Loading...
18223 84TH PL W.PDF111111111111 7994 18223 84TH PL W ADDRESS: TAX ACCOONT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DISCRETIONARY PERMIT DRAINAGE PLAN DA PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: — PERMITS (OTHER): DETERMINATION: E] Conditional Waiver El Study Required n Waiver PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE SHORT PLAT FILE: LOT: SIDE SEWER AS BUILT DATED - SIDE SEWER PERMIT(S).#: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT 4: FOR: WATER METER TAP CARD DATED: LTD #: BLOCK: LATEMMSrsTomiskStreet File Checklist-doc NOTICE: .K.-to ... vva rr a n or I The information *shown on the attached map(s) was comPil,ed for use by the City of Edmonds its Employees and Consultants. he The City of Edm.onds does not * warrant t accuracy of anything set for.th on these map(s). Any person or entity -requesting a copy should conduct an independent inquiry regarding the inform'ation shown on ff�e -map(s), including, but not limited to, th'e lociation of any sewer stub shown. Such sewer stubs may or may, not exist and may or may not exist at the location shown. Neither the city of Edmo'nds nor its empl-o-yee-s o-r office.rs -sh-a-1-1 be 11a.b-Fe for it -he information given' on this rnap(s), nor for any one representation provided based u pon . said map(s). CITY OF EDMONDS CIVIC CENTER — WATER -SEWER DEPARTMENT SIDE SEWER �PERMIT STREET FILE CaJ1 PRospeet 6-1107 when work. is ready for inspection. (No mspec; C-S tions Saturday, Sunday or holidays. A '1 3 ADDREss---- ---------- 18_223._�n...8.4th..Avenue --- West ---------------------------------------- - --------------------_ ................................................ OWNER ----- -------------- C4A_* .... MCDrmzwhie� ------------------------------ CONTRACTop --------- RQy --- Allen ............................................... Perrmssion is granted .-. ............ aept._ ---------- 9_ 19..U., for ........................ days to REPAIR or CONNECT a side sewer with City Seivers in accordance with application or. file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street axea. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full informstion regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must.have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition- Contractors shall be responsible for failure due to improper work wb.ich may develop within one year of completion. NOTE. No. 5—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appur- tenances except to insert the pipe into the wye. APPLKATION for The City of Edmonds STREE7 F& ON SME SEWER PERrMT rm NEW CONSTRUCTION E] REPAIRS OWNER ....................... ADDRESS ..... ----------------------------------------------- . ... . ....... ............. —EASEMENT No . .......................................... 6, CONTRACTOR --------- ....... i ----------- -------- * ------ ------------------------------------- PERMIT No. ................. LEGAL DESCRIPTION: LOT No . ......... 1� ................................. BLOCK No . ............. ....... NAMEOF ADDITION .......... 7.-e . . ...................................................................................... a APPROVED SEP Approved: -Nothing in this permit approval proem shall be interpreied as all6wingr or ��ttjng the In ce of anj� rrently ing illegal, I or unIq%ittit building, stxudm nonco . is tai p- the scope of the or site whi is u d perm ' cat regardleo�<whether such buildi st re ndition is4lhown on the 'structure or site I building, ofa sep 250 con i aralk., enfo 1�4 �jv 771',A!, 1N/1FM/[0r>R ;;4 > IVA, 51TT�_ A x,� 4, bg Lcyr COVERArvE= 2 Msf. A t \'x ? APPR BY P IYMIYG > APPR 13Y P N1\N1 6g C11 01 oe NN, 0 & tv. �h RESUB MAR - 6,2008 BUILDING DEPARTMENT STREET FILE CITY OF EDL40NDS PLANNING DATA SINGLE FAMILY RESIDENTIAL STREET=FILE Name: Date: Site Address: VAL Plan Check #: QQCG - 1170 Project Description: Re?\-e,� -und ;t - (ev8 Ack. Reduced Site Plan Provided: G)/ NO) Zoning: Map Page: 2S611157, 1 Corner Lot: (YES Flag Lot: (YES /a Critical Areas Determination #: Q0oG - 01q,k Eros; A reb-, - 9 Study Required - Ulb-�-% cAs �Y, VAW.'N Geo-se."en 0,01C�1[14dec/ +te� Qle2kr. c*-.,\ JDe� S El waiver �� 4 �:Flc* i�eA SEPA Determination: Exe,,cnp� Or Exempt El Needed (for 500 cubic yards of grading or site within 200 feet of Puget Sound or Lake Ballinger) 0 Fee 0 Checklist 0 APO List with notarized form Required Setbacks Street:(,) Side:(,,) Side: W 101 Rear: (N) Actual Setbacks Street: Si de: Side: Rear:(,) El Detached structures: 11 Rockeries: None, e�loa->rN or% El Fences/Trellises: 11 Bay Windows/Projecting Modulation: Stairs/Deck: cs Heh7ht Datum Point: NA Datum Elevation: 4�A Maximum Height Allowed: Actual Height: 4 er Parking Required: Parking Provided: Lot Area: ;tc, Maximum Lot Coverage: 35% Proposed: Propc,� Der-V- i55cf-anwo,= 90 4V Lot Coverage Calculations: Ex,4. beck (4p 6'e_ceVbs� S1190 Tc.+ a, no 15 -, 7 .7, ADU Created: (YES AD Subdivision: —r,,_ _ G Legal Nonconforming Land Use Determination Issued: (YES Comments Plan Review By: Planning Data Form 04-11-06.doc rr I HWAGEOSCIENCES INC. U LM�IAA I April 2, 2008 FBVA Project No. 2006-153-21 Arthur E. Huycke c/o 18223 84h Place W Edmonds, Washington 98026 Subject: PIN PILE BEAMNG CAPACITIES - ADDENDUM APR 2 2 2C`,`oJJ Huyeke Residence Deck Replacement SUILDIPC V,:iPA9 1822384 th Place W — Edmonds, WA - _N�Tr Dear Mr. Huycke, As requested in recent telephone discussions with our Mr. D. Coltrane, HWA GeoSciences Inc. (HWA) has prepared the following specifications for 2-inch, 3-inch and 4-inch (nominal) diameter pin piles per the City of Seattle, Department of Design Construction and Land Use (DCLU) Director's Rule 12-2001. Pile Size Bearing Capacity (tons) Special Requirements 2-inch diameter 2 (Maximum) Max Penetration Depth 30-feet 3-inch diameter 6 (Typical) ASTM load test on 3% of piles 4-inch diameter 10 (Typical) ASTM load test on 3% of piles The preceding table should only used in conjunction with the HWA letter report for our Project No. 2006-153-2 1, dated October 30, 2006, and all of the following criteria should be followed. Pin Pile Driving Criteria Each pin pile should be driven to "refusal," which is defined as a minimum penetration during a specified time period of driving (e.g., less than I inch of penetration during 10 seconds of driving). The driving criteria are determined based onthe impacthainmey used, pile size, site soil conditions, and load testing. Based on our experience and available design guidelines, each of the above tabulated pin piles, driven sufficiently into the dense native soils, will be capable of developing the stated allowable axial compressive load, with an acceptable factor of safety. Per the City of Seattle, Department of Design Construction and Land Use (DCLU) Director's Rule 12-2001, load -testing is required, for all pile sizes exceeding 2-inch nominal diameter, on a minimum of 3% of the piles up to 5 piles maximum (I minimum) to verify 19730 - 64th Avenue W axial capacity and to establish an acceptable driving criteria. We Suite 200 understand, however, that because of equipment access considerations, you Lynnwood, NVA 98U36.5957 are favoring use of the 2-inch pile size, which will not require load testing' Tel: 425.774.0106 lax: 421.77,1,2714 STREET FILE www.hwagco.coin April 2, 2008 HWA Project No. 2006-153-21 for capacity verification. You should, therefore, have your structural engineer re-evaluate the design of the foundation system based on use of the smaller reduced load capacity pill pile element. Upon completion of this review, and establishment of the number of piles required, we will be able to provide you with an indication of special inspection requirements for the project. Lateral Capacities If lateral capacity is required of the piles, battered pin piles should be installed at an angle of I H:5V (20 percent from vertical) adjacent to all vertical piles installed. For this configuration, all lateral resistance must be taken in the battered piles and lateral resistance offered by the buried portion of any grade beams or pile caps should be ignored. Allowable lateral capacity of the piles battered to the foregoing specification call be assumed to be 20% of the axial capacity given in the above table. CONDITIONS AND LIMITATIONS We prepared this technical memorandum for Harold and Marguerite Huycke and their designated agents for use in design and construction of this project. This letter should be taken as all addendum to our previous report and provided to prospective contractors for bidding and estimating purposes. This report is issued with the understanding that it is the responsibility of the owner, or the owner's representative, to ensure that the information and recommendations are brought to the attention of the appropriate design team personnel and incorporated into the project plans and specifications, and the necessary steps are taken to see that tile contractor and subcontractors carry out such recommendations in the field. 0.0 2006153 addmidum leitcr 04-02-08 2 HWA GEOSCIENCES INC. April 2, 2008 HWA Project No. 2006-153-21 We trust that this letter addresses your current needs, but if we may be of further assistance, please feel free to contact the undersigned at (425) 774-0106. We appreciate this opportunity to be of service. Sincerely, HWA GEOSCIENCES INC. [EXPIRES --- 08/24/19153 -1 Lome Balanko, P.E. Geotechnical Engineer, President 2006153 addenclum letter 04-02-08 HWA GEOSCIENCES INC. HWAut Geotechnical & Pavement Engineering - Hydrogeology - Geoenvironniental - Inspection & Testing .. Wu OSCIENCES INC. January 7, 2008 HWA Project No. 2006-153-21 T200 Marguerite Huycke 18223 84b Place W Edmonds, Washington 98026 Subject: CIUTIcAL A"As RiEPORT Huycke Residence Deck Replacement 1822384 1h Place W — Edmonds, WA Dear Mrs. Huycke, At your request, HWA GeoSciences Inc. (HWA) has undertaken and completed a Critical Areas Assessment of geologic hazards on the subject site in relation to your proposed deck replacement project. This report was prepared in order to satisfy the critical areas requirements as outlined in the City of Edmonds Community Development Code (ECDC), Chapters 23.40 and 23.80, for development within geologically hazardous areas. The project vicinity is shown in Figure 1. BACKGROUND The proposed development consists of demolishing the existing two-story, uncovered wood deck on the back (north) side of the house and construction of a new, two-story, uncovered wood deck. The new deck will occupy essentially the same footprint as the existing deck, with a small addition along the west side, as shown in Figure 2. HWA undertook a geotechnical investigation in support of the deck replacement project, in October 2006. The results of this investigation, along with our conclusions and recommendations, were presented in a letter report entitled, Geotechnical Investigation, Huycke Residence Deck Replacement, 18223 84h Place W —Edmonds, WA, dated October 30, 2006,. Our geotechnical investigation found that the soil north of your house consists of about 8 feet of loose, side -cast, fill that appears to be settling and moving down slope. This ongoing down slope movement has resulted in loss of nearly all deck foundation support, as the existing foundations, consisting of pier blocks resting on the ground surface, have settled and moved down slope. Currently, the deck is extremely unstable, rotted, and is not usable. Our original geotechnical report contains: a description of the site; subsurface exploration information; general geologic conditions; subsurface conditions; and recommendations for pin pile supported deck foundations. The original geotechnical report should be referred to for this information and should be read in 19730 - 64th Avenue W. conjunction with this Critical Areas Report. AV% M R Suite 200 H 1= *'.:o to ts .. MAR - 3 2008 BUILDING DEPARTMENT CITY OF EDMONDS Lynnwood, WA 98036.5957 Tel: 425.774.0106 Fax: 425.774.2714 www.hwageosciences.com January 7, 2008 HWA Project No. 2006-153-21 T200 Subsequent to submission of our report, the City of Edmonds has determined your property to be an Erosion and Landslide Hazard Area, based on both a site visit and a map made with the City's LIDAR data. Accordingly, the City is requiring the a Critical Areas assessment or study of the proposed development in conformance with the ECDC. CRITICAL AREAS ASSESSMENT For this Critical Areas Assessment report, a geotechnical engineer and geologist from HWA visited the site on November 29, 2007, and surveyed two profiles, through the slope from the back (north) side of the house to the bottom of the slope, at each end of the existing deck, depicted as Cross -Sections A -A' and B-B' in Figure 2. The profiles through the slope are presented in Figures 3 and 4, along with subsurface information obtained during the original geotechnical investigation. Logs of the hand hole explorations are presented in Figures 4 through 7 of the original geotechnical investigation. We have conducted this assessment to classify the slope hazard and determine what impact, if any, the proposed deck replacement project may have on the stability of existing slope. GEOLOGic HAzARDs Landslide and Erosion Hazard Area In accordance with the criteria contained in the ECDC Chapter 23.80, and our slope measurements taken in the field, nearly the entire subject property classifies as a Landslide and Erosion Hazard Area due to the inclination and height of the existing site slopes and soil composition. As shown in Figure 2, the area encompassed in the red outline represents the Landslide and Erosion Hazard Areas, based on City of Edmonds LIDAR data. As shown, almost all of the subject property is classified as Landslide and Erosion Hazard Areas, with the exception of the driveway portion of the lot (south end). As such, the existing deck and the proposed deck are within the Landslide and Erosion Hazard Area and no buffers are delineated. Based on our measurements, the backyard slope height is approximately 30 feet from the north side of the house to the toe of the slope at the drainage channel (north property line). However, the existing fill and native soils consist of granular, well -drained, glacial outwash soils that are typically not subject to global failure or deep-seated rotational sliding. The present average slope inclination corresponds to the approximate natural angle of repose for Recessional Outwash sand, at about 33 degrees, and therefore is considered stable under static conditions. Several sections of short steeper zones (old skin slide scarps) were evident. In consideration of existing slope and soils conditions, it is our view that the most significant risk of slope instability at this site is the potential occurrence of shallow skin slides in the near -surface slope soils resulting from erosion. However, we expect that such erosion -induced sliding can be minimized through proper 2006-153 T200 Letter 2 HWA GEOSUENCES INC. January 7, 2008 HWA Project No. 2006-153-21 T200 site drainage measures and will have little to no impact on the deck replacement project, if the recommendations of our reports are followed. Present deck development plans do not include any modification of the steep slope portion of the existing site, and will not extend any closer into the geologically sensitive area than the existing deck. The existing slope is heavily vegetated with deciduous and coniferous trees, ferns and ivy. We anticipate that the deck replacement project will have no impact to the existing slope vegetation. Furthermore, the deck replacement project includes no soil cuts/excavations nor placement of additional fill soils. In our opinion, the planned deck replacement project will have no net impact on site slopes and will not increase the hazard level associated with occurrences of potential shallow landslides. In fact, it is our view that the new deck project will improve existing slope stability as foundation loads will be transferred to deeper competent native soils below the existing fill. As recommended in our original geotechnical investigation, 4-inch (minimum) diameter pin piles will be used to transfer deck loads to competent native soils below the loose fill. Sufficient embedment of the piles in the competent native deposits, coupled with proper connections with the deck structure, should allow for some movement of soils to occur without destabilizing the structure. Moreover, the installation of these piles along the top of the slope should serve to increase the overall stability of the area between the north wall of the house and the top of the steep slope. The slope is part of a larger drainage feature abutting numerous lots in the area, as shown in Figure 5. The subject property continues north to the toe of the slope, where the slope then rises (as part of the neighboring property to the north). No development exists between the subject property residence and the residence on the property to the north. In our opinion, there is no increased risk to life or property as a result of the deck replacement project. CONCLUSIONS AND RECOMMENDATIONS In our view, the proposed deck replacement project will not adversely affect the overall stability of the adjacent steep slopes. Because the new deck will be founded on pin piles driven to refusal in the dense native outwash soil, deck loads will be transferred below and away from the existing slope face. We recommend that the replacement deck foundations (piers) extend no further north, from the north wall of the house, than the existing foundations. No vegetation currently exists in the area between the north wall of the house and the existing deck piers. We envision that all work can proceed from this area and that no disturbance of existing slope vegetation will be required. It is our opinion that construction of the replacement deck will not have a detrimental effect on the slope or cause an increase in erosion as long as recommendations presented herein are met during construction. 2006-153 T200 Letter 3 HWA GEOSCIENCES INC. January 7, 2008 HWA Project No. 2006-153-21 T200 All applicable Best Management Practices (BUT's) as described in ECDC Chapter 18.30 must be followed to mitigate any surface disturbance involved with deck demolition and replacement. These measures include a limited erosion control plan including, but not limited to, a construction access route comprised of quarry spalls, placement of silt fencing along the top of the steep slope and around the perimeter of the work area, and stabilization of all exposed areas. As noted in Figure 3, during our survey, a drain pipe was observed day -lighting mid -slope along the Cross-section A -A'. No water seepage was observed from the pipe during our investigation. We recommend that this pipe be evaluated to determine if it is used to convey site runoff. If the pipe is still active, we recommend that it be extended to the toe of the slope (at the drainage channel) in order to reduce slope erosion. A suitable splash pad or energy dissipation device should be placed at the end of the outfall to prevent creation of a scour hole or erosion channel that might eventually migrate upslope and/or undermine the slope creating a skin slide. CONDITIONS AND LIMITATIONS We have prepared this letter report for Marguerite Huycke, and her designated agents, for use in construction and permitting of the proposed deck replacement on the subject lot. Experience has shown that soil and ground water conditions can vary significantly over small distances. Inconsistent conditions can occur between explorations and may not be detected by a geotechnical study of this scope and nature. We make no warranty of site subsurface conditions at locations other than our explorations and to the depths explored. The scope of work did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or ground water at this site. HWA does not practice or consult in the field of safety engineering. We do not direct the contractor's operations and we cannot be responsible for the safety of personnel other than our own on the site; the safety of others is the responsibility of the contractor. The contractor should notify the owner if any of the recommended actions presented herein are considered unsafe. 0.0 2006-153 T200 Letter 4 HWA GEOSCIENCES INC. January 7, 2008 HWA Project No. 2006-153-21 T200 We trust that this letter addresses your current needs, but if we may be of further assistance, please feel free to contact the undersigned at (425) 774-0106. We appreciate this opportunity to be of service. Sincerely, HWA GEOSCIENCES INC. 03/18/06 Bryan K. Hawkins, P.E. Geotechnical Engineer Lome Balanko, P.E. President/Principal Geotechnical Engineer Attachments: Figure 1. Vicinity Map Figure 2. Site Plan Figure 3. Cross -Section A -A' Figure 4. Cross -Section B-B' Figure 5. Site Contours (from City of Edmonds LIDAR data) 2006-153 nOO Letter 5 HWA GEoSCIENCES INC. HH-3 H 4 ULTA fWAGEOSCIENCES INC. B" Legend' HH 1 .1 � Haxidhole.biesignatioil & Approximatoloc6tion Landslide and Erosion Hazard Areas Outlined in Red Site Plan-.Pr6v.ididby0w'ner SITE PLAN CRITICAL AREAS REPORT HUYCKE RESIDENCE DECK REPLACEMENT 1822384 TH PLW FIGURE NO. PROJECT NO. 2006-153 � 0 Edge of /Existing House Deck Post _ _1 Tm HH- I Top.of Slo e p .......................... . Visible Slide Scarp 0 5— FILL ...... .................... . Drain Pipe Offset 4.5' East . . . . . . . . . . . . . . . . . . . . 0 U 10 91- . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . ILL/COLLUVItTT\4 �0 ...... NATIVE ........ ... ................. . Toe. of Slope 1 -5— .......... ---- NAT117VE ?__- 30 10 110 120 130 140 150 160 Distance Along Cross Section (ft.) HH- I Exploration Designati Ground Surface pproximate Contact Scale V= 10' Bottom of Exploration ULT', HWAGEOSCIENCES INC. CROSS SECTION A -A' LITICAL AREAS REPOIR HUYCKE RESIDENCE EDMONDS, WA. 153 4-4 V 4'� KEY: HH-1 Exploration Designation Ground Surface Approximate Contact ? Scale I"=10' Bottom of Exploration Distance Along Cross Section (ft.) CROSS SECTION B-B' I HUYCKE RESIDENCE 1PROJEC' MM!"i - U �, HWA GEOSCIENCES INC. 18223 84th PI W 2006-153 1 EDMONDS. WA. 11 CMA-2006-143 Subject Property LIDAR data disp lays approximate 2-foot contours. Topography should be, vedfied in the field for accuracy. I inch equals 40 feet 0 12.5 25 50 Feet L—L I Note: Figure from City of Edmonds LIDAR data F6W,A, � HWAGEOSCIENCE.S INC. CONTOUR MAP OF PROPERTY & VICINITY I CRITICAL AREAS REPORT HUYCKE RESIDENCE DECK REPLACEMENT 1822384 TI PLW EDMONDS, WASHINGTON 3 ROJECT NO. 2006-153