DEVELOPMENT SERVICES DEPARTMENT,
February 3, 2015
MEMO TO:
Edmonds School District
Verizon Northwest
SNOCOM Police and Fire Dispatch
SNOPAC
Snohomish County E911
U.S. Post Office
Snohomish County Assessor's Office
Snohomish County Information Services
Snohomish County P.U.D.
Puget Sound Energy
RE: Address Correction
DAVE EARLING
MAYOR
STREET FILE
Fire District I
Edmonds Police Department
Edmonds Utility Billing
Edmonds Public Works
Edmonds Building/Street File
Edmonds Address Files
Lynnwood Disposal
Comcast Cable
Waste Management Northwest
Allied Waste
Please be advised thafthe following site address has been corrected:
18403 Homeview Drive corrected to: 18401 Homeview Dr.
Some maps and departments may already show the correct address but there were
inconsistencies.
Thank you,
V5"
Linda Thomquist
Senior Permit Coordinator
City of Edmonds
425-771-0220
Incorporated August 11, 1890
Sister City - Hekinan, Japan
Page 1 of 3
Snohomishftlline Government Information & Services
CountY4*
Washingftn
Property Account Summary
Parcel Number 100477600006301' 1 Property Address r 118403jiOMEVIEW DR, EDMONDS, WA 98026-5539
Parties - For changes use 'Other Property Da a' menu .
Role
PercenflName
IMailing Address
Taxpayer
LLL�1LOOLBELT
MARLENE F
118401 HOMEVIEW DR, EDMONDS, WA 98026
Owner
1001
BELT MARLENE F
118401 HOMEVIEW DR, EDMONDS, WA 98026
General Information
Property
Description
HOMEVIEW ADD NO 2 BLK 000 D-01 LOTS 63 & 64 EXC E 178.62FT THOFAKA PAR "C" SNO CO
SP S-9-68 REC AF NO. 8701290468
Property
Category
Land and Improvements
Status
Active, Locally Assessed
Tax Code Area
00220
Property Characteristics
Use Code
1111 Single Family Residence - Detached
Unit of Measure
jAcre(s)
Size (gross)
10.29
No Values Found
Installments Paya le
Tax Year
Installment
Due Date
Principal
Int rest, Penalties and Costs
Total Due
Cumulative Due
elect to Pay
2015
1
04/30/2015
2,895.971
0.00
2,895.97
2,895.97
2015
2
10/31/2015
2,895.981
0.00
2,895.98
5,791.95
0
Statement of Payable/Paid For Tax Year: [2015
Distribution of Current Taxes
District
Rate
Amount
CITY OF EDMONDS
1.97
.1,061.52
EDMONDS SCHOOL DISTRICT NO 15
4.93
2,656.50
PUB HOSP #2
0.10
52.44
SNO-ISLE INTERCOUNTY RURAL LIBRARY
0.47
252.02
SNOHOMISH COUNTY-CNT
1.00
537.57
STATE
2.28
1,226.89
SNOHOMISH CONSERVATION DISTRICT
5.01
TOTALS
10.75
5,791.95
I ue Type
https://www.snoco.org/proptax/(oqmudtmOdputd453lqOgy45)/result.aspx 2/3/2015
LLI 1782S
7330 17900 -Z, 17909 17906 7012 <
SN9 17907 17901
LL)
>
-1924 7320 17916 17915 17912 < 17921 7107 -71 OF 7023 70 17908 17907 17910
732S 731S 17926 M:
11): 914 17922 17924
180TH ST SW
17930 IE
1800
180TH ST S�v
007 18020
sail is 14 7104 7024 7028 M26
18013 18012 ;
111024
laoI5 18020 18017
ow — '6�3. 18023 Ile A 18026
18032
Isiol 18026 18027 111026 18027 18020
aj ST PL SW — 18102
18032
18103 18035 18032 Ilos
18111 1810S N1504, 18 02
islos 18107 8 0
(L 18107
18115 b lalle 18109 11 710 u
I FE I
& lails 8, 1
4,
=1.125 �11 7211 181 ST PL SIN 18128
IBM;�STSI
18201 18126 8204
18207 R208
7015 1826
182 1 ; . 18216 1Z, 1—. 18209!-
18214 16220 18212
18219 uwj 18212 L>U 182N L SIN
A 1821,
in 18220 0� I
8226 A
z 18225�:
my CY
18301
7418 18 18303 7101 183M 22 1631 8309
8305
18
75w 12 18,16
ADDRESS CORRECTION:
18317 1 0 ;jg > 18325, 11132E
18 <
7SW INCORRECT 18403 HOMEVIEW DR. 8=
7605 18323 8328 18402
18330
4TH PL SIN, 18325 1UO2 CORRECT. 18401 HOMEVIEW DR.
7607 ,18405,1
18410 Iwo
840 1 a 18417
18420
841 1 16
1843 A 184
15424 18427 18428 T.
0 1 85TH ST SIN '8501;
8423 18430 18502
4,b issoa 18505 185041
nitympi 18507--
18504 18516 18 1r,
18509 18508
aSIt 4432
lasio 18509
1135 18520 185TH PL SIN 1.13 18514 1850
23
w 1851
7512�. lasle 18600 > -
18521 18601 18524 18525 iss 18519 18520 <
14 18512
lee 4
18527 .18528 18529
a 18S29 Ia.
t
1860,�. 18606 18520
18601 18602
18603 18604 18603',
18602
7230 18812 I-60a 18530
P er 18610 -3: 18611 18610 18607 18608' 18609, %
St�tion 18616 18615 18606
> <18617 Isola
18618 < 18615 18818 1.
< 7
18620 18622
'86-
1 �62 . 1 18624 18625 ,2 18614�
18624 18625 '.18030
18624 18625�
I , 18624
18626 4 18630
18627 1862 18700 a
18628 ............
a lee
86 0 1
18632
1863, 1870
18700 18TrH PL S 18712 187
Lynn�vo
Fire St '
R
Ly Ark
mndtile p"
1 9 7123 7115 710 7101
2
'BOB
78
69311"16, z 1 — —
",21 691 .909 6901 681 6811
v
18823 188TH PL SIN
18829
Ni
18904
407
356 <-& 358
307
CITY OF EDMONDS
121 5TH AVENUE NORTH . EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
k� � DEVELOPMENT SERVICES DEPARTMENT
14-4=0w� 9 Z Planning - Building - Engineering
. C. -19
February 26, 2001
Robert Lodwig
Lodwig Homes, Inc.
1h
13405 67, Ave W
Edmonds, WA 98026
GARY HAAKENSON
MAYOR
SUBJECT: NOTICE OF CORRECTION
Undeveloped Lot on Homeview Drive, north of Olympic View Drive
,9-4o3
Dear Mr. Lodwig,
It has been brought to the attention of the Engineering Division that the vegetation on this
site has recently been removed and to this date there are no erosion control measures in
place. Please refer to the attached copy of ECDC 18.30.050 for erosion and
sedimentation control requirements. A copy of the City Standards for erosion control has
also been included. Please note that a clear zone of at least 3 feet is to remain around the
fire hydrant at all times.
Please make the necessary amendments to your site within 5 days to bring it into
compliance with City Code and Standards. Once complete, you are to schedule an
inspection with the Engineering Division at 425-771-0220, Ext. 1326. Additional site
work is not to continue until the City has an approved set of plans.
Should you have any questions regarding this correction, please contact me at
425-771-0220, ext. 1338. Thank you.
Sincerely,
JEANIE MCCONNELL
CIP Specialist
JM/crnc
Enclosure
D:\My D�.uiiienLi\Engi�.\DEVELOP\"wigCorrW"tf�fforporated August 11, 1890
C-4— 0.". tj — 1,;— — — T--,—
Edmonds Community Development Code
18.30.0501�"��`--
18.30.030 Applicability.
A. Abrogation and Greater Restrictions.
When any provision of any other chapter of the
Edmonds Community Development Code
conflicts with this chapter, that which provides
greater environmental protection shall apply.
B. Governed Activities. Consistent with the
minimum requirements contained inthis chap-
ter, the city of Edmonds shall approve or dis-
approve new development and redevelopment
activities. [Ord. 3013 § 1, 1995).
18.30.040 General requirements for
development.
A. Illicit Discharges. Elicit discharges to
storm drainage systems are prohibited.
B. Required Plans and Permitting.
1. Governed activities shall be con-
ducted only after the city approves a storm
water site plan, which includes one or both of
the following:
a. Erosion and sediment control
(ESC) plan; and/or
b. Storm water quality control (SQC)
elements.
2. No approval to conduct any regulated
activity shall be granted until required plans
have- been approved pursuant to the criteria
adopted in this chapter. [Ord. 3013� § 1, 1995].
18.30.050 Development approval
standards for erosion and
sedimentation control (ESC)
plan.
A. ESC Minimum Requirements. All activ-
ities necessitating a clearing or grading permit
and all utility projects consisting of more than
500 lineal feet of trench excavation shall be
required to control erosion and sediment dur-
ing construction and to permanently stabilize
exposed soil resulting from construction.
Projects involving a critical area may also be
required to comply with any combination of
the ESC minimum requirements. Compliance
will be demonstrated through the implementa-
tion of an.approved ESC plan. Guidelines for
preparing ESC plans are provided in the rnan-
ual. The plan must address the following��r
requirements:
1. ESC Minimum Requirement — Con-
struction Access Route. Construction vehicle
access shall be, whenever practical, limited to
one route. Access points shall be stabilized
with quarry spalls or crushed rock to minimize
the tracking of sediment onto public roads. If
sediment is transported onto a road surface, the�.
roads shall be cleaned thoroughly at the end of
each day. Sediment shall be removed from
roads by shoveling or sweeping �and be trans-
ported,to a controlled sediment disposal area
within 24 hours. Street washing shall be
allowed only after sediment is removed in this
manner.
2. ESC Minimum Requirement — Stabi-
lization of Exposed Areas. All soils exposed
by land disturbing activities shall be stabilized
by suitable application of BMPs, including,
but not limited to, sod, hydroseeding, or other
vegetation, plastic covering, or mulching. All
BMPs shall be selected, designed, and main-
tained in accordance with, the manual.. The
exposed soil's shall -be stabilized according to
an approved timetable., (Ty�ically, no soils
shall remain,exposed for more than two days
from October I through April. 30 and no more
than seven days from May 1 through Septem-
ber 30).
3. ESC Minimum Requirement — Pro-
tection of Adjacent Properties. -Adjacent prop-
erties shall be protected from sediment
deposition by appropriate use of vegetative
buffer strips, sediment barriers or filters, dikes
Or'mulching., or -by a combination of these
measures and other appropriate BMPs.
4. ESC Minimum Requirement — Main-
tenance. All I erosion and sediment control
BMPs shall be regularly inspected and main-
tained by the -owner to ensure continued per-
formance of their intended function. All
maintenance and repair shall be conducted in
accordance with the manual.
5. ESC Minimum Requirement — Other
BMPs. As required by the city, other appropri-
18-15
18.30.050
ate BMPs to mitigate the effects of increased
runoff shall be applied.
6. Erosion and Sediment Control
Requirement — Underground Utility Construc-
tion. The construction of underground utility
lines shall specifically address the following:
a. Erosion control for excavated and
stockpiled materials;
b. The placement of excavated mate-
rial where consistent with safety and space
considerations shall be placed on the uphill
side of trenches;
c. Trench dewatering systems (must
discharge into sediment traps, sediment ponds,
or other acceptable means);
d. Tracking and spilling of materials
on streets due to hauling;
e. Daily cleanup and street mainte-
nance.
7. Additional ESC Minimum Require-
ments for Larger Developments. All new
development and redevelopment that includes
land disturbing activities of greater than, or
equal to, one acre in addition to meeting the
minimum requirements set forth above shall
comply with ESC requirements listed.below.
8. ESC Minimum Requirement — Delin-
eate Clearing and Easement Limits. In the
field, mark clearing limits and/or any ease-
ments, setbacks, sensitive/critical areas and the
buffers, trees and drainage courses.
9. ESC Minimum Requirement — Sedi-
ment Trapping. Prior to leaving the site, storm
—water runoff shall pass through a sediment
pond or sediment trap, or other appropriate
BMPs. Sediment ponds and traps, perimeter
dikes, sediment barriers, and other BMPs
intended to trap sediment on -site shall be con-
structed as a first step in grading. These BMPs
shall be functional before land disturbing activ-
ities take place. Earthen structures, such as
dams, dikes, and diversions shall be seeded and
mulched according to an approved timetable.
10. ESC Minimum Requirement — Cut
and Fill Slopes. Cut and fill slopes shall be
designed and const * ructed in a manner that will
minimize erosion. In addition, slopes shall be
stabilized in accordance with ESC Require-
ment No. 2.
11. ESC Minimum Requirement — Con-
trolling Off -Site Erosion. Properties and water
ways downstream from development sites
shall be protected from erosion due to
increases in the volume, velocity, and peak
flow rate. of storm water runoff from the
project site.
12. ESC Minimum Requirement — Sta-
bilization of Temporary Conveyance Channels
and Outlets. All temporary on -site conveyance
channels shall be designed, constructed and
stabilized to prevent erosion from the expected
velocity of flow from a two-year, 24-hour fre-
quency storm for the developed condition. Sta-
bilization adequate to prevent erosion of
outlets, adjacent stream banks, slopes and
downstream reaches shall be provided at the
outlets of all conveyance systems.
13. ESC Minimum Requirement —
Storm Drain Inlet Protection. All storm drain
inlets made operable during construction shall
be protected so that storm water runoff shall
not enter the conveyance system without first
being filtered or otherwise treated to remove
sediment.
14. ESC Requirement — Removal of
Temporary BMPs. All temporary erosion and
sediment control BMPs shall be removed
within 30 days after final site stabilization is
achieved or after the temporary BMPs are no
longer needed. Trapped sediment shall be
removed or stabilized on site. Disturbed soil
areas resulting from removal shall be perma-
nently stabilized.
15. Erosion and Sediment Control
Requirement — Dewatering Construction Sites.
Dewatering systems shall discharge into a sed-
iment trap or sediment pond.
16. Erosion and Sediment Control
Requirement — Control of Pollutants other than
Sediment on Construction Sites. All pollutants
other than sediment that occur on site during
construction shall be handled and disposed of
in a manneithat does not cause contamination
of storm water.
18-16
Edmonds Corrimunity Development Code
18.30.060
17. Erosion and Sediment Control
Requirement — Financial Liability. Perfor-
mance bonding, or other appropriate financial
instruments, shall be required for all projects to
ensure compliance with the approved erosion
and sediment control plan. [Ord. 3013 § 1,
19951.
18.30.060 Development approval
standards for storm water
quality control.
A. Any new development or redevelopment
with more than 2,000 square feet of new imper-
vious surfacing shall be required to provide
storm water quality control. Compliance will
be demonstrated by implementing an approved
storm water site plan. Guidelines for storm
water site plans are provided in the manual.
The plan must address the following require-
ments, in addition to ESC requirements:
1. SOC Minimum Requirement — Storm
Water Detention/Stream Bank Erosion Con-
trol. Storm water discharges shall control
stream bank erosion and flooding of the down-
stream storm system by limiting the peak rate
of runoff from the site. The predevelopment
condition for all cases other than open water
bodies shall be considered meadows or young
second growth forest. As the first priority to
meet this requirement, BMPs shall utilize infil-
tration to the fullest extent practicable only if
site conditions are appropriate and ground
water quality is protected. Due to high ground
water tables in large portions of the city and a
landslide complex in the Meadowdale area
(where high ground water increases the slide
hazard), there are few sites within the city
where infiltration should be considered.
Exhibit B* delineates the areas where infiltra-
tion may be feasible for this requirement if the
site satisfies the requirements outlined in the
manual. BMPs shall be selected, designed, and
maintained according to the manual. The min-
imum diameter orifice size used for control
shall be five -eighths of an inch. In the case of
redevelopment, this requirement shall apply
only to that portion of the site that is being rede-
veloped. Any development or redevelopment
that has less than 5,000 square feet of impervi-
ous surfacing, other than a road constructed for
the purpose of permitting new development,
can comply with this requirement by using the
guidelines outlined in the city of Edmonds'
drainage systems handout (Exhibit A).**
a. All development sites less than one
acre that discharge directly or indirectly to a
sfream shall be required to limit the peak rate
of runoff to the predeveloped condition two-
year, 24-hour design storm, while maintaining
the predeveloped condition peak runoff rate
for the I 0-year, 24-hour and I 00-year, 24-hour
storms.
b. All developments greater than or
equal to one acre that discharge directly or
indirectly to a stream shall be required to limit
the peak rate of runoff to 50 percent of the pre -
developed condition, two-year, 24-hour design
storm, while maintaining the predeveloped
condition peak runoff rate for the 10-year, 24-
hour and I 00-year, 24-hour storms.
c. All other developments required to
comply with this requirement shall maintain
the predeveloped condition peak runoff rate
for the I 0-year, 24-hour and I 00-year, 24-hour
design storms.
d. Development of an access road,
private or public streets for the purpose of per-
mitting new development, shall be required to
meet this minimum requirement for both the
street or road and the new development it is
intended for.
e. Storm water detention/stream bank
erosion control BMPs shall not be built within
a natural vegetated buffer, except for neces-
sary conveyance systems as approved by the
local government.
f. An adopted and implemented basin
plan (minimum requirement No. 8) may be
used to develop stream bank erosion control or
detention requirements that are tailored to a
specific basin.
B. The following developments will be
required to comply with storm water quality
control requirements 2 through 10:
18-17
FILTER FABRIC -
SECURED TO 2' X 2'
14 GA. WIRE FABRIC
EQUAL
2' X 2' WOOD OR
EQUIVALENT
cu
I"I'll-l!
Fl li Rl 1 1-111
1 r
Wr
u
PLACE 3/4'-1.5' WASHED GRAVEL IN
THE TRENCH AND ON BOTH SIDES OF
FILTER FABRIC FENCE ON THE SURFACE.
FILTER FABRIC MATERIAL IN
CONTINOUS ROLLS. USE STAPLES
OR WIRE RINGS TO ATTACH
FABRIC TO WIRE.
WIRE MESH SUPPORT FEUE
:ZZ TO SUPPORT FILTER FAMIC.
%D — — — — — — — — — — — — — — — — — — — — — — — — —
cu BURY BOTTOM OF FILTER
MATERIAL 8' TO 12'
6 MAX.
2' X 2' WOOD POSTS OR
EQUIVALENT
rp EXCAVATE TRENCH 8' DEEP
xjwrRE STRAW BALES WILL
........... .... .... .. .. ''I'll le I I
:1''i-i''i'll-li I , I BE PLACED AND STAKE BALES.
7 '1.11171 T
..........
T fri- T 1T
TWO STAKES PER BALE TO I I I
MAINTAIN POSITION
CONTRACTOR/ DEVELOPER SHALL MAINTAIN AND REPLACE
STRAW BALES TO INSURE PROPER EROSION CONTROL.
1690-199W
STRAW BALES AS
REQUIRED.
�-NSPECTIDN REQUIRED ON EROSION
CONTROL METHODS BEFORE OTHER
WORK CAN BEGIN.
RE7VISIONS STAN DAR DDETAI L
I FILTER FABRIC FENCE AND STRAW BALE DAM FILTRA7`10N SYSTEMS
5/10/99 1 SCALE NTS I DWG 140- E1.1
9!;�P4 71
fY
2'-8' QUARRY SPALLS
4'-12' DEEP
z --�</
PROVIDE FULL WIDTH OF INGRESS/
EGRESS AREA
TEMPORARY CONSTRUCTION ENTRANCE SHALL BE MAINTAINED
DURING THE CONSTRUCTION PERIOD.
INSPECTION REQUIRED BEFORE OTHER WORK
CAN BEGIN.