Loading...
17927 75TH PL W.PDF17927 75TH PL W cry C I z M o 0 z o � a a n d 0 d � � � a z z o S z ° F Z N r° o ; o � z 0 z n 0 z a a 0 z ■ d> o z z 0 i� I� o WL rCITY OF EDMONDS _ ,,' FOR INSPECTION CALL 'l ," PUBLIC WORKS DEPAR*NT Permit 1i"To4 SIDE SEWER PERMIT 775-2525 Ext. 220 Issue Date�t�-��/�j' PERMIT MUST BE POSTED ON JOB SITE 1. Address of Construction 2. Property Legal Description ( include all, easements)w�- L 6T � Z 3. Single Family Residence Multi -Family No. of Units 1 1 Commercial . 1 4. Owner and/or Builder �, �,5 { �'V-V'- RE- 4:3761— 5. Contractor & License No. 6. Invasion into City Right -of -Way: No Ul Yes (If Yes Right -of- I" way Construction Permit Required - Call Dial Dig (342-5344) before 1 excavation). 1 Ei 7. Cross other private property: Yes No Easement required - 1 attach legal description and county easement number. 1 w READ THE FOLLOWING AND SIGN: 1 1 a. Property owners must obtain a permit to install side sewers on their property. A licensed side sewer contractor must be employed to 1 construct side sewers in the public right-of-way. w b. The side sewer contractor assumes full reponsibility for each 1 Ei installation for one year. 1 wC. Commercial establishment requires a minimum of a six inch (6") side sewer line. 1 o d. Side sewers may not be installed closer than thirty inches (30") to any structure. 1 e. Side sewer lines must be laid at a minimum grade of 2% (1.150) 1 O and maximum grade of 100% (450). 1 0 H f. No turn in side sewer greater than 45 (1/8;bend) is0allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 1 bend) and wye with removable cap. 1 g. No down spouts, footing drains or floor drains can be connected to side sewer system. h. Pea gravel is required for bedding when installing sewer lines 1 through other than granular soil. i. Cleanouts are required at 30"-60" from each plumbing exit line 1 and at minimum intervals of 100' along sewer line run. 1 j. Trenches within City right-of-way must be restored to original 1 conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. 1 k.. Side sewer must be left uncovered until inspected and approved by the City. 1. Inspection during normal working hours only. Two (2) working 1 days notice required. DATE: 1 6 1 a') a M I:�I'certify t at I have read and shall comply with the above PERMIT FEE:_ g®DISAPPROVED By: Date: By: Date: CONNECTION FEE: 11 c APPROVED By : Ate_ Date • ,,. -L^--� � O r * PERMIT MUST BE POSTED ON JOB SITE