18226 80TH AVE W.PDF7033
18226 80TH AVE W
ro APPLICATION
for
The City of Edmonds STFaT FINIM SEDE SEWER PERMIT
NEW CONSTRUCTION E] REPAIRS
'e
OWNER -----_----------- ------- A)
. . . ... . ......... .....................
ADDRr,ss ... ...... ...........................
0
-0
A
/0 e, I
EASEMENT No.—
Lo
CONTRACTOR ............. oza..,aeC) ...................................................... _... PERMIT No.
LEGAL DESCRIPTION: LOT No . .............................. .............. BLOCK No . .................... ...................
NAME OF ADDITION /6,5 .f�S -,� ........
... .......
APPROVED
MAY
2-
Approved:
DATE ... ................ BY
.....................................................
8 9 0 - 19 C� -
STREET FILE
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning * Parks and Recreation * Engineering
March 15, 1993
Mr. and Mrs. Thomas M. Langland
18226 80th Ave. W '
Edmonds WA 98026-5414
Dear Mr. and Mrs. Langland:
LAURA M. HALL
MAYOR
We at the City have reviewed the issues documented in your February 28, 1993 letter.
It is my understanding that you have had conversations with Wendie Schulenburg and
Gordy Hyde of our staff. I
The City's Official Street Map indicates that a full right-of-way(ROW) for 80th Avenue
West is proposed as 60 feet. Currently, the secured R (ON along your section of this
street is only 30 feet.. Of the additional required 30 feet, 20 feet is located on your
property. In order to secure building permits for your proposed addition', City staff
informed you that you would be required to make the 20 foot ROW dedication along the
entire frontage of your property.
There is a reason for the City requiring this dedication. The City considers this a
mitigation for potential impacts crated by new development or additions to existing
developments. The addition of people and vehicles would potentially impact the street
system along 80th Avenue West.
In order for 1, or any City official, to render a decision, you need to submit a setback
adjustment application or your building permit application. To minimize your cost
exposure, I would suggest that you first submit a Setback Adjustment application. At
that point, the City will issue its decision. As you are aware, there is a procedure for
you to appeal the City's decision on your application.
It is the City's desire that a decision could be reached which is mutually acceptable to
the applicant and the City. However, you must recognize that the City's decision is
based solely on its review of the application and its conformance with the Edmonds
Community Development Code.
I hope that I have clarified the situation and appropriately responded to your letter.
Please call m6-if you have further questions.
Sincerely,
Paul Mar, Director
Community Services Department
cc: Wendie Schulenburg
o
O�Hyde
e Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
NOTICE:
No warranty of accuracy.
The information'shown on the attached
map(s) was compiled for use by the City of
Edmonds) its Employees and Consultants.
The City of 'Edmonds does not warrant the
ac . curacy of anything set forth on these
map(s'). Any person or entity -req uesting a
copy should conduct an i'ndependent
inquiry regarding the information shown on
th-e rnap(s), including, but not limited to,
the location of any sewer stub shown. Such
sewer stubs may or may, not exist and may
or may not exist at the location shown.
Neither the City of Edmonds nor its
employees or officer---) -shcall be liable for the
information given on this map(s), nor for
any one representation provided based
upon -said map(s).
C- CITY OF EDMONDS
CIVIC CENTER — WATER -SEWER DEPARTMENT CaJI PROSPect- .6-1107 when work
is ready for inspection. (No insPeo-
SIDE SEWER PERMIT "O"S Saturday, Sunday or holida".) N2 2306
ADDRESS ...... Id .. -ape
OWNER ----- ......
......... I . ...... ............ ---------- CONTRACTOR.
-- --�- -4 ...... 0
r ..........................................
Permission is granted ........... .. . au,3 / ----------- 19A�x - ------------------------ days to REPAIR or
with CRY Sewers in accord .. application on for CONNECT a side sewer
file and governing ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. 1—The owners of the Property may obtain a permit to construct sewer Inside Property line. A licensed Side Sewer Contractor must
be employed to construct side sewer In street area. Do not cover any Portion of sewer before it has been inspected,
NOTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when You get permit.
NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 Inches Inside Property line; minimum grade of 2%.
No bends in grade shaxper than % will be Permitted.
NO"6'N No* 4—Trenches In street must be water settled and surface Of street restored to original conditiom
r failure due to improper work which may develop within one year of completion. Contractors shall be responsible for
N(-, ., No. 5—It I, unlawful to alter or do any other work than Is provided for in the permit, or to do any work on the main sewer or its appur
tenances except to insert the Pipe into the wye.
T,