Loading...
18311 84TH AVE W.PDF111111111111 7819 18311 84TH AVE W t ADDRESS: TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver Study Required PWaiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS ( PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: '?, SEWER LID FEE $: LID #: SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DA: LOT: BLOCK: LATEMP\DST's\Fomis\Street File Checklist.doc 0 .0 PLANNING DATA NAME: SVO 0/4 /W LI/ SITE ADDRESS:— DATE: ZONING: PLAN CHK#: PROJECT DESCRIPTION: k Z"' V�1' CORN ER LOT //a (Yes/No) FLAG LOT (Yes/No) SETBACKS: ,Required Setbacks: Front: 2,�_ Left Side: -Right Side: t16 Rear: Actual Setbacks: Front: Left Side: ii d h2o Rear - Street map checked for additional Aset - 42 WryirQVI r7i (Yes/No) LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) LOT COVERAGE: Maximum Allowed: Actual: B UILDING HEIGHT: 2-5 "', Maximum Allowed: Actual Height: Datum Point: 1p-k,A.4 'IL/ � ��4 -Datum Elevation: loo 3 ? z. A.D.U. CREATED?: Al SUBDIVISION: CRITICAL AREAS #: 44 - '� 7 - ( 7 � - C_/ fA- ( VL--h- SEPA DETERMINATION: LOT AREA: 11-2 ez OTHER: Plan Review By: c.\r11es\pennit\-p1and2Ldoc k—IeLi I-11-t INU. Areas Checklio L4 - 97 --- ------------------- -!�Ical --------------- ---------------- Site Infor.m.ation (soils/ topogaf4) h dr6l�' e Metio 1. Site Address /Location-.-. "I A WN -24 4 2. ce), Propert T eT; Z3 0qf 0:7 z 0q, 0 G y- 49.,,Account Numb 7.19 I q re y, oxima te ages ors A feet Am. te Si Size 4. 0�js site currently developed?:��.,y Y"' no. PW is. s Qpped? es; h ite dov De,saibo the genetafkte topol#aphy; r-heck that ap' P Fl;' I e o" th'' f: n, ,afi e over entire site, an , 9 s op.os on pi eprierally less it�an i56/o (a vertical fise of 10-feet overa, tital. i6t, :of 66-fiet). n!si e o more :15 d, -han 30 presen n %: Ah less�,, t �t verl�ka, J. ris of 10� ovet thorizonta dis tariceb 3 to. 66�4ee e X eep giec t 30 0/kpesent on. sit (a Ver#cal rise. oil Ow -lie r'.�: t 'h Itlertp an, taldistaiici of less: than 33.4eet Other (p�e4se desc '�e 6 eas of y0a st water pro th s 4v rmround pdip A tontain ;,..p P 7.: r se m g,water-, cqntains a easpf, a nal stand' so What sqa�on(s) of. the vear? Site i's in the fil OwA AppOplain of a water coUrsO,� 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows ate seasonal? (What time of yearl(-Fq-�,. F.1 10. site is p=a n.ly- f oixested' meadow shrubs ir�ed urban landscap S"s tc) (lawn, 11. Obvious wetlAnd is vresent on site: CKILIST. The Critical Areas. Checklist contained on this form is " An or his/her represen ive tat" ',,, 'tn.ust fill out to be filled out by any person pTeparing a the cheokli t i :,'.''and date it, and is sign g"it it to the Development Permit Application for ''the City :of City. .;.;T ip V ck st make a 11 City will re iqw the chc. Edmonds pTior to his/her submittal of a-'a6vplopment precursor t .y si e visit.. and make a determination of the ermit to the City. p subse4tidt t steps hecessary to complete d velopment permit -application, The purpose of the Chet st-i nab. e .-Plea s bmit. a vicinity mog- a k1i �-tq e. I a city �t. jf to u longmith the �.$igried determine whether Any-p`o'tentfAl' Crid6al Are M ass's Ch 'in findihR and �4�.Pxq,- qr copy 6fthi to I t. y stdf. p rV. 4 may be, present on the su:b'e prty. The: locating the 5p ic piece �,.,of pro e es -ori ­.J 'pt prop pcif �ribed information naded:tb complete th Checklist sh6uld` this fprm�.;. In add -dl include e e ition thO Applicant sh, be easily available from observations of the s th ation (e.g., site plg� to ogrA I p ite Or o er ertifteni inform P �hy its"in-corijunc -he list data available a.i. City Hall (Critical Areas invento ap, etq):6fstud , 6S'C -k c. maps, or Sol surve to assist staff in corn" Y$ p, e ing, ei. ry jrruna of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to th best of my knowledge (fill pigt tjie 4ppwpriate column below). Owner/AP Wicant: Name Applicant Representative; Name 3 Z-u - - .P,O, Cox -PIQ-t 13OX 2714 Street Address Street Address q0A w4, City State Zip (w r ) — w7c-�nc, Telephone 11r. Signature Date cnceptionVaneNcad,doc IL24 Y State Zip Telephone Signature Pate (over) bUftDING JUL 9 1998 15'F 90, A +135' 4' B +137.4' C +131,4' D 4135.4' AVE GRADE = 134,9' ACTUAL 158.7' MAXIMUM 159-9, 0 NOW 09, TAX ACCOUN7 PARCEL 192704-1-DeS-0004 LOT AREAt 41705 FT. 0 -a �V' F;; - ILI 267.23' DRIVEWAy _�]� +117.4' \-777 cop CM RR amx co city A Ppapasn PESIDENCE moo oft. ost nom) 12'4,9' 104 Sul. camo rlmp) 10 7,7 2' T%%&wrL4-4(a Tto Va1TVwA-Tj%pA VAUI-T ro .4 CXLn* AT QAJ Uj 61 ru 847H AVE, W. DATUM PT. *3324' AgPEPTABLE TIGHTLINE MATERIAL s-ratt'. pwT%'A--n MANHOLE COVER N-12 ADS - .. , -/ �4) Sch 40 PVC APPROVED AS NOTED SDR 35(�§jhkk�0 -d- �4r — JANRIS CIINSTRUITIIIN 1PLUTPLAN 84th Ave W, IT SCALE I" = 40' DRAWN BY CHRIS THOMPSON I EDMONDS, WA. 98026C1­E Ci +135,4' ol 'i . l4v� PROPOSED RESIDENCE 1957 jorT. clST rLDER) 18-31 SQ.FT. (2ND FLOW) D - +133.4' 827.53' ar* Mcic 342 $OTT_,- oocw I +137,4' 1BUMING J U L 16 1998 A m +1354' = +137.4' +134 +13 3�4 4 A\/F GRAIE = 135-15' A TU CTUAL 160.5' P .4XI MUJ .Aximum 160.5, +134,4* 1 12 4. 8' # 1-iLtIN PA01041� oo 5- U k -art- cksAeLq-p ON 10 7.7 2' TAX ACCOUNT PARC �h LqL_�REA, 2F-160 SOST, 122,72' 84TH AVE. W. DATUM PT. +332.6' a -1100' 0 MANHOLE COVER JANRIS CDN'�TRUC710N 18310 84th Ave W. I _T DRAWN By CHRIS THOMPSON PLOTPLAN' E:I)MONDS, WA. 98OL16 LOT B SCALE 1,' 30' 0 311 - /�,Z/yl - BOLDING JUL j.6 1998 C = +134.4' TAX ACCOUNT PARCEL 4 IN704-1-072--0006 .k�F? L 22,160 SOYT. 84TH AVE. W. DATUM Pr. +332,6' 0 MANHOLE COVER JANRIS MNSTRUCTION 183 ' 10 84th Ave W. IL07 B SCALE 1' = 30' 183 PLOTPILLAN Enm 8026 DRAWN By CHRIS THOMPSON DMONDS, WA, 9 1 - -FRCM : Design Build Services Inc. PHONE NO. : 13607939659 0 Nov. 134 1998 03:46PM P03 3 2-0 CA) fl_40z &k I., Structural Engineering for Detention Vault A?'J�-c IVOY 5 41�41/0/tv 19-98 Paul Thompson r Janrls Construction Edmonds, WA 98026 (426) 778-7699 Design Engineering Summary Computer Output November 4, 1998 explfws n DuIld ServIces, Imo. AD 0. an Eholm6ar1mg & Goile.tructiori Mamagerriant, Phone lFm: (560) 793-9659 26119 - 120th St. 5.E., Monroe, WA 9,527� Faeor. (425) 290-0766 FROM DeSign Build Services Inc. PHONE NO. : 13607939659 9 L5 0 I �. � 4C) C1 '�> - C. kr'f .1;'S I rz I e 0 t-Aro (.0 1 9U.-""mck ';�� '. k �DGJ,A.S. (to pe Nov. 04 19138 03:46PM PO4 Dosip Build Banks*, Ina. 281 It - 12ft sir"I se *Mae, WASB972-018 4edc�' + ISDCt 4 '10 (pk All 72 44 T c' Lr T D D. WAS r, �A (-L'; C 9 0 NA1- FROM : Design Build Services Inc. 0 PHONE NO. : 13607939659 Nov. e4 1998 03:47PM P05 QB1C - CONCRETE BEAM DESIGN (VER 2-0) JANRIS DEVELOPMENT VAULT DESIGN TIME! 2:10 PM Page 1 of 6 DATE: 11-04-1998 File Namet aANVAULT GENERAL CRITERIA: ----------------- Ream Concrete strength = 2.50 k9i Column Concrete Strength = 2.50 ksi Steel Yield Strength - 40.0 ksi stirrup Yield Strength - 40.0 ksi Ultimate Dead Load Pactor - 1.40 Ultimate Live Load Pactor = 1.70 Pattern Live Loado (YIN) = Y k of Live Load Not Patterned m 100 k Left Span Cantilever (YIN) - N Right Span Cantilever (YIN)- N Left Span Fixed (YIN) = N Right Span Fixed (Y/N) = N SPAN GEOMETRY: -------------- Design as Bm, Slab, ist (BSJ)- S Include Beam Weight (YIN) = N Concrete Weight - 145 pcf Shear Reinf.i Bar Size =#3 No. of Legs - 2 Cone. Cover to Reinf.: Top - 3.75 in. Rot = 3.75 in. DEFLECTION CONTROL CRITERIA: Compression steel - 0.00 in2 k Live Load to be Sustained = 50 Long Term Multiplier, "Xill - 2.00 < -------------------------------- SLABS ----------------------------------- > Length Depth (in) Stem Width (in) Flange (in) Span (ft) (overall) Base Root Width Thickness 1. 5.50 8.00 12.00 12.00 12.00 0.00 2 6.00 8.00 12.00 12.00 12.00 0.0D 3 5.50 8.00 12.00 12.00 12.00 0.00 C --------------------------- COLUMNS/SUPPORTS ---------------------------- > -------- Lower Col ---------- -------- Upper Col ----------- 'Toint Width Depth Height Width Depth Height No. (in) (in) (ft) (in) (in) (ft) 1 12.00 8.00 6.00 0.00 0.00 0.00 2 PINNED SUPPORT 3 PINIZED SUPPORT 4 12.00 . 8.00 6.00 0.00 0.00 0.00 0 FROM ' Design Build Services Inc. PHONE NO. : 13607939659 Nov. 04 1998 03:48PN Pe6 QB1C - CONCRETE BEAM DESIGN (VRR 2.0) JANRIS'DEVELOPMENT VAULT DESIGN TIMEi 2130 PM Page 2 of 6 DATE: 11-04-1996 File Name. JANVAULT SPAN LOADS- 4 -------------- UNIFORM LOADS (k/f t) ---------------- s. Span Dead Load Live Load Beam Wt. 1 0.44 0.00 0.00 2 0.54 0.00 0.00 3 0.44 0.00 0.00 <.' � ----------- CONCENrRATED LOADS (kips, kip-ft.)--7 ------------ Span Type (P,M) Dead Load Live Load Dist.(ft) ----------------- PARTIAL LOADS (-k/ft) ------------------- > Dead Live Distance (ft) Span Start End Start End Start End 1 0.22 - 0.00 0.00 0.00 0.00 5.50 3 0.00 0.22 0.00 0.00 0.00 5.50 Distance is measured from the left support. Uniform and Partially distributed loads are positive dow.-ward, P = Vert. Load, Down is Positive. M - Moment, Counter -clock. is positive. FROM : Design Build Services Inc. PHONE NO. : 13607939659 Nov. 04 1998 03:4ePM P07 OBIC - CONCRETE BEAM DESIGN (VER 2.0) W-mm =MW wf;.-- M a= ===am w==w=== ==M = aANRIS DEVRLOPMENT VAULT DESIGN Page 3 of 6 TIME: 2i3O PM File Name: JANVAULT DATE; 11-04-1998 SPAN NO. I OF 3 ----------------- Dig. From Max. stir. Max. Area Max. Area Sti. L, SUPP. Vu W Spa. (in.00) Mu+ Sti. (ft-k) (in^2) Mu- (ft-k) (inA2) (ft) 0.03 0.50 1.64 none 0.00 0.00 0.00 0.00 -0.41 -0.03 0.00 0.75 1.00 1.42 1.20 none none 0.30 0.02 0.00 0.00 1.25 0.98 none 0.57 0.05 0.00 0.00 0.00 0.00 1.50 0.17 none 0.79 0.96 0.06 0.08 0.00 0100 1.75 2.00 0.56 0.36 none none 1.07 0.09 0.00 0.00 2.25 0.16 none 1.14 0.09 0.00 0.00 2.50 -0.04 none 1,15 0.09 0.00 0.00 2.75 -0.23 none 1.12 0.09 0.00 0.00 3.00 -0.43 none 1.04 0.06 0.00, 0.00 3.25 -0.61 none 0.91 0.07 0.00 0100 3.50 -0.80 none 0.73 0.06 0.00 0.00 3.75 -0.98 none 0.51 0.04 0100 0.00 4.00 -1.15 none 0.24 0.02 0100 0.00 4-25 -1.33 none 0.00 0.00 -o.07 0.01 4.50 -1-50 none 0.00 0.00 -0.42 0.03 4.75 -1.66 none 0.00 0.00 -0.81 0106 5.00 -1.83 none 0 . 00 0.00 -1,25 0.10 5.25 -i.98 none 0.00 0.00 -1.73 0 3,4 5.50 -2.14 none 0.00 0.00 -2.24 0:18 SERVICE LOAD DEFLECTIONS: Vu 6L t d (left) Vu at d (right) Refer to ACI 318, Table 9.5(a or b) ------------------ --------------------------------------- IMMtIDIATE DEAD LOAD . . . . . . . 0.002 L/9999 1.33 -1.92 IMMEDIATE LIVE LOAD . . . . . . . 0.000 L/9999 SUSTAINED LOAD (CREEP & SHRINK.) 0.004 L/99991 S- none S= none SUSTAINED + LIVE LOAD . . . . . . L/9999 Top Bars Bottom I ---------------- Bars ---------------------------------------- Area Steel Rho Min. 0.24 0.12 Area Steel .5*Rho.bal. 0.79 0.79 Area Steel 75*Rho bal. 1.18 2.18 * Stirrups are designed assuming SLAB members. * stirrup spacing is based on 2.1egged #3 stirrups * Phi Vc w 4.34 kips FROM : Design Build Services 41 PHONE NO. : 13607939659 0 Nov. 04 113138 03:413PM POS QaiC - CONCRETE BEAM DESIGN (VER 2-0) ======= ww4iww4-0 mm JANRIS DEVELOPMENT VAULT DESIGN rIME! 2:30 PM. Page 4 of 6 )ATE: 11-04-1998 File Name: JANVAULT 'aPAN NO. 2 OF 3 ----------------- Dib. From Max. Stir. Max. Area Max'. Area L'. Supp. Vu Spa. Mu+ Sti. Mu- '(ft-k) Sti. (ft) (k (in.oc) (ft-k) (in^2) (inA2) 0.00 2.27 none 0.00 �0.00 -2.24 0118 0.30 2.04 none 0.00 0100 -1.60 0,13 0.60 1.81 none 0.00 0.00 -1.02 0.08 0.90 1.59. none 0.00 0.00 -0 . 51 0.04 1.20 1.36 none 0.00 0.00 -0.07 0.01 1.50 1.13 none 0.31 0.02 0.00 0.00 1.80 0.91 none 0.61 0,05 0.00 0.00 2.10 0.68 none 0.85 0.07 0.00 0100 2.40 0.45 none 1.02 0.08 0.00 0.00 2.70 0.23 none !.12 0.09 0.00 0.00 3.00 0.00 none 1.16 0.09 0.00 0.00 3.30 -0.23 none 1.12 0.09 0.00 0.00 3.60 -0.45 none 1,02 0.08 0.00 0100 3.90 -0.68 none 0185 0.07 0.00 0.00 4,20 -!-0.91 none 0.61 0.05 0.00 0.00 4.50 -1.13 none 0.31 0.02 0.00 0.60 4.80 -1-36 none 0100 0.00 -0.07 0.01 5.10 -1.59 none 0.00 0.00 -0.51 0.04 5.40 -1.81 none 0.00 0.00 -1.02 0.08 5.70 -2.04 none 0.00 0.00 -1.60 0.13)� 6.00 -2.27 none 0100 0.00 -2,24 0.18 SERVICE LOAD DEFLECTIONS; Vu at d Vu at d Refer to ACI 318, Table 9.5(a or b) (left) (right) --------------------------------------- IMMEDIATE DEAD LOAD . . . . . . . 0.002 L�9999 ------------------ 2.00 -2.00 IMMEDIATE LIVE LOAD . . . . . . . 0.000 L/9999 SUSTAINED LOAD (CREEP & SHRINK.) O.DO4 L/9999 S= none S- none SUSTAINED + LIVE LOAD, =;7=7 L/9999 .0 Top Bars Bottom Bars ------------------ ------------------------------------- Area Steel Rho Min. 0.24 0.12 Area Steel'.5*Rho bal. w 0.79 0.79 Area Steel .75*Rho bal, a ilia 1.28 * Stirrups are designed assuming SLAB members. * Stirrup apaoing is based on 2 legged #3 stirrups * Phi Vc = 4.34 kips FROM : DeSign Build Service PHONE NO. : 13607939659 Nov, 04 1131311 03:413PM P119 QB1C CONCRETE BEAM DESIGN (VER 2.0) WMM === ===;; ==a ww==M:= = V;w===M= ==M ====on== ====me JANRIS DEVELOPMENT VAULT DESIGN TIME: 2t3O PM page 5 of DATEt 11-04-1998 File Name: JANVAULT SPAN NO. 3 OF 3 ----------------- Die. From Max. Stir. Max. Area Max. Area L. Supp. Vu Spa. Mu+ Sti. Mu- Sti. (ft) W (in.oc) (ft-k) (in"2) (ft-k) (in A 2) 0.00 2.14 none 0.00 0.00 -2.24 aQ 0.25 1.98 none 0.00 0.00 -1.73 0:14 0.50 1.83 none 0.00 0.00 -1.25 0.10 0.75 1.66 none 0.00 0.00 -0.81 0.06 1.00 1.50 none 0.00 0.00 -0.42 0.03 1.25 1.33 none 0100 0.00 -0.07 0.01 1.50 1.15 none 0.24 0.02 0.00 0.00 1.75 0.98 none 0.51 0.04 0.00 0.00 2.00 0.80 none 0.73 0.06 0.00 0.00 2.25 0.61 none 0.91 0.07 0.00 0.00 2.50 0.43 none 1.04 0.08 0.00 0.00 2.75 0.23 none 1.12 0.09 0.00 0.00 3.00 0.04 none 1.15 0.09 0.00 0.00 3.25 -0.16 none 1.14 0.09 0.00 0.00 3.50 -0.36 none 1.07 0.09 0.00 0.00 3.75 -0.56 none 0.96 0.06 0.00 0.00 4.00 -0.77 none 0.79 0.06 0.00 0.00 4.25 -0.98 none O.S7 0.05 0.00 0.00 4 50 -1.20 none 0.30 0.02 0.00 0.00 4 75 -1.42 none 0.00 0.00 -0.03 0.00 5.00 -1,64 none 0.00 0.00 -0.41 0.03 SERVICE LOAD DEFLECTIONS; Vu at d Vu at d Reeer to ACT 318, Table --------------------------------------- 9.5(a or b) (left) (right) IMMEDIATE DEAD LOAD . . . . . . . 0.002 L/9999 ------------------ 1.92 -1.33 IMMEDIATE LIVE LOAD . . . . . . . 0.000 L/9999 3USTAINED LOAD (CREEP &- SHRINK.) 0,004 L/9999 Sm none S= none '3USTAINED + LIVE LOAD . . . . . . -M- 70 L/9999 -------------------------------------------------------- Top Bars Bottom Bars Lrea Steel Rho Min, 0,24 0.12 �rea Stael S*Rho bal. m 0.79 0.79 krea Steel .75*Rho bal. - 1.18 1.18 Stirrupe.are designed assuming SLAB members. St, . irrup gpacing is:baaed on 2 legged #3 stirrups Phi Vc a 4,34 kips FROM : Design Build Services Inc. PHONE NO. : 13607939659 Nov. e4 19138 03:50PM P10 0 *-,--, IRW QBIC - CONCRETE BEAM DESIGN (VER 2.0) JANRIS DEVELOPMENT VAULT DESIGN DATE: 11-04-1999 Page 6 of 6 File Name: 67ANVAULT COLUMN JOINT FORCES: -------------------- ----- FACTORED MOMENTS ------ ------- REACTIONS ------- JOINT COLUMN ABOVE COLUMN BELOW SERVICE DL SERVICE LI, (ft-kip) (ft-kip) (kips) (kips) 1 0.00. -1.34 1.50 0.00 2 PINNED SUPPORT 3.15 0.00 3 PINNED SUPPORT 3115 0.00 4 0.00 1.34 1.50 0.00 NOTES: Shears are positive DOWN as measured by looking at a section cut to the right of the left support. Moments are positive if they cause compression in the top. DOflections are positive DOWN. Sustained load . 100t dead 10ad plus 50% live load. OC .40PM PI pHDNF=- No. : 4-3 481 7292 Cie 19ge 0, FPOtl-q; 1147ENSUS pRC)jECr—/,4-1 INTENSU5 r 1$10 . BuFlvrgylwo ;k PROJECT N10. 1,f 2 70 q ( 6 p.o. 1468 - Snohomish WA gMi DATE L FROM INTGNSUS PHONE NO. : 425 481 7282- ont, 08 1998 ol,:4�Rl P2 INTENSUS PROJE PAGE LNE "0 SURVEYIF40 'PROJECrN& Z720 Om PA. Box 1486 - Snoh*Mlsh. WA OU91 oxe BY4 .(206) 4111 -rm -),2") OW704 Oct. OE3 19136 01:42PM F3 INTENGLG PHONE NO. 42-9 491 7282 ft&h amb . To X toullsolow ow-M .raw &OCZ& Lit 414" FMM my M� or a" Mr. 64 I dk Ir ~ ftft bdftrnro6o*. * bar -No ,*I 20 WORM - - - 6dooa�- Tb f S = +137.4' .A Y PROPOSED RESIDENCE 19ij? sD,rT. OST FLUOR) ism sam (0-ND FLOM) kL,4 227,53' D - +13-3.4' AU�;EPTABLE "IGFTLINE MATERIAL N-12 ADS SC 140 PVC SDR 35 (AS--M D3034) -Tif#WT" k-aw so' f. (a(Ar, , O&I-541,4a "CA"r HEIGiST CALCS A +135.4 B +137.4: C +134,4' D *133.4' AVE GRADE - 135,151 ACTUAL 160.5' MAXIMUM 260.5' C = +134.4' 124.8' 7,721 Nk TAX ACCO-JNL_?-AR.�EL 4: 1-01 AREA, 22.16D SOTT. ls&�A 84TH AVE. W. 0 DATUM PT, +322.6' - +100' MAN64CILE COVER C4-MIA ftrt,*.t I JANRIS CONSTRUCTION PLOTPLAN 18'310 84th Ave 980 6 [IT B SCALE I' 30'i EDMONDS, WA. I DRAWN BY CHRIS THOMPSON Ak"f STREET FILE !FROM, : I N7 f-NSUS 0 PHONE NO. : 360 668 75-34 0 Jul, 08 1998 07:30PM P1 I INTENSUS ENGINIFERWO - SURVEYING 1606 SPIOADWAY AVENUE S.E. P.O. BOX 1486 - BNOHOMW� WA MM (425) 4611-7M - (M) W-7634 DATE: July 8, 1998 TO: Paul, fx 425-77&4257 PROM: Vern Bower W, 84th Ave W Project Storm Outfall frorn Dotention Intensus File 1:6.2704.04 This b-dum Ittal consists of 2 pages Inoluding this cover sheet. Remarlts: The attached map shows the location of ths existing 12" concrew sWm drain that direft runoff to the existing catch basin on the west side of 84th Ave W. Invert elevation of at the Irdet of the 12" Is 423-3. The detention vault has been loomed an the We so that it parallels the owtours and is loeatod just above the bothom oF the too of slope frorn the east. It is proposed thW runoff enter U* vault from the scuffi W& aid discharge from the north Into the drainage corridor. wAMVB0PN$270404W$6WM �.FROM INTe4SLrG PHONE NO. 66G? 7534 ju 1 08 996 V: 3OPM P2 = 710;: Otis Z4/ 41J IL 41 P 44 5z Ao 0 fop 1 N (D a -(� r S v) /'--1 0 c .1152'ej ' - (c /., Co - 'A ko L N� JANRIS CONSTRUCTION BLA 84TH AVE W, EDMONDS, WA J.- INTENSUS, ENGINEERING & SURVEYING, PO BOX 1486, SNOHOMISH, WA 98291 FILE 'Aim DRAINAGE OVERVIEW JANRIS CONSTRUCTION BOUNDARY LINE ADJUSTMENT CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON Existing Conditions The project site encompasses 1.489 acres of second growth wooded land that slopes generally westerly. There are no existing structures located on the site. A plateau area of approximately one-half acre in size dominates the northeastern portion of the site. The ground slopes southerly and westerly from this plateau to a low area along the east side of 84th Ave W. All of the site is covered with second growth trees. The site is bounded on the north, east and south by single family residential development; and on the west by 84th AveW. Present access to the site is from Olympic View Drive. After development of the site access will be taken from 84th Ave W over an easement across the I property of Curtis D. Smith. L)i lroi� fIt" Downstream Drainage Corridor rk A 12" storm culvert conveys runoff under 84th Ave W to the west side where runoff continues-\ westerly. Discharge of runoff from the site is through this 12" culvert located at the comer of the site. 7M Storm Detention c� O's y., lc>,D b7 - �ba'sed Ton site Hydrologic analysis of the site indicates th strrrn2w�at�ere en �ion �ie requ"ire modeling of various storm events. Runo rates for the 10 year and 100 year, 24 hour, storm events were routed through a detention facility to determine volume of storage based on existing rates of runoff from the site. Storm detention is provided which will control th10,100 vearr:t_"_r_'_'_'_) stom event rate of runoff to the existing rate forte 10 year storm eveni storage is to be provided in a concrete vault 8.67 feet x 50 feet x 5 feet of storage depth, with LSutlet orifice 3/4" in latmsus, Enemeering & Survvying. PO Box 1486, SnohomisI4 WA 98291 * 425-481-7282 * 360-668-7534 r c EDSC WATERSHED MODELING Page 1 5/20/98 HYDROGRAPH REPORT NUMBER TYPE SANTA BARBARA DESCRIPTION 2 YR 24 HR EXISTING (HYDROGRAPH INFORMATION] 0.01 (cfs) Peak Discharge ......................... 0.01 (acft) Vol Lane .................................... (min) Time Interval ............................. 704.00 (min) Time to Peak .............................. _ 1656.00 (min) Time of Base .............................. . 1.00 multiplication factor— ... ........ [BASIN DESCRIPTION] 0.56 (ac) Watershed Area ............................. 81 Curve Number .............................. [RAINFALL DESCRIPTION] Distribution Type ......................... Scs';A Total Precipitation ........ I .............. 2 (yr) Return Period ............................. 24.00 (hr) Storm Duration ............................ 0.00 (hr) Impervious Fraction ....................... (TIME CONCENTRATION -- USER DEFINED] 48.90 (min) Time of Concentration ...................... EDSC WATERSHED MODELING 5/20/98 Page 1 HYDROGRAPH REPORT NUMBER 3 TYPE SANTA BARBARA DESCRIPTION 100 YR 24 HR EXISTING [HYDROGRAPH INFORMATION] Peak Discharge .............................. . 0.08 (cfs) Volume .................................... - 0.06 (acft) Time Interval ............................. - 8 (min) Time to Peak .............................. ' 496.00 (min) Time of Base ............................... - 1720.00 (min) Multiplication factor .... I ................ . 1.00 [BASIN DESCRIPTION] Watershed Area ............................ ' 0.56 (ac) Curve Number .............................. - 81 [RAINFALL DESCRIPTION] Distribution Type ......................... ' SCS IA Total Precipitation ....................... - Pw (in) Return Period ............................. ' 100 (yr) Storm Duration ............................. - 24.00 (hr) Impervious Fraction ....................... - 0.00 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) EDSC WATERSHED MODELING 5/20/98 Page I HYDROGRAPH REPORT NUMBER 4 TYPE SANTA BARBARA DESCRIPTION 2 YR 24 HR DEVELOPED CHYDROGRAPH INFORMATION] Peak Discharge ............................ - 0.04 (cfs) Volume ..................................... - 0.03 (acft) Time Interval ............................. - 8 (min) Time to Peak .............................. - 496.00 (min) Time of Base .............................. - 1680.00 (min) Multiplication factor ..................... . 1.00 [BASIN DESCRIPTION] Watershed Area ............................ - 0.56 (ac) Curve Number .............................. . 88 [RAINFALL DESCRIPTION] Pistribution Type ......................... . SC A I I � Total Precipitation ....................... . t��Ion)f ' Return Period ............................. - 2 (yr) Storm Duration ............................ . 24.00 (hr) Impervious Fraction ....................... 0.21 (hr) [TIME CONCENTRATION -- USER DEFINED3 Time of Concentration ..................... 48.90 (min) P-14 A L 1 ' 's 00 SUPPLEMENT 01 TO myoft(DLQG�c AN, ALY�15'11S JANRIS CONSTRUCTION BLA 84TH AVE W, EDMONDS, WA INTENSUS, ENGINEERING & SURVEYING, PO BOX 1486, SNOHOMISH, WA 98291 STREET FILE BOUNDARY LgHE ADJUSTMENT 04TH AVE W,9 [50momosso WA HYDROLD69C ANALYSgSg SUPPLEMENT 09 9H, irgNSM, gmalmEMN6 Q SUAVEygma PC Nox 149(911 WA 190299 4N�@9-7202 * 960490-M, *1 DRAINAGE OVERVIEW JANRIS CONSTRUCTION BOUNDARY LINE ADJUSTMENT CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON Existing Conditions The project site encompasses 1.489 acres of second growth wooded land that slopes generally westerly. There are no existing structures located on the site. A plateau area of approximately one-half acre in size dominates the northeastern portion of the site. The ground slopes southerly and westerly from this plateau to a low area along the east slide of 84th Ave W. All of the site is covered with second growth trees. The site is bounded on the north, east and south by single family residential development; and on the west by 84th AveW. - Present access to the site is from Olympic View Drive. After development of the site access will be taken from 84th Ave W over an easement across the property of Curtis D. Smith. Downstream Drainage Corridor A 12" stonrn culvert conveys runoff under 84th Ave W to the west side where runoff continue/ westerly. Discharge of runoff from the site is through this 12" culvert located at the northwest comer of the site. Storm Detention Hydrologic analysis of the site indicates that stormwater detention will be required based on site Z modeling of various storm events.. Runoff rates for the 10 year and 100 year, 24 hour, storm events were routed through a detention facility to determine volume of storage based on existing rates of runoff from the site. Runoff from the 2 year storm event was too small to route through V/_' the detention system. Storm detention is provided which will control the 10 year and the 100 year storm event rate of runoff to the existing (predeveloped) rate. Storage is to be provided nr Intensus, Fngincering & Surveying, PO Box 14X6, Snohomish, WA 98291 * 425-481-7292 -(%(A7534 1360 kn Jaruis Constructim Smith BLA/18270404/9/8/98 2 equivalent to 74 If of 60" diameter pipe (64 If of 60" diameter pipe; - Type 1154" diameter manhole at each end; and 3 If of connecting 36" diameter pipe). The 60" diameter pipe is to be 14 gage 2 2/3" x 1/2" corrugations, or 16 gage 3" x 1" corrugations. The control outlet is to be a single orifice 3/4" in diameter (0.031 ft radius). The proposed system matches the existing 10 year storm event rate of flow and exceeds the existing 100 year storm event rate of flow by 0.02 cfs (0. 10 existing; 0.08 developed) lower than the predeveloped rate. Santa Barbara Urban Hydrographs were developed utilizing the Soils Conservation Service Type A rainfall distribution to model runoff from the site using "Watershed Modeling, Version 7.OS", Eagle Point, Dubuque, Iowa. Size (volume) of the detention facility was determined by routing the hydrographs through the detention facility to provide storage volume requirements during various inflow/outflow rates of flow. Tabulation of Flows Design < ------------- FLOW -------- ------- > Storm Existing Developed Routing Bypass ex/dev Combined 2 0.01 0.03 0.01 0.01 10 0.03 0.05 0.02 0.02 0.04 100 0.10 0.12 0.03 0.06 0.08 * Too small to tabulate < 0.01 cfs Erosion Control Prior to and during construction erosion control facilities will be constructed and maintained to control sedimentation from leaving the site. These facilities are to be maintained for the duration Intensus, Engineering & Surveying, PO Box 1486, Snohomish, WA 98291 * 425481-7282 * 360-668-7534 Janris Consbuctim Smith BLA /18270404/9/8/98 3 of the project as long as the potential for erosion exists on the site. Rock construction entrances are to be installed at the points of ingress/egress to the site. wrk\int\prj'\l 8270404\bydovrvw Intemus, E'ngin=ing& Surveyin& PO Box 1496, Snohomish, WA99291 0 4254H 1 -7282 * 360-668-7534 Adak INTENSIDS ENGINEERING - SURVEYING P.O. Box 1486 - Snohomish, WA 98291 (2061481-7282 - (206) 668-7534 � PROJECT '-14 &Ifl� `�Z4 — PAGE PROJECT No. DATE By lev-,�7 EDSC WATERSHED MODELING 9/2/98 Page 1 HYDROGRAPH REPORT NUMBER 4 TYPE SANTABARBARA DESCRIPTION 2 YR 24 HR DEVELOPED [HYDROGRAPH INFORMATION] Peak Discharge ............................ - 0.03 (cfs) Volume.................................... - 0.02 (acft) Time Interval ............................. ' 8 (min) Time to Peak .............................. ' 504.00 (min) Time of Base .............................. - 1672.00 (min) Multiplication factor ..................... - 1.00 [BASIN DESCRIPTION] Watershed Area ............................ = 0.56 (ac) Curve Number .............................. ' 82 [RAINFALL DESCRIPTION] Distribution Type ......................... ' SCS IA Total Precipitation ....................... = 1.50 (in) Return Period ...................... : ........ = 2 (yr) Storm Duration ............................ = 24.00 (hr) Impervious Fraction ....................... = 0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) EDSC WATERSHED MODELING 9/2/98 Page 1 HYDROGRAPH REPORT NUMBER 5 TYPE SANTA BARBARA DESCRIPTION 10 YR 24 HR DEVELOPED [HYDROGRAPH INFORMATION] Peak Discharge ............................ = 0.05 (cfs) Volume...* * ...... ' 0.04 (acft) Time Interval ............................. = 8 (min) Time to Peak .............................. = 496.00 (min) Time of Base .............................. = 1696.00 (min) Multiplication factor ..................... = 1.00 [BASIN DESCRIPTION] Watershed Area ............................ = 0.56 (ac) Curve Number .............................. = 82 [RAINFALL DESCRIPTION] Distribution Type ......................... - SCS JA Total Precipitation ....................... = 2.00 (in) Return Period ............................. = 10 (yr) Storm Duration ............................ = 24.00 (hr) Impervious Fraction ......... ... ........... 0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) EDSC WATERSHED MODELING 9/2/98 Page 1 HYDROGRAPH REPORT NUMBER 6 TYPE SANTA BARBARA DESCRIPTION 100 YR 24 HR DEVELOPED [HYDROGRAPH INFORMATION] Peak Discharge ............................ - 0.12 (cfs) Volume .................................... = 0.08 (acft) Time Interval ............................. = 8 (min) Time to Peak .............................. - 496.00 (min) Time of Base .............................. - 1720.00 (min) Multiplication factor ..................... = 1.00 (BASIN DESCRIPTION] Watershed Area ............................ = 0.56 (ac) Curve Number .............................. = 82 [RAINFALL DESCRIPTION] Distribution Type ......................... = SCS JA Total Precipitation ....................... = 3.00 (in) Return Period ............................. = 100 (yr) Storm Duration ............................ = 24.00 (hr) Impervious Fraction ............... -0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... = 48.90 (min) 0 EDSC WATERSHED MODELING 9/8/98 Page I OUTLET, STRUCTURE REPORT NUMBER 1 TYPE CIRCULAR ORIFICE DESCRIPTION 3/4" DIA ORIFICE FOR 5' STORAGE DEPTH [OUTLET STRUCTURE INFORMATION] Radius .................................... - 0.03 Invert Elevation .......................... - 0.00 (ft) # of Openings ............................. - 1 [RATING CURVE LIMITS] Minimum elevation ......................... - 0.00 (ft) Maximum elevation ......................... - 5.50 (ft) El.evation Increment ....................... - 0.10 (ft) [CIRCULAR ORIFICE EQUATION] Q = Co*A*[2ghl/kl^0.5 Coefficient Co ............................ 0.620 [DEFINITIONS] A - Wetted area. (ft2) K = I EDSC WATERSHED MODELING 9/8/98 Page 1 RESERVOIR REPORT NUMBER 2 STORAGE TYPE UNDERGND PIPE DISCHARGE TYPE COMP STAGE/DISC DESCRIPTION Equiv. 74'- 60" DIA STORAGE PIPE [RATING CURVE LIMIT] Minimum Elevation ......................... - 0.00 (ft) Maximum Elevation ......................... = 5.00 (ft) Elevation Increment ....................... - 0.10 (ft) [STAGE STORAGE INFORMATION] RESERVOIR DESCRIPTION: Length ..................................... = 74.00 (ft) Radius ..................................... - 2.50 (ft) [STAGE DISCHARGE INFORMATION] OUTLET STRUCTURE: STR # 1 TYPE CIRCULAR ORIFICE DESCRIPTION 3/4" DIA ORIFICE FOR 5' STORAGE DEPTH INTENS8S ENGINEERING SURVEYING P.O. Box 1486 - Snohomish, WA 98291 (2061481-7282 - (206) 668-7534 lqw PROJECT PAGE PROJECT No. DATE BY Steel Pipe Design Pipe Dia., D (also S) 60" CMP 5 feet Corrugations 2-2/3" x 1/2" 3xI Gage to be determined Height of Cover, H 3 feet H20 Live Load Design 18000/H 18000 6000 Dead Load 120xH 120 360 When H < diameter, TL (total load) = Pv Pv = K(DL+LL) when H > S K=0.86 for 85% Pv = 5469Z Pv = (DL+LL) when H < S S=span in feet Pv = 6360 Ring Compression C = Pv(S/2) C = lb/ft Pv = lb/sq. ft._ C 13674 Wall Stress Fb=Fy=33000 psi D/r < 294 D=dia in inches r--rad gyration, in Fb = 40000 - (0.081) (D/r)A 2 294 < D/r > 500 r-- (I /A)AO .5 2-2/3 x 1/2(14 ga) 3 x 1(16 ga) I = (in4/ft)(S) 0.1435 0.5195 A (in2/ft)(S) 4.84 4.45 r 0.172188154 0.34167466 D/r 348.456027 175.605648 Fc=Fb/2 Use Fb=40000 Use Fb=33000 Fb= 30164.85017 33000 Fc= 15082.42509 16500 Wall Thickness As=C/Fc=_[sq. in/ft] Design As 0.906618128 0.828727273 sq. i n/ft 16 gage 14 gage 12 gage Area 2-2/3xl/2 = 0.775 0.968 1.356 sq. in/ft Area 3xl = 0.89 1.113 1.56 sq. i n/ft Handling Stiffness FF = (D A 2)/El E = Modulus of Elasticity = 30 x JOA 6 psi D = Diameter or span, in inches I = Moment of inertia of wall, in in A 4 perinch FF < 0.0433 for helical pipe 120-inch dia or less FF 0.000167247 wrk�nt+�pdl 8270404\pipesil Intensus, Engineering & Surveying, PO Box 1486, Snohomish, WA 98291 * (206) 481-7282 EDSC WATERSHED MODELING 9/2/98 Page I HYDROGRAPH REPORT NUMBFR 15 TYPE RESER SIOR. IND DESCRIPJJON ROUTING-1.0 YR D[VFI-OPED 60" PIPE [HYDROGRAPH INFORMATION] Peak DiFcharge ............................ = 0.02 ((.-. fs) Volume .................................... = 0.04 (acft) Time Interval ............................. . 8 (min) *riane to Peak . ..... .... ................. = 1130.00 (min) Time Of BdSe. = 2032.00 (min) Peak Elevation ............................ = 2.20 (ft) [INFLOW HYDROGRAPH INFORMATION] Hydrograph # .............................. = 5 I�vdrograph Description . . . . . .. = 10 YR 24 IIR DEVELOPED EDSC WATERSHED MODELING 9/2/98 Page 1. HYDROGRAPH REPORT NUMBER 14 TYPE RESER STOR. IND DESCRIPTION ROUTING 100 YR DEVELOPED 60" PIPE [HYDROGRAPH INFORMATION] Peak Diwharge .. ......................... = 0.03 (cfs) Vo I UrTle .................................... = 0.08 (acft) Time Interval ............................. = 8 (min) Time to Ppak .............................. 1,336.00 (min) Time of Base ............... I .............. = 2808.00 (mill) Peak Elevation ............................ = 4.87 (ft) FJNITOW HYDROGRAPH INFORMATION] H�ydrograph # .............................. = 6 Hydrograph Description .................... = 100 YR 24 HR DEVFLOPED 0 HYDROGRAPH 1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 - 0.2 - 0.1 0.13 0 Soo 1000 1500 2000 2500 3000 TIME (min) EDSC WATERSHED MODELING 9/2/98 Pag6 I HYDROGRAPH REPORT NUMBER 15 TYPE RESER STOR. IND DFSCRIPTION RCIFF I NG 10 YR DEVELOPED 60" PIPE [HYDROGRAPH INFORMATION) Peak Disdiarge ... ... . .............. = 0 02 (cfs) VolLme .................................... = 0.04 (acfL) Time Interval ... . . . .. .... .. . ..... = 8 (min) Time to Peak .............................. = .1224.00 (min) Time of Base ..................... ........ = 2176.00 (min) Peak Elevation ............................ = 1.95 (ft) [INFLOW HYDROGRAPH INFORMATION] Hydrograph # .... I ......................... = 5 Hydrograph Description .................... = 10 YR 24 HR DEVELOPED 0 9 HYDROGRAPH 1.0 0.9 0.8 0.7 - 0.6 - 0.5 0.4 0.3 - 0.2 - 0.1 - 0.0 0 500 1000 1500 2000 2500 TIME (min) EDSC WATERSHED MODELING 9/2/98 Page I HYDROGRAPH REPORT NUMBER 16 TYPE COMBINE DESCRIPTION COMBINE 10 YR DEV 60" PIPE [HYDROGRAPH INFORMAFIONJ Podk Discharyc ............................ = 0.04 (cfs) Volume .................................... = 0.06 (acft) Time Interval ............................. = 6 (min) Time to [leak. . .. ......... = 1092,00 (min) Time of Base ............................... = 2172.00 (min) [COMBINE HYDROGRAPH RECORD #] HYDROGRAPH # 15 TYPE : RESER STOR. IND DESCRIPTION : ROUTING 1.0 YR DEVFI-OPFD 00" PIP[ Peak Discharge— ...................... = 0.02 (cf'0 Time to Peak .......................... = 1224.00 (min) Time Interval.. ............... 0.00 (min) HYDROGRAPH # 8 TYPE : SANTA BARBARA DFSCRIPTION : 10 YR 24 HR DEVELOPED BYPASS Peak Discharge ........................ = 0.02 (cfs) Time to Peak = 1056 00 (min) fime Interval ......................... = 0.00 (min) 0 9/2/98 EDSC WATERSHED MODELING HYDROGRAPH REPORT NUMBER 17 TYPE COMBINE DESCRIPTION COMBINE 100 YR DI*V 60" PIPE [HYDROGRAPH INFORMATION] Peak Discharge ........................ Volume...................................... = Time Interval ............................. = Time to Peak. . ................. = Time of Base .............................. = [COWINF HYDROGRAPH RECORD #1 HYDRO(',RAPH # 14 TYPE : RESER STOR. IND DESCRIPTION : ROUTING 100 YR DEVELOPED 60" PIPE Peak Discharg( ...... ................. = Time to Peak ........ I .... I ............ = Time Interval ......................... = jjyOROGRAPH # 9 TYPE : SANTA BARBARA DESCRIPTION : 100 YR 24 I-IR DEVELOPED BYPASS Peak Discharge ........................ = Time to Peak .......................... = 4 ime InterVd I . . . . ... . = Page 1. 0.08 (cfs) '0.14 (acft) 6 (min) 540, 00 (n) in ) 2808.00 (min) 0,03 (cfs) 1336,00 (min) 0.00 (min) 0.06 (cis) 536.00 (min) 0,00 (min) lip. -j" JANRIS CONSTRUCTION 18705 85TH PLACE WEST EDMONDS, WA 98026 (425) 778-7699 JULY 8, 1 Aft LYLE CHRISMAN CITY OF EDMONDS COMMUNITY SERVICES DEPARTMENT 121-5TH AVENUE NORTH EDMONDS, WA 98020 RE: PLAN CHECK 98-169 DEAR LYLE: ATTACHED YOU WILL FIND A PLOT PLAN BROKEN INTO 3 SECTIONS FOR COMPUTING THE AMOUNT OF GRADING TO BE DOME ON THIS SITE. I BASED THE DEPTH OF THE CUT AT 133.15' BASED ON THE AVERAGE GRADE OF 135.15' MINUS A 2 FOOT CUT. SECTION I— I FIGURED THE MAXIMUN DEPTH OF THE CUT WOULD BE 4.25 FEET ON A PAD OF 32'X 24' WHICH GAVE ME A TOTAL CUBIC YARDAGE OF 139.8 CUBIC YARDS SECTION II— I FIGURED A MAXIMUM CUT OF 2.25 FEET ON A PAD OF 44' X 17' GIVING ME A CUBIC YARDAGE OF 62.3 CUBIC YARDS. SECTION III— I FIGURED A MAXIMUM CUT OF 1.5 FEET ON A PAD OF 56' X 15' GIVING ME A CUBIC YARDAGE OF 46.7 CUBIC YARDS. THE TOTAL CUBIC YARDS MOVED ON THIS SITE IS CALCULTED AT 248.8 YARDS. SIN R LY, P L *A. THOMPSON u�e 4$' lQ-r- 4kf m 4.1 g7.41 , �13 .4' PROPOSED RESI i lilt asT ftaw, cod j wc w=5 260 will D 227,53' 90(4vp Vero 122.72' 84TH AVE- W- 6 PV f,#JG az*i-ma 135-Al A :137.4' B C +134,4' .D +133.4' AVE GRADE - 135'15' ACIVAL 160'5' MAXIMUM 1604' 124.8f Afialk N L io7,72' 1A ARCE ,,A um Pv'' . I 0 MANHOLE COVER - 30' 3io 184t?� AV SCALE I' I Lo'T B la. W PLOTPLAN � EDMONDS, WA, 98026 JANRIS CONSTRUCTION URAWN sy CHRIS THOMPSON JAN= CONSTRUCTION BOUNDARY LINE ADJUSTMENT 04TH AVE Wso EDNONDS,9 WA HYDROLOGIC AHALYSOS,� SUPPLEMENT09 OHTMUSI� EmagmMgmg a SURVE170MV5 Pa §ox 94091, smamommu WA (001,00 425-MI-M2 * Wo-G(69-Wull DRAINAGE OVERVIEW JANRIS CONSTRUCTION BOUNDARY LINE ADJUSTMENT CITY OF EDMONDS SNOHOMISH COUNTY, WASHINGTON Existing Conditions The project site encompasses 1.489 acres of second growth wooded land that slopes generally westedy. There are no existing structures located on the site. A plateau area of approximately one-half acre in size dominates the northeastern portion of the site. The ground slopes southerly and westerly from this plateau to a low area along the east si de of 84th Ave W. All of the site is covered with second growth trees. The site is bounded on the north, east and south by single family residential development; and on the west by 84th AveW. - Present access to the site is from Olympic View Drive. After development of the site access will be taken from 84th Ave W over an easement across the property of Curtis D. Smith. Downstream Drainage Corridor A 12" storm culvert conveys runoff under 84th Ave W to the west side where runoff continue/ westerly. Discharge of runoff from the site is through this 12" culvert located at the northwest comer of the site. Storm Detention Hydrologic analysis of the site indicates that stormwater detention will be required based on site modeling of various storm events. Runoff rates. for the 10 year and 100 year, 24 hour, storm events were routed through a detention facility to determine volume of storage based on existing rates of runoff from the site. Runoff from the 2 year storm event was too small to route through the detention system. Storm detention is provided which will control the 10 year and the 100 year storm event rate of runoff to the existing (predeveloped) rate. Storage is to be provided InWnsus, Engineering& Surveying, PO Box 14K6, Snohomish, WA98291 * 425-41t 1 .7282 360-6 7534 Janris Construction, Smith BLA/1 844/9/8/98 0 2 equivalent to 74 If of 60" diameter pipe (64 If of 60" diameter pipe; Type 1154" diameter manhole at each end; and 3 If of connecting 36" diameter pipe). The 60" diameter pipe is to be 14 gage 2 2/3" x 1/2" corrugations, or 16 gage 3" x 1 " corrugations. The control outlet is to be a single orifice 3/4" in diameter (0.031 ft radius). The proposed system matches the existing 10 year storm event rate of flow and exceeds the existing 100 year storm event rate of flow by 0.02 ds (0. 10 existing; 0.08 developed) lower than the predeveloped rate. Santa Barbara Urban Hydrographs were developed utilizing the Soils Conservation Service Type A rainfall distribution to model runoff from the site using "Watershed Modeling, Version 7.OS", Eagle Point, Dubuque, Iowa. Size (volume) of the detention facility was determined by routing the hydrographs through the detention facility to provide storage volume requirements during various inflow/outflow rates of flow. Tabulation of Flows Design < ------------- FLOW -------- ------- > Storm Existing Developed Routing Bypass exidev Combined 2 0.01 0.03 0.01 10 0.03 0.05 0.02 0.02 100 0.10 0.12 0.03 0.06 * Too small to tabulate < 0.01 cfs Erosion Control 0.01 0.04 0.08 Prior to and during construction erosion control facilities will be constructed and maintained to control sedimentation from leaving the site. These facilities are to be maintained for the duration Intensus, Engineering & Surveying, PO Box 1486, Snohomish, WA 98291 * 425481-7282 * 360-668-7534 Jarm ConaructioM Snuth BLVI 844/9/8/98 3 of the project as long as the potential for erosion exists on the site. Rock construction entrances are to be installed at the points of ingress/egress to the site. wrk\int\Fx]\ I 8270404\hydowm Intamm, Engin=ing&Survcying, PO Box 1496, Snohomish, WA98291 * 4254H 1 -7282 0 360-668-7534 INTENSMS ENGINEERING - SURVEYING P.O. Box 1486 - Snohomish, WA 98291 (206) 481-7282 - (206) 668-7534 .1-A ?"#*" 'a4v // d ?'2 PROJECT SJ4 &1.fl,�5 JZI'�_ —PAGE PROJECT No. 27VW, ed' DATE /' 5'99 BY__Ze-" .7411 77 � _ _. . � )� -77 1 1:41 7' lei I E7. �v 7_- -_ �__F_ _7 ------ tr___ 92 a js EDSC WATERSHED MODELING 9/2/98 Page 1 HYDROGRAPH REPORT NUMBER 4 TYPE SANTA BARBARA DESCRIPTION 2 YR 24 HR DEVELOPED [HYDROGRAPH INFORMATION] Peak Discharge ............................ - 0.03 (cfs) Volume .................................... = 0.02 (acft) Time Interval ............................. - 8 (min) Time to Peak .............................. = 504.00 (min) Time of Base .............................. = 1672.00 (min) Multiplication factor ..................... = 1.00 [BASIN DESCRIPTION] Watershed Area ............................ = 0.56 (ac) Curve Number .............................. = 82 [RAINFALL DESCRIPTION] Distribution Type ......................... = SCS IA Total Precipitation ....................... = 1.50 (in) Return Period..- ..................... 2 (yr).. Storm Duration ............................ 24.00 (hr) Impervious Fraction ....................... 0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) EDSC WATERSHED MODELING 9/2/98 Page 1 HYDROGRAPH REPORT NUMBER 5 TYPE SANTA BARBARA DESCRIPTION 10 YR 24 HR DEVELOPED (HYDROGRAPH INFORMATION] Peak Discharge ............................ = 0.05 (cfs)' Volume... * ... ­­ ....... - 0.04 (acft) Time Interval ............................. - 8 (min) Time to Peak .............................. = 496.00 (min) Time of Base .............................. = 1696.00 (min) Multiplication factor ..................... - 1.00 [BASIN DESCRIPTION]. Watershed Area ............................ - 0.56 (ac) Curve Number .............................. = 82 [RAINFALL DESCRIPTION] Distribution Type ......................... = SCS IA Total Precipitation ....................... - 2.00 (in) Return Period ............................. = 10 (yr) Storm Duration ............................ = 24.00 (hr) Impervious Fraction ....................... - 0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) 0 0 EDSC WATERSHED MODELING 9/2/98 Page I HYDROGRAPH REPORT NUMBER 6 TYPE SANTA BARBARA DESCRIPTION 100 YR 24 HR DEVELOPED [HYDROGRAPH INFORMATION] Peak Discharge ............................ - 0.12 (cfs) Volume .................................... = 0.08 (acft) Time Interval ............................. = 8 (min) Time to Peak .............................. = 496.00 (min) Time of Base .............................. = 1720-00 (min) Multiplication factor ..................... = 1.00 [BASIN DESCRIPTION] Watershed Area ........................... = 0.56 (ac) Curve Number .............................. = 82 [RAINFALL DESCRIPTION] Distribution Type ........................ = SCS IA Total Precipitation ...................... = 3.00 (in) Return Period ............................. = 100 (yr) Storm Duration ............................ = 24.00 (hr) Impervious Fraction ......................... -0.17 (hr) [TIME CONCENTRATION -- USER DEFINED] Time of Concentration ..................... 48.90 (min) EDSC WATERSHED MODELING 9/8/98 Page 1 OUTLET STRUCTURE REPORT NUMBER 1 TYPE CIRCULAR ORIFICE DESCRIPTION 3/4" DIA ORIFICE FOR 5' STORAGE DEPTH [OUTLET STRUCTURE INFORMATION] LIZ Radius .................................... = 0.03 Invert Elevation .......................... - 0.00 (ft) # of Openings ............................. = 1 [RATING CURVE LIMITS] Minimum elevation ......................... = 0.00 (ft) Maximum elevation ......................... = 5.50 (ft) Elevation Increment ....................... - 0.10 (ft) [CIRCULAR ORIFICE EQUATION] Q = Co*A*[2ghl/kl^0.5 Coefficient Co ........................ 0.620 [DEFINITIONS] A Wetted area. (ft2) K 1 0 EDSC WATERSHED MODELING 9/8/98 RESERVOIR REPORT NUMBER 2 STORAGE TYPE UNDERGND PIPE DISCHARGE TYPE COMP STAGE/DISC DESCRIPTION Equiv. 74'- 60" DfA STORAGE PIPE [RATING CURVE LIMIT] Minimum Elevation ......................... = Maximum Elevation ......................... = Elevation Increment ....................... - [STAGE STORAGE INFORMATION) RESERVOIR DESCRIPTION: Length.................................... - Radius.................................... - [STAGE DISCHARGE INFORMATION] OUTLET STRUCTURE: STR # 1 TYPE CIRCULAR ORIFICE DESCRIPTION 3/4� DIA ORIFICE FOR 5- STORAGE DEPTH Page 1 0.00 (ft) 5. 00 (ft) 0.10 (ft) 74.00 (ft) 2.50 (ft) ,Z' INTENSCIS ENGINEERING SURVEYING P.O. Box 1486 - Snohomish, WA 98291 (206)481-7282 - (206)668-7534 PROJECT PAGE PROJECT'No. DATE BY 3 Jd -4-7- 7 y 7. 0 i2 0-- Steel Pipe Design feet Pipe Dia., D (also S) 60" CMP 5 Corrugations 2-2/3" x 1/2" 3x1 Gage to be determined Height of Cover, H 3 H20 Live Load Design 18000/H Dead Load 12OxH When H < diameter, TL (total load) = Pv Pv = K(DL+LL) when H > S K=0.86 for 85% Pv = (DL+LL) when H < S S=span in feet Ring Compression C = Pv(S/2) C = -lb/ft Pv = lb/sq. ft.., Wall Stress feet 18000 120 Pv = Pv = C 6000 360 5469.6 6360 13674 Fb--Fy=33000 psi D/r < 294 D=dia in inches r--rad gyration, in Fb = 40000 - (0.081) (D/r)A 2 294 < D/r > 500 r-- (I /A)AO .5 2-2/3 x 1/2(14 ga) 3 x 1(16 ga) I (in4/ft)(S) 0.1435 0.5195 A (in2/ft)(S) 4.84 4.45 r 0.172188154 0.34167466 D/r 348.456027 175.605648 Fc=Fb/2 Use Fb=40000 Use Fb=33000 Fb= 30164.85017 33000 Fc= 15082.42509 16500 Wall Thickness As=C/Fc=_[sq. in/ft] Design As 0.906618128 0.828727273 sq. in/ft 16 gage 14 gage 12 gage Area 2-2/3xl/2 = 0.7.75 1.356 sq. in/ft Area 3xl = 0.89 1.113 1.56 sq. in/ft Handling Stiffness FF = (D'2)/El E = Modulus of Elasticity = 30 x 1016 Psi D = Diameter or span, in inches I = Moment of inertia of wall, in in A 4 perinch FF < 0.0433 for helical pipe 120-inch dia or less FF 0.000167247 wrkVnt'Td\I 8270404\pipesti Intensus, Engineering & Surveying, PO Box 1486, Snohomish, WA 98291 * (206) 481-7282 EDSC WATERSHED MODELING 9/2/98 Page I HYDROGRAPH REPORT NUMBER 15 TYPE RESER STOR. IND DESCRIPTION ROUTING-10 YR DEVELOPED 60** PIPE [HYDROGRAPH INFORMATION] Peak Discharge ............................ = 0.02 (cfs) Volume— .................................. = 0.04 (acft) Time Interval ............................. = 8 (min) Time to Peak .............................. = 1136.00 (min) Time of Base .............................. = 2032.00 (min) Peak Elevation ............................ = 2.20 (ft) [INFLOW HYDROGRAPH INFORMATION] Kydrograph # .............................. = 5 Hydrograph Description .................... = 10 YR 24 1111 DEVE.LOPED P2 @E) 996 0 PHONE NO. INTENSLG rot Ao W"V AOP AIR -k 0� 0 pow- A410 ED so ROM". IN;ENSLS I=rj L,6 I "T-1 PHONE tZ- : 4215 48, 728-2 V.7% &mff I*fmw CIA- 0 )��Of�9 71K Ot wo- 14 I .. 0 sFROM':-INTENGLG 01 0 PHONE NO. : 425 481 7292 Jul. 07 1998 il:-41R4 P1 Tmo To 86 F&iwr*jvwd UKMW 6*w dwe Hw?woLAkL.Fr-�- ff f k � �10. 0A dw�wjV74. L- cu Lc- v 405 Rep'- gri (.. Zf"p- pa A VLED AS NOTEP M-77' 0 Q 4 - bIq DAILY FIELD, REPORT 0'1E0"rECH TRAVEL/PREP TIME JOB NUMBER CONSULTANTS, INC. TIME ONX, DATE r7 13256 NE 20th Street, Suite 16 P.O. Box 2054 TIME OF'rSITE' DAY OF'V _jE1IiK Bellevue, WA 98005 Tacoma, WA 98401 206-747-5618 FAX 747-8561 206-627-5990 FAX 627-2114 HOURS CHAf*,ED WEATI-kl`�- JOB 4r GENEilg 60NTRACT6R - GEN� CONTRACTOIYS SUPT. MILES. �WITN MBER j GRADING C0.4T'RACTO'R GRAD[ G FOREPERS6N VISITORS PAGE bF NEXT SITE VISIT: COPY TO: SIGNATURt: ) )I) Setbacks/Variance/Setback Adjustment "XX .4- Conditional Use Permit -------- ---- AD13 Requirements . . . . . . . . . . . . . . . . . . . . . . . 3 Other Zoning Requirements A Underground Wiring Required X I X: Lot Slope 15% SEPA Environmental Checklist/Hydraulics Permit . . . . . . . . . . . . Tree Cutting Plan 8 Plat/Subdivision Requirements X! Legal Description Verification . . . . . . . . . 10 Quit Claim/Street Dedications Easements - Public/Private Engineering Storm Drain Review Fee Engineering 2.2 Inspection Fee Drainage Plan (On -Site) Setback - Top of Bank, Stream, Water Courses 7 . Setback - Storm Drain Line Open Ditch - Existing Culvert Required ,A C' A Culvert Size Shoulder Drainage/Shale Open Runoff Catch Basin Required Driveway Slope & Vehicle Access M Sidewalk Required Curb & Gutter Required A-9 Curb Cut For Driveway Required L:2 Street Paving Required ae) 727 Right -Of -Way Construction Permit Required Street Name Sign Required Other Signing Required --- ------- Bond Required For Public Improvements Ap-) 21 FEMA Map Check/Water Table Side Sewer Availability 4,-J I 39 Calculate Sewer Connection Fee If No LID # Create Street File Existin Water Main Size X. Water Meter Size Seivice Line Size Water Meter Charge Required Hydrant Required Hydrant Size Existing yr-3-7 Fire Line Charge Required - Sprinkler 46 Street Cut I've! ?, .45 Miscellaneous --�L rmmmmmml — I 07� ; 44?j Reviewed By: FIRE PLANNING ENGINEERING" % PUBLIC WORKS K �j I%; "� d R E C 0 R D OF C 0 N T A C T S 1 21 2 22 3 23 4 24 5 25 6 26 7� 27 7 8i 28 RW PERMIT # DATE ISSUED RECEIPT # R 29 �o 30 31 32 PAID $ RECEIPT DATE 33 SS # DATE 26 5�tF _PERMIT -ISSUED RECEIPT I PAID $ RECEIPT # DATE 34 .5 35 .6 36 �. t 37 METER SIZE PAID $ 00n DATE 6)6)RECEIET 9 1-36 38 39 40 f V�l MEMORANDUM Date: Septempber 30, 2002 To: Subdivision File S-28-72 From: Star Campbell, Assistant Planner'�--� Subject: Recognition as.valid subdivision. A recent inquiry regarding the subdivision potential of 18111 84 1h Ave. W. led to research to determine how the existing lot was established. In inspection of the subdivision file (S-28-72) showed that the lot was created along with two others 18311 84 1h Ave. W. and 18321 84 th Ave. W. as a 3 lot short plat (S-28-72). This lot was approved by the City but there is no recorded document in the subdivision file. It is therefore, not evident whether the subdivision that was approved by the City was recorded within the allowed time period. A subdivision that is not recorded within the allowed time period autornically expires and thus, is not a valid subdivision. However, further research indicated that a lot line adjustment was approved by the City in 1998 (LL-98-63). This Lot Line Adjustment moved the boundary line between the two southern lots (18311 and 18321 84 th Ave. W.) and changed the location of the access easement across 18111 84 th Ave. W. In addition, two building permits were issued by the City for new single family residences at 18311 and 18321 84 th Ave. W. in 1998. By the granting of these approvals, the City has recognized the original 3 lot subdivision (S- 28-72) as !gggl, regardless of whether or not the subdivision had been recorded within the allowed time limit. This was confirmed by Rob Chave, Planning Manager, and Duane Bowman, Director of Development Services. City of Edmonds cze Planning Division 7w-3 is 1840q M01 I I L T�_0-5� IM . 10607 16616 10612 mrs ism 18611 W61 10619 106" q JU26 111621 186271 1 18621 IBM 18627 06:4 MOOR 18627 16630 ?6RRlq I 187 ST S. W. I I cb. 1 18629 16670 633 — — '___JI 11 18-104 1 It7P ;21 X Q /no/ , :61 1870Z 1 on -V — '19703 18704 a — 8767 OD Z Go go OD 19714 IS )Tm im 'Nor. 147", $719 Q T_. W, 7 _f W_ pq A tarn Go Go Im :! 24 Z 725 t P% ;; .2 -a 8771 00 1 L it it kile WESTr vmr ST. �S. W. IS27W CT lost 0 1 20 DA ZoneB' N.E. 1/4, SEC. 18 T27N., RAW.M. 356 356 178 TH r e V, tic, 01, 1 kn ISO TH :)8 0:13: 1 z% �? % 1 18017 1600 ISO PA 16017. 'SDI) 18021 1509 10026 Alp, )602B 8107 10106 lie) 18105 19103 ISM 141 IWO 16116 181A 1.� /oil PA. 18119 111117 Bill IQ . %. 0- Ilu te I le- - 1 181.18 iffZ PL. 5w. Q 16119 isles, 19203 t IS21Z :t 18208 10220 2"*P it's 21 J2210 a Ok 1820 Co MIS 18226 18227 lozz, 03 16300 1830 If 18321 a 1 18312 18315 19326 18305 3327 Q I 18302 1830(. z 4C — W32 10324 16303 A 18325 0 10400 J 84 S w POST C%j Ir 14 p ___41 6411 jgj05 OF "T Co 00 00 SEA VIE V/ 14 /MIS MIS . I N 10419 A 29 16502 IM26 10427 )"24 " 1 104-32 j Its- J-T 5.0 1801 16502 18503 ISF04 10505 18504 185 8 5 Q, 0. POD PARK , r, 115 0531 Nfig JISM /8515 10514 CO % )1614 8516 in 16526 1 fSZ7 "'S30 ST & W. p 0622 Iku 24 .0 ­w ei rim, -4 40 to cc ao CO 00 fttb m cc W. vj Ln #,. Z' :: ;� Q. 94 In ;; �t qu N M Cm C%d Cm ;:J.. ft Co QD 60 GD am cc C-0 F0 Iwo IW7 12 - & 6W7 IWO IM7 ri N N too— I folly I FF Z4- 18623 IM4 Q ___! " I A IA?2i Z IMM. 00 169294K.'ry Z Ile 4-OZ 035 -'180TH EAVIE FIA 11-065. 4 IT 6. . ..... 2 1 of 02 i 1 1-054: 02 i 2 1 1 21101; 3 of 2 f C 11 66" 1-04 11 1 . 1-01 1-066 02 2 04 IT "--- 4 4 3 M P 5, 11-006 4 4 1-0841 5 6 L L -1 L--- 2 �un-? 1--oll s 1 11 3 S ; 3 2 11014 YER'S 3 5 03 1 4 V 177' cool 02 A$ SP 5-1 -90 V/ 3 .4 . . . ....... 4 7 1013 �4 1080 081ST-PL-SW 4 03 i 02 -9 1IRS 2 01 2 Oq ;11 1 +41�0\$ 7 1 3. Alit' ---JL --- 3 W�Posp : wwol vn- 6 1-002 ! A �L-9§;JM m 6) 4 . . . . . . . . . . . . . . . . . . . . "k ....a (4 03 20 EI I — —.1 TRA ! I WOODS EK P, 6 7 7 10 9 5 1 3 1-017 -036 2 11 2 1 "1 8 3 00 ;tl Of It 1 6 7 1-0741 v 7 11 --.. 1-042 034 1-ma 7 PLACE (8 6) 03 02 TR 999 .�Oq 2 11 1-02 102ND 10 9 7 8 14 (72.94) i lwAvA 4 1 13 11-076 1-04111 FljO43 1 116 1, Ol 9 1 m 1021 1 1 06� L-t 14IJ 2 12 104 1-04b O� ; . P-- 9 04 0, —1-0-6011.03 11 4 7 1-0391-01 It 10 of 2 -4FI&T44--C%T — '41 12 02 1 04 IP-053 1-056 lo 04 1 07 0 13 12 it ... ap 106 if, - - CY 2 1 1-051 1-055 14 105 is 04 2 of SP 217 (S-79) 0511- f i 11-057 7 02 00 =T 9 7 02 e-H S 'S DD 6 17 1 18 19 20 21 1 2 3 4 2 2 6 w of 5 85TH Vl 6 -pL--SW 22 1 Of 04 4 -low. A,j —M let 3 23 104 I No 16 2r. 24 13 3 4 9 10 1 of 2 1 M 0) 04 06 m-j 117 L I Of --------------------- w 15 02 03 7 6 a 4 3 2 1 1 2 3 1 9 39 28 27 le 103 14 _Z BE .�. �T 102 -A PA Z_ 10 7 38 29 26 '17 1 LYN 9 13 02 8 9 10 11 12 13 14 6 ? 4 11 6 37 30 25 18 ,, I E 2 12 r. 12 i I . 1 1— of -------- 36 31 96 24 19 CD 13 uml,* 4 2 4 3 32 2; 21 3 � t 1-0 r 20 19 18 17 16 15 of 02 14 F� 4— - — - 3 M 22 1 22 23 24 25 26 1 — i 9 101 3 27 28 s 3 4 1 ; Is 17 2 --sw ------- J 9 Ti 'ACT " 167f 11 Is 71 1 2 3 6 7 Cl. --198T-H —ST- A AITI ruc 0 9 1 P4 1 17 19 04 1 02 LE 19 3 4 rl 6, /4 1 [,P;A a �] I i I -"-I i 1 [-.!4 11 1 "ok� 4�1 Ov NSN Zoning and Vicinity Map FRPM : P9-nasonic FAX SYSTEM PHONE NO. : 2067787699 Jun. 16 1998 05:56AM Pl o' 811ILDItill JUN 16 1998 JANP,IS CONSTRUCTION 16705-85 PL WEST EDMONDS, WA 98026 1-4 2,c BUSINESS (2,n� 778-7699 L�,tg, rAx (2,M) 778-6257 TO: RTTN NUMBER 44 2'� , -7 111 -2- FAX NUMBER A 2'�-- :2 -1 1 TOTAL NUMBER OF PAGES IZ Tt4cF-,)910-)(' 7-140 7AC-C- ? L AIN C0qW(,7nbtAc,. Ail lovllk7v�LL4'r 2- 't 3 i4Jrtl ort-,� (a A F!mV-r.e #M%J Qwl- "aw4lbQm -'clt�eq. j'-q 1�0 VT it, L�'A-q C"� , J-4 'CI4&S 'P^4 'y0o COP4 bC- 1-4-rr P� ( () t"Tr L4 N1 a sqc wqtk As 'rvvs T' IF %0-) Kqa,.) � —k , -T�: -IL-Ad 44AIle A-W-t QOSV0,13 P02-19S�� 05-7 Zo(, A"79- '3c;,qc> FROM : Pa�asonlc FAX SYSTEM 0 PHONE NO. : 2067787699 Jun. 16 1996 05:57AM P2 After Recording Retum tO: Janris ConsftctiOn 18705 -.85th PI VV Edmonds, WA 98026 CITY OF EDMONDS RECORD OF LOT LINE ADJUSTMENT Grantor. 1) Curbs D. Smith Grantee: 1) Curtis D. Smith 06/15/98 09:03 p.0005 Rocorded Snohomlsb County Z) Dolores M. Smith, husband & wife 2) Dolores M. Smith, husband & wife Legal Description: Portion of trio NW1/4 of the NE11/4 of Section 18, T. 27N., R. 4 E., W.M. Assessoes Tax Parcel 10#: 1 BZT04-1-058-0004 and 182704-1-072-0006 Section -Township -Range: 18-2T-4 This is to cerfify that the properties as shown on the attached map (Exhibit "Ar) and deecribed ars follows Portion of vacated Bloc* 10 and portion of vacated streeW on North and East sides thereto in vacated Fir5t Addition to the City of r-drnondej described as foll*YA: Beginning at the Nortfwm3t corner of the Northvvee� quarter (1/4) of the Northeard quarter (114) of Section 18, Townahip 27 North, Range 4 East W.M.; thence East along the North line of Section 18 for 270 fcvt; therwe South along center line of Gxetar Avenue, in said plat now vacated, for 991 feet to center line of Elwood Avenue in said plat now vacated, the true point of beginning; twoo, South along the center line of said Exeter Street (Avenue) now Yacated, 305 foot to the North line of Olympic Avenue: thence West along the North line of said Olympic Avenue for 270 feet to the West line of said Northwest quarter (114) of the Northeast quarter (114); thence North along said West line for 305 feet to the center of said vacated Clwwd Avenue: thence East to the point of 4eginNng. jr=xCEPT the West So feet for road, and EXCEPT the South 160 feet thereof Situate in the County of Snohoff�sh. State of Washington. Containing 35103 square fe0t (0,806 acres) FROM : Panasonic FAX SYSTEM PHONE NO. : 2067787699 0 Jun. 16 199 8 05:57AM P3 Scrith Lat Lim UjudmeRWI 198 Portion of Vacated Block 15 and portion of vacated Streets on South and East skles thereto in vacated First Addition to the City of Edmonds. described as follows: Beginning at a point 30 feet East of the Northwest comer of the Northwest 1/4 of the Northeast 114 of Section 18, Townshp 27 North, Range 4 East W.M-: thence South 666 feet to canterline vacated Mmont Avenue. the true point of beginning: thence Easterly 240 feet to centerline vacated Exeter Avenue: thence South 325 feet to centerline vacated Elwood Avenue: thence West 240 feet; thence North 325 feet to true point of beginn'ing: EXCEPT the North 202 feet thereof; Containing 29762 square feet ( 0.683 wes). Situate in the County of Snohomish, State of Washington. Beginning at the southwest comer of the above described Parcel B: thence N 70o 57' 19" E, 107.72 feet to a point on the south line of the north 90.00 feet of said Parcel B; thence N NO 38' 13' E, parallel with the north line of said Parcel B, 125.00 feet to a point 15.00 feet west of the east line of said Parcel B; thence N 10 24' 29" W. parallel with the east line of said Parcel B, 90.00 feet to the north line of said Parcel 0; thence N 880 3a' 13" E, along said north line, 15.00 feet to the northeast comer of said Parcel 8, thence 5 10 24'29' E. along the east line of said Parcel B, 122-05 feet to the southeast comer of said Parcel B; thence S 880 3r 14* W, along the south line of said Pa=l B, 242.65 feet to the point of beginning. Containing 7601 aquare fee (0. 174 acm). Portion of vacated Slook 16 and Portion of vacated streaft on North and r=ast sides thereto in vacated First Addition to the City of Edmonds, clancribad 26 f011OWS: Beginning at the Northwest 66mar of the Northwoe-st quarter (1J4) of the Northeast quarter (114) of Section IS, TownsNp 27 North, Range 4 East W.M.; thence East along the North line of Section 18 for 270 feet thence South along center line of Exeter Avenue, in said plat now vacated, for 991 fag to canter line of Elwood Avenue in said plat now vacated. the true point of begimlng: thence South along the center line of said Exeter Street (Avenue) now vacated, 305 feet to the North line of Olympic Avenue; thence West along the North line of said Olympic Avenue for 270 feet to the WW line of said Northwest quarter (1/4) of the Northeast quarter (1114)� thence North along said West line for 305 feet to the corder of said vacated Elwood Avenue; thence East to the point of beginning; EXCEPT the West 30 feet for road, and EXCEPT the South 160 feet thereof. TOGETHER WITH a portion of the follovAng described Parcel B: 1 01049vt FROM : Panasonic FAX SYSTEM PHONE NO. : 2067787699 Jun. 16 1998 05:5eAM P4 Smilh Lot Lim A4usm=t/finigs That portion of Vacated Block 15 and portion of vacated StrCe on South and East sidbs t$ thereto in vacated First Addition to the City of Edmond*, described as folkmm: Beginning at a point 30 feet East of the Northvmst 0orn0r Of the NOrdmfad 1/4 of the Northeast 1/4 of Section 18, Tqwn:ship 27 North, Range 4 East W.M.; thence South 666 feet to Centgrilne vacaUd Belmont Avenue, the true point of beginning; thence Easterly 240 fW to oenterline vacated Ex*ter Avenue; thenoo South 325 feet to canterline vacated Elwood Avenuir, ftngo West 240 feet; thence North 325 feet to true POW Of beginning; EXCEPT the North 202 foet thereof; described as follows' Beginning at the southwest corner of the above described Parcel 13: thence N 700 SIP IV E, 107.72 feet to a point on ths south line oF the north 90.00 feet of Said Parcel 8, thence N 880 3V 13" E, parallel with the north line of said Parcel B. 125.00 feet to a point 15.00 feet wiast of the east line of said Parcel 8: thence N 10 24'20" W. parallel with the east line of said Parcel B, 90.00 feet to the north line of said Parcel B; thence N 889 38' IT E, along said north line, 15.00 feet to the northeast corner of said Parcel B; thence S 10 24'2Gr E, along the east line of said Parcel B, 122-65 feet to the southeast corner of said Parcel B-, thence S 88o 37' 14' W. along the south line of said Parw B, 242.65 feet to tha point of beginning. The total parcel containing 42705 square feet (0.980 acres) Situate in the CountY of Snohomish, State of Washington. Portion of Vacated Block 15 and portion of vacated Streets on South and East sides thereto In vacated First Addition to the C4 of Edmond% described as follows: Beginning at a point 30 feet East of the NortfrNesl corner of the Northwest 1/4 of the Northeast 1/4 of Section 18, Township 27 North, Range 4 East W.M.; thence South 666 feet to centeffine vacated Belmont Avenue, the true point of beginning; thence Easterly 240 feet to centMlne vacated Exeter Avenue; thence South 325 feet to uentedine vacated Elwood Avenue; thence West 240 feet; thence North 325 feet to true point of beginning; Exr,EPT the North 202 feet thereof; and, EXCEPT the portion thered de5cribed a3 follows: Beginning at the wuthwost corner of the above described Panml B; thence N 700 57' 19M E, 107.72 feet to a point on the 3outh line of the north 00.00 feet of said Pareal 13; thence N 88P 38' 13* E, parallel with the north line of asid Parcel 13, 125,00 foot to a Point 19-00 feat vmst of the ea3t line of said Parool 13; thenos N 10 24129" W, parallel with the east One of said Parcel 8, 90.00 feet to the north line of said Parcel 8; thence N 880 38113w E, along aaid north line, 16.00 feet to the northeast comer of said Parcel B: thence S lo 24129" E, a" r* east fine of said Parcel 13, 122.65 feet to the so0heast comer of said Parcel 8; thence 6 88o 37' Ur W, along the south line of said Parcel B. 242,65 feet to the point of be4nning. The total parcel containing 22160 square feet (0.509 acres) A4 FROM ; Pan�sonlc FAX SYSTEM 0 PHONE NO. ; 2067787699 Jun. 16 1998 05;59AM P5 Smilh Lot Lirt A*sbrwV6/1,99 Situate in tha County of Snohomish, State of Washington. The easement herein described affects the following dese(lbed PrOPOrtY. The north 202 feet of that portion of Vacated Block 15 and portion of vacated Stretits on South and East sides thereto in vacated First Addition to Me Cfty of Edmonds, described as foii6ws: Beginning at a point 30 feet East of the Northwest corner of the Northwest 1/4 of the Northeast 1/4 of Section 18, Township 27 North, Range 4 East W.M.; thence 3outh 666 feet to oWerline vacated Belmont Avenue, the true point of beginning; thence Easterly 240 feet to centerline vacated Exeter Avenue; thence South 325 feet to centerline vacated Elwood Avenue; thence West 240 feet thence North 325 feet to true point of beginning; The cenWrIlne of a 20 foot wide easement for ingrew and egress is dewibed 08 follows: commencing at the southeaut comer of the above described paroal; thence 6 880 3V 13- W, along the south line ofsaid paml, 15.00 feet to the point of beginning of said centerline; thence N 10 241 291- W, parallel witl� the eaet [in& of said parcel, 65.00 faot to a point hereinafter referred to as Point "A!'; then" continuing N 10 24' 29" W, parallel vAth the ea3t line of mid parcel, 61.43 foot to the beginning of a tangent curve to the laft with a radius of 72.00 feet; thence along said curve through a central angla of 890 55' 42*, 113.01 feet to a point 13.00 feet south of the north line of said parcel: thence S 880 39'49" W, parallel with the north line of said parcel, 77.42 feet to the beginning of a tangent ourve to the loft with a radius of 115.00 feet; therica along said curve through a central angle of 270 09, 27", 64.61 feet to a point of reverse curve vAth a 11 5.D0 foot radius curve to the right; thence along said wrve through a central angle of 130 35'05", 27.27 feet to a point on the west line of said parcel and the terminus of the herein descaibed centerllrw� said poik being 35.23 feet southerly of the northwest corner of said parcel. Together with an easement 20' in width described as follows: Beginning at the previously mentioned Point "A7: thence S 880 35' 31' W. 30.00 feet to the terminus of the herain described centerline. The sidelines of said easement shall be connected with tho westerly sideline of the previously described easement with 20' radius tangent curves. have had their lot lines adjusted under the provisions of the Edmonds Subdivision Ordinance (Chapter 20.75) File No LL-9M3. We verify that we are the legal owners of the property described above, we warrant that all representations are true and correct and understand that in the event of any misrepresentatio ' n or failure to comply with the conditions and regulabons set forth herein, the City of Edmond5 shall have the right to dedare that lot line adjustment void and record a statement to that effect in the Grantor - Grantees index in the office of the Snohomish County Auditor. Signed this day of June, 1998. FROM : Panisonic FAX SYSTEM PHONE NO. : 2067787699 0 Jun. 16 1998 05:59AM P6 Srrdth Lot Line AdjwW=tt611/" STATE OF WASHINGTON )SS (individual AcknoWedgement) COUNTY OF SNOHOMISH I ceriffy that I know or have satisfactory evidence that Curtis 0. Smith and Dolores M. Smith, husband and wife. are the persons who app4ared before me, and said persons acknovAedged that they signed this instrument and acknovAedged it to be their free and voluntary act for tMe uses and purposes mentioned In the Instrument Dated this �\ day of nNr-� 1M at WMOM!->-, WaShIngtOn. 'A�ry Public. in and for the State of Wa3hington Re5iding at 903 - S;n-' A%jv- S, _, =o"oyqvj My appointment expirea 3.42;2 1 JQ2 FROM : Pan�sonic FAX SYSTEM 0 PHONE NO. : 2067787699 0 Jun. 16 1998 06:OOAM P7 e- 'o M49W, Atflo :W4,11. 7 3 X� �8 -rdAr- jolow 6L ja tit 'Ilk AW to$ 014114JI'Ll 44m 000W ov -poloo iw. Ui DOW006A jo 0111 jjQ AROU Vjowmma ata 10 Woo I'moo pus 9041 io I., ;aawmaout NOUN 8�i mo AMW, A411JOU cp ,10)!pn,f - Alulngo �SI;901415us 'A, gjjjt�A-01 qoQ " 10 FROM Panasonic FAX SYSTGM After Recording Return to: Jands Construction 18705 - 85th PI W Edmonds, WA 98026 PHONF= NO. ! 2067797699 9806150002 06/is/96 09,08 P.0004 Recorded Snohomish County Jun. 16 199e 06!OOAM Pe NO EXCISS TAX REQUIRED JUN 151998 r .;f� Snohom�h County Trossarer 1�y 506 DANTINI ACCESS AND UTILITY EASEMENT Grantor: i) Cortis D, Smith 2) Dolores M . Smith Grantee: Thompson and Thompson Partnership, dba Janris Construction L0921 D060riptiOn! Portion of the NWI/4 of the NE1/4 of Section 18, T. 27 N., R- 4 E.. W.M. Ae"asoes, Tax Parcel. 115B.- 182704-01-009-0004 Section-Township-lUnge- 18.2i-4 The Grantor(a) Curtis D. Smith and, Dolores M. Smith, for and in 00mideration of mutual benefits. do hereby grant and convey to Thompson and Thompson Partnership dba Janris Constmcfion, Grantee , Its succawars and assigns, a non-exclusive easement and Hgh . t-d-way over, through, under, across, upon, and in fl-o folloWdo described real property situated in the City of Edmonds, Snohomish County, Washington. The north 202 feet of that portion of vacated Block 15 and portion of.vacated Streets on South and East sides thereto in vacated First Addition to the City of Edmonds, described as follows: Commencing at a point 30 feet East of the northwest comer of the Northwest 1/4 of the Northeast 1/4 of Section 18, Township 27 North, Range 4 East W,K; thence South, ON feet to the centerline of vacated Belmont Avenue, the true point of beginning; thence Easterly, 240 fast to the centerline of vacated Exeter Avenue: thence South, 325 feet to the centerline of vacated Elwood Avenue; thence West, 240 feet; thence North, 325 feet to true point of beginning. for the construction, maintenance arKyor repair and/or reptacernent of a payed driveway to serve two single family residences on the properties to the south described in attached Exhibit A, and the Prop" described above, Said easement may also be utilized to provide utility service to the single family residences, The no"xclusive easement granted and conveyed herein io described ar. follows* The centerline of the 20 foot Wde nori-exclusive eazernent for ingreW egress and utilities conveyed herein is described as f011OWS: Commencing at the southeast comer of the above described parcel; thence S 8810 38'13"W, along the south Jim of 3aid paroel, 16,00. feet to the point of beginning of sold centerline; thence N 10 24� 290 W, parallel vAth the *art line of said parcel, 55-00 feet to a point hereinafter referred to as Point W; thenoe continuing N 10 24' 2V W, parallel with the east line of said parcel, 61.43 feet to the beginning of a tangent curve to the left with a radius of 72-00 feet; thence along "d curve through a central angla of 890 561 42", 113-01 feet to a point 13.00 feet south of Me north line of said parcel; thence S 880 3V 40" W, parallal with the north line of said parcel, 77.42 feet to the FROM : Famasonic FAX SYSTEM 0 PHONE NO. : 2067787699 0 Jun. 16 199 8 06:0iAM P9 SMM ACM EaSCMMIMNS beginning of a tangent Curve to the left With a radius of 115.00 feet; thence along acid curv4 . through a central angle of 27c 09' 27", 54.51 feet to a point of reverse curve with a 116.00 foot radius curve to the right; tnence along said curve through a central angle of 130 36'06", 27.27 feet to a point on the west line of said parcel and the terminus of the herein described conterlirwo, raid polM being 33.23 feet southerly of the northweet oorner of sold parcel. Together With a non-exclusive ea5ement 20' in width de3cAbod as follows: Beginning at the previously mentioned Point "N'; thence 9 880 36 31" W, 30-00 feet to the terminus of the herein described centerline. The sidelines of eaid non-exoluaiYo easernont "ll be connected with the vve*tedy skidins of the pmvioualy described non-exclusivo eacement With 20' radius tangent curves - The GrantDr ahall retain the right to use the surface of said non-exclusive easement. so Long as said use doee not interfere with the Installation and maintenance of the driveway or utility lines and so bN as no permanent buildings or structures are erected on said not% -exclusive easement. This non-exclusive easement is granted with the Lnderstardng that affected adjacent property vAll be returned to a oondition equal to its original condition upon completion of construction, The Grantee also agreas to indemnify and save h2rMl2M the Grantors from any liability arising from the construction Of %Xh facilities, JOINT MAINTENANCE AGREEMENT FOR PRIVATE ROAD (owam The non-exclusive easement de5cribed hemin shall be for the purpose of ingress tO and egress from the parcels desortbea in attached Exhibity A providing access to 84th Ave W; and for the pu"As of constructing, reconstructing, mairdai tring and repairing publio utilities of all kinds. both above and'below the surface of the non-exckmive easernert promises, including but not limited to, water. sanitary sewer. storm drain liner., telephone and electrical lines. natural gas lines and television cable. The non-excluelve eawment herein granted ch;Wl be a covenant running vAth the land. The cost of grading and improving the roadway over the non-Qxclusive easement promise& and of constructing and in3tWling Wlitie3 therein, and the maintenance of said road and utilities, shall be borne by the present and future ownem of individual properties to the extent the non-exclusive easemerd road lay between 84th Ave W and the point of awes& to each individual property, PROVIDED, that this provision shall not be construed to require the undemigned grantor of this non-exclusive eaSernent to contriibute to the original cost of any improvements made in the said easement premises. (1) Alt 5ubwWont deeds will contain provisions regarding the private road in the manner described herein, (il) Adl maintenance of the private road described by this non-exclusive easement shall be by the owner(s) of the parcels having legal'access therefrom or their successor(s), unless and until such roads are improved to City -of Edmonds stand2rds and accepted by the city for maintenance; (iii) The private road is hereby subject to a utlities easement in favor of the grantor(s) or the successor(s) and of any electric, telephone. television cable, gas� water, or sewer company, public or private. or the succemor(s) to install. construct, operate, maintain, atter, and repair their respective utilities, together with the right of ingress and egress for said purposes, PROVIDED, That if the road should become a public road at some time in the future, all easements within the road shall become null and void. and any ublitY facilities which physically exist shall become subject to the franchise requirements of the City of Edmonds; FROM : Panasonic FAX GYGT9M PHONF= NO. : 20G7797G99 Jun. iG 1999 OG:02AM P10 0 sTnith Am= C*VMWW6("4 (lv) VVIth respect to the private mad descrlbeo by thIs non-exclusive easemem whemer'It remains private or becomes a public road, there Is the additional right to make all necessary slopes for cuts and fillu; and the right to wntinue to drain said roads and ways over and acrow any [at or lots where the water might take a natural courm upon team ble grading pursuant to improvement for dedcation of the roads and ways shown herein. Following rea*onable grading purnuant to impro�ements for dedication of the roada and WOY3 3hown herein, no drainage waters on arry lot or lots shall be diverted or blocked from their natural oour3e so a5 to diwharga upon any public road rights -of -way or hamper proper road drainage, Wthout the approval of ft City of Edmondw, The seller is hweby required to give actual notice to a proopective purchaear of the method of maintenance 6f the private road and is required to include ouch notice in any deeds or oontraoft relating to the eale. Such documents or covenants shall oontain provisions for tranofer of reponsibility to suooessm and aesilgns, the placement of lions against parsone not fulfilling the maintenance agreement and provWon that the road or portion thereof shall be deeded to the City of Edmonds when brought to full city atanJards by one or more of the owners thereof. The covenants are for the mutual benefit of the grantor and his heirs, successors and assigns and are for the hirther purpose of compliance with the ordinances and regulations of the City of Edmonds, and the city and such persons are specifically given the right to enforce these restrictions and reservations by injunction or other lawful procedure and to recover any damages resulting from such violation. Dated this,// day of . loge at Washington. zo Curtis 0. Smith Dolores M. Smith STATE OF WASHINGTON As (Individual AcknoWedgement) COUNTY OF SNOHOMISH I cerft that I know or have satsfactory evidence that CurUs D. Smith and Dolores M. Smith, husband and Wfe, are the persons who appeared before me, and said persons acknowledged that they signed'thIS instrument and acknowledged it to be their free and voluntary act for the uses and purposes mentioned in the instrument. Dated this I I day of rV E , 1998 at QD0\oMI) S -, Washington. kim -ro&NQ�� (Name Printed) Notary Public In and for the State of Wa3hington Residing at 305- <�" &t!4 S. KQ—"6&A4 My appOintment expires 3 jam . 460 FROM : P4nasonic FAX SYSTEM PHONE NO. : 2067767699 Jun. 16 1998 06:02AM P11 SrWih Acm ftiem0AWS EXHIBIT "A - Portion of vacated Block 16 and portion of vacated street& on North and Egiet sides thereto in vacated First Addition to the City of Edmonds, described as follova: Beginning at the Northwest corner.of the Northwest qu2rter (114) of the Northeast quarter (1/4) of Section 18, Township 27 North, Ranga 4 East W.M.; th6nee Gast along the North line of Section 18 for 270 feet: theffee South along center line of Exeter Avenue, in said plat now vacated. for 991 feet to center line of Elwood Avenue in said plat now vacated, the true point of begMna: thence South along the center line of said Exeter Street (Avenue) now vacated, 3D5 feet to the North line of Olympic Avenue: thence West along the Naffi line of said Olympic Avenue for 270 feet to the West line of said Northwest quarter (114) of the Northeast quarter (1A); thence North along said West line for 305 feet to the center of said vacated Elwood Avenue; thence East to the point of beginning. EXCEPT the West 30 feet for road, and EXCEPT the South 160 feet thereof. Situate in the County of Snohomish, State of Washington. Containing 35103 square feet (O.6W acres) PARCEL B UAx Accounj No. j82704-1:M=Q=) Portion of Vacated Block 16 and portion of vacated Streets on South and East sides thereto in vacated First Addition to the City of Edmonds, described as follows: Beginning at a point 30 feet East of the Northwest comer of the Northwest 1/4 of the Northeast 114 of Section 18, Township 27 North, Range 4 East W.M.; thence South 606 feet to Centerline vacated Belmont Avenue, the true point of beginning. thence Easterly 240 feet to centerline vacated Exeter Avenue- thence South 325 feet to centerline vacated Elwood Avenue; thence West 240 feet; thence North 3ii feet to true point of beginning; EXCEPT the North 202 feet thereof, Containing 29762 square feet 0.683 acrea). Situate in the County of Snchomis6j. State of Washington. The north 202 feet of that - portion of O'cated, D(Ock 16 and pqrton, of vacated Streets on South and East sides thereto in Vacated First -Additign- to tho'City of Edmonds, das�-,ribed ds folkmn� Commencing vt.a point'30 fmt- East of the northwea cdroer of tha No6weat'll/4 of the Northeast IM of Section Ia. Township 27 North, Range 4 East W.M.: theri6e *S�Oth, 666,feet to the centerl,ine of vacated Belmont Avenue, the true* point of beginning; thence Eas;terly, 240 feet t� t lle centerfine of vacated Exeter Avenue: thence South, 325 feet to the centerline of vacated Elwood!Avenus: thence WesL 240 feet; thence North, 325 feet to true Doint of beginning; wrks\Wt�M)18270404\ca== FROM ; PanaSonic FAX SYSTEM PHONE NO. ; 2067787699 .;, . go 0 Jun. 16 1998 06:03RM P12 &TA74'; OF WAZHINQW-�F C,GUNTV Or aV40W0M;Gj4 1. Rob Tandilligar, 541ahcsm;sh County kudilor, do beroby barlify that 04 lar4ocirla Ift2framant: ic a true ohd 06troct topy "! t"a 44akimlonj how all We of tocorged Ih 4ir offidli, In Witheis 04�"0 "aw sm my h ILIA Ad --.c ^Aa 0101SAF 0 0 JANRIS CONSTRUCTION 18705 85TH PLACE WEST EDMONDS, WA 98026 . (425) 778-7699 MAY 21, 1998 ROY S. WHITCUTT CITY OF EDMONDS ENGINEERING DEPARTMENT 121-5 AVE NORTH EDMONDS, wA ge020 . i . w mi me, RE: GRADING CALCULATIONS FOR BUILDING PERM17 AT 18310-84 WEST DEAR ROY: IN COMPLYING WITH THE HEIGHT RESTRICTION OF 25 FEET OVER THE MEAN AVERAGE IT WAS DETERMINED THAT WE WOULD HAVE TO EXCAVATE AN AVERAGE OF 3.5 OVER THE ENTIRE BUILDING PAD. THE PAD IS 1957 SQUARE FEET PLUS THE GARAGE OF AN ADDITIONAL 600 SQUARE FEET FOR A TOTAL OF 2557 SQUARE FEET. THIS FIGURES OUT TO BE A TOTAL OF 331.46 CUBIC YARDS OF MATERIAL THAT WILL BE REMOVED AND/OR USED FOR BACKFILL. IF YOU HAVE ANY QUESTIONS PLEASE CALL ME AT 425-778-7699. T Y PAUL A. THOMPSON JANRIS CONSTRUCTION 18705 85TH PLACE WEST EDMONDS, WA 98026 (425) 778-7699 4141#4 JULY 8, 1946� - LYLE CHRISMAN CITY OF EDMONDS COMMUNITY SERVICES DEPARTMENT 121-5TH AVENUE NORTH EDMONDS, WA 98020 RE: PLAN CHECK 98-168 DEAR LYLE: ATTACHED YOU WILL FIND A PLOT PLAN BROKEN INTO 3 SECTIONS FOR COMPUTING THE AMOUNT OF GRADING TO BE DONE ON THIS SITE. I BASED THE DEPTH OF THE CUT AT 133.15' BASED ON THE AVERAGE GRADE OF 135.1�' MINUS A 2 FOOT CUT. SECTION I- I FIGURED THE MAXIMUN DEPTH OF THE CUT WOULD BE 4.25 FEET ON A PAD OF 32'X 24' WHICH GAVE ME A TOTAL CUBIC YARDAGE OF 139.8 CUBIC YARDS. SECTION Il- I FIGURED A MAXIMUM CUT OF 2.25 FEET ON A PAD OF 44' X 17' GIVING ME A CUBIC YARDAGE OF 62.3 CUBIC YARDS. SECTION III- I FIGURED A MAXIMUM CUT OF 1.5 FEET ON A PAD OF 56' X 15' GIVING ME A CUBIC YARDAGE OF 46.7 CUBIC YARDS. THE TOTAL CUBIC YARDS MOVED ON THIS SITE IS CALCULTED AT 248.8 YARDS. SIN R LY, P L *A.THOMPSON m 227,53' 84TH AVE. Id +I3A.4' 15, 0 1 qr LIT4 1040aft"Arr +132.(,- a Dgum PT. . 0 MANHOLE COVER PW 00(o I'all+N j4NRIS CONSTRUCTIC STRU 4PSC)N 4tYl LOT B SCALE 30' DRAWN IBBY C-HRIS TH4VPSON IS310 184tioi Ave W PL.,PL7 v R]26 "M S W, 7 9,8026 PLOTPLAN E:)MICIINDS, WA- NOTICE: a -.c c u �ra-c -Nb--warra-nty of The information'shown on the attached map(s) v\/as compiled for use by the City Of Edmon"ds, its Employees and Consultants. Th.e City of �Edm.onds does not warrant the accuracy of anything set for.th on these rnap(s�-). Any person or entity'requesting a copy should conduct an independent I m'ation shown on inquiry regarding the 'nfor t-Fe 'm a p (s) , including, but not Hm'ted to, th-e location of any sew-er stub shown. Such sewer stubs may or may, not exist and may or may not exist at the location shown. Neither the City of Edmo'nds nor its empl-o-yee-s o-r officle,rs be 1--Jab-l-e forthe information given' on this map(s), nor for ion provided based any one representat' upon . said map(s). 107 ?I, szft "'r, J, —e rmm,- I Mnsm UVE INTENSUS, EngloorMg A Surveft V4 SKTM %, T. 27 M, R 4 � WX 9T I r- NUI' I I NTENSUG PHONE NO. 425 491 72e2 Ex*bw T. a& fb;wtujw '14 4-S,, 011-A re "lly —,A t- - JLII. 0,7 !C)go 11:41R�j PI .".. to Ic" RECE WL7� PERMIT COUNTER p a Ae 106, All ploom By PLIRV,�11NIWG zone 4.(-12- Comer Flag -.Setbacks Required Aqual f- Ae(4� e4r_4-f&,-t Frmt Sides to, ftther Z� Z_ Hei-qk k� to 0jr— dolt 6 0 1�i &I �11_jlili� 4-T (Atd � I STREET FILE 0 . 0 PLANNING DATA NAME: Wfyn; 5 C" , S f-N DATE: 41e/a5- SITE ADDRESS: k 3 11 0 1 PLAN CHK#: 0 5- ti PROJECT DESCRIPTION: Pe(k C-6,z- ( 13-AA p94 t wgkif aver ejajrh!y Age- 4C f-" r--1 REDUCED SITE PLAN PROVIDED?: 60 / No) MAP PAGE: 3 5-b CORNER LOT: (Yes �/o FLAG LOT: (Yes Q ZONING:- P's - I?- - CRITICAL AREAS DETERMINATION#; 1997 - o 12-9 LJ Study Reauired: 54e pt#- 50-� A 12,' fk4p Albp, 1.—� j,16, A. A. 0"17-14 — Ok- 0"Waiver Ll Conditional Waiver SEPA DETERMINATION: Fee Checklist LJ APO list w/ notarized form LlNeeded for 500 cubic yards of grading, Shoreline Area- site within 200 . of Puget Sound or Lake Ballinger) �`Exempt SETBACKS: Required Setbacks: Street: 25-' Left Side: to, Right Side: Rear: ?�S-' 0 Actual Setbacks: &tic. --I— Street:-/19' LeftSide: ?-o' RightSide: 5'2�' Rear: Street map checked for additional setback required? (Yes / Ko-)/ DNA.) LJ DETACHED STRUCTURES: f LJ ROCKERIES: U FENCES/TRELLISES: 1, Ll BAY WINDOWS / PROJECTING MODULATION: IVM 01"STAIRS / DECKS: 1�1� JZI%" PARKING: Required:__�- _Actual: Z- LOTAREA: 2-2.2,1 LOT COVE KAUh. 13 �4 4- (2o-i 4) - Calculations: BUILDING HEIGHT: N� Datum Point:- ro IA Datum Elevation: too' Maximum Allowed: /-5' 62.3' Actual Height: A.D.U. CREATED?: fg'o)/ Yes) SUBDIVISION: LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED: (Yes / OTHER: Plan Review By: New13PPlanningDataForm. DOC CITY OF EDMONDS 111, CONSTRUCTION PERMIT APPLICATION USE ZONE _121- PERMIT NUMBER T0,571 (:Zl JOB ADDRESS SUITE/APT # OWNER NAME/NAME OF BUSINESS — if, r4 a I 1�1` ( 0 t,� �; q ECKI SUBDIVISION NO. LID NO. w NiXILING ADDRESS F, PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. EXISTING — REQUIRED DEDICATION — '11,1/4 PROPOSED &_ TESCP Approved 0 RW Permit Required j6r_0 Street Use Permit Req'dVOO Inspection Required 11i3O,X Sidewalk Required A1,1 0 cc CITY ZIP p TELEPHONE NUMBER bqq NAME M :.TgR S1 IT Y//, LINV SIZE NO. OF FIXTURES PRV ED UR 0 YESWINO ul 1� uj t: ADDRESS REMARKS 7-W 7_14AW 4�01f7b7LY&P-) M ul Lu cc < CITY ZIP T ELEPHONE NUMBEI D/W0L(USTCj0,4-N(_-1_-7 171 bcr-d�o 770)1 0 z Lu NA40 e. _TA P4 rat 5 $-_i1ZJL_Ti0N Cc I 2 ADDRESS 9S P, r ENGINEERING MEMO DATED REVIE)VED 13Y Wjr Z 0 CITY: ZIP O'� L TELEPHONE NUMBER WILD 9-3 0q IRE MEMO DATED REVIEWED BY; W cc STATE LICENSE NUMBER EXPIRATION DATE VARIANCE OR cu ADB# SHORELINE 4 Legal Description o.f Property - include all easements Z co re SEPA REVIEW COMPLETE I EX EMPT EXP SIGN AREA ALLOWED PROPOSED HEIGHT ALLOWED 1PROPOSED cc Lu 0 _j LOT COVERAFE ALLOWED PROPOSED REQUIRED SETBACKS (Fr.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT UR SIDE REAR 0 /51 0 Z Z '.0 Property Tax Account Parcel No. rl 0,4 1 -Ol Z- 00 -0(0 OT AREA Italy P NING _qggLEW BY I,-) 6Zj WTE 5 Q. NEW RESIDENTIAL PLUMBI NGIMECH REMARKS COMPLIANCE OR ADDITION COMMERCIAL CHANGE OF USE N REMODEL APT. BLDG. SIGN Z cc ui M 0 FENCE REPAIR /K!m C_YDS. L x —FT) DEMOLISH WOODSTOVE SWIM POOL INSERT 0 HOT TUB/SPA �GARPO E [] RETAINING WALL/ CAR GRT RENEWAL N ROCKERY_ CHECKED BY TYPE OF C?kS RUCTION N. I V CC Py GRO M­' SPECIAL INSPECTOR REOUIRED dKy ES LM �4,14,V r -7e : & 7 >5 k > OCCU0ANT LOAD REMARKS _4277 PROGRESS INSPECTIONS PER UBC 108 0 Z (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: 1.14 AQ14W -;Q NUMBER OF� STORIES Z NUMBER OF DWELLING I UNITS CRITICALIC'Aq-l— AREAS INUMBE DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) SP ECT104 REO'UIRE'D' Dor, 5/,[Ar—�- :v 41 VALUATION FEE FEE BUILDING HEATSOURCE: i GLAZING (,AS % PLUMBING Plan Check No. kn-Z MECHANICAL This Permit covers work to be done on private property ONLY. Any construction on the public domain (curbs, sidewelks GRADINGIFILL :54 STATE SURCHARGE driveways, marquees, etc.) will require separate permlssio�. Permit Application: 180 Days Permit Limit: I Year - Provided Work Is Started Within 180 Days STORM DRAINAGE FEE uj "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, ENG. INSPECTION FEE S < employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall noi be�deem`ed to ive or reduce any requirement of any c4y ordinance nor m n any way the City's ability to enforce 6 . ny ordinance provision." PLAN CHECK DEPOSIT -7 TOTAL AMOUNT DUE information given is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and state laws regulating construction; and In doing the work authoriz- THIS PERMIT AUTHORIZES ed thereby, no -person will be employed in violation of the Labor ONLY THE Code of thet§ia�e of Washington relating to Workmen's Compensa. WORK NOTED tion Insurance dric RCW 18.27. SIGNATURrM,�tkr:R OR ZGENT) DATE IGNED 0/ INSPECTION DEPARTMENT CITY OF EDMONDS T "UNTION A f CALL FOR INSPECTION IT IS:7UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 771 —Q220 A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 b7 1,21q� 102,q? APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy; and fees are paid, and receipt is acknowledged in space provided. IFFIC AL' 3NATOVI ATE DA ORIGINAL File YELLOW — Inspector PINK — Owner GOLD — Assessor