Loading...
18106 88TH AVE W.PDF111111 lill 11 8323 18106 88TH AVE W F ,,ET FILE 0 USE PERMIT ' CITY OF EDMONDS ""' 21:5-17_ NUMBER t3,JU/215 CONSTRUCTION PERMIT APPLICATION PT OWNER NAME NAME OF BUSINESS ADDRESS LEGAL DESCRIPTION CHECK SUBDIVISION NO LID NO A 4,8 FR 7- f_ y D 1 :5 MAILING ADDRESS !t .14 1 _/ " 1511 . / , 'i , , S PUBLIC RIGHT OF WAY PER OFFICIAL STREET M�P TESCP ApprMed 0 17Y TELEPHONE I, UMBER AW EXISTING — REOUIRED DEDICATION st,eelumpe—IFI.Xi-d PROPOSED S.de.alk P.—I Requ.led 0 0 R-u-c! Requ.,ed NAME M RX L2 JE NO. OF TURES PRV REOUIRED IESXN 0 0 ADDRESS REMARKS Z 7?� CITY ZIP ITELEPHONE NUMBER At!:IX W4- NAME fV1EA) 4,nk--A-� /1)Z_ 3","', A7.ESS 0 . , fl(— L) 5,9 -5-0 ENGINEERING MEMO DATED t W CITY ZIP _ q( ITELEPH ONE NUMBER FIRE MEMO DATED REVIEWED BY STATE LICENSE NUMBER EXPIRATION DATE C— I SIGN AREA ALLOWED PROPOSED SEPA REVIEW TEIAPT COMPLE� No M. Legal Description of Property - include all easements -r Siot ELINE 0 0 /9 -Of-it Y 7 VARIANCE OR CU If EVIEW BY 11 6A e;A1,ff4 C 1 0 U I 1A W rre R, C-- - SETBACKS — FEET FRONT 12 SIDE REAR-Ld HEIG �j LOT COEAA4 E 1 Z Pro a" T.. A.1.61 .Parcel No. RE.ARK. 20NEV4 2"..SIOENTIAL [�I<LUMBING H AN 'CAL ADDITION COMMERCIAL 191MECHANICAL APT. BLDG. N E] REllOOEL SIGN ,C FENCE E X _ " REPAIR I III _FT) 46c, POOL DEMOLISH 0 WOODSTOVE El SWIM POOL INSERT T TUB/SPA No TU.'SPA RETAINING WALL/ W L C1 ROCKERY RENEWAL IT T EXPLAIN: :�E PF 1A6-rWMt9i,11 IJ117-t Cj7ftA2rnM--, .5-0-91 *qy d061-q3-121 CHECKED BY TYPE OF CONSTRUCTION DOE OCC P T GROft SPECIAL INSPECTOR q EOUIRED XYES JOCCUPA NT LOAD FIEMA--- c PROGRESS INSPECTIONS PER LIBC 305 2 c vjn 1 & r/ & . tic a H1Y ge JL9�U �L NU Me ER OF 0 STORIES, NUMBER C )F Uw D ELLING OW NITS , I CRITICAL REA$ JA NUMBER 3 CML 4,5 DESCRIBE WOUK-TO BE DONE (ATTACH PLgj PLAN) ?msrx mer jot e, FINAL INSPECTION REQUIRED PLAN CHECK FEE BUILDING H7 E: GLAZINC� % ;ING Xs* Plan.Check N o. MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any construction on the public domain (curbs, sidowelks, AZ) driveways. marquees, etc.) will require separate permission. STATESURCHARGE .4. Permit Application: 180 Pays Permit Limit: I Year - Provided Work Is Started Within 180 Days STORM DRAINAGE FEE "Applicant, on behalf of his or her spouse, heirs, assigns and ENO. INSPECTION FEE successors in interest, agrees to indemnify. defend and hold harmless the City of Edmonds, Washington, its officials, 2 employees, and agents from any and all claims for damages of whatever nature. arising directly or Indirectly from the issuance PLAN DEPOSIT of this permit. Issuance of this permit shall not be deemed to CHECK 0 modify, waive or reduce any requirement of any city ordinance norl imit I In any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE . I provision. aaaaaaaaa I hereby acknowledge that I have read this application; that the ATTENTION APPLICATION APPROVAL information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until state laws regulating construction; and in doing the work authoriz- ed thereby, no person will be employed in violation of the Labor AUTHOR IZE S THE signed by the Building Official or his/her Code of the State of Washington relating to Workmen . a Compensa- WONLY O"K NOTED Deputy; and fees are paid, and receipt )s tion insurance and RCW 18.27. INSPECTION acknowledged in space provided. SIG ATE SIGNED DEPARTMENT ? - � LL CITY OF OFFC G TUAE E 7 _A_ow EDMONDS CALL FOR VLE ATTENTION INSPECTION IT S UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE I UNITIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 7714220 ORIGINAL — F:,;. YELLOW — inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. USC CITY. OF EDMONDS OFFICIAL TRUCK -ROUTES ull n .-, , ef. L BROWNS BAY - fm J C) A SEAMEW- HTI ELEM S 79 10 Z Mr.' 0 I cc 9 'i, s P_ ­001 Lft p ELIE- ­A.0 ­..tV�,tq �­.:'. 0. p L -xij Lymm'1111000 crry umffs , o 9 __j LU L Y N N W 0 0 D �S` 100, - Y t�'--Aw _, ()j p ir tll* -Z 2 VEE) SEP 2 0 IM eL PERMIT COUN -R AA A Ap. rw OA)dw f j uTsg LAO 6) Laz, v 0 \V co A 314 -zx - lz>o K I t ko - o I --,�ACCE�TABLJkTIGHTLINE MATERIAL I M-19 ADS &h 40 PVC ISOR 35 (ASTM D=q iE5 Z'S-7 r)O c -7- 1 (�-,>WPROVE AS N= CZ�' -Z---Z�7 - Iq 203 xt-a�� 7�'W Pa:zk- EA.) r 'Ciry cop 1-11-STREE 0. 0 L::� CP 0 1---1 -Z'Z G I I to - C> PJECP-IVZ 2 P livi EI ITCOUNfIL;l 2 3 fit r 4,-,,ACCEI 'TABLE TIGHTLINE MATERIAL S�h 40 PVC WR 3s (ASTM D3()34) NOT D T -LAPPROVE� AS NOT AS a 9F ILE coo Paco C4 04 V A A A C4 N 04 0 0 21 24 7, ,5,7 x -t--2 :_ t:) ,,.. r, t iLL IA #A 0 x X, W (a #A coo Inco C4 C4 le I!! A A A C4 C4 C4 (001 0 � �4 , rolol- P!-VLSI-ld IVKxl. ';;7 K 2- - -714 t 4-7 t7 ZI;3 7 -71 +392- ,e�4- Y, � ?, (��) 5-7 2 Legal descriptions ConLintied S-17-91 EYHIAIT P 'qTPI:9:T 1:11 C LOT —3 That portion of Tract A, according to the plat of DOBSON PARK in Volume 16 of plats on pages 90 and 91, records, of Snohomish, described as follows: as recorded County WA. Beginning at the Northeast corner of said Tract A, DOBSON PARK, said corner being on the SOUtherly inargin or Olympic View I.),.iv'p; thence S 6702812011 W along the southerly margin for 87.17 feet: thence S 015212011 W for 134,65 feet to the northwest corner of a private road Known as Tract X; thence S 89007140" E along the north margin of said privaLe road for 66.35 feet to the start of a curve (the radius point of said Curve hears N 0052'20" E a distance of 35..00 feet); thence northeasterly along said curve for 20,152 reel. to the end of said curve; thence N 57*06145" E for 62.52 feet to the Start. Of a curve (the radius point of said curve bears S 32153'15" E a distance of 40.00 feet.); thence northeasterly along said cury ' e for 23.57 feet to die westerly ninryin of 88th Ave W; thence N 0152120" E along said westerly margin for' 10.00 feet to the northeast corner of said Tract A; thence N 89'07140" W for 80.00.feet; thence N 01 5212010 E for 111.88 feet to the Point of Be'ginning. Situated in the City of Edmonds. Snohomish Co. WA Cotitaining 14,496.Sq. Ft. Subject to a permanent utility easement over the west 10-00 feet thereof And: Subject to a permanent easement for storm sewer purposes that is 10.00 feet wide with the center line of said easement being described as follows: commencing at the northeast corner of Tract A of said DOBSON PARK 11 Volume16 of plats pgs. 90 and 91), said corner being on the westerly margin of 88 th. Ave W; thence S 005212011 W along the westerly mat -gin of 88th Ave. W for 6.30 feet to the Point of Beginning of said centerline; thence S G9"54'55" W for 249.48 feet; thence N 7*27115" W for 40.65 feet more or less to the westerly line of said Tract A, DOBSON PARK and the end of said easement. Together with a 4 interest in a TRACT X described as follows: TRACT X, PRIVATE ROAD AND UTILITY EASEMEN'r That portion'of TRACT A. according to the . plat of DOBSON PARK, as recorded In Volume 16 of plats on Pages 90 and 91, records of Snohomish Cou'nty-Wash. - as follows; Commencing at the Northeast corner of*said TRACI A., DOBSON PARK, said point being on the westerly maryin of 88th Ave. W; thence S 0'5212011 W along said westerly margin for 10.00 feet to the Point of I-leginning; said point being the start of a curve (the raditis point of said ctirve Iwars S 005212011 W a distance of 110-00 feet); Lhence in it soutl1westel-lY clil'—do" allilly the arc of said curve a distance of 23.57 feel. to the end of said curve: thence S 51'06'115" W for 62.52 feet to Ahe start of a curve ( the radius point of said curve 1.)ears N 32053115"W a distance of 35.00 feet); thence southwesterly along said curve for a distance of 20.62 feet to the end of said curve; thence.N 89"0714011 W for 66.35 feet; thence S 00521201, V� for 20.00 feet; thence S 89107"10" E for 52.00 feet to the start of a curve (the radius pokit of said curve hears S 0052'20" W a distance of 20-00 feet); the-nce easterly and southerly along Lhe arc,!6f said curve for 31.42 feet to the end of said curve; thence S 89'0'7"10" E fo't 16-00 felit; thence N 0052120" E for 12.63 feet. to'the start of a rurve,ithe radius point of said curve bears S 89007'40 E a distance of 20.00 fePt.); Lhence northeasterly along said curve for a distance of 19.63 feet to the end of said cuve; thence N 57006'45" E for 62.55 feet to the start of a curve (the radius point of siid curve bears S 32053'15" E it distance of 20.00 feet): thence ensLerly along the arc of said curve a distance of 11.70 feet to the elld Of said curve, said point being on the westerly margin of 88th Ave W: thence N 0(152'2011 E for 20.00 feet to the Point of Beginning. � 41 o' P. AUTHORIZi FOR RECOM I*i F, WA V13.1 5 4 2 CITY OF EDM( PLAN (-7f> PAGE__� C�v 19,5 S Ep 2 1 1993 PROJECT REVIEW CHECKLI ST orTm PRCPA"Wi�S C-) r`E51NFCjLE,#:?.3-,, PROJECTADDRESS: zazn�' - AO,5 a) FI'ECEIPT DATE:-- 9-3 REVIEWED BY: Initial/Date) PLAN. WATER COMMENTS FIRE � BLDG. SEWER STREET ENG. Setbacks/Variance/Setback Adjustment . . . . . . . . . . Conditional Use Permit ........... ............. x . 1 1. .... ADB Requirements .. ......... .... 3 Other Zoning Requirements ---------------- 42 Underground Wiring Required 5, .... ..... Lot Slope 15% 6 SEPA Environmental Checklist/Hydraulics Permit ..................... ................. -7. Tree Cutting Plan ..... ..... 8 Plat/Subdivision Requirements 7 -q 7 .. . .. .. 1*1*1"'.'�' .. . ....... 9 Legal Description Verification . .... 10 Quit Claim/Street Dedications Easements - Public/Private ..*.*.*.** .......... *1 ............. �12 Engineering Storm Drain Review Fee -50 13% Engineering 2.2 Inspection Fee Ivy- 14 Drainage Plan (On -Site) -5 - /7 ............... 15 Setback - Top of Bank, Stream, Water Courses ..... .. .. ... ....... ...... ..... . .. .. .. . .... Setback - Storm Drain Line .......... 17 Open Ditch - Existing . .. ............ . - Culvert Required .............. . . . . . . . . . . . . ....... 19. ,Culvert Size 20 IShoulder Drainage/Shale Open Runoff 21 Catch Basin Required -:2Z: Driveway Slope & Vehicle Access .......... 23. Sidewalk Required Curb & Gutter Required Curb Cut For Driveway Required 26 Street Paving Required . . . . . . . . . . . . . ZT. Right -Of -Way Construction Permit Required Street Name Sign Required Other Signing Required Bond Required For Public Improvements FEMA Map Check/Water Table . . . . . . . . . . . . . . . . . . -.32- Side Sewer Availability Ael t#Lw Axe ................ . . . . . . . . . . . . . F_�� ................. .. . . . .... ... . . . . . . . . . Calculate Sewer Connectidn Fee If No LID # /$Y * . . . . . . . . . . . . . Create Street File v4s Existing Water Main Size 36 Water Meter Size 37 Service Line Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............. . . . . . A"' 11�11 3 8 Water Meter Charge Requi ed . . . . . . . ....... Hydrant Required .40 Hydrant Size Existing 41' Fire Line Charge Required - Sprinkler Street Cut ...... . . . . . . . . . . . . . . XX 7A Miscellaneous . . . . . . . . . . . . ............ Reviewed By: FIRE PLANNING ENGIN ING PUEYLIC WORKS, §TRft FILE I M ? ­A­3 k413SQC' 'W 1 1, Date: To: From: MEMORANDUM September 15, 1998 Jeannine Graf, Building Official Jim Walker, City EngineerA e, 641 Subject: Permit #970689 Easements I The Engineering Division does not believe the City needs to require an easement from the property owner of Lot 2 of Short Plat S- 17-91 for access to Lot 1. A plan was approved for Lot I by Jamal on June 6, 1997 with no access easements required from Lot 2 to meet City standards for access width. The only easement referenced on the approved drawing was for a temporary slope easement on Lot 2. Grading and Rockery permit number 970689, approved August 21, 1997, allowed Mr. Sand, the legal owner of Lot 2, to install a rockery and grade Lot 2 adjoining Lot 1. This additional turnaround for Lot 1 was not needed to meet ECDC standards for development of Lot 1. The Engineering Division has no reason to prohibit the property owner of Lot 2 from removing the pavement installed next to Lot 1. Engineering has no requirement for either property owner to give the other an easement for common use of the asphalt surfaces created outside of the common property, Tract X. c: Meg Gruwell Attachment City of Edmonds a VIV %� GAENGRVIMMSANDEASEDOC Community Services Department Engineering Division NWi�l 111,11 wilt, 0. 2 60M. 9XIST� WATEZ "61 fo 171A r f Tw. J.. wl 211 7-Al RAtC Asis 1p . ca koc -wa KZty, 146109T VARtEs TO. 4 ;4 PZ. 4OLb 7-oP AT - p--&O.o 4 ro -.6 "O'j -r T 0 .j C APT F- Z 2 It' Poe- ris ep, LoArT14. Do 70 'Oe, W YE ro e1sres, Tuftv:� �j umbis tART4, WATER SERVItt INSPECTIoMS !f '�E'U'REI CALL 771-0235 J P� ERIAL-T iACCEPTABLE 11GHTUNE M# N-102 ADS SCh 40 PVC SDR 35 WITM 03034) 01'/AN5 X'09 4A005j5- 160 cy C,'r 65- CY (f u7- f0v ISO Or6ona9c GRAD4NG P LAN. 24S SCALE: 1" = 20' j 20 qo fa b'�IVCWAY C!,j W/ C/rs, ar fDl*wps. C-41.1- 0/,E. C,4 SCALE. HeItm. ll'-Zol Ce,,�pc JL �500)yllf/-S35S,5, S It -57',F4<7Vr9S, Sy: C/7�, 'S, D.-M9W,9jl 4CFA Ot Zl,,57-,4,11 r""r,"7V lle^5AIrS DESCRIPTION: blAIC-� I ANDS4 A PIA(6-- LOT I OF CITY OF EDMONDS SHORT SUBDIVISION FILE # S-17-91- AS SHowN AND DESCRIBED IN AF 9309200825. 60Y,511V 17711 R1177* 117 /6 lEr Z/4/60 view PIC Llcp ZZ6 RECEIVED 05 OCT 0 7 1993 PERMIT COUNTER PO fiz n6 #e r f yp, -, ��vf, /6 .214. v - ry 4 x c .74A fly) o .60 FAPE t910 %51G17- )Flln- ZT5 X (L Ae X 232 tj z A len.sElnel7r Axj eg *,14 - rl, �11 lZiM 6,6 S1917. k5EwFR n. S 70P- 140-60 r-o- =165.60 C SHORT PLAT ATTACHMENT Farl R45 STOW1771 AL & NORMA SAND 40)"P, 38.GK.9,rff)77 4015 164th ST. S.W. C7V 6' 98037 5 CM 4YO7 LYNNWOOD, WA ,6y- alrr av-6DI)700 .IPL5 �kjt (206) 742-5107 VN STREET %6rff- y Copy SUPPLEMENTAL LETTER GEOTECHNICAL ENGINEERING INVESTIGATION PLANNED SHORT PLAT OLYMPIC VIEW DRIVE, EDMONDS FOR ALBERT AND NORMA SAND P, c'. il,FP2 COUVRETTE GEOTECHNICAL ENGINEERING COUVRETTE GEoTEcBmcAL ENGINEERING 17406 - 133RD AvENUE NORTHEAST .- WOOD24vuaE, WASHINGTON 98072 - (206) 486-1669 Albert and Norma Sand 4015 - 164th SW #26 Lynnwood, Washington 98037 February 5, 1092 Supplemental Letter Geotechnical Engineering Investigation -Planned Short Plat . Olympic View Drive, Edmonds CGE File No. 274-01 INTRODUCTION GENERAL 'Ibis letter providesa supplement to my original report for your planned short plat in the City of Edmonds. I was not provided a site grading 'Plan at the time the original report was prepared. You have now provided me with a site grading plan, in addition to a copy of the review comments by the engineering firm, Landau and Associates, who is reviewing the geotechnical aspects of the project for the City of Edmonds. My original report for this project was dated June 13, 1991. The site is currently an empty lot. You plan to parcel the site into 4 lots. A copy of the grading plan that you have provided to me is attached to this report. A low area exists on the northwest comer of the site adjacent to Olympic View Drive. The remainder of the site slopes moderately to steeply up to the south and east from the low area dnd Olympic View Drive. A drainage Swale traverses the site from the southeast to the low area in the northwest. The low area is also fed by a creek just off site to the west. The creek is then channeled into a culvert that flows under Olympic View Drive. My original report discussed various types of fill placement, foundations and wall designs. These were intended to be preliminary recommendations in order to plan site development. Those recommendations are still valid and can be used for future site planning. PLANNED GRADING I understand that your current plan is to fill the drainage Swale and low area where the culvert is located. The lots would then be sold and the individual lot owners would be responsible for final grading. The intent is to use clean (free of organic matter and debris) soil as fill and place it in a moderately compact form. You do not intend to place. the fill as an engineered compacted fill. We Ll Report Planned Short Plat February 5, 1992 CGE File No. 274-01 Page 2 have discussed that a fill embankment. -slope in the low area near the west property line would not be suitable if it was constructed with non -compacted fill. The alternative is to use a structural fill berm or to fill the entire low area level. You have decided to fill the entire low area to level and not create a fill embankment in this area based on this discussion. You currently have an easement to fill the low area on the adjacent property. The future structures are expected to be founded on piles or piers that extend through the fill and into the underlying dense or stiff Whidbey Foundation. The deep foundations will be designed when the individual lots are developed. The design of measures to stabilize the upper soils on the steeper portions of the site will also be part of the final plans for individual lot development. The steeper portions of the site (in the south) are considered unstable with respect to shallow failures. Some of these soils appear to be derived from fill that was placed on the top of the slope when the property to the south was developed. These failures were discussed in the original report and would need to be stabilized during final site development. The methods used to stabilize these features should be incorporated into the final site grading.and design. The original report identified methods for stabilization (slope angles, walls, geogrid walls). You indicate that you do not intend to stabilize these slopes at this time but to inform potential buyers that this will be a requirement of final grading. The axis of the swale to be filled slopes at an approximate angle of 12 degrees. The final fill surface slope is to be inclined at 14 degrees down to an elevation of about 230 where is will be sloped only to facilitate drainage of the fill surface. The surface soil conditions expected in this area are silty fine sands. A site grading plan is attached as Figure 1. Figure 2 shows a cross section through the swale indicating the existing ground surface slope and the expected depth of fill. REVIEW OF LETTER BY LANDAU AND ASSOCIATES 'Me original report discussed site stability and landslide hazards. These items were further discussed in the review by Landau and Associates. It is important to note that the report states that it is my opinion that the fractures observed in the lower portion of the Whidbey formation were tight and did not exhibit recent (po st glacial) movement. Soils in the upper portion of this unit appears to have loosened and should be considered unstable. The depth to the intact fracture zones observed in the test pits was on the order of 2 to 6 feet. These soils can be stabilized with engineered structures. It is my opinion that the probability portion of City Ordinance 2261 does not apply. My interpretation of that ordinance is that it was written for areas that have a recent history of deep landslide failures, such as the Meadowdale complex. This type of failure cannot be economically stabilized to bring to a standard factor of safety and some type of risk is assumed by the owner.. I have not observed any evidence of deep, instability, at the site. Providing that the recommendations in my original report are followed, the COUVRETTE GEOTECIINICAL ENGINEERING ' Report Planned Short Plat February 5, 1992 CGE File No. 274-01 Page 3 stability with respect to deep failures should not be changed. The deep stability would be most effected by a deep non -shored cut at the base of the slope. Based on the current grading plans this does not appear likely, however, this is intended to be reviewed at the time the site is developed. 'Me shallow instability noted on the steeper slopes will have to be addressed and stabilized during final site development. This is not a probability issue as discussed in the ordinance. Ilese conditions need to be stabilized to what is considered standard engineering practice for retaining soils. CONCLUSIONS AND RECOMMENDATIONS GENERAL I It is my opinion that the grading planned as proposed is a reasonable approach to site development. 'Me inclination of the existing ground surface is low with respect to the shear strength of imported soil. This assumes that the fill surface will be near level through the low area. If a slope is to be constructed in the northwest comer near the property line, it would have to be evaluated for stability. Most likely, a fill slope near the property line would have to be properly compacted to engineering standards with minimum dimensions determined by analysis. I have not provided recommendations for construction of a structural fill embankment since this option is not intended to be used. Although the fill is not to be compacted to engineering standards, it should be moderately compacted using spreading equipment. It should have the ability to withstand truck traffic. 'Mat is, fill placement should be stopped if trucks cannot cross the fill surface for access. I expect that fill placed with this type of operation will most likely be fine grained and very moisture sensitive. Fill placement may be difficult and not appropriate if the site soils are too wet for nominal compaction. I expect that some weaving and rutting under truck traffic will occur during placement. The recommendations provided in the original geotechnical report can still. be used for design of the development for individual lots. However, once the site grading plans are determined for the individual lots they should be reviewed by a geotechnical engineer. The engineer should provide recommendations and perform additional explorations as needed based on his or her review. A storm drain is to be routed down the center of th e swale. I recommend that a subsurface drain be incorporated into this storm drain. It is currently difficult to justify a drainage blanket under the entire fill mass on the upper portion of the swale as it is relatively shallow in depth and slope angle. However, placing the drain within the storm trench would help if any water does seep toward the swale. Also, if any future wet areas are observed during site development, drains could be installed in these areas and routed to the subdrain in the swale. COUVRETTE GEOTE'CIINICAL ENGINEERING Report Planned Short Plat February 5, 1992 CGE File No. 274-01 Page 4 SITE PREPARATION The sloped portion of the site to be filled should be stripped of surface vegetation prior to filling. This material can be placed- within the low area if desired. Any abrupt topography in the low area should be graded such that there is a transition from the upper to the lower elevation. It may be necessary to construct a road into the area to be filled if the fill- placement is attempted when the on site soils are wet. This road should be constructed of 2 to 4 inch rock spalls. The thickness of the road will be dependent on the condition of the on site soils and the anticipated truck traffic. This should be evaluated at the time the fill is placed. FILL PLACEMENT The fill should be placed by spreading it in uniform lifts and compaction with the placing equipment. I recommend spreading the fill in minimum I foot thick layers and compaction by moving equipment over the fill surface. 'Me spreading in lifts is intended to reduce the potential of creating voids in the fill. The compactive effort can be made by the spreading equipment, truck traffic and specialized compaction equipment. The fill does not require significant compaction effort to achieve the necessary strength for -the planned slope. However, the more compactive effort put into the fill the better it will perform with respect to support of temporary and permanent access ways and concrete slabs. A well compacted fill surface that is not disturbed when wet can recover for construction equipment access much faster than a loose fill that has been exposed to rain. 'Me fill surface should be sloped to drain so that it does not pond water. It would be prudent to compact the fill surface after major spreading is done and fill will not be placed for some time. Ibis is particularly true at the end of the summer when the fill materials will be most easiest to compact. FILL PERFORMANCE The fill placed as described should be expected to settle for several years after placement. It is not uncommon to observe on going settlements and structural distress of improperly founded structures on fill 30 years after the structure was completed. Typically, structures on this type of deposit are founded through the fill into native soils by overexcavation or by drilled piles or piers. Slabs and walkways not supported on piles should be expected to continue to settle. All concrete slabs placed on this fill should be reinforced to resist expected differential settlement. The design of individual lots should allow for the differential settlement between pile supported structures and non -pile supported walkways. Ile use of "transition" slabs should be used.when necessary. A transition slab is a suitably reinforced slab that is hinged at the pile supported structure and the other end floated on the fill. Driveway pavements should be flexible such as asphalt to allow for future settlement. Also, site drainage grades should be accentuated so that future settlements do not effect surface drainage. COUVRETI`E GEOTECII1141CAL ENGINEERING f Report Planned Short Plat February 5, 1992 CGE File No. 274-01 Page 5 The design of future fill embankments or retaining walls will be influenced by the presence of the fill. 'Me actual impact cannot b; determined until the final grading foroach lot is determined and the depth of fill at the embankment location is determined. DRAINAGE As discussed in the GENERAL section, I recommend that a subsurface drain be incorporated into the storm water trench. A typical drain section is shown on the attached Figure 3. The drain should be routed into the storm system at the base of the slope. The intent of the drain is to allow an outlet to any subsurface water that is flowing in the swale. This drain could be tied into at the time of future development if seepage areas are observed on the slope. Ibis drain should be used ONLY for ground water. Surface water should not be routed into a subsurface drain. USE OF THIS REPORT This report has been written for Albert and Norma Sand for their use in obtaining a short Plat for their site. Ibis report is a supplement to and should be attached to the previous investigation report, dated June 13, 1991. Within the limitations of scope, schedule and budget, my services have been executed in accordance with generally accepted practices in this area at the time the report was prepared. No other conditions, express or implied, should be understood. It has been a pleasure to provide service to you on this project. If you have any questions or require further information, please call. P. CO.,, WA.!�/ ,PkIq Z' 0 2028S I Z� �tc; MAL S E 4 " - Three copies submitted Three Figures Yours very truly, Couvrette Geotechnical Engineering 4- Charles P. Couvrette COUVRETTE GEOTECHNICAL ENGINEERING 270 260 250 t u- 240 z 0 >� 230 220 210 200 SECTION A -A SCALE 1" = 20' EXISTING GROUND SURFACE FUTURE FILL SURFACE TYPICAL TRENCH DRAIN SUITABLE NON -WOVEN DRAINAGE FABRIC 1PE PERFORATED PIPE FOR PERMANENT INSTALLATIONS, RIGID PIPE WITH ACCESSIBLE CLEANOUTS SHOULD BE USED COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01' FIGURE 3 SITE PLAN SCALE 1 40' lwoAlAIA"AA-1 'C814H —N JI SOZI�0 COAfC ZID =a'\1 IVzer /W. 7-0 Z�r- COWAAFCr M C-dI 0 7:6 Q, f 44 f 7AZOOT 7MAC7� -0 W. IL VN (ap a 30 C.O. -cl .1-11e., so .11 A — REFERENCE: COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 UNDATED AND UNTITLED COPY FIGURE 1 OF SITE GRADING PLAN STREET FILE 0 REPORT GEOTECHNICAL ENGINEERING UiVESTIGATION PLANNED SHORT PLAT EDMONDS, WASHINGTON FOR ALBERT AND NORMA SAND Pl'ec�ejvz 'o SEP 2 0 1993 PERMIT cou/vr El? COUVRETTE GEOTECHNICAL ENGINEERING COUVRETTE GEOTECBMCAL ENGiNEERING 17406-133RDAvENuiENoRTHEAsT WOODINVELLF, WASHINGTON 98072 (206)486-1669 June 13, 1991 Albert and Norma Sand 4015 - 164th SW #26 Lynnwood, Washington 98037 Report Geotechnical Engineering Investigation Planned Short Plat Olympic View Drive, Edmonds CGE File No. 274-01 9 INTRODUCTION This report presents the results of my geotechnical engineering investigation for your planned short plat in the city of Edmonds. The site is located south of Olympic View Drive, just west of 88th Avenue West. You have retained me to investigate the site and provide recommendations for development. For use in my study you have provided me with a photocopy of a topography map of the site showing potential building lot lines and house locations. The site is currently undeveloped. You plan to parcel the site into 4 lots, as shown on the Site Plan, Figure 1. Currently you do not have a planned . grading scheme for the site, but you anticipate filling the lower portion of the site to create the two northernbuilding lots. An access driveway and potential cuts will be necessary for the southern two lots, particularly the southwest lot. I understand that you expect some of the grading to be done by the individual home builders as part of their site development. SCOPE The purpose of my services on this project is to explore site surface and subsurface conditions and to provide you with recommendations for the planned development. Specifically, my services include: L Explore subsurface conditions at the site by excavating eight test pits. Report Planned Short Plat June 13, 1991 Page 2 6 2. Provide an evaluation of general site stability. 3. Provide general recommendations for site development. 4. Provide general recommendations for foundation support of the structures. 5. Present my recommendations in a written report. SITE CONDITIONS The site slopes moderately to steeply up from Olympic View Drive to the south and east. A drainage-swale traverses the site from the southeast to the northwest. This swale empties into a low area just off site created by a creek from the southwest. The creek is then channeled into a culvert that flows under Olympic View Drive. A single family residence is located on a fairly level bench on the parcel just northeast of the site. Another residence is located above the steep slope, just south of the site. The site has been cleared of most of its trees and brush except along the east and west edges The upper slopes are covered with berry vines and horsetails are scattered over most of the site. The geology of the Puget Lowland was sculpted by a series of ice ages. Ile last ice advance in the region is referred to as the Vashon Stade of the Fraser glaciation. Ile ice is thought to have attained a thickness on the order of 5,000 feet thick and to have retreated from the Puget Sound region about 10,000 years ago. The weight of the glacial ice compacted previously deposited geologic units during the occupation. The geologic unit found on site is interpreted to have been deposited prior to the last glacial advance during a time when the Puget Lowland was impounded with water. Locally, this unit is termed the Whidbey Formation. The subsurface conditions were explored by excavating 8 test pits using a track mounted excavator hoe. The test pits ranged from 3.5 feet to 9 feet in depth below the ground surface. The test pits were located in the field by hand measurements, using the topography data supplied. The location of the test pits are shown on the Site Plan, Figure 1. A subcontracted geologist was used to monitor the excavations and maintain logs of the soils encountered. The soils were visually classified in general accordance with the Unified Soil Classification System, a copy of which is shown on Figure 2. The logs of. the test pits are presented on Figures 3 through 7. Laboratory testing was not performed for this project. COUVRETTE GEOTECHNICAL ENGINEERING I I I -0 I I I Report Planned Short Plat June 13, 1991 Page 3 The site was found to be underlain by very stiff to hard silt with varying amounts of clay. This soil deposit is interpreted to be the Whidbey Formation. 'Me upper portion of this deposit was observed to be fractured and sheared. Most likely these fractures were created during ice movement through the area as they were tight and appeared glacially consolidated at depth. The upper portion of this unit appears to have "loosened" and water has infiltrated the fractures. Ibis loosening is most likely due to rebounding of the soil after removal of the ice load. Some weathering of this material is also evident. Above the Whidbey Formation in Test Pits 2 and 3 we encountered a dense silty sand whi I ch is interpreted to be a glacial drift, material that was deposited at -the base of the glacier. Although the Whidbey was not encountered in these test pits it is expected to also underlie this portion of the site. The upper soils contain landslide debris and fill. The landslide debris is most likely associated either.with failures of the upper weathered zone of the Whidbey or with fill slopes. The fill consists of native soils created by past grading on site, and possibly the site to the south. As part of the site investigation I walked the fence line at the top of the slope on the south property line and observed the site conditions. Scarps on the order of 6 to 12 inches in height were observed along the top of slope. These scarps appeared to be associated with shallow failures of the upper steep slope. A concave slope feature at Test Pit 4 is interpreted to be a failure that contributed to the slide mass found in Test Pit S. The growth of the alder trees indicates that this failure is fairly recent, estimated to be within the last 10 years. Ground water was observed in some of the test pits within the upper weathered and failed soils. This water is essentially perched on the underlying silt and is the result of infiltration of surface water within the drainage basin. It is not inter .preted to be associated with a regional ground water table. I would expect this water to vary seasonally, however, the only way to determine if it dries up during the summer is to explore the ground water conditions at that time. The horsetail plants observed on site indicate that the site surface soils remain wet most of the year. CONCLUSIONS AND RECOMMENDATIONS GENERAL The project site should be compatible with the planned development provided that site grading and construction is designed and implemented to maintain and/or increase the existing site stability. The fractures found in the unweathered lower soils appear to be tight and not to have moved since they were formed d uring the last glaciation. Therefore it is my opinion that the lower soils are relatively COUVRETTE GEOTECII11,41CAL ENGINEERING Report Planned Short Plat June 13, 1991 Page 4 stable. The movement in the upper soils is interpreted to be due to rebound of the soils, after the ice unloading, which allowed water to enter the fractured areas. These fractured areas which have "relaxed" and water been infiltrated by water are considered much weaker than the underlying soils that have not relaxed. The lower fill that is planned against the roadway embankment should increase the overall stability of the site because it should buttress the hillside. This fill should be placed and properly compacted in order to provide the desired hillside support. Grading for residences on the upper portion of the site should take into account the current instability of the surficial soils. All cuts should be supported either by a engineered retaining wall or by a properly constructed buttress fill. Note that the wall pressures provided in this report are substantially larger than those used for standard retaining wall design. Buttress fills may be constructed of reinforced soil if desired. Soil r6nforcement is a technique used to provide a structural soil mass with a steep face. This soil mass has the ability to act as a buttress. Although it is not known at this time if soil reinforcement will be necessary on site, I have included a general section covering the basics in this report. SITE PREPARATION AND GRADING Site grading in the lower portion of the site should, at a minimum, consist of removing the vegetative layer prior to placing fill. If buildings are expected to be placed on top of the fill, the upper soft or disturbed soils should be removed prior to placing the fill. I recommend that I be retained to evaluate the subgrade preparation with respect to the planned future use because the depth of the fill planned for a specific area, and the type of use (support of structure, yard area, etc.) will influence the site preparation. Ile fill should be keyed into the slope using a system of benches. These benches usually have a width dimension that will allow access for earthmoving and compaction equipment. I recommend that all fill on site be placed ass- structural fill, except that which is specifically identified in - the design as not influencing slope stability. STRUCTURAL FILL All fill placed on site should be structural fill and should be placed to buttress the hillside. Isolated small fills that may not need to meet this requirement may be identified during design, but based upon present planning I recommend that all fill meet minimum compaction standards. Structural fill is fill that is placed and compacted in a uniform manner to a specific compaction standard. The compaction maximum dry density is determined in the laboratory. In place density tests are taken as the fill is placed and they are then compared to the maximum. Unless otherwise stated, all reference to percent compaction in this report is based on the maximum dry density as determined by the ASTM D-1557 compaction test standard. COUVRETTE GEOTECEMCAL ENGINEERING Report Planned Short Plat June 13, 199 Page 5 Structural fill should be free of debris and organic contaminants. Ile fill should be spread in uniform.lifts, not exceeding 10 inches in maximum thickness and compacted to a firm non -yielding condition. Fill in building areas and within two feet of roadway subgrade should be compacted to 95% of its maximum dry density. All other fill, unless otherwise stated, should be compacted to 90% of its maximum dry density. Prior to placing fill, the subgrade should be prepared as outlined in the SITE PREPARATION AND GRADING section of this report. The onsite soils are extremely moisture sensitive and will disturb easily when wet. This will influence both site preparation and the use of onsite soils for fill. It would be best to place fill on site only during the dry portion of the year. Site preparation when the site is wet will requir e additional expense, such as the use of clean imported sand and gravel, spalls or filter fabric. Since the horsetails on site indicate year round.moisture, it may not be possible to avoid some use of these materials. If the onsite soils are observed to be too wet for construction traffic, clearing and site preparation should be done with a large excavator type hoe using a smooth bucket. Traffic should be kept off of the stripped surface until the first lift of fill is placed. The thickness of the first lift should be determined in the field based on the site conditions and the planned use of the area. Ile benches for keying the fill into the hillside should also be excavated using the excavator. SHORING AND TEMPORARY CUTS I expect that cuts will be used, particularly on the south lots, in order to construct the building and driveway areas. I should be retained to review each of these planned cuts to provide an evaluation of their potential stability and of the permanent retaining system. Some of the temporary cuts may be made without support. However, this will not only be site specific, but also time of year specific. All cuts should be stabilized with a permanent -retention system as soon as possible. Cuts in some areas of the site should only be attempted during the dry part of the year unless more expensive shoring i s used. Shoring design should be based on site specific conditions and planned excavation. Earth movements can be associated with any cut, in almost all soil conditions. The amount and relative movement is what can cause damage to adjacent properties. I recommend that adjacent properties be documented for condition prior to excavation so that any future claims that are purported to have been caused by the excavation have baseline data from which to judge the effect of the excavation on the structure. I also recommend that survey points be placed upslope of the excavation and readings be taken daily during the life of the unbraced cut. The readings should be measured to the nearest 0.01 feet. This data would be used to trigger remedial stabilization measures in the event that slope movement was noted. COUVRETTE GEOTECHNICAL ENGINEERING F Repo A Planned Short Plat June 13, 1991 Page 6 e covered with plastic in the event of rainfall. As Any exposed soils in temporary cuts should b noted above, temporary excavations should not be left open any longer than necessary. FOUNDATIONS Where possible, the foundations should be supported on the underlying dense and hard glacial and preglacial deposits. Structures may be founded on the fill providing the area was properly s aximum dry density. prepared and the soil is placed as structural fill compacted to 95 percent of it in For design purposes, I recommend a bearing value of 2,000 psf be used for this site. This value may be increased by one4ird for temporary wind or seismic loads. Differential settlement on the order of I inch should be expected for foundations that extend from fill to native dense hard soils. Other options for foundations where non-structural fill or landslide debris exist include drilled piers and augercast piling. These would have to be designed on a site and structure dependant basis. RETAINING WALLS The lateral density of the soil pressure acting on retaining walls is dependent on the nature and behind the wall, the amount of lateral wall movement which can occur as backfill is placed, and the inclination of the backfill. I expect that at least the southern lots will have existing slopes above the Walls. For walls that are free to yield at the top at least one thousandth of the height of the wall, so" pressures will be less than if movement is limited by such factors as wall stiffness or bracing. We iz al ill be designed using an recommend that yielding walls supporting on site soils with a hor ont backf equivalent fluid density of 40 pounds per cubic foot (pcf). This value should be increased to 110 Pcf for slopes with ' inclinations up to 2.5:1 (Horizontal:Vertical), Non -yielding walls should be designed using an equivalent fluid density of �5 and 110 pcf respectively. These values do not include surcharges such as traffic loads or other surface loads. Surcharge effects should be considered, if appropriate. These values assume a drained condition behind the wall. The drains should be constructed as outlined in the section below. The above lateral pressures may be resisted by friction at the base of the wall and passive pressure against the foundation. A coefficient of friction of 0.3,should be used to determine the base friction. I recommend using an equivalent fluid pressure of 200 pcf for passive pressure design where footings bear against fill. An appropriate safety factor should be applied to the above frictional coefficient and passive pressure values. COUVRETI`E GEOTECBMCAL ENGINEERING Report Planned Short Plat June 13, 1991 Page 7 All backfill for subgrade walls should be compacted in uniform lifts to between 90 and 92 percent of their maximum dry density. Care should be taken to prevent the buildup of excess lateral soil pressures due I to overcompaction of the backfill behind the wall. This can be accomplished by placing the backfill within 18 to 24 inches of the wall in lifts not exceeding 8 inches in loose thickness and compacting this zone with hand operated vibrating plate compactors. Permanent drainage systems should be installed for subgrade walls. I recommend that these drainage systems consist of 18 inches of clean (less than 3 percent fines), free -draining granular material placed along the back of the wall. A 3/8's inch pea gravel would be suitable for use as drain material. Slotted rigid PVC drainpipe having a minimum diameter of 4 inches should be embedded within the granular material at the base of the wall along its entire length and should discharge into tight lines leading to appropriate collection and disposal systems. Roof drains should be connected to a tight line system independent from the subgrade wall drain. These drains should be routed -to an appropriate discharge point down slope. SLAB ON GRADE Slabs may be supported on the underlying dense or stiff soils, or on structural fill as outlined in previous sections. I recommend that the floor slabs be underlain by 6 inches of 'free draining sand or gravel for use as a capillary break. A suitable vapor barrier such as heavy plastic sheeting should be placed over the sand or gravel. GEOGR11D REINFORCED SOIL MASS The benches that are expected to be needed for some of the lots can be accomplished by using soil reinforced was, if desired. These walls can be used for retaining and buttressing the existing on site slopes. The soil is reinforced by a series of geogrid reinforcements. The geogrid acts as reinforcing within the soil mass and allows the soil to stand at much higher slope angles than normal, or even near vertical if desired. A slope facing is necessary to prevent erosion or ravelling of the slope. This facing can consist of wrapping the geogrid up the face with some. sort of soil barrier at the face, placing some type of erosion fabric on the face of a steep slope, constructing rockeries or using a product such as Keystone. You may also obtain ideas directly from the geogrid manufacturer. The key to geogrid design is the desired geometry and the final slope facing that will be used. Once this is determined, an analysis can be performed and the geogrid spacing can be determined. Due to the variability of the overlying soils, I recommend that each wall be individually designed for each COUVRETTE GEOTECIINICAL ENGINEERING Report Planned Short Plat June 13, 1991 Page 8 a location. The alternative is to provide a worst case design that would be used at any location on the site. For use in preliminary design, I recommend that a depth of embedment of the geogrid be taken as varying from 0.6H to H, where H is the height of the wall. This will vary with several factors, including the material behind the wall. If the wall is to retain loose fill or landslide debris, the loads on the geogrid soil mass are increased and the length of the grids increase accordingly. Traffic loads should also be considered. The geogrid wall may be constructed using on site soils, but these soils will have to be compacted to engineering standards. This could be accomplished by excavating the soils and spreading them in the building area and allowing them to dry. After they have been dried to the proper moisture content for compaction they may then be placed in the geogrid fill embankment. The fill should be placed in uniform lifts not exceeding 8 inches and compacted to 93 percent of its maximum dry density as determined by the ASTM D-1557 compaction test procedure. The on site soils are moisture sensitive and will be impossible to compact when wet. They can also be over dried and may required the addition of moisture. Moisture control will be important for use of the on site soils. An alternative is to import a clean free draining fill. The actual geogrid design will be site specific. - Most likely all of the loose surficial soils and slide debris that may exist should be removed prior to construction of the geogrid. Ibis will be determined based on slope geometry and expected soil conditions. brainage will be an important part -of the geogrid design and will most likely include a base drain and a chimney drain up the back of the embankment. The drain design should be finaaed at the time the embankment design is completed. USE OF THIS REPORT This report has been written for Albert and Norma Sand for their use in preparing a por . tion of this project. The data.and report should be provided to prospective contractors for their bidding or estimating purposes, but my report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions. Ibis is particularly true with respect to the amount of fill and landslide debris on th e site. The scope of my services does not include services related to construction safety precautions and my recommendations are not intended to direct the contractors' methods, ICOUVRETTE GEOTECUMCAL ENGINEERING Report Planned Short Plat June 13, 199 1, Page 9 techniques, sequences or procedures, except as specifically described in my report for consideration in design. This report should be considered preliminary in nature as specific plans have not been developed for this project. I recommend that I be retained to review any future site grading plans and provide recommendations regarding fills, retaining structures, foundations and other geotechnical related issues at that time. Within the limitations of scope, schedule and budget, my services have been executed in accordance with generally accepted practices in this area at the time the report was prepared. No other conditions, express or implied, should be understood. It has been a pleasure to provide service to you on this project. if you have any questions or require fuqkqr%ig %Tation, please call. COO, :. ... �� Yours very truly, .***0*1 WA4,*%. Jr Couvrette Geotechnical Engineering rr, 0 &- Charles P. Couvrette A %,% 1% Three copies submitted Seven Figures COUVRETTE GEoTECIEqICAL ENGINEERING SIT z LU V5 M �171 , syl, ER �- f= CL 0 013 cr z in a- w a. < /Votj/rod tfooy Al /VlO/ N6C'O 1) 54 S7 %L el NVII NObt W& aNno 41 .3,vono t� Oql or, MY) A A4, 04),Z) 052 Ok A —CO 0 . at V ;7d�..- 04 .04 L IVA 0, 0 /,A OA WM N LO 0 U.1 Oo ccow > z cc :3 w :D 0 =� LD L) U. LL tij I u Z U.1 LU LL ul cc I I I I I I I I a rl SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL WELL GRADED GRAVEL, FINE TO COARSE GRAVEL CLEAN Gw COARSE GRAVEL GRAINED GRAVEL GP POORLY -GRADED GRAVEL MORE THAN 50% OF SOILS COARSE FRACTION GRAVEL WITH RETAINED ON NO. 4 GM SILTY GRAVEL SIEVE FINES GC CLAYEY GRAV EL MORE THAN 50% . RETAINED ON THE Sw WELL -GRADED SAND, FINE TO NO. 200 SEIVE SAND CLEAN. SAND COARSESAND SP POORLY -GRADED SAND MORE THAN 50 % OF SAND WITH SM SILTY SAND COARSE FRACTION FINES Sc CLAYEY SAND PASSES NO. 4 SIEVE SILT AND CLAY ML SILT FINE CL. CLAY GRAINED INORGANIC SOILS LIQUID LIMIT ORGANIC OL ORGANIC SILT, ORGANIC CLAY LESS THAN 50% OF HIGH PLAST-ICITY, ELASTIC MO . RE THAN 50% SILT AND CLAY MH SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY PASSES ON THE INORGANIC NO. 200 SEIVE ORGANIC OH ORGANIC CLAY, ORGANIC SILT LIQUID LIMIT 50% OR MORE HIGHLY ORGANIC SOILS PT PEAT SOIL MOISTURE MODIFIERS: NOTES: I . FIELD CLASSIFICATION IS BASED ON VISUAL DRY - ABSENCE OF MOISTURE, DUSTY, DRY EXAMINATION OF SOIL IN GENERAL ACCORDANCE TO THE TOUCH WITH ASTM D2488-83. 2. SOIL CLASSIFICATION USING LABORATORY TESTS MOIST - DAMP, BUT NO VISIBLE WATER IS BASED ON. ASTM D2487-83. WET - VISIBLE FREE WATER OR SATURATED, 3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY USUALLY SOIL IS OBTAINED FROM BELOW ARE BASED ON INTERPRETATION OF ' BLOWCOUNT WATER TABLE DATA, VISUAL APPEARANCE OF SOILS, AND/OR TEST DATA. COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 2 FA DEPTH UNIFIED SOIL (FEET) CLASSIFICATION LOG OF TEST PITS SOIL DESCRIPTION TEST PIT ONE 0.0-0.5 SM DARK BROWN SILTY SAND, TOPSOIL AND ROOTS 0.5-2.5 SM RED BROWN TO BROWN MICACEOUS SILTY FINE SAND WITH OCCASIONAL POCKETS AND LENSES OF LIGHT GREY CLAYEY SILT (MEDIUM DENSE TO DENSE, MOIST) 2.5-8.0 ML/MH LIGHT GREY AND GREY OCCASIONALLY MOTTLED CLAYEY SILT WITH FINE SAND POCKETS AND LENSES (HARD, MOIST) VAGUE BEDDING, FISSILE PARTINGS ON CRENULATED SURFACES, OCCASIONAL IRREGULAR JOINTING WITH RED BROWN JOINT COATING ON OCCASION, OCCASIONAL POLISHED JOINTS TEST PIT COMPLETED AT 8.0 FEET ON 5/2/91 GROUND WATER NOT OBSERVED TEST PIT TWO 0.0-0.8 OL DUFF, DARK BROWN ORGANIC SILT, TOPSOIL AND ROOTS (SOFT, SATURATED) 0.8-1.8 SM GREY BROWN, POORLY SORTED SILTY VERYTINE TO FINE SAND WITH SCATTERED GRAVEL, MICACEOUS (LOOSE TO MEDIUM DENSE, WEI) ROOT TUBES, POSSIBLY MODIFIED GROUND 1.8-7.5 SM GREY BROWN, POORLY SORTED SILTY VERY FINE TO FINE SAND WITH SCATTERED GRAVEL (MEDIUM DENSE TO DENSE, MOIST TO WEI), DISPLAYS SOME DRIFT -LIKE ASPECTS TEST PIT COMPLETED AT 7.5 FEET ON 5/2/91 GROUND WATER SEEPAGE FROM SATURATED SURFACE ZONE IN UPPER 2 FEET; PIT CAVES THIS INTERVAL AS WELL r COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 3 DEPTH UNIFIED SOIL (FEET) CLASSIFICATION LOG OF TEST PITS SOIL DESCRIPTION TEST PIT THREE 0.0-1.0 Sm DUFF, SILTY SAND, TOPSOIL AND ROOTS 1.0-3.5 SM GREY POORLY SORTED SILTY SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST TO WET) (DRIFT) 3.5-6.0 sm GREY BROWN MOTTLED POORLY SORTED MICACEOUS SILTY FINE SAND WITH SCATTERED GRAVEL (DENSE, WET) GROUND WATER SEEPING IN ZONES AND ALONG ROOT TUBES 6.0-6.5 SM GREY BROWN MOTTLED MICACEOUS SILTY FINE SAND (DENSE TO VERY DENSE, MOIST) TEST PIT COMPLETED AT 6.5 FEET ON 5/2/91 GROUND WATER SEEPAGE FROM ABOUT 3.5 TO 6.0 FEET TEST PIT FOUR 0.0-1.2 SM GREY POORLY SORTED SILTY SAND WITH GRAVEL (LOOSE TO MEDIUM DENSE, MOIST) (FILL) 1..2-1.6 BLACK SANDY SILTY TOPSOIL (SOFT, MOIST TO WET) (RESIDUAL TOPSOIL?) 1.6-3.5 SM REDDISH GREY BROWN MOTTLED SLIGHTLY SILTY FINE SAND (DENSE, MOIST) TEST PIT COMPLETED AT 3.5 FEET ON 5/2/91 GROUND WATER NOT OBSERVED COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 4 LOG OF TEST PffS. DEPTH UNIFIED SOIL SOIL DESCRIPTION (FEET) CLASSIFICATION TEST PIT FIVE 0.0-1.8 SM GREY BROWN INTERMIXED SILTY FINE SAND WITH TRACE GRAVEL (LOOSE, SATURATED) (LANDSLIDE DEBRIS) 1.8-2.2 Sm REMNANT SILTY SAND TOPSOIL ZONE (LOOSE, SATURATED) 2.2-6.0 sm GREY BLUE AND BROWN SPLOTCHY MICACEOUS SILTY FINE SAND WITH SCATTERED ROOTS ORGANICS AND WOOD MATTER TO 3 INCH SIZE (LOOSE, SATURATED)(LANDSLIDE DEPOSIT) 6.0-6.5 REMNANT BLACK TOPSOIL AND ROOT ZONE 6.5-7.5 MH GREY CLAYEY SILT (HARD, DAMP TO MOIST) VAGUE LAMINATION TEST PIT COMPLETED AT 7.5 FEET ON 5/2/91 GROUND WATER SEEPAGE AND CAVING TO 6.5 FEET TEST PIT SIX 0.0-1.0 DUFF, SILTY SANDY, TOPSOIL AND ROOTS 1.0-3.0 sm GREY BROWN LIGHTLY MOTTLED POORLY SORTED SILTY SAND WITH GRAVEL (LOOSE, MOIST) 3.0-5.5 Sm GREY BROWN LIGHTLY MOTTLED POORLY SORTED SILTY SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST) (DRIFT) OCCASIONAL ANGULAR INCLUSIONS OF HARD BROWN CLAYEY SILT TEST PIT COMPLETED AT 5.5 FEET ON 5/2/91 COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 5 LOG OF TEST PITS DEPTH (FEET) UNIFIED SOIL CLASSIFICATION SOIL DESCRIPTION TEST PIT SEVEN 0.0-1.0 DUFF, ROOTS AND TOPSOIL (MOIST) 1.0-2.2 sm GREY INTERMIXED POORLY SORTED SILTY SAND WITH SCATTERED GRAVEL (LOOSE, MOIST TO WE 2.2--3.2 SM GREY BROWN MOTTLED MICACEOUS SILTY FINE SAND (DENSE, MOIST TO WET) 3.2-4.9 MH/CL GREY WITH RED BROWN MOTTLING, CLAYEY SILTY TO SILTY CLAY (HARD, MOIST) (JOINTED, BROKEN AND HACKLED, OCCASIONAL GOUGE AND CLAY ON JOINT PLANES (LANDSLIDE ZONE) 4.9-7.5 sm GREY BROWN WITH RED MOTIUNG, MICACEOUS SILTY FINE SAND (DENSE, WET) HEAVY GROUND WATER SEEPAGE 6.5 TO 7.5 FEET 7.5-7.8 ML/MH LIGHT GREY CLAYEY SILT (HARD, DAMP), MATRIX GENERALLYINTACT 7.8-8.0 PT/OL DARK BROWN TO BLACK PEAT/ORGANIC CLAYEY SILT (HARD, DAMP) (ANCIENT PEAT BED) 8.0-9.0 ML GREY WHITE SILT (HARD, DAMP) (VOLCANIC ASH) TEST PIT COMPLETED AT 9.0 FEET ON 5/2/91 GROUND WATER SEEPAGE AT 6.5 TO 7.5 FEET. COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 6 LOG OF TEST PITS DEPTH UNIFIED SOIL SOIL DESCRIPTION (FEET) CLASSIFICATION TEST PIT EIGHT 0.0-0.6 DUFF OVER DARK BROWN TOPSOIL 0.6-2.5 SM GREY WITH BROWN MOTTLING, POORLY SORTED MICACEOUS SILTY FINE SAND (MEDIUM DENSE, WET), POSSIBLY DISTRESSED, INCLUSIONS OF HARD CLAY 2.5-3.6 SM GREY BROWN WITH RED MOTTLING, FINE SAND WITH SOME SILT (MEDIUM DENSE TO DENSE, SATURATED) (VOLCANIC ASH) GROUND WATER SEEPAGE 3.6-4.0 ML/MH GREY CLAYEY SILTY (HARD, WET) BROKEN AND JOINTED WITH SLIKENSLIDES AND GOUGE COATINGS ON SOME JOINT ON FRACTURE FACES 4.0-4.5 MH/PT BLACK GREY ORGANIC CLAYEY SILT/PEAT (HARD, SATURATED IN JOINTS AND CRACKS) JOINTS AND BROKEN FACES DIP DOWN SLOPE AT ABOUT 25 DEGREES 4.5-5.5 ML/MH GRAY CLAYEY SILT (HARD, WET ON BROKEN - FACES) SLIGHT DISTRESS, JOINTED LANDSLIDE ZONE 3.6 TO 5.5 FEET 5.5-7.5 ML/MH GRAY CLAYEY SILT (HARD, DAMP) MATRIX MORE INTACT TEST PIT COMPLETED AT 7.5 FEET ON 5/2/91 GROUND WATER SEEPAGE TO ABOUT 5.5 FEET COUVRETTE GEOTECHNICAL ENGINEERING FILE NO. 274-01 FIGURE 7 , ; RECEIVED TO: Building Department STREET FILE CITY OF EDMONDS NOV 0 8 1993 PERMIT COUNTER RE: OWNER LIABILITY LANDSLIDE ACKNOwLEDGEMENT DECLARATION T:ie undersigned owners hereby attest to the accuracy of all permit submittal information included in Permit File No. 93-165 held in the office of the City of Edmonds. The said owners have signed a ''Covenant of Notification and Indemnification/ Hold Harmless'' agreement which relieves the City of Edmonds and its staff from any liability associated with reliance on such permit application submittals. All conclusions derived from reports included and referenced in Permit File 93-165 shall be those of the owners and design professionals. The undersigned owners understand and accept the risk of developing in an area with potential unstable soils and agree to advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures or portions of structure on the site, of the slide potential of 'the area. Subscribed and sworn to this 5 day of November, 1993. A-]-�'ertE. Sand, Owner L Nd�r-ma Sand , Ow'6e r STATE OF WASIIINGTC�.I) COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence that Albert E. Sand and. Norma Sand signed this instrument and acknowledged it to be their free and v"61.unt-c )ry act for the purposes mentioned in this instrument. DATED this day of November, 1993. Notary Public, in an&f�# the State of Washington. My commission expires. r) TO: Building Department CITY OF510t40 V 0 8 0 MET FILE RE: OWNER LIABILITY LANDSLIDE ACKNOWLEDGEMENT DECLARATION T:ie undersigned owners hereby attest to the accuracy of all permit submittal information included in Permit File No. 93-165 held in the office of the City of Edmonds. The said owners have signed a "Covenant of Notification and Indemnification/ Hold Harmless" agreement which relieves the City of Edmonds and its staff from any liability associated with reliance on such permit application submittals. All conclusions. derived from reports included and referenced in Permi.t File 93-165 shall be those of the owners and design professionals. The undersigned owners understand and accept the risk of developing in an area with potential unstable soils and agree to advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures or portions of structure on the site, of the slide potential of the area. Subscribed and sworn to this day of November, 1993. Albert E. Sand,-OwrVer Norma Sand, Owner STATE OF WASIIINGTO�V) COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence that Albert E. Sand and Norma Sand signed this instrument and acknowledged it to be their free and voluntary act for the purposes mentioned in this instrument. DATED this day of November, 1993. Notary Public, in' and for� the State of Washington. Mv commission exoires: /,/ - 9 - '2 �-', STREET FIMtical Areas Checklist Site Information Project Name: '�.anrl qhe-irt PInt Permit Number: . S 17-91 SiteLocation: 1A114 88th Ave, W_ Property Tax Account Number: 4188-000-017-0007 Approximate Site Size (a�res or square feet): 1-39 ncrp'c; Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions 1. Has the site been cleared or logged? Yes —Date of most recent action: 1991 Soils / Topography 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? Hard - s i 1 t and clay 3. Describe the general site topography. Check all that apply. Flat: less than 5 feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) • Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of 10 feet of horizontal distance.) • Steep: grades of greater than 30% present on site. Comments HydrologyfVegetation 4. Site contains areas of year-round standing water No 5. Site.contains areas of seasonal standing water: Yes —Approx. Depth: 1 t o 2 i n c h e s 6. Site is in the floodway No floodplain___Eb _of a water course. 7. Site contains a creek or an area where water flows across the grounds surface? are year-round? _AQ__Flows are seasonal? Yps 8. Site is primarily: forested meadow ;shrubs mixed X 9. Obvious wetland is present on site: yes 10. Wetland inventory or map indicates wetland present on site: Yes 11. Critical Areas inventory or map indicates any Critical Area on site: Yes For City Use Only or 90, 194 - City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of thi's form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached. Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: Albert E. and Norma SAnd Naine Owners Title 4ois 164th st- S W-, #26 Street Address I Ngnplair—d WA 98()37 742--107 Cit�, State-, ZIP Phone Signature Date Applicant Representative: Narne Title Street Address City, State, ZIP Phone Signature Date City of Edmonds Critical Areas Determination Applicant: I Albert and Norma Sand Determination #: I CA-93-244 Project Name: Permit Number: Site Location: 1 18114 88th Avenue West Property Tax Acct #: 1 4188-000-017-0007 Project Description: Waiver Criteria (all criteria must be found to apply): XX There will be no alteration of the Critical Area or its required buffers; XX The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; - XX The development proposal meets tile minimum standards of the Critical Areas ordinance; XX The above findings are based on the following conditions of approval: 1. The applicant must follow all conditions found in the short plat 2. All future development must receive a new Critical Areas neview. Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this development permit is hereby Waived, as authorized by Chapter 20.15B. 150 (B) of the Edi-nonds C01111111mity Development Code. "Name Siature DAte I__r4 at CITY CLERK �3' STREETFILE BUILDING '61VIC CENTER L EbIAONDS, WA 98020 JAN 2 ' 1994 COVENANT OF 190TIFICATION AND INDEMNIFICATION/HOLD HARMLESS Under the review procedures established. pursuant to the State Building Code, incorporating amendments promulgated by the City of Edmonds,. and as a prerequisite to the issuance of a building permit for the construction of a residential structure and attendant facilities, the undersigned OWNERS of property do hereby cov enant-1 stipulate and promise as follows: 1. Descripticn cf Z,�,,jaqt prc'-perty. cGvenant of notification and indemnification/hold harmless relates to a tract of land at the street address of 115106 1�0 (insert street address), Edmonds, Snohomish County, Washington and legally described as: Lot 3: That portion of Tract A, according to the plat of DOBSON PARK, as recorded in Volume 16 of plats on pages 96 and 91, recor of FW 1%0 =­4 Snohomish County, WA, as described in EXHIBIT B attached'r" C=) r7l r r- CD C) 2. Notification and Covenant of Notification. The above referenced site (hereinafter "subject site") lies within an area which has lieen identified by the City of Edmonds as having a potential for earth subsidence or landslide' hazard. The r1sks associated with development of the site have been'evaluated by technical consultants and engineers engaged by the applicant as a part of the.process to obtain a -building permit for the subject site. The results of the consultant's reports and evaluations of liSS52079A/0006.040.0-34 -1- RECEIVED WSS/k1t 02/08/ . 90 BUILDING Olt, NOV 0 19jj OQ0 f% C*N 2 F&q 9 - /- 0 MIT COUNTER VOL 2-84 the risks associated with development are contained in building 3-) permit file number c -7,�5 (insert number) on file with the -- 6- — City of Edmonds Building Department. Conditions, limitations, or: prohibitions on development way have been imposed in accordance with the recommendations of the consultants in the course of permit issuance. The conditions, limitations, or prohibitions may require ongoing maintenance on the part of any owner or lessee or may require modifications to the structures and ea rth stabilization matters in order to address future or anticipated changes in soil or other site conditions. The statements and conditions proposed by the OWNERS' geotechnical engineer, geologist, architect and/or. structural engineer are hereby incorporated by reference from the contents of the file as fully as if herein set forth. . Any future purchaser, lessee, lender or any other person acquiring or seeking to acquire an interest. in the property is put on notice of the existence- of the content of the file and the City urges review of its contents- The file may be reviewed during normal business hours or copies obtained at. the Planning Department, City of Edmonds, 505 Bell Street, Edmonds, Washington 98020. 3. Indemnification and Hold -Harmless. The undersigned OWNERS hereby waive any- and all liability associated with - development, stating that t hey have fully informed themselves of all risks associated with development of the. property and do" therefore waive and relinquish any and all causes of action against the City of Edmonds, its officers, agent�>- and employees WSS52079A/0006-040-034 -2- WSS/klt 02/08/90 9312-160281 ' Y o L. 2 8' 4 0- P A 6 E 19 3 S arising from and out of such development. In addition, the OWNERS on behalf of themselves, -their successors in i nterest, heirs and assignees, do hereby promise, to indemnify and hold harmless the City of Edmondsl its officers, agent I s and employees from any loss, claim, liabi lity.or damage of any kind or nature to persons or property either on or off the site resulting from or out of earth subsidence or landslide hazard, arising from or out of the issuance of any permit(s) authorizing development of the site, or occurring or arising out of any false, misleading, or inaccurate information provided by the OWNERS, their employees, or professional consultants in the course of issuance of the building permit. 4.. Insurance Recruirement.. In addition to any bonding which may,* be required during the course of development, the Community Services Director has not (strike one) specifically required the maintenance of an insurance policy -for public liability coverage -in, the amount -and for the.time set forth below in -or der to provide for the financial responsibilities established through the indemnification and hold harmless agreement above.: (insert insurance requirements and time period,. if any --if no insurance required, so state.] No insurance required. WSS52079A/0006.040.034 —3— WSS/klt 02/08/90 VOL. 2840PAGE I j ti 12 16 012.81, 5 - Covenant to . Touch and Concern the Land. 'This covenant of notif ication and indemnif ication/hold harmless touches and concerns the subject tract and shall run with the land, binding, obligating and/or 3-nuring to the benefit of future owners, heirs, successors.and interests or any other person or entity acquiring an , interest in property, as their interest may appear. This provision. shall not be interpreted to require . a mortgagor or lender to indemnify the City except to the extent of their loss nor to obligate such persons, to maintain the insurance above required. DONE this day of 1993. OWNER (S) By: By: By: STATE OF WASHINGTON ) ss: COUNTY OF I certify that I know or have satisfactory evidence that A7Z-13",,!:-'P7- 5AAZD signed this instrument and acknowledged' WSS52079A/0006.040.034 WSS/klt 02/08/96 121-6 0 2' 1 -4- voL. 2840PAGil000 k� es it to be (his/her) f ree and voluntary act fol;�-- thq,,,, mentioned in this instrument. DATED this day of 1999- NOTARY PUBLIC My commission expires: STATE OF WASHINGTON )ss: COUNTY, OF I certify that I know or have satisfactory evidence that, A10,flnP - SA A4D sigried this. ins trument and acknowledged it to be (his/her) f ree and voluntary act for the,,,,,puwp j9ses mentioned in this instrument. 0 17 DATED this day of�, 1996. NOTARY PUBLIC My commission expi es: STATE OF WASHINGTON ) )ss: COUNTY OF I certify that I know or have satisfactory evidence. that signed this instrument, on oath stated that (he/she) was authorized to execute the instrument and acknowledged it as the (title) of (name of party on behalf of whom i nstrument was executed)- to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. DATED this day of 199. NOTARY PUBLIC My commission expires.: WSS52079A/0006.040.0-34 -5- WSS/klt 02/08/90 VOL. 2840PAbIlLoo �u qj -Y TO: Building Department CITY OF EDMONDS V 0 8 RE: OWNER LIABILITY LANDSLIDE ACKNOWLEDGEMENT DECLARATION T:;e undersigned.owners hereby attest to the accuracy of all permit submittal information included in Permit File No. 93-165 held in the office of the City of Edmonds. The said owners have signed a "Covenant of Notification and Indemnification/ Hold.Harmless" agreement which relieves the City of Edmonds zind'its staff from any liability associated with reliance on such permit application submittals. All conclusions derived from reports included and referenced in Permit File 93-165 shall be those of the owners and design professionals. The undersigned owners understand and accept the risk of developing in an area with potential unstable soils and agree to advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures or portions of structure on the site, of the slide potential of the area. Subscribed and sworn to this day of November, 1993. 'Albert E. Sand Ow*r- Nqrma Sand,' Owner STATE OF WASIlIbIGTov) COUNTY OF SNOHOMISH) C, I certify that I know or have satisfactory evidence that Al.bet,�JW$andf�pnld Norma Sand signed this instrument and acknowledged it to be their fr , ee'e'rid. vof6ln't-�ry act for the purposes mentioned in this instrument. A DATED this day of November, 1993. �otary Public, in and T the State of 0 Washington. r Mv rnmmiqsinn exoires: 9 .9 6, Legal descripti.ons conLinUed S-17-91 LOT 3 EXHIBIT B That portion of Tract A, according to the plat of DOBSON PARK, as recorded in Volume 16 of plats on pages 90 and 91, records, of Snohomish, County WA. described as follows: Beginning at the Northeast corner of said Tract A, DOBSON PARK, said corner being on the SOUtherly inargin or Olympic view i.),-iv, thence S G702812011 W along the southerly margin for 87.17 feet; thence S 00521201, W for 134.65 feet to the.northwest cornet- of a private road Known as Tract X; thence S 890071401, E along the north margin of said privaLe road for 66.35 feet to the start of a curve (the radius point of said Curve bears N 0052'20" E a distance of 35.00 feet); thence northeasterly along said curve ror 20,G2 feet. to the end of said curve; thence N 57006145" E for 62.52 feet to the start or a Curve (the radius point of said curve bears S 32'53'15" E a distance of Q0.00 feet.); Lhence northeasterly along said curve for 23.57 feet to the we'sterly of 88th Ave W; thence N 0152'20" E along said westerly margin for' 10.00 feet to the northeast corner of said Tract A; thence N 89'07140". W for 80.00 feet; thence N 01) 5212011 E for 111.88 feet to the Point of Be'ginning. - Situated.in the City of Edmonds, Snohomish Co. WA Coiit'ainihg 14,496 Sq. Ft. Subject to a permanent utility easement over the west 10.00 feet thereof And: Subject to a permanent easement for storm sewer pUrposes that is lo.00 feet wide with the center line of said easement being described as follows: commencing at the northeast corner of Tract A of said DOBSON PARK ( Volume16 of plats p9s. 90 and 91), said corner being on the westerly margin of 88 th. Ave W; thence 8 0*5212011 W along the westerly mat -gin of 88th Ave. W for 6.30 feet to the Point of Beginning of said centerline; thence S G9054'55" W for 249.48 feet; thence N 7'2711511 W for 40.65 feet more or less to the westerly line of said Tract A, DOBSON PARK and the end or said P-asement. Together with a 14. interest in a TRACT X described as follows: TRACT X, PRIVATE ROAD AND UTILITY EASEMEN-r That portion of TRACT A, according Lo Lhe*pInt of DOBSON PARK, as recorded In Volume 16 of plats on pages 90 and 91, records of Snohomish County -Wash, - as follows; Commencing at the Northeast corner of'sai . d TRAC1 A, DOBSON PARK, said point being on Lhe westerly margin of 88th Ave. W; thence S 0152'2011 W along said westerly margin for 10-00 feet to the Point of l3egillni6g; said point being the sLart of a CUrve (the raditis point of said citt-ve 1).!ars S 0'52,201, W a distance or 110-00 feet); thence it, 0 sutAhwPstelly direcl.ion Niolig Lhe arc OF said curve a distance of 23.57 feet to the end of said curve: thence S 57'0641511 W for 62.52 Feet to the start of a curve ( the radius point of Silid Curve bears N 32*53115"W a distance of 35.00 feet.); thence' southwesterly alolig s ic curve for a distance -lid curve; thence N 89"07114011 W for 66.35 feet; of 20.62 feet Lo the end of S, a I thence S 005212011 W for 20.00 feet; thence S 89'07'110" E for 52.00 feet to the start of a curve (the radius Point Of Sclid Curve betars S 0052'2011 W a distance of. 20.00 feet); the.nce. easLerly and southerly along the Irc.of said curve for 31.42 feet to the end of said curve; thence S 8947'110" E for 1G.00 fettt.; thence N 0152'20" E for 12-63 reeL to.'the start of a cut've,(Lhe radius point of said curve bears S 89*07'40" E a dIst.ance of 20.00 fepl.); Lhence "iOrt.heasterly along said curve for a clisLance of 19.63 feet Lo the end of said cuve; thence N 57006145" E for 62.55 feet to the. start. of a cul-ve (the radius point of sa*id curve bears S 32*53'15" E a distance of 20.00 feet): thence easterly along the arc of said curve a disLance of 11..78 feet to the elld of said curve, said point being on the westerly margin of 88th Ave W; theiice N 0'52'20" E for 20.00 feet to the Point of Beginning, c., :, �/(,( /9" � P. i` 13.1 5 4 2 AUTHORIZI F0R RECORI CITY OF EOM( PLAN( �Q.F 312160281' VOL. 28 4 0 P46E 11' 9' 8 V7 City of Edmonds SMEUG%J�F-WAY CONSTRUCTION PERMIT Permit Number. 15 issue Date: - ------ A. Address or Vicinity of Construction: 18106 88 Ave W ( 9413419 9 0 1 9 C� B. Type of Work (be specific): Install new Service C. Contractor: Washington Natural Gas Company Contact: Frank Swan Mailing Address: 815 Mercer St,Seattle WA 9811Phone: 224-2278 State License #: Liability Insurance: Bond:$ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. E] Commercial 0 Subdivision n City Project n Utility (PUD, GTE, WNG, CABLE, WATER) E] Multi -Family E] Single Family E) Other INSPECTOR: INSPECTOR: kJ_A1JC41*A F. Pavement or Concrete Cut 0 Yes 91No G. Size of Cut: x H. Chargq�_$ APPLICANT TO READ AND- IGN INDEMNITY. Applicant understands and by his signature to this application, agrees to h _t * e (City of Edmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made'�agtatt the City of Edmonds, or any of,,its departments o## employees, including or not limited to the defense ofany legal proceedings including dej.�n9exl4d, and attorney fees by'Veasono'fgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIAL$ FOR -A PERIOD OF ONE YEAR FOLLOWING THE FINAL S.� ET PA TCH INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES*,J;LL- EHELD UNTIL THEWIMAL , IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESS4 FOR ISSUANCE TO � FJ ANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the abovestatements and understand thepermit requirements and thepink copyof thepermit will be available on site at allU�for inspe tion purposes. Signature: Date: May 11, 1994 (Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVEDBY: RIGHT OF WAY DEPOSIT TIME AUTHORIZED': VOID AFTER I �1 FAY�— DAYS SPECIAL CONDITIONS: r_-ocP"1mArr, DISRUPTION FEE/FUND 111: RESTORATION FEE: W#T H &0^� HOL_�._ovp ­;�-Al�-50z�,(,, PERMITFEE: IV47�7- -rO TOTALFEE: e_e LXCAT100 Ayl-zc� 44 Alers 7- COMMENTS: RECEIPT FEE: DATE: ISSUED BY: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Nv. 1991 FIELD INSPECTION NOTES (Fund 111 - Route copy to Street Dept.) Comments: I Diagram.: CONTRACTOR CALLED FOR INSPECTION El YES El NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: BROWNS 0A Y 1L 7 FREWIM m tL OVERLOW rK 4V W, FK Lem iW 1"s S;w, PL Sw 18113 1"rH � ST 'if . , - —.- . n_v_ t 19m ST sw -PrG 1961 ST SW Ri ri HILMYLA DR —o Jul It �'A ST 81110111A X�;O ST I= ---- ----- 7N N.T�� T. Ro= *106 MELD MIEWL 1"Y IC�aU JW-4T TRe*4Ci4 c.,::�osca senc4jow I ft 1'14'f Y, 174 TIEF -T-,EFF-- Fjhr1:D Loe, /,tj Co A X11 F>�- -- 0* loop- -p-Rc-,p 1114"-Pr- f-1 5T- mp—lm -r-fff-L:p L-r�� 643" 100,5 1969 IS 2,. 41-7 W 190 5/o,, '310's NOTES: EDMONDS 1.) FIELD LOCATE ALL UTILITIES CALL 1-800-424-5555 48 HOURS BEFORE DIGGING 2.) INSTALL LOCATING WIRE OVER ALL PE DIRECT BURIAL PIPE 3.) INSTALL A ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE 4.) SURVEY IS NOT REQUIRED 5.) MAINTAIN A MINIMUM OF 5' HORIZONTAL AND A 31 VERTICAL CLEARANCE FROM ALL CITY UTILITIES AND APPURTENANCES 6-) C TS 1N PAV-ING PAIE SHOWN AS 7-) CUTS ANTICIPATED COMPLETE EXPOSED PIPE CONDITION REPORT WING FORM #563.13 (D-1) 10 z -?Q -17�t7: �LL VALVAE BD)l, 60 76- 5'&- 00 17.�; 4. 2 1 2,30' %/,A-LVE (30A 1'14- Fla 6 e4,T?13 vALva-, 2- 1 '14 -DU c z-/f x 2-" t"::t- -44= 14 z-rAiA6a; wrRE — ------ V+ I I -Fa 7-1 Pl-=7 -.0c)'340 7c)-- oo r7o ITEM!QUANT. DESCRIPTION STOCK NO. BILL OF MATERIAL PERMITS: 114 SEC: N \A/ 'ELDI-\O N D5 PLAT: I Go. (0e F-5m-r OP MAP: 1 (00- 68 AMM 012mm"Iromm Natural Ges AV^c sWgton EnerW Cryrp-YN AREA: TAX CODE: SEQ. NO: D.G.R: 7-/S 94 T? T 1 '/4 1 —= FP' -T-r AAA I M EX /0/0(0 AIV w AL—,6E7<-r �rM-P 4-Hole�r -PLA,-r DWNR,;o CIIK'D� 9C.Al F- IR RR JOB '94134-19 DESCRII'TION nAJ p-r) 941,3419 HLE 'C ERMIT ITY OF ED-19 ES" S [0 E, SEWER'? PERIV11T 5 6 7 Address of Co.nsiruction: Property Legal Description (Include all --easements): Owner and/or Co"ntractor: Z State License No. 64;� C 6'A Building Permit No. Single Family El. multi -Family (No. of Units-) El Q.o mercial CIT Pub I i c Invasion into City Right -of -Way: 1� No Yes RW Construction Permit No. RECE1 CrVossEoRer Private Property: EO/No. 0 Yes MAR- 2 2 1994\ttach'l'e'g*al-.descripti6n and copy of.recorded easement PUBLIC WORKS -DEp7 I certify thdt I have re' ­ad and shdll C_o�nply with all city requirements as,indicated on the back of the Permit Card. Date CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION OFFICE USE ONLY 'I FOR INSPECTIONCAL L[gffl Permit Fee: 771 Trunk Charge: Assessment Fee: AD .11q .Lid No.: Partial Inspection: Comments Reason Rejected: Final Inspection Approved: .PUBLIC WORKS DEPT. 2 Issued By Datelssued:_ Receipt No.: z 6) lnitial_� �' Date Initial. Date -Initial PERMIT MUST BE POSTED ON JOB SITE White Copy: File Green Copy: Inspector Buff Copy: Applicant Re�isecl 3!90 I Side Sewer Drawing The City of Edmonds EASEMENT NO - ------------------------------- - ----------- NEW CONSTRUCTION REPAIRS F] LID NO - ------------------ ASMT. NO - ------------------ ul) CONTRACTOR -------------------------------------------------- --------------------------------- PERMIT NO. ............ V-1 W ------------------------------------------------------------ I ......... --------------------- JOB ADDRESS -tJA-t0---- �s AjicE- � 0, --- I ---------------------------------------------------- - -Z-4� C) \,- L� V"' '� � C- \1 VCL,k) -�) k - PWW-0001 -11/75 (REV.1 1/78) LEGAL DESCRIPTION: LOT NO . ......... ---------------------------- BLOCK NO . .............. --------- ------------------------- --------------------------------------------------------------------- I ---------- ------ ----------------- ------- NAMEOF ADDITION ---------------------- -------------------------------- -- ------------------ :_� --------------------------------------- �, k �N 7-- \r\l 4 U�- q t,?-V-c, A- 3 3 C, v Approved: j DATE ------------------- By --z NOTICE;, wa No - The information shown on the attached of Map(s) was compiled for use by the City Edmonds/ its Employees and Consultants. Th,e City of �Edm.onds does not. w . arrant the et forth on these accuracy of anything s map(�-). An . y person or entity,requesting a copy should conduct an independent inquiry regarding th-e inform-ation shown on tf�e -map(s)l including, but not limited to/ -h th . e lociation of any sewer stub shown, Suc sewer stubs may or may, not exist and may at the location shown. or may not exist ,�;ty of Edmo-nds nor its Neither the "-..I emp-l-o-yee-s o-r offi-ce-rs -sh-a-11-1 be 11a.b.-I-e for the information given on this map(s), nor for any one representation provided based upon'said map(s). \,t\/A-MR The City of Edmonds ----RSeww Drawing EASEMENT NO - -------------------------------------------- NEW" CONSTRUCTION [if REPAIRS F� LID NO . ............... .---ASMT. NO - -------------- OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO.9-S-0-7.95 JOB ADDRESS -191-0.G ------- ---------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------------------------------------ NAMEOF ADDITION .... , ---------------------------------- I ------------------------------------------------------------------------------- C/5 188 -r4-4 A,,,J. W - PWW-0001 -11/75 (REV. 11178) SS-rt4 Av. V. ,a-s' 3 0/4" INTERSTATE PC. '00� I (DO ps.l. \A'/TAA,Cerk WilkE Approved: DATEMA�� .... B, 41� ---- Cw ------------------- City of Edmonds A. RIGHT-OF-WAY CONSTRUCTION' PERMIT Permit Number- Wue Date: ------- A. Address or Vicinity of Construction: 890 19c) pecif, B. Type of Work (be sic): CW T NN-1,0 S\C�eWPA"c- 11�)ez UNI)CQ. QQN!D �:7 K C. Contractor: (U.W\( Contact: MailingAddress: J\U\�J Phone: State License #: 9SOAt Liability Insurance: - Bond: $ D. Building Permit Al (if applicable): E. 0 Commercial IV Subdivision E] Multi -Family r] Single Family INSPECTOR: Side Sewer Permit # (if applicable): El City Project 1x_ Utility (PUD, GTE, MING, CABLE, WATE9' E] Other INSPECTOR: F. Pavement or Concrete Cut Wes ONo G. Size of Cut: /x- APP - LIC - AN . T TO - READ AND' AGN H. Chargq,� z INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of EdmondsOor any of its departments or employees, including or not limited to the defense of any legal proceedings including defensq costs, and attorney fees b��-�-. �fgrantiyfg this permit. ir THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALA�OIPA-PERIOD OF ONE YEAR-JF071�)W!Nh HE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH. IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE, TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches �hall be patched with asphalt or City approved material prior to the end of the working day; Vr NO EXCEPTIONS. Ihave read the above statements and understand thepermit requirements and thepink copy of thepermit will be available on site at all time inspe t' n urposes. Signature: 'k.-q - n = Date: -(Contractor or Ake)nt) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: _Al-/-� TIME AUTHORIZED': VOID AFTER DAYS SPECIAL COND ITIONS: HAW u0te One, NV, COMMENTS:, RIGHT OF WAY DEPOSIT DISRUPTION FEE/FUND 111- RESTORATION FEE: PERMIT FEE: TOTAL FEE-44 RECEIPT FEE: -4 DATE: ISSUEDBY: 4_9Z -A- NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE EngTg. Div. 1991 FIELD INSPECTION NOTES Comments: Diagram.: (Fund Ill - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION El YES Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: FEMME 01, Mi 11 Olp ,1. coz 00;61- Y. Y_?Af Vol, Ot, OF ,C2 /w"3i '_Zb_y 91 co rn 'i IPA Oily T z?:a,4.z 111--11 L3 I .......... . . OOYP2?-,12,9 cc) 90 _71Y19-119, 0/6, gy1d 012 C), g""?Oq T3 Og-0 0 rl)l L )A S d ,c%n 1-9 19 -P,) C 2,? zzwy '0Z JO GO, flog Old LO C� c c �:j cj C) C3 Ci r-\— \,� \, __3 CITY OF EDMONDS BARBARA FAHEY 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works - Planning /Building - Parks and Recreation Engineering - Wastewater Treatment Plant July 15, 1998 A] & Norma Sand. 18106 88'h Avenue West Edmonds, WA 98026 RE: Request for Interpretation Dear Mr. & Ms. Sand, The Planning Department received your letter requesting a waiver from the Critical Area requirements for the construction of a new home one Lot 2 of S-17-91. In it you identify the various studies and reports that were required as part of the subdivision process. It should also be noted that a Mitigated Environmental Determination of Nonsignificance was issued during the short plat review. Based upon the information supplied at the time of the short plat, and Section 20.15B.040.5. of the Edmonds Community Development Code (ECDC), additional studies related to the Critical Area requirements are not necessary. Section 20.15B.040 lists the exemptions and exceptions from the critical area requirements that can be waived by staff. Item 5 states, "An application for building permit for a lot within a development for which critical areas study had previously been prepared; provided, that the previous study contemplated and evaluated the type of development proposed on the lot." The survey, geotechnical report, soils test and MDNS all qualify as elements of a critical area study. Although the two remaining lots of your subdivision are not subject to additional critical area study, a letter from Building Official, Jeannine Graf, to you dated October 5, 1993 indicates that portions of the Earth Subsidence Ordinance will be applied to building permit application for the lots (attached). I strongly recommend you and potential purchasers of the 2 vacant lots consult with Building Official Graf to obtain the specific requirements that may be involved in construction on either lot. The properties are also identified on the City Environmentally Sensitive Area map. Any new building permit application would have to complete a SEPA checklist and be issued a determination. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan I apologize for the time it has taken to reach this conclusion. If you have questions, feel free to contact myself or Jeannine Graf, regarding the Earth Subsidence Ordinance. Sincerely, Karissa Kawamoto Planner Attachments: ECDC Section 20.1513.040 Letter from Building Official Graf dated Oct. 5, 1993 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-02.20 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works 9 Planninn a Parks and Recreation * Enaineering 9 0 October 5, 1993 Mr. & Mrs. Albert Sand 4015 164th Street Southwest, #26 Lynnwood, Washington 98037 RE: Single Family Permit Application #93-165 LAURA M. HALL MAYOR The Building Division has concluded the initial review of the subject application. The subdivision soils report and the Landau Associates analysis have been studied and it has been determined that portions of the Earth Subsidence Ordinance shall be required for the development of individual lots within the short plat. The Landau review indicated that site instability and drainage concerns needed to be addressed in greater detail in order to determine the type, depth And lateral dimensions of existing landslides, fill placement and subsurface drainage. An investigation by a licensed geotechnical engineer shall be conducted and a report prepared which includes measures for modifying or stabilizing potential landslides and assesses.the risk of future movement. Additional test borings including piezorneters installations may be necessary. Subsurface draina,,e considerations and assessments shall also be addressed and called out 0 in the geotechnical review. All concerns and/or recornmendations shall be, discussed with the designer and the foundation and drainage plan's shall be altered accordingly. Other Earth Subsidence requirements that shall be imposed on this project are: 1) Lead Design Professional declaration. 2) Site specific grading plans prepared by a licensed engineer. 3) Foundation plans prepared and stamped by a licensed engineer with a professional declaration. 4) An applicant/owner landslide declaration. 5) A Geotechnical declaration. 6) A Hold Harmless agreement shall be required. For your convenience I have enclosed copies of the ordinance for further clarification of these requirements. If you have any questions please feel free to contact me at 771-0220, Thank you, rxw�xl�lt Jeannine L. Graf Acting Building Official c: Short Plat File S-17-91 Lxcl�� * Incorporated August 11, 1890 * Sister Cities International — Hekinan, Japan 20.15B.050 4. Existing and ongoing agriculture as defined in ECDC 20.15B.020(R). Such activi- ties shall not allow critical areas or their buff- ers which are not currently under agricultural use to be converted to agricultural use. Normal and routine maintenance of existing irrigation and drainage ditches shall be exempt except for those ditches used by salmonids; or $^n application for a building permit for a' lot within a development for which criti- cal areas study had previously been prepared; provided, that the previous study contemplated and evaluated the type of development pro- posed to occur on the lot. This exemption does not preclude city staff from conditioning a land division permit pursuant to the requirements of this chapter to require subsequent individual building permit review on specific lots within a subdivision or short plat. B. Public Agency or Utility Exception. If the application of this chapter would prohibit a development proposal essential to its ability to provide service by a public agency or public utility, the agency or utility may apply for an exception pursuant to this section. After hold- ing a public hearing pursuant to ECDC 20.100.010, the hearing examiner may approve the exception if the hearing examiner finds that there is no other feasible alternative to the proposed development with less impact on critical areas, and the proposal minimizes the impact on critical areas. Any decision of the hearing examiner is final unless appealed pursuant to ECDC 20.15B.170(C). Proposals approved for an exception by this section shall be constructed using best management prac- tices as defined within ECDC 20.15B.020(C). C. Reasonable Use Exception. If the apph- cation of this chapter would deny all reason- able use of the property, development may be allowed which is consistent with the general purposes of this chapter and the public interest; provided, that the hearing examiner, after a public hearing, finds: 1 - This chapter would otherwise deny all reasonable use of the property; 2. There is no other reasonable use con- sistent with the underlying zoning with less impact on the critical area or its buffer; 3. The proposed development does not pose an unreasonable threat to the public health, safety or welfare on or off the property; 4. Any proposed alteration of the critical area or its buffer is minimized to the extent pos- sible to allow for reasonable use of the prop- erty; 5. The proposed activity complies with all state, local, and federal laws including those related to sediment control, pollution control, floodplain restrictions, and on -site wastewater disposal; 6. The inability to derive reasonable economic use of the property is not the result of actions by the applicant or a predecessor in title in segregating or dividing the property and creating the undevelopable condition after the effective date of the ordinance codified in this chapter; and 7. The applicant may only apply for a reasonable use exception under this subsection if the applicant has also applied for a variance pursuant to ECDC 20.15B.170(A). Any decision of the hearing examiner regarding this reasonable use exception shall be final unless appealed to the city council pur- suant to ECDC 20-15B.170(C). (Ord. 3087 § 2, 1996]. 20.15B.050 Sequence of actions. When an application for a development pro- posal, as defined by this title, is made, the fol- lowing sequence of actions will be required of the applicant and city staff prior to issuance of any development permit. Details of the full sequence of actions will be contained in the administrative procedures for this title. A. Applicant completes and subm * its a crit- ical areas checklist, as provided in the admin- istrative procedures for this chapter, to planning staff, B. Staff reviews the checklist and deter- mines any requirement for detailed - critical area study within' two weeks of receipt of the (Revised 8/96) 20-30 IrD Q. -A \z C"I"' Ex. 3Rn. tYfW69 AN -0 CA DiR R1177: 217 18 /..f vie p........ ..... OLY Ile 18 r YRA12r-54 00 16- n � 20 o 00 lb rx. 110ase R//77, 212. Ilk it to A77 99 0 'tic -If 4j -r r11, r r C8 *14 7 Y,,,-,= Z T It Z31. 06 SR17- S4EWFR G. �41 C 0449,?OaT /CZ r 70P- Z40.50 MV 30, sts OYSAAFM 9F 110 -.8Y a1rr WEST 7-1 9 It I ; S-rREET FILE STREET FILE RECEIVED SEP 2 0 IS913 PERMIT COUNTER A It c* (J --N 7n c"" 91177.r ZI z /6 z 212.3 2 C. 2 4 czt tv) rN A z6 zm- 00 0 Ex. House 215 - 0 ?10 �j ee5. 0 el %tl 0", ra r6 IRI- (n 9 PIA'iff cf RIC SIGn 205 Ink, eg - 810pe .4 I (x1v D SEr) W 2(1)/. CO 7 a 9-2 -jg- �4() tv 1�, Aj R1177 E`0!�o - CC If Pd. 00 (0 U 201. 00 @j z 2-C35 ,za, x ca eg Y.-154f 11 Up - R1177-- 220.00 16-s Z1/-cv -ry I -A 08 #4 ff uj, A Q1 eqw1var --_7"OP- Z40-60 1,77191,7hVe-e rigp,�- zes, 00 (\J 00 clo 6YD, SS 6Y,9rff)77 C 7 V 6E C V/ 7S FR� �(�r. E,�O r IN. V 0-4. 1 G 06 6eweg a eglvelr C4 61170elr 0 PeRlIc'y 15119le w It ngs r moI7 i Io R1177, Mg. 150 0 FERGUSON SON 3 13 0 F04 1, t:. 2 Z iw. 401 < LLJ 0y Lj L!J un jr) un > to LLJI I �- Aly W, 0.f 6MRP7 8 rP,,9,59 t5 YS rEI77 ( rO 81_6VnS7:FX1F0 6)e rH,6 cIrr 0/. Z0177cW,95) 0 41, Is 11 Q ty Tel r-ji'2 I- DST iLJ LJ (F� GENERA" NOTES: 1. ALL WORK TO BE PERFORMED AND MATER' �L TO BE USED FH'.i,,, Pt7 1.4 ACCORDANCE WITH THE "AMERIW PUBLIC Wr-RK3 ASSOC IAT IGIN" !-./NY.S..H-m,0.T, STANDARD SPECIFICATIONS FOR NUNICIPAL P*JBL!r. V!IRK5 CON;3TRUC71C , CURRENT EDITION, AS APPLICABLE AND AS MODIFIED BELOW, A -ND U!ILF;S OT�IEF�'ISZ NOTED, SHALL BE SUBJECT TO INSPECTION AND PPPROVAL BY 'ik," CIT� OF EDMONDS. 2. PRIOR TO CONSTRUCTION AND IN ADDITION TO ANY CT�J'�l :Y': I RE A CITY OF EDMONDS "RIGHT OF WAY PERMIT' MUST BE IOR ,:,Y AND 'il,f. WORK T T E C RGHT OF WAY, 3. AN APPROVED SET OF.001-'S-.-eIJCT1,0?I PLAAF- THE CONSTRUCTIUN SITE Al ALL TIOVS v.1% il; Pzi 4. THE ENGINEERING DIVISION SHALL BE NIT-71ED 24 X31URS PRIOR TO WATER MAIN, STORM DRAINS, SIDEWALKS, DRIVEVAYS, i�ND PAV!NG. 5. WHERE MATERIAL EXCAVATED FROM TRENCHES 15 UNS:JI-TABLE 70JR B.kC`.:,-'LLt j 1% THE CONTRACTOR SHALL BACKFILL THE TRENCH WITH CLAIIIS C PAH�-,VN '""A'VEL. 6. ALL CATCH BASINS AND MANHOLES SHALI. 'ih':Z' LOCKING ?WDS� 7. ALL BUILDING DOVNSPOUTS TO BE TIGHTLINED TO STORArll --iYSr:N- m- IMPERVIOUS SURFACES VILL BE DIRECTED TO GRASS Llt�':D (Ta'ALk. k.�:CEN-,DLE TIGHTLINE MATLRIALI N - 12 ADS SCH 46 PVC -OR EQ�jAL SDR 35 (ASTM D3054)[ MAY 2 9 1997 SEWER & WATER NOTES: 1. ALL SEWER PIPE AND FITTINGS SHALL MEET T . HF EXT,iA STRE14GTV MiN!r:UM OF SDR 35 OF THE REQUIREMENTS OF ASTM SPEC I FICA71ONS U3034. BEDDIOG AND BACKFILL SHALL MEET WSDOT AND APWA SPECIFICATIONS. 2. MINIMUM SLOPE FOR SIDE SEWERS SHAI.'- BE 2% FOR L" PIP.':'. 3. SIDE SEWERS SHALL HAVE A CLEAN9UT (C.O.) WITH C;ST iRr"14 CC, 1.) LOCKING LID PER CITY SPECIFICATIONS AT 100' INTERVALS -54. ,,fl T: -,:e. SURFACE. 4. WATER SERVICE (W.S.) SHALL BE COPPER PIPE. 5. SERV I CES TO HAVE TRACER W I RE, 12 G&. . SOL I D CORE, P"C , ACKETED, ATTACHED TO EACH SERVICE LINE AND BURIED. 6. MUST BE INSPECTED BY WATER DIV. BEFORE BIJAYING. 7, FOGTITE OR BROOKS METER BOX. S. CHANNEL NEW AND EXISTING MHs TO ENTER AT 46' TO PR -:VENT HYDRAULIC' BACKUP. KL Of WA NNG 'E"NGINEER aft gmk, CONSUL" APP v 1 e715 S.E. 28th STREET - BELLEVUE, WA. 980-08 \(f7 Kv Fc) jj 14693 PH. (206) 746-3992 AL Iq 75-s 0 7 Sheet of Job \N0.-9 Design 8 y: -CSO Fon AL B NORMA SAND 'I E* Drawn BY: TLR 4015 1641h ST. SW S11 E UT I L. IT -S orry Seale's 1 .30' LYNNWOOD, WA 98037 P L A N PH. (206) 74 2 5107 E --PT. .21 1 9-6 �CITY OF EDMONDS S, P S 17 9 1 9 mom IIIIot*7rFecr z10 oo ryRr Rermlcmwol rlslffLe ?//77- R11 n - II/77//7. ENT /VIV 2" AIR V vef 20'EASEMENT 4?15. 2 7. 12 cmp Ii y4 IE. 214.2 7 I0177,0 46 C17?,Il� 36 '077P sIIRK`Ve17Z617r Z"96'6. ZE14,61-1170 COURSE lar Xesm oR Rebme 54 II.. . ... ......... or Yp/ ?"I D z fo r7 RORD on /?-)q I170 4.6c,9LE 3 W/ CIT 9 COn rRO4 177H - r Yto5 B"-,54 c 3 - rr1ce zr- s4 f 8, I Zo NOTES It10 SWA GATE SKU B11. Ass SHIA GATE, CAST. I RON JOK-AND QM OLTMPIC FDY. M. 09 MALt 01 1), SHIA GATE ALMINIUM OR CW 1UNt DLA51AGE ISIOECIALTIES (SAVAMM CA) 0- 01 EQUAL. 1. GATI WAU BE Ov DIA. LNUSS OVERVISISPECIFIED. 3. GATI WU U JOINED TO TEE MION IT BOLTING (ra= FLANG0 VELDINGo OR ?..I OR "m SECm &W. 4, -LIFT IMI - AS SPECIFIED if Mo VITH BMW UMING TO VITHIN ONE FOOT OF -COW -AIND WMABU M L0CX 1ASTID8 TO FLQ2 Of UPPO KAWW* So U MAL PAM AND MACES MUST U XADE OF COMION WISIMT WERIAL 02 - -GALVARIM, -IRMT LEVEL OF OVWV PIPI TO PIDW ANY OIL ESCAPING. ROn 8YSrefrl lo"))=r/91e. S. FILL CATCH BASIN TO. ren%WOF sII........ ... .. .......... ....................................... ...................... ........ ....... .............. ... ........... .......................................................................................... ... ......... ......... ............ ....... .... ....... ..... . .................. ............. ....... ....... ....................................... ....... ....... ........ .... ............... .................... ... ......... ..... ...... . ....... ........... ........... ....... ..... ...... ........ ... ..... ..... ...... .... .... ...... ........ ........ .. ......... ......... .... .. ................ ...... . ........ ........ .. ...... . ......... .............. ........ I .... .... ! ... : , . I, : : .. : , - . I :. - - 1 . . . ....... ......... I . . . . I . . . . I . I I . I I . . . . I . I . . . . . . . I I . I . I . I I I . . . I . . I . . . . I . . . . . . . I . . . I . I I I I . . . I I I . . . . . . . I . . I I . . I . . I I I I . I I . I . . . . I I . I . . . I . I I I I . I . . I I I I . . I . . . I . . I I I . . . . . . ..... ...... 7 ........ .... .... ..... . ......... .. ...... ........ ......... 141 ........ ......... ....... ... ......... ........ ...... ........ ....... ......... ......... ....... ......... ........ ........ ......... ......... ...... ....... .. ...... I . . . . I . . I . I . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . I I I I . . I . I . . I I I I . . . . . . . . . . . . I . . . . I . . . . . . . . . . . . . . . . . . . I . I . . . I . . . I I . . . I . . . . . . . . I . . . . . . . . . . . I I . .. . I I . . I I . I I . . I I I . . . . . . . . . . . . . . . . . . . . . . .... . . .. . .. . I . .... ................. . .................... ... ....................................... ..... ................ ........... ............ ......... ......... ......... ..... ....................................... ....................................... ............. i : ......... ....... I............... .................................. ........................ .... I ........ ................ ........... ........ ... .... .......... .......................... ........... ....... ....... .. ..... 1Z .................. ........... ........................... I ... . ...... ......... ............. ... ............... .. ................................. ................. .. ..... ................................... .... .. ......................... ................ . ....... .. I. . . . I I I I . . I I . . . . . . . . . I I I . . I . I . . ................... ....................................... ........... .... .... .... .... .. I . I I ....... . . I I . . . . . . I . . I . I . . . ... . . . . . I . I . . . . . . . I . . . . I I . I . . . ..... ll.......... .... ........ ............ I .. ......... ......... . ......... ........ ....... ........... ......... ........ II....... ......... ...... I ....... ......... . . . I I I . . I . . . . I . I . I . I I I I . . . . . . . . I I . . . . I . . . . . . . . . . . . . I . . . . . . . . . . . . . . . I . . . I . . . . . . . . . . I I I I I I . . I . I . . . . . . . I I I . . I . I . . I. . . . . . . . I I . . I ... . . I . ......... ...... ....................... .................... ........ ............................ .......... ...... ....... ............. ............................. ....... ... .Z.3 ............ ....................... ........................ ::: :: : : 1 ........ ......... ................................. . 1 : :­ I ........... ....... ......... ... .... . ......... ......... ...... ......... I ......... ......... ......... ........ I ..... ......... ......... ...... .. ...... ................... ................... ............... ...... ................... ... .. .. .................... ................................... .. . .. ....... 1, : - i 163.4, .. . I. ...... z ...... ....... ......... ..... ......... ... . ....... .. .. ........ ... ......................... . ... .... . ....... . ............ .... .................................... ............. II .. ... ........ ?" ................ ; I . . I .............. ... .......... .................. ....... I ......... .... .. ...... .... ... ................... ... ....... .. ......... ..... ... ..... .. ......... ......... ...... I .......... ......... . . . I I . . . I . I I I I I I I . I I I ......... .... I I I I . I. . I. . . . . . . . . . . . . . I . I I . . . . I . . I . . I I I . I . I . I . I ... ... ... ... ... ... ...... .... ........ ......... ......... ......... ......... I ......... ........ . . ....... ..... .. ......... ......... . ........ .. ..... .. .. ......... . I ....... .......... .. ...... ..... .. ....... .. .......... ......... A ..... ...... I.... ...... ........ ....... ..... ....... ......... ......... ......... ..... .. . . . .. . . . . . I I I I .. . I I I I I I I I . I . . I I . . . . ... ... . I I . I I ... I I . ... . . I . . I I . . I . . . . . I I . I I I . I I I . I . . I . . . . . . . I I I . I. . . . . . I I . . I . I . . . . . . . . . . . I . . ... ....... ....... ..... .. .............. .............. .... .. . ... ........................... ........... ........................ ....... .............. . ............. I . . . I . . . . I I I I I I I I I I I . I I I I . ... I I . ... I . . . . I I . I . I . I . . . I . I . I I . . . . . I I I I . I . . . I . . . . I I I I . I I , I , I I * ...... .......... ......... . ................. ............ ................... ..... I.. ........................... .. .. ... .. ... .. ........... ... ... ... .. ........ ............ .. . ............. .. ....... ..... . ............. .... ........... .................. . .......... .... ............. . . ........... ...... ............ . ......... .. ... . .............. .... ......... . . .. ........ .... .. .. ...... . .. ....... II I . . I I I I I I ex -6�,Rg I I I I I . . . I . . . I I I . . I . . I I . . . I I I . I . I I . . . I . . . I . .. . ......... : : : : I . I . I . I I I I I . . . I I . . . . . . . . . . . . . I . . I . I . . . . I I I I . I I I I . . . I . . I I I . I I I I I I . . I . I I I . . . . . . . . . . . I I . . . I I . I I I I . I I I . . . . . . . . . . . . . . I . . . . I I . I I I I I ......... ..... ......... ........ ..... ....... ...... ........ :FROPOL'aD :6RqDg ...... ........ ... . ......... ......... .. ......... ...... ..... ...... ........ ....... .......... ......... ... .... ......... .. ...... 90 ...... ...... ......... ......... .... ... ......... ......... ... .... i A ............. ...... ..... ........ ................. ... I ............ .................... . ... ... . ... . I ...................................I . . . .. ... I. ....... ................... ............... ... ....... ... ... .. ..: : : ... : ... : : : ........... ........ .... ......................................I ...................................... ........................... ... ............... .. . ....... ........ ... ............................... I ......... I .......... ................. ........ ....................................... .... ....................... I ...................................I ............ ........ ......................... . .. ......... ................ ............... ......................................I .................................I ... ... ... ... ... ....... I .... .... ... ...... ... .. ...... .... ....... ...... .... ......... ......... .... ... ........ ........ ... ......... ....... ... ......... ....... .... ...... 11 .... ....... I I ...... ....... . I...... ......... ..... .... . ... .. ..... ......... ......... .... .......... ......... .. .... ....... .... .... .. ...... .. ... ......... ...... ... ......... ...... .. ..... ......... ......... ........ ......... ..... ....... ....... t........ .. .... 717 ... I I I I . I . I I .. I . . . .. . I . I I I . . I . I I I I . . I I I . . I . . I . I I I . . I . . . I . I I I I .. I . I . . I . . . .. . . . I . . . I . . . . . . I . I I . I . I . . . . . . I I . I . I . I I . I I . I . . . . . . I . . . . . . I . . . . 0WO ... ........ ................. ........ ............. ............ .. ....... ................. ... ........ ...... ......... ................. .......... ......................................I ........ .......... ....... ............................................. ..... . ............... ... ... ...... .............. I ....... ............. 590. t5eWElf- 17// . ...... . ................ ...... ................... ...... .... ................................I ...... ......... .... ... ....... ........ ......... ...... I ....... ...... ....... ....... ... ... ... ... ... ... ... ... ... ....... ... ... I..... .. .... ......... ......... * ... ......... ......... ppm . I . . I . . . I . I I I . . . . . . . . . . . I I I I I . . I I LAW I . I . . . I I I I . I . I . I . I . . I I I . . I I . . . . . . . . I . I . I I I . . . I I I I I I I . . I I I I I I . I . . . I I . I . I I . I I I I I I . . . I I I I . . . I I I I I . I . I I . . I I I . I . I . I I I I I . . . I I I I I . I I . I I I I . I � � . . . . I ... . I . I . . I . . I . I I I . . I I I I . . . I . . I . I I I I I . . I I I . I I I I . I I I I . I I . I I I . . I I I . I I . . . . I 'O ........ uc: I 4 #is ... .... .... ......... .. ......... ....... I I . I I . . . . I . . . . I I I I . I I . I . . . I . . I . . . I . . . . I I I . . I I I I I I I I I . I . I I I I . . I I I . I I I . I . I . I I . I I I I I I . . I . I I I I . I I I . . . . . I I I I . . I I I . . . I . . I I I . . . . I . . I . I I . . I. 2.6 : . . . . . . . . I . . . . . . ZI . I I . I I I I . . . . . . . . . 7: ..... ........ ... .... .... ......... ... ..... .. ...... .................... ................. I .... ... Lj ......... ..... I ... ......... ..: : ... : ....... I ... : *..: ....... ... ... ... ....... .... . . .......... ........... ......... ............. .. . ...................................... ................... .......... . ........................ . I ................................. ....... I... .... ........................... ........... ...................................... ....... ............................... ....... : ................... .... ..... ........... ......... ....... ......... .................... ..... . ......... .............. .................... .. ............ .................. ....... .... ... . I I .. I ........ ......... I. ...... .... ...... ......... ... ......... ......... .. I ...... ......... . ...... .... .... ......... ........ ...... ........ ........ ..... . ......... :,,� . I ....... W: ......... I ....... .... ......... .......... ......... ......... ......... ........ ......... ......... ......... ........ ......... ......... ......... ......... ......... ......... ......... ......... .......... II I I I . . . I I . I I . ... . I I I I I . . . I I I . I . . . . I I . I I . . I I . . . . . . . . . I I I . I . I I I I I I . . . . . I . . . I . ......... ......... ......... ......... 7Yz�41�&N I. : ... ::: : : : : : : : : -�.o r: : .................. ........ .... .. I....... . ......... ......... ......... ......... I. : ::: : ­* .... * ...... * I ''' I I I ­ I'll I 11 11 I I I I 11, *1 I'll, I'll I 111*1 I 11 ... I I .... I ...... .... .. . ... . . . . . I . . . I I . I . . . . . I I . . . . . . I . I . . . . . . . I I . . . . . . . . . . . . . . . I . . I . . . . I . . . . . . . . . . . . . . . . . . . I I . . . . I I I . I : I . . . I . . I I I I .. . . . I . I I I . I I I . . I I I I . I . I . I I I I I I I I I . . . I I I I I I I I I I I I I I I I I I . . I I . I I I . I . I I I I . . . I I . I . I I I I I . . I . . . c� . . . . . . I I I . . I . I I . I I I I . . . . I I I I . . I I I . . . I I I I I . . I . . . . . I I . I I . . I I I I I . . I I I . I . I I . . . I I I . I . I . I I I I I . ... I I I . . I I I I I . . I I . . I . I ...... ......... ......... ......... ... ......... I ....... ........ ........ I I ... * .... ....... ... ....... *1111 ... .............. ...... ................................... ......... ...................................... ................................ ..... .......... ............. ............... I . . I I I . I . I I I . I . I I . I I I . . . . . . . . I ........... ........ ...... ............... . I I I I I . . . I I . . I I I I I I . I I I I I I I . . I I I I I I I I I . . I I I I I I I I . I I I . I . I I I . I I ................. ... ........... ...................................I .............. . I ................ I I I I . . I I I .. I I I I I I I I I I I I I I I I I . . I . I I I I I I I I I I I I I I . I I I I I . . I I I I I I . I I . I I I I I I I I I I I I I I I . I I I I .. ......... I. ...... ...... ......... ......... ....... Coo, SHAWN OrBRIEN, P,E. ......... ....... . I I I I . I . I I I . . ... . I I I I I . I I I I I I I I I I I of WAA, I I . . I . . I . I I I I . I . . . . I I I I I . I I . I I I I I I I I . I I I I I I I : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :: : : : : : : : : : : : : : : : . I . . . I Ic I I . . . I . . . I I . I I . I I I I I I I I . I . . I . . I I I I I I I I . I I I . I . I . . . . . . I I I I I I I . I . I . ... ... .... .... ........... .... ...... .................. . ..... ......... . . ......... ... ........ ............ ................................ ...... ................... I ............. . ... I ..... .... ........ ................. .................... .... . .... . ..... .............. . ............ ............................ ... ................... ............... ...... ....... .. I. ... ... ... ... ............. CONSULTING ENGINEER ......... .... : .... ......... ........ ........ ..... .......... ....... ..... :::: ::::::::: ::::::::: ::::::::: :::::::: I .......... .. ......... I .......... ......... ......... ...... ......... ......... ......... ......... ......... ......... 16716 S.E. 28th STREET — B, WA. 98008. . I I . I I I . . I . . I I I I . . I . I I I I I I . . I I I I . I I I . I I I I I I I I . I I . I I I I I . . I I . I . . . . . I I I I . I I I I . . I I I I . I . I . I I . I . . . . . I I . . I I . I I . . . I . . . . . . I . I . . . . . . . . I . . . . . I . . I I I I I I I I I I I . . . . . I . I . . . I I . I . . . . . . I . . I I . . . . . . . I I . . . . . I I I I I I I I I I I . I I . I I I I I I . I . I I I I I . I I . . . . . . . . . . I I I I . . .. . . . . . . . . . I . . I . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . I . I . . . . . . . I I I . . . . . I I I I I . I I I . . I I I . I ......... ......... ......... ......... ...... PH. (200) 740-3992 . . . . . . I I I I . I . NAL . . . I I . . . . . . I . I . I . . . I . I . I I . . . I I I I I . . . . I I . . . . I I . . I . I I . I I . I . . I I . I . I I . . . I I I I I . . . . I . . . I . . . Win ........... ..................... ...... I I I I . . . . . . . . . . ......... ......... ..... ......... . ...... . . I 93-05 ..... ......... ................ .......... ....................................... .................. . .............. .. ... ........ . .. . ...... ..... . ... . .... ....................................I ............... .................. .... ................................. ......... ........ .70.44. vrR r ......... I I ..... ..... ................. ..... ... ... ... Sheet---g—of 3 Job No. ... ........ ......... ........ ...... 6K:Cv5 ... ......... ........ ......... ... .... ......... I ....... ...... .. ....... ....... Design By: cso For: A L a NORMA SAND ....... ......... ........ ... ........ ...... I $..$#so .. ...... ...... ......... ......... ......... ......... ......... .......... Drawn BY: TLR .... .... 4015 1641h ST. SW let$##$ .. ....... ....... ......... ......... ...... ....... ......... ......... ......... ......... ......... ......... ....... ... ......... ......... ...... .. ..... ..... .... PROFILES PETAIL 0 fit 111111111 IfIff!#41 it's ,it. ....... .. ......... ... 9-664, 0 ...... 111111off lit I to 1-11 $Is ---t ..... ......... SC819: AS NOTED LYNNWOOD, WA 98 031 ...... .. lost Otto f to I I III$ oil 01 111111111 111110 it. .... PH. (206) 742 5107 . . ..... ....... .... . ............................ ........ . ............................. .............. . ...... . . ....... . .......... . ..... ....... . ... .. ...................................I ......... ........ ........... ... ............. i. ..... ...... .... ......... Date: SEPT, Z', 1993 1111tio.111 ........ . . ............. .......... ........................... - . - -- — 2 tIf) c1jX QFEQMQNQS_S,p _1Z. FERGUSON SoNs 134?04 HERCULEN CRYSTALERVII 111AC" 0"101 014#011 0164t. get ftfI.q .0 I L-5 I7 9 jug t PERMIT COUNTER A�7`. R 4 f e. ;'j;! I 1� .;V X.0 13 ,Y ­j or. �r 2 0 4 A 'j, 9.20 R 'A a - .11 0�11vi 0 1 ,v 210 Ex. 8 101 t. All FIZ MR FRMIC oErli!lt MIS 2-C35 "I J lot A. 7z, V J, 'Af. L 11771 ", , , 'I t, I i.', - 4H kj .4 2 Jt A iWIA. til 4 it F J., 7 136104 Op. :vq V 16 IC - I go n 63 0 - �8 to q�s C\j IN ttv WE sp 7S. 00 'f 70 p go u. ID 0 13.5 01 N P AR 1\ v c L.) I G P r,,, 9 C, Ole 05 0.0 It 4 am 111, 1�� > LLJ > 11 0 0 60' 3401 n .300 r WIRe ME19N W/o/ F11 rex FRJ/r/c 0/7 rOP GR19 vel If WIRE reR,6-0 W1q rER A/Z MR eYMY 8RS117 PROrEcrlon oErfilzo a FILTER FAVIC STAPLES OR 2 2 14 GAGE WIRE RINGS ITY V MATERIAL, MIRAFI PI \71"�LrI.1t,%; 11RE FAIRIC 140, OR EOWAL 0 A,_ NEWLY GRAQEO OR DISTUR1360 Sj.0PE n n 2 2.0 a 14 GAGE W F. m FILTER FA13RIC it MATERIAL v u u —2, &DOW-1 It 11 . it LAS F OR u u Tl: it T T'JRB 0 A "' 0 1 4 GAG STYLES UR 14AT VIM RING S ITYPI 1 4 0. OR P,7 \n F k T R FAII RIC MA T ERIAL V-1 112' VVIASIIED EOLIAL 11 GRAVEL OR PEA _1!4 — — - — .. r GiVEL j 1, 1i T. 2' 4' DOUGLAS FA AT 4! O.C. V—OVRY BOTTOU Of FILTER FASAIC MATEA:�L ON V TRENCH SECTION ELEVATION TEMPORARY SILT FILTER FENCE DETAIL N.T.S. A'S REII2UIR60 100'MI17. Ex CERr fniq Y 8`15 REOUCecl JOG ro 5olmln FOR StrEs WlrH 4ESS rMI 017e dI, 010 AEXPOS16D L90111. a. .0 a 0 a*. oo. 0 -0 0 0 .11' 0 4 44 1 R s 25 177N. 0 ; . 4 44 111 ", 12*177117. yj to . 0 W ., Qaq /5' M117. - PRO V10,6 irtall 4' WOM 010 MCI? consrRu crIon elvlmncE no 115CAE T E S C P N 0 TE S 1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITY SHALL BE CONSTRUCTED PRIOR TO ANY GRADING OR EvTENSIVE LAND CLEARING IN, ACCORDANCE WITH THE APPROVED T.E.S.C. PLAN. THESE FACILITIES MUST'SE. SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION AND LANDSCAP!NGAS COMPLETED AND THE POTENTIAL FOR ONSITE EROSION HAS PASSED. 4 2. WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL.,,,. 3. ONCE WORK HAS STOPPED IN ANY AREA STRIPPED OF VEGETATION, FOR -A PERIOD NOT TO EXCEED 60 DAYS, IT MUST BE STABILIZED WITH GRASS OR. -OTHER EROSION CONTROL TREATMENT. ef)" j?. CONSTRUCTION SEQUENCE: 1. ARRANGE AND ATTEND PRE -CONSTRUCTION MEETING'WITH CITY OF EDMONDS. so 2. BUILD CONSTRUCTION ENTRANCE AND INSTALL FILTER FENCE,# STRAWSALET CAM. It 3. CLEAR AND GRUB SITE. I A I.' f. 4. RILL AND GRADE SITEI INSTALL TEMPORARY PIPE. 5. INSTALL STORM DRAINAGE SYSTEM. So INSTALL INTERIM CATCH BASIN PROTECTION. 7. INSTALL OTHER UTILITIES (SANITARY SEWER, WATER, POWER, ETC,_.). 8. REMOVE TEMPORARY CULVERT. 9. FINAL GRADE AND PAVE. 10. HYDROSEED AND MULCH. 11. REMOVE REMAINING T.E.S.C. ITEMS ONLY AFTER SITE HAS STABILIZED -WITH CITY APPROVAL. 12. CLEAN OUT STORM DRA INAGE SYSTEM. NOTEI CITY STREETS SHALL BE CHECKED DAILY AND CLEANED I F REQUIRED. A ALL TRACKING FROM VEHICLES LEAVING THE SITE SHALL BE CLEANED DAILY, rwo 6r17xv9 FO? Sfl�E ro m,9117mm FosIrloo 0 VCAIF to ell N t (7 7117 117761177 o-RC _?(WRO .)vc -rcn-rtew 'I. 4 '9 rlm W 0,96es 67R #9 VC4 Flt reR - (rnAtY 8e PEZ0117 1019ce WIr wncg 1776S H) oqn ri -suP mo Pipe 610Cx1f7C7 J. 5rRRW6`64E 09M OErRILIII ILI no Srl?lr MAY 2 9 1997 PERMIT Cow 'ER Aarp"PRO"WED FOR C 0"INSTIR'UCTION T, DATE".. e, iLa_ VrY N GIN E E A _E N o-1, W 4.1, A, " r A v Deslgn B y: cso Drawn B Y: TLR Scale: 1" 30, Date: SEPT. 2, 1993 ., I 515IL- ;7-1(0 g 2-j 24 0 ;Z� 7M A �D z10 Z05 EX. 8 0,oe el? 8,6177E, r FIZ 761? F61706 eSEe o,6r1711_ r7l/s 2 C", 3 5 T . E . S - C P N 0 T r= S 1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITY SHALL BE CONSTRUCTED PRIOR TO ANY GRADING OR EYTENSIVE LAND CLEARING IN� - ND V I,roplc 0 In 30 SAO V� celi velvr rLt L /m/ lc\j 7 - - --- - ------ Tu T16 ID G 13 G N P A R- I I G, 1*)G,,9C` I 136104 f LQ LLJ x Ct 1!L, 'I M�l t �Ius. 1� �j 80 W, lz�_ C) CY I — > < L!j Co PO r; 0 > 0 0 .30' R1 9 Ve3� -fn , OZ N RunoF,oc, wg rly WlrH &EUP767r 0 WIRC MESN w1rN 1-14 r--X FRdiM GRqV4F1 4f WIRE 0/7 NOR cif , 1.rnvev WgrER A14 M 0M.H. 8RS117 PROrecrlon DEmlz k FILTER FABRIC STAPLES OR 2 . 2 11 IjAGI MATERIAL, MIRAF1 WIRE RINGS (TYPI 7W�LOE; Wo�, FABRIC 140, OR EOUAL DUAL NEWLY GRADED OR DISTURBIED SLOPE 2.;.2 x 14 GAGE T W F. 'IfIff __7 FILTER FABRIC a u MATERIAL 2' 4* DOUG- I LAS FIR OR 1`1 112 ASHED EOUAL u Ll GRAVE OR PEA GRAVE it if .7" u u 4* DOUGLAS FIR AT 4' O.C. BURY ECITTOIA OF FILTER FABRIC MATERIAL ON 6' 1, rRENCH SECTION ELEVATION TEMPORARY SILT FILTER FENCE DETAIL N.T.S. ,99 R"UIRED 100'MI17 EX CERr fl?19 y 8e REA9410ED rO 50'MI17. FOR 6ME3 WIM zEss m,917 olze 'ReRe ac exposeo to r 0 01 .41 60 40, 4 25 177117. *.of 4 8 Q419RR Y SPR4 4 8 /5 M117. PRO vloc rj1j I W10M OF 117aRZ0S61eoRE61S RREN conarguc r1on /70 6Cq4,ff At-ounw—on W11" inn AFFRUVED T.L.S. C. I LAN. THESE FACILITIES HUST.,,BE- SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPINGAS COMPLETED AND THE POTENTIAL FOR ONSITE EROSION HAS PASSED., 2. WHERE POSSIBLEj MAINTAIN NATURAL VEGETATION FOR SILT CON ROL�-%'o� 3. ONCE WORK HAS STOPPED IN ANY AREA STRIPPED OF VEGETATION, FWA PERIOD NOT TO EXCEED60 DAYS, ITHUST BE STABILIZED WITH GRAPS 011-�'QT E EROSION CONTROL TREATMENT.' Z? CONSTRUCTION SEQUaNCa: I. ARRANGE AND ATTEND PRE -CONSTRUCTION MEETING WITH CITY OF EDMONDS. 2. BUILD CONSTRUCTION ENTRANCE AND INSTALL FILTER FENCE STRAV-SALE EAA4 3. CLEAR AND GRUB SITE. 4. RILL AND GRADE SITEI INSTALL TEMPORARY PIPE. 5. INSTALL STORM DRAINAGE SYSTEM. 6. INSTALL INTERIM CATCH BASIN PROTECTION. 7, INSTALL OTHER UTILITIES (SANITARY SEWER, WATER, POWER,. -ETC,.:'-),*: 8. REMOVE TEMPORARY CULVERT. 9. .-FINAL GRADE AND PAVE. 10. HYDROSEED AND MULCH. 11- REMOVE REMAINING T.E.S.C. ITEMS ONLY AFTER SITE HAS STABILIZED. -.WITH CITY APPROVAL. 12. CLEAN OUT STORM DRAINAGE SYSTEM. NOTE CITY STREETS SHA' LL BE CHECKED DAILY AND CLEANED IF REQUIRED. ALL TRACKING FROM VEHICLES LEAVING THE SITE SHA LL BE N CLEANED DAILY. 15r9RW 619CE15 PS rivo 6rRxEo IcER 81jrE rO MR117rq#7 POSIrIO17 0 V45,1FFZ0 W ORO/ A- v v I'MI17117711177 FReE8O,9RO 1980ve OYERFLOW, -ml/7. RIO 6'R 9 ve�_ 'i r.-R 077,9 Y 66- 100PIC16 W1rH ME,5,q) qj7 y -56 1 r 077117 Lit PlPer 6iocKIncp 5rR9W&WE 019177 0. MIL. no 'Trl?ZF t t Av ,01 -7 e, CrrY 1ENGINEEA ,44 IN o-p 11,� P.E %\?% N OT R I E Cm SHAWN L Zr CONSULTING ENGINEER Z ivie&E. 28th STREET - BELLEVUEl WA. 98008 PH. (206) 746-3992 A L 93 05 Shoot_� 0. Job N Design 8 y: Icso For; A L 8 NORMA SAND Drawn 8 Y: TLH 401b 11541h ST. SW Scale: 1 30, LYNNWOOD, WA 48037 T. E. S. C, R PH (20G) 142 - 5107 Date: SEPT. 21 1993 - CITY OF EDMONDS S.p S-1 -911 7 2 1 r -A 7M !FX. 9/9/7- 6,0j1,5A`fi7H R1177= 217 /6 EX. 09- /.,F V lev 1­155:555�< R1177.r Z/ z / 6' Z 21.?.3 PIC OLY rn 2-j 0 24 Sp z 6-,8 Y)t112'r-,54 I S 13 7 20 359. 46. x 2 /4.27 (0 /1 0. it s) 1 3 1 i If ryp,�- z 0 �RI177 e4 em. 00 IVI 0 Vj. 50 0.50 Hol-166 Z10 6,917� SEW5R 177,Y� to Y1172 = e25. X A rlVE cf 910 SIG17- �Ij Eff. es EX. 84010,6 91177-- 205.,5 15)9s '60 1 98. 0 611-11D SEr) m 201 00 890-027" W (rle� D SEV ,56P-1211C177,0 6rel,60elr C6 rYPC Y- _j 91177-- 06*.00 9(5?. 00 (OL)7) 2 01. 0 0 tq /a) z 2-C35 m_Y 2 rroe i2r -,54 I IN 4 R1177-- ZOO. 00 VC11 ra < I � eg - 00 *14 7 .27 0 15 �!;:� -, - 1 04. 4 F. Cal I Ile 7 lu it 1,,77R,17 TOP= 040. 70 Z35. 0 / C 225.00 14'arzI,fl!!� Cd C\j z k,1Rc groRI771 8YP, 98 GYSre-177 Z3 0V 9.5 It -,6K a1ry lo "\arle r),, /7 7 WE 2p /? 1691 1) 0 IT' N P A R I I G,, I V 0.-, 1 G I 0 S1717 SeW,51? De aeW67R ae1717oar 04,6AI70Ur -,1eeD ""I'Oe w / cRs r maq z Io S,FWelf L0019,rle-117 R1177 282.50 Z,F. Xg, .50 :z ej I 1� 'I kwv q �i (I,) 5r I- 0/0 5'1617 C) < 4% �28 u-) r) rr* 0 1 Lr) co > e- C-) ZO' LLJ I �- -r1_1;r0Re 0MR177 8YPASS SYS rV77 (TO 66C0176rRZ1Cr,-0 SY rHE C / 7 r 0/` E0177017,0,!�) �10� 0 -30 60' 16 6W E.- 30' vlclnl;rr GENERA" NOTES 1. ALL WORK TO BE PERFORMED AND MATERIAL TO BE USED SHALL BE IN ACCORDANCE WITH THE -AMERIW PUBLIC WORKS ASSOCIATION- -A.P.W.A./W.S.H.D.O.T. STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION,' CURRENT EDITION, AS APPLICABLE AND AS MODIFIED BELOW, AND UNLESS OTHERWISE NOTED, SHALL BE SUBJECT TO INSPECTION AND APPROVAL BY THE CITY OF EDMONDS. 2. PRIOR TO CONSTRUCTION AND IN ADDITION TO ANY OTHER PERMITS REQUIRED, A CITY OF EDMONDS "RIGHT OF WAY PERMIT" MUST BE OBTAINED FOR ANY AND ALL WORK WITHIN THE CITY RIGHT OF WAY. 3. AN APPROVED SET OF CONSTRUCTION PLANS FOR ALL WORK SHALL BE KEPT ON THE CONSTRUCTION SITE AT ALL TIMES DURING -THE 4. THE ENGINEERING DIVISION SHALL BE NOTINED 24 $:16URS PRIOR TO STARTING ANY TYPE OF CONSTRUCTION INCLUDING CLEARINKG, SANITARY SEWER, WATER MAIN, STORM DRAINS, SIDEWALKS, DRIVEWAYS, AND PAVING. 5. WHERE M14ATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL THE TRENCH WITH CLASS C BANKRUN GRAVEL. 6. ALL CATCH BASINS AND MANHOLES SHALL HAVE LOCKING LIDS. 7. ALL BUILDING DOWNSPOUTS TO BE TIGHTLINED TO STORAGE SYSTEM. NO IMPERVIOUS SURFACES WILL BE DIRECTED TO GRASS LINED SWALE. ACCEPTABLE TIGHTLINE MATERIAL: N - 12 ADS SCH 40 PVC 1-�-OR EQUAL SDR 35 (ASTM D3054) SEWER & WATER NOTES: 1. ALL SEWER PIPE AND FITTINGS SHALL MEET THE EXTRA STRENGTH HINIMUM OF SDR 35 OF THE REQUIREMENTS OF ASTM SPEC IFICATIONS D3034. BEDDING AND BACKFILL SHALL MEET WSDOT AND APWA SPECIFICATIONS. 2. MINIMUM SLOPE FOR SIDE SEWERS SHALL BE 2% FOR 6" PIPE. 3. SIDE SEWERS SHALL HAVE A CLEANDUT (C.O.) WITH CAST IRON (C.I.) LOCKING LID PER CITY SPECIFICATIONS AT 1001 INTERVALS BROUGHT TO THE SURFACE. 4. WATER SERVICE (W.S.) SHALL BE COPPER PIPE. 5. SERVICES TO HAVE TRACER WIRE, 12 GA., SOLID CORE, PVC JACKETED, ATTACHED TO EACH SERVICE LINE AND BURIED. 6. MUST BE INSPECTED BY WATER DIV. BEFORE BURYING. 7. FOGTITE OR BROOKS METER BOX. 8. CHANNEL NEW AND EXISTING MHs TO ENTER AT 45* TO PREVENT HYDRAULIC BACKUP. C. SHAWN 01BRIEN, P.E. ,:7 of WA 'k, 0 CONSULTING ENGINEER 16716 S.E. 28th STREET - BELLEVUE, WA. 98008 14893 PH. (206) 746-3992 NALO Z Olaf f 3 93.,-05 sh Job No. Design By: cso For., A L a NORMA SAND SITE a UTILITIES Drawn By: TLR 4015 164th ST. SW Scale'. I" = 30, LYNNWOOD, WA 98037 P L A N PH. (206) 742 - 5107 Date: SEPT. .2, 1 �ES CITY OF EDMONDS S.P,S-17-9-1 FERGUSON & SONS 136704 zID so Rlm- 2oam /F//77 D,9RD GRI_ V M,,9171Va_,5 tW 1'177117, 2" AIR VENT,% 00 11461f 0. SWIll 015,27. 1211 CA4p 20'EASEMENT �e .......... E. 214,97 8 46 0177P 46 0177/0 16"CI77P "CI77,0 0.0y. f,-Y 9 .2/11 09 17re J.H. L Z q C. P 19q V,6177,617 7 54." M Z 96-6 IT 4 66. 81q8P_ c0z//T.q)= R Xe,`� WICMW Pe_filz�, V'4 Ion R-9 it ?r1c_ TYPI no 6C,91-E Z 0 0 0 C8 2 con rRo e H r Y10E W/ -3 rrP6 177 Alt 8 MR Fl- 0 W ReV RIC MR 1.17 HOON NOTES 0 .$HEA1,GATE SIWL BEI, A, SHEAR GATEOXAST. IRON BODYAND,GATEt OLYRIC FDY- STD- 01 EQUALt-01 , SHEM GATE ALUNINIUM 01 CO IRA DRAINAGE STD, 01 1QUAL4 (SAVANNAHj AA) SPECIALTIES 1. GATE SMI1 BE 60 DIA. UNLESS OTHERWISE -SPECIFIED- /2z 17n V146W TEE SEnION BT BOLTING (THROM FLANGE) WMIHG# OR 3, GATE GIIALL BE JOINED TO 01 Om SM HEMP ITH HAWLE EXTEND ING To VITHIN ONE FOOT OF ED BY NFR6 V -LIFT RODI AS SPECIFI TASTENED -TO FUM OR UPP0 RANDHOLD. .000 -AND UJUSTABLE ROM LOCK Rr46 5. ALL MAL PARTS AND SURFACES RUST BE.WE OF MUDSION USIMANT KATRIAL OR /v IV 6405"Le GALVANIZED. OUTFLOV PIP]i TO PRIM MY OIL ESCAPING. TO -I WOT LEVEL OF 6. FILL: CATCH BASIN REmnrlan 8ysTe177 Offh911. ..................................... ..... ....... ...... ............. ........................ : ................................................................................ ....................................... ............ . .................... .............................. ......... .............................. .... ........................................ ... ........ .. ......... . .. . . . . . . . . . . . . . . . . . . . . . . I . I . I ................................... .... .......................... .......................... ................... ..................... ....... .... ....................... ................................. ................................... ........................... I . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . I I I ........................................ ................................... .... ......... ................ ............ It . . ..:.& -A A. ............................ . . . . . . . . . . . . . . . . . . . . . .:,. . � :� ................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . I . . . . . . ... . . . ........................ .............. ....................................... ........ . . . . . . . . ............................................................................. . . . . . . . . . . . . . . ............... ............................... ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . I . I . . . . . . . . . I . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . I . I . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . I . . I . . I I I I. c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . I . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I .......................................................................... ....................................... ....................................... ................. ....... . . . . . . . . . . . ................... ....................................... ............................ -fe�t? .... ............... ................................ . . . . . . . . . . . . . . . . . . . . ..... ............................... ................. .............. . . . . . . . . . . ...... . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . I I I . I . I . I .... . I I . I . . . . . . . . . . . . . . ........................... ......... .............. . ............................. . . . . . . . . . . . . . . ............... ....... ........... . . . . . . . . . I . . I . . . . . . . . . . . . i . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14, ... i . . . - : . . . . . . . . . . . . ....................................... ....................................... ........... ... . . . . . . . . ........... .................. ........... . . ... . . . . . . . . . . . . . . ... ............ ............................... . . . . . . . . . . . . . riz : :: . . . . . . . . . I . . . . ............................. .......... .... ......... . . . . . I . ............ . . . . . . . . . I . . . . . . .......... ................ ...................... ............ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . .. . . . ............ 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . � I . 1 1 .14 . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................................... ..................... ................. ....................................... ............................ . . . . . . . ... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . I I ........... ............................... ....... ............ .............. .............. . . ..... ... .. .. ........ ....................................... ....................................... .. ... ... ... ... ... .... ....................................... ............................... . ....... . . . ... . . . . . . . . . . . . . . . I . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . .. . . . . . . . . . .. . . ........ -30 ..................... . .................... ........ ......... ......... ..... . .. ... ... ... .. ... ... ...... ... ... ... ... ... ... ... ... ... ... . . . . . . . ... ................. ......... ....................... ............ .. ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I I I . . I I I ... .. . . . . . . . . . . . . . . . 1 . i 4 . I i . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : .................. . . . . . .... ...... . . . . . . . . . . . I . . . . I . I . ......................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I I . . I . I . I . . ... : : , *. , * - . . . . . I . . . . . . . i . . . . . . . . . I . . . . I . . . I . . . . . . . . . ...... ........ ......... ... .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . * . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . .................. . . . . . . . . . . . . . . . . . . . . .... . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . I . . I . I . . . . . . . . . . . . . . . ... . . . . . . . . I . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ . . . . . .................... .................... .......... ..... ............................ .... .................. ... ... ....... ... ... ... ... ... ... ... L.. - - - , . . . . . ......... ... I .............. ....................................... ........................ ..................... ......... ........ . . . . . . . . . ----- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ... ...... ........... ................. I ......... .......... . ........... ....... ....... ............... ............. ....... ..... .. ....... ......... ................ ....... ... .................... ........................... ........... ............. . ..... ........................ .... ....... . ..... .. ......... ......... ............ ........................ ........... I ..... ........ .......... ......... ......... .. ..... ........... .............. ................. ...... ...... ...... .................. ............. ........ ....... . ...... ... ....... ......... ......... ....... ......... ........ .... ......... ......... ..... ......... ..... ..... .. ......... ......... ........... ............... ........... ........................ ............ I .... ....... I.i.. I ...... 1 . ..... ..... ....... ......... .......... ....... .... ................ Iq .... .......... ......... ....... ...... ........ .. ........ ............... . ...... ......... .... .... ...... ... ... ....... ..... ........ ... ..... .......... ......... ........ ......... . . . ................ ......... .... ........ .... . ...... ......... ....... .... ........ .. ......... ... 69 . . . . . . . . . . . . ........ ......... I .... .... ..... ........ . ....... . ......... ..... 0 ......... ....... ......... ......... ... ......... .. ...... ............ ...... ..... ... ........ . ......... ........ ......... ...... ..................................... ............ . .. ...... i .............. ....................... ............... .............. ........................ ............................... ....................................... .................................. . ... ..................... .. .......... . ........................ .............................. . ..... ................................ ... ... ............... . . . . . . . . . . . I : - - ........... ......... ....... ........................ 1 1. 1 . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..................... . . . . . . .. Q I I - I - : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ......... . . . . . . . . . . . . . . . . . . .. . ...... ... ... ... ........... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .......... ... ... 4j t . ... .................................. ... ....... . . . . . . . . . . . . . . ....................... ....................................... ...... ............ .......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . ....... ............................... ............................... .............. ....... ......... ................. ........ ... ... ........ ..... ................ ......... .... ....... ....... .. ..... 1. ..... 0 .... ........ ....... .... .... ....... ......... ......... ......... ......... ......... .. .... ......... .... ......... .... ......... ........ ................... ......... ......... .. ........ ....... ...... ...... ... ......... .......... ......... a v . . . . . . . . I ........ ........ ..... . ......... ........ .... .. .. .... .... ........ .. ...... .......... ......... ........ ........ ....... PIP ....... ....... ...... ...... . ..... ... ... ............... .............. 1: . ........... ............. W ....................................... ....................................... 1 ........... .... ......... ......... 16. - I :**'** ... ........ ... ..... . .... ......... ...... tj ....... -W ......... i ::,:: : , : . . : I ......... ....... ......... ......... ..... ... ........ .. ..... c..................... ....................................... tj : ::: :, :7, ...... ........... ...... ......... .... ...... ... ..... .... ......... ...... . ... ... ..... .... ... ........ ......... .... .... .............. , * : . : ....... ...... ... fil, . 1 .1 , � t: . I .. ... ... ... .... ........................ I .. ......... I : - : - : - - 0 ... ........ ................................ ................... ....... ... ...... ...... ..... I I - _ - I I I ... . : : ....... . ................. ......... .... .... ........ .. ... ..... ......... ... ... .... .... ... ... ... ......... ......... ......... ...... .... ...... ......... ... ....... ...... ... . .... .. .. .... ......... ... U id . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R1 ... ... ... ... le- I - - - I - I . . . . . . . . . .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . I . I I I I I I . . . . . . . . . . . . . I . . . . - - : - - : - I L I I . I . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LAW . . . . . . . . . . . .......... ......... .... . ......... . ....... . ......... ......... ......... ......... ......... ......... . ......... ...... ......... ........ ... ... ......... .. ............ .. ... ... ... ... ... .... ................. ....................................... .. ................. ....................... ........ . ... . ........ .. ....................................... ............... .............. . . ... ... . . ....... . . 0 .... ...... .. ........ .... .. ... ... ......... ......... ..... . .................... .... .............. .......... ... : ........... .................. .... .... .. ...... ...... ........ ..... ...... ......... ... ....................................... .......... .... ... ........... . . . . . . ...... * ............. . ........... ....... , ............ , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . ................... .......... ... ... : . . . . . I . . . I . . . . . . . . . .......... ....... ... ....... ... ... ....... ... f;ITY ........ .... .. .... .... .. ...... ... ........ . ... ......... ..... ......... .. ........ .. ......... ........ .... ........ ..... ......... .. ...... .. ..... ....... ......... ......... ......... ...... ...... ........ ..... ......... .. .......... .. :::: ::::::: ......... ..... ......... ........... ... .... .... .. ...... .. ...... , ... . . . ......... ......... ... ......... .. ............ ......... . .......... ......... ..... . .. . . ........... ................................ ................ ........... ... .. ... ..... .......... ......... ....... ..... .. . ...... I ........ ...... ....... ....................................... ....................... : ... : : : ... ... ........ . . :*",.,*,"",.*":"**.*":",:, : ......... ....... :. I . : : I_: ... ... ... ... ... ... 91177X 9/ 7 .............. I ............. ................................. ... ............................... i :...: :...: : : : I : :., . . ..... ... ... ..... ....... ........ ......... ..................... ................. ................................ ............. .... ......... ......... ......... ...... ..... ..... ......... ...... . : - - . . . . I . : , : : ......... I'll .... ....... ....... ... N . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . : * . , , : I I : : ......... ... C, SHAWN ORIREN, P.M. . . . . . . . . . . . . . . a* WAS . . . .. . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o. . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . cz, CONSULTING ENGINEER ......... .. ......... ......... ..... .. ........... ...... ..... ......... ... ! ... ......... ...... .... ......... ........ ... ... : ........... ................... ... ....................................... .......................... . ... ...... ..................... ... ........... ................... ... ... ... ... ........... ............... ....................... ....................................... ........... ........................... ....... ... ... ... ... 16716 S.E. 28th STREET BELLEVUEj WA. 98008. . ..... . ..... ......... ......... ..... .. ......... .......... I. ... ......... ...... ..... ... . ......... .. ...... . ...... ....... ....... ...... PH. (206) 746-3992 ......... . .... I. ... ......... .. ...... .......... I : ::. .:: I :*:: : : : : : ......... ....... ......... ......... 1 . . : .::::: -:: :::: : ::,: - ..... .... ....... I : i . . . . . . . . . I : : : : : : : : j : : : : : : : : : : : : : : . : . . . . . . . . . . . . . . . . AL . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . .. . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . I . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... ........ ......... ......... ......... W R .::::::: 93-05 . ......... .. I ....... .... ................... ...... ......... ......... ..... .. .. . ......... ........ ......... ......... ......... Sheet__?�_of 3 Job No. ........... .......... I .... ....................................... ......................... ... ................ I ...................... ............ ........................ ...... ....... poFM ...: .... I .... .1 1 ......... ...... ..... ............. ............. ......... .......... .... ........... ............... ...... ................................... ... .................................... .................... . ... ....... I... I.T oe . I .. ..... For: A L a NORMA SAND ......... ......... ....... I "'. eo, CRr. ......... ......... ......... ......... ......... . Des gn By: cso ... ... VERr ........ ..... ....... ......... ........ ........... ...... .... .. ......... ..... ................... . ........ ...... ......... ......... .......... ..... ... .... :. .. .... Drawn By: TLR 4015 164th ST. SIN . ......... ........ ... ....... ..... ......... .... .... I .... .. ...... .... PROFILES PETALS..'— ... ..... .. LYNNWOOD, WA 98031 ......... ....... . ..... ........ ....... to......... 1.111.11. . I ... .... . I I I ....... I ... ... ..... . 'AS NOTED . ......... ::: ...... . ... ... I .... PH, (206) 742 5107 III loll I I 111 -1 1 Date: SEPT, Z lift ........ I. .... ......... 1993 ..... . I ....... ........... ....... ........... ........... ................... ........... ............. . ... ... ....... ... . . ... ... .. I . I I I I . I I I . tIf lilt ........... HECULENE" 11101C 11[i DAA?tlkG FILM FERGUSON SONS'138704 CRYSTALENE- 11 41411to 11MARI:" "It Polito" 40 0