Loading...
18530 76TH AVE W.PDF111111111111 6253 18530 76TH AVE W 0 0 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning * Parks and Recreation * Enaineerina 890 . I C) 17 July 14, 1994 Mailed 7/14/94 Erich 0. Tietze, P.E. 121 - 5th Ave. N. #205 Edmonds, WA 98020 �MEFTITTM- Dear Erich, LAURA M. HALL MAYOR The Engineering Division cannot perform additional review of the subject site plans. The following comments/corrections referenced in the earlier letter of May 26, 1994 have not been addressed. 1. Show cross section detail for bioswale. 3. Use Edmonds standard construction entrance detail (enclosed in first letter). 4. Add note for frontage of 76th "existing curb, gutter, and sidewalk to be inspected by City. Remove and replace as required." 7. Paint curbs yellow within five (5) feet of each side of driveway entrance. 8. Provide dimension for driveway width between curbs. When the revisions are completed, please resubmit two (2) sets of plans so that the Engineering Division can complete its review. If there are any questions, do not hesitate to contact me at 771-0220. Sincerely, ?!i� GORDON C. HYDE Engineering Coordinator GCH/sf Enclosure c: Donald Robertson Sharon Nolan, Permit Coordinator CA C-1- Alberts ADB9421.DOC Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works 9 Planning a Parks and Recreation 9 Engineering U - 9 0 . 19 May 27, 1994 Mailed 5/27/94 Erich 0. Tietze, P.E. 121 Fifth Avenue North, #205 Edmonds, Washington 98020 SUBJECT: Robertson Building (Plan Check 94-98) ADB-94-21 Dear Erich: LAURA M. HALL MAYOR The Engineering Division has completed initial review of the subject site plans. The following comments/corrections apply. 1. Show cross section detail for bioswale. 2. Submit Manning's calculations for capacity of bioswale. 3. Use Edmonds standard construction entrance detail (enclosed). 4. Add note for frontage of 76th Avenue West, "existing curb, gutter, and sidewalk to be inspected by City. Remove and replace as required." 5. Remove and replace existing driveway cut to conform to new driveway location. 6. Remove and replace, if necessary, parking striping to conform to new driveway location. 7. Paint curbs yellow within five feet of each side of driveway entrance. 8. Provide dimension for driveway width between curbs. 9. Install siltation fence at time of construction entrance installation (Construction note). When the revisions are complete, please resubmit four sets of plans, together with the enclosed red -lines, so that the Engineering Division can complete its review. If there are any questions, do not hesitate to contact me at 771-0220. Sincerely, GORDON C. HYDE Engineering Coordinator GCH/cmc Enclosure c: Sharon Nolan, Permit Coordinator Lc=� ROBTSN.DOC 9 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan Form 4E PRICING SHEET JOB ?I WORK 81 I -IF SIAR El ECTRIC. INC %AIA QQn13n ESTIMATE NO. Sheet Of No. Sheets ESTIMATED BY RtMEMyn h I EXTENDEM) -778.7 439 CHECKED BY DATE [D P _�d�ri — . . __. . resi 81ye Star Elprtrir lor HP i0a V,-, - 1 4 so NAZI 0=EEhM7LMMqUM02* L 0 wi MATERIAL EXTENSION ON No P 11 lmmffm�', , MCIOMMMENN I M IN 20 291 E 1#1 No -affeW 0,00140011W. qmmlll�_ - MENEM 1M w1wi "MIPFIV, W, u I I M" 0 ao 0 11 10"U'a MA I 1111A a -94 No mms 111 min 1E �mmummm�om MA111111 1E MAIMINIMUSIM IMERNMEMME 1E SIBRIMME M1 MINEENWEEN 0 IMIEMMMI morE ml-- I 11111100119=01ME1111 go M1 �MEMEN�ommommom M1 mommilmommommimom M1 ��mmi�mmomm� 1E ��omm�m=mm=lm 0 011 Ell Ell M11 MAMIA. - M__ EMMUMOM MAIMME Totals This Sheet Transferred To Recap By -INITIAL 00. MATERIAL )0- _'BOR 0-1 F rm 4-E 0 --H.- f-, Ilari—I Fl­t,i�nl 0 City of Edmonds Engineering Dept. Attn: Lyle RE: Robertson Building Plan Check 94-98 Blue Star Electric, Inc. (206) 778-7439 P.O. Box 698 Edmonds. WA 98020 Construction Divi§M C% jr., V r- D 7-23-94 ,I I ,.I . 1 2 1Z1VUJJVE:Eai , JTVQ As per your request, our estimate for the site. improvements for the above project will be $17,000.00 (a pricing estimate for the improvements is attached) . The breakdown of the work is: Paving $ 9,800-00 Detention system and utility piping 6,605.00 Contingency 595-00 Total - $ 17,000.00 4�701'- 4Df---< ,F-qf,- DONALD W. ROBERTSON President Blue Star Electric, Inc. I S K I L L INTEGRITY IT ONSISV RECEIVED. 7Z- �Jcf MAT 1-6 ISSA! 7 PEFUT-COUNTR - — ------ . ........... .. .... A�.-Ac�n 5 c (S 15 .5 F 0-7 A-) tj t Cl; L, CA- vo ;A, ,-tc 3 OLLj &I efy OL oA� �7� 5 e 4 -r tg Z\ N 0 LF V. 7FS 4 —A Z Vx 1,0 0 - 9-.t 60 V/1 J-J. vi Tc . ......... . A�-,r ..T� 1 /-7 1 .4 ro. L7 I& AC -=O, 7 .1-O.Ac 0. Z, + 0. .0 .- 71 1_0 0.&1 cl� 6.. Z 6 x 0%7 CA ­757 z 5- 56.7 A4 21 7-S:' Y-Tis­ 9 Z, Cf-7 ._-�eUZ9�AAbL7_ 'Er b. -7 .7 Z I q Z x 0, Z 6 o. 71 A4.;� Vol u OA e U, cfe.,c( 6%- 1- -47 3. z /1Z �46-. 0. Z 4 15 \3 s -e- r. . SAa_ 191 lz .77 Q-Z-7— A v- ecA- kj ) I vo e 4&-�) It + \j ) K-CAR-S- ro�- -740 85: 0.025-2 READY A c D F G H 2 3 B= 2 4 Slow 0.01 5 H= 0.0252 6 n= - 0.027 7 side 3 P= 2.159378 9 A= 0.052305 10 T= 0.024222 11 Odesign= 0.066 12 V= 0.460749 13 Q= 0.024099 14 15 16 0 17 18 19 20 401NAL get CMIT APPLICATION REQUIREM . ENTS6 To: Applicant From: Lyle Chrisman, Engineering Inspector Owner Waft%T1501') Plan Check No:. Address:— ("00 -76TW-A%*5 Date: - - --------- - - - ----------- - - After review of the subject permit application, the following requirements must be met: 1. Construction hours are: WEEKDAYS — 7:00 A.M.40:00 P.M.WEEKENDS/HOLIDAYS — 10:00 A.M.-6:00 P.M. 2. A separate RIGHT-OF-WAY CONSTRUCTION PERMIT is required for all work on public property. (ECDC 18.60) 3. Truck haul route plan must be submitted and approved prior to permit issuance. 4. Builder/owner is responsible for containing all temporary runoff and erosion control on site. (ECDC 18.30.030d) 5. NO WORK SHALL BE DONE WITHIN 15 FEET OF STREAMS OR 10 FEET FROM ANY CLOSED DRAINAGE FACILITY. BUILDERIOWNER IS RESPONSIBLE FOR IDENTIFYING CONDITIONS ON THE DRAWING. (ECDC 18.30.50G) 6. FILTER FABRIC FENCE SHALL BE INSTALLED AND INSPECTED PRIOR TO CLEARING AND CONSTRUCTION. (ECDC 18.30) 7. INSPECTIONS ARE REQUIRED ON STORM DRAINAGE SYSTEMS, TIGHTLINES AND CATCH BASIN INSTALLATION. INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. (ECDC 18.30) 8. Repair or replace all defective existing curb, gutter and sidewalk adjacent to the property. If an intersection is involved, a handicap ramp may be required.. Contractor shall meetwith the City Engineering staff to determine the extent of repair prior to issuance of the permit. (ECDC 18.90) 9. Driveway slope shall not exceed 14% without a waiver. Every attempt should be made to keep the slope below 14%. Waiver granted to %. (ECDC 18.80.060D) 10. Driveways must be paved from property line to City RIGHT-OF-WAY. A separate permit is required. (ECDC 18.80.060C) 11. INSPECTIONS ARE REQUIRED ON DRIVEWAYS AND SIDEWALKS PRIOR TO AND AFTER POURING. (ECDC 18.30) 12. No burning of construction refuse without a permit frorn the Fire Department. 13. Connection to City water system is required. There is a separate charge for the water meter. (ECDC 7.20) 14. A back water valve is required if downstairs plumbing is below the elevation of upstream manhole. (ECDC 7.20) 15. Water and sewer main lines should be separated by 10 feet minimum. (ECDC 18.10) 16. Connection to the City sanitary system is required. A separate permit is required. LID# LAO)OW&V Fees paid: Yes— No Charge (ECDC 18.10Y 17. Underground wiring is required on all new construction, and for additions, alterat ions, and repairs that exceed 56% of the total assessed value of the structure. (ECDC 18.90) 18. A FINAL ENGINEERING INSPECTION IS REQUIRED PRIOR TO THE BUILDING DIVISION GRANTING OCCUPANCY OF THE BUILDING OR STRUCTURE. (ECDC 18.90) PRMTMQP-D0T t,17 Al HoLe tATUV4 or 4 %D-1 Op ".0 'A 1 .5- ANUE CONM rin M Zo, 64! 4, M, � . to I &-- .1 . UL-47 (CD.4- latz eF-1 MISS 99m. 0?4 M CZ, 1� A LF 4 4 1 .. Arl AWtA cm? I Co A t v Pf �D b. Pla 5. U-40 AQVJ N CT - IN f OV- ALL CoZff i f 014 RX2, 104, (oD U., ->r SIMWAU�� Ara, Exl:� Mr ON I 15U I UDN& A" N5AU 64ficp) %Regr �wq ?A I 1IT- Cu izes yfumi 15ioll 6,-FD(Zvz:- at !"L, W4 WALL.- 104 104. A.1 Ldcjl loll —uo4 + 104 104. TO :z C- =Jr S4 WDDQ bbve; fU� ID4- MCA:. _\A) t42 6v -7 ]02, (p 5 V4, A4 WailorfAuO. 10S .......... 95b job 1611 Af NV A Oa4 a:-- .411.5 —14- W)A+ 25D 60, MIN - 11 A CON5MCnON FgTRANCX- pl. 1h SkEer gaef� Cum T-rF I \-- Sia rms- - 1w (%ra- DMI 101F 1640 rr , SR,-- UUA-r 1 AM A L, 4-0 2- IN WA ft::�14DLISC v tbl-, 97 v 5MLL bb IWEI c15 tj4aa 54XL ft -W �L ALUM eA? 54ALL ft— I(D� \A I 6?11?A� 9A15 (n 45rM -5DN- ft A ILI uj LP D.ATM -014111:201 0.. Nil r alry 71PTh Avl�� W %%MnON &NW EROSIONISEDIMENTATION NOTES LIMITS OF CLEARING AND AREAS OF. VEGETATION PRESERVATION AS DESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION 'PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. - ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OFTHE PERMITTEE. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENT TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE 'SHOULD ANTICIPATE 'THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHAH BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER_ QUALITY OF THE RECEIVING DRAINAGE SYSTEM. ANY DISTURBED AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE MUST BE IMMEDIATELY STABILIZED WITM MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEARIN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABI F ONLY DURING THE MONTHS OF APRIL THRU SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED OUTSIDE THE SPECIFIED TIME PERIOD WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR 0 THi-R'[_kEj:�-iivIENT APPROVED BY THE SOILS ENGINEER. MAINTENANC SILT FENCES AND FILTER BARRIERS SHALL.33E INSPECTED IMMEDIATELY ,,,,AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. ,SHOULD THE FABRIC ON A SILt FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE —REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMO.� . /r-T'AFTER'EACH STORM EVENT. THEY MUST.BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE­ i HALF THE H:-_IGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER. REQUIRED, SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. lum i�eAM"600VVIOW MUAW MAIL zaxtl WeLvev FAV1914- ftlf-r, FA061t- MAf' tjIeAFI 140 Oe CQUAL- I"- IV WAOHFP eAeAV9L. Or- rM I�UKY FILTM PAKI(, IN 4KAVf.L-LINf-V lZeNC44 01/f IfLOW Alrwrtf (Z teal FV4. P104HAUt WN1901, DeVlCe- 0&fI4L_I?IA-IY60 kip lyrlcoit,!)61f� X'Art'oel ot wl 13 xx-4 CW&LAO pir- Or, %ol tQUAL- Il 4 ilz Zi kv ............... ... .. IL U Li fig ley wflom or rlvrf�c -MOCIC MfL. IN I'A V No VALIADLE� I " ;Z#-A..SFHAVT IV;e-40�44F.17 6UerA6IN&'_Vf M96E mijw -4u e = I u x- ";se -,-& i zif? e 7 Per, 9 IIZEMWR� WAIVE -SOIL-0e -.6,104-TUILAL-M.- -TYFVAL- IXIVEWAY �PE�6110kl; wo _6z--W ICINAe .4 Ovee w1ul rANI7 OFENINA M_4D 50A,-1h AA ALUM-4MF p Pg b4fi twIoN hre 4 eLev- �—KIN& AND WVeZ 0 I�LOW CON­T_T"4\'0L 5T-RUCTURE ANP PETENVON PIF- �L, RET-41L No .5c.41-r- TyF% z CONSTRUCTION SCHEDU ATTEND PRE -CONSTRUCTION MEETING. FLAG PROPERTY LINES AND CLEARING LIMITS. k0�2RrAVRAON ENTRANCE AS REQUIRED. INSTALL DETENTION PIPE. KEEP EXCAVATED SLOPES COVERED WITH PLASTIC. EXCAVATE BULDING AREA. POUR FOUNDATION AND RETAJNING WALL FOOTINGS. POUR FOUNDATION AND RETAINING WALLS. WATERPROOF ALL FOUNDATION WALLS. PARTIALLY BACKFILL FOUNDATION WA.LLS. INSTALL ALL ROCKERIES. INSTALL UNDERSLAB PLUMBING. POUR CONCRETE SLABS. COMPLETE BACKFILL FOUNDATION WALLS. INSTALL DOWNSPOUT PERIMETER DRAINS. CONNECT TO DETENTION SYSTEM. FINAL GRADE AND PAVE. UPON COMPLETION OF LANDSCAPING, REMOVE TEMPORARY EROSION CONTROL AND CLEAN UP SITE STORM DRAINAGE SYSTEM. GENERAL NOTE ALL ROOF DOWNSPOUTS AND FOOTING DRAINS WILL BE TIGHTLINED TO THE DRAINAGE SYSTEM SEPARATELY. NO CONCENTRATIONS OF STORM RUNOFF WILL BE DISCHARGED TO GROUND SURFACE. ALL SITE WORK IS TO BE CONDUCI DURING DRY WEATHER' !N THE EVENT OF RA:M, ALL EXPOSED SLOPES WILI_ BE COVERED WITH PLASTIC AND THE EXCAVATION KEPT DRY BY PUMPING OR BY OTHER POSITIVE DRAINAGE MEASURES. EXCAVATION WILL BE PERFORMED WITH LIGHTWEIGHT EQUIPMENT. NO CUT SLOPES ON THE SITE SHALL EXCEED: 2HAVTEMPORARY 3HAV PERMANENT NO SIGNIFIcANr I REES ON SITE. Me.) &un, y r %VF_ �eRAL6 Af) iO4utjoj�eD APPROVED A C Tluw DATE! %i r rA T.Y' Cl EN%NEER cl 15569 3 911 . ............ RD C) C)6 :z cl 18530 76TH AVE W 0 Uc TAX ACCOUNT/PARCEL NUMBER: ol BUILDING PERMIT (NEW STR COVENANTS (RECORDED) FOR - CRITICAL AREAS: DISCRETIONARY PERMIT #'S. DRAINAGE PLAN DATED: PARKING AGREEMENTS DA EASEMENT(S) RECORDED FOR: PERMITS �'LANNING DATA CHECKLIST DATED: tp SCALED PLOT PLAN DATED: SEW'ER LID FEE SHORT PLAT FILE: SIDE SEWER AS BUILT DA SIDE SEWER PERMIT(S).#: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DA DETERMINATION: E] Conditional Waiver E] Study Required [] Waiver LID #: LOT: BLOCK: ED: 6q k () V / '��41 04 po-,+ rA-,P\a I (-I S' tf I C) LATEMP\DSrs\Fom,s\Street File Checklist-doc OLANNING DATA New Commercial I Multi -Family Projects 11 STREET��J Name: K�A' C_ V. ez) Date: co/ls/n _Zotym 12� If V. Site Address: Aye W - --a Plan Check #: BLD - gLo �C) — 0 �a Project Description: 4e CYC 90CA"C>r\ 0-0 -CC-0 rv--% C> ., - M,, r- V�e_cp Mo,,A '7 Use(s) Proposed: Allowed Use: NO) 0, c, CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES /(OP Reduced Site Plan Provided: (YES I NO) Zoning: ?,,4 Map Page: Comp Plan Designation: Net4n6c-�poal Cornmera'ir Comer Lot: (YES /0) Flag Lot: (YES ADB File Number (date waived): AcG,,'­',Skr­V-,,,eLot Area: Plans Match ADB Approved: (YES I NO) Shoreline Required: (Y�4_- lgp Critical Areas Determination #: C�ZAtqc? q000g Study Required r% A V�e L�, �red -Po Waiver P,-, SEPA Determination: 0 Exempt El Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Requhl�ffS�ethqcks Street: Side: Side: Rear: Actual-&Jffi,�ieks Street Side: Nn CA, Sid Rear: Lot Coverage/FAR Required: /A L��overage/FAR Provided: Lot Coverage/FAR Calculations: NO C�-�C7CSQ_ Weigftt Datum Point: Datum Elevation: WA Maximum Height: 4J /A Actual Height: I Subdivision: Lot Aggregation Required: eaping- Landscaping Matches ADB Approved: A d Landscaping Bid Provided: (YES Bond Amount (100% Bid): A/ _JA �6). Plan Review By: PLANNING DATA 0 New Commercial / Multi -Family Projects IFSTJWET :Fl:�j] comme An4lysis; rcial in Business Name Type/Use Parking Ratio Tenant Area Required Parking nj%gcnp�C, Vie-C-0 MO CZ 11300s.p or- '01 yz 4 Llnkc% 0&0,� lerv, pink$ 9 ao e." A.Ovec ;:>/0 o" Total Parking Required: Total Parking Pro vided. ultf amflyP.4rking, q" M -F # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.2/D.U- 1 Bedroom 1.5/D.U. 2 Bedrooms 1.8/0.U. 3 + Bedrooms 2.0/D.U. Total Parking Required. Total Parking Provided. Other., 'b- Sec.C>,-\CJ d\ need \be, r-e-- <-e_,_,` in c>c-olex- Jro M V�,,r Plan Review Bv: 4� ;__10 � htr -V, M. *PLANNING DATA -- Sigm -- 0 [E:i i: : �7- 1 , Name: 01V'Pic, Viecz A Date: I Site Add ress: -4(-.A�, W Plan Check 9: BLD-,'A0J0071-y Project Description: -Onc- neg�a ,nl - Reduced Site Plan Providecl:EP NO) Zonin Comprehensive Plan Designation: e, Map Page: ]Corrier ner Lot. (YE Lot: (YES tFlag Lot: (CYES ADB File ff (or date waived): TO TA L A re, 3 Ler Typ of -5iqn Allowed in Matrix Allowed i I TOTAL sign Type of Sign zone? conditions area per Unit area allowed for Proposed met.2 unit sign area this siqn Example Wall -linternal Illuminatibn Yes, with conditlons Ye5 I sq. &.111neal /t. attached 41 ft. attached Waff 41 square feet 20 square fi�et W8// Sign #I Sg . C4. fer Yes N/A \ I �, ��. e- Sign 92 21 K36 NIA On"m Sign #3 TO TA L Sign Area for Tena T, Max Permitted: Previous Total: Proposed Total: Slgf i Height G, Sign Type: Max Permitted: cr -Actual Height: < �,e CIP Sign Type -CL - Max Permitted. I n "N Actual Height: Sign Type: Max Permitted: Actual Height L�� �/7 Sign Type: Proposed: Allowed in Zone: WA Sign Type: Proposed: done- Allowed - Z '!2�/A M STREE PLANNING DATA Signs Si�n CWqrs Proposed: e-e- Acceptable? Yes, ��Requtires ADS Approval? fj Sign Location if freestanding and 3-feet or over (unless a fence) meets setbacks? S I ICA-N -Z)o -a-Ac"Oed Reqqired Settx3cks Street: '60 go Side: Side: I Rear: Actua/Selba6ks� Street: Side: 0 *5 Rear: L,7ndscaping for Free -,;W�7&W Sia Size: fe, LLOC ation: Critical Areas Determination c9,AXqc?q6009 Study Required El waiver Other Plan Review B��. I* PLANNING DATA signs -- Name: Ed wovc� Y""s Tn V-? S �y� Date: 3 Site Address: 6 -7 Fl I Plan Check ff: BLD-200,--o Project Description: c4rrlef— Reduced Site Plan Provided:�Y Zoning: T)l NO) Comprehensive Plan Designation: (1, 6 or ko o Cclmwc (it Map Page: 3 Y-6' Corner Lot: (YES / tV Fla� LO _(YES /CN� _C ADB File # (or date waived): TOTAL Area Type of Type of Sign Allowed in zone? Matrix conditions Allowed area per Unit TOTAL sign area allowed for Proposed sign area met? unit this siqn Example Wall wlInteinal illumination Yes, with conditions Yes I sq. ItIllneal ft. dttaChed 41 It. attached Wall 41 square feet 20 square feet wall Sign # 1 0- /A '7 L 4-6 70 h . C9/k ly— WdJ Sign 92 I a k #3 Sign VA� (4jrf" OL OA TOTAL Sign Area for Tenan4lSlte Max Permitted: Previous Total: Proposed Total: Sign Height Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: Sign L hNn Sign Type: gin Proposed: i/tf (1 Allowed in Zone:i Sign Type: 'A Proposed: 4 Allowed in zone: 01'. � . f N" art UP Roal - - 'i F - I . ( I /�,l -6 be -<-- CMVVC'.-1 (9�01 t VIL 2-0 � 60020- M. 7— PLANNING DATA F FILE --signs On colors. Proposed: /I Acceptable? Requires ADB Approval? A/0 Sign Locat6n If freestanding and 3-feet or over (unless a fence) meets setbacks? eequin�V.�M,30� Street: A Setbacks Street: Side: Side. for Fr.�estaqding._$igns Size: Location: Critical Areas Determination #: Study Req Waiver Other Plan Review By: qb ED STREET RECF.IVF FILE MAY-1-6159h GKALA-� ------- PERMIT.-C'OUNTER ... ciov 0. Z. b A,-� Z C- Q-A,4 IS 6 T��PtA,�-u e 1 -0 .0-7 A-) 4�5 'S Tt vz, e- c ell� 4� 4 f 2-1 Z,- 9 t�o Lr Z. 4 loc. . ..... T, lo 7-1 .4 %A JZ-3.... vn't vi 7 lle -�Aw D., D6 A CAI . ....... ..... IT-4-1338is 2, Fo c � . . -... . - - --....4 0 ;;- v Au-e-411249- C t 0 .71 .0 -.0-b V, h-,N- - A CA L ce- zs--,�. 56.7 `�Zc�fAADL7-- +-+-AQ,!?�-+O- T!r b. -7 &f. 7 Z, c-7 e- 'Z I Z A 0, Z 6 X 0. 71 0-57 WN Up u , Cf 0, Z -4 04 P) 47 5 3., 2 tz- v 7C - 'Ve�c/ Z 4 Ol C& 6 TZ5 �-�7 717 2: _ ` ` ----'-------'------------- - ----- ------ — -------- } = ` . '*" -'' -- '--'-'---' ----- `'---- � I '*ev0-A� ' -----' ---------' � .. � � ' ----------- > I f. �- 'r0- 170 -/,�C( 85: 0.0252 READY ''A 8 c D F G H 2 3 B= 2 4 slope= 0.01 5 H= 0.0252 6 n= 0.027 7 side 3 8 P= 2.159378 9 A= 0.052305 10 T= 0.024222 11 Odesign= 0.066 12 V= 0.460749 13 14 Q= 0.024099 15 16 17 N 18 19 20 1555, -- " 'W"IP W - 3-IS-�6 Pe NO CITY OF EDMONDS BARBARA FAHEY MAYOR 121 5TH AVENUE NORTH EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works - Planning/ Building e Parks and Recreation Engineering - Wastewater Treatment Plant November 4, 1997 Blue Star Electric 18530 - 76th Ave W Edmonds, WA 98026 Subject: Maintenance Bond Dear Blue Star Electric: The City (Engineering Division) is holding a maintenance bond as security to insure that the sidewalk, curb, and drainage at 18530 - 76th Avenue West is maintained in compliance with the engineering codes.. Prior to release of the bond, the City must inspect the site to insure compliance. A site inspection was made on November 3, 1997. This inspection revealed that the curb is broken on the east side of the driveway. Please replace the curb and call me for final inspection. Once the curb is in compliance with the codes, the maintenance bond will be released. If you have any questions, feel free to call me or Jamal Mahmoud (extension 328). Sincerely, 944ft e, wA, James C. Walker, P.E. City Engineer JM/JCW/sf c: Permit Coordinator 18530-76.DOC e Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan TO DATE BOND RELEASE FORM CITY OF EDMONDS TO: ENGINEERING DIVISION -PLANNING DIVISION FROM: PERMIT COORDINATOR Et4W4FERiNG PERMIT# ADB#--q PLAT# _t4 PROJECT ADDRESS 3-0 1 fV DEVELOPER/CONTRACTO TYPE OF BOND TO BE RELEASED BOND DATE POSTED BOND EXPIRES Please field inspect for the release'of the subject bond. If there are outstanding requirements, please note in the space provided. Failure to respond by the expiration date constitutes approval by your department and automatic release of the bond. /V (2 V. 0) 3. 4. BOND APPROVED FOR RELEAS DATED BOND NOT APPROVED (see notes above) DATED WORK TO BE COMPLETED WITHIN - DAYS -COPY TO FILE -COPY TO DEVELOPEWCONTRACTOR SUSPENSE TO /BONDREL12/96 0 The City of Edmonds Water Service Drawing EASEMENT NO . ............................................ NEW CONSTRUCTION REPAIRS F� LID NO . .................. IASMT. NO . .................. OWNER ... S. 1. -0. F . ..... S77AP-... M ....................... CONTRACTOR .................................................................................... PERMIT Nc,-54.04.84 JOB- ADDRESS --- J-S-5.3-0 ......... 7. 6X '� AN � ... W .......... LEGAL DESCRIPTION- LOT NO . ...................................... BLOCK NO . ................................. - PWW-0001-11175 (REV.11/78) 76 -r P Av c - W. ................................... 4� ......................... -�, ....... ... ....... ...................... Approved: DATE ��J. .. � ..tg.g.,5.... By ........................... CITY OF EDMONDS Address of Construction: I �30 ,'Property Legal Description (Include all easements): Owner and/or Contractor: State License No. I ". � El Single Family Multi -Family (N Comm&cial El Public ovo a'w S - k I certify that I ha4read'and shall comply with all as ihdicated on the back of the Permit Card. "'.elveo 0 . VIAR 0 3 iWGIDE SEWER flUBLIC, VqO'B" D"' PERMIT N2 111) - Building Permit No. q 0 Lq PERMIT 3674 1­1 - / ,, I I I ) - ivasion into City Right -of -Way: 9 No 11 Yes RW Construction Permit No. �ross oth er Private Property: 1� No 11 Yes Attach legal description and copy of recorded easement requirements . 3 Date CALL DIAL -A -DIG (1-7800-424-5555) BEFORE ANY EXCAVATION OFFICE USE ONLY FOR INSPECTION CALL 771-3=, PUBLIC WORKS DEPT. Q. A.; k 1 10 Permit Fee: — _�o , M Issued By /0 Tru nk Charge:_0?,5— Date Issued: -S —,3 Assessment Fee: X) I L19 Receipt No.:/ F4 72 Lid No.:— LIA)AL) WO Partial Inspection: Date —Initial — Comments Reason Rejected: Date —Initial Final Inspection Approved: Datel-46—A Initial PERMIT MUST BE POSTED ON JOB SITE White Copy: File Greeri Copy: Inspector Buff Copy: Applicant Rev�sed 3!90 Side Sewer Drawing 10 The City of Edmonds NEW CONSTRUCTION A REPAIRS E] OWNER JOB ADDRESS .... *3 c> -7(o-�4 ............................. . ........... . ........... ...... p-i PWW-0001 .11/75 (REV. 11/78) EASEMENTNO . ............................................ t LID NO . .................. . ASMT. NO . .................. CONTRACTOF . ............................. ------------------------------------------------------- PERMIT NO. LEGAL DESCRIPTION: LOT NO. .— .................................. BLOCK NO . .................................... NAME OF ADDITION --7bT'-' 4or-_ V� . 14 lli2v-e- C.& . -S Li --- \P- C% Approved: ............ . .. . ....... DATE iK,ER ENGINEERS FRUCTURAL DESIGN 6628 "M2TH. S.W. O(NNWOOD WA P.O. BOX 1697 LYNNWOOD WA 98046-1697 SUBJE T E-YW� W"L-c= J'0B.*NO-.s5T9:5%40-T (206) 771-6666 FAX (2) #5 RS RS 42 DIA. 3 1/2 KEY )RAIN TILE AVELPOCKET O.C. OR TO DAYLIGHT RS ts � 2" CLR ij,jAfj co SHEET I — !,- �OF 771-6558 4SA 91110INC; MAR 2 3 1995 RF,TATNII\IG NYALL NOTE UBC 1991 ED. -6-5 PCF EQ. FLUID PR. Zono PSF SOIL BRG. DESIGN' ..N.O. PSF SURCHARGE 5 SACK CEMENT/CYD (2500 PSI MIN) MAX 6 GAL. WATEMACK GR. 60 STL. FOR 45 & LARGER GR. 40 STL. FOR 44 BACKFILL w/ POROUS MATL CONTROL JOINTS SPACED AT 25'-0" O.C. - JOINT DEPTH '/4-X WALL THICKNESS - CUT ALT. T-BARS AT JOINT JOB ADD�ESS: - .9.06SR750N A .. t.*5 3 0 -7G 18 A,4 (LE "' \)V APPROVED — DATE AL7 k— cITY OF EQMONDS - BLDG. DEPT. Building Officilal RETAINING WALL SCHEDULE a b c V-13ARS H-BARS T-BARS 4L 5 ......... . 10" — --------------- - ----------- — — ---- At: r (Ettp of (1b oub DEPARTMENT OF BUILDINGS 2- E P".1 , I � " Ir I I', PER International Building Code Section 111 ilding Permit Occupancy established by this certificate: I Dwelling Units: N/A S2/E Construction: VB Maximum Occupant Load ** 41 ** - (Per IBC 1004) Room capacity signs, when required, must remain posted at all times. No. Stories: I Basement: N/A Building Owner: Myrth LLC Owner Address: PO Box 1534, Lynnwood, WA 98046 THE Olympic View Montessori HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 2009 EDITION OF THE INTERNATIONAL BUILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 18th day of July, 2011 REET FILE CHIEF BUILDING OFFICIAL BY: This certificate shall be posted in a conspicuous public area and shall not be removed, mutiljor obUred and shall be maintained in legible condition at all times. Anychange of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. AN (1) th W \V \V W Z'#; \V \V IF F t:trttftt At: 1853076 th Ave W Occupancy established by this certificate: S21E/B of DEPARTIVI (lb 011b 4a� ENT OF BUILDINGS A A, -A41kk K116 International Building Code Section 110 BuildingtPermit'M BLD2C _T Dwelling Units: **N/A** MaximurniOccuvant Load nstruction: VB mainposted at kint? IBC 1004) No. Stories: I Basement: No Building Owner: Myrth LLC —.'-Ownd'r Add 534, Lyn nwodd, WA 98046 Beg" ',COMPLYING WITH THE REQUIREMENTS OF THE THE Olympic View Montessori Vj� '!S�699 �IN,,� JED VEDZ S, 2006 EDITION OF THE INTERNATIONAL BUILDING DE AS DOPTEDZY-THE,CITY FOR.THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANC*,IS C � SSIFILD. h Issued this 26t �Auaust. 2010 CHIEF BUILDING OFFICIAL BY: This certificate shall be posted in a conspicuous public area and shall not be removed, mutilld or loscured and shall be maintained in legible condition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. as sees Sao 0 7rtranSPOGROUP WHAT TRANSPORTATION CAN BE. 11730 118th Avenue N. E. Suite 600 Kirkland, WA 98034-7120 T 425-821-3665 TG: 10059.00 F 4215-825-8434 www.transpogroup.com June 4, 2010 Bertrand Hauss City of Edmonds 121 5th Ave. N. Edmonds Wa. 98020 Subject: Olympic View Montessori - Trip Generation/Impact Fee Estimate Dear Mr. Hauss: This_1etter provides the trip generation and impact fee estimates associated with the relocation of the Olympic View Montessori from its current location (7526 Olympic View Drive, Suite 0) to its new location at 18530 76th Avenue A(e'st-in Edmonds, Washington. Olympic View Montessori has been a Montessori Preschool and Kin&e-rgarten se�rving the Perrinville Area of Edmonds for the past five and half years. Olympic View Montessori is-proposiiig-a-move �Itectly across the street from their current location in un-incorporated Snohomish County. Currently, Olymp�ic �View Mo�ri-is licensed under the Department of Childcare and Earty Learning, which has a code requirement.of 26'itudents maximum in a preschool/daycare classroom. Olympic View Montessori has a tot�lof-30-students,'I'O-stude�-fs'aften�-d-fulltime preschool and 20 attend half -day class either in the _'9sori intains the 20 student requirement by having 10 students in �homing or aftemoon.-Olympjc View-Monie ma - of the -half-time morning 0/2011 school year and plans on enrolling 8 more studerits-by-September to ni-eet-its-g( i-- View Montessori plans on expanding o two-classroon &ccu—pation-of-20-students-and-operate 3 days a week classroom having a maximum occup�t_ion oiTCF-st06 and half -day classes. mum The drop-off and pick-up schedule for the full and half day programs include drop-offs between 8:45 and 9:00 with half day pick-upstdrop-offs from 11:45-12:00. Full -day and afternoon pick-ups occur between 3:15-3:30. Penalties are assessed for late pick-ups. These schedules would not change with the increase in student enrollment noted above. Staff is limited to the owner and one to two teachers depending on the time of day. Typically, all staff leaves within 30 minutes of the last child being picked up, thus the school is typically dark by 4:00 in the afternoon. No activity typically occurs during the PM peak hour. If however there was some later trips from the teachers or assistants, these trips would be less than what would be generated by this use during the weekday PM peak hour under a general office use as previously noted. The new location includes up to 1,485 sf of classroom space with an external warehouse building of which the program will use 1,040 for physical'activities. The external building is currently used as warehouse for other uses in the building. The current use of the 1,485 includes general office space. Based on ITE (8h Edition) trip rates, the weekday PM peak hour trip generation for the existing use is estimated to be 2 trips. The existing ADT associated with the office space and associate warehouse space totals 20 trips. 0 0 Bertrand Hauss June 2, 2010 Page 2 Based on our previous discussions, the City of Edmonds assesses road impact fees based on the standard uses noted in Table 4, page 18, of the Edmonds Road Impact Fee Rate Study. This table identifies a number of "typical" uses for which fees have been calculated. The fees are set based on ITE Trip Generation rates for the weekday PM peak hour period of the adjacent streets. Based on Table 4, the current use of the space assuming general office and warehouse uses would be assessed a fee of approximately $3,011.65. As noted in the previous text, based on the school and staff schedules, no activity is anticipated during the PM peak hour. Since the Montessori program does not generate trips during the weekday PM peak hour (4 — 6 pm), no road impact fees should be assessed for this project. As a comparison, as outlined in the Traffic Impact Analysis worksheet, if a High School use was assumed for the project, no fees would be due as well. Sincerely, Transpo Group Michael Swenson, PE, PTOE Associate Principal 0 BZY G10 A 47 �Wk zo 1 16Z-Z 1 CW_ CITY OF EDMONDS TRAFFIC IMPACT ANALYSIS q1l'11 WORK SHEET RECEIVED APR - 12011 Name of Proposed Project: Viemi 004 e -.-5 0 V�, DEVELOPMENT SEFMCES CTR' I W11, -. Owner/Apolicant: 1'�C, f-V-1 J�P-e tA G (-a � Ck V\.,\ Name --7152.6 01)�Mplt View Street/Mailing Adclress- t"On6j city State zip Applicant Contact Person: .5A V" Name Street/Mailing Address city State Zip Telephone: (�12- 6"Q— 0346 Telephone: Traffic Engineer who prepared the Traffic Impact Analysis: -Fray\->P. iW,6x0,tt Ll ON) Firm Name Contact Name Telephone 1. PROJECT DESCRIPTION a. Street address (if known): 12�,T-30 -7-61"' A\Wnvc V\J b. Location: Pe r (-,. r)\,( f4V\J\0VN4 (Attach a vicinity map and sileplan.) c. Specify existing land use: ce - 1. 43 G-s� + 1,040 Px+efy1V\ WcIrT�\%Nl< -)P acc! d. Specify proposed type and size of development: IIIIT)tl M1 + 1.0-10 Wor?-VIO'Alirc .5pot-e �a bt� '�or- sc,�ioal cmL\ oji-Ae)or ftc QW"S. - c. When will the project begin construction and when will it be completed? 'T'i- -Afrb-,L�LW, iv\ 2ojo f. Define proposed access locations: 0 r- �X CAA $:�f gLf f'ro v\,\ C -Cvt 0 C CM r- 1 40 C�Mticy" g. Define proposed sight distance at site egress locations: t\1 1,4 - Yb (-KOA!�( f"VC�V U Page I 2. TRIP GENERATION a. Existing Site Trip Generation Table: Land Use aTE Daily (ADT) ( 60,Ea� PM Peak -Hour Trips IN OUT C C L) Z_ 0 -1 L) Ll C> 0 b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT t�-Cw,& Over. 00ro not Mf k-C A-< b V c. Net New Pro ect Trip Generation Table: j Land Use Daily (ADT) PM Peak -Hour Trips IN OUT �J fo. -7 b d. State assumptions and methodology for internal, link -diverted or passby trips: Page 2 3. TRIP DISTRI9UTION Prepare and attach a graphic showing project trip distribution percentages and assignments. I 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? A no V b. Intersection Level of Service Analysis., Existing Conditions LOS �J Delays Year of Opening LOS Delays / JV+ Five Years Beyond Change of Land Use LOS PIA . Delays (Intersections to be evaluatedshall be determined by the CityofEdmonds Traffic Engineer.) c. Describe channelization warrants: (Attach striDing nian-) d. Vehicle StoragelQueuing Analysis (caiculate 50% and 95 % queuing lengths): 50% 95% Existing Conditions A - Year of Opening L�J 1Z A 1Z A e Five Years Beyond Change of Land Use e. If appropriate, state stop sign and signal warrants: f Summarize local accident history: 14 0 / A - Page 3 9 0 5. TRAF71C VOLUMES a. Describe existing ADT and peak -hour counts, including turning movements, on street adjacent to and directly impacted by the project. Lo � A b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). I Vq c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and vHthout project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below'and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations. Existin2 LOS: Existing Condition: Year of Opening LOS: With Project: WithoutProject: __ - t f I I Page 4 Five Years After Opening LOS: With Project: Without Project: Note any assumptions/variations to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. + pro Wk(6 (IliqhSchoo 0 L\6 -A C )'OL-10 A- 1, V1 v�-) )a No Pr1% p'-Co*- VwjrrU g-eV\ef-CA"Cn 2�ef- '�' k-�C) 's -A, L SAENGRk0a=U\rity Pmjectz%*nA GaidefineffrallwMnalyWork 9.04.doo Page 5 0 0 ranSPOGROUP 11730 118th Avenue N.E. 1,qHA:1 T11pNSPORTATION CAN BE. Suite 600 Kirkland, WA 98034-7120 T 425-821-3665 F 425-825-8434 TG: 10059-00 %AA�Amlranspogroup-COM June 4, 2010 Bertrand Hauss City of Edmonds 121 5th Ave. N. Edmonds Wa. 98020 Subject Olympic View Montessori - Trip Generation/Impact Fee Estimate Dear Mr. Hauss: This letter provides the trip generation and impact fee estimates associated with the relocation of the Olympic View Montessori from its current location (7526 Olympic View Drive, Suite 0) to its new location at 18530 76th Avenue West in Edmonds, Washington- Olympic View Montessori has been a Montessori Preschool and Kindergarten servingthe Perrinville Area of Edmonds for the past five and half years. Olympic View Montessori :is proposing a move directly across the street from their current location in un-incorporated Snohomish County. Currently, . Olympic View Montessori is licensed under the Department of Childcare and Early Learning, which has a code requirement of 20 students maximum in a preschool/daycare classroom. Olympic View Montessori has a tota I I of 30-students, . 10 students attend full time preschool and 20 attend half -day class either in the morning.or afternoon. Olympic View Montessori maintains the 20 student requirement by having 10 students in each of the half-time morning and afternoon progr ams. Olympic View Montessori currently has-22 students enrolled for the. 2010/2011 school year and plans on enrolling 8 more stud6rits by September to meet its goal of 30 students. In the 2011/2012 school year,,Olympic View Montessori plans on expanding to two classrooms, -and 40 students.- One classroom will have a maximum occupation of 20 students and operate 3 days a week offering -full day.apd half -day schedules, with the second classroom having a maximum occupation'of I 0--students, operating -5 days aweek and also offiering full day and haff-day classes. The drop-off and pick-up schedule for the full and half . day programs include drop-offs between 8:45 and 9:00 with half day pick-u.pstdrop-oft from 11:45-12:00. Full -day and afternoon pick-ups occur between 3:15-3:30. Penalties are assessed for late pick-ups. These schedules would not change with the increase in student enrollment noted above. Staff is limited to the owner and one to two teachers depending on the time of day. Typically, all staff leaves within 30 minutes of the last child being picked up, thus the school is typically dark by 4:00 in the afternoon. No activity typically occurs during the PM peak hour. If however there was some later trips from the teachers or assistants, these trips would be less than what would be generated by this use during the weekday PM peak hour under a general office use as previously noted. The new location includes up to 1,485 sf of classroom space with an external warehouse building of which the program will use 1,040 for physical activities. The external building is currently used as warehouse for other uses in the building. The current use of the 1,485 includes general office space. Based on ITE (8th Edition) trip rates, the weekday PM peak hour trip generabon for the existing use is estimated to be 2 trips. The existing ADT associated with the office space and associate warehouse space totals 20 trips. RECEIVED APR - 12011 DEvELUPlvt'Cl0' SENCES CTR. CITY OF EDMONDS 0 0 Bertrand Hauss June 2, 2010 Page 2 Based on our previous discussions, the City of Edmonds assesses road impact fees based on the standard uses noted in Table 4, page 18, of the Edmonds Road impact Fee Rate Study- This table identifies a number of "typical" uses for which fees have been calculated. The fees are set based on ITE Trip Generation rates for the weekday PIVI peak hour period of the adjacent streets. Based on Table 4, the current use of the space assuming general office and warehouse uses would be assessed a fee of approximately $3,011.65. As noted in the previous text, based on the school and staff schedules, no activity is anticipated during the PM peak hour. Since the Montessori program does not generate trips during the weekday PM peak hour (4 — 6 pm), no road impact fees should be assessed for this projecL As a comparison, as outlined in the Traffic Impact Analysis worksheet, if a High School use was assumed for the project no fees would be due as well. Sincerely, Transpo Group ^ '" 4 a /. Michael Swenson, PE, PTOE Associate Principal A(#OVED R Y ENGINEERWc. We: CITY OF EDMONDS TRAFFIC IMPA . CT ANALYSIS RESUP WORK SHEET 12, 1 0 7 26 1'0 BUILDING DEPAR*�.,,�,.,�:-, Name of Proposed Project: CITY OF EDMONDS Owner/Applicant: Name -7!52-6 Qt)unR�c Vir-yv D,6\,j-c- Strcet/Mailing Adaress' i-A,1V\0n6J �,J city State zip Telephone: ( L-1 Z --, ) - 6-1 Q '-' 0 J'q 6 Applicant Contact Person: VVI C- Name Street/Mailing Address City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis: �FF'aV%',>Pv G',fO.J�2 L)lcK(k-d Ll?��_ J>b Firm Name Contact Name Telephone 1. PROJECT DESCRIPTION a. Street address (if known): I%T3'0 J-V"" W b. Location: P—e f-c- , , rw ". k k -f 1, ;�,4V\J\0,V-0S (Attacis a vicinity in ap and site plan.) c. Specify existing land use: ce - 1, 93 + i, 0 9 0 f-o4c f 1', �,- N �N 6 f--c - o (c d. Specify proposed type and size of development: 1, 'i"o' �:, SC- -f- ). 0 -10 w orz- vi -s po Le f Z, e. When will the project begin construction and when will it be completed? 'IT fvK 7aio f. Define proposed access locations: iQ 0 , C. 'K C�A 5,f I-LK c Q iV-cvx 0 (- Q1 F )�, CCLA-t.cy- V g. Define proposed sight distance at site egress locations: 1^0 C Kcv�-qxl( fovv U. Page I 0 0 1 2. TRIP GENERATION a. Existing Site Trip Generation Table: Land Use -3-7-E- Daily (ADT) PM Peak -Hour Trips IN OUT L) C) vjaf-c�)O"v 1, 0 -.1 L) Ul 0 2-0 b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT S�VS4 "Cper ',56 v�A,tAvl-j. of C1.55 3�00-W A S)j-� c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT -1 b d. State ass=ptions and methodology for internal, link -diverted or passby tips: o I A Page 2 L - 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. P//A I 4. SITE' ACCESS ROADWAY/DRIVEWAYSAND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service Analysis:, Existing Conditions LOS Delays P I A Year of Opening LOS Delays 1,-" / A Five Years Beyond Change of Land Use LOS Delays (Intersections to be evaluated shall be determined by the 00) of Ednionds Traffic Engineer.) c. Describe channelization warrants: (Altacli stripingplan) d. Vehicle Storage/Queuin.g Analysis (calculate 50% and 95 % queuing lengths): 50% 95% Existing Conditions A - Year of Opening �!/A Five Years Beyond Change of Land Use e. If appropriate, state stop sign and signal Warrants: f Summarize local accident history: M Page 3 5. TRAFFIC VOLUMES a. Describe existing ADT and peak -hour counts, including turning movements, on street adjacent to and directly impacted by the project. Lo b. Describe the estimated ADT and 'Peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and kithout project traffic). d. State annual background traffic growth factor and source: A 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations. Existing LOS: Existing Condition: Year of Opening LOS. With Project: Without Project: Page 4 Five Years After Opening LOS: With Project: T Without Project: Note any as4umptions/variations to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. E �,A Cc-.,r ( D�-'V�Cv -J Ux;O-VA0,,�-tc 0 0� ) = 6 "7 4- 0' — '0*3 0 11 P-OWS(CN Schoo) = A- oieA�') , ---. 6 1 i -(�, I a — AN W-\ �� v ; n i� V�U - -NV\AQ0(A- CS -+�Z. _Q:,":— -FV,—P— SAEKGR\D=c11\n'ty ProjeciATTA Gaide1!nd\TYa0nipAna1yWcTk 9�04.doc Page 5 `%FtranSPOGROUP WHAT TnANSPORTATION CAN BE. 11730 118th Avenue N.E. Suite 600 Kirkland, WA 98034-7120 T 425-821-3665 TG: 10059.00 F 425-825-8434 www.transpogro�ip.com June 4, 2010 Bertrand Hauss City of Edmonds 121 5th Ave. N. Edmonds Wa. 98020 Subject: Olympic View Montessori — Trip Generation/impact Fee Estimate Dear Mr. Hauss: This. letter provides the trip generation and impact fee estimates associated with the relocation of the Olympic View . Montessori from its current location (7526 Olympic View Drive, Suite 0) to its new location at 18530 76th Avenue West- in Edmonds, Washington. Olympic View Montessori has been a Montessori Preschool and Kin&�rgartpn serving the Perrinville Area of Edmonds for the past five and half years. Olympic View Montessori is proposing -'a mq�e directly across the street from their current location in un-incorporated Snohomish County. __._____._Curre n t ly, Olympic View'Mo n tes s6ri- is licensed under the Department of Childcare and Early Leaming, which �ii a -code requirement of 26�tudents 'maximum in a preschool/daycare classroom. Olympic View Montessorif has a tota-1-6f -30�students, 10 stude4s attend full time preschool and 20 attend half —day class either in the rnorning.or aftemoon:-Olympic View Monte-s'sori.niaintains the 20 student requirement by having 10 students in each of the half-time momin'i-6nd-afternoon programs, s -2Q1 0/2011 school year and plans on Olympic View Montessori currently'ha 22_students-enrolled for the enrolling 8 more students'by -September to meet its go�ai_6f-,36_'stUde­hts'..In the 20,1.1/20.1.2, schoo-1-year, Olympic.. ------------- 9' View Montessori plans on expandin totw6cIassroom§and40 Udent�: One classroom. will have a: maximum--- _66dipation-of 20 students and operate 3.days a week . Offering full-da"y a�-d-half:-,day-schodules�.with-the-second-----7,---- classroom having a maximum occupation of I O'students, operating 5 days a- week'Ind -also offering fUl I day and half -day classes. The drop-off and pick-up schedule for the full and half day programs include drop-offs between 8:45 and 9:00 with half day pick-ups/drop-offs from 11:45-12:00. Full -day and afternoon pick-ups occur between 3:15-3:30. Penalties are assessed for late pick-ups. These schedules would not change with the increase in student enrollment noted above. Staff is limited to the owner and one to two teachers depending on the time of day. Typically, all staff leaves within 30 minutes of the last child being picked up, thus the school is typically dark by 4:00 in the afternoon. No activity typically occurs during the PM peak hour. If however there was some later trips from the teachers or assistants, these trips would be less than what would be generated by this use during the weekday PM peak hour under a general office use as previously noted. The new location includes up to 1,485 sf of classroom space with an external warehouse building of which the program will use 1,040 for physical activities. The external building is currently used as warehouse for other uses in the building. The current use of the 1,485 includes general office space. Based on ITE (8th Edition) trip rates, the weekday PM peak hour tri p generation for the existing use is estimated to be 2 trips. The existing ADT associated with the office space and associate warehouse space totals 20 trips. REF'SU13 JUN 0 7 2010 WILDING DEPARN�EN-r CITY OF IRDIVIONDS 0 Bertrand Hauss June 2, 2010 Page 2 Based on our previous discussions, the City of Edmonds assesses road impact fees based on the standard uses noted in Table 4, page 18, of the Edmonds Road Impact Fee Rate Study. This table identifies a number of "typical" uses for which fees have been calculated. The fees are set based on ITE Trip Generation rates for the weekday PM peak hour period of the adjacent streets. Based on Table 4, the current use of the space assuming general office and warehouse uses would be assessed a fee of approximately $3,011.65. As noted in the previous text, based on the school and staff schedules, no activity is anticipated during the PM peak hour. Since the Montessori program does not generate trips during the weekday PM peak hour (4 — 6 pm), no road impact fees should be assessed for this project. As a comparison, as outlined in the Traffic Impact Analysis worksheet, if a High School use was assumed for the project, no fees would be due as well. Sincerely, Transpo Group &wAva" /,, Michael Swenson, PE, PTOE Associate Principal RMIT APPLICATION REQ UIREMEN* To: Applicant From: Lyle Chrisman, Engineering Inspector R FILE. Owner. L 3 Plan Check No: Address:— Date: After review of the subject permit application, the following requirements must be met: 1. Construction hours are: WEEKDAYS — 7:00 A.M.40:00 P.M.WEEKENDS/HOLIDAYS — 10:00 A.rvL-6:00 P.M. 2. A separate RI I GHT-OF-WAY CONSTRUCTION PERMIT is required for all work on public property. (ECDC 1&60) 3. Truck haul route plan must be submitted and approved prior to permit issuance. 4. Builder/owner is responsible for containing all temporary runoff and erosion control on site. (ECDC 18.30.030d) 5. NO WORK SHALL BE DONE WITHIN 15 FEET OF STREAMS OR 10 FEET FROM ANY CLOSED DRAINAGE FACILITY. BUILDER/OWNER IS RESPONSIBLE FOR IDENTIFYING CONDITIONS ON THE DRAWING. (ECDC 1830.50G) 6. FILTER FABRIC FENCE SHALL BE INSTALLED AND INSPECTED PRIOR TO CLEARING AND CONSTRUCTION. (ECDC 1830) 7. INSPECTIONS ARE REQUIRED ON STORM DRAINAGE SYSTEMS, TIGHTLINES AND CATCH BASIN INSTALLATION. INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. (ECDC 18.30) 8. Repair or replace all defective existing curb, gutter and sidewalk adjacent to the property. If an intersection is involved, a handicap ramp may be required. Contractor shall meet with the City Engineering staff to determine the extent of repair prior to issuance of the permit. (ECDC 18.90) 9. Driveway slope shall not exceed 14% without a waiver. Every attempt should be made to keep the slope below 14%. Waiver granted to %. (ECDC 18.80.06ODj 10. Driveways must be paved from property line to City RIGHT-OF-WAY. A separate permit is required. (ECDC 18.80.060C) I 1ANSPECTIONS ARE REQUIRED ON DRIVEWAYS AND SIDEWALKS PRIOR TO AND AFTER POURING. (ECDC 18.30) 12. No burning of construction refuse without a permit from the Fire Department. 13. Connection to City water system is required. There is a separate charge for the water meter. (ECDC 7.20) .14. A back water valve is required if downstairs plumbing is below the elevation of upstream manhole. (ECDC 7.20) 15. Water and sewer main lines should be separated by 10 feet minimum. (ECDC 1&10) 16. Connection to the City sanitary system is required. A separate permit is required. LID# LA#h)0J4"* Fees paid: Yes— No Charge�_ (ECDC 18.10y 17. Underground wiring is required on all new construction, and for additions, alterations, and repairs that exceed'50%.of the total assessed value of the structure. (ECDC 18.90) 18. A FINAL ENGINEERING INSPECTION IS REQUIRED PRIOR TO THE BUILDING DIVISION GRANTING OCCUPANCY OF THE BUILDING OR STRUCTURE. (ECDC 18.90) PRMMMQPLD0T Tnr-p-- . E - I Lit- S n, &- I I L, 0 City of Edmonds Engineering' Dept. Attn: Lyle RE: Robertson Building Plan Check 94-98 0 Blue Star Electric, Inc. (206) 778-7439 P.O. Box 698 Edmonds, WA 98020 Construction Divi§ZMC- 7-23-94 25 14994 As per your request, our estimate for the site improvements for the above project will be $17,000.00 (a pricing estimate for the improvements is attached) . The breakdown of the work is: Paving $ 9,800.00 Detention system and utility piping Contingency 595.00 Total $ 17,000.00 N KIM 0 rel I I :�] a DONALD W. ROBERTSON President Blue Star Electric, Inc. 0-1 A�el VZ,5-1-74- SKILL AM[ INTEGRITY OONSIS% Forrr%tk4E PP11-11I C,'Wlzl=T ESTIMATE NO. Sheet Of No. Sheets ESTIMATED BY DO n R EXTE4SUEMOW, _39-" CHECKED BY DATE President 13111ye Star FlPrtrir 10C mom MI mommom MI El min MI MIINN!I� NI MI MI 111loom MI m���Elloom 1111111111INNE1 Elmo I MI mlolllllli� 111 MINE 110010 14.10110.2 -0 0 1 MI ENl11 MI ON MI__ 2 Me M 1111111 1 ONION 11111111111111MIN MI MIN MI MI 111111 am Totals This Sheet Transterred'To Recap By -INITIAL MATERIAL STRET FILE 0 MEMORANDUM July 26, 1994 TO: Sharon Nolan, Permit Coordinator FROM: Gordy Hyde, Engineering Coordinator SUBJECT: Warehouse at 18530 76th Ave, W. Plan Check No. 94-98 Due to a misunderstanding, the applicant bonded for $22,000.00, which includes $17,000.00 for engineering and $5,000.00 for landscaping. He has taken out an additional $3,400.00 for engineering in the form of a cash set aside. When the storm system is complete, he may ask for a partial release. At that time, if Lyle has signed off on the storm, the entire cash set aside can be authorized for release, as.the approved amount for the storm is more that the $3,400.00. There will still be the bond to hold for the remainder and all maintenance. ROBTSN.DOC CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering July 28, 1999 Mr. Erich Tietze, PE EOTA J8530 — 76' Ave. W., Suite B Edmonds, WA 98026 SUBJECT: Proposed Foundation at Stevens Hospital (ADB-99-36)(I!C-99-= i�:r, � �, Dear Mr.—Tietze, BARBARA FAHEY MAYOR The Engineering Division reviewed your civil site design. The review team notes the following revisions/ corrections. Please contact the review team members directly for questions regarding their comments. Storm Drainag_e — Don Fiene. &draulics Engineer at (425) 771-0220, Ext. 323 • Show existing detention system. • Profile storm system and show utility crossings. • Provide necessary calculations and narrative. Trao:zc 0 Show dimensions of handicap accessible parking stalls. • Please be aware that parking stall dimensions are 8.5' x 16.5'. • Show existing parking on 216'h Street SW and indicate how it will be altered. • Use attached high traffic load driveway detail and reference it on drawing. • Show how the easterly entrance will be restricted to "exit only." Utilities — Jim Waite, WaterlSewer Supervisor at (42�) 771-0235, Ext. 34 • Provide a sanitary sewer cleanout, raised to grade, as shown • Relocate proposed double detector check valve assembly to a point within 10 feet of the public right-of-way. • Provide water valves as shown. When the revisions are complete, please return the attached redlined plans together with three sets of revised plans for additional review. It will be necessary to provide a construction cost estimate for City staff to determine the Engineering Division fees. If you have any other questions, do not hesitate to contact me at (425) 775-7744. Sincerely, ( �®r A.1— Gordon C. Hyde Development Services Engineer GCH/cmc c: DST Chris Kirk; KSI; 1822 North 46' Street; Seattle, WA 98103 — (206) 545-7143 �Fax) Incorporated August 11, 1890 GAENGR\G0RD"036.D0C Sister City - Hekinan, Japan C> C> N, A5C51V50 JUN 23--1994 CITY OF EDMONDS COMMU'NI TTY, SEM*/ . I I CES This is to certify that a City of Edmonds Critical Areas Variance (File - 11�- ; , ( - - Ap- 15) has been approved. The variance request was to remove the requirement rf 0 ti� Slope Critical Areas buffer and buffer setback which encompassed the west 65 feet of the property described below. All other City regulations apply to this property described as follows, (Legal Description) The- north 100 feet of the south 152 feet of the east 125 feet of tract 107, Edmorrds Sea View Tracts as recorded in Volume 3 of Plats, Pages 75, records of Snohomish County, Washington, less the east 10 feet as per Snohomish County Superior Court Cause # 106013 to City of Edmonds. I / we verify that I / we are the legal owner(s) of the property described above. I / we warrant that all representations are true and STATE OF WASHINGTON) ss: COUNTY OF SNOHOMISH) On this er all peared before me k_ y Jay kki r A�7tun I to me known to be the individuals described in and who executed -the within and foregoing instrument, and acknowledged that ' -1" signed the same as AWL free and voluntary Ict and deed., for the uses and purposes therein mentioned. fii:V e i Vade rk., . kmy hand and official .04P SOT r 0 seal this2Aay of -AWR—, _ 19 0 fA 0 *. 7- RUORN-- tA I/ I; LIC, -94 IN 23 P 3 .29 k. I so TERWILLIGER AWITUR S%I)HOMISH COUNT Y. WAS1 I Kitary PuWic in' d r t State of Washington r%esi g at 1A pq City of Edmon 71�-111��-`��,,-, Y CONSTVJ RGHT-OF-WA CTION PERMIT Permit Number. Lcsue Date: ------- A. Address or Vicinity of Construction: 9 0 -19 C) B. Type of Work (be specific): (-�.Al Q—SffiltZ 114 Q-��Q�' sccl�(,J 0 r PQzwous�-N pmuf�c CS N-L-,Pws�j C. Contractor . : t�\ AP n:1 f.U.ft-AlContact: C MailingAddress: UL)�:( Phone: co--70-3:2ns State License #: C nHQk1hS LQN Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. Commercial [J Subdivision El City Project Utility (PUD, GTE,-WNG, CABLE, WATER) Multi -Family E] Single Family F] Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut: es 1JNo G. Size of Cut: x H. Charge�_$ APPLICANT TO READ AND S INDEMNITY. Applicant understands and by his signature to this application, agrees to h, Id e Q JQ+mages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made agai t the City of Edmonds, or any of its de0artment8 or employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofAFanting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FORIA PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATIOXIM98%,WILL BE HELD UNTIL TAM FINAL �TREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PR . OCESSED FOR ISSUANCE TbtTHA APP'hIfANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the yvprking day; NO EXCEPTIONS. /�� C Iha ve read the above statements and understand theperm it requirements and thepink copy of thepermit will be available on site at all times for inspection purposes. Signature:GWAPA a Date: (Uontract�r CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: R1'6 H'T OF WAY DEPOSIT" P TIME AUTHORIZED': VOID AFTER 02 DAYS DISRUPTION FEE/FUND I 11: SPECIAL CONDITIONS: RESTORATION FEE:, PERMIT FEE: TOTAL FEE:, '50. 0 COMMENTS: RECEIPT, FEE: DATE: ISSUED BY: -=;el 41 gal d z IyVr- 2; NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Fngrg. Div. 1991 4 �UBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY kv.'7/87 LOCATION 0 QT_Y AREA �' C) POLE NO. 1/4 S T2_� R-� DATE �Q W. 0. N 0. REASON FOR WORK ENGINEER DWG. NO. �A�7 DRAFTER U. G. NO. DATE WORK COMPLETED FOREMAN - SCALE DATE PRINTED f PHASE t (IL Av 1 -2- L -T !AT Rm__ PC-)L\--- — Z> Qc) A L�Lcc) C)�,_) 'U�� - T 0 W`0+164D 119 - E:x PiDQ 6AUS t _7(aTwm1U W City`bf Edmon ni VONST 1fGHT-0E-'W- A�V' CTION PERMIT '751-qq_3 Permit Number. Issue Date: .7 A. Address or Vicinity of Construction: 18530 76 AV W 9507114 8 9 0 1 9) B. Type of Work (be specific): Tngt-ali Npw qtnryip C. Contractor: Idembington Untur-01 Gas coffipg�uy Contact: FL=anl; 21; a .- -6. a Mailing Address: 1199 75 SZ S12 Rver-att Phone: 447-3284 State License #: 98203 Liability Insurance: Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. [] Commercial E] Subdivision 0 City Project Ja Utility (PUD, GTE, WNG, CABLE, WATER) E] Multi -Family [] Single Family n Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut: Yes ONo G. Size of Cut: x H. Chargq�_$ . - ... - .. - - ( 1 Mit APPLICANT TO READ ANDt.S1zN th C INDEMNITY: Applicant understands and by his signature to this application, agrees to ho n� I ity ofEdmonds harmless f��Wnj�5., damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Eddionds, or any of its departments or employees, including or not limited to the defense ofany legalproceedings including defense cqst� and attorney fees by reason ofgranting thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR AjPERIOD OF ONE YEAR FOLLOWING THE FINAL I— �' . . '_ - I INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILr., BE HELD UNTIL THE FINA'L S'tRf,ET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE, TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City'regulations as required bythe'City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the above statements andunderstand thepermit requirements andthepink copyof thepermit ivillbe available on site at all times for inspection purposes. Signature: ��� 7wZyAn Date: 12-27-94 'AdgwactM %Iwe�4 CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: TIME AUTHORIZED: VOID AFTER 3 0 —DAYS SPECIAL CONDITIONS: RIGHT OF WAY DEPOSIT' DISRUPTION FEE/FUND.1111:� RESTORATION �FEE:, PERMIT FEE: TOTAL FEE: C) COMMENTS: RECEIPT. FEE: A -f I I �J DATE: ISSUED, B NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 0 NaturNGm A Walwigton ErvTv CompaN WNG to window Watermain depth Unknown 2--- gas main Addendum to: City of Edmonds Right of Way * Permit Application Submitted by: Mariamne-Kingsbury Engineering Aide Washineton Natural Gas 1356-7500 -X7596 3 " got 4k =DT Key: -G- _SS- 0 Water Gas Sewer Water hydrant Water valve Washington Natural Gas Company 1122 75th Street S.W.. Everett. Washington 98203, (206) 355-3331 NaturillGas�� AVMIvVon Energy CornpYN WNG to window Watermain depth Unknown gas main 4�) ilc Z3 4" (a I � Addendum to: City of Edmonds Right of Way Permit Application Submitted by: Mariamne-Kingsbury Engineering Aide Washington Natural Gas 1356-7500 X7596 3 �7 50-4 11 Key: -W- Water -G- Gas _SS- Sewer -& Water hydrant 0 Water valve Washington Natural Gas Company 1122 75th Street S.W., Everett, Washington 98203, (206) 355-3331 0 WV43M Na Gm AVMWffVon EnergyCOMEYN (04 I Addendum to: City of Edmonds Right of Way ' Permit Application Submitted by: Mariamne Kingsbury Engineering Aide Washinuton Natural Gas 1356-7500 X7596 3 ';7 4 3 (Ot 50-4 11 '&.V WNG to window Key: Watermaiu depth 111/0. -G- Unknown _SS - gas main. 0 Water Gas Sewer Water hydrant Water valve Washington Natural Gas Company 1122 75th Street S.W.. Everett, Washington 98203, (206) 355-3331 54 CiTY OF EDMONDS�--'--, BUILD ING DEPARTMENT WORK_Zf, 7 "_ Vxj, � L.-R.,FMIT MUMBE Olympic View a Montesson Pre'school & Kihdergarten So -0746 .2 425-640 City of Edmonds Buflding Department A?PROVEDPLM APPRUVED By PLANNING Side View cut vinyl mounted onto 3mm thick dibond (alu rn'-inum composite panel) then mounted to the wall with .5 inch stand off posts. 0%`T -4 2010 C OF STREET FILE 'V m/rnpic vieW Mentessori qv� E P-7 I A-04 DEVELOP.va'j CITY OF 24 in Olympic View Montessori -?Y 1� -T� Preschool & Kindergarten 425-640-0746 '71 Cut vinyl applied to 6mm d1bonc (aluminum composite panel) secured between (2) painted wt 41$x 4 it 44 appearance grade to pres: treated wooden posts. Set in concrete filled 12 is x 18" h Total Height of sign 36 inches. 4vtM no\- vmc-e-eld 3 1 :n UB NOV - 2 2010 BUILDING DEPARTMEjMT OW OF SDMONDS % I ' RESUB NOV -22010- WLDING DEPARTMENT OrTY OF SOMONDS -AJ-i (j I AV, 4 ux In n, O,wx,lo.q AN x 14.61 w x 10.W r "av r APPRO VED AS 'EER y G Cain -714 IS RESPONSIBLE Foil t AND DRAINAGE RESUB NOV - 2 2010 UILDING -DEPARTMENT GM OF raDMONDS 6e- vn m - -�>Uw k � RESUB v - 2 2010 spi H STREET FILE, W, WALL, rn� AL plamad IwA C�UX Lk� � - 0� ------------ APR 0 4 1995 11 CoL UR IT 45 AppROVED DATE* 1� OF, EDMONDS . B DG. DEPT. CTY Building OffIC181 71f RE ocll�l i V, LI =T a APR 0 4 1995 r-MVP.,.qlT COUI �ITOR R R� ................. . ............ — — — -------- ---- - - — -------------- — -- ----------- w /'Z //,(NOi OCCUPIED,. BY C�.V�M.') (NOT OCCUPIED. BYOV.M). OLYMPIC VIEW MONTESSC X, PLANT04 PApxwG PARM6 PAWNG P�joo.o MMOW PAIFOGIM HANDWAMED as.lev ELF x 16B P .0 5 x 116 8.5. x I" 8.vX1cv iiw�r 141 "'ir 4" hw6tv r PARIUNG PAFUGMG esxw OEX21Y % ----------- 2 - — — — - — - — — - — - — — — — - — - — - — - — 'Nodong to tho perout approW proem aW be a auowmg or permteung die d any cu.�' tky emun; wegal, =0 Cor M routted buddmg sUvI*M Tuon whro ou%We the Scope oftbe =Vruccum of wnd—o te she, an the afte pin or dreww Such Wddm& seructom or obtain Electrical Perselt *on oondibon may be Lh! tnibjed of a State LabOr & Indushies enforcement ccun PROPOSED SITE PLAN IEW MONTESSORI SCA* LE': 1/8" OLYMPIC V 18530 76TH AVENUE W EDMONDS, WA 98026 6/241201-0. ppFtOVED Sy � PLAWANG ';P CIF C, 0 0 0-P . q_P 011 CONSTRUCTION TYPE _r6 OCCUPANCY GROUP OCCUPANTI-OAn City of Edmonds Budding DePar6ent AppRoVED PLAN PARKING SPACES REO'D PARKING SPACES PROPOSED APPROVED By ENGINEERING BARRIER FREE PARKING SPACES =11� Date: CITY OF EDMr%,r% CITY OF EDMONDS BUIL ING,_PF�A T�ENT WORK ADDRESS —1 EM - -7/6 ;kj tL) OWNER 1� APPROVED 11DATE: �1/01/10 IBLDG. OFFICIAL z PERMIT NUMBER I O?D/() -033-,-5 CHRISTINA MERKELBACH design 2015-920-8502 145921stAVENUE, SEATTLE,VVA98`122 CHRISTINA@CHRISTINAMERK.COM BUIL I WORK I G DEPARTMENT AD RESS 0 FR APPROVED DATE- BLDG OFFICIAL PERMIT NUMBER CITY COPY ,Aj 4 -4,1- RESUB- JUN 2 4 2010 Al. 1012— i I 7x- �- f? Lj ?�..r. CD I t t t: 'q J,' ­71 Ji. Ay- b)r v 4o� e -�i -P� ince V,,jo(-,. L J�� 44 VI -I p s r C, o4r,r"8,847c, R FS 1� 1P Schematic Only - Not to Scale H NIAX [ Rock Wall Section 2 ef X_ It ve V, Rock Wall Elevation 1+ Keq I AD. The long dimension of the rocks should extend back towards the cut or fill face to provide maximum stability. Rocks should not be stacked like shoe boxes. They should be placed to avoid NOTES: C01-111111.10US pini pkines in vertical or lateral directio . Whenever possible each rock should bear on two or more rocks below it, with • Rock wall construction is a craft and depends largely on the skill good f lat-to-f lat contact. and experience of the builder. All rock walls over 4 feet in height should be constructed on basis • A rock wall is a protective system which helps retard the of wall mass, not square footage of face. weathering and erosion process on an exposed soil face. While by its nature (mass, size and shape of the rocks) it will provide some degree of retention, it is not a designed or engineered system in the sense a reinforced concrete retaining wall would be considered designed or engineered. The degree of retention achieved is dependent on the size of the rock used; that is, the mass or weight, and the height of the wall being constructed. The larger the rock, the more competent the rock wall should be. Rock walls should be considered maintenance hems that will require periodic inspection and repair. They should be located so that they can be readied by a contractor if repairs become necessary. • Maximum inclination of the slopes above and behind rock walls should be 2.1 (HorizontalNertical). • Minimum thickness of rock filter layer B = 12 inches, Minimum embedment D = 12 inches undisturbed native soil or compacted fill placed in accordance with report recommendations. • Maximum rock wall height H feet. • Rock walls greater than 8 feet in height to be installed under periodic or full time observation of the geotechnical engineer. • Rock should be placed to gradually decrease in size with increasing wall height in accordance with geotechnicall engineers recommendations. • Minimum widthof keyway excavation, W. should be equal to the thickness of the basal rock (as determined by geotechnical engineer's design) plus B. \A'^ Approximate Approximate Size Weight - lbs. Diameter 1 Man 50-200 12 - 18' 2 Man 200-700 18 - 28" 3 Man 700- 2000 28 - 36' 4 Man 2000 -4000 36 - 48' 5 Man 4000 -6000 48 - 54' 6 Man 6000 -8000 54 - 60" Ref , erence: Local quarry weight study using average weights of no less than six rocks of each man size conducted in January 1. 1988. LEGEND: Drainage materials to consist of clean angular 4 to 2 inch spalls, or other material , approved by the geotechnical engineer Surface seal: may consist of impervious soil or a fine free draining granular material. Undisturbed firm Native soil Drainpipe: 4-inch minimum diameter, perforated or 0 slotted rigid plastic ADS pipe laid with a positive gradient to discharge under control well away from the wall. F±1 Designates size of rock required, i.e. 4 man. TYPICAL DETAIL NATIVE CUT, ANY HEIGHT OVER 4 FEET Rockery Wall Notes Rockery wall not to exceed 3 ft high. All work will be done 'as per City of Edmonds Rockery and Retaining Wall Reqirements. Door and Door Hardware Schedule I 1. Solid wood exterior door Hardware to knerled to HCcodes 2. Same same /�AUST 196 L_F_VEW-� PIAL4.; 3. Solid wood interior door same Of� 4. 1 hr rated ubc ire door same I %-4-,4as PC 1R.. VA.,A—. e-ake- 5&6 Metal exterior door(double) same Doors Sec. 3106. (j) Doors. 1. General. Door� required to be accessible shall comply with Section',3304 and with provisions of this section. For the purpose of this section, gates shall be considered to be doors. An accessible gate or door shall be provided adjacent to any turnstile or revolving door. Where doorways have two independently operated door leaves, then at least one leaf shall comply with this section. 2. Clear Width. Doors shall be capable of being opened so that the clear width of the opening is not less than 32 inches. EXCEPTION: Doors not requiring full userpassage. such as shallow closets. may have a clear opening of not less than 20 inches. 3. Maneuvering Clearances at Doors. Except as provided in Section 3106 (aa). all doors shall have minimum maneuvering clearances as follows: A Where a door must be pulled to be opened. an unobstructed floor space shall extend at least 18 inches beyond the strike jamb. B Where a door must be pushed to be opened and is equipped with a closer and a latch. an unobstructed floor space shall extend at least 12 inches beyond the strike jamb. C. Where two doors are in series. the minimum distance between two hinged or pivoted doors shall be 48 inches. in addition to any area needed for door swing. 4. 'Thresholds at Doors. Thresholds at doors shall comply with Section 3106 (f). Sec. 3304. (b) Swing and Opening Fo,!c'e Exit doors shall be of the pivoted or side -hinged swin,ging type. Exit doors shall swing in the direction !of exit travel when serving any hazardous area or when serving an occupant load of 50 or more. The door latch shall release when subjected to a 15-pound I force. and the door shall be set in motion when subjected to a 30-pound force. The door shall swing. to full -open position when subjected to [a] 1 5-pound force. Forces shall be applied to the latch side: except that at exit doors within the accessible route of travel such force shall not exceed 8.5 pounds, and at sliding and folding doors, andiinterior Swinging doors such force shall not exceed 5 pounds. At exterior doors where environmental conditions require greater closing pressure, power operated doors shall be used within the accessible route of travel. I RECEIVE:'D J U L 12 1994 PERMIT COUNTER C�N CN _<:C0 CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OMER NANIE/NAME OF BUSINESS �L L D W. r W MAILING ADDRESS 0. bo �, 696 CITY 41P TELEPHONENUM ER ty t '0 12D -3tV ADDRESS L) cc ZIP TELEPHONE NUMBER < CITY I I VZ11: : PERMIT � ZONE NUMBER 940484. JOB SIUITE�APT # ADDRESS EGAL DESCRIPTION CHECK SUBDIVISION NO. I NO 4 PUBLIC RIGbIT QE WAY PER OFFICIAL STREETJAP. COW TESCP Approved 0 RW Permit Required 48, EXISTING REQUIRED DEDICATI N 0 Street Use Permit ReQ'd 13 Inspection Required PROPOSED Sidewal� Required 0 cc W METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 13 3: 4EMARKS Lit 6 - W I g', [e, CA f cc u, W Z ME �,f V N �Iu U f6 Ilk LO e1q (4 kDDRESS JENGINEERING MEMO DATED REV EWED BY SAA16 I 1TV ZIP IFTELEPHONE NUMBER ST TE LICENSE NUMBER XPI ATE ;92u6-5,cro(01 ;x, .,K ., .0,77 SIGN AREA ALLOWED OPOSED /R 12.1 SEPA REVIEW COMPLETE JEXEMPT EXP DB NO qillt_ I SHORELINE 0 Z in Legal Description of Property - include all easements 04JU7 �0 :76 ve, aj CU ?NG REVIEW BY —7 It f�� eowpci� Sa vlboT" -Fr--P-"ty 00 FT OF 6 195'L OF C: ILL.") rT OT T x A cou P:111C No. Uj, SETBACKS — FEET HEIG;�i6T COVERAGE FRONT 7-10 SIDE if REAR 0 -71 fl�MARKS f RIEW RESIDENTIAL PLUMBING ADDITION Z"'COMMERCIAL MECHANICAL EIREMODEL APT. BLDG. SIGN GRADING FENCE REPAIR cYDS. x _FT) WOODSTOVE SWIM POOL DEMOLISH INSERT HOT TUB/SPA GARAGE iETAINING WALL/ CARPORT .W9GrCRERY RENEWAL 4 �'. !,_8 C 2%6y TYPE OF CONSTRUCTION M—/j/ CODE OCCUPA G SPECIAL INSPECTOR I REQUIRED C3 YES AREA OCCUPAt4l :REMARKS PROGRESS INSPECTIONS PER UBC 305 (TYPEOF U S CTIVI Y) EViMN: s MIN 4246' (L W 0 in 0—. - ne NUMBER i OF STORIES.,I I I NUMBER OF 6WELLING [UNITS� CRITICAL AREAS NUMBER q OESCRIEleWoOf�.TO BE DONE (ATTACH.PL I WW D.- fP-Vxt-7­ fit& INSPECTION REO'U'IR'ED VALUATION FEE P LAN CHECK FEE 379 xtar 4W1C1eA_1K4,y C, .0. r."W 011!*V40315 ,eo;r Ave BUILDING //�,F,4420 Z. c:k43 C'e-1 HEAT SOURCE- I w-r 6 GLAZING % -7 PLUMBING _6�_40146__ Plan Check No. MECHANIqz // I , LLW I - r,,f AWT 5�-r� I - ; %, I. — — GRAD16GIFILL _-- This Permit covers work to be done on private property ONL Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permIssion. �i A.T. - E . SUF�IbHARGE Permit Applic . ation: 180 Days Permit Limit: 1. Year -Provided WA Ii S`tarted Within 1180-0'ay�s RM D4NAGE STO FEE ENG. INSPECTION FEEZ296 in 20 2 cr < 0 I "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to Indemnify, defend and I.Vjw harmless the City of Edmonds, Washington, its officials, employees, and agents from any and'all claims for damages o f whatever nature, arising direct ly or indirectly from the Issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirement of any city ordinance nor limit in any way the City's ability to enforce any ordinance provision." 30 PLAN CHECK DEPOSIT TOTAL AMOUNT DUE IASI I hereby acknowledge that I have read this application; that the ATTENTION APPLICATION APPROVAL information given is correct; and that I am the owner, or-th.e duly authorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until state laws regulating construction; and in doing the work authoriz- AUTHORIZES THE signed by the Building Official or his/her e, hereby, no person will be employed in violation of the Labor "' ONLY WORK NOTED Deputy; and fees are paid, and receipt is od,V" ting to Workmen's Compensa- C f the State o,�Washington rela acknowledged in space pr ovided. tion urance an(:rRCVV'%18-27. INSPECTION . SI NA RE IN DATE �IGNED r— DEPARTMENT CITY OF OFFICIAL's SIGNATURE DATE EDMONDS CALL FOR AELEAS 91 tI DATE ATTE TION INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE BEEN MADE AND APPROVAL 08 771-0220 ORIGINAL — File YELLOW — inspector U ' NTIL A FINAL INSPECTION HAS A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor Z Z . . . ... ... I NT�SSORI I c �M VIEW 118530 76TH AVENUEM, [EDMONDS, WA 98026 I Cp ui =3 z 6% Uri 8 APPROVED By PLAWING A I'VP CONSTRUMION TYPE OCCUPANCY GROUP_ SZ-Z OCCUPAW ff)AD City of Ednionds Buflding Department APPROVED PLA N F4 L APPROVED By ENGINEERING late'. vk 540 to CHRISTINA. MERKELBACH design 206-920-8502 1459 21st AVENUE, SEATTLE, WA 98122 CHRISTINA@CHRISTINAMERK.COM PARKING SPACES PARKING SPACES PROPOSED BARRIER FREE PARKING SPACES..Z�" I V,ev � I F EDMONDS UIL ING DEP - WORK ARrMENT ADDRESS OWNER A PPROVED DAI: BLDG. OFFICIAL PERIWIT r4UpA 13ER RESU JUN 24-2010 CITY COPY A 1 /,o/z- 18530 76TH AVENUE W EDMONDS, WA 98026 GENERAL NOTES: 1. CHANGES IN ELEVATION LESS THAN IZ'SHALL BE BY RAMP AND COORDINATED WITH TEH BUILDING INSPECTOR. 2. REFER TO HEARING EXAMINERS DECISION ON CONDITIONAL USE PERMIT (PLN201000025) FOR CONDITIONS OF APPROVAL PROPOSED SITE PLAN SCALE: 1/8" = 1' 3/11 J201 1 �7� w M z w I f, P I A t c- nING Zone ..... Comer Setbacks EgLuired Ac—tual Front Sides Rear Other 04 Ek-ght ----------- CHRISTINA MERKELBACH design 206-920-8502 1459 21 st AVENUE, SEATTLE, WA 98122 CHRISTINA@CHRISTINAMERK.COM PARKING �PACES REQ'D.- PARKING SPACES PROPOSED. BARRIER FREE PARKING SPACES:­ APR - 12011 DEVELOPMENT SERVICES cTR. CITY OF EDMONDS w,we"Al ro �#,' N/ RECEIVED APR - 12011 D LOPMENT SEFMCES GTR. EVELJ C�y OF EDMONDS a`� UP.Of AWA HW�: MANwar-- 100 V 56F.- V81AIL) 2-d7o w 11/0 6) "maE A I In f LtWLICTU e)F, 10� 412. OVWFUW t=. 99.e+ lb OP-4f9tZ, PIA lb 19 Le a NCO 15 �- e.g �'% 95.1 Nra it :.j v ID, AW�l Cm? j(o(-4A- u L 2 0 ig(91,4 r PERN11T G`()UNTER T -440 460jqfri �6 K45:= 14EY-D EOT WW'F' *oo� Offic, Fr IDI NOS tpo ALL 001Z� 6tUM96 WIQ)46f4 f IN RX P-" 104, (oD I N'5TA 11 64 1 UD I q Er A VP IS93� ON VL 5 i�TRC:gr 511DF�� OF bi I Lot�A (::x 10110 ?A I IJT- Cu P.65 yfuLvi, L WP PAM* wALL ca eA& �'r-c e- se Xf rk -4 W1AT--uo4-+ 104 1w 1A, br /4UAIW 104 wAil :z :& , OSJ2 C-1� c A its "00 UL4 �;4 vec,.vj ARM Apr MOO A f5tf 6� Pvi WAM 1�1)' 1.57. -ft. Imsm-ir rD 4"Y 0 tz 141101IRWIV, fro k- IDS 40 N N ( J 43- IW 41; q -�44 34ALL ft -Nlt -12. EXTRaor-O CUM Tre Awm OMP 5"Au- -ft IGLik 5? 5 fg, &WL ft 0A V -�o�4- 31 LT f e4 ce- rs. DM i L) 14� to IP 0 FT- F, Ar. ROWE 2 R 5 7, 11 , R—) 0 T H 0. QTY ENPINEER J I 106 i4ff fr Om 1654 10('10 71PT1.1 ft�- kv C" ISMS 4- ():::� - + *1� < 12-4 - I ACUJ A L, Emma EROSIONISEDIM AL L LIMITS 0 . F CLEARING AND AREAS OF- VEGETATION PRESERVATION AS DESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED. IN THE FIELD AND OBSERVED DURING CONSTRPCTION. AH REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. - ALL EROSION AND SEDIMENT FACILITIES SHALL BE, MAINTAINED IN A SATISFACTORY CONDMON UNTIL.SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMEkATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. THE EROSION AND SEDIM ENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENT TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE -SHOULD. ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIESO M REQUIREMENTS, AS MAY BE NEEDED TO OVER AND ABOVE MINIMU ER. . QUALITY OF THE PROTECT ADJACENT PROPERTIES AND WAT RECEIVING DRAINAGE SYSTEM. ANY DISTURBED AREA WHICH HAS 13EEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR APERIOD OF 30 DAYS OR MORE MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING --THE MONTHS OF APRIL THRU SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED OUTSIDE THE SPECIFIED 'TIME PERIOD WHENEVER IT is IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR OT HEVIlkEiz�TiVIENT APPROVED BY THE SOILS ENGINEER. I MAINTENAME SILT FENCES AND FILTER BARRIERS -SHALL _'E INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALLANY REQUIRED.REPAIRS, SHALLBE MADE IMMEDIATELY. ER BARRIER DECOMPOSE ,SHOULD THE FABRIC ON A SILT FENCE OR FILT OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STIH BE NECESSARY, THE FABRIC SHALL BE -REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMIDA19D AFTER EACH STORM EVENT. THEY MUST -BE REMOVED WHEN DEPOSITS RLA.CH APPROXIMATELY ONE ­ MIGHT OF THE BARRIER. HALF THE H:_ EMAINING IN PLACE AFTER THE SILT FENCE OR ANY SEDIMENT DEPOSITS R R IS NO LONGER -REQUIRED, SHALL BE DRESSED TO FILTER BARRIE D AND SEEDED. CONFORM WITH THE EXISTING GRADE, PREPAR . E mum AAM' 00=6flow . MAW PKA w6L.ME7 wlr-f,— fAPKV, rIL15r, rAOelt- MAI'l.- tilitArl 14o oit I�QUAI� im- I W WA01-If. exeAnl.� M rm bx,"L. If j�UKY FILTM PAKI IN AKAVeL-LANtV f KeN (44 0 mum- - 011eltfl,OW tLtV- XAM4 Or- wl *4 a. is a::: ,massiie O:u 0 0 111 �,l f Fit of- II No WUAL, liz u - our-y Pof-fam or FIL;f'f-f-- -fA0r_IC lio %A�e- VACIADLE" :Z0-A0RAL-*T (6LAW0 ,cUWA4IWA'_laf 54101 1" I L, WIVEWAY -,/7E�CIIOW W. ag tf4,v)---4_gl ,-INVer-f rvi 11 [ELEY-961i A 4 WNIKOL MICE of=�_VIAAS' KINA� 01(tF- WIZ4' gj _-_ areNINdg S-1 Tym- t ALUM. PeTeWION Fire 47 V it ItAPe tLf V- ANP 6OVEIZ FLOW IION-11-ROL -!��UCTIJRE- 14NP -n A I I fik I ^ e 01 A L� U, I'm � A CONSTRUCTION SC EDULE ATTEND PRE -CONSTRUCTION MEETING. FLAG PROPERTY LINES AND CLEARING LIMITS. MNST S290% MAION ENTRANCE AS REQUIREb: INSTALL DETENTION PIPE. KEEP EXCAVATED SLOPES COVERED WITH PLASTIC. EXCAVATE BUlDING ARE-k POUR FOUNDATION AND RETAINING WALL FOOTINGS. POUR FOUNDATION AND RETAINING WALLS. WATERPROOF ALL FOUNDATION WALLS. pAFMALLY BACKFILL FOUNDATION WALLS. INSTALL ALL ROCKERIES. INSTALL UNDERSLAB PLUMBING. POUR CONCRETE SLABS. COMPLETE BACKFILL FOU NDATION WALLS. INSTALL DOWNSPOUT PERIMETER DRAINS. CONNECT TO DETENTION SYSTEM. FINAL GRADE AND PAVE. UPON COMPLETION OF LANDSCAPING, REMOVE TEMPORARY EROSION CONTROL AND CLEAN UP SITE STORM DRAINAGE SYSTEM. ALL ROOF DOWNSPOUTS AND FOOTING DRAINS WILL BE TIGHTLINED TO THE DRAINAGE SYSTEM SEPARATELY. NO CONCENTRATIONS OF STORM RUNOFF WILL BE DISCHARGED TO GROUND SURFACE. ALL SITE WORK'IS TO BE CONDUCTED DURING DRY WEATHER.' W THE EVENT OF RA!'.-., ALL EXPOSED SLOPES WILI.- BE COVERED WITH PLASTIC AND THE EXCAVATION KEPT DRY BY PUMPING OR BY OTHER posmV8 DRAINAGE MEASURES. - EXCAVATION WILL BE PERFORMED WITH LIGHTWEIGHT EQUIPMENT. NO CUT SLOPES ON THE SITE SHALL EXCEED: 2HAVTEMPORARY PERMANENT NO SIGNIFICANr I REES ON SITE. y any ;�a-R_L6 A5 ftutQ&D V 6 6- Iml-,,,wle-�ocreur-r fito,4f# p s / � Ile ,IIII xhtll lepeo dwl�wf kc111vq,0la1o&f#`e1 /v 7 1WAe,W47 rlWe SI-O& 9 7711 W p f/ v 3)14sr,o4,iexwf s-t?w,4,f rAvu11v R"'VED F"OKSN10%. A'mr P DATE:_ my mm�mem- lRor 017Y& N Ft,oleoew�!.2:11:01 . N, L �15569 AL7 > sa< WE LAI __73 m aK+4, m D A i 5 "