Loading...
18010 ANDOVER ST.PDFIIIIIIIIIIIIII 10162 18010 ANDOVER ST .f 41 CITY OF EI)MCONDS Call PRospect 6-1107 when work CIVIC CENTER — WATER -SEWER DEPARTMENT Is ready for Inspection. (No tnspec- SIDESEWER PERMIT tions Saturday, Sunday or holidays.) N 02; 18010 Andoyer,Street ------------------- - ----------------------------------------- ADDRESS ............................................................................... OWNER ....................... W.iAli.am --- Ma.th-e.ws ..................... S ..... CONTRACTOR ........ �qy Allen .. . .. .... ..... ..... .... .. .... ------ ........................... 2527 Permission is granted ......... No-vemb-er... 9. ..... .......... ..... ..... 19 .... �7 for . .1 ....................... days. to REPAIR or �ONNECT a side sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I—Th6 owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before It has been inspected. NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No' 3—Top of side sewer must,have at Moat 30 Inches coverage at property line and 12 inches inside property line; minimum grade of 2%. 1 1 No bends In grade sharper than % will be permitted. NOTE �No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for t .- failure due to improper work which may develop within one year of completion. ,,�OTB-i�5—It is unlawful to alter or do any other work than Is provided for, in the permit, or to do any work on the main sewer or Its appur- t* ten&nces except to insert the pipe into the wye. 40 JUL 10 1967 PAID, City -of Edmonds ... Water Department XVAP CARD L Datej U..._XL)..!a6.7TAM_ Meter )S Tap ize..... ...... ................. Siz.t ................ L."ll .... Mfgrs.'No ..................................................... St yle ..................... . .. T­ .... ... For ...................... 12�62142 ....... 1� Lot No ....................... Add. ........................... Service Location .................... Blk. No ........ ................................... MeterLocation ......................... ......................... ........................................ .................................................................... ......................................... ... ............... MakeTap ........................................................... . ....... . ...... . ............ . ............ . . ................................................................................................ ............ . ... . . . ...... .. Pressure.............................. lbs. Test .................................... % SendBills to .......................... ..................................................... . ................ . ... Date of Work Foreman Guar. Voucher No ......................................... $ ........................................ Remarks: .................................. ........ ......................................................... ............... 7 ........................................... ...... ................. ................. ....... ......................................... . ....... . ............. . . . ................ . ....... . ....... . ..... . . . . . ......... .......................................... . .... . . . ..... . ...... .. . ..................................... OUTGOING Index ......... Reg ....... Route Bk ..... . . StenciL ..... Card. — INCOMING Index ......... Reg ....... Route Bk .... . ... Stena.—Card...— ial Chargeable to Installation s M91F � Me NO. S17E .......... DESCRIPTION RATE AMOUNT ................. Meter ...................................... ............. . .......... ------- : ..... .......... Meter Box .............................. .............. ............. .......... .......... . ... .......... Meter Plate I . ........................ .............. .. . ......... . . ....... .............. .......... Check Valve .......................... .............. . . ......... .......... .............. ......... Pipe, Galv. Screw .................. ........... I ... . . ......... .......... ............. . .......... Nipples ...................................... ............... . ......... .......... .............. ......... Bushings . .................................. .......... ------ -- * ....... ............... .......... Plain Ells ................................ .......... 7 ... ............ .......... .......... . ... .......... St. Ells ...................................... .............. ............ .......... .......... . ... .............. .......... .......... Tees ......................................... ................................ * ..................... .......... ......... ........... ........... .......... ..... 7 -------------- ............... ............... ----------- I .. ............... ---------- .......... .......... .......... .......... ----------------------------------------------------- ...................................... 1 ............... ...................................................... .................. I ......................... ...................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ .............. ............... ...... ....... ............. . . . . . . . . ........... ............ ........... ............. ............ . . . . . . . . . . . . .......... ......... .......... ........... ........... . . . . . . . . . . Material Chargeable to Taps Connected NO. SIZE DESCRIPTION RATE AMOUNT ............... .......... Pipe, Black Screw ........... ...... ...... : ...... ............. ......... .............. .......... Pipe, Galv. Screw .... ............. .............. ............. ......... ............... .......... Lead Connections .................. .............. ----------- - --------- .............. .......... I Curb Cocks ............................ .............. -: .......... ......... .............. ........... Corp. Cocks ............................ .............. ............. .......... .............. .......... Unions .................................... ....... .... ............ -------- ............. .......... Saddles ................................ ... .............. ..... . ... . ......... .............. .......... Nioples ..................................... ............... ............ ......... ............... ..... : ... Bushings ......... .................. : . .............. on.� ....... .......... ............... .......... Plain Ells ................................ ............. ............. ........ .............. .......... Street Ells . ............................ ... .............. ............. .......... ............ .......... Tees ............. .............................. ............... ............ .......... .............. .......... Curb Boxes ------- ** ----------------- * ............... ............. .......... .......... : S. 0. Extensions .................... .............. . . .......... ......... ---------- ---------- Gates ........................................ .............. . . .......... ........... .............. .......... Plugs ......................................... ............. . . ......... .............. .......... Couplings ................................ ............. .. . . .......... ........ ......... .......... .............. .............. ............. .............. .......... .......... .......... .......... .......... .......... Gate Boxes ............................ ................. ................................... .................................................... ........................................................... ........................................................... ........................................................... .............. ............. .............. .............. .............. .............. . . ......... . . ......... . ......... ------------ .... . ....... . ........ . ........... .......... ---- ----- . ....... ....... .............. ............ ............... .............. ................ ............ ......... .......... .......... .......... .......... ...... L ... ... !: ..... . ........ ........................................................... ........................................................... .................... I ...................................... ........................................................... ........................................................... ........................................................... Hours Time —Day Men ........ .............. .............. .............. .............. .............. .............. ............... ............. ------------ ............ ............ ............ ............ ............ . ........ .......... .......... .......... .......... ... * ...... ............... .......... Hours Time —Monthly Men .. ............... ---- 1 ....... . ......... Hrs Time —Auto ............. ... , .............. ....... . ... .......... ........ :::::: I . S uperintendence ...................... .......... ---- ------------- ---------- .......... . . Total .................. I ............. ........... .......... ADDRESS: TAX ACCOUNT/PARCEL NUMBER: ,Z 7 6 0 6 BUILDING PERMIT (NEW STRUCTURE): jq Uj 0 ZD (5Ff) COVENANTS (RECORDED) FOR: CRITICAL AREAS V DETERMINATION: E] Conditional Waiver E] Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): iio014W6uth) PLANNING DATA CHECKLIST DA SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) 5A -7 GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: - till 61 ta OTHER: LATEMP\DS'rs\Fomis\Street File Checklist.doc L w :ci -"-t ,-BUILDING,-D.EPARTMEPT A-11 -tAU- pp cm -� "a H-- L L Imsida 11mvy L- :,TERMITIP? JaTION MAKE (Olt N"Z OF BURLNXSS) 'M& -4% e w s -0 A - S NE -704, 16+6 -Seoai-ke 'OkWS P\ -'3 NA" R " r-\--%(>"r � R R 0 s A*% 0, AnDHT." NE SL--tn S c ov". 01 'B Z:21-,!�- M-5z,!�s L -7 177 q cqi 1-�- D--P�. a V-�Y - A - see* rC�l RZIMISMAL El Ck" Ant NEW o ALTER =CAVATE Olg "LL --------- YL) 'P-IPAM PR--U SWIM POOL Q DwZLLDro NATURZ OF WOMC TC BZ DONZ cons-truci new Tes - %Aence 0 SY I t-br mk�1*4" �t I M� Qb avv�. Me 0� romau- IMI� w 4-9 Me antbwLwd �mb7. � � � a - � C� a a r.�-Ung W W�W, Ccmtp� L- NOTE: Pirmit Umit One Year a�� D�O�O.,,s � W dW M =Ity XOV�LN ZrU.DLNW �n be W _� III III SIONAT11 1111 511-IlKi,77�Aj NOTE: Applicant Subject to PLm Cbeck Fee IMLI-L MAP.So.: PM"! 670280 NUMBXR 400 R C4 -!�.A Q�s MIR TA� fiETBICK St ZONX LOT 3 /V ONO 14T P"� ffraxcr M/W rlmr.mnG 8rPj=r 11,111 Ole. DIFICTEMT TMS i d IT. COMP. PIAM or. RnT SO—". rmif-,x &UM CL&.jul.V-% :A ft-a-K-0-77- �4 4j!. M, RAMAR" � R�l 5� F= SIM'. Or CLwwM=wN EM=T "WROVED - .V I r, Tin ij 1:) NO 13 Tw RIMIAJUM tL V C� 2MVING MUMUNG a= r & cL" mrz, c ai:, SCON RC7AMCM WALL sVrDamLXO POOL D=OXXrTO.IC P -YWX L EX �EMOX A TOTAL &WCNT Dre APPLkAtON APPRO-VAL 77M MOM This application Is not ape�it.tirrffi, /.UTRDRE= signed by the Building Oftj�w'oi WS Dep:��, O�Ly wo� NOTED uty; and few nre�pald, and re6lpt Is," knowledged in space provide& DZPA*iM=4T CITY OF EMMIMS PQ GAM "N 7 N- g 4, The City of Edmonds APPLICATION for SEDE SEWER PERMIT ,,,,,,--"---'-EASEMENT No . ........................... NEW CONSTRUCTION REPAIRS 0 coNTRACTOR...... ............................................... PERMIT No. ............ OWNE .......................... o . ....... LE IPTION: LOT N ..... Bp ........................................... GAL DESCR ADDRESS ... ................. "k a, NAMEOF ADDITION ............................................................ R 4 X& 91! LU CP <L-a 0---L Approved, DATM................................. . ....... By........ A P P V N . 9 1961 0V - STREET FILE CITY OF EDMONDS 250 51h AVE. N, - EDMONDS, WASHINGTON 98020 - (206) 771- 3202 COMMUNITY SERVICES August 18, 1987 4 " Mr. Sven Helleren 928 Spruce St. Edmonds, WA 98020 Mr. Sigve Helleren 15920-68th Ave. W. Edmonds, WA 98020 Subject: Site Distance at 18000 A Gentlemen: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR upon inspection of the site distance problem at the above addrazzleS, I you may slope the bank on the immediate corner of 18010 & Andover Street. Per our conversation on July 7, please do not disturb the roots on any of the large trees. If you should have any additional questions, please feel free to give me a call at 771-3202, extension 296. 1 Sincerely, BOBBY R. MILLS Superintendent of Public Works cc: Chris Beckman BRM/mo SITEDST/TXTMB061 PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING %STREET FILE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS 250 Fifth Avenue North, Edmonds, Washington APPLICATION FOR A SEWAGE DISPOSAL SYSTEM PERMIT (Submit 3 Copies) Permit to be issued t4kilham ... C—MiLthewS ----- 390.Q-.KE ... 70th-.Seattle,.-Washington. . . ....... For installation at: (street address). --- 18-010 .. Anover-.St . ..... ...... ....................................................................................... Addition or Subdivision ...... * --- legal ... Attached -_--------_------_ - -- .................................... Lot-. .............. Block ................ Type of Building: New. .... ..... Existing ......... _ Single family residence ................ Number of bedrooms ------- 3 ................. Other: (specify type or use) ..................................... ........ __ ...................................... ................................................................ Builder .... Ruaia --- Cojistru_aion --- -------- ................ ......... Address ---- ............ ............................... ....................................... Designer. C.... R. - .1yon --- Engineering --------- ----------------- ,Address.P.. 0. - -.Box ... 187 ----- Lynnwood.,_._WC-Mh1ng.ton ..... Soil Log Hole No. 1.-3.6".-.Loos.e,-..br.own,.--sand.y....Ioam- and..gravel, _6"._.cours.e.,gray,_- loose... --------------- Sand - ----- 6-".-.r-ou.r.se,-.browa,-..I.00se --- 11NOXHU.-sand.... ............. .... .................................. ................ Soil Log Hole No. 2 .... 1.o.am­a_n_d..9r.a.ye.1 ...... ..................................................... Elevation of Water Table, if encountered. (Distance from ground surface) . ........ None..encountered ...................... Corrections to control surface water if needed ...... ................... ............... .......................................................................... Specify if any removing or grading of topsoil in field area ............ ...... : ....................... ......................................................... ............................................................ I ............................................................................................................................................. Percolation: Test Hole No. I —Average Rate..10.3... --- --- #4 ... _2_5 .... .. . (Fall in ininutes/inch-bottom 6" test hole) Test Hole No. 2—Average Rate ..-� _8­8 .......... #5 ........ 3.7 .......... .... (Fall in minutes/inch-bottom 6" test hole) Test Hole No. 3 — Average Rate ..... 7...3 ...................... ­ ........... ...... .(Fall in minutes/inch-bottom 6" test hole) Average percolation rate on which �to base drain field design 6_6 ........ Date Taken 6/16/6-7..... Septic tank requirements based, on present rules and regulations: Septic Tank Size. .... 9.00 ............. . allons. 91 Amount of Square Feet o sposal Id .... 4-A ........ . .. .... ...... Signature — Desig .. . ... . ............... .... ---------------------------------- - Date .... 61195.7 ---- ...................... DO NOT WRITE BELOW THIS LINE (To be c��rieted by ISSUing Agency) Permit issued (date) ................................................................ Permit Number .................. ....... .................. Remarks: ....................... .................................. ................................ ...... ...................................... ................................................ zi 1 -0.10 3.5 F so-\ 9-A 140 FLOOK 0 N .6 0 t�Lv-'*J- \4 0 -1..a FUTURE I FtootA 5 0 -B.1 r_>RAX�4 FIELM AREA -5— P_ 0 alo, 1,40- ovvll�l ER 4. WILLIAM rc. mA -To AMIC>OVER STRF-F_T7 I%I.F-- SEATTLE IWASRINLAIONL 6 46 46 LECjAL: 5EE A=Ae-HED, (=0P*r liaoic) At-.�V=OVE:R STRE--r r_,jl%/r=.R-r DOVVW SPou-rI5 FRoM IDR^IW F-IELD. 2-DRA%N V-1ELD NAAY SF-' VARie.E> IW ARE:.^ 5vAovyW FOR r"ELD% 3.SY15TE:NA SIAALL BE by F_t4c;lvm7F_R 0 Fl F_ R C. -r'F-- S-T- 0 SOIL. \-OC:5 A-11:)001CIAL.SF_PrC-r��NK C-4"OPEQ Zwxr ut4F- (4k4 Sq.;rr.)oTk(s) 468 LOV4C? _..LY _j .4­1-y;;;�� O-D - SRH 34�