17806 73RD PL W.PDFIIIIIIIIIIII
5824
17806 73RD PL W
City of Edmonds
-100
REEI&Yth-OF-WAY CONSTRUCTION.
PERMIT
--WWEW— C� 1z)
9 0 - 1 9
A. Address or Vicinity of Construction: -
B. Type of Work (be specific):
C. Contractor: Washington Nat'l. Gas Co.
MailingAddress: 815 Mercer, St.Seattle, Wn_
State License #: 98111
D. Building Permit # (if applicable):
rermit Number.
Wue Date: :i2LA3
17806 73:Pl. SW (9320624)
Install New Service
Contact: Frank Swan
Phone: 224-2278
Liability Insurance:
Bond: $
Side Sewer Permit # (if applicable):
E. F1 Commercial E) Subdivision El City Project NWtility (PUD, GTE, WNG, CABLE, WATER)
n Multi -Family EJ Single Family E] Other
INSPECTOR: INSPECTOR:
F. Pavement or Concrete Cut INVes []No G. SizeofCut:(I/)2 X�4 Cut H. Chargt�_$
Gas *Gas is at e
,avfng edg
APPLICANT TO READ A Ab SIGN
U-1) ZL-ges, or
__?d ' r
INDEMNITY. Applicant understands and by his signature to this application, agrees trho the City ofEdmonds harmless m injurt
claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or
employees, including or not limited to the defense ofany legal proceedings including defense Costs, and attorney fees by reason ofgranting thispermit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BEPRbC&SSED FOR ISSUANCII�Q THE Apf� ICANT.
11 ,
Const ' ruction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times. -
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved material prior to the 6nd of the working day;
NO EXCEPTIONS.
1have read the abouestatements and understand thepermit requirements and thepink copyof thepermit will be
available on site at all times for inspection Bpxpirses.
Le July 16, 1993
Signature: Date:
(Contractor or Agent)
CALL -DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVEDBY: RIGHT OF WAY DEPOSIT
TIME AUTHORIZED: VOID AFTER DAYS DISRUPTION FEE/FUND'I.111:.
SPECIAL CONDITIONS: COM40 P0,toeL TO RESTORATION FEE:
FAIL- P 4-u- K-AM PER . MIT FEE:
1,_oototm4TC t-v ('T M CJT r TOTAL�FEE: 0 30-7. ;t!�6-
7'�,c 4 C-,-oX-. - I .
COMMENTS: RECEIPT FEE:
DATE: ISSUED'BY:
W
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
Engrg. Div. 1991
cl I
FIELD INSPECTION NOTES
Com,ments:
I Diagram.:
(Fund 111 - Route copy to Street Dept.)
CONTRACTOR CALLED FOR INSPECTION El YES NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
Bndum, to city 'of Edmonds
Right of Way
Permit Applicatinn
Submitted by: Guyla Connors
Engineering Aide
Washington Natural Gas
521-5248
U(49 PL
\.vAjc---,,--)nE 4f:,
A.-r JDA�j I LIL-4
WNG to window
Water main depth
gas main
K- ey:
-w-
water
-g-
gas -
-ss-
sewer
-e-
water hydrant
0
water valve
815 Merccr St. (RO. BOX 1869). Scattic, WA 98111 (206) 622-6767
ST RE.ET FILE 'PROJECT REVIEW CHECKLIST
PROJECT NAME:' PLAN CHECK 5/6.,
PROJECT ADDRESS:-../ 76 n(o - -,73 Pz- 6,c) RECEIPT DATE: A;kk /,Fnx
REVIEW
D BY: (I
nitial/Da
PLAN.
W
WATER
L.Gl
COMMENTS
FIRE-
BLDGI.XWER
S
STREE EN
Setbacks/Variance/Setback Adjustment
Conditional Use Permit
ADB Requirements
.3
Other Zoning Requirements
Underground Wiring Required
Lot Slope IS%
SEPA Environmental Checklist/Hydraulics Permit
:7
Tree Cutting Plan
9
Plat/Subdivision Requirements
9
Legal Description Verification
1 0
Quit Claim/Street Dedications
Easements - Public/Private
Engineering Storm Drain Review Fee
. . . . . . . . . . . . . . . . . . . . .
--------------
13
Engineering 2.2 Inspection Fee
Drainage Plan (On -Site)
Setback - Top of Bank, Stream, Water Courses
Setback - Storm Drain Line
Open Ditch - Existing
Culvert Required
Culvert Size
...........
Shoulder Drainage/Shale Open Runoff
2 .. I
Catch Basin Required
Driveway Slope & Vehicle Access
........... . . . . .
Sidewalk Required
4.1
Curb & Gutter Required
"'00000.1
Curb Cut For Driveway Required
............ ........ .... ?.
:226-
Street Paving Required
Right -Of -Way Construction Permit Required
Street Name Sign Required
Other Si6ning Required
Bond Required For Public Improvements
FEMA Map Check/Water Table
Side Sewer Availability�_
38
Calculate Sewer Connection Fee If No LID
Create Street File
S.
Existing Water Main Size
. ..... . . "I . . . . . . . .
- - - - - - - - - - - - - - - - - - - - - -
Water Meter Size
REHM
.14 g
Service Line Size
Water Meter Charge Required
Hydrant Required
Hydrant Size Existing
Fire Line Charge Required - Sprinkler
IStreet Cut
Imiscellaneous
Reviewed By:
FIRE
PLANNING
ENGINEERING
PUBLIC WORKS
kv
11:4
'Jv
PE
147tp
WOW,
00
zi.
ZY
A
0 7'�
Jr
�J%
vi
t i.
'.—lc
pa 17 C:�!
lu
10
40 3c
A
ti
Jr"
o t' i�il 4 'p
or 4:1 All,
tqx:
;..tf
0"'TREET FILE
6,90 - 199 -
Are 04-40�.
City of Edmonds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a development permit
to the City.
The purpose of the Checklist is to enable
City staff to determine whether any potential
Critical Areas are or may be present on the
subject property. The information needed to
complete the Checklist should be easily
available from observations of the site or
data available at City Hall (Critical Areas
inventories, maps, or soil surveys).
* 4f77'
01
An applicant, or his/her representative, must
fill out the checklist, sign and date it, and
submit it to the City. The City will review
the checklist, make a precursory site visit�
and make a determination of the subsequent
steps necessary to complete a development
permit application.
With a signed copy of this fbrn3� the
applicant should also submit a vicinity map
of the parcel with enough detail that City
staff can find and identify the subject
parcel(s). In addition, the applicant is
encouraged to include any other pertinent
information or studies in conjunction with
this Checklist to assist staff in completing
their preliminary assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
Steve & Linda Mitchell
Name
Owner
Title
17808 73rd P1. W.
Street Address
Applicant Representative:
Martin R. Brown
Nwne
Buyer
Title
3607 228th St. SW
Street Address
Edmonds, WA 98026
742-5979
Brier,
WA 98035
778-3199
City, State, ZIP
Phone
City, State, ZIP
Phone
Ag6nat--e
Date
Signatj��-
Date
Critical Areas Checklist''
Site Information
Project Name: Browr� Cons`truct.�,,,,n
Permit Number:
Site Location: 17 8 0 6 73 EdM. Property Tax Account Number:
Approximate Site Size (adr�s or square feet): 12308 S.F.
4737000008004
Have you filled out a Critical Areas Checklist for a project on this site before? Ald
General Site Conditions
1. Has the site been cleared or logged?
Soils / Topography
Date of most recent action:
uv6-^ te-1
X+- V tv--ce-k r(-P-
2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? a
A10
3. Describe the general site topography. Check all that apply.
F1 at: less than 5 feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a
horizontal distance of 66 feet.)
Hilly: slopes present on site of more than 15% and. less than 30% ( a vertical rise
of 10 feet of horizontal distance.)
Steep: grades of greater than 30% present on site.
Comments
Hydrology[Vegetation
4. Site contains areas. of year-round standing water: A/0
. 1
5. Site contains areas of seasonal standing water: Ille � --Approx. Depth:
6. Site is in the floodway A/d floodplain— A40 of a water course.
7. Site contains a creek or an area where water flows across the grounds surface? MO -flows
are year-round? Flows are seasonal?
8. Site is primarily: forested meadow _; shrubs mixed
9. Obvious wetland is present on site: &0
10. Wetland inventory or map indicates wetland present on site:
11. Critical Areas inventory or map indicates any Critical Area on site: Ald
-----For City.Use Only
STUDY REQUIRED: Critical areas study is required.
CONDITIONAL WAIVER: Critical areas study not required if specified conditions satisfied.
WAIVER: Critical areas study is not required.
Determination Number. CA A a Reviewer c�l 1/9 Z__
Rev 3n7/92 Planner
City of Edmonds
Critical Areas Determination
Applicant: I Steve and Linda Mitchell Determination #: I CA-92-22
Project Name: I Brown Construction I Permit Number: I
Site Location: 17806 73rd Pl. W. Property Tax Acct #: 1 4737-000-008-00
Project Description:
New Home
Waiver Criteria (all criteria must be found to apply):
xx There will be no alteration of the Critical Area or its required buffers;
xx The development proposal will not impact the Critical Area in a manner contrary to
the goals, purposes, objectives and, requirements of the Critical Areas ordinance;
xx The development proposal meets the minimum standards of the Critical Areas
ordinance;
xx The above findings are based on the following conditions of approval:
1. The applicant must follow the requirements of the Building Official for
construction on steep slopes (ECDC title 19.05, 19.00-UBC chapter 70).
2. The applicant must follow the requirements of the Engineering Division for
erosion control (ECDC title 18)..
Based on the above findings and conditions, the requirement for a Critical Areas Study
associated with this development permit is hereby Waived, as authorized by Chapter
20.15B. 150 (B) of the Edmonds Communj Development Code.
Stgphen F. Bullock NhI LS, Lf7
Name Sig�ature Date
USE
ZONE PE
CITY OF EDMONDS URM T
M
CONSTRUCTION PERMIT APPLICATION f5C6 N BER 9:3 01 Uk
JOB 'F(APT
OWNER NAME /NAME OF BUSH SS ADDRESS sU76
7 /76016, � 7
ECKI SUBDIVISION NO. 1.1�0 ONO
Z MAILING ADDRESS
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP, TESCP Apirrmed a
CITY ZIP TELEPHONE NU /"-.ER RW Permit Required
EXISTING — REOUIRED DEDICATION Street Use
7 75 Permit A*Wd 0
PROPOSED Inspection Required
NAME Sidermalk Required
REMARKS
C
ADDRESS
2 7
CITY ZIP ELEPHONE NUMBER
77Y5 92&-3
NAME
dWw(01V57— ENGINEERING MEMO DATED AEVIEWSY
ADDRESS
0 jTDING;y, PLY SIZE
2-,?-g _5T_5�hl METE�71
2 ZIP ELEPHONE NUMBER ZD
Z REMAR NO. OF FIXTIJRES u�
L
STATE LICENSE NUMBER EXPIRATI; VgV
4.1— SIGN AREA SEPAREVIEW
I D include all ALLOWED PROPOSED COMPLETE 1EXEMPT
eiasem;�
_ZNo.
0 14 ;,7;LINE 0
rL EXP
VARIANCE OR CU 7 REVIEW BY. TE
I
SETBACKS - F
HEIGHT LOT ;,VEAAG
FRONT Z—) SIDE 7,
PPa_rcPee1=No` -4173 7-000-608 -4p.9- REMARKS '/7-PEAR
T A
NEW RESIDENTIAL 1Z PLUMBING
UADDITION COMMERCIAL MECHANICAL
El REMODEL APT, BLDG. El SIGN
CHECKED BY TYPE OF CONSTRUCTION rCODeE
REPAIR CY.S. I FENCE I HEIGHT
x _FT)
=—/I/ 9 2.5-
DEMOLISH WOODSTOVE SWIMPOOL SPECIAL INSPECTOR OCC PANCY PA
INSERT HOT TUB/SPA U OCCU NT
UARAGE REOUIRED 13 YES ZY70Z I GROUP LOAD
G RETAINING WALL/
CARPORT L_J ROCKERY RENEWAL MARKS
Z
(TYPE OF USE. WJSINESS OR ACTIVITY) EXPLAIN: PROGRESS INSPECTIONS PER UBC 305 Z
ER OF STORIES NUMBER OF
DW ;W1f1n171_ live-
ELLING
to UNITS olve
0
DESCA113E WORK TO BE DONE (ATTACH PLOT PLAN)
�P/ysrx we r Sj,,y,61er FINAL INSPECTION REQUIRED
VALUATION FEE
--swee oc 4pr as. IXD PLAN CHECK FEE
HEAT SOURCE: G BUILDING 102—
IN)
7-DI 5 PLUMBING
Plan Check No. OF= MECHANICAL
This Permit Covers work to be done on private property ONLY. GRADINOIFILL
Any construction on the public domain (curbs, sldewplks,
driveways, marquees, etc.) will require separate permission. STATE SURCHARGE
Permit Application: 180 Days
STORM DRAINAGE FEE
Permit Llmft: I Year - Provided Work Is Started Wlthln 180 Days
"AppliCant, on behalf of his or her spouse, heirs, assigns and ENO. INSPECTION FEE
successors in Interest, agrees to Indemnify, defend and hold
harmless the City of Edmonds, Washington, Its officials,
I employees, and agents from any and all Claims for damages of
ICE whatever nature, arising directly or Indirectly from the Issuance
of this permit. Issuance of this permit Shall not be deemed to PLAN CHECK DEPOSIT
modify, waive or reduce any requirement of any city ordin:nc:
Ox nor limit In any way the City's ability to enforce any ord n nc
TOTAL AMOUNT DUE
provision."
I hereby acknowledge that I have read this applic Ion; that the
Information given Is Correct; and that I am the own:1r, or the duly ATTENTION APPLICATION APPROVAL
authorized agent of the owner. I agree to comply with city and THIS PERMIT
5 tate laws regulating construction; and In doing the work authoriz. AUTHORIZES This application Is not a permit until
�tate -'aws 't'at'�
Led thereby, no person will be employed In violation of the Labor ONLY THE signed by the Building Official or his/her
a
Code of the State of Washington refiating to Workmen's Compenea. WORK NOTED Deputy; and fees are paid, and receipt Is
ti— Ing.rance. INSPECTION acknowledged in space provided.
s .Tu..
'.N=
,OWN�ER. OR AGENT)- OAT� DEPARTMENT
TURE DATE
CITY
EDMONDS
CALL FOR ED 6_Y/ DATE
ATTENTION INSPECTION
IT S UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 771 - 0220 ORIGINAL — File YELLOW — Ins
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
STANDARD DRAINAGE DETENTION SYSTEM
WORKSHEET
OWNER
ADDRESS
5: d-lki e vdy"
IMPERVIOUS AREA
CALC BY:
PHONE:
DATE:
*****DESIGN DATA*****
PIPE DIA PIPE LG
le A/
'z' 4 .1e 3-2
DETENTION PIPE LENGTH
RIM ELEV- C MIN COVER
2*MAX COVER-
410
.5% - r/. SLOP,
W mitt SPACE
ROW ELEV-
PIPE MIN.
INV ELEV--
W'Pfl? CArCH
BASIN CONrROL CArCH
BASIN
SYSTEM CROSS SECTION
>
',oace /cze
ELEV
ORIFICE
-it ki, WASHED GRAVEL
OUTFLOW TR�NCH, MIN 10- LONG
TOP AND 4 PERF PIPE TO BE LEVEL
FROM
CONTROL -
'OUTLET 14,
4"PERF PIPE W/CAPS
RUNOFF SPREADER
OUTLET
-2*� 2'.6- DEEP, 4'-6'OUARRY SPALLS
.2. 3" DEEP, 3/4- CRUSHED ROCK
FROM CONTROL
OUTLET
RIPRAP OUTLET
179-"4'
A�O`CEF-TABLCE T+Ir.-�,t-4
-E MATERIAL
N-!?.ADS
SCh 40 PVC
SDR .35 (ASTM D3034)
FOOTING +DRAINS SHALL NOT BE CONNECTED To DETENTION SYSTEM
NOTES:
I - Call Engineering Division (771-0220) for a tightline and detention system, inspection
before backfilling and for final inspections. APPROVED BY
2, Responsibility for operation and maintenance of drainage systems on private property is the
responsibility of the property owner. Material accumulated in the storage pipe must be flushed 11�711"
out and removed from the catch basins to allow proper operation. The outlet control orifice DATE
must be kept open at all times.
REV 2/92 Page 6 of 6
Table 1 - Detention Pipe Size
T
.Lmpermeable
Required
Area Sq. Ft.
I
-------------
Vol Cu Ft
2000
----------
50
211 5 0 0
62
loon
7r,
-8-7
4000
100
4500
1121
5000
125
Pipe
Diameter
15
18 -
24"
30"
-------------------------
40
28
16
10
50
35
20
13
(!7 �O,
so
(W
3�2
15 Required pipe
K1-8-) length in feet
"ZV
90
100
6-3)
70
36
40
25
Note: Allowable Pi-pe Materials: Reinforced Concrete
Aluminized Steel,
Aluminum
CMP Asphalt Coated
N-12 ADS (Not permitted on roads)
Table Outlet Orifice Sizes
T mDermeable
Area Sq. Ft.
-------------
Outlet Orifice Diameter (Inches)
2 0 0 0
---------------------------------
t7. /0
5 0 01
3 0 0 (1)
01/4
—35.no
11
4 0 0 0
t
A500
7/8
0 0 0
7 /e,
Table 3 - Rectangular Catch Basin Requirements*
Detention
Max. size
Catch Basin
pipe diameter
--------------
knockout
Type
18"
----------
-
----------
Type I,
C13
1 15
18" to 24"
26"
Type IL,
CB
16
-24'"o 36"
.36
Type II,
-type
Basin)
36" to 42"
42"
II,
C13
19 (54" Basin)
*Source: Assoc.
Sand & Gravel Co.
Standards
Page 5 of 6
"A' i
C.
M-01
--wamox— C� Q5
9-0 - 19 �
-��.7
Contractor:
City of Edmonds
RIGH.T-OF-WAY CONSTRUCTION .
PERMIT
Permit Number. 13— 25B
Issue Date:
7
A. Address or Vicinity of Construction:
B. Type of Work (be specific): ;F,,vy -, 0
Mailing Address: V 9�
State Licens e #:
Building Permit # (if applicable): 2-
Contact:
Phone: *7 76f- *3 / '91
1�iability Insurance: -VACL- Bond; $
Side Sewer Permit # (if applicable): ##4
E. E] Commercial 0 Subdivision El City Project E] Utility (PUD, GTE, WNG, C LE, WATER)
Multi -Family EJSingle Family EJ/ Other
INSPECTOR: INSPECTOR:
F. Pavement or Concrete Cut: El Yes EJNo G. Size of Cut: x H. I Charge-t
APPLICANT TO READ AND SIGN
INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmless from injuries, damages, or
claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments o
employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUA NCE TO THE APPLICANT.
Construction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
Ihave read the above statementsa4 nderstand thepermit requirements and thepink copy of thepermit will be
available on site at all time or s ection purposes.
Signature: Date: —,/Y—
tor or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
: Ole -
APPROVED.BY
TIME AUTHORIZED: VOID AFTER D)kYS
SPECIAL CONDITIONS:
COMMENTS:
DATE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. I)iv. 1991
FIELD INSPECTION NOTES (Fund 111 Route copy to Street Dept.)
Commentg:
Diagram.:
CONTRACTOR CALLED FOR INSPECTION El 'VES El NO
Partial Work Inspection by, �.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
- t4 - WU%�$14'
I
RF.CF.1VF-0
CITY OF EDMONDS 31993 SIDE PERMIT
PT. PERMIT N 2 8492
9 PUBLIC \NORKS DE
7 -3
Address of Construction: 7SVC-
Property Legal Descript ion (Include all easements): -72 7 — e26C— CC P" -
Owner and/or Contractor:
State License No. A)*77ly-4-17? A"M Building Permit No.
01eingle Family
Multi -Family (No. of Units
11 Commercial
El Public
Invasion into City Right-of-Way)(No 0 Yes
RW Construction Permit
Cross other Private Property:XNo 0 1. Yes
Attach legal description and copy of recorded easement
I certify that I �avJrea'j,4_'�s 11 comply with'all city requirements
as indicated on the bZk ofthe' Permit Card.
Z _—
Date
* CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION *
OFFICE USE..ONLY,....
-------------------
FOR INSPECTION CALLOTAM, PUBLI ' C WORKS DEPT.
7 71-od-,;L-0
Permit Fee: 00 Issued By
Tru n k Charge: 5-1 00 Date Issued: 7-/2--17
Assessment Fee: Receipt No
Lid No.:— 2V5-
Partial Inspection: Date —Initial —
Comments
Reason Rejected: Date —Initial —
I
Final Inspection Approved: Date/-Q-_'23 Initial/ —A' 4"p
** PERMIT MUST BE POSTED ON JOB SITE **
White Copy: File Green Copy: Inspector Buff Copy: Applicant
Revised 3190
Side Sewer Drawing
The City of Edmonds EASEMENT NO - ------------------- ----------------------
NEW CONSTRUCTION REPAIRS F1 LID NO - ------------------ ASMT. NO - ----------------
OWNER------------------------------------------------ ----------------------------------------------- CONTRACTOR ---------------------------------------------------------- ......................... PERMIT NO. & -- - --- Z
JOB ADDRESS Tlf . ........
................. LEGAL DESCRIPTION: LOT NO - --------- ----------------------- BLOCK NO - ------------------------------------
c", a
70
0 k
m
c-;
aj� a
M
-
0
n
Q cl
C.,
ci
r, Ic
7-3 CD
NAMEOF ADDITION --------------------------------------------------------------------------- ------------------------- ................
-1 -1, ---*- I
374-
J
EEEEE
V
PP.Dip.
C&;?
Approved: u 1E. w.
PWW-0001-1 1/75 (REVA 1/78) DATE7 ------------ - By ....... . .... .........
,Z-'V5PEr-7-E9 by - -S- L-4-L-P
WATM se-mvice
la Drawing
The City of Edmonds .777.- t. I EASEMENT NO - --------------------------------------------
NEW CONSTRUCTION Eg REPAIRS F-1 LID NO - ------------------- - ASMT. NO - ------------------
OWNER------------------------------------------------------------------------------------------------
JOB ADDRESS -1-'7.!B.C)G ------- 73-RD --- kk,� - W- ---------------------------
P�avqzlamm —
lq�
PWW-0001-11/75(REV.11/78)
CONTRACTOP- ------------------------------------------------------------------------------------ PERMIT NO - --------------------
LEGAL DESCRIPTION: LOT NO . .......................... ---------- BLOCK NO . ................. - -----------------
.................. ------------------------------------------------------ ------------------
?7 Z� Z5 -12
................... ........ ;c� ---------- ----------- !-i—lz-�� --------- -----------------
E
'�j
E
cl .-3
up
-�-2j
ci
cc
cr-
2
C) cl.,
E
Llj
///'Approved:
PL.W.
rl- VA-53 ............. / At
DATE ...... L .................... --- By ----------------------------
STREET FILE
PROPOSED MITCHELL RESIDENCE, LOT 8
73RD PLACE WEST
EDMONDS, WASHINGTON
JOB Nd. 9606-11G
I
TABLE OF CONTENTS
Scope
Page 1
Project Description
Page 2
Site Description
Page 2
Subsurface Soil -and Ground Water conditions
Page 4
Soil Conditions
Page 4
Ground Water
Page 5
Laboratory.Testing
Page 6
Conclusions
Page 6
Slope Stability
Page 6
Recommendations
Page 7
Site Preparation
Page 8
Grading
Page 9
Erosion Control
Page 9
Foundation Design
Page 10
Drainage
Page 11
Structural Fill
Page 11
Retaining Walls and Lateral Forces
Page 12
Construction Monitoring
Page 13
General
Page 13
Appendix A-- Test Boring Location Map
Appendix B
Test Boring Logs
Appendix C
Laboratory Results
Appendix D Unified Soils
Classification System
CASCADE GEOTECHNICAL INC.
12911 N.E. 126TH PLACE (206) 821-5080
KIRKLAND, WASHINGTON 98034 FAX: (206) 820-6953
May 7, 1991
Job No. 9006-11G
Linda Mitchell
17808 73rd Place West
Edmonds, Washington 98026
Reference: Proposed Mitchell Residence, Lot 8
73rd Place West
Edmonds, Washington
Dear Ms. Mitchell:
At your request, we have conducted a subsurface soils investigation
-for the above site. The following report summarizes our findings
and pr . dsents conclusions and preliminary recommendations f or the
proposed project.
SCOPE
The scope of our study was to determine the subsurface soil and
ground water conditions in order to formulate conclusions and
recommendations which conform to the city of Edmonds' Meadowdale
Checklist per ordinance 12661 for construction and
Site Evaluation
development of the site. . At this time no building plans have been
developed; therefore, it will be necessary for us to review the
building, grAding and drainage plans once they are available so we
can update our report to conform with the City . of Edmonds
requirements.
The site investigation was based on a detailed, visual surface
reconnaissance' of the site, a review of the available geologic
information, one (1) portable augerboring and one (1) hand, drilled
boring. this report presents , conclusions and preliminary
recommendations for site preparation, grading, foundation design,
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 2
lateral pressures, drainage, erosion control, and construction
monitoring requirements.
PROJECT DESCRIPTION
We understand that the proposed project is to * consist of the
construction of a new residence utilizing a daylight basement.. No
building plans have been developed at this time.
We were provided with a site plan which was prepared by Darell
Ford, dated November 13, 1990. This site plan shows the proposed
residence location and the existing topography using two (2) foot
contours. Based on the proposed building footprint, the proposed
residence will cover approximately 2200 square feet and will be
located on the central and southeastern portions of the property.
The City of Edmonds requires a review of the final building plans
by our office to confirm that our recommendations were properly
interpreted. The existing. topography and the proposed house
footprint as shown on the site plan are presented in Appendix A.
SITE DESCRIPTION
The site is an undeveloped, irregular shaped property located
immediately northeast of the cul-de-sac of 73rd Place West which is
south of the Meadowdale area in Edmonds, Washington. The site is
bounded by a northeast -southwest. trending shallow gully to the
north and existing residences to the northwest, south, and east.
The proposed residence site is located near or on a relatively flat
terrace at t . he top of moderately to steeply sloping ground on a
west -facing hillside. We observed no indications of past slope
instability on the property.
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 3
As determined from on -site visual observations and the site map',
the ground sloped down to the west and northwest on the southern
a nd northern portions of the property, respectively, from an
existing residence and a landscaped yard along the eastern property
line. on the northern end of the property, the ground sloped down
at about thirty (30) to thirty-five (35) degrees for a vertical
distance of twenty (20) feet before flattening out at a dry gully.
on the southern end, the ground sloped down at approximately twenty
(20) degrees to a relatively f lat terrace. This terrace was
approximately thirty (30) f eet wide at the southern edge of the
property and tapered to a point sixty (60) feet north of the south
property line. The western edge of this terrace appeared to be
oversteepened by the placement of fill material. The ground then
sloped down towards the west at approximately thirty-f ive (35)
degrees for a vertical distance of about sixteen (16.) f eet before
flattening out at the perimeter of the existing residence on Lot 9
and the ground adjacent to the cul-de-sac.
The site had been cleared of mature trees and was presently
vegetated with grasses and brush. Horsetails were observed at the
base of the slope and adjacent to the existing residence on Lot 9
located to the west. Soft soil with weak seepage was also observed
in this area.
The site is not located within the Meadowdale la ndslide complex as
shown on the "Landslide Hazard Map" by GeoEngineers, Inc. presented
in the City of Edmonds I '.'Meadowdale Site Evalua ' tion Checklist".
Based on our review of the above map, the. site is located about
5000 feet south of the southern extent of the mapped slide area.
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 4
SUBSURFACE SOIL AND GROUND WATER CONDITIONS
The site subsurface conditions were determined by drilling one (1)
test boring and excavating one (1) test hole using a hand -driven
split -spoon sampler on March 24, 1991. A portable, hollow -stem
auger was used to advance Test Boring 11. -Samples were obtained
from selected depths in accordance with ASTM D-1586 sampling
procedures. Test Boring #1 was drilled near the southern end of
the flat terrace. The hand -driven test hole (Hand Boring ji) was
located on the slope immediately below the northern tip of the
terrace area. The boring locations were selected by an engineering
geologist from our office -and located by pacing relat ive to known
landmarks. The boring locations are shown' on the site plan
presented in Appendix A.
The soil samples obtained were described in the field and were
classified using the, Unified Soils Classification System. The
boring logs and soil descriptions are presented in Appendix B. A
copy of the Unified Soils Classification System is presented in
Appendix C. All elevations mentioned in this report are referenced
to the existing ground surface at the time of our study.
soil.conditions
Test Boring #1 showed approximately three (3) feet of a loose,
poorly sorted sand overlying interbedded, hard clayey and sandy
silt. This soil was observed to grade into a sequence of very
dense sandy silt, silty sand and sand below five (5) feet. - Test
Boring 11 was terminated at eighteen and one-half (18 1/2) feet
below the exis ting ground surface.
Hand Boring #1 showed approximately eight (8) feet of uncontrolled
fill consisting of wet to saturated silty sand. Below the
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 5
uncontrolled fill was a loose to medium dense, wet sand and silty
sand. The test boring was terminated at eight and one-third (8
1/3) feet due to the limiting driving forces used in this hand -
driven boring.
The site lies within an area that has been geologically mapped near
the contact of Vashon Till and the older, underlying Advance
Outwash as shown on the "Geologic Map of the Edmonds East and part
of the Edmonds West Quadrangles, Washington" (USGS MF-1541, Minard,
1983). The interbedded hard silts and very dense silty sand and
sand are generally consistent with lower sections of the till and
the upper section of the advance outwash.
Ground Water
In Test Boring fl, ground water was encountered at the base of the
loose sand between two and one-half (2 1/2) feet and in the very
dense sand between seventeen (17) and eight een (18) feet below the
surface. In Test Boring #2, the uncontro lled fill was observed to
be wet throughout this soil unit.* Mottling wa s found in the soil
immediately below the uncontrolled fill.
It is our conclusion that the ground water found in Test Boring 11
is transmitted �through relatively permeable. granular soil layers or
lenses. The underlying and/or overlying silts and silty sand beds
are relatively impermeable and confine any appreciable ground water
.flow to the permeable sandy soils.
Horsetails were observed within the area of weak seepage at the toe
of the steep slope. This area is roughly at the same elevation as
-the observed ground water seepage in the very dense sand in Test
Boring *1 and may indicate that this water table intersects the
base of the fill slope.
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 6
Laboratory Testing
'All soil samples obtained from the test borings were returned to
our office for further visual examinations. In addition to visual
examinations, representative samples were tested for grain sizel
moisture contents, and whe . re applicable, plasticand liquid limits
as aids in soil classification. The results of these tests are
included in Appendix D'.
CONCLUSIONS
The site is suitable f or the. proposed development, provided our.
recommendations are closely followed and special precautions are
taken. We anticipate that a spread and stri * p footing foundation
can be used if the footings bear directly, on the native, very . dense
and/or hard soils found below the uncontrolled fill and loose sand.
The most appropriate approach for control of storm drainage from
footing drains and impervious surfaces is to utilize an enclosed
conveyance system which routes the water to the bottom Of the slope
and then to a suitable outlet on the relatively flat, western edge
of the property.
Slope StabtilllitYy
The provided site map shows the western edge of the proposed
residence to be situated on the slope. We understand that the
building will utilize a daylight basement so a cut approximately
ten (10) feet high would be excavated into the west sloping
hillside.
It is our conclusion that the uncontrolled fill mantling the lower
west sloping hillside and the slope immediately north of the
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 7
terrace is potentially unstable. In order to stabilize the slope
before construction commences-1 the uncontrolled fill should be
regraded. as recommended in the Grading section of this report. The
native soils found below the uncontrolled fill and loose sand
presently appear stable, and would be expected to present little
risk of slope failure.' However, on the slope north of the fill
area, surface sloughing and movement can be expected in heavily
weathered soil mantling the relatively steep.slope, especially in
areas where the vegetation has been cleared. While this should not
affect the stability of the proposed residence during or after
construction, it may affect the pool area on Lot 9.
We conclude that the- construction of the residence will not
decrease the stability of the site or the surrounding area if our
recommendations are carefully followed. The construction of a
-daylight basement will minimize the potential of slope instability
on the- slope below the proposed residence due to the decreased load
from the removal of the excavated volume of soil, and the removal
of uncontrolled fill.
We have conducted a slope stability analysis of the slope before,
during and after construction to confirm the observations presented
above, using a simplified Bishop method of analysis on a computer
program designed for this purpose. We utilized estimated soil
parameters based on our experience and the test boring 'IN" value
(standard penetration test).
PRELIMINARY RECOMMENDATIORS
The native soils on the site are very moisture sensitive due to the
relatively high amount of fine-grained materials 'present. We
therefore recommend performing site preparation and excavation work
during an extended period of dry weather to avoid excessive costs
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 8
and construction problems associated with soil deterioration. If
wet weather construction is unavoidable, conformance with specific
recommendations for site preparation, drainage and erosion control
will be required.
Site Preparation
All uncontrolled f ill areas should be regraded as recommended in
the Grading section of this report bef ore construction begins. All
building and paved areas should be stripped of debris, topsoil.and
any uncontrolled fill down to native, bearing soil..*Care should be
taken to ensure that no debris or excavated soil is placed on the
slope face or near the top of the slope. Preferably, all excavated
material would be removed from the site altogether. The ground
surf ace and existing vegetation on the slope outside the building
area should be disturbed as little as possible during and after
construction. All disturbed areas of the slope should be planted
with deep-rooted vegetation immediately after construction.
All excavation subgrades should be graded or drained to avoid
uncontrolled runoff of water to the top of the slope or onto the
slope face. If necessary, temporary construction drainage,
tightlined to a suitable drainage point should be used. Runoff.
water should be directed away from the slope and the excavation to
a suitable outlet No runoff 'water should be discharged onto the
slope.
Based on our subsurface exploration, we anticipate that ground
water seepage, should be minimal in any basement excavation.
However, if ground water seepage is found to be greater than
expected, we should be engaged to observe the cut and to make
further recommendations regarding cut slope stability and drainage.
It may be necessary to place hand driven sand point drains and/or
shoring.
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 9
It may also be necessary to provide subdrainage to improve the flow
of the ground water which presently exits at the seep near the
property line. The details of this drainage should be developed
after the site is opened up.
Grading
We should be engaged to review the proposed grading plan. All
uncontrolled fill areas outside the building area should be
regraded to a 2.5(H):l(V) slope or flatter to minimize any future
instability.
Temporary cuts for the basement less than six (6)' feet high in the
glacially overconsolidated native soils may be sloped at a
1/2(H):I(V) grade. Any unsupported cuts over six (6) feet high in
the native very dense soils should be- sloped at a grade of
I (H) : I (V) or f latter f or temporary construction purposes. if
easements cannot be obtained for the southern edge of the basement
cut, shoring may be necessary. We should be engaged to observe the
excavation of all cuts over six (6) f eet high to evaluate slope
stability.
Erosion Control
Erosion control during construction will be required to protect all
exposed soils. We recommend placing a filter fabric fence
downslope from the proposed excavation level. This barrier should
be constructed to prevent.any sediments from being deposited on the
lower elevations of the west slope. No excavated soils should be
placed on or near the slope.
We recommend covering all cuts with plastic sheeting during and
after construction to minimize the potential for erosion and soil
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 10
deterioration. The plastic sheeting should be, anchored to the top
of the slope with stakes, and weighted down on the f ace of the
slope with sandbags. We recommend that we be engaged to observe
the placement of all erosion controls. All erosion control
measures should, conform to the City of Edmonds' specifications.
Immediately after construction is finished, all disturbed areas of
the slope outside the building area should be seeded with deep-
rooted vegetation or covered with other suitable landscaping to
resist surface erosion.
Foundation Design
Spread and strip footings may bear directly on a firm, horizontal
subgrade of the native, very dense or hard soil consisting of
interbedded- clayey silt, silt, silty sand and sand. The native
bearing s ' oil is suitable to support spread and strip footings
designed to a maximum safe bearing value of 2000 psf if the soil is
firm, undisturbed, free of organic material, and does not become
wet prior to concrete placement. A one-third (1/3) increase of the
bearing value may be used for the calculation of wind and seismic
loading. Spread and strip footings should have a minimum width as
determined by local building codes and should be placed at least
eighteen (18).. inches below final -grade for frost protection.
Any soft, wet or yielding areas within the foundation area should
be overexcavated down to firm ground. Structural fill which is
placed as recommended in the Structural Fill section of this report
may be used to raise the grade to subgrade elevations if the
overexcavated area is limited in area. Structural fill should not
be used to raise grades on the slope.
EM
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 11
Drainage
Footing drains should be placed at the base of all footings and
tightlined to the storm sewer system. We recommend using a four
(4) inch diameter, rigid, perforated pipe which is bedded in
several inches of pea gravel and backfilled with at least twelve
(12) inches of pea gravel.
Roof and parking area drains should be tightlined to the storm
. s . ewer system. These drains should be separate from the footing
drains and from each other. No water should be discharged onto the
western slope face or to the top of the slope.
Structural Fill
If structural fill is required to repair- the foundation subgrade,
i t should be placed on a horizontal subgrade of f irm, undisturbed,
native bearing soil in maximu m eight (8) inch, loose lif ts and
compacted to at least ninety-five (95) percent of the ASTM D-1557
maximum dry density value. We recommend that we be engaged to
review all proposed fills.
The on -site native soils are extremely moisture sensitive due to
the presence of fine-grained materials. The on -site native soils
may be used i;ut if the moisture content is over the optimum level,
the material will have to be dried or discarded.
If imported fill is required to repair the subgrade, it should
conform to the following gradation:
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 12
CASCADE GEOTECHNICAL
sieve size
4 inch
#4
1200..
Percent Passing
100
25-75
5 maximum, based'on
the percent passing
the 14 sieve.
We recommend that we be engaged to observe and test the placement
of any structural fill to confirm that the fill has been placed in
accordance with our recommendation s.
Retainina Walls and Lateral Forces
All retaining and basement walls should be backfilled with a free -
draining, imported granular fill which conforms to the structural
fill gradation presented in the preceding section of this report.
Where -the backfill supports structural features such as entries,
stairs and paved areas, the material should be placed in maximum
twelve (12) inch loose lifts and compacted to at least ninety-five
(95) percent of the ASTM D-1557 maximum dry density value. We
recommend compacting the wall backfill with light weight,. hand -
operated equipment to avoid overstressing the wall.
A - f our (4)._ inch diameter, rigid, perf orated pipe f ooting drain
which is bedded in several inches of pea gravel and backf illed with
at least twelve (12) inches of pea gravel, should be placed at the
base of all retaining walls. The drain should continue along the
length of t he wall (s) a nd should be tightlined to the drainage
system.
Rigid retaining walls that cannot deflect when backfilled 'may be
designed to resist an at -rest lateral force of 55 pcf equivalent
fluid pressure. Flexible retaining walls that can def ldct at least
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 13
0.001H when backfilled may be designed to resist an active lateral
force of 35 pcf equivalent fluid pressure.
These forces assume a horizontal backfill with no surcharge. For
any other configuration, we should be contacted so that we may
comment on design suitability. The native soil may be assumed to
have a passive earth pressure of 406 pcf equivalent fluid pressure.
We recommend that we be engaged to review the final plans to verify
that our preliminary recommendations have been properly
interpreted.
Construction Monitoring
We should be engaged to observe all proposed cuts on the slope and
to observe all erosion control placement. We recommend that we be
'engaged to observe all site preparation and the installation of
drainage a nd to confirm that bearing soils have been reached for
the building foundation. Structural fill placement and compaction
f or subgrade repair should be observed and tested, respectively, by
our office. These recommendations are for engineering review and
goes beyond any testing agency involvement which may be required.
General
We r . ecommend that we be engaged to review the building, grading and
drainage plans to verify that our preliminary recommendations have
been properly interpreted and implemented into the plans, and so
that we can make adjustments to or report for conformance with the
City of Edmonds' Meadowdale Site Evaluation Checklist per ordinance
#2661.
We expect the on -site soil conditions to reflect our findings;
however, some variations may occur. Should soil conditions be
CASCADE GEOTECHNICAL
May 7, 1991
Linda Mitchell
Job No. 9006-11G
Page 14
encountered that cause concern and/or are not discussed herein,
Cascade Geotechnical should be contacted immediately to determine
if additional or alternate recommendations are required.
This report has been prepared f or the exclusive use of Linda
Mitchell for the specific application to the proposed residence
located on Lot 8 at 17808 73rd Place West in Edmonds, - Washington"
in accordance with generally accepted soils and, foundation
engineering'practic'es. No other warranty, expressed or implied, is
made.
Thank you for this opportunity to assist you with this project.
Should you have any questions, please feel free.to contact us at
any time.
Sincerely,
CASCADE GEOTECHNICAL
Geoi7ge E. Lamb, P.FI
President and Princ
Jason Olsson
Engineering Geologist
J6:pg
5 T
Um
N
MITCHELL SITE
HAND & TEST BORING LOCATION MAP
310
8
H.B.,
PROPOSED
HOUSE
T.B. 1
w
w
(r
co
FROM TOPOGRAPHIC SURVEY SUPPLIED BY THE MITCHELLS
Job No. SCALE 30'
FWCASCADE GEOTECHNICAL, INC. 03/24/91 1
LOCATIONS ARE APPROXIMATE
12919 N.E. 126TH PLACE (206) 821-5080
KIRKLAND, WASHINGTON 98034 FAX: (206) 823-2203 Date —FD---By Eng
9006-1 1G HLA
Project
JobNo. 9006-11G
Date 03/24/91
MITCHELL SITE
Boring No. 1
Dwn.BY HLA
Driller DRILLING UNLIMITED
Drill Type HOLLOW STEM AUGER (PORTABLE)
Geo/Eng J. OLSSON
Hole Dia. 4"
Fluid NONE
Penetration
M
Soil Description & Classification
Notes
0
C1
4)
-a
a
Cn
E
0
0
SOD. 4%
SAND; as below, except moist. (SP)
--
SAND; top 6", light brown with mottling, loose, wet to saturated.(SP)
-
9
16
30
46
CLAYEY SILT/SANDY SILT; bottom 1', brownish gray, very dense,
- 03/24/91
5—
moist, interbedded. (CL/ML)
-
35
50
-
+50
SANDY SILT/SILTY SAND: gray, with trace gravel, very dense, moist,
-
interbedded. (ML/SW)
21
50
-
+50
SANDY SILT/SAND: as above. (ML/SW)
10
moo
-.11:-
.0
..o o'
00
22
50
+50
SAND; light gray, with trace gravel, very dense, damp. (SW)
15
.0
SAND: top 6", gray, with trace gravel, very dense, saturated. (SW)
- -
03/24/91
21
50
+50.
SANDY/CLAYEY SILT; bottom 6", gray, very dense, moist. (ML/CL)
-
T.D. 18.5'
-
20
25
3b—
Notes: Ground water seepage encountered @ 2.5'- 3' and 17'- 18' within sand units.
Conditions shown represent our observations at the time and location of the field work, modifications based on lob tests. analysis, and geological and engineering judgement. The" conditions
may not exist at other times and locations, even in close proximity. This information was gathered as part of our investigation, and we are net responsible for any Lae or interpretation of the
information by at
CASCADE GEOTECHNICAL, INC.
TEST BORING LOG
Page 1 of 1
H.A.
Soil Description & Classification
H.A
Soil Description & Classification
0 8' UNCONTROLLED FILL: light brown
0-
MO to light gray, wet to saturated,
-
silty sand.
-5
-18'- 8'4"SAND/SILTY SAND; brown with some
mottling, with trace gravel, loose
to medium dense. (SW/SM)
T. D. 8'4"
-10
-10
Notes:
Notes:
H.A.
Soil Description & Classification
H.A.
Soil Description & Classification
0-
0-
-10
-10
Notes:
Notes:
CASCADE GEOTECHNICAL, INC.
HAND AUGER LOG
Project MITCHELL SITE
Conditions shown represent our observations at the time and location of the field work. modifications based on lab tests. analysis, and geological and engineering judgement. These conditions
may not exist at other times and locations, even in ciose proximity. This information was gathered as part of our investigation, and we we not responsible for any use or interpretation of the
information by at re.
Date - 03/24/91
Job No. 9006-11 G
Dwn. By HLA. T
Geo/Eng J0
CASCADE TESTING LABDRATDRY. INC.
7ESTINWG INSPECTION/ENGINEERSIGEOLOGISTS
12919 N.E. 126th PLACE
KIRKLAND, WASHINGTON. 98034 [M) a23-9800
SEATTLE (206)525-6700
ENERETT (206)259-0817
GRAIN SIZE DISTRIBUTION TEST REPORT
Cu
A
1.0 0.1 0.01 0.0011
GRAIN SIZE - mm
Test
% +3"
% GRAVEL
SAND
% SILT
% C
1 2
1
-
�H
Project No.: 9006-IIG Date :04/01/91
P-roject: MITCHELL RESIDENCE
*Location: Sample #1 (7.5"- 9")
MATERIAL DESCRIPTION
Remarks:
WATER CONTENT: 3%
CHECKED
w
ONKAIREMB
anommumon
MOMMEMNIN
nommoommen
women
2;;;;nzll
Wo
UNIFIED SOILS CLASSIFICATION SYSTEM
MAJOR DIVISIONS
SYMBOL
LETTER
DESCRIPTION
GW
Well - graded gravels or gravel - sand mixtures,
CLEAN
little or no fines
Poorly graded gravels orgravel-sand mixtures.
GRAVELS
GRAVEL &
GP
little or no fines
GRAVELLY
SOILS
M
Silty gravels or gravel -sand -silt mixtures
GRAVELS
GC
Clayey gravels or gravel- sand -clay mixtures
COARSE
WITH FINES
GRAINED
Well -graded sands or gravelly sands. little or
SOILS
CLEAN
SW
no fines
Poorly graded sands or gravelly sands, little
SANDS
SAND &
SP
or no fines
SANDY
SOILS
SM
Silty sands,or sand -silt mixtures
SANDS
SC
Clayey sands or sand -clay mixtures
WITH FINES
Inorganic Silts & very fine sands, rock flour. silty
ML
or clayey fine sands. or clayey silts with slight'
SILTS & CLAYS
plasticity
Inorganic clays of low to medium plasticity,
CL
gravelly clays, sandy clays, silty clays or lean clays
Liquid Limit Less Than 50
organic silts & organic silty clays of low
FINE
1111111
OL
plasticity
GRAINED
Inorganic silts. micaceous or diatomaceous fine
SOILS
1111HE
MH
sandy or silty soils, elastic silts
SILTS & CLAYS
CH
Inorganic clays of high plasticity. lat clays
Liquid Limit Greater Than 50
Organic clays of medium to high plasticity.
OH
organic silts
HIGHLY ORGANIC SOILS
.7
PT
Peat or other highly organic soils
TOPSOIL
Humus & duff layer
F I L-I.-
Uncontrolled. with highly variable constituents
SYM
BOL
DATUM
NOTE
2" O.D. Split Spoon Sampler
Sample Interval
Ring or Shelby Sampler
Sample Interval
PSampler
Pushed
Sample Interval
Other Sample Type
Sample Interval
SYM
BOL
DATUM
NOTE
Water Level
Date Recorded
Ts
Torvane Reading
qu
Penetrometer Reading
iwater
Observation Well
Tip Elevation
CASCADE GEOTECHNICAL, INC. KEY CHART
LO �46
CASCADE GEOTECHNICAL INC.
12016 115TH AVENUE N.E., BLDG. H (206) 821-5080
KIRKLAND, WASHINGTON 98034 FAX: (206) 820-6953
February - 10, 1993
Job No. 9006-11 G
Martin Brown
3607 228th St. S.W.
Brier, Washington 98036
Attention: Martin Brown
Reference: Plan Review
Mitchell Site
17808 73rd Place West
Edmonds, Washington
Dear Mr.'Brown:
op%agr
Z51 REET FILE
RECEIVED
FEB 1 6 1993
PERMIT COUNTER
As you requested, we have completed our review of the set of building plans you provided. The
following letter summarizes our conclusions relative to the geotechnical recommendations as
outlined in our Soils Report, dated May 7, 1991.
We are also providing a minimum risk statement in this letter as requested by The City of
Edmonds.
SCOPE
The scope of this work consisted of a review* of the set of building plans you provided, a review
of the available information in our files, and the preparation of this letter. The purpose of this
letter is to provide a summary of our review of the plans as well as an evaluation of whether our
recommendations regarding geotechnical concerns, as stated in our Soils Report dated May 7,
1991, were interpreted accurately and incorporated in the plans.
PROJECT DESCRIPTION
We understand from reviewing the set of building plans, that the proposed. development will
consist of the construction of a two (2) story, single family home with a slab on grade basement
grade floor. We understand from the plans that the. structure win utilize a spread footing
foundation. We were provided with the following sheets in the set of building plans prepared
by Phillip N. King, Designer: An undated site plan, an undated and unnumbered elevation plan,
and Sheets 2 of 9 through Sheets 9 of 9, dated December 11, 1992.
4200 MERIDIAN, SUITE 216 (206) 647-8588
BELLINGHAM, WASHINGTON 98226 FAX: (206) 671-4329
CASCADE GEOTECHNICAL INC.
February 10, 1993 Job No. 9006-11G
PLAN REVIEEW
Based on our review of the set of plans and our soils report, it appears that the plans are in
general conformance with our recommendations regarding geotechnical. concerns as stated in our
Soils Report, dated May 7, 1991. However, there are internal discrepancies or omissions in the
set of plans which must be addressed.
0 We understand from the site plan that cuts up to eight (8) feet in depth will be made during
the excw.,ation cf dh. footina foundation. We recommend that these. cuts be sloped at a grade.
of I (H): 1 (V) or flatter for temporary construction purposes. If adequaae s-pace it not available
to slope the cuts adequately and/or adverse soil conditions are encountered on -site, then shoring
would become necessary. Additional recommendations for deep cuts as stated in our Soils
Report, dated May 7, 1991, should be followed.
* We were not provided with the grading, drainage, and erosion control plans in the set of plans
that we reviewed. We recommend that these be implemented in the final set of plans and that
we be engaged to review these plans before the initiation of construction to insure that our
recommendations as provided in our Soils Report, dated May 7, 1991, were properly
incorpor ated in the plans.
0 On the building section detail (Sheet 9 of 9), the following footing drain specification was
provided on the plans: ", 4 inch perforated drain with 12 inch gravel cover " We recommend
using a four (4) inch diameter, rW, perforated pipe which is bedded in several inches of
gravel and backfilled with at least twelve (12) inches of pea gravel or washed rock.
0 In the plans that we reviewed, a capillary break was not provided for the slab on grade fl-oors.
We recommend that a four (4) inch layer of clean sand, pea gravel, or crushed rock having less
than five (5) percent material passing the #200 sieve, based on the fraction passing the #4 sieve,
should be placed below the floor slab as a capillary break. We recommend placing a vapor
barrier between Lie bottom of the slab and the capillary'break. If desired, one (1) to two (2)
inches of clean sand may be placed over the vapor barrier to aid in concrete curing.
0 In addition to the recommendations provided in our Soils Report dated May 7, 1991, we were
asked by you through a phone conversation to provide a statement of risk evaluation for a 25
year seismic event in the vicinity of the site. Based on our analysis and experience in this. area,
it is our conclusion that there is less than a 30% chance of movement on the above referenced
site within a 25 year period.
0)
CASCADE GEOTECHNICAL INC.
February 10, 1993
GENERAL
Job No. 9006-11G
The conclusions provided here are based on our understanding of the project at this time. The
plans should be modified to reflect the conclusions as stated above and those provided in our
Soils Report, dated May 7, 1991. In addition, we should be engaged to review the final set of
building plans prior to the commencement of construction to confirm that our recommendations
have been properly interpreted.
We recommend that we be engaged continuously to monitor the stability of the on -site slopes
during construction. We recommend that we be engaged to monitor all excavations so that we
can provide on -site recommendations, should any adverse soil'and/or ground water conditions
be encountered. We recommend that we be engaged to observe site preparation and earthwork
to verify subgrade conditions and confirm bearing soils. We should also be engaged to observe
and test the placement -of structural fill and the backfill of all retaining walls. These
recommendations are for engineering review and go beyond any testing agency involvement
which may be required.
This letter has been prepared exclusively for Mr. Martin Brown for the specific application to
the proposed development at the Mitchell Site in Edmonds, Washington, and is in accordance
with generally accepted soils and foundation engineering practices. No warranty, expressed or
implied is made.
Sincerely,
CASCADE GEOTEO'
6
7,
rge E.
Presi ent
EX P I R E S 1 -2 �2>
3
Anh-Tuan Ngo Dinh
Civil Enigineer
ril M111
Critical Areas Checklist
Site Information (soils/. topography/ hydrology/vegetation)
1. Site Address/ Location:
2.
3.
4.
5.
CAFileNo:.
71 1.dul
E�_�a W W �1 \",I L's ED
IM
Property TaxAccount Number: 00 ?)rl (Do 0 0 0� 00
INTER
Approxninate Site Size (acres or square feet): RMIT COL
Is. this site currently developed? yes; —no.
If yes; how is site developed?
Describe the zeneral site topo
Flat less than 5-feet elevation change over entire site..
Rolling: slopes on - site- generally; less than15% (a vertical rise of 10-feet over 'a horizontal
distance of 66-feet).
Hilly: slopes present on site 6f more than 15% and less than 30% (a vertical rise of 10-feet
over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a'vertical rise of 10-feet over a horizontal
distance. of less than, 33-feet).
Other (please describe):
6 . Site contains areas of year-round standing water: Approx. De th;
p
7. Site contains areas of seasonal standing water: Approx.DeOth:
What season(s) of the' year?
8. Site is in the'floodway - floodplain of a water course..
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round?
Flows are seasonal? (What time of year?
10. Site is primarily: forested meadow ;shrubs* mixed
urban landscaped (lawn, shrubs etc)
11. Obvious wetland is present ori site:
For City Staff Use 0 . nly (4Di)
1 Plan Check Number, if applicable? tA 0 Y16 oiveyl.
2. Site is Zoned? P- S
3. SCS mapped soil type(s)? 6- Al &-&VVVDD4 IAIVIO OL V) I(AVId WVVIRI D 12-e,5
9/ 2) — A-1 drAlm) t) d cwaVrAlu g;,avA&.A InaM I E5 - n n -r. r--?
4. Critical Areas inventory or C.A. map indic�ates Critical Area on site? &,De, i UY) h a 7,a rd-.,
MMICAtt� fn�iM hA-1). -P,(Af7t Of FrDF��j 9it& ff:., f�IA-;;rIlf-014 Lj
5. Site within designated earth subsidence landslide hazard area?. NJ 0 VWi- e7 U
0 f f� u a I t-p yn A -H ri cA I d ff &y vvi i vi 61-h Dyl
DETERMINATION
STUDY REQUIRED X. WAIVER
Reviewed bv- 0 1 NV&,l (10 Cc4 OL/I Date: 00i I 1A /U015-
#P20
City. of Edmonds
Development Services Department
Planning Division
Phone: 425.771.0220
Fax: 425.771.0221
The Critical Areas Checklist contained on this form is to
be filled out by any person. preparing a Development
Permit Application, for the City, of Edmonds prior to
his/her submittal of thb application to the City.
The purpose of the Checklist is. to enable City staff to
determine whether any potential Critical Areas are, or
may be, pre -sent on. the subject property. The information
needed to xomplete� the Checklist :,should be easily
available from observations of the site or data available at
City Hall (Critical areas inventories,, rr�aps, 'or soil
surveys).
Date Received: 9 / / f, /;a- 00;
City Receipt#: Z :2 Z 5-&
Critical Areas File#: 7,0015-011+1
Critical Areas Checklist Fee: $135.00
Date Mailed to Applicant:
A property owner, or his/her authorized representative,
must fill out the checklist,. sign and dateit, and submit it
to the City. The City will review -the checklist, make a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a development
pennit application.
Please submit a vicinity map, along with the signed copy
of this, form to,assik City staff in finding and locating the
specific piece of property described on this form. In
addition, the applicant, shall include other pertinent
information .(e.g. site plan, topography map, etc.) or
studies in conjimction with this Checklist to assistant staff
in completingtheir prelirriinary,assessment of the site.
The undersign ed applicant and his/her/its heirs, and assigns, in consideration on the processing of the application agrees
to irlease, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including i-ea.sonable
attorney'S fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or
incorn plete information fumished by the ipplicant,-his/her/its agents or employees.
B 'my §ignattlie'-I c&rfif�46t the information'.aind exhibits herewith submitted are true and correct to the�best of
y 2 MY
kn6wie'dit andihitJ.'ar authorized to fil this ication on the behalf of the: owner as'listed below.
DATE
-0-
�SIGNATIJRE Ot APPLICANT/A0,E:NT
Property Owner's Authorization
'By -my signature, I.cer* that I have auth
orized the above Applicant/Agent to apply for die subject land use application,
and grant my permission for.the public officials..and the staff of the City of Edmonds to enter the subject property for the
purposes of inspection and attenda�t to this application.
DATE
SIGNAITIUM Of 0
PLLASE PRINT C.LEA_
�OwneHcant, Applicant Representative:
r/App
Pken �ino(CL 1_,� -V C, ke I
Name
Naxne.
W
-Street Address Streei Address
C�
on
`M5 -WA
city State n City State zip
-7 2-- 6ct
Telephone: Telephone:
Email address (optional): 10 n� _SM Q Email Address (optional):
comca5t nit
.STREET FILE
11
060
IV ,
o
-TV ln;kaf-d
ru -Ps4*4ioK pk
Avwnw,)
tl
ATJOkL
M" (4 2 S�)
Mko Flk�e, U., iA - 2*
11 . q
za