18325 80TH AVE W.PDF111111111111
7036
18325 80TH AVE W
NOTICE:
No warranty of accuracy.
The -information'shown on the attached
map(s) was compiled for use by.the City of
Edmonds, its Employees and Consultants.
The City of 'Edmonds does not warrant the
accuracy of anything set for ' th on these
map(s�). Any person or entity -req uesting a
copy should conduct an independent
inquiry regarding the information shown on
___ tFe -ma--p(s), including, but not limited to,
the location of any sewer stub shown. Such
sewer stubs may or may, not exist and may
or may not exist at the location shown.
Neither the City of Edmonds nor its
employee-s or officerS, Shall be Hable for the
information given on this map(s), nor for
any one representation provided based
upon said map(s).
no charge per easement agreement dated 5/19/66 auditor's file #1877071
Vol 38wpate,391- notation on easement is as follows: The City agrees to pro
vide t o tTXPEcPffiPH19Rs for Lot 11 at no extEa char&e to the property
Cap PRospect 6-1 07 when w
CIVIC,1' )ENTVR — WATER -SEWER DEPARTMENT is ready for inspection. (No inspec- w2QT,-% 9
tions Saturday, Sunday or holidays.) N2 0 03
SIDE SEWER PERMIT
18325 80th Avenue West
ADDRESS---------------------------- ---------------------- ---------------------------------- ---------------------------------- - -----------------------------------------------------------------------
W.E. Shultz
'TOR ... Own r ...............................................
OWNER ----------------- : ------------------------------------------------------------------------ --- CONTRAC ------------------------- P ...
April_l? .. .......... 6 7-, for ........................ days to REPAIR or CONNECT a side sewer
Perinission is granted ......... A ------------ ------ -- 19 .......
with City Sewers in accordance with application on file and governing ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must
be employed to construct side sewer in street area. Do nort cover any portion of sewer before It has been inspected.
NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%.
No bends in grade sharper than % will be permitted.
130TE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for
failure due to improper work which may develop within one year of completion.
is appur-
AOTE No. 5—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or I
tenances except to insert the pipe into the wye.
'30
APPLICATION
for
Th*C*--of Edmonds FU SIDE SEWER PERMIT MN PLANT EASEMENT No . ..........................................
NEW CONSTRUCTION C] REPAIRS E]
03-
OWNER...... jkl�� ........ --d -- - ----------- ... . ...................... ...................... CONTRACTOR .................................................................................................. PERMIT No ..........
ADDRESS ........ ........... ..... ................. LEGAL DESCRIPTION: LOT No . ........................ IA ............ BLOCK No . ......................................
.............. ....
V,
0
141V
t,
Approved:
DATE .... ....... 4..e.7 .................. By Sel
............................
"I
Critical Areas Checklist
Site Information, ti
(soils/topography/hydrology/veg,,eta—on)
- % 0 7-F/
L Site Address/Locition:
P
FopertY Tax Account Number: LO 7' 19,0 In
Approximate Site Size (acres or square feet): :3 3
3. cx�>
4.- Is this site currently developed? __2!_yes; — no.
If yes; how is site developed? 'S:F Z-
5. Describe the general site topography- Check all that apply.
Flat: less than 5-feet elevation change over entire site.
154-
74/
TAW
C'o 0':'o
37a
S Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet -over a
horizontal distance of 6&feet).
Hilly: slopes present on'site of more than 15% and less than 307a ( a vertical rise
of 10-feet over a horizontal distanceof 33 to 66-feet).
Steep: grades of greater than 30%'present on site (a vertical rise of 10-feet over a
horizontal distance of less dian 337feet).
Other* (please describe):
6- Site contains areas of year-round standing vrAer Approx. Depth:
7. Site co�tains areas of seasonal standing water: Al 6) Approx. Depth:
What season(s) of the year?
S. Site is in the floodway plain /L) C) of a water course.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? —A-) 0 Flows are seasonal?
(What time of year?
10. Site is primarily: forested meadow _; shrubs mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is present on site:
For City Staff Use Only
L Site is Zoned? / � (�' — I �_>
2. �CS rnapped soil type(s)? /jt,0&
q Alp
3. Wetland inventory or C_A_ map indicates wetland premot on site? No
4;.,. :-,Critical Areas inventory of C.A. MaP indicates Critical Area on site?
5.. -�i.te within* designated earth subsidence landslide hazard area? A10
6. des,;ignated on the Environmentally Sensitive Areas Map7
DETERNMMATION
CONDMONAL WAIVER
WAIVER
R 6wed by:
evi 7 // 416,
PAqjne '/'Oate
P--V 0IM4V4
v
'T�
X�
I k�7
'ATI,
.9 0 S
. C4
tY of
-Criti&a1'A'reas',. CheCK1 ISt",
'Me Critical Meu'Checkfist . con . tai . ned on
this form is to be filled Out by any person
preparing a Development Permit
Application for the City of Edmond'sp'nor'
to his/her submittal of a de%6elopment
permit to the City.
The purpose of the Checklist is to enable
City staff to determine whether any
Potential Critical Arcas'are or may be
present on the subject property. IMe
information needed to complete the
Checklist should be easily available from
observafions of the site or data available at
City Hall (Critical Areas inventoxies, maps,
or soil surveys).
An applicant, or his/her representative,
must fill out the checklist, sign and date it,
and submit -it to thebty. The City will
review the duxklist� make a precursory site
visit. and make a determination of the
subsequent geps necessary to complete a
development Permit application.
..'"Fith a signed copy of this form,- the
aPpIlicant should also submit a vicinity map
or plot plan for Individual lotsof the parcel
with enough detail that City staff can find
and identify the subject parcel(s). In
addition, the applicant shall include
Other Perfinent infonnation (e.g. site'
Plaz4 tOP0gv2PhY map, etc.) or -studies in
Conjunction with this Checklist to assist
staff in completing their preliminary
2 ssmentof the site.
I have completed the attached Critical Area Checklist and attest -that the answers provided are
factual, to the best of my knowledge(fill out the appropriate column below).
Owner I Applicant:
Nam
X Aq ue
Street Address
'City, �Ute, Z1,P Phone
Signature
Date
Applicant Re . resentative:
V
C qu ce, 11A 4
Name
do 9-3 T �7-
Street Address
411
City, State , ZIP— Phone".
Signature V T_
.City of Edmonds
Critical Areas Determination
Applicant: Earl Smith Determination #: CA-96-134
Project Name: Permit Number:
Site Location: 18325 80th West Property Tax Acct 3708-001-001-0004
Project Description
non -project specific
A site inspection has revealed that steep slopes which appear to be greater than 40% with a
vertical gain of at least 20 feet on or adjacent to the subject property
Based on the above findings, it is determined that there is potentially a steep slope critical area on
or adjacent to the site. A Critical Areas Study is required to delineate the boundaries of this
potential critical areas, the buffers and setbacks. For the steep slopes, a licensed surveyor must
create a topographic map of the site which indicates all areas which slope 40% or more and have
a vertical gain of 20 feet or more within the 40% slopes. The map must also show the location of
the steep slope buffers and setbacks. The surveyor must also create legal descriptions for the
critical areas and the buffers. The critical area study must be created through a three party
contract between the applicant, the City and the consultant.
If the property owner wishes to apply for a specific development permit which they feel would
not impact the Critical Areas located on the site, they may submit their proposal to the Planning
Department for review. If the Planning Department finds that the proposed development permit
will not adversely impact a Critical Areas or its buffers, a conditional waiver may be issued on a
project by project basis.
John Bissell July 1. 1996
Name Signature Date