Loading...
18717 92ND AVE W.PDFiiiiiiiiiiii 8849 18717 92ND AVE W Cit�,,of Edmonds RIGHT-OF-WAY CONSTRUCTION j?ERMIT -Permit NuiaWr. . 14, Wue Date: A. Address or Vicinity of Construction: - 18717 92 AV W (9616700) Co B. Type of Work (be specific): Tnat 9 9 C� -nj I saryllce C. Contracthr: Vashington Naturill "s MailingAddress: ISZ27792SkySW"�1 Everett State License #: . 98203 D. Building Permit # (if applicable): Contact: —Mariamne Kingsbury Phone: 356-7500 X7596 Liability Insurance: Bond:$ Side Sewer Permit # (if applicable): E. F] Commercial 0 Subdivision El City Proj4Tct [11 Utility (PUD, GTE, WNG, CABLE, WATER) Ej Multi -Family El Single Family n Other `;' 1, INSPECTOR: I INSPECTOR: Wri—Ax F. Pavement or Concrete Cut k] Yes E]No G. Size of Cu x HrpafEo�$9�( APPLICANT TO READAND SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofgranting thispermit. THE CONTRACTOR IS WSPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. '17raffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the abovestatements and understand the permit requirements andthepink copyof thepermit will be available on 7s 11 * es for inspection oses. t a t P#rp —5-96 7 Signature: Date: Y�Itracior �(r Arent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR'CITY USE'ONLY APPROVED BY: RIGHT OF WAY DEPOSIT TIME AUTHORIZED: VOID AFTER 6EeF3QDAYS DISRUPTION FEE/FUND.111*: SPECIAL CONDITIONS: N/A RESTORATION FEE: PERMIT FEE: TOTAL FEE: COMMENTS: RECEIPT' FEE: DATE: ISSUED, NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. 1994 FIELD INSP ECTION NOTES I Comments: D iagram (Fund 111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION El YES El NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: IL- 2— FIatUrWCTfISV= Aw6**Vtcn-ErwWCbnv" V V'Mo- gas main 41 V— =>A&C*J CC, Addendum to: WOODW*Y-fARK "Right of Way Permit Application Submitted by: Mariamne Kingsbury Engineering Aide Washington Natural Gas 1356-7500 X7596 9 (�"( Qp�+O C) I '?) I- I '-+- .� (9 2. v4(V Key: -W- Water -G- Gas -SS- Sewer -& Water hydrant 0 Water valve Washington Natural Gas Company 1122 75th Street S.W., Evere'tt, WashingtonNA203, (206) 355-3331 Naturaiuwv= AVAWWKAOnffV-nWCDTVffV V,rre- gas main F&V Addendum to: R igbt Of way Permit Application Submitted.by: Mariamne Kingsbury Engineering Aide Washington Natural Gas ST- Is N&/ 1356-7500 X7596 fit.- Key: -V- Water -G- Gas -SS- Sewer -& Water hydrant 0 Water valve Washington Natural Gas Company (206) 355-3331 1122 75(h Street SX. Evere"tt, Washington"99203, I i"N 0 T I C E: a ck. No­war-ranty--OT The information on the attached map(s) was compiled for use by the City Of Edmonds/ its Empl-oyees and Consultants. Th,..e City of EcIrn.onds does. not. warrant the accuracy of anything set for.th on these Map(s�. An . y person or entity -requesting a copy should c:onduct an independent inquiry regarding th*e inform-ation shown or -.--t-Fe -map(S)i including, but not limited to, -er stub shown. Suc the lotation of any sew sewer stubs may or may- not e.xist and may or may not exist at the location shown Neither the City of Edmonds nor its =mpj*0*yee,s o,r office-rs -sh-a-1-1 be 11a-b-'Fe for the information given on this map(5), nor for ovided based any one representa I tion pr upon said map(s). The City of Edmon V'REU NEW OWNER Aj� ,c ............. ............ ADDRESS --- 1.t� APPLICATION for SIDE SEWER PERMT STRUCMON 0 REPAIRS 0 CONTRACTOR --- z / EUMEMAENT No . ................ PERMT No. LEGAL DESCPJPTION: LOT No . ...... ................ BLOCK No . ............................................ NA3m OF ADDmoN ..... ....... e ... f ffz..k ......... "2 C�-5- 7-1 � /YCT3 ApProved: DATE ......... .... ... By CITY OF EDMONDS C1VJ1C CENTER—WATER-sEWER DEPARTMENT SIDE SEWER PERMIT Cajl PRospect 6-1107 when work Is r"dy for Inspection. (No Inspec- "O",S Saturday, Sunday or holIdays.) NO 2681 ADDRESS ....... 1�?IT .. ..... 9.2n.d. Avenue West ..................... OWNER........... A ....................... tt ....................... I .......... CONTRACTOR ..... QAjt� p:�i Permission is granted ...... ...... 0�4;w4rY ........... 16 .... 19. t. ............ "'it]' CitY Sewers in accordance wi -�8 for ........................ days to REPAIR or CONNECT a side Sewer th aPPfication "I file and governing ordinances. ATTENTION is CALLED TO THE POLLOWING: NOTE No. I—Tbe Owners Of the Property may obtain a Permit to construct sewer inside Property line. A licensed Side Sewer Contractor must be employed to construct side sewer In street area. Do not Cover any Portion Of sewer before It has been inspected. NOTE No. 2—Obtaln full Information regarding Ordinance 11-16.030 and Regulations governing side sewers when You get Permit. NOTE No. 3—Top Of side sewer must have at least 30 Inches Coverage at No bends In grade sharper than % will be Permitted. Property line and 12 Inches Inside Property line; minimum grade of 2%. NOTE NO. 4—Trenchesuintstreet must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure d e 0 Improper work which may develop within one Year Of Completion. NOTE No. ti—It Is unlawful to alter or do any other work than Is Provided for in the Permit, or to do any work on the main sewer or Its appur- tenances except to insert the Pipe Into the wye.