18109 69TH PL W.PDF11111111 lill
5350
18109 69TH PL W
From: Ron Trickett 425-775-2687 To� Duane Bowman Date: 911312004 Time: 9:23:56 AM Page 2 of 3
18025 69h Pl. W
Edmonds, WA 98026
September 13, 2004
Mr. Duane Bowr nan
Director of Development Services
121 5" Ave. N.
Edmonds, WA 98020
Re: Construction of Westar Development Lot 17 - 18109 69h Pl. W. Edmonds
Dear Mr. Bowman,
The Estates at Olympic View Crest Homeowners Association wishes to express
several concems regarding the construction of lot 17. There appears to be several
issues that are not in compliance with erosion control measures and safety standards.
The private road has been undermined due to a 10 — 12 foot deep cut along the edge
of it. There appears to be a loss of the road base. The plywood safety barrier that
was constructed was ineffective in that it blew into the lot sometime during the night
of September I &. Larry Seitz was notified the following day, via fax, that this had
occurred. So fair, there has been no effort to rectify the problem.
The Association is concerned about the long term stability of the road. We request
that corrective measures be implemented to restore the integrity of the road base. We
also request that a maintenance bond naming the homeowners association as
additional insured be posted by Westar'Development for any future maintenance or
repair of the road, should additional settlement or deterioration of the private road
occur along the edge of property line.
Another area of concern is the exposed soil. There appears to be a lack of proper
erosion control in these areas.
Finally, the existing water line that serves the lower lot 18 has already been damaged
during the excavation, leaving the homeowner with soil in the water and a risk of
contamination. The locate wires have been broken and the line is lying on the
ground resulting in the potential for additional damage during subsequent
construction activities. The water line must be adequately supported to prevent any
future damage and needs to be subsequently backfilled with sand or pea gravel
during the backfill process to prevent any future damage to this service. Also, the
locate wires need to be repaired along the length of this water line. It appears as if
. . . . . . . . . . . . . . . . . . . . . . 0 . . . .
From: Ron Trickett 425-775-2687 To: Duane Bowman Date: 9/1312004 Time: 9:23:56 AM Page 3 of 3
Septemher 13, 2004
Page 2
the water line has already been patched in with a new section. We are curious as to
if this work meets the City of Edmonds standards.
The Association is asking that you enforce the proper erosion control measure,
construction requirements and safety standards during the construction of this lot
and not to allow work that creates . a haz . ard to the community and or exposes the
community to future liability and replacement costs for the private road.
Sincerely,
)al 17.1;wl&
Ron Tribkctt
President
Cc_AI Muzzy, Vice -President
Arz- I"
r . riga., v-4
ROzdNVM*V
City of Edmonds
12156 Ave= Nm*, Edwmda - WA 98020 - (425) 771-WO Pat (425) 771-0221
Websits:
I AIJA 9
---- ----- --
ZOO -0-7441
Eftonds Building P.minit No. —
With reforence'to the above identified project, this will cer* that this institution has a savings
accoum (or loan) for the above -referenced dcveloper/owner for &e project so identified. In
consideration of the permitted development of dw property� and in lieu of a performance bond, this
insfitution hereby agrees that It will bmw the sums of money for the indicated site improvements
pending vaitten authorization for release of said funds by the City of Edmonds in the amount of
$ 16A Ise —1
The total sum indicat@d will be wifteld b� this institution from any disbumments of any kind
until written mithorization has hen received by the institutiou fiom the City of Edmonds to releme the
sum of money indicated by the written authorization from the City.
The design, location, materials and Otba specific9tiOns for the indicated site improvernents are
those required by the City of Edmonds and appear in -the above -referenced Edmonds building pcnnit
file and are in compliance %ith the Mionds Community Development Code of said City.
In dw evcvt the gwnuddeval"a we to complete the indicated improvements within
6, (not to exceed 24 mouft) the City of Edmonds may demand,
and the institution shall make, payment to the City of said fimds so that the improvements can be
installed or completed Immediately to City standards. The institution shall not be liable to the owner
for any disbursement of said funds to the, City of Edmon&
Rl_ 14,
i ' W ' !, I" . "I ,
14, .'
I irtl I-, C--?-- r_r_w_p LC- - LIP
r' . M),' 014
City ofEdmanda Pmfomaum From Fmd Amcoad
FqpTwo
C D -rz-v
Fin=
Ownw/Dw@10por
Moor/Title I=Iqllullju-�, Title
Vi fol
) 6et ZI7 qa*n� &E-,
P6 eft q] Ob-I —UA"L2�— 04(p , q &,OrLc,
M.WMAddrms T- Mailius Afteris
p
STATE OF WASUNWON)
wkwwWjed the mid kutrment to be the fiw and voluatuy act and dwd of said mpwation, for the
umm and pauposm thmmin moationed, and on Odh stated that z -Yas
antha&W to momte said iumment and thet the seal afted is the corpmate seal of said owpomfiom
WMUSS my hand and official wal hamte offixed the day awl ym fimt, above wfitten.
TAMRY !nod r&e
P PUBOG
gd
City of Edmonds Poformmcc Fwm FWd Account
Page Tbm ,
131*11,0118 �4111W
STATE Of WASMJGTON )
COUNTY m6z�'
on us day of before me, the under-sigaed�
a Notary Public in and for dw State of WadAn&n, My commissioned od swoyn, personally appeared
to me known to b . v the F'A V— S I PVISM of-
77 3�1
the gmmsI*Mmhip dmt executed the foreping instwmakL and
acknowledged the said insWmuent to be the five and voluntary act wd deed of a9d partnership, for the
uns and purpom themin mwtianA wd on oath st@W do
authorized to execute said instrument.
VMMSS my hwd md official seg hemto afted the day and &M above WrittaL
Y'
LIC �/Snd for the S of
el
4,4 O� . ........
Flui I
TOTAL P.04
T
d, T
17 #F 801949 -fL�W,;
�"e,'s T&x- paMl #: 00" 6400 -0017 000
OPP,'
C
---�--0Wwer.-Westqr-DeveWpw o. lue - -7
ent
do
. . . . . . . . --1692-7-84T--Ave-�-N1E—,--
-Kev�m�re-,*A-9802&-
4-254
—:N
Lee
Tv
4�,
FACECALCULATIONS
ProinnW Ekdldirso Pid -1244 -SF.
Proposed GW�90
Proposed PaW & decks 320 SF
Proposed Walkways 100 SF
..WL Proposed Dfive
Impervious Surbice,
2574 BF
ILL
T-
Lot
�bN SF
C-A-CULATKM
Origirml Vaniance Pio
posed
A 346.00 348.50
345.00 346.50
C 350.00 346.50
0 348.00 346.50-
Aywage, Grade 347.26 8.25 346.50
Datum = C13 97 351.64
cut I fdl 0.00
-7 Height of Structure 25.00 25.00 33.e2'
�68
U0.32;
Ma)dmum Allowed 372.25' 380.'50
GRADING- �GALCULATIONS
CUT 196 CY
FILL' 135 CY
Balan.1ce I e;kpo'rt 75 CY
4 TOTAJ- 406 RECEIV D
I [WT SLOPE 14
% AP ED AS NCTED
Y NPINEERI P AUG 2 3 200
oi cto ___ .1. - -1
PAVA
Ugi'4ERICONTP%A�,TOR�ISRLESPUNSIBLL PERMIT COUNTER
FOR EROSION CONYROL AND DAMAGE Date: --4114,12aol
01 P.
M
Legal: Lot 17 mpic View. Crest
C.
_j
A Address: 18019 69h Pl. W.
7! Assessor's Tax Parcel M 0090 6400 0017 000
U
Owner: Westar Development Co. Inc
16927 84b Ave. NE
Kenmore WA 98028
425-487-2757
ir
. V11,
V(Vj -To tub O.W Wj 11 0 .1=0
0
'Web,
9A)ii
AUGLIJ BLE TIGHTLINE
r ERIAL
J�qq
t- '%SDR 35
S 0
Nzi X N - 12
0
Ak C
OR-
------ '..,IMPERVIOUS SURFACE CALCULATIONS
Building Pad 1244 SIF
Proposed
pro
posed Garage 0
SF
Proposed Patio & dedm 320
SF
Proposed Wak*dys 100
Proposed Drive 910 SF
2574 SIF
Impervious Surface
D
�ot Size 8001 SF
Lot Coverage 32% 2574 SF
V(
X,
SIC
.00,
>
6
GRADIN CALCULATIONS
CUT 196 Cy
0.
FILL 135 CY wr% 11A
ly LAW
Balance export 75 C *k91
TOTAL 406
f
LOT SLOPE 2 3 2po�
WATER & SEWER
,rr,,uv Mi AU
BY EQ1NEE I G INSPECTIO�S RMPERM/T�CC)
nu "d
j 9y CALL 425-771-0220 EXT. 1326 UNTER
Date: �� AP M4
HEIGHT CALCULATIONS
Original
Variance Proposed
A
346.00
346.50
345.00
346.50
C
350.00
346.50
D
348.00
346.50:
Average Grade
34725
346.50.
Datum = CB 97
351.64
cut I fill
0.00
'A Height of Structure
-
.25.00
_4J '3A.1K
,-,Ma)dmum Allowed
372.25
380.50 380,09
1910N� 61 P1 h)
February 12, 2005
P. E C I E1111 %. I E
FEB 2 3 2-005
DEVELOpMENT SEfiVICES
Mr. Duane Bowman
Director of Development Services
City of Edmonds
121 5h Avenue North
Edmonds, WA 98020
RE: Excavation in the area of private driveway at 18017 69h PL. W.
Mr. Bowman:
Alan H. Muzzy
18017 69h Place West
Edmonds, WA 98026
425-670-8845
I am contacting you on behalf of Olympic View Crest Homeowners' Association, especially those who
are responsible for the future maintenance and upkeep of the private road under discussion.
Long-term stability of the road remains in question due to improper excavation of the adjacent building
site. In her letter of September 14, 2004, Jeanine Graf included a technical memorandum from Landau
Associates to Dave Gebert expressing several concerns about the stability of the excavated bank and
water line. In response, Ms. Graf ordered Westar Development Company Inc to impose road use
restrictions pursuant to UBC Section 3307 because, as she stated, the driveway "may be susceptible to
further failure until repaired under the direction and supervision of the property owner's licensed
geotechnical engineer." (emphasis added). Per your letter of September 15, 2004 to Ron Trickett,
Homeowners Association President, Westar was ordered to:
• "Obtain the services of a licensed geotechnical engineer to perform a detailed site investigation
and submit a plan that includes temporary and pennanent erosion control and slope protection
measures and monitoring."
• "Immediately perform any work deemed emergency by the geotechnical engineer."
• "Report any additional slope sloughing or failures or driveway undermining immediately to the
City Engineer."
Several homeowners observed continued sloughing of the middle and upper portions of the bank
undermining the edge of the roadway. I contacted the City Building Department in late November to
again express my concerns regarding the continued erosion of the slope, requesting an inspection prior to
commencement of work on the retaining wall while the bank was still exposed. During the week of
December 6, pallets of landscaping blocks were delivered to the site and work on the wall began during
the week of December 13. In my absence, my wife contacted the City again and an inspector was
dispatched to the site. In his letter dated December 17 2004, Mr. Lyle Chrisman wrote that the " . . .
inspector looked at the site and reported there was no undermining and the contractor was in the process
of installing a block wall." Further "according to the inspector, the block wall will not be very high . .
At this time, the landscape block wall is complete, with portions reaching 60-inches in height. The
retaining wall is constructed of common garden landscaping blocks. Manufacturers of this type of block
recommend structures not exceed 48-inches in height nor be subject to surcharges from sloped banks and
or roads.
At this time, I am requesting the City provide the following documents to be kept in the records of the
affected property owners and homeowners association.
I . A copy of the final report to the City from the licensed geotechnical engineer as to the efficacy of
the repair to the slope
2. Evidence refuting residents' claims of bank sloughing and undercutting of road edge
3. Evidence that the repair was made under the direction and supervision of a licensed geotechnical
engineer
4. A copy of the approved Engineer's plan and City permit for the construction of a block retaining
wall exceeding 3-feet in height
Sincere
Alan H. Muzzy
Vice -President, ympic View Crest Homeowners' Association
cc: William Crowley, Atty.
STREET FILE
/00/ � � 1? 1611- W,
WestarDevelopment Companq Inc.
16927 84th Ave. N.E. Kenmore, WA. 98028 (425) 487-2757
RFCF
. J%4NED
March 10, 2005 MAR 15 2005
Pad Madja Vrudhula I)EVELOPMENT sERVICES
18021 69g' PI W
Edmonds, WA 98026
—Rc:- Water-Seryi&
Dear Ms. Vrudhula:
During the construction of a residence on Westar's property located at 18019 69h PI W (the
"Property'), Westar encountered a water -line, which serves your property, well within the boundaries of
the Property. At considerable expense, Westar attempted to relocate the water -line in order to satisfy the
rq*remdhts of the City of Edmonds. The City of Edmonds has imposed additional requirements that
Westar,it unable'to comply with as the water -line was installed improperly by your contractor.
Jfi'additi6� io ihe above, your contractor failed to obtain an easement from Westar prior to
placement of the water -line on the Property; therefore, the reason for this letter. Westar hereby demands
dig you bring the water -line up to code (at your expense) and, in conjunction therewith, obtain approval
*om the City of Edmonds. Additionally, it will be necessary for you to obtain an easement across the
'Prop'erty�fbrthe water -line (also at your expense).
Time is of the essence. ne improper placement of the water -line is delaying the closing of the sale
of the Property. Unless this matter is resolved immediately, you will be responsible for any and all costs
incurred due to the improper placement of the water -line and the resulting delay of Westar's closing.
Further, absent immediate resolution, Westar will be left with no alternative other than to disconnect the
water -line, and remove the water -line from the Pr6pert�
Tbank,you for 'your immediate attention to this
matter.
Sincerely
Larry I -Seitz
President.
Cc:�J'il`�Jim Friii
Frits and Leonardson
-City"of-Edin6iids
-1 it -
LIU & ASSOCIATES, INC.
4 �011 + (e -rf4e
CI_05S:r r0IH1,)
2-14 : w �,Lore
(I&T14e �,M6fe�T)
WALL,
T (C A\ L, C
I Geotechnical Engineering - Engineering Geology - Earth Science
eq V
Z! I
MAR 2 12005
DRIVEWAY TRAFFIC LOAD PRESSO-PrEr
SINGLE-FAMILY RESIDENCE
18019,.:-69THt PLACE'' S
T
EDMONDS, WASHINGTON
JOB NO. I DATE 3120/2
E
PLATE 1
Westar Development Compan!) Inc.
16927 84th Ave. N.E. Kemnore, WA. 98028 (425) 487-2757
Facsimile Cover Sheet / Memo
TO: C,/-r,/ 0 r- E�>M*Aza
ATTENTION: VA-Y,6
DATE: 3 174 105
RECEIVED'
MAR 2 1 2005
FAXNUNIBER: DEVELOPMENT SERVICES
SUBJECT:
gjC,
FROM: Z4M -55"M
TOTAL NUNIBER OF PAGES �'2, PLUS THIS PAGE
C bo W Wl OA
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
March 21, 2005
Mr. Larry Seitz
Westar Development Company, Inc.
16927 — 84"' Avenue NE
Kenmore, WA 98028
Dear Mr. Seitz:
Sublect: Driveway Surcharge on Block Walls
Single-Famlly Residence
18019 — 69"' Place West
Edmonds, Washincyton
RECEiVED
MAR 2 12005
PERMIT CUOUNTER
At your request, we have performed an evaluation of the impact of traffic load of the neighbor's
driveway to the north oil the stability of the Keystone block walls installed oil the sublect
I 'deiice site. Presented this letter are our findings and Conclusions.
-esl I
As stated in our 3/2/2005 letter, the block wall adjacent to the neighbor's driveway is within
about 4 feet of the driveway at its closest point. Between the driveway and the block wall, the
ground slopes down at about 2H: I V to 5H: I V from the driveway to'the block wall. A typical
section of the most critical case is presented on Plate I attached hereto to show the potential
impact of the traffic load of the neighbor's driveway on the concrete block wall.
We estimate that the equivalent traffic load for passenger vehicles and light trucks oil tile
driveway will be about 100 psf. Assuming the pressure envelope of the traffic load spreads
downward at a 45-degree plane as shown on Plate 1. It shows that the pressure envelope of tile
traffic load on the neighbor's driveway would pass under the block wall. Therefore, it IS Our
conclusion that the traffic load of the neighbor's driveway should exert minimal or no surcharge
19213 Kenlake Place NE Kenmore, WA 98028
Phone (425) 483-9134 Fax (425) 486-2746
March 21. 2005
Mr. Larry S.eltzJWestar Development
Page 2
pressure oil tile block wall. and therefore should have little impact oil the stability of tile block
wall.
Please call if you have questions.
G S.
%VM1 A S
�27589
0 �j
ExPims 7/171
Yours very truly,
LIU & ASSOCIATI-ES, INC'.
J. qS.((JI itan) L lu, I'll.D., P.E.
Consulting Geotechnical Engineer
Attach.: Plate I — Driveway Traffic Load Pressure Envelope
LIU & ASSOCIATES, INC.
March 24,2005
City of Edmonds
Development Services Department
121 5h Ayenue North
Edmonds, Washington 98020
Attri; Lyle Chris
RE: GEOTIECHMCAL REvimw OF RETAINING WALLS
18019 69T1iP`L,,ACE WEST
EDMOKIDS, WASHINGTON
Dear Mr. Chrisman:
LANDAU
ASSOCLATES
BULDING
MAR 2 4 2005
In accordance with your request, Landau Associ�ares completed a geotechnical engineering peer
review of correspondence and typical cross sections prepared by the developer's geotechnical engineer
related to modular block gravity waLls constructed near the north and northwest property boundaries at
18019 69d' Place West in Edmonds, Washington. This review was conducted under Landau Associates'
On -Call Geotechnical Engineering Services Agreement with the. City of Edinonds and Task Order
No. 05-02.
We have reviewed a letter prepared by Liu & Associates dated Much 2, 2005, a letter from the
City of Edmonds dated March 7, 2005 requesting an evaluation of the surcharge influence of traffic on the
adjacent driveway, and a response letter from Liu & Associates dated March 21, 2005. We have also
reviewed a. hand sketch of dimensions and elevations of the existing wall con -figuration prepared by Lyle
Chrisman of the City of Edmonds to boner understand the overall configuration and heights of the
existing wall.
Landau Associates concurs with the Findings and conclusions of Liu & Associates'
March 21, 2005 letter that addresses the influence of the driveway traffic surcharge and concludes that the
driveway should exerL-minirml or no surcharge pressure on the block wall given the most critical section
described in the letter prepared by Liu & Associates.
However, Landau Associates is concerned abOUt the overall configuration of the wall and in
particular the configuration of the two -tiered wall system. it is our opinion that the upper wall, which is
set back from the lower-fier wall a horizontal distance less than the height of the lower -tier wall, would
impose a surcharge on the lower wall in this two -du wall systern. We agree with the statement in
Liu & Associates Maich 2. 2005 letter that "the general rule of thumb is that the upper -tier wall should be
ENVIRONMrNTA4 I GCOTECHNICAL I NATURAL RESOURCES
130 2nd Avenue South - Edmond*.WA 96020 - (425)778-0907 fax(425)778-6409 - www.landau;rc.com
SEATTLE - SPOKANC - TACOMA PORTLAND
7 7 � 6 1 � 9 L k N 9 � 9 S 0 3 1 5 1 8 P 0 3
set back from the lower -tier wall a horizontal distance at least equal to the height of the lower -tier wall in
order not to exert additional surcharge on the lower -tier wall."
Limited - information has been provided to assess the stability of the two-tier wall.
Liu & Associates states that the wall is a Keystone block wall. Information was not provided to us as to
the block size and no calculations were provided to support the design of the wall in its current
configuration. The approximate block size has been described to us and we have compared this to
technical literature fxom Keystone Retaining Wall Systems. The block size de -scribed is consistent with
the Keystone "Compac" unit blocks. nie Keystone technical literature indicates that the recommended
maximum wall height for a modular block wall constructed of the Keystone Compac units is 3 ft, without
soil reinforcement and rio surcharges (no slopes, roadways, etc.). The height of the existing wall, whether
in a single wall'or two-tier configuration, exceeds 3 ft in some areas and has a sloping backfill. The
Keystone technical literature also cautions that a two-tier wall can impose higher stresses in the lower
wall when the height of the lower wall is greater than the horizontal space created by the terrace between
the walls. This configuration is also consistent with the City of Edmonds requirements for spacing
between rockery walls, which in many ways are similar to modular block gravity walls.
Liu & Associates states in their March 2, 2005 letter that "the Keystone block walls constructed
on the subject residence appear to be stable� with no signs of movement, such as tilting, bulging, or
sliding." Liu & Associates also states that the two -tiered wall configuration is not according to the
"normal rule of practice." In our opinion, the current absen&c of signs of imminent failure of the wall do
not provide the necessary assurance that the wall will perform. as intended over the long term. Since the
information currently available to us indicates that the wall system does not appear to comply with the
manufActurer's recommendations regarding wall height and the configuration of tiered walls, we
recommend that the stability of the wall and slope configuration be evaluated with engineeCing
calculations to provide appropriate design support for the cutTent configtmition, or remedial measures be
taken to increase the stability of the current wall and slope system.
Please contact us if you have any questions or if we may be of further assistance.
LANDAU ASSOCIATES, INC.
Dennis R. Stettler, P.E.
Principal
DRS/ltm
Cc: Jewmine Graf, City of Edmonds Building Official
3124JD5 kTamda1&kwproc\074N13(h1 8019 69LTI P1 W_GmFlavlew.doc 2 LANDAu AssociATEs
LANDAU
ASSOCIATES
March 24, 2005
BURDINO
City of Edmonds
Development Services Department 2 5 2005
121 5`h Avenue North
Edmonds, Washington 98020
Attn: Lyle Chrisman
RE: GEOTECHNICAL REVIEW OF RETAEVING WALLS
1801969TH PLACE WEST
EDMONDS,MASHINGTON
Dear Mr. Chrisman:
In accordance with your request, Landau Associates completed a geotechnical engineering peer
review of correspondence and typical cross sections prepared by the developer's geotechnical engineer
related to modular block gravity walls constructed near the north and northwest property boundaries at
18019 69th Place West in Edmonds, Washington. This review was conducted under Landau Associates'
On -Call Geotechnical Engineering Services Agreement with the City of Edmonds and Task Order
No. 05-02.
We have reviewed a letter prepared by Liu & Associates dated March 2, 2005, a letter from the
City of Edmonds dated March 7, 2005 requesting an evaluation of the surcharge influence of traffic on the
adjacent driveway, and a response letter from Liu & Associates dated March 21, 2005. We have also
reviewed a hand sketch of dimensions and elevations of the existing wall configuration prepared by Lyle
Chrisman of the City of Edmonds to better understand the overall configuration and heights of the
existing wall.
Landau - Assd-ciates concurs- with the findings -and - conclusions of Liu & Associates'
March 21, 2005 letter that addresses the influence of the driveway traffic surcharge and concludes that the
driveway should exert minimal or no surcharge pressure on the block wall given the most critical section
described in the letter prepared by Liu & Associates.
However, Landau Associates is concerned about the overall configuration of the wall and in
particular the configuration of the two -tiered wall system. It is our opinion that the upper wall, which is
set back from the lower -tier wall a horizontal distance less than the height of the lower -tier wall, would
impose a surcharge on the lower wall in this two-tier wall system. We agree with the statement in
Liu & Associates March 2, 2005 letter that "the general rule of thumb is that the upper -tier wall should be
ENVIRONMENTAL I GEOTECHNICAL I NATURAL RESOURCES
130 2nd Avenue South - Edmonds, WA 98020 - (425) 778-0907 fax (425) 778-6409 - www.landauinc.com
SEATTLE - SPOKANE - TACOMA PORTLAND
set back from the lower -tier wall a horizontal distance at least equal to the height of the lower -tier wall in
order not to exert additional surcharge on the lower -tier wall."
Limited information has been provided to assess the stability of the two-tier wall.
Liu & Associates states that the wall is a Keystone block wall. Information was not provided to us as to
the block size and no calculations were provided to support the design of the wall in its current
configuration. The approximate block size has been described to us and we have compared this to
technical literature from Keystone Retaining Wall Systems. The block size described is consistent with
the Keystone "Compac" unit blocks. The Keystone technical literature indicates that the recommended
maximum wall height for a modular block wall constructed of the Keystone Compac units is 3 ft, without
soil reinforceme nt and no surcharges (no slopes, roadways, etc.). The height of the existing wall, whether
in a single wall or two-tier configuration, exceeds 3 ft in some areas and has a sloping backfill. The
Keystone technical literature also cautions that a two-tier wall can impose higher stresses in the lower
wall when the height of the lower wall is greater than the horizontal space created by the terrace between
the walls. This configuration is also consistent with the City of Edmonds requirements for spacing
between rockery walls, which in many ways are si I milar to modular block gravity walls.
Liu & Associates states in their March 2, 2005 letter that "the Keystone block walls constructed
on the subject residence appear to be stable, with no signs of movement, such as tilting, bulging, or
sliding." Liu & Associates also states that the two -tiered wall configuration is not according to the
t6normal rule of practice." In our opinion, the current absence of signs of imminent failure of the wall do
not provide the necessary assurance that the wall will perform as intended over the long term. Since the
information currently available to us indicates that the wall system does not appear to comply with the
manufacturer's recommendations regarding wall height and the configuration of tiered walls, we
recommend that the stability of the wall and slope configuration be evaluated with engineering
calculations to provide appropriate design support for the current configuration, or remedial measures be
taken to increase the stability of the current wall and slope system.
Please contact us if you have any questions or if we may be of further assistance.
LANDAU ASSOCIATES, INC./
Dennis R. Stettler, P.E.
Principal
DRS/ltm
Cc: Jeannine Graf, City of Edmonds Building Official
3t24/05 �XEdnidata\wproc\074\130\1801969thP[W—GeolReview.doc 2
LANDAu AssocIATES
.' t it .
LIU & ASSOCIATES, INC.
4 �011:t (6 -roe
CIL.05SIr r0IHT)
2- H - I\/ z2 Lo re
((&,rHe �,T�re5T)
&Look
WALL,
1 2-
I Geotechnical Engineering - Engineering Geology Earth Science
TKNr-r-ic Lo/,c>
ot� �616He'OF"��
_pKfvr-'wNy_-.,
Z! I
RECEIVED
MAR 2 12005
DRIVEWAY TRAFFIC LOAD PRESSURr_'
SINGLE-FAMILY RESIDENCE
18019 - 69TH PLACE WEST
EDMONDS, WASHINGTON
JOB NO. I DATE 3/20/2005
E
PLATE 1
fflll`�� WestarDevelopment Compan'q Inc.
16927 84th Ave. N.E. Kenmore, WA. 98028 (425) 487-2757
Facsimile Cover Sheet / Memo
TO: Cl-ry 0 r- E�>J*70^4>S: DATE: 3 /2� 105
RECEIVED
ATTENTION: VAM5 G-613&r--'r MAR'2 1 2005
FAXNUMBER: DEVELOPMENT SERVICES
SUBJECT: (09-fi� P&
- a
I C
TOTAL NUMBER OF PAGES "7% PLUSTHISPAGE
e C '* 0 V'q-�S. e5 bo W *1 &A
PY
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science —
March 21, 2005
Mr. Larry Seitz
Westar Development Company, Inc.
16927 — 84"' Avenue NE
Kenmore, WA 98028
Dear Mr. Seitz:
SUbJect: Driveway Surcharge on Bloclk Walls
Single-Fam I ly Res I dence
18019 — 69'11 Place West
Edmonds, Washington
RECEWED
MAR 2 12005
PERMIT COUNTER
At your request, we have performed an evaluation of the impact of traffic load of the neighbor's
driveway to the north oil the stability of the Keystone block walls installed oil the subject
residence site. Presented in this letter are our findings and Conclusions.
As stated in our 3/2/2005 letter, the block wall adjacent to the neighbor's driveway is within
about 4 feet of the driveway at its closest point. Between the driveway and the block wall. the
ground slopes down at about 2H:IV to 5H:IV from the driveway to the block wall. A typical
section of the most critical case is presented on Plate I attached hereto to show the potential
Impact of the traffic load of the neighbor's driveway on the concrete block wall.
We estimate that the equivalent traffic load for passenger vehicles and light trucks oil the
t--
driveway will be about 100 psf. Assuming the pressure envelope of the traffic load spreads
downward at a 45-degree plane as shown on Plate 1. It shows that the pressure envelope of the
traffic load on the neighbor's driveway would pass Linder the block wall. Therefore, it 'IS Our
conclusion that the traffic load of the neighbor's driveway should exert minimal or no surcharge
19213 Kenlake Place NE Kenmore, WA 98028
Phone (425) 483-9134 Fax (425) 486-2746
41
March 2 1, 2005
Mr. Larry Seitz/Westar Development
Page 2
pressure oil tile block wall. and therefore should [lave little impact oil the stability of the block
wall.
Please call ifyou have qLICStlolls.
G S.
VIAS&,,
27589
N
ExPims 7117/
Yours very truly,
LIU & ASSOCIATES. INC.
44— 7�
(JL
J. S. (JL ian) L 1u, Pli.D., P.E.
Consulting Geotechnical Engineer
Attach.: Plate I — Driveway Traffic Load Pressure Envelope
LIU & ASSOCIATES., INC.
r;7H : tv 01Z
P L AT T'619,
P_" Loe'K
E-MP. CUT
-1 P/
MAX. co t _\r_Tr-'0
4"10 PaRF-ofCATC-_0
rvc, C)r'Ajr4 pw&,
ROCK PILL-6-0
0 ITCH r_- 5
-0
4
AT CLO
�' H - 1,4 OK
P: LAr T Cz K
N veq H 60R�
jqfz1vG;wA-f
Tem P 60T
'14
'7
L �,C-efjorl 0�4e�TISR WALL
Lo-r Lftfr_-�
r)�PICAL SECTIONS - KEYSTONE BLOCK WALL
LIU & ASSOCIATES, INC. SINGLE-FAMILY RESIDENCE
6 'H P 6
0 -� � OT LA
18 19 EST
Geotechnical Engineering - Engineering Geology - Earth Science EDMONDS, WASHINGTON
1 ir)R mn I nATF= vqms; I P1 A TE-1
1�
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
March 2. 2005
Mr. Larry Seitz
Westar Development Company, Inc.
16927-84 1h Avenue NE
Kenmore, WA. 98028
Dear Mr. Seitz:
Subject: Stability of Keystone Block Walls
Si.ngle-Family Residence
'18`0 19 — 60" Place West
Edmonds, Washington
ew- 1%
111seevr,1W
M NR t 4 Ztt5
eERMIJ ()0%Jt4TEFk
At your request. we have inspected and evaluated the stability of the KeNtone block walls
constructed on the subject residence site. Presented in this letter report are our findings and
conclusions.
A curving Keystone * segment concrete block wall (hereinafter referred to as Wall 1) is
constructed to line a toe cut along the north and west lot lines, and a straight wall (hereinafter
referred to as Wall 2) line the south lot line of the subject residence. Wall 2 is a single -tier wall
lining the south side of the driveway and garage of the subject residence, and stands at about 4
feet tall. About the middle half of Wall I splits into two tiers', with the lower tier wall stands up
to 3 feet 4 inches tall and the upper tier up to 2 feet 8 inches tall, and the upper tier wall is set
back at 2.0 feet from the lower tier wall. Wall I is within about 15 to 20, feet of the sidewalk to
the west and within about 4 feet -of the neighbor's driveway to the north at its closest point. The
area between Wall I and the sidewalk is now covered with grass sod and shredded bark, and the
area between Wall I and the neighbor*s driveway is mostly bare. We understand that the
stability of Wall I is.the main concern, and hence the subject of our stability evaluation.
19213 Kenlake Place NE Kenmore, WA 98028
. Phone (425) 483-9134 Fax (425) 486-2746
March 2. 2005
Mr. Larry Seitz/Westar Development
Page 2
Two typical sections of Wall I are shown on Plate 1. attached hereto. You stated that a
perforated PVC drain pipe is installed along,the base in front of the lower tier wall, and that
crushed rock filled trenches are constructed under the base -course of the lower -tier block wall at
to 4 points to hydraulically connect the sand backfill to the drain pipe in front of the wall. . The
drain pipe is then tightlined to the drain line of the roof drain system. You also informed us that
free -draining sand is used to backfill the block walls, and that the sand backfill is placed in lifts
no more than 12 inches thick with each lift compacted with a vibratory plate compactor to a non -
yielding state. It is our,opinion that the block walls constructed as you described should have
adequate drainage control provision.
As presented on our 10/29/04 letter, the original surficial soil unit at the residence site and its
vicinity is mapped as advance outwash deposits of dense to very -dense, slightly silty. fine to
medium sand with a trace to some gravel. The native undisturbed advance outwash soils are
quite stable. We understand the roadbed of the neighbor's driveway to the north is constructed
with structural fill placed over the advance outwash deposit. The structural fill was compacted to
at least 95% of the maximum dry density determined by ASTM D1557 (Modified Proctor
method), monitored and certified by Nelson-Couvreue Associates. It is our o . pinion that cut
slopes or fill embankments at 2H:lV in such structural fill -material or in the compacted sand
backfill of the block walls should be able to maintain stability. The surficial soils on the slope
next to the north neighbor*s driveway may, have been disturbed by construction traffic. The
disturbed soils should be compacted with a vibratory plate compactor to a non -yielding state, and
the slope should be seeded and covered with a layer of straw mulch. Shrubs may also be planted
on the slope to provide erosion protection.
With multi -tier walls, the general rule of thumb is that the upper -tier wall should be set back
from the lower -tier wall a horizontal distance at least equal to the height of the lower -tier wall in
LIU & ASSOCIATES, INC.
March 2. 2005
Mr. Larry Seitz/Westar Development
Page 3)
order not to exert additional surcharge on the lower -tier wall. This is based on the assumption
that the pressure envelope of the foundation load of the upper -tier wall spreads downward at a
45-dearee angle. In dense native soils or structural fill. the pressure develop may actually be
spreading downward at a steeper angle, and thus requires less setback of the upper wall. The
Keystone block walls constructed on the subject residence appear to be stable, with no signs of
movement, such as tilting, bulging or sliding. The pressure envelope from the upper -tier
foundation load does hot appear to an adverse impact on the stability of the lower -tier wall of
Wall 1.
Based on our observation of the conditions of the Keystone walls built on the subject residence
site, it is our conclusion that the one -tier portion of the block walls is stable. The two -tiered
portion of the walls appears to be stable without any discernable movement, even though the
upper -tier is not set back far enough from the lower -tier wall according normal rule of practice.
Please call if you have any questions.
-Aw.,
'27539
A'A
uz-'Piq,S3 '7/ 17 / Zo a t::�'
Yours ven- truly,
LIU & ASSOCIATES, INC.
J. S. (Julia� Liu, Ph.D., P.E.
ConsultinLy Geotechnical Engineer
Attach.: Plate I — Typical Sections of Keystone Block Wall
LIU & ASSOCIATES9 INC.
4�1
BUILDING
DEC 3 - 2004
WestarDevelopment Compan!) Inc.
16927 84th Ave. N.E. Keranore, WA. 98028 (425) 487-2757
Facsimile Cover Sheet / Memo
TO 0 1)10 N 0 S.
ATTENTION -
.FAX NUMBER:
SUBJECT: VG
N
DATE: /Z—/ ) /04
TOTAL NUMBER OF PAGES PLUS THIS PAGE
E001d atll:tlo to/zo/ZT Z S2 Z Z 9t SZ'17
11
=uj oo ^aa ae4.sam
LIU & ASSOCIATES, INC. -
Geotechnical Engineering Engineering Geology Earth Science
November 22, 2004
MT. Larry Seitz
WestarDevelopment Corn.pany, Inc.
16927 — 84"' Avenue NE
Kenmore, WA 98028
Dear Mr. Seitz:
Subject: Backfill and Grade Restoration
Sinale-Family Residence
18019 — 69"' Place West
Edmonds, Washington
BUI'Loitil;
DEC 3 - 2004
Regarding the comments by Jeannine Graf of City of Edmonds, we have the following responses:
I . Backfill for the against basement walls and for the driveway of the subject residence
should be constructed with compacted structural fill. Structural fill is the fill that
supports structural or traffic load, Structural fill should consist of clean soils free of
organic and. other deleterious substances and with particles not larger than four inches.
Structural fill should have a moisture content within one percent of its optimum moisture
content at the time of placement. 'rhe optimum moisture content is the water content in
the soils that enable the soils to be compacted to the highest dry density for a given
compaction effort.
The on -site advance outwash soils meetinL, the above criteria may be used as structural
fill provided that their moisture content carl be controlled to close to its optimum
moisture content. The transitional beds soils of clayey slit to silty clay excavated out of
the lower elevation of the building footprint excavation are unsuitable, for use as
structural fill. Imported material for structural fill, if required., should be clean., free -
draining, granular soils containing no more than 5% by weight finer than the No. 200
sieve based on the f�action of the material passing 'No. 4 sieve, and should have
individual particles not larger than four inches.
Z:�
19213 Kenlake Place NE Kenmore, WA 98028
Phone (425) 483-9134 Fax (425) 486-2746
10018 dtl:tlo to/zo/zl /-SZZ /_et szt Dui co ^aa ueisam
November 22, 2004
Mr. Larry Seitz/Westar Development
Paae 2
2. . Structural fill should be placed in lifts no more than 1.0 inches thick in loose state, with
each lift compacted to the minimum percentage of the maxii-nurn dry density determined
by ASTM D.1557 (Modificd Proctor Method) as follows:
Application
Roadwav/drivewav suberade
Retaining wall backf ill
L_
Utilivy- trench backfill
% of Maximum Dry Density
95% f-or top 2 feet and 90% below
90%
95% for top 4 feet and 90% below
Fill embankments of structural fill should not be steeper than 2H: IV. The sloping face of
fill embankments should be compacted with a hoe -pack to a non -yielding state following
the cornpletion of the embankments.
4. Permenent fill embankments should be re -vegetated as soon as possible, and should be
covered with clear plastic sheets, as required, until the ve-etation are fullv established.
Please call.if you have questions.
Yours very truly,
LIU & ASSOCIATES, INC.
a-T-f_ �__ _�
J. S. (Julian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
6 ZLI
LIU & ASSOCIATES, INC.
Z00*6 dtIT:t10 t0?z0?ZT 4SLZ zet szt mul co ^aa ieisam
f
Westar Dev Co Inc
42S 467 27S7 11/09/04 02:10P P.002
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
October 29, 2004
Mr. Larry Seitz
Westar Development Company. Inc.
16927 — 94"'-Avenue NE
Kenmore, WA 98028
Dear Mr. Seitz:
Subject: Cut Slope Stability Evaluation
Sinule-Family Residence
18019 — 69"' Place West
Edmonds, Washington
INTRODUCTION
At your request, wc have completed a stability evaluation for tile cut slopes of the building
footprint excavation of the subj1ect residence. Presented in this letter report are our findings,
conclusions and recommendations.
SITE CONDITIONS
The subject residence site is fronted by 69"' Place West to the west, and adjoined by residential
developments to the otber sides. It is located on a moderate to steep, SOLItheasterly-declinin(T
hillside. We visited the site oil October 4. 2004. to observe the site conditions. Sloped Cut.;
dow,n to the footing levels are made for tile construction of the foundations of the building. Tile
0
slopes are cut at 1H:IV or flatter.. in combination witli a vertical toe cut to about 3 to 4 feet bluh
at tile base of the slopes. Minor -round\vater seepage was encountered just above the vertical toe
L- Z=
cut near tile northwest coriler of the excavation. There have been no sialls of soil movement or
erosion witilln tile site.
19213 Kenlake Place NE Kenmore, WA 98028
Phone (425) 483-9134 Fax (425) 486-2746
Westar Dev Co Inc 425 487 2757 11/09/04 02:10P P.003
October 29, 2004
Mr. Lamy SeitzilVestarDevelopment
Pail-c I
GEOLOGIC SETTING AND SOIL CONDITIONS
The Geologic Map of' the East Edmonds and Pai-t of the West Edmonds Quadraiifdes.
Washinotori bv James P. Minard, published by U. S. Geological Survey in 1983, was referenced
for the aeologic and soil conditions at the site. According to this publication. the surficial soil
C!
unit at and in the vicinity ofthe residence site are mapped as Advance Outwash (Qva)-
The Advance Outwash deposits consist of stratified sand and gravel with minor amounts of silt
and clay, deposited by the meltwater of advancing glacial ice. The Advance Outwash deposits
are glacially overridden and is generally dense to very dense in its natural, undisturbed state,
c,.\cept the top 2 to 4 -feet -which tnay be weathered to a loose to medium -dense state. It can stand
in steep cuts or natural slopes over an extended period oftime when undisturbed. When exposed
on slopes of poor vegetation cover and subjjected to storm runoff. the Advance OUtwash deposits
can be gradually eroded and may slough to a flatter inclination.
The soils exposed on the cut slopes consist of up to 5 feet of loose to mediurn-dense fill with
wood debris. brick fraurnents, waste concrete... etc. Tlic fill is underlain by 2 to 4 Feet of brown,
medium -dense, sligAitly silty fine to mediurn sand, which is in turn underlain by gray, dense to
vcry-dense fine to coarse sand Nvith a trace gravel to the bottom of excavation.
SLOPE STABILITY AND RECOMMENDATIONS
The temporai),- cut slopes at 1H:IV in the surficial fill and weathered and I"resh advance outxvash
deposits, and at vertical toe cuts in the fresh advance outwash soils will be able to maintal.11
stabilitv over the duration of' foundation construction and oradino. The fill and weathered
advanced out,,vash soils. however. are easilv erodible which may results in sloughing of these
weaker soils if overly saturated. Thcrefore, the cut slopes should be covered Nvitli plastic larps
LIU & ASSOCIATES, INC.
Westar Dev Co Inc
425 4e7 2757 11/09/04 02:10P P.004
October 29, 2004
Mr. Larry Seitz.!Westar Development
P a a, e 3
and securely weighted down xvith sand bags to protect the soils on the cut slopes from storm
runoff.
Please call if you have any questions.
N
I EXPIRES 7117 1 "t) C t
Yours very trulv.
LIU & ASSOCIATE'S. INC".
'67�
J. S. (( qJu I i W) L i u, P 11. D.... P. E.
ConsultinLir Geotechnical Engineer
LIU & ASSOCIATES, INC.
WestarDevelopment Companq Inc.
16927 84th Ave. N.E. Kenmore, WA. 98028 (425) 487-2757
September 20, 2004
Ms. Jeannine Graf
City of Edmonds
121 YhAve N.
Edmonds, WA 98020
RE: 18019 69;h PI W / Permit 2004 0741
Dear Jeannine,
REC:FjV5D
SEP 2 12004
DEVELO,PME;N-T SERVICES CTR-
C TY OF EDMONDS
We have installed the barricades and erosion control measures outlined in your correction notice
date&STt=W 15,2004.
: I
We have met with you engineering inspectors onsite on the 151 and 16th and have made minor field
corrections and have received approval for erosion control on the 10h.
We received ap from the building department on Friday morning the 16" and poured
f�s ji�hat. 'aftmoon.. ptoval
We are removing the footing forms today and will deliver wall panels tomorrow the 2it and be&
building the walls and anticipate requesting inspection Friday morning the 24th and hope to pour them that
afternoon. After pouring walls we will need a few days to remove the forms and waterproof the walls. I
anticipate beginning backfill on about the 29th of September.
I believe we have addressed the City's concerns in a timely manner and will be restoring the
shoulder of the adjoining driveway so that the slope will not exceed a 2:1 slope. It does not appear diat
there has been any sluffing of the driveway in question- Furthermore the backfill will be restored in such a
manner that I do not seethe need for additional, engineering.
I hope that this. will provide you with a schedule as to what we have planned. I want to assure you
that we are checking our erosion measures -daily andwill be diligently pursuing completion and restoration
of this site.
If you have any questions or concerns please do not hesitate to call me. My cell phone number is
iO6-940-1757
IL
94 2 5 3 7 8 6 4 0 9 LANIIAU ASSOCIVES INC 09/13/01
LANDAU
ASSOMTES
TECHNICAL MEMORANDUM K I GUM002AL I NMROL RVOMAMS
TO: Dave Gebert, City Engineer
City of Edmotids, Washington
FROM Dennis Stettler, PX. t5��-
DATE: September l3j2004
RE: ]EXCAVATION AT 18019 69rK PLACE W.
EDMONDS� WASWNGTON
Dear Mr. Gebert
At your request, Dennis Stettler of Landau Associates and Dave Gebert of the City of Edmonds
i
observed an excavation fbi a ftbire residence at 18019 69" Place W. on the aftemoon of September 13,
2004. '1he purpose of thp visit was to mess potential excavation slope stability concerns that could
impact the adjacent driveway.
OBSERVATIONS I
The excavation conditions were observed from the -private dziveways bounding the property on
the north and south sides. We did not enter the excavation. At the time of our visit no construction work
was being conducted andit was raining- Rain had been Ming intermittently overnight and during the
daylight hours preceding our site visit. A temporary, moveable wood fence %w present along the south
side of the north driveway. The driveway is about 15 ft wide and asphalt paved.
T'he excavation for the basement of the proposed residence Wended down into what appeared to
be gray, glacially-cousolidated soil. Brown soil that appeared to be topsoil was present between the gray
soil and remnants of a sod line that were visible around portions of the excavation. Fill appears to be
present in some areas, in Rarticular the upper portions of the north side of ft -mcavation appear to be fill.
ne north side of the excavation is near -vertical for the lower approximately 4 to 5 ft, steeply sloping
above the ne2r-vertical slope, then near -vertical again for the upper portion of the slope. The top of the
excavation on the north side comes up to the edge of the pavement for the driveway that services
residences north and east.of the subject excavation. The soil exposed in the. upper portion of the slope
beneath the pavement appears to be angular quarry spill material that is sloughing into the excavation.
During the brief time of oursite visit, portions of the quarry spill material and a small segment of the
ricar-vertical excavation in the gray soil near the base of the slope were observed to slough into the
excavation.
130 2nd Avenue South Edmonds, WA 98020 - (42.5) 778-0907 - fax (425) 778-6409 * www.landauinccom
12 5 7 7 8 6 10 LAKPAU ASSOCIATES INC 0 13 0 1 16 i P 0 0 3'/ 0 1) 3
A plastic waterline was observed in the base of the excavation near thc north side and the sides of
the excavation on the cast and west sides. We understand that this waterline services the residence to the
cast and the, line was bmken during excavation for the basemnt and bas been temporarily repaired.
Portions of the waterline are suspended in air as the pipeline traverses betwe-m the excavation sides and
the bottom o t the excavation.
ExcAvAmN STABiLfry
The excavation contains near -vertical portions and the overall slope inclination appears to be
significantly steeper than i 2H: 1V (horizontal : vertical) slope. In our opinion, the excavation is overly
steep and threatens the adjacent driveway to the north. Sloughing and failure of uiaterial into the
excavation could be expe bted to continue and could undermine the south portion of the driveway oil the
north side of the excavation. This could present a h=rd to vehicles traversing the driveway. In our
opinion, the present situation presents a danger to any vehicle traversing the south side of the 15 ft wide
driveway. At tbis' time, we reconnnend that (he teMorary fence or other temporary barricades be moved
so tlmt vehicle traffic is pievented from access to at least the southerly 6 ft width of the driveway. It will
also be important that the driveway be monitored for signs of cracldng or settlement that could be
warrung signs of movement that could ftu-ther endanger the stilbility of the driveway. If such signs are
observed, it may be appro . priate to prevent all vehicle traffic on the driveway until the adjacent excavation
is backfilled or otherwise. stabilized by shoring.
Worker safety in and around the excavation is the responsibility of tJte contractor. Howevc-, we
note that the excavation i I s steeper than that prescribed by WISELA, and according to WISHA.excavaLtion
requirements (WAC 296 455), should either be flattened or temporary shorirqv- provided-
t
WATERLM STABILM
The waterline has been temporarily repaired, but is presently exposed and partial.1y suspended
near the base of the excavation. Should sloughing of the excavation side slopes or movement of
constniction equ4nnent damage and break the waterline, the release of water could potentially result in
erosion of the slopes at; the base of the excavation and further reduce tho stability of the temporary
excavation. It would be �rudent to protect and relocate this waterline as soon as it is practicable.
I
We appreciate this opportunity to be of service to you on this assipment Please caU if you have
any questions of if we mal y be of further assistance.
rMM%MU CMk=-Vl-.k k-A- 9- LANnAl i ASSMIATFIR
-777777
PERMIT NO: .9446
City of Edmonds
SIDE SEWER PERMIT PERMIT EXPIRES
Address of Construction: /9/62 6,qZ.�W'?L, &Q LID #
Property Tax Account Parcel No. Q (3 !70 4e) (n:!Y I I Q(D
Attach copies of all access and utility easements
Verified and Approved b
Owner and/oyCo_n_tractor)
Contractor License#:
O�Single Family
Multi -Family (No. of Units
F� Comm eircial (No. of Units
E] Public
ilding Permit#: ZA01 V 3 39
Invasion into City *Right -of Way: El Yes RNO
*RW Construction Permit
Cross other "Private Property: 0 Yes
.'�*Attach legal description and copy of recorded easement.
Owner/15ontiracrol
Owner or c0,0(ractoj/sjA�afjre a. "da nowledgement statement: Datb
By signing for thi Vrmit r cerh y that I have read the City's public handout entitled
ide Sewer Specifications, and -shall comply with all City requirements outlined ther,ein,
9 CALL DIAL -A -DIG (1-800-425-5555) BEFORE ANY EXCAVATION 2
.W TOR INSPECTION CALL 425-771-0220 extension!329 W
HOUR NOTICE REOUIRED FOR ALL INSPECTION REOUESTS.
.. ... .....
. .... .. FOR OFFICE USE ONLY
............ . . ....... . . ..
Permit Fee $ Repair Fee $ Issued' By.
Date Issued:
Trunk Charge $
Assessment Fee $ Receipt No:
City Permit Surchar��,Fee-'_ $5.00 Total Fees Paid $.
NOTE: IF JOB SITE IS NOT READY'FOR INSPECTION WHEN
INSPECTOR ARRIVES A $45 RE -INSPECTION FEE WILL BE CHARGED.
Job Site Ready YES NO Date: Initial:*
Partial Inspection: Date: Initial:
Partial Inspection: Date:' Initial:
FINAL INSPECTION APPROVED: Date: As -built to-Str
I Initial.. eet File: E]
t PERMIT MUST BE POSTED ON JOB. SITE t-
White Copy: File Green Copy: Inspector Buff Copy: Applicant
L;tcmp-,bldg,forms,sspennitjlg4/00.
RECEIVED
City of Edmonds MAY 2 0 1999
DEVELOPMENT SERVICES
CPJTICAL,&'RF,A.q CPTC-KT,11.1RT
:Le Critical Areas Checklist contained on this form is
be filled out by any person preparing a
evelopment Permit Application for the City of
imonds prior to his/her submittal of a development
.rmit to the City.
.ie purpose of the Checklist is to enable City suff to
-terinine whether any potential Critical Areas are, or
av be, present on the subject property. The
&mation needed to complete the Checklist should
- easily available from observations of the site or
Ita available at City Hall (Critical Areas inventories,
aps, or soil surveys).
An applicant- or his/her representative
must fill out
the checklist, sign and date it, and submit it to the
City. The City wiH review the checklist make -a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a develo'pment
permit application.
Please submit a vicinity map along with the signed
copy of this form to assist City staff in finding and
locating the specific piece of property described on
this form. In addition, the applicant shall include
other pertinent infor mation (e.g., site plan, topography
map, etc.) or studies in conjunction with this Checklist
to assist staff in completing their preliminary
assessment of the site
:Lave completed the attached Critical Areas Checklist and attest that the answers . provided are factual, to the
:st of my knowledge (fill out the appropriate column below). R E C E ry E D
wner/Applicant:
Al J-z f A IV& LaDPA
I
une
16 1 C I
reet Address
?I C16T4
- If)
ty State Zip
lephone
mature
FEB 2 7 2001
Applicant Rep resentattyeIPMENT SERVICES CTR.
CITY OF MONDS
A—)
Name ' 1z;' - -
Xyl-y
�--JS7e---2 0 Po
Street Address
f\l)t4
-- ��C'
City, State Zip
I
.e
gdon%jPnd%cAcI.doc
Date
(over)
Wri.tical Areas Checklil*
--------------------------------------------------------------
N
z5 ite ALciaressiLocation: I LI-1 4 ;;;; -10 C,,Z -
2. Property Tax Account Number. -7 Z-7o�t no
3. ' Approximate Site Size (acres or square feet): Zi, -7 Cl C_
4. Is this site currently developed? i,,-' yes; no. -
.1f yes; how is site developed? 0AIn— _F _fz�
5. Describe the general site topography. Check all that apply.
Z,— Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% �a vertical rise of I 0-feet -over a
horizontal distance of 6&feet).
4,--Hilly: slopes present on site of more than 15% and less than a vertical rise of
I 0-feet over a horizontal distance of 3' :1 to 66-feet).
Steep: grades of greater than 30% present on site (a verti cal rise of I 0-feet over a
0 '�horizontal distance of less than 33-feet).
00"
Other (please describe):
6. Site contains areas of year-round standing water: Approx. Depth:
7. Site contains areas of seasonal standing water: 00 Approx. Depth:
What season(s).of the year?
8. Site is in the floodway h2o floodplain of a water cou rse,
9. Site contains a creek or an area where water flows a9r,oss the grounds surface? lows are year-
round? lu hA Flows are, seasonal? (What time of year? /A
10.* Site is primarfly: forested meadow shrubs mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is pre3ent on si te,
P
_Y
Ppve.
thym.
Af
to.p
A)(-' 4--ft,
QU
.�d �1--4 4ecq 6—f 4,1eA S-0
.dw; W03M
ATTACHMENT 12
W
RECEIVED
City of Edmonds MAY 2 0 1999
DEVELOPMENT SERVICES
CRITICAL AREAS CHECKLIST
:Le Critical Areas Checklist contained on this form is
be filled out by any person preparing a
evelopment Permit Application for the City of
inionds prior to his/her submittal of a development
-nnit to the City.
.-le purpose of the Checklist is to enable City staff to
�tcrrnine whether any potential Critical Areas are, 'or
av be, present on the subject property. The
&mation needed to complete.the Checklist. should
easily available from Obs ations of the site or
ery
tt-c. available at City Hall (Critical Areas inventories,
aps, or soil surveys).
An applicant, or his/her representative, must fill out
the checklist, sign and date it, and submit it to the
City. The City will review -the checklist, make a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a develo*pment
permit application.
Please submit a vicinity map along with the signed
copy of this form to assist City staff in finding and
locating the specific piece Of Property described on
this form. In addition, the applicant shall include
other pertinent infor mation (e.g., site plan, topography
map, etc.) or studies in conjunction with this. Checklist
to assist staff in completing their preliminary
assessment of the site
,iave completed the attached Critical Areas Checklist and attest that the answers . provided are factual, to the
:st of my knowledge (fill out the appropriate column below).
mci er/Appli cant:
461 1z I C I A 1z"AJA6.
ime
61' 72 C I
reet Address
IA,,�o4
ty State Zip
le'Dhone
.mature
Applicant Representative:
Name
2:>JY
4, Z f 2
Street Address
I --
AAA
city State Zip
!e
Date
s g1lon%janaknel.doc (over)
IMPERVIOUS SURFACE CALCULATIONS
Proposed Building Pad
1176
SIF
Proposed Garage
663
Proposed Patio & docks
140
SF
Proposed Walkways
125
SF
Proposed Drive
1275
SF
impervious SurPace
3369
SF
Lot Size
am
SF
Lot Coverage 21%
1829
SF
HEIGHT CALCULATIONS
Original Current Proposed
A
343.50
344.41
344-00
B
344.00
343.71
344.00
C
342.00
343.91
344.00
D
343.60
343.21
3440
Grade
343.25
343-81
344-00
Datum = MH #3
342.91
cut / fill
-0.56
0.00
Height of Stuctu
25-00
2&75
,Ma)dmum Allova
368.26
307.761
1k.
A/0716 -.*. AtA. R;A;,? Z7/dE,7-
-rC> &J57 COVOrLW
,11AJ
08
.0 tro evo
AMAIM *A0b
r
Addrem/0/0--j ro?,Zi4P4-e-fJ
AMMOes Tax Pareel #.-Vocto �64c,<no i -oo
own'Mr. Wader Deveb)pMent Co. Inc
16927 60 Ave. NZ
KasnwnWASISM
425487-2757
P"� \ / — S- "V4
LATIONS
135 CY
48 CY
0 CY
184
0
C; E--'
FEB 2 20131
Mt-LOPMENT SERVICES C-r.q.
Set&: 1"=209099 1- 01-1 Y OF ML,rjiu)S
K/
0�9
dw
*I I
4F
C
IMPERVIOUS SURFACE CALCULATUM
posW Building Pad
1176
SF
Proposed Garage
653
Proposed Pago & docks
140
SF
Proposed WWWjays
125
SF
Proposed Drive
1275
SF
Impervious Surfaw
3309
8F
Lot Size
8666
SF
Lot CM ~- 21%
1829
SF
.Z;.�
HEIGHT CALCULATIONS
Odom) Currerd Proposed
A
343.60
344.41
344-00
S
344-W
343.71
3".00
C
342.00
343.91
344.00
D
343.60
343.21
344.00
AverW Grade
3aW
343.01
344.00
Datum w MH 83
342-91
cut / fill
-0.56
0.00
HeWft of Strudu
25-00
23.75
Mwdmum Aflowe
368-25
W7.761
memo
V
Z9,
J#
410
7CPPAI
> P LI t
A
17
�7
FEB 2 7 200M
CMT CTR-
,- I
DEVLL�,,�� �by
Addrow/0/61 &,?V�Fe—w OF ,oNDS
AnamesTax Parai #--co9 o I oo
RY CONSTRUCTION ENTRANCE
"BVWNTRACTOR IS RESPONSIBLE FOR
EflO$I0N CONTROL AND DRAINAGE
owner. Wexter —t Co. Inc SeaW. 1"=20"O"
WATER SERVICE INSPECTIONS
lCmwen WA MM
as-w-217P REQUIRED. CALL 771-Mzzeao,-/z�6
4 \W I
0 0
6
0 0
11,4-01
Ii.sweb Tft# I I Mumide View Crmt
as
ct
0
*-,-0000le
IMPERVIOUS SURFACE CALCULATIONS
Proposed Building Pad
1176
SF
Proposed Garage
653
Proposed Patio & decks
140
SIF
Proposed Walkways
'125
SF
Proposed Drive
1275
SF
Impervious Surface
3369
SF
Lot Size
8686
SF
,Lot Coverage 21%
1829
SF
HEIGHT CALCULATIONS
Original.
Current Proposed
A
343.50
344.41
344.00
B
3".00
343.71
344.00
C
342.00
343.91
344.00
D
343.50
343.21
344-00
Average Grade
343.26
343.81
344.00
Datum = MH#3
342.91
cut / fill
-0.56
0.00
Height of Structu
25.00
2375
lMa)dmum Allowe
368-25
36
0
5; 1, T & PLA4�
Legah Lot 11 Olympic View Crest,
Address:/0/01
, ta 96 (,
tQ
to.
it
A
cr
all
c4z
OF
LA
AA80311101173 I 8X r8rM ffe`t�- I U (C? Iwo
H11 E
Owner: Wester Development Co. Inc Scale: 1"=2010" RECEIvEr)
16927 80 Ave. N19 APR 2 3
Kenmore WA 98028
AppRovED Y PLAMM I QG
425-417-2757
"E1111T COUNTER
0,0
"::::000000q
60
P
1410
000
Ua/ 1"/ 4r-jur) IV. -4 J 44�.)401 4il U
1NML.MU1N_k1UUVMM I I M rkot Ui
F�-z o 4-
NELSON-COUVRETTE &ASSOCIATES, INC.
CONSULTING GEoTEcHwAL ENGINEERS, GEoLoGisTs
ANo ENVIRONMENTAL SCIEN77STS
Facsimil e Transmiffal
R
To: LYLt MAR 10 2000
Company: clrq C*- f�DAviOD5 ENGINEERiw
Phone:
Fax: (42,�-) 771
From:
Company: Nelson-Couvrette & Associates, Inc.
Phone: 425-486-1669
Fax: 425-481-2510 BUILDING
Date: MAR 1 6 200 . 0
Pages including Cover Page:
NCA File #:
cc*
Comments:
")f LU/ "Uu �U. 4�) 44,J40.L/--0.LrJ rmur- U4
NELSON- COUVRETTE & ASSOCIATES, INC.
CONSULTING GeowpmICAk ENGINSERS. GEOLOGISTS FIELD REPORT
ENVIRONMENTAL SCIENTISTS
17311-135th Avenue NE. A-500 Project: OLqMR%(!, ftE" File No. --2 kI 419 9
Woodinville. WA 98072
(425) 486-1669 - (425) 337-1669 Owner: �V) WbtK0-DLJ1' &)ILCU51 Date: S.11 00
Pax (425) 481-2510
Location: Report No. 14
Weather: NE- il Page: Of 1-4
Purpose
of Visit: BY:
P di 4;�,A &:Ill,
I byr -10 90b) hTf- CLU WE- ALI
Ult 'FILL,
1-40� AWM ht- wf Atg: L�rni I LL. L E En le OF T. f- , U14566 C0A9JLJ CW,*A-s�YI-
J�11.k- J�)fijjolf-Q QA :DAL-C -T'Mf,— C" Urf— r*� -I'Vl— d0k1h F-A)6L OFF -I'rtf- GEM &I yJ6
iS02 46-r sy) mo ui� i:�v a
e-, .dProN) -rK- -som. eLL
2-
A-T-- -Vtq- SCPOT� tVGL- OF TA- 14AD M-LA) CD—'JkRF Of.
PUCL S-4U-S, A,�D C-MIM44-1 0 ',"2' /10EP7' LIZ 10046; Of ;-LJS41�,f, kC,4K- fb"O�J.&
-ra
Mf- -CoiL !Flu- f'o& 9NAL04110A) -rK- f:iLL COJLD &F, PADMID, I -re .2" 43)1-H A
t� t-AC'L wk tbn: w6ff-
J#JDP-,�L Alv"Alg- KI�-SGLXf-, I TAW/.
f%',LA— - ALSO -OW-hEi-, VS -Tht-,17 a) L-OTS 15' -T�J U2 06 H 19 RAD 9.943 CWW
(31LL F"" A -MAT
15rOC-TKAL f-ILI- 'HAD Af� FJ-A.CfP Q� LUTS 10 At� D 19 - 9 ILL- 14TINTEp 1�*T-
P 'vo 6r- r'30� �jLL- HAP af..O fihcEb io,3 A 1W41p( fbooO
LL_ Ee,,rl M A-,T
01N 0 i �F.b TVAT Op TV Ig 1 OF 00�J - -59tOCTUOL F:ILL
41;� Kk�c lnx) 1-1-yr ) 9 . , . 1 80 U is � 6 Pli a
MAR 1 6 2UU0
L4f L.-ITs (P a 0 LLS 0
-to lilt A. K kE Ifl Lt,4 fh�L LD 0,5f--, -MPS L- 'M
flLt� , -nC WT fn-L cooL-p bf, fWgf-p 1 4' Wily. 'i
s-a- - L t) y 0 lll i� k- f L A \ 0 i., IF. fa C'
Y2- >At�f,-MP, - -CL
A V-F-.rJ , UX q-40Q,, DJ4-1% -M VfgY J)&).Gr, dAVIV& SOIL It') 90MUS O� 10TS 12
Attachments:
Signed:
Distribution:
kiw wow JMT- -M W k W
03/10/2000 10:45 4254812510 NLLtDUN-t-;UUVKL11t
NELSON- COUVRETTE & ASSOCIATES, INC.
CONSualml �GEO TECHNICAL f N('71IVEEAS. GEOLOGISTS
AND ENVIRONMENTAL SCIENY/SrS
17311-135th Avenue NE, A-500 Project:
Woodinville, WA 98072 Owner:
(425) 486-1669 - (425) 337-1669
Fax(425)481-2510 . Location:
Weather:
Purpose
of Visit:
r"Hur- Ua
FIELD REPORT
FileNo-21o*M,
Date: ---- 3/ 7 / 00
Report No.- 14
Page: 2 of
By: MJP k'
mr-v-la-Y I M��g. oF ne--A�02 �S-r �-;w �cU'
0 P nT, AS7.4i D-6:57 m kYlA d A p4e P W� n
of- L C �0 f- � �0, 11 E�-tl �%
j7\U— 11tK fYcif-ifth-) oF TW4 AQP-AS-
r)p1f
npl LOTS, 10 AOL 19,
RNA)C'
f-om7,)c,,5 ME I
fq-ft\)ATEp
MAR
Distribution:
M4=kmNVELLOSWCOUVREWE A ASSOMTES,
cowLym ceamooful Damn a
" mm
PROJEC�TNAM�E: 0� ��)Llq?MtA�FPIIC �Vlf, �CpRlt
LOCATION: EDMO14DS.
PROCTOR METHOD: — ASTM D - 698-91
APPROX.
TEST GENERAL FEETTO
DATE NO. LOCATION GRADE
C, 7 .5a.5af- PLA4 2
c q
c 9-1
IN -PLACE MOISTURE AND DENSITY TESTS
JOB NUMBER:
2 (o /+ cl
REPORT NO.:
( J3 JE�GE
OF
-Z- ASTM D - 1557-91
PPROX.
FILL % WET
DEPTH MOIST DENSITY
TESTS CONDUCTED BY: /MV�,
I -
DRY MAX % %
DENSITY DENSITY COMP. SPEC COMMENTS
BLOWS
PASS
OR
FAIL
(p
Q.7
1,34,7
! 0,S- 121
'�S
95-
fbg�'e 1
Z5
1 S2S-
117, 12
97
'�,g
*&tS 1,,,
z)
Z 1
99
95-
fg*$ / -.2
zz
PAS
a 1 -2 �71
c?<-
q 47
9&tR 1- 2
2o I
m
=min
mm
CIN
'Al
C7 c
cs
sEcTjoN I
TO SHIP 27 ORTH, RANGE 4 EAST, WILLAMEICS
CS
,5 i
W 0. �J6714' C5
e W/ 2
Cs
A7r UPT
) Ll
ex. 5rR
M6 Aj
YEWPOWY
cs
,tp
00,
J)w
ex 3m LX Ism
r
-366 U
5W
i56 MONONA
c
C
V
332
350 — ----- rl
3M
Pty-I ODLE5 "rv-5ED 0
PEA"k- F34-T\,)V- .5011-S
i2 y
sjoft, - - - - - - - - - - - ----
To
C)Lymf(C- VjW C"ZT- G
C=
C= axwwr. 1.." .1 2kt(9q
c
L
.370
4 oF
0 OUNFAr-F rAl f'-111 Alno%ju,
Julng rao
1176
SF
rage
653
Proposed Pago & dec%s
140
SF
Pro Walkways
126
SIF
Pro Drive
1275
SF
Impervious Surface
3369
SF
Lot Size
8686
SF
Lot Covera e 21%
1829
SF
Original Current Proposed
.,*— *0
v
A
343..50
344.41
344.00
B
344-00
343.71
344.00
C
34�.00
1
343.91
344.00
0 . V
1
D
50
—M.-25
343.21
344.001
1.
Average Grade
81
344.001
Datum = MH #3
341.91
cut / 111
-0.56
0.00
Joe
Height of Structu
25.00
23.751
I
kAnvimiam All
I
367.75
-% rl- 0; UZ
7-0 6-,='7 Ge�VC�rj-Vo
V: Lot 11 Olymple View Crest
AL 4FrCMs: / E:511 C)17 (o �e ev
Ampnoes Tax Parcel #:(Ooc�o
oo
�v I C Ar:5
-T-
Owper: tar Development Co. Inc
16 SO Ave. N19
Klare WA 98028
42SL497-2757
1 loco
A:/ .08"MMW IOG
135 CY
48 CY
0 CY
184
0%
SCSIO: 1"=20vogg
243,
AN
1.0
L
V)
RECEIVED I 9T 0 1 PERMIT EXPIRES
0 -
USE 112CORA11'r
CITY OF EDMONDS ZONE NUMBER
CONSTRUCTION PERMIT APPLICATION JOB SUITFJAPT#
OWNER NAME/NAMEOF BUSINESS ADDRESS f7
W ' MAILING ADDRESS
W
z
3711-, �Ij
0 It, 9 7_-�Z 04
CITY ZIP TELEPHONE
kc �'Wlo ac 190ZAP6 �42-5')J
PP NAME1SUBDIVISION NO.
LOT NJ./
LID NO.,�IP'W-1�
LID FEE $
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
EXISTING � PROPOSED
TESCP Approved
RW Pernift Required
Street Use Pennit Req'd
Inspection Required
�7 -Z'7-57
REQUIRED DEDICATION— FT
Sidewalk Required
Underground
wil ng
required
NAME
=LINESIZE
17
NO. OF FIXTURES
PRV REQUIRED
0
0
z
YE NO
!X
uj
ADDRESS
x
REMARKS
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE
z
z
tu
Zip
C0000
TELEPHONE
INVI L( ILI
NAME
W-Es.,-r'N-rz_ bzv-�Cv
ENGINEERING REVIEWED/DATE
—Lic-
M ADDRESS
0
i6ci -77 e4-w- N�
FIRE REVIEWED BY DATE
Lu
z CITY ZIP
0
0
f-,� (Y) o iu- '
TELEPHONE
" 1 - - )407 - �7
'+:Z_��
STATE LICENSE NUMBER EXPI:R
/16RECK
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
BOND
WATINDAT
GO 65- rpd)U) 5,5D,
b
REQ'P
0 Y�E 0
S
S
POSTED
SE PA REVIEW
COMPLETE EXEMPT
SIGN AREA
ALLOWED PROPOSED
HOE I 'T
ALLOWED PROPOSED
PROPERTY TAX ACCOUNT PARCEL NO.
0C 0 &* c—) 00 1100
EXP
EW RESIDENTIAL
Ef 91 PLUMBING/ MECH
LOT COVERAGE
ALLOWED PROPOSED
REQUIRED'SETBACKS (FT.)
FRONT SIDE REAR
PROPOSED SETBACKS (Fr.)
FRONT UR SIDE REAR
n ADDITION C3 COMMERCIAL o COMPLIANCE OR
,
S;;'h9V9'Z7'
CHANGE OF USE
z
PARKING
REO'D PROVIDED
;3�4-
LOT AREA
PLANNING REVIEWED BY DAT
n REMODEL E] APARTMENT 0 SIGN
FENCE
0 REPAIR CYDS X FT)
REMARKS
-7
Ej DEMOLISH 0 TANK OTHER
,/GARAGE ROETAINING WALL C-
z LYJ CARPORT R CKERY RENEWAL
(TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN:
CHECKEDBY
TYPE OF CONSTRUCTION
M
OCCUPANT
GROUP -2
rL_-."
i
G G� L--t-, -m ( U\
NUMBER
OF
0 STORIES
NUMBER OF
DWELLING
UNITS
CRITICAL
AR
NUMbtH'
SPECIAL INSPECTOR
REOUREI[:)YES
JAREAfy)AI M 11-7
kit
OCCUPAN
LOAD
DESCRIBE WORK TO BE DONE
REMARKS
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION
Aj kou<,--t, (a,;4 i
VALUATION
FEE
�PLAN CHECK FEE
1;1-7 JY
HEAT SOURCE GLAZINA9/91 LOT SLOPE */*
5�e;
BUILDING
6 / 5(b4
PLAN CHECK NO: VESTED DATE
PLUMBING
0
MECHANICAL
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
2.
GRADING/FILL
_44
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
:1
-
/
SEPARATE PERMISSION.
I
.
STATE SUR�RAR
PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
ENG. REVIEW FEES
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
0 "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
5
ENG. INSPECTION FEE
UJ IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
i
LANDSCAPING
M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
cc
INSPECTION FEE
4 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLYOR INDIRECTLY
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
0
PLAN CHECK DEPOSIT
RECEIPT [':fVbg�
_j DEEMEDTOMODIFY, WAIVEOR REDUCEANY REQUIREMENT OF ANY CITY ORDINANCE
0 NOR LIMIT IN ANYWAY THE CITY'S ABILITY TO ENFORCE ANYORDINANCE PROVISION.,
R CEIPT
TOTAL AMOUNT DUE
i: "
2
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECTAND THAT I AM THE OWNER, OR THE PULY AUTHORIZED AGENT OF
APPLICATION APPROVAL
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
CALL
This application is not a permit until signed by the
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EM YED
Pe
Building Official or histher Deputy: and Fees are paid. and
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATI G TO
FOR INSPECTION receipt is ac knowledged in space provided.
WORKMEN3'A1eMRNWSATI0N/lN.SU RANCE AND RCW 18.27.
A
N R G
SIGNATU DATE Sl NED
(425)
�Flj�ALS SIGNATURE DATE
r
771-0220
JX AL W "M /2�
A TT TI
4TTI
EXT13313
RELEASED by _DATV f
ITI S L T(
IT IS NLAWFVL T ;CUPY A BUILDING OR STRUCTURE UNTIL
9"Ust OR
771
4,
A FINAL I SPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
10221
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
FAX
ORIGINAL - FILE YELLOW - INSPECTOR
PINK OWNER -
5t98
- GOLD - ASSESSOR