Loading...
18101 84TH AVE W.PDF111111111111 7812 18101 84TH AVE W ADDRESS: ck�yc TAX ACCOUNTIPARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): -2 (z)n I - Q 'S COVENANTS (RECORDED) FOR: C5 -c�?,C)oo - 5� -�S�CRITICAL AREAS: 93-0 — DETERMINATION: E] Conditional Waiver E] Study Required iver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: 13 10 PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: S47 SCALED PLOT PLAN DATED: SEWER LID FEE LID SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED. c'� /D /o SIDE SEWER PERMIT(S) M SA GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: q — &I — C200 LATEMP\DSrs\Foffns\Street File Checklist-doc C/o � 18101 7� 22" r7 3:2'-__ �k 19, C/O 4' C) 1> 1> m 00 PRIVA TE RD CITY OF EDMONDS SIDE SEWER AS -BUILT ADDRESSi 18101 84TH AVE W PERMIT NUMBER: 9569 HOMEOWNERi xxxxxxxxxx CONTRACTDRi I . FULLER 3/27/02 DRAWN 1. ABILA BY, I - SCALE1 N TS I I NOTICE: N'o ... warranty -of accuracy. The information on the attached map(s) was compiled for use by the City of its Employees and Consultants. Edmonds, The City of Edm.onds does not - wa rra nt the accuracy of anything set for ' th on these map(s). Any person or entity -requesting a copy should conduct an independent I mation shown on inquiry regarding the 'nfor -m a p (s) / including, but not limited to, the loc'ation of any sewer stub shown. Such sewer stubs may or may, not exist and may or may not exist at the location shown. Neither the City of Edmo*nds nor its .hall be lial-D-11--e for the ern pl-o-yees o-r off i Cle r-,,) S) i information given on this map(s), nor for ion pr 'ded based any one representat' ovi upon said map(s). 0 0 PLANNING DATA STREET FILE NAME: SITE ADDRESS:-q(PR,(4 M121 PL-aW —DATE: W-i ZONING: ('A- PLAN CHK#: e�;�(- ( (Ci PROJECT DESCRIPTION: !�Zj=a_ 2�1 5t)(d-,D �2 C-01 P�rr-rr.�C� to 2?)n �q C:)Najkcr-- CORNER LOT t'Y36/No) FLAG LOT (YesjR SETBACKS: Required Setbacks: '��T 2- C;r-- 1:DD Front: Left Side: 10 - -Fttght-Side: �_Rear: 10 I Setbacks: Front: a n Left Side: a Co e: af). 41eaf- C_� Street map checked for additional setback required?j��:_,�_ ffesgo) LEGAL NONCONFORMING LAND,USE DETERMINATION ISSUED Y�% LOT COVERAGE: Maximum Allowed: �)SOIM --.Actual: (U-,G�> ta, - P. F:ba- �-�rA 114 F=L0Ce_+- BUILDING HEIGHT: P ec.N I I-> Ej:) c,>,,,,( 6 C)r-- PLA4� Maximum Allowed: Actual Height: - �)Q Datum PoInt:!Bjg&5&,,zqa �-� Paturn Elevation: '&cx, - c&o A.D.U. CREATED?: �40 SUBDIVISION: fZ)- ac�Cn- !:�o CRITICALAREAS#: C.A- SEPA DETERMINATION: r)c--r-c Qm i,__4,k-notj --n_jP,-r 7Tgq_ C_,"pj�k, F-cy -r,415 N-Q'Er-,D�j o4 roo 11- �)(�00 LOT AREA: H, 'A,"Z. q (, OTHER: -To KNcco L_2_,2r_5r hlqgJZE�) �Z 4PANI r5i -TC) I KO Plan Review By: O�Aj&pq bgA_L cAfil . es\pe=iA^p1andaLdoc L 6a C� 0 0 CA FlL#. Z Y1 Critical Areas Checklist -------------------------------------------------------------- I- Site Information (soils/topogra ily/hydrology/vegetation) ovp 4� I . Site Address/Location: 2. Property Tax Account Number: e--n rnr-- 1-,� -La�g ED Approximate Site Size (acres or square feet): 4. Is this site currently developed? -yes; Y no. If yes; how is site developed? Q7!0 M P., 5. Describe the general site topography. Check all that apply. v o nct: FILE Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of I 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of I 0-feet over a horizontal distance of 3 3 to 66-feet). Steep: grades of greater than 3 0% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway Y\Q floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- ..W.e.tl.dhd-*ihY . �fiio,rY...b,r.C,.A.�:nj.eip:ihdi,t;at&�:�w,e,t]An..d:pre,se.n.t:.o.n sJte,? 4.'- :Cntica fAr6as ..irivehtory,:Ot..C�.A..:.m.ap:.ind.i.c?ite5 .,Q.r.itJcA.l. Area on -site? 5. Site within designa*tediarth su6s.i.dence 1and. hazard. ar,�.A?., Sit d 'd :.ihe:E AtonnientAl!y, Sdnsitiv.e Areas: Map? mgnate .:o.n.­. M.... . ... .. . --------- ^ca_chk.doc; Rev 10/03/97 0 0 CC T 2 6 City of Edmonds CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, . or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Name 1 -� L Street Address ') C.4' - u, ") 0, () City 1 State Zip 0?,()L- - Telephone Sign ure V Date Applicant Representative: Name Street Address city State Zip Telephone Signature Date creception\jana\caddoc (over) PERMIT NO: 9569 'City o,.f Edmonds, PERMIT EXPIRES 9131d,;I. 1,61i . PERMIT 40C. SIDE S= 00i <;� rK A L0, LID # Address of Construction: Property Tax Account Parcel 140. 2 7 Attach copies of all access and utilily easements Verified and Approved b Owner and/or Contractor: �6LUA IOLA-0 ULJ_t� Contractor License U& -Building Permit#: Z-7-S-ingle Family Invasion into City *Right -of Way: 0 Yes E3-lqo F� Multi -Family (No. of Units *RW Construction Permit # F� Commercial (No. of Units Cross other "Private Property: Yes Z No E] Public "Attach legal description and copy of recorded easement. OwnerX, ��r a c��o 0 'ner or cont' ctor si nt statement: Date ra gnature and aCKnowredgeme By sighing for this permit I certify that I have read the'City's public handout. entitled ide Sewer Specificitions, and shall comply with all City requirements outlined therein. 9 CALL DIAL -A -DIG (1_-8004�,' -�5555) BEFORE ANY EXCAVATION 9 W FOR INSPECTION CALL 425-771-0220 extensionLIZR-602 24 HOUR NOTICE REOUIRED FOR ALL INSPECTION REOUESTS NOTE: IF JOB'SITE IS.NOT READY FOR INSPECTION WHEN INSPECTORARRIVES A $45 RE-INSPE,CTION FEE WILL BE CHARGED. Job Site Ready YES NO Date: Initial: Partial Inspection: -Date: Initial:, Partial Inspection: Date: Initial: FINAL INSPECTION APPROVED: Date.. to Street File: nitial: As -built 1,� PERMIT MUST Bl� POSTED ON JOB SITE t� White Copy: File Green Copy: Inspector Buff Copy: Applicant L,temp;bldg;forms;sspermitjlg4/00 FROM : SOUNDUIEW HOMEBUILDERS FAX NO. 4256703359 10 12 2001 06:51AM P1 9&OG141115 SOUND -�� VIEW U11_,DE1LS 902 Sixth Ave S. *jdmond.,,WA98020 MASTER LICENA -SERVICE ENSES REGISTRATIONS AND 1.10 STATE OF WASHiNGTON ID #: 602 046 901 UNIFIED BUSINESS ID 0: 001 BUSINESS EXPIRES '. 06-30-2002 ORGANIZATION TYPE DOMESTIC PROFIT CORPORATION SOUNDVIEW HOMEBUILDERS, INC. 902 6TH AVE S 'EDMONDS WA 98020 DOMESTIC PROFIT CORPORATION RENEWED BY AUTHORITY OF SECRETARY OF STATE 5ujiness: rogistra0oni or licenses 11sw Thq above �ntity haa been iSSu0d the-';,NESS & pRof�EWONS DIVISION.- few. 0t.L4e.r!snq,. J ... W.- DEPAR1VEj4rOFUcENSING,W�,,,*t.'9W OW).66014W. �2 p.c,.:8OX 9m4, O!Lymplkkv� AT 0 9 t N LD lz LD 4/ C/o 2'c 2' 5'_1 32' LLJ C/o 00 181ST ST, S.W, F CITY OF EDMONDS SIDE SEWER AS -BUILT ADDRESS 18101 84TH AVE, W. PERMIT NUMBER 9569 HOMEOWNER xxxxxxxxxx CONTRACTOR FULLER DATE 12/05/01 DRAWN BY ISMAEL ABILA 05/01/2000 21:44 4257760194 CURTISSMITH 41 PAGE 01 4ril C. 1 B9Q CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - PAX (425) 771-0221 BARBARA FAHEY MAYOR COMMUNITY SERVICES DEPARTMENT Public Works * Planning/ Building * Parks and Recreation - Engir)eering * Wastewater Treatment Plant 4 r PA September 14, 1998 Curtis Smith 8344 Olympic View Drive Edmonds, WA 98020 Re: Address Correction Plan review #98-276 Mr. Smith, This letter is to inform you that in order to change your address we need a written request from the applicant per City policy. You can fax or mail this to us at your earliest convenience. Unfortunately, in my first letter to you I suggested even number addresses for your new house number when in fact the number should be odd. Your new address will most likely be � 111 841b Ave W but again, the request for any address change Must be initiated b the applicant, for our records. If you have dny questions, piease call rrie at 771-0 Thank you, 1('t"11'1 V--'- Lara Knaak Permit Coordinator cc: Building Official CV11F ov- * Incorporated August 11, 1890 0 CZ;ctn� 1-;t;,*c — 14olxin�kn .11;tnnn 0 0 14 C. 1891) CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering December 1, 2004 Orlo Fuller 18101 84"Ave W Edmonds, WA 98026 GARY HAAKENSON MAYOR SUBJECT: Maintenance Bond Release for Short Plat, S-00-050,18101 84 1h Ave W Mr. Fuller, This letter is being sent in response to your letter dated November 10, 2004 and received by the Engineering Division November 22, 2004. Our records indicate the two year maintenance bond was due to expire May 9, 2004. Request for bond release was given to a staff member June 9, 2004 in response to your request for release dated June 7, 2004. It was discovered July 12, 2004, when you made a visit to our office, that the request for bond release had been misplaced. The information was then given to Jeanie McConnell to complete. It is our procedure to notify the City of Edmonds Public* Works Department whenever a request for bond release has been submitted. Public Works in turn checks their maintenance records and in some cases performs a site visit before authorizing release. After Public Works had completed their checks, Jeanie McConnell performed a final site inspection to determine if there were any deficiencies from Engineering's standpoint. It was noted that there was failure in the extruded curbing and some replacement would be required. Jeanie discussed these issues with you at the counter on August 26, 2004 and had understood that you would make these corrections and notify the City. Jeanie McConnell then received a phone call from you October 15, 2004 stating you would like to meet on site to determine what needed to be fixed. Jeanie placed your project in the inspection log for Tuesday, October 19, 2004. She then called you the morning of October 19 to let you know what time she would be on site, which was approximately 10:00am. Jeanie did arrive at the site earlier than the stated time of 10:00arn and decided to note the areas that required replacement with orange paint. She was later contacted by Bill, of Soundview Home Builders regarding the painted areas. She discussed the issue with Bill and was informed that you did not feel that all the areas marked needed to be replaced. That is where the issue was left on the City's end of it. 0 Incorporated August 11, 1890 0 0 0 I have discussed this issue with Jeanie and she has since met with representatives from the City's Street Division to discuss the areas in which the curbing has been damaged and/or deteriorated. During this field meeting the Engineering Division and Street Division agreed upon which sections needed to be replaced prior to release of the maintenance bond. Once again, the areas to be replaced were marked with orange paint along the curb. Due to the type of curbing, the asphalt walkway in these areas will also have to be replaced in order to install new curbing. Please contact Jeanie McConnell with any questions you may have at 425-771-0220, ext. 1338 and/or to schedule a meeting with you to discuss the areas that are required to be replaced. Upon completion of the required curbing replacement, we will release your bond. ASincere AVID K GEBERT, P.E. CITY ENGINEER c: Bond file vl**'Street file DA ZoneB N.E. 1/4, SEC. 18 T27N.. RA E.W.M. R W., W, AW r y 4. 356 I'D Molo )8013 -7 kn let 'IN" AD qb — )8017 1 ­9 ISO P4 ISO,. 180 16017 21 cm #soft 27 - 18025 fol ISM In 18107 M QD 19106 lei 18105 18103 # ef.1005 16110., leliq �, is AL 18119 19117 18111 14 181 4- pt I § I,8Z PL, 5W, 18118 to 1TLT__,9j lei for— 1. IS214 181 16M "PIL 18213 ISZO9 !89 1922S fj 197-2 /92 303 .0, 18226 FD 18-503 14 1�_ 183010 1 Q 18301 18312 18335 18326 10305 .3, 181 is'327 18302 1830(a r7; 1031 183006 — 183 3Z IBE303 M 18406 ozo 1�0 Q� to am 00 , m m I �; 17, Hq —ST. S. W. POST N 9411 19j05 l"n N Z9 *1F 194 Ic go 04 E 00 It. 00 SEAVIEW 18415 . 10419 tM94 29 26 ISS02 1 Vb 1 3;. 18427 4 Im 2— XT 5.91 185015 ro'7 ISS02 JgS03 18C04 ISIF,05 18504 1 508 0. ,aa A PA R K 10 rc," 1z 51 'Pot. 19532 105*15 IFS 14 1*11 /95/5 16514 Iq 11K - - t� 9614 8516 1,152( W% :11, 0- '8-cz )135.30 �25 00 .0 om 1851(0 86 ST S W. Irco N 106'22 im 1186;M j,_, 4 — 18601 ib(.c4n 7860-3 19604 19603 186M 19604 — __ 186 /0607 L=J 18616 18612 18613 1961� I tow 186) "U, R422 16619 ict 18625 1069? 18677 J"2q 18621 186a 18627 )8630 .4— 18127 187 S T. S. W. lab 18629 19630 10633 :1 PC-RAjq'1_ 18704 a A71, 11 I , 1187 1 t7v/ 8705 187v6 %. 18703 �870Z 1,t D_ 51 97;M 19721 N C4 # 8767 it N 6 %. /8703 18714 m ao co 00 Do no VA 107/4 IN 187/15 187A r% 187/9 /8725 t 2 In 13715 18718 roe S.W. — 0 W 51. fn m N 187#6 1597 18720 a C"m "co 188 ST. 188" 1 .1 /9810 6907 18807 19810 4 - CE, ) !11 lull Ift' : 13 �j c, C, I f-3 18816 11 168 'Zo 00 18823 J6824 0 00 18 In co tv N N cu `2 to WT co Go 40 go go C4 FN I !� N cm 11 ao co co ft I co ao "0 co cc OV ED A RECEIVED . . . . . . . . . . CITY OF EDMONDS APR 18 2000 ENVIRONMENTAL CHECKLIST DEVELOPMENT SERVICES CTR. St. J%p CITY OF EDMONDS RECE�VZD r'171, 1 "7' 77,77" DEVELOPMENT SERVICES C'!:Z. Purpose of Checklist.- CITY OF ED�,CZL Ile State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the cnvironmental impacts of a proposal before making decisions. An environmental impact statement (ETS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructionsfor Applicants. This environmental checklist asks you to describe some basic information about your proposal. Clovernmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or does not apply". complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions ff you can. If you have problems, the governmental agencies can assist you. Ile checklist questions apply to all parts of your proposal, even ff you plan to do them over a period of time or on different parcels of landL Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining ff there may be significant adverse impact. Use of checklistfor nonprojectproposals. Complete this checklist for nonproject proposals, even though questions may be answered 'does not apply." IN ADDMON, complete the SUPPLEMENTAL SBEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant" and "property or site" should be read as "proposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed project, if applicable: iC-Cl Ilelf- Lo � SAO;^-1 2. Name of applicant: 3. Addmss and vhone 0 IAS Ze IV/ P1 4V number of �Qo�icant and contact person: I n L"' �� //Ca4�- C' & &-. -4- <�. I Z ""Pler C-e— --5 K/ va 'Fe'nz-0 -4z!5-) '771-1000 X-*7 ez - cv 46 4:::- cz -,5 c- c / /4c'p r- ap e- -3 -o-i c 7-/ c77- �V Pap lof24 CHXLTDMI-NM-93 10. List any government approvals or permits that will be needed for your proposal, if known. 11. (STAFF COMMENTS) Give brief, complete description of your proposal, including the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. w zsn e, 7 (STAFF COMMENTS) NP�SA-- �'AJ k'4 8w—VUA — C4( L—T fy+�4 '9 '0-k 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a Proposal would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans requimd by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 5W 74 /0 A,? 'V ,W/ 47 .4L� 5 :5 &V /,' da tn 0-10 L 0 e 74 ZA. c/-,e., M-1 /0 t1l. 4)4b14n&e-I0I 14 po" (STAFF COMMENTS) Pap 3 of 24 C Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source Of fill. '-, /' �;—/ 7 C: d -5-2 0 v,/-s f. RECEIVE-Lv— (STA" COMMENTS) DEVELOPMENT SERVICES CTR cai-" 6F EBIAGN99 f1duild emAnn nerur as a remit of clearinp- construction. or use? If so, renerally describe. (STAFF COMMENTS) g. About what percent d the site will be covcred with impervious surfaces after project construction (for example, asphalt or buildingg)? r-_3 ---7 7 4�0 �0 40 V6 -1-;4 x2- CY,/, I - (STAFF COMMENTS) L Proposed measures to reduce or control erosion, or other impacts to the earth, if any: (I 4n ze7 e C>011 la A-? elf_; Ir/ (STAFF COMMENTS) 2. AIR IL What types of emissions to the air would result from the proposal CLe., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if knowiL A, -/Je - W7-- 'e C� / V 7 7, 0 Z> 40 (STAFF COMMENTS) P&V 5 of 24 CKXLT.D0C-%1-N0V-93 (4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and appro3dmate quantities if known. (STAFT COMMENTS) (5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. (STAFF COMMENTS) (6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. (STAFF COMMENTS) b. Ground: (1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and appro3dmatc quantities if known. 17 a (STAFF COMMENTS) Pap 7 of 24 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder,(*a-p-�N aspen, other: evergreen tret5fi � �ed!!A pine, other. shrubs elle C 9r= - pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other. water plants: water lily, eelgrass, milfbil, other. other types of vegetation: (STAFT COMMENTS) b. What kind and amount of vegetation will be removed or altered? ---a 47 >r- -Z2 A nn 7741 A,,- ;2: 4A-1 Z e-- e -=,-s e (STAF7 COMMENTS) C- List threatened or endangered species known to be on or near the site. e/ A--7 . '�-/ (STAFT COMMENTS) P.- 0 V74 d. Proposed measures to preserve or enhance wildlife, if anr. -4 Y -,e _5 /U (STAFF COMMENTS) 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for beatin ' manufacturing, etc. Z.,,z C-Ck.: A;1 6- 7t- 7-S 74 -7r-, - , � -- .-- � /�— /--- _,/ 0V z (STAFF COMMENTS) b. * Would your project affect the potential use of solar energy by adjacent properties? U so, generally (STAFF COMMENTS) C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 4- r /7/ �,xeZl &,o V C--, 7 z 74 ..- — -o, -^ ey (/ C e3 , 1—�,q , b4- Zk-o- CI - (STAFF COMMENTS) --- Page I I of 24 (2) What types and levels of noise would be created by or associated with the project on a Short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. SALZ L", All) —d. "Oe- 8.- '/�' 40 A4.4 1,14 (STAFF COMMENTS) (3) Proposed measures to reduce or control noise impacts, if any: A01Z %!.> p-7 - "C0- (STAFF COMMENTS) Land and Shoreline Use JL What is the current use of the site and adjacent prop�rties? :T z 7�� '- --,3 C- -> '�f -7'IV 4w-,Ofl C4 V-ewl (STAFF COMMENTS) b. Has the site been used for agriculture? If so, describe. (STAFF COMMENTS) Pap 13 of 24 h. Has any part of the site been classified as an ItenAronmentally sensitive" area? If so, specify. (STAFF COMMENTS) L Approximately how many people would reside or work in the completed project? (STAFF COMMIENTS) j. Approximately how many people would the completed project displace? (STAFF COMMENTS) k. Proposed measures to avoid or reduce displacement impacts, if any: . /�I 0 PI -6tl (STAFF COMMENTS) L Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: X/ LL' 0 (STAFF COMMENTS) Page 15 of 24 b. What views in the immediate vicinity would be altered or obstructed? (STAFF COMMENTS) - C. ]Proposed measures to reduce or control aesthetic impacts, if any: (STAFF COMMIENTS) 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? (STAFF COMMENTS) b. Could light or glare from the finished project be a safety hazard or interfere with views? (STAFF COMMENTS) C. What existing off -site sources of light or glare may affect your proposal? (STAFF COMMENTS) Pane 17 of 24 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. (STAFF COMMENTS) 1b. Generally describe any Ian ' dmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. (STAFF COMMENTS) C. Proposed measures to reduce or control impacts, if any: (STAFF COMMENTS) 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. e) X1-1e.:'=;-'C-- 1—�e (STAFF COMMENTS) Page 19 of 24 f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. -DC ,v, — �= L4 i,,' ;=/C-Z V -'. -;� �/ I Z� e k C. '? - ,-el Xq 7te, -o t4�, � " 4 0" INEM M- - (STAFF COMMENTS) g. Proposed measures to reduce or control transportation impacts, if anr. (STAFF COMMENTS) 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? if so, generally describe. I I e-ex s-c-- loa .�2 cz -15 le- I=- cy-.-r.-�ce7 9�x Ze� eff C- Z-T- -z -.f?- 4z Vily-a -.57 7-�' 72L A-7 4- C 5�A kulwd, (STAFF COMMENTS) b. Proposed measures to reduce or control direct impacts on public services, if any: _ LZ -0 & 4E!.J (STAFF COMMENTS) - -- I I -4MA D. 1. 2. SUIPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (do not use this sheetfor project actions) Because these questions are very general, it may be helpful to -read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. How would the proposal be likely to increase discharge to water, emissions to air, production, storage, or release of toxic or hazardous substances; or production of noise? il . / . - - '*/- - /- _IAL I Proposal measums to avoid or reduce such increases am: How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: rcl� &A-? 3. How would the proposal be likely to deplete energy or natural resou alp .4-141-1-7 _4CZ 47--4 Proposed measures to protect or conserve energy and natural resources are: 7, :5- e 0-0 P&W 23 of 24