkA r)DAIKIAr1C' 1 IKIC7-, PROVIDE COMPOST AMENDED SOIL 0 C_ IN ALL PLANTING AREAS DISTURBED AND RESTORED IN CONSTRUCTION < 0 SEE CITY OF EDMONDS DEVELOPMENT 0": INFORMATION HANDOUT #E72C < PROVIDE VIDEO INSPECTION OF EXISTING STORM AND SEWER TO BE -REUSED ONSITE. A VERIFY CONDITION AND SUITABILIR FOR REUSE. PROVIDE REPORT TO GH�' '94L4 WO GQQwPI _-IA4;W SIZ,�NSPECTO __ N*E 150 LF 1%" WATER SERV LINE TYPE K COPPER OR APPROVED EQUAL. VERIFY A SIZE PER PLUMBING AND FIRE SYSTEM DESIGN S-row 0L.&P C- M IN .65616 INSTALL NEW 1" WATER CONFIRM SIZE IRE AND PLUM�, Lj ­71 ell, XXXXXXX:" D 70 4. Y." , x, Q /4 V, COORDINATE W/ PSE F GAS SERVIC OR Co Rl,,V­82� 6 0 66 oi/ 21 IWI180X A W eN Z,� A, �,,w, AN FOR 1INSPECT A0,M-PTABLE TIGHTIM MATERIAL SrOM, '460 N 412 no HANCOR Applicant shall repair/replace all damage to utilities or frontage Improvements in City right-of-way per City standards that is caused or occurs during the permitted project. Line Type Area (square feet) Non -Regulated None�::.:­: Note: Due to steep slopes, geotechnical engineer recommends not using infiltrative storm water measures on this site. All Impervious surface run-off handled through direct discharge 2605 WESTERN AVENUE SEATTLE, WA 98121 PH: 206-728-0480 FX: 206-728-0476 WWW.MCCARCH.COM COPYRIGHT 2012 McCLELLAN ARCHITECTS 413 PINE STREET - SUITE 300 SEATTLE, WA 98 101 P: 206/343-0460 F: 206/343-5691 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION PROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 CLIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 ISSUE: PERMIT SET 2012-12-06 21 PERMIT CORRECTIONS C. WA rA 26577 I S T 1NAL z DATE: 14 NOVEMBER 2012 SHEET TITLE: APPROVED FOR CONSTRUCTION s ClTY OF EDMONDS DATE: Z, BY- k,�Y E�INEERING DIVSION a,&_ V0 �ek V CIVIL SITE PLAN 1EET: RESUB DEC 0 11 2012 DUILWO 'D,%,ARMMNT 0 OF E MONDS 0 LL U) #3 BAR EACH CORNEI #3 BAR HOOP EACH SIDE fli PAP Plar'] FRAME AND VANED GRATE 0 M-10 2",4". 6",12", OR 24" )R 6" HEIGHT INCREMENT (SPACED EQUALLY) RECTANGULAR ADJUSTMENT SECTION PRECAST BASE SECTION PIPE ALLOWANCES MAXIMUM PIPE MATERIAL INSIDE DIAMETER REINFORCED OR 12" PLAIN CONCRETE ALL METAL PIPE 15" CPSSP (STD. SPEC. 9-05.20) 12" SOLID WALL PVC 15" (STD. SPEC. 9-05.12(l)) PROFILE WALL PVC 15" (STD. SPEC. 9-05.12(2)) CORRUGATED POLYETHYLENE STORM SEWER PIPE #3 BAR EACH CORNEI 181, Ml� #3 BAR HOOP (SEE NOTE 1) ALTERNATIVE PRECAST BASE SECTION NOTES I . As acceptable alternatives to the rebar shown in the PRECAST BASE SECTION, fibers (placed according to the Standard Specifications), or wire mesh having a minimum area of 0.12 square inches per foot shall be used with the minimum required rebar shown in the ALTERNATIVE PRECAST BASE SECTION. Wire mesh shall not be placed in the knockouts. 2. The knockout diameter shall not be greater than 20". Knockouts shall have a wall thickness of 2" minimum to 2.5" maximum. Provide a 1.5" minimum gap between the knockout wall and the outside of the pipe. After the pipe is installed, fill the gap with joint mortar in accordance with Standard Specification 9-04.3. 3. The maximum depth from the finished- grade to the lowest pipe invert shall be 5'. 4. The frame and grate may be installed with the flange down, or integrally cast into the adjustment section with flange up. 5. The Precast Base Section may have a rounded floor, and the walls may be sloped at a rate of 1:24 or steeper. 6. The opening shall be measured at the top of the Precast Base Section. 7. All pickup holes shall be grouted full after the basin has been placed. r3V IVA S11,, 44 3 ec, , S10 NAL Z 0 g 21 0:8 Q, 2 0 gg 2 STANDARD PLAN B-5.20-01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakotich 111 06-16-11 A=X STATE DESIGN ENGINEER DATE UP Washington State Department oFTransportcrtion FRAME AND GRATE FINISHED GROUND 260E PER PLAN SEA: PH: IF X: ww� COPYF NOTES: D GRATE 1. BASE CTION HAS RISERS AS NEEDED-< ME 6 X 4'j MAX IN RALLY CAST m 1TOM AND SIDES. C PC MAX DESIGN WSE OUTLET PIPE C-0 3.5" 4131 3.5" 6 SEA1 12 TYPE 1- CB SE UNIT-----' P: 2( E APPLICABLE STANDARD DETAILS. F: 2( CONFORMS TO WASHINGTON STATE 12" APWA/WSDOT STANDARD �`-STRAP TO WALL. A C( 30 SPECIFICATIONS & STANDARD PLAN 2 STRAPS MIN REQUIRED. STRL E APPLICABf. T-SECTION OR EXISTING STRUCTURE ENG PRO, 12" 34" ON NOTES: 4" 1 179- 1 MAX OUTLET PIPE DIAMETER IS 8 INCHES. EDI NTS A PRECAST BA E SECTION NTS 2. ALL METAL PARTS AND SURFACES MUST BE MADE OF CORROSION RESISTANT MATERIAL OR GALVANIZED. NTS NTS Not Used Catch Basin - Type 40 Spill Control (8c) Separator Type 1 Not Used CLIE /-A-BUILDING WALL DE SEE STRUCT'L PLANS 17E SLOPE TO DRAIN AWAY ED 12" MIN FROM STRUCTURE SAWCUT, TACK AND MATCH FINISHED GRADE EX ASPHALT FULL DEPTH CTED BACKFILL U4_ �11(1 UALAIUI�!� SLOPE MEETING GRADATION NON -WOVEN FILTER FABRIC REQUIREMENTS FOR MIRAFI, 140N OR EQUAL STRUCT'L FILL (SEE NOTE 2) ISSUE GENERAL ASPHALT PAVING NOTES: C GRAVEL BACKFILL FOR PER 4" SDR 35 PVC PERF PIPE-----. co 1. SPECIFICATIONS FOR ALL ASPHALT CONCRETE WORK SHALL BE PER THE LATEST EDITION IN EFFECT OF EXTERIOR USE ONLY DRAINS PER WSDOT 201: THE "WASHINGTON STATE DEPT. OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND CONNECT TO STORM 9-03.12(4). =IF-11=11=11EII 12" MIN MUNICIPAL CONSTRUCTION," CONVEYANCE SYSTEM. d 14 14 _==1 W IR =-_I Ni I El W I M R M W 10 If 11 _11MIE1014011- I W R 11 K I IM I fl W R1 im I EXISTING ASPHALT- 2. ALL ASPHALT CONCRETE PAVEMENT SHALL BE PLACED IN ACCORDANCE WITH WSDOT/APWA SECTION 5-04, El �Ikdl = BUILDING FOOTING----)o- .141MIANINI lifil RHEIN kl: X� UNLESS OTHERWISE SPECIFICALLY NOTED. EX UNDISTURBED PAVEMENT SEE STRI.I(T'L PLANS N/ �\ t// 114 K 1E] I i E �j I=- 6" MIN 11-EIT-101 �HMNI SUB -BASE MUST BE 3. PROOF ROLL AND REMOVE ANY SOFT SPOTS. REPLACE REMOVED MATERIAL WITH STRUCTURAL FILL PER THE INK COMPACTED TO 95% MAX. =1 =,I F01i , — — NOTES: GEOTECHNICAL ENGINEER. CONTRACTOR SHALL TEST AND VERIFY SUBGRADE MEETS COMPACTION REQUIREMENTS 'y -EL" DENSITY PER ASTM D 1557 L1-U RAIL PLANS FOR DRAINAGE GRAVEL PRIOR TO PAVING. 1. SEE ARCHIT SUBDRAIN PIPE BENEAT!! 9"LOING SLAB. 3" HMA F ASPHALT CONCRETE PAVEMENT 1. 4" MINIMUM DIAMETER PERFORATED OR 4, CRUSHED SURFACING SHALL BE PLACED IN ACCORDANCE WITH WSDOT/APWA SECTION 4-04, AND SHALL MEET SLOTTED PIPE; TIGHT JOINTS; SLOPED TO DRAIN THE REQUIREMENTS OF WSDOT/APWA SECTION 9-03.9(3). SUBGRAD' 2" CRUSHED SURFACE TOP COURSE 2. STRUCTUAL FILL SHOULD CONSIST OF WELL -GRADED (6"/100' MIN. SLOPE); PROVIDE CLEAN -OUTS. COMPACT TO 95% MAX DENSITY GRANULAR SOIL WITH NOT MORE THAN 20% FINES 5. AGGREGATE SHALL BE HMA 1/2" MAX MEDIUM GRADING CONFORMING TO SECTION 9-03.8 OF WSDOT/APWA. (BY WEIGHT BASE ON 3/4" PORTION) PASSING NO. 200 2. PERFORATED PIPE HOLES (3/16" TO 1/4" 0) ASPHALT BINDER SHALL BE ASPHALT PAVING GRADE AR-4000 AND SHALL COMPLY WITH WSDOT/APWA 9-02.1. 4" CRUSHED SURFACE BASE COURSE SIEVE (BY WEIGHT SIEVING) WITH NO PLASTIC FINES. TO BE IN LOWER HALF OF THE PIPE WITH ASPHALT MIXING AND PROPORTIONING SHALL COMPLY WITH WSDOT/APWA 9-03.8. COMPACT TO 95% MAX DENSITY LOWER QUARTER SEGMENT UNIPERFORATED 3. BACKFILL WITHIN 18" OF WALL SHOULD BE COMPACTED WITH FOR WATER FLOW. 6. SAWCUT FULL DEPTH WHERE NEW PAVEMENT ABUTS EXISTING AND APPLY TACK COAT. 12" (MIN) STRUCTURAL FILL AS REQUIRED OR HAND -OPERATED EQUIPMENT. HEAVY EQUIPMENT SHOULD NOT EXISTING SUBGRADE COMPACTED TO 95% BE USED FOR BACKFILL, AS SUCH EWPMENT OPERATED 3. SLOTTED PIPE TO HAVE 1/8" MAXIMUM MAX. DENSITY PER ASTM D 1557 NEAR THE '�IALL COULD INCREASE LATERAL EARTH PRESSURES WIDTH SLOTS. AND POSSIBLY DAMAGE THE WALL. NOTES: 4. ALL BACKFILL SHOULD BE PLACED IN LAYERS NOT EXCEEDING 1. SEE DETAIL(� FOR ASPHALT PAVING NOTES. 6" LOOSE THICKNESS AND DENSELY COMPACTED. BENEATH PAVED OR SIDEWALK AREAS, COMPACT TO AT LEAST 95% C lIi MODIFIED PROCTOR MAXIMUM DENSITY (ASTM: D1 157). NTS OTHERWISE COMPACT TO 90% MINIMUM. NTS NTS Standard Asphalt Paving Section V Exterior Footing Drain W/Filter Fabric Wrap Not Used 8 DATE 14 SHEE C D APPROVED FOR CONSTRUC11ON SHEE CITY OF EDMONDS DATE: OAA - t� NTS NTI 10 NTS BY: I_z/1 IV I rl- Not Used Not Used Not Used CITY ENGINEERING DIVISIO'N CL4_, WESTERN AVENUE FTLE, WA 98121 106-728-0480 06-728-0476 V.MCCARCH.COM IGHT 2012 McCLELLAN ARCHITECTS IINE STREET - SUITE 300 7LE, WA 98 101 16/343-0460 16/343-5691 )NSULTING ICTURAL AND CIVIL NEERING CORPORATION JECT: SLOW RESIDENCE 28 TALBOT ROAD VIONDS, WA 98026 NT: qNY & HOLLY ONLSOW 28 TALBOT ROAD VIONDS, WA 98026 MIT SET !-12-06 1 PERMIT CORRECTIONS C. WAS rA 26577 VL� 4�GISTS 001 z .............................................. ........................ ........................ ........................ ........................ ........................ ........................ ........................ ........................ ................. ------ 80 EXISTING GRADE ........................ ................... .... :APPROXIMATELY. 20% ..................... ........................ ........................ .. . ..... ........................ ........................ ........................ .............. . ..... ::(lV:5H) SLOPE ....................................................................................... .................................... ................................................. ................................................. ; ....................... .... ............... ............. . ....................... ..................... R 70 .................. ........................ ........................ ........................ .............. ..................... ........................ ........................ ...... ................ .................... ...................... .............. ; ...................... .... ........... ........................................................ ........... ........... A ....................... ............... ...... ...... ................................................... - - - 7 ..... ....... ..... ....... ...... ...... �SLAB::ON GRADE x GARAGE 60 ..... ........................ ........................ ........................ ........................ ........................ ................... ................... ........................ ........................ ..................... ...... . . . . . . ...................... ........................ BACKFILL: EAST END - OF OLD BASEMENT 50 ........................ ................................................. ........................ ........................ ................................................. ..................... ....... ................. 0 . + . 0 . 0 ................... ......................................................................... 1+00 ......... L EXCAVATION. . FOR ............ -LIS FOUNDATIONS EXI STING BASEMENT NEW CRAWL SPACE TO REMAIN BELOW SLAB .................................................................................... ........................................... IUKIL. I I U VERT. 1 10' kirtio nrnil 2605 WESTERN AVENUE SEATTLE, WA 98121 PH: 206-728-0480 FX 206-728-0476 WWW.MCCARCH.COM COPYRIGHT 2012 McCLELLAN ARCHITECTS C"o 0 U %02"H L I N PORTER "LUNDEEN 413 PINE STREET - SUITE 300 SEATTLE, WA 98 101 P: 206/343-0460 F: 206/343-5691 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION PROJECT: ONSLOW RESIDENCE 17528 TALBOT ROAD EDMONDS, WA 98026 CLIENT: DENNY & HOLLY ONLSOW 17528 TALBOT ROAD EDMONDS, WA 98026 FIT&W A LIP ISSUE: PERMIT SET 2012-12-06AJ PERMIT CORRECTIONS 701 OLANTER PER ARCH'L EXISTING GRADE APPROXIMATELY 20% (lV:5H) SLOPE an ............ ... ...................... ........................ EX ROCKERY TO REMAIN 50 ........................................................................ 2+00 APPROVED FOR CONSTRUC11ON CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION C. 0 WA 26577 GISTS DATE: 14 NOVEMBER 2012 SHEET TITLE: