Loading...
17919 75TH PL W.PDF1111111111116085 17919 75TH PL W -4 m zt 4 ,OD b M 6 Jo" IOU -4 -:u I . 0 _ _ o CL (D 0 CD 0 Z (D > n > 0 t7l n z 2) (A -i 0 0 o �(A 0 z 0 L ✓ p, Z 0 to 2 o z n �r CITY OF EDMONDS PUBLIC WORKS DEPARONT FOR I TION CALL r Permit SIDE SEWER PERMIT 775-2\515 Ext. 220 Issue Date PERMIT MUST BE POSTED ON JOB SITE 1 1. Address of Construction 1 2. Property Legal Description (include all easements) 3. Single Family Residence Multi -Family No. of Units Commercial 4. Owner and/or Builder 5. Contractor & License No. 6. Invasion into City Right -of -Way: No Yes (If Yes Right-of- way Construction Permit Required - Call Dial Dig (342-5344) before excavation). Ei 7. Cross other private property: Yes No Easement required - Uattach legal description and county easement number. H ' w READ THE FOLLOWING AND SIGN: a a. Property owners must obtain a perm't to nstall side sewers on >4 their property. A licensed side sewer cont or must be employed to construct side sewers in the public right-of-way. w b. The side sewer contractor assumes full reponsibility for each H installation for one year. wC. Commercial establishment requires a minimum of a six inch (6") z side sewer line. o d. Side sewers may not be installed closer than thirty inches (30") to any structure. co e. Side sewer lines must be laid at a minimum grade of 2% (1.150) and maximum grade of 100% (450). H f. No turn in side sewer greater than 45° (1/8!bend) is0allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 bend) and wye with removable cap. g. No down spouts, footing drains or floor drains can be connected to side sewer system. h. Pea gravel is required for bedding when installing sewer lines through other than granular soil. i. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 100' along sewer line run. j. Trenches within City right-of-way must be restored to original conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. k.. Side sewer must be left uncovered until inspected and,,approved by the City. 1. Inspection during normal working hours only. Two (2) working days notice required. DATE: PERMIT FEE: U W CONNECTION FEE: O w * PERMIT I certify that I have read and shall comply with the above DISAPPROVED By: Date: Date: APPROVED By: Date: T BE POSTED ON JOB SIT