Loading...
18620 94TH AVE W.PDFiiiiiiiii 9158 18620 94TH AVE W 1"PinfliP, .4 S 'ME ET FILE CITY OF EDMONDS SIDE SEWER �-,PERMIT 18 9 0 (o PERMIT N 02 8287 Address of Construction: Property Legal Description (Include all easements): Owner and/or Contractor': �_D4-(,tQCrAk Z �W l� State License No. L 1"' 0 K) S-T I A 4 IR Building Perrri'l. 140. Q-_S'i*`ngIe Family C3 Multi -Family (No. of Units-) 0 Commercial El Public EDMONDS TREATMENT P1 Invasion into CitV,RIght-of-Way:10/No 0 Yes RW Construction Permit N - Cross other Private Property: 1� �No 11 Yes Attach legal description and copy of -recorded easement I certify that I have read and shall comply with all city requirements as indicated on the back of the. Permit Card. Date CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION 0MICE 'USE. ONLT FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fee: Issued By Trunk Charge, IVA9 Date Issued: Assessment Fee: Rec'eipt No.: /3 -f-570 Lid No.:- /57 Partial Inspection: Date -Initial - Reason Rejected: Comments rJ0 (L4e-tt,� I ol madt, I W(04aw Wok Date 12,-� -L, Initial ge,& Final Inspectlon Approved: Date-Initial- JAN 18 AVk 1-k a a AVft rr_mnni II nnuo I or. ruo II r_LJ UN juD all II C PUBLIC WORKS White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3190 0 Side Sewer Drawing I The City of Edmonds EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION REPAIRS R LID NO . .................. ASMT. NO - ------------------- ' a -7 OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO. JOB ADDRESS ------- q%- -q, I --- 4�k—: -.'W ------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------ NAMEOF ADDITION --------------------------------------------------------------------------------------------------------------------- S C) j DkAC�) —MONDS VV\%, E D "'0 N rl, T ETREAINVIENT PLANT PWW-0001-11/75 (REV.11/78) Approved: DATE.-�k "' ...................... By --------------------------------------------------- A STREET FILE 1wao C(y1-'6 h4towe MITIGATED FILE# N/A DETERMINATION OF NONSIGNIFICANCE Description of proposal Single Family Dwelling Proponent Robert & Deborah McCallum 18620 94th Ave. W. Edmonds, WA 98026 Location of proposal, including street address, if any 18620 94th Ave. W. Edmonds, WA 98026 Lead Agency Edmonds Planning Division The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available tothe public on request. There is no comment period for this DNS. x This DNS is. issued -under 197-11-340(2); the lead agency will not. act on this proposal for 15 days from the date below. Comments must be submitted by July 27, 1990 Responsible Official John Bissell Position/Title Code Enforcement Tech. Phone 771-3202 Address 250 5th Ave. N., Edmonds WA 98020 Date July 12, 1990 Signature X You may appeal this determination of nonsignificance to Hearina Examiner at 250 5thAve. North, Edmonds, WA 98020 no later than 5:00 p.m. Aug. 6, 1990. by filing a written appeal citing reasons. You should be prepared to make specific factual objections. Contact John Bissell to read or ask about the procedures for SEPA appeals. CONDITIONS OF MITIGATION ROBERT & DEBORAH McCALLUM BUILDING PERMIT ' This determination of nonsignificance is subject to the following conditions: 1. All excavation and grading shall comply with Chapter 70 of the Uniform Building Code, 1989 edition. 2. The Applicant shall obtain a building permit from the Building Department and comply with all conditions of permit approval. 3. The Applicant shall submit a drainage plan to the City Engineering Division and follow the required guidelines. 4. A qualified engineer shall be retained on site to observe excavation and soil conditions, and the applicant shall follow the foundation recommendations of said engineer. 5. The Applicant shall make every reasonable effort to keep exposed soil covered during construction. 6. All landscaping and existing vegetation located on the slopes to the west, north and east of the building site shall'be retained during construction. Two stumps existing to the west of the building site shall not be removed. 7. The Applicant is to make every possible effort to keep dust controlled and to keep the streets clear of dirt and debris. 20' SCALE: It 4 gp$( 40 co l< _j 13 .4e C9 0.0 30, lA Sru z 0 '�jjl . C) TOPOGR APH I C ON LOT 1861 0 "A JJt&QU10&ckl ist for nonproject proposals, even though questions -may be answered *doqs� o Mapply".' IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words."project,' "applicant," and "property or site" should be read as uproposal," "proposer," and "affected geographic area." respectively. A. BACKGROUND 1. Name of proposed project, if applicable: 2. Name of applicant: t),-_V-0 ro, C_ CC. I f Y\ 3. Address and phone number of applicant and contact person: 4.. Date checklist prepared:. (d Agency r g chec 5.` kl i s t: equestin' f _V. ,. Mr.. SW. K phasin� ­-Y 1, Pro osed-Iti6ing or schedule'.(includin' if 'ap`plicabk):e .,,p .1. A W ��a 'plan ..-future additions.'expan o urt er,activity lat�d I s i n f h u 7 hav*c' , ny'. �C, .: % ecte -.",If yes, expli -to or conn "A",_ d with this proposal?,..' a in., elk\ S� U - i4x- ­1: �J _K % P. 8 List'any-*e virofimental, information y6u-know about,that.has been* p epared,,o A W1 �A�,� ill be pr Zared, directly related.to this proposal" f Do you know -whether applications are- pending for.governmental approvals;,o �,A other proposals 'directly affecting the'property covered by your proposal? .1.1f yes, expi ain. List anygovernment approvalsior permits that.will be:-'needed'for you g,.: proposal if known."' k M. "4 `11 Gi e'b ; rief;,'complete'description of 'your proposal, inclu ng-,th p d use IV i s e -in I and the siz of, the project and site. There:.are several questions later, d checklist that ask you to describe certain aspects of- your 'proposal." .,:You 0 need to rep* eat':those answers on this page. (Lead agencies.may.modify1hise1c to include additional specific information on project description.),.,,.�'� 4- .12. Location of the proposal. -Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a.. proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency. -you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. <d TO BE COMPLETED BY -APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hill slopes, mountainous, other b. What is the steepest slope on the site (approximate percent.slope)? c 'What general.types of -soils'are 4ound on.1he site"-,(forjexia'mple, clay, sand, -muck)?. If,..you-kno,�'the�.classification of,-agricultural;:soils, specify Wgrave j:peat,� an them,and.note"any.prime faml d CA 2W 4 A! vicinity? If so,�*describe.' - face ndications,or *history: stable soi szi n su�l � .. 1 '4 ': - -,' 'Ar I th�1=ediate T �d. ethere"' 4 J e—Describe the'.purpose, typei'and approximate,quantities of any.filling or '--,�.,grading,proposed .-Indicate source of J.i. I I. Could erosion occur as a result of clearing, -construction, or use. If so,, tt"generally describe 0 :�- vl 'Ab t what'percen Uthe 'site w be'covered with imp es after ou t 0 ervious,surfac: -A project,.construction,(for example, asphalt or., buildings)? AW r I'M k- . . . . . . . . . . . 'f, "-h 0, 'other.impacts to the earth s c roposed mea to. re uce r. ntrol erosion;,or b1.*!;*,,1r".'-V�if iny-'- -1V e ure 7 2. Ai r .'a.* What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If -any, -generally describe and give approximate quantities if known. b..Are there any off -site sources of emissions or odor.that may affect your proposal? If so, generally describe.- c. Proposed measures -to reduce or control emissions or other impacts to air. if any: T. Water a. Surface.: ...4) Is there any surface water body on or in the immediate vicinity of the site _Aincluding year round and.seasonal streams, saltwater, lakes .ponds wetlands)? if yes,describe type and provide names.'Af appropriate, state what stream or.river i t flows into. roject require any wor 'over, in or a Jac n:.200 feet.) theo..' k d' ent tor thi 'please-descrIbe and attach'available plans.� _*�.describ�d waters?,,..If, yes, Al. IV_,"JV V, S.; 'dredge t wml be placed -in �or removed V ,,,3),.is�iilte:-tni!'�amount-,,of.�filI and'dredge erial 4' he'a t tfte� site that':would'be A.Pi V rom surface waier'or'.-1 nds and indicate'the'a I 'X­ A a V affected., Jndicate the"source of fill material., r\9 a , Oe proposal requi re- -surface water withdrawals or diversions. 4) Wil 7 Give general d escription' purpose."'.'And approximatequantities ifAnom_ . 'T 'note f J, 5), boei,",the proposal lie within a 100-year floodplain?Jf so,' ocati d,on the 0 plan.,,,- 6) Does -'the proposaltinvolve'any discharges.of waste'ma'terials .'to, surface waters? .1f, ,so,-,,describe.the, type, ofwaste and anti ci pated volume of discharge .41 A V1 4;� RR A, 1; 'Tt `X4 AY �'G'rio'un_d':­ J tha d I) 'Wi n a be-withdrawn,;or will water be discharged.to ground water? Give q�, -.,,�and- approximate quantities if known. -purpose, �general'� scription, T-Z� J" .2) Describe waste material that will be discharged into the ground from'septic tanks or other sources. if any (for example: Domestic sewage; industrial, containing. -the, -- following chemicals... ; agricultural; etc.). Describe the general"iize of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. c. Water Runoff (including storm water):.. 1) Describe the source of runoff .(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Y)p V,� ro 2) Could waste materials enter ground or surface waters? If so, generally describe. NO d. Proposed measuresjo reduce or.control surface, ground, and runoff water 'impacts, if any. 4. Plants. a. Check or circle types of vegetation found on the 'site: L""deciduous tree: alder, maple.'aspen, other &,,,evergreen tree: fir, cedar, -pine, other T/--shrubs 1:.Irass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants:-water,lily, eelgrass, milfoil, -other­ other types of vegetation b—What kind and amount of vegetation will be removed or altered? C. List threatened or endangered species known to be'on or near the site. AOA d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: OQ— WO QJ-40 ;,N- &Vav-p— S-O Op -1j--,JcA5 L 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Is other - birds: hawk, heron. eagle, songbird mammals: deer, bear. elk, beaver, other: 16. fish: bass, salmon, trout. herring, shellfish, other: ........ b. List..any'threatened or endangered species known to be on or near the site. c. Is the site part of a migration -route? If so. explain. d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and Natural Resources a. What 'kinds -of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the,completed project's energy -needs? Describe whether it.will be used for heating. manufacturing, etc. b..Would�your project affect theLpotential use of solar energy.by adjacent properties? If so, generally describe. RO c..What kinds of energy conservation.features are included in the plans of this pr9posal?.List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a.'Are there any environmental health"bazards, including exposure to toxic chemicals,'r.isk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so,.describe. 1) Describe special emergency services that might be required. 2) Proposed.measures to reduce -or control environmental health hazards, if any: b. Noise A What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation. other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction. operation, other)? Indicate what hours noise would come from the site. C�*Vv cii 0 3) Proposed measures to reduce or control noise impacts, if any:* 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? 6J b. Has the site been used for -agriculture? If so, Jescribe. c. Describe any structures on the site. "CW d. Will any structures be demolished? If so, what? e. What is the current comprehensive plan designation of the site? h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. i. Approximately -how many people would reside or work in the completed project? 4 j. Approximately how many people�would the completed project displace?. PrOL, k. Proposed measures to avoid or reduce displacement impacts, if any: 1. Proposed measures to ensOre the proposal is compatible with existing and projected land uses and plans, if any: 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: 10. Aesthetics - a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? b. What views in the immediate vicinity would be altered or obstructed? Y�O VA (�, � c. Proposed measures to reduce or control aesthetic' impacts,'if any: u 1Z rVNQ1\f, 11. Light and Glare a. What type of I ight or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off -site sources -of light or 91 are may affect your proposal? j", t an glare impactsj�tjf Any:- -co Proposed measures'to reduce or ntrol.. 0 12. Recreati n'rll��. -informal'recre !�",ae e te a..What designated and ationO opportunities are ?4* vicinity? Ir b. Would the proposed'project disp ace any existing.recreational uses? If so, describe. ding c Proposed measuresto reduce'or control impacts on recreation, inclu recreation opportunities to be provided by.the project or. applicant,',.if 'any: rvai- �13.' Historic and.Cultural Prese ion �,-o,a. -Are.,there'4ny, places',. or'. objects., listed ;onitor;l)�oO�sed'z.fo�,'�.,ni'tional,�. tion-regisfers -A 0 0 g era] ly., state, or �;f, ­o �* �,:y - . , 4 - _', 4 -to' be� n;- r. next-��to the site7 Jf .,so.- en local preserva nown descr be. A b. Generally describe any landmarks or evidence of historic, archaeological,, "'t scientific, or culturalimportance known to be on or next to the site .ligh i mm dia J PV mo*, C. Proposed measures to reduce or control impacts, 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. ACCe SS b. Is site currently served by public -transit? If not, what is: the approximate',:�, distance to the nearest transit stop? 7. _fit, C. How many parking spaces would the completed project have? How many would t e project eliminate? d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe,(indicate.' whether public or private). kX3 e.- Will the project use (or occur.in theAmmediate vicinity of) water, rai I or air transportation? If so, generally describe. How many vehiCular'trips p6r day �ould be �gen6rated by th4:completed project? -if-known, indicate when peak volumes would oc '11,4 Mn V -, A po easu -,..to reduce-'ivr-,�control ;�6in`s 66, 1. aQ C U V, Ilk, ':'Publ i c ervi ev A; I a�'�Would the project resul t'-A n -an increased need'for'*publ ic li�rvicei- (for'example.X fi re protecti on, pol ice protection health,care schools, other.)? If.so. generally "'V,,describe. R; contro 'direct impacts on p� I i si rv'i c e s :"o f A- P:4�sxr,b. .Proposed measures'to'reduc'e' I a6y. L 4 �_y 16 Utilities urrent y availab e at,the 's i tdz_ nitu a -s� sew&�, septic, sys other— Q rc e tits )Lefe�ctri�i� r I gi; R_ mae 1E!u:s:e :ervice��e,< anita tic Sys 4 W. r 4� utijity -provi Ing e`proOosed,1,f&*,,t e,p 11Z'- b."Describe-ilie' ti I i e's.'Iha t'a'r' :u -and.the'tgeneral,construction activities,on.,,the,site or J the MQ11 Ithe' service; IN' immediate vicinity which might be needed. -4, d res ces,,, 171. '10 # A;I ar. v The above answers are true and complete to the best of my knowledgi. I understand that the lead a!Nac .,y relying on to make its decision. Signature: ..... ............. Date Submitted:.'... . ......................................... . Supplemental Sheet for Monproject. Actions (Rezones, Code Changes., Annexations,'etc.) Do �-not use this sheet for project actions. Because these questions are very general, it may be helpful to read them in conjunction with the -list of the elements of the environment. When answering these questions. be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in geni!ral terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production. storage. or release of toxic or hazardous substances; or -production of noise? ko, VI,.I* 7; Proposed measures to.avoid or reduce such increases are: �2 "How would _the.proposal be likely.to affect plants, animals; fish, or marine MN I i fe? j, P osed mea's" t .62_1-.�kl. *�Oq rop ures', o rotect,or-,conserve plants'�- animals'� fish;�'--( r . 1% ile 1.4fe'.4irtnir 4V 'k n- , Mnl 4F.. J the he p b-�� I i kely to deplete energy.or natural �resburces? A OCA V*� I�x C c^ S� ropo !�P sed measures o protect'or cpnserve energy and natural resources a e t 4 vV f c ould �the eAikely'to se r a fe environmentally sensitive areas _-W u proposal'b s orareas designated (or eligible or'under tudy) for governmental.orotection; such J A; --as parks, wilderness,.wild and scenic rivers,: threatened oi-7 endangered species 7 - habitat historic or.�cultural sites wetlands, floodplains,"or pr,ime-farmlands? -, MY, h resoIC&eor*. to,avoid or-reduce:Impacts 'are:,!,�­Vni� Prop� sed meas�res to'rprotect suc -use I d' -S' .,-,How',would -.the'proposal,,be -1 i kely, to affLvland and shoreline ,inc u ing, ether.- it'would allow or, encourage'.1and or ­.�. AS" -shore.] ine;uses �iricompatible`with existing plans?"- NIN Y, V�I "to A` _? 0_� roposa Proposed measures to �avojd or reduce shoreline and land use' impaci�'ar�: , �ri 4 6. - How would the proposal.,.be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible. whether the proposal may conflict with local', state, or federal laws or requirements for.the protect f the environment. �po ENVCHK3/PFORMS 7� -1 W V STREET FILE i5r.ao qq* kvt. ii L; j:� j.v't� D JUN 2 2 1911n PE01 COUNTER GEOTECHNICAL REPORT ON MC CALLUM HOME SITE ON LOT 68, EDMONDS SEAVIEW TRACTS . IN CITY OF EDMONDS, WASHINGTON n-VA JAMES H. REID, P.E. JUNE 22, 1990 GEOTECHNICAL REPORT ON MCCALLUM HOME SM ON LOT 68, EDMONDS SEAVIEW TRACTS IN MY OF EDMONDS, WASHINGTON INTRODUCTION This report constitutes an initial geotechnical evaluation and analysis of the buil 9 din site for a new home for which a building permit is being requested from the City of Edmonds at this time by Robert and Debbie McCallum, at 18620 - 94th Avenue West, Edmonds, situated on Lot 68, Edmonds Seaview Tracts. A supplemental report will be compiled and submitted if deemed necessary by City officials. In this instance, the writer is acting not only as a qualified professional engineer, but also as the original developer of the site in 1947, and its resident/owner for more than 30 years thereafter. PROJECT DESCRIPTION The subject building site is on a prime view tract 0.62A in area, with access westerly from the intersection of 94th Avenue West and 186th Street Southwest, in Edmonds. The present owners plan to remove entirely the existing structures, consisting of a two-story house of 2,100 square feet floor area and its attached two -car garage and breezeway, and to construct at the same location a subs' antially larger three-story house and attached three -car garage. The plans and specifications for the new struct ures already have been prepared by architect Tom Mitchell, 1010 Turner Way East, Seattle, WA 98122 (tel. 206-323-6751). 1 GENERAL TERRAIN AND SURFACE DRAINAGE The subject tract embraces a "nose" of relatively level ground at an elevation of about 245 feet above sea level, which slopes off steeply to the north and west and, to a lesser degree, to the south. The building site is at the forward (or westerly qnd) of this "nose." A deep and steep -sided gulch has developed through the centuries at the north side, tapering up easterly to its origin near the entrance to the tract; and into this gulch flows the surface water drainage from streets and lots over a substantial tributary area. The terrain is such that virtually no off -site surface drainage enters this tract; and the upper portion readily sheds non -absorbed rainfall. Roof water runoff at present is collected in gutters and downspouts discharging onto the hillside slope on the westerly side of the buildings without problem, and will continue to be so disposed of after the new construction is completed. SOILS CONDITIONS The entire area of this tract, and of a far surrounding area consists of glacial till. On -site it is typically of a heavy, gravelly, sandy, clayey composition. However, on the flatter area easterly from the west end of the topographical "nose," leaching action over the centuries following glacial deposition appears to have formed a hardpan strata overlain by a layer of gray clay, somewhat plastic in nature. This formation was encountered in the bottom of the southwest portion of the 1947 excavation made for the existing house, at a depth of from 6 to 7 feet, and remnants of the plastic clay material are still apparent on the forward edge of the terrace formed from that original excavation. The designer and builder of the new home on this site should anticipate encountering this same condition over a substantial portion of the excavation extending east from the present structure. Considering the heavy foundation loading produced by the planned three-story structure, it is strongly recommended that any 2 plastic clay strata encountered at foundation design levels be removed, notwithstanding possible overexcavation requirements. Except for this foregoing disturbing factor, the soils at this site appear most favorable for construction purposes, with a presumptive load bearing capacity of:perhaps 5 tons per square foot in a native or thoroughly compacted condition. However, such capacity with only a thin layer of such soil overlaying plastic clay should not be presumed capable of that high a loading. Any detailed predetermination of the exact soil conditions to be encountered at the building design depth over the rather extensive planned area of excavation is rather impracticable; and the architect and/or structural engineer for the project will need to carefully observe soil conditions encountered duri ng ex cavation, and at that time make any foundation design modifications which may be warranted. HILLSIDE STABILITY Disastrous experiences in the so-called "Meadowdale slide area" have necessitated adoption by the City of Edmonds of stringent policies concerning construction on steep hillside slopes. The subject building site, by virtue of its steep northerly and westerly slopes, falls within the of suspect" category. However, in the writer's professional opinion, the nature of the soils type and ground structure precludes any possibility of slides or related ground failure, even in event of earthquake shocks. During the lengthy period of the writer's development and occupancy, extensive excavations were made throughout the tract for water lines, drain lines, sewers, etc. In all cases, the trench sides remained vertical, without caving, until backfilled. Picks were used in digging, by reason of the substantial gravel content of the soil. A four-' foot wide terrace created across the hillside westerly of the house in 1947 for installation of septic system drain tile remains clearly defined and undeformed to this day. A fill slope of one vertical to one -And -one-half at the westerly end of the existing garage at the time of 3 original construction remains unchanged after 43 years. No problems of erosion have been experienced on this site during the same period. UNDERGROUND UTILITIES Water supply and distribution lines on this site are to be replaced in their entirety by reason of pipeline age and non -conformity with building and landscaping plans. The sanitary sewer service line connecting to a City manhole will remain undisturbed except for new house connections into it. It presently extends from a point, perhaps- 10 to 12 feet southerly of the northwest comer of the existing house, diagonally across the hillside slope to a City sewer manhole in the road right-of-way easement nearby the most southwesterly comer of the subject tract. BUILDING CONSTRUCTION AND SITE PLAN Detailed plans and specifications for the new building construction are being furnished to the City by the owners in connection with their application for a building permit. A copy of a topographic survey performed in March 1990, on behalf of the* owners, and utilized by the architect in connection with his plan preparation, is attached for City records. A sketch, to true scale, portraying a ground profile through the subject tract and project site has been prepared and is included in this report. ABSENCE OF SOILS BORINGS Notwithstanding that the City's "Geotechnical Report Guidelines" refers to "test borings or test pits" as an item for inclusion in the site investigation, such costly work has not been undertaken by reason of (a) present intimate knowledge of soils formations and characteristics 4 gained in the past, and (b) the fact that the entire area for new house foundation is to be exposed by the excavation work entailed in construction. It is the writer's understanding that City staff concur in this avoidance of costly deep -soil exploration at this time. CONCLUSION In conclusion, it is sincerely hoped that this report will satisfy the City's needs and requirements for geotechnical evaluation and analysis of the subject site. In any event, the writermay be called upon by City staff, the owners or their architect or contractors for any further information or assistance which may be desired. A 6 & Lt.; � 0 � -2c_! 6. IES H. REID, P.E. - 9th Avenue South onds, WA 98020 phone (206) 771-5126 Incls. H. _N Site Profile Z�j WAS8, Topographic Map 1 0; Overlay Showing Relation of cl) Old House to New House 00 k 0 �Zfio 240 200 COGINAl- t, EX15TING GV-OQND 5UV-lFbCE PeOFILES AT mcc-A,�-%-um "caN%tsvrr= AT- 18(,,2-0-944'.Avrmt4Vr. ON -LOT &99, F-DMV4M5 5eA.VjeWTV.A6C-T-5 2 V--tomw4os, vi VL&S T A4 C)Ztr.IqAL FILL (04-7) V>tIZIA F017- 4C)LU YAI lie 5EPTIC IDIZWN FIM &r SM CADp-v4tlt GeoumD suermice ?Zr:S ENT G7.0.)ND Sup-l-Ace w 7-irz 0 ov EXCA%4. 40 8,0. 100 12.0 DISTAMCFE FROM MOST LOT C 0 7- N P., (T- T) we o tw/t-vl.i b, t7l 02NIeV7 491 ts� 13 -tit affioT USE CITY OF EDMONDS ZONE CONSTRUCTION PERMIT APPLICATION JOB SUIT E/APT 9 ADDRESS OWNER NAME/NAME OF BUSINESS 20 ­1RaZe_7e "(-wlt,� LEGAL DESCRIPTION CHECKI SUBDIVISION NO. LID NO. cc Uj Z 3: MAILING ADDRESS 7A TESCP 0 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. APPROVED BY CITY ZIP TELEPHONE NUMBER EXISTING REQUIRED DEDICATION ial PROPOSED Ike- NAME Z RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED 0 ADDRESS STREET USE PERMIT REQUIRED 0 L) -71) A er VIEW Dy SEE ENGINEERING MEMO DATED An) Z U, LIF ry FTE�LEPHONE NUMBER 97M&RKS kle NAME L r-iz) e_CA-v, 5Aj5W01A-) cv-rq 11V�q L V 6- /Z cr ADDRE SS 0 METER SIZE BUILDING SUPPLY SIZE FIXTURE UNITS LA:% C.-Y-% cc a: CITY ZIP TELEPHONE NUMBER I— Z 0 14- i (L.- U.-C 0 3 3 REMARKS STATE LICENSE NUMBER Ify h SIGN AREA ENV. REVIEW ADB NO. Legal Descriptio6 of Property include all easements ALLOWED PROPOSED COMPLETE EXEMPT (show below or attach two copies) SHORELINE # Ll cc VARIANCE OR CU PLA G REVIEW BY Ln U SETBACKS - FEET HEIGI LOT COVERAGE Z RONT S IDE REAR Z Z < Uj Tax Account Parcel No. REMARKS _j (L ITINEW RESIDENTIAL El PLUMBING 0 El 0 ADDIALTER COMMERCIAL MECHANICAL ElREPAIR El APT.BLDG. El SIGN -[:] EXCAVATE, FILL FENCE DEMOLISH OR GRADE I- X _ FT) CHECKED BY . TY 0 ONSTRUCTION 1 171 CODE rr3?-) HEIGHT 215-1 CARPORT swim REMODEL 0__ GARAGE EIPOOL SPECIAL INSPECTOR REQUIRED AREA OCCUPANCY GROUP 93 OCCUPANT LOAD WOOD STOVE/ F_� RETAINING WALL/ El RENEWAL rl YES NO REMARKS INSERT I I ROCKERY Z 0 (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: PROGRE SS INSPECTIONS PER LIBC 305 Z CL a: rm_5 a e- lee- 716 k1X x-IW46Y 41::!�_ W NUMBER OF STORIES NUMBER OF -1�0 LU 0 DWELLING a) UNITS NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) FINAL INSPECTION REOUIRED VALUATION FEE PLAN CHECK FEE AlePti.1 BUILDING PLUMBING Plan Check No. MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. STATE SURCHARGE Permit Application: 180 Days Permit Limit: 1 Year - Provided WorK is Started Within 180 Days U&AZ& "Applicant, on behalf of his or her spouse, heirs, assigns and 'IrrCE 00 ,n successors in interest, agrees to indemnify, defend and hold 'Unj harmless the City of Edmonds, Washington, its officials, 2 employees, and agents from any and all claims for damages of a: .zr whatever nature, arising directly or indirectly from the issuance M of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT 0 modify, waive or reduce any requirement of any city ordinance 0 nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE provision." I hereby acknowledge that I have read this application; that the ATTENTION APPLICATION APPROVAL information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and state laws regulating construction; and in doing the work authoriz- THIS PERMIT AUTHORIZES This application is not a permit until ed thereby, no person will be employed in violation of the Labor ONLY THE signed by the Building Official or his Code of the State of Washington relating to Workmen's Compensa- WORK NOTED Deputy; and fees are paid, and receipt is tion Insurance. _ _ _ INSPECTION acknowledged in space provided. SIGNATURE (OWNER OR AGENT) DATE SIGNED DEPARTMENT CITY OF OFFICIAL'S SIGNATURE DATE EDMONDS CALL FOR RELEASED BY: DATE ATTENTION INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 771-3202 UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector L A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 The City of Edmc;-nds APPLICATION for 43-MUT FILE SIODE SEWER PERMIT EASEMENT No. ......... NEW CONSTRUCTION C] REPAIRS 0 � i) �!- OWNER ------ ........................................... ...................................... ADDRESS .... ...... A', . ........... ............ . ............ ........................... I . . 7 1 � CONTRACTOR ........ ............ r ------------------- ----------------------------------------------- PERMIT No . .... ................. LEGAL DESCRIPTION: LOT No . .......... * z;.y ........................... BLOCK No . ............................................ NAME OF ADDITION e ll,� '14 t. ..... ....... . .... ............... w .................. 56 305' A P P,,-� FEB 12 1968 .. . ........ .......... Approved: By .2c) DATE..................... S;2 ................. ......................... ZITT- OF -EDMoSTRIEET FILE CIVIC CENTER — WATER -SEWER DEPARTMENT Call PRospect 6-1107 when work is ready for Inspection. (No Inspec- 0 tions Saturday, Sunday or holidays.) N_ 2722 SIDE SEWER PERMIT ADDRESS................................ 18.6.2.0 ..... ... 9.4t.h...Ay.e.nue --- We.s.t .......................... . ............................................................................. OWNER ............. James ... H ...... Reid ......... :­ ......... ­­ ------------ * ----- CONTRACTOR ----- loy..Allen ................................................... Permission is granted ... TOrq4PY .. !:�_ .......... for ........................ days to'REPAIR or CONNECT a side sewer with City Sewers in accordance with application on Me and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No.. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been Inspected. NOTE No. 2—Obtaln full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches Inside property line; minimum grade of 2%. No bends In grade sharper than % will be permitted. NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 5—It is unlawful to alter or do any other work than Is provided for In the permit, or to do any work on the main sewer or Its appur- tenances except to Insert the pipe Into the wye. 0 ZZIIA W 0 coo C4 C4 40 A A A C4 C4 C4 —0 0 196&�9 ee-2— 214-7 5 4 V, mm -,STRE FILE i E'15 �4. ZEE t C) 7E:_ 1,5 u rz: c� I 642p z 5 OLY W, PIC v I E\l/ 00, N� 'z- m A- I N "IV 14 MAZC.NV-r=T M, Fi4\-NlW4' isr.0-7 oLYmPlr-\.,,IM\v, MAP OF JCDl N7 USE F-5 m H N N N 0 Z Sl N-� M F- 1 0 CjL)6L)=- '72:1 NL-r 50',F= L-crr 15 -,S--LY f -1 C=) E=- 6. - -7-74,D L.� lit, E X H-131311 T