Loading...
18608 SOUNDVIEW PL (2).PDFiiiiiiiiiiiiii 14438 18808 SOUNDVIEW PL Y ADDRESS/aD& (fr j TAX ACCOUNTIPARCEL NUMBER: BUILDING PERMIT Q�EW STRUCTURE): COVENANTS (RECORDED) FOR, CRITICAL AREAS: DETERMINATION: Conditional Waiver Study Required F-1 Waiver DISCRETIONARY PERMIT #'S:_ DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER'LID FEE $: LID SHORT PLAT FILE: LOT. SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED ---- STREET USE ENCROACHMENT PERMIT #-.. FOR: WATER METER TAP CARD DATED: BLOCK:.. L:\TEMP\DST's\Fomis\Street File Checklist.doc 9— 1 L 0 5- . L A A 5.1 1 6 . 1 6A M Lovell-Sauerland and Associ4as, Inc. Phone 425-775-1591 1 0 W S a I i V - V 6 V 0 a &Z 19400 33rd Avenue W SulEje 200 Fax 42*5-672-7998 - Lynnwood, WA 98036 Phone 800-775-7663 MEMORANDUM File No. 4367 REQUEST FOR FIELD CHANGE Date: September 24, 2002 To: Don Fiene City of Edmonds Fax: (425) 771-0221 T�l SME 't, From: Robert Long, PE (PoiB J! Re,- Pacific Emerald Horries: 1 4 Sound View P/ace lit -infiltration Trench Sizina Field Chanae Due to site constraints the originally proposed 30 foot infiltration trench is too long to fit in the available area on -site. The following calculations indicate that 20 feet of a 4 foot wide trench would adequately replace the original proposed 30 foot by 2 feet wide infiltration trench. Assuming a treatment rate of 0.027 cfv. gnd a porc0l2tion rate of 8.27 inthr. thp frilinwino nalmilatinns Si7e the proposed infiltration (dispersion/spreader) trehch. L I(Q) / (Im/ 12 in/ft x 60 sec/min)] / (trench surface area) -L = ? (length of trench) -IM = 0. 138 in/min (per rate per soils- 8.27 in/hr) -Trench Surface area = 6 ft. (see diagram below) L [(0.022) / (0.138 / 12 x 60)] / (6) L 19.1 Revised Design Trench Length 20 feet 40a". 4 4 4- '1 + -1 = 6' SURFACE AREA Please confirm the attached calculations meet the City's requirements for the requested field change. Your timely response is appreciated so construction can continue and the field work can be completed. Thanks for your time ana eTTori in reviewing xhis 1-equust. I r yvu I ii:svc c2i y yuuDbvi ;s i%eed additiomell information, please give me a call. 141, ler 7 - Robert Long, PE (425) 775-1591 "I we-�IWNMRKRII BUILDING PER= REVIEW ri cl k I (address) (date�- 0 Street Right -of -Way Existin�....._REQD Z Access Easements Existing, REQD C4 Utility Easement Existing 1 4 (REQD Lot Per Subdivision Plat. I MOR=essor Map_ Site Plan Checked for Accura Z Underground Wiring Reqd. �-4 U Check Accuracy of Legal Description Z Review by, Date Existing Water Main Size Water Main Required IYIA Service Line Required Hydrant Size Existing f4 Hydrant Reqd Per Fire Code 1YI14 Size Detector Check 1,1--ter Reqd. Cross Connection Inspection- VA Fire Department ConTnents Water 1-kter Charge qd. Review by_ Date 2 7 Septic Tank Design Approved Date Septic Tank Permit Reqd. Permit No. Sanitary Sewer Availability Proj,. Drawing No. File No. Side Sewer Availability�— Sanitary Sewer Connection Fee Reqd. :3: Review by, Date Open Ditch Exist' qd. Z Culvert Reqd. Size r4 Catch Basin Reqd. (�Z Indicate on Site Plan 0 5X Shoulder drainage maint jn 'colleceio-�� swale open runoff (n Manhole reqd. Indicate on Site Plan Soil Conditions and Ground Water Field Checked Review by, Date Revised: lvlO-1977 r-o V\ '1--79 - ) 01 A// ('U 7L--" 0- 17� r -7-1 \)Ol w v e 4c) w vo r- /z, (-o V 0 47.04 DATE: I c7-� !�::A- —72Z-) HEMO TO: Building Division Community Development Department FROH; Eno-ineering Division t3 Public Works Department SUBJECT: After review of the subject buildinp the following comments: , permi . t application, we have %n' 0, 0 - e-2-2 - GS'