Setbacks/Variance/Setback Adjustment
-- - ------- ---
Conditional Use Permit
2
ADB Requirements
101
X.0
Other Zoning Requirements
-M MIN
Underground Wiring Required
Lo t Slope 15%
.................
6
SEPA Environmental Checklist/Hydraulics Permit
.:'7
Tree Cutting Plan
. . . . . . . . . . . .
..8
Plat/Subdivision Requirements
14
9
Legal Description Verification
01!
Quit Claim/Street Dedications
----- . . . . . . .
. . . . . . . . .
.0 ..
Easements -Public/Private
Engineering Storm Drain Reviewfee
Engineering 2.2 Inspection Fee
..... . ....
Drainage Plan (On -Site)
Set -back - Top of Bank, Stream, Water Courses
... X
Setback - Storm Drain Line
. . . . . . . . . .
T.
Open Ditch - Existing
18
Culvert Required
P, 1,441
Culvert Size
Shoulder Drainage/Shale Open Runoff
M.
Catch Basin Required
...................
1.3 - MEN
-T—
Driveway Slope & Vehicle Access
Sidewalk Required
Curb & Gutter Required -
Curb Cut For Driveway Required
Street Paving Required
Right-Of-Way Construction Permit Required
-Y-
T:
29..
Street Name Sign Required
f. . . . . . . . . .....
Other Signing Required
Bond Required For Public Improvements
FEMA Map Check/Water Table
Side Sewer Availability
3
Calculate Sewer Connection Fee If No LID #
Create Street File
Existing Water Main Size
Water Meter Size
.;Jf:
Service Line Size
Water Meter Charge Required
Hydrant Required
o
rr
Hydrant Size Existin
Fire Line Char Required - Sprinkler
2.-'
,Street Cut
Miscellaneous
Reviewed By:
FIRE
PLANNING
Q1.11100/
INGINEERING
4--CC,55 dk
o1v
PUBI R-",L L) R K$,� C
SEP 1 8 Zqoll CIO,
PUBLIC WORKS OFIF,
O
SC00
;�.4
Cn'
V.:,W
N'
F-�
O
tD
00-
V
01
In
A
W
N
, •-•
a
a
v
v
42-1
�
z
m
m
c-)
c-)
m
m
A
a
m
m
?
W
W
W
W
W
W
W
W
w
W
N
N
N
N
N r%3
N
FNCDcG
00
V
C1
DTI
-A
W
N
�-
O
t0
00
V
N
r
m
'o
z
m
m
(n
3
3
a
v
v
a
v
n
rn
m
L
Ln
v
c
m
m
c
m
m
m
�
0
m
O
d
1
N
a
I�
r
(X 4N
Q
J v,
Ir.
0
0
SP�
V •
r'
O
d
0
z
w Co e- em fd r) lb
03
CS v' n
cr:T0
52!> a a -
_ =� gQ�.
R 52 9(DaK�
a� on a�
R.
p .o m�
0 a
:0 a—
�a
A
$ �� �tu
ID
C =I -�
Lisp iia g
z
m
O
z
C
O
z
0
n
17
S
fD
n
0
m
CL
3
0
N
23
CD
CD
0'
CD
a�
i
ca
CITY OF EDMONDS
8g0.1q
c�o
Address of Construction:
Property Legal Description (Include all easements):
Owner and/or Contractor:
/:r A�)091,I Yo _DAys
SIDE SEWER PERMIT
PERMIT N-0 8993
TREATMENT PLANT ( Is �-,
KN
pURi._ rsfn_
G � �o Spa `"�'°i
State License No. ,6Ar� �_ � 10 4 y S 5 Building Permit No. .
I Single Family
❑ Multi -Family (No. of Units )
la
t ' ❑ Commercial
❑ Public
Invasion into City Right -of -Way -A& 0 *Yes
RW Construction Permit No.
Cross other Private Property No ❑ Yes
Attach legal des(ri, n and copy of recorded easement
I cely that I have read and shall comply with all city requirements
as i dicated on the back of the Permit Card.
y
Ia
Da e
* CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION
I OFFICE USE ONLY
* FOR INSPECTION CALL 744-SM, PUBLIC WORKS DEPT.
Permit Fee: Issued By I�LL�
Trunk Chargeo Date Issued:
i
Assessment Fee: r Receipt No.: /a
Lid No.: nn
Partial Inspection: AeeAS Adu5,e Co:1ne-fil -% 4I-1011>C C,0_ iv ,SWIcrli Date-)7"5ktialAC—
Comments
Reason Rejected: Date —Initial —
Final Inspection Approved: DateZ'1p"9ol Initial-//�� ���� —
** PERMIT MUST BE POSTED ON JOB SITE **
White Copy: File Green Copy: Inspector Bull Copy: Applicant
Revised 3!90
W
b
0
S'-
V
y
x_t=
n
$
,�
cX
o.
r
1
r "Zi"
c
o
�
oh
a.:
rn
m
2v
!70
'z
M
0
d
d
0
z
rB(lZ7
BUILDING
GEOSCIENCES INC.
Post Office Box 2385
Kirkland, WA 98083
Telephone (425) 827-1084
Facsimile (425) 828-9443
Eaglewood Homes, Inc.
847 Daley Street
Edmonds, WA 98020
Subject: Geotechnical Engineering Report
Proposed Residence
15(o2 77 -� Olympic View Drive
Edmonds, Washington
Dear Mr. Reimer:
0 C T 12 1999
Job Number 8088
September 30, 1998
We are pleased to present the Geotechnical Engineering Report for the proposed new.
residence to be constructed on the vacant parcel at 18XXX Olympic View Drive in
Edmonds, Washington. The purposes of our work were to professionally evaluate
subsurface soil and groundwater conditions, recommend general procedures for the
grading and underslab treatment in the buildings, and recommend bearing capacities for
shallow wall footings. The scope of our services included:
• 1) Logging and sampling two test pits excavated to a ,maximum depth of nine
feet below existing grades. The test pits were located in a manner to provide
broad coverage of the proposed building site. The test pits were excavated
with a rubber -tired backhoe and logged by the undersigned, professional
engineer. Selected samples were taken of subsurface soils.
• 2) Reviewing collected soil samples in our office, and assigning appropriate
laboratory tests consisting of moisture contents and sieve gradation tests. At
the conclusion of the testing program, laboratory results were analyzed and
compared with field notes and logs.
3) Preparation of this preliminary summary report in accordance with our
understanding of project requirements and generally recognized local
r geotechnical engineering practices. No other warranty is expressed or
implied. Plate 1, attached, provides the guidelines in the use of this report.
Project Understandings:
• This office was provided with a site plan which documented site conditions including site
topography and lot dimensions. Another small plan showed the location of the proposed
new residence. Our knowledge of this project is generally limited to the information on
these plan sheets site plan..
We anticipate the new structure will be a wood -frame and multiple storied with a daylight
basement. A setback of ten feet and buffer of fifteen feet from the slope crest is planned.
•
18=OLYMPIC VIEW DRIVE
September 30, 1998
General Site Conditions — Surface:
The proposed new residential structure
18XXX Olympic View Drive in Edmonds,
2, shows the general vicinity of the site.
Job Number 8088
am
will be constructed on the vacant parcel at
Washington. The attached Vicinity Map, Plate
At the time of our fieldwork, the proposed building site had been cleared and was
covered with some shrubs, tree stumps, and grass. The property had a gentle to moderate
slope down towards the west.
Subsurface Exploration and Description:
Two test pits were excavated with'a rubber -tired backhoe to a maximum depth of nine
feet below existing grades at the locations shown on the Site Plan, Plate 3. The test pits
were logged and sampled by the undersigned engineer during the excavation process.
The test pit logs are attached to this report. Recovered soil samples were subjected to
moisture content and sieve gradation tests. Test results and field density information are
summarized on the test pit logs. Although there may very well be some variation in the
subsurface and/or conditions may not be readily apparent from the ground surface, we
expect the following subsurface interpretation will be essentially correct:
The proposed building site is generally overlain with two to three feet of loose to
medium -dense gravelly silty sand with some cobbles and trace boulders.
Underlying the site is gray -brown medium -dense to dense gravelly silty sand with
• some cobbles and trace boulders. There are some lenses of gravelly silty sand in
this underlying layer. No groundwater was encountered in our test pits.
The final test pit logs attached to this report present our interpretation of the field data
and laboratory tests. The stratification lines on the logs represent approximate
boundaries between soil types at the exploration location. In actuality, the transition may
be gradual. The relative densities and moisture descriptions on the logs are interpretive
descriptions based on observed conditions during excavation. The logs should be
reviewed for specific subsurface information at the location tested.
0
•
18XXX OLYMPIC VIEW DR[ VE Job Number 8088
September 30, 1998 Page 3
Conclusions and Recommendations
General:
The following general geotechnical conclusions can be drawn from our field and
laboratory test data:.
1) The native medium -dense to dense gray -brown sandy soils at about three feet
below existing grades can provide adequate bearing to the structure. A
0 bearing pressure of 2000 pounds per square foot (psf) can be utilized in design
2) We recommend footing drains around all sides of footings at the elevation of
the footings. Positive drainage to an appropriate drainage structure is
recommended.
3) Soils with a high percentage of silt and/or clay (>15%) are moisture sensitive
and difficult to impossible to utilize as structural fill is the soil is more than
two to three percent wetter or drier than the optimum moisture content at the
time of compaction. The soils at this site are silty, and are moisture sensitive.
4) The site slopes are currently stable. Our analysis indicates a setback of ten
feet and a buffer of fifteen feet is appropriate for this site.
5) In our opinion, this site could be safely developed during the wet winter
months.
Foundations:
0 The proposed new structures may be supported on conventional continuous and spread
footings bearing on the medium -dense to dense gray -brown gravelly silty sandy soils at
about two to three feet below existing grades. Alternatively, the footings may bear on the
compacted structural fill built up from competent dense native soils.
All footings should bear at a minimum depth of two feet below existing grades. A
bearing pressure of two thousand (2,000) psf may be assumed for footings bearing
directly on the medium -dense to dense native sandy soils. Footings bearing on
compacted structural fill should be designed for a maximum bearing pressure of two
thousand (2000) psf. The design bearing pressure may be increased by one-third to
accommodate short term wind and seismic loads. To provide protection against shear
failure, we recommend continuous and spread footings have minimum widths of sixteen
(16) inches and twenty-four (24) inches, respectively.
0
•
r,
r,
18XXX OLYMPIC VIEW DRI VE Job Number 8088
September 30, 1998 Page 4
Structural fill or crushed rock that is placed under footings should extend out beyond the
edges of the footings a minimum distance equal to one-half the fill depth. For example, if
two feet of structural fill was placed under a sixteen -inch -wide footing, the total
minimum width of the fill (and therefore the footing excavation) would be forty inches.
We estimate that footings bearing on medium -dense to dense native sand soils or on
compacted structural fill will settle approximately one-half (1/2) inch between building
corners or for every forty feet of continuous footing distance.
• Lateral loads such as wind and seismic forces are accommodated by friction between the
foundation elements and the bearing soils and by passive earth pressure against the
foundations. However, passive earth pressure is only available if compacted structural
fill is used to backfill against the foundations, or the foundations are poured against the
existing soil. The passive resistance of undisturbed native soil and properly compacted
• structural fill may be assumed to be an equivalent fluid pressure of three hundred fifty
(350) pounds per cubic foot (pcf).
Seismic Design:
• The site is classified as Seismic Zone 3 by the Uniform Building Code. We recommend
the designer utilize site soil coefficient SD in their analysis.
Site Drainage:
•
The site should be graded during construction so that surface water is directed away from
any excavation. Water should not be allowed to pond where foundations, pavements, or
slabs are to be constructed.
• Final site grades adjacent to the buildings should be sloped away from the structure for a
minimum distance of ten feet. Roof and surface water drains should discharge to an
appropriate facility.
Footing drains are required and should consist of a slotted four -inch -diameter PVC pipe
• bedded in, and covered with a minimum of six inches of drain rock. The invert of the
pipe should be placed at the elevation of the footings. A non -woven geotextile fabric
(Mirafi MON, Supac 4NP, or other equivalent) should be wrapped around the outside of
the drain rock. The PVC pipe should be sloped to drain, and may be connected to the
roof and surface water discharge pipe down -gradient and away from the structures. The
• pipes should discharge to an appropriate discharge facility.
0
I•
18XXX OLYMPIC VIEW DRIVE
September 30, 1998
Excavations and Slopes:
Job Number 8088
Temporary and permanent excavation and slopes for this project must meet all applicable
government safety regulations. Temporary cuts to a depth of four feet may be attempted
• vertical, although they may not hold. Excavation slopes greater than four feet in depth
should be cut no steeper than 1:1 (Horizontal: Vertical) through the sandy soils. Flatter
slopes may be required depending upon location variations in soils conditions and
whether there is groundwater present. Temporary- construction slopes should be
protected with plastic during the wet winter months. Contractors working in excavations
• should use caution at all times. Sudden caving of the side slopes is possible. Permanent
cut and fill slopes which are not otherwise reinforced should not exceed 2:1 (H: V).
•
Foundation and Retaining Walls:
Foundation and retaining walls must be designed to support the lateral earth pressures
which abutting soils will impose. The following recommendations are for walls which
are less than twelve feet high that support level backfill:
Active Earth Pressure .........................40 pcf
Passive Earth Pressure .......................350 pcf
Unit Weight of Soil ..........................125 pcf
Coefficient of Friction ...........................0.40
The Active Earth Pressure recommended above assumes the wall can deflect at least
0.002 times the wall height. If this assumption is incorrect, a uniform lateral pressure of
one hundred psf should be added to the wall pressure given above.
The values recommended above are ultimate values, and should be reduced by an
appropriate safety factor. As a guideline, we recommend a minimum Factor of Safety of
• 1.5 for overturning and sliding. The resultant force from the soil (neglecting the passive
pressure force) can be calculated by taking moments about the toe of the wall. The
resultant force should pass through the middle third of the footing.
The above design values do not include hydrostatic pressures behind the walls and
• assume that no surcharge slopes or loads (such as traffic) are placed above, or near the
walls. Design values can also be exceeded if heavy construction equipment is allowed
within twelve feet of the wall. If any of these conditions exist, then the above design
values should be augmented be appropriate additional pressures. If walls higher than
twelve feet are required for this project, please contact our office for additional
recommendations.
U
•
18XXX OLYMPIC VIEW DRIVE Job Number 8088
September 30, 1998 Page 6
Foundation walls should be appropriately waterproofed, and then backfilled with a clean,
compacted, free -draining granular soil or an approved drainage composite. This will
prevent the buildup of hydrostatic pressures. The wall backfill should contain no more
than five percent silt and clay, no organics, and no cobbles greater than four inches in
• diameter. The percentage of sand (from the #4 sieve to the #200 sieve) should range
from 25% to 75%. During compaction of the wall backfill, care should be taken to not
damage the wall. The top one to two feet of wall backfill should consist of a relatively
impermeable soil or topsoil.
F-1
General Earthwork and Structural Fill:
Site construction should begin by stripping and clearing the property of all roots,
vegetation, organic -rich topsoil, and any other deleterious material. Stripped materials
may have to be removed from the site. Groundwater seepage was not noted during our
fieldwork. Nevertheless, the contractor should anticipate, and be prepared to
accommodate moderate seepage into even shallow excavations.
Structural fill is defined as any fill placed below structures, including slabs, where the fill
soils would need to support loads without unacceptable deflections or shearing.
Structural fill should be placed above unyielding native site soils in maximum eight -inch -
thick loose lifts and compacted to a minimum of 95% of Modified Proctor (ASTM
D1557).
Soil is typically difficult to place and compact as structural fill if more than three percent
• from the optimum moisture content at the time of compaction. During wet weather or
under wet conditions, structural fill should consist of a granular soil having less than five
percent silt or clay (measured on that portion which passes the 3/4-inch sieve). During dry
weather, water may have to be added to the soil to achieve the required soil density.
Wet Weather Construction:
If the site is developed during extended periods of wet weather or in the winter, the
following are anticipated additional costs and changes which should be anticipated:
•
1) Excavated slopes and fill piles will have to be protected with plastic.
2) Some to most of the excavated soils will be unusable as structural fill.
3) Foundation excavations will required over -excavation on the order of six
inches to one foot), and replacement with crushed rock.
• 4) Numerous site visits will be required by this office to evaluate soil conditions,
confer with the contractor, and make remedial recommendations.
[7
18XXX OLYMPIC VIEW DR[ VE
September 30, 1998
Job Number 8088
• 5) Costs of maintaining the site and cleaning adjacent streets/property will
increase.
6) Construction access road reinforcement may be required. This may require
quarry spalls, geotextile fabric, lime or cement addition, or some combination
of these methods.
7) Total construction costs will rise a minimum of twenty to thirty percent above
summer construction costs.
Closure:
• It is recommended we be retained to review the final development plans to verify site
specific subsurface requirements are met and our recommendations have been accurately
interpreted in the plans. It is also recommended that we be retained to provide
professional geotechnical consultation and observation services during design and
construction. This allows us to: 1) Confirm that design conforms to specific subsurface
requirements; 2) Confirm that subsurface soils conditions exposed during construction
are consistent with those indicated by this report; 3) Evaluate whether earthwork and
foundation construction activities conform to the intent of the contract specifications and
plans; and, 4) Provide recommendations for design changes in the event of changed
conditions. While on the site during construction, we will not direct or supervise the
• contractor or work, now will we be responsible for providing on -site safety or
dimensional measurements during construction activities.
It has been a pleasure providing you with our professional services. If there are any
questions concerning this report, please contact me directly at 425-827-1084.
• Thank you,
DODDS Geosciences Inc.
•
•
Mark K. Dodds, P.E.
9/3►/9e,
El
•
•
•
Cl
•
•
•
DODDS GEOSCIENCES INC.
PLATE 1
GUIDELINES IN THE USE OF THIS REPORT
This report for Job No. 8088 was prepared in accordance with local generally accepted
engineering principles and standards. No warranty is expressed or implied.
The findings and recommendations contained in this report are based upon the limited services
which you requested. Geotechnical engineering requires the application of professional
judgment, as no study can completely quantify subsurface conditions. The owner should
seriously consider any recommendations for additional work contained in the report, as it is then
our professional opinion that this additional work is necessary to augment and/or fulfill site
specific requirements.
This report is an informational document, and is not to be used for contractual purposes. Any
interpretation of subsurface conditions in the report including the test pit logs, and/or text
discussions are based upon our testing, analysis, experience, and judgment. There is no warranty
that these subsurface interpretations represent subsurface conditions other than that which
occurred at the exact locations tested at the time the fieldwork was conducted by this firm.
Groundwater levels can be especially sensitive to seasonal changes. This firm is not responsible
for interpretations others make using this report.
The conclusions and recommendations in this report assume that the field tests that were
conducted accurately represent subsurface conditions of the site. If, during construction,
significantly different subsurface conditions are encountered from those described in this report,
our firm should be notified at once to review these conditions and revise our recommendations as
necessary. Also, if there is a significant lapse of time between this report submittal and the start
of work at the site, our firm should be allowed to review and verify site conditions.
Unanticipated soil conditions are commonly encountered during excavation and construction,
and simply cannot be fully anticipated by periodic soil and/or rock sampling at widely spaced
testing locations. The owner should be prepared to accommodate potential extra costs through
the development of a contingency fund.
This firm cannot be responsible for any deviation from the intent of this report including, but not
1united to the nature of the project, the construction timetable, and any construction methods
discussed in the report. The recommendations contained in the report are not intended to direct
the contractor's methods, techniques, sequences or procedures, except as may be specifically
described in the report. This firm will not be responsible for any construction activity on this
site, nor are we responsible if others attempt to apply this report to other sites.
C
DODDS GEOSCIENCES INC.
J
DODDS GEOSCIENCES INC.
E
u
0
•
10
�m
Um
'
TEST PIT 1
O
:. w
W
L)
DATE EXCAVATED: 8/28/98
a
w (n
ii
a
EXCAVATION METHOD: Backhoe
W
(U o (n
a
CC o
LOGGED BY: Mark K. Dodds, P.E.
u)
o z
ur
W
DESCRIPTION SURFACE ELEVATION: 1 161 MSL
SP-SM
Brown Gravelly Sand with some Silt, slightly moist, medium -dense.
With trace cobbles and boulders.
2—
SP
Gray -brown Gravelly Sand to Sandy Gravel, slightly moist, dense.
1 3.0'- 4.0' 2.4% I
4
Stopped at 7.0 feet. No groundwater seepage noted during digging.
f
TEST PIT 2
o Z
v cn w
-
DATE EXCAVATED: 8/28/98
n
w U) a
s
EXCAVATION METHOD:Backhoe
(D
cn o
o U)i a
s cn
¢ o
co
LOGGED BY: Mark K. Dodds, P.E.
DESCRIPTION
��
SURFACE ELEVATION: ! 159 MSL
SP-SM
Brown Gravelly Sand with some Silt, slightly moist, medium -dense.
With trace cobbles and boulders.
SP I rxA Gray -brown Gravelly Sand to Sandy Gravel, slightly moist, dense.
4
2 7.0'- 8.0' 8.0% With lenses and layers of Gravelly Sand with some Silt, moist.
8
3 85-9.0'10.8%
Stopped at 9.0 feet. No groundwater seepage noted during digging.
10
DODDS Geosciences Inc.
P.O. Box 6960 LOG OF TEST PITS 1 AND 2 TEST PIT
Bellevue, Washington 18XXX Olympic View Dr.
Tele: (206) 867-3297 Edmonds, Washington REPORT
10
DODDS GEOSCIENCES INC.
MATERIAL: Native Soil
SAMPLED BY: Mark K. Dodds, P.E.
SOURCE: TP-2; 8.51- 9.0'
DATE: 8/28/98
SCREEN
SIZE
ACCUM-
WEIGHT
RETAINED
(Grams)
ACCUM-
PERCENT
RETAINED
PERCENT
PASSING
2"
100.0
3/4"
100.0
3/8"
20.5
5.1
94.9
#4
43.2
10.8
89.2
#10
67.0
16.8
83.2
#40
188.2
47.1
52.9
#100
314.3
78.6
21.4
#200
341.0
85.3
14.7
X
ASTM C136 ASTM D1140
Job Number 8088 - Plate 6
Sieve Analysis
Eaglewood Residence
Olympic View Drive
Edmonds, Washington
J
J
•
J
7
7
,DODDS GEOSCIENCES INC.
MATERIAL: Native Soil
SAMPLED BY: Mark K. Dodds, P.E.
SOURCE: TP-1; 3.01- 4.0'
DATE: 8/28/98
SCREEN
SIZE
ACCUM-
WEIGHT
RETAINED
(Grams)
ACCUM-
PERCENT
RETAINED
PERCENT
PASSING
2"
100.0
3/4"
111.2
21.3
78.7
3/8"
224.8
43.0
57.0
#4
279.3
53.4
46.6
#10
334.0
63.9
36.1
#40
426.3
81.6
18.4
#100
494.0
94.5
5.5
#200
504.3
96.5
3.5
X
ASTM C136 ASTM D1140
;0
ev
9
cn
562Z-7 0
��1'C�%�.� SA sl���
ACCEPTABLE TIGHTLINE MATI
N-12 ADS SEP
Sch 40 PVC
SDR 35 (tTffVP4)
COPY v Ail
ti
(on SID W\V\ v\�� 9Q`' ...--'' . .. ... ........
\,01LO-b 1-460
� i 16 c'
5
2 6'- 07
�s
-I WA
to
39-280r] E
f-
10*-0-
(MIRRORED)
BY
EAGLEWOOD HOMES. INC.
Plow"
\0%6
M(f\0M
4346 003 OM ea b\
L 01 1%,'ZMY-
1vsm 5'�'
"Mm
Iwo,
IDINV- 653,0'
(""EAN:
}
Amv h\- %1. S
17 1w -t- -1 6 o e_:�o L. ku
32 S0 f4vas8-
cn
4-o -7 s-
o
P.#IAJS Sajq4k77E
F740M Do WAI Stoll ')�/'o c;vv r7DA/
ALAN MASCORD OES= ASSOCIATES. 1C
6 MDT LIABLE FOR THE ACCLRACY OF THE APPR09D AS NOTED
TOPOGRAPW IFORUTIOK IT 6 THE SOLE
REPONSOLITY OF THE BULDER TO VMY
ALL SITE CONDITIONS, WMUOING ANY FILL
PLACED Of TIE SITE AIIIO WON O%*RS
OF MV POTENTIAL MD MODIFICATIOM
A L A n MAICORD D C f 10 n A f f 0 C I A T C f I n C
09/21/98 IVIRR
A �kl . I I �. 11 �.k 10
0
5 a t (5
1305 N.W. 18TH AVENUE, PORTLAND, OREGON 97209 (503) 225-9161 S C A L E 2 0 0
STANDARD DRAINAGE DETENTION SYSTEM
WORKSHEET
OWNER`SwOo�
ADDRESS ` 0� `� V �Cv► pt .
CALC BY:
PHONE:
DATE:
*****DESIGN DATA*****
IMPERVIOUS AREA _PIPE DIA PIPE LG ORIFICE
OCTENTION PIPE LENGTH
FINISHED GR
MINIMUM
TIGHTLI E
.SX TO IX SLOPE
UPPER CATCH BASIN
NG LID
ICAL)
MEASURED P&C#GP OF
CONC BOX OR RISER
--�T OUTLET
OUTLET CONTROL
MIN.
fo�r�rr
CONTROL CATCH BASIN
SYSTEM CROSS SECTION
W.
2'X2'X6' DEEP, 4-6' SPALLS OR EQUAL
FROM CONTROL CB 21 2'X 3' DEEP, 3/4' CRUSHED ROCK
FROM CONTROL' 01
WWI
RIPRAP OUTIr4T
\PRI0RNT0 PLACEl1EN1N0F MASH RORAIN ROCK
RUNOFF SPREADER. TRENCH
FOOTING DRAINS SHALL NOT BE CONNECTED TO DETENTION SYSTEM
NOTES:
I. Call Engineering Division (771-0220) for a tightline and detention system inspection
before backfilling and for final inspections.
2, Responsibility for operation and maintenance of drainage systems on private property is the
responsibility of the property owner. Material accumulated in the storage pipe must be flushed
out and removed from the catch basins to allow proper operation. The outlet control orifice
" OVED BY
ca f jqg
DATE
l�Z-7 0 VD
suJ'Lj)jjwJ; ^STY Copy
OCT 12 1998 -V O�-
SIN
....... ... ...........
NOV 160
pL�. . . ...........
AM
CD
m
26'-0**
of
.................. .
. . .........
In
"'01 , 70' io
"101 XA�
L SX2
DECK
EL.-168.8'
— — \ , r - - -
Z \V
LOWER FLOOR;
EI-AbOV.
MAIN..FtOOR
EL':170
6
G.ARAG
EL.:: 110.0
C?
�Q
4/ ONC*,
''DAIVEWAYySj1
,N
19*28.07E
106.00,
QavEO Emtrkv� NO-Y>
1207D
(MIRRORED)
BY
EAGLEWOOD HOMES, INC.
0041 ()hW( 5l'
U(110011'
P'omw-k%(
m
43%% 003 VA 0 M
L 0*1 MR-N',
k\'st\ 53'
WWI CALLS'.
r
h lg;-A n
to -\Al- 653,01
Lk
MEAN:
k
I 0� Ki 10 Wy -
pk-Nos I
09/21/98 MRR
ALAN MASCORD DESIGN ASSOCIATES. PC
IS NOT LIABLE FOR THE ACCURACY OF THE c
TOPOGRAPHY INFORMATION. IT IS THE SOLE
RESPONSIBILITY OF THE BUILDER TO VERIFY
ALL SITE CONDITIONS, INCLUDING ANY FILL
PLACED ON THE SITE AND WORM OWNERS -7
OF ANY POTENTIAL FIELD MODIFICATIONS.
A L A n tl A f C 0 Q D D C f 10 n A f f 0 ( I A T C f In
1305 N.W. 18TH AVENUE, PORTLAND, OREGON 97209 (503) 225-9161 S C A L E 2 0 0
v
cn
09101mo SA s� E�
SEP 2 5 1998
STREET FILE
..............160
16o
—7
LOWER FLOORP,
EI-AbO.5'cl�
MAIN...FLOOR
EL'.A70.5-
I:E
L
co IO ^
Im
GAOAG
I.
1110.0 10.0
10 0"
26'-0"
0 M " 4. WIR
9
0RIVE AX VE AX
E
In
Nsli
. .......... .......
...... .....
. . .............. .—N'39*2 .'.074 E
1 6.00,
ALAN MASCORO DESIGN ASSOCIATES. INC.
IS NOT LIABLE FOR THE ACCURACY OF THE
TOPOGRAPHY INFORMATION. IT IS THE SOLE
RESPONMITY OF THE BULDER TO VERIFY
ALL SITE CONDITIONS. INCLUDING ANY FILL
PLACED ON THE SITE AND INFORM OWNERS
OF ANY POTENTIAL FIELD MODIFICATIONS
A L An 11 A f ( 0 D D
1z' z
vW-b, P\ILLv--Y>
jDjq I ql
D C f 10 n A f f 0 C I A T [ f I n C
1207D
(MIRRORED)
BY :
EAGLEWOOD HOMES, INC.
1%41 (AtEl( 4:;Vl
Umook)S 'Ar\o\%D�0
P'oK(vX%( N00k'6s'-
M
43\D D3 OM 01 M,
L0-\ KR-P\'-
k\"5t\ 5S,
09/21/98 MRR
1305 N.W. 18TH AVENUE, PORTLAND, OREGON 97209 (503) 225-9161 S C A L E : 1 " : 2 0 ' - 0 "
Igo ; , ex (Hv c�� b e\ev ac�. o MIS -
lowe �.\e�►e� FF = I(o��5' - q�Ccvo��e �v e�ev��;on 6�..
v m, Ar G 1 u (
S�a�--..eAti -e.�cb,�e.�-. vesu��, of ,_ a,O.O _� : e _��, ,��.o�- �►c�� � -. � �; _ _
• I
j
-f
� I
r
I , i
;
I 1 ,
`(Z"'\ *ILL- OAUL k'e, ,0� a �� O Rr ;t��vt NrLQ\<ETD
';
� i I
14
i
D--
.71 up
-Y v 7, 1A
I-
SEP 2 5 1998 5A S` ��
kBLETIGHTLINE 1207D
ACCEPTP N-1 DS (MIRRORED)
sch BY
SID)R 35 FILE EAGLEWOOD HOMES, INC.
SID Wtf\
... ............
..........
f6O
NA� t�
� L01 KRE-k.
1\"5t\ 53,
/,
C4
io
DECK 1 .0•
r.
EL.-168.8'
4 - - -
4
LOWER FLOOq--'
EL A60.5'
0l�
MAIN ..FLOOR
9
c
n16
bfEDGE HGT..Rjj()
6
CD
im
GARA
EL.- 11
L
6
6
s.N 'R
39. 28,DT
E
41
7
�o
r
FooimJ(5 1>04,v
09/21/98 MRR
P�t��.a.Rc�E-ems
F& M
-SPlv-1 /�)e7-ZA1771AI
—
ALM MAW= CES G ASSOCIATE& W.
4 407 LIABLE FM TIE ACCWACY OF TFIE
TOPOMAMIT 100MUTIM IT IS TM SOLE
FIE"ISMITY OF PC MDR TO VW'f A D AS NOTED
ALL SITE COMMIS, MMUM AIIY F&L
PLACED 00 TIE SITE M FFM OWNERS
OF Nff Ponink mo mowaim
A L A n fl A f ( 0 P D D C f 10 n All cCI T---[ f In
.1305 N.W. 18TH AVENUE, PORTLAND, OREGON 97209. (503) 225-9161 SCALE: 1* 20'.0-
STANDARD DRAINAGE DETENTION SYSTEM
WORKSHEET
OWNER-L66,�(woo�
ADDRESS �� ��,��o� (, V �Cr► pr .
w
PHONE:
DATE:
*****DESIGN DATA*****
IMPERVIOUS AREAPIPE DIA
4,0 -K ^ ��
• DETENTION PIPE LENGTH
FINISHED G
' MINIMUM
TIGHTLI
.SY. TO IX SLOPE
UPPER CATCH BASIN
PIPE LG
ING LID
ICAL)
ORIFICE
l�
ONC BODEGRaRIS RP OF
OUTLET
OUTLET CONTROL
�9MIN.
fa�r�rr
CONTROL CATCH BASIN
SYSTEM CROSS SECTION
2'X2'X6' DEEP, 4-6' SPALLS OR EQUAL
FROM CONTROL CD 2'X 2'X 3' DEEP, 3/4' CRUSHED ROCK
FROM CONTROL'
R/PRAP OUTLET
LUNG.
VASNEDI DRAIN ROCK
RUNOFF SPREADER. TRENCH
FOOTING DRAINS SHALL NOT BE CONNECTED TO DETENTION SYSTEM
NOTES:
I. Call Engineering Division (771-0220) for a tightline and detention system inspection (•b�
before backfilling and for final inspections. AP ROVED BY
2, Responsibility for operation and maintenance of drainage systems on private property is the t 0 lm
responsibility of the property owner. Material accumulated is the storage pipe must be flushed
out and removed from the catch basins to allow proper operation. The outlet control orifice DATE
0
0
0
N
��sLDs�G STREE"T FILE
0 C T 1 2 1998 -r �AP
; Lo
�RVEO ERSEfhENS P azY>
ALAN MASCORD DESIGN ASSOCIATES. W-
IS NOT LIABLE FOR THE ACCURACY OF THE
TOPOGRAPHY WORMATIDN. IT IS THE SOLE
RESPOWMITY OF THE BUILDER TO VERIFY .�
ALL SITE CONDITIONS. WCLUDDIG ANY FILL
PLACED ON THE SITE AND WON OWNERS
OF ANY POTENTIAL FIELD MODIFICATIONS
A L A n f1Af(0DD DE110f1 AIIOC
1207D
(MIRRORED)
BY
EAGLEWOOD HOMES, INC.
04� ORLE`(
Qfrlool15
p��PEt�i�c �ooaE�s•.
VDffv S W R 01\%;o
"46 003 MIL as M
L n AVER'.
1\,58\ 5,�,
HE16K1 CALKS',
- Iwo,
r
0=151.D
iml.- 653.0'
:t�
MEAN: 163'75'
aS,DF
MA`S = Igg,aS'
AnvN\- IS
�I.EvA�I0ti5-
09/21/98 MRR
ROVE NN O
iarei inc
1305 N.W. 18TH AVENUE, PORTLAND, OREGON 97209 (503) 225-9161 S C A L E . 1 " - 2 0 ' - 0 "
OEOSCIENCES INC.
Post Office Box 2385
Kirkland, WA 98083
Telephone (425) 827- 9 084
Facsimile (425) 828-9443
Eaglewood Homes, Inc.
847 Daley Street
Edmonds, WA 98020
Subject: Geotechnical Engineering Report
Proposed Residence .
18XXX Olympic View Drive
Edmonds, Washington
Dear Mr. Reimer:
Job Number 8088
September 30, 1998
STREET FILE
We are pleased to present the Geotechnical Engineering Report for the proposed new
residence to be constructed on the vacant parcel at 18XXX Olympic View Drive in
Edmonds, Washington. The purposes of our work were to professionally evaluate
subsurface soil and groundwater conditions, recommend general procedures for the
grading and underslab treatment in the buildings, and recommend bearing capacities for
shallow mall footings. The scope of our services included:
1) Logging and sampling two test pits excavated to a maximum depth of nine
feet below existing grades. The test pits were located in a manner to provide
broad coverage of the proposed building site. The test pits were excavated
with a rubber -tired backhoe and logged by the undersigned professional
engineer. Selected samples were taken of subsurface soils.
2) Reviewing collected soil samples in our office, and assigning appropriate
laboratory tests consisting of moisture contents and sieve gradation tests. At
the conclusion of the testing program, laboratory results were analyzed and
compared with field notes and logs.
3) Preparation of this preliminary summary report in accordance with our
understanding of project requirements and generally recognized local
geotechnical engineering practices. No other warranty is expressed or
implied. Plate 1, attached, provides the guidelines in the use of this report.
Project Understandings:
This office was provided with a site plan which documented site conditions including site
topography and lot dimensions. Another small plan showed the location of the proposed
new residence. Our knowledge of this project is generally limited to the information on
these plan sheets site plan.
We anticipate the new structure will be a wood -frame and multiple storied with a daylight
basement. A setback of ten feet and buffer of fifteen feet from the slope crest is planned.
18XXX OLYMPIC VIEW DRIVE
September 30, 1998
General Site Conditions — Surface:
Job Number 8088
MM
The proposed new residential structure will be constructed on the vacant parcel at
18XXX Olympic View Drive in Edmonds, Washington. The attached Vicinity Map, Plate
2, shows the general vicinity of the site.
At the time of our fieldwork, the proposed building site had been cleared and was
covered with some shrubs, tree stumps, and grass. The property had a gentle to moderate
slope down towards the west.
Subsurface Exploration and Description:
Two test pits were excavated with a rubber -tired backhoe to a maximum depth of nine
feet below existing grades at the locations shown on the Site Plan, Plate 3. The test pits
were logged and sampled by the undersigned engineer during the excavation process.
The test pit logs are attached to this report. Recovered soil samples were subjected to
moisture content and sieve gradation tests. Test results and field density information are
summarized on the test pit logs. Although there may very well be some variation in the
subsurface and/or conditions may not be readily apparent from the ground surface, we
expect the following subsurface interpretation will be essentially correct:
The proposed building site is generally overlain with two to three feet of loose to
medium -dense gravelly silty sand with some cobbles and trace boulders.
Underlying the site is gray -brown medium -dense to dense gravelly silty sand with
some cobbles and trace boulders. There are some lenses of gravelly. silty sand in
this underlying layer. No groundwater was encountered in our test pits.
The final test pit logs attached to this report present our interpretation of the field data
and laboratory tests. The stratification lines ' on the logs represent approximate
boundaries between soil types at the exploration location. In actuality, the transition may
be gradual. The relative densities and moisture descriptions on the logs are interpretive
descriptions based on observed conditions during excavation. The logs should be
reviewed for specific subsurface information at the location tested.
18XXX OLYMPIC VIEW DRIVE Job Number 8088
September 30, 1998 Page 3
Conclusions and Recommendations
General:
The following general geotechnical conclusions can be drawn from our field and
laboratory test data:
1) The native medium -dense to dense gray -brown sandy soils at about three feet
below existing grades can provide adequate bearing to the structure. A
bearing pressure of 2000 pounds per square foot (psf) can be utilized in design
2) We recommend footing drains around all sides of footings at the elevation of
the footings. Positive drainage to an appropriate drainage structure is
recommended.
3) Soils with a high percentage of silt and/or clay (>15%) are moisture sensitive
and difficult to impossible to utilize as structural fill is the soil is more than
two to three percent wetter or drier than the optimum moisture content at the
time of compaction. The soils at this site are silty, and are moisture sensitive.
4) The site slopes are currently stable. Our analysis indicates a setback of ten
feet and a buffer of fifteen feet is appropriate for this site.
5) In our opinion, this site could be safely developed during the wet winter
months.
Foundations:
The proposed new structures may be supported on conventional continuous and spread
footings bearing on the medium -dense to dense gray -brown gravelly silty sandy soils at
about two to three feet below existing grades. Alternatively, the footings may bear on the
compacted structural fill built up from competent dense native soils.
All footings .should bear at a minimum depth of two feet below existing grades. A
bearing pressure of two thousand (2,000) psf may be assumed for footings bearing
directly on the medium -dense to dense native sandy soils. Footings bearing on
compacted structural fill should be designed for a maximum bearing pressure of two
thousand (2000) psf. The design bearing pressure may be increased by one-third to
accommodate short term wind and seismic loads. To provide protection against shear
failure, we recommend continuous and spread footings have minimum widths of sixteen
(16) inches and twenty-four (24) inches, respectively.
18XXX OLYMPIC VIEW DRIVE
September 30, 1998
Job Number 8088
sm
Structural fill or crushed rock that is placed under footings should extend out beyond the
edges of the footings a minimum distance equal to one-half the fill depth. For example, if
two feet of structural fill was placed under a sixteen -inch -wide footing, the total
minimum width of the fill (and therefore the footing excavation) would be forty inches.
We estimate that footings bearing on medium -dense to dense native sand soils or on
compacted structural fill will settle approximately one-half (1/2) inch between building
corners or for every forty feet of continuous footing distance.
Lateral loads such as wind and seismic forces are accommodated by friction between the
foundation elements and the bearing soils and by passive earth pressure against the
foundations. However, passive earth pressure is only available if compacted structural
fill is used to backfill against the foundations, or the foundations are poured against the
existing soil. The passive resistance of undisturbed native soil and properly compacted
structural fill may be assumed to be an equivalent fluid pressure of three hundred fifty
(350) pounds per cubic foot (pco.
Seismic Design:
The site is classified as Seismic Zone 3 by the Uniform Building Code. We recommend
the designer utilize site soil coefficient SD in their analysis.
Site Drainage:
The site should be graded during construction so that surface water is directed away from
any excavation. Water should not be allowed to pond where foundations, pavements, or
slabs are to be constructed.
Final site grades adjacent to the buildings should be sloped away from the structure for a
minimum distance of ten feet. Roof and surface water drains should discharge to an
appropriate facility.
Footing drains are required and should consist of a slotted four -inch -diameter PVC pipe
bedded in, and covered with a minimum of six inches of drain rock. The invert of the
pipe should be placed at the elevation of the footings. A non -woven geotextile fabric
(Mirafi 140N, Supac 4NP, or other equivalent) should be wrapped around the outside of
the drain rock. The PVC pipe should be sloped to drain, and may be connected to the
roof and surface water discharge pipe down -gradient and away from the structures. The
pipes should discharge to an appropriate discharge facility.
18XXX OLYMPIC VIEW DRIVE Job Number 8088
September 30, 1998 Page 5
Excavations and Slopes:
Temporary and permanent excavation and slopes for this project must meet all applicable
government safety regulations. Temporary cuts to a depth of four feet may be attempted
vertical, although they may not hold. Excavation slopes greater than four feet in depth
should be cut no steeper than 1:1 (Horizontal: Vertical) through the sandy soils. Flatter
slopes may be required depending upon location variations in soils conditions and
whether there is groundwater present. Temporary construction slopes should be
protected with plastic during the wet winter months. Contractors working in excavations
should use caution at all times. Sudden caving of the side slopes is possible. Permanent
cut and fill slopes which are not otherwise reinforced should not exceed 2:1 (H:V).
Foundation and Retaining Walls:
Foundation and retaining walls must be designed to support the lateral earth pressures
which abutting soils will impose. The following recommendations are for walls which
are less than twelve feet high that support level backfill:
Active Earth Pressure .........................40 pcf
Passive Earth Pressure .......................350 pcf
Unit Weight of Soil ..........................125 pcf
Coefficient of Friction ...........................0.40
The Active Earth Pressure recommended above assumes the wall can deflect at least
0.002 times the wall height. If this assumption is incorrect, a uniform lateral pressure of
one hundred psf should be added to the wall pressure given above.
The values recommended above are ultimate values, and should be reduced by an
appropriate safety factor. As a guideline, we recommend a minimum Factor of Safety of
1.5 for overturning and sliding. The resultant force from the soil (neglecting the passive
pressure force) can be calculated by taking moments about the toe of the wall. The
resultant force should pass through the middle third of the footing.
The above design values do not include hydrostatic pressures behind the walls and
assume that no surcharge slopes or loads (such as traffic) are placed above, or near the
walls. Design values can also be exceeded if heavy construction equipment is allowed
within twelve feet of the wall. If any of these conditions exist, then the above design
values should be augmented be appropriate additional pressures. If walls higher than
twelve feet are required for this project, please contact our office for additional
recommendations.
18XXX OLYMPIC VIEW DRIVE Job Number 8088
September 30, 1998 Page 6
Foundation walls should be appropriately waterproofed, and then backfilled with a clean,
compacted, free -draining granular soil or an approved drainage composite. This will
prevent the buildup of hydrostatic pressures. The wall backfill should contain n6 more
than five percent silt and clay, no organics, and no cobbles greater than four inches in
diameter. The percentage of sand (from the #4 sieve to the #200 sieve) should range
from 25% to 75%. During compaction of the wall backfill, care should be taken to not
damage the wall. The top one to two feet of wall backfill should consist of a relatively
impermeable soil or topsoil.
General Earthwork and Structural Fill:
Site construction should begin by stripping and clearing the property of all roots,
vegetation, organic -rich topsoil, and any other deleterious material. Stripped materials
may have to be removed from the site. Groundwater seepage was not noted during our
fieldwork. Nevertheless, the contractor should anticipate, and be prepared to
accommodate moderate seepage into even shallow excavations.
Structural fill is defined as any fill placed below structures, including slabs, where the fill
soils would need to support loads without unacceptable deflections or shearing.
Structural fill should be placed above unyielding native site soils in maximum eight -inch -
thick loose lifts and compacted to a minimum of 95% of Modified Proctor (ASTM
D1557).
Soil is typically difficult to place and compact as structural fill if more than three percent
from the optimum moisture content at the time of compaction. During wet weather or
under wet conditions, structural fill should consist of a granular soil having less than five
percent silt or clay (measured on that portion which passes the 3/4-inch sieve). During dry
weather, water may have to be added to the soil to achieve the required soil density.
Wet Weather Construction:
If the site is developed during extended periods of wet weather or in the winter, the
following are anticipated additional costs and changes which should be anticipated:
1) Excavated slopes and fill piles will have to be protected with plastic.
2) Some to most of the excavated soils will be unusable as structural fill.
3) Foundation excavations will required over -excavation on the order of six
inches to one foot), and replacement with crushed rock.
4) Numerous site visits will be required by this office to evaluate soil conditions,
confer with the contractor, and make remedial recommendations.
18XXX OLYMPIC VIEW DRIVE
September 30, 1998
Job Number 8088
Page 7
5) Costs of maintaining the site and cleaning adjacent streets/property will
increase.
6) Construction access road reinforcement may be required. This may require
quarry spalls, geotextile fabric, lime or cement addition, or some combination
of these methods.
7) Total construction costs will rise a minimum of twenty to thirty percent above
summer construction costs.
Closure:
It is recommended we be retained to review the final development plans to verify site
specific subsurface requirements are met and our recommendations have been accurately
interpreted in the plans. It is also recommended that we be retained to provide
professional geotechnical consultation and observation services during design and
construction. This allows us to: 1) Confirm that design conforms to specific subsurface
requirements; 2) Confirm that subsurface soils conditions exposed during construction
are consistent with those indicated by this report; 3) Evaluate whether earthwork and
foundation construction activities conform to the intent of the contract specifications and
plans; and, 4) Provide recommendations for design changes in the event of changed
conditions. While on the site during construction, we will not direct or supervise the
contractor or work, now will we be responsible for providing on -site safety or
dimensional measurements during construction activities.
It has been a pleasure providing you with our professional services. If there are any
questions concerning this report, please contact me directly at 425-827-1084.
Thank you,
DODDS Geosciences Inc.
V3 0 IS
Mark K. Dodds, P.E.
DODDS GEOSCIENCES INC.
PLATE 1
GUIDELINES IN THE USE OF THIS REPORT
This report for Job No. 8088 was prepared in accordance with local generally accepted
engineering principles and standards. No warranty is expressed or implied.
The findings and recommendations contained in this report are based upon the limited services
which you requested. Geotechnical engineering requires the application of professional
judgment, as no study can completely quantify subsurface conditions. The owner should
seriously consider any recommendations for additional work contained in the report, as it is then
our professional opinion that this additional work is necessary to augment and/or fulfill site
specific requirements.
This report is an informational document, and is not to be used for contractual purposes. Any
interpretation of subsurface conditions in the report including the test pit logs, and/or text
discussions are based upon our testing, analysis, experience, and judgment. There is no warranty
that these subsurface interpretations represent subsurface conditions other than that which
occurred at the exact locations tested at the time* the fieldwork was conducted by this firm.
Groundwater levels can be especially sensitive to seasonal changes. This firm is not responsible
for interpretations others make using this report.
The conclusions and recommendations in this report assume that the field tests that were
conducted accurately represent subsurface conditions of the site. If, during construction,
significantly different subsurface conditions are encountered from those described in this report,
our firm should be notified at once to review these conditions and revise our recommendations as
necessary. Also, if there is a significant lapse of time between this report submittal and the start
of work at the site, our firm should be allowed to review and verify site conditions.
Unanticipated soil conditions are commonly encountered during excavation and construction,
and simply cannot be fully anticipated by periodic soil and/or rock sampling at widely spaced
testing locations. The owner should be prepared to accommodate potential extra costs through
the development of a contingency fund.
This firm cannot be responsible for any deviation from the intent of this report including, but not
limited to the nature of the project, the construction timetable, and any construction methods
discussed in the report. The recommendations contained in the report are not intended to direct
the contractor's methods, techniques, sequences or procedures, except as may be specifically
described in the report. This firm will not be responsible for any construction activity on this
site, nor are we responsible if others attempt to apply this report to other sites.
DODDS GEOSCIENCES INC.
DODDS GEOSCIENCES INC.
a
w
U
ru
a)
p
cn
o
x
n
SP-SM
TEST PIT 1
N U
DATE EXCAVATED: 8/28/98
i a
EXCAVATION METHOD: Backhoe
N �
DESCRIPTION LOGGED BY: Mark K. Dodds, P.E.
SURFACE ELEVATION:: 181 MSL
Brown Gravelly Sand with some Silt, slightly moist, medium -dense.
With trace cobbles and boulders.
SP 2
1 3,0'- 4.0' 2.4% I
4
6
Gray -brown Gravelly Sand to Sandy Gravel, slightly moist, dense.
Stopped at 7.0 feet. No groundwater seepage noted during digging.
tn TEST PIT 2
o zz v w DATE EXCAVATED: 8/28/98
a y rn a CL EXCAVATION METHOD: Backhoe
fu ch N CC DESCRIPTION LOGGED BY: Mark K. Dodds, P.E.
�� SURFACE ELEVATION:: 158 MSL
SP-SM Brown Gravelly Sand with some Silt, slightly moist, medium -dense.
With trace cobbles and boulders.
SP 4-1 Gray -brown Gravelly Sand to Sandy Gravel. slightly moist, dense.
6
2 7.0'- 8.0' 8.0% With lenses and layers of Gravelly Sand with some Silt, moist.
8
I
3 8.5'- 9.0' 10.8%
Stopped at 9.0 feet. No groundwater seepage noted during digging.
10
DODDS Geosciences Inc.
P.O. Box 8988 LOG OF TEST PITS i AND 2 TEST PIT
Bellevue, Washington 18XXX Olympic View Dr.
Tele: (208) 887-3297 Edmonds, Washington REPORT
DODDS GEOSCIENCES INC.
MATERIAL: Native Soil
SAMPLED BY: Mark K. Dodds, P.E.
SOURCE: TP-2; 8.51- 9.0'
DATE: 8/28/98
SCREEN
SIZE
ACCUM-
WEIGHT
RETAINED
(Grams)
ACCUM-
PERCENT
RETAINED
PERCENT
PASSING
21,
100.0
3/4"
100.0
3/8"
20.5
5.1
94.9
#4
43.2
10.8
89.2
#10
67.0
16.8
83.2
#40
188.2
47.1
52.9
#100
314.3
78.6
21.4
#200
341.0
85.3
14.7
X
ASTM C136 1. ASTM D1140
DODDS GEOSCIENCES INC.
MATERIAL: Native Soil
SAMPLED BY: Mark K. Dodds, P.E.
SOURCE: TP-1; 3.01- 4.0'
DATE: 8/28/98
SCREEN
SIZE
ACCUM-
WEIGHT
RETAINED
(Grams)
ACCUM-
PERCENT
RETAINED
PERCENT
PASSING
2°
100.0
3/4"
111.2
21.3
78.7
3/8"
224.8
434
57.0
#4
279.3
53.4
46.6
#10
334.0
63.9
36.1
#40
426.3
81.6
18.4
#100
494.0
94.5
5.5
#200
504.3
96.5
3.5
X
ASTM C136 ASTM D1140
PLANNING DATA
NAME:
SITE ADDRESS: l �Z �! U0 • DATE:
ZONING: PC— 1 Z PLAN CHK#: Ik - 3 3 /
PROJECT DESCRIPTION: s/A6e F*,,. Rej•
CORNER LOT AQ (Yes/No) �LQWG LOT 'yb (Yes/No)
SETBACKS: 2 s
Required Setbacks:
Front: Z Left Side: Right Side: Rear: f
Actual Se b cks:
Front: 5 Left Side: Zit Right Side: l 6 Rear: Z
Street map checked for additional setback required?_ (Yes/No)
LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (YIN)
LOT COVERAGE: ''
Maximum Allowed: 5 �' Actual: ��
BUILDING HEIGHT: 115
Maximum Allowed: Actual Height: Z� 3
Datum Point: 11744)/1� Datum Elevation: /72
A.D.U. CREATED?: Alo
SUBDIVISION:
CRITICAL AREAS #: 2S
SEPA DETERMINATION: eu%'%.
LOT AREA. ll
5�
Plan Review By:
a\r1c9kpamie\^p1a,aa.a«
4
- J U N 2 3 1998
City of Edmonds uhr%
PLANNING DP
ET. FILE
NCW CRITICAL AREAS CHECKLIST
The Critical Areas Checklist contained on this form is
to be filled out by any person preparing a
Development Permit Application for the City of
Edmonds prior to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable City staff to
determine whether any potential Critical Areas are, or
may be, present on the subject property. The
information needed to complete the Checklist should
be easily available from observations of the site or
data available at City Hall (Critical Areas inventories,
maps, or soil surveys).
An applicant, or his/her representative, must fill out
the checklist, sign and date it, and submit it to the
City. The City will review the checklist, make a
precursory site visit, and make a determination of the
subsequent steps necessary to complete a development
permit application.
Please submit a vicinity map along with the signed
copy of this form to assist City staff in finding and
locating the specific piece of property described on
this form. In addition, the applicant shall include
other pertinent information (e.g., site plan, topography
map, etc.) or studies in conjunction with this Checklist
to assist staff in completing their preliminary
assessment of the site
I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the
best of my knowledge (fill out the appropriate column below).
BUILDING
Owner/Applicant:
0�\ '
Nam
Street Address
City State Zip
Te hone
�f - /1LJ .
Sign ture
;MM
Date
c: mception\Jana\cacl.doc
Applicant Representative: SEP 2 5 1998
Name
Street Address
City State Zip
Telephone
Signature
Date
(over)
CA FILE NO.
Critical Areas Checklist
--------------------------------------------------------------
Site Information (soils/topography/hydro logy/vegetation)
1. Site Address/Location:ti ,��D�f i O�W tne,t.�i�Q,y► �jC,
2. Property Tax Account Number:
3. Approximate Site Size (acres or square feet):
4. Is this site currently developed? yes; no.
If yes; how is site developed?
5. Describe the general site topography. Check all that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a
horizontal distance of 66-feet).
Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of
10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe):
6. Site contains areas of year-round standing water: Approx. Depth:
7. Site contains areas of seasonal standing water: Approx. Depth:
What season(s) of the year?
8. Site is in the floodway floodplain of a water course.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? _INO Flows are seasonal? A9 (What time of year? )•
10. Site is primarily: forested meadow ;shrubs ;mixed
urban landscaped (lawn,shrub etc)
11. Obvious wetland is present on site: rq)
-- -=--= --- - -For City Staff Use Only --- --
1. Site is Zoned? S f--
3.
4.
5:
SCS mapped soil types)?'
Weiland inventory or C.A. map indicates wetland present on site? 1 .�
Critical Areas inventory: or C.A. map indicates Ctitical.Area on sites
Site within designated earth subsidence landslide hazard area?
Site designated on the Environmentally Sensitive Areas Map? ,y1c
]�)+; Ilk' WATION
"ea_onk.doc Rev 10/03/97
City of Edmonds
Critical Areas Determination
Applicant: Craig Reimer Determination CA-98-169
Project Name:
Site Location: 18607 Olympic View Drive
Project
Description:
Non -Project Specific
Determination: Study Required:
Permit
Number:
Property Tax Acct 4346 003 014 02
#:
During review and inspection of the subject site, it was found that the site appears to
contain and/or is adjacent to a Steep Slope Hazard Area pursuant to Chapter 20.15B of the
Edmonds Community Development Code (ECDC). To determine if a Steep Slope Hazard
Area does exist, a topographic survey prepared by a Licensed Land Surveyor delineating
Steep Slope Hazard Areas must be completed. Any slope over 40% with more than 20 feet
of rise will be classified as a Steep Slope Hazard Area. A 50 foot buffer is required from
both the top and toe of the slope. A 15 foot building setback is required from the 50 foot
buffer.
For development of any kind which is proposed within the critical area, 50 foot buffer or 15
foot buffer setback, it must be shown that the development will not adversely impact the
Critical Area or its buffer, by doing one or possibly both of the following depending on the
outcome of the study:
1. For development proposals which will occur within the 50 foot buffer, but no closer
than 10 feet from the top or toe of the slope, the 50 foot buffer requirement may be
reduced to 10 feet if a study is completed by a licensed geologist or geotechnical
engineer which clearly demonstrates that the proposed buffer alteration will have no
adverse impact upon the site, the public or any private party. All Critical Area
Studies must be completed by a licensed Geotechnical Engineer (as defined in
ECDC 20.15B.020.Y) or under a three party contract where the City hires the
professional required, and the applicant pays for the study (pursuant to ECDC
Section 20.15B.140).
2. If development must occur within the critical area, buffer, and/or buffer setback,
and is not identified as an exception per ECDC Chapter 20.15B, a Reasonable Use
Exception and Variance must be obtained pursuant to ECDC 20.15B.170A and
20.15B.040C.
All proposed development of the subject lot must meet the requirements of Chapter 19.05
(Building Permits - Earth Subsidence and Landslide) of the Edmonds Community
Development Code.
If the property owner wishes to apply for a specific development permit which they feel
would not impact the Critical Areas located on the site, they may submit their proposal to
the Planning Department for review. If the Planning Department finds that the proposed
development permit will not adversely impact a Critical Areas or its buffers, a conditional
waiver may be issued on a project by project basis.
Name
Signature
Date
2
_� 'ax .. -- �^r^ �.,. 7 a`e aJ+' y` � M rtr .,,rwr . 't. r• ✓ - - e F ..
IT9i. e„r
City of. Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT,c Permit Number.
Issue Date:
A. Address or Vicinity of Construction:
nc lg9
0 B: Type of Work (lie specific):
C. Contractor:
Mailing Address.
State License #:
D. Building Permit # (if applicable):
Contact: C'tA I� 1 MR r
Phone:
Liability Insurance: \YQk_ Bond: $ LMA,00
Side Sewer Permit# (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project ❑ 'Utility (PUD, GTE,. WNG, CABLE, WATER)
❑ Multi -Family Single Family ❑ .. Other
INSPECTOR: INSPECTOR:
F. Pavement or Concrete Cut: ❑ Yes ❑No G. Size of Cut:. z H. Charge $
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or. claims of any
kind.or description whatsoever, foreseen or unforeseen, that may be made against the City.of Edmonds, or any of its departments or
employees, including or not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR, CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
Two sets of construction drawings of proposed work required with. permit application.
A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times. .
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut trench work shall be'patched with asphalt or City approved material prior to the end -of the working day;
NO EXCEPTIONS.
I have read the above statements and understand the permit requirements:and the pink copy of the permit will be
available n ite at V times for inspection purposes.
(Contractor or Agent)
Date:IVILon
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: RIGHT OF WAY FEE:{�
TIME AUTHORIZES. VOID AFTER DAYS DISRUPTION FEE/FUND I 1 l:
SPECIAL CONDITIONS:
RESTORATION FEE:
T OTAL FEE: _5 0 • cc
RECEIPT NO.: 42 .tom ("
ISSUED BY: 1/
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. 1997
j - J !1. N ♦. ���t ,.- ail:.. _ '1MVJM'rn . �'`' . r ..... -
FIELD INSPECTION NOTES (Fund II1 = Route copy to Street Dept.)
Comments
CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
in c. -1.g9�
City 'of Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT Permit Number.
Issue Date:
A. Address or Vicinity of Construction: 164 2 7 0
B. Type of Work (be specific): 6X APfkO ✓4�D jr4 r-7L A Al
C. Contractor: 6y\,Q1co \0f*, ` \( Contact: \ v
Mailing Address: ��� �t. . �• Phone: 'S ) -i -�O�a
State License #: r_1-A1\104 75 Liability Insurance: Bond: $
D. ;Building Permit # (if applicable): Side Sewer Permit # (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project ❑ Utility (PUD, GTE, WNG, CABLE,. WATER)
❑ 'Multi -Family [r]'Single Family. ❑ Other
INSPECTOR: WO / 7-Gd77- INSPECTOR:
F.. Pavement or Concrete Cut: B-Ye�, QNo 'G. Size of Cut: x H. Charge,$
APPLICANT TO READ AND. SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or claims of any
kind 'or description whatsoever, foreseen or unforeseen, that may be made against the City)»of Edmonds, or any of its departments or
employees, including or not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PA TCH IS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
Two sets of construction drawings of proposed work required with. permit application.
A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
I have read the above statements and understand the permit requirements and the pink copy of the permit will be
available orlsli t 9R7ime,�for inspection purposes.
V V Date: NAM
(Contractor or Agent)-
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: `''/ 6, � n RIGHT OF WAY FEE: 3 +G
TIME AUTHORIZED: VOID AFTER 9� DAYS DISRUPTION FEE/FUND 111:
SPECIAL CON
RESTORATION FEE:
T OTAL FEE: .3y ..—
FIELD INSPECTION NOTES (Fund 111 - Route copy to Street Dept.)
Comments
I Diagram
CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
fnc.� 1.89v
City of Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT permit Number:
Issue Date:
A. Address or Vicinity of Construction: 18(,z7 Q L YM P I G V t E Li D
B. Type of Work (be specific): "ewtj C N R LW —> 80 RL9 ROAIS--to 1,q-T1"A C L
UG Fowase
C. Contractor: !�nlo O MI SP( C n QU ti oey P(JJ. i Contact: Q O3 K A K A L E Y
Mailing Address: Z 1 p l A #W Y i i Phone: ( y Z S) (o 70 - 3 2 1 1
State License #• -'.a -A oN eix �� R 8 O � �, Liability Insurance: Bond:
D. Building Permit # (if applicable):
Side Sewer Permit # (if applicable):
E. ❑ Commercial ❑ Subdivision ❑ City Project ❑ Utility (PUD, GTE, WNG, CABLE, WATER)
❑ Multi -Family (Single Family ❑ Other 3 d
INSPECTOR: INSPECTOR: ;
F_ Pavement or Concrete Cut: ❑ Yes ❑No G. Size of Cut" x H. Charge $
t
k.
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or claims of any
kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or
employees, including or not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE'APPLICANT
r.
Two sets of construction drawings of proposed work required with permit application.
_ A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
I have read the above statements and understand the permit requirements and the pink copy of the permit will be
available on site at all times for inspection purposes.
Signature: R . 4 . ' �( Date:
V (Contraobr or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: � �� .► RIGHT OF WAY FEE: / (f � Do
TIME AUTHORIZED: VOID AFTER 59::1 DAYS DISRUPTION FEE/FUND 111:
SPECIAL CONDITIONS: q6 RESTORATION FEE: T O'4 FEE: —70 ' 00
RECEIPTTNO.:
ISSUED
f 1
NO WORK SHALL BEGIN PRIOR TOP RMIT ISSUANCE Eng. Div 1997
FIELD INSPECTION NOTES
Comments:
I Diagram
(Fund 111 - Route copy to Street Dept.)
CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
Public Utility District No. 1 of Snohomish County
1476-W Rev. 11198
Location: 18627 OLYMPIC VIEW DR EDMONDS WA Qar»n
Oni MU Y`P11 IAIT/n
Pole No.:
27 N R: 2 E S: 13 A(NE1/4
Date: 12/31/98 W. 0. No.: 306445
Reason For Work: install sec ug power for eaglewood homes
Engineer. Kakaley Task No.: 05
Drafter. U.G. No.-
gas heat
Scale: nts
Date Work Completed:
Approved:
Date Printed
Foreman:
Fee's Req'd: ®Yes ❑No
Environmental Analysis
❑Exempt El Not Exempt
Substation: 46 - Maplewood
Para. Item
Circuit No.: 12-345 Phase: 1
Primary Overhead
O.H. U.G. Cond. KV
❑Residential ❑Commercial
ADD CKT.FT. PH
REM CKT.FT. PH
Enges Tel. #
LEO #
NET CKT.FT.
1 (425)-670-3214
'@ P =$ 0.00
Engr's Pager #
(425)-787-7523
O.H. U.G. Cond. KV _
ADD CKT.FT. PH
Secondary Overhead
Basic Fee $0.00
REM CKT.FT. PH
'@ P =$ 0.00
NET CKT.FT.
Meter/Conv. Pole $0.00
Permits (Date Granted)
❑Tree Trim
Primary Underground
❑Residential ❑Commercial
❑State
Basic Fee $0.00
❑County
LEU #
®City
'@ P =$ 0.00
❑__
Secondary Underground
Easements
Basic Fee
❑Required ®Not Required_
@ /' _$ 0.00
Underground Plat
Date Released
Basic Fee $0.00
c-ft@ P =$ 0.00
Foreign Contacts
❑GTNW . JPN #
Street Lighting
c-ft@ P =$ 0.00
❑CAN .. JPN #
®Joint Trench GTNW & CATV
Work in Right of Way
❑Primary
❑Joint Bore GTNW &CAN
❑Secondary
❑
Pole Stenciling
From To
c-ft@ /' =$ 0.00
Miscellaneous Fees
Vault $0.00
Take Off Pole
Permit $30.00
Pre-Const. Requirements
cost estimate $2,893.55
❑Tree Trim ❑PUD Locator
$0.00
®Backhoe ®Flagging
®One Call Date
Total bue: $2,923.60
#
PassPort Pole
Date Paid:
Logs GIS
Receipt #:
Phasing 1-Line
Location Map Page 454h-3
NSA #:
A Set UG distribution ped at base of pole as staked
Intercept existing 4/0 triplex in 2" riser and re-route into new distribution ped
Rmv 2" riser from pole
Install new 3" riser on pole(iU707) and run — 45' of 350kcm Al triplex into distribution ped
B From distribution ped, trench 111' N and install 111' of 3" PVC
Bore road/sidewalk(27' E) BY PACIFIC CABLE
Connect on to 23' of customer installed 3" PVC and set UG secondary ped as staked inside of P.C.
Run 170' of 350kcm Al triplex from distribution ped to new secondary ped
LEGEND
-®- utility pole
E —
electic line
telephone/
T
®
water servi
-&
fire plug
—X—X—
fence
Q
sanitary se
®
storm drain
catch basir
set rebar,
®
"LEE 1766°
water valve
top of 4W
D E
R
L
D 10*05'57"
R 593.08'
L 104.54'
,k« =jWJP,'HV �I
LE
NOTES:
This survey was performed by field traverse with a
five second theodolite and EDM.
Basis of bearings is the plat of . Edmonds Sea View
Tracts; volume 3, page 76.
Basis of position is the east quarter corner of
section 13, T27N, R4E.
Vertical daturn is City of Edmonds per the invert
elevation of manhole #235, 172.00'.
All vertical information on this map was derived by
vertical angle rneasurFment. Expected vertical
accuracy is f
s
Traverse closures meet or exceed the requirements
of WAC 332-130 -090.
This snap is a modification of a drawing dated
August 13, 1998.
Top of slope occurs off —site to the east. Toe of
slope is the .east edge of the Olympic View Drive
roadway. The average slope for the site does not
exceed 40%.
120