Loading...
18805 89TH AVE W.PDF11111111 lill 8564 18805 89TH AVE W NOTICE: w ra nty ... oT. N'O... a r The -informatiOn 'shown on the attached map(s) was compiled for use by the CitY Of Edmonds/ its Employees and Consultants. Th,e City of Edmonds does. not warrant the t these accuracy of anything set for. h on rnap(s�. An . y person or entity a copy should conduct an independent inquiry regarding the inform-ation shown on .__ffi�e -map(s)/ including,, but not limited to, er stub shown. Sucl- the lotation of any sew sewer stubs may or may- not e,xist. and may or may not exist at the location shown Neither the City of Edmonds nor its emp-l-o-yee-s o-r office-rs -shall be 1-Jabl.e. for the information give-h on this map(s), nor for e representation provided based any 0 upon said map(s). a APPLICATION The City of Edmond" ru It for rsx; SIDE SEVEM PERMIT NEW CONSTRUCTION &?l REPAIRS 0 OWNER .... - ----- W.. CONTRACTOR ..... Se.yJ er. -�� -------------------------------------------------------- �� !-- No. ........ ADDRESS jgl'n.,57 ............... gl±:� '77 � .......................... LEGAL DESCRIPTION: LOT No. .-J.-P .................................. BLOCK No . ........................ . .......... .......... NAME OF ADDITION ....... ��A.VA , e � .-, a ,., A � I W et 3 � 01 Approved: APPROVED APR 3 0 1970 - OZ61 0 9 M G3AO8ddV DATE .... 0. CITYOF EDMONDS Call PRo8pect 6-1107 when -work CIVIC CENTER — WATER -SEWER DEPARTMENT is ready for inspection. (No inspec. tions Saturday, Sunday or holidays.) N2 3693 SIDE SEWER PERMIT ADDRESS......................... JMOS_� --- 8.9-th --- Avenue ... West .............................................................................................................. OWNER ............................. Erwin Web ................................................................. CONTRACTOR .... bYPql?�Qg�!Jjewer and Const. ................................................. Permission is granted ..Ap.ril ........... I 197Q .... for ........... ............ days to REPAIR or CONNECT a side sewer with City Sewers in accordance with application oil file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches Inside property line; minimum grade of 2%. No bends in grade sharper than 'A will be permitted. NOTE No. 4—Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper work which may develop within one year of completion. NOTE No. 5—It is unlawful to alter or do any other work than Is provided for In the permit, or to do any work on the main sewer or its appur- tenances except to insert the pipe into the wye. STREET AD P RE S- 3 N, CITY OF EDMONDS BARBARA FAHEY MAYOR 7110 - 210TH ST. S.W. - EDMONDS, WA 98026 - (425) 771-0235 - FAX (425) 744-6057 COMMUNITY SERVICES DEPARTMENT - PUBLIC WORKS DIVISION I-q,c . 18 (),3 November 10, 1997 Willman Marquette 18805 - 89th Ave. W. Edmonds, WA 98026 Subject: Water Leak. Credit (#343100) Dear Mr & Mrs Marquette: I have reviewed your account and will allow a credit for the billing period between September 22, 1997 through October 31, 1997 in accordance with our City policy. The policy states that the customer will be billed at the retail rate based upon the average water consumption for the same period during the previous year. In addition, the excess water lost from the leak will be billed to customer at the City's wholesale rate with a 15% surcharge added for administrative cost. Only one leak credit will be granted in any three year period. Should you have any additional questions after you receive your new billing, please contact Ilene Larson, Utility Billing Clerk, at 771-0241. Sincerely, Jim Waite Water/Sewer Supervisor JW/lk cc: Ilene Larson Utility Billing Clerk wordata\water\credit97\#343 100 9 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan DEPI ldl,?Z) 117 y li��io2aj: I -A -41 f V-,4 dzall all /e)- g%,f- ( 0 P e "0 7;7�- 77 �'City of Edmonds -OF-WAY CONSTRUCTION RIGHT PERMIT Permit Number. A a STREET'FILE Wue Date: /V OWN~ A. Address or Vicinity of Construction: 18805 89 Ave W 9418357 paw op, ,e" 8 9 0 1 9 C� B. Type of Work (be specific): Install New Service C. Contractor: -Washington Natural Gas Company Contact: Frank Swan Mailing Address: gl 9 Mprrpr St, Rpnttl P. WA Phone: 224-2278 State License #: 98111 Liability Insurance: Bond: $ D. Building Permit # (if #pplicable): Side Sewer Permit # (if applicable): E. F1 Commercial E],,, Subdivision El City Project '[M Utility (PUD, GTE, WNG, CABLE, WATER) F1 Multi-Familly [] SingleFamily Other INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut 0 Yes E]No G. Size of Cut: — x H. Chargq�,$ APPLICANT TO READ A IGN INDEMNITY. Applicant understands and by his signature to this application, agrees to the City ofEdmonds harq ",Aes, damages, or ainst the City of Edmon ts claims of any kind or description whatsoever, foreseen or unforeseen, that may be m e JrRAI epartments or employees, including or not limited to the defense of any legal proceedings including deense,co8te, and attorney fees by r�asoqo granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL,THE FINAL STREET PATCH is COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSLTANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. 1'raffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. Ihave read the above statements and understand thepermit requirements and thepink copy of thepermit will be available on site at a Ltimes for inspection purposes. Date: Signature: -4 May 19 , 1994 (Contractor 6r AgeW0 CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVEDBY: RIGHT OF WAY DEPOSIT TIME AUTHORIZED': VOID AFTER 1-654 12 DAYS DISRUPTION FEE/FUND Ill: SPECIAL CONDITIONS: VO4 RESTORATION FEE: L./PERMIT�FEE TOTAL FEE: COMMENTS: DATE: RECEIPT FEE: ISSUED BY: .P NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 I FIELD INSPECTION NOTES Comments: Diagram.: (Fund 111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION El YES El NO Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Cvw== A &WWCVqVV Addendum to Citx of Edmonds Right of Way Permit Application Submitted by.- MITCHELL S.-LANKFORD Engineering Aide �re Washington Natural Gas # .' -521-'5246 AA-C -T— I -.YNG to window ,WA*ew,,imain depth gas main Key: -w- water -g- gas -ss- sewer -&- watex hydrant 0 watt,---- valve 815 ""=cr St- 0 ')- 18-W), ScattV, WA Sq I I 1 (206) 6-22--767 LE COPY* OSTREET FILr'E'I ' CITY OF EDIVIONDS CIVIC CGNT9P - F=DMONDS, WASHINGTON 98020 . (206) 775-2525 DEPARTMGNT OF PUBLIC WORKS May 15, 1980 Its. Willman 11. Marquette 18805 89th Avenue W. Edmonds, WA. 98020 Dear Ms. Marquette: HARVP H. HARRISON MAYOR SUBJECT: PROPOSED CULVERT AT 18805 - 89th Ave. W. Your request to install the subject culvert as shown in your letter of April 28, 1980 is approved. The pipe must be 12-inch diameter concrete culvert pipe installed with the bell end facing East. Two alternatives exist regarding installation: 1) You can contract with a bonded, licensed contractor to install the culvert, perhaps in conjunction with driveway installation. The contractor must obtain a Right-of-way Construction Permit.from the Public Works Department prior to starting work. 2) City forces will install the culvert if you provide the culvert at the site. This material can be obtained from Associated Sand & Gravel, Everett Concrete, or other similar companies. We should note that the paving or other work done in the right-of-way requires a Right-of-way Construction Permit. Please contact Bob Franklin at 775-2525, Ext. 220 if you have any ques- tions. If you wish to pursue alternative 2, please contact Abe Blandin at 775-2525, Extension 250. JEA/j f Abe Blandin Dt Sincerely, JAME- �E. ADAMS, P.E. City Engineer B I ob Franklin Dt 18805 89th Avenue West Edmonds, Washington 9BO20 April 28, 1980 Mr. James Adams City Engineer City of Edmonds, WA 98020 Dear Mr. Adams: I wish to inquire as to the feasibility of obtaining vehicular access to my property from lB8th street. This would require removal of some young trees and installation of a culvert in the present open drainage ditch. I assume an average width diive- way of approximately 12 feet would suffice. In addition, I would like to receive an estimate of cost for such an installation. 1% Thank you. 4 Sincerely, Willman M. Marquette 3