,,' FOR INSPECTION CALL
'l ," PUBLIC WORKS DEPAR*NT Permit 1i"To4
SIDE SEWER PERMIT 775-2525 Ext. 220 Issue Date�t�-��/�j'
PERMIT MUST BE POSTED ON JOB SITE
1. Address of Construction
2. Property Legal Description ( include all, easements)w�-
L 6T � Z
3. Single Family Residence Multi -Family No. of Units
1
1
Commercial
.
1
4. Owner and/or Builder �, �,5 { �'V-V'- RE- 4:3761—
5. Contractor & License No.
6. Invasion into City Right -of -Way: No Ul Yes (If Yes Right -of-
I"
way Construction Permit Required - Call Dial Dig (342-5344) before
1
excavation).
1
Ei 7. Cross other private property: Yes No Easement required -
1
attach legal description and county easement number.
1
w READ THE FOLLOWING AND SIGN:
1
1
a. Property owners must obtain a permit to install side sewers on
their property. A licensed side sewer contractor must be employed to
1
construct side sewers in the public right-of-way.
w b. The side sewer contractor assumes full reponsibility for each
1
Ei installation for one year.
1
wC. Commercial establishment requires a minimum of a six inch (6")
side sewer line.
1
o d. Side sewers may not be installed closer than thirty inches (30")
to any structure.
1
e. Side sewer lines must be laid at a minimum grade of 2% (1.150)
1
O and maximum grade of 100% (450).
1
0
H f. No turn in side sewer greater than 45 (1/8;bend) is0allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
1
bend) and wye with removable cap.
1
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
1
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
1
and at minimum intervals of 100' along sewer line run.
1
j. Trenches within City right-of-way must be restored to original
1
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
1
k.. Side sewer must be left uncovered until inspected and approved
by the City.
1. Inspection during normal working hours only. Two (2) working
1
days notice required.
DATE:
1
6 1 a') a M
I:�I'certify t at I have read
and shall comply with the above
PERMIT FEE:_ g®DISAPPROVED By: Date:
By: Date:
CONNECTION FEE: 11 c APPROVED By : Ate_ Date • ,,. -L^--�
�
O r
* PERMIT MUST BE POSTED ON JOB SITE