18068 86TH PL W.PDF111111111111
8185
itoolflooloolloolool I: I W WZ
APPLICATION
for
The City of Edmonds 3TH"A"'E'r—N&T OFFIRLYE SIDE SEWER PERAHT EASEMENT No.
NEW CONSTRUCTION E] REPAIRS 191"
. I S
....................................................
OWNER ..... MA-Vw..�k ......
ADDRESS ..... ....... ............ ..... � ./ ......
6
AP/
R4Y
MENNEV-1-71
113M
?-( 6'
....................
lo /57
-b'6WfPPERMIT No.
CONTRACTOR ---- C ------------- ............
LEGAL DESCRIPTION: LOT No . .......... ...... ------------------------------------------
,,_�AWLOCK No...
NAMEOF ADDITION ......... 0 .................. 61 ......... ......................................................................
.1
-Vr ;
—) ID,
G
Approved:
"Ali
DATE ... J ------- -- ------- By
;;;� . .............
5
CITY OF EDMONDS
CIVIC CENTER — WATER -SEWER DEPARTMENT
SIDE SEWER PERMIT
Call PRogpect 6-1107 when work
Is ready for Inspection. (No Inspec-
lions Saturday, Sunday or holidays.) NO: 2964
-ADDRESS ............... 1.8.0.6.8 ..... ... 8-6t.h .... P. la-ce .... We.s.t ............................................................................................................................
.. .. .... .. - -- -- ---- .... .. ..
OWNER .................. M.a.ck .... Rho.a.ds ............................................... CONTRACTOR ...... �niversal Contractors,.'Jnc.
.. .. .... ....... .. .... ....................................................... ............
Permission is granted ............................. May .... 7_ 19 ... 6.8, for ...... ................. days to REPAIR or CONNECT a side seNver
-svith City Sewers in accordance Avith application on ffle and governing ordinances.
ATTENTION IS CALLED TO -THE FOLLOWING:
NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must
be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been Inspected.
NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches Inside property line; minimum grade of 2%.
No bends in grade sharper than % will be permitted.
NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for
I failure due to improper work whJeh may develop within one year of completion.
NOTE No. 5—It is unlawful to alter or do any other work than Is provided for in the permit, or to do any work on the main sewer or its appur-
tenances except to Insert the pipe into the wye.
i
GENERAL NOTES AND SOIL., NAIL
WALL DESIGN PARAMETERS
1 ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE
WITH THE REQUIREMENTS OF WASHINGTON STATE DEPARTMENT
N 1000.00 OF TRANSPORTATION, STANDARD SPECIFICATIONS FOR ROAD,
_ROW BRIDGE, AND MUNICIPAL CONSTRUCTION, ENGLISH, DATED 2000,
N 1000.00, E 1169.20 AND AMMENDMENTS (WSDOT).
E 1000.00
PK PK 2. CODES: STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES
-------- .(SIXTEENTH EDITION), 1996 (AASHTO), AND INTERIMS THROUGH
2000, STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND
100.00 101.31 MUNICIPAL CONSTR.UCTION (WSDOT).
EP Y CB 3. LOADS: THE WALL FACING HAS BEEN DESIGNED FOR FACING
OLYMPIC VIEW DR FLEXURE AND PUNCHING SHEAR IN ACCORDANCE WITH
EP ROW SOIL NAIL LOAD OF 33 KIPS PER NAIL. REFER TO
N 962.57 SUPPLEMENTAL GEOTECHNICAL REPORT BY LANDAU
E 997.46 00� ASSOCIATES INC., DATED JUNE 18, 1999.
NEW EXT UDED CURB ANGLE PT No. 1 4. CRITERIA: THE SOIL NAIL WALL STRUCTURES HAVE BEEN
- 2 N 965.39 END EXTRUDED CURBING DESIGNED IN ACCORDANCE WITH THE SLD (SERVICE LOAD
E 1042.53 DESIGN) PROCEDURES CONTAINED IN THE FHWA "MANUAL
ANGLE PT No. 2 -ROW FOR DESIGN AND CONSTRUCTION MONITORING OF SOIL NAIL
WALLS" REPORT NO. FHWA-SA-069 DATED NOVEMBER 1996.
EP 101.36 1�j
STRUCTURAL DESIGN OF ANY INDIVIDUAL WALL ELEMENTS
I NOT COVERED IN THE FHWA MANUAL HAVE BEEN DESIGNED
START 12 N 963.97
10 IN A"'CORDANCE WITH AASHTO, STANDARD SPECIFICATION
. .... .... , %.'
G ___71 �v_lnlf�S E 1095.54
EXTRUDED CURBIN r -1 00,q-a- -1996, AND INTERIMS
OF HIGHWAY BRIDGES, SIXTEENTH EDITION
THROUGH 1998, OF HIGHWAY BRIDGES. ADDITIONAL
106 kB1
GEOTECHNICAL INFORMATION IS PROVIDED IN THE
CB3
.......... GEOTECHNICAL REPORT BY LANDAU ASSOCIATES INC. DATED
949.10 0 6 DECEMBER 12, 1996, ENTITLED "GEOTECHNICAL ENGINEERING
E 960.68 9
SERVICES SLOPE REPAIR, 8500 BLOCK OF OLYMPIC VIEW
START OF TOP DRIVE, EDMONDS, WASHINGTON". SESMIC DESIGN OF THIS
STRUCTURE WAS DONE USING AN ACCELERATION COEFFICIENT
OF WALL SLOPE
OF 0.3g
REMOVE CLUSTER OF
VINY MAPLES
9 8.
N 943.63 p 5. SOIL NAIL CRITERIA:
(0 i< ROW REINFORCING LENGTH FROM BACK OF WALL: 13 FT.
E 945.75 DECLINATION FROM HORIZONTAL: 15 DEGREES
OF SLOPE DIAMETER OF REINFORCING ELEMENT: 1:: (#8 BAR)
99.1 SOIL NAIL WALL P.) DIAMETER OF GROUTED HOLE: 6
REMOVE TREE SOIL NAIL
c3 6. MATERIALS: C.I.P. CONCRETE CLASS 4000 WITH AIR
N UPPER ROW 01
kREA ON SHOTCRETE: F'c=4000 psi
OR;��THIS I
ANCH S HoWN FOR CLA NOTE: REINFORCING STEEL: ASTM A615, GR 60
(OTHER AREAS NOT S -1. REMOVE ALL VEGETATION IN THE CONSTRUCTION ANCHOR BOLTS: ASTM A307 GALV.
"'�TOr*O�OF SLOPE TO REMAIN MISC PLATES AND SHAPES: ASTM A36
AREA AND COVER WITH VISQUEEN. ANCHOR WITH WELDED HEADED,STUDS: ASTM A108
SAND BAGS DURING CONSTRUCTION OF THE SOIL NAILS: ASTM A615 GR.60,
EPDXY COATED PER
10' PERMANENT CONSTRUCTION EASEMENT SIF LK15 VP�t,, AMAR W9 DO'W'. ( f NMZM OF 6 RETAINING WALL.
(TYP.). NO VEHICLES ALLOWED, EASEMENT tc>4.15- 2. TOPOGRAPHIC INFORMATION SHOWN ON THESE DRAWINGS ASTM. A775.
FOR SOIL NAILING ONLY. iF?Dm FURNISHED BY ChY OF EDMONDS HAS NOT BEEN VERIFIED. 7. UNLESS OTHERWISE SHOWN ON THE PLANS, ALL . EXTERIOR
CONTRACTOR SHAt.L FIELD VERIFY THE SURVEY INFORMATION CORNERS AND EDGES SHALL HAVE A 3/4" CHAMFER AND
AND SHALL RE -GRADE SLOPE TO AVOID FUTURE SLUFFING AT
ENDS OF WALL. ALL INTERIOR CORNERS SHALL HAVE A 3/4" FILLET.
LAN SOI I L WALL
0\/D MAIA SCALE: 1 10' 8. THE r'ONTRACTOR IS RESPONSIBLE' FOR FIELD LOCATING
ALL UTILITIES.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
MAINTAINING STABLE SLOPES. ABOVE. AND BELOW THE SOIL
NAIL WALLS.
EL 130
EL 120
EL 110
EL 100
EL 90
EL 80
DO
Lq
cc)
�0
12
vi
0
z
CONSTRUCTION
3/8"
GALV. WIRE ROPE
JOINT (TYP-) 5
@ 4"
O.C., TYP.
z
SEE DETAIL
0
U.N.O.
TOP
OF
_j
0
- GALV. WIRE ROP
TYP.
SLOPE -
z
ILMAUNINU I UMNOUUMLL,
EACH END, TYP.
CIP CONCRETE WALL, #4 @ 10" O.C.f E.W. OR EQUAL 10. LAP ALL #4 AND #5 BARS 14-INCHES MINIMUM.'
SHOTCRETE WALL, #4 @ l'-O" O.C., E.W. OR EQUAL 11. WALL FINISH SHALL CONSIST OF PIGMENTED -SEALER PER
SPECIFICATIONS. APPLY ON EXTERIOR FACE OF CIP
CONCRETE WALL V-01" BELOW GRADE.
PROPOSED GRADE AT 6
TOP OF WALL, TYP. z
I- EXPANSION SOIL NAIL, TYP.
l'-O" STRIP PREFA13RICATED z JOINT (TYP.)r6_*_� SEE SHEET 4
DRAINAGE, MATERIAL CENTERED F5 SEE DETAIL
VERTICALLY BETWEEN SOIL 1�� U3
NAILS @ 9'-0" O.C. (TYP-)
_j
0
z
GROUND SURFACE
rAPPROX. EXIST.
- - - - - - - - -- - - - -- - - - - - - - - - - n - - - - - - - -
+ +
- - --- - - - - - - - - - -
+
- - -
V)
. --+ +
+
- - - - -
+
+
+
+ + +
L0
+
+ +
+
+
+
+
+ + +
+ + + +
+ +
+ + +
6' 1
TYF.
+
+ ��+
+
4-
+
AL 1
4- 14 . . ............. + +
+
+
7ryl. � Xl.
\\/
L - - - - - - - - - -
3 HORIZONTAL
WALL DRAIN PLP-_E.
STAGGER,
TYP.
PROPOSED GRADE AT
BOTTOM OF 'NALL, TYP.
3 EQUAL SPACES
JOINTS CENTERED BEWEEN NAILS
tAt-'ANblUN SEE DETAI
JOINT (TYP.) 6
SEE DETAIL
2 EQUAL SPACES
JOINTS CENTERED BEWEEN NAILS
NORTH ELEVATION - SOIL NAIL WALL
SCALE: 1 "= 10'
(LOOKING SOUTH)
FRACTURED FINISH 7
TYP., SEE Dq_AIL
I�L_p
3 EQUAL SPACES
JOINTS CENTERED BEWEEN NAILS
2'- 6'
EL 130
EL 120
EL 110
EL 100.
EL 90_
EL 80
60
WAS.,
6 �9y()NAL
EXPIRES 6/28/OZ
&mom
CIVIL & STRUCTURAL
AMAR Re��l DC-NC(57
leac(lpe? pthc,'�, 4 -0vD(
C:)