Loading...
18028 76TH AVE W.PDF111111111111 6230 18028 76TH AVE W .:dl 00 CD rk 4 N T I oL EDMON S I D E S,E W E R P E R M I T For Inspection Call, 77,1-,3dTRF Dl�'RMIT NO. Ad.dress.of Cons . truction: -�-,Ipnl wl� -ah 4 VE, w LINE] 01 d 12 Property Legal Description (Include all easements):* 4 7- er: 1,14)16 W4e-7L 6 5 lFe Owner,and/or Build Contractor & License No: U S S 30 KI SO W Single Family Residence Multi -Family .(No. of Units -Comme);,cial .(No: of fixture Units Invasion into City Right -of -Way; N o Yes' .(If Yes, R,ight-of-Way Construction Permit required. Call One-Ca.117Center 1 '(1-800-424-5555) before any excavat.ion.) Cross other.Private Property: No Yes.. (If Yes, easement required, attach legal description and county easement number..)' PLEASE READ THE ITEMS LISTED ON THE BACK /3, I certify thdt I h2ye�'r6ad and shall comply Da�e with the'items listed on'the back. Permit,Fee:.. 30100 'is sued,By: Trunk Charge:, Date Issued: q-13 As'sessment Fee:. Rec6ipt..No.: Partial Inspection: Comments Date Initial PMnAl_ 1#js#:� Final Inspection Approved: A A Ad/ .'R - 440IL&A AJ Date -I —ni - �1 ES - Rejected: eason PERMIT MUST BE POSTED.ON JOB SITE Wh-ite Copy File Green Copy - Inspector -Na—te Ini-tial Buff Copy. Ap�plicant The City of Edmonds Side Sewer Drawing I , " EASEMENTNO - ------------------------------- --------- NEW CONSTRUCTION REPAIRS F� LID NO . .................. . ASMT. NO - ------------------ OWNER --- --------------------- CONTRACTOR ------- 30 -SO-N ---------------------- PERMIT NO. .7,37-7 JOB ADDRESS ..... I ISO 2-8 7G -rH ��P — - ------------ LEGAL DESCRIPTION: LOT NO.3 -- ------ ----------------------- CK NO. ------------------------- ... . ... . .................. ---------------------------- --------- -- ---------------- --------- CK�N, At)mipu� ... Ac-Res ------------ -------------------------------------------------- ----------- NAME OF ADDITION ------------------------ ---------- 6 -------------------- ��j ..... -------------- =Ann- 118028 7(c) i� � �� =a r Teru CW-R r "cusa EXISTING 6'PY.C. FOR- i6104 76vu 4- OL" fteiDuceR Semo PWW-0001-11/75 (REV.11178) 3' PRIVATE PUMP Sf-WGR S 155 TF- M FROFA 140USIE T a W L.&-Tcj%k^.L N'JDPJNv4T P 2.s,op. -rH AvE�. \A/ �v TAUS , 0-s- 5 tv WATER "EVERS Approved: DATE ..... ByJc.df ---------------- ,/ .. . ... ..................... FART-IAL INSP Stl 006"M LLMD ,V7 AX~ CITY OF M40NDS STREET SECTION STREET CUT REPAIR R/W Const. Permit No - Notg- TNKE Date Received SiMSEWF-FA 'PeRt-AYT 173r7r7 -SF-Pr. 13,4195.5 Project No. Date processed Receipt No. Date Assigned Date Corrpleted. r of reeir: A!Xhalt Roadway Conc. S/Walk 4 r X 10W Concrete Curb CS, oe SEW R 114ST I-LN PUMP 'PRESSUR.F- LIWE Total area repaired 2 �2,-ft - x _5 ft., Total sq. yds/ln. ft Sq.yds/Ln.ft Minimum Charges @$ =$ Sq.yds/Ln.ft Additional Sq.yds Additional base lift Yds. Additional base aggregate $ Total cost ................ $ 72. 00 Fund #111 deposit fee .................................. =$ t4owe- Totalreimbursement .................................... =$ Total additional expense to bill ....................... =$ 72-00 The Finance Division is authorized to: Prepare a check in the armunt of $ made payable to the following: IV Bill the below mentioned company for $72,.'00 to cover additional expenses incurred by the Street Division on'the above subject work: RUSS %A0V4WS0K SF-WF-P. COMS'T. sooe t4o-rK sw. F—DmomM) WA,. i)1902,0 Requested by:/i 11-11- �S�r�et Supervisor ,iqls LoDw,,kW Date Approved by: A-2 ;0� �'-*S—. Superintend&t of P.W. - Date Verified 'by: 1--1 -4 '�w-b�rk:�Jei(/Coordinator Dat�e RL&Poc'�19' FILE # DeRoster Building Permit DETERMINATION OF NONSIGNIFICANCE Description of proposal Single family residence on lot bordering creek in -designated environmentally sensitive area. Proponent Mike DeRosiers Location of proposal, including street address, if any. 18028 - 76th Ave. W. Lead agency City of Edmonds The -lead agency for this proposal has determined,that it does not have a prob- able signi'ficant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decisi'on was made after review of a completed environmental -checklist and other information on file with the lead agency. This information is available to the public on request. ,P7 There is no comment period for thi,s DNS. Th.is DNS is issued under 197-11-34OC2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by___ Responsible official . Dan Smith Position/title Planning/Engineering Inspector Phone Address 505 Bell Street Date Signature ,gy You may appeal this determination of nonsignificance to James M. Driscoll, Hearing Examiner at 250 Fifth Avenue N. Edmonds, WA 98020 no later than 5:00 p.m., September 9, 1985 by filing an appeal in writing 771-3202 You should be prepared to make specific factual objections. Conta - ct Dan Smith to read or ask about the procedures for SEPA appeals. 0 There is no agency appeal. CITY OF EDMO14DS ENVIRONMENTAL ASSESSMENT PROJECT NAME DATE SUBMITTED The information on this form will be used to determine the effect of your action upon the environment of the City of Edmonds. Please answer each question as thoroughly as possible. I . LAND Area- /, -,� 11 C-9 AF-S Soils Type S19A-IA LA01 Limitations Description of topography (%Q slope) NOTE: If grading or filling will GradiAg: Estimated cubic yards /Sc> �S. exceed 500 cubic yards a grAding and filling plan must be sub - Filling: Estimated cubic yards OOA),q mitted with the application. Estimated area to be paved (including buildings)_ Estimated area in open space (pervious surface) C IQ 1�- 2 . WA T E Stream. - Estimated flow (cubic feet per second) �Z. Y c&L'LT' II)e-Y S-OLOA.')& Will stream be altered? A.10 If yes, to what degree? Other water bodies? Impact on storm drainage Method of handling runoff Adjacent to shorelines zone?___A/4 Within 200 feet of MHHW? 3. VEGETATIO': Type and approximate number of trees C) P1 I u's Minimum diameter of trees to remain % of trees to be removed 0 Ground cover tj 'Al weo&� Aiqe,4 % to be removed Proposed landscaping, if any 4. EXISTING LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT: Single Multi - Vacant Family Family Commercial Other North -South -East West 5. CIRCULATION Estimated increase in auto trips daily__ )q -T bo� I, I Availability of public transportation �e�s 6. AREA OF IMPACT Neighborhood City-wide Regional 7. EFFECT ON AIR QUALITY X) C9-AJ C_' B. CHANGES IN NOISE GENERATION 'u- 0- "o-e 11/78) ENVIRONMENTAL CHECKLIST Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide Information to help you and the agency identify impacts from your proposal (and to reduce id impacts from thC'PTOPOSal, if it can be done) and to help the agency decide whether an EIS is required. or avol C� Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agen- cies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best�"de- scription you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not ap- ply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach an), additional information that %Yill help describe your proposal or its environmenjal effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional�4n- formation reasonably related to determining if there may be significant adverse impact. Use or checklist for nonproject proposals:' Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN AD- DITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. A.BACKGROUND 1. Name of proposed project, if applicable: 2. Name of applicant: 3. Address and phone number of applicant and contact person: tA� C� QA NEZ Pq 40 % il 0- (Z A �_J ;kA I WQtV�-kS qTr WLOO(�� 4. Date checklist prepared: Wite / rs- 5. Agency requesting checklist: C,11 Proposed timing or schedule (including phasing, if applicable): 7. Do you have any plans for future additions, expansion, or further activity related to -or connected with this proposal? If yes, explain. bo,as 8. List any environmental Information you know -about that ha.,� been prepared, or will be prepared, directly ielated to, this proposal. 6 e� % 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government lapprovals or permits that will be needed for your proposal, if known. (RAJ 0 i _V 0 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific infor- mation on project description.) � VC I k � % " '.5 (� le �-4 )41 8 11 �) ID " P_ 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your pro- posed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you arc not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 0 '7 (J'_ 4 V,- \,A) A , tit '� - 1� 10 C-k TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat ®roliin hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 0 1/4) 0 EVALUATION FOR AGENCY USE ONLY -2- TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. What general types of soils are found on. the site (for example, clay, sa . nd, gravel, peat, muck)? If you know the classification Of agricultural soils, specify them and note any prime farmland. CJ41 — d. Are there surface indications or history of unstable soils in th e immediate vicinity? If so, describe. t' 0 WES AJ' OT 4 e. Describe the purpose, type, and approximate quantities of anv filling or.gradino pro- posed. Indicate source of -Fill. f. Could erosion occur as a result of clearing, construction, or use'? If so, generally describe. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 0 /X 0 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: C> e—S 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed'? If any, generally describe and gi ive approximate quantities if known. b. Are there any off —site sources of emissions or odor that may affect your proposal'? If so, generally describe. c. Proposed measures to reduce or.control emissions or other impacts to air, if any: TO BE COMPLETED BY APPLICANT 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site. (including year—round and seasonal stloeams, saltwater, lakes, ponds, wetlands)? If yes, describe type and Provide names. If appropriate, state what stream or i . t flo s into. 11 nto, P", U"A C U-1 Will the project require any work over, in, or adjacent to (within 200 feet) the described J waters? Jf yes, please describe and attach available plans. I H0 tL& Pe 3) Estimate the amount of fill and dredge material that wou,ld be placed in or removed from surface water or wetlands and'indicate the are� of the site that would be affected. In- dicate tfii source -of fill material. �s 0 e--% i-.5 4) Will the proposal require surface water withdrawals or diversions? Give general de- scription, purpose, and approximate quantities if known. V\ t) G�s N-J't- VN � P I \.(. - C5D)Does the proposal lie within a I 00—year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of -waste and anticipated volume of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give ,' I general description, purpose, and approximate quantities if known. (2Describe waste material that will be discharged into the ground from septic tanks or e r sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . . ; agricultural; etc.). Describe the general size of the system, the ri�mbcr of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. EVALUATION FOR AGENCY USE ONLY r -4- TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY (--E�Nater Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this wat'er flow into other waters? If so, describe. ,prilew. A� A e1r1qdk 2) Could waste materials enter ground or surface waters? If so, generally describe.. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: ON PI-k -','OA A.) 4. Plants a. Check or circle of vegetation found on the site: — deciduous treeV.�-Mde �aple, aspen, other r — evergreen tree. i edar R5 other �74hrubs -jz-grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, kunk cabba other water plants: water lily, eelgrass miffoil, oth ±--other typq4_of vegetation b. What kind and amount of vegetation will be removed or altered? c. List threatened or endangered species known to be on or near the site. . -- d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the..site, if any: 5. Animals a. Circle any birds and animals which have been'observed on or near the site or are known to be on or hear the site: birds: hawk, heron, eagle, Q�LQrd other: ... ..................... mammals: deer, bear, elk, beaver, other: ............ P . . .......... fish: bass, salmon, trout, herring, shellfish, other: ..... .................. b. List any threatened or endangered species known to be on or near the site. A TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Is the site part of a migration route? If so, explain. b 0 e�� A�_ � � �q d. Proposed measures to preserve or enhance wildlife, if any: ts 0 e�� A-� �\ P_� � __P � � 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be u�sed for heatin-, manu- faCtUTing; etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. . 6 Apr c. What kinds of energy conservation features are included , in the.plans of this. proposal? List other proposed measures to reduce or control energy impacfs-, if any- KO A q T I PrALAL. C- 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill., or hazardous waste, that could occur as -a result of this proposal? If so, -descfibe. C­_ 1) Describe special emergency services that might be required. t�sv Q--S (,\- f f t I 2) Proposed measures to reduce or control environmental health hazards, if any: 6 0 C--, Xro-l— Af F I -k b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? it�5 2) What types and levels of noise would be created by or associated with the project on a short—term or a long—term basis (for example: traffic, construction, operation, other)? Indi- catc what hours'noise would come from the site. PQ 0 V_-� U-11 TO BE COMPLETED BY APPLICANT 3) Proposed measures to reduce or control noise impacts, if any: NO EjE!, -Fs, 0 10 1� 8. Land and Shoreline Use a. What is the current use of khe site and adjacent properties? IQ les I- �� 1�- I cx-�- b. Has the site been used for agriculture? If so, describe. �6 ct A- c. Describe any structures on the site. d. Will any structures be demolished? If so, what'? t-J,0- 1�,W-( 4<:4, � f I \-� EVALUATION FOR AGENCY USE ONLY e. What is the current zoning classification of the site? f. What is the current comprehensive plan designation of the site? ,� � -) I �t-- �00,pt-�, g. If applicable, what is the current shoreline master program designation of the site? '��Has any part of the site been classified as an "environmentally sensitive" area? If so, p)e c i fy. 0'2 4 L-7: PAWIAI& S,,K5 7T/1� i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace'? k. Proposed measures to avoid or reduce displacement impacts, if any: 0 1. Proposed measures to ensure the proposal is compatible *with existinj and pr9i e*ctcd land uses and plans, if any: Lo &\� -y, c�t% c9 A� S Ck X We. C—t .7— I TO BE COMPLETED BY APPLICANT 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, Or low-income housing. b. Approximately how man), units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. -t' A t) N-0 -? f�' c. Proposed measures to reduce or control housing impacts, if any: 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building mate rial(s) proposed? b. What views in the immediate vicinity would be altered or obstructed? )'_�_A__ A-V k� c. Proposed measures to reduce or control aesthetic impacts, if any: S!V Yy 11. Light and Glare a. What type of light or glare will the proposal -produce? NA'hat time of : day wou)d.it mainly occur? lzhl") I b. Could light or glare from the finished project be a safety hazard or interfere with views? ID a QNS A- V P I Y c. What existing off -site sources of light or glare may affect lour Oroposal? d. Proposed measures to reduce or control light and glare impacts, if any: bo e.'�. Aji—k- kof I Y 12. Recreation a. What designated and informal recreational oppor.tunitics are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. ,,,, EVALUATION KiR AGENCY USE /JNLN' TO BE COMPLETED BY APPLICANT c. Proposed measures to reduce or control impacts on recreation, including recreation op- portunities to be provided by the project or applicant, if any:. . T-1 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed. for, national, state, or local preser- vation registers known to be on -or next to the site? If so. generally descri I be. b. Generally describe any land'marks or evidence of historic, archaeolooical. scientific, or cultural importance known to be. on or ncxt.to the site. . If c. Proposed measures to reduce or control if any: EVALUATION FOR AGENCY USE ONLY ( I �. ransportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans. if any. V A V e�L 16 \r 'i %, vi cL AA -r ifA v , �,u C iF&v-to b. Is site currently served by publickransit. If not. what is t e approximate distance to the It stop nearest trans '? P c., How many parking spaces would the completed project havj? How m ny would the project eliminate'! d. Will the proposal require any new roads or streets. or improvements to existing roads or streets, not including drive,.vays*l 11' so. _,enerally describe (indicate whether public or private). aA e. Will the project use (or occur in the immediate vicinity of) water, rail. or air transporta- tion? If so, gen erally describe. f. How many vehicular trips per day would be generated by the completed project'! If known, indicate when peak volumes would occur. 'A- -'r 1.') P� " � -I C, C-0 t ii S . , M TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE 6NLY. g. Proposed measures to reduce Or control transportation impacts, if any: 15. Public Services ire pro - a. Would the project result in an increased need for public services (for examp e: r. lection, police protection, health care, schools, other)? If so, generally describe. C) 0 ., -^)-; —I— " kA b. Proposed measures to reduce or control direct impacts on public services, if any. '�So ta'�' t'a- - A, � f � V I ' 16. Utilities a. Circle utilities currently available at.the site: electricity, natural gas, water, refuse serv- ice, telephone, sanitary sewer, septic system, other. t---. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are tru and om te t the b of my knowledoe. I understand that the lead agency is ern t m e ts ci on. Signature: ... . ... . . . ..... . ..... . . ..... .................... Date Submitted: ...... F . . 4./ ............................................ TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Rezones, Code Changes , Annexations, etc. (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the.types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to ;air; pro- duction, storage, or release of toxic or hazardous substances; or production of noise? A) Proposed -measures to a.void or reduce such increases are: t G�S 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy. or natural resources? 0 \--% 1^4 ? X -( ' Proposed measures to protect or conserve energy and natural resources are: '�") 0 itq.& X-J'- cpv— - i�4_ � f k � - 4. How would the proposal be likely to use or affect environmentally sensitive areas or ar- eas designated (or eligible or under study) for governmental protection, such as parks,.,wil- derness wild�_and sce.nic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, 1`1664-2ibs, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? ilo C:) '-­� .6 et— P�1' F I t �-( . . . . ­' _11— TO BE COMPLETED BY APPLICANT EVALUAiiOl� FOF'r AGENCY USE O?�LY Proposed measures to avoid or reduce shoreline and land use impacts are: 6. 'How would the proposal be likely to increase demands on transportation or public ser- vices and utilities? Alf Proposed measures to reduce or respond to such demand(s) are: ')�40 7. Identify, if possible, whether the proposal may conflic ' t with local, state, or federal laws or Tequirer�ents for the protecti the environment. Side Sewer Drawing The City of Edmonds EASEMENT NO. ............................................ LID NO . ...... ........... NEW CONSTRUCTION REPAIRS F _ASMT. NO . .......... .......... 737.7 OWNER ... CONTRACTOR ....... 0 ... ....................... PERMIT NO. ... ..................... JOB ADDRESS ----- ........................ ..................... ................. CK -NO. 02, 8 7 G e LEGAL DESCRIPTION: LOT NO3 . .............................. z ......................... Ac............ ....................................... .......... .......................................... -- ------------- C K ............ NAMEOF ADDITION ............. ............. ................................................. .................................... NO F:k-r H— I SO 2-S 7(o 0 3- 5.5 Op. 4 'ZM F_ 4 2." "x Z­ tkeou"sa FOR 18104 '7GT-v a T,0p. 3. -.RL- I a .1 1 PRIVA-TE PUMP 56%-4(-:R S55TF-M FROM "OUSIE To (0­Ljh,.rcrAA.L 0DRANT u e -ra %a 1 1 V.. 2-5*0P. FH V A ed- pprov .. ......... .. ...... DA-M 13 !v �v Lij I. 3inov [\ <D cx CD CD C1 (--) w w Li w U- L" . C.3 — LM = — U- w C:) Z�z W = --I C:I U- LLJ LAJ = —i CM C) LLJ CD LLJ ca LAJ = C-D = C) 0 LL, CD = L.) F- = LLJ = le = V) = P" -j C� 0 P" U- U- 0- LLJ a- C) 0- 0 u PRDJECT NAME: APEI�JCATION RECEIPr DATE: M��M loiLl FAMM, v A /4�62 Reviem� 4y: (initial/date) CMAENTS PLANNING WrRIswR I'm= l'IENaqmG FIRE . FUILDING 117111111 //F//77// 3124= FAmny/MULTmz/cmmcIAL - (Circle One) BACKS CHECKED - Planning T777TRI VARIANCE/SETBACK AW. 7777777777777 )ONDITIONAL USE PM*= //////// 2 7T-17T7 7 T17 T 7 7 7 / 7 7 7 7 7 —7777-7-7 —777 - ,)DB REQUIPME2M CHEM= ///////// //////// 3 YrHER ZONING MQUIREMENTS 777/77 777777-777 Tf7= 7T77TI7777 M,�7/M/ 4 T77777 TTMRONMENTAL FEATURES .WCESS SLOPE & VEHICLE ACCESS 777777777T/777777 6 )RAINAGE PLAN (On Site) 7 MEET FILE 77777 TRTF177 T177777 8 MAL DESCRIPTIM VFRIPICATION 7717-1777177 -17777TI-f 9 )UIT CIAIM/DEDICATIONS :e�- 7T777 7777T/T/7 7 7 7 7 7 7 7 7 / 7777/77 10 [//////77777/7777 ZASEMERr - PUBTIC/PR-MTE a242E 11 2ALCMTE SOM CQME)CTION IF NO LID# 777777 //////, 777777777777777777 ///////// ///////// 12 7777/77777TF77777 ?EAT/SUBDIVISICN MQUIREMM 13 7/7T=7//////// �VY7-�/e, RIGHT-OF-WAY CONSTRUCTIM PERMIT REOD ///////// /w/w/� 0 14 77T/7/7/77T///T/77 BOND REQD FOR PUBLIC IMPROMOM 15 SOILS CONDITIMS & GROUND 177Tff 777777T/7777777/7T 4ATER FIETD MCKED -16 777T/77777/777/ STREET PAVING M)UIRED ////// 17 17TTF 77177T9 77777777' CURB AND GUTTER MQUIRED 3IDEWAIX RE*UIRED 7M11 19: 7T/T/7 111111171 777/7T/7 L.-7- /////7T/r/ -IM CUr FOR DRIVEWAY REQD 26 IT17777777 37,Kwr NAME SIGN REQD �f 7777777Tl7T7777'111111111 L-7,i 7777777777. 7 YIHM SIGNING REOD //////////.22 31DE SEWER AVAIUU31LITY 77777 111111171 7777='/////Yt/ ///////// //////// 23 j EKISTING WATER MAIN SIZE //////// 24 ,aTER M'w= SIZE 777TI7 77777777 25 — MMICE LINE SIZE 777Tff 11111711 7TI777TI77 26 — iYDRAUr REQUIRED 7T7777777 -RT17= 27 — 111-17T -IT17TITff .qYDRANr SIZE EXISTING ////// ///////// 28 'ROSS,0ONNECTICN INSPWrICN REQD 7T/T9 7TTr= T7TR77T Al �/G/ .29 111171 ATER METER CHARGE REM 1t11111111 30 FIRE'LINE CHARGE REM SPRINKLER 11711111 117171W STREET CUr //////,fjfl j2, 7 j DITCH EXISTING -)PEN 777777 11111111T 14 CULVERr REM 77 111111117 V" SIZE. 77777T777777777 MTOi BASIN REM 777777777 w/wa 5XV INDICATED CN SITE PLAN 77TTIT7TIT17771 MOULDER DRAMAGE MAIMMN 777777777 SHALE OPFN RUNOFF 39 AISC: 7777777P REVIEWED BY: PLANNING MGR. K17 ENGINEERING MGR. PUBLIC WORKSMGR. CITY OF EDMbNDS CONSTRUCTION PERMIT APPLICATION NAME (OR NAME OF BUSINESS) M / - I I /) -7- . - r,-- -, , - . �-/? ,c> n CITY, ]TELEPHONE NUN CITY ITELEPHONE NUMBER M21=1 A DDR S C TELEPHONE NUMBER 4 & _0 -7 -7-2 lee ql_6� "7'7-----) STATE LICENSE NUMBER I CITY LICENSE NUMBER I Legal Description of Property - include all easements (show below or attach four copies) USE %4�..-�ERMIT ZONE NUMBER JOB ADDRESY�100 /I 11L� 4 4e, jV, LEGAL DESCRIPTION Z��VISION NO. LID NO. 6)4- - 1 14,9 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. EXISTING 4� '7 REQUIRE[) DEDICATION PROPOSED-.60 RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED 0 STREET USE PERMIT REQUIRED 0 SEE ENGINEERING MEMO DATED SEE PIW DEPT. REVIEW CHECK LIST 4 D1 METER SIZE,// IBUILDING SUPPLY SIZE IFIXTURE UNITS REMARKS SIGN AREA ENV. REVIEW ADB NO. ALLOWED PROPOSED COMPLETE EXEMPT SHORELIN5 VARIANCE OR CU PLANNING REVIEW BY _j YARDS 01 A_ WI FRONT V NEW RESIDENTIAL 191 PLUMBING ANJ ADDIALTER NON-RESIDENTIAL MECHANICAL REPAIR EI RETAINING WALL SIGN EXCAVATE DEMOLISH El OR FILL FENCE CHECKED BY T OF L_x-FT) I EPRE -MOVE INSPJ T COMPLIANCI SIDE SEWER WATER LINE swim SPECIAL INSPECTOR POOL REQUIRED 0 YES 0 NO REMARKS . NUMBER OF STORIE9 ----T-NUMRFR OF DWhLLINU NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) PLAN CHECK FEE BUILDING PLUMBING MECHANICAL This Permit covers work to be done on private property ONLY. Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. 7ermit Application: 180 Days Permit Limit: 1 Year - Provided Work Is Started Within 180 Days GRADINGIFILL "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of < whatever nature, arising directly or Indirectly from the issuance of this permit. Issuance of. this permit shall not be deemed to VV 0 modify,,waive or reduce any requirement of any city ordinance nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE provision." I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and state laws regulating construction; and in doing the work authoriz- THIS PERMIT AUTHORIZES ed thereby, no person will be employed in violation of the Labor ONLY THE Code of the State of Washington relating to Workmen's Compensa- WORK NOTED i9riln-su.r?nce, R A NT) DATE S GNE I NSPECTION DEPARTMENT CITY OF EDMONDS ATT�:KITInKi 771-3202 SIDE REAR 1. LOT COVERAGE ZI LU 0 Z Z Z n CL N Uuut HEIGHT /1 02 OCCUPANCY OCCUPANT GROUP LOAD Z VALUATION 'I - FEE APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. OFFICIAL'S SIGNATURE DATE IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE L UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OA UG -6 1985 ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UB CHAPTER 3. PINK — Owner GOLD — Assessor 102-78 E.­­ A DATE : - 5�— 36- MEMO TO: Building Division Planning Department FROM: Engineering Division Publ ic Works Department SUBJECT: After reviea of the subject Building Permit appl ication , vie have the fol lowing comments: 1. Connection to City water system required. 2. Connection to City sanitary sewer system required. 3. Right-of-way permit required for any work on City property. 4. Driveway slope not to exce-nd 1401 5. ac k,.-ia I-er val ve requ i red i f downs ta i rs pl umb i nq is below elevation oF upstream manho e. 6. Water and' sewer lines to be separated by 10 foot minimum. V bppp- C A-rcl EAS I t' (vr.t,4-r M2 TT�MDN- Ps LENGTH MIN-, '2' L4Ax CovrLp, SYSTEm CROSS SECTION CON-I"ROL CA-TC61 a" I t4 --� EE PAGE 3 FOR OUTLET CONTROL DETAIL OVrLST C004TROL!, rzwt�17_ 4" le TO 0UTk_ZT (PJ PRAP OP P,UNOFF .S'P;ZEADEV,) 2' 2' 6" Dawr, At& - sp^LL& �% vou^L) 2' X' DErp, !V,'- CAUS"ED KOCV. FROM 0U_rLET CON_r1k0L RIPRAP OUTLET VVA3HED r&P-*,VIFL —.6. IL FRD%i OLMLET CONTROL OL"FLO* TOWNCk, MIN 10' LONG, 'To' 4 A" 1"WRIF P'"r _rD IbIr 1=11KIL 4' FERF Pipt WrrH CAP—% RUNOFF SPREADER OUTLET STANDARD DRAINAGE PLAN DETENTION SYSTEM PAGE I OF 3 for 1) F-P Q location=b plan by phone date DESIGN DATA System Imperm Pipe Pipe Orifice Number Area Diam Length Diameter _�0'90 Yq I I NOTE S I. Call Engineering Division (771-3202) for prebackfi)l and final inspections. 2. Responsibility for operation and maintenance of drainage systemson private property is the resDonsibill'ty of the property owner(s). Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times. '47 CITY OF EDMONDS _J] A UG 6 1985 '-HAEL L EROSIER ZO N E 2� A 81 TY LTY i ES, ACCORDING TO :ORDED IN VOLUME 12 OF PLATS SETBACKS: )F SNOHOMISH COUNTY, WASHINGTON. r- -.) r r"-,,-)NT 2-5 R 1E A R - 2- OTHER HFICIHT e) S-/ 0 �700TIN6) DeA'46 ZVLL No-rbc- FOUND IRON PIN WITH PLASTIC CAP NO-D 4561 FOUND 2" x 2" WOODEN HUB WITH TACK w A[ 01 A[ 13' /0 cv -c .a- (0 Des. A�ca' - Nawe" ENGINEERS e SURVEYORS . PLANNERS T T 324 Main Streat Edmonds, Washington 98020 cm. R L S