Loading...
19023 83RD AVE W.PDF111111111111 7718 19023 83RD AVE W NOTICE: N'o -wa rra nty of __.a_c_C._u__r-a-cy-.--- The information'shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. Th,,e city of �Edm.qnds does not ' warrant the accuracy of anything set for.th on these map(§-). Any person or entity -requesting a copy should conduct an independent inquiry regarding the inform'at'on shown on _tF�e -map(s), including, but not limited to, the location of any sewer stub shown. Such sewer stubs may or may, not exist and may or may not exist at the location shown. Neither the 'ity of Edmonds nor its e rn p-'I- o-y e e-s o -r o ff ic e,r s -s h. a-'r I b e 1-`1 a- b-.11--e f o r -,I- h e information given on this map(s), nor for ation provided based any one represent upon . said map(s). CITY OF EDMONDS- Can pnospect 6-1107 when work VER DEPARTMENT is ready for InSPOCUOn- (NO InsPec- C][V,][C CENTER — WATER-SEV tjos Satarfty, Sunday or holidays-) N 0. 1744 SIDE SEWER PERMIT venueWest ..................................................................... .................................... ........... ............. ADDRESS ........ ................... OwNEP ........ charles-EreaA ---------------------------------------------------- C01wrRACTOR ....... C ... ... U --- CanstructiOn ----------------------- Perniission is granted ---- ---- t*r9b --- @� ------------------ 1 for ---------------------- days, to REpAJ[R or CONNECT a side sewer with City Sewers in accordance with aPPlication on file and governing ordinances. ATTENTION is CALLED To THE FOLLOWING: -operty line. A licensed Side sewer contractor must NOTE No. 1—The owners of the property May obtain & permit to construct sewer inside P1 sewer before it has been inspected. be employed to construct side sewer In street area� Do not cover any portion of NOTE No. 2—Obtain full information regarding ordinance 11.16.030 and Regulations governing side sewers when You get permit. NOTE No. 3—TOP Of side sewer must have at least 30 inches coverage at property line and 12 inches inside Property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. -et restored to original condition. Contractors shall be responsible for NOTE No. 4—Trenches in street must The water settled and surface of stre failure due to improper work which may develop within one year of completion. n the permit, or to - do any, work on the main sewer or its ap- NOTE No. 5_—It is unlawful to alter or do any other work than is provided for I purtenances except to insert the Pipe into the wye. t_ The City of Edmonds APPLICATION for STREEm T FILE SI]DE SEWER PERMIT NEW CONSTRUCTION [;( REPAIRS W-6- OWNER..... CA".-J-E4 . ...... nilua -------------------------------------------- ADDRESS ... 0/.e43 ........ F-3.4 ........ W,,_p4t ........................... C/o 0 IV ble �jo IYNN -PLAIN EASEMENT No . .......................................... CONTRACTOR ------ c- ...... ........................... PERMIT No. LEGAL DESCRIPTION: LOT No - ----- * .. ......................... BLOCK No . ...... 5 ......... ..................... NAME OF ADDITION .... ...... .... Approved: DATE ....... By .... )/)-t . .......... ----------------------- 0 IV ble �jo IYNN -PLAIN EASEMENT No . .......................................... CONTRACTOR ------ c- ...... ........................... PERMIT No. LEGAL DESCRIPTION: LOT No - ----- * .. ......................... BLOCK No . ...... 5 ......... ..................... NAME OF ADDITION .... ...... .... Approved: DATE ....... By .... )/)-t . .......... ----------------------- STREET FILE 6� go - 199 - City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, -must fill out the checklist, sign and date it, and submit it to the City. 'Me City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit avicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assiststaff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: C Name — C, Title 111)A0 J(- po'e-ax r C- / q 0. -_ �' i '? 3 ccv-'. Street Address '. O_J� Vn e JU 0 _� U"", 3 3 cl-.33 11 City, State, ZIP Phone Signature Date Applicant Representative: Name Title Street Address City, State-, ZIP Phone Signature Date 1Z Critical Areas Checklist Site Information Prej ect Name: - 06 Permit Number: NOV 12 ly92 PLANtV1pj,S De PT SiteLocation: Mt:'-Z�,S C%�v R LO Property Tax Account Number: 1,M - - c,6,n i Approximate Site Size (acres or square feet): Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions 1. Has the site been cleared or logged? YtF S- Date of most recent action: It /,,o I Soils / Topography 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? 3- Describe the general site topography. Check all that apply. a- 4M, Szelc'e.- OCR Flat: less than 5 feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 feet.) Hilly: slopes present on site of more than 15% and less than 30% a vertical rise of 10 feet of horizontal distance.) -Steep: grades of greater than 30% present on site. Comments Hydrology[Vegetation 4. Site contains areas of year-round standing water: 5. Site contains areas of seasonal standing water: /V,l --Approx. Depth: 6. - Site is in the floodway /Jc- floodplain /J,-. of a water course. 7. Site contains a creek or an area where water flows across the grounds surface? PA flows are year-round? J-'A Flows are seasonal? 1-,4 8. Site is primarily: forested meadow ;shrubs s;e�_g ;mixed 9. Obvious wetland is present on site: L4 10. Wetland inventory or map indicates wetland present on site: /J 0 11. Critical Areas inventory or map indicates any Critical Area on site: For City Use Only Rev W27192