Loading...
180 2ND AVE S.PDF11111111111111 14583 180 2ND AVE S ADDRESS: 1802 n' AVENUE S. TAX ACCOUNT/PARCEL NUMBER: 27032300409000 BUILDING PERMIT (NEW STRUCTURE): 19990792 COVENANTS (RECORDED) FOR: CRITICAL AREAS:- 97-170 DETERMINATION: E] Conditional Waiver [] Study Required El Waiver DISCRETIONARY PERMIT #'S:—ABD 83-7, ABD 86-97, CU 97-115, DRAINAGE PLAN DATED PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER): 19630227(supermarket) 19630355(sign) 196600169(sign )19740193(found) 19740277(add) l9740523(mgLcw 19990440(demo) 19990792(convaUnursing home) .19990793(sign) 19990794(tanks) 20000876(fire alarm) 20000883(fire spmklr) 20010008(fire sup) 20040362(renew) PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: SHORTPLAT SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED STREET USE / ENCROACHMENT PERMIT WATER METER TAP CARD DATED: 3*13*01 x2 OTHER: ROW 99*392(construction) LID #: LOT: BLOCK: ROW 00*188 (GTE) ROW 01*398 (PSE) *ADDRESS CHANGED FROM 141 DAYTON STREET CADocuments and Settings\imfeld\My DocumentsNue sheet 180.doc THAT POR-11ON OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 23JOWNSHIP 27 NORTH, RANGE 3 EAST, W.M-.f DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THIRD AND DAYTON STREETS IN THE CITY OF EDMONDS; THENCE WEST 338 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 1 18-22- E. A DISTANCE OF 263.88 FEET; THENCE'N 88 41'22- W, A DISTANCE OF 231.24 FEET TO THE EASTERLY MARGIN OF SR-104, AS CONVEYED TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER AUDITORS FILE NUMBER 2141566, SAID MARGIN BEING A CURVE TO THE LEFT HAVING A RADIUS OF' 500 ' 00 FEET AND FROM WHICH INTERSECTION POINT THE CENTER OF SAID CURVE BEARS S 72 52'59" E; THENCE SOUTHERLY ALONG THE ARC OF SAID CURVE TO THE LEFT AND CONSUMING A CENTRAL ANGLE OF 9 27'11", AN. ARC DISTANCE OF 82.49 FEET TO A POINT 100 FEET EASTERLY, AS MEASURED RADIALLY TO THE L.LINE, OF HIGHWAY ENGINEERS STATION 20+00; THENCE S 23 25'27" W, A DISTANCE OF 61.26 FEET TO*A POINT OPPOSITE AND 80 FEET EASTERLY OF HIGHWAY ENGINEERS STATION 20+68.17 P.T.; -THENCE S 1 09'15" W, 80 FEET EASTERLY AND PARALLEL TO SAID L LINE, A DISTANCE OF 106.83. FEET TO A POINT OPPOSITE HIGHWAY ENGINEERS STATION 21+75; THENCE S 44 26'45" E. A DISTANCE OF 28.10 FEET. TO A POINT OPPOSITE HIGHWAY ENGINEER STATION 9+00 AND 30 FEET NORTHERLY, AS MEASURED AT RIGHT ANGLES TO THECENTERLINE OF DAYTON STREET, THENCE S 88 41'22" E, ALONG THE NORTHERLY MARGIN OF DAYTON STREET, A DISTANCE OF 249.74 FEET TO THE TRUE� POINT OF BEGINNING; EXCEPT THE EAST 30 FEET THEREOF* FOR ROAD; SITUATE IN THE COUNTY OF SNOHOMISH, �TATE OF WASHINGTON. MICROFILM PERMIT EXPIRES U USE PERMIT CITY OF EDMONDS ZONE 9 NUMBER 904A0­ 0 . SUITEIAPI CONSTRUCTION PERMIT APPLICATION jou j ;AODRESS J, JN� OWNER NAMEONAME r' -31LISINESS _q L L-e— IlGGAL DESCRIPTION CHECK kSdBDIVIStON NO. LID NO, I� MAILING ADDRESS 10: P U ELIC RIGHT Or WAY PER OFFICIAL S1 Frig. T MA�j TESC� Ap­­ 0 UITY 71P LEPHONE IS fs-�ev we Per- R. 1, 0 �T EXiSTING REOUMM DEDICATION'— ITE t ­­n A ... 0 w e4z I v6,t f P11-P—D! j: 0 fzo��-. '�M2. 0-M NAME METER SIZE LINC SIZE NO. OE�,I��X PRV REOU!."IEU 0 .7,jURES . ' -YE S 0 No 0 -0 -r EA Al..rRESS REMARKS rp EV elg Ig CITY ZIP TELEPHONE �2 S4,7- NAME EN NEERINrMEMOITATED REVIEWED By ADDRESS "'.7" N 0 FIRE MEMO DATE.[) AEVIIfW FD.,�n L-4 ., tI z CITY ZIP TELEPHONE I 0 c ..ADB. LNE I VARIANCE OR SHOR E.I. s � kE. 'r7'7 OP a 0ZN E �HECKEDPY -7 IlEvirwj�',� SIGN AREA HEIGHT ":�, L,_ .�'�EPA �G . qMPLETE. EX " PT ALIOWED 'I PROPOSED, ALLOWED PROPOSED LEGAL DESCRIPTION OF. PROPERTVI. INCLUUE ALL EASFJeFNTS 0 EX L 1 COVERA� rTBACKS (FT.), P'NOPOSri) SE113ACKS (FT.). o LL ED P p EAR FRONI URISIDE Rt'AR A OW OPM a z PROPERTY TAX ACCOUNT PARC EL NO. LOT AREA PLANNING REVIEW By DATE -5/7 -7/)V, A rx" n - nl-)01" 0 CS102NTIAI. PLUMPNG I MECH EW 'g 0 ADDITION 'COMMERCIAL E) COMPLIANCE OR a CHANGE,OF USE 0 REMODEL APARTMENT SIGN air) -v.. .,o GRAUING CyDS1 FENCE b REPAIR I X FT) CHEC.KED BY 71 CONSTRUCTION CODE OCCUPANT T _ —d' OTHE14 GROUP Q4EM.LISH 0 TANK SPEIIAL'INSPECTOq. JAREA OCCUPANT * ,.U'Rr C GARAGE E3 RETAIN.ING, MLL FIENE'.11AL R, yr. LOAD 3 CARPORT ROCK Y * !!YPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN. REM . ARKi* PROGRES NSPECTIONS PER UBC 168 &I NUPAI_3L�R OF L 1,klla�l NUMBER CRIA,-x— . . OWE A EAS OF NO o RIr UNITS NAMBER STO U DESCRIeE WORK TO BE DONE �rIOAEOUIRED_ VALUATION FEE A 0/11 14- A e ri-I4A 7- - :4, �3, r2 EAT �101111� BUILDING. PLAN CHECK NO: ST ED DATE !PLUMBING IV� N1CAL �ECHA THIS PERMIT AUTHORIZES ONLY THE WOFIX NOTED. THISPE RMIT COVERS WORK TO 13 E DONE ON PRIVATE PROPERTY ONLY. ANY CONS, AUCTION ON THE PUBLIC GRADING/FILL DOMAIN (CURB S, SIDEWALKS. DRIVEWAYS, MAROUEES.ETC.) WILL REOUIRE SEPARATE PERMISSION. STATE SUFICHARG%, PEAMITAPPLICATHON: 160DAYS . : I S AA.PROVIDEDWORK SSTARTEDWITHIN ISODAY ;1EAMIT LIMIT: I YE STORM DRAINAGE �Es HIS OR HER SPOUSE� HEIRS. ASSIGNS AND SUCCESORS ENG�I N SPECTION PP6,0ANT. ON'REHALF OF L IN INTEREST AG.EUr TO INDEMNIFY. DEFEND AND HOLD HARMLESS THtl CITY OF EDMONDS. WASHINGTON. ITS OFFICIAI.S, EMPLOYEES. AND AGENTS FROM ANYAND ..LL CLAIMS FOR OAMAGESOF WHATEVER NATURE. ARISING LIRECTLYOR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PEAMIT SHALLNOT'BE FLAK' CHECK DEPOSIT BE T OF ANY CITY ORDINANCE [M.ED TOMODIFY. WAIVE OR REDUCEANY FIEGUIREMEN 0 NO�LIMIT INANYWAYTHECITY'SABILITYJO ENFORCE ANY ORDINANCE PROVISION. - TOTAL AMOU NT DUE, I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION MV�N IS CORRECT, AND THAT I AM, I HE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL+ THE OWNER, I AGRE5 TO COMPLY WITH CITY AND STATE LA%VS,REGULA1!NG CONSTRUC. CALL .-I ThIs "op"al'on ii not " por . mit un!,illSigned Ly the NO PERSON WILL BE EMPLOYED TICN: AND IN DING . HE WORK AUIHONIZED 1`11F RE 8�4d, 1'611. ini'll, ! opWY.i,n m—paid-ld IN VI GLATtON OF THE LABOR CQpt-: Or THE STATE OF.WASHINGTON nELAIING TO FOR INSPECTION o p't _�:,�d, w;p WORKMEN'�,COMPENSA1 ION IN?DPANCE AND RGV4 !R,27. 1711 A" SIGNAT AT (425), 1 7,I(`iNA,r;AE (OWNER �.E DATE 1IG110 -7 h 771-0220 ]P I . E 1 SE. I, EASED 13Y DAT ATTENTION w 0. .... .. ...... m m 0 m m z c 0 iP, m T 0 0 r4i c cl) K w M Co-) Z rr :r z 0 0 IT. IS UNLAWFUL TO USE OR OCCUPY A 9UILDING OR STRUCTURE UNTIL I - - I . ir A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 0-_;Icl­�11 'ILE Ii7-, o�,_,if3"Tr to-, CATE OF OCCUPANCY HAS BEEN GRANT ED. UBC SECTION 109 4 RECORD OF INSPECTIONS. INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... t 4 Wall Pier/Porch ............ `7 Retaining Wall ........... Slab Insulation .......... O�: IT1 PLUMBING: I Underground _i,. I -n Rough -In .................... M. Commprdal R nal C) M C M EATING H 0 0, 0 C Gas Test ..................... 3: M MZ Gas Piping ................. ID.-Il C Equipment .................. > Commercial Final i 0 EXTERIOR SHEATHING -:'NAILING' ............. : ......... . M M i FRAMING ........................ i , 0 INSULATION ................... f7 0 n C 0) K 6); Floor Insulation ......... 1711 0, Z r Wall Insulation ..... In Ceilin sulation :C SHEETROCK NA , ILIkG z dw SP, ECIAL INSPECTION z 0 MISCELLANEOUS IT! FINAL APPROVAL FOR OCCUPANCY ....... ........... 4-7 a A CA F ENO. Wtic'al Areas ChecklisA Site Information (soils/topography/hydrology/vegetation) I. Site Address/Location: 141 Dayton 2. Property Tax Account Number: - 232703-4-090-0002 3. Approximate Site Size cres or square feet): 60,086 SF 4. Is this site currently developed? X yes; _ no. If yes; how is site developed?_ Retail / of f i , c , e 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet)- Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: N/A Approx. . Depth: 7. Site. contains areas of seasonal standing water: N/A Approx. Depth: What season(s) of the year? 8. Site is in the floodway N/A floodplain of a water course- 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? . (What time of year? 10. Site, is primarily: forested ; meadow shrubs mixed urban landscaped (lawn,shrubs etc) X 11. Obvious wetland is present on site. N/A RevOl/04/94 ,Y 9 0 - -") 9 - City of E&mon& Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City, The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, 'maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the - applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find ,and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site ,plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that -the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: Sunrise Developments Name 13115 Avenida Dela Valencia Street Address Poway, CA 92064 (619) 625-1034 City, State, ZIP Phone Signature Date Applicant Representative: .C�Ithony Roth Nam Lovell-Sauerland�& Assoc., Inc. 19400 - 33rd Ave. W., Suite 200 Street Addre--,s Lynnwood, WA 98036 (425) 775-1591 City,-St4te, ZIP Phone I &/ -n�-7 Signature Date 44-k)­P0 1-4'--(' 57CIP-1 I W. . . 117'.18913 9-8-97 CITY OF EDMONDS BARBARA FAHEY MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works - Planning/ Building - Parks and Recreation * Engineering o Wastewater Treatment Plant Sunrise Developments 13115 Avenida Dela Valencia Poway, CA 92064 Determination regarding Critical Areas Checklist # 97-170 Dear Apolicant: Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City is located on the reverse side of the- form (bottom of page). It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records. IMPORTANT INFORMATION TO $ENOTED: PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIST ORJ2RITICAL AREAS STUDY. The 'DETERMINATION' for the Critical Areas Checklist you 'submitted is a site -specific determination not a project -specific determination. 4woo.. You must submit a copy of the CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL PERMITAPPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED. Permit applications include the following: Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. Thank you. Diane Cunningham Planning Secretary cc: Anthony Roth, Lovell-Sauerland & Assoc. Note Attachments: Architectural Design Board C: ReceptionUa na\CRLTR. doc Incorporated August 11, 1�00 Sister Cities International — Hekinan,'-Japan OEOTECIO CONSULTANTS, INC. 13256 NE 20th Street, Suite 16 Bellevue, WA 98005 (425) 747-5618 �AX (425) 747-8561 The Johnston Associates, Inc. Architects 375 Ericksen Avenue, Suite 222 Bainbridge Island, Washington 98110 Attention: Charlie Wright April 20,1999 JN 99123 8 L Subject: Transmittal Letter — Geotechnical Engineering Study Proposed Assisted Learning Development Dayton Street at 2nd Avenue South Edmonds, Washington Dear Mr. Wright: RF-CF-I)f E:D MAy 17 1999 DEVELOPMENT SERVICES CTR- CITY OF EDMONDS We are pleased to present this geotechnical engineering report for the proposed assisted learning development to be constructed in Edmonds, Washington. The scope of our work consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design criteria for foundations and retaining walls. This work was authorized by your acceptance of our proposal, P-4846, dated March 11, 1999. The subsurface conditions of the proposed building site were explored with four test pits and four test borings. The northwest section of the site revealed from 10 to 14 feet of loose -to -medium - dense fill overlying medium -dense to dense, gravelly, silty sands. The one boring in this area revealed dense glacial till at a depth of 30 feet. The southern section of the site revealed from 8 to 10 feet of fill overlying dense to very dense, gravelly, silty sands. The northwest section of the site revealed approximately 6 feet of fill overlying dense to very dense, silty sands. It is our opinion that the proposed development should be supported on augercast concrete piers. The attached report contains a discussion of the study and our recommendations. Please contact us if there are any questions regarding this report, or if we can be of further assistance during the design and construction phases of this project. Respectfully submitted, GEOTECH CONSULTANTS, INC. 4�" f 1-1-117 James R. Finley, P.E. Principal dEOTECHNICAL ENGINEERING STUDY Proposed Assisted Learning Development Dayton Street at 2nd Avenue South Edmonds, Washington This report presents the findings and recommendations of our geotechnic'al engineering study for the site of the proposed assisted learning development in Edmonds, Washington. The Vicinity Map, Plate 1, illustrates the general location of the site. Development of the property is in the planning stage, and detailed plans were not made available to us. The plans provided to us by The Johnston Associates, Inc. Architects showed the location of the proposed development on the lot. In addition, plan views of the building and sectional views of the building exterior were provided. SITE CONDITIONS Surface The site for the proposed assisted learning development is located at the northwest corner of the intersection of Dayton Street and 2nd Avenue South in Edmonds, Washington. The site is bordered to the north by an existing two-story office building, to the east by 2nd Avenue South, to the south by Dayton Street, and to the west by the northbound Kingston Ferry holding lanes of State Route 104. The site is relatively level with grass on the northern section of the site, an existing one-story office building on the southwest section of the site, and an asphalt/grave I parking lot on the southeast area of the site. The existing building will be demolished. Subsurface The subsurface conditions were explored by excavating four test pits and drilling four borings at the approximate locations shown on the Site Exploration Plan, Plate 2. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The four test pits were excavated on March 30, 1999, with a rubber -tired backhoe. A geotechnical engineer from our staff observed the excavation process, logged the test pits, and obtained representative samples of the soil encountered. "Grab" samples of selected subsurface soil were collected from the backhoe bucket. The Test Pit Logs are attached to this report as Plates 2 and 3. The four borings were drilled on March 31, 1999, using a truck -mounted, hollow -stem auger drill. Samples were taken at 5-foot intervals with a standard penetration sampler. This split -spoon sampler, which has a 2-inch outside diameter, is driven into the soil with a 140-pound hammer falling 30 inches. The number of blows required to advance the sampler a given distance is an indication of the soil density or consistency. A geotechnical engineer from our staff observed the drilling process, logged the test borings, and obtained representative samples of the soil encountered. The Test Boring Logs are attached as Plates 4 through 8. GEOTECH CONSULTANTS, INC. The Johnston Associates, In hitects JN 99123 April 20, 1999 . 0 1 Page 2 The test pits and borings on the northwest section of the site revealed from 10 to 14 feet of loose to medium -dense fill overlying medium -dense to dense, gravelly, silty sands. The one boring in this area revealed dense glacial till at a depth of 30 feet. The southern section of the site revealed from 8 to 10 feet of fill overlying dense to very dense, gravelly, silty sands. The northwest section of the site revealed approximately 6 feet of fill overlying dense to very dense, silty sands. Throughout the site, a layer of peat and organic soils were observed between the fill and the medium -dense to dense, gravelly, silty sands. The final logs represent our interpretations of the field logs. The stratification lines on the logs represent the approximate boundaries between soil types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. If a transition in soil type occurred between samples in the borings, the depth of the transition was interpreted. The relative densities and moisture descriptions indicated on the test pit and test boring logs are interpretive descriptions based on the conditions observed during excavation and drilling. The compaction of backfill was not in the scope of our services. Loose soil will therefore be found in the area of the test pits. If this presents a problem, the backfill will need to be removed and replaced with structural fill during construction. Groundwater Groundwater seepage was observed at a depth of 5 to 25 feet. Heavy caving was also observed in the test pits excavated on the northwest section of the property. The test pits and- borings were left open for only a short time period. Therefore, the seepage levels on the logs represent the location of transient water seepage and may not indicate the static groundwater level. It should be noted that groundwater levels vary seasonally with rainfall and other factors. We anticipate that groundwater could be found in more permeable soil layers, pockets within the till, and between the near -surface, weathered soil and the underlying glacial till. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion that the buildings should be supported on augercast piers because of the poor soil conditions. The peat and organic soils are highly compressible. If a foundation were placed on these soils and the overlying fill soils, considerable foundation settlement would occur. Therefore, it is our recommendation that the entire structure be placed on pier or pile foundations, even if some of the piers or piles are relatively short. The building floor slab should also be structurally supported. Because of the shallow depth of groundwater that was encountered in our subsurface explorations, we recommended that construction dewatering be used when building the foundations. The construction dewatering may consist of sumps that are installed below the excavation level. If this is not successful, dewatering wells may have to be installed. Permanent dewatering should consits of perimeter and interior drains. The slab'should'be placed on 10 inches of washred, crushed rock. GEOTECH CONSULTANTS, INC. The Johnston Associates, lnd�chitects JN 99123 April 20, 1999 0 Page 3 The drains should discharge into a storm water system or a pumped sump. If a pumped system is used, measures should be provided to prevent hydrostatic uplift of the slab should the pumps fail. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. Auggercast Concrete Piers Augercast piers are installed using continuous flight, hollow -stem auger equipment. Concrete grout must be pumped continuously through the auger as it is withdrawn. We recommend that augercast piers be installed by an experienced contractor who is familiar with the anticipated subsurface conditions. An allowable compressive capacity of 50 tons can be attained by installing a 16-inch-diameter, augercast concrete pier at least 10 feet into dense strata. For transient loading, such as wind or seismic loads, the allowable pier capacity may be increased by one-third. We can provide design criteria for different pier diameters and embedment lengths, if greater capacities are required. The minimum center -to -center pier spacing should be three times the pier diameter. Refer to the site exploration logs to estimate the depth of piers required. We estimate that the total settlement of single piers installed as described above will be on the order of one-half inch. Most of this settlement should occur during the construction phase as the dead loads are applied. The remaining post -construction settlement would be realized as the live - loads are applied. We estimate that differential settlements over any portion of the structures should be less than about one -quarter inch. We recommend reinforcing each pier its entire length. This typically consists of a rebar cage extending a portion of the pier's length with a full-length center bar. Each pier can'be assumed to have a point of fixity at 10 feet below the ground surface for the computation of lateral load resistance. The loose soil against the piers can be assumed to have a design passive earth resistance of 150 pounds per cubic foot (pco acting on two times the pier diameter. Passive earth pressures on the grade beams will also provide some lateral resistance. If structural fill is placed against the outside of the grade beams, the design passive earth pressure from the fill can be assumed to be equal to that pressure exerted by an equivalent fluid with a density of 300 pcf. Seismic Considerations The site is located within Seismic Zone 3, as illustrated on Figure No. 16-2 of the 1997 Uniform Building Code (UBC). In accordance with Table 16-J of the 1997 UBC, the site soil profile within 100 feet of the ground surface is best represented by Soil Profile Type Sc (Very Dense Soil). The site soils are not subject to seismic liquefaction because of the dense nature of the soils. GEOTECH CONSULTANTS, INC. The Johnston Associates, I rchitects JN 99123 April 20, 1999 0 0 Page 4 Permanent Foundation and Retaining Walls Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following re6ommended design parameters are for walls that restrain level backfill: Parameter Desig Valu'e,.,: Active Earth Pressure 45 pcf Passive Earth Pressure 250 pcf oe icient of Friction 0.35 Soil Unit Weight 130 pcf Where: (I) pcf is pounds per cubic foot, and (ii) active and passive earth pressures are computed using the equivalent fluid pressures. * For a restrained wall that cannot deflect at least 0.002 times Its height, a uniform lateral pressure equal to 10 psf times the height of the wall should be added to the above active equivalent fluid pressure. The values given above are to be used to design permanent foundation and retaining walls only. The passive pressure given is appropriate for the depth of level structural fill placed in front of a retaining or foundation wall only. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the. wall height from corners in the walls. The design values given above do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill isdesired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. Retaining Wall Backfill Backfill placed behind retaining or foundation walls should be coarse, free -draining, structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of GEOTECH CONSULTANTS, INC. The Johnston Associates, rchitects JN 99123 April 20, 1999 Page 5 particles passing the No. 4 sieve should be between 25 and 70 percent. For increased protection, drainage composites should be placed along cut slope faces, and the walls should be backfilled with pervious soil. The purpose of these backfill requirements is to ensure that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved. The ground surface must also slope away from backfilled walls to reduce the potential for surface water to percolate into the backfill. The sub -section entitled General Earthwork and Structural Fill contains recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof the below -grade walls. If moist conditions or some seepage through the walls are not acceptable, waterproofing should be provided. This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. Applying a thin coat of asphalt emulsion is not considered waterproofing, but will only help to prevent moisture, generated from water vapor or capillary action, from seeping through the concrete. Excavations and Slopes No excavated slopes are anticipated other than for utility trenches. Excavation slopes should not exceed the limits specified in local, state, and national government safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil, if there are no indications of slope instability. Based upon Washington Administrative Code (WAC) 296, Part N, the soil type at the subject site would be classified as Type B for sands, and C for the fill overlying these sands. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an inclination steeper than 1:1 or 1.5:1 (Horizontal:Vertical), respectively, extending continuously between the top and the bottom of a cut. The above-recom mended temporary slope inclinations are based on what has been successful at other sites with similar soil conditions. Temporary cuts are those that will remain unsupported for a relatively short duration to allow for the construction of foundations, retaining walls, or. utilities. Temporary cut slopes should be protected with plastic sheeting during wet weather. The cut slopes should also be backfilled or retained as soon as possible to reduce the potential for instability. Please note that loose soil can cave suddenly and without warning. Utility contractors should be made especially aware of this potential danger. All permanent cuts into native soil should be inclined no steeper than 2:1 (H:V). Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. Also, all permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve the stability of the surficial layer of soil. GEOTECH CONSULTANTS, INC. The Johnston Associates, In hitects JN 99123 April 20, 1999 W 9 Page 6 Drainage Considerations We recommend the use of footing drains at the base of footings, where (1) crawl spaces or basements will be below a structure, (2) a slab is below the outside grade, or (3) the outside grade does not slope downward from a building. Drains should also be placed at the base of all earth - retaining walls. These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then wrapped in non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. Drainage should also be provided inside the footprint of the basement. Underslab drains and basement perimeter drains should be connected to a storm water system or a pumped sump. The storm water system would need to be designed to,prevent tidal water backup as is the system on the adjacent building. We suggest at least 3 cross -drains be placed under the slab and the slab be underlain with at least 10 inches of clean washed rock. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail is attached to this report as' Plate 9. For the best long-term performance, perforated PVC pipe is recommended for all subsurface drains. Groundwater was observed during our field work. If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to the building should slope away at least 2 percent, except where the area is paved. General Earthwork and Structural Fill All building and pavement areas should be stripped of surface vegetation, topsoil, organic soil, and other deleterious material. It is very important that existing foundation remnants and foundation walls be removed before site development. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but they could be used in non-structural areas, such as landscape beds. Structural fill is defined as any fill placed under a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not compacted to specifications, it can be recompacted before another lift is placed. This eliminates GEOTECH CONSULTANTS, INC. The Johnston Associates, ln#Srchitects JN 99123 April 20, 1999 0 Page 7 the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: Location of t: Minimum Fill Placement RelatNe''C6nipacti6n Beneath footings, slabs 95% or walkways Behind retaining walls 90% 95% for upper 12 inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction is the ratio, expressed In percentages, of the compacted dry density to the maximum dry density, as determined In accordance with ASTM Test Designation D 1557-78 (Modified Proctor). Structural fill that will be placed in wet weather should consist of a coarse, granular soil with a silt or clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve should be measured from that portion of soil passing the three -quarter -inch sieve. LIMITATIONS The analyses, conclusions, and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditi ' ons encountered in the test pits and borings are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples in test pits and borings. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures to attain a properly constructed project. It is recommended that the owner consider providing a contingency fund to accommodate, such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of The Johnston Associates, Inc. Architects, and its representatives, for specific application to this project and site. Our recommendations and conclusions are based on observed site materials, and selective laboratory testing and engineering analyses. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. We recommend including this report, in its entirety, in the project contract documents so the contractor may be aware of our findings. GEOTECH CONSULTANTS, INC. The Johnston Associates, rchitects JN 99123 April 20, 1999 is Page 8 ADDITIONAL SERVICES In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. The following plates are attached to complete this report: Plate 1 Vicinity Map Plate 2 Site Exploration Plan Plates 3 and 4 Test Pit Logs Plates 5 - 8 Test Boring Logs Plate 9 Typical Footing Drain Detail We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of further service, please do not hesitate to contact us. GDB/JRF: alt Respectfully submitted, GEOTECH CONSULTANTS, INC. Gerry D. Bautista, Jr. Geotechnical Engineer Cn FI WAS].,., "IN 0' C.A Cis C� ql;z 0 A FEXPIAES 8 / 17 / -71 James R. Finley, P.E. Principal GEOTECH CONSULTANTS, INC. , �Nplqf�SH. -COUArry PARK I 9TH Pl- 2 sw OVERLOOK PK f HUrT —7 PL SW PK — PL 187TH Lf. �T PL SW 187TI ST 0 TPT 'w 188TH ST S 89TH SW 61 AKE Pt St ..W TER ST n < 190TH CHERR' ST N 00 M �13 ST Sw < Ve e c P'L 196TH ST w PU'1' PUGEI 8600 MLLUUY LN DR Al wy PLEkOOl I iL Z� BROOKNFRF HINDLE LN v [WI -AND wf PILL PAA C c000 '--' . L-1,4 . S OR T BROOk�m[RE ST B CKETrs 99TJI ST S ASP R ST BEACH 800 --iL VIST, FR 200111 ST w 'NA OK.'� '.. cl 20IST Sl FRRA < t UNDERWArER WO" —, ; 202ND PARK Q, 70M p NY S, GLEN �ki' sl pk� 424 j PL )A ST I ce- CTR SPPAGI 'T i�� HU*fl L9 PINE "ILI PK: . St 'RIOGE� or ;14 'k, z' PK-- T GIN s —F,7r 207 Tf ST sw AIN ST sp DAYTON �7- WLI Wl ' i" -. -i - ' ros T, .4.4,7. ar 09TH MARIAM 'sj . ... ;I PL n ST I -L— . Sw HFMRrA L 4k 23 M 3T �IA L�A UNION W LNU r 212-4 OIL CEDAR ST FS HOWELL WY !21-1 A PA S MARSH SPRUCE I-LDCV EH�OrK — 214TH Pt SW 214 LAUPIL 215N ST 4 Sw NOS OR TH ST Sw --gum., P BEACH 21( sw 217TH ST sw MAKAH PL , : I 1�z '10 ' ' - F R c PL FIR P. 2 6 21 TH— !.V5? V5 — 30= ELLA z COOLA po E I ST 0 0, H c E kc .1r !FT I T s GEOTECH CONSULTANTS I- ZZIST PL �Wlll223 x VICINITY MAP DAYTON ST & 2nd AVE S, EDMONDS, WA /ob No. I Dot*. 1-ogg-�d78 Plott 99123 1 APR 199 9 1 I R I ui w z 0 LEGEND.* 0 SR 104 FERRY HOLDING AREA B-4 & B-1 TP-2 PROPOSED BUILDING TP-1 TP-3 B-2 B-3 2nd AVENUE S (9 APPROXIMATE BORING LOCATIONS APPROXIMATE TEST PIT LOCATI.ONS GEOTECH CONSULTANTS A--------- SITE EXPLORATION PLAN DAYTON ST & 2nd AVE S EDMONDS, WA -lob No. I A710., Role . 99123 APR 1999 27 5 10 15 iul Is TEST PIT 1 o 0; , e, CC,;, �00 cjp "'0 NO Description V V - —6" Topsoil/Grass FILL I Brown, silty SAND tine- to medium-i Brown, gravelly, silty SAND, moist to wet, medium -dense (FILL) FILL I - becomes gray, saturated, with wood chips HIBlack fibrous PEAT, saturated, loose P�RPI Gray/brown, gravelly, silty SAND, wet, medium -dense to dense 'N Test Pit was terminated at 13 feet on March 30, 1999. Heavy groundwater seepage was observed at 5 feet during excavation. Heavy caving was observed at 3 feet during excavation. TEST PIT 2 cll� Description sj' Topsoil/Grass FILL Brown, silty SAND, fine- to medium -grained, moist, loose to medium -dense (FILL) Brown/gray, gravelly, silty SAND, wet, medium -dense (FILL) FILL L'��' I\Plack fibrous PEAT, wet, loose to medium -dense Test Pit was terminated at 10.5 feet on March 30, 1999. Heavy groundwater seepage was observed at 5 feet during excavation. Heavy caving was observed at 4 feet during excavation. GEOTECH Jto CONSULTANTS, INC. 4,, TEST PIT LOG Dayton Street at 2nd Avenue South Edmonds, Washington Job No: Date: Logged by: I Plate: 99123 1 April 1999 1 DB 3 'h 010 TEST PIT 3 Description FILL 5 FILL Ll 0 15 i 'N el 4 C" 4V 0 v 0, 0� 5 10 15 -Y Topsoil/Grass Brown, gravelly, silty SAN-b—,moist, medium -dense (FILL) Old Topsoil/Peat, very dense (FILL) Brown to reddish -brown, silty SAND, medium -grained, moist to wet, medium - dense (FILL) Blue/gray, gravelly, silty SAND with wood chips, wet, medium -dense (FILL) Black fibrous PEAT, moist to wet, medium -dense Brown to gray/brown, gravelly, silty SAND, moist, dense • Test Pit was terminated at 13 feet on March 30, 1999. • Groundwater seepage was observed at 11 feet during excavation. • Some caving was observed at approximately 10 feet during excavation. FILL f 71 L—L FILL sm] TEST PIT 4 Description ,_3" Topsoil/Grass Brown, gravelly, silty SAND, moist, medium -dense (FILL) Old Topsoil/Peat, very dense (FILL) Brown/gray, gravelly, silty SAND, moist, medium -dense (FILL) - becomes gray with wood chips Black fibrous PEAT, moist, medium -dense Brown to gray/brown, gravelly, silty SAND, moist, dense • Test Pit was terminated at 10.5 feet on March 30, 1999. • Some groundwater seepage was observed at 7.5 feet during excavation. • Some caving was observed at approximately 8 feet during excavation. GEOTECH CONSULTANTS, INC. TEST PIT LOG Dayton Street at 2nd Avenue South Edmonds, Washington Job No: Date: Logged by: I Plate: 99123 1 April 1999 1 DB 47 e" 5 10 15 20 25 30 35 40 41 7 2 21 35 18 86 BORING 1 Description Sod Brown SAND, medium- to coarse -grained, very moist, loose (FILL) FILL Blue -gray SAND with organics and occasional gravel, fine-grained, very FILL moist, very loose (FILL) 21 Brown/black PEAT, moist, very loose FTI Blue -gray, silty SAND to sandy SILT with some organics, moist, medium -dense to very stiff 31 Gray, silty, gravelly SAND, very moist, medium -dense SM V becomes moist, very dense (Glacial Till) 16 Ro;'j1:j:j]:j:j]:jj , l�::: : • Test boring was terminated at 31 feet during drilling on March 31, 1999. • Groundwater seepage was encountered at 25 feet during drilling. GEOTECH CONSULTANTS, INC. BORING LOG Dayton Street at 2nd Avenue South Edmonds, Washington Job: 9123 1 Date:l,.g I Loggedby: Plate: 5 9 April EMT 0- BORING 2 0 Description Asphalt parking lot FILL Brown, gravelly SAND (FILL) Gray, silty SAND with occasional gravel, very moist, very loose 5 M, 3 1 E?,-1 Brown PEAT, very moist, very loose W14 SM Gray, silty SAND with occasional gravel, very moist, very loose r 10 41 2 Brown, silty SAND, fine-grained, very moist, dense SM 1j::::;jj -becomes gray, gravelly, moist, very dense, 50/6" 3 * Test boring was terminated at 15.5 feet during drilling on March 31, 1999. * Groundwater seepage was encountered at 8.5 feet during drilling. 20 25 30 35 40 41 GEOTECH CONSULTANTS, INC. BORING LOG Dayton Street at 2nd Avenue South L Edmonds, Washington Job: Date:, 9., 1 Logged by: Plate: 99123 April EMT 1 6::]_ 0- BORING 3 0 Description 4 le 13$6 Asphalt parking lot Brown, gravelly SAND, very moist, loose (FILL) FILL 5 2 1 becomes coarse -grained, very loose 10 40 2 ..... Gray, silty, gravelly.SAND, medium -grained, very moist, dense 63 3 S becomes very dense 20- 55 4 * Test boring was terminated at 21.5 feet during drilling on March 31, 1999. * Groundwater seepage was encountered at 10 feet during drilling. 25 30 35 40 41 GEOTECH CONSULTANTS, INC. BORING LOG Dayton Street at 2nd Avenue South Edmonds, Washington Job: Date: Logged by: Plate: 99123 April 1999 1 EMT 1 7__j 5 10 15 20 25 30 35 40 41 'I* BORING 4 idd. Description Grass, gravel Brown, gravelly SAND (FILL) 3 FILL I Gray, gravelly SAND, very moist to wet, very loose (FILL) T -grained, very moist to wet, medium - Gray, silty, gravelly SAND, medium 12 2 dense THITHI N/A 3 becomes fine-grained, less gravel, dense SM 83 4 becomes silty N/A 5 • Test boring was terminated at 26.5 feet during drilling on March 31, 1999. • Groundwater seepage Was encountered at 8 feet during drilling. GEOTECH Jt4 CONSULTANTS, INC. BORING LOG Dayton Street at 2nd Avenue South Edmonds, Washington Job: Date: I Logged by: P/ate7-1 99123 April 1999 EMT 1 8 Slope boc*fill ow0y from foundation. rIGHrL INE ROOF DRAIN Do not connect to fooling droin. BA CKFIL L See text for VAPOR BARRIER requIrements. SLAB WASHED ROCK 4 m1n. 6 m1n. FREE - DRAINING NowwovEN GEorExrlLE SANDIGRAVEL FILrER FABRIC — 4"PERFORATED HARD PVC PIPE Invert a/ least as low as foolh7g andlor crawl space. Slope to drain. Place weepholes downward. 4 GEOTECH CONSULTANTS FOOTING DRAIN DETAIL DAYTON ST & 2nd AVE S EDMONDS, WA dob No. I Dote., I P/�": 99123 1 AM 1999 f 0 0 N N 0 �Geolechfllcfll Eflulneeping Repopl___� r Geotechnical Services Ape Pepfopmed fop Specific Pupposes, Persons, and Ppojects Geotechnical engineers structure their services to meet the spe- cific needs of their clients. A geotechnical engineering study con- ducted for a civil engineer may not fulfill the needs of a construc- tion contractor or even another civil engineer. Because each geot- echnical engineering study is unique, each geotechnical engi- neering report is unique, prepared solely for the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who pre- pared it. And no one —not even you —should apply the report for any purpose or project except the one originally contemplated. A Geotechnical Engineering Report Is Based on A Unique Set of Ppoject-Specific Factops Geotechnical engineers consider a number of unique, project -spe- cific factors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management pref- erences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates other- wise, do not rely on a geotechnical engineering report that was: not prepared for you, not prepared for your project, not prepared for the specific site explored, or completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light industrial plant to a refrigerated warehouse, • elevation, configuration, location, orientation, or weight of the proposed structure, • composition of the design team, or • project ownership. As a general rule, always inform your geotechnical engineer of project changes —even minor ones —and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering report whose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natural events, such as floods, earthquakes, or groundwater fluctua- tions. Always contact the geotechnical engineer before apply- ing the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Ape Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual sub- surface conditions may differ —sometimes sign ifica ntly—from those indicated in your report. Retaining the geotechnical engi- neer who developed your report to provide construction obser- vation is the most effective method of managing the risks asso- ciated with unanticipated conditions. A Repopt's Recommendatiofte Not Final Do not overrely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recom- mendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation. A Geotechnical Engineeping Repopt Is Subject To Misintepppetation Other design team members' misinterpretation of geotechnical engineering reports has resulted in costly problems. Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review perti- nent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redpaw the Engineep's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photo- graphic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk. Give Contpactops a Complete Repopt and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface condi- tions by limiting what they provide for bid preparation. To help prevent costly problems, give contractors the complete geotech- nical engineering report, but preface it with a clearly written let- ter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy isolted; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contractors have suffi- cient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Read Responsibility Ppovisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappoint- ments, claims, and disputes. To help reduce such risks, geot- echnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations", many of these provisions indicate where geotechnical engi- neers responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenviponmental Concepns Ape Not Coveped The equipment, techniques, and personnel used to perform a geoenvironmental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report ' does not usually relate any geoenvironmen- tal findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regu- lated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvironmental information, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared for someone else. Rely on Youp Geotechnical Engineep fop Additional Assistance Membership in ASFE exposes geotechnical engineers to a wide array of risk management techniques that can be of genuine ben- efit for everyone involved with a construction project. Confer with your ASFE-member geotechnical engineer for more information. PROFESSIONAL FIRMS PRACTICING 11. 11- GEOSCIENCES 8811 Colesville Road Suite G 106 Silver Spring, MD 20910 Telephone: 301-565-2733 Facsimile: 301-589-2017 email: info@asfe.org www.asfe.org Copyright 1998 by ASFIE, Inc. Unless ASFE grants written permission to do so, duplication of this document by any means whatsoever is expressly prohibited. Re -use of the wording in this document, in whole or in part, also is expressly prohibited, and may be done only with the express permission of ASFE or for purposes of review or scholarly research. 11GER06983.51M IE J. FINAL STORM DRAINAGE REPORT FOR RECEWED, T c 1­2 on-^ PERMIT COUNTER EDMONDS ASSISTED LIVING COMMUNITY EDMONDS, WASHINGTON OCTOBER 1999 PREPARED BY: TEAM 4 Engineering Suite A, Box 2 5823 NE Minder Road Poulsbo. WA 99370 (360) 297-5560 /fi/zlp I cl - - 7 (o 'e -c-- U "s t'll 04 Op - : to Edmonds Assisted Living Community-Preliminmy Drainage Report 1.0 Site Location The site is located on the Northwest corner of the intersection of Dayton Street and 2 "d Avenue South in Edmonds, Washington. (Section 23, Township 27 North, Range 3 East) 2.0 Proposed Development The proposed project is an assisted living facility on the 1.38-acre site. The improvements will consist of a two-story building with underground parking beneath a portion of the building. The development will include a concrete access driveway, water service for domestic and fire flow, gravity sanitary sewage service, miscellaneous utilities, storm drainage collection and conveyance system and an underground storm water detention tank for quantity mitigation. The storm drainage collection system will consist of sheet and gutter flows to catch basins and storm drains discharging to (lie detention tank. 3.0 Existing Site Conditions The site is currently developed with an existing building located on the southwest corner of the property with asphalt parking in front of the building. Approximately half of the site is undeveloped. The undeveloped portion contains grasses and some gravel areas. Run-on does not occur at this site. Curb and gutters are on three sides of the project and a paved alleyway is oil the fourth side with drainage away frorn the site. Runoff from the site occurs as sheet flow or shallow channel flow. The runoff flows overland to existing catch basins. 4.0 Hydrologic Analysis An existing detention tank located on the proposed project was designed to accommodate the detention requirements of both the property to,the north (Edmonds Financial Center Associates) and the proposed project. The existing detention tank is 48 inches in diameter and 115 feet long. A storillwater report was prepared by Love I I-Sauerland and Assoc., Inc. (10/17/95) which analyzed both sites together and one detention tank was designed to accommodate both sites. The report is included as an attachment to this report. As shown in their analysis they assumed existing conditions to be the conditions of both sites, a-, they were then, not as the existing state of the sites prior to development. At the direction of the City of Edmonds engineer we were allowed to utilize this existing tank for our detention requirements for the portion of our site that we were able to route to the existing tank which is approximately half of our total site area (0.53 acres). The portion of our site that is unable to be routed toward the existing tank would require a new detention tank and would need to be re -analyzed with pre -developed conditions as meadow or second growth forest. Since at the time the original stormwater report by Lovell-Sauerland and Assoc. was prepared the proposed development was unknown, therefore the report makes some assumptions. Those assumptions were bypass areas for the proposed project would be 0.33 acres and detained areas would be approximately one acre. The actual area from our proposed project that can be detained in the existing tank is 0,5 1 acres and the actual area being bypassed is 0.24 acres. For the remaining area that can not be detained in the existing detention tank, a new 60-inch-diameter dual - barrel detention tank system is proposed, The new tanks will be located on the Southwest corner of the building. The detention tank system will be a dUal barrel system connected by a 24-inch pipe. The First barrel is 28 Feet Iono and the second barrel is 22 feet long. The tanks will be anchored to a concrete slab to tp prevent the possibility of floating when empty. The program used to design the storrilwater facility was WaterWork ST11 using the SBUH (Santa- Barbara Unit Hydrograph) method and a Type I A Rainfall Distribution, Rainfall data for the 10- and I 00-year storm events %vas obtained from the report prepared by Lovell-Sauerland and Assoc., Inc. The precipitation for the 10- and I 00-year recurrence interval, 24-hour �Uration storm events were 2.00 and 3.00 inches respectively. Edmonds Assisted Living Community -Preliminary Drainage Report For pre -developed conditions, the total contributing area to the common point of analysis for the site is approximately 0.58 acres. (Figure 1) For a soil type "C" a CN value of 85 (meadow) was used for the pervious area. For post -developed conditions, the total contributing area is 0.58 acres. The total area is impervious and a CN value of 98 was used� 5.0 Detention Tank Design The detention tanks were designed to discharge the pre -developed flows for the 10- and I 00-year storm events. The resulting tank was sized to be 50 feet long and 60-inches in diameter. Because of site constraints, a dUal-barrel tank system is proposed, The tanks will be connected by a 24-inch pipe. See the attached computer printout for the results of the analysis. 10/7/99 8:36:15 am Bannon Engineering page 1 Edmonds Assisted Living Community BASIN SUMMARY BASIN ID: 100yr-po NAME: 100 yr post-dev SBUH METHODOLOGY TOTAL AREA ....... 0.58 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... TYPElA PERV IMP PRECIPITATION .... 3.00 inches AREA..: 0.00 Acres 0.58 Acres TIME INTERVAL .... 10.00 min CN .... 86.00 98.00 TC .... 5.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.36 cfs VOL: 0.13 Ac-ft TIME: 480 min BASIN ID: 100yr-pr NAME: 100 yr pre-dev SBUH METHODOLOGY TOTAL AREA ....... 0.58 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... TYPElA PERV IMP PRECIPITATION .... 3.00 inches AREA..: 0.58 Acres 0.00 Acres TIME INTERVAL .... 10.00 min CN .... 85.00 98.00 TC .... 10.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.19 cfs VOL: 0.08 Ac-ft TIME: 480 min BASIN ID: 10yr-po NAME: 10 yr post-dev SBUH METHODOLOGY L-� TOTAL AREA ....... 0.58 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... TYPElA PERV IMP PRECIPITATION .... 2.00 inches AREA..: 0.00 Acres 0.58 Acres TIME INTERVAL .... 10.00 min CN .... 86.00 98.00 TC .... 5.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.23 cfs VOL: 0.09 Ac-ft TIME: 480 min BASIN ID: 10yr-pr NAME: 10 yr pre-dev SBUH METHODOLOGY TOTAL AREA ....... 0.58 Acres BASEFLOWS; 0.00 cfs RAINFALL TYPE .... TYPElA PERV imp PRECIPITATION .... 2.00 inches AREA..: 0.58 Acres 0.00 Acres TIME INTERVAL .... 10.00 min CN .... 85.00 98.00 TC .... 10.00 min 10.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.08 cfs VOL: 0.04 Ac-ft TIME: 480 min 4 Is 10/7/99 8:36:15 am Bannon Engineering page 2 Edmonds Assisted Living Community HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. - cf\AcFt Acres 1 0.083 480 1672 cf 0.58 10-YR PRE-DEV. 2 0.234 480 3719 cf 0.58 10-YR POST-DEV. 3 0.189 480 3337 cf 0.58 100-YR PRE-DEV. 4 0.359 480 5804 cf 0.58 100-YR POST-DEV. 19 0.083 550 3722 cf 0.58 10-YR ALLOW. REL. 20 0.189 510 5807 cf 0.58 100-YR ALLOW. REL. STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No. 60-inch Description: 60in tank (3, / Diameter: 5.00 ft. Length: 50.00 ft. Slope ... : 0.0050 ft/ft DISCHARGE STRUCTURE LIST MULTIPLE ORIFICE ID No. orifice Description: north struc Outlet Elev: 100.00 Elev: 98.00 ft Orifice Diameter: 1.3257 in. Elev: 103.20 ft Orifice 2 Diameter: 1.5762 in. LEVEL POOL TABLE SUMMARY MATCH INFLOW STO DIS PEAK OUTFLOW STORAGE <-DESCRIPTION-> (cf.$) (cfs) id id STAGE id (cfs) VOL(cf) 10 year ....... 0.08 0.23 60-inch orifice 103.07 19 0.08 600,20cf 100 year ...... 0.19 0.36 60-inch orifice 104.79 20 0.19 951.71cf AL -AREA 1.35 AC TOT AREA DETAINED I N EXIST. TANK 0.53 _'AC. AREA BYPASSED 0.24 AC AREA'.DETAINED IN NEW TANK = 0.58 AC PRE-DEV. COND. CN=85 ...... .... POST-DEV. COND. CN=98 PROPOSED -0 U_ T ILI I -E LEGEND AREA TO EXISTING DETENTION TANK BYPASS AREA AREA TO NEW DETENTION TANKS ---- ------- co ZMD AVE 5 LD L_ 0 LOVELL-SAUERLAND & ASSOCIATES, INC. 19400 33rd Avenue W. Lynnwood, WA 98036 REVISED DETENTION STORAGE VOLUME CALCULATIONS FOR EDMONDS FINANCIAL CENTER ASSOCIATES Second Ave. South between James and Dayton Edmonds, Washington Prepared By: At INTRODUCTION '-..�This report replaces the original report dated 9/21/95. It provides the basis for the detention design for improvements proposed for the subject property, and addresses comments made by the City during the first review. The design is based on the City of Edmonds Storm Water Management ordinance No. 3013 effective 3/31/95. Due to the level of redevelopment proposed for this project, the code requires that the entire site comply with the new standards. The ordinance requires postdevelopment runoff rates to match the predevelopment runoff rates for the 1 0-year and 1 00-year 24-hour storms. The assumed "existing" condition for establishing allowable release rates is lawn, with a SCS curve number of 85. (Soil type is assumed to be hydrologic group C.) The proposal includes nearly 100 percent impervious cover, giving a postdevelopment curve number of 98. The site has no tributary offsite areas. The times of concentration assumed for the predeveloped and postdeveloped condition are assumed to, be 10 minutes and 5 minutes respectively. Rainfall characteristics include a hydrographic shape of an SCS Type 1A storm, and total precipitation (interpolated from SCS isopluvial charts) as follo s: I 00-year 24-hour storm 3.0 inches 1 0-year 24-hour storm 2.0 inches 2-year 24-hour storm 1-a�?nches /I � An allowance has been made in the detention calculations for bypass of runoff from future mpervious areas. This area is assumed to be 0.33 acres, which is 25 percent of the \--undeveloped Parcel B, or about 16 percent of the entire site. Since it is not known how Parcel B will be developed, the location of the bypass area is hypothetical. The detention volume has been sized to allow the bypass to occur without exceeding the allowable flow. Therefore, the peak discharge rate from the sum of the bypass hydrograph and the detention pipe discharge hydrograph are less than the calculated existing flow. SPECIAL SITE DRAINAGE CONSIDERATIONS This site is located on relatively low lying land near the Edmonds waterfront. Due to the need for parking under the building there is some concern that tidal flooding could occur in the areas which are excavated below the existing grade. In a telephone conversation with staff at the NOAA Pacific Tides Field Office in Seattle it was indicated that they have 100 years of data for the Seattle Area. The historic maximum tide for Seattle was in December 1977, which was the result of a large low pressure storm in conjunction with the winter solstice. The tide level was 14.63 (MLLW datum). To adjust the tide for Edmonds, a correction factor of 0.96 must be applied, giving an equivalent historic high tide of 14.04. The elevation of the water in a drainage system serving the site could be higher if storm runoff is flowing at a high volume at the same time as the high tide. Such a situation would result in a backwater, since the pipe system to the sound has a limited capacity. /V Lovell-Saueriand and Associates 3 A-r� Page 2 I.W4 ? I -Ilk -r" ),,c r-e- X"o The finished floor elevation of the parking garage was originally identified to be 13.5 feet. Since the first report, that has been modified downward to about 11.08 feet. The floor of the \,,garage is not particularly sensitive to occasional minor flooding, although such flooding by salt water is not desirable. Floor drains in the covered portion of the garage will be drained to a sump, for pumping to the sanitary sewer. The overall drainage design must consider various factors involving peak flows, tides and water table conditions. The following were selected as design criteria: 1. A maximum potential water level in the storm system is assumed to be higher than the garage finished floor under peak tide and storm loading. Offsite, such a level would result in widespread shallow flooding in the ferry holding lanes. It would be the result of peak storm loading on top of maximum high tide loading, and would be for a relatively short duration. 2. The potential maximum water level in foundation soils is unknown, but could be a foot or two higher than the surface water elevation, It is assumed that with foundation drains installed, the groundwater level in the immediate area of the foundations would not stay high for long periods, but would drop with a drop in the tide. Since the ground water elevation could occasionally be higher than the lowest parking level, it is not desirable to have an uncontrolled hydraulic connection between foundation soils and the parking lot surface. 4. It is preferable to have no uncontrolled hydraulic connection between the detention system and the parking lot surface, or between the detention system and the foundation drains. A full detention tank should not be allowed to backflow into either location, The detention system would drain all surface drains higher than the parking level. If the detention system outlet became plugged, overflow should come out somewhere other than the parking area. 5. The detention system design should consider the effects of buoyancy in a high water table situation. With high ground water conditions, and an empty detention tank, the tank may be subject to greater buoyant forces than could be balanced by the weight of normal earth co 7 The means of addressing the water elevation concerns is the installation of tide gates in the form of flexible rubber check v ialves. Two are specified: 1. The first isolates the detention system from tidal backflow. 2. The second isolates the foundation drains from backflow from the tide or releases from the detention system 3. The parking area will be drained using sump pumps. Areas under cover and not receiving storm water from direct precipitation will be pumped into the sanitary sewer. The areas receiving storm runoff will be pumped to the detention system. Lovell-Sauerland and Associates Page 3 n -I _JWJ W 4. With the amount of cover over the detention tank, the detention tank buoyancy issue is not a problem. The weight of backfill and the catch basins exceeds the buoyant uplift which would _,be generated by submerging the pipe. DETENTION STORAGE CALCULATIONS Two alternatives were considered for detention storage. The first alternative would only provide detention for the portion of the site currently being desig'ned. The second alternative included detention for the future redevelopment of the entire site. The second alternative proved to be economical, in that for a small increase in construction costs, a future construction project for a separate system could be avoided. The following calculations address the build -out detention requirement for the entire property bordered by James and Dayton Streets, Second Avenue and SR1 04. Calculations were performed using an S'CS-SBUH method to estimate hydrologic 11--' performance. The software used is WaterWorks, a commercially available program designed for this purpose. A pipe configuration was specified in the calculations, but an attached spreadsheet provides more detail. The printout from the analysis follows the summary tables, CALCULATION SUMMARY -- FULL SITE ALTERNATIVE Re ' cu interval: 1 0-Year I 00-Year FRecurrence Predeveloped discharge 0.47 cfs 0.83 cfs Calculated design discharge 0.48 cfs 0.80 cfs Calculated detention storage 812 cf 1504 cf Lovell-Sauerland and Associates Page 4 F1 I\,. DETENTION CALCULATION DETAILS -- WaterWorks printout --full site alternative BASIN ID: DOB SBUH METHODOLOGY TOTAL AREA ....... RAINFALL TYPE .... PRECIPITATION .... TIME INTERVAL .... TIME OF CONC ..... ABSTRACTION COEFF: BASIN SUMMARY NAME: 100-YELR BYPASS 0.33 Acres BASEFLOWS: 0.00 cfs TYPElk PERVIOUS A REA 3.00 Incbes AREA-: 0.00 Acres 10-00 min Cx.... : $5.00 5.00 tin IMPERVIOUS AREA 0.20 AREA..: o ii it -roe Cx.... : 98.00 PEAK RATE: 0.21 cfs VOL: 0.08 Ac-ft TIME: 480 min BASIN ID: OOE NAME: 100-YR EXISTIVG SBUR METHODOLOGY I/ TOTAL AREA ....... : 2.07 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPEIA PERVIOUS AREA PRECIPITATION .... : 3.00 incbes AREA..: 1.37 Acres TIME INTERVAL .... : 10-00 Min,/ Cx.... : 95.00 TIME OF CONC ..... : 10.00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 X AREA..: 0. 70 Acres 11 *' Cx.... : 98.00 PEAK RATE: 0.87 cfs VOL: 0.34 Ac-ft TIME: .480 Min BASIN ID: OOF NAME: 100-YR DEVELOPED SBUR METHODOLOGY TOTAL AM ....... : 1.74 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERVIOUS AREA PRECIPITATION .... : 3.00 incbes; AREA..: 0.00 Acres TIME INTERVAL .... : 10-00 min CN.... : $5.00 TIME OF CONC ..... : 5.00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA-: 1.74 Acres CN.... : 98.00 PEAK RATE: 1.08 cfs VOL: 0.40 Ac-ft TIME: 480 min �M BASIN ID: 02B .: NAME: 2-YEkR BYPASS SBUE METHODOLOGY TOTAL AREA ....... : 0.33 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElk PERVIOUS AREA PRECIPITATION .... : 1.30 incbes AREA..: 0.00 Acres TIME INTERVAL .... : 10.00 min CN.... : $5.00 TIME OF CONC ...... : 5.00-min IMPERVIOUS AREA ABSTRACTION COEFF; 0.20 AR A 11 irroe PEAK RATE: 0.08 cfs VOL: I CH.... : 98.00 0.03 Ac-ft TIME:, 480 loin Lovell-Sauerland and Associates Page 5 N BASIN ID: 10B NAME: 10-YEAR BYPASS SBUH XETRODOLOGY TOTAL AREA ....... : 0.33 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElh PERVIOUS AREA PRECIPITATION .... : 2.00 inches AREA..: 0.00 Acres TIME INTERVAL .... : 10.00 min Cx.... : $5.00 TIME OF CONC ..... : 5.00.,min IMPERVIOUS AM ABSTRACTION COEFF,- 0.20) AREA..: 0.33 Acres Cx.... : 98.00 PEAK RATE: 0.13 cfs VOL: 0.05 Ac-ft TIME: 480 tin BASIN ID: IOE NAME: 10-YW EXISTING SHE METHODOLOGY TOTAL AREA ....... : 2.07 Acres BASEFLOWS: 0.oO cfs RAINFALL TYPE .... : TYPElk PERVIOUS AREA PRECIPITATION .... : 2.00 inches AREA. 1.37 Acres TIME INTERVAL .... : 10-00 min CN. .1. 85.00 TIME OF CONC ..... : 10.00 min IMPERVIOUS AM ABSTRACTION COEFF: 0.20 AREA..: 0.70 Acres CH.... : 98.00 PEAK RATE: 0.47 cfs VOL: 0.19 Ac-ft TIME: 480 min BASIN ID: 1OF NAME: 10-YR DEVELOPED SBUR XETEODOLOGY TOTAL AREA ....... : 1.74 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPEIA PERVIOUS AREA PRECIPITATION .... : 2.00 inches AREA..: 0.oO Acres TIME INTERVAL .... : 10.00 tin CN.... : 85.00 TIME OF 0ONc ..... : 5.00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA..: 1.74 Acres Cx.... : 98.00 PEAK RATE: 0.70 cfs VOL: 0.26 Ac-ft TIME: 480 tin HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib KUM RATE PEAK HYDRO Area cfs min. cf-AcFt Acres 1 0.408 500 11166 cf 1.74 2 0.706 500 17424 cf 1.74 11 0.482 490 '13284 cf 2.07 12 0.795 490 20729 cf 2.07 Lovell-Sauerland and Associates Vil Page 6 STAGE STORAGE TABLE UNDERGROUND PIPE ID No. PIPE Description: PIPE Diameter: 5.00 ft. Lenqtb: 90.00 ft. slope... : 0.0100 ft/ft STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > STAGE ( ---- STORAGE ---- > STAGE < ---- STORAGE ---- > (ft) --- Cf --- -- Ac.Ft_ (ft) --- cf--- --Ac-pt- (ft) --- cf-- --AC-Ft- (ft) --- cf--- --AC-Ft- 0.00 0.0000 0.0000 1.50 283.00 0.0065 3.00 905.70 0.0208 4.50 1519 0.0349 0.10 0.4686 0.0000 1.60 318.93 0.0073 3.10 949.97 0.0218 4.60 1551 0.0356 0.20 2.6343 0.0001 1.70 356.17 0,0082 3.20 994.00 0.0229 4.70 1582 0.0363 0.30 7.2150 0.0002 1.80 394.52 0.0091 3.30 1038 0.0238 4.80 1611 0,0370 0.40 14.717 0.0003 1.90 433.90 0.0100 3.40 1082 0.0248 4.90 1637 0.0376 0.50 25.549 0.0006 2.00 474.16 0.0109 3.50 1125 0.02 59 5.00 1659 0.0381 0.60 40.040 0.0009 2.10 515.23 0.0118 3.60 1168 0.0268 5.10 1686 0.0387 0.70 58.480 0.0013 2.20 557.02 0.0128 3.70 1210 0.0278 5.20 1709 0.0392 0.80 91.113 0.0019 2.30 599.30 *0.0139 3.80 1252 0.0287 5.30 1727 0.0397 0.90 108.16 0.0025 2.40 642.28 0.0147 3.90 1293 0.0297 5.40 1742 0.0400 1.00 130.02 0.0030 2.50 685.51 0.0157 4.00 1333 0.0306 5.50 1753 0.0402 1.10 155.98 0.0036 2.60 729.10 0.0167 4.10 1373 0.0315 5.60 1760 0.0404 1.20 184.71 0.0042 2.70 773.11 0.0177 4.20 1411 0,0324 5.70 1765 0.0405 1.30 215.67 0.0050 2.80 917.27 0.0188 4.30 1449 0.0332 5.80 1767 0.0406 1.40 248.51 0.0057 2.90 861.46 0.0198 4.40 1484 0.0341 5.90 1767 0.0406 STAGE DISCHARGE TABLE XULTIPLE ORIFICE ID No. 0 Description: ORIFICE RISER outlet Elev: 0.00 Elev: 0.00 ft Orifice Diameter: 3.0000 in. Elev: 3.20 ft Orifice 2 Diameter: 2.5000 in. STAGE <--DISCHARGE --- > STAGE <--DISCRUGE --- > STAGE (--DISCWGE---> STAGE <--DISCHARGE --- > (ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- (ft) --- cfs -- ------- 0.00 0.0000 1.60 0.3089 3.20 0.4369 4.90 0.7496 0.10 0.0772 1.70 0.3184 3.30 0.4973 4.90 0.7618 0.20 0.1092 1.80 0.3277 3.40 0.5262 5.00 0.7737 0.30 0.1338 1.90 0,3367 3.50 0.5498 5.10 0.7853 0.40 0.1545 2.00 0.3454 3.60 0.5707 5.20 0.7968 0.50 0.1727 2.10 0.3539 3.70 0.5897 5.30 0.9080 0.60 0.1892 2.20 0.3623 3.80 0.6075 5.40 0.8191 0.70' 0.2043 2.30 0,3704 3.90 0.6242 5.50 0.8300 0.80 0.2184 2.40 0.3784 4.00 0.6402 5 , 60 0.8407 0.90 0.2317 2.50 0.3862 4.10 0.6554 5.70 0.8513 1.00 0.2442 2.60 0.3938 4.20 0.6701 5.80 0.8617 1.10 0.2562 2.70 0.4013 4.30 0.6843 5.90 0.8719 1.20 0.2675 2.80 0.4087 4.40 0.6981 6.00 0.8821 1.30 0.2785 2.90 0.4159 4.50 0.7115 1.40 0.2890 3.00 0.4230 4.60 0.7245 1.50 0.2991 3.10 0.4300 4.70 0.7372 LoveU-Sauerland and Associates Page 7 40 LEVEL. POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE < -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> A VOL (cf) 10-Year ...................... 0.47 0.70 PIPE 0 2.79 1 812.61 100-year ......... ; ............ 0.87 1.08 PIPE 0 4.46 2 1504-47 The final detention pipe size and release orifice diameter is adjusted to fit the actual site conditions, within the performance characteristics calculated above. The following spreadsheet gives greater detail above the actual design. DETENTION PIPE SIZE Estimate of required detention storage volume 1505 cf Assume a det. pipe 48.0 inches, diameter Cross section area 12.6 sf Usable vol. of Type I CB 6.0 sf/ft cf Usable vol. of 2.0 Type II MH 54.0 inch dia = 127.2 cf Usable vol. of Type II HE 72.0 inch dia = cf Usable vol. of 18.0 inch pipe: ft long = cf Usable vol. of 36.0 inch pipe: 4.0 ft long = 28.3 cf Required pipe volume = 1349.5 cubic feet 11) Required pipe length = 107.4 linear feet o( Length of pipe used 115.0 FT. - \ ',--,,-Storage.provided = 1600.6 cubic feet Minimum'grade elevations: Top D/S detention CB 16.47 with 2.50 ft Overflow cleara Top D/S detention CB 15.34 with 2.0 ft cover Top U/S detention CB 15.97 with 2.0 ft cover Min Grnd surf. elev = 14-47 (over any inlet: 0.5 ft above Inv eley at U/S end = 9.92 Max water surface elev 13.97 (detn. pipe si. = 0.50%) Invert elevation = 9.34 CALCULATION OF OUTLET SIZE Required release rate, orifice 1 = 0.460 Required release rate, orifice 2 = 0.300 Storage Orif. Elev. H, ft a, sf d,ft d,incbes provd. -------------------------------------------------------------------- 9.34 4.05 0.046 0.24 2 - 7/8 0 11.54 1.85 0.044 - 0.24 2 - 7/8 874 - 0 Full storage = 1601 -------------------------------------------------------------------- area, a c Qdo / (.62 x (2 x g x h)**.5) g = 32.2 orifice diameter, d = ( 4/pi x a)**.5 LoveU-Sauerland and Associates Page 8 0 Edmonds Financial Center Assoc. MAP OF PROPOSED SITE CONDITIONS '�—LSA No. 3383 50' DEVELOPED AREAS: Assumed 100% impervious J PARCELA Driveway/park area 0.2 ac Roof/landscape 0.489 ac PARCELB Id, Assumed detained 1.0011/ac Assumed bypass = 0.33AC (A conservative (25916) Of A allowance for future JW design constraints) A% I - - - - - - I J, ed r r ------------ \ . ............. . 04 --------- -- -------------- J kA ILO VFW Edmonds Financial Center Assoc. .MAP OF EXISTING SITE CONDITIONS LSA No.3383 ill = 50' 4"1 % APPROXIMATE AREAS: 621 PARCELA Impervious = 0.275 ac Pervious = 0.414 ac PARCELB Impervious 0.69 ac Pervious 0.64 ac - - ------------ -------------------- ------------ r 4P ......... .............. - - - - - - - - - - - - - - - - - -T 4A 00 It P 4-0 ­E R D ;E=: CITY OF: E MOXOS' B. SEW PERMIT 9 PERMIT.[ Address of Construction: Property Legal Description �(I nclude all easements): 3";t +_6, C) q, S.. .T 1��a -VE1bCU1,fi.F_ MhAol-& 00 V, eg, PQ, Owner and/or Contractor, - State License N o. Bu.ilding Permit No., ;7_ El Single Family. Invasion. into City Right -of -Way. 0 N,0�—C] Yes El M u*lti-Family .(No.. of Units- RW,ConstructIDn_!P,�pr-rrrff No. Ed Commercial Cro§s,oth,er'P)dviate..Pr6perty: 13 o 3—Y-* PS El Public ,�ttachlegefl.description and�copy:of recorded easement I certify that I have -read and'�Shall comply with all-dity -requirements' .�I Date as,Ydicated.on the back of Ahe Perm it Card.. CALL'DIAL-A-DIG (1-.800-424-5555) BEFORE ANY EXCAVATI-OW' OFFICE USE ONLY FOR- INSPECTION CALL 77142,02- PUBLIC�, ORKS DEPT.- Permit Fee: /,z 0 - I's s u led B y Trunk Charge:. Datejssued: Oft Assessment Fee: RbceiptNo.:— Lid No.: Partial Inspection: Date. —Initial — Comments Reason Rejected: Date 'Final Inspection Approved: 'Date. Initia''I:_ ."PERMIT MUST'B'E POST�-D..O..N. JOB SIT 'White Copy: File Green 6o'py:!nspect6r­:, 66ti Copy: Applicant 3/90 I 1994 Wirl,vton State Nofiresidential EneW Code Lighting Summary—, 1994 WashftM StMe Nmmddw" En*W Code Conpkme FW= Forrn Project Wo VA,7 P"JadAdd"a Data For Building Deparlrnerd Use Applicant Name: -f-eV-"t-J JOHt-4�2T-CI-4 A;VIcant Address: `� L, 'Tr-- Wis.. APp"'an"Ph": OTC10 54,,L-d?11Z-q Project Description New Building EJ Addition t-krArteration Compliance Option D Prescfipm 0 Ughfing Power AJbwanoo Systems Analysis (See Cluallfication Cheddist (over). indicate Prescriptive & LPA spaces clearly an plans.) Alt I eration Exceptions (d*ck appropriate box) 9'No changes are being made to the lighting - I Ll Less than 60% of the fixtures are now, and Installed lighting wattage Is not being Increased Ma)dmum Allowed Li0ting Wattaxe (Interior) Locatiorl (floor/roorn no.) Occupancy Description Mlowed Watts per fe Area In fe Allowed x Am From Table 15-1 (ove* - document all exceptions taken from footnotes Total AJIowed Watts Provosed Liahtiniz Wattaste (Interior) (May not exceed Total Allowed Waft for Interior) Location (floor/room no.) Fixture Description Number of Fixtures Watts/ Fixture Watts Total Proposed Watts may not exceed Total Aflowed Watts for Interior T0tWPr1FMAA Waft J Maximum Allowed Lijzhtinz Wattaire (Exterior) Location Description Aflowed Waft per fe or per 0 Am In fe (or N for perlmeteo AJ10wed Waft xfe(orxff) Covered Parking 0.2 WIfe Open Parking .0.2w/fe Outdoor Areas 0.2 WIte Bldg. (by facade) 0.25w/fe T�g-. (by perlm) 7.5 WAf Note: for building exterior, dmose eldw the facade area or the perimeter mediod, but not both) Total AJlowed Watts Provosed Lfichting Wattaste (Exterior) (May not exceed Total AJlowed Watts for Exterior) Locdon Fixture DesrApIJon Number of Fixtures Watts/ Fixture wafts Proposed Total Proposed Watts may not exceed Total Allowed Watts for Exterior MAP, 3 6TWAroposed Wattsl ff -1 Ar-,% U11"y �,kj!Py PERMIT COUNTER At 1864m Ave'Sotft, Edmondje� Cate!. C Occupancy established by this�ce LCM Maximum Owner of Building: Edmonds Asshi THE Ed m*6nds', Land Ing HA EDITION OF THE UNIFORM BUILDING CODE N WHICH THE PROPOSED OCCUPANCY IS CLAS, Issued this 17`1+1�`4tt- BUILDING CODE SECTION T atTnl ,welling Units:* **83**. foe Construcdo-n: V-1 No. Stories: 2 + basement Basement Yes 1002) THE REQUI REMENTS OF THE 1997 [VISION OF OCCUPANCY AND THE USE FOR 2001 BY: VOO, 'No certificate shed be posted in a consploxwe public wea and alud[ not be arnaved, mutilated or obsatrad and died be maintained In legible don at all Imes. Any clump d o= pancy oruse reqtdres a building paffntt arid a new Cerfificate of OccL4)ancy Issued by the City d Edmands Bulding offldal. At - — ----------------------------------- ------- ---------------------- — ----- -- — — ------------------- ...................................... --------------------------- I it�11 V/ Permit No: M City ofEd 'onds RIGHT-OF-NYAY CONSTRUCTION PERMIT Issue,Date: 06 A. Address or Vicinity of C ion: -.­480 2nd AyP_ S. Ttc! B. Type of Work (be specific): GTE to replace pedestal with a 31 X 51 Hand. Hole PLEA9E SEE "ATTACHED PRik. C. Contractor:GTE NORTHWEST INC. Mailing Address: 2312—C W. Casino State License #: 0 A) f, D. Building Permit #'(if appliciibln... A-Unq Side Sewer Permit # (if applicable): 5 Ifs 5 Isf ed U V I N, 0o E n Commercial F SubdiVision�, &Cff�'V`roject E] EUC(PUD,(2DPSE,.CHAMBERS,OVWD) F] Multi -Family E] S'ingfe Faimily, Other GTE W.O..# 2.100-8PO01HX 2823.10 INSPECTOR - Contact: RTCH RDWARDS Phone: 10S_200-8755 Liability Insurance:— Bond: 3 F. PAVEMENT: YES NO G. SIZE OF CUT 31 x 51 H. Charge:,$-. CONCRETE CUT: PK YES RAO 1DEMNITY. App liea n t U'n ders ta n ds by h is1h er s ign a tu reto- ih is-,ap�licdiion h els h e h o lds th e City of, Edni o n ds h arm less fto m injuries, damages or claims.of�an� kind or description whatsoj�ver,fpre�eeni' or unforeseen, that may be made againstAe City of Edmonds or any of its departments or employees, including but noMimited to the defense of, any'legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. z�_11' THE CONTRACTOR IS RESPONSIBLE,`FOR_� WORKMANSHIP- AND MATERIALS FOR A-PERIOb Of, O]qE".,TEAR,- FOLLOWING THE FINA L INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMA7ED—R—ESTORATION FEES WILLBE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES,"A T WHICH TIME A DEBITOR CREDIT WILL BE PROCESSED. FOR ISSUANCE TO THEAPPL.ICANT. * Traffic control and'public safety shall be in accordance "with City regu�ations as required by the City Engineer. Every flagger must be trained as required by.(WAC) 296-155-305 a,nd 011ii'have certification ve , �ifying completion of the ,required training in their possession. with asphalt, r City- # Restoration is to be in accordance with City codes. X11 stieet-cut ttehch_work­s'hall`b.e approved material prior to the end of the workday -NO EXCEPTIONS, * Three sets of construction drawings of proposed work are required with'Ad permit application. IRAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNbWLEDGE THA TIMUST MAKE THE PINK CO YOF HE PERMIT AVAILABLE ON SITE AT ALL'TIMES FOR INSPECTIONS Signature- Date: bave flawkiris roup Wgr-Access Design (Contractor or AgentYG CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY USE ONLY C. pproved bvl__� PeMO ta Right-of-way Fee: 180 t 510- rized, Void After I I * 1 0 / 00 Disruption fee/Fund 111: iti6ns:-114A*(. (11ft Restoration Fee: on I r �c W, Total Fee: /75 4 love- IV)A irA -"W lot No: iA �hlf; -th �J _�7 UPON COMPLETION OF PERMITTED WORK9 AN ENGINEERING FINVL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS 0, COMMUNITY DEVELOPM NT.'COPE. fi5s V/0 FINAL APPROVAL OF PERMITTED WORK:- LA I . A.8 INSPECTOR'S SIGNA TUA DATE. �, 1� TPW For inspection requirements see Engineering Information Handoli.t. A NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Date:, To: From: Subject: May 31, 2000 GTE Maryanne Zukowski Traffic Engineer -1 Right of Way Permit traffic control conditions of approval Traffic Control in the Ci!y Right -of -Way All signs, barricades and related equipment and their use must be in accordance.with Part IV, "Traffic Controls for Highway Construction and Maintenance Operations," of theManual on Uniform Traffic Control Devices, as prepared by the National Joint. Committee on Uniform Traffic Control Devices and per the City of Edmonds Developmental Standards. Reasonable accommodations shall be made for distance requirements in §ignage for geometrical conflicts, Coordination with the City Inspector prior to all work to check traffic control. Particular attention should be made to the following items: There shall be at all times reasonable pedestrian and vehicular access to and egress� from the properties adjacent to the project, so far as possible. Contact the affected homeowners directly to prevent- conflicts. The Pub lic Safety Department (police and fire), 771-0200 and 771-6215,,the Edmonds Public Works Department 771-0235 shall be notified 24 hours prior to the construction. Proper provisions shall be made for public convenience., safety, and travel.. Any asphalt concrete pavements, crushed surfacing, gravel base or water required for maintaining traffic during the life ofthe project'shall be placed by the contractor immediately upon request by the engineer and/or inspector. All unattended excavations shall be properly barricaded so as to prevent accidents. Construction along or across the City. right7of-way shall be as per the contract documents, City of Edmonds Standards, or as directed by the engineer and/or inspector. City of Edmonds 182+20 # 21317 1`�_71 C542 L��F zP11 Ln :::j, 00 Cc: a- LI) W LO �< Z�� X cc — N Q CQ <E Uj 4"-PVC-2 WOY 210 FT UG 4R3:826-850 oFF25-24 4RJ:1-600 ----- AEFG-26 -------- 4RJ:1-900 ------ AE4-24 ------- 1_ -j---U1<F9-26 ------- UG -------- 4RJ:601-900,1801-1900 2-2" PVC AND ---/ DEVELDPER PLACED PVC-4 WAY G 0 F T C�� Q) CO C\j __j 72-vO2 5�� E479 DCL.2851-2875 (IA /�b 50XD-DCL:2851-2900- 2701-2800 01<F2-26 DCL:2601-2900-100XD AKF4-26 PED IS IN THE FRONT OF THE BUILDING CHANGE OUT PED TO A HAND HOLE AND PLACE A BMT PLACE ONE 4"PVC OUT OF HANDHOLE FOR CUSTOMERTO CONNECT THE PVC FROM BUILDING TOO DAYTON ST. ---- UG -------- DCL:2826-2850 U G -AKF25-26 DCL:2601-2800 AEF2-24 DCL:2601-2900�100XD — A K F 4 - 2 6 I T 0 C 0):::: I certify that work I completed on this work order and As -Built Is In compliance with GTE Oualfty standards as Identified on the IPOI P checklist. (Signature and Date) USE FOR BULK WO ONLY IN SERVICE DATE 06/30/00 PERMITS EI BLANKET CONSTRUCTION El STATE 0 DIAL. A DIG 0 COUNTY El FLAGGING E) CITY 0 BRUSHING 0 NONE SPECIAL CIRCUITS CAUTION 0 YES a NO POWER MUG DAE OTHER 0 UG El AE CUTS REOUIRED 0 YES M NO TELCO 0 UG El AE JOINT POLE. 0 PUD JOINT -TRENCH • PSP&L • CATV • GTE 0 NONE 0 PUD EIPSP&L 0 CATV 0 GTE 13 NONE FEES RED'S POINT OF CONTACT Ell GOP El LEC PEARSON El SPEC. CONST. El NONE ENG. TECH. RICH EDWARDS PHONE NO. 425.290.8755 FACL. TECH -BOB VIEN PHONE 425.710.4144 FIELDED BY MATERIAL MATERIAL ENGR CONST CODE DESCRIPTION EST ACT 180046 CONCRETE HH-' THOMAS BROS. MAP NO. 454 F-G EXCHANGE HALLS LAKE 1111T, SNOHOMISH TITLE: CHANGE OUT PED FOR A HANDHOLE AT 180 2ND AVE S t 0 0 OD APPROVED BY DATE x T. 27NR.3E SEC-23D � SHEET NO.: 1 OF oo CD CD _cj STEATP 1889 STATE OF WASHINGTON DEPARTMENT OF HEALTH PO Box 47852 * Olympia, Washington 98504-7852 March 23, 2001 William Dassler The Johnston Associates 375 Ericksen Avenue, Suite 222 Bainbridge Island, WA. 98110 RE: Edmonds Assisted Uving Community CRS# 01-10270-5818-009 Dear Mr. Dassler: BU110IN6 MAR 2 6 2001 We received your letter and revised drawings on March 7, 2001. Staff reviewed your project per Chapter 388-78A WAC-Boarding Homes and found them accep table. The local building official is responsible for building construction permitting and occupancy. The local building official or the State Department of Labor and Industries is responsible for electrical construction pennitting. Enclosed is your set of stamped "Approved" Construction Drawings. These documents should become a permanent part of the facility records. Final licensing approval is subject to a site inspection by Department of Social and Health. Services (DSHS), Boarding Home Licensing, to verify compliance with boarding home regulations. Also enclosed are two notification cards. Please complete and return the green card when construction begins. When construction is complete, return the completed pink card with a copy of the Certificate of Occupanc . We will notify DSHS, when we have received these two items, that the construction review process is complete. Then they will schedule their site inspections for licensing. CV mQ 18 E March 23, 2001 CRS # 0 1 - 10270-5 818-009 Page Two Please note that the boarding home regulations do not allow occupancy of the completed project area until authorized by DSHS Boarding Home Licensing. Call (360) 725-2417 for opening and licensing information. If you have questions concerning Construction Review, please call Lori Miller at (360) 705-6778. Sincerely, Richard M. Swanson, Architect Construction Review Services Office of Certification & Enforcement Enciosures: Notification of Construction Start Card Notification of Construction Complete Card Stamped 'Approved' Plans cc: DSHS, Boarding Home Ucensing Washington State Patrol, Fire Protection Bureau City of Edmonds, Building Official File 0 PUGET SOUND MECHANICAL, INC. 1818 99th Street East * Tacoma, Washington 98445 (206) 537-8900 - PUGETI - 217LO To: City of Edmonds Building Department Subject: Revised Plumbing Layout HEEi-- I March 28, 2000 The main reason for plumbing redesign is to comply with the 1997 U. P.C. chapter 7, paragraph 709.0 which states: wherever practicable, all,plumbing fixtures shall be drained to the public sewer or private sewage disposal system by gravity. The new P-3 dated 03/27/2000 shows a gravity system that will work with little or no structural changes to the building design. We have indicated some one- percent slope on 4-inch pipe and loaded said pipe according to table 7-5 footnote 5. P-2 page shows a gravity system for the fixtures located below crown level of the main sewer. These fixtures will discharge by gravity to the new SP-1 lift station and to the 1 st floor gravity system as indicated on P-3. Please, feel free to contact me with any questions you have concerning these changes. Our intent is to give the owners a quality -plumbing job and to work with you in any way we can. Thank you for your patients. 'Respectfully, NN Martin McWillis Puget Sound Mechanical, r� IV44etw 0 ,4,&v1aAe17 li'soiM6 Mow City of Edmonds Permit No:,'ZZno� -38 RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: C2 Q6 nf� 180 2 AV S A. Address or Vicinity of Construction: B. Type of Work (be specific): PERMISSION IS 1z, JJESTED TO INS�_�ALL A 1 11411 pLAqTTC -;FgvTrF. TTT?. Tw To 'W C/L EXISTING 4" STW MAIN AT ±100'W C/L Of 2 AV S AND ±14'N C/L OF W DAYTON ST, AND CONTINUE NWCEH TO THE PROPERTY LINE. 2 PAVING CUTS ANTICIPATED C. Contractor: PUGET. SOUV!D MR.GY 1122 75th ST SW Mailing Address: State License #: Contact: DOUG USITALO/ SUE SIDICK Phone: 475-156-7520.1 425-990-7095 Liability Insurance:- Bond: D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. F] Commercial Subdivision 0 City Pr ' oject EUC (PUD, GTE, PSE, CHAMBERS, OVWD) F� Multi -Family Single Family F� Other, INSPECTOR- F. PAVEMENT: k-1 YES F 2 X 4 NO G. SIZE OF CUT H. Charge: $ CONCRETE CUT: E] YES NO hel IDEMNITY. Applicant understands by hislher signature to this application she holds the City of Edmonds harmlessftom injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made -against the City of Edmonds or any of -its depari - ments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT, Traffic control and public safety shall b e in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and, must have certification verifying completion of the required training in their possession. Restoration is to be in accordance with City codes. Al . I street -cut trench work . shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. Three sets of construction drawings of proposed work are required with the permit application. IHAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENT'v AND ACKNOWLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Date: (Contractor or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY USE ONLY I Right-of-wa Approvedby, Fee: y 'Disru' tion Fee/Fund 111: Ti'm�'e Authorized:, Void After 4 117,-) /a/ P ,,!Speciat Conditions,:­,�. T-,b twv 'P�sv_"T -N-WAC- Restoration Fee: Qe"W#e'_A&?5 'TVA&AC_ eWI L PgE' Total Fee: 4 AFMV9't> JPLA-N Receipt No:"­"� � �'Tx -4 UPON COMPLETION OF PERMITTED WORK, AN. ENGINEERING FINAL INSPECTION IS: REQUIRED PER CHAPTER 18.09 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE. ih,;iSW (A V1 FINAL APPROVAL OF PERMITTED WORK.- n INSPECTOR 'IS SIGNATURE DATE: 01 For -inspection- requirements see Engineering Information Handout. NO WORK SI-IAt,I, BEGIN I"RIORTO PERMIT ISSUANCE PUGET SOUND ENERGY 180 - 2 AVE S Or der # 106063030 Date: 2/8/2,001 V) 0 00 q- Adum To: City of Edmonds Right of Way Permit application Submitted by: Juliano Nguyen Engineering Planner Puget Sound Energy 425-290-7026 -,----PROP. 1-1/4" PE SERVICE V) W DAYTON ST Fiber Optics Q G cs 34' PAViNG > 'tj W W 0 S J EX. 4" STW IP 14'N 'i 1960-J-2187 W Paving cuts anticipated: 2 Cuts shown as: KEY: --W-- Water 4__ los j ewer i torm QroiQ -G OffVunication jri�: . .. ........ . . .. ..... PUGET OAFFIC CONTROL PLAN SOUND City of Edmonds ENERGY Submitted by: Juliano Nguyen 180 2 AVE S Engineering Planner Order # 106063030 425-290-7026 Date: 2/8/2001 TABLE A T 200 F <R> + T 200 FT 2 or T TRUCK WITH r FLASHIN ORt WITH BEACON < > WORK AREA 7 1 100 FT SR-1 04 N1 1-- V) SPEET (MPH) TAPER LENGTH (FT) CONE SPACING ALONG TAPER IF OFFSET WIDTH 10, 121 25 105 125 25 30 150 180 30 35 205 245 35 40 320 40 45 540 45 NOTE: z 1. FLASHING BEACON SHALL BE 0 INSTALLED AT EACH SIGN FOR NIGHT-TIME USE. 2. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 3. FLAGGERS REOUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW. 4. SIGN SIZE PER MUTCO. LEGEND: M CONE OR CHANNELIZING DEVICE (SEE STO 702) Z LAO I 200 iia) *IA7 L3&00 61.,K DAYro* 41 %P fj,� CO j) ro T) LO G1 4W� N ro ra Cc L fo (m Is N 01 AV (3 M 9-4 ID 01 M ZL61 :f X 11 .4f :�rz th LOW 371ASSS di s3wvc all Q-"QA1 NNW cv - §'ee A ro -^44 Q GARY HAAKENSON CITY OF EDMONDS -2 H AVENUE NORTH - EDMONDS, WA . 98020 (425) 771-0220 FAX (425) 771-0221 MAYOR .121 5T DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering January 17, 2000 Washington State Department of Transportation Attn: Doug Thompson, Developer Services P.O. Box 330310 Seattle, WA 98133 SUBJECT: NW Care Management/Assisted Care Facifily 141 DWon Street Dear Mr. Thompson, .Per the contractor of the above-re,ferenced project, who is also the representative,for the developer of the project, there is the.. need for a Washington State Department of Transportation (WSDOT) Signal Inspector. The maintenance of the signal located at the intersection of SR104 and Dayton Street is under the jurisdiction of WSDOT, and the contractor will be impacting the electrical systems that control this signal. The contractor has agreed to pay the costs ofthese inspections and follow the directions of the State Electrical Inspector. If you have finiher need for information, please contact me at 425-771-0220. Sincerely, MARYANNE ZUKOWSIU Traffic Engineer c: Lyle Chrisman, Engineering Specialist Jim Kammerer, Public Works — Street Division Supervisor CAMy Documents\Engscc\TRAFFIOWSDOT.Dayl.n.kC4Pr.Porati-'d August 11, 1890 Sister Citv - Hekinan. JaDan �t�o C. 189 \3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering January 17, 2000 Washington State Department of Transportation Attn: Doug Thompson, Developer Services P.O. Box 330310 Seattle, WA 98133 GARY HAAKENSON MAYOR SUBJECT; NW Care Management/Assisted Care Facilily 1441 DWon Stree' Dear Mr. Thompson, Per the contractor of the above-refe.renced project, who is also. the representative. for the developer of the project, there is the, need for'a Washington State Department of Transportation (WSDOT) Signal Inspector. The maintenance of the signal located at the intersection of SR104 and Dayton Street is under the jurisdiction of WSDOT, and the contractor will be impacting the electrical systems that control this signal. The contractor has agreed to pay the costs of these inspections and follow the directions of the State Electrical Inspector. If you have further need for information, please contact me at 425-771-0220. Sincerely, MARYANNE ZUKOWSKI Traffic. Engineer c: Lyle Chrisman, Engineering Specialist Jim Kammerer, Public Works — Street Division Supervisor a 0 CAMy D�ocuments\Engsec\TRAFFIOWSI)OT.Dayton.k&prporatiad. August 11, 1890 0 Sister City - Hekinan, Japan 4P CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering C. January 7, 2000 Washington State Department of Transportation P.O. Box 330310 Seattle, WA 98133 Attn: Doug Thompson — Developer Services GARY HAAKENSON MAYOR SUBJECT: Agency Request for Coordination Documents on Development Project NW Care Management/Assisted Care Facilily / 141 Dayton Street Dear Mr. Thompson, Per your request I have copied the detail of the work proposed by the contractor for the subject project, a vicinity map and information regarding the Engineer that completed the design for the project. The contractor understands that your department will be establishing a charge number for the special inspections of work to be performed. that is required by your department. Your developer/contractor contact is Jeff Reed at 206-405-1268. Electrical plans are not within the approved permit application pac.ket. The location of the work is east of the holding lanes. WSDOT impacts incurred by the contractor are highlighted. The contractor's trench is next to the signal control cabinet. and the state luminaire. The trenchc'ut will be approximately 7 ft. in depth. The loop will be cut from the saw cut. If you need further assistance, please contact me at 425-771-0220. Sincerely, MARYANNE ZUKOWSKI Traffic Engineer MZ/cmc Enclosures c: Lyle Chrisman, Engineering Specialist CAMy D�ocuments\Engscc\TRAFFIOWSDOT.,.YA-s�K.qcrpo rated August 11, 1890 0 Sister City - Hekinan, Japan zj SIMONN z SITE 4n ST VICINITY MAP 0, SCALE.- 1�4000 I . QUARTER OF THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 27 ,CRIBED AS FOLLOWS: RNER- OF THIRD AND DAYTON STREETS IN THE CilY OF EDMONDS; TRUE POINT OF BEGINNING; 9. r— t F" 1 A.84 ­4_2> 01 'OU, 1 b�) 6,."r.."', 10 041 F "0., 1AW, ir C J E APPROXIMATE LOCATION-.-I-Y. OF 8"0 CONC. IJ I jET PE F CATCH BASIN ANUFA RED )UTLET PIPE F CATCH BASIN. M IDEFLE)C MODEL AS MANUFACTUREDI! I C.i BL 0 G C INC., AVAILABLE THRO.VGH ANTEC W 0 WA (206-454-2442),.. If APPRO. 11 4ATE LOCATION 0 0 4 F 6"0 �3�NITARY S�WEF 4AD il�lt: FORCE AN FO TYPE 11-48" 4� 1 �-R MEE SEE SH RIM ± 'l 12 �F 12 0 !.,, , o. 14M 1 CM IE 7 - .2 SO., cl! 88 Ws8c CMP IE ± 6� It , 1 .9. ILF "12"0 D, S= .020 _rf IREPAIR! ROADWAY AN6 60 G t -77 I . 7 77D7., 171, jCONCRETt CURB+ &I I' I E 1114. 0 IGUTTER�l AND SIDEWALK I r J-A:A�, S TO ORIGINAL. CONDITIPN. 14 14.1 -;DS 60"0 UNDERGROUND 6"0 PVC DOWN- b UTI. DETENT N TANK S=0.01 ....,I)RA01 50 TO LF r! T'A IE IN 1 .53 REPAIR ROADWAY AND DS CONCOETE CUkB & f fff , jj IE OUT .90 Tq WALK AND tIDE D INAL tONDITION. 3 (L o '21.2 IF TO PVC iss'-�'.. (xp� I I -�x I �3 I-I!f (8DR135) 0 S-O.P20`1'�MIW" B f e a,,017e-5 CLE 0 T AT 4:5 PRO ER Y �AN ns 7VA-If f To 131E, EXISTING' N'ATUA*AL' D Gm, LIN�J 410 0 In F, f A." 4 D S 'UR&,*.-. GAS LINE l(BY OTHERS,'. 1�1_1.*RAQTOR dookbINATE INSTALLATION' OF LINII A PUGETI.SOUNIJ ENERG" A INiM Y UM OP VEEKS PhIOR �T CON�T'RUCTI N WAY AND 6 REPAIR I S CONPRETE CURB & rnTr 1. 09 AU SF = 0.29 AC OUNDARY DRAWING INDEX SHEET 1 OF 9 SITE PLAN ECTION SHEET 2 OF 9 SECTIONS SHEET 3 OF 9 GRADING PLAN SHEET 4 OF 9 UTILITY & STORM DRAINAGE PLAN SHEET 5 OF 9 TEMPORARY EROSION CONTROL AND DEMOLITION PLAN SHEET 6 OF 9 SECTIONS AND DETAILS SHEET 7 OF 9 SECTIONS AND DETAILS I NHOLES SHEET 8 OF 9 SECTIONS AND DETAILS SHEET 9 OF 9 NOTES L;DI14, P. E R m""l T U or"M I T T A L K- PC .uj Qz U--j L-u- cl c) Q t N g) SHEET I OF-2- FILE NO I tlD --A low City of Edmonds Permit No: RI;ij#%SW-WAY CONSTRUCTION PERMIT Issue Date: 9,9 A. Address or Vicinity of Construction: 160 - AL"-_ B. Type of Work (be specific): C. Contractor: Mailing Address: State License #: D. Building Permit # (if applicable): Contact: P�one: Liability Insurance: - Bond: $ Side Sewe r Permit # (if applicable): 1�is� -A E. Commercial E] Subdivision E] City Project F-1 EUC (PLJD, GTE, PSE, CHAMBERS, OVWD) f-1 Mulftil-Flamily Single Family n Other INSPECTOR-WIA c�.rr— F. PAVEMENT: N YES E] NO G. SIZE OFTUT x H. Chargc $ CONCRETE CUT: YES JPeN_ NO APPLICANT TO READ AND SIGN IDEMNITY. Applicant understands by hislher signature to this application helshe holds the'City of Edmonds har ' mlessfrom injuries; damages or claims of any kind or description whdtsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or e ' loyees, including but not limited to the defense of any legal proceedings including defense costs and Mp attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP- AkD MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING. THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICHTIMEA DEBITOR CREDIT WILL BE PROCESSED FORISSUANCE TO THEAPPLICANT. Traffic control and public safety shall be . in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the --.-,,,required training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched, with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. * Three sets oftonstruction drawings of proposed work are required with the permit application. IRAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Date: (Contractor or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY USE ONLY �-Aiapproved-b.y:'94 Right-of-way Fee: :T* e Author 00 . ARM i,zed:. Void After Disruption Fee/Fund 111: -Restoration �AO.'e0aLConditions,: POE,41V V& 410/11-s Fee: -6ZA1&,­2 _S S Total Fee: Receipt No: Issued by: cl:�M_m V, 0-1 A V UPON COMPLETION OF PERMITTED.WORK, AN ENGINEERING FINAL INSPECTION, IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE. FINAL APPROVAL OF PERMITTEDWORK.- d.. INSPECTOR'S SIGNATURE DATE: For inspection requirements see Engineering Information Handout. Vl! CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS. WA 98020 - (425) 771-0220 - FAX (425) 771,0221 1-..� DEVELOPMENT SERVICES DEPARTMENT /17 1 B 1;,�, Planning - Building - Engineering September 24, 1999 Mr. Mark Kuhlman, P.E. Team 4 Engineering 5823 NE Minder Road, Suite A, Box 2 Poulsbo, WA 98370 VA7 M3.0717"rim-WITIT11 "forr==- II11101 Dear Mr. Kuhlman: The Engineering Division reviewed Your civil site design. The review team notes the following revisions/corrections. Please contact the review team members directly for questions regarding their comments. VII Drainavp — I)nn Fipnp AsTf ("itv Fnainioorijt IW�5) 771.0�70 f Provide additional information noted in Storm Drainage Report BARBARA FAHEY MAYOR Install a tide boot/gate in catch basin southwest of property, Provide detail. Confirrn presence of tide boot as noted. Show location on plan. Utilities — Jim Waite. WhterlSewei- Su.12eryisor at (425) 771-0235 9 Revise water design as indicated on plans. Trao2c and Othe Maintain a minimurn of 44" of clear zone on the sidewalk by the bus shelter and in areas of tree grates. Note that installation of bus shelter requires a Street Use Permit. Coordinate with Community Transit. 0 Parking pavement markings and signage to be revised in adjacent public right-of- way as shown. Note addition of ternporary construction signage. Also please note revisions to proposed on-strcet parking areas. 0 Provide a, PE starnp for on -site parking plan. Note that the minimum parking stal I is 8'-6" wide by 16'-6" long. -These dimensions are clear widths, exclusive of columns. The architectural plan shows some stalls that do not meet this standard and will not conform to required parking code. Revise note on construction sequence. Please add an approval block on each sheet with "Approved for Construction" and a line for the City Engineer's signature and date. Incorporated A(IgUSt 11, 1890 Sister City - Hekinan, Japan Mark Kuhlman, P.W. Team 4 Engineering September 24, 1999 Page 2 When revisions are complete, please return the attached redlined plans and ston-n drainage report together with four sets of revised plans and two storm drainage reports for additional review, Please provide a construction cost estimate for City staff to deten-nine the Engineering Division fees and bond amounts. If you have any other questions, do not hesitate to contact me at 425.775.7744. erely, GORDON C. HYDE Development Services Engineer GCH/cmc DST Mr. Charles Wright: c/o The Johnston Associates, Inc. 375 Ericksen Avenue, Suite 222 Bainbridge Island, WA 98110 RAENG R\GORDY\71164. DOC RECEIVED MAY 17 1999 PERMIT COUNTER (40' CITY copy Mr. Jamal Mahmoud, PE Traffic Engineer Community Services Department Engineering Division City of Edmonds 121 5th Avenue North Edmonds, WA 98020 Re: Northwest Care - Edmonds Assisted Living Facility Traffic Impact Analysis ENGINEERS / SURVEYORS / PLANNERS / DEVELOPMENT CONSUIJANTS January 5, 1999 LSA No. 4014 The purpose of this letter is to provide traffic information regarding the Edmonds Assisted Living Facility proposed by Northwest Care, an assisted care facility designed for up to 84 units to be located in downtown Edmonds. The following traffic impact analysis is an update of the traffic analysis prepared for a previous proposed facility at this same location. The proposed building location is north side of Dayton Street west of Second Avenue. The proposed structure will have two occupied stories and a lower level dedicated to parking. The front of the building faces Second Avenue'where the building garage entrance "to the lower parking level is located. The parking exit will be located on the north side of the building where exiting traffic will access an existing alley. Existing Street System The proposed facility abuts Second Avenue, Dayton Street and Edmonds Way (SR-104). No direct vehicular connection will exist with the adjacent stretch of SR-104 which acts as a holding area for the Washington State Ed monds- Kingston Ferry. The other two surface streets. will have direct access. These streets provide access to the various commercial sites and residences in Edmonds. A number of the major downtown arterials routes are under the jurisdiction of Washington State Department of Transportation (WSDOT). These roadways include SR-524 beginning at the ferry terminal and consisting of Main Street west of Third Avenue and Third Avenue north of Main Street. SR-104 begins at the ferry terminal and proceeds south on Edmonds Way west of the proposed project. SR-104 provides access to SR-99 and 1-5. A spur of SR-524 begins on Third Avenue at Main and includes Third Avenue to Dayton and Dayton to Edmonds Way. Trip Generation The total number of vehicle trips expected to be generated by the project were determined using the ITE Trip Generation Manual, 5th Edition, 1991. The expected trip generation is based on the number of beds and rooms for the residents of the proposed building space. Lovell-Satterland & Associates. Inc. 19400 33rd Ave. W.. Suite 200. Lynnwood. WA 98036 800-775-7663 425-775-1591 425-672-7998 fax ('40 Mr. Jamal Mahmoud Nofthwest Care, Inc. Traffic Study January 5, 1999 Page 2 Traffic is primarily generated by employees, visitors and deliveries. The expected trip generation from the proposed building is shown in Table 1. Total Average Weekday Daily Traffic (AWDT) Assisted Nursing Care, 84 units @ 2.60 ADWT per unit .................. 218 Total AM Peak Hour Trips Nursing Home 84 units @ 0. 19 ADWT per unit ......................... 16 Inbound Trips ................................................ 10 Outbound Trips ................................................ 6 Total PM Peak Hour Trips Nursina Home 84 units @ 0. 17 ADWT per unit ........................ 14 Inbound Trips .................................................. 8 Outbound Trips ............................................... 6 (1) Trip rates from ITE Trip Generation Manual, 6th Edition, Land Use Code 620, Nursing Home. Trip Distribution The projected trip distribution for thg 218 ADT and 14 P.M. peak hour trips generated by the project is shown in on Figure 1, Trip Distribution. Since trip generation is primarily staff and visitors, most of trip distribution is expected to be on arterials accessing areas of residential land use. The trip distribution indicates that half of the traffic will access the site via SR-104 south of Edmonds. The remainder of the traffic is expected to travel by major routes to and from north, major routes to and the east, and a smaller portion diffused through the City of Edmonds surface streets. No segment of the WSDOT road system will have 10 or more project generated AM or PM peak hour trips. Mr. Jamal Mahmoud January 5, 1999 Nolthwest Care, Inc. Traffic Study Page 3 Trafric Mitigation The City of Edmonds has a traffic concurrency mitigation program whereby the City has identified projects designed to maintain an acceptable level of service within the City. Accordingly, the fee charged by the City, $269.33 PM peak hour trip, is designed to provide funds to complete capital projects to maintain traffic within the City to an acceptable level of service. Traffic mitigation is provided for trips within Edmonds and is therefore based on 8 P.M. peak hour tjips. On this basis the fair share traffic mitigation fee is $2,152. The, applicant agrees to traffic mitigation for this amount. This letter constitutes a voluntary offer. the intent of this voluntary offer is to achieve a determination of nonsignificance for traffic related impacts. It is understood that this money would be held by the City and utilized to assist funding of projects within the sphere of impact of this project. Sincerely, "D /C -a V. sa? t. k-: t. Dale B. Watkins, P.E. B. WAA WAS&Z' I EXPIRES 3=/00 1 200/0 44 3 9 1 T E (d w w W. IVA 2 w MAN STREET VAYTOW STREET TRAFFIC GENERATION Weekday ADT ................... 216 Pm Peak Hour Trips ........... 14 .LEGEND XX% % Distribution YY Average Daily Trips ZZ PM Peak Hour Trips FIGUP-C- I �,%OP-TH WCEST Cb�P-C- IWC, Lovell-Saueriand & Associates, Inc. 'C'st . 189' CITY OF EDMONDS 250 5TH AVENUE NORTH - EDMONDS, WA 98020 (206) 771-0220 FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works o Planning e Parks and Recreation'* Engineering September 19, 1996 BARBARA FAHEY- MAYOR Terry McGill Sister Schools P.O. Box 99492 Seattle, WA 98199 RE: Sister Schools proposed location at Ff4.l_Dayton.StrJ Dear Mr. McGill: Thank you for your quick response to our request for more i . nformation regarding occupancy of the subject building for storing, packing, and shipping "school supplies and other basic needs" to Uganda. Based on the information provided in your fax of 9/18/96, the proposed use does not warrant the need for a Change of Use permit. Temporary occupancy is granted through December 31, 1996 for use, as described in your response for the area (approximately 2000 sq.ft) as shown on the attached floor plan. Should you find that you' need to occupy this space past the date specified., please contact me at 771-0220. Thank you, eannine L. Graf Building Official 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan B ARMARA FAHEY also m�m WOMMN00. W^ 960410 (200) 771.0220 P^X 4206) 771-0a2j COMMUNIT'V' &GRIVICES 0ZPARrMEN-r Public Work* a planning & Parke and Racreation a RnafnewrIne -rF-L-04--C�PIEIR (--C:)VE1lR PAC-615- -r— % 8- . -17CO: 11110�=-4 ft e� =2 FReciplents'relecopler Ntimber: FRCDM: .Seanclar's -releocnppier Nurnt>cir: (206) 77-1-0221 R NUMSER C1,F PAC-IM�S' ::z (IncSucling Cover Page) Automatic/0kroup 11 (27.3 mIns.); (Br4zup III If there are any protMerns ciuring trans rms4lc:i n c>r documents are received Incc:)rnpIete. please call (208) 77*1-0220 and ask far - qLjfi7L.Sr 11, 1890 TRANSMISSION REPORT THIS.DOCUMENT (REDUCED SAMPLE ABOVE) W A S E N T COUNT # 2 *** SEND *** NO REMOTE STATION I.D. START TIME DURATION #PAGES OMMENT 1 1 206 285 1543 9-19-98 12:54PM 1'32" 2 TOTAL 0:01'32" 2 1 XEROX TELECOPIER 7020 4�'s t. 18 9 %j IA CITY OF EDMONDS BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH �� EDMONDS, WA 98020 (206) 771-0220 - FAX (206) 771-0211 C0MMLjNITY SERVICES DEPARTMENT Public Works e Planning * Parks and Recreation 9 Eng . ineering TELECOPIER COVER PAGE Recipients Telecopier N.umber: L24 s 5 — i trf �-qj,--- FROM: Sender's Telecopier Number: (206) 771-0221 RE: dm D:\D\Wordd ata\FaxForm DATE TRANSMITI-ED: 4 NUMBER OF PAGES:--�-� (including Cover Page) FACSIMILE EQUIPMENT: Automatic/Group 11' (2,3 mins.); Group III If there are any problem * s during transmission, or documents are received incomplete, please call (206) 771-0220 and ask for *.Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 6 09-18-19 95 05:59pm FROM McGill TO 7710221 P.01 WGMP.O. Box 99492 SOM14 WA 93199 Tel: 26&29&19(A Fax: 206-295.1543 To; City QfEdnonft - Doilding DepL DaW Sq*mbor J 8, 1996 Fwr. 206-771-0221 Rr. 141 Daytoa SL Building Pa M.' 4 Including Cover CC. immim CTd Mixft ;kR'rp&vfvw a PIN= ComnWrIt E3 Now Pw* Nobc —Thmim fbr ym fmE daftd 91106. To amist in your review fOr Occupancy appm-al I am respmdhg to the spedfic quesfions C(MVC* in yew fax Tfyou need any fiutber kformation or clarifimion pie -we donh besitat to cd or fax. I Will be Oul Of lOwn ft6& Thw%ft. Sepf 19 tmWh Monday SePL 23. . I hope ft will not be an . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 09-18-1996 05:59PM FROM McGill M 7?10221 P.02 L Ile mAximum numba ofpeoOle in the building at any one time would not be mom thim,eigh I do mwt of thv wrting myn1fand when I m 0 h* dwe as usnny jug two or thm of us. 7- The IbArwing is a summary of our pa�kin list from hist yees shipmtrit, mom details can be provided if neede& Atts & Cmft Supplies Felt Markers, Water Color Pakt� Colored Paper 120 Textbooks Madi, Reading, Librwy� etc. 9,725 Clothing Used Sb* Pants, Dresses, Sweaters, etc, 1,35s computem XT CwVvters, Monitors, Prifftm 3,900 TOYS Stuffid Annnals, Puzzles, Small Toys 170 Bindm Thmv Ring DWum & Notebooks - 1,060 Rulcd P4w, Drawing PkL-, Spiral Notibooks 775 SpoTb Eq-hm--nt lunifiwrns' "is, 13afs, Nab, Bases, eto. . 910 Toiletries I Toilet Paper, New ToothbmhM Tooftam 115 Writing Supplies Pencils, Pens, crayons 200 I have also included one orow flyers for contribution guidelines. We do not. accept any food contnjWon 3. We will NOT be using the loading dDck off of SR-1 04 4- For Our pwt We doo need aqy*p=kin8 Taco qpo6fioa* aflmaja UguallY irs jug my vehicle thd is at the site. On rm Occasions we have ftw or 1bur vehicles on site at the same time. A] . I the sOrtiRS aetivities occur fiffOr normal business hours or on we&mdkL 5. 1 dont have the actual dinmsions afthe building. I was told it was approximately 6,000 square fi=L Wc will be using about 1/3 afthespam - ruugb�y 2,00 squwv fccrt (if the 6,000 c3tinmtc is corrcct). A &aming is provided using the site Plan You provid4 duinks. 6. Wc will not be makins MY tManT ftWuvemenls. Some tcruporay tables wfll be set up on whtb 14t will be sorting the donations. I hOPe this is the information you needed, If it's "nsufficient Plemiust call or fax and 1711 get right back to you (after I get back frorn our fimt va4*ion since the)ddr, wwe born four years ago!). I 09-ie-1996 06-OOPM FROM McGill TO 7710221 P. 04 f 14 LA E 09-18-1996 06: 0OPM 'FROM McGill TO 7?10221 P.03 Supply Diive. Guidelines Thefollowing are some basic guiMin,esjor conWbudons. Because of the high cost 0fSh1pptng, we ask Mat you Seriously discussKWh your childre.n the items befAg consideredf-or donation. The list below should be considered a guideline only, providedfor your convenience - there is always roomfor cr*ealive thinking! Bolh new and used items are gladly accepted. Primar y Needs schoolsupplia.-I Pencils, Pens, paper. pencil shweners, emsers. chalk thre-e-rifng bindan, spiral notebooky. Books., Dieftonarim, atlases, children's boola, beginning readers, tewbook scu, rqj�7rrnce wvrA:% ek.. I Spar6 Eqa�pmenh Soccer, softball and baseball, basketbaI4 vofleybaI4 football, plaWound balls. Secondary Needs Ara A Craffi: Crayow, coloredpaper, glue. scUsors, nders, ca6ring books, paint seb. Hedth & RrstAi& Toiletpaper, tootApaste & toothbrushas, band -aids, soap, sewingsuppliej, Other Needs Clothing: shira, pan&, draues, _rkipis, hats, rainv4wtrsocks, shoe3, light sweaters &Jac -Ads. A3r we xanhaHy mcehv a i0re quan'by of C10*ing, thme comtribmelom tv afew &am on#. Too-, Board games, pu=lej, toyfigure$, cars, etc.. ThefiWowing items are not appropriatelor donation'; Food, tems and candy Items requhIng banvies or electricity 11davy winter clothing Infant clothine Usedfelt markem W-F E0MC)1%JE)S 200 UTH optTH B^F%BARA PAHeY '"INUM P4 nomomos, W^ 04020 . (ace) 771.0220 rAx (200) 771.0221 MAYOR COMMUNITY 801WIC65 OEPARTMEN-r Public VVOrks � Planning 0 Parke and FRacreatlon finginearing Fleciplersts -relecqpler Number: FfRaM:. C�;COVER PAGIS C3.A'rM NUMBER C>F P^13es; (Including Cover Page) .Autorn0tl=/(3roup11 (2.3 mins.); (3rcvup fit It'rhere ane arry prot�lerns during transrnis6io�n or clacume�nts are re4--efved incomplete. please 4--all (206) 771-0220 ancl ask or Sender's -relecopter Nurnt�ar- (206) 771-0221 esm VADMIvolda"W.—F—M. a. Awat"Ar 12, 2890 - Clrj�a Internetical — Makinan, Japan TRANSMISSION REPORT THIS DOCUMENT WASSENT' ** COUNT # -3 *** SEND *** N� REMOTE STATION I.D. 11 1 205 285 1543 (REDUCED SAMPLE ABOVE) START TIME 9-18-96 10:36AM TOTAL I DURATION #PAGES 2'50" 3 0:02'50" COMMENT XEROX TELECOPIER 70�O -C's t. 18 C)Q So. CITY OF EDMONDS 250 5TH AVENUE NORTH EDMONDS, WA 980 , 20 (206) 771-0220 0 FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning 9 Parks and Recreation 9 Engineering TELECOPIER COVER PAGE TO: AIALI- Recipients Telecopier Number: FROM; 211 x> i t�G e�m c, tt Sender's Telecopier Number: (206) 771-0221 RE:, dm D:\D\Worddata\FaxForm- BARBARA FAHEY MAYOR DATE TRANSMITTED: I- f NUMBER OF PAGES: S3 (including Cover Page) FACSIMILEEQUIPMENT: Automatic /Group 11 (2,3 mins.); Group III If there are any problems during transmission or. documents are received incomplete, please call (206) 771-0220 and ask for 0. Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 4C7,st. 189�) CITY OF.- EDMONDS. BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH EDMONDS, WA 98020 (206) 771-0220 FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works e Planning o Parks and Recreation Engineering September 17, 1996 - Terry McGill Sister Schools P.O. Box 99492 Seattle, WA 98199 RE: Sister Schools - proposed location at 141 Dayton St. Today, our division received your letter dated August 26, 1996 regarding occupancy of the subject building for purposes of storing, packing and shipping "school supplies and other -basic necessities" to Uganda. One of the responsibilities of the Building Division is to review and 'approve occupancy of buildings (even temporary occupancy), to ensure that minimum life safety codes are met, thus providing your volunteers a level of assurance that they have a safe place to work. To'review for occupancy, approval of the building, we need the following information from you: 1. What is the ma-ximum amount of people that will be occupying the building?� 2. Provide a list of items you will be storing/shipping (a flyer was not included in your . letter). If you will be . shipping food items, have, you received approval from the Snohomish County Health Department? 3. . Will you be using the loading dock off of SR-104? 4. How many parking spaces will be specifically allocated for your. use of the building, since it is currently used for construction vehicles and-su'pplies for.the adjacent project. 5. What portion of the building will you be occupying (including total square footage)? Enclosed is a site plan showing the building to assist you in accurately providing this information. 6.- If you are proposing to do any interior remodel i ng, you must obtain a tenant improveme nt permit. Enclosed is a. handout on this. process for your inforination, as well as a permit application form. Once we have received the above information, it will be determined if'a Change of Use permit is required prior to occupancy of the building. Due to the short notification the Building Division has had to respond regarding your occupancy of the subject building, we are sending this letter in the most timely manner via fax. Please feel free to contact me at 771-0220 if you have any questions. Thank you, Jeannine L. Graf %" -Building Official 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan NAM ...... - ------ t4' Mi PQ K�] 0. q., MEMORANDUM SkIp 03, PZ4 49196 Date: August 30, 1996 To: Planning/Building From: Lynne Hann, Deputy City Clerk Subject: Temporary Building Occupancy Attached. for your information, is . a letter from Sister Schools, a non-profit organization, explaining that they will be occupying.the vacant Crowe Hardware Building until December. They ' will be using this space for the collection, sorting and shipping of school supplies to schools,in East Africa. We asked them to write a letter explaining what they will be using the building space for so that we could inform any City departments that may have an interest. Attachment City of Edmonds AUG 3 0 1996 ster Schools EDMONDS CITY CLERK P.O. Box 99492 Seattle, WA 98199 Tel: 206-286-19.64 Fax: 206-285-1543 26 August 1996 Ms Sandy Chase City Clerk's Office City of Edmonds 505 Bell St. Edmonds; WA. 98020 Dear Ms Chase, I am writing to inform the City of Edmonds that,we will be occupying the vacant Crowe Hardware, Building from September 1996 through December 1996. The space is being donated free of charge�by Dower, Meeks & Ekrem, Inc. to our organization, Sister Schools.. Sister Schools is a nonprofit organization run entirely by volunteers. We partner schools in the Western Washington areawith schools in Uganda, East Africa. As part of the program, our school children participate in a supply drive. School supplies and other basic necessities are collected and sent . to Ugandan schools. The Crowe Hardware Building will be -used to sori and pack the supplies for shipping. Normally, about 20,000 pounds *of supplies are collected and. shipped each year.. En ' closed is one of our program fliers. On the back page is a more detailed list of the items we will be sorting and storing at the building this fall. If you have any questions or need any ftwiher information please don't hesitate to call. Sincerely, r Terry McGillY AUG 3 0 1996 iSter SCh00jS EDMONDS CITY CLERK P.O. Box 99492 Seattle, WA 98199 Tel: 206-286-1964 Fax: 206-285-'l 543 26 August 1996 M r. Mike Meeks Dower, Meeks, Ekrem Edmonds, WA 98020 Dear Mr. Meeks, It was a pleasure meeting you lastFriday. Once again, I'd like to express our appreciation for your generosity in allowing Sister Schools the free use of the your building through December 1996. It will be a tremendous help to our work. I would also like -to take this opportunity to record, in writing, that neither you, your company, nor the clients you represent assume any responsibility Whatsoever for any loss or damage that may occur to our materials while being sorted or stored at the building. We have also notified the City of Edmonds that we will be occupying thd,building a*nd explained our activities. If you need anything else from us please don't hesitate to contact me at 286-1964 or Greg Jones at 776-2825. Sincerely, Te McGi �(n C. i sc)\3 June 7, 1999 0 0 CITY OF. EDMONDS 121 5TH AVENUE NORTH - EbMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering Mr. Mark Kuhlman, P.E. Team 4 Engineering 5823 NE Minder Road, Suite A, Box 2 Poulsbo, WA 98370 SUBJECT: Proposed Building Permit for Edmonds Assisted Living at 141 Dayton Street (ADB-97-116)(PC 99-IL6) Dear Mr. Kuhlman: The Engineering Division reviewed your civil site design. The review team notes the following revisions/corrections. Please contact the review team members directly for questions regarding their comments. Storm Drainage - Don Fiene. Hydraulics EngjiLneer at (425) 771-0220. Ext. 323 Provide additional inforniation noted in Storm Drainage Report. C a--fch basins -must be provided -at angle -points in the'storm line. -- Provide slope data for drain on west and north sides of building. Provide profile for storm sewer. N-12 pipe is not allowed in traveled areas. Provide sequence of construction on Erosion Control Plan. Revise notes as indicated. Utilities - Jim Waite, WaterlSewer Suj2ervisor at (425.) 771-0235 Provide a cleanout for sanitary sewer line on the property line. Revise water design and notes as indicated on plans. BARBARA FAHEY MAYO.R Tra ic and Other Minimum access width is 24' from face of curb to face of curb. Maintain a minimum of 44" of clear zone on the sidewalk by the bus shelter. Installation of bus shelter will require a Street Use Permit. What do numbers in circles on sheet 1/9 refer to? Show pavement marking and signage present and to be revised in adjacent public right-of-way. e Provide parking plan complete with all dimensions. Revise notes and details as indicated. Incorporated August 11, 1890 Sister City - Hekinan, Japan Mark Kuhlman, P.W. Team 4 Engineering June 7, 1999 Pagc 2 When revisions are complete, please return the attached redlined plans and storm drainage report together with three sets of revised plans and two storm drainage reports for additional review. It will be necessary to provide a construction cost estimate for City staff to determine the Engineering Division fees and bond amounts. If you have any other questions, do not hesitate to contact me at 425.775.7744. Sincerely, ORDON C. HYDE Development Services Engineer GCH/cmc C: Lara Knaak, Permit Coordinator Mr. Charles Wright c/o The Johnston Associates, Inc. 375 Ericksen Avenue, Suite 222 Bainbridge Island, WA 98110 GAENGRkGORDY%7116.DOC M �C's t . 18 9,j CITY OF EDMONDS BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH EDMONDS, WA 98020 - (206) 77i-0220 FAX (206) 771-0221' HEARING EXAMINER FINDINGS, CONCLUSIONS AND DECISION OF THE HEARING EXAMINER CITY OF EDMONDS APPLICANT: Julie Brockman / NW Care Management, Inc. CASE NO.: CU 97-115 and ADB 97-116 LOCATION: 141 Dayton St. APPLICATION: Consolidated Permit Application for a Conditional Use'Permit for an 83-bed "Assisted Living, Care Facility" and compliance with the City's Architectural Design Board Design Criteria. (Exhibit A, Attachments 2, 3, 4 and 6). REVIEW PROCESS: Conditional Use Permit: Hearing 'Examiner . conducts public hearino, and makes final'decision. The Architectural Desi-n Board (ADB) has reviewed the proposal and has made a recommendation. MAJOR ISSUES: (1) Compliance with Edmonds Community Development Code (ECDC) Section 16.53 (Community Business - BQ. (2) Compliance with Edmonds Community Development Code (ECDC) Chapter 20.05 (Conditional Use Permits). SUMMARY OF RECOMMENDATION AND DECISION: Staff Recommendation: * Approve with conditions Hearing Examiner Decision: Approve with conditions C) PUBLIC HEARING: After reviewing the official file which included the Planning Division Staff Advisory Report; and after visitino, the site, the Hearing Examiner conducted a public hearing on the application. The hearing on the application was opened at 10:55 a.m., April 1, 1999, in the City Hall, Edmonds, Washin-ton, and closed at 12:08 a.m. Participants at the public hearing and the exhibits offered and entered are listed in this report. A verbatim recording of the hearing is available in the Plannina Division. a Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan IsHearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 2 HEARING COMMENTS: The following is a summary of the comments offered at the public hearing. From the City: Steve Bullock reviewed the staff advisory report and entered it into the record (Exhibit A). He noted this is a consolidated review for both design and use. He also noted that after the Architectural Design Board (ADB) review of the proposal, the applicant redesigned the roof to provide modulation in accordance with the ADB motion. From the Applicant: Julie Brockman, Applicant, reviewed the proposal and discussed the assisted living concept. Charlie Wright, Johnson Architects, explained the revised plans and said they had attempted to mitigate view impacts. From the Community: Shirley Faris, neighbor, asked questions about the ratio of employees to clients, hours of construction, length of construction, noise, access to the trash area, and deliveries to the site. She also expressed concerns about traffic and parking related to the proposal. Sterling Jensen, neighbor, said he too was concerned about parking (including visitor parking) and had a strong objection to the loss of Landau parking, which now uses the site. He asked where the mechanical equipment would be placed. Merrill Younkin, neighbor, took exception to the view analysis that was submitted with the revised plans. He expressed concerns about loss of views from the El Capitan condominiums and he expressed concerns about loss of parking in the area. Response from the Applicant: Julie Brockman responded that there will be maximum of 15 staff on site during any shift. She also said after construction 24 parking spaces will be provided to Landau and that Edmonds Financial will provide the other 12 spaces. Jeff Saboda, Johnson Architects, discussed the parking issue and responded to questions about the location and design of the trash enclosure. He said construction would take place over a period of 12 to 14 months and noted that parking may be able to be staged on 0 site during construction. He said they plan to locate much of the mechanical equipment in the garage. Dale Watkins, Traffic Engineer, said the use will be a low traffic generator and only 14 trips are expected during the PM peak. He said he doesn't foresee any congestiQn problem. Wearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 3 CORRESPONDENCE: Two letters, with attachments, were submitted by Karen Wiggins (Exhibits B & Q. She expressed an issue about the parking easement her firm (which leases to Landau) has which needs to be addressed prior to commencement of construction. REVIEW BY THE ARCHITECTURAL DESIGN BOARD The ADB met on March 17, 1999 to review the request and adopt a recommendation to the Hearing Examiner (Exhibit A, Attachment 2). The following recommendation for approval was made: Boardmember Sullivan moved, seconded by boardmember Chalupnik, to recommend approval of ADB-97-116 and CU-97-115 to the Hearing Examiner, because the Boardfinds that: • The applicant has successfully met the requirements of ECDC section 20.10.070.A.6, that all sides of the building be adequately modulated, • Although the proposal does not meet the requirements of ECDC section 20.10.070.A.6 and 20.10.070.C.3, in discussions with the applicant, it appears that it could be modified to meet these requirements; • It should be noted that the roof as proposed does not meet the roof modulation requirements; With these modifications the application is found to be consistent with the Comprehensive Plan and other adopted City policies, it meets the requirements of the zoning ordinance, and satisfies the criteria in the Edmonds Community Development Code. Motion Carried The Board's major concern was that the ridgeline of the roof that runs north and south the length of the building be broken up to allow for view corridors of Puget Sound to the west to be maintained for properties to the east of the proposed building. In discussion between the applicant and the Board it appeared that the applicant could make some changes to their proposal to address the Boards concern. Drawings have been submitted which reflect the Board's request (Exhibit A, Attachment 7). With this design, the Board would recommend approval of the roof as a modulated design. All other element of this proposal met with the approval of the Architectural Design Board, including landscaping and materials. Wearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 4 FINDINGS OF FACT AND CONCLUSIONS A. SITE DESCRIPTION a) Facts: (1) Land Use: The subject property contains a single warehouse type structure. (2) Zoning: The subject property is located in a Community Business (BC) zone (Exhibit A, Attachment 1). (3) Terrain and Vegetation: The site is relatively flat with a slight slope from east to west side of the property. 2. Neighboring Development And Zoning: (1) Fact: The property is surrounded on the north, east and west by the BC zone and commercial and mixed -use development. The property across the street to the south is the City wastewater treatment plant. (2) Fact: The ferry holding lines are adjacent to the property on the west. B. STATE ENVIRONMENTAL POLICY ACT (SEPA) 1. Fact: SEPA is required of any project, which requires a Conditional Use Permit. A Mitigated Determination of Nonsignificance was issued November 13, 1997, based on a submitted traffic study. No comments or appeals were received. C. EDMONDS COMMUNITY DEVELOPMENT CODE (ECDC) COMPLIANCE 1. Critical Areas Compliance a) Facts: (1) This proposal is subject t6 review under ECDC Chapter 20.15.B (Critical Areas Ordinance). (2) A Critical Areas Checklist (CA-97-170) was submitted and the requirement for a study waived. b) Conclusion: The applicant has met the requirements of the Critical Areas Ordinance. 2. Compliance with the Community Business (BC) Zoning Standards a) Facts: (1) The fundamental site development standards pertaining to development in the Community Business (BC) zone is set forth in Chapter 16.50.020. 'Wearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 5 (a) Street Setback: 0 feet (b) Rear Setback: 0; 15 feet from residentially zoned property (c) Side Setbacks: 0; 15 feet from residentially zoned property (d) Height: 25 feet (up to 30 feet with a 3-in-12 pitched roof or an approved modulated design) b) Conclusion: The applicant has provided a proposal, which complies with the Community Business (BC) zone standards. 3. Compliance with Requirements for a Conditional Use Permit a) Fact: (1) Chapter 20.05 of the ECDC sets forth the mechanism whereby the following findings and criteria must be n�et. The criteria are as follows: (a) The proposed use must be consistent with the Comprehensive Plan. (b) The proposed use, and its location, is consistent with the purposes of the zoning ordinance and the purposes of the zone district in which the use will meet all applicable requirements of the zoning ordinance. (c) That the use, as approved or conditionally approved, will not be significantly detrimental to the public health, safety and welfare, and to nearby private property or improvements unless the use is a public necessity. (d) The Hearing Examiner shall determine whether the conditional use permit shall run with the land or shall be personal. b) The applicant has submitted the following declarations with their submittal which address the decisional criteria (see Exhibit A, Attachment 4): (a) The project is consistent with the Comprehensive Plan in that it is in Edmonds, and it is zoned Community Business. (b) The project is consistent with the Zoning Code in that the BC zone states as one of its purposes: "To allow for multiple dwelling units(s) as a secondary use to the business uses. (c) The project will not be detrimental in that the proposed use does not put a great burden on surrounding properties or uses. The typical resident will be 84 years old, not drive their own car and have occasional visitors. The pleasing look ofthe building will help ensure that it will not be detrimental to the community. *Hearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 6 (d) The applicant has requested that this Conditional Use Permit 44 run with the land" and be allowed to transfer if necessary. 0 Conclusions: (1) The Comprehensive Plan designation for the site is part of the Downtown Activity Center with a Mixed Use Designation. The application is in compliance with the following Comprehensive Plan policies: A. I. Extend Downtown westward and connect it to the shoreline by positive mixed -use development as well as by convenient pedestrian routes. A.5. Support a mix of uses downtown without encroaching into singlejamily neighborhoods. A.6. Encourage opportunities for new development and redevelopment, which reinforce Edmonds' attractive, small town pedestrian oriented character. Existing height limits are an important part of this quality of life, and remain in effect. A. 7. Provide greater residential opportunities and personal services within the downtown, especially to accommodate needs of senior citizens. A.11.Provide for the gradual elimination of large and inadequately landscaped paved areas. (2) The proposal will comply with all aspects of the Community Business development standards of the ECDC. (3) The type of use proposed generally does not generate as much traffic as a typical residential use, and is appropriate to be located in a mixed use area with its potential access to transit. If approved with conditions addressing parking during construction and visitor parking after construction, the use should not be significantly detrimental to the public health, safety and welfare, or to nearby private property or improvements. (4) Staff recommended that the permit be allowed to transfer to future owners of the property. D. TECHNICAL COMMITTEE a) Facts: (1) The ADB and Conditional Use Permit application has been -reviewed and evaluated by the Fire Department, Public Works Division, Engineering Division, and the Parks and Recreation Division. No Wring Examiner Decision Case No. CU 97-115/ADB 97-116 Page 7 department has any concerns that will significantly change this proposal. b) Conclusion: No technical problems have been identified. E. COMPREHENSIVE PLAN (ECDC) 1. Comprehensive Plan Designation a) Fact: (1) The Comprehensive Plan identifies the site as part of the Downtown Activity Center with a Mixed Use Designation., The application is in compliance with the following Comprehensive Plan policies: A.1. Extend Downtown westward and connect it to the shoreline by positive mixed -use develo�ment as well as by convenient pedestrian routes. A.5. Support a mL-x of uses downtown without encroaching into single family neighborhoods. A.6. Encourage opportunities for new development and redevelopment, which reinforce Edmonds' attractive, small town pedestrian'oriented character. Existing height limits are an important part of this quality of life, and remain in effect. A. 7. Provide greater residential opportunities and personal services within the downtown, especially to accommodate needs of senior citizens. A.11-Provide for the gradual elimination of large and inadequately landscaped paved areas. b) Conclusion: The proposed development is consistent with the existing Comprehensive Plan Land Use designation for the site. DECISION Based upon the foregoing findings and conclusions, the request for a Conditional Use Permit and Architectural Design to allow and assisted care facility to be constructed is approved, subject to the following conditions: (1) The applicant must obtain all necessary permits and pay the required traffic mitigation fee (required in the MDNS) prior to any construction. (2) All landscaping per the approved landscape plan must be installed prior to Certificate of Occupancy. Wearing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 9 reasons why the appellant believes the decision to be wrong. The appeal must be filed with the Community Development Director within ten (10) working days after the date of the decision being appealed. LAPSE OF APPROVAL Section 20.05.020.0 states 'Unless the owner obtains a building permit, or if no building is required, substantially commences the use allowed within one year from the date of approval, the conditional use permit shall expire and be null and void, unless the owner files an application for an extension of the time before the expiration date.' NOTICE TO COUNTY ASSESSOR The property owner may as a result of the decision rendered by the Hearing Examiner request a change in the valuation of the property by the Snohomish County Assessors Office. EXHIBITS: The following exhibits were offered and entered into the record. A. Planning Division Advisory Report B. Letter from Karen Wiggens, dated 3/26/99 C. Letter from Karen Wiggens, dated 3/29/99 D. Modified site plans PARTIES OF RECORD: Thomas Johnston Northwest Care Management 385 Ericksen Ave., Suite. 123 Bainbridge Island, WA 98110 Julie Brockman NW Care Management 285 Ericksen Avenue, Suite 123 Bainbridge Island, WA 98110 Shirley Faris 200 James St. Edmonds, WA 98020 Charlie Wright 385 Ericksen Ave., Suite 123 Bainbridge Island, WA 98110 Sterling Jensen 200 James St. #101 Edmonds, WA 98020 Jeff Saboda 375 Ericksen Ave., Suite 222 Bainbridge Island, WA 98110 *earing Examiner Decision Case No. CU 97-115/ADB 97-116 Page 10 Merrill Younkin Dale Watkins 200 James St. #104 Lovell Sauerland Edmonds, WA 98020 19400 33d Ave. W Lynwood, WA 98036 Planning Division Karen Wiggins Engineering Division Wiggens Propeties, LLC 152 3rd Ave. South, Suite 102A Edmonds, WA 98020 OTHER PARTIES REQUESTING A COPY OF THE DECISION: Roger Hertrich 1020 Puget Dr. Edmonds, WA 98020 Mark Kuhlman T4 Engineering - 5823 NE Minder Poulsbo, WA 98370 * 2:4 'z C I T Y 0 F E D M. 0. N.D.5'." DEPARTMENTOF BUILDINGS CERTIFICATE OF OCCUPANCY - UNIFORM BUILDING CODE, Sec. 306 740277 At 141 Dayton Gatreet Building Permit Numb-r OCCU pancy established by this certificate: Fire Zone No. Stories F-2 1V_K Type Const. Basement ad signs in place (per Sec. 2308 U.B.C.) — Capacity signs posted (per See. 330' (i) U.B.C.) Fl(.x)r Lo, Floor load and room capacity signs, wbf-n requirrd, mnvt remain posted at all times. THE-ALASKA NORTINEST PUBLISHING HAS BEEN INSI'rCTED AND APPROVED AS COMPLYING WITH PROVISIONS OF THE EDMONDS BUILDING CODE AND WITH UNIFORM BUILDING CODES. January 77� 'ssued this 17th day of 19 — CHIEF BUILDING OFFICIAL By This certificate shall be posted in a conspicuous public area and shall not be removed, mutilated or obscured and shal: be main tained In legthle condition at all times. Any change of occupancy requires a new certificate. M'ML wilat-2ul-, [PERMIT EXPIRES CITY OF EDMONDS USE ZONE r2ri PERMIT 950792 6k-,/ NUMBER CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS ISO zrd 6x �'s OWNER NAME/NAME OF BUSINESS Edmonds Assisted Living Community LLC LEGAL DESCRIPTION CHECK UBDIVISION NO. LID NO. iu- z MAILING ADDRESS 0 385 Ericksen Ave. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP I" EXISTING - REQUIRED DEDICATION TESCP Apprmed Y403 RW Per.11 Requiredya Street Use Permit Req I CITY . ZIP Bainbridge Is, WA 981101206-842-0929 ITELEPHONE P , ROPOSED Impaction Required Sidewalk Required �:Vf NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV The Johnston Associates, Inic. I 444- I I SREQUIRED YE NO 0 t: x ADDRESS I REMARKS 04W11VeE, f W z 0 375 Ericksen Ave., Suite 222 S ar- A^ORV /eV O-Vill 4Z z CITY ZIP TELEPHONE .Bainbridge Is, WA 98110 206-842-7641 NAME NOT DPFERNHE-0- ow "_,x, ENGINEERING MEMO,DATED REVIEWED BY o: ADDRESS 0 FIRE M MO Y W L) wnt� cg�NAyre/� M "- z OED '? I 7; E . U. CITY ZIP I TELEPHONE 0 VARIANCE'OR CU ADB# SHORELINE st e u �.AIA -C) 7 STATE LICENSE NUMBER," CHECKED., BY;,: I . SEPA REVIEW, SIGN AREA 1 HEIGHT COMfLETE ,,EXEMPT . , ALLOWJ) PROPOSE 0 +1:) 1 J* ALLOWED PROPOSED z 0 LEGAL DESCRIPTION OF PROPERTY - INCLUDE ALL EASEMENTS, EXPA E SEE ATTACHED LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) U) Lu ALLOWED PROPOSED FRONT- SIDE REAR FRONT UPSIDE REAR, _j p 161 z PROPERTY TAX ACCOU�IIT PARCEL NW z LOT AREA PLANNING REVIEW By DATE UJI 23270j-4!-090-0002- Rx NEW E] RESIDENTIAL PLUMBING MECH REMARKS f-1 ADDITION COMPLIANCE OA'� COMMERCIAL CHANGE. -AM, :4 r C] REMODEL R ME' C]- APA T, N. T( C] REPAIR FENCE DIX CYDS:' Cg (,'c 2.5-IF 4 FT) CHECKED BY TYPE OF CONSTRUCTION Cen OCCUPA7 GROU P OTHER UXTA IMF& LandsCapg �NK GARAGE P t , olp a XRETAINING WALC 1&igatl 5a CA PORT REN! 07R W, SPECIAL INSPEC' CCUPANT rQ,R, REQUIRED D -3 -71 )14-43 r- ROCKERY (TYPE OF USE, BUSINESS OR ACTIVItY'JJEi0LAIN: A. A-72 A.7 I! I F 11 CIL Assisted Li ing Licens I ed BoaH bg H o m e REM ARKS ER 613C 1108 PROGRESS INSPECTIONS z NUMBER NUMBEROF CRITICAL o OF STORI 2 AREAS NUMBER Attached. zils 96%1.11-11 gzif"5 rj"Zam DESCRIBE WORK TO BE DONE Construct a 2 story Assfsted Living Facilft'�Y",-.­ with under ground parking, landscaping and FINAL INSPE CTION REQUIRED site development VALUATION FEE PLAN CHECK FEE tHEAT SOURCE Ct GLAZING % LOT SLOPE % Na Gas/Ele F 9.6 1.5% BUILDING PLAN CHECK NO: P61 1,3ta VESTED DATE 7 PLUMBING MECHANICAL 3 0 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL :i DOMAIN (CURBS,SIDEWALKS, DRIVEWAYS, MARQUEES,ETC.) WILL REQUIRE SEPARATE PERMISSION. STATE SURCHARGE ILI IL PERMIT APPLICATION: 180 DAYS / 7740,70)V PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS g=f �/ff AaE.EEES 37? APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESOR S ;N ENG. INSPECTION FEE _j 2 INTEREST. AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF M 4 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Afo x ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY a _j FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT -SI X 0 DE EMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE x NOR LIMIT IN ANYWAYTHE CITY'S ABILITYTO ENFORCE ANYORDINANCE PROVISION.* I TOTAL AMOUNT DUE Li 385 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT T�!E INFORMATION GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL This application is not a permit until signed by the IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Building Official or histher Deputy: and Fees are paid. and receipt is acknowledged in space provided. WORKMEN'S CAPENSATION INSURANCE AND RCW 18.27. SIGN E NE NT DATE SIGNED (425) OF�� [U17A ;p4— 771-0220 ATTENTION J. V LEASED BY DATE 'ez, j IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR ::�hcl CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - ASSESSOR 5/98 EC TION P31 . T01?vNSHIP 27 NoMrH,.RA'NGE 3 E S. R f04 EX. CB fop=l,ul INV=10.81-12" Cp �FN) .1" :.) INV=10.81- ."CP - INV�-10.81-8-cp(s) INV=10.81-12'CP(W%l N 01'09'15" E 156.05' EX. CB TOP=13.73 EX. CB INV=l 1,58-12"CP('VV) TOP= 13.61 INV=12.56-12:,'CP(N) INV=12.46-12 CP(S) INV=12.51-12"CP(E) FERRY HOLDING LANES IMI EX. CB 6. 09 13.73 INV=11.39-12"CP(W) C B 1. 52-8"CP(N) ,/* AeAmll A UL r('R 8 " WATERM�IN N'--�W APPROX. J-.00. EX. CB TOP=14.01 INV-11.56-12':CP(N) INV=11.56-12'CP(S) INV=11.61-12"CP(E) x 13.82 PK X144,0 Zz-, -zz-- - - � \_ . . I � I E!:- � - � X. C 8 .....................................................................................................-;. I ..... , * ......... ..--..-.-..�.---..--,--.--.--.�'...-.-.--,--.-- .............................................................. . . . . . . . V.V. . . . . . . . . . . . . . . . . . . .............. -.,.- "-,')P -­ 13-27 - ANN= Apm ........................................................................... . . . . . . .%,.,.%*.,., "'� ml�f I/ �, .1 ................ I ... I ................................ .... ....... ' 10.3-7-12"CIF "r) ....... ....... ............... . ........'....... I - 1_" 1,­� ........ ........ .......... % *. V.,. , ................ * ....... ............... . . . . . . . ............... . . . . . . . ...............'............... . . . . . . ....... . . ... . ... . . . . . . . . . . . . . . . . . . I ........ ........ ....... ..................... X 13.27 S/ / b: PLAN I ...................................................... ­ .............. 1 ('10 ...................................................... ........... ............. . 11� 1�_, I.................................................................................... _4�. .�� . ......... . !:_� -'-'-.V-­ -1v-v-1-v-v­­­1 A .w ....... I ................................ I .. ...... ........... . ...................................... * ... : ...... ......................... ......... I ................................ .. .. ................. IqORTH I 0EIG i-IUN 23 ..................................................................................... I.. ... I .. .................. .r TUWNSHIP 27 NORTH ..... ................ I ....... - j-----___ , R) NGE 3 EAST . - .1 W. M. ..................................................... . ': 4- ...... ....... .. ..... . . . . . . . . . . . . . . . . . . . . . . . . . - - , &.494 ............... 0 ...................... . SCALE: 1"= 20 _1 ..... ­ U llor*� ................................................................................. -.11, .................................................. ......... I __­_,_­_ . . . . . . . . . . . . . . ................. . . . . . . . . . . . . . ................. . . . . . . . . . . . . . ...........'..... . . . . . . . . .. . . I . .............::::::::::::::::::::::::., __', ........................................................... __ — I I ­1 *11 .­­ ...................... PUGET SOUND.'.'.'.'.'.'.'.'..'....*..".'.- ........ ..-..,..-..-..-..-..-.-.-.-.-.-.-.-.-..-..-..-.-.- .............. :::::........... ........ ............. ............. I ........... . S.R. 104 ..................................................................... I.,- X. C B" '... 1.1, . , . . . . . . . . . . . . ................ , . , . , . , ............................................................I ........... ­:­­­.. ­­­ ... .. .. ..... ....... . ... ... .._­.­­­­1 .....,.............................................................................. .- , __ .. -1 ... ... - _­_` I .... I .................. ........ ..... .. ;, , I � 13. 8 4 .......................................... I ................. %, .1� ....... ....... ....... ; ............................................................ JN, v;-7,24-1, lj;'CP(1�,I) I—— _­ ­ -11, _­ ....... ___ -,- ___ .. ....... ____ N 01*09'15" E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..................................... ....... 1!11',,��­7.1�:,i­jl , ­,11,P( ,w) j ___...___­_.__.__ __ ----------�--l��,-��---�.��-,�.-"��- ___ ­_.1_._.­_.._ . . . . . . . ............... .... . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . ... . ..... . . . . . . . . . .,. . . . . . 4- - , I i __ __ _._­._­_1__ .............................................. . (11' ) 1 156.05' ______.__ ­­-­­_- -_ - __ � ............ _.. ............................................................ "NV�-7.94-8`(',F` I., I I -\---------- -­ -_ ­­ --I----,,-------- - ------I- ---.-- -1 --------_---_ . 1 -6 '. C . i 1,\ , , I I Fx. C13 ______,_.___..,_._ ... I ............................ I ................. ... 'W ! E ...- ....... 11 - ,� VVI ! i - - ___ __­­­_ " ....................................... * .... �,' I-., i ­ ; I .........'..... . . . . , . . ............. . . . . . . . . . , . . . . . . . . . . . . . . . . . . 1 "'! V ----.- (5 , I , " " - ) - I ) ! ­­­._ -------- _____._ -- - - ----- . ... :t%1'v'----9�s9­'12'1,: (Nivi, ­1(` �N!_!_, i \ RiF=1­T_f1._T�3* " -,---,-*--, -, ... ........ ........ ................ -, ----..-.,. ...................................... i � I-- X � r- � . 1NIV=11-58-12 Ci ,�( W) _­­'... ...,.%%%,.,.* ........................ ......... ! i i F - __.- .................................. ,.,.,.,.,. . . . . . . . I � . . C.u. ­ __­­' _i_X_._CB __­_­­_._ / (­_­-____._.._.___..__ ___..____ ............................... ............ __ - - I I // ", Or�� 1 3. 61 TO P - 1 -3. 6 1 8 , �,, � ­_ --"-*---, .. - lAv .......... - ,­ ......... ............... .. . . ...... . . .................. .... ........ . ..,. . .......... . ... . . I I , \ / V A i E P M A1,Nj 1,1 -'- s '--- _11- '_­____.,. ...... ... .. - ......... . . . . . . . . . . . . . . . . . . . . . . . .,.,.,.,.,.,. * ...... S. i i i / F� v­`1 0.81 - 12"Ci"(1,") I N\ , iz-- 1 2,56 -1 2 " Gr'-'(N) / R� , ­_ ...................... I I / 2,46 \ APP'N0x, � ()C - - ............... . . . . . . . . . . . . . . . . . . .. . . . ................ I I '''''' ................ / I , - .................................. \__,_ _A / ': i, � -1, k. . .......... * ........... 1"'I 1!..­.1 0, 8-1 - ", 2"CP1([.-) IN / / � V= -1 2"CP(S) \ ­1 ...... � I I I I i V:::-- I 0, 8 1 - 8 " C p (s) I N V= 1 2.51 - I' 2 " C P- (E) / ­___ .................. * , I I - / EX, C B / , ­­ .-.., ............ ........ i 1 1 11NI V::� 1. 0,81­12`r'P(w\ / . ".�........�.....---�-�-.�.�-..� ........ � ....... ­­ - ­.. . ............. . . . . . 4 / ) --- ....................... .... SITE I I ! I . / 11 . \ I 1OF!--1 4�01 \ . /-- A = 29*1 3'1 9" ", 1- - ........................................................... . G1 ?A) PHIC SCA L E � / I / INV-11.56-12"01" N) \ R = 600.00' __ - ............................. V) � ! ! I I "I \ / � - .. - .- ... ..... ............................................ . , I ----4—i� , . ____ IN'V�-­'. 1,56­12"CP�S) \ L = 306.01' ., ­­_ ........................ I Ld . , ... ........ . .... --- ,----- ------- x � . ,2-.---- -_ -.-- ....... .... I I .- .. __ ___ ___ / INV:�11,6)1­12"GP(E) \ ­_ I ...................... . .. - ., 20 2 10 20 1 ! i . ­v rn ___F_4,-5�64 —, ........ ....... �z I I ! 1i i \j I-- ....... imm m I I I � - / _" \ ­. � .................... , � 4 __ ...................... 0 Elm I j : ; F \_ - . -) f , ", \J pl� .. ......'............... I LEM I I 1.\ \` I- E1 R IR \ ,�- I 0 I D I 11 h L-ANES / ------ X 13.82 1 _ ­ . ... * , * w ____r_ - I ..... .............. 1q_ � i I I , , 1.� i / --- - ---FT14-. Gl----.-,_ -, . . . . . ............. . . . . . . _0 ­ ­v ( I N FEET) ! I ,r 1, X. " - .- _­ , i-,, ­. I . ...... ............ 0 t I 1 1 �, -'--...--.-�..�.E.,--..,----.-.-------.. __ _ - . ..................... - 1 inch = 20 feet i 11 t ) I \ F' 'L, . . ) 1 i I I I N, / T011­15.09 1'� 13.73 __ " _­­ . . . . . . . . . . . . . . . . . . I . . . ...... . . . . . . . . I I ................... _0 - ;1 I -, !Nv=11_391_12"(.;I­(w) C13 ­ " - ­ _­ .................. .- - �� I I , \ ��, - ,..--. 1,, . k - ­ -_ ­ . ...... ­ ................. 'D ! 11! i I I \ JWV=11 1.52-,s,-,-.;p(N) _ _.,__.._.. ___ _­ V I ................ ;y I I \ ­ --,!---I 2.-1i_q_-..­."",v , e , .-.-.-. _. - \.� __ - .1 I ........ . /­-�,� 0 ,,---,� � L� i j . .... 11"t t I ­ _ _... - . . . . . . . ............... ; �,. i i \, _­, a��) (sY­ --..- -,.,-,- \ ............... �,: �1- � I ; \ ,FILECTRiC 9��X­-- I ; .............. I i i i6' 1_11'014- - - - \' , , "' , . . . . . . . . . . . . . . W I I ',,�, I I I. __�! I/ . . . . * . . . . ....... �_ i i �__ - --- .1 . . . . . . , . . . � :. -, I 1 1 i i 111�cl ; ,7�'� '%*_'i��_ �7_1_. ---:: ­.._.: I..-..-. . . . . . . . . . . . . - - -_ _ ­_ � ­ - \ ---- -_ __ -".-,- .­­_ �' I It. .1 _1_ __ .--. ___ . . . . . . . . . . . . �; - - ... I , _.:� - -,7.- - ­ ...------- =, - . . . . . . . I �0 ... I I , , r,a __�' =1 - - , - - - ______ _­ - -,-. __ _ , - _. - . . . i 1,11 I i `;� :_ t f _­­ _­ -.11 --- ..--: -, -_ ­ ­_'___ � . ............... . . I ! I , .��.. \\ / �� I=. :�:.'_ .,---"* -.1_ ­ , � \ �.. I I -,!..� ... V-1 PINE ST : I ".; 11 1�_ ___�­m ............... __..._.,__ _ �_ - _._,*�`:: .. ( .......... - -_ ,� v k ,.-.- I _­ - :;; 111`i:1 __ !_,_ ,,, U..; .......... , 1) ­,_,_­&.i ... * -- - ------------ _ ` -)! . � ....... ! i. I i . , � ,�, i . -__.____­__._._­_. __r - ----------- ,...- .'".- � - -,- ­ __­­ ... ..... ­­­ ... � .. ..... . .......... ......... I .. I ,�". /A ;�� _­ i&f§_� __ � '. `STA.­1-+Z,i9:-3a _-, -, __:.- / !I, . - H.3, ��2 . . . � -,,�-;,c'i-, r ...... - I ... I . L___..j ,�­ I' . ', j 11� - - ..m .......... , !� & . ....... , , �: I " I '. . j 2. 1,'/,­8"(A,4P-,'!,,J) . . ,_� `��� ; � I .,�, "'269.79 R -1, I I , /, , " ! I I.., i i � i /":, b OFF` - -26-09 R _______.____. - �:.:,. I/ �kl,v­l " . . . " / ! .: .. ­_­: 11 - ; -.;(c:) I Q I SDMH o 1 . '_ i CB � —1 ____�'. __,", 1. !:�_­_ B \ 61 11N'V­12�04-8 (�j ,­' .... . . . . . . . . . . . . . . I 1, ; �11 I � _', � , ., . . . . . . . . . . . i * - - -,-"*, ,_,� ­-, f , 1 li,-j V;;- 1 1. 9 7,­ 1 ."), !':' P (S W'\ .......... ; 1 ,� ­_ _^11 N 01'09'1 5" E - , .. I — — ...,-,.,:..- I r STA. 2+95.02 1 i 1, i �16 --,\/,I[ --,-�- - 70 0 D 7 -- - '.66 ___1 ,_ '.�%­ ,,,, � 'I � . [i__.- - ". . ............... . . . F � iI , r ( - I --- ! . -----'- _'��, - ''f 11 I - . . . . . . . . ......... "'*� 9.78 R I 1 ! , I � v 'oor I .,� 1. 1\ \ — . "... , F, -:��-.- - - ` /,-­ ............ f OFF:' 26 fi ,I T" ,� I . .1 ,_ . ...... 4141`­_-_-� Av _­ , I I. Q t� . . - I I . 1 _6,� �\ ., .1 !, ,-,. �.*_,,. \ 1,�3"56,:i ............... . . . . . �: I ; 'k, \ , ,-- \ I \11 \\ *'. I '\-,-- -, I '\ .. _____ '11".- ­­ ,:" -_ i , ­ % ...... . I I . \ , - SDMH '-` I ,.,I( _117- . -.'--'.,-. - -; / .......................... � 1,1/ i , , , ___-z -zz I I i�il �5­1 .-- -7 �._ - ", 1. i ! ; il 11.11 , 1, ,.,\ I ... DMH \, . \,� I I . . . .- - __ / ........ ; , 1i ­ ­j­- . I , 1, \1 \ I \ \,­��,, .. .... - .................... , 1�': " t . I I 1- H , / \ "", J."k " "I \ \ �1\ \ , I': :-" r I .­ --- t__�\_ � ,�- ­­_­_ � .,:�,_ / 4: . � - \ I 1 4 1 1 1 ­-..... - . . 6.., I . 1- ,.I... _.. ­­ I '... I N 11 "'. 1\ \ � - -"- ­ . .. , , . '.." . i ; I I, I .... 11. 11 \, " I .. . _�_7 _.., . .. I ,::.- .,. � �. , \ '�,, 1, , . \STA: 1- � .. � -------_Z�>__., _. / _ 1.1. 72 .. I : I l I , I "I ,�, I,;' � . 1\1 . , I/ I I F7b 3E�\11 - � . ul-, _­. 1-** ___ ElRf�`­ ---�z. - I ;11.iMl .... 1i ! i , \ . ( i " .1 ""... ! I", I., \ ---- ' , - %�.< . - -, -_ - __ ...... __ - I -, , - I \ ' ' - .. PR 11, . - 0 -_ ­1 . E� / : , � 71 V,') IL, � I __ " ­ " , . . ­-.1 ­­ I—- - 7 .%, .. .. - - - - -- - - / f., v. ___ .., - , . 4. - - - - ("', " i - � ,." \ - — " '. %,, " � . . - _- - ! � � , 70,YF. ,`�60.67 R\ . \ .,1)0._\ \ \ - .., ,:), --,.:� ------ ­­', 1, C'r,;";/(1 . \ ­`_ ` - \ : -.I - - ---�, � -­-, , , ­_. ,� . r * --- ------ * � I I u I-— - , � i �4. 8 �Syk � "' ­ QFF: '\ , " - ,� - � �i _ -1. : . � ....... . .. _�' __ ____ _ I . I 11 �' +98-Wi -\ --- - --- --- --- --- " ' 260., \ ""I \1 '\ 1�9 I, ! , , A ­,_'. - _ ., _- -�_','., , �, i � ? - � \ \ \ I if, I \ \ \ - I , , I ... - ,� . � i 1 1 �ll! \ \ _.�-__ ....- - , i I .... - - _ _1­_ -<-,, I.- .711:1- ___ � : -.1 C( qn- . 1i .. , - ... � � � " \ \ \ \ I _­_­_ - I.., - � , I I(.) ; � , ----,,. i ! I I "', \,", \ " \ " 1, , 1" - ". , " \ N\ , , , N I "I ,,, __ - _. - . I -, -.:,- - ` ­,,� " j ; l"I.-I 'I, t I 1�. I , I\X". , ,\ "\\ N\ \ � .-'4'- ,- - A . , I I I !:: !,� %. � I . " \1 I" \ . _1 I - -, ­-, (.,I --r,, � \. \ --- ____Z-_4Q'1 ... ; : 1 1'� 1, , (\1 \. 11 , I '\ 1, �, \ 1..� � - '4 T I— - - ­_ - �_r 1 1 � i * \, \ I \I\ , \ \-\ \ \ \ \ .:...., ,.- '_-____. --- ­:��:l . I , . \ \ , " \ \ i .4 R :� 5 0 0. 0 (), :�4 , i i 1 . . 1, , I .. . � - __ __ ��: ... \ \ , 1. \ ." 1\ \, : � I,- 1 i . \ \ \, \ \1 "'\ " N, , 1. _-� _ � 1) ...:. .,_ � ­ I i \ 'I., \, \ \ \ , \ \ \ \ \ \ \ - . . . ......................... I ,�� _-_ --: ---- � " ,_,_ , \11 \ , - :: _ . .L I � 1 �1 " " \ � ". .,., \ I \,\\ I 1. - - Iftft . .. I ,_ ­' I i ' . � I . . - I '114,42,1 ' 1, \ 11 _­�_ - - -_ .. " - .: I � -,,� I tjjj .1, \,,,, \, " , , \ 11, \ \ \ ,\ \ ,\ ", I �t ': I , - � , , \ ­­� __11 " - I I i i * I 1. , \ , \ �, \ ,,, I \ \ \ 11 , I i - - , j __ .1 .'.-�., i .1.11 ..... f I I." 1, \ \ . . . . \ " ,, " L ': * --- "" ....... - , I -, ! I -1 I I . . � \ I I N. \ "', " `\ \ \ OR ­'� [m . \ \ , \, ,\ \ \ \ \ \ ml � " \, " .,.: .1 ft.. - -, ­:: : I 1. \ � \ - r - o 1- i ! I I ­­ I � /:, � :,� ill , �,, \1 I \ '\ \ \ \ _. -- 'z- " ,� / , ,__� I I '. � , \ , _w I . z .1 I I- \ . I " I * - . .r, ---� I I . __ ____..1­__­ - I _____...­._ __ � ...... .. ...., i I ;i . I 1 ., ,,,, ". \ . \ \ \L_1 '�\, _��\__ �kv .�\ . . \ I \,\ \ \ , , \, " " I '. \ 1, \ \11, :2 : I � , ____ ,'. \ I .-I _ I 0 :1. - I \ 11, - - _T ' \ \ \ ' - -, I .1 1,C)FI, _­ 15.65 \, I ! .--"/ "7 . , '... , \,* ,� \ : . ,:N _\�, \ \ \ \ 9 __ , . �_ � I QK1 ,� \ , 1%vm , , "\r ,,, \ I ­_ \1 " ." ") I \ !� - �_-�' - _/ - .\ \_,, ,, . IN ' _­ - ,_­_ .1 - , , ­'zz - �, .- , .. :� 1, ,_ � I I � .. ) I 0 - '. , . / � \ , 'r "I / -, 1_*.,�._,�, ". , f 4,: . - . -, , " \ \ -\ , \� '.,, \ , -----j,z,­-1 -;, \ \ "', \, "\ \ ,., 1, � I ��. ­ . , X I.- .., ,., , \ , I -.-- 1. \ % \., , I I . ' I i : - �,jl I - \ \ .\ ", , 1. 1, "I , . , , 4 / I \ ., � , I - 11 / I E ��, _.". _ �:�z � ' . .1 .? ., \ , I" �,. 1, - -i.-I IN \ I I x 1\ 1<-- \ , J\ " , , - ____ ' 11 . . 1, ,40-,,?4"(.J-`(E'1 I - , 1, \. 1. \ \ ' "�7\ '\'\ '\7- �'� ',�- , ,\ ,, - , 1 7, ��.� -_ ;N " i , SY1111 , " \1 \ ,\ \ \ \.__1____ - �,,'.k­ ','�'., ­,"*-, �4­! . I _ , ". ...... V ,­ '8-- 2 P(W I ) \ I ','� ( � � 11 1 C. J. �; '1� � I \ - . �x i '/ \ \ \.,� x I S, , I , \1 I - ��_ ., ..", � j,-- 7_1 4"(., , . , � , " " 1 \ I !<--- --> \ \\ I - I i , - \ \ ". \ \ I'di x �!�jl��\t 1::" ­­­ , ' 7 "" - I 11 _' ,.-- � it4' � :: \ 11 \ ", " \\ ,,, 1, "\ \ 10 \ ..'� \ 1, 1. , - - �, \1 . \ �D­ �CO C. WALL I - " .. . I.. - - \ \ \ ". \ I., ,\ ., \.. , ,; ­­_ -_ - I i0l - __ �� - I I i " � rt. " `� 1 " 1 1 '\,, � , \ I 1 4") 1 )II - �" ­ . \ : ; .. 1, . ., I . . , -_ i - - . - , 1. � ..:",. i ( 7 . � \ \ \j _ -1 / . ..... i \ 1, , , _- ,�. \ ; , 1 , 1___� _j__ .- - ��,� _ ., � ; , I (�' , , . \ _, I \ . i I.. - , ; I �_) LL . . N - � i -I- I ; A") - I ; , !, I , , . " . , I 1 I, , I , . ,-, 1 1 ) I—_ 1--­-, I , �, " n _ . . "'y' . I . . I I" , � ", , ." 1". ,I - 1, � \ ,, 11 \ I \ \ I �, \,N\ \", ." I I", �� , 1, ", / \, . ) ". ! I I . ., . ! I "' \ , \ \ , \ ­;-V 1.4 Ou LU! "-y';;AD I !.,\ lvbl�. I /M, th, U I L ) I N,( / Tiu, / UT \ " ..,. , " , ". I 1. . 16 � �-. , I , � . , -____ :--..---. I �' \1 I \ ,; - -_ I . '. 1, . I i ;it, � 1.1 \1 \ N, � ., , , 11 , 11 \ , / /__ - , . � __1 ____ �­ Q vi:::-- \ I , \ 11", '�, " \ " 1, ,,, , � , ! , . , 1_. N � ., � . \ 1�., ! i �� \ /`,�\ 1\ I ­ \ <-- 1--> , , \ \ \ , 22q.46 R 11 I I ,�` " Ill\ \. , \ � I '-\ / i \ .x \ _\ . , \ , 01 1 i, I \ \ \ \ -, 1. - . "� , "' ", ", .,. , \ - , / '\ " I I - \�. -,, � '� "' �"% \\,. " � "., \ I", N �< 11., i ( , , , \ \, -) f ,\ i i I .�j Ii 111) - 11 , .\ 1\ I 11� N ­ 1. ­­­ 11 , � I", 1". \ "," I (.- ; - - I �, I / "I I , \ , , \ _1/ " \. \ ; 1-i \ � I . . I -- L - D'd -_ __ ...... \ \ , in, " "I'l..-,� I \ , , , 1-1 , -----] ----,- 1".. I--- t----- I \ " � \ . I , I ,\ , I'- 1! :I. I I,% 1, 1� , � \' I-\ ". .\ ,.,. j, , , \ , " " , , ".. , , , ." i i" ', ".\ , "" \ \ " I,, "" , .N�. 0�:- f�, f ' , - - " "' -, T'-­ [""11-1 i "I 11 " , , . . \ " * , I ----- 1-4 v -�L,"p , � 11 I - -of- � 11,14 ,; (� , \ \ I � \ , I \ \ -� ­ , � / I I ­ - . ., \\ \" T I T! ,, I . 1, . \ " , , ,,, , / ; , ! U, I . '.., \ I �. . I � li \ , I \ I I \ , �, \ � . ",/ -, ! I ..� - I I" ... " 11"', 1. " �. " ., , ". , , I I � I ", 1 i . . \ , � 1, \ \ " N \ r) ; \ \, "N I \ ,5 , I ,.�, \ � , I ! � .1; \\ ,,. \ .. I \� ,I - I " � " ) j 1 1 , I I 1, ,\ \ \ , 3_1 , � \, ." , . , L-i \ .'o " i* - I \ \ " Nl\ \ \ \', I \I/ ),N\,,\,\,�,\1 \ , . o'n \ I \ \ ,\,>, ', 11 I I -----,. " \,. , , , . \ \ \ " \ \ I /\,_I_�_ .� " , ,\ ,., , ( "� 4 \ No,", //I,\, // �� , \ .\ ", \, IK �,/\ , , ! i I .1� �!. 11, ", \, \, \ I � I e '. 'I"Juv/ )1N\\ \, I\ \ \\" \ -\ 1-\ "I � \, ,"\,\ " / ! 1, A � \' \ . \1 "I'll'' . � V, , , ,, � , \ 11 . ..... _.v �j ._ , I" �, , , , , \ ____ \ I , , ,,, ,\ , I., \ \, "'. - -:�, ,k,---- \ " 1, ,.\ " ""', \,\`:,,,11 \ \ N I ----A.---, � ­_.vf�4L__­ 1._._...:�.______ .. , \ / , , " , , , , , � I . , I N - . * \ -- ��j­­_­___­­__F/ I '\ , I'XI ,,.,I , \ , .�, , I ..'' 10 __ 1­ I I ; k1l ;��, I I \ " I \ \ , I � \ I I \ \ I " \ , a ; I � , , � , , .. " ' "'\ \ I \ \ \ \ . 1 \, , , I � ,,, '4� " 11 /_ . I I 1, ,.� \ , I . , , C) I , ! :_� ro- , " \ \ -1-­ -� --- J_'-,K_�Lj_�, L '� \ � - 1-J ... ;-I---- " � 1 L�! fl-, : \ "I, \1 "I - I'-/- \ V) I , '. � .. I \\\ ". \ \,� � � ". ". - .� 11 , _A_,J:p� ) \ \\ 1_" " "\ "\ \ I ill / 1. . \ \\. \ %', 1, ,� C, I , , ", , , \ i\�. -,, 0, ^1 I,- a , ., I" \ .1. j _Ir,�__� 0 ' I (.) �1 `�,.",�,� \ , I // \ \ , I ___ z . w \' "I , '. , -) I \, I.- I—— ­ ", I , \, '. \ " . I \ , . . I 0 - � � \ \ \ ;, < -_A , \ \ � I X I 55.65 i . .i , \ _. _­_.�� ��,M­4-,­ __ 0 1 , I ( 0"), 4. i � � I \ , < - � .. \ 'i 11 I 1. -\ I , . 1. , , . /, , < : , , '. � \ , i I I I � .1 \, � ", ! I" I I '., ., N \1 1, "" i �\� ! / .., 1, \ I, ", ..1., , , 1, . 11 / _. . I I 11. \ \1, "I,.\, \ \ ,., \ 11. , T­­­ ,_____��Ij ------ ­­,\ ­ . , .11 " \ "� ". , \ , , i" ." I i �.) I . I ,/ , , , \ I :1 : k c, I; H I'\ \, . �` \ \ " I'l "I � I I ., Z ii .1 , , \, I\ \ \ " .. \ " \ \ �, \ \ \ \ \ \ , I/ 0 I. I C-P IM � I i \ , \ , 1, , \ \ ,, � \ -, I i ,.� !I I , I. , . I � .1 I \ ". _L \1. ,_ I \ \ , \ \ \ \ 1, I., I \"\ I . \ \ "', ,\ ',.11� \\ 1\ . ! , 1. .. �. . '0 m- 0) ; I , �. - , ., , . \ , " -_ ... � 1�_ -, I \ 11 ., I I 1, \, , .. ), \ i\ I . < r,j 01 � ; I \, , \ ­­ .,�. \ I \ \ \ +_-'��I_ I " �/ . j,v _.j,_,_/___ Ih �,� * -_ b.- \ I , 1,7, I - , , I \ I 11, � \ - , ­_ I , I I " r,- I \ \ I I \ , 11 . I` .-, ", "'I, 3 - ; ", \ ", '. �, \ \, 1, \ / I ,\ I \ I I" % I � , . .,�'. 1, � 4- . ! I , , , . - . I I \ 'I, -,,\ ". " \ \ I , " , \, 1, -, i -,, , \", , "I I" , I i I ", _� C) I I I \ \ I , I I \ I \ I \ ,\ � , " / I I 11 , I, . , �'. I , � 0 , , \ 1�. ." \ " ", \ " \ \ , " \ ", . , 1, -) I -;,, I , ul� \ '. ; 'I \ � ,., . - '. --j ") 1� 1, , I \ . , \ \ \ I I I" .-, , ,\ , \ \ ,. I '.. , ­T. -- -- "I '�_� ...... . 1, \ \ ., -. \ . �, T .". i , , " I . . 1, , \, " I I . � \, " �, 1, ., I I J,/' 1 "'. i ( , > 1, .... 1� �,. " . "� �, � � 1. I , \ \ " \ I , . \ I . ­�­ , , I : ­N 5 7 7 1 q) '; "�' * :1 ' \1 ' " I I I 11 � \ \ I I \ I �­ I 11 I , /, '_�, 1 �,-� LfA-�_ : ,� , I , LL- " , \ ­.._­_T_ , , , A, i. - ., \ , �, � �� ( �Jl '�� - .\ " , i( M � \ . \ , \ \, " __ . , .�', \. .., I � . . 1, \I \ I %.., \ . " ,I! \ " , 1, \, I I", .,., ! . i �. .� . '_�",. ;r lv.!-� . '. �. \ , ., .. \, ", \ � 1, I \ ., \ I , , Al" � _­f- ­­J , .1 . . 7 !; Ix ,,,:�, " - 0 1 , , �, , " uo- ..1 '. - ", . , ".. \ , 1". ,�, \ \ 1� 11. I 11 "I I � \ � \ " \ I , -1, " "' V"**' I I - I 11 \ " , d , , , ', , �, .�- �� ,,, : I,- I ,.\ \ '. , \." I" ..." \, .1', \ , , I , � I \ . .1­_f­._ 1�' ., I I , 1� � Ij I" '... .1. 3 . , , . , I , I., I ..� "I ;I 1"', \ , � I x \' I., I" � , 1�11, 11 " " . , � 11, 11 , , � , \ \ \ \ \ " , � 11 \ I ,,, I , -, ! ... �1 ____ \ *\ \ . , " .. - �i `,��,,,� . �� / j 5 I il , 1, , I 1 li­­., �` -_ . I , i I . \ "I \ , If I_ - \ \� . '_1 , , \ " , �, , \ �, N, , I ", \ ", ",\ \ ", \ / "I 11 I � ; i '' 11 1 1, \ � \� , \ , I I I \. \ I \ \ . , . '. , , I ,., \ ,, "" , .\ ", Cd . \, % ,\ . '��, ! I 1� 1, 1, \ \ ,\ . � " , . i \, " �%, I \ - � � � \ � , " I � ll . . i I \ ,\ \, , ". - 1 \1 1� 1, , , , � " � , \ 4 - I � \ ... \1 , t ", : .1 . I \ \ 1, � I " " 1\ , I ,.�, , 11\ ,,,. , � \, \ ,� . '. I " 1, . \ , ,� � I � , \ \ .-, 1\ " 1, I ... , � 1, I.. , ., i I , z 5 11 � I -.1 1\ "I I 1, 1, 1, , 11, ,� I I \ \ ".."., "I \'\ \\ 1_\. %-\., "I ", -I. �'. \ ""% � I\", ,\ ..."', 'I." \ -,,., I,-, '. 'If I..".1. !, 1, I 'N I . " " % , \ I � \ I 1\ , . \ , " .1 I . 1; � / , \ \ , \ , , \ \ "\ 1, " \1., .i , , .\ .1, � --, \ � , , - , I" "� \ . I 1�1__ ,__� '_1 EL ('4 1 // . I , \ \ \ I\ I " \1 \1 \ , \ '. i I '. , i ", 1\ 1, \ \ . I , I , ,� '. , � d� �� , -, 1, \ , , , ., , \"',r" � "\ i'RTH LIN`* , , . . .1 , , " ., 1, I ".\ "', ." . " \. 1. "\ \ I" 1, I I \ �. 1. ,\ � . I , z � i , 1. \, \ 11. \ \,, � \ \ I 1, I 1, \, "\ \ \ \ , I I I \ . I I I . \ I .111, '.1 � \ \ , \ �, I I 1 �� " 1_1-�, !I �Ajj7lr)A\/j 1� I I \ I , \ I \ \ \ \1 I I , I r \ "'; 11 t . � I '. , I % , \ . '. ." 1". I',, \ \ \ I \ `� ,' " ."', I \ \ I \ I \ , \ N \ \, 1, \.. \ \ 11 \ " 1 I.., \ I 1, , I , \ 11 1, , 1, , 1, " 1� "'. \ ., 1. 11 I.,\ 1, I., � \,', I, ." . , , , .- � ­ - - : - __ ­ i . _11� . - - I - 1 : 1p - , 1, \_ ,., , . , �, , , \ % \ \. � \1 " " " % \ " I 'L � I \ i -1 \ I \ , . \ I , :P1 I 11 i __ __ , . . .. I , \ \ I" , ". � % 11, 1, \ 1. " I., - . . , . ­ ., -, , , ... \ " \ . '. , .. , . , . : \ - : I , ,� � '. . \ , I., I " .., , 1, � , � , I "I % , ,. I, , �, . , , - 111.� ".. I !I . i� " � . 1\ �, .� " 1". . I ' , � ,� �� ., ) , . .,.� I 11, � %. ". I ., . . \ "I", , , , , I .,. -1ki" .. I., 11 � I ", �, � �. ..­. \ '\ � , , %,, � I . ". I..,.. ',, \ ''. ' "PROPOSED", \ 1, \ ,-, , " \ " ,�, ___.,�___', \ \ ,." ", 1". __,� 1.,, 11 A.�. NO. 9605220436 ��,-, � , ; . � " , , , I . . , . \ . , , - 1, " " , , � ,� \ " I BOUNDARY L E ADJU§TMEN7" - ,. "­ I I . I :1 , -. � \ , \ , � 1, \ " I \ � \ ., , �" . . , , \1 '1%, \ ,, I ,� � � I IN __) I \ A I -, , , , , , I \ ." " ", '. _. ". I � 1 ? ; i \ \ \ \ �, 1� \., \, '. , , \ ", ,�\ I ,", \., � , , , , " ", " � , ", , , � ., . - I ,,i , ", ,� %,\ \ ., \,. . , I I., , ,­ , "I .- .\ \ , "�,)" \ "k I 11 , . \ - I : - " " , I I., \ , I , , , , \ . \ � \ 1\ , , , . . I � . , 11"� . , \ \ I\ .", ,,� , - , I [i . C� � I . I . 1, , I '. �, , , \ "', ... _-,;�� _.'�,� \ , 11 � ,. , .,,- . � .. I - ­1 T..­ ., 1, . ,:­.- 1, I , ., I , I .. , ,� - -,, -- -, ,�_ -, . - ' ", . ., , , I.. .., . ... ..... ;:: ­ - __ - '. 11 1, .. - I, ., 1 " 1\ � � , \ I, " �� , I I..-:, (), " 1 -, , . 1, "' '-,. , - ` " , 1. ., , , I �, \ \ I " I . . :"., , , , , .1 11, , , . . �,, , '\ 1. DING -,-,� \,,\ �-,,,, I" ; " , � ,,,, ,,, '\%" , - "I , -4 1. N I., �'.. " . I I ,:��,,.,. "., � , ,� 11 I " , " ", , � � , , %, ", I,, ,% I I .., . I \ , - -1 . I � .., 1) !1 i �, \ , I ;� ". I\, I." ", \ \ " �!�11 I "� � 1 1 1.",1­'­ \ , '- '- . �` \ "I ., '.., '.1, �,� . \ % - ,BUIL . \, \ . . ,. . . ? I I ­_ - I \ , _,� %, I. '\ " N, \ " , , 11" ". - 1, ! ,� ,_ �, -_ ".." -, , :.1 - ,� � � � "... I , I . . N '. . , 5 ' 1\ �\ ' ' , -�, ­,, "-,.,\ , 1. , " ! " i ,_ \" jj A,— .��111 _­.\ \ . \ p . � , ! " � `�:­ .,-,. __.., "�.__ --,,--. __��YRST FLOOR FF=20.,� \ . \ \ " , EX. 14'jj INGRESS, . \ \ , \ I", , , , .. . I \ ., \ ,��, \ \,, \ "'. \' -�,. "" ." '. 1, I ", .., ".. I 1 4 . ,'.-� : ; , . . % " , � , " . \ , , \ ., ., 1, 11, " , I 'k, '. I I ! ! i I I . , .i i f �,'.� \ 1, -_ ­1 I— . , , \ '. , 1. I 1. I \ \, ,. % . f ", .11. � 11, 1 , �, � I f ... _ _ , ....., . ­­. .1. 1. I I , \ Ii I ; � 11, " I., , 1, � 1�, 1, \ "I " I �, '. \ . '..1-1­ .I- - _��._ , 1, . ,,,, I - \ \ \ .. I", 1, , ., , , i ,,, " , . � . % � I . � '. � , I , - � . , 1, I.. " �. . � , ., ", . � ! . \ 1, I I I i N ; \ k / [:o: '.. \ . , \ \ I "., \ \ " I \ ", % ." " , , , , \ \ I 11� , �, 1i A.F. N ! 970130016 11 . � 11 I , , 1� \ , I , ... � 1, ,." \., 1.\ 1. I \1 ,\ \,.' I", \ . , 11 " ".1 .. 1, , �.1.11 , \ I . , I , - ... �, I , "I ., 1. '. , I ,� I :. --�;--1-\--- - - � - -- _ -- .... . 'I" "'Ix '� -- I ., .1 I 11 !� - r" , " - " " I , 1, \. \ \ \ -�`,­.., .-.,, 11,�.. ­ �, ,� . N �.. " ., 1\ 1, . I _.. " , . �. \1 .. 1, 11 \ I I , ­ I ��_..'.',,. - -.,., _ _... - \ 1\ I , I I" 1�� t , � , ""\ "", .. I ',11�z� ,.�_ 1, .. I , 1, I , :1 , _11.) 7­ 2 4 " CF-` (E J i i -- , �:�, ", , ,,, \ I , ., - \,\\ , � 1\11,,�\ �� \ \ � , , . . '.. . " 1, % .- k d' 4 . , \ \\ ,,, "", " \ , I I \ ­'. '1�11. , , 11 UTILITY 1EASEMENT : .... k ,.I.;­1 I , . , 1\ 1, \ '1� N, \ %" ,., \ 1, '. ", \ I , .. � I \� " � . f . i " . \ %, .. '.> , ,. 1\ \;.-, , I , "I " '. I ., " � ., 1. i I / _L� L_ " I., ""'. \ , \ \ , � ,- ­-, '. - . \ \ \ �� EGRESSI AND , - � , \ I ,,, ��', ,,I, , , ') ) "i" ` , , , \ ., \ . . ,% , I.. EX CO'N(� io, F, E , �,, 1E I., k� . - r \ \ � . , ", '. \ _.... 1. _ ., � ,:, ". ,.i , "' " \1 "" '\ I ,,, , \- ". ,,- I -,. \.. .11 I \11, %.� " \ I I I I "N­._ I ,\\ " '. \ , � ", ; ;'�j / 1�'111` , \ , \ \ , � \ ." "\, , , N 1�' .,%., .- 1, \ _,\ _-, �11 " \ , z : "I I I , 1 ; , i ", , \ , .,., \ , I , 1�1­ , , � I CI I '' , : \ i ,._�� ') I . ...... _. \ \ " \ \ .. _�.,.,,, , I . , j,1,'\,, ,,_ , 7 I !! ; � \ , , , , i 1. !� i I . /\ ., '- .'- ,\, 1, � \ , \ ., " " , \,\ \\_1- , ., A , . I , N, ,,, -- �.8"*)'..')�1"c-1w)" UT OR(REMOY I \ ". \, "', \. '\ " \ \ . \ , \ 1� `\ . 1, % , "', I %1", ., \ .\ .. � \ \ ,�,,� , ,\.. I '. 1, , 1. " ! '. 11 '� Z, i , ­1:1­11.��, .... . . , - ._*�,\_"___,�, . A , ; !! I - -.- _ '__.�,� %_,''. , " \ - ,., 1 41C \ , " 1\ , ,� I I - I 11 . , I 11 I '. \ \ \ 11, 1, \ , ., " , ,\ \ \\ , \ \ , \ � I , ; I H ! - ,,,, � , I, I", I "" ." \ \" 1. ."\ �1\ "\ �\, � ". ". I\ \ \ " \ \ � , '. I , , ,� I A � , \ I I \ , \ , , \ \ " \ ; I, I i ! REST 1, . I , , " , , I., � , 11 \ \ , , 11 1.1, ". \ I.. ., .1, I \ .,.. \ % N \ \ , " ., ,% \ I \ ., " ,� I . i , , \ , � i tl JHE NEA' I -, '.. , " " ,\ \ \1 , i , I 4 I ; A ' f � \ , \ '. ". \ \� \ \ , ,\ ,, ", \ \ I\ .. 1\ \ ,\ \! ,\ \,, � ,,, \\ . ., -1 \, %,., 1'\ 1,1\\ I I : \� I -%,\ \'. I \ \ \1 '11\ \ t, \ \ \ , , , ,., , I . \ \1% , � \ � \ I I \ \ � I .. ". �.. % - , I.., \ \ If' \ " . '\ � I . 1, I �, I I BEGIN QONC. WAL�! -!SI( OINT 'I -1 I 1_�; - I \ I., \ 1',� ., , \ \ 11 \ -, I \ I � ,� ON � - I I \ \ ., - \ '\ ", \ '\ \ � \ \ -1 � I 1\ " .1. �1. "'. ,�. \ , " \ " ,, !", , . 77 --'-I I , I ", \ I .. 1� ,-,:,-..,-\, \ . I,\ - � . . I , \ , , \ " �111 I " \ ,� \% ,-."\ \\ \ \ I , \ \ I " "., ,,.,,, ,N\ 111�. N", ", , , '.11 _. , %, I \ / " I I � \ I" ! "; i I 1! I . \ , \ \ \ \ \ \, \ - \ , , \ , , \ , , 1, \ \,\ , , �, I., .� , 1, I I, . - ' \11 \ \ I / \_ I , ,� , I - �, , Av I - I\, v ��, TR .1� , , 'I" ".. �. ... \ STA: 0 1 1232 , "", ; , .. , 1. \ \, " \111, ;" , OFF: 1 05 R 11 . ! \ , / � \ I I I I '. . , ` 5 " , I'\ `\ ­ ,.­_.__.,_.__, _.._-_1J____] ". \ \ �, N \ I " , I I -1. � I " I ' , ", .1 '. , ., I \ , I � " \ . . ! F _­-) i ! % I . I" 1�7\ \ \ ", [ -I- .1 \ . \ �, \ . I . \ '11, . . \ � % � 11 '. I I (,o , I I ____ f',��I, \ 'o , ,STA: 2+ __ _\ 1. �/:* , � . , ENCHj DRAIN\ L. X. . : 'AD 0 1 11 �`,,, \ -, \ " \ ..\ 'N. \ \ \ \, \ \,. ," , Z, , i . � , _._ , I z OFF: 126.28 R `%, , �, \ \ \ \ .1 "\ I ,,, \ \ \ .. " \ ," 1; I _... ­ -.-,-. I—— "..'...­'.. 1-1. ­1.11 I �, \ )") " ,� , R . _ "\` \- \ , - ;\I,�,-� _ .. ` .1 "' I � \ 1, 1 (;5, \ t ", " � � . � BUS i 0 �, I 1 - zS �LTE '� ()P ,.7. 5 � _. __ .__ ­­ ___ "'. \. I \1 \1 \ I . I \ " ., , - \ ! -,I- � 'r­_A0- �10: ", 1.111, N. \, . \ / \ -1, \ . 1� \. ", 1) , 1. \ 1� (14 i 0 -n _ . -, ­ ­T' "' , A— \ -- N , I', IN ,\ . i — � 11 -, , ,,�. ) J, ._ ., I I _­­Tj 1:� '. , ,,,, , \\ \ , \1 i � ! I 1� , i . ... ... �, " , ,., - \ \ , .. -.,/( I \ . - ,,, \ \ ____1 11 11�_ ,, I ------ � I , . I K) I /� \�Ao \ I , 1. .- I I \ \ I , - I ,.".;. - " - ." I 11 � , \ I I \ I \1 \ - " -1, 11%,, - ,- l \ \ I I\ 12 ; "Pi , , 91. 0 ,,� t"! ( I "', I :3 , . ­. , \ / , I // , I ! \ \ \ , ;�. " , . , � \ \ , I � ___ SEE A �,CH. DWGS I , , I I I \ Cn - �. __ ­ .... .. I ,,.�, \ \., ,,,\ , I , I \ : . ­�,, . , A b I N I . , , � - � . 0 1 1 -_ i .... .. , , , \ , I \ \ , \ 1_�­-j - \ N \ \ - \ , 1\ �, '. . : . , . , 1%, , 1\ , \ \-� -.., '. , I � 04 : �, \ , \ , , . _ I - ­1 , 1, �, �.­. � \1 . . ,.,-: *.' , \1 I \ I I ", I .. . I., , , , \ \ I .. . 1. .. I \ *-," \ I \ I I . , . "' , \ \ ,-,. I . .. , . . . \1 , , I �, . _,__­___ 1 ­11 . , " , " , I -*,-,- \ \ \ I !A'.: \ � \", - . . ... , I \, , \ .., \ )'I \, I , i � --- , ­__ \ , \ "'I, \ / 1 \ I "\ , . . , , , I I L j, . ,� I , , -,� I , \ , I - \ I . , \ _T_ I . " \ 'N \ " i" ­ ­ \\ .. I . .. . I . I , \ I \ T � .--.. . 11 \ �, , /11, ., �\ "".. \ _. , ; � -- \ / \ I I., \' \ A i i \ 11 \ 11 \� .�Ii.11 \ . I ", \ , % � I \,% !ELE64RICAL f: I . I \1 "_,� � I � , . - . . \ . �_ ., ., 1\ , � .- \'. \ I / 1 1 "I" I I ;: '11". \ \ . " " . .� .. . . ... . L , � \ ", , � I , , I " PA(z 4Ar7mT- i i I F.- - -----. (I", j ­1k - ,�­ �-�- .��,.­,, \�r­ - , - , - I / I I I " ", � \-,, i -, �, \ \ " .�, e - - . 1� \ I \ \ \ � \ � 1, �, , � I " I ! t__1 i I j . I I I cl) � I i �� � ! � . e-s .1 /j_1 ­\ �_, 111zq �� %, I", %, .... —_ - \ I- i. , �� I (1i \ \ \ I , .. -_ --k- t"­ '_ _'.),� � \ \ " I \ \, \ " ,, \ , 11 ". —, j_- ,_ ."k. ­\--,­�. .:>,. ,1� . , , /I \ \ " " \ .. ... \ I Vo): ', '. � ". \ "71 . i . \ \ , ,� I : %,.:: \ \ 1. \ I \ . �-.!, � . \ . , \ ".. - D_ I " \ \ \ \ , \, 11, 1. 1 � \. , \ , \ , 11� \ . X . I b.. . I , �,�, I I., \ \ :D Eo / I \ " .\ , .\ \ ,.\ \ "\, - - \ � 1\ -, N11 "'..t.... ) \ \ \ "' \ I , 11 ........ \. \ �!�,i- \ .*,�,: 4 1 \ , \ '\,, \ . .... ...., 1\1 "I. , ".. , .. \ \ I \ ":*. \ 1K I I \ % '\ . I......, I ,/ \ \\ \ \ 1\ . . .*. .,.,..`. 11 \ \ \ ! ,r�, � \, �. \1', \. �� . '. , \ , \ "I \ I I , I " \ \ 1\ \ . `,�- uj.:i 1,% \ , " (\. I � \ ,. " � . \ " j\: - , ., , '. 1Y 7'�-.. : - ':. I I \ ':, , � r, " "'I - 1. "'k I "I, .� - . _y , /C ". . �\ \ \,-- \ I Ap,Pf�'(--,,.,,/ ,-,) 'r I :: 1 / �­--`<: , , \ * \ t I, , I 14 �.. ! __ 1�,_ �,,. i� ".1 \. An 1. .1 \1 ". 1, I '. i - f.� - I \ \, \c�- A j I I I r . r, - \ \ . 9 "I �, I., . ,�. x f II, .,L. it-,-, r .1 : I . 11� * I I , , ,\ I q \ _�! , 1tT7�_ J ­­ ___ . \ \, M K \ \s . .. \ \ N '�, : I \ , -'. ! \ ,. . � . - .. t;,,.: 1 �/ � � "" \1 \ \ %AWN'�:'ROH 6�_)' 13A ",\ 1�: 1+76.09r . . 1%. \ \\\ \," , \' , I. "' , \ \ I .. I 1< \ \ N"') ! � ! . *2 11 � " -, \­". '-',,. \ I P. .. . . . " �.,. \ ,., , \, ,.\,. �, \ , . \ ',, \OFF: 93.34 R i� . �, , . , , I'- . / ­.... " \ "I - .. .... . IN. . 11, . �\ \ I . 0 - - 2�_ \\\ ". I . . I - , '� .. \ I I \ , , N'� ,\ " ." i ,,,- � I - \. , \ "'. _\--�- 1'� , � .,�,- - -�, \ � \x \,\ ,,,,, ,\ � i � 11 '60 , I.. \ , I '.,I \ 1, 1-,�\-. I I .. , - \ " - - , \ : : , I I , , , I I r - - \!' C-F$jj'/.�t: liw\-,�,,�"fo-E , 11 . \ , . . I � I I ­P�� 'v D I i i I "I I , . :A� . "�- N­­ ��. \ ,,�,e 1, _�! . " f,�p" , F" . \ " f \ \ I \ \\ ! I I.. I ! , I., - 1, .:,6 " , I �. I \ \ \ , I. 11 . , - I I,\ I \ \ , I ,i, , , - , ! ; -1 I .." I - `.' I ! )C( I , STA: 2+4386 -1 '. \ I I- S. - I � , \ , , i f I 1, ., . I \\ \ " ' .lfylu I 1, 11-io"L141.1d - *� -, \ I 11 : � I , 11 � . , � ! 1\ -\, .1 � P.. ­­ _­ . , � ", J\ , , � ip , 1toril-1.14- , � - , '. -� ! \ ' \ \ \ 'I 1, dl '. \ \\ \ ,)�,� i\\ '%,, %\' ,,, � ..� \" , , 1 " , � I ") � " . . ` ­­__'__'__'_ __­__'_ ­_ *. � ., \ I y . \ 1, 1, ,.. , \,.\ , ; . . \ \ . \ \ \ . , !�"-_, --DUM SIER. * , . " I- I.. ", 1, 11 �'.. \ , \ , I ., �j a -, (�, I \ ' . 'OFF: 54.33 R -'\ " \ ' \ \ 11 \ 1. I \ I ! '... � ! � I , \ .1 \ - \ \ " , s-� '.. ��j ­_.% \ , N� :\ " \ \ \ " � I ; I PROPERTY . - � . ! ." ,\"., I'll \ \ \ \ I \\ 'STA: 11+76.0V.ARED� ' \1 � �\_ `,_�_ \ - I \ k \ \ ! z LINE 1 1 i C., \ 1. \ . .., I ` - �__ \ I 1� , \ I - r'.. I , \ \ . \ I - ` \ ,\ ,, ', N, i '... I \ \%, \ ,EX. 20' PRIVXrE\ '. , \OFF: - 68.32 7 - " tB-- i . .-': , STA- 11+60.�7,\ \ \ \ %\ ,, i � ,�� . ., 11 . " . _ ; , \ % 1, N i ­ "o � , , , � I \ . _-.I." " �_.. %, * \ \ , tl. - I - '\ - . . , \ \ , - , - v DRAINAGE EASEMENT,, . - ­ . ­ 1 .. : . I I I \ ,, t , 4d I" A I \ \ \,! ,,, \ \ \ ", I . .. j : I j _f . OFF: 68.32 i R� ; 65\ I.. �j . . I I " -6 ! - ,,� I . 9 ' ' ` - " . r, 6 - . 1 -] .4 , I . , , \ DRAINAGE 114�;`-.-' - " I -� ...... �yb. 67 ' . . .1� .. I . . 1. ,, � . N" . . 1 11 1. i I I ", . , , "'t , � .pool \ . �. .4 ! SWALE- - - . I \ � " \ . . '. \ \1 ; - \ \ x .. ... , �.,,. - I. ... . I . . ... _�� '1 : -� \ ... .� - �-'. � ( � "'4.-,' 01 ) -1, I \� - ,, -\ .6% *. . , .. *I ... 1, ,6 1. .. . :- .1, , - I I � . , I V, - ,�i ') 4\,��q ol I \11 \ .. t \ 1 '\ �, \ \ � .�. .. , .1 1. '� ; N'. 11 , 1. " . . . . .., ., . i 1. � - , . t I- I s IJ � 11 I / / , .. . . , . '� . . . ..... ­ . �_ X. - _ . . . - - I -------- I . _- .1'...., _­i � I .1 . .: : t . I -. . -, \, ! \ \ ., .. .: I .... . . ". / /' .:.16 . .r. . " .. . . - I ; i , *:, !� " /L - - - - - - - - !; ... .. *. :, * " � I .1.... -.,. I . . . ...� . . ...4'. -- i-b. - - - - . . i STI . i .. i d 2+30.55 1 .: . - � , I . - . 7�=i� - ..4 . .%.6.. .5' 1 :; 1 ,,, I I ,�_ ,24,_-TC ,,,i--- . '�-�_-.-- ---- - - __5TA;__1 +30.38 . I , " AD , . . 1; I - — I ! ,\ ." ,�, ,- ---... X, I . . .f .. __ __- . . .... .. ) � 'I ..., -,r -------- ­_____-____­ --- . . OFF: r, 0 . ; I � -\- �L�L .. I . F-- - - - - .. _- _,�: - --- _____ *�-_, - - ��.. �? - I! � - " . ! .� - - - . ... , : 2+74.2b , �,:.. . ------ � " ,=.-. . --�-7= __ - - , I ! i - __ - --X "', .7 , 7 - ­ ' -,- t t�-4�- � -- - " , � I I ___ - . .. i ­ -7T _�_ . - --STA: 1+76. -----. _� ? � I - - i- _ -_ �,� ­,t ­­ ­-F. ; i - f , .�]A: 3.00, � L7 _. . 4 � - - - _7 =-�� i OF : 31.54 ve .: ,�. 69 . . 3 : . - `:��.� . vOFF: 33.42 I " CE3 I _­­­ .­J i I . - . 4f - U3. ! i O1T_'j,j.4 __R`-6`- . '.. i. ,- ..., 11 - . :. I � . .!., . 1117 ..;, -I. ­.. " - 1_ 1, I. - . . .. - � I . 1. . wl /I .� .1-f. . . , ; III:. .,. 4, . � I � - - � -_ .) 1. :.. .11 I , ... . . 11 I ,Tf. .1 _�x . ...... ­- ----I.., ..- ,. , , 'I.-,. 1, .0 . . . . ... - t .4 � . - - *. � ' . ., i -:- , ), : . I "4�.!.. I., .11 . ", .. 11 - , - , , - I * - . . . ,; . * " , � � , , F' 'I R'F-'A ", 0 0i _A I .. . I. * - - il.:.i.1'.f , -11,14 i ; I", ,e 4 ,1,-,pkb,..4:.... .�j .. . _:�"' '! r _­& . . 0 1 t, t, 11 i ... . 1, = 15' �4, :.. j 0, . - � .1. � , : 11 I I .�. 1. I , , I � . . .�V'1' - , . , '11�--� " I - t jFf C . ". &'.' . " 5.* - .� .t .-�? N-T�:�-- :; --.-.' r;�!o 1-,'-;',!'-','�'; '-�.- : - ' . .. ,. - , I .�A . . ....1-1.­.... I ""' !, _.. � _ . _­_ , . - ,R .-- �', . -� -� I . ...... _­_11 11 - - - -1 ..-.-..I- ... ­ �'.In: * ... ...... ­ ___ . ____,__._.__ 11, I __`_ I I, - I . � rmosm. 'C= ,wm_'_fl1mm___ Cm " -, ­ , , � , STA. 2+62.71 _VE G=-- --ammmw- - i \ --OR ma - I "", OFF: 16.56 4 \ SAWCUT , R EM 0 �t., IN 0= . __�,­ = 3 �R ., , I# ' " v � i 0 s I D'eWAL. �� . 8 5 . � \ x1.,51._,._._.__.,__ __.....­___1 ­ - , \ , 3+27.00 3+00 %,�� -L sgb"l ­_ EXPANSIONJOINT- I \ ; PS� SNI H 'o i \ __­._�1­2+0'0-­­- --­­------­--- --­--­---­ -____.______1_._ -_____-_ -,--.-, � 0 C ­­ ­.. ....­..".., ­­­ � ".. ...__­1 ... ­ I., � ... ... -,..,-.I—.., i . . ............ 4 . I -- '(,= , =1 — .--- _­ . .. __ -> 4­ ! R., I -pp - - UP- I-Ir-2- _.___ I - . .J." "I i I \ -, " ,,.--. 1---7, , 3 \ I , i-I 11 ; � \ � - ��_, � ! \ �. ") i (_X ,c22.30 � , I \111, ­smill I . r I 1­11 \ I . X � , i� ill -. �3 , -- , --, ,_ , -:. .. , 11 ..' - 'S � ai) roxc _..._.­..__._.1 � IN I ,I ,,, .. ; , I - , I I �t,�. :�. I ! !.. 'I . �'. , 41P I : :1. " _. ! 1. I O', "."`(',1,(,w.,) I I I ,,,, / .- i 6, 8 (), - - 1� 2 " C; �- 0�-:L-, 1) i ! I N, V, 7­ " 11. 18 01, .1 '.'� "' � p ( c r " i , - " "�'��". I !1.,�'.' -­ 1 9. 40111 ,,,, _--6,"C1'.P,v.-) ) i . 1 ! I I � - ___ _.__­� � - .- - N 01*18'22" E ----.-- -.-- ::�_+_ �__�__, s=___=__ - __ - X", rk. " Ll D_ _==� :-:==- ­�� F.- 3 9,:3 8 I I b., t.. ". � I \ , \ \ -\ \ 1, I \ �, I L-. 4- - 4__ , � �. *. ... I - , ,\, 1- I I NO: 960826074 . . . 1 .-,. �_ .­',;�qq, ��J. �, ��,,�, 1�� ,,,� _..; .1 I , 1\ 1, 1\ I _-.�"_:�-",�,,� � . A.F.' � - . ,.(I�.'., - ,_�.,,,�_` " . 1, \ , - "I i - I.... . 1, , ,, ". %"� , ��, ., I ,�- I..., 1i 1-4 11., 11 r-> .tz ,� .. . .. .. '.. \ \ 1. - "" \., . �\\ \ %� ." .�..." .. b . . . .. ..,. \ I N7- " \ " 1_1 11"_ ,,, I rl- , . I . . '. :. A \ \ , I" - . ... . 1\ I, 'I', ,", I.." 'I", \1 I " ." , , . -I- 0 .: ,`�. . . . \ \ , 1, , , I , o . . 1. li, . . , I .", ,, " '.. ,\ -I.' \ �, � 11 �o �, 7) -- o , I 1\ \ , " ", I , I" JIM .� , . . -, - :,'.* 14.b:.1- \ , 1, \ , % [,-� . .. .. . \ \ .., ,\ .1, \ 1, I "'.\ I 1 ;�7 1 . . .. � . . . *1, \ , , , .,,� ,.,\ I .... . .. ... . � , " , t z , 0) . : ... - .. 1. I 1, -." \ \ _\ I i i , L0 , ... .. 4 . . \ . \ \ \ " �,, \ I ; - . \ , , " I I \ . . , . \ \\,\ \ \ I" ,� \'\ ", "�' � k . 0 ., ,* . . , , \ 1�� 1, .\ , , � I I I I ') >. : - ... - .. .. !- . \ ., , ljl'%,, . I 1 6--, ". .. I � ", N , , � \ \ i III, , - - *4 .. . : * .: : , A - 0. ... , . N.,� , \ \ , \ ., I \ , ,.", \. I % � .) I I a Z 0 " , , \ \ \ I ., A - .1m I : - . . . . . . . . I \ ., \ N, ", , 1, � , � I - I ___ in . , , , \ , E'll", , , . 0 .. . '. .. ". % * \ \ , , , . , 1, \ 11 . � I I - N . . . � . . I 0 .. ,., \ , \ \ I .." I 0 . . , -.0 &.­ .. \ "IN, "\STA- 0+76.22',, \,,�, I ... � �1, \, I � I IL 1 1 I'l z I 7. .. i. ... - I : .. , \ . I I -11 _�, I ') N ... . . '. .,.\ ".. OFF: 64.91 R 'I, '\" \\ '.., .. I Z_' il o M .4 , , . '. � I I 1. \ " I ;& CN . 1. .. .Ir . . , 4 '* \ \ ". 1� . ., �,,, '\ %.... \ 1, \'. 1, " ­ .: . I- (-) . . . & , . \ " I 1\ . __ _. __ i ; . \ , , I I I I) . ... . . .. A \ \ it 111A 1! 1, LL_ . , , , , ., 1 o: I uj . : -1: 111�> , - . - - I " "' ` ' ' iCAL', \1' ,\ I " ,\. CrI. � I \ , 1 . i . - - . � 1--.1i 8.,�, , __� � I � . . . . _. .11 A,\ '� ", '\EASEMENT \ , ... 1� i .. < , /' 11 CJ . . � , , . ". ,; * I " , " �, I . , \1 , \ 1 9 i! " I ol . ........t ".. ... I. - / , �, \ , .-,.,A. F. NO. 960826074--,.. , � ill � .. ., .. '.. \ � L 1, . % 1� , I I ,�-.�-,i . . . �, 1 \ \ 1\ 1,.�, ',,\\.\ \ \ ", \ "', \ ,, ". I ; > 1i :.� V . :,.. b: .. . I \ , ' ' F . C-I . ..b.. .. ... . ..4 1 1 \ ', ', ,,STA- 0+ 1 9.03\\ 1 ­� I .1. i ... 'it. .., " ,� ," , ., 1. I �! il. 1 1 ;il Z. . . 4., .. . :: .1 . I." \ \' " \ ." -\,. OFF! . 54.34 '. 11 �.: \ ..& .. . � " " ,.- . \% \ ii . . , 1. I ,% . � ---��', , � . .... . . \ I ! I" ;.1, .�". ,� : � 0 / . . . b . . 1, X, �­ , 1�. .. ., - - . � 11 1 B - -, '�__' _L_"L:.Lx - - ... .:. I., _... 11 .. �. - r, I ; ! ::­­­_1­ ­­1 I , , - "" _­ - . - ..- - - . - - Ll�_,-- I __ . _­_, T" ,,�'_ "' 1 8. 1� :.110,i ',.!.,J�. . L..,\k,? . .. . .*. - --,� - "I . - � ., EX, 8" cF, 16*..� T I ", , r., . - --'--- * m 44 *. .. ' - . i 0 1� - ... fNV :�a 101.1"43 ; , C ". 7 ! . .� -'- '2114, " ... .. ____ .A, ---I,- -.--F. I , , ., ,;­ , , - -- --ft-, , . ... I 1 ) - �-_- F..,,, 4 , � . I ,,, - r., I..,:) w - - - b... . . - . i .:,, lk,,r� ... . . . AD I 'VICINITY MAP SCALE.- V4000.9 LEGAL DESCRIPTION — I I , . ____.� _��� ERS ST z uj z m r, ---f DALEY ST _ EDMONDS MAIN §L____ 'L z . w �z �il II ON � CN \ Cw 114- q I �\ � . I w - H, . � . -N- . :�: I < , �4 , P - , 11 �� 11 pq pq � , , ) M j C-) ,�\- ,Iz� n lqz . Ld � Cj K z z \e z Lu 2 3'- 0 _j � V) < Lu 0 0 < I Lu a_, _117 ui 0 0 _�� (n I - ') - ., -, /11� THAT PORTION OF THE SOUTH&_ QU,\Rl'.- JF THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THIRD AND.-DAYTON STREETS IN THE CITY OF EDMONDS; ET TO THE TRUE POINT OF BEGINNING; . - THENCE NORTH 1*18'22" EAST, A DISTANCE OF 263.88 FEET; THENCE NORTH 88'41'227 WEST, A DI,cTANCE OF 231,24 FEET TO THE EASTERLY MARGIN OF SR-104, AS I WASHING"ON BY DEED -RECORDED UNDER AUDITOR'S FILE NO. 2141566, SAID MARGIN. BEING A CURVE TO THE LEFT HAVING A RADIUS OF 500.00. FEET AND FROM WHICH INTERSECTION POINT T C *52'59" EAST; ' . . LONG THE ARC OF SAID CURVE TO THE LEFT AND CONSUMING A CENTRAL ANGLE OF 9*27'11", AN ARC DISTANCE OF 82.49'FEET TO A POINT' I '1 00, FEET EASTERLY, AS MEASURED RADIALLY TO THE "C' LINE, OF HIGHWAY ENGINEERS STAJ'i0N 20+00 - ------ rr,,: I 11 � THENCE SOUTH 23*25�_�7"_ WEST, A 1)1�,iANCE. 0'r b'l.I-b FEEF 10 A POINT OPPOSITE AND 80 FEET LASTERLY OF' HIGHWAY ENGINEERS STATION 20+68.17 P.T.; I . � I ­ . . ' ' � - ' � I THENCE SOUTH 1*09'15!' WEST, 80 F1­_,­F EASTERL . Y ANU PARALLEL'TO SAID "12' LIN-E, A DISTANCE OF � 1 1 06. . 83 .1. � � FEET TO A POINT OPPOSITE HIGHWAY I*NGINEERS STATION 21+75; THENCE SOUTH 4,V26'45" EAST, A D!';rANCE OF 28.10 FEET TO A POINT OPPOSITE HIGHWAY ENGINEER STATION 9+00 AND 30 FEET NORTHERLY, AS NEASURED AT RIGHT ANGLES TO THE CENTERLINE OF DAYTON STREET; THENCE SOUTH 88'41'22" EAST, ALON(: THE NORTHERLY MARGIN OF DAYTON STREET, A DISTANCE OF 249.74 FEET TO THE TRUE POINT OF BEGINNING; I FEET THEREOF FOR ROAD; SITUATE IN THE COUNTY OF SNOHOMIS�, STATE OF WASHINGTON. 11-1 11 ___111 , SITE DATA I I EARTHWORK QUANTITIES: . I NOTE: THE QUANTITIES OF EXCAVATION�AND FILL ARE SHOWN ONLY FOR THE PURPOSE OF OBTAINING A GRADING PERMIT AND SHALL NOT B[ USED FOR . CONTRACTURAL PURPOSES. : TOTAL AREA = 1.38 AC � TOTAL IMPERVIOUS = 47,293 SF = 1.D9 AC . TOTAL PERVIOUS AREA = 12,820 SF = 0.29 AC NOTE: AREAS WITHIN PROPERTY BOUN[ARY . - � v.** � 1 .17� .,�-,3 . ---- .- I - I -- ---- - , — ' ; ,0,` !40*� A! ' - - L I IJ______-__-.,.....__., ,_', / � , I /---- 1. \11 c . -4 -STA: 0+6 E' _�(. . P. . :�S,� 0+42 i-El- 7-:4- 1 I---- ----..-- - ` , LEGEND ' ' ' . . AD L .,:,? 'p -, 1_-��, INV, �:-- ,­41.1,i N10" `!�.!.�t -OFF. 38.00 w - Z:� . . . . _.. ul-F: 34.0 1!� !! ­778 1 ,`�,_..'z,,�., 4 . I-1 , " , * , - . - I I , - - � I i Z.-. ,,Z��.. . - , - I I , r­ ...___1 , 4* . .i . .. TRAFFIC FLOW DIRECTIO1 pL,6x !: -� " . .,. ,,� , (I 7�. ,'_ .. . .. . . " .,� � `.jF';` :-`,eA-r�' - - I .1 -'t-,, �� , * ; , , ­-,­ tl�ll ,.� �'� -, I E (1, `P , � V / , _Z�, �­ ­ -- �' , �\ "', ,:, - - __ __ 't;_. I __ __._ -­1 - 1* 1") L �,,., � ­. , , 1�_ R )PI-1 .) �_­­_._, , :,_,,. . ,­,. __,_`�. I 1 .61"00 ^v N," , ."", 1,.�, - C MMMM3 - . ­ e -,.,- .. 'Z�,_��.- -am --- -ammul .I , .Z., — - - — DRAINAGE SWALE am _-3- -.C=M*-- ­ ----( ..._____­­­__ `�, I �_ - -, �\\ I - -, "', - 3 ., , �', " ,,,, 2 ,.'.,.'%-,,, I _.- "' .,'Z�,� .." �, & ". ,,, ":,, " �,�,�.__ . r7VA1 �� �,..'­_�. z '--",. _­_-," ,Z,�Z, - - __­....______._, - I ­%-­,:� . , ,.'11.", ,�", 11 , ".., I` ___ /I / / ... ... - . ­­­ ­­­ -1_.1__._.____. HORIZONTAL '?Y� " ` -�--,,* - __ %,.�: E , I C� ,",'. -, 1,'� " I .,� I `_" - 0+0 \_',Isl.cqn-�.,i� %'�, . , ,,� - -.--.--.- ASPHALT AREAS - ­ � , ,.- F 'a\ -, ­ __ _­__­__X­ .. .. ... ONTROL-LINE-" __ ­ � -X")2. ,/ , � _.. � 0 ­ - _­ 0­ , ­ ­ ­ ... " b,63 -1 lz�___�' ... 1 -=--====_-7 _=Z==��_ .. �1­ Y " ,�:;­ . , , .. - _=�_ __ - I . .... .1 . _ - '_ ___ ___ / , . ­��. I _ee� . . I ­ ­ / " ­ 1�1 -'I' ,� )", .., , _11;�', . . "� I , �-_".`_ - ,- "I , ` ­�___�_____­__ `k� ""r .., " ��.,� , - .1, I .\ -,--- --F-:-- I \ "' , '' "' - \ TOP --- ..)J.) ,�OT A13 ! 0" -­ /"E-3 N . , ­.1 _�wv,iw, -� li�q!,! . ! i _�! -.1 - W/ = 9.38 NOT XG, I ,� -.9 1 ". ., � .,� .1 I . N01' A.B ­_­.�­­_4_1 ___ "I 1-1. " AD 0 ! ."". Ic . ..... �.,.� , R �t s',4 = 2.11. 5 I - *`� � , _. \j_x. S.,-- ` \ F_x Cli � B """' _� - '' " '' ." ..,. ..-.,� . AREA DRAINS -��.--...-�l-I..-.,),-t,�,!,-�---..--�--...--, 00 16*09'1 6' ____ �F. , .. ­­ (!:::�owdsmlz N'of* A . TOP = 1 1, BENCH`MARk . . !NV­­'1 2.74- 2,',-"CP(S','-,1) 6*4 I 6L3­(,v(E.) _�. ____,_ 1-ID E�,/ - """' "1\1'.., '",.�_._,._­' ....._." EK � ,­ 20.4j/ `-, - --- I ,, ., 1, "., CB 13 CATCH BASINS ­­ __.1�2..__.________ __/ I .:.,.1.,., ", , " ' 2,""-,P N) I—. --.-- - -�" -I , � , ., '. �. i,1 V:J2.9 -,., ____ . . !;4 � .1 .. , 2N TOP - 2 0. 6 9 11 . ..�., . . D A VE. S. I I , � '­ ! I - -; i , , 1� I ___ I/ ,�._�, ._., '. .,..,. .. , SDMH @ STORM DRAIN MANHOLE'S ; ,� -, - I INV = 1 2I.A, 4 -1 2 " (11 Ir I ( IN,` . ,, - ',,�� I.", N 15 � 1_,C'' , ____ I / / �. 1, , - I v - 6 � - I I P *** I ___� i N, v - !,'�_*5.'.'­,'1 2 " CP (-S) 11 ".1,., .." 1, PLACE "SlbEWpt 4 � v __� 1, I /I K !*I',-,--- __...'_�_? .____._­w_ qf Id< If4 C= I ____ .,r-\" �--Q'.­ ! ; ­�:�� ", , `�S ,� A 4eq-b ^ . .___.._1­­_­ ­­_.­­11 .__'.­_­1­­ _­_.1­_­__ ' /. 1�:_ A , _-) _,'!V1;--1 " , - _­_._..1____ ___� . ____ i - - "'"" ' ­_ ­­ - - ­ __ " ' I... I , S 16 A.1 1.4 r I- _­_1_6 Ij , i, —TEMPORARY. .... L --- ­ ��_____ -----.- R ',,'4,';= i . (' .z 1.�, = V_ 11-4 C=t AaeA , I.Nj\/._-;'.4_.1 _,"e�:.)(c-) & ,,,,.-,'y, __) I . ,� I-, 11! , � ,_ , :2 1 U N P L A T T E D BENCHMkR_K _­­ - .,! ,,') Im `�,, " ..� yo�/J-wps , - " � 1. I . - - _P I T A­­I�­ ­­'­­­__,_,_, *---*,-,---- ­ ----- _­ __ .----------- .-----'' " . ,_�11:14 MANVIN AND LESLIE NELSON � /1'k , � i .. �, w ewQi45v_s , BIC , !,,.�'V----,'Izl.,�8,-18"i�,!:,(I,il?�;_�/"��l!"(.,�";:".,) 1. � I .� 232703-4-085-0009 EL 20.90 --- A CONDOMINIUM ,.',� �kj 'j`.-_-­ 1,; "(";,.,�I.1�� I I " - �"11' / Al-l-Ex", U-770 �V, 4� 6782-000--XXx-xXXX � "' . :.. �, -1 ­". ... , - 4_->L>K1" !?'+44,��e cf-- .." -IV 7�'/,& -�,014�7 . ,o,ve� - - To'lpop-Azy coo's-ilwc-800\1 secug,(Ty 4�CC_ TD 56- PLAC-62S ,�A L�O 10 & a)U.S 7-1 A) 6 r-r-I le-8 I- VA./t-5- SO 45 TZ) QO A.1 7_) XtL49 . _11." .� 11.1,4 �,,V.. TAI 0 r-*4 � f __1\ I a) 0 //- -, -, e'zt_TT- -p A e- r- / A) C-,-- I ", � �'� ,Q,�"-,r4 V e_-, 70 4) - p f;v-� I I - Tb i " �. ,)T - : 1`�_. L I I Tl__3'�, I . __1 I --- .. - ., Ak" . I . . -, - I , / RC-CEjN!E:D_ AUG 2 7 1999 DEVELOPMENT SERVICES CTR. C Ty Ut* EDMOND' , DRA WING INDEX SHEET 1 , OF 9 - I-- , , i 1'r-i- - , ", - � 1, �� ! � \� i �, ­11'.Ii�"_�:. _ , , , li rl 0 i,r , . I SITE PLAN - L _11 j.�­ I - t 1�,­v _1 1. J-� / SECTIONS SHEET 3 OF 9 GRADING PLAN I SHEET 4 OF 9 UTILITY & STORM DRAINAGE PLAN TEMPORARY EROSION CONTROL AND DEMOLITION PLAN SECTIONS AND DETAILS SECTIONS AND DETAILS SECTIONS AND DETAILS NOTES 1. I ., .. '1-1�1_, i I . I I . I .. � . I 1. .1. ER`MIT SU > a � 0 C 2 C I- a- 0� C cr, ILL C z C Cn > LLj 0� 0 z > LIJ w . I - - — 0N `� 1114. I I �\ �_ 6-4 z cj� �� L-1) Z ;� �� � cl� �1:1 F_,� Ld _.) . - - . I (-) .", I . I " I AK k 1) ,7\-\ ��,t N11 N `� 0 1 . - to 0 1 -'�; 0 1 m 4 �� I �3 w . . 11- >� K, - - , AC 0 — ....." �'. � � � ___ _ ." I .<,,, . I - ., . � . A. J, I . . . . - �LNI � , , 11, I �, .1 ,�. .. '. - I . .,�, �"­ . lo �. , � I I ( ­ I 3- I., - � :� N , � Z9 %-I.b. 7N_ , _..j . M � _�j. , k� ,CK 2- - � - gu- :.;z g� Q Cj_ 11 ) 4�T , (f) � 19 41-T �,s q ( W_' 0 �' Q- C - ii N �) :;z-p —I . 4-1,0 w C..�, _() _0 , z- _� : z- (j Q14 - o .C)- � � Lo W �_ .. w LLJ z Ir H Ld _j g F= I C) I < I ge- I � (5 V) Co N\ �z '� . . N 1. �t\ �_ "��j '_� I __ rry . �E Q - ft. kj'� ( I rt L-L j �� C� 4z� .?.r %- Q s I — ,#< _N :<� �E t� , ()- :� cr) - I 0 0_ N_ '41. LU .C:t oa- C33 :;� � N Ir :z ,j ,.N w Cr 41: ) �s Qi . .� N- — W LI i __ -0 � .L u .0 0- (c) cf- z r., t r) CL,,;� < 2 F_ 0 w ) 0 SHEET _1 OF 9 ,­ � SECTIONS 50 45 40 35 30 25 w z =3 (L I DAYTON STREET 0 20 2Z 15 10 5 45 40 35 -- ...... .... 30 25 z (L 20 EXISTING GROUND 15 CL AVERAGE EXIcj'nNG GRADE = 17.23 MAXIMUM ALLOWABLE BLDG. HEIGHT = 30.00 IZZ 12 MAXIMUM ALLOWABLE clu ELEVAIION AT RIDGELINE = 47.23 10 ... ....... G% APPROVED FOR CONSTRUCTION w cld C) CM OF FDMO ENGINEER In FYI( -f c 610rr 29 RIDGELINE .LTL=46.75 GARAGE FF=9.5 - SCALE: HORIZ. 1"=10' VERT. 1"=5' SECTION B-B SCALE: HORIZ. 1"=10' VERT. 1"=5' OD cv) di ON 0) d L C,)l t1% cu c� In . I NORTH !4, A�� SCALE: 1"= 20 LEGEND SURFACE WATER FLOW DIREC11ON 19-00 FINISHED GRADE ELEVATIONS - - - GRADE BREAK 20 PROPOSED CONTOUR DRAINAGE SWALE E/. - SAS 9011,1NA161h PL A 11- 1.6-1 C�J( EX. QB uRAu U AN Ir.rl '(2j3 WNSHIP 27 NORT'H, RANGE 3 EAST ON1 2' *To I W. M. CF3 1-0,.84 S. k 104 TOP- 13,134 fj-,IVz:�7 24- 12"o k- ....... . ... 21_01'09`15" E PkIII.- f 04 r- A. Utj Top --- 13.73 ru !m..1 IHV=11.,9E3-I2_"CP0N) ' L 3'ii E X. C 6 IE". QQ 101"=13.61 ­9 2"CP(N) RIV- 12.56-1 2"(,P(-'1) A P 1 N v �.- 11), 8 1 - 1: iPIV= I 2.40-12"CP(5) L 0 111V= 10. 8 1 - 8"cp(s) EX. QQ I NV- 1 -0. 81-12 (,P I W) ;1 2913'1191* R 600.00' IN V=1 1. 56-12."CP(S) INV= 11.51 -1 2"W(E) -1 lei GEI x 13.62 R y I—] C L D IN C, 1\1 E S JI I Pl< x CB 1:3. 7 , 3 IfI'v*tzI 1.52-8"CP(N) I T4 _V 7 �4 9 -4 " f I VC El ECIRIC PDX It of A"Cr, EX. QQ RIM 15.10 MP=15.82 .4.81 m I 1-J., cly . ' . � Ii - 1 (1-4) -71,Z INV=1 2.12-8"CI-AP .4 1 i i I -z' / , SDMH INV--12.04-8"CP(S) N 1 6 Oct t 1 r SDMH _j I A& 0 15.87�� 44- Gv r-j 7 S.', J_- L I ;, RIM 15.64 RINI 14. $2 I i * -. !�i.00 I 1 .11, .. optk . . ....... .... Y S LI 94 F. IV T. i 6' cofvc R 90.00, 0 20.25. x - - 2 18.52 71 Fo IN"-., -24**cp(t_--" 7 40 2 It 1J. i CL >: 7 04 Z. .4- I< 637 IN", 7,82-24 CP(W FX'. C�*.':�.__ 3 CR DRAIOAGE SWALE ..jEX'. S'S).N11-1 �4 o 19.4 TO IRFA1NIrliff"IFT P;- AVIT % I . \ - ".4 ..... . .... -''BMITTAL I op I IN IN V a. 98­1 2"cv� ito k ; IN, 1,NV 1 (). 7 0 - 18 " C i-l(E) INV - 8.81ill-I 2­,-:p(-,%1i:-) I,' -IV 5 0- 2 i -)( s t: I INV 10 - - - c p ro 1� -i 0 E'XISTING 'E X1 STI [,.I Q Ile, BI.-OCK B'UILDING 'METAL BUILM4G A4 Bt7-- REMOVED B F. (RENA0YF`D. -10" i5.50 1211 0 0 0 0 CbNck6t, J� RETAJNING ............. 16.78 TOW 15. 0 20.25 BOW 12.16 PROPOSED A, 20.15 20.25',,. BUILDINC FF=20.25 7 1 90, 0 16.43 TOW 15.50 BOW 1 �.56 'EX C. 0 11 C. I . '0 K ['0 . VoIt"ED. it 20.25 .20.25 6.82 20.25 ITOW 14.30 'DRAIN 17.52' TRENC4 JIBOW 13.54 'P'i RIM 16.53 ...... 10 - EL 9.43,. .1 0.99 C14 OUTLINE 'OF 01 Of of UNDERGROUND Ld 17.96 PARKIN J� EL 10.63 r 0.25 20.�5.. cli ST RIM ADJU 2D AS NEEDED D APPRIDX.. LOC. Ex (i P.vc z RIM 1 5 _41114 ARY S"M R -FORCE TY IVAP) > I 12 EX. s! p 1 .20.00 It 12 �0. 20.2 V TREN�H DRAIN n: < RIM! RIM_i� 20.10.... EL 15.50 18.16 cc LIJ EX. CB 2021 -NOT 9.7' 20.10 oc 19.72 19.89 BOC 20.07 Boc 'A5 0 19.20 E". C B IM 19.73 ............ IOP 13.1:? NOT AA.3. INIV 10.33 NQT A.D. RIM 18.77" . ...... RIUJ9�68`% RIMI, 1 EX. C8 Irp 18'2. p 0 90.17 t�-, Lp ........... __­_...­ . ..... 2 9n nR 008, "FIROX. L A. 8 "'MERMAIN I v BOC 19.37 IE X. C B -393.88' ­f6P - 20.0 NOT /I.P., X. SS"t"Al-i INV 9-58 NOT A.B. N! -­ 21.51 ,1- 2.9 6-24 "CPIN) 2AT A 17A. V ®R FVT ,X=;J M E7 X. C, B TOP 19.0 NOYT A.B. INV 9.98 NOT A.D. U N - ------ F) rD 131C A 6 -1182 - 000-- X XX_ xXXX TOP 18.19 ,NV fi. 76-8"cP(E) fOP 11`1V KY14-12"CP(Il) ff,Pt/ 14.34-12"CP(S) - - ------- TOP 19,4 NOT A.B, MV 14.44 NOT A.U. 7.78 EX. SS11,fl-1 RIM=20.63 IN*,,'�-=114.21-24"CPIS) 24"0417) INV=I 4.48-1 A"CP�i'l 6 - ABANDONED w -4 uj cz cu I TOP ',4.'?-,) lk All IM AINAGE PLAN U TIL T r S TORM DR NORTH SCALE: 1"= 20 1 SECTION 23, TOWNSHIP 27 NORTH, RANGE 3 EAST W.M. EX S -S RO X. 3- ..r-* X. G 1.1 G9A RN V 4 6CA L E C [3 260 2 IF9 F9 IN FEM I Inch 20 feet S. R. 104 LEGEND T SURFACE WATER .84 10'. FLOW DIRECTION ".24" 1 "I"RIM 15 f 156.05, GRADE BREAK !N V=83. 1 7� ��"rp(rqw) 7 10 11.111, STORM DRAIN PIPE CIP ....... .... vv '61 ---PRO 56 Arl")PR(" 12"C-PtN) \ pqSED CATCH BASIN IN V.- 1 81 .)X. LOC. IN'v---::,2.46 12"l PROPOkD STORM­- INV- 1,, 1:51 ­;.V 7 CP(!3) 00 DRAIW_yMHO �,3 y. 14. 01 R - 600.00' APPROXIMATE Lp 101l AREA DRAIN 3,%. ol, ,CA1 - ----- 3P OF 8l CONC. 1�s -------- x 13.82 DS DOWNSPOUT ......... ..... .............. ............. :-I'j1­'y 1-101-D11\R0 PK GCO CLEANOUT PROVIDE TIDE CATE ON OUTLET PIPE , F CATCH BASIN. 1'. rC B DE GATES SHALL BE *11DEFLE)C MODEL AS MANUFACTURED I'X BY RED VALVE'COMPANY. Ill AVAILABLE THROUGH ANTEC 2_%'-P(1,Vj ... ...... CORPORATION, BELLEVUE, WA (206-454-2442t� i APPRO IMATE LOCATION COTG CLEANOUT TO GRADE I All OF l6r,0 S�NITARY S�WER �! 11 j17(, 1 TYPE 11-49' 'B I Rit, ROY - - 'A 3 FORCE AIN, 11ci+_ - * - 11 CONCRETE, AREAS /RIM ±15.10 FORUSTORM .. . . ....... I E 8.72 AL� SEE��g ....... .. I tj P - JYPE 11-49 9. QrO ,RO PVC DOWNSPOUT 12 *2 W i X. C B Cm D, S= IE 7.F(N) 10 CB 9. 1 [F- CMP- RIM t5.21515 I - - I N V= 12. 1 P_ - 8 C IM, I (IN )i RIM ±11 4.81 1 8 TYPE I CR� RAI �O.005 MIN. SB C IE ±6.88(ftty,�I,, SD, S=0.020 E­ 1-3-.66- INV=11.97-12"G, "!SW) 43P Z:: bt` IREPW ROADWAY 6 1. 1 . Eil 14 0 ' ' / I . r----, I* , .. DS CONCREJt CURB tK-- ... . 'kv / I . I I! . . __ , -7 - " - - SL GUTTEk lil ---- Pvc.- V.- 12.7 Lr 0 ':'X AL CONDITTN. I AND SID TO ORIGIN !. cv SD, S=0.010 07 ;j DS 4'14 s 6 0 UNDERGROUND. cro I v ul D ENT N TANK cc)/Vc 13 4 35`-�zz�:'Zz S=G,(.Ol 1 4 7- 50 TOT LF A IE IN 1 .53 -6`0 PVC DOWNSPOUT f REPAI ROADWAY AND DS IE OUT .90' DRAIN, S=0.005 MIN. 00.00, CONC ETE CUkB & Plk-,-�COTG. JE­-.� - --------------- - IGINAL E ­3 GLITTE AND �IDEWALK f C-L D )s 0 INv 1�.40-24"Crj[`E) ! I i-.1) 17 Top `15.65 ONDITION. .1 V_ 1 47 M. INV 0 PVC -Ss X1 s -ri G. K3 S '21.2 LF Er 4p _14 ('SPR 35) 0 S=O .021t Dt CLEANOUT, TYP.- ir B M L.J BU11.- 91 _'K 113 U, L 1) T CLEA40 r, Ds 0 FEID T(` 13E AT PROF 13 R E 1-10 V DS ti 00. I Ar, 1�0 6"0 PVC DOWNSPOUT 10 . 1. 1 1. . I !A DS 15.: 0 ..0 00 DRAIN, S=0,005 NIN. b(ISTING' NlL" GAS,,,Ll all IN, y Ic N .1 0 0 N A� K 4. > 0 CIS4-" ...... .. ... ..... CL0 URlS LINE J(BY OTHERS Lo bs TO d.0000INATE INSTALLATION -'OF LIll I DS MTH PU ET1 SOUNd Ell A INIMUM OF DS 3-.,WEEKS PhIOR TO CON�TRUCTI N. REPAIR RO WAY AND s J�- r CONCRETE RB & COTG PROPOSED GUTTtR AN6, SIDEWALK E 14.58 BU1LD1NG*,. TO O)RIGIKAL'CONDITION. L G, T 1 7 16 21�1 FF�r,?6.2t '-�E R040"t'M E X.. C TO 0 9" 18.4 TOP �.5.77 ... ... . ..... T S'D�' S--0.02 Fo_ J! I V. SEE ARCH. DWGS INV 1N V 7.82 "(Jl -Ili FOR— PATIO -AREA--' DS E' ZVO 6E 11 AREA DRAINAG (CUz-,,.,Cb CRETE PROD OR M AL TYP AREA DRAIN'. DS ..CONNECT TRENCH DRAIN ....... ..... .. D� TO "MECHANICAL DEWATERING.. JDS RIM 16.53 -SYSTEM, EL 12.65,. % E c, B 0 4. IE 15.03 k W WGS) 'MECH. D AR I'- __ DS ;Kv 9.07 f"jol" ob os ------- 13.2 LF 6"0 LIJI SD, S=0.020 SD, S=0.020 31.7 LF 6'0 DS - - - - - --- - - - - r tr 0 CONNECT TO 7. i39, EXIST. SDMH AREA DRAIN I cz� IE 14.77 RIM 19.57 b E, DS C, APPR I% j7r, S S S. 11, 31 CMP. U) C) JLF IAAII Sb,'SX20 15. s 0 D1 71 L� 6% z E X. k�.J�J�,:_]--C4:-,13��R_h_, -im D r, K. 711 SD, ' -"0 035 JRENCH DRAIN -T TYPE'l CB IS -. -. EL 16.50 CIS AREA DR4q,:: RIM 19.30 ' -D IE 14.50. 19.85. RIM IE 16.57(E&W) jr. ­ IE- -1835 D IE 17.80(N) V S'. Ds I.DS EX. (.3-4.9 LF 1 CrO CMP. CONNECT TO LF 4!'0 -T DS D 0.005, s P-V TIDE BOO CONFIR ED F EXIST. sdmH',. - C SD, S .!NV,,= `E IN 140(E) 1.0 RE. I �S ESTRUC ON Ms EXISTING COTG DS. w 0 Cp S �'-`--IE 15 29 VOR T140 tHE OTHE` AAREA DRAIN Ero CP b �fi 0 -7 EXISTING C DETE ON TANK 7 RIM NOATION D NMI S EX. CB ------ - IE- 1-71.92- DRAIN_ STORMWAT�R A3 UMRTION�'TAN 0. A. B. -5"0 WATER NIV -3:5 NO] > IM 19.68 IE_ 16'52'-- METE� VAU AREA DRAIN 7 1 -) T E" CJ3 19.28 19.4 NOT, A.B. IL f6'.78_'_­__ 44o r t p 0,1V 114.44 1 Op 0 RE A FIM!T,111 1' [Sj I E. X. 'IEp 7.78' Ail- W90 N 0 ... ....... .. . IRE HYD.­' _35A. LF.-A-ITO Z3. Z L ff'O CMP S=O. 0 CMP SWFFf?ox' 10c' 1 -Alr-r�504 S=0.020 RREASSEMBLED' STATE S=0.020 CB Of TYPE 1 APPR. DOUBLE DETECTOR .... ........ .... .. ..... RIM-_.A8.7.7__.J ..... . ..... 1A, � __ ­­­ Z:­­1__­-___ -, * - I CHtCK VALVE ASSEM. (10' TYPE 1 CB -.1 ...... - ------------ PE-'-l---CB I MAX.,, LINE) j 4, FRO TY c1ri,91E.,?l 4.96(S) X. (I 'El E _01. _J H [7. x IE 16.12(S) TOP -T �.-'O.O NO IE 15.87(W&N) k19 X. T�gE IE 12.42(lil 111v - 9_1"'. ".p. AAA -.4t)RE32. GATE 'VkLVE INV 9'x TEE cl., LO F A H BA N C TC RED1' S U )EL A MAN FAC U 13LE T14RO GH ANTEC 54_2442)i I ��p r 87 RES. GA TE VALVE 4!'0 VALVE Fj ij, PLACE CATCH BASIN Q 2AID yj v r" 6"0 VALVE EPAIR ROADWAY AND E X 7' 11 22. V., 1. A IN -LINE OF THE EXISTING"O" 20-69 16eVO FIRE S M LINE CONCRETE CURB 'NV 8"0 CONCRETE SD PIPE ............ . UTTER AND SIDE K ;Nv TO ORIGINAL CON ITION. RE, R3, M-4- S. E .. . ... ..... 3 m 20 - -------- r E L 4 zoo� OR L -H '0. (0 w M r- -H 15 10 5 0 20 . NATURAL (LOCATION 3TING POW CATION AP 9 6.6 �F 1 EXIST. 6'0 SS I (LOCATION APPR LEXIS�. 870 CONC. � 3S IE 9 6± (1.1' CL _j APPROX) STO SCALE: HORIZ. 1"11 VERT. 17 I Mt S=O-020 15 Lq 101 ­­-­ - EXISTING GROUND __34.9 -z 10; In 00 Of Lu L" __XIST. WO F )ETENTION TA z 00 0 6:2 < af� 20 35.6 15 10 5 zmlll 4 7 tj EXISTJ 48"9 DETEN ON, STO SCALE: HORIZ. 1"] l VERT. 1 GROU 0 U-) H 00 w (A 17� :;tj "It z W 2i co ON Lu _j a REFER TO CHART z r in Z U- - < 20 Lu Jj < l 0: % z 0 PS Ar. LLJ 0 -7 EL Ld LLJ % _jm -------------------- --------- _i 0 2-1/2",SIMESE HOSE CONNECTION t < U I - - - - - - - - - - - - - - - - - - - - - - - - (AS REO D BY FIRE DEPT) I PRE -ASSEMBLED. DOH STATE APPROVED DOUBLE DETECTOR CHECK VALVE ASSEMBLY I ICHECK VALVE 6- 18" 1 (TYP) 18 MIN. MIN. n-L---n 0 w FL JO E:2 03 71 00 FL X FL TEE S L) al z A FLANGED COUPLING ADAPTER 3: 2! D 00 4SENSUS SRII W/TRPL z Do REMOTE READ. THE TRPL SHALL BE INSTALLED ON HATCH CLOSE TO HINGE ---------- - ------------------------- --------- A. A. D'OBLE LEAF LID (MODEL-L.W. LATCH- TYPE D)\ LADDER PERAPWA STD PLAN #41 VA UL T SIZES ALIGN WITH HATCH. METER SIZE AND TYPE APPROXIMATE EQUIP DIMENSIONS INSIDE VAULT DIMENSIONS (EXCLUDES SIMESE CONNECTION) ALTERNATE UTILITY VAULT NO. A 8 C D LENGTH WIDTH HEIGHT 4- X 3/4- 2'-9- V-1- 0'-6- 4'-3- V-16" I 4'-2- 4--0' 6- X 3/4- S-9" V-2- 0--a- 5'-6- 8'-4- 4'-4- 6'-2- 8- X 3/4- 4*-5"1 V-4" 0*-9" 6'-4" 10'-6" 5'-0" 6'-2- 10" X 1" 6*-0" l'-8" W-1 1" 8'-6" 12'-0' V-0- 6'-2- GENERAL NOTES: 1. SPRINKLER CONTRACTORS LIKE TO ADD 4" OUTLET TEE DOWN STREAM FOR FIRE DEPT. CONNECTION. 2. ACCESSES BY L..W. HATCH: TYPE "D" ( H-10 PEDESTRIAN LOAD; HD-10 TRAFFIC LOAD) TY OF EDMONDS ,ago-199V T PRE -ASSEMBLED STATE APPROVED V- MIN. DOUBLE DETECTOR VALVE ASSEMBLY .9. STANDARD DETAIL COMMERICAL DOUBLE DETECTOR CHECK ASSEMBLY (PLAN) rE 3/15/99 SCALE NTS DWG NO. E7.8 PIPE RESTRAINT 16' MIN. SENSUS SRII W/TRPL REMOTE READ, 5/6, X 31,V 7 - It. . % : -:4 All 4 A. A DOUBLE DETECTOR CHECK VALVE rgK (31-In SCALE: NTS 1kit (atfru rr-il �A APPROVED FOR CONSTRUCTION All" 0 0.+4el- 29. fill DATE f I Q LQ (3 w L,j z _j Lli F_ _j F- 0 L wj L-1a U_ N uj M V) cr) %4 QL SHEET 4 OF_2_ FILE NO 142 Alm- E Cl CD cki V-4 c IIII a*I lo: u w 11- PI cu cno ul C13 TOP '12 INV AND "hRA Aguh Y ERO"I"UN CON79"R"U'"I A us'EMOL11110N PLAN _lttMPU H NORM RANGE 3 EAST, W.M, SCALE: 1*= 20 SEC TION 2 TO WNSHIP 27 NOR I n S. R. 104 NOTE: _F Y. CB 1. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAI TOP=;13.84 FRON AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE W=7.24-12"CIFI(III) . .......... .... ..... . . ..... . .......... - ----- CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS INV=7,19-12"CP(`M, AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF N V= 7 94-8"MI I_­y CIQ UTILITY CONFLICT NOTE: CAUTION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 0 1-800-424-5555 AND THEN POT HOLING ALL OF THE EXISTING UTILITIES AT LOCA71ONS OF NEW U11UTY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BANNON ENGINEERING, INC. (360-297-7479) TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. Top- CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE MINIMUM EROSION AND SEDIMENTATION CONTROL REQUIREMENTS 1*0 IN1,1J) CONTRACTOR SHALL NOTIFY 'THE PUBLIC WORKS INSPECTOR AND ANY EX. CO Ev. C13 Ill 11. 5 8 - 1? C P ('N) / - . ...... -CHANGES-REQUIRED SHALL BE APPROVED BY THE ENGINEER PRIOR TO 1. STABILIZATION AND SEDIMENT TRAPPING. ALL EXPOSED AND UNWORKED SOILS, INCLUDING SOIL TOP=1161 rOP=1 3.61 ------ ------- -OF STOCKPILES, SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS WHICH PROTECT SOIL FROM THE FEROvIAIN N--S COMMENC6KIENT CONSTRUCTION ON THE PROJECT. I NV� 11AV-= 12.56-1 r) 11X- LOC. EROSIVE FORCES OF RAINDROP IMPACT AND FLOWING WATER. APPLICABLE PRACTICES INCLUDE, BUT ARE !N'V=zl 0.81 -1 2"C!"60 IN V-1 2.4(,- 1.2"M S, EX. CB NOT LIMITED TO VEGETATIVE ESTABLISHMENT, MULCHING, PLASTIC COVERING, AND THE EARLY APPLICATION OF Top= 14,01 GRAVEL BASE ON AREAS TO BE PAVED. FROM OCTOBER I TO APRIL 30, NO SOILS SHALL REMAIN I NV- 1 1.56-12"CP UNSTABILIZED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL REMAIN CNA PHIC SCA L E 114 V�- 1 UNSTABILIZED FOR MORE THAN 7 DAYS. 2 - ------ ......... ............ 2g 0 AT ALL TIMES OF THE YEAR, THE CONTRACTOR SHALL HAVE SUFFICIENT MATERIALS, EQUIPMENT AND LABOR Y k-011-1-ANG L_Al\-q`[_*_'­S ON -SITE TO STABILIZE AND PREVENT EROS;ON FROM ALL DENUDED AREAS. IN FEET) C B I Inch - 20 feet I OP-! 5.09- PA Ild I N 11 - Z. L)"MIN" S-;lJIN-.-lwlJL;IIUN, lHt CONTRACTOR SHALL BE REQUIRED TO CONTROL ON -SITE STORM WAZER RUNOFF BY USING TEMPORARY OR PERMANENT DRAINAGE EROSION/SILTATION CONTROL PROCEDURES. INV PR�T�.Cl ELEC'MC BOX EXI I 6rO PVC TEMP. 3. CONTROLLiNG OFF -SITE EROSION. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES TYPE 11-4ff CB SEDIMENT TRAP SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE YA. LIGHT -u -PIPE- OF STORMWATER RUNOFF FROM THE DEVELOPMENT SITE BY THE IMPLEMENTATION OF APPROPRIATE EIMPS TO III' 46r UTLET TYPE CEI RIM 1" .81 OUT 8.72 EX. QB 12 2 F I tO J,-A MINIMIZE ADVERSE DOWNSTREAM IMPACTS RVA 14.72 INV 9.97(W) TOP 15.65 IIqV 7.40-24"(P(I INV 7.38-24"CP( C) LiJ IE IN 11.55,.� (T , .) \N IE 7., - iN 11 Cmp S S=qa z -, '8, \ .. , T 2-8"CNW(N) IE ±E .88 W&E) PM Ir N V=. 1 2.04-8"CP(§) 4. STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE a mamalm -.2 :I`4V--11.97-12"CP(SW) CONVEYANCE CHANNELS SHALL BE DESIGNED. CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED FLOW VELOCITY FROM A 2-YEAR FREQUENCY, 24-HOUR DURATION STORM FOR THE REPAIR EX ING PIK T 3 @Q0 UTTER, CATCH BASIN LH J kvg, POST- DEVELOPMENT CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT )CURB AND -,I [PROTECTION, STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL AND SIDE K TO Ll 5 'o, - Z:-:- i-) CONVEYANCE SYSTEMS. 6 EXISTING NDITION x U - - f, 11 -Tq nn q 0 100.01 MAIN INI KAAr)p n0grPAPI C n"DIKIIIIII Ki -r H Ki 5. STORM DRAIN !NLET PROTECTION ALL STORM 103 < iij 1 1 1 __j N EX. CB TOP 15.77 !NV 114V 7.82-24"CP(,,� EX. C8 70p SI tNV 9.02 NOT A.B. 64 PR( Pol EX. Sz-., m I I 1-0 TREAi"ki 1,4.r PLANI RE NE SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT I P E) ISTII G" FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. G(j 7--rr- F1 E HYbRA4T 6. CONSTRUCTED ACCESS ROUTES. WHEREVER CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAV ED ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT (MUD) ONTO THE PAVED ROAD BY USE Or APPROPRIATE BMP'S SUCH AS A STABILIZED CONSTRUCTION ENTRANCE. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY, AS A MINIMUM, AT THE r4 END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVEUNG OR SWEEPINO AND 13E I-XISTItIlIG EXISTING SILT IJENCE TRANSPORTEb TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY CL it _.ly� zzz IRLOCK BUILDING31 i'METAl. BUILDII AFTER SEDIMENT IS REMOVED IN THIS MANNER. 7. REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE Y. TO 13E REM101VED TO BE REMOVED REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY EIMPS N1, N ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON -SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL OF TEMPORARY BMPS SHALL BE PERMANENTLY STABILIZED. if f 8. DEWATERING CONSTRUCTION SITES. DEWATERING DEVICES SHALL DISCHARGE INTO AN APPROPRIATE PROPOSED SEDIMENT TRAP OR POND, DESIGNED TO ACCEPT SUCH A DISCHARGE, PRECEDED BY ADEQUATE ENERGY INTERCEPTOR ........... .. it L j BUILDING DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE. OUTUN SWALE 9. CONTROL OF POLLUTANTS. OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON -SITE DURING CONSTRUCTION SHALL BE HANDLED AND LEGALLY DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM OR SURFACE WATERS. POLLUTANTS OF 7L-� CONCERN INCLUDE, BUT ARE NOT LIMITED TO, FUELS, LUBRICANTS, SOLVEN TS. CONCRETE BI-PRODUCTS AND CONSTRUCTION MATERIALS DEMOLISH AND REMOVE DEMOLISH AND REMOVE RISTING BUILDING EXISTING BUILDING 10. MAINTENANCE. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS SHALL BE L MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. cis 1 L77. IT - - - - - - - - - - -- ALL MAtNTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE WSDOT STANDARD PLANS. i It EX CoNc. 1,01 BE REIvio'VED, THE APPUCANT SHALL BE RESPONSIBLE FOR ASSURING THAT ANY SUCH FACILITIES DAMAGED DURING I -7 FLOODS, STORMS OR OTHER ADVERSE WEATHER CONDITIONS ARE IMMEDIATELY RETURNED TO NORMAL OPERATING CONDITION. KiSTABILIZED i I J, I CONSTRUCTION SEQUENC CONSTRUCTION 1 11 %, q ENTRANCE 'pX 17.71 PRIOR TO CONSTRUCTION: UT RRTl­` lEt TYP . . . . . . . . . . y`II­ly Y, Ld CONFIRM THAT ALL APPLICABLE CONSTRUCTION PERMITS HAVE BE SECURED. A 5 2. SCHEDULE A PRECONSTRUCTION MEETING WITH THE CITY OF EDMONDS ENGINEERING INSPECTOR. CALL (425) x 771-0220 XT 326. 0 3. POST SIGN WITH NAME AND PHONE NUMBER OF TESC SUPERVISOR. 0 0 APP11%OX. 1.0h, -IVC FX. 6" SANITARY SE16I F"ORCE 4. LOCATE EXISTING UTILITIES AND INITIATE COORDINATION WITH UTILITY AGENCIES. MAIN (FF DEMOLISH AND REMO MPA CHY MAP) EXISTING ASPHALT c) 5. INSTALL S:LT FENCE AS SHOWN ON PLANS. - m D E M 0 LI �R- Ak&�RM dit L4 Q -jf,) -t3 E� L4W� D Ltj N 6. CONSTRUCIll INTERCEPTOR DITCHES AND SILTATION TRAP AS SHOWN ON PLANS. EXISTING ASPHALT U. 7. INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCES. A I REMOVE EXISTING 18 - if LIGHT AS NEEDED 8. IMPLEMENT ADDITIONAL SILTATION CONTROL MEASURES AS DIRECTED BY THE CITY AUTHORITIES ANDI AS _j LIJ SHOWN ON THE PLANS. ,.---E X. C 13 N�, tICT EXI 701:1 20.0 NOT AA. ER POLE 8 HNV 9.34 NOT @ _j DURING CONSTRUCTION: __j 1. STRIP BUILDING AND PAVEMENT AREAS. _x. CB PROTECT EXISTING jp -.--.--MANHOLES . ....... -- ------- REMOVE TEMP. 18.9 NOf'AJ3, .4, FK'tl" Ci3 RELOCATE FIRE INV 110.33 NOT All. 2. OVER -EXCAVATE AND REMOVE LOOSE OR SOFT MATERIAL TO A DEPTH THAT WILL PROVIDE A STABLE BASE C.; -PIPE AND­REPAIR-- 'Ey. FOR STRUCTURAL FILL AS SPECIFIED IN SOILS REPORT. RE -LOCATE. EXISTING..-.. HYDRANT-;W­ SDMH AT PIPE jr-p ':X. CB NEEDED -�-EX-36"I-10( TYP. ION. ----..- AS NEEDED PENErRA EX. 48" Hf.)PE 1--x. F5, cp TOP = 19.4 NOT A.B. 3. PLACE AND COMPACT FILL MATERIAL IN ACCORDANCE WITH SOILS ENGINEER'S RECOMMENDATIONS AND/OR p INV 14.44 NOT A.D. ...... ..... PROJECT SPECIFICATIONS. 1'.:X. f�LAI EXIST. VAULT L I APPROXIMATE LOCATION APPIRIOX. r - -- ---- AT 1 4. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF EDMONDS STANDARDS AND OCATE OCATION OF MANUFACTURER'S RECOMMENDATIONS. EXIST. FIRE HYD.---- FRRRS--AS E -PROT-E-GT--EXISTING.,______ T�4 PROTEaT EiCSTING. 5. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE RELOCATE STOP-., A3AWC,(gTl-'. II YWWRII VAULTS, MANHOLK, . ...... ------- LINE, TYP. AND THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY TESC MINIMUM SIGN AS NEEDED"' CATCH BASINS, REQUIREMENTS. io MANH LE - .... . .. . ......... .. 6. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DA DURING THE DRY S ON FOR YS EAS \EX. CB TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR TOP 20.0 NOT A.B. '13 1Y t EQUIVALENT. '58 110 T A. 6. 01�21-__ \ 1-:x '­B I*0Ij !9.0 NOT A.B. IN V \_Ext smil ------ I N V 9.198 NOT A.D. Torl 18.19 INV 16.76-8"GP(E) RIPI 7. BEGIN SITE STRUCTURES AND UNDERGROUND UTILITY INSTALLATIONS. f-p E X. C I _3 I.-V , I. ) 96-2,11 70P - 23.69 2ND A VE. S. I N V = 14.4-4-12"MM) < 8. STABILIZE ALL AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 14.34-1 INV CALL TWO WORKING DPYS 14V=16.- -4 p X. Ssm-rj APPROVED FOR 0�81utljc ...... ------- . ......... BEFORE YOU DIG Rl�. 2 0. 613 9. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. INV = !8.80--12"C0(N1I-\ D INV=14-21-24"CII(S) 10. FINAL GRADE, COMPLETE SITE WORK AND PAVE SITE. '�IJE INV - l'I 12-CP(-S1.') AWONI AND LE, ALI ANbCNED i ' , BIC A P I - "' INV = A CONDONII 2,32 4­ 08,15­000,1 UTILITIES UNDERGROUND LOCATION CENTER AFTER CONSTRUCTION: GINEER 040-lp-r 1. LANDSCAPE AND PROVIDE EROSION PROTECTION ON ALL DISTURBED AREAS. GrTY OF EDMONDS DATE 2. OBTAIN FINAL SITE APPROVAL FROM OWNER. AND CITY OFFICIALS. -------- --- -- E ro"I'M I T S U-110"346 M I T T A L 0� cr c z w 8 5 DOI zi bi Q ON CIN - - CA \- tr) c\j CII cj� L3 Z Lsj LAJ LAJ k FzI L_Aj VI (\j -I CII 7 Yj La v Zz co I-_ z Lli -1 F- 0 -0 - C Q ­7 �E r DIS o uj Is SHEET �5 OF-2- FILE NO I 7'-V' WIDE SIDEWALK BITUMIOUS TACKCOAT ON CONCRETE PRIOR TO ASPHALT PAMNG 12" MIN. ASPHALT & BASE CONCRETE SLAB PER PAVEMENT DETAIL--i l"R 4 Y4 j k > REFER TO ARCHITECTURAL & 6r THICKENED STRUCTURAL DRAWINGS FOR EDGE OF ASPHALT CONCRETE SLAB DIMENSIONS 1&11: 6-1 z ITY-1 �ql'L CONCRETE AND ASPHALT PAVEMENT A DETA L SCALE: NTS 1/fR 2% 4 is, 4 7" j4. 44 .14 SCALE: NTS NOTE: 1. FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED. 2. DUMMY JOINTS SHALL BE PLACED ON 15 FOOT CENTERS. DUMMY JOINTS SH'.'", S&E, 1/2'xl 1/20. 3. THRU JOINTS SHALL BE PLACED ADJACENT TO CATCH, BASINS, INLETS AND AT POINTS OF TANGENCY ON STREETS, ALLEY AND DRIVEWAY RETURS. MAXIMUM SPACING SHALL E 30 FT. PRE -MOLDED JOINT FILLER SHALL BE 1/2' WIDE AND CONFORM TO AASHTO DESIGN M213. 4. ALL JOINTS SHALL BE CLEAN AND EDGED. 5. CONCRETE SHALL BE CEMENT CONCRETE, CLASS 3000. 6. FINISH SHALL BE LIGHT BROOM FINISH. 7. THE FINISHED CURB SHALL BE SPRAYED WITH A TRANSPARENT CURING COMPOUND COVERED BY WATERPROOF PAPER OR PLASTIC SHEEIING IN THE EVENT OF RAJN OR OTHER INCLEMENT WEATHER. CURING TIME SHALL BE FOR A MINIMUM OF 72 HOURS. 8. ALL CURB AND GUTTER SHALL BE PLACED ON A MINIMUM OF 2* OF CRUSHED SURFACING TOP COURSE. 9. DUMMY JOINT 1/2"xl 11t BETWEEN CURB AND GUTTER AND THE SIDEWALK. INSTALL 1/2' EXPANSION JOINT MATERIAL, TYP. CEMENT CONCRETE CURB & GUTTER SEE'DL7AIL 4 THIS SHEET APPLY TACK COAT BETWEEN ASPHALT AND CONCRETE ASPHALT & BASE PER PAVEMENT DETAIL XN 12" COLORED WARNING TAPE—` TRACER WIRE FOR NON-METALLIC PIPE 1/2" EXPANSION J u- I INT ... Lf . 4 1 A �-4 "'4 '57 '�-4 27 CRUSHED SURFACING TOP COURSE, COMPACTED TO 959 DENSITY CURB AND GUT.17ER AT SIDBNALK ME T A � I L— SCALE: NTS Ko PAVING SECTION SEE DETAIL 3, THIS SHEET. REPLACEMENT PATCH TO BE 1" THICKER THAN PREVIOUSLY EXISTED Cr MIN, LIPE O.D.1 10 MIN. I-f- -- - I - PIPE TRENCH DETAIL SCALE: NTS CURB AND t; is MIN. GUTTER 0 0 <�"- 0"(,> . f 0 <11 0 ­4 0"o 0 e� 1 0 'c .4 SIDEWALK 0 Li 0. 'L 4 A :f 3 Ulm NOMINAL DIMENSIONS VOL 1 WIDE TACTILE o", 0 0 0 0 0 0 CURB AND 0 0 5' MIN. LONG GUTTER::� C. 0 0 0 RAMP AT 12:1 MAX. SEE TRACTION GRID .**i .. :A DETAIL, THIS SHEET . 4 0- 0 0 0 .0 0 /,> 0 0 < 0 < 0 0 , /0 0 0 0 0 0- I"> < 0 0 .4 > > \/ .11 '�"> 0 06, 4 RAMP TRANSITION I , <1 .. '.. 0 0 0 0 0 0 10:1 TYP. > '�' ^ �> '\ 0 NOTE: <> SIDEWALK* 1 - AT LOCATIONS WHERE NEW RAMPS ABUTT EXISTING CURB, GUTTERS, PLANTER STRIPS, AND SIDEWALKS, CONSTRUCT A.- NEW RAMPS TO MATCH ADJACENT SURFACES. . A 2. FORM INSPECTION REQUIRED BEFORE POUR. 5' MIN. LONG HANDICAP RAMP SHALL BE POURED SEPARATELY RAMP AT 12:1 MAX. FROM CURB AND GUTTER. SEE TRACTION GRID 7'-d" WIDE SIDEWALK DETAIL, THIS SHEET HANDICAP RAMP TYPE 2 DETAIL K­8-� SCALE: 1"=4' Qy HANDICAP RAMP TYPE 1 A DETAIL SCALE: NTS 'X 127 TRENCH BACKFILL COMPACT TO 95% MAX. DENSITY BEDDING MATERIAL FOR FLEXIBLE PIPE PER WSDOT STD. SPECS. RAMP TEXTURING IS TO BE DONE WITH AN EXPANDING METAL GRATE PLACED AND REMOVED FROM WET CONCRETE TO LEAVE A DIAMOND PATTERN AS SHOWN. THE LONG AXIS OF THE DIAMOND PATTERN SHALL BE PERPENDICULAR TO THE CURB. GROVES SHALL BE 1 X DEEP AND 1/4!' WIDE. INSTALL 11Z EXPANSION JOINT MATERIAL, TYP. 1 r 4- SIDEWAL Ljj . . PLACE l' WIDE TACTILE 1' BEHIND START OF RAMP 5" THICK SIDEWALK .11 4 4 NOTE: LANDSCAPE AREA, SEE LANDSCAPE PLAN 1. SIDEWALKS SHALL BE A MINIMUM OF 6' THICK, AND SHALL BE CLASS 3000 CEMENT CONCRETE, WITH AIR ENTRAJNMENT (MIN 4.57., MAX 6.5%) 2. FULL EXPANSION JOINTS SHALL GENERALLY BE PLACED TO MATCH THOSE PLACED IN ADJACENT CURB & GUTTER, WITH MAXIMUM SPACING OF 30 FEET, FINAL SPACING DETERMINIATION SHALL BE DECIDED BY THE INSPECTOR IN THE FIELD. 3. SUBGRADE SHALL BE COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DENSITY. 4. THE FINISHED SIDEWALK SHALL BE SPRAYED WITH A TRMSPARENT CURING COMPOUND COVERED BY WATERPROOF PAPER OR PLASTIC SHEETING IN THE EVENT OF RAIN OR OTHER INCLEMENT WEATHER. CURING TIME SHALL BE FOR A MINIMUM OF 72 HOURS. 5. ALL JOINTS SHALL BE CLEANED AND EDGED WITH AN EDGER HAVING A 1 le RADIUS. 8" MIN. THICK CONCRETE WITH FIBER MESH (2500 PSI) 67 MIN. COMPACTED DEPTH CRUSHED RO.CK RA -SE COMPACTED SUBGRADE NOTE: PROVIDE CONTRACTION JOINTS AT CENTERLINE OF DRIVEWAY AND AT 20' INTERVALS ALONG LENGTH (SAWCUT 1.5' DEEP) TYPICAL CONCFEM PAVING SEc'n0N DETAIL_ SCALE: NTS 31W EXPANSION JOINT AT PROPERTY LINE 15' RADIUS TO FACE OFCURB 311T EXPANSIO JOINT SECTION A -A EXISTING PAVEMENT 24' MIN. CONCRETE DRIVEWAY DETAI SCALE: NTS 2� MIN. COMPACTED DEPTH TYPE "Er ASPHALTIC CONCRETE 2" MIN. CRUSHED SURFACING TOP COURSE MIN. CRUSHED SURFACING BASE COURSE COMPACTED SUBGRADE TYPICAL PAVING SECMN DETAIL 3 SCALE: NTS SWALE CEMENT CONCREM VEFMAL CURB DETAIL 7 1 6 SCALE: NTS 15' RADIUS TO FACE OF CURB Z)MWUV I UK XLMUVE TO NEXT CLOSEST JOINT EXISTING CURB AND GUTTER I I :F R L -2 Z- ct -k ;Z ;� rz, r- F14 01 MhAl-1`1- A I HEL-COR ALUMINIZED c".r.f.1 -M�m� - -.-- STANDARD FRAME AND GRATE RIM EL 15.64 6Cr0 TYPE 11 CATCH BASIN WITH CONTROL STRUCTURE AltO OUTLET PIPE - - - I T EXIST. STORM DoRk'!N SYSTEM FINISH 307 SQ. GRADE -�. i -0. 12* Pvc SLEEVE �� FIBER JO!n PACKING ItO SD PIPE 0 MANHOLE STEPS TYP., 1 t O.C. NOTE: 1. CLEAN -OUT PIPE AND FITTINGS SHALL BE PVC 2. STRAIGHT TEES ARE kl* ACCEPTABLE. CAST IRON LOCKING RING AND COVER, SEE DETAIL BELOW SEWER CLEAN -OUT DETAIL K-2-s� SCALE: NIS ls�jy CEMENT CONCRETE CLASS 4000 6' GASKETED SPIGOT CAP OR MECHANICAL PWG �0�1 5'0 DETENTION TANKS c CRUSHED SURFACING BASE COURSE, COMPACT IN 8- LIFTS TO 90% MAX DENSITY 31eO STEEL ROD OR #6 BAR WITH BITUMINOUS COATING (10' O.C., 2 MIN.) SECTION B-B NOTES: 1 - ALL SUBGRADE PREPARATION SHALL BE PER WSDOT/APWA SECTION 2-06. 2. STORM DRAZ,11/0ETENTION PIPE INSTALLATION SHALL BE PER WSDOT/APWA SECTION 7-08. 3. ALL CMP PIPE SHALL BE CONTECH 12 GAGE ALUMINIZED STEEL TYPE 2 PIPE, OR EQUAL. ALL STORM DRAINAGE PIPE SHALL BE ADS N-12 CORRUGATED POLYETHYLENE PIPE WITH A SMOOTH INTERIOR, OR EQUAL. 4. ALL CONCRETE SHALL BE CLASS 3000 OR AS NOTED. 5. ALL REINFORCING STEEL SHALL BE GRADE 40 OR GRADE 60. 6. COMPACT ALL FILLS IN 8" MAX. LIFTS TO 90% MAX. DENSITY. FINAL 2 FEET OF FILLS SHALL BE COMPACTED TO 95%. 7. CONTROL STRUCTURE PER WSDOT STD PLAN B-3 8. PROVIDE TIDE GATE ON OUTLET PIPE OF CONTROL STRUCTURE. TIDE GATES SHALL BE "TIDEFLEX" MODEL AS MANUFACTURED BY RED VALVE COMPANY, INC., AVAILABLE THROUGH ANTEC CORPORATION, BELLEVUE, WA (206-454-2442) 90* BEND 45* BEND PROTECT PLUG FROM CONCRETE A B c c AY A ---PIPE SIZE P L U G G LED 'CROSS PLUGGED TEE PLUGGED CROSS D B 13 221/2" BEND TEE '�"�PROTECT PLUG FROM DEAD END CONCRETE WITH POLYETHYLENE BLOCK CONCRETE AREA IN SO FT AGAINST SOIL FOR EACH PIPE SIZE LETTER 6r ir 1 cr 12" A 112.3 4.9 8.4 13.0 18.2 B 1.5 3.5 5.9 9.2 12.9 C 1.2 2.7 4.5 7.0 9.9 D 1.0 1.4 2.3 3.6 5.0 -NOTE: CONCRETE THRUST BLOCK SHALL EXTEND FROM PIPE FITTING TO UNDISTURBED SOIL. CONCRETE SHALL NOT BE LESS THAN THE TABULAR VALUES SHOWN. CONCRETE BLOCKING EXISTING �rO WATERMAIN - EXISTING IrO WATERMAIN - IOWA_ mlwo 12"o OVERFLOW EL 13.69 PIPE SUPPORT PIPE 20f 1.58"0 ORIFICE Rw ANCHOR EL 12.10 1270 N-12 SD OUTLET PIPE--\ ------- HANDLE HEL COR ALUMINIZED I FLOW IE 8.90 STEEL TYPE 2 PIPE LZ SLOPE.O.005 44 SEE NOTE 8 IF A an ..4 CLEANOUT/SHEAR lb I GATE: Wo MIN. c*4 NON-SI-IRINK METAL PIPE-'..'' GROUT, -P(P. RESTRICTOR PLATE y MANHOLE STEPS WITH 1.3S'll ORIFICE W'll TYP.l 120 O.C. _Cr 4 '1 .091 44 . 4.. -A Al SFC.TION A 60`0 TYPE 11 CATCH BASIN GRAVEL BACKFILL FOR PIPE BEDDING, C MIN. COMPACTED DEPTH FOR PRECAST BASES ONLY DEMMON TANK W/CONTROL SMICTURE . A I DETt% L 1" = 2'-Cr lzD _QENNERAL NOTES A. INSTALL MH FRAME AND LID, CENTER OVER METER (SEE STD. B-606) B. WHEN INSTALLING TURBO -METERS WITH A STRAINER, A MINIMUM OF 5 PIPE DIAMETERS OF STRAIGHT RUN OF PIPE IS REQUIRED UPSTREAM OF -rHE METER. (A MINIMUM OF 10 PIPE DIAMETERS OF STRAIGHT RUN OF PIPE SHOULD BE USED UPSTREAM OF A METER INSTALLED WITHOUT A STRAINER. THE DEL"El ON OF A STRAINER, HOWEVER, IS NOT RECOMMENDED.) C. DO NOT INSTALL CHECK VALVES AND PRESSURE REDUCING DEVICES UPSTREAM OF THE METER. D. EXTERNALLY WEIGHTED CHECK VALVES AND PRESSURE REDUC;NG DE�jCFS SHOULD NOT BE LOCATED CLOSER THAN 5 PIPE DIAMETERS DOWNSTREAM OF THE METER. E. UNWEIGHTED CHECK VALVES SHOULD NOT BE LOCATED CLOSER THAN 3 PIPE DIAMETERS DOWNSTREAM OF THE METER. F- VALVES IMMEDIATELY UPSTREAM OF THE METER SHOULD ONLY BE FULL -OPEN GATE VALVES. BUTTERFLY VALVES ARE ACCEPTABLE IF THEY ARE 5 PIPE DIAMETERS OR MORE UPSTREAM FROM THE METER. DOWNSTREAM, FULLY OPEN GATE OR BUTTERFLY VALVES CAN BE USED. 3' WATEPI SERVICE CONNECTION D` E T A I L 3 SCALE: NIS CUT -INS TO EXIS11NG C900 OR C905 PVC, C.I., OR D.I. PIPE REQUIRES: 1-lEr D.I. NIPPLE 1-(MJ) SLEEVE (LONG) CUT -INS TO EXISTING A.C. OR STEEL PIPE REQUIRE: 2-le D.I. NIPPLES 2-ROMAC FLEX COUPLINGS #4 0 16" O.C. #4 0 21" O.C. CONCRETE RETAJNING WALL DETAIL SCALE: 1 3 7 1. ADAPTER: MJ X FL, DI 2. .3" SENSUS TURBINE METER 3- 3" GATE VALVE -FL X MJ, R/S WITH HAND WHEEL. 4. CENTER METER INSTALLATION IN THE VAULT.' 5. 4�O GATE VALVE 6. CONCRETE VAULT -SIZE AS REQUIRED, INSTALLED WITH NO BOTTOM 7. PLACE VALVE SUPPORTS UNDER VALVES AND SERVICE LINE AS REQUIRED. 8. 470 DUCTILE IRON PIPING 9. STRAINER ATTACHED TO METER. 10. 4!Xl DI REDUCER 11. �YO DUCTILE IRON PIPING 12. 8"x47 TEE 13. frO RESILIANT SEAT GATE VALVE 14. TIO I Er LONG D.I. NIPPLE 15. ROMAC FLEX COUPLING OR (MJ) SLEEVE ME7MRAlor r%t ir-&AAln--W- A a ION Q Li ;-Et L L-4 Qc L a L VA U . _u LQ R_! LQ 00 N uj a- ol 9$ :Z la '5' Z kZ� SHEET 7 0Fj_ FILE NO I CONCRET PAMNG Qy - FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE.--N ACO TRENCH DRAIN WITH 4! END CAP (K100S CHANNEL OR EQUAL) --\ TWNCH DRAIN DETAIL A - WIRE MESH SUPPORT FENCE FOR SILT FILM FABRICS I/- WIRE STAPLES FT OR RINGS ACO GRATING. CLASS E (461 SLOTTED DUCTILE IRON GRATE OR EQUAL) 3/8" EXPANSION BURY BOTTOM OF FILTER 6' MAX. MATERIAL IN Erx1f TRENCH Li SILT FENCE _DETA1L__r4-NN SCALE: NTS \c) MAINTENANCE STANDARDS I. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WTH THE SPECIFICATIONS. 2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DiM9aONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SV&EPING. THE SEDIMENT COLLECTED BY SfWING SHALL BE REMOVED OR STABILIZED ON -SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBUC SWETy. IF IT IS NECESSARY To WASH THE STREETS, THE CONSTRUCTION OF A SMALL SUMP SHALL BE CONSIDERED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP. 4. ANY ROCK SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 5- F VEHICLES ARE ENTERING OR EXITING THE SITE AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED 70 CONTROL TRAMC. E E E 04 WIRE SUPPORT 6' FENCE --\ FILTER FABRIC MATERIAL PROVIDE WASHED GRAVEL BACKFiLL OR COMPACTED NATIVE SOIL AS DIRECTED By LOCAL GOVERNMENT 4!' TO 6' QUARRY SPALLS Sk N�!'k r- dlg�____ 'M 'N -n NOTE: ALL DIMENSIONS ARE SHOWN IN ENGLISH AND [METRIC]. COMPONENT NO'S: (2)TREE GRATE 9002-0001 MATERIAL: CAST GRAY IRON ASTM A-48, CLASS 358 FINISH: NOT PAINTED WEIGHT. 310#/SET I 1—N. 19* MIN.j I-fxt WOOD POSTS, STD. OR BETTER OR EQUIV. Li SECTION All z Po 4/w STABUZED CONTRUC11ON ENTRANCE DETAIL r6--� NTS 1QD TREE 43RATE _DETAIL_'Z� SCALE: \�Jy PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA R=W(203mm) TREE GRATE HALVES BOLTED TOGETHER W/ (2)1/2-13 X S*STNLS. STL. HEX. BOLT AND HEX. NUT W/. WASHERS NEENAH RETROFIT TREE GRATE (R-9002) AePROVED FOR CONSTRUCTION QUARRY SPALLS 6" MIN. THICKNESS o,c-)-* ")- a DATE f SEDIMENT SHALL BE CLEANED AFTER EACH STORM EVENT 1210 FILTER FABRIC, MIRAFI 4_� 1 OOX OR EQUAL, WITH r CB GRATE ON TOP SUPPORT EDGE AROUND FABRIC WHILE NOT BLOCKING DRAINAGE PATH CATCH BASIN PROTEC11ON DETAIL 3 SCALE: NTS \�y SLOPES 6% 0 TO 6% OR GREATER SLOPES 2 2 1:Z' MIN. 2' MIN. - INTERCEPTon swALE D E T A I L SCALE: NTS rlf�nr-^M A­­­ w w I V%� STANDPIPE AND GRAVEL f9LTER CONE FOR TEMPORARY SEDIMENT TRAP -DETAIL -7 NTS 5 8 CATCH BASIN "THIT&W m�� m 00 C14 - Ir It N t:3 z 4 LZI 0�_ Q�. Q3 !R cv Fl� rLl�j Olt Zj LQ ism Zi 00 N_ _00 SHEET 0F.2— FILE NO Ilip A AR 40 �n SEC TION 23, TO WNSHIP 27 NOR TH, RA NUE, a EA 8 T W. M. GENERAL NOTES 1 - ALL WORKNI'ANSHIP AND MATERIALS SHALL CONFORM TO THE MOST CURRENT S TIANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION (APWA), WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT). 2. THE CONTRACTOR SHALL MAINTAIN A SET OF THE ACCEPTED CONSTRUCTION DRAWINGS ON -SITE AT ALL TIMES WHILE CONSTRUCTION IS IN PROGRESS. 3. ALL DIMENSIONS SHOWN ON THESE PLANS AND THE EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR 'PRIOR TO BID AND CONSTRUCTION. ANY DISCREPANCY SHALL WARRANT IMMEDIATE ATTENTION OF THE ENGINEER TO RESOLVE PRIOR TO PROCEEDING WITH CONSTRUCTION. 4. THE ENGINEER DOES NOT GUARANTEE THAT THESE PLANS ARE CONSISTENT WITH PLANS, SPECIFICATIONS, SHOP DRAWINGS, ETC., THAT ARE PREPARED BY OTHERS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND VERIFY THAT ALL PLANS AND SPECIFICATIONS ARE CONSISTENT. 5. 11T SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SCHEDULE/COORDINATE/ATTEND ANY/ALL REQUIRED PRECONSTRUCTION MEETINGS AND INSPECTIONS BY EACH RESPECTIVE GOVERNING AG�NT. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL PERMITS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION. 8. THE LOCATIONS OF EXISTING UTILITIES ON THIS PLAN IS APPROXIMATE ONLY. THE CONTRACTOR SHALL CONTRACT THE -UNDERGROUND LOCATE7 CENTER AT PH: 1-800-424-55559 AN'p NON -SUBSCRIBING INDIVIDUAL UTILITY COMPANIES 48 HOURS IN ADVANCE OF THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL PROViDE FOR PRPTECTION OF EXISTING UTILITIES FROM DAMAGE CAUSED BY THE CONTRACTOR'S OPERATIONS. 9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFE TY OF EMPLOYEES ON THE PROJECT AND SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF FEDERAL, STATE, ANP MUNICIPAL SAFETY LAWS AND BUILDING CODES. CONTRACTOR SHALL ERECT AND PROPERLY MAINTAIN ALL NECESSARY SAFEGUARDS FOR PROTECTION OF WORKMEN AND THE PUBLIC AND POST DANGER SIGNS WARNING AGAINST KNOWN OR UNUSUAL HAZARDS. 10. DATUM IS FROM EXISTING BENCH MARKS USED DURING THE DESIGN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO CONSTRUCTION TO ESTABLISH CONTROL FOR THE PROJECT. 11. WHERE CONSTRUCTION IS CARRIED OUT IN AREAS WHERE LANDSCAPED, APPROPRIATE MEASURES SHALL BE TAKEN TO RESTORE SUCH AREAS TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. SUCH AREAS SHALL INCLUDE, BUT NOT LIMITED TO SOD REMOVAL AND REPLACEMENT OR RESEEDING AND REPLANTING, SUBJECTED TO THE APPROVAL'OF THE OWNER. 12. CERTIFIED RECORD DRAWINGS ARE REQUIRED PRIOR TO PROJECT ACCEPTANCE. 13, ALL DIMENSIONS SHOWN ON THESE PLANS AND EXISTING 'CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. ANY DISCREPANCY SHALL WARRANT IMMEDIATE ATTENTION OF BANNON ENGINEERING, INC., TO RESOLVE ALL PROBLEMS PRIOR TO PRPCEEDING WITH CONSTRUCTION. 14. CONTRACTOR SHALL RECORD ALL AS -BUILT INFORMA71ON NOTING ALL VARIA I TIONS FROM THE PLANS AND SUBMIT COPIES TO BANNON ENGINEERING, INC. 15, ALL WORK AND MATERIALS AS INDICATED ON THIS PLAN SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS OTHERWISE SPECIFIED. SANITARY SEWER NOT 1. ALL CONSTRUCTION SHALL CONFORM TO THE STANDARD SPECIFICATION FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS. 2. ALL CONSTRUCTION IS SUBJECT TO. INSPECTION BY . THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF PROJECT SCHEDULE TO PROVIDE SUFFICIENT TIME FOR INSPECTION PRIOR TO AND DURING THE WORK. 3. ALL SANITARY SEWER PIPE AND MATERIALS SHALL CONFORM WITH WSDOT STD. SPECIFICATION 7-17. PIPE BEDDING TO BE CLASS "B" ACCORDING TO APWA STD. PLAN. 4. BACKFILL TRENCH OF NEW SANITARY SEWERS SHALL BE COMPACTED AS SPECIFIED IN WSDOT STD. SPEC. SECTION 7-17.3(3). 5. MANHOLES TO BE PER WSDOT STANDARD PLAN NO. B-23a. 6. ALL SIDE SEWERS SHALL BE LAID ON A 2 PERCENT MINIMUM GRADE. CONTRACTOR SHALL NOTIFY THE CITY IN TIME TO PERMIT INSPECTION OF THE SIDE SEWERS PRIOR TO BACKFILLING. 7. SIDE SEWERS SHALL BE INSTALLED PER CITY OF EDMONDS STANDARDS. 8. SIDE SEWERS STUBS SHALL BE MARKED WITH 2"x4!' WOOD STAKE. THE PORTION ABOVE GROUND SHALL BE PAINTED WHITE WITH BLACK LETTERS LABELED "SEWER" WITH DEPTH INDICATED. 9. SEWER LINES SHALL BE CLEANED AND TESTED IN ACCORDANCE WITH THE CITY OF EDMONDS STANDARDS AND SPECIFICATIONS. 10. ALL UTILITY LINE EXCAVATION BEDDING AND BACKFILL MATERIALS, AND COMPACTION SHALL BE PERFORMED IN ACCORDANCE WITH SOILS ENGINEER'S RECOMMENDATIONS AND THE GOVERNING AGENCY REQUIREMENTS. 11. ALL METER BOXES, CLEANOUTS, AND GATE VALVES IN PAVED AREAS SHALL BE SET FLUSH WITH FINISHED GRADE AND HAVE CAST IRON CASINGS. STORM DRAINAGE NOTES 1. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEE OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF THE' LOCATIONS SHOWN AND FOR DISCOVERY OF POSSIBLE ADDITIONAL UTILITIES NOT SHOWN SO AS TO AVOID DAMAGE OR DISTURBANCE. THE UNDERGROUND UTILITY LOCATION SERVICE SHALL BE CONTACTED FOR FIELD LOCATION PRIOR TO ANY CONSTRUCTION. THE OWNER OR HIS REPRESENTATIVE SHALL BE CONTACTED IF A UTILITY CONFLICT EXISTS. FOR UTILITY LOCATIONS IN SNOHOMISH COUNTY, CALL 1-800-424-5555. 2. ALL CONSTRUCTION SHALL CONFORM TO THE STANDARD SPECIFICATION FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 4. ALL, -REQUIRED STORMWATER RETENTION/DETENTION FACILITIES SHALL BE CONSTRUCTED AND OPERABLE PRIOR TO PAVING AND BUILDING CONSTRUCTION UNLESS OTHERWISE APPROVED BY T H E C " 01F EDMONDS. 5. ROAD RESTORATION SHALL BE PER CITY OF EDMOND S STANDARDS. 6. ALL ROOF DRAIN STUBS SHALL BE MARKED WITH 27X4!' POST SHOWING DEPTH AND MARKED D RAIN". 7. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH WSDOT 7-02.3(l). IF, IN THE OPINION OF THE ENGINEER THE EXISTING FOUNDATION IS UNSATISFACTORY, THEN IT SHALL BE EXCAVATED BELOW GRADE AND BACKFILLED IN ACCORDANCE WITH STANDARD SPECIFICATIONS. PIPE SHALL NOT BE INSTALLED ON SOD, FROZEN EARTH, OR LARGE BOULDERS OR ROCK. 8. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE* PIPE. COR PIPE -ARCH IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, COMPACTED TO A DENS11Y OF 95 PERCENT. REFER TO WSDOT STD. SPEC. 7-04.3(3) AND STD. SPEC. 2-03.3(14)C, METHOD B & C. 9. ALL GRATES (INLETS, AREA DRAINS, AND CATCH BASINS) SHALL BE DEPRESSED 0.1 FEET BELOW FINISH GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE, INLET, AND CATCH BASIN FRAMES AND GRATES JUST PRIOR TO POURING OF CURBS AND PAVING. 10. ALL CATCH BASINS WITH A DEPTH OVER 5 FEET TO THE INVERT SHALL I BE ATYPE IICATCH BASIN PER WSDOT STID PLAN B-lc OR B-2f. 11. STANDARD LADDER STOPS SHALL BE PROVIDED IN ALL CATCH BASINS/MANHOLES EXCEEDING 4 FEET IN DEPTH. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REPAIRING ASPHALT AND GRAVEL SURFACES DISTURBED AS A RESULT OF THIS CONSTRUCTI�`-�\l UNTIL THEY ARE ACCEPTED BY THE CITY OF EDMONDS. WATER NOTES 1. ALL WATER MAINS SHALL BE PRESSURE TESTED AND DISINFECTED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE CITY OF EDMONDS AND THE STATE OF WASHINGTON HEALTH DEPT. ALL PRESSURE TESTING SHALL BE DONE IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY OF EDMONDS. ALL MAINS TO BE STERILIZED PRIOR TO PLACING LINES INTO SERVICE. 2. DUCTILE IRON PIPE SHALL BE NEW, CLASS 52, CEMENT -LINED, CONFORMING TO ANSI STANDARD A21.51 (AWWA C-1511). PIPE SHALL BE PUSH -ON JOINT OR MECHANICAL JOINT. PUSH -ON JOINTS SHALL BE FURNISHED WITH A SINGLE RUBBER GASKET AND SUITABLE LUBRICANT TO EFFECT THE SEAL. MECHANICAL JOINTS SHALL BE OF' THE STUFFING BOX TYPE, INCLUDING RUBBER GASKET, CAST IRON GLAND, AND THE HEAD BOLTS AND NUTS TO EFFECT THE SEAL. ALL. JOINTS SHALL CONFORM TO ANSI STANDARD A2 1.11 (AWWA C- 111). EACH LENGTH SHALL BE PLAINLY MARKED WITH THE MANUFACTURER'S (DENTIFicATiON, YEAR CAST, THICKNESS, CLASS OF PIPE AND WEIGHT. BOLTS FURNISHED FOR MECHANICAL JOINT PIPE SHALL BE HIGH STRENGTH CAST IRON, WITH A MINIMUM TENSILE STRENGTH OF 50,000 P.S.I. 3. TEES, BENDS AND FITTINGS SHALL BE CLASS 125 DUCTILE IRON OR CAST IRON WITH -A LIGHT CEMENT MORTAR LINING, 4. CONCRETE BLOCKING SHALL BE IN ACCORDANCE WITH THE STANDARD BLOCKING. 5. WATER METER AND SERVICE FROM MAIN TO METER LARGER THAN 2 INCHES TO BE INSTALLED BY CONIFRACTOR. 6. VALVE BOXES SHALL BE CAST IRON WITH ADJUSTABLE SECTIONS 18-INCHE . S TOP �S'ECTION AND BASE SECTION AS REQUIRED. 7. BEDDING FOR PIPE SHALL BE CLASS "B" PER WSDOT STANDARD PLAN NO. B-18C (PEA GRAVEL FROM 4 INCHES BELOW PIPE TO SPRING LINE, TRENCH WIDTH 40 INCHES MIN., OR 1 1/2 TIMES PIPE DIAMETER PLUS 18 INCHES, WHICHEVER IS GREATER). BACKFILL SHALL BE PLACED IN 6-INCH LAYERS COMPACTED TO 95 PERCENT OF MAX. 'DENSITY PER WSDOT STD. SPEC. SECTION 7-10. 8. ALL WATER MAINS TO MAINTAIN A MINIMUM COVER OF 36 INCHES BELOW FINISH GRADE. WHERE UTILITY CONFLICTS OCCUR, WATER MAINS ARE TO BE LOWERED TO CLEAR. GRADING NOTES 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARDS AND SPECIFICATIONS. 2. TEMPORARY SILTATION I CONTROL FILTERS SHALL BE APPROVED FILTER FABRICS. 3. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED BY TEMPORARY SEEDING AND MULCHING. 4. COMPACTION. ALL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95 PERCENT OF MINIMUM DENSITY AS DETERMINED BY THE U.B.C. STANDARD NO. 70-1. FIELD DENSITY SHALL BE DETERMINED IN ACCORDANCE WITH U.B.C. STANDARD NO. 70-2 OR EQUIVALENT AS APPROVED BY THE BUILDING OFFICIAL. 5. ALL SITE WORK MUST CCMPLY TO CHAPTER 70 OF THE UNIFORM BUILDING CODE (LATEST EDITION). 6. A GRADING PERMIT ISSUED PURSUANT TO CITY OF EDMONDS REQUIREMENTS AND CHAPTER 70 UBC AND APPROVAL OF THE TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN SHALL HAVE BE OBTAINED FROM'THE DEPARTMENT OF PUBLIC WORKS FOR ANY ON -SITE GRADING WHICH IS NOT EXPRESSLY EXEMPTED BY SECTION 7003 UBC. 7. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPFOTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. CONSTRUCTION SEQUENCE PRIOR TO CONSTRUCTION: 1. CONFIRM THAT ALL APPLICABLE- CONSTRUCTION PERMITS HAVE BE SECURED. 17Y...... ....... I'll, ............... !III ............ lllr� %ill", I I lry_y__�\, .2. SCHEDULE A PRECONSTRUCTION MEETING WITH THE CITY OF EDMO I NDS ENGINEERING INSPECTOR. CALL (425) 771-0220 XT 32F5, ll,_)k�_.ol 3. POST SIGN WITH NAME AND -PHONE N UMBER OF TESC SUPERVISOR. 4. LOCATE EXISTING UTILITIES AN P INITIATE COORDINaION WITH UTILITY AGENCIES. 5. INSTALL SILT FENCE AS SHOWN ON PLANS. 6. CONSTRUCT INTERCEPTOR DITCHES AND SILTATION TRAP AS SHOWN ON PLANS. 7. INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCES. 8. IMPLEMENT ADDITIONAL Sil - TATION CONTROL MEASURES AS DIRECTED BY THE CITY AUTHORITIES AND/OR AS SHOWN ON THE PLANS. DURING CONSTRUCTION: 1. STRIP BUILDING AND PAVEMENT AREAS. 2. OVER -EXCAVATE AND REMOVE LOOSE OR SOFT MATERIAL TO A DEPTH THAT WILL PROVIDE A STABLE BASE FOR STRUCTURAL FILL AS SPECIFIED IN SOILS REPORT. 3. PLACE AND COMPACT FILL MATERIAL IN ACCORDANCE WITH SOILS ENGINEER'S RECOMMENDATIONS AND/OR PROJECT SPECIFICATIONS. 4. MAINTAIN EROSION CONTROL, MEASURES IN ACCORDANCE WITH CITY OF EDMONDS STANDARDS AND MANUFACTURER'S RECOMIMENDATIONS. 5. RELOCATE EROSION CONTROI�. MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSON AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY TESC MINIMUM REQUIREME4TS. 6. COVER ALL AREAS THAT WILI BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON FOR TWO DAYS DURIN� THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALINIT. 7. BEGIN I SITE STRUCTURES A4 UNDERGROUND UTILITY INSTALLATIONS. 8. STABILIZE ALL AREAS TO REIAIN UNWORKED FOR MORE THAN 30 DAYS. 9. SEED OR SOD ANY AREAS _D REMAIN UNWORKED FOR MORE THAN 30 DAYS. 10. FINAL GRADE, COMPLETE S`E WORK AND PAVE SITE. AFTER CONSTRUCTION: 1. LANDSCAPE AND PROVIDE EDSION PROTECTION ON ALL DISTURBED AREAS. 2. OBTAIN FINAL SITE APPROVA, FROM -OWNER AND CITY OFFICIALS. APPROVED FOR CONSTRUCTION Vol z An 0% N 04 �R zj Q3 A� f:4 $Z4 I, Sam& EH`__M I T 'Ur`Ml�Tm 1= 5027SITE.Olwg 5-16-99 6140,31 am 0 0 N r kbJ T .......... ......... \"4' - — — ------------- - - u r- I% rtt Fl\ T Jr� a,-ir W-4' 9'-4- -3 ul u ul u u u \k :v m:d A IV —IV Z'3 u VT F-I El F-I F-I F� F. -0 ul -------- Fu� 9'-0 1/2* L r — — --- — — — rTT J11 0 I (E co u (T YP. STALL LENGTH) LL LENGTH) 10'-3- > Lo f > m CC) -0 m > :z ------------------ _0 r- vm > KVI N 77 > 9t Pnomr MANAGEts.. _fmv NO sp 7m - I�,. KU TEAM 4 ENGINEERING EDMONDS ASSISTED LIVING 5 582J N.E. MINDER RD. COMMUNITY SUI TE A., BOX 2 EDMONDS, MIA, POUL,580., WA. 98J70 NW CARE MANAGEMENTINC. ko (J60) 297-5560 STE 12J, J85 ERICKSEN A VE. 2/v I __l BAINBRIDGE IS., WA. 981(206) 842-014a; sr'" oTqq o(o NNN rr 0 0 'N ir-1 F7-] all REMSION DESCRIP110N nAlr Q%* 5114199 __j ISSUED FDR BUILDING PERMIT lc-) *11L rT� DESIGN VLB DRAWN VLB CHECKED MA SEC '23 T 2 7N R _3E DISC NQ_ __nAT9r,5/14/99 AS NOTED L RECSIVED APR 2 0 2000 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS R -o FILE Elic F__ Lli Lij cr_ -7 0 BUS STOP SHELTER PAD ACCES51BLE � RAMPS :IVIL -NEW 8'-0- WIDE CONC. WALK WITH 4'X4' IRON TREE GATES AT 20'-0' O.C. RE CIVIL 2ND AVENUE S. SR 104 (FERRY HOLDING LANES) DATUM POINT uB" 14.14, @XL."'ii7i CIVIL DujGS. HEIGHT CALCULATIONS DATUM POINT DESIGNATION A B C D AVERAGE GRADE = 16,69' MAXIMUM BUILDING HEIGHT -46-69' ACTUAL BUILDING HEIGHT 4&5' o NOTES: ELEVATION 14-91' 19.29' 1. SEE CIVIL FOR OFF -SITE WORK. UTILITIES, GRADING AND DRAINAGE AND FOR INFO ON EASEMENTS 2.SEE CIVIL FOR ASPHALT PARKING AREAS AND CONCRETE CURBS AND SIDEWALKS ADJACENT TO STREET 3.LOCATION AND CONSTRUCTION OF INTERNAL SIDEWALKS AS SHOWN ON ARCHITECTURAL DWGS 4.NOTIFY ARCHITECT AND CIVIL ENGINEER OF ANY DISCREPANCIES BTdJN AIRCH A,40 CIVIL OWGS* 14 S.COORDINATE LAYOUT OF PATIOS AND CURVED PATHS WITH ARCH INCLUDING LOCATION OF CONTROL JOINTS AND EXPANSION JOINTS. &PAVED WALKWAYS TO HAVE CONTROL JOINTS (CJ) AT 5'-Om O.C. MAX. I.PAVED WALKWAYS TO HAVE EXPANSION JOINTS (EJ) AT 20'-0" O.C. MAX. SEE ELEC. FOR SITE LIGHTING 9.VERIFY REQUIRED SIZE OF CONCRETE PADS FOR EQUIPMENT BEFORE POURING PADS. IO.SEE LANDSCAPE PLAN FOR LOCATION OF LANDSCAPED AREAS 1 ST 19 EXISTING F-DMONDS FINANCIAL CENTER zz zz 0 0 0 I-- I ­ 0 co 0 Co L z 9 z z 0 w CC < U. co M Lu > co a- Lu LU v 0 d z S < M 0 W X U lu _j < t: LA C-4 :;i: C4 co C4 uj z CNI Go co , 00 0 04 z E-4 U) 0 o p--q Fq zP-4 Z 7 z 0 F_ c!) Z E-1 co < Lu D 3:: 0 E­4 Z Lij - Q > < z < z co LLI co y — uj o 0 C3 cc; LLJ co L0 r`_ z < co co 0 0 c!) z C3 LLJ F_ co) 0 ra co I - z < 9 co CC < Z 0 o ce 1-2 ?� 0 22 Lu w 0 X Lu co N SITE PLAN SCALE: I' = 10'-0" APPROVED BY PLANNI`.!C7 6 Tk�� CAL 717,(99 SHEET NO. Als] I rr�-7 LW� "I jtECF-jV9D MAy 17 1999 DEVELOPMENT SERVICES CTR, CITY OF EDMONDS RIFCIFIVEr) . APR 2 0 2000 1 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS . ZZ- � R� - ,r 1�-. I BETF I L tu"i - t 4 fl.- 14* F, 9 ftl 4 ON 0% I r- I %-A -4 a 3r -a Li �- " 0 r- cu CD W) , - --l- I . I ................. a . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1�-`� E X. C Q � .........................................................................................O............................................................. I I . �11 1) .- 3.2'7 - .-,---. , * , , * ...,.*.%%*.* .............................................. %, ............... ,.%%%%%. - .................................................................... a ........... I ,.-, 1701" = 1, V mill" MEW 121 A ............................... .. . . ... . . . . . . ................................................ . .. . . . . . . .................... . . . . . . . ... . . . ......................... I 1-1, INV = 10.-37'-12"CP(1.--) . � I - .............................i .............................................................. 1.3.2- - zi It: jr &= AN . .......................,...................................................................................................................... I [�� , ....... ............................................................... * ..... i i C13 ......... *.,.,.......f ........................................................... ............................................................................ I i . ............................................................................ . I . ........................................................................... I I ...................................................................... **** .......................................................................... I I 1/ ul-07 E CTION 23 NOTES: ........................................................... .......... NORTH I,-. ,, TOWNSHIP 27 NOR-irf"7, RANGE 3 EAST, W.M. . ............................................. *.,.*.*.* .......... 2���� . "-**--*- " ...................................,....................................................... !4 I --[-�, .................................................. 1-' ,�,-ai.p"t .................. i ............. ....... ....................................... I SCALE: I = 20 -r .--...j--- - CR ................................. ,............ I..................................................................... -- G) DETAIL 4, SHEET 6 ..............* ............. illum lamul ............................... *.* ........ .............. ......... --,..-- I � ....... *.*.*.* ......... * ................................................. I - I ; ... .................................................. I ........ ---.,-, 1. ...................................................................... / --,.-- I I 11 S. R. 104 ----- NEW SIDEWALK PER ............................................................................................................................... .- ............................................................. I U/- DETAIL 2, SHEET 6 - .................................. ....................... EX. CB ------.---...------- I f \ ............................................................... ` .......................................................... I OP=l 3.84 f , ......................................................... k I �.--- -...-..--. -- -., , N 01-09"15" E HANDICAP RAMP, TYPE 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............... . . . . . . . . . .*....................................................... ,---.- .------\--------.-- -... - ..--....-.....-.�..-.-.,---.--.-.-. -- --.-......-.-.-. � lN',/=7.24-12"CP'f-1) --- ----..--.- --.--- ....... 1 INV=7.19-12 11 cp W, I Nk I 0 ............................,............................................................... , . * ..... )l ( , 156.6-�7'------,------ - ---l----r-,-7l-- - 1,* --ll -----.-. ---..----------- - --------....--.- ... ........ �.............................................. - INV=7.94-8 CP(E',* I I � I- , ". U F J , -----.--..-...- ...%%%%%* ................... .......... ................................................ ............... ............................ iNV-8.17-8"C-P(N'%Vl I I �1� -f�.1-�".-=-,,:�-,-"75----*","----! -,--,-,--,-.-------.----- HANDICAP RAMP, TYPE 2 - I ................. *.*.,.* ..... IN ";l I . NLETN \ - - . (*-, it ...................... ............................................. V=9.891-12 1p(rill; R), If , I r "r, J � - PER DETAIL 8. SHEET 6 1 .......... %,.,.%%* ....................... . - IN V=- I 1.58-11,41"cp - ........................................... ! ,L---- X. c B '.. -1 i . I -,----I----.-..- 0 ............... ................... , - I , I \ " -.--- .L--,..__ cl-)___.___...._._.. : \,. .11 ---.-..----------- -- -- ............... ....... ... ,- , I I . -V '.*.*;*.*.,.*.*.'.*.*.'.*.'.*.'.*.*.'.*.*.*.*.. . TGP=l.'l,.6I 'I"P=i3.1,51 " p ! �k-I/-A--­----- t ----"---.----.,.-, ............... * I f 1, - "' , -j V11A TE J, u,j '&4--s- ..--.. ------_--.-.. .... ** ............ : .................... I , / Af::-F-lR,-,,;e. j C, .................................................... I i i \ .." Ill 11/= I 0.3 11 - I':1 "I"F11. 14) ll'q'-,'.�-12.�-t6--'i2"r,P(r4) %\ I. I . ,-, .(,. i -,--,- . FM I % , .. , PER DETAIL 2, SHEET 8 .... ...... :. ......... I II I i ,�--p",0 illiv=l 2.4-ci- 1.'�,,cr- \ / / --- .... I .............................. I ! I !NV--1,0.-31-11,, G ki. I - (�) ........ ... 14 rqlumw" am I \ / � (s) � 1* . f - . . ­ ..... i ...... ...... * " * ............... 1. U.-Fiz- I 0.1ii _8"cp(s 1 �Nv=Vl EX. c r3l / -----­--- .....................................,........ I \ 1 17 -.51-12"CP(E.) \' i ---.------,..-., . \ / i I T I `,.�-- I 0, 3 i - 1 2 " CP ( W) � ! - - ....................... I I I : \ / N if TOP= 14.01 '- -'l - 29'13'ig' I .l.%l.'.'.'.* ..................... - 44 � 1. / \ \ 11 i IIlv=-'il,56-12"cr(-- , ri � 600.00' --PER-DETAIL 1, SHEET 8 .... , I t 1,11 \ � ................................................. I 1. ,- . (c..) ................................ GMPHIC XALE I I 11 N " \ ,----- ........... I I / INV-11.56-12"C'P L = 306.01' - � I - -..-.....--r--1 -.---....-.... I �11. "i k -% ........ *.*.*.* ........... w - - - , - [MV... i3l,-I2,,Cp(F- - CONCR , 20 9. 1p 2,0 1 ---.i';, +�i-�--------------- - .--.-- .--.- ----.- ...-. � 11 �' �--- ----- , --... I ETE MVING ...,........�.......................,....... . .--] . _ ..-...---. .-......------... ' -i j- \ PER DETAI HE _ ................... :� .... . - -..-. X14 j WA I I I .\,-� .:.- .--�( -6. 1 "--,-.--..------.-. I 0 L 6, S 'ET- 6 1. * , , - * I * - j , F - 13 1 x 13. " �21 .............. . . ..... l.... :��IIIII . I I % . 1 --J�4�1-----__ � *.%%,.-.%'.%'.%l.'., * , , I �::::., q� R -) - I 11 I 11 E f? R "( FIOLDING L AN !-.-- "S \ / PK -,I'- "'---__,, .*-*.:::::::::: cl Ii \ -- - -, / - -- ........ ........... I ! I't .. - \ - -- �-\Ge CONCRETE DRIVEWAY AT ----". ................. ..........i... ( IN FEET), I if i i I .,� E X. C2 'l- - -1� -%* ... . . ' . P" - \ ...-.-..-.--�-.�-..---....-......--- - ----- 1 8 - STA 1+83.39 -- .......... I... -:-:-:;� I Inch - 20 f3et I I i I il 11:5. 73 . . I 0 STA 0+88.22 & . --_-,-� .............. :.: ... � - I I *1 / TOP-151.09 � Ix -- - . ..... .......... I 11 I � I . R(W) 4,1 "--,---*-,*-,, k . , ........ - - . i I I , , , i . \ . . \ / I N V- I 1. 39-12"Ci -.1 'IF, .. - - �. � k PER DEiAiL -10, SHEEi 6 � I I ul I I 1.11 ..-."-- ". �? i \ -.--.-�. - . I. . %%l.'.%'.* .. ...... I I -.1 I I \ \ ! I N V= I 1. -52- 8"CP(N) -... - - - - , - ........ %%..... � 1-I i 1. I 1� ---F!*�,-::-.v, �4,4 --..-----. 1-1 -, \ I I ; ... ............................ (r I I . 4 , \ - -- --J,l . .. 7- -i.lfg��', ,x(S7� ,--,-------i'�-- , I . -:� ..� CONCRETE VERTICAL CURB . . * " � �t , i , - %.., - ` , ,,� r�ntmc fjl�).t. - -','- - ­ i I. , .............. I , � :- � � �' -1: - . I . PER DETAIL 7, SHEET 6 .'.%%%%%%,.%%- , , 4 1 i -X I . 0 z : . ; � - i --) I I \ \- ,-... p� 44-- \ /I I . \ I . ............... . , . . . . - / \ .......... . I Wcj!�-,--==-:----;-. 7:..: ------ :,��-:==.--- ----l-----.- -----------.--.---. 1%1. CONCRETE RETAJNING WALL .................. f I I k I - 4=---,------------..-.---.--------------- - . . ..... I �? tz-1 - - . -� :1 � ......... % I . I '�- 'ri / �E :4z7:4-,-W-=------------, i 11 I W I I . A, - \1 - -,--, ---��Z--1 a PER DETAIL 4, SHEET 7 ................... -11,11,11111,11, -zz- EX. CB I '� ..:� - . I � .1 . 4 1 - \ ......... � � I (i 1 9.1 ­ � � I .J I I -i-. -.-..--.. ....... - -.-.-.,*., � - I .-:z� \ --l'.12 'a�lp(1\4) IMPROVE EXIST. PAINTED PARKING ................... 0 -1 - :-�J4-�--,4"-q-- .... ��,-Z�Z� . \ / TOP---1 5.82 .......... . 1 '(3 - i . 7 I ,-1 , .--- t., -- .,�-:..:- !NV� 4 -8' � I i ", . I ��-4� f-- - . .e .-.- .- --- - - STALL ............. I ----.- \ J .. STA. 1 467 I / =12.04-8"CP(S) 8' WIDE x LENGTH AS SHOWN . *.*.*.*.*. . I : .. - NY . # , I I " I 11 , 'T SDMH I ,,p I --�-z B G ..... *'**�16 d: L ..L 40) 1 - - -� OFF: 266.79*-'R--,------ ---_ ... - INV=1 1. 9 7-12"CP(SW) e WIDE WHITE STRIPING .. I // I 4 F ---....--..-, -'ao _.. :Zzz: / ! %%%%%%% K ; :F� - 1: ��7j . . * , 1+95.02 1 X N F. X. WOOD I N 01110i), ' - - ----*4� ____ - / . . * .*. � 1 .6 ' - \ .%%%%%% . . ,1� i I ,f, . N,) --lc T-7 - 7 - � --:�--17 Vr6-, -- ,-/ 11 . . . , �.�� // - �l <fl _6 , .. I B CB ---- .; - - -,--' \ , Q ... , ... , - 0 01 � .. "-� tv % ---'��- x .*.*.,.*.* ........ 0 1".. . ..Z,� , N. - Ill- .. @ ks .�, x , . 1 . . .1 !- - - i OFF. � 2 � . -- -- - 9' 9 �" . . 1 P9 78 R i .. �-- I. i .. . - - - - - - 1. .. . �.Z:Z:Z-.. � .......... # I *1� - `P ---, .. I r I -, ,-*'- --- -7 - - .., ... .... --- .,�.-- - .,.%%%%% ( I I le i . , , SDMH ... I BETWEEN DRIVEWAY TANGENT POINTS . � I --/ t _, K/ . I . . -.- � '# G . - ,� \ L-*-*-'-*-'-*-*-*-*-*-*-* I I - - - ... . : .;, , . . -�--.. C! . --.� W - - I I - L;�, - . - I;. -�- . * . . L- - - - 1� "... .. . .. I ..---.---- . --.- _-�, - - - - - �-- Z::... -Fl- TO BEGINNING OF PARKING STALL - ,:5 -- - - . \ �j P MPU L - - -- I , " PT I .. '. --- / �Z. 15_ H ,,, r_lu - q w r it , - --. -_4 '- I . . - _NL__� �; "� V, .v,7 it * . . , TO INDICATE NO PARKING --_ ... 1+7486 RIM14 -72 � *-- i . . . . ... = , ., I & I . * . *' " 4.�, . - vrtK I T----zz.z7:::z:. -p- - "11--, , -SID K CLOSE . . -.:- -- -!�L- ....-I---..-. i�� --j-7-7 260.72 F . . '. ".. .,. -, -,: . ------- ----, INV = q.97(Vi) .._ I . - - .. .-... 111 - j I( , ) ` . .: . -9 ,--. - -- ­ -.- ­ �. -. - � ft%% .. . . -- _:Z---Z� lu. r I ,�', - --7 :� . , �, 'r , _ I 8 . . . . , , -�Ll E % /--��-----�: �'ER NO PARKING SIGN z -�_.. 1 6 1: . i . I .. . I .. *-.7 - .. . . . , *" ". . . ... . .... .51k3� . I . . , , . I I ----.------.- - . N ,�, 1p -----Z.::Zzzz:�z-t:t�j`jc. cupfi, , @ f . . . . . . . . . 1p -,- 11 -'- " rl , . : . .. .. . .. I , . - . .1 . , .... ... 1. .... . . .. . . .. . . --� - - - . -... ... �� - . 6, cu ,- . .. t I 'r ... , . . . . . .. . . . . . .. zz::�Z7 1% . I .. . . . I I - - - -0, I I , . - -1?4 1-,�, ! I J I , 11 %. � , . _0- 3 HOUR PARKI G SI N . , r , , I , .. - .. . . ( I� � 17' - ! '--.!., -Ll ! . I .. . . . 0 . . - . I . . . . . . I . � I 1. . ", * %J 0 0. � 07� * . :"--, . . . !. ... .. . . .. . ft.% . ��--- .. - I *'� 14 --- -.. . - . .. . . . . . I . . I - I It " . --,- - Z��-- I ; -..", . I i , . I,. I - - , .., . I ( � ftft. I ,ft �zl--`�7--��-1 3 ) I , ..,.. I it Vi .. 1. '. . ; . . . . 1. . . . . --l' I . t .1 . .. . :.- � . . . . . I l....., ll�����ll 1. 5, - ---Z.- . - . - .; . . .. .. 1. Z�. *. , .., --�---- I '.. I , .. - . . .. . I .. ... .. , I I . .!� . .. �, . . I -EX. C ----.- I 11 ; .. i I . . , :.... . . . . ... . . 1. - I -;.-- I .. I . ... . . . ---�\ - -Z-� .- . L- * -1 I', . . . . ! ; I ... ... . . I ; ,- i [-. I..-., I --- `- .. .. - - - - . -. - .1 . . . .. . I I '. .., . I .. . .. . ,- . -- I �-- \1 I I ("< )l 4 - --2.:- -.9. T- - ---, TOP = 15.65 . -- .. . . - . I-- 1- < e I-) -"- -.- - --.- .- -* .-..i - .-;,- -- I . . 1. . .1 .. . -� --- . . - !! .4 , , . . . .7 ... . . .. .. ... -- '-�-- - -.- � , . . . I- -lE -0O3 WAL ) . INV = 7.40-24"Cp�E' � I - - .� j ,,, , . . * . , , . 7. . I .. �.- %, ..-F, . " NO Nc. ,-'------ , .. .. �. .1 ., . -1 ., .. . % - '-��. I/ lid . I.. , .. .. . .-l. I . . I . . .- �.. .. , '. . / I -- --0+12- --,-�� .-,z�� IS \ ;� 1". I I \t 1 ,- I , -. I .. .. . . , EXIS TIING . . .. 'EXIS fil-AG '-- " 1. I . .. , \ / . i: - - STA. -1-3 , , . . . .. . � ic ; I a: . I. .. . . . . .. . . . � . , ,,I 1111, - INV = 7. -24"CPkVj) , " , , . I :.. \ 1) S� .. .. . . . .. . . .. 1-1 . . ! I ".... " .. . 1, . a . I.. .. ."-- . . ,.,. .l.. . , / x .::O --- - -----` ---lz 11 I , . . - . " , . . I I . . - / - - zzz:t�z EL v - . . .. . r-rAll., BUILD1111r, %. .1 . I.. . . -. . .. I ... � , Fzl�, 226. ,R - 'k I I I . I -- '.-, * . E �-- --.Jl i I I ,I- . . � . . , . . . I , L -i:�:::::::::::::: _. ! &- . .. .1 I � I 1-9. -A-- Ill . 1� . . . . . . . . . � �-- \i � .1. . . I D'LOCK Blill-DiNG7 . . tvi . I 1. . .. .� ... -� . -- ---k 12. .,- . . .. - . , . , . . . . . . I I -��- ... . . . . .. . . I ' * . ., . .. . ..� .... .. . I .... .. , " . I . . --,- . . . . . . . . T(D BE tREM0\4ED '- - " TO ' . , / I . rf $ :j:t . . . . . :5- - - - I... - .. . B F-. RENiOVED. . .. . . . . , '%. . - . -..., I Ll .. . .. . .. . . , . " . . .1 . -�------,-�--z I .0 I I I i , . . . .. - . . i I .. ... . .,..,�* ".. / - ,-k--:-" � I -�----- i I I I - :::I - - I i , - (-) t 1 i �� . . I � � ---� �,--, - . f . . . . . . . .. I . . . ".. I/ -� - / ,. , , - ��, 4 , - I . . . . .. . . . - (�,�- H . .. , � . . , I I-, , :Z�-- i f. - .. .. . vi'll *. *. .. .. .. . I .. ., I ... ... . 1. . . .. / . . /... i 11 I zz,-- ,- 11 '�' I, 0 .. . . . . . . . 11 \ I f" 0 i , 'i : 4 . . .. . . . .. . , . . . . . >� / .��- � t .. '. I . di .. I ! I . , , le -\ I . . . � 0 . * , . � . .. I . . I . .. I . . . I .. . ... . . ., .-. - . '��---- �-- I J I I I . .. . I .-.---.- -.t% I � . .. - . I I I 11 . / � .. 01 . .. . . .. I . . / .. 0 / 1\ - .. . f - I .-j "I -�-1 �, �l I I I 4 Fl I .-*' " - '%. . ... .. . . . .. I . . . , ... . . . I 11 I . ... ... . . .. I " .. I ", I \ `-:Z�-,* * -� *��� ,� MI . .. . . * . - ., - . .. .- , , . . I . a, . . . - -] L-- . I . , - . , - . . . . . - I --1 , , . .. . - . - . . . . . . I I � ., ... . . . . . .. .. . .. ., .. . , ,- , , -- , -- �-- , 1- _7, . .. . . . . ., . I . .. .. . - . . . . I i I I I . . . - . . . - - I m *.-.. `-� --�--,,,. ---, , . 6 I ;�-, .t� : .. I . fo i . .. I 0 c 11 1�41., .. .. ... I . , . . . I L . ' . . I I . - , 1,0 / . .--. ,--.,. (() I \ I I .1 , . * I . . . . . . . . . . 0 0 (;I , , .. . - . . ( , - -- . ." . . " .. 0 0 1 - , . . . - . - . I . . , 0�1 t,:�� I � , 35 -, 1. - - ; �ORX t;. ( X 1 . . . f ... . . .. I I ... . . .. .. I . ` . , ,.,,, -� -��.. .." I ., .. . . 1. ... �. ,�, .. . ... .. . .. i ,- *1 -p- ... ..,. 11, "A I . I L. -i . . . . . . . � i I . '.. . , .. , . - - - . - . . . I I 1. ..., I I. .. �.. ... .. .. . I .1 I - I - I � -- . , , ., :�'� �---,-_-. ----- 0 : '<.. , 0 .. . .. . .. . .. "I .� CBMH I.. ; I 'I - , . , - . .. . . I . ... .. . I .. . .. .3 . 1. - :E. m I I . I I % . � . � ...... .... a a I *-' "- , , . . . I , . . . i i I .. ... I .. ......... . . , . . . � :3 < %t ,�O- 1. :' I . . . I . . I . . . I . . . I . . . . . I , . t . . .,. zl� I Irl . . . . . - . . . . . I I .. . . 1. � .. .. ... .1 1 A ... ..� I--- .�,,�, t� ; "I 1'r. I . .. . . . . I oe-�� �1- - ` .. . ; . . ... .. j I.. .-,. 11, -Zz7z��i� .i: - 1� -1 . .. . .. . .. . . � . . . .. . . I I . .. .. .... ... ... ... '... ...." , . . . .. . ... . . . . . . . . ... . ... . . .. . . . . I . . Y<-, , . .,. �. ... --. 1..�', . I V, l.-I . . .. �. . . . . . f I . . *w . � . 0 ,� I I I I CL I , i it JF�- 91 %fi 5. ,77 1 . .. . . . .. . .. .. . . .. . . � ... . . -.�. .... . I ,.-.. rq - --. , 1.:��.�:�, �; >- 0 - I i - - - I . . . ., A I. aw , " I . � I . r. . . . .. . . . . . . . .� . . . . � . .. . .. .. . 4 .,q (W . :.1 '-- .. ,,, - . . - . . I I I . - n_ . . . . . . . .. . i - . P- / A, I I I 1 - - - . . . . . . ..., ;- . ;,C13-Mli : I.. , - .. . . I. . . . .. . , .I'. �: :! - i.-) " . 1. - . .. . . , . . .. . . i . . I . -- . . . . 1. 11 -. . I . ll-`--,�', . " I - . . .. . I . ... . . r % K i ---- ---N--� .l. * ... '". - . * % .. I . I '. .. - . . - . . . fl cli I \ � . .. . . . . . ... . . .. . . . . . ... ... I a i ! - -.. . t I . I '.. I - -0 NORTH LINE OP"'PARCEL A PER '--, I I f . I . . . . . . . .. 94-4-� , - .. - , , , , , , , - I . / \ 11 i I.- .. . . . . . . I . . . I ,- I , . , . . �. .- - I � ., . . .i. ! . . �. . ... . .. . I' . . . .. ..... ... . .... . it .. .. . . .-. . .. .. . . .. . . .... .... I I ., . 1. .. I - . V., z- i . I \ 5 1 1 - - . . . . . . . . . 1-.. .. '. . %. . - .. .1 . . .. .. . .. it - , 11 .. ,- .l... �.,.. ., . .. . . . . . � .. .. I . - , ,- - "A�FIDAVR OF COOECTION OF --_,,, iI . I- . . . . . . . .. ... . % '. -i . .. . , .. . ... .... .. .. I I '.X- . " 1'.-� � I .. ,c�,� % ! .,.]:( � I - . . . .. . . . , . . I .. 1. - I .. - * , " " %. .. 1. . . A ..� 1% BOUNDARY LINE ADJUtWENI '. .." - .. . ... . . - - ' ' . - . . t .. , .. - -... - 1. . . .. ... - _- - I . \ . \ t .1....� . . . . . ... 1�, - .. . . . .. I -��-- . -�-.r- . . .. .. .. . .. .... % ., .... V. ". -... i A.r. NO. 9605220436 __, . �l D I ��, I - . . . . . . . ED '. % - - . -,' ' . - . . ., . ... v 6. _,..,., . . . .. / \ .. - . . . . . . . .. . . . . I - - . PROPOS ' . - 1 . ` ., . -1-- .. . . - . - . . ,.� ;; -'...... .\ � - . . . . . 1. . . . - . ' . I - �9 .. '. .. . .. ... I . . -, . . . I.. 10 , " 11 li -,.... / . . . . . - .. . . . . I 1. ... .1 -.----�' . . . 1, . , % ,�,., I , I 11 'i, . - - .. - BVILDING' .. . 1. .1 �. . . . 1, . 1. - .. ... ,PROVIDE TEM. ORARY - I , 1! . . . . . - - I .. .. .- - " . -- .. ..... , . . . I - . . - * '- I EX 14': INGRESS, -.. I / I . ,f%c- I L.- �- = -- -r- - --- -- - --.- - ..--. ..-- -- -z. ....-,..-- - . ' . , - . I ... . . I.. .. . ..,. . .... . -..-.-:--, -,. '-.. \ 1. 11' 1. . I ' .......-N I-r- ---.-7...-. . . - ---- -- -. - ----- -1� --*, ---.,-*-..--fIRST. FWOR FF=20.25 . ., .. , . . I . I I ' SIGN SID Cucts� It i . . . . . . .. . . .. . I .. . . . .. . . . ... . \ , .", I" � - , � "I" I . . .. . . . . - - I . . . . EG�ES�'AND I i -\ .. . . . . .. 'O -0 i- ,�Ev -1 . . 1. . . ... . . - . - . ..., . .. . .. . ... 1. I.. . 1 1� .. - -�- r-- N/ 3 / i 01.1") , . ., .. . i i - * .... . .. I - --�-.,. L-A . 1 1 . . . EX. Q If 4 0%. i IF' F .. , .. . . " \1 .. . I I . .. ... . .. . I , , ... V. 11 UTILITYI.MEMENT . *.- . CB , .--. 1. I -, . . I I . ,.[-.,-" -- =. -7.-. � . . I'.-.- . . . . .. - . ` :. -.�. Top = 15."' .--. I I % ! it . . . . . .. T-- -... .-,�.. -- ,--. --,.,-.,71 * . -1 .. . . .. .. . . . I / " -.. . I '. \ .1, k ....:..,._.. r. I... .1 N . . . . .. .. . I .. i%.. ... . �. I . .% . . - .... \% . . . . - �l . , . I . . . .x I " 11 A.F. NO: 97013001 .1.1 .. ' ' I \ 0 : I . . . . .. . . % - . . . .% 64 A I . . I . 1- . - ,� .%. I .-; ---- . . . . . - . mi .l.. HV -= 7.97-24-CP(E)l I . - - - - .. - -.-.- -..,-.- � .. .. . . . . .. . , 1. . I - ". , . - I . , . .. . .. I ''-.. "... * . . -. .. , " ., 1. , f, .� . I . ri. :. '*.!. A I E . . .1 . . I - . I .. A I - .11 . . . 1, . %- :; . I . --...-..�..---.-.:�--�.-.---.--,.-""-'-----:----.-..---.. - .j . . ., . . .. * --.,.�-� .. . , � . .... . . ­--.-­--...-.j 1. . . . . .. ... ... - .; . . ....... CL -REk . .1 . . I , .. . . . . I. .� ; . - ... . m 1. . , % 'P( , s . . I . . . 4?:-1 * . I '.. . . -24"C A ^ . . .. . . . . . . . - .. . . -1 . . . .. . . .. . I � . . . . . . . . I . . . . . 111 i . : . .. .. . . . . . ! 1. I . .. . . ^ - 7.82 1 ;T OR' I . INV � . S-A , 4,1 1 1 . . . . . . .. .1 . I - . . . . .. I : %. 1. . . . . . .. ., . .. I !; -D THE NEA�EST ' - 1. . . . . . . I . .. ; . . . .. . . / . � . . " � . . . . . . . . . � .. . I M�N I I -�; -� 1� - . . . I . . . . . . .� . . . I.. ... . . . I... ! . I �. i, - , . * . I , ." ., .... . 1. i ... BEG ,. SION JOINT \ - . . I . . . . . . ., I It-0 QQNC. WALQ. I . . . . .1 . . ... I , . . .1 - - . . - - , I . ::* . - . .. - - , . V - I .. -.�. .1 . . i - - . . , . I - . .�-.-- - I .. . . . . STA: �a 12.32 -- .. I \ . . . . . . , . .. .4 . .. ,-.�, . - 'r " ' . .. ... . ... . . . ' . . 1 . I . :,-.-. '. . .. . . . I . . ...---6 . . _:._ -- .. . . . " -.; . . I , ----],, STA:- 2+53.97 . " ' ' . . . � ... --1 ',- , � TRENCHIf DkAl N " .. - . .. I .. I.. ... I - OFF: 1 .75 R :: K) I . I - I 1. .. .. . I . . I . .. . . . . 'I : ... .� - ... " . . .. . --I . .1 ... - %* . .. . I - . 1. . .. - ./ .. .. ... .. , - " --. - . . . . . . . . I .. % . , 1;1 ". -4 :: F-- X. C B I BU HELTER . 0 AD -ft f"' . I . . lz .. . - . ... . I., - . . - I < . - -. . I .. . , . .��, . I . . . .., .. . . .. , .. .. ..� - - . . . I ., OFF: 1.26.28 R. ' .. . -i 0:-. � 1. . - - F .1 .... I .. :! (n �. . I ��. . I . .. ----- 2� . . .. . ;f - I " . , . 1. I , , I I ... :1. I . i� 1, , (11 --s -----L RCH. D S. .. ol TOP = 17.5 N40" 1, -I-- --.. SEE .. .1 . . . .1 1. . . -,�-- -- - � . .. I . . I , . " I . . - --- . . I . . . � .. . . . . I -5:� ,* -, . I .. .. . !NV = 9.02 tar i..B. IT. .. \ T . .. I . ... . . . . . ., % V i � 0 'i . . 3- 1 i-�, . . . .. . . 1. .. .ZE , , . , , . - *-- - : - A - ,,, - . . . . . % .i " .. I 1 -zz -,- f \ . . .. . . . . 1. 1.1; / % . . .. . . � -. ... - . . % . . � ., . . 1. . . cli !� I I . I ­------.-- . .:. I , . . . . . I . . ! I.. I .. . I . .� . .. . -... -,,. ee. . - ... .. I ., . .. .. �. Ix f.. .1 � - * . I . ! 1" , . . I .. . �. \-. �: L�&RICAIL , , . . . I .. ** , * I I . . . . . I * - ------ \ vi . . . I . , - EX. �:E -1 \ - li " .. 1. . ;:�-! . . , . 1 1�4 . - . .. . .. .. . I% . I . I . . ; " , .. - '. . , ;, -.. . .-. ., & ..� . . . . . . .. .. � .- t .. : , . . . I i* . . . a ., .. ., , . I I EAStMENT- P. �. . �*: 1. . . �l * . . . . . . I . I . I � I � I I ,.� -- ,- I - - - - - - - . 0 i - - - - . - . I f.-,: I . . . . t.4 t. . , . . .1. . .. . I . . . I �-- ., llllj� .. . I E-� 1 t ,p f. . . .. '- - - - , : .. ., . ... . , ) .. . - r- - - - - - -... ., . . . . :1 I . I �, I 11, . I . ... . . . .. .�' .. ... � - . r , - - . � . . . ... . 1 - - --.-'- - " ., � .. . 1. I A.F.�: NO. 960826074 .: - : '. - .. I 1. . . - i I.,:. . .. - - . 1. *1 . - - . � � .: 1 . . !:/) , - .. . .. . , % 1. .,: .. .. . . . . -. . . . . - - -�-- - -... , �, a I � -.7 � .. .. . . � t . . -,f' . . . . . - . . ,- , L'4 , .-.: 0 . . . . - , :: I I . . . . ... - I .... - :.... ..i .`.... .� 1.�� . . . .. . . N "' �T - I I - -- . . - 11 � ; i . . . --,� ! . /-� . . . ... . . .. . . .. . - - :,�-. - - �. i I i !::. . I.: . .. I � .. . I .. .;;.:.: - . .. I . , . . . & . " * . ... 1. .. ... I ., . � - ., .. . .. ... :: V. . . I .. - : . !.* . . .. , �. I I .--t - - 0 . 1 - �-, i I 811 . , . . . ft. . T, ::" n CD - . I.- . i I . ... . . . * - - c� . . I ". . . . � � . �.%;: . *, . . - . & . .. . . . .. .. . . . . 1. I " '! -, - .. . " .. �0 I - I - , I I 1 -Z) k.. .*..*. * . . -,. . . i . . . .. .... -A C. . I -D c .1 t, A / I . I .:: . ) * i . .. ... . ., . .. ,.,. . I 1. . . . . % I ., I - - - . .. " i , --l- co . , . .1. -I.. - . `< :,., i .. I . . , . . . . L-J.: . . ,,.& ..*:.*' - . . . . -:.." -Z , - . I - , . . 1! . . � 11 .. . . .6. .16. . . ; . . . . , . , . , I .. . . I :;, . I I f - I 0- - - "PP-RO-X. [.0C.*-E:l.' - 6" P�vf; . .. . . i - 7: - , . I . . . . . . % I - a) I !� - .. . I , . . 4 . . . . . . , I . . . ; . .. . . . . . . i. it - . . .. .. . . .. .. % I - Lr, I .: . . AD - '* . I- I .. .:. .... . .. ... . . * , . .. . .1 . . . . .. . . % . �� � 0 . ' .1. . S AIN! I - A 1 i Y -R FORCE % - . . .. 1. : I . . .- . . : '. - ..... .. .. .. ". . ... ..... .. . .. . I c-:� ., N ----m --7z-�5'* / . SEWF : ; . .. . I i... . . . . � I � li ') I -,.-/ *- I ,- 1- . ' - .. 1. I :. . . � . ... - * - t, .. . .. . \ I I .... i ,><-i -4 IFR - 1+76.09 . � . . . I . *.11-: , . . . % . . . . , .. I I , I ­1 .. f14 Aff k. -OM 01 Y fl,l AP " STA. p * :. 7 . I :11, .- I I.:- .*&.. - .. .. . . . . I \ Q .. 4 : . I . . .1, . . ... . I I .. .. , . I . . . I \ .. :7 0 . I I I 1* � - - - - --.- -.-. - 1--' , I , - , OFF: 93.34 A * - .. ... .. I .. . 1 .-.-- -: - . .. ,,, , '. . ... . . . . .1� ... I6 : - I - 14. . :... . : . . .. . .. I . .. � .. . . .. I . . �l ,� j 11 _75. 1 ,� - 0 : I --. - '. . . .. . .. - j - . .. . I .. . . . . .. . Ili ; I I' 1 7 . . . . . . . . , ill 11 0 I . .1 -- . . . ... 'i. . I .. . . ... . . . I . . . . .. .. �-- on 0 \ I . ". . - EX. -t'k'�)!�'144��Pi'%--'.z�.1-1('�--T'-3- - 1) .. .. - . I 1; . . .. . .. . . '. .. .,&, I I... . . - , - r, i I . BE. RE-fv )fYr,.l- 1 6 . , , , I .. I . * - -. . . , .. . . . ....... w'.., .. . . . .. STA: 0+76.22-. '- -, - I " I - - N . . . '. ..!. . I -., -` i t.,i I .. I . - ' h k . .. . . . - . . " ., . --'. . .. . . 11) **. ., I . . -1 . . . . 1. . . . . . . . " , . I .. 0 ... " . .. . I . I , - ,.. ' . I , , I I \ .. . 1 86. . .. . , . . , . ' ' .. " . V - . . . . I - �: N .. � - () .. ., . . I I I . . . . - '. �: I 0 . , , - - STA:- 2+43. . . . .. - - . - - -;l � . I I ! , . - " I I .� . FF. 64.91 R `- %- ' -,.' I . '. .:.; I 4r, . . ...... .. .. .. I .. . . .. .,. , - .. .. . ... . .. -- � . . . %. I . .. .. ;,\ ;. w , . OFF. 54.33 R . 09TER * *'- .. .. . �l . * . -- :, - i ... i . . . . . . . I ---. - I : z L--1 . I I � - . I I . . ,-f 1 /:� , L 1, - - - - . Ll- I .. I . . : .. *.'- -- -DU %- ... . /. -p - - - I . ' . ' " ' ` . --r' , � - � . I PROPERTY . . �* .. .... .. . .. '.. a . .. m . � 0� 4i - " I . . . - --- .. .-,:" I . I .* '. ..*. . - . -- . % :: Er � .. . -,., . � ... . : 1. 7M9 - .. �,.- . . � , .%. %. � V. EX. ELECTRICAL I .. .4. n- I . . . . I .AREA. -,... , . . -1.8-.-\ ' " , 6 .- - .1 .. . * .. 11 .1 . "d CB % % + I* I � . . . . %. .. . / 1. ... \ 'EASEMENT '-. - -.. I - .... I . ; : I I LINE-- I I U I . . '-. ­ * . . , . . .� .. STfi- i , , - ` '' . . . .. 6 .,- .: .! ;l/ �., V 9 1 c , � -�- - JA I I .EX. 20' PRIVATE R. 1 3-.,, q.. 4 .., - . i - I - - . I 11 w .! ;i: I I 1. al. . . . . .. , * , ..t .... - ... " - ..� \ �. \A. F! NO... 960826074 ' m 2 .-- . OFF: 68., 1 C: \ 1. * ��',C , ; n uj C-4 1 1 - . . . i 1. X 1)171L�PAGE EASEMENT . ....!.. .. .. . .. . . '. .1 , - . \ .. ... -: i , * ,,;� . . I � . : *,. . �-' -, .. . \ � . 1. I > ; 2 9 - * .... i .. !. ::,. 11 I . . . . . I . :, - . I � -?t . , --.*..' !! .: ,.,... 1 . . I .. . . ... . ; 9 DRAINAGE - *-" . z - 0 - . . . � - iv -( .. . . . . 3 : -�--., --A- -1190- ()q7,Q��001 65' ..4 . I � .. � . - , . . . - ... . .. . . 1". . .... I �� :: �3 Z - . OP -- 70. 0 M . , .. :.- .!' . . - . L* -- 4m" *- - ' - 1:-1i . . . . s :: - . - .:1. -- - - -. .4 . . � :; I I .. I I . I , -- - .. -. i 's\ - I " * * %, � SWA14 .. .J., T . .. . , ­ I .. -.* . . . . , - . . sTA. o+19.03 ' .. . . . I , - . .. k 47% 1 . . . " . . . . w M .& � I'll ) , r . . . . . , , 1 ; 11 : I I , . . . . ..�.'.. - , : ,..,, w , I . I ; , : .. . .:. . �....*.. ..: * * .. , * , , . I : I V, : 14V- = 9.34 . .. - I -�- I . . .. . . .. I ! . . * -" R .11 , � -, , . . - * . . , . ... � � .. '. . ;: . z ... . I 1. - . . !� .. . .. .. . � . ;. ... . 11 ..* -1 - . I , 0 , r- -8 - .1 . .. .- , , - I . * , - Jllw . ! , -- . , . I � 'A '. *.** . ) x , .. . 11 �� . . . . . . . . . .- .. ,> . " -.* . .. x .r,l i - %. - . . )st'l t � ': ..: i b��:-- .,� ... - I . - ! i I 11 ) -- - - - - - - . - .. , -. . **' ., - " . - - - - -t- - - - - .1-0 - - �- � �--�--�- - -*�:, -�D' --- - . i; EX. C B I ...* f6, . 4�� .to ...--. -, i. . - --'-� . . I I -, �O 9-1-30.55 � .. I ......a- - . . -- . -`. I'\ ' --- , *1 0 . ,5p . . :*5! ��- ;� .. . - - xj- ----..--- " 1 ----fd� --1 let.9 P40T A.R. � ,- IeD. -.---. --!j!!ft .. .. -- - . - 1'�--,-it . --41- ' - ------ -t . . . .� - 1-.*�'24'.. '. ...'- \ 'b�-. � -T-- --& . - --�ll I �', I pla .-- ..ft- i i I I : . (,�p I - . , I --!" 7---- .STA- 1 .38 I ... -;-.- -) -4 � !'Z INV = 10.33 NOT A,8. . 8: . I . . .. : -G : - - -1 �. ... - !: ;� . . -6� '-'.- . .---..-.. -t-.�..�7 I *i*.* - .. -, , I; .... - - - ,;. " - . . " . i -- - - - - . ..- . -.---..--.. ---61-- .61* . & � . . -7- -- --- -/-i v p 1 1 - . .-.-..------.----- . - --- \ 11 -. . ! . F"L. :1 I ll�. -'<6 AD :�: 7 . . .. - OFF: 33.42 , . _ I i - M`47---r--R`� -- _---- - I I -- � -- . .- .-...--. - - :. . : ! �---J- 4-2 :�-� . .. i, - , - I STAI. 2+74.ib- .,." . Iq - - # &%. . """ I . �i -'X. "B I I > - . F I . ---- ----- 'TP-i i:--,--rq�----... .... . . --," - - - - - - - � CB 00 ,., ------ �-.l .. I 5-, .. - -.--.---- - ---- - I -111 F96M - - - --- _:;14- ... - -'--- -� -- -.-.;* --. - - -- --..----,: . . . ---.--I OF --.- 31.54 ;*..., L. - - 4 -- - . .. - - -STlk-f-.-lU; -" .... . I 'STA.- 0+64.90- .71. _-j- - -L -- :I IOP = 19.4 NOT A.R. , ._. I . , -- Uti. 0 .-*.. .42, _ 5 'xB �! .�, �-. ; - .�:� I I I 1. .3 P�ul..l zo 0+42.09 - - -�� IIIIV = 14.44 NO' A.B. ; 'I .,Fjj - " . I � I - & , I.". �-�. : .. ... - - .-.: - I - - Off. ',38.'06 34.02 .,.. �. -18 �-. 7.7 . C,q-�l . - , -.I- . . -:�. . . . .: ---"- - . - . �'.* * - I- .....z. ..... . -,t..z ;. . 1. 4.. . .. . I � . * .. -� . -1: '. ,:. 11 TREA'-E-f- -a / . . 1. Er( - 0 :-:. -f 1. ; . . . M ... .0, � ,%.--.� *. % . . , .. � 11 TO i I.- I 11 % - . . R= 5'-r . . - , ` *.. : ... , - .. 11 "T , - ,-, 1, .,;*:,* :**.;*, , . . : . c- . .. . . .. - PLANT I \ I . . :�: .. . * -. ., .. I / ---� - * . '. � -U? - .. jkO\IDE T � , - ��- ��:-` = 1 R, , -..l-..;....xl .. " 1�, \ . . . . . . % Ix-1 �- - - . ----------I------.------ . - I .--- - - , ----- ----.--. I--.-- - .- . .... - �l (j) 1'1-�', �,SIGN'*SIP,EWALK CLOSEO" -�M +62.71 3 -2...-- -------, �g 3 ".. I -' 1--�­­­ . PF-Rox. - -�f --T . I - I - - I L �l '.. . 3 -, Xf - - 'I----- - -- % . ..... - 1. , - ..! -1 1 A'. - -5, - - - 16.56 1 -1. .1 f -- - .,- � R2 t � .... I 1\ 19 L36-Y\ .,, ,-- -- , . _ -----------..--.-- \ 1, ,.:-_., ., . . Off. I. -,- -e.. -- - ��7' 1 --- li _____. \ . \ N --- - - - 17- - . -.- -- -----... �kl - .: . 8 cl i \ Y4 --- 1.� .,: I I ---_ I- f1361 I . �..*,�>, -� , " 3+27.00 �-.&l---------- .---.. - - 3 1 1 �� �, "". - - ---- -1-1-2-+-0.0-- .------ ...--..-- , 12 \ i 12 1 - -.... -...- / ,�� - 1 3+00 DR, nit - -..- ... -�- �, .. �� - �-1 *:I. , . - , ------ ,L.--- -I- - -Z�r- !, ---I- . -------. I �� I .----. - 0 " ,.- / / ,; ,- -:�:.. zlzlb-f- .-F -- ____- - --- - - -,- I 9- C -/---- - - - :,, , _ ., '�, I.:. - - - - - --- -----:=--.�----.--.. -.- -.-- . .. .", , -- -L=�--�- - - .- - , -110U - - � ------- --.- --]--..,. � r') 11 --'-'.z.. .. . ,--4 - - I *- . ...l. �� -Eil�T. -�] - - - . --,-- ssmjV-,, m � ..- , . �. "�� , , .. Ql),/ , ".4y, . . . -\ - - -j --i 7- :=- - -- - Ilk '�% ... '�--1 I I . . B"'---- --- -\�\-, - i - �;<`!"" -.-- - ---- --..--- ----- . -118 'i . .--- � .�0,0 -1--- N" ­ .. . -.------I-- - 4 �4,'--`--�a N 0! - �----- -4 � - - - IAOF.uONlAL--- --- ,� - " *,:::. ./ _ 11 l,b - � � R k; 17C AT . S�jcw OR REMOVE ECU9,ANa 3 1=� .. CONJROC' -111. . . . .. ,� -.- 1. :�: .1 -- k I . . i - .... .. -��-�"=��-- - �- ��f��--�--- lll�b- I--,' .1. .. -+=�-- -Z, --- - .. �17_ -,/ ..., .. I % !. SMP\SIGN -- d-NklR% PARKING SIGNT TO I A * t . . -- , 1�, ..,-:I..- . . � t , � il.. � ---� . P', _4DL ' C' \11 EX. c- m im,b) 1� -.... , ..:tz%, 4 - .. I" , '.. \ 4!k. C'�,V,,' cr �3 . :��,, � - -.,-,. 11�22.30 \ lm� x X - ---' -.-----. E-1- I\-) ' -��, t '. �, 11 , 6 _ TIONS i t - ----. --- " , ,-� I \ P .. - , NEW LOCA � IfSTUJ N, . OT A.B. TOP = -- i8.19 -- - CHMA�'-( 1, .. '. � I EX. ssmH ; � �. ., \ --jSS1,JH '\:I------------.....- ** * i PARKIN(33',8i t-!)]* A. B. r,!Fog, 1 6" ----- ---� 10B]!�/ ' ^rk,e'! ., ",- ,�,-.,. \1 RltM=21.51 i STRIPING i 11'. " 7� i 6. 7 F, - 8, C. " --- 'E� 20.44/'--, "--'-., .,.. .'-< .,. -�.11 % '!'4\�=12.'.;"I-��,t'%,P(S'li'�I � . --E.X. CQ ---.-- .�..� -.,.� .,.�-` �l �l i � --- I I..", �,., ,',2- .�, "'." , - - � I ". , A :l,IV==`I2.qC--24 � . "OP = 20.69 1 - ,� " �-1 . , %P(N) 1 . ; , I P-- % '-,-. C. B - Z!NID A VE' S . f -- -- . ---- -12"(,P(N) / -I- -<1 .., .""'.. - -,- - .. -.11 - k-) I i ---- RELOCATE "3 HOUR i4.44 , - 11 ,, ... ..-. ��-��-- ir-1v = 8.98-12"CP(N) it 7-8. 1 ----- PARKING SIGN!P'VTO 11-34-12".'P(S) / "�,., ""I.. 11 "�.�.- W= 15. -,l, cp(mv) i . i � , , iNV'=16.�-j1-4*RVC"'W) . ,,, r,- c - ,,, 1-1 ". -1. 11 1. � 1� i , 'I �.. - . t I � . , � : .1 ---- NEW LOCATIONS A: _.- -- '. H .�ll ., . APPRO OR CONVU M-110N I-- ----- ..-.-.-...--- .. . I , . I ---.----.- ---- ....------ -... � --- . �: '. 11 . : ..--- -------T ---TE-MP-Of;kP,Y-..---. ---..----. --- �-- . - -.------ 7-- RIM-"O.63 . ( .�-, 1--� I',, 11 I VT I I -1 - `� -C ' ' "' ) -- 11 i 1� 1 N P j, ;N -- -i - - r--- 7--, -.--------. � ., ' I ) BENCHMARK 11 .x .-- I 4 Pt,S1 & 2 4 (IN E -1, , -Cf " I -, Iff-i"i = 18.80-12 "(f4b . - r - -;��, , . .--..----.- ---- INV=i -.21-/ - . . ; 11 1!7131 � - I T A N ---- cp 14) - B A t "), I - . .", j I - -I -130N . �, - 1�,.;- . 1�"---Zl * ,cp(SE" '- i ' *, F. jN,'f7 ! '- i' INV=14.4 11,PV = 14.80-12" %4;lR'viN AN! --�-- P '� ! -�. I ,;- Bil C EL 20.90 A `()f-4j)l0,k-1 qj%j, .1, -j ";;�, - -lz�l I ", , -j---,,�,C,()S, ----- �* ,gt� -p - . . i !NV = 19.4O--2--6"CP(E,' -.270-3-4- (.i;_zz I " 6'.7-9---0ljG-xxXx-1,x-�lxx x 1�1. !Nv=- - . � �1. , . ' J/ kS STREET --'- , I - ri 1%) I M.\.) x AT THE INTERSECTIO"F kM . 'I, x Daloza / Q c-l-v Le- r 2 9 7,7 1 ;�17 0 r- - b , SOUTH'--P - ee, I da-4f, .Lf' r I 1-1) 3 AND 2ND AVENUE ,9 6�-,A : � �-- . . . r- M Ill .., - 0\4 VTY OF EDMOPD-S--ENGINEER DATE ; E.0 - . i- I- r- r,,) 1, ", 0 M, � 1 4.0 -r�- . TEMPORARY SIGN "CROSS ktRE ' "..., I I I'D (A C.- I- qinr-w,&l k, ri nczp,n &4;7ArYl k--l-1 , � ST VICINITY MAP SCALAE- V4000" m as M ST \ La DO C,)l c\-3 = -N- Ir w !49 ,zt I 0 r- ki C�j � �L-lj , � I cq vq 121 I j -� l- I ow sr j " I � I a 1�t mcmDe . 5 i I z � 0`5 w 0 ?) . ig i ?i 19 25 8 - MAN ST. __L _�� - - LEGAL DESCRIPTION . THAT PORTION OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THIRD AND DAYTON STREETS IN THE CITY OF EDMONDS; TH W E TRUE POINT OF BEGINNING; THENCE NORTH 1*18'2:r EAST, A DISTANCE OF 263.88 FEET-, THENCE NORTH 8941'2:r WEST, A DISTANCE OF 231.24 FEET TO THE EASTERLY MARGIN OF SR-104, AS CONVEYED TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER AUDITOR'S F11 E NO. 2141566, SAID B THE LEFT HAVING A RADIUS OF 500.00 FEET AND FROM WHICH INTERSECTION POINT * THE CENTER OF SAID CURVE BEARS SOUTH 7Z52'59" EAST; TO THE LEFT AND CONSUMING A CENTRAL ANGLE OF 9-27-1 1", IAN ARC DISTANCE OF 82.49 FEET TO A POINT 1 00 FEET EASTERLY, AS MEASURED RADIALLY TO THE "L! LINE, OF HIGHWAY ENGINEERS STATION 20+00; THENCE SOUTH 23!25'27" WEST, A DISTANCE OF 61.26 FEET TO A POINT OPPOSITE AND 80 FEET EASTERLY OF HIGHWAY ENGINEERS STA11ON 20+68.17 P.T.; THENCE SOUTH 1-09'15' WEST, 80 FEET EASTERLY AND PARALLEL TO SAID -[: LINE, A DISTANCE OF 106.83 FEET TO A POINT OPPOSITE HIGHWAY ENGINEERS STATION 21+75; * THENCE SOUTH 44!26'45- EAST, A DISTANCE OF 28.10 FEET TO A POINT OPPOSITE HIGHWAY ENGINEER STATION 94-00 AND 30 FEET NORTHERLY, AS MEASURED AT RIGHT ANGLES TO THE CENTERLINE OF DAYTON STREET; THENCE SOUTH 8941'2:f EAST, ALONG THE NORTHERLY MARGIN OF DAYTON STREET, A DISTANCE OF 249.74 FEET TO T,HE TRUE POINT- OF BEGINNING; � ' * SITUATE I� THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. , � SAF TE DATA � EARTHWO�K QUANTITIES: I FILL = 1�0.0 CY NOTE: THE QUANTITIES OF EXCAVATION AND FILL ARE SHOWN ONLY FOR THE PURPOSE OF OBTAINING A GRADING PERMIT AND SHALL NOT BE USED FOR CONTRACTURAL PURPOSES. I TOTAL AR,� = 1.38 AC TOTAL IMPERVIOUS = 47,293 SF = 1.09 AC TOTAL PERVIOUS AREA = 12,820 SF = 0.29 AC NOTE- AREAS WITHIN PROPERTY BOUNDARY . I I I � i 1EGEND DRAWING INDEX SITE PLAN 4 TRAFFIC FLOW DIRECTION SECTIONS - -- L -�- GRADE BREAK - . . I I - DRAINAGE SWALE GRADING PLAN I T UTILITY & STORM DRAINAGE PLAN r------.2 1. -, - ::- CONCRETE AREAS _ - F.--..-' 77-1 ASPHALT AREAS IT AD e � AREA DRAINS SECTIONS AND DETAILS i ! CB In I I CATCH BASINS SECTIONS AND DETAILS � T SECTIONS AND DETAILS . I T NOTES i � x 0 -1, - " � - - 114 1, :L-� - I " 1, -'. � � I -p- W--j -- . . .- &-�lw vi � 7 �� 11 I I � , I , 10 I � " " Fe, LIV i i - I � � - I � � . 1, - � " I I � I �ill i � i -1 I � - 1% i V -1 I K - -,- i-pk I , AN U. " � I 0 1 -- I 44 , h cy% 0% cys ffi, 'IN 1 .\ 1.6 1 4 4,� CNJ '0 , , z , c%j '%I- - � 1 I - --4 1 8 . �- z �- 1-4 Z Q�: -k � �- �--�' cwl. II.-M IL3 Li z CLI � ;- .2 1� , - ;� L-i ,A -i Z R !�; ;� 04 -j F-4 04 � -Q� � � c4 � s�zt 'z cl: � -" F-14 w, I I 1c): Zj " 1-"-, (") (�j -4 -0 - . ;; Z L-4 &4.. C4 -- % " >,� .5. (3- � - co 0 0 a- ,4. W r 0-0 g) - :;� "�K � %'4 cc Z :-:440 8 cv% I F� , '111i::K - 11 - - ,- cm (0 N ji� 0, I k-�� �- 8 iSHEET I OF-2- I vlec�A 2,u� 2- It co"J"4 0 6 PVA x-yWD W IV ciu, IN 2 >c- -50e ar- aDoriaAvu- 5W 0%,ey - -1 R'LL - hoLj�� f "51 pj.�LL- MULTJ- FALMA!sll-J M -7'—&' v7 iB;ryQ#%A, Q D a �L� �4 L�-L� -71 4W A L C-11 —LIO —�sc� - PULL- CA*�-16Py 6e&prlw-,- AqN M ri N RZU-N-us 1-14 M 'n --i - Fuj MT. W, FtffT M- cef ezef- %Y - r-:u L�L- CAvf-4 npy -5 LM ral, ... .. ...... QED K6,RE A<'m i-�u5lam 1 '4 twifu'o 11. . — -- - ----- ---- v . 'Flow n&� QED MAPIS; - ....... A4-tm ."?Rom "P'Ep :5LJ m 5ET- MAPLr— 4/ .5fT#4— PUL-L MIN lbll� 2A -O�WarMy Ljt4Er-> N-SK: A-Z44-B.&I -EvDaseffo-A ��Q LL, 16, 1 ooze?'�j W— I a if I P4 QPLP-- 12_1 -ZA" I P-ENr- Vcc:7>c-R, �t"E� BLY,-Af, FqLL- K(N. la -Z .4 KP<-Y— 04p-�F '37IF-MAPIF, BLLe QnY A41 R-F-D 10 FU L.A, M. I r-4 Z4 .7, DCOE H)b'sh4"eu'*:5. Mc�LL-15 51d� PULL, tA 1�4. ItS'— Zoe' 8 CIIC�jD o!M,57v— -PA�44 :?All L315 M LAC MLK-v� Pfr4F- PAJ M IK 144E -Z4 FloaA vh5 Y4�� . ..... ..... . ....... ........... . W--;- EN6FL�4 YEW,' ui W Pa�u tip e;c*4faK cr cf) z 0 \1 I W—'j&s . ...... 1.=Lt. U, M IN 12!' RL�.NNe25 Pt�'-� I t-4 eHL� 15PE-M *A� A4W:#4r=' 24 L5U J3 it-L Hcwor""Nz�;r INC)Wlt>UA4�LVI MIN 12 )ZQNNCZ::& PLP+-4Mt> IN '50 N 24" CIC. I r--L ipp TRokpINErc Pe5 NO Pfu- \/E.i�f=y- Rn L-LO -c—;. L N Sk�eqT5 cOKDFM-N5' LM Lj-n$�� 'pp4L.jt P -K5 w T4-�F- L-P-� �PPn :�-P �'- F=44TICKS - 6ONT PCM�2, L-2-, FM Tt�E. LP-4��� FN:SPL��� �TTE- Ct"AC-ir� (nZ CC3�MN5 -T . W �'o C'&T701-f- iibl% 12JEIIEV'r - JR, IZ eo-,L� 1'�ARC- )or OA4.4- aw- lr"NK. z: mg K P"" m fik IMILA 11, MEN 4lia p Ar a .. .... .... NAWO ......... . ....... . ... .... 7�N I RON mmo rl PA �l Elm ill 40-cly I .7, 0 =13mosiAv, ----- ---- ---- 161=1 1 mz- 2ND AVENUE S. RSC:Flvso APR 2 0 2000 DEVELOPMENT SERVICES CTFL CITY OF EDMONDS AP OVED BY PLANNIN! �NDS TER W LANDSCAPE PLAN s H I' = 20'-0" E r 9 W > W co am U.1 W, cc co F- co z 0 In < @ < < in LU Ln N co z c" LLJ I-- 5 'Ct4 OD co , CID z 0 E-4 Oo (24 -It4 E--i z Z 0 zo U) F- 0 ZF-4. U) z 'r u 0 E-4 Z z cr Ul cc ca Lc) Z z 0 C.) 0 z LLJ 1�- co Q z c$) z 0 < CO _3 CL ul LLJ CO3 CL z 0 co < z Cl Ul 3: ul < __j %-EET NO. L I T k,-,. LANDSCAPE SPECIFICATIONS Edmonds Assisted Living Community 141 Dayton Street Edmonds� WA 100 GENERAL 1.01 Scope of Work the work under this contract shall include but not be limited to the following items as indicated on the drawing and as specified herein. A. histall an automatic irrigation system - Optional. B. Fine grade site and prepare soil for all planting and hydroseed areas as shown on plans. C. IrL4A all plant materials as shown on planting plan. D. Install hydroseed or sod - manicured or non -manicured areas. 1.02 Coordination Landscape contractor shall coordinate his work with the general contractor. He shall notify the construction superintendent of his schedule in advance of his operations and be informed of the general and subcontractors! requirements. 1.03 Permits� Laws, and Regulations Landscape contractor shall secure and pay for all permits and licenses required to complete his portion of the project. Check with the City of Edmonds. Landscape contractor shall comply with all building codes and regulations bearing on the conduct of the work as drawn and specified. Any necessary changes must first be reviewed and approved in writing by the general contractor. Changes made without the review and approval of the general contractor will be the responsibility of the landscape contractor. 365 Ericksen Avenue NE * Suite 323 + Bainbridge Island, WA 98110 * (206) 842-7325 1.04 Review of Eiristing Conditions Landscape contractor shall review the site before commencement of work. If existing conditions and drawings do not agree, notify the general contractor before proceeding with the work. Review the subgrades and drainage patterns as set by the general contractor. 1.05 Schedule of Work Landscape contractor shall Provide the general contractor with a proposed schedule of work before proceeding with the work. 1.06 Storage and Protection of Materials Landscape contractor shall protect and be responsible for any damage of his work or materials from date of agreement to date of final acceptance of work, and shall replace or repair damaged items at no extra cost to the Owner. Should any material be found damaged, or not in accordance to specifications, this material may be rejected at any time during the work by the general contractor. 1.07 Material Verification Landscape contractor shall provide load tickets� invoices, sales slips, etc. for all materials used on this project. These must be submitted to the general contractor before final payment is authorized. 1.08 Samples Landscape contractor shall submit samples and sources for all materials as noted in specifications to the general contractor. Failure to do so may result in nonacceptance of materials at the contractor's expense. 1.09 Substitutions -Changes in materials and placement shall be made only after a written change order has been issued by the general contractor. 1.10 Guarantee and Replacement A- Guarantee - Landscape contractor shall guarantee all materials and workmanship for a period of one year following final acceptance of the work by the owner. Contractor shall not be held responsible for any damage caused by excessive climatological conditions. Any materials vandalized or stolen from the job site prior to final acceptance shall not be the contractor's responsibility.. An agreement will be signed between the owner and landscape contractor at the time of acceptance prior to the final payment. EF40 B. Replacement - Any plant included in this contract that is dead, diseased or in unsatisfactory condition during the guarantee period, as determined by the general contractor, shall be removed from the site and replaced with an acceptable replacement at the landscape contractor's expense All replacement plants shall have the guarantee period reinstated for one year as originally specified above. Landscape contractor shall identify and if appropriate do all work necessary to prevent replacement plants from a similar demise. C. Replaceme ql."'�Iaterials - All replacement materials shall be ofthe same variety, size, and root- condition of existing adjacent plant materials and shall match existing plants of the same variety. 1.11 maintenance Landscape contractor shall properly maintain and protect all plant materials until final acceptance of work by the owner 1.12 Daily Cleanup All work areas shall be kept in a neat, orderly condition at all times. Prior to final inspection all debris shall be removed from site and work areas cleaned. 1.13 Protection of Property and Existing Utilities Landscape contractor shall locate and protect all existing structures and utilities both above and below ground. Any damage caused by landscape contractor shall be repaired at no additional cost to the owner. Existing tagged trees will be protected by the landscape contractor during construction. 1.14 Final Acceptance Upon notification by landscape contract(ir of completion of work, the general contractor will inspect and review the work. Any items not in accordance with specifications or drawings shall be completed before final payment is authorized. A document of record and warranty sheets will be s ubmitted by , the landscape contractoji- to the owner. 2.00 MATERMLS 2.01 Plants Landscape contractor shall provide sizes, conditions, and quantities of plants shown on the planting plan. Plants not conforming to standards and requirements listed may be rejected at any time. A. Standards for grading:"American Standard for Nursery Stock," 1980 edition. D. Standards for identification: "Sunset Western Garden Book," 1979 edition. C. Oregon Association of'Nurserymen, Inc. -3- B. 4ydroseed areas - Subgrade shall be V below finish grades of adjacent paved 3.06 Planting seedbed prior to hydroseeding. Follow supplier's maintenance specifications. Hydroseedmixto surfaces. I be approved by the general contractor prior to installation. All plants shall be pit planted. Hold Plants in center of planting pit a minimum of 2" above C. Planting beds - Subgrades of planting beds shall be 8" below adjacent paved surfitces normal growing Position and backfill 11alfWay with even blend of 5(r/o specified topsoil and 5oo/o 3.12 Irrigation to allow for 6' of specified topsoil and 2" of specified mulch. All planting beds will native soil and loam. Place transplanter fertilizer as recommended by manufacturer around root be crown-bermed. Rototill soils in planting beds to + 8". ball. Backfill to within 1/4" of finish grade, fill hole with water and allow to settle. Backfill to Provide all materials and equipment and install automatic irrigation system as shown on plans. nursery grown depth and firm soil. Apply "Osmocote to surface around the perimeter of plant!s Upon completion of system, contractor shall perform a test run of system with the general 3.02 Soil Preparation root ball. Finish grade at plants after planting and settling shall provide sufficient drdumge away contractor present. If initallation of system varies from plans, contractor shall provide an as - from plant at no greater than 1/2" per foot. Soak root balls before planting. Prune broken roots built plan indicating any changes. A- Remove any vegetation, debris, rocks larger than V diameter, and unsatisfactory soil that are 1/2" or gr . eater in diameter. Plant at any time plants are available and weather conditions from planting areas prior to rototilling. permit. If container is rootbound, slash roots vertically with a sharp knife along outside Of root 3.13 Final Cleanup ball in at least three places before planting. Remove all burlap and string ties from root ball. See B. Rototill subgrade to a depth of 8" minimum. For sod lawn and planting beds add Design Details. Remove grown bags. All areas shall be maintained in a neat� orderly fashion at all times. Prior to final inspection, specified topsoil in 2" lifts and rototill thoroughly into subgrade. remove all deleterious materials and debris from all areas, rake neatly all planting areas to an 3.07 Pruning even, fine grade, wash and clean all hard surfitces. C. Rake smooth all grades and remove all debris, rocks larger than I" diameter, and properly compact soil. No Pruning shall occur without the direct on -site supervision of the general contractor. No 3.14 Site Administration Schedule - Optional - Not in contract exceptions. Remove damaged and dead wood. 3.03 Finish Grades 0 Review subgrades and drdmage patterns left by the general contractor and review 3.08 Staking scope of work with�seelected landscape contractor. All areas shall be fine graded before planting in the following manner Review site prep, final grades, irrigation, and miscellaneous construction. Stake and guy all trees and shrubs which may become loosenea or uppou nom meir proper Review irrigation Lyout prior to ditches being JR11ed-in. Pressumtreat the system. A. Finish grades for planting beds shall be V below adjacent paved areas and crown- position during the first growing season. See Planting Details. Review and inspect plant materials upon delivery. benned. Review planting layputs prior to installation. 3.09 Mulching Final inspection - rm''ew all warranties and documents of record. B. Finish grades for hydroseed and sod lawn shall be V below adjacent paved surfaces. Grass will be flush with top of curbing. Provide all planting beds with a uniform 2" layer of specified mulch over a properly cleaned and Note: Above schedule to be followed carefully, Twenty-four hours Muired to graded subsurface. Mulch shall be applied only after a final inspection and approval of the schedule Patrick Leuner for any site visits. C. All grades shall flow smoothly into one another and provide positive drainage (note general contractor of plant locations and fertilizer applications. engineer's gm&ngp1m) or topog plan. 6 3.10 Lawn Instal1lations 3.04 Staking and Layout Prepare soil as specified in paragraph 3.02. Float or drag soil and compact to provide a fine No work shall commence on installation of plant materials until staking and layout is verified uniform finish grade that flows smoothly into all other graded areas and produces positive and approved by the general contractor Should landscape contractor choose to begin installation drainage. Remove all surface debris 3/4" or larger and dispose off site. Finish grades shall be prior to approval, he does so at his own risk. approved by the general contractor prior to installation of sod. Apply 10-20-20 fertilizer to the lawn bed at the rate of 20 pounds per 1000 SF. Wet soil before laying sod. Install sod so that all The general contractor reserves the privilege to adjust layout of materials as is appropriate for the joints are tight and smooth and alternate in a running bond fiLshion. Ile long edges of the sod job. shall be laid parWIel to the contours and perpendicular to the slope. After installation, sod shall be rolled to provide a uniform surface. Landscape contractor shall mow lawn once, ten days 3.05 Plant Location after installation. Set all trees, shrubs, and ground covers according to spacing on plans. Notify the general 3.11 Hydroseed Areas contractor of planting schedule and review plant location and layout for final approval before # planting. Plants installed without approval of 1he general contractor may require replanting at Prepare soil as specified in paragraph 3.02. Float or drag and properly compact to a fine uniform landscape conh-dctoes expense. grade. Remove all surface rock and debris larger thari 3/4" diameter and dispose off site. All grades shall flow smoothly into one another and provide for positive drainage. Finish grades shall be inspected and approved by the general contractor before installation of seed. Moisten -5- -6- -7- 2.02 Topsoil and Mulch Topsoil will be a Uniform blend of 50% washed sand, 25% sawdust, and 25% rotted steer manure- Provide sample and source. for approval by the general contractor. "11"',Mulch w ' ill be auniformblend of rotted steer manure and sawdust, "Steerco" or rotted bark. Provide sample afitl source for -approval to the general contractor. 2.03 Fertikw A. Provide "Osmocote 14-14-14 or equal for all trees, shrubs, and ground covers. B. Provide granular form 4-2-2 -Agro-Tran-splanter- for all trees, shrubs, and ground covers. C. Provide lo-2o-2o fertilizer for sod iawiii. Apply all fertilizers according to manufacturer's recommendations. 2.04 Tree Staking Materials A. Stakes shall be constructed grade Douglas fir 2" x 2" x 8V or equivalent. B. Wire shall be 10 gauge non-galvAhiied wire. _C.. Hose shall be vinyl-thm garden hose or equal. Reviewany materialchanges with PL, Inc. or the general contractor. Follow the planting -staking details. .2.05 Sod Provide BluegrasslRyegrass mix sod from source approved by the general contractor Sod is to be free of Poa anna (annual bluegrass), weeds, pests, diseases. It shall be no less then 10 months old and no more than 30 months old. All sod shall be of one continuous cut from the same field. Protect sod during shipment and storage on site to prevent dehydration and overheating. 2.06 Hydroseed Mix Hydroseed mix shall be approved blend of low growing grasses. Mix to be approved by the general contractor. 3.00 INSTALLATION 3.01 Subgrades A. Sod lawn areas - Subgrade shall be _+ 6" below adjacent paved surfaces to allow for 4" of specified topsoil and 2" sod. T9p of grass will be flush with top of curbs. -4- 1E LU > LU W co W cc co Z =3 CD CC < _J (V _J @ < of I I J Cn CL cr 4� I Ln 04 04 Co Nt'_ Z UJ I 04 U) V CD C$) P4 , CD 0 cm Z Ermi -<:4 PEI 00 U) F__4 P4 Z Z 0- E­4 ­t� z. F- 0 Z CQ F, LLJ < 0 E-4 UJ > Q Z Z _J UJ co LLJ a Cc LLJ on E__4 cr) Z < ca F- Z M 0 0 Z cr) LLJ F- Cf) LU _J Cf) D LLl < cr) 0 ca < Z 0 ca Z C) _J UJ lu 0- 1� SHEET NO. L2 / ge� � 's 61&M,6 44011v�& RECEIVED APR 2 0 2000 DEVELOPMENT SERVICES CTFL CITY OF EDMONDS IT FILLt CL c:) lu c:) ci= (L CL "04;z < w ifi m i z p EDMONDS ASSISTED LIVING COMMUNITY 160 SECOND AVENUE SOUTH EDMONDS. WASHINGTON 96020 SITE PLAN THE JOHNSTON ASSOCIATES INC. ARCHITECTS A. I. A. INTERIOR DESIGNERS 375 ERICKSEN AVENUE SUITE 222 BAINBRIDGE ISLAND. WASHINGTON (206) 842-7641 5/14/99 PERMIT SUBMITTAL 1/21/19 PERMIT RESUBMITTAL REVISIONS 8/23/99 ISSUED FOR BID 9/30/qq I PERMIT RESUBMITTAL REVISIONS 1/21/2000 ISSUED FOR CONSTRUCTION 3/10/00 REVISED CONSTRUCTION SET 8/11/00 TERRACE 'A' REVISION c No. 9806-ED2 IJOB rl DRAWN CCW. KN. JS c- CHECKED J5, BD FILE No. 9806AI-I.DC5 (02000 ALL RIGHTS RESERVED E S AFrC-,IH kTHOMAS J. JOHNSTONI ISTATE OF WASHINGTON L EAJ,J,(),C�5 but (Qq Q <zo �7 � PUl- k