Loading...
18312 OLYMPIC VIEW DR.PDF1111111111 lill12539 18312 OLYMPIC VIEW DR Z I N O N O to Z N OrnN y .Or..� > 70C > p O Z C r m g m v rn m 0 O Z [�1 H- 77 o�g 6 v f� N N „ Z 82.0' 80.0' 78.0' O — OLYMPIC VIEW DRIVE — x( 3� EXIST. SHOULDER ! ,W-01 . . I. IN I —i Recce 'P 7 199i PERMIT COUNTER 84.0' _ 1 � _ _ to 82.0' _ 80.0' 78.0' _ BURUNG NORTtYlspa - z RAI(.ROAO L4'' •' - ;, dr.. .• ll tX T�, b is RE E-T FILE 723 S i +-C- .•t 0 b90-199 J'- Q3-ia3 SEP 1 7 19,93 STREET F I L PERMIr c01j1Vrr;1 City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City_ . The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map Of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: 4kLLAL4, �Llel57 ,Ilysb A/ Name Title 1Y 3I z 01-ylfi,lc V i0-'/ ✓folk Street Address r-70IVoh1af wVI �9vzv 776-g162- City, State, ZIP Phone Signature Date Applicant Representative: TOO M A-,S M. !-% U P0,1 Name 1� TC cf. 7- Title FIBS A `n?e 2-4ni,nl[ Street Address City, State, ZIP Phone Signature Date Critical Areas Checklist- oe Site Inform-2 fon —Project Name: /Ittv 6,4-RAe;E permit Number: P(-N0iN(, Site Location: 421 V1nP/e 1//61, l /Moperty Tax Account Number: �XP510 ooa D I 0 01 Approximate Site Size (acres or square feet): 121-�5 Have you filled out a Critical Areas Checklist for a project on this site before?� General Site Conditions 1. Has the site been cleared or logged? �,�D Date of most recent action: Soils / Topography 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? S wrrw rcw� 3. Describe the general site topography. Check all that apply. Flat: less than 5 feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a / horizontal distance of 66 feet.) I/ Hilly: slopes present onsite of more than 15% and les s than 30 /o (a vertical rise of 10 feet of horizontal distance ) 1/ Steep: grades of greAter than 30% present on site. Comments 14C (�(lU►�El�iy S'�Of SfEEPty DOL,1n11-AI�� FP-dl')l P i-ANC_ Hydrology/Vegetation 4. Site contains areas of year-round standing water: (� 5. Site contains areas of seasonal standing water: 90 Approx. Depth: 6. Site is in the floodway � floodplain � � of a watercourse. 7. Site contains a creek or an area where water flows across the grounds surface? ij� flows are year-round? _Flows are seasonal? /Vo 8. Site is primarily: forested _ ;meadow ;shrubs ; mixed 9. Obvious wetland is present on site: __ gDi -__ 10. Wetland inventory or map indicates wetland present on site: _ �( 11. Critical Areas inventory or map indicates any Critical Area on site: UeS For City Use Only ;. 9 City of Edmonds Critical Areas Determination Applicant: Kristjanson, Douglas Determination #: CA-93-163 Project Name: Permit Number: Site Location: 18312 Olympic View Drive Property Tax Acct #: 5656-002-010-00 Project Description: New Garage Waiver Criteria (all criteria must be found to apply): XX There will be no alteration of the Critical Area or its required buffers; XX The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; XX The development proposal meets the minimum standards of the Critical Areas ordinance; XX The above findings are based on the following conditions of approval: 1. Any future construction must complete a new Critical Areas Review 3. No new construction is allowed west of the eastern side of the existing Residential - Single -Family - 12,000 square feet of area required per lot house Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this development permit is hereby Waived, as authorized by Chapter 20.15B.150 (B) of the Edmonds Community Dev ment Code. Gf2 John Bissell, AICP Name S' ature Date Critical Areas Checklist- STIJEET FILE �:-'Sife Infor�a ..Ffbject Name: 6,4PA-e E Permit Number. Site Location: % 5/7 01YtWlC 1110,1 property Tax Account Number: '5(P5(* ooa 01 O ob Approximate Site Size (acres or square feet): 121 �5 UO SF Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions go 1. Has the site been cleared or logged? 00 Date of most recent action: Soils / Topography 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? 3. Describe the general site topography. Check all that apply. Flat: less than 5 feet elevation change over entire site. 56& Arm rc14Q� Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a - / horizontal distance of 66 feet.) f/ Hilly: slopes present on site of more than 15% arid less than 30% ( a vertical rise / of 10 feet of horizontal distance.) I/ Steep: grades of greater than 30% present on site. Comments 2C Q Fl i y SIOfFS S 116f t n1 L y 06b,'A--f--D FEM, OW o (�( C- - Hydrology/Vegetation 4. Site contains areas of year-round standing water: u 5. Site contains areas of seasonal standing water: 1 90 Approx. Depth: 6. Site is in the floodway 14 o floodplain A) 0 of a water course. 7. Site contains a creek or an area where water flows across the grounds surface? iJ) flows are year-round? 1/0 Flows are seasonal? AN 8. Site is primarily: forested :meadow ;shrubs ; mixed 9. Obvious.wetland is present on site: —g 10. Wetland inventory or map indicates wetland present on site: _9_ 11. Critical Areas inventory or map indicates any Critical Area on site:es For City Use Only City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person Preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). PERM/r �oU� rFR An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development Permit application. With a signed copy of this form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: , Y Name F tJ&)N . Title - 131 z 01_Yh41°ic v/6W ✓elw Street Address 4oIVolvVJ' -ri8-?162 City, State, ZIP Phone AM2 Signature Date Applicant Representative: -too h1A-_S M. /-/_0140f1 Name -12�r+ i rc-c. i Title 671 �- /"lr s i AVE- . lltjEz �1_AN trli Street Address S EAi( lx' W f} c / G 4— City, State-, ZIP Phone 14 hma-E. Signature Date — U- 1� VI 1A N In ui Prot J9zi ~O AVL p (ail �C V)W Atli •J U Z Z a' Z Y mma W K O w 7 n 0 Q w 0 JD," -- — _ — — Li N Ir In a X a a K W Ll J • � - pzi I----- `— Ate I •o Z .0." O 2 W N N s 01 w N ' Q x Z U M N x K N N J N 11 N ccO O Li N (j O m N O ' --- Ova I 0 .m- J n K O 1- f L - W " z -J a Z O O Z x " Z --- 0 N c0i ,,� 1' S `\ q Aye - \ — — — — p•y ^ o 1 .o AM L J— ON o rn i o 0 S A1" _ — — — A'ie 6\� Z O a m - 1 n 1 > = K c A'eel - — — — — — — ptl01 Cfl Q 1 U z (') 1 O J -- — e Q o w m e� A M3�ili •%IDj Kill A9 99 U a Q m U L] (wj • J . A A�LLJw 0 o x o a a a a a, 6 y� - — $ — — 3AIaO MIA 01dKk-10 — — _ w . o ' z 4 - 1•� = W .� K 0 Z Z o O o, o Q Q rn Q' N Vz 0 W w o N F--• = w o N Q ; Z Q ,z w o p S . w N W �. �-� Q. Q 1—� F K U W O V) � w O cn W W W W LLJ4 Ly Z LL F- +� o o U 0 1- Q i O a V) w J '0--a IL �. QcaN C S. ULVAK I MEN 1 OF A6111,- _ _ 1 UKL IL CONSERVATION,SERVIC= SNOHOMISH CO SOIL LEGEND SYMBOL NAME 1 Alderwood gravelly sandy loam, 2 to 8 percent slopes 2 Alderwood gravelly sandy loam, 8 to 15 percent slopes 3 . Alderwood gravelly sandy loam, 15 to 25 percent slopes 4 Alderwood-Everett gravelly sandy loamy, 25 to 70 percent slopes 5 — Alderwood-Urban land complex, 2 to 8'percent slopes 6 Alderwood-Urbari land complex, 8 to 15 percent slopes 7 Bellingham silty clay loam 8 Bellingham Variant mucky silty clay loam 9 Cathcart loam, 3 to 15 percent slopes 10 Cathcart loam, 15 to 25 percent slopes 11 Cathcart loam, 25 to 50 percent slopes 12 Cryohemists, nearly level 13 Custer fine sandy loam 14 Elwell silt loam, 3 to 30 percent slopes. 15 Elwell-Olomount complex, 15 to 30 percent slopes 16 Elwell-Olomount-Rock outcrop complex, 30 to 60 percent slopes 17 Everett gravelly sandy loam, 0 to 8 percent slopes 18 Everett gravelly sandy loam, 8 to 15 percent slopes 19 - Everett gravelly sandy loam, 15 to 25 percent slopes 20 Fluvaquents, tidal 21 Getchell silt loam, 3 to 30 percent slopes 22 Getchell-Oso complex, 15 to 30 percent slopes 23 Getchell-Oso-Rock outcrop complex, 30 to 65 percent slopes 24 Greenwater loamy sand 25 Hartnit-Potchub-Rock outcrop complex, 65 to 90 percent slopes 26 Indianola loamy sand, 15 to 25 percent slopes 27 Kitsap silt loam 0 to 8 percent slopes 28 Kitsap silt loam, 8 to 25 percent slopes 29 Kitsap silt loam, 25 to 50 percent slopes 30 Lynnwood loamy sand, 0 to 3 percent slopes 31 Lynnwood-Nargar complex, 65 to 90 percent slopes 32 McKenna gravelly silt loam, 0 to 8 percent slopes 33 Menzel silt loam, 0 to 3 percent slopes 34 Mukilteo muck 35 Nargar fine sandy loam, 0 to 15 percent slopes 36 Nargar fine sandy loam, 15 to 30 percent slopes 37 Nargar-Lynnwood complex, 30 to 65 percent slopes 38 Nargar Variant sandy loam, 3 to 30 percent slopes 39 Norma loam 40 Norma Variant loam 41 Ogarty-Tokul-Rock outcrop complex, 65 to 90 percent slopes 42 Olomount gravelly loam, 3 to 15 percent slopes 43 Olomount-Elwell-Rock outcrop complex, 65 to 90 percent slopes 44 Orcas peat 45 Oso gravelly loam, 3 to 15 percent slopes 46 Oso-Getchell-Rock outcrop complex, 65 to 90 percent slopes 47 Pastik silt loam, 0 to 8 percent slopes 48 Pastik silt loam, 8 to 25 percent slopes 49 Pastik silt loam, 25 to 50 percent slopes - 50 Pilchuck loamy sand 51 Pits 52 Potchub silt loam,-3 to 30 percent slopes 53 Potchub-Harmit complex, 15 to 30 percent slopes 54 Potchub-Hartnit-Rock outcrop complex, 30 to 65 percent slopes 55 Puget silty clay loam 56 Puyallup fine sandy loam 57 Ragnar fine sandy loam, 0 to 8 percent slopes 58 Ragnar fine sandy loam, 8 to 15 percent slopes 59 Riverwash 60 Rober silt loam, 0 to 15 percent slopes 61 Rober silt loam, 15 to 30 percent slopes 62 Rober silt loam, 30 to 65 percent slopes 63 Skykomish gravelly loam, 0 to 30 percent slopes 64 Snohomish silt loam , 65 Sulsavar gravelly loam, 0 to 8 percent slopes 66 Sultan silt loam 67 Sultan Variant silt loam 68 Sumas silt loam 69 Terric Medisaprists, nearly level 70 Tokul silt loam, 2 to 8 percent slopes 71 Tokul silt loam, 8 to 15 percent slopes 72 Tokul gravelly loam, 0 to 8 percent slopes 73 Tokul gravelly loam, 8 to 15 percent slopes 74 Tokul gravelly loam, 1.5 to 25 percent slopes 75 Tokul-Ogarty-Rock outcrop complex, 0 to 25 percent slopes 76 Tokul-Ogarty-Rock outcrop complex, 25 to 65 percent slopes 77 Tokul-Winston gravelly loamy, 25 to 65 percent slopes 78 Urban land 79 Verlot mucky silt loam, 3 to 25 percent slopes 80 Winston gravelly loam, 0 to 3 percent slopes 81 Winston gravelly loam, 3 to 30 percent slopes 82 Xerorthents, nearly level l City of Edmonds Critical Areas Determination Applicant: Kristjanson, Douglas Determination #: CA-93-163 Project Name: Permit Number: Site Location: 18312 Olympic View Drive Property Tax Acct #: 5656-002-010-00 . Project Description: New Garage Waiver Criteria (all criteria must be found to apply): XX There will be no alteration of the Critical Area or its required buffers; XX The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; XX The development proposal meets the minimum standards of the Critical Areas ordinance; XX The above findings are based on the following conditions of approval: 1. Any future construction must complete a new Critical Areas Review 3. No new construction is allowed west of the eastern side of the existing Residential - Single -Family - 12,000 square feet of area required per lot house Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this development permit is hereby Waived, as authorized by Chapter 20.15B.150 (B) of the Edmonds Community Dev ment Code. John Bissell. AICP Name (-aature Date STREET FIT. Rec"9 8 V OLYMPIC VIEW DRIVE' � �" _. p WIT COUr4 i ap S o g N .N--� I 1� DUST. SHOULDER . V1 ,y !v � y IffW.ORIY�WA O Q� i NO - )t�� . I 100.0' 08' � o — --- 100.0' sZ� 98.0' EE — — — -� 98.0' 96.0' 96.0' 94.0' 0 ' 92.0— --- m 92.0' 90.0' 88.0' 88.0' :D r1 g� m c� N m z 86.0' o NNo r 86.0' K n S y O O Ly D O M O o Sy N i 84.0' 82.0' -- _ _ \ 84.0' _ �" 78.0'co o 82.0' tJn Oi <o T UI O EA Wes/ (n � $(� _ • � _ \ _ \ _� � 10 � ;Zp Z . SURL'NCTON NOR STREET_` � 0 F O '"'POAO S --- : ` CITY OF EDMONDS* STREET FILE PUBLIC WORKS DEPARTMENT, ENGINEERING, DIVISION � APPLICATION FOR RIGHT-OF-WAY CONSTRUCTION PERMIT THIS PERMIT MUST BE AVAILABLE AT THE JOB SITE FOR INSPECTION PURPOSES Applicant to Complete Parts A an-d B 0 Permit at:(address or vicinity) Type of Work to be done: t,f5 (attach drawing when applicable) Time Required -- Start: %D�f7 Z Finish: Owner VlLy JLate Gip Contractor: Mailin City . State Zip Ci% i / • State License Number Telephone Number ** NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE ** B, INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may, be made against the applicant or the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the restoration by the Engineering Division. Funds held from the Security'Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time 'a debit or credit will be processed for issuance to the applicant. - Work is subject to inspection, and restoration in accordance with City Code. A 24-hour notice is required for inspection by Engineering. Call 775-2525, ext. 220. I understand that this permit must be available at the job site for inspection purposes at all times. Signature: V-'ODate: %kIZ174 Owner or Agent („ TO BE COMPLETED BY ISSUING AGENCY: q Date Issued:7,/p —/a — Permit No.: 70 —oZs 0—Fee .4l,� Security Bond: Time Authorized: APPROVED B Date: 0 way✓ �� t � old. Q�s STREET FILE - . bumiC WORKS DEPART= CHEM-* BUILDING PERMIT REVIEW aDate )L,W`�)Q Address Street Right -of -Way Existing 6 OZA',q REQD & 6o Access Easements Existing (INOcLte- REQD Utility Easement Existing REQD Lot per Subdivision Plat. Assessor Map Site Plan Checked for Accuracy Underground Wiring Reqd. Check Accuracy of Legal Description Enviromentally Sensitive Area. Environmental Checklist Reqd. Lug: Flood Hazard Zone lu-, Shoreline Management Area VA, Slope, Soil, Vegetation Stream, Creek, Drainage Basin Existing Zoning Per Code Amenities Design Board Approval Reqd. Board of Adjustment Approval Reqd. Review By:� Date: Existing Water '1ain Size Water Main Reqd. Service Line Reqd. Hydrant Size Existing Hydrant Reqd. Per Fire Code Detector Check Meter Reqd. Cross Connection Inspection Fire Department Comments Water'Meter Charge Reqd. Review by: Date: Septic Tank Permit Reqd. Sanitary Sewer Availability Drawing No. Side Sewer Availability Sanitary Sewer -Connection Fee Reqd. Review By: ADB # Approval Size liate: Permit No. Proj. File No. Date: I Open Ditch 'Existing. Reqd. H Culvert Reqd. Size. 04 Catch Basin Reqd. Indicate on Site Plan O Shoulder drainage ninintain collection on swale open runoff H R-.wtiole read. Indicate on Site Plan Soil Conditions and Ground Water Field Checked Review, by Rite Street Paving Reqd. H Curb and Gutter Reqd. W Sidewalk Reqd. ~W' Curb Cut for Driveway Reqd. � Right -of -Way Construction -Permit Reqd.e H Bond Reqd. for Public Improvennts Street Na-ne Sign Reqd. cn Other Sip-iing Reqd. Q Pre Permit Site Inspection made on z BY: SS,,T,R H U W W WATER a CIO ~' STREET H �' ENGINEEF.ING . Special Requirements listed in meno to Coimunity Development Department, Building Division BY Date o All items filled in on Building Permit Application BY Date R' Drawings Stamped and No atio Made w BY Date 177 Approve by Public �dorks Deparcincnt Revised: 1v 10-1977 •. CITY OF EDMONDS, PUBLIC. WORKS 200 DAYTON STREET EDMONDS, WA 98020 775-2525 DEPARTMENST"Ee-- il FILE APPLICATION FOR STREET USE PERMIT Name of Applicant: Mailing Address: Telephone Number: 7;% Description of Public Place or Portion thereof desired to be used: (exhibit may be , i- + , - tL, ., A 1 If applicable, attach plans and specifications and/or maintained on the Public Place: TEMPORARY PERMIT: Unless otherwise designated herein,'this permit is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If this application is for a specified period of time, the .terms of said application is: INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or descrip- tion whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense.costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands that the City shall be provided a certificate of insurance to indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 6.40 OF THE EDMONDS CITY CODE: Applicant warrants that he has read, or had the opportunity to read, Chapter 6.40 of the Edmonds City Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter of the Edmonds City Code. Applicant s gn u r e ate 11/7/74 rev. City of Edmonds ., Public Works Dept. APPLICATION FOR STREET USE PERMIT -- Page 2 Approval (and Agreement, if applicable) of Abutting Property Owners: Signature Printed Name Address Date DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (Attach Minute Entry): Permit Fee: Annual. Fee: due January 1, 19 Amenities Design Board Approval (if applicable) Attach Minute Entry: Building Official Approval (if applicable): Signature Date Provision for Indemnity: Terms and Provision of Performance Bond, if applicable: (Reference 6.40.050 of applicable Ordinance) PERMIT AUTHORIZATION BY P.W. DIRECTOR: gnTcure PERMIT NO. Remarks: 11/7/74 rev. /G//Z/7,5_ ate DATE Se o toe$" 0 Now" Im c- 3> 2t 00 co rr, . & b I "NO Pl. 0 STREET FILE jo i � . m C. a CITY:, -OF EDMONDS,_ - CIVIC CENTER = WATER -SEWER IDEPARTMENT SIDE' SEWER PERMIT Call PRospect 6-1107 when work ls`ready.for Inspection. (No inspeo- tions Saturday, Sunday or holidays.) No_: 2688 ADDRESS............. 18312.... 1.Ymp c...View.... rive-----------------•---.........-------------------------:..............................................-----......---------- Ethel Ce Newton Tucker Construction OWNER ................ ......:....................................................................... CONTRACTOR .......................................................... .............-------- .. Permission is granted ........... J nudrX.... 18..., 19...681 for ........................ days to REPAIR. or CONNECT aside sewer with City Sewers in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side sewer Contractor must be employed to construct side'sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. - NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 Inches inside property line; minimum grade of 2%. No bends In grade sharper than % will be permitted. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper work which may develop within one year of completion. NOTE No. 5—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appur- tenances except to insert the pipe into the wye. ;4A I� November 12, 1970 Kassler West Mortgage Corp. 822 NE Northgate Way Seattle, Washington 98125 Attention: Peggy Mortgage Processor Re: Property Address; 13312 Olympic View Drive, Edmonds, Washington 98020 rientlemen : This is to certify that the house at 18312 Olympic View Drive within the City of Edmonds, was connected January 18, 1968, on permit number 2688 to the City of Edmonds sewerage system according to the City of Edmonds standards. RLW:rla Respectfully, CITY OF EDMONDS RONALD L. WHALEY Asst. Director of Public Works f�,�r� °�� � � °'a4^ii�TM'7Yt°^Y'. ���iwTiv�i7�� w�Ts� � t �f�^'�`�Y�'��iVz�ir'�yx.+S'^Jrr'.� r�;R;•i%Yb�3its^�` � �8'a't��.a 0 8go-199 City of Edmonds RIGHT-OF-WAY CONSTRUCT% 1`�iE E T FILE PERMIT permit Number: 9.3 - GG f�l� Issue Date: A. Address or Vicinity of Construction: 18312 nt mpic UeW—riS (9400117) B. Type of Work (be specific): Install New Service C. Contractor:W,,hin1ZtoIIContact: Frank Swan Mailing Address: 815 Mercer St., Seattle) WA Phone: 224-2278 State License #: Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): ' E. ❑ Commercial ❑ Subdivision ❑ City Project E] Utility (PUD, GTE, WNG, CABLE, WATER) ❑ Multi -Family ❑ Single Family ❑ Other INSPECTOR: INSPECTOR: F., Pavement or Concrete Cut : 0 Yes ❑No G. Size of Cut: 1 ( 2 x 4) H. Charge $ at Gas in Pav Shoulder APPLICANT TO READ ANrinst INDEMNITY: Applicant understands and by his signature to this application, agrees to hf Edmonds harmle y& yi ps 11 es, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be mad City of Edmonds, or any, �t depar ents or employees, including or not limited to the defense of any legal proceedings including defense costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATF,D RESTORATLOA,! FEES WILL. BF, HELD UNTIL THE FINAL, STREET PATCH '�^ - "7S COMPLETED BY CITYFORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROC1-SSF.D FOR ISSUANCF, M'THF t1 PHIrLCANT. Construction drawing of proposed work required with permit application. A 24 hour, notice isregwred for inspection; Please call the Engineering Division, 771-0220. Work and ater1a1`1s to �e Insp cted during progress and at completion. Restorationis to be in accordance with City Codes. Street shalllbe kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.. All street cut ditches shall be patched with asphalt or City approved'Inaterial prior to the end,of the working day; NO EXCEPTIONS. I have rea�the above statements and understand the permit requirements and the pink copy of the permit will be available nsite at all times r inspection purposes. 4 Signature: -- Date: October 12 1993 M'hctor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: I_AJ6_ ISIA RIGHT OF WAY DEPOSIT TIME AUTHORIZED: VOID AFTER fit^ . DAYS DISRUPTION FEEYFUND,111: - SPECIAL CONDITIONS• $J Q Ac-P 1 W RESTORATION FEE: " WP�&DwA-Y PERMIT FEE: �. TOTAL FEE: COMMENTS: RECEIPT FEE: DATE: ISSUED BV4 A C2 'd NO WORK SHALL BEGIN. PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 FIELD INSPECTION NOTES i (Fund 111 - Route copy to Street Dept.) Comments• Diagram CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: r Addendum �to.-: City of Edmonds Right of Way = Permit Application t Submitted by: Guyla Connors _. _.... ... .- .-----•---- - Engineering Aide - - - - - Washington Natural Gas 521-5248 .. I N `Q w N 7 •� ti a - r 0 N WNG to window Water main depth (� unknown ,+—" gas main` ftA,� -w- water -g- gas - -ss- sewer $ water hydrant 0 water valve 815 Mercer St. (P.O. Box 1869), Scank, WA 98111 (206) 622-6767 OF E MOB CITY OF EDMON 121 5TH AVENUE NORTH - EDMONDS, WA 98020 INEIT i o PHONE: (425) 771-0220 - FAX: (425) 771-0221 F11E STATUS: APPROVED ENG20130190 Permit Number: ENG20130190 Address of Public Use/Encroachment: 18312 OLYMPIC VIEW DR. EDMONDS 18312 OLYMPIC VIEW DR EDMONDS, WA 98020 rocks, shrubs for landscaping in the row (originally permitted in 1978) STREET USE. Placement of any temporary or movable objects in any portion of public space or City right-of-way shall meet all code requirements as set forth in the following chapters of the Edmonds Community Development Code. ENCROACHMENT.- Permanent structures encroaching upon any portion of public space, City right-of-way or easement area shall meet all Code Requirements as set forth'in the following chapter of the Edmonds Community Development Code. CODE APPLICATION. • Chapter 18.70, 17.65, and 17.70.040 of the Edmonds Community Development Code. All terms of the adopted ordinance are incorporated herein as if set forth in full and this permit therefore is subject to the terms of those chapters. FOR THE TERM IN WHICH THIS PUBLIC USE/ENCROACHMENT IS IN EFFECT, THE OWNER SHALL COMPLY WITH THE PERMIT CONDITIONS SET FORTH BY THIS PERMIT. J NOTE. The issuance of this permit is understood by the owner to be of a temporary nature, shall vest no permanent right and shall be issued and may in any case be revoked at the sole discretion of the City per ECDC 18.70.040. Applicant is responsible to provide a copy of the insurance certificate to the City at the beginning of each calendar year, no later than the 21st day of January. INDEMNITY. • The Applicant understands and agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court cost, and attorney fees by reason of granting this permit. In addition, the applicant understands that he/she shall provide and continually maintain during the term of the permit a certtfcate of insurance naming the _city as an additional insured, with respect to liability, and providing that it shall be primary as to any other policy of insurance. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN SPACE PROVIDED. Printed: Friday. ADril 12. 2013 DATE ❑ FILE COPY ❑ INSPECTOR COPY APPLICANT COPY STATUS: APPROVED ENG20130190 ;} THe,proposal will not adversely impact public space open to vehicular or pedestrian travel. '_' • Architectural Design Board Approval has been granted or the process has been administratively approved. • The proposal will not unreasonably interfere with the rights of the public. • The proposal either benefits the public interest, safety or convenience (e.g., supports or protects the city street) or is an accessory structure such as fence normally associated with residential use of the property as (fully complies with the requirements of criteria above. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per J City standards that is caused by or occurs during the permitted project. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS • None