Loading...
17966 TALBOT RD.PDF11111111111111 13470 17966 TALBOT RD 0 6 TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS:— DETERMINATION: F1 Conditional Waiver Atudy Required 0 Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DA PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): Z PLANNING DATA CHECKLIST DATED: A11,4, 7 SCALED PLOT PLAN DATED: SEWER LID FEE S: LID #: SHORT PLAT FILE: LOT: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: �75 3 GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DA BLOCK: LA1`EMP\DSrs\Fonns\Street File Checklist-doc r"i Nttli- MCI, vo 9 - VED �S NOTEP I bporp of jo;!o., fR I vr, g A 4% kM rAYA Y WK c I F p 7iMo % t% . . . . . . . . . . IN exlifff oghAN(r X vL 1 V -q t7' Eflagr fix .10 fir- tPr otirt.4 o Ao, RESUB- JUN 25 2007 FRONT .12V-15AM! allILDING blEPARTMENT -EDMONDS CITY Yftp; /7' V A WOW, hRFA, 2- 41r, bovRmir", owe ro 4',x 4Af WW4 ?,I I -t 70 4. e� PRIUVA, FKR &(T� OrWAIN6 .—r-Ri-apt-rimp,rogle Kmo &olvr ON rw1jrm �T�p Awl 110 Pr 613019 M-1 <10HH Ar, 17 9,v, r/f PA) r 8 ov, APPROVED BY PLANNING 0/0 Zone__q,%a—_.'e1Q Lb_#a_C _1k s Sides ew ,I ercess shall be S� Rew "Nothing in this permit approv, 0 interpret ed as allowingor permitting the -Other maintenance of any core .ntly existing illegal, nonconforming or un , ted building; structure or site condition whi is ouWde the scope of the permit application, of whether such building, structure or condition is shown on the jite plan or drawing. Such building, structure or ,vndition may be the subject of & separate -�nforcement action." Re uire Comer�__Flag__V_ Actual JUN 2 5 2007 BUILDING DEPARTMENT CITY OF EDMONDS 0 STMI-E-F-7, F-LE 0 PLANNING DATA SINGLE FAMILY RESIDENTIAL 11 STREET=FILE I Name: M�c�, � KI rc--4', en, Foa�=� Date: Site Address: Plan Check #: aoo-7 Project Description: ErNc_�ee,_ 1( Or\ ZZ e.�e _.k k1*10 e)c 'n VJ,4%5�� 1�, , Reduced Site Plan Provided-UES NO) Zoning: Map Page: Y015 Corner Lot: (YES 1 /e Flag Lot:n Arc, 893 I (YES N 0) Critical Areas Determination #:C Study Required ->P E:ri=�cwN *a-zz_�c( waiver cl"d G1. 0/ Z o* C.0 C��e of e ct oil, ce- V-0 rV\ SEPA Determination: Pew, f\g , de, ,�<Exempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Required S?tbacks Side- / Side: 3"=�Ao TS _JO/ Actual Setbacks sue, Side- Side: RAW: Detached Structures: Rockeries: El Fences/Trellises: El Bay Windows/ProjeJng Modulation: NoNf, "0c,-.)c, On (_k, -red crlej _� 4 4 " OStairs/Deck: ,cc�.je -bkr�a !Zl,, Height Datum Point: -VOR 9�p elggAnl C_ \0� lllc� NEC C�0(_ tx Datum Elevation: + ion Maximum Height �llowed: N\ - Actual Height NoO�ne— %c.,, le. k !_ U 6ther U 91�5 Parking Required: Parking Provided: r.0 0( - — - — "a f!6��Xiey\UAVt OC­t Lot Area: 6_A�I&ed CXN — Maximum Lot Coverage: 35% Proposed: 07 V, Lot Coverage Calculations: ADU Created: (YES Subdivision: Legal Nonconforming Land Use Determination Issued: (YES Comments -KNake' Plan Review By: Planning Data Form 04-11-06.doc #P20 "0' City of Edinonds Developr Farm-eg I V E nent-g�ervices Planning Division Phone: 4i5/.771.0220 MAR 0 1 2006 gqc) Fax: 4 1 25.771.0221 DEVELOPMENT SERACES The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily I available from observations of the site or data a�vai,�%' City Hall (Critical areas inventories, MaH , surveys). DateReceived: 024DI ' b 0 Mity Receipt#: 2,9, V3-1 Critical Areas File #: W - 22 Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant: A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit appli ion. ,Wt Ple vicinity map, along with the signed copy I Xh assist City staff in finding and locating the sk.ci c piece of property described on this form. In hddition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this avplication on the behalf of the owner as listed below. SIGNATURE OF APPLICANT/AGENT DATE 6 Property Owner's Authorization'(/ By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property ibr the purposes of inspection and posting attendant to this application. Owner/Applicant: -�To- A -/-, Name -�J -Cot I h o76 �oad Street Address Mwimd5 64 q90AK City State Zip Telephone:- -�Tg - 30 2- 6 Email address (optional): �-O' me- ftA P (\c ,)/Vs J - -11 �r\ C Applicant Representative: 5e-, M r Name Street Address city State Zip Telephone: Email Address (optional): ':Site Inforn-tation (sol'.1--s/ 1. . Site Address/ Location: 0gl'al.pAy /hy d"fology/vegeta-tion) 1 0 C IV �. '.7 2. Property Tax Account Number: 00 5 Cl -f _� 0000 I'Z 0 -71 3. Approximate Site Size (acres or square feet): a 0 .5" "r 4. Is this site currently developed? X yes; — no. if yes; how is site developed? �(e.5id-evlCe__ OYI 5L�,'__ L3 5. Describe the general site topography. Check all that aWy- X Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). XHilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet I over a horizontal distance of 33 to 66-feet). q/'aevL ea>'�' C)v� Urizontal Steep: grades of greater than 30% present on sie�a'rveN� rise lbfV�-eet over distance of less than 33-feet). __ Other (please describe): 6. Site contains areas of year-round standing water: /VO Approx. Depth: 7. Site contains areas of seasonal standing water: NO Approx. Depth: jLV�A What season(s) of the year? &/-14 8. Site is in the floodway 1VQ floodplain IVO of a water course. 9. Site contai a creek or an area where water flows across the grounds surface? Flows are year-round? P70 Flows are seasonal? A6 (What time of year? /V/A . mixed 10. Site is primarily: forested meadow ;shrubs urban landscaped (lawn, shrubs etc) X 11. Obvious wetland is present on site: — For City Staff Use Only 1. Plan Check Number, if applicable? 2. Site is Zoned? kpl — = 3. SCS mapped soil type(s)? 2 - A166,-� qu-melly _--bn4 ka.�_ <R Aopr.& 4. Cxitical Areas inventory or C.A. map indicates Critical Area on site? gakem6­'� e_7-0E'_.Z" 5. Site within designated eartti%ubsidence landslide hazard area? DETERMINATION Reviewed Critical Areas Cheeklist.doc/2.17.2004 WAIVER 4P20 OV E IDV City of Edmonds Development Services F?eFarQ91VE Planning Division Phone: 425.771.0220 MAR 0 1 2006 J%qr� Fax: 425.771.0221 DEVELOpmENT SERVICES The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, or soil surveys). 0 Date Received: 02�') I Mity Receipt#: 1,9, S,3::i Critical Areas File #: - 2Q Critical Areas Checklist Fee:-----$1M.00 Date Mailed to Applicant: k, 5!111-0,6 A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in fi-nding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this a7plication on the behalf of the owner as listed below. SIGNATURE OF APPLicANT/AGENT DATE -?— -Z 2))o Property Owner's Authorizationf 1 By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. Owner/Applicant: Name I -M, 6� 7-0-t 0 Street Address f�iwmd 5 ttA City State Zip Telephone:-( 4-z--S) -�Tg - 30 Z- 6 Email address (optional): -Fy 4e-ftA to 6cph/s J - 1, �Fc t- Applicant Representative: Name Street Address city State Zip Telephone: Email Address (optional): Site Inforn-tation (soils/ tc)giigi'a.ph),,/i,iydroj'.ogy/ vegetal,101) 1. Site Address/ Location: bo-6 ?'00d C�0' 7. Z 2. Property Tax Account Number: 0 0 0 0 4- 'Z 0 -2- 3. Approximate Site Size (acres or square feet): A� 000 5 r 4. Is this site currently developed? X yes; — no. if yes; how is site developed? F-vtmizv 5. Describe the general site topography. Check all that aWy. X Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). ( 44 ec7�-�, 5CX'/A Steep: grades of greater than 30% present on ske�Tafv&tiv rise loifrIl-Lt oc'v�v�eMbrizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: IVO Approx. Depth: 7. Site contains areas of seasonal standing water: A10 Approx. Depth: iVIA What season(s) of the year? A11A r 8. Site is in the floodway AIV floodplain IVO of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? 7 __ Flows are seasonal? A6 (What time of year? IV IZA 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn, shrubs etc) X 11. Obvious wetland is present on site: NO 1. 2. 3. For City Staff Use Only I 13LV r-bA+-- Plan Check Number, if applicable? 4ZA, Site is Zoned? P'Tz — = SCS mapped soil type(s)? Q 5- - Ada-,zoW- ad.,. sz X 4. Critical Areas inventory or C.A. map indicates Critical Area on site? 5. Site within designated Reviewed Critical Areas Checklist.doc/2.17.2004 landslide hazard area? Mo. DETERMINATION Date: WAIVER 714 :P�v 4+ JjT -YL lo Y-4 rs� A, D/,v 0 0 � yl;"DI--lk -1) 109 ) s YO vowr--�� �.A tO —aoA PIN I!L 996+—( b-LL N -;Zg I V-L 9 �b--L I J04 � 1 v I D 1/'\ 0 0 CITY OF EDMONDS CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 17966 Talbot Road Tax Acct. Number: 00594400004202 Determination: Study Required Determination #: CA-06-22 Applicant: John Fosberg Owner: John Fosberg CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED (CA-06-22) During review and inspection of the subject site, it was found that the site may contain critical areas, including Geologically Hazardous areas, pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify, and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area, the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose to submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas that are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study, and there is an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. STUDY REQUIREMENT — EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area. Erosion Hazard Areas include: 0 Those areas with Alderwood and Everett series soils on slopes of 15 percent or greater. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage. Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development within an Erosion Hazard Area must meet additional criteria. For erosion hazard areas with suitable slope stability, the only critical area study needed is an erosion and sediment control plan prepared in compliance with the requirements set forth in a I 0 0 Chapter 18.30 ECDC as part of the construction documents. This option is at the director's discretion, per Edmonds Community Development Code section 20.80.050.G. In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer or other qualified professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. 0 Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.090.D. 0 Development standards are given in ECDC 23.80.060 and 23.80.070. STUDY REQUIREMENT — LANDSLIDE HAZARD AREA It appears that this property contains or is adjacent to a Landslide Hazard Area. A Landslide Hazard Area is any area with a slope of forty percent (40%) or steeper and with a vertical relief of ten (10) or more feet (except areas composed of consolidated bedrock). 0 Landslide Hazard Areas are further defined and illustrated in ECDC 23.80.020.B. In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Landslide Hazard Areas are provided in ECDC 23.80.050. DEVELOPMENT PROPOSALS ASSOCIATED WITH LANDSLIDE HAZARD AREAS Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. 0 The criteria that are applied depend on the amount that the buffer is reduced. The buffer can be reduced to a minimum often (10) feet (with an additional 15' building setback per ECDC 23.40.280) if a report is prepared that meets the standards listed in ECDC 23.80.050. The alteration must also meet the requirements listed in ECDC 23.80.060. In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. Jennifer March 13. 2006 Name S i g n a tjo957� Date NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. 2 116" C,( p 10.& �0- Js eeP) 00 14-4- com 4 20 7- STREET. FILE ,o N s CA 19- 20 V'o -(-e s - C i 4-1 / c ov VN-& / Pr Z V, C, v4-i li'll 61170�ccess ctto-n v�o�r+K e-614�- o -�- p -to f�P- t- e y , 0 V4476-,t- PACf-e- f- (o cct+eJL 4t:, 7-4%oi6- (,omct. S-tokq-- -se've'r koCQ6,0,\ 60,6- V- 1\0 C', v\ . 1 6 r)AAl lq CITY OF EDMONDS WATERLINE AS- BUILT ADDRESS: WATERLINE ta 17966 TALBOT RD No- 2002-0038 CONTRACTOR: HOMEOWNER: SCALE: UNKNOWN FOSSBERG NTS DATEINSPECTED: INSPECTED BY: DATE DRAWN: DRAWN BY: 1/22/02 UNKNOWN 7/14/06 J. COLLINS 0 APPLICATION for The City of Edmonds A�z SKIWER 91MU7, %J SEMVJ4T- No. ....... . . .. . ........... NEW CONSTRIUCtION E] HEPAIRSq bb-)J014 OWNER ... ---------------------- ------------------------- ---- CONTRACTOR ...... ...... . .. Pmlc�i N 33.7 ..... ..... ADDRESS .17.W?.!� ........... ---------------------------------- LEG." DESCRIPTION: LOT No - ------------------------------------ ......... BLOCK No . ............................................ NAME OF ADDITION -k - 4 C-0 5-7 AH�ROVED JUN 16 1970 Approved: (/ 400%..% 0 DATIC ...... ..... 2 ......... M��M -lot �feb"OmW Wo -ytIO 9dT X 31OT-)ARTK-)D .... ....... OT4 TOJ ...... -aA -- - -------------- ---- -- ---- - --- --- ---- - - - ;-IOITIUaA '40 :11MAX C,-?— oze, Octt', 14 75-1 4e 4 1 A A 0 A -�, ". 71 :bevo-sqqA ........... 0 I e a CITY. OF EDMONDS Call PRospect 6-1107 when work CIVIC CENTER WATER -SEWER DEPARTMENT Is ready for Inspection. (No Inspec. SIDESEWER PERMIT tions Saturday, Sunday or holidays.) N2 037 5 3 ADDRESS........................... 179-6.65 ... Talb.ot --- Road ................................................ . ............................................................................. OWNER ....................... Leonard-.F._.-Chriatia .................... CONTRACTOR ........ liy.atl .... & ... $.QT).'..$ ..... !T19, ...................... Perinission is granted ..�AXDA ... 1� ......................... 19.79., for ........................ days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—Tbe owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. rE No. 2—Obtain full information regaxding Ordinance 11.16.030 and Regulations governing side sewers when you got permit. F No. 3—Top of side sewer must have at least 30 Inches coverage at property line and 12 inches Inside property line; minimum grade of 2%. No bends In grade sharper than % will be permitted. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for fallure due to improper work wWch may develop within one year of completion. NOTE No. S—It to unlawful to alter or do any other work than is provided for In the permit, or to do any work on the main sewer or its appur- tenances except to Insert the pipe Into the wye. 4dKrazan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING e ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 20, 2007 Mr. Dwight Steele Steele Home Service 23424 88h Ave West Edmonds, Washington 98026 RE: City of Edmonds Plan Review Comments for Plan Check #2007-0534 Proposed Addition — Existing Single Family Residence 17966 Talbot Road Edmonds, Washington Dear Mr. Steele: KA Project No. 092-07039 Per the request from the City of Edmonds, we have prepared this addendum letter regarding the proposed decks on the northern and southern sides of the residence. It is our understanding that the proposed decks to be constructed will be a 12' X 14' deck at the front of the house and a 6' X 8' deck at the back of the house. Based on our site observations, our Limited Geologic Hazard Evaluation and Recommendations Letter dated April 12, 2007, and our understanding of the proposed deck locations, the proposed deck to be located at the back of the house should have a minimum setback of 20 feet from the top of the designated critical'slope area. The proposed deck to be located in the front of the house should have a minimum setback of 15 feet from the top of the existing slope area. We hope that this letter provides the information required at this time. If you have any questions, or if we may be of farther assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, & 0 -TX Q I N C. s Behrens, L.G.. Senior Engineering Geologist CB/ph JUN 2 5 2007 BUILDING DEPARTMENT CITy OF EDMONDS �M; L Lc- L Eleven Offices Serving The Western United States 11715 N. Creek Parkway S., #C- 106 * Bothc1l, Washington 98011 - (425) 485-5519 * Fax: (425) 485-6837 A 1.'..,,.Krazan& ASSOCIATES, INC. r-r--. = 9MVIRIL. 1� GEOTECHNICAL ENGINEERING 9 ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 12, 2007 Mr. Dwight Steele Steele Home Service 23424 88h Ave West Edmonds, Washington 98026 RE: Limited Geologic Hazards Evaluation and Recommendations Proposed Addition — Existing Single Family Residence 17966 Talbot Road Edmonds, Washington Dear Mr. Steele: KA Project No. 092-07039 This letter report presents the results of our Limited Geologic Hazard Evaluation and Recommendations for the referenced project. A Krazan & Associates senior project geologist visited the site on April 6, 2007. PURPOSE AND SCOPE We have prepared this letter to address the applicable elements of the Edmonds Municipal Code — Natural Resources — Chapter 23.80 — Geologically Hazardous Areas. In preparation of this report, we have reviewed the published geologic information for the site and performed a limited subsurface exploration program to evaluate the existing shallow soil conditions. A visual assessment of the site vegetation, slopes, and surficial conditions was also performed. PROPOSED CONSTRUCTION We understand that the proposed construction includes an approximately 300 to 400 square foot addition to the western end of the existing structure. We understand that additional perimeter footings will be placed to provide foundation support for the addition. SITE LOCATION AND DESCRIPTION The site is located at 17966 Talbot Road in Edmonds, Washington (Parcel No.00594400004202). The property is nearly rectangular with a total area of approximately 16,000 square feet. The area of the proposed addition is currently developed with a concrete patio slab and deck areas. The majority of the site is gently sloping and vegetated with grasses and typical residential landscaping. A slope area is located along the western property line and extends downward to the west at magnitudes of up to 80 percent. This slope is approximately 15 feet tall and is vegetated with trees, vines, and brush. The site is bordered to the south, east, and west by residential structures, and to the north by Tal JZDad FILE Eleven Offices Serving The Western United States 11715 N. Creek Parkway S., #C-106 * Bothell, Washington 98011 9 (425) 485-5519 * Fax: (425) 485-6837 0 0 GEOLOGIC SETTING KA No. 092-07039 April 12, 2007 Page 2 of 8 The site lies within the central Puget Lowland. The lowland is part of a regional north -south trending trough that extends from southwestern British Columbia to near Eugene, Oregon. North of Olympia, Washington, this lowland is glacially carved, with a depositional and erosional history including at least four separate glacial advances/retreats. The Puget Lowland is bounded to the west by the Olympic Mountains, and to the east by the Cascade Range. The lowland is filled with glacial and nonglacial sediments consisting of interbedded gravel, sand, silt, till, and peat lenses. The Geologic Map of the Edmonds East and part of the Edmonds West Quadrangles, Washington, indicates that the site is near the contacts of Vashon Glacial Till and Vashon Advance Outwash. Vashon Glacial Till is typically characterized by an unsorted, nonstratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden and incorporated by the glacial ice. Vashon Advance Outwash deposits are typically dense to very dense, and composed of sand and gravel with minor amounts of silt and clay. FIELD INVESTIGATION A field investigation consisting of excavating one hand excavation adjacent to the area of the proposed foundation system was completed to evaluate the shallow subsurface soil conditions. We encountered 2 inches of grass and topsoil underlain by medium dense, fine to medium grained sand with variable amounts of gravel. These materials are consistent with Vashon Advance Outwash. Local T-probing of the steep slope area indicated medium dense or firmer soil conditions. GEOLOGIC HAZARDS Landslide/Slope Hazard An approximately 80 percent magnitude slope is located 15 feet from the proposed addition (western end). This slope is up to 15 feet tall, and is currently vegetated with trees, vines, and brush. We did not observe evidence of past slope movement, and there is no evidence of likely future movement. There are other slope areas on, and adjacent to, the subject property; however, they are generally less than 10 feet in height and have relatively low slope magnitudes. Erosion Hazard The Natural Resources Conservation Service maps indicate that the site is near the contacts of Alderwood-Urban land complex and Alderwood gravelly sandy loam. The Alderwood-Urban land complex is a soil unit typically derived from glacial till. The Alderwood gravelly sandy loam is a soil unit typically derived from outwash materials. These soils are described as having "Slight" to "Moderate" erosion potential in a disturbed state. It has been our experience that soil erosion potential can be minimized through landscaping and surface water runoff control. Typically erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, i.e., silt fences, hay Krazan & Associates, Inc. Offices Serving The Western United States KA No. 092-07039 April 12, 2007 Page 3 of 8 bales, mulching, control ditches or diversion trenching, and contour furrowing. Erosion control measures should be in place before the onset of wet weather, if any grading occurs outside of the structure. Seismic Hazard It is our opinion, based on the overall density of the soils encountered in the subsurface explorations, that the Soil Profile in accordance with Table 1615. 1.1 of the 2003 International Building Code (IBC) is Soil Class C. We referenced the 2002 map from the U.S. Geological Survey (USGS) website to obtain values for Ss and S1. The USGS website includes the most updated published data on seismic conditions. The site specific peak ground accelerations, seismic design parameters, and adjusted maximum spectral response acceleration parameters are as follows: Peak Ground Acceleration (PGA) 30.48 (10% probability of exceedance in 50 years) 54.33 (2% probability of exceedance in 50 years) Ss 121.90% of g S, 42.77% of g FA 1.0 From Table 1615.1.2(l) of the 2003 IBC Fv 1.37 From Table 1615.1.2(2) of the 2003 I13C Additional seismic considerations include liquefaction potential and amplification of ground motions by soft soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The relatively dense soils interpreted to underlie the site are considered to have a low potential for liquefaction and amplification of ground motion. CONCLUSIONS AND RECOMMENDATIONS The proposed addition to the residence may be located as proposed, approximately 15 feet from the steep slope west of the residence. It is our opinion that this distance provides an adequate setback and buffer during and following construction, provided adequate erosion control measures are in place during construction. The addition may be supported on continuous footings placed on the medium dense native soils, or on compacted structural fill placed on the suitable soils. Re -compaction of the footing subgrade soils should be performed following excavation and prior to concrete placement. We found no evidence of a landslide hazard, and recognize that the soils present a limited erosion hazard. It is our opinion, based on our site observations and knowledge of the proposed construction, that subsurface exploration and detailed slope stability analyses are not required. It is also our opinion that detailed survey work and geotechnical analyses for the site slope conditions are not warranted. Krazan & Associates, Inc. Offices Serving The Western United States 0 0 Foundation Support KA No. 092-07039 April 12, 2007 Page 4 of 8 The proposed structure may be supported on a shallow foundation system bearing on the medium dense or firmer, native soils, or on properly compacted structural fill placed on the suitable native soils. Continuous wall or column footings may be designed for a net allowable bearing pressure of 2,500 pounds per square foot (psf) dead plus live load, if the footings bear directly on medium dense or firmer native soils, or on structural fill placed on the suitable native soils. A 1/3 increase in the above values may be used for short duration, wind and seismic loads. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Footings should have a minimum width of 12 inches regardless of load. If constructed as recommended, the total settlement is not expected to exceed I inch. Differential settlement, along a 20-foot exterior wall footing, or between adjoining column footings, should be less than 1/2 inch, producing an angular distortion of 0.002. Most settlement is expected to occur during construction, as the loads are applied. However, additional post -construction settlement may occur if the foundation soils are flooded or saturated or if a strong seismic event results in liquefaction of the underlying soils. It should be noted that the risk of liquefaction is considered low, given the composition and density of the native, on site soils. Seasonal rainfall, water run-off, and the normal practice of watering trees and landscaping areas around the proposed structures, should not be permitted to flood and/or saturate footings. To prevent the buildup of water within the footing areas, continuous footing drains (with cleanouts) should be provided at the bases of the footings. The footing drains should consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed down and enveloped by 1-inch sized washed rock in all directions and filter fabric to prevent the migration of fines. Resistance to lateral footing displacement can be computed using an allowable friction factor of 0.35 acting between the bases of foundations and the supporting subgrade. Lateral resistance for footings can alternatively be developed using an allowable equivalent fluid passive pressure of 225 pounds per cubic foot (pcf) acting against the appropriate vertical footing faces (neglect the upper 12 inches of exterior soils). The allowable friction factor and allowable equivalent fluid passive pressure values include a factor of safety of 1.5. The frictional and passive resistance of the soil may be combined without reduction in determining the total lateral resistance. A 1/3 increase in the above values may be used for short duration, wind and seismic loads. Krazan & Associates, Inc. Offices Serving The Western United States 0 0 KA No. 092-07039 April 12, 2007 Page 5 of 8 Drainage and Landscaping The ground surface should slope away from building pads and pavement areas, toward appropriate drop inlets or other surface drainage devices. It is recommended that adjacent exterior grades be sloped a minimum of 2 percent for a minimum distance of 5 feet away from structures. Roof drains should be tightlined away from foundations and slope surfaces. Roof drains should not be connected to the footing drains, but may use the same outfall piping if connected well away from the structure such that roof water will not backup into the footing drains. Subgrade soils in pavement areas should be sloped a minimum of I percent and drainage gradients should be maintained to carry all surface water to collection facilities, and off site. These grades should be maintained for the life of the project. Specific recommendations for and design of storm water disposal systems or septic disposal systems are beyond the scope of our services and should be prepared by other consultants that are familiar with design and discharge requirements. Erosion and Sediment Control Erosion and sediment control (ESQ is used to minimize the transportation of sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be taken and these measures should be in general accordance with local regulations. As a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features of the site: 1) Phase the soil, foundation, utility, and other work, requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BUT's), grading activities can be undertaken during the wet season (generally October through April), but it should also be known that this may increase the overall cost of the project. 2) All site work should be completed and stabilized as quickly as possible. 3) Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. 4) Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. To prevent erosion after the project, the homeowner should limit the removal of native vegetation in the area on and adjacent to the slope, although we understand that the slope is part of the adjacent property. Vegetation should not be removed from slope areas without protection of exposed soils, and immediately re-establishing permanent erosion control on the site. Water flow on the slope should be limited, and roof, footing, and yard drains should not be directed toward, or onto the slope. Krazan & Associates, Inc. Offices Serving The Western United States E Structural Fill KA No. 092-07039 April 12, 2007 Page 6 of 8 Best Management Practices (BMP's) should be followed when considering the suitability of native material for use as structural fill. The on -site soils are considered moisture sensitive and will easily degrade during rainy periods. The native soils are generally considered suitable for reuse as structural fill, provided the soil is relatively free of organic material and debris, and it is within ± 2 percent of the optimum moisture content. If the native soils are stockpiled for later use as structural fill, the stockpiles should be covered to protect the soil from wet weather conditions. We recommend that a representative of Krazan & Associates be on site during the excavation work to determine which soils are suitable for structural fill. It should not be taken for granted that the onsite soils may be used as the sole source for structural fill (especially during winter construction activities). During wet weather conditions the soils with higher silt and clay contents will be moisture sensitive, easily disturbed and most likely will not meet compaction requirements. Furthermore, during the winter the native soils typically have elevated natural moisture contents, which will limit the use of these materials as structural fill without proper mitigation measures. The contractor should use Best Management Practices to protect the soils during construction activities and be familiar with wet weather and wintertime soil work. An allowance for importing structural rill should be incorporated into the construction cost of the project (for wintertime construction this may be as high as 100 percent import). Imported structural fill material should consist of well -graded gravel or a sand and gravel mixture with a maximum grain size of 11/2 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Angular crushed rock (clean — no fines) as well as control density fill (CDF) or lean mix concrete may also be used as structural fill. All structural fill material should be submitted for approval to the geotechnical engineer at least 48 hours prior to delivery to the site. Fill soils should be placed in horizontal lifts not exceeding 8 inches loose thickness, moisture - conditioned as necessary, (moisture content of soil shall not vary by more than ±2 percent of optimum moisture) and the material should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. In place density tests should be performed on all structural fill to verify proper moisture content and adequate compaction. Additional lifts should not be placed if the previous lift did not meet the compaction requirements or if soil conditions are not considered stable. LIMITATIONS Geotechnical engineering is one of the newest divisions of Civil Engineering. This branch of Civil Engineering is constantly improving as new technologies and understanding of earth sciences improves. Although your site was analyzed using the most appropriate current techniques and methods, undoubtedly there will be substantial future improvements in this branch of engineering. In addition to improvements in the field of geotechnical engineering, physical changes in the site either due to excavation or fill placement, new agency regulations or possible changes in the proposed structure after the time of completion of the soils report may require the soils report to be professionally reviewed. In light of this, the owner should be aware that there is a practical limit to the usefulness of this report Krazan & Associates, Inc. Offices Serving The Western United States KA No. 092-07039 April 12, 2007 Page 7 of 8 without critical review. Although the time limit for this review is strictly arbitrary, it is suggested that two years be considered a reasonable time for the usefulness of this report. Foundation and earthwork construction is characterized by the presence of a calculated risk that soil and groundwater conditions have been fully revealed by the original foundation investigation. This risk is derived from the practical necessity of basing interpretations and design conclusions on limited sampling of the earth. Our report, design conclusions and interpretations should not be construed as a warranty of the subsurface conditions. Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. The recommendations made in this report are based on the assumption that soil conditions do not vary significantly from those disclosed during our field investigation. The findings and conclusions of this report can be affected by the passage of time, such as seasonal weather conditions, manmade influences, such as construction on or adjacent to the site, natural events such as earthquakes, slope instability, flooding, or groundwater fluctuations. If any variations or undesirable conditions are encountered during construction, the geotechnical engineer should be notified so that supplemental recommendations can be made. The conclusions of this report are based on the information provided regarding the proposed construction. If the proposed construction is relocated or redesigned, the conclusions in this report may not be valid. The geotechnical engineer should be notified of any changes so that the recommendations can be reviewed and reevaluated. Misinterpretations of this report by other design team members can result in project delays and cost overruns. These risks can be reduced by having Krazan & Associates, Inc. involved with the design teams meetings and discussions after submitting the report. Krazan & Associates, Inc. should also be retained for reviewing pertinent elements of the design team's plans and specifications. Contractors can also misinterpret this report. To reduce this, risk Krazan & Associates. Inc. should participate in pre -bid and preconstruction meetings, and provide construction observations during the site work. This report is a geotechnical engineering investigation with the purpose of evaluating the soil conditions in terms of foundation design. The scope of our services did not include any environmental site assessment for the presence or absence of hazardous and/or toxic materials in the soil, groundwater or atmosphere, or the presence of wetlands. Any statements, or absence of statements, in this report or on any exploration log regarding odors, unusual or suspicious items, or conditions observed are strictly for descriptive purposes and are not intended to convey engineering judgment regarding potential hazardous and/or toxic assessments. The geotechnical information presented herein is based upon professional interpretation utilizing standard engineering practices and a degree of conservatism deemed proper for this project. It is not warranted that such information and interpretation cannot be superseded by future geotechnical developments. We emphasize that this report is valid for this project as outlined above, and should not be used for any other site. Our report is prepared for the exclusive use of our client. No other party may rely on the product of our services unless we agree in advance to such reliance in writing. Krazan & Associates, Inc. Offices Serving The Western United States KA No. 092-07039 April 12, 2007 Page 8 of 8 If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, KRAZAN & ASSOCIATES, INC. '4d Phil Haberman, L.G. Senior Project Geologist PH/gs V V Gopal Singam, P.E. Geotechnical Division Manager Krazan & Associates, Inc. Offices Serving The Western United States 00 SNOHOMISH HEALTH DISTRICT Sit r DIVISION OF SANITATION , . I Tt"i , ' ' 3011 Rockefeller Avenue, Everett, Washington APPLICATION FOR A SEWAGE DISPOSAL SYSTEM PERMIT (Submit 3 Copies) Permit to be issued to:-./ / .......... )t:.:�_2 ------------ For installation at: (street addr C ess) ------- ------------------------- --------- Addition or Subdivision.-74- ? lil.) - 7 ------ ...... ----------------------------------------- ------ -- L o t. 0 ........ Block ................ Type of Building: New --- ..... Existing ------------ Single family residence ----- ;!� ------- Number of bedrooms ----- 17&1 .................... Other: (specify type or use) .............................................................................. --------------------------------------------------------------- ---------- n J-1 ----------------- Builder./-") /C - -------- ------------ ---------- Address_/!�?_ V .... 4� ----------- ---- ---- ------- Address-/ W_1� ------------------- ...... ................................. ------ .......... Soil Log Hole No. I ..... if, ... ................................................................................................................................................................................................... SoilLog Hole No. 2 .... 5 -------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Elevation of Water Table, if encountered. (Distance from ground surface) ................................. ............ Corrections to control surface water if needed_t��'.'e ------------- --------------------------------------------------------------------------------------- ..................................................................................................... ------------------------------------------------------------------------------- .................... Specify if any removing or grading of topsoil in field area.-/ z/ ...... -----------_--------- ....................................................................................................................................... Percolation: Test Hole No. I —Average Rate ----------- / ---- -------------------- ---------------- .-(Fall in minutes/inch-bottom 6" test hole) Test Hole No. 2—Average Rate ...... 0 ---------------------------------------------- (Fall in minutes/inch-bottom 6" test hole) Test Hole No. 3—Average Rate -------------------------------------------------------- (Fall in minutes/inch-bottom 6" test hole) Average percolation rate on which to base drain field design . ....... 4? ;0.o'�": ............... ------- ------------------------- Septic tank requirements based on present rules and regulations: Septic Tank Size --- 15K J ---------- gallons. Amount of Square Feet of Disposal Field ... --------- ----- --- Signature — Designer- ............ . ezj ex -It ------- _ ........ ----- Date-. 1.7 ..... ------------- DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Permit issued (date) ......... ........... .......................................... Permit Number. -------------------------------------------- Remarks: ----------------------------------------------------------------------------------------------------------------------------------------- BROWN 4 SPECIFICATIONS cal. Septic Ta4k lin Ft Drai# Th Trench Ft. Min. Wall To Wall Drainfield Not To Exceed Shaded Area USIGNat bbn A. Crawfad 1220 N. 205th Seattle 331 WWL PR $-loll - PR 8-3101 17r/ ve- u,,o r 10�.